1 The Formwork Experts. Safety with Formwork Doka Formwork Pte. Ltd.

2 Safety with Formwork Content: 1. Responsibilities of the Formwork suppliers 2. Formwork systems 2.1 Slab formwork 2.2 Shoring 2.3 Wall formwork 2.4 Protection screen 3. Conclusion

3 Safety with Formwork What are responsibilities of the formwork supplier:

4 Safety with Formwork Responsibility of supplier: Provide safe product & minimize risks in all areas Products: Safe formwork system Tested and certified product Integrated safety features & accessories Documentation: User Information Method statements Product Quality criteria Static calculations Document Products Training Trainings: Safety trainings on site Customer training Workshops Project- and customer oriented formwork solution What are responsibilities of the User?

5 Vertical formwork (Corewall, columns) Protection screen High shoring formwork Table lifting platforms Slab formwork The Formwork Experts. Formwork systems Doka Formwork Pte. Ltd.

6 The Formwork Experts. Slab formwork Doka Formwork Pte. Ltd.

7 Slab formwork: Conventional

8 Slab formwork: Dokamatic Tables

9 Slab formwork: Table Lifting system (TLS) The Table Lifting System TLS is used for safe, craneless vertical repositioning of Doka tableforms

10 Slab formwork: Good practice example Tie - down Guard rails Housekeeping

11 Slab formwork: Good practice example Guard rails

12 Slab formwork: Incident with the tower crane Tie - down

13 The Formwork Experts. Shoring Doka Formwork Pte. Ltd.

14 Shoring: Conventional

15 Shoring: Staxo100 towers 1. assembly battens 2. Integrated ladders 3. non-skid rungs 4. unmistakable "top and bottom, hitching point for safety harness, stamped type designation 5. Captive connection sleeve with Quickacting frame connector 6. Assembly railings

16 Shoring: Good practice example - erecting the towers in horizontal position

17 Shoring: Good practice example

18 Shoring: Good practice example

19 Shoring: Site accident

20 The Formwork Experts. Wall formwork Doka Formwork Pte. Ltd.

21 Wall formwork: Crane lifting platforms (MF240) 1 st casting 2 nd casting Fixing rebar 3 rd & typical casting

22 Wall formwork: Good practice example

23 Wall formwork: Autoclimbing platforms (SCP) Full closure Equipment storage sealed gap

24 Wall formwork: Autoclimbing platforms (SCP) Integrated safety features

25 Wall formwork: Autoclimbing platforms (SCP) Rebar installation

26 Wall formwork: Autoclimbing platforms (SCP) Prevent of falling objects C B A D Level 0, -2 A Decking B Rubber sheet C lining disc D screw all 20cm prevent the falling of small parts.

27 Wall formwork: Autoclimbing platforms (SCP) - Reference projects

28 The Formwork Experts. Protection screen Doka Formwork Pte. Ltd.

29 Protection screen Before Now

30 Protection screen Mount the portable hydraulic unit Hydraulic climbing operation Dismount the portable hydraulic unit

31 Protection screen: Reference projects

32 The Formwork Experts. Conclusion

33 Conclusion Safety features are not always appreciated

34 Conclusion Is it worth to compromise on safety? System formwork reduces risk of accidents Safety cost money No safety cost MORE MONEY!

35 For more Information

DOKA SLAB FORMWORK.

DOKA SLAB FORMWORK. DOKA SLAB FORMWORK www.doka.com Doka floor systems Dokamatic table Doka Xtra Dokaflex 1-2-4 Load-bearing towers The unbeatably fast tableform with the perfect fit The manual system with integrated removal

More information

The Formwork Experts. Capability in highrise construction. The safe way to great heights.

The Formwork Experts. Capability in highrise construction. The safe way to great heights. The Formwork Experts. Capability in highrise construction The safe way to great heights. www.doka.com A firm focus on quantifiable customer-benefit First understand, then act. The starting point for our

More information

Since it was established in 1989, with a small manufacturing base in Qwa Qwa, Uni-Span has grown to become one

Since it was established in 1989, with a small manufacturing base in Qwa Qwa, Uni-Span has grown to become one access scaffolding Since it was established in 1989, with a small manufacturing base in Qwa Qwa, Uni-Span has grown to become one of the major players in the scaffolding and formwork industry in South

More information

T-60 Shoring Robust shoring

T-60 Shoring Robust shoring T-60 Shoring Robust shoring // Fast assembled heavy-duty falsework // Table of content Features Benefits Solutions Basic components 2 3 4 7 // Features Solution for shoring requirements in Building Construction

More information

HUGE OVERSTOCK SALE 50%

HUGE OVERSTOCK SALE 50% HUGE OVERSTOCK SALE Effective from 09/01/2017 while supplies last. ROCK BOTTOM PRICING ON: Top 50 gang formwork D22 Dam brackets C8 A-Frames 8, 10, 13, 16 C8 Steel Walers T7 Spindle Struts 140 Kip Girder

