1 Requests for Information pm Draft for Request for Proposals Sprouts - Shell/Civil Issued on April 25, 201 RFI 01 Is the RFP due at 4pm or 5pm on May 16th? Response: RFI 02 Do you have an anticipated start date for this project? Response: Assume July 01, 201 RFI 03 There is a Bid Form issued with the RFP labeled Sprouts Bid Form April 201. This bid form has (3) break-outs (Sprouts T.I. Build-Out / Shell Build-Outs / Civil). The RFP and Sample Contract reference (2) proposals & SOV s. There is also a separate Sprouts Bid Form in each of the Project Manuals provided in the Bid Documents. RFP / Section 2 / Item 2.1-A lists Bid Proposal Forms Complete, Exhibit A. There are no documents labeled Exhibit A in the RFP which was issued. Please clarify specifically what Bid Forms are to be submitted by the GC. Response: An Addendum is being issued that will remove the bid form from the Project Manual(s). A bid form will be formally included with the Addendum. An advanced copy has been added to the Share folder within the Addendum Folder. RFI 04 The improvements indicated on the Civil Exhibit for Bid document provided in the Bid Documents are not shown on the Civil Drawings provided in the Bid Set. There is insufficient information on the Civil Exhibit for Bid document which will be required in order to provide a hard bid for this scope. Please provide revised Civil Drawings which include the proposed improvements along with relevant specific details if this scope is to be included in the GC base bid. Response: Ignore the Civil Exhibit for Bid document. A new document Sprouts Retail Exhibit has been added to the Sharefolder within the Addendum folder. Provide a budgetary dollar value. The exhibit will be formally issued in the Addendum.
2 RFI 05 There are no Site Demo drawings in the bid set detailing the existing improvements to be removed or what the thickness is of the existing asphalt & concrete. Please provide Site Demo drawings, details and additional information. Response: Sprouts_Civil_Demo_Plans_Add1 has been added to the Sharefolder within the Addendum folder. The demo drawings will be formally included in the Addendum. RFI 06 Can the RFP due date be changed Response: Yes. RFI 07 The Responsibility List on Sheet T1.0 of the Sprouts TI Bid Set (See Below) lists several items which are to be supplied and/or supplied and installed by the Developer (D). Please confirm & verify that all of the items shown as supplied and/or supplied and installed by Developer on the Responsibility List will be the sole responsibility of the Developer and are not part of the GC bid scope and should not be included in the Bid. Response: The bid form has been revised to have an add/alt for the GC to provide and install all Owner/Developer scope. The revised bid form will be added to the Sharefolder, and will be formally be included in the Addendum.
3 RFI 0 Sheet A1.0 / Keynote 11 references pilasters provided by others under separate permit. These (4) pilasters are shown with hashed lines. These pilasters are not shown on the exterior elevations but they are shown on the Sprouts TI bid set on sheet A1.0. Please clarify the scope of work involving these pilasters and what portion, if any is to be included in the GC bid. Response: The whole "tower" element is going to be provided by others. Allan Industries will be doing this work. Allan Industries will also be completing the canopies on the Sprouts façade. Our shell documents show the canopies along the 3 adjacent tenants, which the GC will be responsible for providing. RFI 09 Sheet A4.0 / Detail 1 shows a tower by others & (7) canopies by others. These items are shown with hashed lines. Detail 3 shows (2) canopy locations which are shown with standard solid lines. Please verify that the items identified as by others are not to be included in the GC base bid and that only the canopies detailed with standard solid lines are to be included. Response: The whole "tower" element is going to be provided by others. Allan Industries will be doing this work. Allan Industries will also be completing the canopies on the Sprouts façade. Our shell documents show the canopies along the 3 adjacent tenants, which the GC will be responsible for providing. RFI 10 There are two specification manuals included with the bid documents totaling over 1500 pages. One is 14 pages (RI Project Manual ) and the other is 745 pages (TI Project Manual 04231). Please clarify which specification manual is to be used for the bid? Response: Both spec manuals will be used. The TI manual for the TI project and the RI manual for the RI project. RFI 11 Document (CIVIL-EXHIBIT-FOR-BID ) What is the intent of this document? If this document is meant to be used in bidding, we will need civil plans with pavement sections for the various different asphalt conditions as well as there appears to be a new water line going diagonally thru the Home Depot Garden center, and the new water lines in the public street (Cline St).
4 Response: This exhibit is no longer valid and should be removed from the bid package. There is a new exhibit which provides a schematic layout of proposed waterline improvements, which are in addition to the civil plans provided in the RFP. Contractors should provide a budget for this waterline work as a hard bid is not expected since we do not have construction documents for this work, at this time. RFI 12 In Brixton Retail Improvements page D1.1 keynote 2 calls for interior slab to be removed but it also calls for keynote to remove only the flooring down to slab. The area for keynote 2 does not have the hatching to indicate slab removal. Please clarify the limit of slab removal at the retail improvement area. Response: The slab inside the Sprouts space will need to be removed flush with the proposed demising wall. In the adjacent retail tenants the existing floor material will need to be removed down to top of floor slab. RFI 13 In Brixton Retail Improvements page A4.0 states tower and canopies by others. There are no exterior elevations in the Sprouts plan set. Please clarify the responsibility for the scope of work for exterior elevations. Response: The tower and canopies on the Sprouts will be provided by others. All other work will be the responsibility of the GC. RFI 14 In Brixton Retail Improvements page3.0 keynote 2 states match existing roofing. What is the existing roofing specification to be matched? Response: The GC will be responsible to match the existing/adjacent roofing assembly in its entirety. RFI 15 In Brixton Retail Improvements page A5.2 & A5.3 exterior wall sections call for dens glass over fire treated plywood over metal studs. Is this required? Either of these materials (dens glass & fire treated plywood) are suitable for EIFS substrate, the manufacturer does not require both? Response: Yes. It is required. The places where we have plywood is where signage will be placed. RFI 16 In Brixton Retail Improvements architectural demo plans call for the existing slab in the future Sprouts space to be removed and replaced, but the structural plans call for it to be existing to remain. Please clarify the scope of work for the Sprouts slab on grade. Response: This is a coordination issue. The slab will be removed and replaced in the Sprouts space.
