1 Technical Instruction Manual

2 Product features EcoAs is a small-sized, versatile and adaptable formwork system and most suitable for contractors involved in structural and civil engineering projects. EcoAs is particularly economical in areas which are still formed using traditional timber shutters, such as strip footings, bucket and block foundations, light shafts, various beams, landings, drain shafts and the like. The EcoAS panels can be transported and assembled manually. The system s tie hole locations are suited to form all kinds of foundations even with joint tapes involved or kickers cast in advance. A fast and safe panel connection is achieved with just one part the EA assembly lock. Weighing only 1,5 kg, it can be attached with only one hand at any position on the frame between the cross stiffeners. A solid and safe connection with a perfect alignment is achieved with a few hammer blows. An improved protection against rust and corrosion is achieved with the annealed powder coating. This prolongs the life span and considerably reduces cleaning efforts. The proven alkus all-plastic facing made of polypropylene and aluminium offers the advantages of plywood facing such as nailability while avoding the plywood facing s disadvantages such as shrinking. The alkus lasts as long as the frame, it is easier to clean and repair than plywood and fully recyclable. The MEVA multi-function profiles with weld-in Dywidag-threaded nuts facilitate the attachment of all accessory parts, e.g. Push-pull props and alignment rails are attached with flange screws. Scaffolding brackets are quickly attached with integrated selflocking pins. Problem areas can be bridged with Dywidag tie rods of any length. The location of tie holes does not matter. Material planning with EcoAs is easy to do, there is no need to have many parts on stock and no need to search for various parts. The maximum admissisble fresh concrete pressure of the EcoAs frame formwork system is 50 kn/m². The fresh concrete pressure on plumb-vertical formwork is easy to calculate using the calculator that can be downloaded from Make sure to observe the German Industrial Standard DIN 18218: when calculating the pressure. Abbreviations, measurements, decimal numbers, figures and tables The abbreviation EA is used for the EcoAs system. DIN means Deutsche Industrie-Norm (German Industrial Standard). E DIN (E = Entwurf / draft) means that the DIN is in draft status and not yet approved of. Any further abbreviations are explained where they are used the first time. TÜV means Technischer Überwachungsverein. This is the independent German organisation that tests the safety of technical installations, machinery and motor vehicles. If a product passes the test, it is permitted to carry the GS seal. GS stands for Geprüfte Sicherheit (approved safety). Measurements: This manual uses the metric system and thus m (for metre), cm (for centimetre) and mm (for millimetre). Dimensions without a measure are in cm. Decimal numbers: Note that the comma is used in decimal numbers, e.g. 1,5 means 1 and a half. The page numbers in this manual start with EA. The figures and tables are numbered per page. Depending on its product abbreviation, a cross reference in the text refers to a page, table or figure in this or in another manual. Updated 6 July 2012 EA 2

3 Please observe Contents This Technical Instruction Manual contains information, instructions and hints describing how to use the MEVA equipment on the construction site in a proper, quick and economic way. Most examples shown are standard applications that will occur in practice most often. For more complicated or special applications not covered in this manual, please contact the MEVA experts for advice. When using our products the federal, state and local codes and regulations must be observed. Many of the details shown do not illustrate the wall formwork system in the ready-to-pour condition as to the aforementioned safety regulations. Please adhere to this manual when applying the equipment described here. Deviations require engineering calculations and analysis to guarantee safety. Please observe the assembly instructions that your local contractor or employer has created for the site on which the MEVA equipment is used. Such instructions are intended to minimise site-specific risks and must contain the following details: The order in which all working steps including assembly and disassembly must be carried out The weight of the panels and other system parts The type and number of ties and braces as well as the distance between them The location, number and dimensions of working scaffolds including working area and protection against falling down Pick points for panel transport by crane. With regard to panel tranport, please observe this manual. Any deviation will require a static proof. Important: Generally, only well maintained material may be used. Damaged parts must be replaced. Apply only original MEVA spare parts for replacement. Attention: Never wax or oil assembly locks. The EcoAs panel...4 The alkus all-plastic facing...6 Panel connection...7 Tie holes...9 Rate of placing...10 Flatness of surface...11 Attachment of accessories...12 Wall braces...13 Working scaffolds...14 Fall-down protection / Support 800 for guard-railing post...15 Crane hook...16 Inside corner Outside corner 90 Alu(minium)...18 Hinged corners...19 Length compensation...21 T-wall connection...22 Connection to existing walls...23 Stop ends...24 Wall offset...25 Pilasters...26 Differences in height...27 Panels in horizontal position...28 Substitution of ties...29 Height extension...30 Crane-ganging...33 Column formwork...34 Multi-purpose panel...35 Corner solutions with multi-purpose panels...36 Formwork assembly and stripping...37 Transport...41 Service...42 Product List...43 EA 3

4 The EcoAs panel Fig. 4.2 The steel frames are made of closed hollow profiles and welded in mitred joints. The profiles are provided with a groove and an edge protection. Fig. 4.3 Panel connection with the EA assembly lock (see p. EA 7) Fig mm 23 mm Fig. 4.4 Weld-in DW 15 nut for the fast and solid attachment of accessories (see p. EA-12) Fig. 4.3 Fig. 4.5 Cross stiffeners made of closed and solid steel profile Fig. 4.6 Tie hole with conical sleeve for the easy attachment of tie rods (see p. EA-9). Fig. 4.4 Fig. 4.7 Transport hole for the attachment of lifting devices. Allows fast loading and unloading as well as transport of panel stacks near ground level Fig mm Fig. 4.1 EcoAs panel 300/100 Fig. 4.6 Fig mm EA 4

5 EcoAs The EcoAs panel The EcoAS frame formwork is available with heights 300, 240, 160 and 120 cm (Fig. 5.1). ea ava.pdf St. 06/07/12 Printed in Germany Fig. 5.1 Height selection EA 5

6 The alkus all-plastic facing The proven alkus allplastic facing made of polypropylene and aluminium (Fig. 6.3) offers the advantages of plywood facing such as nailability while avoiding the plywood facing s disadvantages such as shrinking. The alkus lasts as long as the frame, it is easier to clean and repair than plywood and fully recyclable. Frame profile with plywood facing Frame profile with alkus facing Besides the obvious advantages, such as considerably reduced cleaning effort, minimum consumption of release agent and an excellent concrete finish, alkus offers substantial ecological benefits. Substituting plastic for wood saves valuable timber resources and puts an end to the highly toxic dioxin which is released in the process of burning plywood that is bonded with phenolic resin. Fig. 6.1 Negative imprint in the concrete when using panels with conventional plywood facing Fig. 6.2 Smooth and even concrete surface as there is no projecting profile of the panel frame Used or damaged alkus facing can be recycled into the same product. It is 100 % recyclable, and the manufacturer guarantees reacceptance. Plastic layer Metal or fibres Foamed plastic core Metal or fibres Plastic layer Fig. 6.3 Layers and material of the alkus all-plastic facing EA 6

7 Panel connection The fast and efficient connection of the panels is accomplished with the EA assembly lock (Fig. 7.1) no matter if the panels are assembl ed side by side or on top of each other. The assembly lock can be attached anywhere at the frame between the cross stiffeners and connects the panels solidly. Weighing only 1,5 kg, the assembly lock can easily be attached with only one hand. Vertical panel connections require three assembly locks for panel height 300 cm, and two assembly locks for panel heights 240, 160 and 120 cm. If walls are to be poured with architectural concrete of the SB3 type (*), an additional assembly lock is required per panel joint for formwork that is 240 cm high or higher. (*) The German category SB3 refers to architectural concrete with a high surface quality used for highly decorative building parts, e.g. facades of high-rise buildings or inside walls. Fig. 7.1 Horizontal panel connections always require two assembly locks. For the number of assembly locks required for outside corners and columns refer to p. EA-18 und p. EA-34. EA assembly lock EA 7

8 Panel connection The EA assembly lock is attached between the cross stiffeners anywhere on the panel frame. Its 5-point contact does not only draw the panels together but also aligns them. With only a few hammer blows a safe connection and a perfect alignment are achieved (Fig. 8.1 through 8.4). = 5 point contact Fig. 8.1 and 8.2 show the frame profile of EcoAs panels with single groove while Fig 8.3 and 8.4 show the frame profile of EcoAs panels with double groove. Fig. 8.1 Fig. 8.2 Fig. 8.3 Fig. 8.4 EA assembly lock EA 8

9 Tie holes The conical anchor sleeve (Fig. 9.1) for the insertion of tie rods DW 15 is welded inside the panel frame. 21 mm The formwork can be inclined up to 5 cm per metre or by 3. Inclined formwork requires articulated flange nuts and must be secured against uplift. Fig. 9.1 Conical anchor sleeve 24 mm The articulated flange nut can be tightened with a hammer (Fig. 9.2). In order to avoid material damage and for the ease of use, we recommend using a spanner SW 27 when tightening or loosening the articulated flange nut 15/120 (Fig. 9.3). Fig. 9.2 Correct Wrong When connecting panels with different widths, the ties should always be placed through the panel with the larger width (Fig. 9.4). Fig. 9.3 Always use all tie holes, i.e. all usable tie holes must be used for tieing and non usable tie holes be closed with plug D20. Tie claw 23 Fig. 9.4 Outside the frame, panels can also be tied with tie claw 23 (Fig. 9.5 und 9.6) See p. EA 29 for further tieing opportunities. Tie rod 15/ Flange nut Articulated flange nut 15/ Plug D Tie claw Spanner SW Fig. 9.5 Fig. 9.6 EA 9

