1

2 PART 2 FINANCIAL BID SCHEDULE (BILL) OF QUANTITIES 2

3 PART 2 SCHEDULE (BILL) OF QUANTITIES (PERCENTAGE RATE TENDER) ABSTRACT OF COST (PERCENTAGE TO BE QUOTED BY THE BIDDER) SCHEDULE DESCRIPTION TOTAL ESTIMATED COST (IN RUPEES) (1) Supply & Delivery of P. Rs.93,00, Way Fittings. (Rupees forty ninety three lakhs two hundred fifty seven and paise zero two only) (2) Supply & Spreading of Track Ballast (3) Laying & Linking of Track TOTAL ESTIMATED COST OF SCHEDULES (1) TO (3) (RUPEES) PERCENTAGE ABOVE (+) OR BELOW (-) OF TOTAL ESTIMATED COST OF SCHEDULES (1) TO (3) AS QUOTED Rs. 1,17,90, (Rupees one crores seventeen lakhs ninety thousand only) Rs.60,48, (Rupees Sixty thousand forty eight thousand four hundred fifty eight & paise fifty two only) Rs.2,71,38, (Rupees Two crores Seventy one lakh thirty eight thousand seven hundred fifteen & paise fifty four PERCENTAGE IN FIGURES PERCENTAGE IN WORDS only) * (+) or (-) * (PLUS) or (MINUS) TOTAL QUOTED COST OF SCHEDULS (1) TO (3) BASED ON PERCENTAGE QUOTED (+) or (-) (RUPEES) AMOUNT IN FIGURES (RUPEES) AMOUNT IN WORDS (RUPEES) LESS REBATE ( (IN WORDS) %), IF ANY Rs. NET QUOTED COST OF SCHEDULES (1) TO (3) (RUPEES) * strike out which is not applicable i. SIGNATURE OF AUTHORISED SIGNATORY OF TENDERER ii. NAME OF SIGNATORY iii. NAME AND SEAL OF TENDERER iv. DATE v. PLACE 3

4 Schedule of quantity Name of Work:- Laying, Linking of Railway track including supply of Track Ballast and P. Way fittings in connection with Construction of Railway siding from the existing Rail Head at Gankar Railway Station of Eastern Railway for connecting the proposed Cement Grinding Unit of M/s. Sonar Bangla Cement ( A Division of Century Textiles & Industries Ltd) at Gankar, Dist. Murshidabad, West Bengal. Schedule 1 (Supply of P. Way Fittings) Sl. Description of Item Unit Qnty 1 Supply of 52 Kg Fish Plates 610 Pairs mm. long to Drg..T- 090(M) & IRS specification (te: 1 Pair = 2 Fish Plates). 2 Supply of Fish Bolts, nuts and s washers, for 52 Kg. rails 25 mm. Dia x 140 mm long to RDSO Drg..T Supply of Combination fishplates for 60 Kg x 52 Kg rails as per RDSO rg.. CSO( C ) with fish bolts,nuts & washers complete. (1 set = R1-1, RO-1, LI- 1,LO-1) Set Supply of Combination fishplates for 52 Kg x 90R as per RDSO Drg.. CSO-C-1901(M) rails with fish bolts,nuts & washers complete. (1 set = R1-1, RO-1, LI- 1,LO-1) 5 Supply of Elastic rail clips to RDSO Drg..T-3701 protected by anticorrosive paint 6 Supply of J-Clips conforming to RDSO/T Supply of Grooved rubber sole plates 52 Kg Rail Layout to RDSO Drg..T Supply of Combination GFN Liner for 52 KgRails as per RDSO Drg.. T-3707 & 3708 = 1 Set 9 Supply of Fastenings and Fixtures for fixing check rails on Level Crossiings as per RDSO Specifications i) C.I.Brackets as per RDSO Drg.. T for 52 Kg Rails Section ii) C.I. Spacer as per RDSO Drg.. T for Level Crossing Set s s s Set Each Each

5 Description of Item Unit Qnty iii) Bolts & Nuts to Drg.. RDSO/T including single spring washer(22 x 110) for L.C. Each iv) Double coil spring washer to Drg.. RDSO/T Each v) Plate Screws to Drg.. RDSO/T & specification IRS.T-16/81 10 Supply of Joggled fish plates 60 Kg Rail Section as per RDSO Drg.. T with bolts, nuts & washers for providing at welded joint with clamps 11 Supply of Switch Clamp (Male & Female)) as per RDSO Drg.. T Bolts & Nuts to Drg.. RDSO/T including single spring washer(25 x290mm). Each Set Set Each a) Supply of Switch Clamp (Male & Female)) as per RDSO Drg.. T & T-4017/1 Set Supply of Switch Clamp (52KG X 60 Set Kg)) as per RDSO Drg.. T-2135 with Pad Lock & Key Fabrication, Manufacturing & supply of glued Insulated joint of following rail section as per RDSO Drg.. provided with 2 s x3.25m long rail and joining by 1m long fish plates & upto date alt & conforming to IRS Specfn including cost of all supplied materials required thereof i.e. the cost of rails, fish plates, bolts & nuts complete in all respect With 52 Kg/m90 UTS 1st quality Each rails to RDSO Drg.. T-5361(G3L Type) Total of Schedule 1 (Rs.) 93,00,

