24 Fertilize, Seed & Mulch Fertilize, Seed & Mulch Fertilize, Seed & Mulch STATE PROJECT N0. YEAR TOTAL SHEET NO. SHEETS If rock is exposed at KANSAS 3-5 KA FUTURE SURFACE FUTURE SURFACE the bottom of a ditch, it shall be left in place and seeding shall not be required. Exposed rock, shale, or other material 4 Replacement Sheet RAMP CUT SECTION Fertilize, Seed & Mulch Fertilize, Seed & Mulch FUTURE SURFACE FUTURE SURFACE P.L.S. RATE/ ACRE CLT SL/CH ACRES CLT SL/CH SUMMARY OF SEEDING QUANTITIES BID ITEM QUANTITY UNIT Temporary Fertilizer ( ),0 LB Temporary Seed (Canada Wildrye) 96 LB Temporary Seed (Grain Oats) 666 LB Temporary Seed (Sterile Wheatgrass) 666 LB RAMP FILL SECTION Soil Erosion Mix LB Agricultural Limestone TON Temporary Berm (Set Price) LF Fertilize, Seed & Mulch Fertilize, Seed & Mulch Fertilize, Seed & Mulch Temporary Slope Drain LF Temporary Stream Crossing FUTURE SURFACE FUTURE SURFACE Temporary Inlet Sediment Barrier Silt Fence 6,600 LF Biodegradable Log (9") 780 LF FILL SECTION TYPICAL SECTION - DUAL PAVEMENT CUT SECTION Biodegradable Log (") Biodegradable Log (0") Temporary Ditch Check (Rock) Temporary Sediment Basin Sediment Removal (Set Price) LF LF CU YD CU YD CU YD SWPPP Design LS SWPPP Inspection Drawn By :sdobbs Plo ted :/8/05 4:48:50 PM File :J:\04Proj\4507\K-3 Bridge Site\DW GS\Replacem ent Sheets\ka30780 la85a.dgn FERTILIZER: A ratio and application rate that equals or exceeds the required minimum rate per acre of N, P O, K O listed in Summary of Quantities will be 5 acceptable. * - N = Nitrogen Rate of Application ** - P O 5 = Phosphorous Rate of Application *** - K O = Potassium Rate of Application The Contractor will be required to finish areas of excavation, borrow and embankment in accordance with the specifications. Areas that require installation or construction of temporary water pollution control items will be finished in reasonable close conformity to the alignment, grade and cross section shown on the plans or as established by the Engineer. GENERAL NOTES The entire disturbed area, excepting the paved or surfaced areas, steep rocky slopes and areas of undisturbed native sod or other desirable vegetation shall be fertilized (limed when required), seeded, and mulched. Soil preparation shall conform to the Standard Specifications. Temporary seeding shall be done during any time of the year that the soil can be cultivated. After the temporary seeding has been completed on the entire project, a permanent seeding shall be done by during the normal seeding season. MULCHING: Mulch shall be spread uniformly over all disturbed areas and punched in the soil, unless otherwise noted on the plans. The rate of application per acre, thickness in place, for the mulching materials is as follows: - Tons per Acre = "loose depth spread uniformly over acre. Agricultural products, such as native prairie hay, used for mulching and erosion control practices, excluding wood based mulch, shall meet the North American Weed Free Forage Standards. Other vegetative mulches are acceptable only with the Engineer s concurrence. The above rate is a guide. It will be at the discretion of the Engineer to determine what rate is sufficient for adequate protection of newly seeded areas. shall be paid for according to Standard Specification Section 904. CLT = Construction Limit Tract. This area is defined by the entire disturbed area of the project that requires seeding and erosion control measures to be placed. Any impervious areas (i.e. pavement, gravel, riprap, etc.) shall not be included in this measurement. Slope = Defined by the area of the project that requires Class erosion control material to be placed. This area shall be seeded using the Soil Erosion Mix prior to placement of the material. Drilling seed is preferred, however, broadcasting is acceptable if drilling is not possible. Channel = Defined by the area of the project that requires Class erosion control material to be placed. This area shall be seeded using the Soil Erosion Mix prior to placement of the material. Drilling seed is preferred, however, broadcasting is acceptable if drilling is not possible. The amount of mulch and mulch tacking slurry in the bid quantities is estimated. The total mulch and mulch tacking slurry required shall be determined in the field. The bid item for mulching and mulch tacking slurry Water Pollution Control Manager Erosion Control (Class I, Type C),608 SQ YD Erosion Control (Class, Type E) 375 SQ YD Erosion Control (Class, Type F) 54 SQ YD 900 lbs / acre 4.8 Mulch Tacking Slurry 3,30 LB tons / acre 4.8 Mulching (Temporary) 9.6 TON Water (Erosion Control) (Set Price) MGAL NOTE: Projects less than acre shall be bid as Seeding by the lump sum. All disturbed areas shall be seeded, fertilized and mulched at the listed rate per acre. The acres are estimated. These Bid Items will not be included when the project is less than acre. Regreen and Quick Guard are the approved sterile wheatgrass products. **** List size of material. SOIL EROSION MIX PLS RATE NAME QTY (lb) 0.5 Blue Grama (Lovington) Buffalograss (Treated) Perennial Ryegrass Prairie Junegrass Side Oats Grama (El Reno) Tall Fescue (Endophyte Free) Western Wheat (Barton) Total (lb) The Soil Erosion Mix is to be placed under the Class and Class (if used) erosion control material. SWPPP Design Removed & Increased 4 /3/4 Silt Fence Quantity RSC SM 3 6//3 6/0/3 Revised Standard Revised Standard MRM MRM SHS SHS 3/0/3 Revised Standard MRM SHS NO. DATE REVISIONS BY APP D LA85A FHWA APPROVAL DESIGNED DESIGN CK. KANSAS DEPARTMENT OF TRANSPORTATION TEMPORARY EROSION AND POLLUTION CONTROL 5/4/03 MRM DETAILED MRM QUANTITIES CADD MRM SHS DETAIL CK. xxxxx xxxxxxxxx SHS APP D xxxxx QUAN.CK. Scott H. Shields CADD CK. SHS KDOT Graphics Certified KDOT Graphics Certified