10 Rate of placing Rules for placing concrete based on the values shown on this page According to DIN 4235, concrete should be placed in layers, the thickness of which can vary from 0,50 to 1,00 m. Concrete must not be placed at free fall from heights of 1,50 m or higher. When vibrating the concrete, which is done layer by layer, the vibrator must not penetrate more than 0,50 m into the layer below. A final vibrating over the overall concrete height is not permitted. Since concrete that has been vibrated once cannot be compacted any further, a final vibrating would not provide any advantage but may result in water bubbles (shrinkage cavities) on the concrete surface. Specific values of tie rods DW 15 Dywidag (DW) tie rod 15 d1 (mm) 15 d2 (mm) 17 Nominal cross section in mm² 177 Admissible working load in kn according to DIN Tie rod elongation in mm/m when using the admissible working load Table 10.1 Walls up to 2,40 m Concrete can be poured without considering the pouring rate. Walls higher than 2,40 m The maximum admissible rate of placing can be precisely determined acording to DIN 18218: by using a calculation programme or by observing the rate of placing shown in Table The values in this table can only be used if the end of setting of concrete t E is known (i.e. the time the concrete needs in order to completely set). The end of concrete setting can be determined by using MEVA s ultrasonic measuring device USM, with the kneadbag test acccording to DIN 18218: or by asking the concrete supplier. Note Table 10.2 shows the recommended rate of placing that according to DIN 18218: is compatible with the fresh concrete pressure and applicable when using tie rod DW 15 together with the articulated flange nut 15/ ,5 Rate of placing The maximum admissible rate of placing can be precisely determined acording to DIN 18218: by using the online caculator available in the download area of www. meva-international.com Maximum rate of placing v b (depending on the consistency and end of setting of concrete t E )* in m/h EcoAs (50 kn/m²) t E =5h t E =7h t E =10h t E =15h Consistency range F3 2,29 1,81 1,29 0,73 F4 1,94 1,30 0,73 0,23 F5 0,83 0,60 0,42 0,23 F6 0,66 0,47 0,33 0,22 SCC 0,76 0,54 0,38 0,25 Table 10.2 * According to DIN 18218: (fresh concrete pressure on plumb-vertical formwork) t E = End of setting of concrete v b = Maximum rate of placing EA 10

11 Flatness of surface The admissible deflection of formwork parts is defined in DIN Ebenheitstoleranzen (flatness tolerances), table 3, lines 5 through 7 (Table 11.1). There, the maximum admissible deflection is laid down in relation to the distance between the measuring points. The admissible fresh concrete pressure that is in line with the flatness tolerances as defined in DIN 18202, table 3, line 6 is 50 kn/m² for EcoAs. DIN 18202, Table 3 Column Distances as critical value in mm for distances between measuring points in m up to Line Reference 0,1 1* 4* 10* 15* 5 Not exposed walls and undersides of slabs Exposed walls and undersides of slabs, e.g. plastered walls, paneling, suspended ceiling Like line 6, but with increased requirements Table 11.1 * Interim values can be found in fig Round up found values to full mm. The measuring lath is placed on the highest protruding points of the surface and the deflection is measured at the deepest point inbetween. Tolerances of deflection of walls and undersides of slabs (according to DIN 18202, Table 3)) The distance between measuring points is the distance between the highest protruding points. Tolerances Line 5 Line 6 Line 7 Fig Distance between measuring points EA 11

12 EcoAs Attachment of accessories All panels are provided with multi-function profiles. Dywidag threaded nuts are welded inside the profiles (Fig. 12.1, 12.4 and 12.5). The difference be tween multi-function profiles and cross stiffeners is that accessories can be attached to the multifunction profile. Scaffolding brackets are provided with selflocking pins (Fig. 12.2). They are attached to the multi-function profile and can be secured with a flange screw 18. Fig Fig Alignment rails can be used when lifting large panels gangs with a crane or in order to bridge problem areas or brace panel units in compensation areas. The alignment rails are attached with flange screws to the multi-function profiles. Formwork can be set plumb by using a push pull prop that is attached to the panel with a form work-propconnector as shown in Fig Fig Fig EA 12 ea ava.pdf St. 06/07/12 Printed in Germany Fig. 12.3

13 Wall braces Push-pull props and brace frames These wall braces are attached to the multi function profiles with formwork prop connectors 18 (Fig. 13.1). Formwork-prop connector x If they are used to align wall formwork, we recommend a max. brace spacing of 4,00 m. For transfer of wind loads a max. spacing of 2,50 m is recommended. For further applications contact our application engineering department. Horizontal spacing (x) of push-pull props / brace frames For alignment of the formwork For transfer of wind loads Max. 4,00 m Max. 2,50 m Please note Wall braces and push pull props must be anchored to the ground by using foot plates and dowels. Before anchoring the formwork to the ground, the properties of the ground and the rating of the dowels or nails must be verified according to the federal, state and local codes and regulations. Observe any regulations that apply when working with high walls. The formwork height and the length of the push-pull props should be identical. The angle shown in Fig should be max. 60 degrees. Fig Adjustment range (m) Adm. pressure (kn) Formwork-prop connector Adm. tension (kn) Max. 60 Weight (kg) Push-pull prop / Brace frame Recommended use Braces SRL SRL ,90 1,50 20,0 30,0 8,3 Horizontal alignment of the bottom formwork, brace frame 250, climbing formwork SRL ,20 2,20 25,0 40,0 10,5 Folding shaft formwork Push-pull props R Brace frame 250 with formworkprop connector Brace frame 250 without connector Flange screw R ,35 2,00 25,0 25,0 11,0 Horizontal and vertical alignment R ,90 3,20 25,0 30,0 18,5 Upper prop of brace frame 250 for formwork up to 4,05 m R ,40 5,20 20,0 30,0 35,8 Wall formwork up to 6,00 m R ,10 7,60 9,5 25,0 67,8 Wall formwork up to 9,00 m Table 13.2 EA 13

14 Working scaffolds Scaffolding bracket The pluggable scaffolding bracket 90 or 125 (Fig. 14.2) is suspended to the Dywidagthreaded nut of the multi-function profile by turning the scaffold bracket by 45, then turning it back to vertical position and securing it with a flange screw 18. The planks can be bolted to the brackets. The max. bracket spacing for an admissible load of 150 kg/m² (scaffold group 2) is 2,50 m (in accordance with DIN 4420). The minimum plank thickness is 4,5 cm. Guard-railing post It is plugged into the scaffolding bracket (Fig and 14.4) When using scaffold tubes as a fall-down protection, guard-railing post 48/120 is installed. This guard-railing post consists of a round pipe (dia. 48 mm) to which scaffold couplers are attached, and of a rectangular adapter which is plugged into the scaffolding bracket (Fig. 14.5). Note The minimum cross section of the handrail and midrail is: 15 x 3 cm for a post distance of up to 2,00 m 20 x 4 cm for a post distance of up to 3,00 m (Fig. 14.1). Working scaffold according to DIN 4420, Part 1 and Sheet 8 10/01 of the Bauberufsgenossenschaft (German Professional Construction Association) 100 ± Fig Handrail, min. 15 x 3 Midrail, min. 15 x 3 Toe board, min. 10 x 3 Planking width 30 Lateral protection If the fall height exceeds 2,00 m, a lateral protection (Fig. 14.5) consisting of handrail, midrail and toe board is required. Fig Scaffolding bracket 90 or 125 Lateral protection Scaffolding bracket Guard-railing post UK Side railing 90/ / Swivel-joint coupler 48/ Scaffold tube 48/ / / Fig Guard-railing post 100 or 140 Fig Guard-railing post 48/120 UK Fig Lateral protection EA 14

15 Fall-down protection / Support 800 for guard-railing post A fall-down protection must also be installed opposite the working scaffold for heights from 2 m onwards. A flange screw 18 and a guard-railing post per support must be ordered separately. Guard-railing posts are connected as follows: MEVA guard-railing post 100, 140 or 48/120 UK Square guard-railing post 40 by 40 mm The support 800 for guard-railing posts (Fig. 15.1) is used to install the opposite fall-down protection in combination with any MEVA wall forrmwork. The support is suspended over the frame profile of the wall formwork panel and secured with a flange screw 18 (Fig. 15.2). The MEVA guard-railing posts 100, 140 and 48/120 UK as well as square guard-railing posts sized 40 by 40 mm can be connected to the support. The guard-railing posts are automatically tilted by 15 (Fig. 15.2) to make more room for concrete buckets. The toe board is attached to the clamp in the front. Boards sized 150 by 30 mm are used as midrails and handrails. Guard-railing post Fig Toe board support Guard-railing post Support 800 for guard-railing post Flange screw 18 Scaffolding bracket Support 800 for guard-railing post Guard-railing post /120 UK Flange screw Fig EA 15

16 Crane hook The admissible load of an EA/ML crane hook (Fig. 16.1) is 600 kg. Handling 1. Open the safety lever as far as possible. 2. Push the crane hook over the panel profile until the claw engages completely in the groove. 3. Let go of the safety lever and it will go back to its start position and lock the crane hook. Check that the crane hook is locked before using the crane hook. Important handling notes When moving panels, make sure to always use 2 crane hooks, also when moving single panels (Fig and 16.4). When moving horizontal panels, the crane hooks must always be attached at the cross stiffeners (Fig. 16.3). When moving panel gangs, make sure each crane hook is attached at a panel joint (Fig. 16.5). This avoids displacement of the crane hooks. Safety check Always check the crane hook before using it. Do not overload the crane hook. Overloading causes damage. A damaged crane hook is not capable of full load and its safe use can no longer be guaranteed. Safety regulations When using our products, the federal, state and local codes and regulations must be observed. Also observe the operating instructions delivered with the crane hook. Max. 60 Fig Fig Fig Max. 60 Reference dimension: 24 mm When to replace the crane hook If the reference dimension exceeds 24 mm, the crane hook must be replaced immediately. The crane hook must also be displaced if only one side of the hook exceeds the reference dimension (Fig. 16.2). EA/ML crane hook Fig Fig Max. 60 EA 16