6 Schedule 2 (Supply & Spreading of Track Ballast) Sl. Description of Item Unit Qnty 1 Supply, delivery and stacking of Cu.m ,08,00, machine crushed 65mm gauge, clean, hard, angular and durable stone ballastas per specification and stacking the same on cess of formation or Toe of bank or at suitable places as direted by Engineerin -in-charge at Site. The rate includes all cost of lead lift, Royality, Sales Tax, and other taxes and duties and all incidental charges, complete as applicable, with all contractor's labour, tools, plant and machinery etc. complete as per RDSO specification. The rate also include levelling of ground if necessary, where the ballast are to be stacked.and follow the guide line of RDSO. 2 Handling, lifting and leading of Cu.m ,9, ballast from stacks within all lead,lift,ascent,descent,crossing Road/Rly lines etc. which have been duly measured and released for spreading and spreading the ballast on formation to ensure uniform and compact ballast cushion under the sleepers. The rate shall include spreading of ballast as per specified line and level and maintaining approved profile as provided in the technical specifications. Spreading of ballast on formation will be done only after supply is completed for a particular stretch as decided by Engineer in charge and ballast stacks have been released for spreading. Quantity of ballast used and payment thereof shall be made for the net quantity of ballast. Total of Schedule 2 (Rs.) 1,17,90,000 6

7 Schedule 3 (Laying & Linking of Track) Sl. Description of Item Unit Qnty 1 Laying, B.G.straight or curve P.Way Track kg 3 rails panel and concrete Metre sleeper (M+7) density with standard fittings ensuring correct spacing of sleepers, fixing & tightening of Fish bolts & nuts and maintaining proper guage, alignment, level (both cross & longitudinal), expansion gap at rail joints, super elevation where necessary and with one initial through packing. The rate should be inclusive of dekinking of rails as required, cutting of rails as required on straight and curve track for squaring of joints, drilling holes on web of rail square to rail surface by using proper template for fish plated joints, champhering of drilled holes, greasing and oiling of fish plates & fish bolts and nuts and at fishing zone of the rail ends including supply of grease oil etc. Sleeper spacing, versine, super elevation etc shall also be marked by the contractor with white paint at his own cost. The work has to be carried out as laid down in IRPWM and as per direction of the Engineer-in-Charge at site. The unit of track metre consists both sides rails, sleepers and all other fittings required thereof including provision of reference pillar at 100m apart on cess of the formation 7

8 Description of Item Unit Qnty 2 Laying, B.G.straight or curve P.Way 52 Kg Single rails on any type of concrete sleeper (M+7) density with standard fittings ensuring correct spacing of sleepers, fixing & tightening of Fish bolts & nuts and Track Metre maintaining proper guage, alignment, level (both cross & longitudinal), expansion gap at rail joints, superelevation where necessary and with one initial through packing. The rate should be inclusive of dekinking of rails as required, cutting of rails as required on straight and curve track for squaring of joints, drilling holes on web of rail square to rail surface by using proper template for fish plated joints, champhering of drilled holes, greasing and oiling of fish plates & fish bolts and nuts and at fishing zone of the rail ends including supply of grease oil etc. Sleeper spacing, versine, superelevation etc shall also be marked by the contrctor with white paint at his own cost. The work has to be carried out as laid down in IRPWM and as per direction of the Engineer-in-Charge at site. The unit of track metre consists both sides rails, sleepers and all other fittings required thereof including provision of reference pillar at 100m apart on cess of the formation 3. a) Regradation of existing track with new track of any kind of Rail section and Sleepers near Chainage 0/763 to 0/923 by liifting of track and through packing and stable the track complete including all labours, Tools & Plants, Machinery, alignment, gauging, levelling, complete in all respect( Apporach of Track) Track Metre