25 Fertilize, Seed & Mulch Fertilize, Seed & Mulch Fertilize, Seed & Mulch STATE PROJECT N0. YEAR TOTAL SHEET NO. SHEETS If rock is exposed at KANSAS FUTURE SURFACE FUTURE SURFACE the bottom of a ditch, it shall be left in place and seeding shall not be required. Exposed rock, shale, or other material 4 Replacement Sheet RAMP CUT SECTION Fertilize, Seed & Mulch Fertilize, Seed & Mulch FUTURE SURFACE FUTURE SURFACE P.L.S. RATE/ ACRE CLT SL/CH ACRES CLT SL/CH... SUMMARY OF SEEDING QUANTITIES BID ITEM QUANTITY UNIT Temporary Fertilizer ( ) 65 LB Temporary Seed (Canada Wildrye) LB Temporary Seed (Grain Oats) 50 LB 45. Temporary Seed (Sterile Wheatgrass) 49.5 LB RAMP FILL SECTION Soil Erosion Mix LB Agricultural Limestone TON Temporary Berm (Set Price) LF Fertilize, Seed & Mulch Fertilize, Seed & Mulch Fertilize, Seed & Mulch Temporary Slope Drain LF Temporary Stream Crossing FUTURE SURFACE FUTURE SURFACE Temporary Inlet Sediment Barrier Silt Fence,800 LF Biodegradable Log (9") 99 LF FILL SECTION TYPICAL SECTION - DUAL PAVEMENT CUT SECTION Biodegradable Log (") Biodegradable Log (0") Temporary Ditch Check (Rock) Temporary Sediment Basin Sediment Removal (Set Price) LF LF CU YD CU YD CU YD SWPPP Design LS SWPPP Inspection Drawn By :sdobbs Plo ted :/8/05 4:48:5 PM File :J:\04Proj\4507\Kansas Ave Bridge Site\DW GS\Replacem ent Sheets\kta5677 la85a.dgn FERTILIZER: A ratio and application rate that equals or exceeds the required minimum rate per acre of N, P O, K O listed in Summary of Quantities will be 5 acceptable. * - N = Nitrogen Rate of Application ** - P O 5 = Phosphorous Rate of Application *** - K O = Potassium Rate of Application The Contractor will be required to finish areas of excavation, borrow and embankment in accordance with the specifications. Areas that require installation or construction of temporary water pollution control items will be finished in reasonable close conformity to the alignment, grade and cross section shown on the plans or as established by the Engineer. GENERAL NOTES The entire disturbed area, excepting the paved or surfaced areas, steep rocky slopes and areas of undisturbed native sod or other desirable vegetation shall be fertilized (limed when required), seeded, and mulched. Soil preparation shall conform to the Standard Specifications. Temporary seeding shall be done during any time of the year that the soil can be cultivated. After the temporary seeding has been completed on the entire project, a permanent seeding shall be done by during the normal seeding season. MULCHING: Mulch shall be spread uniformly over all disturbed areas and punched in the soil, unless otherwise noted on the plans. The rate of application per acre, thickness in place, for the mulching materials is as follows: - Tons per Acre = "loose depth spread uniformly over acre. Agricultural products, such as native prairie hay, used for mulching and erosion control practices, excluding wood based mulch, shall meet the North American Weed Free Forage Standards. Other vegetative mulches are acceptable only with the Engineer s concurrence. The above rate is a guide. It will be at the discretion of the Engineer to determine what rate is sufficient for adequate protection of newly seeded areas. shall be paid for according to Standard Specification Section 904. CLT = Construction Limit Tract. This area is defined by the entire disturbed area of the project that requires seeding and erosion control measures to be placed. Any impervious areas (i.e. pavement, gravel, riprap, etc.) shall not be included in this measurement. Slope = Defined by the area of the project that requires Class erosion control material to be placed. This area shall be seeded using the Soil Erosion Mix prior to placement of the material. Drilling seed is preferred, however, broadcasting is acceptable if drilling is not possible. Channel = Defined by the area of the project that requires Class erosion control material to be placed. This area shall be seeded using the Soil Erosion Mix prior to placement of the material. Drilling seed is preferred, however, broadcasting is acceptable if drilling is not possible. The amount of mulch and mulch tacking slurry in the bid quantities is estimated. The total mulch and mulch tacking slurry required shall be determined in the field. The bid item for mulching and mulch tacking slurry 900 lbs / acre tons / acre.. NOTE: Projects less than acre shall be bid as Seeding by the lump sum. All disturbed areas shall be seeded, fertilized and mulched at the listed rate per acre. The acres are estimated. These Bid Items will not be included when the project is less than acre. Regreen and Quick Guard are the approved sterile wheatgrass products. **** List size of material. SOIL EROSION MIX PLS RATE NAME QTY (lb) Water Pollution Control Manager Erosion Control (Class I, Type C) Mulch Tacking Slurry Mulching (Temporary) Water (Erosion Control) (Set Price) Blue Grama (Lovington) Buffalograss (Treated) Perennial Ryegrass Prairie Junegrass Side Oats Grama (El Reno) Tall Fescue (Endophyte Free) Western Wheat (Barton) Total (lb) The Soil Erosion Mix is to be placed under the Class and Class (if used) erosion control material. 4 3 NO. LA85A FHWA APPROVAL DESIGNED DESIGN CK. 6//3 6/0/3 3/0/3 KANSAS DEPARTMENT OF TRANSPORTATION TEMPORARY EROSION AND POLLUTION CONTROL 5/4/03 MRM DETAILED MRM QUANTITIES CADD MRM SHS DETAIL CK Revised Standard Revised Standard Revised Standard SHS APP D QUAN.CK. SQ YD LB TON MGAL SWPPP Design Removed & Increased /3/4 Silt Fence Quantity RSC SM MRM MRM MRM DATE REVISIONS BY APP D xxxxx xxxxxxxxx xxxxx Scott H. Shields CADD CK. SHS SHS SHS SHS KDOT Graphics Certified KDOT Graphics Certified