17 Inside corner 90 The EcoAs inside corner is equipped with the alkus all-plastic facing. Like standard panels, the inside corner is connected with EA assembly locks (Fig and page EA-7). Each corner side is 25 cm long (Fig. 17.2). Gaps on the inside of the corner can be bridged using a filler or timber (Fig and 17.4). The filler (Fig. 17.4) is 5 cm wide. The connection is achieved with Uniassembly locks and an AS alignment rail must be attached at each tie hole level for stabilisation (Fig. 17.3). Fig Fig Filler or timber EA inside corner AL 300/25 Alu AL 240/25 Alu AL 160/25 Alu AL 120/25 Alu Uni-assembly lock Filler 240/ / Fig Fig EA 17

18 Outside corner 90 Alu(minium) The EA outside corner has a 5 cm wide facing on both sides and an integreated chamfer strip (Fig. 18.1). It is made of alu minium with annealed plastic coating. Together with EA panels and EA asssembly locks, the EA outside corner provides a solid solution for 90 outside corners. (Fig and 18.3). The number of the required assembly locks depends on the height of the outside corner, see Fig and positions a through c. Corner height 160 cm The connection between outside corner and adjacent panel requires 3 assembly locks per height (a). Two assembly locks are required for all other panel joints (b, c). Corner height 120 cm The connection between outside corner and adjacent panel (a) as well as all other panel joints require 2 assembly locks per height (b, c). Fig WT Panel width 1 Panel width 1 = wall thickness (WT) + 20 cm Corner height 300 cm The connection between outside corner and adjacent panel requires 4 assembly locks per height (a). Four assembly locks are required at the panel joint between 1st and 2nd panel (b) and 3 assembly locks at all other panel joints (c). Fig Corner height 240 cm The connection between outside corner and adjacent panel requires 4 assembly locks per height (a). Three assembly locks are required at the panel joint between 1st and 2nd panel (b) and 2 assembly locks at all other panel joints (c). EA outside corner 300 Alu Alu Alu Alu c c b Fig Height 300 cm a a b c c EA 18

19 Hinged corners Acute and obtuse angled corners are form ed using hinged inside corners and hinged outside corners. The outside corner requires alignment rails to be attached to the multi-function profiles with flange screws (Fig and 19.2). Uni assembly lock 22 Timber filler Alignment rails with bolt M18x100 Hinged outside corner Hinged inside corner If the inside angle is larger than 100, a wooden blocking and alignment rails must be used on the inside (Fig. 19.1). Timber fillers and Uniassembly locks 22 are used for length compensation. Uni assembly lock 22 Timber filler Fig >100 Additional wooden blocking Alignment rails with bolt M18x100 Hinged outside corner Side length Outside corner 7,5 cm Inside corner 30 cm Adjustment range 60 to Hinged inside corner Min. 60 Fig EA hinged corner inside 120/ inside 240/ outside outside Uni assembly lock EA 19

20 Hinged corners We recommend attaching the alignment rail with flange screws before installing the tie rods (Fig. 20.1). The required timber fillers depend on the wall thickness, inside angle and panel width. See Table Panel Bolt M18x100 Hinged outside corner Hinged inside corner Timber filler with Uni-assembly lock y = panel width E1 plus required timber filler Inside angle α Fig WT WS Equation to calculate width y = + 22,5 [cm] α tan 2 Wall thickness (WT) in cm Inside angle α y in cm Panel width E1 Required timber filler Job-built compensation 25,0 22,5 1,8 0 5,0 0 5,0 0 5,0 0 10,0 0 5, Job-built compensation 25,0 22,5 3,2 0 5,0 0 5,0 0 5,0 0 10,0 0 5, Table Job-built compensation 25,0 22,5 10,3 0 5,0 0 5,0 0 5,0 0 10,0 0 5,0 0 EA 20

21 EcoAs Length compensation Timber filler Gaps up to 17 cm can be formed on site by using timber fillers and Uni-assembly locks 22. Compensation areas are reinforced with alignment rails (Fig and 21.2). Fig Up to 17 cm Compensation plate It is used for compensations from 6 to 20 cm and attached to the panel with 2 EA assembly locks. Alignment rails must be used for bridging and reinforcement (Fig through 21.5) Uni assembly lock 22 < 70 cm Fig Fig to 20 cm Fig Tie rod DW 15 ea ava.pdf St. 06/07/12 Printed in Germany Alignment rail EcoAs panel Uni assembly lock Compensation plate Fig EA compensation plate 120/ EA 21

22 T-wall connection Fig through 22.5 show a T-wall connection using 2 inside corners. Different wall widths can be compensated as follows: widths from 6 to 20 cm with the EA compensation plate and EA assembly lock (Fig. 22.4) widths up to 17 cm with timber filler and Uni assembly lock 22 (Fig. 22.5) Fig Standard panel Admissible span depends on alignment rail (see p. EA 26) Timber filler Fig Fig EA inside corner AL 300/25 Alu AL 240/25 Alu AL 160/25 Alu AL 120/25 Alu Uni assembly lock EA compensation plate 120/ to 20 cm Compensation plate with EA assembly lock Fig Up to 17 cm Timber filler with Uni-assembly lock 22 Fig EA 22

23 Connection to existing walls Fig through 23.7 show some options for connecting formwork to an existing wall. Depending on the wall layout and conditions on the construction site, the most suitable solution may vary from site to site. Make sure the formwork is tightly attached to the existing wall to avoid a leakage of the fresh concrete and a patchy concrete surface. Wooden blocking (as thick as panel) Existing tie hole Fig Fig Panels with different lengths For connections to an existing wall or for the next cycle using the multi-purpose panel see Fig and 23.7 and refer to p. EA-35. Fig Hexagonal nut with counter plate The alignment rail is attached by tieing through an existing tie hole and used to press the formwork against the existing wall Fig Fig Connection for next cycle with multi-purpose panel (MPP) Connection to existing wall with multi-purpose panel (MPP) MPP MPP Fig Fig MPP MPP EA 23

24 Stop ends Stop ends can be formed as follows: either with a stop end fixture (Fig and 24.2) or with outside corners and standard panels (Fig and 24.4). Two stop end fixtures with different lengths are available: stop end fixture 23/40 for walls widths up to 35 cm stop end bracket 2,5-60/23 for wall widths up to 75 cm One brace is required per tiel hole level. When forming stop ends with outside corners and standard panels, panels that are wider than 50 cm require an additional bracing (Fig and 24.4). One brace is required per tiel hole level. Fig Fig Panel width max. 50 cm up to first tie hole Stop end fixture 23/ Stop end bracket 2,5 60/ EA outside corner 120 Alu Alu Alu Alu Fig Stop end with EA oustide corner and additional bracing Fig Stop end with EA outside corner without additional bracing EA 24

25 Wall offset Wall off sets up to 8 cm are formed by moving back the corresponding panel (Fig and 25.4). For offsets of 8 or more centrimetres, inside corners should be used (Fig. 25.2, 25.3, 25.5 and 25.6). Detail A Up to 8 cm All wall offsets require alignment rails (Fig through 25.2). Job-built tie rods in different lengths can be used to align and bridge different kinds of problem areas such as pilasters, wall offsets and projecting parts. This can be done at any multi-function profile without considering existing tie holes. Fig Fig DW tie rod with flange nut Wooden blocking Detail B Attach with Uni-assembly lock cm 15 to 23 cm Detail C Fig Attach with Uni assembly lock 22 Detail A Detail B Detail C Wooden blocking EA inside corner AL 300/25 Alu AL 240/25 Alu AL 160/25 Alu AL 120/25 Alu Uni assembly lock Uni assembly lock 22 Fig Wooden blocking Fig Fig EA 25

26 Pilasters Pilasters are fast formed with inside corners, standard panels and, where necessary, wooden blockings. Alignment rails must be used for reinforcement and statical reasons (Fig through 26.3). Flange screw 18 Tie rod with flange nut Wooden blocking Wooden blocking Fig Flange screw 18 Tie rod with flange nut Fig Flange screw 18 Tie rod with flange nut Wooden blocking Wood Fig EA 26

27 Differences in height Being independent of a grid, the panels can easily be connected without further accessories. Vertical, horizontal and even inclined panels can all be safely connected with EA assembly locks, even with differences in height (Fig. 27.1). Job-built fillers are made with a board and a facing cut to size and, where necessary, a square timber. The EA assembly lock is used for connection. Alignment rails may be required for load transfer in the compensation area (Fig. 27.1, Fig and p. EA-29). Fig Job-built compensation and support construction Fig Compensation EA 27