More information

Tru-lift. The self lifting, core forming system from Forming Concepts Inc

Tru-lift. The self lifting, core forming system from Forming Concepts Inc Tru-lift The self lifting, core forming system from Forming Concepts Inc Features & Benefits Complete system raised during the lifting cycle, maximizing system effectiveness. Introduction Tru-lift is the

More information

INDEX. introduction 4. access scaffolding 5. selflock system 16. wall system 17. column boxes 29. slab system 31. props 36. contact details 40

INDEX. introduction 4. access scaffolding 5. selflock system 16. wall system 17. column boxes 29. slab system 31. props 36. contact details 40 PRODUCT BROCHURE INDEX introduction 4 access scaffolding 5 selflock system 16 wall system 17 column boxes 29 slab system 31 props 36 contact details 40 INTRODUCTION Augusta Manufacturing was established

More information

RAPID Column Formwork For the highest requirements on concrete surfaces and edge formation. Product Brochure Issue 10/2017

RAPID Column Formwork For the highest requirements on concrete surfaces and edge formation. Product Brochure Issue 10/2017 For the highest requirements on concrete surfaces and edge formation Product Brochure Issue 10/2017 Content System advantages 5 For the highest requirements on concrete surfaces and edge formation 8 For

More information

CIRCULAR COLUMN SK 100

CIRCULAR COLUMN SK 100 CIRCULAR COLUMN SK 100 www.variant-factory.eu 1 2 VARIANT FACTORY LTD. CIRCULAR COLUMN SK 100 Contents GENERAL INSTRUCTIONS.....................................................................................

More information

Health & Safety Policy and Procedures Manual SECTION 23 MASONRY CONSTRUCTION

Health & Safety Policy and Procedures Manual SECTION 23 MASONRY CONSTRUCTION SECTION 23 MASONRY CONSTRUCTION 1. Masonry Construction: A. Whenever a masonry wall is being constructed, a limited access zone will be established prior to construction meeting the following requirements.

More information

Bonner Bridge Replacement Update:

Bonner Bridge Replacement Update: Bonner Bridge Replacement Update: Jerry D. Jennings, PE - NCDOT Division 1 Engineer Pablo A. Hernandez, - NCDOT Resident Engineer September 18, 2017 Bonner Bridge Replacement Timeline Refresher Bonner

More information

MAXIMO MXH Heated Formwork The cost-effective solution for concreting operations at low temperatures. Product brochure

MAXIMO MXH Heated Formwork The cost-effective solution for concreting operations at low temperatures. Product brochure MAXIMO MXH Heated Formwork The cost-effective solution for concreting operations at low temperatures Product brochure Product advantages MAXIMO MXH Heated Formwork The cost-effective solution for concreting

More information

User information 10/2011. Method statement. en-gb. Dokamatic table The Formwork Experts

User information 10/2011. Method statement. en-gb. Dokamatic table The Formwork Experts 10/2011 User information 999767002 en-g Method statement Dokamatic table 9767-307-01 Introduction User information Dokamatic table tion Introduc- by Doka Industrie GmbH, -3300 mstetten 2 999767002-10/2011

More information

WILLIAM HARE LIMITED CELLSHIELD LIMITED HEALTH AND SAFETY DEPARTMENT

WILLIAM HARE LIMITED CELLSHIELD LIMITED HEALTH AND SAFETY DEPARTMENT WILLIAM HARE LIMITED CELLSHIELD LIMITED HEALTH AND SAFETY DEPARTMENT BASIC INSTRUCTION MANUAL FOR CELLSHIELD 2 SAFETY BARRIER SYSTEM WI 72 Written by Approved by Signature Date B Hughes B Hughes 17 04

More information

Mobile Towers - 3T Method

Mobile Towers - 3T Method Safety First Safety First INTRODUCTION SAFE USE Mobile Towers - 3T Method Please read this guide carefully. Please note that diagrams are for illustrative purposes only. User guides are also available

More information

CLIMA 3T. Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE

CLIMA 3T. Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE CLIMA 3T Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE Safety First Mobile Towers - 3T Method INTRODUCTION Please read this Userguide carefully. Please

More information

PERI PD 8 The cost-effective shoring for slab tables and high loads

PERI PD 8 The cost-effective shoring for slab tables and high loads PERI PD 8 The cost-effective shoring for slab tables and high loads Edition 06/2010 PERI GmbH Formwork Scaffolding Engineering P.O. Box 1264 89259 Weissenhorn Germany Tel +49 (0)7309.950-0 Fax +49 (0)7309.951-0

More information

TRITEC light Steel Panel Formwork

TRITEC light Steel Panel Formwork TRITEC light Steel Panel Formwork Perfection made in Germany Various practical illustrations of TRITEC Panel Combinations Guaranteed the largest possible range of sizes with the least possible amount of

More information

MK SYSTEM. // Pieces that can be easily assembled with minimal tools. Numerous configurations with standard components

MK SYSTEM. // Pieces that can be easily assembled with minimal tools. Numerous configurations with standard components MK SYSTEM Numerous configurations with standard components // Pieces that can be easily assembled with minimal tools // Table of contents Product description MK Systems Basic components MK SYSTEM product