26 LEAVENWORTH COUNTY WYANDOTTE COUNTY ROAD CLOSED R - 48"x30" R - 48"x30" ROAD CLOSED STATE PROJECT N0. YEAR TOTAL SHEET NO. SHEETS 58th Kansas Ave nd 7 SUMMARY OF TRAFFIC CONTROL DEVICES () WORK ZONE SIGN (SPECIAL) SIGN NO. 6.5 SQ.FT. & LESS 6.6 SQ.FT. & OVER SUMMARY OF TRAFFIC CONTROL DEVICES ( PER DAY) QUANTITY MOST USED ON THE PROJECT AT ANY ONE TIME WORK ZONE SIGNS KANSAS Replacement Sheet RECAPITULATION OF QUANTITIES ITEM QUANTITY UNIT WORK ZONE SIGNS (O TO 9.5 SQ.FT.) PER DAY WORK ZONE SIGNS (9.6 TO 6.5 SQ.FT.) PER DAY WORK ZONE SIGNS (6.6 SQ.FT. & OVER) PER DAY WORK ZONE BARRICADES (TYPE III - 4 TO ) PER DAY 3 SIGN NO. SIZE - SQ.FT & OVER W0-7 R- R-3b CHANNELIZER (FIXED) CHANNELIZER (PORTABLE) WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) WORK ZONE WARNING LIGHT (RED TYPE "B" HIGH INTENSITY) ARROW DISPLAY PER DAY PER DAY PER DAY PER DAY PER DAY BRIDGE LOCATION W0-3 4 PORTABLE CHANGEABLE MESSAGE SIGN PAVEMENT MARKING (TEMPORARY) 4" SOLID (TYPE I TAPE OR PAINT) PER DAY 4" SOLID (TYPE II TAPE OR PAINT) 4" BROKEN (8.0 ) (TYPE I TAPE OR PAINT) 4" BROKEN (8.0 ) (TYPE II TAPE OR PAINT) 4" BROKEN (8.0 ) (FLEXIBLE RAISED PAVEMENT MARKER) 4" BROKEN (3.0 ) (TYPE I TAPE OR PAINT) 4" BROKEN (3.0 ) (TYPE II TAPE PAINT) 4" BROKEN (3.0 ) (FLEXIBLE RAISED PAVEMENT MARKER) US-4/40 4nd St. K-7 R -3b 60"x30" 4" DOTTED EXTENSION (TYPE I TAPE OR PAINT) 4" DOTTED EXTENSION (TYPE II TAPE OR PAINT) SOLID (LINE MASKING TAPE) BROKEN (LINE MASKING TAPE) LOCAL TRAFFIC ONLY 60"x30". MILE S AHEAD R -3b BRIDGEOUT KANSAS AVE. Stagger Behind 58th St. KS. AVE. (CLOSED) BRIDGEOUT 0. 7 MILE S AHEAD LOCAL TRAFFIC ONLY PAVEMENT MARKING REMOVAL CONCRETE SAFETY BARRIER (TYPE F3)(TEMPORARY) CONCRETE SAFETY BARRIER (TYPE F3)(TEMP.-INSTALL ONLY) CONCRETE SAFETY BARRIER (TYPE F3)(TEMP.-RELOCATE) INERTIAL BARRIER SYSTEM REPLACEMENT MODULES WORK ZONE SIGN (SPECIAL) (6.5 SQ. FT. & LESS) WORK ZONE SIGN (SPECIAL) (6.6 SQ. FT. & MORE) TEMPORARY RAISED PAVEMENT MARKER (TYPE I) LIN. FT. LIN. FT. LIN. FT. LIN. FT. Drawn By :sdobbs Plo ted :/6/05 4:3:08 PM File :J:\04Proj\4507\Kansas Ave Bridge Site\DW GS\Replacem ent Sheets\kta5677 cdt-0.dgn NOT TO SCALE -70 (KTA) 36"x36" W F T C LOSE D ROAD TYPE A LOW INTENSITY WARNING LIGHT TYPE BARRICADES EXISTING 36"x36" K-3 W F T C D LOSE ROAD EXISTING SIGNS NOT SHOWN AT THESE JUNCTIONS SHALL REMAIN IN PLACE UNLESS OTHERWISE DIRECTED BY THE ENGINEER. ERECT DETOUR CONFIRMING ASSEMBLIES IN CONJUNCTION WITH EXISTING ROUTE MARKER ASSEMBLIES ALONG DETOUR ROUTE. ROAD C D LOSE ROAD T 500F Stagger Behind D LOSE C MARKERS AND ANY CONFLICTING DESTINATION SIGNING ON T 000F WEST AND EAST KANSAS AVE. (CLOSED) TO PROJECT SITE. W0-3 COVER OR REMOVE ALL WEST AND EAST KANSAS AVE. ROUTE W0-3 36"x36" 36"x36" BARRICADES CHANNELIZING DEVICES TYPE III (4 TO ) FIXED PORTABLE 4 LIGHTED DEVICES WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 8 WORK ZONE WARNING LIGHT (RED TYPE "B" HIGH INTENSITY) ARROW DISPLAY PORTABLE CHANGEABLE MESSAGE SIGN TEMPORARY RAISED PAVEMENT MARKER (TYPE II) TRAFFIC SIGNAL INSTALLATION (TEMPORARY) TRAFFIC CONTROL (INITIAL SET UP) TRAFFIC CONTROL LUMP SUM LUMP SUM LUMP SUM FLAGGER (SET PRICE) HOUR 3 0/6/ Modified Pavement Marking Requirements J.A.M. K.P. 0/4/ 8/8/07 NO. DATE TE795 FHWA APPROVAL DESIGNED DESIGN CK. Added IBS Quantities, Added TWorks Quanity DETAILED DETAIL CK. 4 /3/4 Traffic Control Lump Sum R.S.C. S.M. 007 Spec Revision J.A.M. M.B. K.P. A.A.A. REVISIONS BY APP D KANSAS DEPARTMENT OF TRANSPORTATION SUMMARY OF DEVICES AND KANSAS DEPARTMENT OF TRANSPORTATION RECAPITULATION OF QUANTITIES xxxxx xxxxxxxxx 0/6/ APP D xxxxx QUANTITIES QUAN. CK. TRACED TRACE CK. KDOT Graphics Certified KDOT Graphics Certified

27 STATE PROJECT N0. YEAR TOTAL SHEET NO. SHEETS REFER TO STD. TE70 FOR ADDITIONAL INFORMATION ON TEMPORARY TRAFFIC CONTROL SIGNS AND SIGN SPACING. REFER TO STD. TE704 FOR TYPE III BARRICADES. KANSAS 3-5 KA KTA Proj B 35 REFER TO STD. TE70 FOR INFORMATION ON TAPERS AND CHANNELIZING DEVICES. REFER TO STD. TE700 FOR LENGTH OF BUFFER SPACE. 4" WHITE WORK SPACE C B B/3 B/3 B/3 A A/4 L BUFFER SPACE (MIN.) ARROW DISPLAY Drawn By :sdobbs Plo ted :/7/05 5:00:8 PM File :J:\04Proj\4507\K-3 Bridge Site\DW GS\ka30780 te744.dgn 48"x 48" TYPE III BARRICADES LENGTH TO THE NEAREST WHOLE MILE W 0- CHANNELIZING DEVICE AHEAD, 500 FT, OR MILE AHEAD, 000 FT, 500 FT, OR MILE RIGHT OR LEFT WORK ROAD SPEED TO BE DETERMINED BY THE ENGINEER TYPE "A" LOW INTENSITY WARNING LIGHT 48"x 48" W 0-5 CLOSED LANE 48"x 48" W 3-5 L I M I T S PE ED 48"x 60" R4- DO NOT PASS LEFT-SIDE SIGNS SHALL BE OMITTED FOR A FOUR-LANE UNDIVIDED HIGHWAY. 48"x 60" LIMIT R- SPEED ALONG CHANNELIZING DEVICES. 48"x " KM 4-0 FOR LEFT LANE CLOSURES USE W4-L AND YELLOW EDGE LINE THE W0-5 ( LANE CLOSED) AND W7-3A (NEXT X MILES) SIGNS SHOULD BE PLACED AT MILE INCREMENTS ON A PROJECT OF 4 MILES OR LONGER. WORK ZONE 48"x 48" W 4-R 4"x 8" W 7-3A X MILES NEXT 48"x 48" W 0-5 CLOSED LANE KG0-48"x 4" 3 8/8/07 Sign Spacing Chnaged M.B. A.A.A. /9/05 //05 M4-0 Changed To KM4-0 Clarified Notes, Updated Warning Signs M.B. B.H. A.A.A. A.A.A. NO. DATE REVISIONS BY APP D TE744 END ROAD WORK KANSAS DEPARTMENT OF TRANSPORTATION TYPICAL TRAFFIC CONTROL FOUR-LANE HIGHWAY ONE LANE CLOSED xxxxx FHWA APPROVAL DESIGNED B.A.H. DETAILED 8/8/07 R- 48"x 60" xxxxxxxxx APP D xxxxx B.A.H. QUANTITIES DESIGN CK. DETAIL CK. QUAN. CK. SPEED LIMIT Anthony Alrobaire TRACED TRACE CK. KDOT Graphics Certified KDOT Graphics Certified B