5 RFI 17 In the Sprouts Farmers Market plans page T1.0 on the responsibility schedule for BTS, all the items on this list are either provided by Sprouts or the Developer. Is this correct, the GC will not be responsible for providing any materials or equipment on this list? Response: The T1.0 responsibility list is correct. This matches the prototype drawings. Please proceed with the responsibility stated on there for each item. See response to RFI 07. RFI 1 In the Sprouts Farmers Market plans page T1.0 on the responsibility schedule for BTS and Page F1.1 & F1.2 provide conflicting information for a few items. Please clarify which page will have precedence for the supply of conflicting material and equipment responsibilities. Response: The T1.0 schedule trumps that F1.1 and F1.2. Please use the T1.0 for reference. RFI 19 In the Sprouts Farmers Market specification manual section 3543 states Sprouts CM to provide name of concrete polishing subcontractor prior to bid. Please provide concrete polishing subcontractor name and contact information. Response: National Concrete Polishing & Grinding, Inc. will be the concrete polishing sub. The contact is: Brian Cribbs (bcribbs@nationalpolishing.com) 5145 Brecksville Road, Suite 101, Richfield, OH 4426 RFI 20 Will a piping diagram and branch/loop piping sizes be issued for this store? Additionally, there are several circuits on the refrigeration schedule that list multiple CDS valves. Can you clarify what the correct valves are? Response: This has been updated in the ADD#1 please refer to the piping plan on Sheet R3A. The overlaid text boxes calling out Kit 2CDS is the correct and intended CDS selection on legend. The text box insert was a solution for an internal spreadsheet calculation issue on legend, nothing more. RFI 21 Does the interior pour back of the Sprouts slab on grade go in the Sprouts or Shell column of the bid form? Response: Sprouts scope of work goes into the Sprouts column of the bid form, Shell scopes of work go into the Shell column. RFI 22 Does the exterior concrete curb at the storefront of the Sprouts go in the Sprouts or Shell column of the bid form? Response: Sprouts scope of work goes into the Sprouts column of the bid form, Shell scopes of work go into the Shell column. RFI 23 Do the skylights on the Sprouts go in the Sprouts or Shell column of the bid form?
6 Response: Sprouts scope of work goes into the Sprouts column of the bid form, Shell scopes of work go into the Shell column. RFI 24 Will the Sprouts building exterior get elastomeric paint? Will it be required on the white shells exterior for elastomeric also? Response: No none of the façade will have elastomeric paint. RFI 25 When will the contract be awarded? Response: Target is mid-june. RFI 26 Is there an owner's required roofer? Response: At this time, no. RFI 27 How old is the roof. Response: 10 years. We are working on getting an extension (warranty expired in Feb. 201) RFI 2 Who is responsible for the structural special inspections? GC or Developer. Response: Developer is responsible for QAA-3rd party Special inspections - GC is responsible for ALL other testing, certifications, reports, etc. RFI 29 Is an empty suite available for construction office or is trailer needed? Response: No empty suite is available. GC is responsible to provide the lay down area, office, trailer, and dumpster to include safety and security RFI 30 Provide any drawings available for the Allan Front Structure. Response: Final drawings are not available. Allan Industry drawing(s) has been included in the Addendum folder to use for reference and GC coordination RFI 31 Define rework to front elevation area that buts up to new Allan structure. Response: Please refer to sheet A4.0 for new materials that will abut the Allan Industries structure. Please construct 33'-0" lineal feet of new parapet to replace tower to be demolished. RFI 32 Clarify all areas to be removed for new Allan structure.
7 Response: No finish is to be removed from storefront, unless noted. Please refer to Sheet D1.0 and D1.2 for extent of demolition to occur at façade. RFI 33 Confirm Sprouts will direct purchase RO system, GC will assemble and install per plumbing drawings. Response: Per the F1.2 in the Sprouts drawings, Sprouts will furnish, receive, assemble and install the Whole Store R.O. System. Final control/power connection by Plumbing Contractor/Electrical Contractor. RFI 34 Confirm Existing bolts in slab at owners Tenant area are to be sheered off at ground level. No other work to be done. Response: Only shear off bolts at ground level. No repair of spalling included in bid. RFI 35 Confirm Roof is a wood 4 ply system Response: Existing roof system will have to be GC field verified and identified on site. RFI 36 Complete Civil drawings for utility portion? Response: Yes, budget the water schematic scope, all other utilities are covered in the current set of drawings. RFI 37 Existing scrim/insulation to remain. Patch or repair allowance # Response: Yes, existing scrim/insulation is to remain. RFI 3 Confirm removing all existing sprinkler system at Sprouts area. Reroute for TI spaces. Response: Fire Protection sub to design and submit to city, deferred submittal. RFI 39 Fire Protection sub to design and submit to city, deferred submittal. Response: Correct. RFI 40 Verify: Do not include refrigeration cases in bid number (Huessman to provide). Add later. Response: Correct. Hussmann to provide.