More information

Contents of my presentation

Contents of my presentation 1 Design and Techniques for Safety in High Rise Buildings- Focus on Temp. Structures-Formwork Dr. Kumar Neeraj Jha Department of Civil Engineering Indian Institute of Technology Delhi Email: knjha@civil.iitd.ac.in

More information

LEWIS Miniscaff Folding Tower Assembly Guide

LEWIS Miniscaff Folding Tower Assembly Guide LEWIS Miniscaff Folding Tower Assembly Guide This document is a complete guide for the LEWIS Miniscaff Towers The user should read the entire contents of this document before commencing assembly and pay

More information

SCAFFOLDING. Scaffolding Systems. Aerial Work Platforms. Access ways

SCAFFOLDING. Scaffolding Systems. Aerial Work Platforms. Access ways SCAFFOLDING Scaffolding Systems Aerial Work Platforms Access ways 1 NAVFAC ATLANTIC June 2008 Scaffolding Fall Statistics 65% of all construction workers will use some form of a scaffolding system frequently.

More information

LAYHER ALLROUND SCAFFOLDING SHORING TG 60

LAYHER ALLROUND SCAFFOLDING SHORING TG 60 LAYHER ALLROUND SCAFFOLDING SHORING TG 60 Edition 05.2015 Ref. No. 8116.206 Quality management certified according to ISO 9001:2008 by German TÜV-CERT Allround Scaffolding LAYHER ALLROUND SCAFFOLDING THE

More information

Safety First Mobile Towers - 3T Method INTRODUCTION

Safety First Mobile Towers - 3T Method INTRODUCTION BoSS Room-Mate 3T - Through the Trap Method Safety First Mobile Towers - 3T Method INTRODUCTION Please read this guide carefully. Please note that diagrams are for illustrative purposes only. User guides

More information

LADDERSPAN 3T USER GUIDE. Mobile Aluminium Tower 1450/850 Ladderspan. 3T - Through the Trapdoor Method

LADDERSPAN 3T USER GUIDE. Mobile Aluminium Tower 1450/850 Ladderspan. 3T - Through the Trapdoor Method LADDERSPAN 3T Mobile Aluminium Tower 1450/850 Ladderspan 3T - Through the Trapdoor Method USER GUIDE Safety First Mobile Towers - 3T Method INTRODUCTION Please read this user guide carefully. Please note

More information

Climbing solutions for any geometry. Conventional climbing systems are formwork support structures used to pour high walls in several casting steps.

Climbing solutions for any geometry. Conventional climbing systems are formwork support structures used to pour high walls in several casting steps. Climbing solutions for any geometry Conventional climbing systems are formwork support structures used to pour high walls in several casting steps. CONVENTIONAL Climbing Systems CLIMBING BRACKETS To cast

More information

TERWA REBAR CONNECTION COUPLERS. CARES Technical Approval 5058 TA1B

TERWA REBAR CONNECTION COUPLERS. CARES Technical Approval 5058 TA1B EURO ACCESSORIES TERWA REBAR CONNECTION COUPLERS CARES Technical Approval 5058 TA1B www.euroacc.co.uk Introduction The Terwa Parallel Threaded Coupler is a full bar strength system (the coupling is stronger

More information

Edition Ref. No Quality management certified according to ISO 9001:2008 by German TÜV-CERT

Edition Ref. No Quality management certified according to ISO 9001:2008 by German TÜV-CERT LAYHER Allround scaffolding shoring tg 60 Edition 04.2013 Ref. No. 8116.206 Quality management certified according to ISO 9001:2008 by German TÜV-CERT Allround Scaffolding Layher Allround Scaffolding the

More information

Prepared by Andrew Panda. EXPANDA Fence System

Prepared by Andrew Panda. EXPANDA Fence System Prepared by Andrew Panda EXPANDA Fence System Index 1.Introduction Page 3 2.Background Page 4 3. Existing Fence Systems Page 5 4.Features 4.1 Packaging Page 6-8 4.2 Rubber flaps Page 9 4.3 Exclusion Zone

More information

PRODUCT BROCHURE. RMD Kwikform Hong Kong. Maxima

PRODUCT BROCHURE. RMD Kwikform Hong Kong. Maxima RMD Kwikform Hong Kong Maxima Product Overview Maxima is a robust, versatile large-panel 80kN/m² wall formwork system, with column and stripping corner add-ons providing unrivalled flexibility. Faster

More information

Economic concrete distribution with stationary booms

Economic concrete distribution with stationary booms Economic concrete distribution with stationary booms 1 MT 2059-5 GB File under: A 1.00, BP 1.03, A 4.00, BP 4.03, CPD 4.10 The MX stationary boom system a summary The factor of time is playing an increasingly

More information

BoSS Clima USER GUIDE. Mobile Aluminium Tower with Climbing Frame 1450/850. 3T - Through the Trapdoor Method