28 Panels in horizontal position Due to the central position of the tie holes in the 80 cm wide panels when horizontally used (except panels with height 300 cm), EcoAs is particularly suited for job-built solutions to form complicated foundations even when joint tapes or kickers involved (Fig through 28.3). When combined with 120 cm inside corners, the 80 cm panels are horizontally used. The use of foundation tapes and tensioners for foundation tapes (Fig through 28.6) eliminates the timeconsuming job of installing bottom ties. The tensioner for foundation tape is attached to the formwork with a wedge. The upper tie in the concrete can be replaced as follows: by a push-pull strut. The push-pull strut tightly connects opposite panels up to a wall or foundation thickness of 64 cm (Fig and 28.5). or by tie claws 23. Two tie claws 23, one DW tie rod 15 and two flange nuts 100 are required per tie (Fig. 28.8). We recommend using an anchor sleeve as a spacer between the opposite panels and in order to protect the tie from dirt Fig Fig With tie and push-pull strut Fig Max. distance Push-pull strut (up to 64 cm) Fig With tensioner for foundation tape and push-pull strut Anchor sleeve Tie claw 23 Fig Foundation tape Push-pull strut Tensioner for foundation tape Push-pull strut Fig Foundation tape Tensioner for foundation tape Max. spacing of tensioner for foundation Pouring height 80 cm 185 cm Pouring height 100 cm 120 cm Pouring height 135 cm 70 cm Table 28.7 Push-pull strut Tie claw Flange nut Foundation tape Tensioner EA for foundation tape Trolley for foundation tape Flange nut 100 Fig Fig EA 28

29 Substitution of ties In certain cases tie rods need not be installed at certain tie holes and their number can be reduced by using alignment rails. If a horizontal panel 160/80 is placed on top of a vertical panel 160/80 (Fig. 29.1), one tie level can be substituted by using 2 AS alignment rails 125 at multi-function profiles at tie hole level Length compensation (Fig. 29.2): When using adequate alignment rails, no tie rods need to be installed through the tie holes of the filler. In order to guarantee an effective alignment with the alignment rail, we recommend placing the alignment rails at multi-function profile level and limit the length of the residual measure to 50 % of the length of the alignment rails (Table 29.3 and Fig. 29.4). Fig If the fresh concrete pressure P bmax is 50 kn/m 2 and if lines 5 and 6 of standard DIN (tolerances in surface building) are observed, the following residual measures can be bridged using AS alignment rails: Alignment rail AS-RS 50 AS-RS 125 AS-RS 200 Res. measure Up to 0,30 m Up to 0,60 m Up to 0,70 m Fig Table 29.3 AS alignment rail 50, galv , galv , galv Fig /4 Residual measure 1/4 Length of alignment rail EA 29

30 Height extension Combinations for height extension All panels can be combined vertically or horizontally and must always be connected with the EA assembly lock. With the standard panels being 120, 160, 240 and 300 cm high, heights in increments of 40 cm can be achieved (Fig. 30.1). Different heights Fig EA 30

31 EcoAs Height extension When crane ganging height-extended panels, make sure to place an alignment rail at every other panel (Fig and 31.2). 160 When extending the height with vertical panels, alignment rails must be used for bracing. Make sure the alignment rails are long enough. ea ava.pdf St. 06/07/12 Printed in Germany Fig Fig EA 31

32 Height extension When extending the height with horizontal panels, please observe: If the extension exceeds 30 cm, i.e. if the panel on top is wider than 30 cm, make sure to anchor trough the tie holes shown in Fig > 30 Horizontal height extension of more than 30 cm Fig Horizontal height extenion of up to 30 cm Folding platform An extension up to 30 cm requires tieing at the top only when using folding platforms or scaffolding brackets (Fig. 32.2). 30 Use a board as spacer Fig EA 32

33 EcoAs Crane-ganging When lifting and transporting large panel gangs with a crane, the crane hooks are attached at the panel joints to prevent them from shifting (Fig. 33.1). Max. 60 Important Note that each transport unit always requires a minimum 2 crane hooks. No transport unit must exceed the weight of 1200 kg when using 2 crane hooks (each with a load capacity of 600 kg). Example (Fig. 33.1): The panel gang sized 6 by 4 m and consisting of 8 EcoAs panels 300/100 weighs 876 kg including accessories (2 AS alignment rails 125 and 26 EA assembly locks). ea ava.pdf St. 06/07/12 Printed in Germany Fig Transport angles When using transport angles (Fig. 33.2), panels stacks need not be placed on square timbers, which saves room, and panel stacks can also be moved when they are not complete. Simply attach 4-rope crane slings directly over the top panel of the stack. Never use 2-rope crane slings! Five to 12 EcoAs panels can be moved when using transport angles. The maximum load capacity per angle is 10 kn. Transport angle 10 foldable rigid Fig EA 33

34 Column formwork Foundations with a maximum side length of 90 cm (Fig. 34.2) and a maximum height of 120 cm can be formed using 2 assembly locks per height (Fig. 34.1). Columns with a maximum side length of 60 cm (Fig. 34.4) and a maximum pouring height of 300 cm (Fig. 34.4) can be formed using outside corners and standard panels. Max. 120 Fig Fig Max. 90 Max. 90 Columns with larger cross sections and/or heights require more assembly locks and additional strengthening collars due to their increased fresh concrete pressure (Fig und Table 34.5). Max Fig Strengthening collar with alignment rails at multi-function profile level EcoAs EA assembly locks column formwork plus str. collars h = 1,20 m 2 h = 1,60 m 3 h = 2,40 m 6 h = 3,00 m 8 EA outside corner 300 Alu Alu Alu Alu Fig h = 3,60 m h = 4,00 m h = 4,80 m h = 6,00 m Table str. collar str. collar str. collars str. collars EA 34

35 Multi-purpose panel The multi-purpose panels are particularly suited to form pilasters, stop ends, connections to existings walls, 90 corners and wall offsets (Fig through 35.3). MZE = Multi-purpose panel Connection to an existing wall Existing wall The multi-purpose panels are provided with perforated profiles (see p. EA 36) to attach tie rods, stop end fixtures and flange nuts. Attention The stop end fixture must not be inserted into the outermost tie hole because it has to fully rest on the panel. The stop end fixture is applied with flange nut 100 (Fig. 35.3). Fig Pilaster Articulated flange nut 120 Tie rod DW 15 ARS 125 = AluStar alignment rail 125 Tie rod DW 15 Articulated flange nut 120 If applied with a hinged corner, there is no need for an additional alignment rail or strengthening collar on the outside if distance X is less than L/2 (Fig. 35.4). The perforated profiles are punched every 2,5 cm (Fig. EA-36.4) and thus allow the multipurpose panel to be used for many applications. When, for example, pouring against an existing wall or pouring the next cycle, tieing can be done very close at the existing wall, which prevents the concrete from bleeding (Fig. 35.2). Fig Fig Obtuse angled corner If the height of the wall to be poured is less than 120 cm, no special accessories are required. If the height of the wall to be poured exceeds 120 cm, the formwork must be secured with tensioning chains against lateral shifting to the outside. Flange nut 100 Stop end fixture 23/40 yellow X Pouring direction L EA multi-purpose panel 120/ Stop end fixture 23/40 yellow Fig Articulated flange nut 120 Tie rod DW 15 EA 35

36 Corner solutions with multi-purpose panels Figures 36.1 and 36.2 show corner solutions with multi-purpose panels for wall thicknesses of 25 cm, 30 cm and 35 cm The perforated profile of the panel is punched every 2,5 cm (Fig. 36.4). This allows an accurate forming of all the typical dimensions found with stop ends, pilasters, 90 angles and wall offsets. Attention The stop end fixture must not be inserted into the outermost tie hole because it has to fully rest on the panel. The stop end fixture is applied with flange nut 100 (Fig and 36.4). MZE = Multi-purpose panel Fig Fig Flange nut 100 Stop end fixture 23/40 yellow Perforated profile Must not be used for tieingwith stop end fixture Fig Perforated profile Stop end fixture 23/40 yellow Flange nut Fig EA 36

37 Formwork assembly and stripping Important! When assembling and stripping formwork, strictly observe the local accident prevention rules and all other applicable federal, state and local regulations. Attention Formwork with a height of 2 or more metres requires a fall-down protection to be installed on both sides of the formwork. Planning If you want to benefit fully from the efficient and economical use that the EcoAs formwork offers, we recommend you first plan and prepare its use. Start planning by determining the optimum formwork quantity to be held in stock (such quantity is usually based on the amount of formwork required for a one day s work). When determining the quantity, consider this: the formwork weight the time required for formwork assembly and stripping transport of gangs from one pour to the next considerably reduces forming time capacity of the lifting devices a logical cycle plan that takes corner configurations, reinforcements etc. into account Once all these aspects have been considered, the quantities of formwork items can be specified. Ground The ground on which the formwork is going to be placed should be clean, even and capabable of bearing the expected load because this will help reduce the time required for the assembly and stripping. Panel transport When unloading panels or moving panel stacks make sure to use appropriate transport devices that can bear the load. The steps required for the assembly For ergonomic reasons, the outside formwork is ususally assembled and placed first. Start the assembly in a corner or at a determined point and perform the following steps: Step 1 Place and brace the outside formwork. Step 2 Define and mark the pouring height, build in the reinforcements and blockouts. Step 3 Place the inside formwork, tie the outside and inside formwork and close the formwork. Refer to the following pages for a detailed description of these steps including the working platform and formwork stripping. Fig Double-sided formwork EA 37