8 RFI At the job walk, it was directed that the existing ductwork was to be left in place and reused. Sheet D1.1 & D1.0 of the Shell / Civil plans reference remove all lighting, conduit, ceiling and associated accessories, diffusers, ductwork and associated equipment. Please clarify the correct bid scope and whether or not the ductwork, diffusers, and HVAC related equipment is to be removed. Response: Please proceed with plan direction. Please refer to MEP drawings in both sets regarding new scope of work. RFI 42 Are there As-Built plans available for this project? Response: Yes, included for reference in the RFP Sharefolder. RFI 43 What is the thickness of the existing slab and base section which is to be removed at the Sprouts tenant space? Response: This will have to be field verified at the site. RFI 44 At the job walk, it was directed that the project would require (2) superintendents. Please confirm that the bidding GC s are to include costs for (2) superintendents in their bid. Response: No. 1 superintendent should be able to handle this. Especially with a majority of the facade work being a sign vendor. RFI 45 Please provide reference plans for the Allen Industries scope of work discussed at the job walk. Response: Included for reference within the RFP Sharefolder.
Requests for Information pm Draft for Request for Proposals Sprouts - Shell/Civil Issued on April 25, 2018
Requests for Information - 0.08.18 pm Draft for Request for Proposals Sprouts - Shell/Civil Issued on April 2, 2018 RFI 01 Is the RFP due at 4pm or pm on May 16th? An Addendum will change to due date to
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1
SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 3: Roofs 1 & 3 DATE: December 29, 2017 1235 Mission
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1
SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1 PROJECT: 300 Seneca New Academic Campus DATE: September 23, 2013 300 Seneca Ave., S.F.,
More informationMETROPOLITAN PIER AND EXPOSITION AUTHORITY INVITATION FOR BIDS (IFB) # M OFFICE BUILD OUT, 5 TH FLOOR OF ABC BUILDING ADDENDUM NO.
METROPOLITAN PIER AND EXPOSITION AUTHORITY INVITATION FOR BIDS (IFB) #2017-20-M OFFICE BUILD OUT, 5 TH FLOOR OF ABC BUILDING ADDENDUM NO. (1) September 28, 2017 This Addendum No. 1 consists of seven (7)
More informationRFP /ME - ADDENDUM 2
RFP 201013/ME - ADDENDUM 2 RFP Closing: February 5, 2015 at 2:00 PM (Local Time) Page 1 of 33 RFP Number: 201013/ME Date: January 28, 2015 RETURN PROPOSALS AS SHOWN BELOW Copies of proposal required: Eight
More informationADDENDUM #2 REQUEST FOR COMPETITIVE SEALED PROPOSALS FOR A GENERAL CONTRACTOR. The University of Texas Health Science Center at San Antonio
ADDENDUM #2 REQUEST FOR COMPETITIVE SEALED PROPOSALS FOR A GENERAL CONTRACTOR The University of Texas Health Science Center at San Antonio Renovate Floor 1 and Floor 2 of the PARC Bldg. RFP No.: 745-16-9935
More informationRFI s Blake s Lotaburger #91
Wells Fargo Plaza 221 North Kansas Street, Suite 820 El Paso, Texas 79901 (915) 613-4576 phone (915) 532-8839 fax www.pwarch.com RFI s Blake s Lotaburger #91 RFI No 1. Are we to supply a cost for asbestos
More informationPort KC RFP NORTHLAND PARK BUILDING V
Port KC RFP NORTHLAND PARK BUILDING V 1. The RFP refers to landscaping plans. However, it does not appear that the landscaping plans were issued with the rest of the RFP. Will these be issued with an addendum?
More informationProject Manual Index of Specifications Shenandoah Schools Concession Building
INDEX OF SPECIFICATIONS Division 0..BIDDING AND CONTRACT REQUIREMENTS 00 11 13 Advertisement for Bids 00 21 13 Instructions to Bidders 00 41 00 Bid Forms 00 43 13 Bid Security Form 00 72 00 General Conditions
More informationSOLICITATION ADDENDUM
CITY OF PALM BEACH GARDENS PURCHASING DEPARTMENT SOLICITATION ADDENDUM Addendum No. 1 DATE: January 30, 2018 TO: SOLICITATION NO.: TITLE: OPENING DATE: All Potential Bidders ITB2018-097GF Prefabricated
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1
FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 2: Roof 2 DATE: December 29, 2017 1235 Mission Street San Francisco, California SFUSD Project
More informationSolicitation Number: FA B-A001 Project Numbers: RKMF Demo Base Gymnasium & RKMF Demo Pool Facilities.
Solicitation Number: FA4861-14-B-A001 Project Numbers: RKMF 13-0134 Demo Base Gymnasium & RKMF 130135 Demo Pool Facilities Responses to RFIs 1. Does all the building material get hauled off base? Response:
More informationSECTION ADDENDUM NUMBER ONE
Softball Field Repairs and Upgrades 03 February 2012 University of South Carolina Upstate State Project Number: H34-I350 DP3 Architects Project Number: 11124 GENERAL INFORMATION SECTION 00 09 10 ADDENDUM
More informationThis Addendum forms a part of the Contract Documents and modifies the Drawings and Project Manual as hereinafter indicated.