BoSS Clima USER GUIDE. Mobile Aluminium Tower with Climbing Frame 1450/850. 3T - Through the Trapdoor Method BoSS Clima Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE Edition April 2009 Safety First Mobile Towers - 3T Method INTRODUCTION Please read this guide

More information

Mounting the shell walls or VE-element consisting of two concrete panels forming permanent formwork for casting of walls

Mounting the shell walls or VE-element consisting of two concrete panels forming permanent formwork for casting of walls 31 GSA Walls Installation of concrete shell walls Mounting the shell walls or VE-element consisting of two concrete panels forming permanent formwork for casting of walls Pre-conditions Preparation Self-control

More information

Cantilever Loading Platform Erection Procedures and Guidance Notes

Cantilever Loading Platform Erection Procedures and Guidance Notes Cantilever Loading Platform Erection Procedures and Guidance Notes Please note this is a six page document. 1 Introduction 1 Issue Date: January 2007 It is essential that the procedures are read and fully

More information

Mecalux Pallet Racking Assembly

Mecalux Pallet Racking Assembly Guide to Assembly & Usage Mecalux Pallet Racking Assembly Read this Guide thoroughly before commencing assembly and retain for future reference. Installation plans and design drawings should be strictly

More information

A.R.E.S. Scaffolding. Steel Scaffolding Aluminum Scaffolding Scaffolding on Hire

A.R.E.S. Scaffolding. Steel Scaffolding Aluminum Scaffolding Scaffolding on Hire Steel Scaffolding Aluminum Scaffolding Scaffolding on Hire A.R.E.S. Scaffolding Group Companies :- Analog General Trading LLC, Dubai (www.analoggulf.com) A. R. Engineering Services, India (www.arenggservices.com)

More information

Garage Beam System DAYTONSUPERIOR.COM FORMING. For Post-Tensioned Beam and Slab Parking Structures

Garage Beam System DAYTONSUPERIOR.COM FORMING. For Post-Tensioned Beam and Slab Parking Structures Garage Beam System For Post-Tensioned Beam and Slab Parking Structures FORMING The Garage Beam System is a complete forming system designed specifically for post-tensioned beam and slab multi-story parking

More information

GRIDFLEX The flexible slab formwork with safe accessible grid elements

GRIDFLEX The flexible slab formwork with safe accessible grid elements GRIDFLEX The flexible slab formwork with safe accessible grid elements 07044 Edition 04 2011 PERI GmbH Formwork Scaffolding Engineering P.O. Box 1264 89259 Weissenhorn Germany Tel +49 (0)7309.950-0 Fax

More information

Generic HEIGHT SAFETY IN FORMWORK 16/11/2012. Built from basic generic components like planks, beams, and posts of timber, steel etc.

Generic HEIGHT SAFETY IN FORMWORK 16/11/2012. Built from basic generic components like planks, beams, and posts of timber, steel etc. Traditional using scaffold material HEIGHT SAFETY IN FORMWORK By James Tay System formwork TOKA FORMWORK Table form Generic Built from basic generic components like planks, beams, and posts of timber,

More information

FALSEWORK SOLUTIONS: SLAB SHORING SYSTEM - ROYALFRAME50 SERIES

FALSEWORK SOLUTIONS: SLAB SHORING SYSTEM - ROYALFRAME50 SERIES ROYALFRAME50 SLAB SHORING SYSTEM ROYAL FRAME 50 ROYALframe50 is a lightweight, improved alternate formwork shoring frame. It has galvanised tube legs, each with a 51mm outside diameter and a safe work

More information

PORTABLE LADDER SAFETY

PORTABLE LADDER SAFETY LADDER AND SCAFFOLD SAFETY PLAN Ladder & Scaffold Safety Falls can result in serious injury or death. Falls from a higher elevation account for approximately 10% of workplace fatalities and 5.2% of nonfatal

More information

Megashore system. Method statement

Megashore system. Method statement Megashore system Method statement Method statement Megashore system Contents Page Introduction 2 Disclaimer 2 Site safety 3 Your responsibilities 3 Safe working practice 4 Personal protective equipment

More information

CLIMA AGR. Mobile Aluminium Tower with Climbing Frames 1450/850 Camlock Advanced Guardrail USER GUIDE

CLIMA AGR. Mobile Aluminium Tower with Climbing Frames 1450/850 Camlock Advanced Guardrail USER GUIDE CLIMA AGR Mobile Aluminium Tower with Climbing Frames 1450/850 Camlock Advanced Guardrail USER GUIDE Contents Safety First Safety Checklist Quantity Schedules Assembly and Dismantling Procedure Toe Boards

More information

Allround Scaffolding

Allround Scaffolding .. Allround Scaffolding I n g e n i o u s. S t r o n g. L i m i t l e s s. Faster. Stronger. Safer. More Profitable. Introduction Layher s Allround scaffolding makes an ideal propping system: being both

More information

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

National Craft Assessment and Certification Program S P E C I F I C A T I O N S National Craft Assessment and Certification Program S P E C I F I C A T I O N S Industrial Carpentry V5 TBD Focus Statement An industrial carpenter erects concrete forms, plumb, level and to grade; places

More information

PRODUCT BROCHURE. RMD Kwikform UAE. Maxima

PRODUCT BROCHURE. RMD Kwikform UAE. Maxima RMD Kwikform UAE Maxima Product Overview Maxima is a robust, versatile large-panel 80kN/m² wall formwork system, with column and stripping corner add-ons providing unrivalled flexibility. Faster Maxima

More information

Bajaj Products.