9 Description of Item Unit Qnty 4. Through packing of any kind of sleepers with stone ballast to maintain correct alignment cross and longitudinal level as required for maintaining track gauge, versine, superelevation etc. on both straight and curve track laid with contractor's tools and labour inclusive of all charges as per IRPWM and as directed by Engineer-in-charge a) 1st through packing Track Metre b) 2nd through packing Track Metre c) 3rd through packing (Under specific orders of Engineer-incharge) Track Metre d) 4th through packing (Under specific orders of Engineer-incharge) 5. Dismantling of existing B.G.Track of 52Kg or any section of rails with any kind & any density of sleepers with fittings and fastenings. The rate should be inclusive of cutting of rails, fish plates, bolts & nuts, if necessary, for dismantling of track. Replaced materials should be segregated and are to be kept separately i.e. Rails, Sleepers, fastenings etc. by the side of the track or as per direction of the Engineer-in-Charge including dismantling of rail claster, if any 6. Dismantling of existing Points & Crossing of 52Kg ( 1 in 12 ) on any type of Sleepers with fittings and fastenings. The rate should be inclusive of cutting of rails, fish plates, bo;lts & nuts, if necessary, for dismantling of Points & Crossings. Replaced materials should be segregated and are to be kept seperately i.e. Rails, Sleepers, fastenings etc. by the side of the track or as per direction of the Engineer-in-Charge including dismantling of rail claster, if any Track Metre Track Metre Set

10 Description of Item Unit Qnty 7. Dismantling of existing Derailing Awitch of 52Kg ( 1 in 8.1/2 ) on any type of Sleepers with fittings and fastenings. The rate should be inclusive of cutting of rails, fish plates, bo;lts & nuts, if necessary, for dismantling of Points & Crossings. Replaced materials should be segregated and are to be kept seperately i.e. Rails, Sleepers, fastenings etc. by the side of the track or as per direction of the Set Engineer-in-Charge including dismantling of rail claster, if any 8 Assembling, linking and laying in position B.G. Standard turn-outs & Derailing switch on P.S.C. sleepers including approach & exit PSC sleeper portion to correct alignment & gauge. This includes switches lead rails, stock rails both straight and curve, crossig with 60 kg rails and standard fittings ensuring correct spacing of sleepers fixing & tightening of Fish bolts & nuts and maintaining proper guage, expansion gap at rail joints, including fitting & fixing Hand Lever Box and one initial through packing. The rate should be inclusive of dekinking of rails as required, bending stock rails, cutting of rails to required standard size and drilling holes on web of rails square to rail surface by using proper template (for fixing Fish plates, distance block, stretcher bars), greasing and oiling of Fish plates and Fish bolts and nuts and at Fishing zone of the rail ends including transportation at site, supply of grease, oil etc. complete in all respect. Contd 10

11 Description of Item Unit Qnty contd...the rate should also be inclusive of carrying rails, sleepers, switches, crossings, fittings & fastenings with all lead, lift, ascent, descent crossing Road/Rly line if necessary from the M/s RITES/Sonar Bangla Cement store Depot to site of work within a distance of 3Km.Sleeper spacing shall also be marked by the contractor with white paint at his own cost. The work has to be carried out as laid down in IRPWM & as per direction of Engineer-in-Charge i)1 in 12 Turn-Outs (LH-5& RH-2) Set ii) 1 in 8.1/2 symmetrical Turnouts( Set Sym-4) iii) 1 in 8.1/2 Derailing switch (LH-1 & RH-1) Set Through packing of 1 in 12 Turn-out on any kind of sleepers with stone ballast to maintain correct alignment cross and longitudinal level as required for maintaining track gauge, versine, superelevation etc. on both straight and curve track laid with contractor's tools and labour inclusive of all charges as per IRPWM and as directed by Engineer-in-charge a) 1st through packing Set b) 2nd through packing Set c) 3rd through packing (Under specific orders of Engineer-incharge) d) 4th through packing (Under specific orders of Engineer-incharge) Set Set

12 Description of Item Unit Qnty 10. Through packing of 1 in 8.1/2 Turnout on any kind of sleepers with stone ballast to maintain correct alignment cross and longitudinal level as required for maintaining track gauge, versine, superelevation etc. on both straight and curve track laid with contractor's tools and labour inclusive of all charges as per IRPWM and as directed by Engineer-in-charge a) 1st through packing Set b) 2nd through packing Set c) 3rd through packing (Under Set specific orders of Engineer-incharge) d) 4th through packing (Under specific orders of Engineer-incharge) Set Through packing of 1 in 8.1/2 Derailing Switch on any kind of sleepers with stone ballast to maintain correct alignment cross and longitudinal level as required for maintaining track gauge, versine, superelevation etc. on both straight and curve track laid with contractor's tools and labour inclusive of all charges as per IRPWM and as directed by Engineer-in-charge a) 1st through packing Set b) 2nd through packing Set c) 3rd through packing (Under specific orders of Engineer-incharge) d) 4th through packing (Under specific orders of Engineer-incharge) Set Set