28 STATE PROJECT N0. YEAR TOTAL SHEET NO. SHEETS SUMMARY OF TRAFFIC CONTROL DEVICES () WORK ZONE SIGN (SPECIAL) SUMMARY OF TRAFFIC CONTROL DEVICES ( PER DAY) QUANTITY MOST USED ON THE PROJECT AT ANY ONE TIME KANSAS 3-5 KA Replacement Sheet RECAPITULATION OF QUANTITIES ITEM QUANTITY UNIT WORK ZONE SIGNS (O TO 9.5 SQ.FT.) PER DAY WORK ZONE SIGNS (9.6 TO 6.5 SQ.FT.) PER DAY WORK ZONE SIGNS (6.6 SQ.FT. & OVER) PER DAY SIGN NO. 6.5 SQ.FT. & LESS 6.6 SQ.FT. & OVER WORK ZONE SIGNS WORK ZONE BARRICADES (TYPE III - 4 TO ) PER DAY IBS REPLACEMENT MODULES REPLACEMENT MODULE SIZES REPLACEMENT MODULES (FOO) REPLACEMENT MODULES (F4OO) REPLACEMENT MODULES (F7OO) REPLACEMENT MODULES (F4OO) REPLACEMENT MODULES (FO0) QUANTITY SIGN NO. SIZE - SQ.FT & OVER W0-7 R- R-3b 4 M-5 4 M3- M3-4 M4-8 5 M4-8a M4-0L M4-0R M6- W CHANNELIZER (FIXED) CHANNELIZER (PORTABLE) WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) WORK ZONE WARNING LIGHT (RED TYPE "B" HIGH INTENSITY) ARROW DISPLAY PORTABLE CHANGEABLE MESSAGE SIGN PAVEMENT MARKING (TEMPORARY) 4" SOLID (TYPE I TAPE OR PAINT) 4" SOLID (TYPE II TAPE OR PAINT) 4" BROKEN (8.0 ) (TYPE I TAPE OR PAINT) 4" BROKEN (8.0 ) (TYPE II TAPE OR PAINT) 4" BROKEN (8.0 ) (FLEXIBLE RAISED PAVEMENT MARKER) 4" BROKEN (3.0 ) (TYPE I TAPE OR PAINT) 4" BROKEN (3.0 ) (TYPE II TAPE PAINT) PER DAY PER DAY PER DAY PER DAY PER DAY PER DAY 4" BROKEN (3.0 ) (FLEXIBLE RAISED PAVEMENT MARKER) 4" DOTTED EXTENSION (TYPE I TAPE OR PAINT) 4" DOTTED EXTENSION (TYPE II TAPE OR PAINT) SOLID (LINE MASKING TAPE) BROKEN (LINE MASKING TAPE) PAVEMENT MARKING REMOVAL LIN. FT. CONCRETE SAFETY BARRIER (TYPE F3)(TEMPORARY) LIN. FT. CONCRETE SAFETY BARRIER (TYPE F3)(TEMP.-INSTALL ONLY) LIN. FT. CONCRETE SAFETY BARRIER (TYPE F3)(TEMP.-RELOCATE) LIN. FT. INERTIAL BARRIER SYSTEM REPLACEMENT MODULES WORK ZONE SIGN (SPECIAL) (6.5 SQ. FT. & LESS) WORK ZONE SIGN (SPECIAL) (6.6 SQ. FT. & MORE) TEMPORARY RAISED PAVEMENT MARKER (TYPE I) TEMPORARY RAISED PAVEMENT MARKER (TYPE II) TRAFFIC SIGNAL INSTALLATION (TEMPORARY) LUMP SUM Drawn By :sdobbs Plo ted :/6/05 4:3:09 PM File :J:\04Proj\4507\K-3 Bridge Site\DW GS\Replacem ent Sheets\ka30780 te795.dgn BARRICADES CHANNELIZING DEVICES TYPE III (4 TO ) FIXED PORTABLE 0 48 LIGHTED DEVICES WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 0 WORK ZONE WARNING LIGHT (RED TYPE "B" HIGH INTENSITY) ARROW DISPLAY PORTABLE CHANGEABLE MESSAGE SIGN TRAFFIC CONTROL (INITIAL SET UP) TRAFFIC CONTROL LUMP SUM LUMP SUM FLAGGER (SET PRICE) HOUR TWORKS SIGN ASSEMBLY 3 8/8/07 NO. TE795 FHWA APPROVAL DESIGNED DESIGN CK. 0/4/ DETAILED DETAIL CK. APP D QUANTITIES QUAN. CK. 0/6/ Modified Pavement Marking Requirements J.A.M. K.P. DATE 4 /3/4 Traffic Control Lump Sum R.S.C. S.M. Added IBS Quantities, Added TWorks Quanity 007 Spec Revision KANSAS DEPARTMENT OF TRANSPORTATION SUMMARY OF DEVICES AND RECAPITULATION OF QUANTITIES 0/6/ TRACED J.A.M. M.B. TRACE CK. K.P. A.A.A. REVISIONS BY APP D xxxxx xxxxxxxxx xxxxx KDOT Graphics Certified KDOT Graphics Certified

3Bureau of Construction and Maintenance

3Bureau of Construction and Maintenance Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still FAX IT TO the Estimating Section at (785) 96-0999. Any instructions not followed will result

More information

61,792 13,633 9,731. Page 3 of 23

61,792 13,633 9,731. Page 3 of 23 Page 1 of 23 The areas that remain after sidewalk removals shall be graded to drain using the surrounding on-site soils. These areas shall be seeded with Fescue, Tall, (K-31), (Rebel II) and fertilized

More information

Contractor Construction Staking 1.0 Lump Sum. Granular Backfill (Wingwalls) (Set Price) 1.0 Cu.Yds $50.00 $ Mobilization 1.

Contractor Construction Staking 1.0 Lump Sum. Granular Backfill (Wingwalls) (Set Price) 1.0 Cu.Yds $50.00 $ Mobilization 1. KTA Contract No. 5677 KANSAS TURNPIKE AUTHORITY ALT 1 Schedule of Prices Contract No. 5677 County Leavenworth Type of Work: Remove and reconstruct Bridge 221.542 (120'-170'-170'-120' Weathering Steel Spans).

More information

ITEM QUANTITY UNITS UNIT PRICE AMOUNT. Contractor Construction Staking 1.0 Lump Sum

ITEM QUANTITY UNITS UNIT PRICE AMOUNT. Contractor Construction Staking 1.0 Lump Sum KTA Contract No. 5677 KANSAS TURNPIKE AUTHORITY ALT 1 Schedule of Prices Contract No. 5677 County Leavenworth Type of Work: Remove and reconstruct Bridge 221.542 (120'-170'-170'-120' Weathering Steel Spans).

More information

3Bureau of Construction and Maintenance

3Bureau of Construction and Maintenance Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still FAX IT TO the Estimating Section at (785) 296-0999. Any instructions not followed will result

More information

Please note the requirement for alternate bids as described in Section 3 of the Instructions to Bidders portion of the contract specifications.

Please note the requirement for alternate bids as described in Section 3 of the Instructions to Bidders portion of the contract specifications. Kansas Turnpike Authority Project 5677 Note regarding schedule of prices: Please note the requirement for alternate bids as described in Section 3 of the Instructions to Bidders portion of the contract

More information

3Bureau of Construction and Maintenance

3Bureau of Construction and Maintenance Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still FAX IT TO the Estimating Section at (785) 296-0999. Any instructions not followed will result

More information

3Bureau of Construction and Maintenance

3Bureau of Construction and Maintenance Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still FAX IT TO the Estimating Section at (785) 296-0999. Any instructions not followed will result

More information

Kansas Department of Transportation DISTRICT 1. Project(s): 089 U / HSIP-U231(701) Min: Max:

Kansas Department of Transportation DISTRICT 1. Project(s): 089 U / HSIP-U231(701) Min: Max: Page 1 of 18 SECTION: 01 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 025600 FIELD OFFICE AND LABORATORY (TYPE A) 4 012340 FOUNDATION STABILIZATION (SET PRICE) 5 020100 CONTRACTOR CONSTRUCTION

More information

!"#$ % 1( =4+0(1*0)4 A)*.(.)44)4 8(: 4 0, 2(3*05. Page 1A of 10 11

!#$ % 1( =4+0(1*0)4 A)*.(.)44)4 8(: 4 0, 2(3*05. Page 1A of 10 11 !"#$ % 9 8 8 8784 867 *-+(+ +,- 40. -8/5 '()* +,-. *()/ 0,, 0, (*0 )4 *, /)(*0)4 06&5 &60 455678 ()() 90( (:8; +,- (7)4 4 0 4(+0()*0/ 0()*5 ', 0@A' +,- -* =B9C+ ()( 0 0, +0(0 8(:5 ', =40(*0( +,- (?)/ 4