Bajaj Products. +91-8048763600 Bajaj Products https://www.bajajpro.com/ We are designers, manufacturers & exporters of Centering,Shuttering & Staging systems (Scaffolding & Formwork). We have design based turnkey solutions

More information

PRODUCTIVITY ANALYSIS OF THE TABLE FORMWORK METHOD FOR MAKING A COST-EFFICIENT EQUIPMENT INPUT PLAN

PRODUCTIVITY ANALYSIS OF THE TABLE FORMWORK METHOD FOR MAKING A COST-EFFICIENT EQUIPMENT INPUT PLAN PRODUCTIVITY ANALYSIS OF THE TABLE FORMWORK METHOD FOR MAKING A COST-EFFICIENT EQUIPMENT INPUT PLAN J. B. Kwon, H. S. Lim, T. H. Kim, M. S. Cha, *H. H. Cho and K. I. Kang School of Civil, Environmental

More information

Smarter. Safer. Leaner.

Smarter. Safer. Leaner. Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter

More information

PERI The Service Provider We offer more than just products

PERI The Service Provider We offer more than just products PERI The Service Provider We offer more than just products The broadrange of PERI equipment and systems offer the perfect solution for every requirement. However, the PERI range of services goes far beyond

More information

Mobile Tower 3T Method (Through The Trapdoor) Please read this guide carefully. Please note that diagrams are for illustrative purposes only.

Mobile Tower 3T Method (Through The Trapdoor) Please read this guide carefully. Please note that diagrams are for illustrative purposes only. Mobile Tower 3T Method (Through The Trapdoor) INTRODUCTION Please read this guide carefully. Please note that diagrams are for illustrative purposes only. LOYAL mobile aluminium towers are light-weight

More information

PIP STF05501 Fixed Ladders Fabrication Details

PIP STF05501 Fixed Ladders Fabrication Details COMPLETE REVISION July 2018 Structural PIP STF05501 Fixed Ladders Fabrication Details PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this

More information

SAFE ERECTION AND USE OF ALUMINIUM TOWERS/SCAFFOLDS

SAFE ERECTION AND USE OF ALUMINIUM TOWERS/SCAFFOLDS SAFE ERECTION AND USE OF ALUMINIUM TOWERS/SCAFFOLDS PERSONNEL DIVISION Revised 2002 CONTENTS Page 1 INTRODUCTION 1 2 APPLICATION 1 3 ERECTION AND INSPECTION 1 4 ERECTION 1 4.1 Before erection of tower

More information

PZ HANDSET PANEL SYSTEM PAVLOS ZENONOS & SONS LTD CATALOGUE

PZ HANDSET PANEL SYSTEM PAVLOS ZENONOS & SONS LTD CATALOGUE PAVLOS ZENONOS & SONS LTD CATALOGUE VERSATILE PANELS FOR LARGE AND SMALL SCALE PROJECTS WORKING WITH HANDSET CONNECTION TOOLS PUSH & PULL PROPS FOR HANDSET PANELS WORKING WITH HANDSET COLUMN FORMWORK

More information

Formwork Direct International. Tel: Heavy Duty Panel System

Formwork Direct International. Tel: Heavy Duty Panel System Formwork Direct International Tel: 0151 532 0179 sales@formworkdirect.co.uk www.formworkdirect.co.uk Heavy Duty Panel System Product Overview The FD Max panel is a heavy duty wall formwork system capable

More information

BoSS Room-Mate. 3T - Through the Trap Method

BoSS Room-Mate. 3T - Through the Trap Method BoSS Room-Mate 3T - Through the Trap Method User Guide Edition 2: 2010 Safety First Mobile Towers - 3T Method INTRODUCTION Please read this guide carefully. Please note that diagrams are for illustrative

More information

STABILO. System Parts Facade Scaffold. Vertical Frame (Steel) Vertical Frame (Aluminium) Vertical Frame. Vertical Frame (Aluminium) (Steel)

STABILO. System Parts Facade Scaffold. Vertical Frame (Steel) Vertical Frame (Aluminium) Vertical Frame. Vertical Frame (Aluminium) (Steel) STABILO STABILO ø 48.3 x 4.0 mm Weight kg 6,0 14,0 19,0 Art.-No. 700193 700186 700179 Vario Equipped with exchangeable stabilizer Weight kg 3,5 6,0 8,0 Art.-No. 700223 700216 700209 Vario ø 48.3 x 4.0

More information

ROOM-MATE. 3T - Through the Trapdoor USER GUIDE

ROOM-MATE. 3T - Through the Trapdoor USER GUIDE ROOM-MATE 3T - Through the Trapdoor USER GUIDE Safety First Introduction Please read this user guide carefully. Please note that diagrams are for illustrative purposes only. User guides are also available

More information

Elevated Slab Sequence

Elevated Slab Sequence Elevated Slab Sequence The following group of photos shows the sequence for installa4on of a one- way elevated slab. (Slab & Beam with Reinforcing & Post- Tensioning) Columns Placed & Form Support (Scaffolding)

More information

Don t let them fall for it!