BIDDER RESPONSES RIARNG P-6 ADDITION TO ALL BIDDERS OF RECORD: This Addendum forms a part of the Contract Documents and modifies the Drawings and Project Manual as hereinafter indicated. ADDENDUM 001 2/14/2019
More informationA1.01 SITE PLAN 394 W OLENTANGY ST POWELL, OH BUILDING TO BE RENOVATED SITE PLAN. P F www. archa ll.
N O R T H F I F T H S T R E E T C O L U M B U S O H I O P.. 00 F.. 000 www. archa ll. com W OLENTANGY ST POWELL, OH 0 DRAWING SET 0 0 0 preliminary check bid permit construction REVISIONS BUILDING TO BE
More informationSOLICITATION ADDENDUM
TO: SOLICITATION NO.: CITY OF PALM BEACH GARDENS PURCHASING DEPARTMENT SOLICITATION ADDENDUM Addendum No. 8 All Potential Bidders ITB2017-078PS DATE: June 18, 2018 TITLE: OPENING DATE: Municipal Complex
More informationQuestion 2: Regarding Section VII, part 10, which jurisdiction issues permits for work performed at Ronald Reagan Washington National Airport?
RONALD REAGAN WASHINGTON NATIONAL AIRPORT METROPOLITAN WASHINGTON AIRPORTS AUTHORITY SOLICITATION RFP 1-11-C138 TERMINAL B/C PRE-SECURITY RESTROOM RENOVATIONS RESPONSES TO CONTRACTOR QUESTIONS Question
More informationQuestions and Answers Construction of New Amenities At Folly Beach County Park
Questions and Answers Construction of New Amenities At Folly Beach County Park 2019-003 1. A410, Keynotes 11.34 Responsibility Chart -stainless steel table does not indicate if it is provided by the owner
More informationCONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS
CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS (August 28, 2018) PIERCE HALL IMPROVEMENTS PROJECT NO. 950511-950532 UNIVERSITY OF CALIFORNIA, RIVERSIDE PREQUALIFICATION PROCESS ALL
More informationUniversity of Akron. Addendum No. 2. For. Zook Hall Renovation Phase 2A Abatement & Demolition Project #: UAK120015
University of Akron Addendum No. 2 For Zook Hall Renovation Phase 2A Abatement & Demolition Project #: UAK120015 University of Akron Capital Planning & Facilities Management Lincoln Building Akron, Ohio
More informationADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:
ADDENDUM NO. 1 TO THE DRAWINGS AND SPECIFICATIONS FOR THE New Dishman-McGinnis Elementary School Bowling Green Independent Schools Bowling Green, Kentucky BG 12-256 RTA 1209 March 11, 2013 To All Plan
More informationFOR IFB #PC436 Exterior Improvements at Colton Public Housing Complex
HOUSING AUTHORITY OF THE COUNTY OF SAN BERNARDINO PROCUREMENT AND CONTRACTS DEPARTMENT 715 E. BRIER DRIVE, SAN BERNARDINO, CA 92408 (909) 890-0644 FAX (909) 890-2349 http://www.hacsb.com/procurement.htm
More informationCherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12
SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and
More informationADDENDUM 2 TO INVITATION FOR BID 5270-FG UNLV SOUTH RESIDENTIAL COMPLEX RENOVATION
ADDENDUM 2 TO INVITATION FOR BID 5270-FG UNLV SOUTH RESIDENTIAL COMPLEX RENOVATION University of Nevada, Las Vegas Purchasing Department 4505 Maryland Parkway Las Vegas, Nevada 89154-1033 (702) 895-3521
More informationSOLICITATION ADDENDUM
CITY OF PALM BEACH GARDENS PURCHASING DEPARTMENT SOLICITATION ADDENDUM Addendum No. 7 DATE: August 22, 2018 TO: SOLICITATION NO.: TITLE: OPENING DATE: All Potential Bidders ITB2018-095RC Construction of
More informationUpdate on FCPS Construction/Renovation Projects. June 2016
Update on FCPS Construction/Renovation Projects Squires Elementary -- Renovation Architect: General Contractor: JRA Architects D.W. Wilburn, Inc. GC Contract Sum: $12,166,000 Total Project Cost: $15,207,000
More informationSee attached answers to questions and requests for clarification received.
Office of the Vice President 971 Elmore Drive and Chief Financial Officer PO Box 115250 Procurement Services Gainesville, FL 32611-5250 http://procurement.ufl.edu/ (352) 392-1331 Fax 352-392-8837 June
More informationDIVISION 7 - THERMAL AND MOISTURE PROTECTION
07100 WATERPROOFING 07150 DAMPPROOFING 07175 Water Repellent Coatings 07190 VAPOR AND AIR RETARDERS 07192 Vapor Retarders 07200 INSULATION 07240 Exterior Insulation and Finish Systems 07250 FIREPROOFING
More informationELEVATION GENERAL NOTES: 1. ALL PAINT / FINISH SYMBOL DEFINITIONS FOUND ON A8.1. 2. ALL NEW GLAZING WITHIN 18" OF GROUND OR ADJACENT TO DOOR(S) TO BE TEMPERED. 3. REMOVE ALL EXISTING METLA COPING CAPS
More informationDick s Sporting Goods Demolition Package
REQUEST FOR PROPOSAL FOR COMPETITIVE SEALED PROPOSALS TO PROVIDE: Dick s Sporting Goods Demolition Package at Salt Lake City, UT 2425 E. Camelback Rd. Suite 750 Phoenix AZ 85016 Notice of Extended Payment
More informationSAN DIEGO STATE UNIVERSITY PACIFIC CORNERSTONE ARCHITECTS TENOCHCA HALL PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION
SECTION 02 41 14 SELECTIVE BUILDING DEMOLITION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Procedures for systematic removal of site improvements or portions of exterior and interior of buildings
More informationMONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #07. Latrobe Elementary School. Greater Latrobe School District
MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #07 Latrobe Elementary School Greater Latrobe School District 08 January 2018 PROJECT SUMMARY Work Completed to date: Ductwork sealed off. Slab Prep in Main
More informationTABLE OF CONTENTS VOLUME 1. DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages
TABLE OF CONTENTS VOLUME 1 DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages SCHEDULE OF DRAWINGS...... 1 PROJECT PERSONNEL & DIRECTORY......