13 Description of Item Unit Qnty 12 Manufacturing and fixing of check rails for R/M L-Xing by cutting flange of 52 kg rails of required size and bending/planning the ends as per RDSO Drg.no. T-3282 with upto date Alt. conforming to IRS-T-10, drilling holes on web. Fixing the check rail to the inner side of running rail the curve & Level Crossig both side with the help of C.I. Bracket, bolts, nuts and plate screw at an intervals as directed by Engineer-in-charge maintaining proper check rail clearance and fixing them on each concrete sleeper. 13 Making and fixing in position cement Each concrete (1:2:4) Fouling Mark as per enclosed drawing with proper painting and lettering as per directives of the Engineer-in-Charge of the work. The rate is inclusive of all materials like cement, stone agreegates, sand and paints etc., earth work in excavation and all incidental works required for fixing in position complete in all respects. 14 Welding of rail joints 52 kg from single rail to 3-rail panel by SKV process with contractors supply PORTION approved by RDSO (to be supplied with authenticated certificate), dry moulds including supplying skilled/artisan staff like welder, moulder, chipper,lutter, aligner, striker/hammerman & adequate nos. of semi-skilled and unskilled labour and supplying litre/joint for facilitating welding works on track by shifting the joint sleepers on either side, providing suitable gap of about 23 mm to 25 mm for welding, fixing the petrol tanks & heating the rail ends by approved contractor's equipment and chipping the exess materials if required, aligning, levelling etc. complete including filing after welding. The work is to be carried out as per alumino Thermic Welding Manual and as per Specification IRS-T The rate should also be inclusive of pulling back of rails for providing required gap at rail joint for Thermit welding. Per Joint

14 Description of Item Unit Qnty 15 Making and fixing in position cement concrete (1:2:4) Curve Post as per enclosed drawing with proper painting and lettering as per directives of the Engineer-in-Charge of the work. The rate is inclusive of all materials like cement, stone agreegates, sand and paints etc., earth work in excavation and all Each incidental works required for fixing in position complete in all respects. 16 Making and fixing in position cement concrete (1:2:4) Kilometre Post as per enclosed drawing with proper painting and lettering as per directives of the Engineer-in-Charge of the work. The rate is inclusive of all materials like cement, stone agreegates, sand and paints etc., earth work in excavation and all Each incidental works required for fixing in position complete in all respects. 17 Making and fixing in position cement concrete (1:2:4) Gradient post as per enclosed drawing with proper painting and lettering as per directives of the Engineer-in-Charge of the work. The rate is inclusive of all materials like cement, stone agreegates, sand and paints etc., earth work in excavation and all Each incidental works required for fixing in position complete in all respects. 14

15 Description of Item Unit Qnty 18 Manufacturing, fabricating, supply and Each fixing in position of steel boards e.g. W/L boards, STOP boards, CAUTION boards with stand or any other similar type of boards as per drawing and specification mention in IRPWM with contractor's all materials such as steel sheets (2mm thick), M.S. angles (65 X 65 X 10mm), electodes, etc. including earth work in excavation & grouting complete in all respect. The rate should be inclusive of painting with two coats of priming coat of approved quality, lettering incl. supply of contractor's paint with all lead, lift, ascent, descent, etc. 19 Providing and fixing of Gate post of RM m height from road level with depertmental rails. The work includes supply of contractor's materials e.g. concreating materials, paint, etc. with all lead, lift complete. The item also includes carrying & cutting of rails into required size as per sketch (enclosed). The rate to be inclusive of cement, sand and stone agreegate, painting the gate post with black and white paint bands (two coats over a priming coat) as per directives of Engineer In-charge. 20 Scrapping rust, dust etc. from rails surface by wire brussing, chiselling etc. and painting of rail surface with anti corrosion paints i.e. one coat zinc chromate primer followed by two coats of bituminous emulsion after properly cleaning the surface including handing, rehandling etc. painting is to be done on web, foot & bottom of rail surface of rail except surface of rail head. The rate includes cost of labour & cost of approved make primer & bitumimous emulsion ( berger, shalimer, ICI, Acianpaints or any other make of equivalent quality) supplied by the contractor. [te:- The rails must be painted before the same are laying into track.] R/M

16 Description of Item Unit Qnty 21 Construction of Sand Hump with Each Brick work as per RITES drawing including supply of Cement, Sand, Bricks and all other materials. The rate should also include all labours, tolls & plants, machinery with all leasd, lift, ascent, descent etc.including Sand filling on sand Hump portion complete in all respect (As per RITES Drawing) 22 Transportation of rails, sleepers, MT fittings & fastenings from the dept. store of RITES/Sonar Bangla Cement to the nearest point of site within 3 Km of work by contractors transport including handling, loading, unloading of materials with all lead, lift, crossing road/ rly. tracks etc complete. 23 Installation of 52Kg G-3L Glued Joint Rail of about 6.5 mtr. Length each at different locations by cutting rails with provision of Welding joint gap as specified 23mm to 25mm on both end of glued joint rail and drilling holes on running lines and drilling necessary holes obn at either end of Glued Joint Rail as per requirement during traffic block, fish plating the same on at either end of Glued joints with fish bolts & nuts as per Engineer-in-Charge. The rate Set should be inclusive of transportation of Guled Joint rail from TITES Store depot to site of work with in a distance upto 5 Km ande bringing back the released rail from site of work to RITES store including loading, unloading with necessary lead, lift, ascent, descent and crossing the road/railway lines if necessary and stacking the same in proper manner complete in all respect. 24 Cutting of GFN Liner as per s instruction of Engineer-inCharge Total of Schedule