Don t let them fall for it! Don t let them fall for it! Most contracts involve working at height. This poses a risk of falling, which you can help mitigate ing protection into your project. Falling from height is the most common

More information

Low Level Access Platform

Low Level Access Platform ALTO LOW LEVEL ALTO ROOM SCAFFOLD Low Level Access Platform ISSUE 2 Instruction Manual EN 1298-IM-EN The ALTO Room Scaffold System is certified to BS 1139-6:2014 Lakeside Industries Ltd www.altoaccess.com

More information

CLIMA 3T. Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE

CLIMA 3T. Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE CLIMA 3T Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE Safety First Mobile Towers - 3T Method Introduction Please read this user guide carefully. Please

More information

Alisply Circular Headquarters - Spain Alsina USA - Chicago Alsina USA - Miami

Alisply Circular Headquarters - Spain Alsina USA - Chicago Alsina USA - Miami Alisply Circular Headquarters - Spain Encofrados J. Alsina, S.A. Camí de la Font Freda, 1 08110 - Montcada i Reixac, Barcellona - Spain Tel. +34 935 753 000 Fax. +34 935 647 059 E-mail: alsina@alsina.es

More information

BROCHURE. Steel Forming System. A durable, all-steel forming system that is ideal for pier caps and self-spanning applications. DAYTONSUPERIOR.

BROCHURE. Steel Forming System. A durable, all-steel forming system that is ideal for pier caps and self-spanning applications. DAYTONSUPERIOR. Max-A-Form Steel Forming System BROCHURE A durable, all-steel forming system that is ideal for pier caps and self-spanning applications. DAYTONSUPERIOR.COM Max-A-Form System Design The Max-A-Form Forming

More information

BoSS Climalite Camera and lighting tower

BoSS Climalite Camera and lighting tower Contents Safety First Safety First Quantity Schedules Toeboard 2 9 13 33 INTRODUCTION Please read this guide carefully. Please note that diagrams are for illustrative purposes only. User guides are also

More information

LADDERSPAN AGR. BoSS Camlock Advance Guardrail Mobile Aluminium Tower 1450/850 Frames USER GUIDE

LADDERSPAN AGR. BoSS Camlock Advance Guardrail Mobile Aluminium Tower 1450/850 Frames USER GUIDE LADDERSPAN AGR BoSS Camlock Advance Guardrail Mobile Aluminium Tower 1450/850 Frames USER GUIDE Contents Safety First Safety Checklist Quantity Schedules Assembly and Dismantling Procedure Toe Boards Stabilisers

More information

High speed and safety when forming slabs

High speed and safety when forming slabs The Formwork Magazine 1/2011 www.doka.com High speed and safety when forming slabs Supertower in China automatically climbed Page 3 Top-speed slab forming with no need for a crane Page 4 Hydraulic tunnel

More information

CRANE LOADING PLATFORMS

CRANE LOADING PLATFORMS CRANE LOADING PLATFORMS www.samsonequipment.co.uk INTRODUCTION Samson Equipment Ltd have over 50 years combined experience in the cranes and lifting industry and have drawn on this expertise to offer a

More information

Adjustable Pallet Racking Installation Guide

Adjustable Pallet Racking Installation Guide Adjustable Pallet Racking Installation Guide Read this Guide thoroughly before commencing assembly and retain for future reference. Installation plans and design drawings should be strictly adhered to.

More information

MOBILE ACCESS TOWER INSTRUCTION MANUAL SHALLOW BRACE. Incorporating the 3T method of assembly

MOBILE ACCESS TOWER INSTRUCTION MANUAL SHALLOW BRACE. Incorporating the 3T method of assembly MOBILE ACCESS TOWER Incorporating the 3T method of assembly SHALLOW BRACE INSTRUCTION MANUAL 2 INTRODUCTION This instruction manual contains all the information required to correctly assemble the OCTO

More information

USER S MANUAL HAKI PUBLIC ACCESS STAIR

USER S MANUAL HAKI PUBLIC ACCESS STAIR USER S MANUAL HAKI PUBLIC ACCESS STAIR HAKI AB 2017 Important information HAKI s product liability and user s manuals apply only to scaffolds that are entirely composed of components that have been made

More information

Span 400 Series Instruction Manual

Span 400 Series Instruction Manual Span 400 Series Instruction Manual DESIGNATION 400 400 004 3 8 2 400 400 004 3 8 8 CEN designation of this instruction manual EN 298 IM en Rev-0 WARNING NEVER STAND ON AN UNGUARDED PLATFORM SAFE WORKING

More information

Heavy-Duty Braces Triplex Assembly and Operating Instructions

Heavy-Duty Braces Triplex Assembly and Operating Instructions Heavy-Duty Braces Triplex Assembly and Operating Instructions Product features and use How to read this manual Triplex is a heavy duty brace (three chords) to align and brace formwork with heights exceeding

More information

Method Statement Concrete Support Systems

Method Statement Concrete Support Systems Method Statement Method Statement Concrete Support Systems Introduction Concrete Support Systems is renowned as one of the leading manufacturers and suppliers of equipment to the construction and civil

More information

Imperial. folds. Wall braces are attached to the multifunction. guard-railing post. Formworkprop. connectors and flange screws.