More information

Kansas Department of Transportation DISTRICT 5. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT 5. Project(s): Min: Max: Page 1 of 11 518105 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025603 FIELD OFFICE 3 025323 MOBILIZATION 4 070626 MOBILIZATION (DBE) 5 025200 REMOVAL OF EXISTING STRUCTURES 6 012340

More information

Project # Brown County PCN i40h Replace Section Line Road Culvert

Project # Brown County PCN i40h Replace Section Line Road Culvert Project # 010-151 PCN i40h Replace Section Line Road Culvert R 64 W FREDERICK POP. 199 R 63 W R 62 W R 61 W 6 5 4 3 6 5 4 3 1 Dry 402 AVE 102 ST 387 AVE 12 388 AVE 390 AVE 7 8 9 10 11 12 391 AVE 393 AVE

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 8 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Note: This Special Provision is generally written in the imperative mood. The subject, the

More information

Sheet 2 of 27

Sheet 2 of 27 Sheet 1 of 27 Sheet 2 of 27 Sheet 3 of 27 Sheet 4 of 27 Sheet 5 of 27 INDEX OF PLANS SHEETS Sheet 1 to 5 (Incl.) Sheet 6 Sheet 7 to 9 (Incl.) Sheet 10 Sheet 11 to 13 (Incl.) Sheet 14 Sheet 15 Sheet 16

More information

3Bureau of Construction and Maintenance

3Bureau of Construction and Maintenance Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still FAX IT TO the Estimating Section at (785) 296-0999. Any instructions not followed will result

More information

SANBORN COUNTY

SANBORN COUNTY Sheet 1 of 12 SPECIFICATIONS ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 110E0500 Remove Pipe Culvert 134 Ft 110E1010 Remove Asphalt Concrete Pavement 178

More information

Page 3 of 14

Page 3 of 14 Page 1 of 14 Page 2 of 14 Page 3 of 14 666.67 666.67 666.67 666.67 VAILST. STATE OF KANSAS DEPARTM ENT BRIDGE REPAIR KANSAS PROJECT SHAW NEE COUNTY US-75 Creek Creek Elmont Creek Indian Litle Messhoss

More information

902 TEMPORARY EROSION AND SEDIMENT CONTROL SECTION 902 TEMPORARY EROSION AND SEDIMENT CONTROL

902 TEMPORARY EROSION AND SEDIMENT CONTROL SECTION 902 TEMPORARY EROSION AND SEDIMENT CONTROL SECTION 902 TEMPORARY EROSION AND SEDIMENT CONTROL 902.1 DESCRIPTION Install, maintain and remove temporary erosion and pollution control devices as required during the construction of the project. BID

More information

ANSWERS TO QUESTIONS RECEIVED THROUGH 1:00 PM ON MAY 24, 2018:

ANSWERS TO QUESTIONS RECEIVED THROUGH 1:00 PM ON MAY 24, 2018: ADDENDUM NO. 3 PROJECT NO. 43805 (PART A & B) PAGE 2 ANSWERS TO QUESTIONS RECEIVED THROUGH :00 PM ON MAY 24, 208: Q#32 Addendum # answered Question #7 indicating that an average depth of 3 feet for the

More information

Figure Inlet protection (Source: Minnesota DOT)

Figure Inlet protection (Source: Minnesota DOT) 3.9 INLET PROTECTION Figure 3.14. Inlet protection (Source: Minnesota DOT) Overview Description: A manufactured protective device or barrier used to trap sediment at a storm drain surface or curb inlet.

More information

SECTION 903 EROSION CONTROL

SECTION 903 EROSION CONTROL SECTION 903 EROSION CONTROL Delete this Section in its entirety and replace with the following: SECTION 903 EROSION CONTROL 903-1 DESCRIPTION: This work consists of providing all; administrative, labor,

More information

Maine Turnpike Authority

Maine Turnpike Authority PAVEMENT REHABILITATION & CLEAR ZONE IMPROVEMENTS MM 80.7 TO MM 88.6 202.121 Removing Existing Concrete (6CY) 1.00 LS 202.127 Removing of Existing Bituminous Pavement (470 SY) 1.00 LS 202.202 Removing

More information

Kansas Department of Transportation Bureau of Construction and Maintenance Estimating Section

Kansas Department of Transportation Bureau of Construction and Maintenance Estimating Section Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still FAX IT TO the Estimating Section at (785) 296-0999. Any instructions not followed will result

More information

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL 901.1 DESCRIPTION Install, maintain and remove temporary erosion and pollution control devices as required during the construction of the project. BID

More information

BID TABULATION ( BIDS OPENED MONDAY, APRIL 24, 1:00 P.M. ) CONSTRUCT PARALLEL TAXIWAY - PHASE 3 HABERSHAM COUNTY AIRPORT, CORNELIA, GEORGIA

BID TABULATION ( BIDS OPENED MONDAY, APRIL 24, 1:00 P.M. ) CONSTRUCT PARALLEL TAXIWAY - PHASE 3 HABERSHAM COUNTY AIRPORT, CORNELIA, GEORGIA BASE BID 1 01000 MOBILIZATION 1.00 L. SUM $799,945.96 $799,945.96 $1,150,000.00 $1,150,000.00 2 01510 FIELD ENGINEER'S OFFICE 1.00 L. SUM $40,000.00 $40,000.00 $5,000.00 $5,000.00 3 ALL-1 4 ALL-2 5 MISC-1

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016138 TRACS No. Project No. County District Gross

More information

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 There are three ways to accomplish urban soil erosion and sedimentation control: Allow erosion to take place and then control sediment

More information

BRIDGE REPAIR BARBER COUNTY R 12 W R 11 W R 11 W DEPARTM ENT OF TRANSPORTATION. Page 1 of 12 BRIDGE NO (030)

BRIDGE REPAIR BARBER COUNTY R 12 W R 11 W R 11 W DEPARTM ENT OF TRANSPORTATION. Page 1 of 12 BRIDGE NO (030) KANSAS SOUTHW ESTERN R 11 W R 11 W KIOWA 8 TO CHEROKEE, OKLA. Stubbs R 12 W Creek 2 BURLINGTON STATE OF KANSAS DEPARTM ENT BRIDGE REPAIR KANSAS PROJECT BARBER COUNTY K-2 2-4-1.81 (00) TITLE SHEET Page

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2017.02 Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5 The following changes are made to the Proposal, Specifications and Plans: SPECIFICATIONS:

More information

Width (Feet) Depth (Feet)

Width (Feet) Depth (Feet) 1 11 2 11 ESTIMATE OF QUANTITIES BID ITEM NUMBER 009E0010 120E9000 230E0100 250E0020 260E1010 320E1200 632E2510 634E0010 634E0100 634E0120 700E0210 Mobilization Pit Run Material Remove and Replace Topsoil

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $13,984,117.36 Reed & Reed, Inc. - Woolwich, ME $14,883,139.00 Page 1 of 11 CPM Constructors Freeport, ME 201.11 Clearing AC 2.00 10000.00

More information

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2 MERCED COUNTY BID LIST CAMPUS PARKWAY SEGMENT 2 CONTRACT 2017191 The bidder must provide unit prices for each bid item listed below, based on the specified unit of measure. The unit price for each item

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $3,379,844.00 Scott Construction Corporation - Portland, ME $3,572,184.50 CPM Constructors - Freeport, ME $3,732,667.25 Page 1 of 16 Wyman

More information

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with

More information

SECTION EROSION AND SEDIMENTATION CONTROL

SECTION EROSION AND SEDIMENTATION CONTROL SECTION 312500 EROSION AND SEDIMENTATION CONTROL Scope : During construction, temporary and permanent protective structures and measures as detailed in the following paragraphs shall be implemented and

More information

3Bureau of Construction and Maintenance

3Bureau of Construction and Maintenance Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF T BDING. Or you may still FAX IT TO the Estimating Section at (785) 296-0999. Any instructions not followed will result in

More information

FEDERAL AID PROJECT I-70 PROJ. NO KA FEDERAL PROJ. NO. NHPP-A516(401)

FEDERAL AID PROJECT I-70 PROJ. NO KA FEDERAL PROJ. NO. NHPP-A516(401) STATE OF KANSAS DEPARTM ENT OF TRANSPORTATION BRIDGE REPAIR FEDERAL AID PROJECT SHAW NEE COUNTY 0/06/019 I-70 FEDERAL PROJ. NO. NHPP-A516(401) 4 Menoken N.W. 17TH ST. KANSAS RIVER BRIDGE NO. 70-89-9.08

More information

Mainelli Wagner & Associates, Inc.