More informationBID ADDENDUM #1 September 24, 2010
BID ADDENDUM #1 September 24, 2010 To: Prospective Bidders/Planholders For: Science 1 Seismic Retrofit & Renovation California State University Stanislaus One University Circle, Turlock, CA 95382 Bid /
More informationADDENDUM NO. 1. PROJECT: Lowell High School DATE: January 28, Eucalyptus Drive, SF, CA 94132
SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM LOWELL HIGH SCHOOL PROJECT #11493 INTERIM HOUSING for VOLUNTARY SEISMIC STRENTHENING ADDENDUM NO. 1 PROJECT: Lowell High School DATE:
More informationDALLAS-FORT WORTH INTERNATIONAL AIRPORT
DALLAS-FORT WORTH INTERNATIONAL AIRPORT ADDENDUM NO. 2 TO THE REQUEST FOR BIDS Contract No. 9500445 Restroom Rehabilitation at Terminal B (Phase 3 & 4) December 20, 2010 THE REQUEST FOR BIDS (RFB) FOR
More informationBIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D
HOSKINS ARCHITECTURE, LLC 1827 1 ST AVENUE NORTH, SUITE 104 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 3 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS
More informationRESPONSES TO QUESTIONS and/or RFI s Date: 26 January 2017
MPA Project No. M574-C1 Project Title: Black Falcon Cruise Terminal Façade Repairs and Coating Location: Black Falcon Cruise Terminal, South Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 26 January
More informationAddendum #1. January 22, 2018
Addendum #1 January 22, 2018 Building B 8500 Public Works Drive Renovation for City of Manassas Water & Sewer Department 8500 Public Works Drive Manassas, VA 20110 Job Description Renovation of the existing
More informationRevised Drawings A, E, and M dated 11/13/18 (that include additional specifications)
Addendum No. 1 To: All Prospective Bidders Description: Holocaust Resource Center Expansion Stockton University Galloway, New Jersey 08205 Bid Number: B190003 Date: November 19, 2018 Pursuant to N.J.S.A.
More informationTABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS
AIA General Conditions... GC-1 to GC-44 Amendments to General Conditions... AM-1 to AM-2 Supplements to General Conditions... SU-1 to SU-7 00200 Instructions To Bidders... 1 3 00201 Contractor s Bidding
More informationJune 12, 2017 Addendum #6 RFP # Modular Relocation & Site Development
June 12, 2017 Addendum #6 RFP #2017-003 Modular Relocation & Site Development Questions & Answers 1) To better facilitate a functional and qualified design build budget, please provide details, drawings,
More informationC. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of:
02070 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.1 STIPULATIONS A. The specifications sections " General Conditions of the Construction Contract ", "Special Conditions", and "Division 1 - General Requirements"
More information1292 WESTMINSTER ST PROVIDENCE CITY PLANNING COMMISSION FRIDAY AUGUST 11, 2017
PROVIDENCE CITY PLANNING COMMISSION FRIDAY AUGUST 11, 2017 AERIAL VIEW EXISTING CONDITIONS WESTMINSTER STREET MASONRY, AND WOOD STRUCTURE TO BE DEMOLISHED IN ITS ENTIRETY MASONRY, CONCRETE, AND STEEL STRUCTURE
More information186 TH AIR REFUELING WING KEY FIELD, MERIDIAN, MS ADDENDUM #1 PERFORMANCE WORK STATEMENT
186 TH AIR REFUELING WING KEY FIELD, MERIDIAN, MS PROJECT NUMBER MDVL092051 Renovate Vehicle Maintenance Facility Bldg 200 23 June 2017 ADDENDUM #1 PERFORMANCE WORK STATEMENT 1.0 SCOPE. This addendum to
More informationCompleted. Project. Melbourne High School. Comprehensive Additions and Renovations
Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project
More informationQ&A: The Block/Parsons Alley Construction RFP
Q&A: The Block/Parsons Alley Construction RFP 1. Is there a Geotechnical Report available? 2. Would it be possible to extend the bid date to a day other than a Monday? 3. Is it possible to extend the date
More informationC P A. Presented By Jason G. Smith, CCM, LEED AP. Founder and Principal of Construction Analysis and Planning, LLC
C P A CONSTRUCTION ANALYSIS AND PLANNING, LLC Presented By Jason G. Smith, CCM, LEED AP Founder and Principal of Author of Construction Management: Subcontractor Scopes of Work 1 Division of work: Primary
More informationADDENDUM 3 TO INVITATION FOR BID 5300-FG. Interior Renovations for UNLV Quality Assurance Lab (QAL) and UNLV Monitoring Systems Lab (MSL)
ADDENDUM 3 TO INVITATION FOR BID 5300-FG Interior Renovations for UNLV Quality Assurance Lab (QAL) and UNLV Monitoring Systems Lab (MSL) University of Nevada, Las Vegas Purchasing Department 4505 Maryland
More informationWalgreens Store #10787 Grosenbacher and Potranco RFI s
1207 West Blanco Rd. San Antonio TX 78232 210.492.7775 Fax 210.492.8490 www.dbc-tx.com Grosenbacher and Potranco RFI s RFI #1-Reference Sheet G-010 shows A-520 as one of the included sheets. There is no
More informationFlorida Army National Guard Construction Facilities Management Office. Scope of Work:
Florida Army National Guard Construction Facilities Management Office Florida Armory Revitalization Program (FARP) Design Guidelines September 2011 Scope of Work: To provide complete design for the renovation/alterations
More informationA. Remove Table of Contents and insert new attached Table of Contents.