Imperial. folds. Wall braces are attached to the multifunction. guard-railing post. Formworkprop. connectors and flange screws. Wall all braces / Working scaffolds folds Wall braces are attached to the multifunction profiles by formwork-prop connectors and flange screws. guard-railing post brace frame 250 consists of push-pull

More information

Span 400 Instruction Manual

Span 400 Instruction Manual Span 400 Instruction Manual DESIGNATION SPAN 400 Double Width EN 004 3 8/2 XXCD SPAN 400 Single Width EN 004 3 8/8 XXCD CEN designation of this instruction manual EN 298 IM en Rev-00 WARNING NEVER STAND

More information

Miami Marlins Baseball Park

Miami Marlins Baseball Park Miami Marlins Baseball Park Roof Support Track Beams Construction by Incremental Lifting Project Owner Miami Dade County General Contractor Hunt-Moss JV Frame Contractor Formworks-Baker Concrete JV Engineer

More information

PRESENTATION PLAN A MODEL COMPARISON FLOOR CONSTRUCTION

PRESENTATION PLAN A MODEL COMPARISON FLOOR CONSTRUCTION PRESENTATION PLAN A MODEL COMPARISON FLOOR CONSTRUCTION An overview of costing strategies for wood framed construction elements CREATING A PROJECT ENDLESS POSSIBILITIES COMPATORS LIST A FLOOR Cast in Place

More information

Dr. Ahmed Hussien Elyamany 2017 Questions

Dr. Ahmed Hussien Elyamany 2017 Questions Questions Question 1 (25 Marks): Select the best answer from the available choices for each of the following: 1. Cranes may be used for 2. cranes consist of a carrier and superstructure equipped with a

More information

MiniMax USER GUIDE. Mobile Aluminium Trade Quality Access Tower System. 3T - Through The Trapdoor Method

MiniMax USER GUIDE. Mobile Aluminium Trade Quality Access Tower System. 3T - Through The Trapdoor Method MiniMax Mobile Aluminium Trade Quality Access Tower System 3T - Through The Trapdoor Method USER GUIDE Contents Safety First Component Diagram Component Quantity & Safety Data Schedule Build Method Pre-use

More information

Aluma EasySet Continuing Innovation from Aluma S ystems

Aluma EasySet Continuing Innovation from Aluma S ystems Product Sheet Aluma EasySet Aluma Systems Concrete Construction Aluma EasySet Continuing Innovation from Aluma S ystems Introduction With more than 35 years of experience in shoring and formwork, Aluma

More information

05 Roofing, Roof Fabric & Roof Safety

05 Roofing, Roof Fabric & Roof Safety 05 Roofing, Roof Fabric & Roof Safety Version Date Authors Summary of Changes 1.1 9 January 2011 Barry Owers 1.2 8 February 2012 Solomon Elijah Section and Numbering amended 1.3 27 February 2012 Barry

More information

distribution Modular Scaffolding

distribution Modular Scaffolding Modular Scaffolding Modular scaffolding PDM Universal scaffolding system plettac-pl PDM Application A characteristic feature of plettac PDM system is the use of wedge joint which provides quick and safe

More information

COCO PALMS SITE SAFETY PRACTICES WORK AT HEIGHT SAFETY

COCO PALMS SITE SAFETY PRACTICES WORK AT HEIGHT SAFETY COCO PALMS SITE SAFETY PRACTICES WORK AT HEIGHT SAFETY Project Brief: Project Scale : 12 blocks / 12 to 16 storeys building with 2 basement car parks Total Units Site Area : 944 Units, 6 Ancillary Commercial

More information

A.R.E.S. Scaffolding. Steel Scaffolding Aluminum Scaffolding Scaffolding on Hire. "Commitment to Excellence"

A.R.E.S. Scaffolding. Steel Scaffolding Aluminum Scaffolding Scaffolding on Hire. Commitment to Excellence Aluminum Scaffolding Scaffolding on Hire A.R.E.S. Scaffolding Group Companies :- Analog General Trading LLC, Dubai (www.analoggulf.com) A. R. Engineering Services, India (www.arenggservices.com) Phone

More information

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- STRUCTURAL

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- STRUCTURAL SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- STRUCTURAL 3300 SUMMIT BOULEVARD WEST PALM BEACH, FLORIDA 33406 TEL (561) 688-7687 FAX (561) 688-7654 http://www.palmbeach.k12.fl.us/fm/bd/index.htm

More information

In This Document. Scaffolds Lesson Plan. Overview

In This Document. Scaffolds Lesson Plan. Overview Scaffolds Lesson Plan Sample Lesson Plan In This Document Construction Training Program (10-hour) Planning the Lesson Presenting the Lesson Overview Evaluate Student Learning When OSHA revised its scaffolds

More information

Walco Equipment has grown into a successful Canadian manufacturing & distribution Company.