MEJA URJA NIGAM PVT. LIMITED

MEJA URJA NIGAM PVT. LIMITED MEJA URJA NIGAM PVT. LIMITED NAME OF WORK: TENDER AND CONTRACT DOCUMENT FOR Supply of PSC Sleepers, P-Way materials (except rails) including Points & Crossings, Laying and linking of track including Points

More information

NTPC Ltd. KORBA VOLUME-II (FINANACIAL BID) Consultants

NTPC Ltd. KORBA VOLUME-II (FINANACIAL BID) Consultants NTPC Ltd. KORBA OPEN TENDER NOTICE NO.RITES/GGM/NGP/T-07-2015, DATED 05.03.2015 Name of work: Earthwork in Drain Foundation, construction of minor bridges and RCC drain, P-Way works etc for the construction

More information

Brahmaputra Cracker and Polymer Limited SCHEDULE OF RATES

Brahmaputra Cracker and Polymer Limited SCHEDULE OF RATES SCHEDULE OF RATES NAME OF WORK: EXECUTION PACKAGE I (Part-A: Earthwork in Railway Formation & Part-B: Laying of Railway Track), FOR RAIL INFRASTRUCTURE OF BRAHMAPUTRA CRACKER AND POLYMER LIMITED (BCPL)

More information

Bihar State Power Generation Company Ltd. (BSPGCL)

Bihar State Power Generation Company Ltd. (BSPGCL) Bihar State Power Generation Company Ltd. (BSPGCL) Open Tender tice. 16/OT/BSPGCL-BTPS/Rly. Siding/PKG-II/2015 Dated 06.05.2015. Tender document for the work of Earthwork in formation including blanketing,

More information

KANTI BIJLEE UTPADAN NIGAM LIMITED (KBUNL) (A Joint Venture of NTPC Ltd. And BSEB ) SCHEDULE (BILL) OF QUANTITIES (Percentage Rate Contract)

KANTI BIJLEE UTPADAN NIGAM LIMITED (KBUNL) (A Joint Venture of NTPC Ltd. And BSEB ) SCHEDULE (BILL) OF QUANTITIES (Percentage Rate Contract) KANTI BIJLEE UTPADAN NIGAM LIMITED (KBUNL) (A Joint Venture of NTPC Ltd. And BSEB ) TENDER NO. 39/OT/R/KBUNL-MTPP/Formation /PKG- II/2013 Dated 27.08.2013 Tender and Contract document for earthwork in

More information

Sieve Size 2" 1" 3/8" No. 10 No. 40 No. 200 % Passing Size

Sieve Size 2 1 3/8 No. 10 No. 40 No. 200 % Passing Size VII. MATERIALS 7.01 SUBBALLAST Subballast shall be crusher-run stone (dense graded aggregate), preferably limestone or granite material and shall meet the requirements as set out in Chapter 1, Part 2,

More information

MTSP MANUFACTURE AND SUPPLY OF INSULATED RAIL JOINTS

MTSP MANUFACTURE AND SUPPLY OF INSULATED RAIL JOINTS Engineering Specification Track MANUFACTURE AND SUPPLY OF INSULATED RAIL JOINTS Version: 2 Issued: December 2015 Owner: Engineering Division Approved By: Liam Palmer Cannon A/Head of Engineering Track

More information

Schedule Of Works. 35 Konkan Railway Corporation Limited Signature of Tenderer

Schedule Of Works. 35 Konkan Railway Corporation Limited Signature of Tenderer Schedule Of Works 35 Konkan Railway Corporation Limited Signature of Tenderer Schedule of Works (Package II, Chainage 5/400 to 7/800 = 2400 mtrs SCHEDULE - A (CUTTING) Name of work: Limited tender for

More information

WATER WORKS SECTION भ रत य प र द य स स थ खड़गप र Indian Institute of Technology, Kharagpur TENDER NOTICE

WATER WORKS SECTION भ रत य प र द य स स थ खड़गप र Indian Institute of Technology, Kharagpur TENDER NOTICE WATER WORKS SECTION भ रत य प र द य स स थ खड़गप र Indian Institute of Technology, Kharagpur TENDER NOTICE No. : IIT/WW/2017-18/ 35 Dt. : 19.01.2018 The Sr. Executive Engineer (Water Works), IIT Kharagpur

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

No # Specifications Rate To Be Quoted. Unit Qty (in figures) (in words) Total Amount