38 Formwork assembly and stripping Step 1 Place and brace the outside formwork The following description is based on an even wall. Before starting, keep in mind: When preassembling large panel units on an even surface, attach the wall braces and the scaffolding brackets as well, i.e. before executing step 1. Walls of less than 6 m require a filler for easy stripping (Fig. 38.3) as otherwise the formwork may wedge when stripping and stick to the concrete. 1. Spray the facing with the release agent MevaTrenn FT8. 2. Place the first panel and immediately attach it with two brace frames to the ground to prevent it from falling over (Fig. 38.1). Attach the foot plate firmly to the ground, with two soil nails when attached directly to the soil or with two heavy-duty dowels when attached to a concrete foundation. If the scaffolding bracket was not preassembled before step 1, you can now assemble the working platform and attach it. 3. String further panels together, connect them with EA assembly locks and brace them. The panels are usually connected with 2 or 3 assembly locks (see p. EA-7). For outside corner configurations see p. EA-18. Step 2 Pouring height, reinforcements and blockouts Following step 1, the pouring height is defined and marked, the reinforcements and blockouts, if required, are installed. Step 3 Place the inside formwork and tie the outside and inside formwork The inside formwork is placed after the outside formwork. Then the inside and outside formwork are tied firmly with tie rods and articulated flange nuts. Fig Fig After plac ing panels, always reinforce them immediately with pushpull props or brace frames so they withstand tensile force and pressure and are protected against displacement and wind. The push-pull prop spacing depends on the application. Fig Filler for easy stripping EA 38

39 Formwork assembly and stripping Working scaffold The plug-in scaffolding bracket is the basis for the working scaffold (Fig. 39.1). The bracket spacing (max. 250 cm) depends on the planking (taking into consideration DIN 4420, Part 1, Table 8, for a load of 150 kg/m² (platform group 2)). The planking and scaffolding bracket can be firmly connected. Do not place any planks before having secured the formwork with push-pull props or before having tied the inside with the outside formwork. Fig Do not forget to attach a side railing to the working scaffold if such a protection is required. Pouring concrete Once you have placed, attached and closed the formwork, you can start pouring concrete. When doing so, observe the admissible rate of placing which also depends on the temperature and type of cement used (see p. EA-10). Fig EA 39

40 Formwork assembly and stripping Stripping Do not start stripping before the concrete has set to the point where it cannot deform anymore. It is best to start stripping at the stop ends or at a corner. Walls of less than 6 m require a filler for easy stripping at the inside formwork (Fig. EA-38.3) as otherwise the formwork may wedge and stick to the concrete. Start stripping with the inside formwork. Stripping of both the outside and inside formwork is done as follows: 1. Remove the working scaffold. 2. Remove the articulated flange nuts and tie rods section by section. Make sure the unbraced formwork is immediately secured against falling over or strip it immediately. 3. Loosen the formwork panels or large panel units by removing the assembly locks at the panel joints and remove them manually or with a crane. Before removing them with a crane, make sure the formwork is detached from the concrete. 4. Clean the facing and remove any concrete. Before the next use, spray the facing with the release agent MevaTrenn FT8 (for the alkus facing). Observe the operating instructions for the alkus facing. Note that the release agent must not be stored in galvanized containers. Please note When stripping manually, detach and disassemble the working scaffold and brace frames before stripping the panels. When transporting large panel units with a crane, the work ing scaffold and wall braces are not detached from the panel units. While in vertical position, all components are cleaned and sprayed before being transported together to the next place of use (see p. EA-33). If there is no further use for the panel units, the working scaffold and wall braces are detached and disassembled in horizontal position, cleaned and stacked for transport. Fig Fig EA 40

41 Transport Make sure that all material is secured properly. Recommendation Use one load/cargo strap per 1 metre of cargo. That means for a fully loaded truck with a trailer length of 13,60 m, 14 load or cargo straps would be required. EcoAs panels require 2 or 3 straps. Due to their low weight, EA corners require only 2 straps (Fig. 41.1). When moving panel stacks make sure that panels are secured against shifting. MEVA secures EcoAs panels with the black AS/ST safety bolt (Fig. 41.2) These plugs should also be used by the job-site when returning material. Fig Safety regulations When using or transporting our products, the federal, state, and local codes and regulations must be observed. Fig Safety bolt AS/ST black EA 41

42 Service Cleaning The formwork is cleaned professionally upon return. Cleaning is done using industrial equipment with assembly lines. Regeneration The regeneration is carried out as follows: The frames are checked and, if necessary, repaired, painted and provided with a new facing. As long as the formwork equipment is up-todate, a regeneration will always be a more economical solution than purchasing new formwork. Please note that the cleaning and regeneration service is not available in all countries in which MEVA does business. RentalPlus Since MEVA started the flat rate for cleaning and repair of rented formwork systems, more and more contractors experience the outstanding advantages. Ask our representatives about the details! Formwork drawings Of course, all offices in our technical department have CAD facilities. You get expert, clearly represented plans and work cycle drawings. Special solutions We can help with special parts, custom-designed for your project, as a supplement to our formwork systems. Static calculations Generally, this is only necessary for applications like single sided formwork where the anchor parts are embedded in the foundation or the base slab. If requested, we can perform static calculations for such applications at an additional charge. Formwork seminars To make sure that all our products are used properly and efficiently, we offer formwork seminars. They provide our customers a good opportunity to keep themselves up-to-date and to benefit from the know-how of our engineers. Rentals With much equipment on stock, we offer our customers the option of renting supplementary material during peak times. We also give prospective customers the chance to test MEVA formwork so they can see its benefits for themselves in actual use. EA 42

Heavy-Duty Braces Triplex Assembly and Operating Instructions

Heavy-Duty Braces Triplex Assembly and Operating Instructions Heavy-Duty Braces Triplex Assembly and Operating Instructions Product features and use How to read this manual Triplex is a heavy duty brace (three chords) to align and brace formwork with heights exceeding

More information

AluFix Technical Instruction Manual

AluFix Technical Instruction Manual AluFix Technical Instruction Manual Product Features AluFix is a versatile and flexible modular formwork system for all applications in structural and civil engineering. It is used in residential construction,

More information

AluFix Technical Instruction Manual

AluFix Technical Instruction Manual AluFix Technical Instruction Manual General Notes AluFix is a versatile and flexible modular formwork system for all applications in structural and civil engineering. It is used in residential construction,

More information

Mammut 350 Technical Instruction Manual

Mammut 350 Technical Instruction Manual Mammut 350 Technical Instruction Manual Product features The Mammut 350 formwork is based on the experience made with the Mammut wall formwork since 1982. Mammut 350 offers the following improvement: Seven

More information

EcoAs Assembly and Operating Instructions

EcoAs Assembly and Operating Instructions Assembly and Operating Instructions A versatile system for all kind of applications EcoAs is a smallsized, versatile and adaptable modular formwork system. It is most suitable for all contractors involved

More information

Mammut Technical Instruction Manual

Mammut Technical Instruction Manual Mammut Technical Instruction Manual Product features Mammut is a crane-dependent frame formwork system and ideally suited for use in industrial engineering as well as administration and housing projcets.

More information

StarTec / AluStar Technical Instruction Manual. Certificate of approval for AluStar, issued by GSV (German concrete formwork association)

StarTec / AluStar Technical Instruction Manual. Certificate of approval for AluStar, issued by GSV (German concrete formwork association) StarTec / AluStar Technical Instruction Manual Certificate of approval for AluStar, issued by GSV (German concrete formwork association) Product features StarTec The StarTec wall formwork is a frame formwork

More information

Imperial. folds. Wall braces are attached to the multifunction. guard-railing post. Formworkprop. connectors and flange screws.

Imperial. folds. Wall braces are attached to the multifunction. guard-railing post. Formworkprop. connectors and flange screws. Wall all braces / Working scaffolds folds Wall braces are attached to the multifunction profiles by formwork-prop connectors and flange screws. guard-railing post brace frame 250 consists of push-pull

More information

Circular formwork Radius Technical Instruction Manual

Circular formwork Radius Technical Instruction Manual Circular formwork Radius Technical Instruction Manual Product features Radius is a circular formwork that allows adjustable radii. Pre-assembled standard panels with powder-coated steel profiles provide

More information

MevaLite Technical Instruction Manual

MevaLite Technical Instruction Manual MevaLite Technical Instruction Manual MevaLite Product Characteristics MevaLite is a modular, handset clamp system. It is perfect for all contractors involved in commercial, industrial and highway projects.

More information

TRITEC light Steel Panel Formwork

TRITEC light Steel Panel Formwork TRITEC light Steel Panel Formwork Perfection made in Germany Various practical illustrations of TRITEC Panel Combinations Guaranteed the largest possible range of sizes with the least possible amount of

More information

MevaLite Technical Instruction Manual

MevaLite Technical Instruction Manual MevaLite Technical Instruction Manual Product Characteristics MevaLite is a modular, handset clamp system. It is perfect for all contractors involved in commercial, industrial and highway projects. The

More information

Imperial Technical Instruction Manual May 2017

Imperial Technical Instruction Manual May 2017 Technical Instruction Manual May 2017 Introduction Imperial is a crane set modular formwork system suitable for use on civil, commercial, industrial and highway projects. The panels are composed of strong,

More information

MevaLite Technical Instruction Manual May 2017

MevaLite Technical Instruction Manual May 2017 Technical Instruction Manual May 2017 Introduction MevaLite is a modular formwork system that can be either handset or gang formed. It is suitable for use on residential, commercial, industrial and highway

More information

RAPID Column Formwork For the highest requirements on concrete surfaces and edge formation. Product Brochure Issue 10/2017

RAPID Column Formwork For the highest requirements on concrete surfaces and edge formation. Product Brochure Issue 10/2017 For the highest requirements on concrete surfaces and edge formation Product Brochure Issue 10/2017 Content System advantages 5 For the highest requirements on concrete surfaces and edge formation 8 For

More information

Imperial Technical Instruction Manual

Imperial Technical Instruction Manual Imperial Technical Instruction Manual The Imperial wall form work is a cranedependent modular formwork system for use in industrial and civil engineering projects as well as ad ministration and residential

More information

July Climbing Scaffold with retractable formwork Instructions for erection and use