Mainelli Wagner & Associates, Inc. www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 December 28, 2018 The Platte County Board of Supervisors will

More information

PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co

PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO. 3690 NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Commissioners Kitsap County 614 Division Street Port

More information

ODOT District Roadway General Notes R401: LINEAR GRADING R402: ITEM RESHAPING UNDER GUARDRAIL R403: CURB RAMPS / DETECTABLE WARNINGS

ODOT District Roadway General Notes R401: LINEAR GRADING R402: ITEM RESHAPING UNDER GUARDRAIL R403: CURB RAMPS / DETECTABLE WARNINGS R401: LINEAR GRADING R402: ITEM 209 - RESHAPING UNDER GUARDRAIL R403: CURB RAMPS / DETECTABLE WARNINGS R404: DELETED R405: BARRIER REFLECTORS R406: PAVEMENT MARKING LANE WIDTHS R407: TYPE A ANCHOR ASSEMBLY

More information

KANSAS TURNPIKE AUTHORITY KTA CONTRACT NO Mill and Superpave overlay I-35 (KTA) from MM 13 to MM 26.8 ADDENDUM NO. 1

KANSAS TURNPIKE AUTHORITY KTA CONTRACT NO Mill and Superpave overlay I-35 (KTA) from MM 13 to MM 26.8 ADDENDUM NO. 1 KANSAS TURNPIKE AUTHORITY KTA CONTRACT NO. 6028 Mill and Superpave overlay I-35 (KTA) from MM 13 to MM 26.8 ADDENDUM NO. 1 The Contract Documents for KTA Contract No. 6028 are hereby amended in the following

More information

COMMUNITY PLAZA WAY ASPHALT PAVEMENT OVERLAY ADDENDUM NO.1 UPPER SKAGIT INDIAN TRIBE PAGE 1

COMMUNITY PLAZA WAY ASPHALT PAVEMENT OVERLAY ADDENDUM NO.1 UPPER SKAGIT INDIAN TRIBE PAGE 1 UPPER SKAGIT INDIAN TRIBE COMMUNITY PLAZA WAY ASPHALT PAVEMENT OVERLAY ADDENDUM NO. 1 (7 pages total) Issue Date: May 11, 2016 General: Recitations of each and every section of the bid documents impacted

More information

Town of Fortville Utility Street Standards

Town of Fortville Utility Street Standards Town of Fortville Utility Street Standards SECTION 02101 - TEMPORARY EROSION AND DUST CONTROL PART 1 - GENERAL 1.1 DESCRIPTION A. Temporary Erosion and Dust Control measures must meet the current Town

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT 2018.03 EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3 The following changes are made to the Proposal, Specifications, and Plans. PROPOSAL Proposal Sheets

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 04/03/17 Comp. Dt: 10/06/17

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 04/03/17 Comp. Dt: 10/06/17 Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 6216-127 Contract ID: Contract Description: Contract Location: Recommendation: 170023 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

DECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids

DECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids General Info Number: PROJECT NO. 43-17-04 : BRIDGE DECK REPAIR AND BRIDGE REMOVAL OHIO TURNPIKE OVER QUARRY ROAD, M.P. 138.0 OHIO TURNPIKE OVER INACTIVE RAILROAD, M.P. 138.2 LORAIN COUNTY, OHIO Deadline:

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Scott Construction Corporation - Portland, ME $918,886.00 CPM Constructors - Freeport, ME $1,059,738.71 Wyman & Simpson Inc. - Richmond, ME $1,084,545.00 Page 1 of 7 Scott

More information

ITEM 164 SEEDING FOR EROSION CONTROL

ITEM 164 SEEDING FOR EROSION CONTROL ITEM 164 SEEDING FOR EROSION CONTROL 164.1. Description. Provide and install temporary or permanent seeding for erosion control as shown on the plans or as directed. 164.2. Materials. A. Seed. Provide

More information

PAY QUANTITY NOTES INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS EARTHWORK WHERE NO QUANTITY IS SHOWN ON P & P SHEETS.

PAY QUANTITY NOTES INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS EARTHWORK WHERE NO QUANTITY IS SHOWN ON P & P SHEETS. PAY QUANTITY NOTES (F-1) (F-2) (F-3) (F-4) (F-5) (F-6) (F-7) (F-8) (F-9) (F-10) (F-11) (F-12) (F-13) (F-14) (F-15) (F-16) (F-17) (F-18) (F-19) INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS

More information

Kansas Department of Transportation DISTRICT TE / TA-T045 (501) Project(s): Min: Max:

Kansas Department of Transportation DISTRICT TE / TA-T045 (501) Project(s): Min: Max: Page 1 of 11 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025600 FIELD OFFICE AND LABORATORY (TYPE A) 3 025323 MOBILIZATION 4 070626 MOBILIZATION (DBE) 5 025200 REMOVAL OF EXISTING

More information

APPENDIX I APPENDIX I SAMPLE COST ESTIMATES AND SUMMARY

APPENDIX I APPENDIX I SAMPLE COST ESTIMATES AND SUMMARY APPENDIX I SAMPLE COST ESTIMATES AND SUMMARY May 7, 2002 This page left blank intentionally. May 7, 2002 Preliminary Cost Estimate Summary ESTIMATE TYPE A ABC Consulting Hwy 99:06 ABC Project No. 1234-01-56789

More information

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc. 2004 Specifications CSJ 0299-04-049, Etc. SPECIAL PROVISION 000---979 Detours, Barricades, Warning Signs, Sequence of Work, etc. 1. Description of Project. A. General. This project provides for the construction

More information

ESTIMATE OF QUANTITIES

ESTIMATE OF QUANTITIES STATE OF PROJECT SOUTH DAKOTA 029 N-291 SHEET NO. TOTAL SHEETS 2 25 SPECIFICATIONS ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 110E0100 Remove Concrete Footing(s)

More information

IM 0291(108)0 UNION COUNTY INDEX OF SHEETS. Index of Sheets. Estimate of Quantities. Table of Fence Quantities. Details for Right-of-Way Fence

IM 0291(108)0 UNION COUNTY INDEX OF SHEETS. Index of Sheets. Estimate of Quantities. Table of Fence Quantities. Details for Right-of-Way Fence INDEX OF SHEETS Sheet 1 Sheet 2 Sheet 3 Sheet 4 Sheets 5 & 6 Sheet 7 Sheets 8-15 Layout Map Index of Sheets Estimate of Quantities Table of Fence Quantities Plan Notes Traffic Control Details for Right-of-Way