No # Specifications Rate To Be Quoted. Unit Qty (in figures) (in words) Total Amount Revised Schedule B as per corrigendum no. SASB/NIT/Works/818/2016/09 dated 28.01.2016. SCHEDULE B (FINANCIAL BID) B- a FABRICATION AND SUPPLY OF 200 EUROPEAN TYPE TOILETS (Rate to be quoted in Rupees both

More information

TENDER SPECIFICATION

TENDER SPECIFICATION TENDER SPECIFICATION BHEL PSSR SCT 1324 FABRICATION & ERECTION OF STRUCTURAL STEEL IN POWER HOUSE, MILL BUNKER BAY, AUXILLIARY BUILDINGS AND PIPE RACK ETC FOR 2 X 600 MW TPP FOR TAMIL NADU ELECTRICITY

More information

UNIT III Earthwork Estimation & Reinforcement Estimation

UNIT III Earthwork Estimation & Reinforcement Estimation SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road 517583 QUESTION BANK (DESCRIPTIVE) Subject with Code : ECV(13A01605) Year & Sem: IV-B.Tech & I-Sem Course & Branch: B.Tech

More information

ST ANDARD SPECI FI CAT I ON FOR T ANK PADS

ST ANDARD SPECI FI CAT I ON FOR T ANK PADS ST ANDAR D SPECIFICAT ION 0 26.10.2005 I SSUED T ENDER HS HS RPB No. Date Revision By Chkd Appd C1088-ECS-SP-211 Page 1 of 6 0 CONT ENT S 1. SCOPE 2. R EFER ENCE STANDARDS 3. SUB-GR ADE PREPARATION 4.

More information

BALMER LAWRIE & CO. LTD. 32, Sattangadu Village, Manali, Chennai Phone: /628, Fax No:

BALMER LAWRIE & CO. LTD. 32, Sattangadu Village, Manali, Chennai Phone: /628, Fax No: BALMER LAWRIE & CO. LTD. 32, Sattangadu Village, Manali, Chennai 600068 Phone: 044-25946621/628, Fax No: 044-25941436 Email No: srinivas.pcs@balmerlawrie.com DUE DATE & TIME: [16/02/2018 at 15:00 Hrs.]

More information

S.No Description Unit Quantity Rate (Rs) Amount (Rs)

S.No Description Unit Quantity Rate (Rs) Amount (Rs) , S.No Description Unit Quantity Rate (Rs) Amount (Rs) 1 2 Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge method and preparation

More information

TECHNICAL SPECIFICATION FOR 11mtr. LONG STEEL TUBULAR POLE

TECHNICAL SPECIFICATION FOR 11mtr. LONG STEEL TUBULAR POLE Annexure-A TECHNICAL SPECIFICATION FOR 11mtr. LONG STEEL TUBULAR POLE 1.0 SCOPE 1.1 This specification covers the design, manufacture, testing at works, supply / delivery & transportation of 11 mtr long

More information

: Supply, Installation, Testing &Commissioning of 2 Nos. Façade cleaning Roof Top Trolleys at SCOPE Minar, Laxmi Nagar, Delhi

: Supply, Installation, Testing &Commissioning of 2 Nos. Façade cleaning Roof Top Trolleys at SCOPE Minar, Laxmi Nagar, Delhi SCOPE Minar/MMO/17-18/173 15/12/2017 NOTICE INVITING TENDER Subject: Supply, Installation, Testing &Commissioning of 2 Nos. Facade cleaning Roof Top Trolleys at SCOPE Minar, Laxmi Nagar, Delhi-110092.

More information

De Montfort Mark 7 Incinerator (Flatpack)

De Montfort Mark 7 Incinerator (Flatpack) De Montfort Mark 7 Incinerator (Flatpack) Introduction This design is specially for those occasions when a large number of incinerators are to be built at one location and transported to the places where

More information

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. Beit Hanoun Emergency Water Supply Project "Beit Hanoun Emergency Water Supply Project" " Rehabilitation and Construction of Beit Hanoun Water Network " BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE Bill of Quantities PREAMBLE TO

More information

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1 March 2002 No. 400 INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS 400. 1 SCOPE... 1 400. 2 REMOVING CULVERTS AND TIMBER STRUCTURES 2.1 Concrete and Metal Pipe Culverts... 1 2.2 Structural

More information

BOQ for Lintel, Chajja, Brick work & Plastering work at Pkg. - III - Phase - I

BOQ for Lintel, Chajja, Brick work & Plastering work at Pkg. - III - Phase - I BOQ for Lintel, Chajja, Brick work & Plastering work at Pkg. - III - Phase - I S.No. Description Unit Qty RATE Amount PART-I CIVIL WORKS B-PLAIN AND REINFORCED CEMENT CONCRETE : Notes : ( the following

More information

SITE VISIT REPORT DATE: JOB: NO. OF VISIT: PAGE OF : PURPOSE OF VISIT: CONTRACTOR: Items to be checked Observations Actions SETTING OUT