July Climbing Scaffold with retractable formwork Instructions for erection and use July 2008 Climbing Scaffold with retractable formwork Instructions for erection and use Contents Page Important remarks 2 Product features 2 Overview of climbing system Components 4 11 Assembly 25 Climbing

More information

PERI PD 8 The cost-effective shoring for slab tables and high loads

PERI PD 8 The cost-effective shoring for slab tables and high loads PERI PD 8 The cost-effective shoring for slab tables and high loads Edition 06/2010 PERI GmbH Formwork Scaffolding Engineering P.O. Box 1264 89259 Weissenhorn Germany Tel +49 (0)7309.950-0 Fax +49 (0)7309.951-0

More information

GRIDFLEX The flexible slab formwork with safe accessible grid elements

GRIDFLEX The flexible slab formwork with safe accessible grid elements GRIDFLEX The flexible slab formwork with safe accessible grid elements 07044 Edition 04 2011 PERI GmbH Formwork Scaffolding Engineering P.O. Box 1264 89259 Weissenhorn Germany Tel +49 (0)7309.950-0 Fax

More information

MevaFlex Assembly and Operating Instructions

MevaFlex Assembly and Operating Instructions Assembly and Operating Instructions is a slab formwork which is not restricted by modular dimensions and therefore doesn't dictate to any rules of a modular system. Due to the versatility of the system,

More information

PERI UP Easy * The lightweight and fast frame scaffold for safe working on facades

PERI UP Easy * The lightweight and fast frame scaffold for safe working on facades PERI UP Easy * The lightweight and fast frame scaffold for safe working on facades Product Brochure * If approval is required for the scaffolding system PERI UP Easy to be placed on the market in a country,

More information

Steel Forming System BROCHURE. A durable, all-steel forming system that is ideal for pier caps and self-spanning applications.

Steel Forming System BROCHURE. A durable, all-steel forming system that is ideal for pier caps and self-spanning applications. Max-A-Form Steel Forming System BROCHURE A durable, all-steel forming system that is ideal for pier caps and self-spanning applications. Max-A-Form System Design The Max-A-Form Forming System combines

More information

INDEX. introduction 4. access scaffolding 5. selflock system 16. wall system 17. column boxes 29. slab system 31. props 36. contact details 40

INDEX. introduction 4. access scaffolding 5. selflock system 16. wall system 17. column boxes 29. slab system 31. props 36. contact details 40 PRODUCT BROCHURE INDEX introduction 4 access scaffolding 5 selflock system 16 wall system 17 column boxes 29 slab system 31 props 36 contact details 40 INTRODUCTION Augusta Manufacturing was established

More information

Formwork Direct International. Tel: Heavy Duty Panel System

Formwork Direct International. Tel: Heavy Duty Panel System Formwork Direct International Tel: 0151 532 0179 sales@formworkdirect.co.uk www.formworkdirect.co.uk Heavy Duty Panel System Product Overview The FD Max panel is a heavy duty wall formwork system capable

More information

StarTec. Multi-Purpose Formwork

StarTec. Multi-Purpose Formwork StarTec Multi-Purpose Formwork Flexible, universal formwork solution StarTec has the answer to many different challenges The universal steel formwork that is capable of accommodating fresh concrete pressures

More information

User Guide MEGALITE 01FDL34

User Guide MEGALITE 01FDL34 User Guide MEGALITE 01FDL34 IMPORTANT: Any safety provisions as directed by the appropriate governing agencies must be observed when using our products. The pictures in this brochure are snapshots of situations

More information

NEVI Light modular formwork

NEVI Light modular formwork NEVI Light modular formwork // Heavy duty, versatile and easily handled without a crane // Table of content Features Advantages Solutions Basic components 2 4 5 7 // Features Innovative range of panels

More information

HANDSET WALL FORM. Handset Wall Form. Quick Assembly - can be built using only a hammer. Reduced weight increases productivity

HANDSET WALL FORM. Handset Wall Form. Quick Assembly - can be built using only a hammer. Reduced weight increases productivity HANDSET WALL FORM Quick Assembly - can be built using only a hammer Reduced weight increases productivity Unsurpassed flexibility in design and availability of panels for a wide variety of applications

More information

User Manual. Formwork System.

User Manual. Formwork System. User Manual Formwork System www.scformwork.com Content Square column system...3 Specs & Capability...4 How to set up...5 Clamps...7 Pour rate & Safe filling height...09 Circular column system...11 Detail

More information

ALISPLY. Scaffold Plank. Aligner. Plate Washer ½ x 6 x 6

ALISPLY. Scaffold Plank. Aligner. Plate Washer ½ x 6 x 6 Alisply components and accessories illustrated herein have been designed with safety and performance in mind to help achieve a safe and productive forming operation. It is recommended that all construction

More information

3.1. FOLDABLE WORKING PLATFORMS. and accessories

3.1. FOLDABLE WORKING PLATFORMS. and accessories .1. FOLDABLE WORKING PLATFORMS and accessories SAFETY TECHNOLOGY FOLDABLE WORKING PLATFORMS AND ACCESSORIES GENERAL INFORMATION INDEX General information.....................................................................

More information

Modular Scaffolding MEKA 48

Modular Scaffolding MEKA 48 Modular Scaffolding MEKA 48 MODULAR SCAFFOLDING MEKA 48 MODULAR SCAFFOLDING The Modular Scaffolding MEKA 48 is designed to adapt to the most complex scaffold structures. Its versatility offers a wide range

More information

ASSEMBLY INSTRUCTIONS

ASSEMBLY INSTRUCTIONS ASSEMBLY INSTRUCTIONS WALL AND CEILING FORMWORK Dear Sirs, Reading these instructions carefully and following the recommendations included in it concerning the operation and maintenance of the equipment

More information

DOMINO Panel formwork. Assembly Instructions for Standard Application

DOMINO Panel formwork. Assembly Instructions for Standard Application DOMINO Panel formwork Assembly Instructions for Standard Application Edition 09/2007 Contents Page Overview 1 Introduction 2 Product features 2 Intended use 2 Safety instructions 3 B7 B8 Page Extensions

More information

CIRCULAR COLUMN SK 100

CIRCULAR COLUMN SK 100 CIRCULAR COLUMN SK 100 www.variant-factory.eu 1 2 VARIANT FACTORY LTD. CIRCULAR COLUMN SK 100 Contents GENERAL INSTRUCTIONS.....................................................................................

More information

SP Prop Steel prop. // Versatile, strong, safe

SP Prop Steel prop. // Versatile, strong, safe Steel prop // Versatile, strong, safe IMPORTANT: Any safety provisions as directed by the appropriate governing agencies must be observed when using our products. The pictures in this brochure are snapshots

More information

Noetop is a versatile, robust integrated formwork panel system. The basic panels incorporate the strongbacks and

Noetop is a versatile, robust integrated formwork panel system. The basic panels incorporate the strongbacks and NOEtop Noetop is a versatile, robust integrated formwork panel system. The basic panels incorporate the strongbacks and walers into one timber faced panel. The panel range provides economic forming with

More information

Alisply Circular Headquarters - Spain Alsina USA - Chicago Alsina USA - Miami

Alisply Circular Headquarters - Spain Alsina USA - Chicago Alsina USA - Miami Alisply Circular Headquarters - Spain Encofrados J. Alsina, S.A. Camí de la Font Freda, 1 08110 - Montcada i Reixac, Barcellona - Spain Tel. +34 935 753 000 Fax. +34 935 647 059 E-mail: alsina@alsina.es

More information

Miller Collective Safety at Height Solutions EPIC ULTRA Barrier System EPIC Post-N-Barrier System EPIC Basic Barrier System

Miller Collective Safety at Height Solutions EPIC ULTRA Barrier System EPIC Post-N-Barrier System EPIC Basic Barrier System For over 65 years the Miller brand has been synonymous with personal fall protection products and services. As the global leader in safety at height solutions, Honeywell Safety Products introduces a new

More information

Alisply Walls. Product brochure

Alisply Walls. Product brochure Alisply Walls Product brochure Encofrados J. Alsina S.A. Pol. Ind. Pla d en Coll Camí de la Font Freda, 1 08110 Montcada i Reixac (Barcelona - Spain) Tel.: (+34) 935 753 000 Fax: (+34) 935 647 059 E-mail:

More information

CONCRETE FORMWORK CHECKLIST AT SITE

CONCRETE FORMWORK CHECKLIST AT SITE CONCRETE FORMWORK CHECKLIST AT SITE Concrete formwork is a temporary supporting structure for concrete when it is placed at the construction site to keep the concrete in position and shape till it gets

More information

FALSEWORK SOLUTIONS: SLAB SHORING SYSTEM - ROYALFRAME50 SERIES

FALSEWORK SOLUTIONS: SLAB SHORING SYSTEM - ROYALFRAME50 SERIES ROYALFRAME50 SLAB SHORING SYSTEM ROYAL FRAME 50 ROYALframe50 is a lightweight, improved alternate formwork shoring frame. It has galvanised tube legs, each with a 51mm outside diameter and a safe work

More information

distribution Modular Scaffolding

distribution Modular Scaffolding Modular Scaffolding Modular scaffolding PDM Universal scaffolding system plettac-pl PDM Application A characteristic feature of plettac PDM system is the use of wedge joint which provides quick and safe

More information

TEMPORARY EDGE PROTECTION SYSTEM DESCRIPTION CTS. Combisafe International AB

TEMPORARY EDGE PROTECTION SYSTEM DESCRIPTION CTS. Combisafe International AB TEMPORARY EDGE PROTECTION SYSTEM DESCRIPTION CTS Combisafe International AB CTS Combisafe International AB Contents Safety instructions... 3 Important... 4 General... 4 Data... 5 Safety posts 4140/4145/4150...