More information

CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR STORMWATER

CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR STORMWATER CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR STORMWATER Tavares, Florida Jones Edmunds & Associates, Inc. Project No. 06806-012-01 CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR

More information

Department of Transportation Rapid City Region Office 2300 Eglin Street P.O. Box 1970 Rapid City, SD Phone: 605/ FAX: 605/

Department of Transportation Rapid City Region Office 2300 Eglin Street P.O. Box 1970 Rapid City, SD Phone: 605/ FAX: 605/ Connecting South Dakota and the Nation Department of Transportation Rapid City Region Office 2300 Eglin Street P.O. Box 1970 Rapid City, SD 57709-1970 Phone: 605/394-2244 FAX: 605/394-1904 May 17, 2017

More information

35-46 KA KA

35-46 KA KA 35-46 KA 4586-01 7-46 KA 4583-01 HOST PROJECT 6 KA 4590-01 Page 1 of 48 HOST PROJECT 6 KA 4590-01 70-5 KA 4588-01 5-5 KA 4584-01 Page of 48 6 KA 4590-01 Page 3 of 48 70-5 KA 4588-01 At the Contractor's

More information

STATE OF SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION PLANS FOR PROPOSED

STATE OF SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION PLANS FOR PROPOSED STATE OF SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION PLANS FOR PROPOSED PROJECT 000P-151 US HWY 12 DAY COUNTY Construction of New Field Approach PCN i4g8 Sheet 1 of 11 ENVIRONMENTAL COMMITMENTS An Environmental

More information

3Bureau of Construction and Maintenance

3Bureau of Construction and Maintenance Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still FAX IT TO the Estimating Section at (785) 296-0999. Any instructions not followed will result

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2018.05 EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 The bid opening date is Thursday March 15, 2018 at 11:00 a.m. The following changes

More information

The Manitoba Water Services Board SECTION Standard Construction Specifications Revised May 2015 Page 1 of 5

The Manitoba Water Services Board SECTION Standard Construction Specifications Revised May 2015 Page 1 of 5 Revised May 2015 Page 1 of 5 Part 1 General 1.1 DESCRIPTION OF WORK.1 This work shall include the supply of all materials. Seeding shall include the preparation of the seed bed and the supply and placement

More information

CONTRACT ID : COMPLETION DATE : 09/15/08 =========

CONTRACT ID : COMPLETION DATE : 09/15/08 ========= PAGE : 1 COMPLETION DATE : 09/15/08 PROJECT(S): ER-1453(310)X LOCATION(S): YORK, CULVERT REPLACEMENT MAINE STATE DEPARTMENT OF TRANSPORTATION A TRUE COPY : TITLE : ATTEST : CONTRACT DESCRIPTION : YORK,

More information

ADDENDUM #3. STATE ROUTE 60 AT POTRERO BOULEVARD INTERCHANGE PHASE I AND IA City Project No ; Federal Project No.

ADDENDUM #3. STATE ROUTE 60 AT POTRERO BOULEVARD INTERCHANGE PHASE I AND IA City Project No ; Federal Project No. ADDENDUM #3 STATE ROUTE 60 AT POTRERO BOULEVARD INTERCHANGE PHASE I AND IA City Project No. 2016-003; Federal Project No. DEM10L-5209(008) November 9, 2017 Addendum for: AND IA STATE ROUTE 60 AT POTRERO

More information

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max: Page 1 of 5 518102 EMERY SAPP & SONS INC SECTION: 01 COMMON ITEMS Cat Alt Set: Cat Alt Member: LCC: 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 020001 MAINTENANCE AND RESTORATION OF HAUL ROADS

More information

DOCUMENT ADDENDA AND MODIFICATIONS

DOCUMENT ADDENDA AND MODIFICATIONS DOCUMENT ADDENDA AND MODIFICATIONS PART 1 1.1 PROCEDURE GENERAL A. For filing purposes, add Addenda and Modifications to the Contract Documents following this page. Modified June 20, 2017 Addenda and Modifications

More information

Bidder Name: ITEMIZED BID: The bidder should complete the following section in accordance with Sec 102.7. The bidder proposes to furnish all labor, materials, equipment, services, etc. required for the

More information

WASTE DISPOSAL SITE (CONTINUED)

WASTE DISPOSAL SITE (CONTINUED) ESTIMATE OF QUANTITIES SPECIFICATIONS Standard Specifications for Roads & Bridges, 2004 Edition and Required Provisions, Supplemental Specifications and/or Special Provisions as included in the Proposal.

More information

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS PAGE : 133-1 CONTRACT TIME : 12/20/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : BR-080-5(094) ROUTE 80 BRIDGE OVER ROUTE 287 NORTHBOUND AND SMITH ROAD GRADING, PAVING & STRUCTURRS CONTRACT

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,417,760.75 Scott Construction - Falmouth, ME $1,418,884.50 T Buck Construction - Auburn, ME $1,520,203.00 Page 1 of 16 CPM Constructors

More information

Department of Transportation Mitchell Region Office

Department of Transportation Mitchell Region Office Connecting South Dakota and the Nation Department of Transportation Mitchell Region Office PO Box 1206 Mitchell, SD 57301-7206 605/995-8129 FAX: 605/995-8135 September 28, 2018 TO: Interested Bidders (pdf

More information

FEBRUARY 13, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $9,000,000.00) Bids. Kokosing Construction Company, Inc. $8,623,609.96

FEBRUARY 13, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $9,000,000.00) Bids. Kokosing Construction Company, Inc. $8,623,609.96 General Info Number: PROJECT NO. 43-19-02 Description: BRIDGE DECK REPAIR AND REHABILITATION OHIO TURNPIKE OVER ABANDONED RAILROAD M.P. 34.2, OHIO TURNPIKE OVER STATE ROUTE 108 M.P. 34.5, COUNTY ROUTE

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 7 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION SECTION TRAFFIC CONTROL Page 628, subsection.01. Delete the following bid items: Advance

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

Mainelli Wagner & Associates, Inc.

Mainelli Wagner & Associates, Inc. www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 August 8, 2018 The Cuming County Board of Supervisors will be

More information

Please print or type.

Please print or type. SOIL EROSION AND SEDIMENTATION CONTROL PERMIT APPLICATION 6-18-07 Ann kjjkjkff- ANN ARBOR CHARTER TOWNSHIP 3792 Pontiac Trail, Ann Arbor, Michigan 48105-9656 Phone (734) 663-3418 Website: www.aatwp.org

More information

SECTION SOIL EROSION, SEDIMENTATION CONTROL AND LANDSCAPING TABLE OF CONTENTS

SECTION SOIL EROSION, SEDIMENTATION CONTROL AND LANDSCAPING TABLE OF CONTENTS SECTION 04000 SOIL EROSION, SEDIMENTATION CONTROL AND LANDSCAPING 04010 SCHEDULING 04020 TEMPORARY MEASURES 04030 PERMANENT MEASURES 04040 COMPUTATIONS 04050 CONSTRUCTION SEQUENCE TABLE OF CONTENTS 04000-1

More information

Guardrail Repair and/or Replacement Due To Damage on Interstate 90 In The Winner Area Project No. 000I-391 PCN i21n

Guardrail Repair and/or Replacement Due To Damage on Interstate 90 In The Winner Area Project No. 000I-391 PCN i21n Sheet 1 of 46 ESTIMATE OF QUANTITIES Bid Item Number Item Quantity Unit 009E0197 Mobilization 1- East of Murdo 4 EACH 009E0198 Mobilization 2 - West of Murdo 4 EACH 110E0700 Remove 3 Cable Guardrail 175