SITE VISIT REPORT DATE: JOB: NO. OF VISIT: PAGE OF : PURPOSE OF VISIT: CONTRACTOR: Items to be checked Observations Actions SETTING OUT SETTING OUT Correct to boundaries Correct to building lines? Diagonals accurate? Levels correct? EXCAVATIONS Adjoining structures OK? Centres of foundations line with walls? Bottoms of trenches uniform,

More information

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL This section covers the furnishing and installation of ductile iron water pipe, fittings, thrust restraint and pipe disinfection. Ductile Iron Pipe MATERIALS

More information

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

B. Polyethylene samples shall be submitted for Owner approval of color and quality. Glass Rail ENGINEERED DASHERBOARD SPECIFICATIONS PART 1 - GENERAL 1.01 PROJECT SCOPE A. Contractor shall furnish and install one complete set of steel framed dasherboards as indicated on the drawings and

More information

RAILTEL CORPORATION OF INDIA LTD (A Govt. of India Undertaking)

RAILTEL CORPORATION OF INDIA LTD (A Govt. of India Undertaking) RailTel /Tender/OT/WR/HQ/2007-08/100 RAILTEL CORPORATION OF INDIA LTD (A Govt. of India Undertaking) TENDER DOCUMENT FOR Supply trenching and laying of 6 Quad cable & OFC along with associated accessories.

More information

TENDER DOCUMENT. TENDER No.: BHI/PI(S)/675/1007 FOR

TENDER DOCUMENT. TENDER No.: BHI/PI(S)/675/1007 FOR TENDER DOCUMENT TENDER No.: BHI/PI(S)/675/1007 FOR Tender for supply of perforated cable tray for the Project of - Augmentation of Fuel & Flux Crushing Facilities (Pkg- 064) for Bhilai Steel Plant at Chhattisgarh

More information

September 13, Enclosed is Addendum No. 6 to SEPTA's Sealed Bid No AMJP Frazer Shop & Yard Expansion Contract 2.

September 13, Enclosed is Addendum No. 6 to SEPTA's Sealed Bid No AMJP Frazer Shop & Yard Expansion Contract 2. September 13, 2016 Dear Sir/Madam Enclosed is Addendum No. 6 to SEPTA's Sealed Bid No. 16-00138-AMJP Frazer Shop & Yard Expansion Contract 2. The bid opening date and time scheduled for Monday, September

More information

STOCKHOLDING DOCUMENT MANAGEMENT SERVICES LIMITED FORMERLY KNOWN AS SHCIL PROJECTS LIMITED

STOCKHOLDING DOCUMENT MANAGEMENT SERVICES LIMITED FORMERLY KNOWN AS SHCIL PROJECTS LIMITED STOCKHOLDING DOCUMENT MANAGEMENT SERVICES LIMITED FORMERLY KNOWN AS SHCIL PROJECTS LIMITED REQUEST FOR PROPOSAL (RFP) 130616 FOR SUPPLY INSTALLATION AND COMMISSIONING OF STEEL MEZZANINE FLOORING AT MAHAPE

More information

MASTERSPEC - SHORT FORM. B. See Division 5 Section "Metal Stairs" for steel tube railings associated with metal stairs.

MASTERSPEC - SHORT FORM. B. See Division 5 Section Metal Stairs for steel tube railings associated with metal stairs. SECTION 05721 - ORNAMENTAL RAILINGS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Glass supported railings. B. See Division 5 Section "Metal Stairs" for steel tube railings associated

More information

Estimate FOR THE SEPTIC TANK

Estimate FOR THE SEPTIC TANK Estimate FOR THE SEPTIC TANK S.NO ITEM DESCRIPTION. 1 Excavation in soil,soft & hard murum... Qty UNIT Rate Excavation for footing, machine foundation, plinth beams, wall footing, gutters,brick wall, tanks

More information

CHAIN LINK FENCES AND GATES

CHAIN LINK FENCES AND GATES SECTION 02831 CHAIN LINK FENCES AND GATES PART 1 GENERAL 1.01 SUMMARY A. Alternate Material for Fence Post and Framing Material: Where schedule 40 galvanized steel is specified, the following will be accepted:

More information

MISHRA DHATU NIGAM LIMITED P.O.KANCHANBAGH, HYDERABAD. Part-II (PRICE BID)

MISHRA DHATU NIGAM LIMITED P.O.KANCHANBAGH, HYDERABAD. Part-II (PRICE BID) MISHRA DHATU NIGAM LIMITED P.O.KANCHANBAGH, HYDERABAD Part-II (PRICE BID) RETROFITTING OF B5 & C5 COLUMNS OF FORGE SHOP, MIDHANI, KANCHANBAGH, HYDERABAD-58. PURCHASE DEPARTMENT Tender Notice No: MDN/PUR/AP2061032/ADVT/146/16-17

More information

TRACK TOLERANCES NEETHU NARAYANAN B060128CE MURSHID B060471CE

TRACK TOLERANCES NEETHU NARAYANAN B060128CE MURSHID B060471CE TRACK TOLERANCES NEETHU NARAYANAN B060128CE MURSHID B060471CE 1 Introduction The safety and comfort of rail travel depend primarily on the track geometry and the standard to which it has been maintained.