More information

EN 1065 ULTRADECK SLAB SYSTEM

EN 1065 ULTRADECK SLAB SYSTEM . M. B. G G I p i m p i u u q e q g n e i d l i bu g n i d l i u EN 1065 b ULTRADECK SLAB SYSTEM P O N T E G s t en Maximum flexibility and quickest forming time for mounting of all ceiling types Flexible:

More information

SecuritBasic. Contents. Ref.-No. Description / Application Product m² List kg

SecuritBasic. Contents. Ref.-No. Description / Application Product m² List kg Ref.-No. Description / Application Product m² List kg This product list includes all parts necessary for most applications. For parts required for special applications, please refer to the MEVA price list.

More information

modular scaffolding R+

modular scaffolding R+ modular scaffolding R+ 1. Stand 6. Transverse U-transom Stand is the main element of modular scaffolding. Made of 48.2x3.2 mm steel pipe. Every 0,5m on the whole stand length are installed steel plates

More information

Atlas ACS. Atlas Clamp System ATLAS CLAMP WALLFORM SYSTEM

Atlas ACS. Atlas Clamp System ATLAS CLAMP WALLFORM SYSTEM ATLAS CLAMP WALLFORM SYSTEM Atlas ACS Atlas Clamp System The efficient ACS (Atlas Clamp System) heavy-duty modular ganged wallform offers an allowable,650 psf pour pressure, and weighs only lbs per sq.ft.

More information

MAXIMO MXH Heated Formwork The cost-effective solution for concreting operations at low temperatures. Product brochure

MAXIMO MXH Heated Formwork The cost-effective solution for concreting operations at low temperatures. Product brochure MAXIMO MXH Heated Formwork The cost-effective solution for concreting operations at low temperatures Product brochure Product advantages MAXIMO MXH Heated Formwork The cost-effective solution for concreting

More information

PRODUCT BROCHURE. RMD Kwikform UAE. Maxima

PRODUCT BROCHURE. RMD Kwikform UAE. Maxima RMD Kwikform UAE Maxima Product Overview Maxima is a robust, versatile large-panel 80kN/m² wall formwork system, with column and stripping corner add-ons providing unrivalled flexibility. Faster Maxima

More information

Since it was established in 1989, with a small manufacturing base in Qwa Qwa, Uni-Span has grown to become one

Since it was established in 1989, with a small manufacturing base in Qwa Qwa, Uni-Span has grown to become one access scaffolding Since it was established in 1989, with a small manufacturing base in Qwa Qwa, Uni-Span has grown to become one of the major players in the scaffolding and formwork industry in South

More information

Modular Scaffold MEKA 48

Modular Scaffold MEKA 48 Modular Scaffold MEKA 48 Imperial units NA MODULAR SCAFFOLD MEKA 48 MODULAR SCAFFOLD The Modular Scaffold MEKA 48 is designed to adapt to the most complex scaffold structures. Its versatility offers a

More information

Allround Scaffolding

Allround Scaffolding .. Allround Scaffolding I n g e n i o u s. S t r o n g. L i m i t l e s s. Faster. Stronger. Safer. More Profitable. Introduction Layher s Allround scaffolding makes an ideal propping system: being both

More information

1 Exam Prep Prov Module: Vertical Formwork Questions and Answers

1 Exam Prep Prov Module: Vertical Formwork Questions and Answers 1 Exam Prep Prov Module: 27308-14 Vertical Formwork Questions and Answers 1. The amount of formwork needed for a job can be influenced by. A. The size of the forming crew B. The project budget C. Materials

More information

PZ H-BEAM FORMWORK PAVLOS ZENONOS & SONS LTD CATALOGUE

PZ H-BEAM FORMWORK PAVLOS ZENONOS & SONS LTD CATALOGUE PZ HBEAM FORMWORK PAVLOS ZENONOS & SONS LTD CATALOGUE PZ HBEAM FORMWORK PZ HBEAM FORMWORK SOLUTIONS PZ HBEAM FORMWORK SYSTEMS & APPLICATIONS PZ HBEAM COLUMN FORMWORK PZ HBEAM RETAINING WALL FORMWORK PZ

More information

Heartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785)

Heartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785) Perma-Column Installation Instructions Unlike any other concrete post-frame foundation system, Perma-Column Precast Concrete Piers use 10,000 psi concrete and our unique Sturdi-Wall Plus wet-set bracket

More information

Mammut XT. Mammut XT. New

Mammut XT. Mammut XT. New Mammut XT Mammut XT New Choose. Set. Done: Tie from One Side. Or Both! The new wall formwork system for civil engineering and architectural construction Tieing from one side only can be an advantage when,

More information

BY DAYTON SUPERIOR. FormRight FORMING SYSTEM

BY DAYTON SUPERIOR. FormRight FORMING SYSTEM BY DAYTON SUPERIOR FormRight FORMING SYSTEM System Design The FormRight concrete forming system is a modular design suitable in handset or gangform applications. Modular versatility Panels come in 23 different

More information

BROCHURE. Steel Forming System. A durable, all-steel forming system that is ideal for pier caps and self-spanning applications. DAYTONSUPERIOR.

BROCHURE. Steel Forming System. A durable, all-steel forming system that is ideal for pier caps and self-spanning applications. DAYTONSUPERIOR. Max-A-Form Steel Forming System BROCHURE A durable, all-steel forming system that is ideal for pier caps and self-spanning applications. DAYTONSUPERIOR.COM Max-A-Form System Design The Max-A-Form Forming

More information

MEGALITE Medium duty steel panel formwork in imperial sizes

MEGALITE Medium duty steel panel formwork in imperial sizes MEGALITE Medium duty steel panel formwork in imperial sizes // Light, durable, handled without crane // Table of contents Features Advantages Solutions Basic components 2 4 5 7 // Features Modular wall

More information

LOGIK. Forming System

LOGIK. Forming System LOGIK Forming System LOGIK Wall formwork crane-handled Description The Logik panel system for crane handling, produces up to 1670 psf concrete pressure resistance from a strong panel. The panel frames

More information

Aluminum Beam Gang System

Aluminum Beam Gang System Aluminum Beam Gang Aluminum Beam Gang System Symons Aluminum Beam Gang Forming System offers computer-optimized aluminum beams with an extremely high strength-toweight ratio. The unique beam attachment

More information

Concrete Framing Systems - Walls and Columns

Concrete Framing Systems - Walls and Columns Concrete Framing Systems - Walls and Columns Casting a Concrete Wall Wall Footing Reinforcing Wall Forms Pouring Concrete Finishing the Concrete Controlling Cracking Insulating Concrete Forms (ICF) Tilt-Up

More information

VARIO GT 24 Girder Wall Formwork. Assembly Instructions for Standard Configuration

VARIO GT 24 Girder Wall Formwork. Assembly Instructions for Standard Configuration VARIO GT 24 Girder Wall Formwork Assembly Instructions for Standard Configuration Edition 02 I 2010 Content Introduction Overview, Main Components 1 Standard configuration 4 Intended use 4 Safety instructions

More information

PRODUCT BROCHURE. RMD Kwikform Hong Kong. Maxima

PRODUCT BROCHURE. RMD Kwikform Hong Kong. Maxima RMD Kwikform Hong Kong Maxima Product Overview Maxima is a robust, versatile large-panel 80kN/m² wall formwork system, with column and stripping corner add-ons providing unrivalled flexibility. Faster

More information

MEGALITE Medium duty steel panel formwork in imperial sizes

MEGALITE Medium duty steel panel formwork in imperial sizes MEGALITE Medium duty steel panel formwork in imperial sizes // Light, durable, Handset Forming // Table of contents Features Advantages Solutions Basic components 2 4 5 7 // Features Modular wall and column

More information

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1 16 May 2014 Page 1 PART 1 GENERAL 1.1 DESCRIPTION This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories

More information

12/2014 Design Calculation. MESA Revola (HDWF) Modular Wallform System

12/2014 Design Calculation. MESA Revola (HDWF) Modular Wallform System 12/2014 Design Calculation MESA Revola (HDWF) Modular Wallform System Contents Introduction System Description 1 System Overview 3 Technical Features Connection Variation 7 Loading Limits Concrete Pressure

More information

Cantilever Racking. Cantilever Racking

Cantilever Racking. Cantilever Racking Cantilever Racking Cantilever Racking Cantilever raking is specially designed to store long or varying length items, such as metal beams, pipes, moulding, wooden boards, metal and plastic sheets among

More information

PZ ALU-FRAME SYSTEM PAVLOS ZENONOS & SONS LTD CATALOGUE

PZ ALU-FRAME SYSTEM PAVLOS ZENONOS & SONS LTD CATALOGUE PZ ALUFRAME SYSTEM PAVLOS ZENONOS & SONS LTD CATALOGUE PZ ALUFRAME SYSTEM PZ ALUFRAME SYSTEM PZ ALUFRAME COLUMNS DOUBLESIDED WALL CONSTRUCTION PUSH & PULL SYSTEM SINGLESIDED WALL CONSTRUCTION PZ ALUFRAME

More information

Framed formwork Frami Xlife

Framed formwork Frami Xlife The Formwork Experts. Framed formwork Frami Xlife The crane-independent manhandled steel-framed formwork for foundations, walls and columns formtechinc.com 3-0 (91.4 cm) 2-6 (76.2 cm) 2-0 (61.0 cm) 1-6

More information

Rolling Towers. Layher Rolling Towers Uni Wide. Safety Structure Instructions for Assembly and Use. Mobile working platforms to DIN EN 1004:

Rolling Towers. Layher Rolling Towers Uni Wide. Safety Structure Instructions for Assembly and Use. Mobile working platforms to DIN EN 1004: Layher Rolling Towers Uni Wide Safety Structure Instructions for Assembly and Use Mobile working platforms to DIN EN 1004:2005-03 Working platform 1.5 x 2.85 m Rolling Towers max. working height: indoors

More information

Climbing solutions for any geometry. Conventional climbing systems are formwork support structures used to pour high walls in several casting steps.