ADDENDUM NO. 01 PROJECT Colby Glass E.S. Window Upgrades and ADA Work PROJECT NO. 16043 DATE February 07, 2018 TO: All Prime Contract Bidders and all others to whom Drawings and Specifications have been
More informationReason for Change Identifiers: OR= Owner Request; FC= Field Condition; AJ= Requirement of Local Authority CL= Clarification (No Scope Change)
Page 1 of 6 ADCI Bulletin No. 01 Date: March 30, 2015 Project: @580 Renovation for New Apartment Units Address: 580 Walnut Street Cincinnati, OH 45202 Commission: Prepared For: Prepared By: PDT P266 Cincinnati
More informationINVITATION TO TENDER ITT NO. PS CONSTRUCTION SERVICES FOR INTERIOR OFFICE RENOVATIONS AT 236 E CORDOVA STREET QUESTIONS AND ANSWERS NO.
FINANCE, RISK, & SUPPLY CHAIN MANAGEMENT Supply Chain Management INVITATION TO TENDER ITT NO. PS20170908 CONSTRUCTION SERVICES FOR INTERIOR OFFICE RENOVATIONS AT 236 E CORDOVA STREET QUESTIONS AND ANSWERS
More informationADDENDUM #4 FOR THE WEST VALLEY FACILITIES INCREMENT 2 REPLACEMENT PROJECT WEST VALLEY COLLEGE
ADDENDUM #4 FOR THE WEST VALLEY FACILITIES INCREMENT 2 REPLACEMENT PROJECT AT WEST VALLEY COLLEGE Owner West Valley-Mission Community College District Saratoga, California Bid #01-1516 12-22-15 WEST VALLEY-MISSION
More informationFarmington Public Schools 2015 Bond Issue Bid Package 9- Beechview & Kenbrook Elementary School Remodeling Project Wednesday, January 24, 2018
Farmington Public Schools 2015 Bond Issue Bid Package 9- Beechview & Kenbrook Elementary School Remodeling Project Wednesday, January 24, 2018 POST-BID ADDENDUM 1 CONSTRUCTION MANAGEMENT PACKAGE - Bidding
More informationCarter's Oshkosh (SIS) # The Center at Pearland Parkway - Pearland, TX Scope Of Work / Bid Qualifications
Carter's Oshkosh (SIS) #1185 - The Center at Pearland Parkway - Pearland, TX 77581 - Scope Of Work / Bid Qualifications Please fill out the blanks associated with your trade scope or work with the words
More informationCommercial Remodel Permit
Commercial Remodel Permit Zoning requirements Staff recommends always verifying the zoning requirements for your project before deciding to build. Warrensburg has eleven separate zoning districts, each
More informationPROJECT INFORMATION REPORT INFORMATION. Date: February 25, Owner s Rep: Alrich Lynch. 123 Project Address Drive, Savannah GA 31404
LDG Consulting Providing Orientation, Direction, and Execution to the Design, Construction, and Real Estate Industries REPORT INFORMATION Date: February 25, 2015 Owner s Rep: Alrich Lynch Electronic Copy:
More informationCinema-Dining Terrace Expansion. Suburbia, USA. Technical Report II. Image Courtesy of The Whiting-Turner Contracting Company.
Cinema-Dining Terrace Expansion Suburbia, USA Technical Report II Image Courtesy of The Whiting-Turner Contracting Company Nicholas Kline Cinema-Dining Terrace Expansion 10/16/2013 Executive Summary This
More informationMECHANICAL M-1 LEGEND AND DETAILS M-2 FLOOR PLAN - DUCTWORK M-3 FLOOR PLAN - PIPING
SHEET TITLE ARCHITECTURAL A-0 COVER SHEET A-1 DEMOLITION NOTES A-2 DEMOLITION PLAN A-3 FLOOR PLAN NOTES A-4 FLOOR PLAN A-5 INTERIOR ELEVATIONS A-6 DOOR SCHEDULE A-7 DETAILS MECHANICAL M-1 LEGEND AND DETAILS
More informationTYPICAL APARTMENT FLOOR PLAN
PHOTO #7 PHOTO #8 EAST 8TH STREET (60' WIDE STREET) P L P L PHOTO #4 P L P L A B C D E F G H I #21 ASTOR PLACE 11 STORY BUILDING HEIGHT = 130' (11 STORIES) STAIR #3 BROADWAY (100' WIDE STREET) L STAIR
More informationC o u n t y o f F a i r f a x, V i r g i n i a
001961 Page 2 C o u n t y o f F a i r f a x, V i r g i n i a A D D E N D U M DATE: August 2, 2016 ADDENDUM NO. 4 TO: REFERENCE: FOR: DUE DATE/TIME: ALL PROSPECTIVE BIDDERS Government Center Generator System
More informationSAVANNA HALL ZOO ATLANTA 800 CHEROKEE AVENUE ATLANTA, GEORGIA /14/2017 DEMOLITION PACKAGE G-000 GRANT PARK ZOO ATLANTA AERIAL MAP GRANT PARK
GEORGIA 0 0//0 PACKAGE 99 EDGEWOOD GA 0-88 0..00 (O) Seal GRANT PARK ELEPHANT BARN NUMBER: OWNER NUMBER: ENTRY PLAZA CYCLORAMA ZOO BOUNDARY SAVANNA TICKETING BREEDLOVE LAND NING, INC. SIMPSON STREET, NW
More informationNote #2: Refer to Commercial Permitting Handbook 2016 Denver Building and Fire Code for asbestos regulations.
CITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY Subject: PREPARATORY DEMOLITION, NON-STRUCTURAL FRAMING, ELECTRICAL, MECHANICAL, PLUMBING, FIRE SUPPRESSION, AND FIRE ALARM
More informationADDENDUM # 1 To: File RFP for: New Affordable Home Construction Services
Procurement Department ADDENDUM # 1 To: File 1605-909-23-4532 RFP for: New Affordable Home Construction Services Please note the following change: Change #1 RFP closing date and time is changed to July
More informationMAKE THE FOLLOWING ADDITIONS, MODIFICATIONS OR DELETIONS TO THE DRAWINGS AND SPECIFICATIONS:
ADDENDUM NO. 1 CITY OF PORT ARANSAS ELLIS MEMORIAL EXISTING LIBRARY RENOVATIONS AND REPAIRS CSP #2016-22 700 W. AVE A PORT ARANSAS, TX 78373 Issue Date: 01/07/2019 The following additions, deletions, modifications,
More informationBusiness Services Procurement University of North Texas University of North Texas Health Science Center University of North Texas at Dallas
DATE: September 25, 2018 TO: FROM: SUBJECT: Potential Proposers Denise Harpool Senior Buyer Addendum 1Answers to Questions RFP763-19-133521DH CMAR-UNTHSC East Parking Garage Renovation Clarification to
More informationWATER 107 TOILET 106 EXISTING TYP. EXISTING CLG. TYP. (E) RETURN REGISTER SUPPLIES 105 NEW RETURN REGISTER
GFI (E) ROOM NOW WORK REQUIRED 60x66 30x60 ISTING TYP. ISTING CLG. TYP. AURORA, LLC 1155 S. Havana St. Space 53 Aurora, CO 80012 Code Information: 2009 International Building Code Address: 1155 S. Havana
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1
FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 1: Stairs DATE: December 29, 2017 1235 Mission Street San Francisco, California SFUSD Project
More informationCITY OF TACOMA Department of Public Utilities Tacoma Power
CITY OF TACOMA Department of Public Utilities Tacoma Power ADDENDUM NO. 1 DATE: August 4, 2017 REVISIONS TO: Request for Bids Specification No. PG17-0130F TPU Eductor Waste Decant Facility NOTICE TO ALL
More informationMichael Teller, CBI Consulting Inc. Gymnasium & Auditorium Restoration at South Middle School
A D D E N D U M # 1 DATE: TO: FROM: PROJECT: All Bidders Michael Teller, CBI Consulting Inc. Gymnasium & Auditorium Restoration at South Middle School CBI JOB NO.: 11063 The following items shall modify
More informationA. Section includes: removal of paving, pipes and utilities, and other site items as required by the project drawings.
SECTION 024113 - SITE DEMOLITION PART 1 -GENERAL 1.1 SUMMARY A. Section includes: removal of paving, pipes and utilities, and other site items as required by the project drawings. 1.2 SUBMITTALS A. Obtain
More informationADDENDUM NO. 1 FOR RENOVATIONS TO LINCOLN ANIMAL SHELTER RFP # February 1, 2018
ADDENDUM NO. 1 FOR RENOVATIONS TO LINCOLN ANIMAL SHELTER RFP #2018-09-01 NOTICE TO PROSPECTIVE BIDDERS February 1, 2018 Prospective bidders are hereby informed of the following corrections, additions,
More informationQUESTIONS & ANSWERS FOR B SOUTHWEST SERVICE CENTER BOOKING REMODEL 02/20/2019
QUESTIONS & ANSWERS FOR B1900051 SOUTHWEST SERVICE CENTER BOOKING REMODEL 02/20/2019 Answers to questions: 1) Question: Is the existing slab post tensioned? Answer: No. Existing slab is 4 thick with welded
More informationAddendum No. 5 Tender Call No Closing: 12:00 NOON (LOCAL TIME), February 17, 2017
Michael Pacholok, Chief Purchasing Official and Director Purchasing and Materials Management Division City Hall, 18th Floor, West 100 Queen Street West Toronto, Ontario M5H 2N2 Joanne Kehoe Manager Construction
More informationSAMPLE WORK PLAN. 2. Execute subcontractor agreements and gather forms and documentation required from each sub
SAMPLE WORK PLAN You have just been awarded a $500,000 construction contract as a prime bidder. You will perform 60% of the work in-house (including your suppliers) and 40% will be performed by 3 different
More informationCONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist
CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist This checklist is a convenient reference to the 2012 Michigan Building Code. The checklist
More informationAddendum No. 3: EAST HIGH SCHOOL AUDITORIUM RENOVATIONS
Rockford Board of Education 501 Seventh Street Rockford, IL 61104 May 30, 2014 Addendum No. 3: 14-70 EAST HIGH SCHOOL To All Bidders: Attached are modification, clarifications and/or corrections for the
More informationThe Housing Authority of the County of Marin ( MHA ) 4020 Civic Center Drive. San Rafael, CA Addendum #1. Released October 3, 2016
The Housing Authority of the County of Marin ( MHA ) 4020 Civic Center Drive San Rafael, CA 94903 Addendum #1 Released October 3, 2016 Addendum #1 to IFB MHA-010-2016 Re-Roofing, HVAC Unit Replacements
More informationFlorida Army National Guard Construction Facilities Management Office. Scope of Work:
Florida Army National Guard Construction Facilities Management Office Florida Armory Revitalization Program (FARP) Design Guidelines October 2008 Scope of Work: To provide complete design for the renovation/alterations