Walco Equipment has grown into a successful Canadian manufacturing & distribution Company. WALCO CARGO CONTROL COMPONENTS WINCHES H.D. Small Frame ------Page 1 Portable-----------------Page 1 Loose Frame -----------Page 1 Weld-on ----------------Page 1 Low Profile -------------Page 2 Three Bar

More information

CAC Meeting Construction Update April 8, 2014

CAC Meeting Construction Update April 8, 2014 CAC Meeting Construction Update April 8, 2014 Period Summary There have been over 1,000,000 craft hours completed, excluding demolition, through March 31, 2014. An increase of nearly 50,000 hours since

More information

Rosette Modular Scaffolding System

Rosette Modular Scaffolding System Rosette Modular Scaffolding System The rosette modular security scaffolding system to be used in facades, has been produced in accordance with the structural design conditions stated by the following applicable

More information

BoSS. Mobile Aluminium Tower 1450/850 Ladderspan. 3T - Through the Trapdoor Method

BoSS. Mobile Aluminium Tower 1450/850 Ladderspan. 3T - Through the Trapdoor Method BoSS Mobile Aluminium Tower 1450/850 Ladderspan 3T - Through the Trapdoor Method USER GUIDE Edition November 2011 Safety First Mobile Towers - 3T Method INTRODUCTION Please read this guide carefully. Please

More information

Construction Technology for Tall Buildings

Construction Technology for Tall Buildings Construction Technology for Tall Buildings (3rd Edition) This page intentionally left blank Construction Technology for Tall Buildings (3rd Edition) CHEW Yit Lin, Michael Department of Building National

More information

1 Exam Prep Prov Module: Vertical Formwork Questions and Answers

1 Exam Prep Prov Module: Vertical Formwork Questions and Answers 1 Exam Prep Prov Module: 27308-14 Vertical Formwork Questions and Answers 1. The amount of formwork needed for a job can be influenced by. A. The size of the forming crew B. The project budget C. Materials

More information

CARPENTER STATUTORY DECLARATION OF WORK EXPERIENCE

CARPENTER STATUTORY DECLARATION OF WORK EXPERIENCE To qualify to challenge certification in this trade or be granted authority to supervise and sign-off on apprentices in this trade, individuals must have: worked a minimum of 9,720 hours performing the

More information

WORKING AT HEIGHT. The company will comply with the Work at Height Regulations 2005, its schedules and Codes of Practice.

WORKING AT HEIGHT. The company will comply with the Work at Height Regulations 2005, its schedules and Codes of Practice. WORKING AT HEIGHT The company will comply with the Work at Height Regulations 2005, its schedules and Codes of Practice. Principally this means that we comply with the hierarchy of risk in that we shall:

More information

TERWA REBAR CONNECTION COUPLERS

TERWA REBAR CONNECTION COUPLERS TERWA REBAR CONNECTION COUPLERS CARES Technical Approval 5058 TA1B Introduction The Terwa Parallel Threaded Coupler is a full bar strength system (the coupling is stronger than the associated rebar, sometimes

More information

Alisply-M Walls (Handset)

Alisply-M Walls (Handset) Alisply-M Walls (Handset) Product brochure Encofrados J. Alsina S.A. Pol. Ind. Pla d en Coll Camí de la Font Freda, 1 08110 Montcada i Reixac (Barcelona - Spain) Tel.: (+34) 935 753 000 Fax: (+34) 935

More information

Safety First Mobile Towers - 3T Method

Safety First Mobile Towers - 3T Method USER GUIDE Edition Aug 2011 MiniMax Mobile Aluminium Trade Quality Access Tower System 3T - Through the Trapdoor Method Safety First Mobile Towers - 3T Method INTRODUCTION Please read this guide carefully.

More information

Safety First Mobile Towers - 3T Method INTRODUCTION

Safety First Mobile Towers - 3T Method INTRODUCTION Safety First Mobile Towers - 3T Method INTRODUCTION Safety First SAFE USE BoSS Mobile Aluminium Tower 1450/850 Ladderspan 3T - Through the Trapdoor Method Please read this guide carefully. Please note

More information

ADMINISTRATIVE BULLETIN

ADMINISTRATIVE BULLETIN 2013 SAN FRANCISCO BUILDING CODE AB-023 ADMINISTRATIVE BULLETIN NO. AB-023 : DATE : January 2009 (Updated 01/01/14 for code references) [This bulletin supersedes AB-023, dated September 18, 2002, revised

More information