Climbing solutions for any geometry. Conventional climbing systems are formwork support structures used to pour high walls in several casting steps. Climbing solutions for any geometry Conventional climbing systems are formwork support structures used to pour high walls in several casting steps. CONVENTIONAL Climbing Systems CLIMBING BRACKETS To cast

More information

Allround Scaffolding System

Allround Scaffolding System Quality management certified according to ISO 9001:2008 by German TÜV-CERT L i m i t l e s s. S t r o n g. 8116.221 I n g e n i o u s. Catalogue Edition 01.04.2012 Allround Scaffolding System Layher Allround

More information

BY DAYTON SUPERIOR. Max-A-Form FORMING SYSTEM

BY DAYTON SUPERIOR. Max-A-Form FORMING SYSTEM BY DAYTON SUPERIOR Max-A-Form FORMING SYSTEM System Design The Max-A-Form Forming System combines the labor-saving benefi ts of modular forming with the strength of an all-steel design. It is ideal for

More information

FrameFast Shoring System

FrameFast Shoring System FrameFast FrameFast Shoring System The FrameFast shoring system is engineered for maximum strength, labor productivity and reuse capabilities. FrameFast components feature high strengthto-weight ratios.

More information

SafeDeck Supported Scaffold System

SafeDeck Supported Scaffold System SafeDeck Supported Scaffold System Table of Contents Origination 1 Range of Motion 1 Installation Efficiency 2 Third-Party Testimonial 2 SafeDeck Specifications 3 Competent Person 4 Tools Required 4 Components

More information

Building construction

Building construction Transport equipment Storage equipment Civil engineering Building construction Mobile fence Event Road construction Road construction Building construction Building construction - pages 64-87 Formwork prop

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

Aluma EasySet Continuing Innovation from Aluma S ystems

Aluma EasySet Continuing Innovation from Aluma S ystems Product Sheet Aluma EasySet Aluma Systems Concrete Construction Aluma EasySet Continuing Innovation from Aluma S ystems Introduction With more than 35 years of experience in shoring and formwork, Aluma

More information

Midi-Box. Construction sector 1.02 Midi-Box

Midi-Box. Construction sector 1.02 Midi-Box Construction sector 1.02 Midi-Box Midi-Box ALTRAD Baumann GmbH Ritter-Heinrich-Strasse 6-12 88471 Laupheim/Germany Telephone: +49 7392 7098-0 Fax: +49 7392 7098-555 Internet: www.altradbaumann.de Email:

More information

TRIO The most successful panel formwork with only one connecting component

TRIO The most successful panel formwork with only one connecting component TRIO The most successful panel formwork with only one connecting component TRIO-L Alu TRIO 330 TRIO Structure TRIO Column Edition 09/2008 Contents Page PERI GmbH Formwork Scaffolding Engineering P.O. Box

More information

Reinforced Earth wall Construction Manual

Reinforced Earth wall Construction Manual COVER PAGE CT-PE-W02 Rev: 5 Reinforced Earth wall Construction Manual Concrete Facing Reinforced Earth Malaysia Sdn Bhd 80-1, Jalan 8/62A Bandar Menjalara 52200 Kuala Lumpur Tel : 03-62746162, Fax : 03-62747212

More information

Important: Before You Start

Important: Before You Start Advantage ICF System Advantage ICF System TM Field Guide Important: Before You Start Does Your Building Inspector Know You Are Building with the Advantage ICF System? You are required to check with your

More information

P: F: Resi-Ply FORMING SYSTEM BY DAYTON SUPERIOR

P: F: Resi-Ply FORMING SYSTEM BY DAYTON SUPERIOR Resi-Ply FORMING SYSTEM BY DAYTON SUPERIOR Resi-Ply System The Resi-Ply forming system is a 1 1 thick plywood with steel backing bars designed especially for residential foundations and low industrial

More information

Rapid Clamp EUROBUYSERVICES EBS

Rapid Clamp EUROBUYSERVICES EBS Rapid Clamp Forming System EUROBUYSERVICES EBS System Design The Symons Rapid Clamp system is a highstrength concrete forming system designed for fast-paced gangform operations. Panels and fillers This

More information

SECTION METAL STAIRS

SECTION METAL STAIRS SECTION 05 51 00 METAL STAIRS PART 1 GENERAL 1.1 SUMMARY A. Section includes steel stair frame of structural sections, with closed risers; pan to receive concrete fill stair treads and landings; integral

More information

Custers. Camino CHIMNEY SCAFFOLDING ASSEMBLY AND USER S INSTRUCTIONS. Nov. 2003

Custers. Camino CHIMNEY SCAFFOLDING ASSEMBLY AND USER S INSTRUCTIONS. Nov. 2003 ASSEMBLY AND USER S INSTRUCTIONS Custers Camino CHIMNEY SCAFFOLDING 9505.903.001 ENG / (9505.202.015/016) Nov. 2003 CUSTERS HYDRAULICA B.V. Smakterweg 33, 5804 AE VENRAY NL Telephone : +31 (0) 478 55 30

More information

PZ HANDSET PANEL SYSTEM PAVLOS ZENONOS & SONS LTD CATALOGUE

PZ HANDSET PANEL SYSTEM PAVLOS ZENONOS & SONS LTD CATALOGUE PAVLOS ZENONOS & SONS LTD CATALOGUE VERSATILE PANELS FOR LARGE AND SMALL SCALE PROJECTS WORKING WITH HANDSET CONNECTION TOOLS PUSH & PULL PROPS FOR HANDSET PANELS WORKING WITH HANDSET COLUMN FORMWORK

More information

modular scaffolding R+

modular scaffolding R+ modular scaffolding R+ 1. Stand 6. Transverse U-transom Stand is the main element of modular scaffolding. Made of 48.2x3.2 mm steel pipe. Every 0,5m on the whole stand length are installed steel plates

More information

Interior Hangers. Application

Interior Hangers. Application Application Interior bridge deck hangers are typically fabricated using two heavy duty sheet metal end clips that have been electrically resistance welded to an appropriate sized wire or formed metal connecting

More information

Reinforced concrete double walls

Reinforced concrete double walls Reinforced concrete double walls Build faster, pay less. Strength in building technology Uses The Kerkstoel reinforced double walls consist of two slabs of reinforced concrete joined to each other by lattice

More information

Note. Floor beams can also be made from wooden beams put through the holes in the longitudinal beam and boards nailed to it.

Note. Floor beams can also be made from wooden beams put through the holes in the longitudinal beam and boards nailed to it. Assembly instructions for HAKI IV These assembly instructions are designed for the construction of sectional HAKI IV scaffolding approved in accordance with the technical standards TP 73-05-60/020/83.

More information

Folding Platform FB Platform System. Instructions for Assembly and Use Standard Configuration

Folding Platform FB Platform System. Instructions for Assembly and Use Standard Configuration Platform System Edition 03 2015 Content Introduction Overview, Main Components 1 Key 4 Intended Use 5 Instructions for Use 5 General Safety Instructions 6 System-Specific Safety Instructions 7 Storage

More information

PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING!

PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING! INSTALLATION GUIDE This guide is intended to aide in the installation of Dura-Trench systems. There are many different applications and situations for the use of this product and the installation procedures

More information

Adjustable Suspension Hanger Technical Datasheet

Adjustable Suspension Hanger Technical Datasheet Adjustable Suspension Hanger sheet The Adjustable Suspension Hangers Clip are a component of the Keylock Ceiling System. The upper vertical side of the hanger allows the Suspension Rod that goes through

More information

SYSTEM S7-RHOMBOS INSTALLATION MANUAL

SYSTEM S7-RHOMBOS INSTALLATION MANUAL SYSTEM S7-RHOMBOS INSTALLATION MANUAL GENERAL INFORMATION GENERAL INFORMATION This assembly manual addresses all metal ceilings manufactured by durlum. The different sections describe the related/relevant

More information

ASSEMBLY AND OPERATING MANUAL LTW SLIDE RAIL SYSTEM - Type PV

ASSEMBLY AND OPERATING MANUAL LTW SLIDE RAIL SYSTEM - Type PV Manufacturer: LTW Tiefbauvertriebs GmbH Holter Weg 11 D 41836 Hückelhoven-Brachelen Phone: +49 (0) 24 62 / 2009 0 Fax: +49 (0) 24 62 / 2009 15 e-mail: info@ltw-verbau.de homepage: http:\ \ www.ltw-shoring.com

More information

TECHNICAL MANUAL. PEC Column Shoe. Heavy-duty Bolted Column Connections

TECHNICAL MANUAL. PEC Column Shoe. Heavy-duty Bolted Column Connections TECHNICAL MANUAL PEC Column Shoe Heavy-duty Bolted Column Connections Version: PEIKKO GROUP 09/2018 PEC Column Shoe For bolted column connections Advanced casting process with the help of standard accessories

More information

S7 Taifun Installation Manual

S7 Taifun Installation Manual CEIL ING LIGHTING AMBIENCE S7 Taifun Installation Manual GENERAL INFORMATION GENERAL INFORMATION This assembly manual addresses all metal ceilings manufactured by durlum. The different sections describe

More information