More information

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 2004 Specifications CSJ: 0932-01-076 SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 1.0 Description of Project 1.1. General. This project provides for the widening of

More information

NOTICE TO BIDDERS ADDENDUM NO. 3. Dated: March 25, 2019 SAP

NOTICE TO BIDDERS ADDENDUM NO. 3. Dated: March 25, 2019 SAP Public Works Department Donald J. Theisen, P.E. Director NOTICE TO BIDDERS Wayne H. Sandberg, P.E. Deputy Director/County Engineer Type of Work: ADDENDUM NO. 3 Dated: March 25, 209 SAP 082-68-022 Removing

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids 1 COUNTY'S ESTIMATE Skanska USA Civil West CA Dist. Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066100 DUST CONTROL LS 1 3,000.00

More information

SWPPP Inspection Procedures and Form 247 Instructions

SWPPP Inspection Procedures and Form 247 Instructions SWPPP Inspection Procedures and Form 247 Instructions 1. Pre-Construction Conference a. A stormwater pollution pre-construction conference shall be held prior to beginning work on each project. b. The

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2018040 TRACS No. Project No. County District Gross

More information

HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST

HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST CONSTRUCTION PLAN BID SET PREPARED FOR: LOCATION MAP CARRABELLE US ROUTE 319/98 EASTPOINT Prepared By Plan Design Enable CORPORATE

More information

:00 PM CST. McDonald Construction Inc of Slidell $1,002, Magee Excavation & Development LLC $1,

:00 PM CST. McDonald Construction Inc of Slidell $1,002, Magee Excavation & Development LLC $1, General Info Number: 316-00-17-47-2 Description: Lake Village Drainage Improvements - N. Pearl Mill & Overlay Deadline: 2017-7-9 2:00 PM CST Bids Business Bid Total McDonald Construction Inc of Slidell

More information

SECTION EROSION CONTROLS

SECTION EROSION CONTROLS SECTION 31 25 13 EROSION CONTROLS PART 1 GENERAL 1.1 SUMMARY A. Section Includes installing, maintaining and removing: 1. Silt Fence. 2. Temporary Construction Entrances. 3. Diversion Channels. 4. Sediment

More information

GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ

GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ *THE BELOW NOTES ARE COMMONLY USED IN SE&SC PLAN APPLICATIONS THE NOTES MAY BE EDITED AS APPROPRIATE FOR PROJECT BEING DEVELOPED

More information

SECTION 603 SEEDING I. GENERAL 1.1 DESCRIPTION OF WORK

SECTION 603 SEEDING I. GENERAL 1.1 DESCRIPTION OF WORK SECTION 603 SEEDING I. GENERAL 1.1 DESCRIPTION OF WORK The Contractor shall furnish all labor, supervision, material (except as herein provided), tools, equipment, supplies, and services; and, shall perform

More information

WAKULLA SITE PLANNING

WAKULLA SITE PLANNING WAKULLA CIVIL SURVEYING SITE PLANNING TRAFFIC CONTROL PLAN WAKULLA ARRAN ROAD WIDENING & RESURFACING UTILITY CONTACT LIST NO. DATE: APPR. REVISION: DATE: CIVIL SURVEYING SITE PLANNING GENERAL NOTES WAKULLA

More information

SOIL TRACKING PREVENTION DEVICE TYPE A

SOIL TRACKING PREVENTION DEVICE TYPE A Approach Length Swale Sediment Pit B Slope To Drain (0.1 Min.) 50 Std. 15 Std. Full Width 1-lane 30 Std. Full Width 2-lane A Slope To Drain A Construct Paved Turnout (Index No 515). May Be Deleted If Approved

More information

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN SITUATED IN THE SW ¼ OF SECTION 18, T.2S., R.67W., OF THE 6 TH P.M. COUNTY OF ADAMS, STATE OF COLORADO PREPARED FOR: Thornton Cornerstone

More information

Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities

Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities Development Services 1775 12 th Ave. NW P.O. Box 1307 Issaquah, WA 98027 425-837-3100 issaquahwa.gov Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction

More information

General Info Number: PROJECT NO Description: REPAIRS AND RESURFACING INTERCHANGE 209 MILEPOST TRUMBULL COUNTY, OHIO

General Info Number: PROJECT NO Description: REPAIRS AND RESURFACING INTERCHANGE 209 MILEPOST TRUMBULL COUNTY, OHIO General Info Number: PROJECT NO. 59-18-03 Description: REPAIRS AND RESURFACING INTERCHANGE 209 MILEPOST 209.20 TRUMBULL COUNTY, OHIO Deadline: April 25, 2018 at 2:00 P.M. (Eastern) (Estimated Cost: $3,100,000.00)

More information

EXAMPLES OF GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ

EXAMPLES OF GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ EXAMPLES OF GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ *THE BELOW NOTES ARE EXAMPLES OF COMMONLY USED IN SE&SC PLAN APPLICATIONS THE NOTES MAY BE EDITED AS APPROPRIATE FOR

More information

Mainelli Wagner & Associates, Inc.

Mainelli Wagner & Associates, Inc. www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 January 30, 2019 To Whom It May Concern: The Burt County Board

More information

Construction Requirements for Installation of Utilities in the Public Right-of-way of McPherson County, Kansas October 2011

Construction Requirements for Installation of Utilities in the Public Right-of-way of McPherson County, Kansas October 2011 Construction Requirements for Installation of Utilities in the Public Right-of-way of McPherson County, Kansas October 2011 General Provisions and Specifications - These provisions and specifications shall

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2018.03 EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3 The bid opening date is Thursday February 15, 2018 at 11:00 a.m. The following changes are made

More information

ADDENDUM NO. 1. 1:30 PM, Thursday, September 14, 2017 (Not Changed)

ADDENDUM NO. 1. 1:30 PM, Thursday, September 14, 2017 (Not Changed) ADDENDUM NO. 1 TO: PLANS AND SPECIFICATIONS FOR STATE OF MISSOURI Construct Range Macon Training Site Macon, Missouri PROJECT NO. T1805-01 Bid Opening Date is: 1:30 PM, Thursday, September 14, 2017 (Not

More information

Erosion and Sediment Control Plan for a Timber Harvesting Operation

Erosion and Sediment Control Plan for a Timber Harvesting Operation 3930-FM-WM0155 Rev. 7/2004 Erosion and Sediment Control Plan for a Timber Harvesting Operation 1. GENERAL INFORMATION A. Location Municipality B. Timber sale area = acres Date County C. Landowner Name

More information

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17 S&L Gravel, Section B: Proposal Page 10701.0 - TRAFFIC CONTROL - LUMP SUM 1.00 $6,425.00 $6,425.00 $6,425.00 $10,000.00 10720.0 - TRAFFIC CONTROL SIGN - PORTABLE ARROW BOARD - DAYS 25.00 $25.00 $625.00

More information

JASON COTE-WONG RESIDENTIAL SUBDIVISION AND STORMWATER PERMITTING EAST MONTPELIER, VERMONT JUNE 21, 2017 OWNER: JASON COTE-WONG

JASON COTE-WONG RESIDENTIAL SUBDIVISION AND STORMWATER PERMITTING EAST MONTPELIER, VERMONT JUNE 21, 2017 OWNER: JASON COTE-WONG OWNER: 4028 U.S ROUTE 2 05651 (802) 223-7171 JUNE 21, 2017 ENGINEER: 34 SCHOOL STREET LITTLETON, NH 03561 (603) 444-4111 EAST MONTPELIER SURVEYOR: CHASE & CHASE SURVEYORS 301 NORTH MAIN ST., SUITE 1 BARRE,

More information