More informationPROCUREMENT AND CONTRACTING DOCUMENTS GROUP
PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 11 00 Notice To Bidders 00 21 00 Instructions To Bidders 00 22 00 Supplementary Instructions To Bidders
More informationDIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT
TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders
More informationProud of its Heritage, Preparing for its Future
TUSTIN Proud of its Heritage, Preparing for its Future Revised August 2013 USER GUIDE FOR THE INSTALLATION OF RESIDENTIAL ROOM ADDITIONS OR ALTERATIONS PURPOSE This guide describes the City of Tustin s
More informationProcedure Yes; No; greater than
Procedure 1. Project manager (PM) notifies facilities information coordinator of forecasted substantial completion date one month prior to reaching substantial completion. 2. PM completes the project information
More informationStructural Condition Assessment
108 6 th Street, Garland, Texas Engineering Report Date: September 29, 2016 RLG No. : 16729 Prepared for: Mr. Jeff D. Bulls III AIA 3030 LBJ Freeway, Suite 1220 Dallas, TX 75234 PM: Harold F. Phillips
More informationADDENDUM 3. Conversion of Machine Shop to Tissue Culture Laboratory
ADDENDUM 3 DATE: July 21, 2015 PROJECT: RFP NO: 744-B1531 OWNER: TO: Conversion of Machine Shop to Tissue Culture Laboratory University of Texas Health Science Center Houston, Texas Prospective Bidders
More informationThe addendum consists of six (6) pages of 8½ x 11 text and three (3) 30 x 42 drawings*. End of Addendum 1
ADDENDUM # ENTRYWAY UPGRADES KILLINGLY INTERMEDIATE SCHOOL 99 UPPER MAPLE STREET DAYVILLE, CT 0 S/P+A PROJECT NO. 8.8 DATE: July, 08 The following changes to the Drawings and Project Specifications shall
More informationADDENDUM 2 - JULY 14, 2015
7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures
More informationTECHNICAL QUESTIONS FOR ITB-DOT-17/ LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE
TECHNICAL QUESTIONS FOR ITB-DOT-17/18-7004LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE Question 1: Question 2: Question 3: Question 4: Question 5: Question 6: When area configurations
More informationCity of Westerville Guide to Commercial Inspections
City of Westerville Guide to Commercial Inspections FOOTINGS - After the excavation, with the form work and any required reinforcing steel in place. All footings shall have loose soil removed, reinforcing
More informationDIVISION 02 SELECTIVE DEMOLITION
DIVISION 02 SELECTIVE DEMOLITION SECTION 02 41 19 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.01 SUMMARY A. This Section includes the following: 1. Demolition and removal of selected portions of a building.
More informationRefer to Sheet A-203 and modify Floor Plan Demolition Keynote #23 as follows:
10 September 2018 ADDENDUM NUMBER 2 To the Contract Documents for the Construction of Locker Room Modernization @ Corona High School (Bid No. 17/18-008) (DSA A#04-116960) Corona-Norco Unified School District
More informationHILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District
HILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District Facilities and School Safety Committee Meeting September 20, 2018 Progress Update PROGRESS UPDATE Rien Construction (General
More informationNew Main Hospital, Site Park, and Underground Garage Construction Progress Update #16
New Main Hospital, Site Park, and Underground Garage Construction Progress Update #16 Date: March 1, 2010 From: Gary Claar Engineering Services 355-1660 Gary.Claar@NationwideChildrens.org More and more
More informationMASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 01 GENERAL REQUIREMENTS SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 SUMMARY A. This Section includes administrative and procedural requirements for the following: 1. Salvaging non-hazardous
More informationDIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT
TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders
More informationTown of Milton Halton Paramedic Services Station No. 17 and Milton Fire Station No. 5 Tender No and
Town of Milton No. 17 and Milton Fire Station No. 5 Tender No. 19-500-1 and 19-500-2 BID SUBMISSION 19-500-2 Part Two In accordance with Tender No. 19-500-2, Tender Form Part Two must be submitted electronically
More informationSERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS
SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS INDIANA UNIVERSITY BIDDING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 (REVISED 2005) MINORITY,
More information3. Has a hazardous materials survey been completed for the project to identify any potential contaminates? Answer: Yes.
1. Page A401 details 3, 4, 5 show storefront sections, but no storefront specification exists. Can this be provided? Answer: This frame these sections apply to is to be changed to hollow metal. Delete
More information