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

SCOPE OF WORK FOR PILING JOB

SCOPE OF WORK FOR PILING JOB SCOPE OF WORK FOR PILING JOB 1.0 PURPOSE This document defines the scope of works and specific requirements for the tank pad construction including pile foundation system for the proposed tanks at Wadala

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY):

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): 01 Providing and Fixing of CPVC pipes confirming to ASTM standard including all CPVC fittings like tees, elbows, bends, unions, coupling, reducer

More information

TENDER DOCUMENT FOR OVERHAULING OF IRON REMOVAL PRESSURE FILTERATION PLANT AND ANNUAL MAINTENANCE CONTRACT 9B, QUEEN S PARK, KOLKATA

TENDER DOCUMENT FOR OVERHAULING OF IRON REMOVAL PRESSURE FILTERATION PLANT AND ANNUAL MAINTENANCE CONTRACT 9B, QUEEN S PARK, KOLKATA TENDER DOCUMENT FOR OVERHAULING OF IRON REMOVAL PRESSURE FILTERATION PLANT AND ANNUAL MAINTENANCE CONTRACT AT 9B, QUEEN S PARK, KOLKATA-700 09 RESIDENTIAL COMPLEX OF BALMER LAWRIE &CO. LTD. Tender No.

More information

METAL HANDRAILS AND RAILINGS. A. Properly identified manufacturer's literature, including shop and erection drawings before starting work.

METAL HANDRAILS AND RAILINGS. A. Properly identified manufacturer's literature, including shop and erection drawings before starting work. SECTION 05520 METAL HANDRAILS AND RAILINGS PART 1 GENERAL 1.01 SUBMITTALS A. Properly identified manufacturer's literature, including shop and erection drawings before starting work. B. Railing Assemblies

More information

Panel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT

Panel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT IMPORTANT SAFETY INFORMATION FOR USERS OF THE REECHCRAFT, BRACING SYSTEM PLEASE READ BEFORE USE Panel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT UK Edition 1.3 26/11/2012 1 TABLE OF CONTENTS

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

IBC Compliant Seismic Rated Isolators

IBC Compliant Seismic Rated Isolators ISOLATORS IBC Compliant Seismic Rated Isolators Features & Benefits Rugged steel housing is designed to handle high wind and seismic forces. Housing serves as blocking during equipment erection. Top plate

More information

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014 STATE STRUCTION FUND DIRECTIVE 5-1 Issue date: October 2014 STRUCTURAL STEEL 1. General: It is the Fund's policy that the design of the structural steel is the prime responsibility of the project's Structural

More information

TECHNICAL BID. Name of the party :

TECHNICAL BID. Name of the party : TENDER FORM FOR QUOTED RATE FOR THE SUPPLY OF. TENDER FORM II TECHNICAL BID Name of the party : --------------------------------------- Address : ---------------------------------------- ----------------------------------------

More information

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2 INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...

More information

Schedule (A) Non Schedule Items:

Schedule (A) Non Schedule Items: BILL OF QUANTITY Annexure D Name of work: Construction of 50m x 30m x 4m size store shed on RCC footing, RCC and steel columns, Brick wall, SAW tooth type steel truss, Beams, purlins etc. Galvalume and

More information

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL 1. SCOPE 2. DESIGN 3. MATERIALS 4. CONSTRUCTION 5. METHOD OF MEASUREMENT AND PAYMENT SCOPE This Specification sets out requirements for the design,

More information

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING SECTION 05400 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work of this Section shall include all materials and installation necessary to provide all cold formed metal framing. B. This Section includes:

More information

A-Series Aluminum Gantry Crane

A-Series Aluminum Gantry Crane SPANCO PRODUCT SPECIFICATIONS 1 A-Series Aluminum Gantry Crane This guide can be used to prepare a bid specification for the incorporation of an A-Series Gantry Crane into a competitive bid project or

More information

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT 325.0 957 100.130 F.L.=99.780 12205 2300 2300 2300 2720 125 EXPANSION GAP 125 EXPANSION GAP OUTER COVER PLATE 640X40X1070 938.5 1350 1350 1350 1282.5 1350 1350 1122.5 1350 1356.5 1356.5 1350 1122.5 1350

More information

F-84/MAINT./W.S./

F-84/MAINT./W.S./ F-84/MAINT./W.S./2017 20.03.2017 Sub.: Limited tender for O & M of Water-Supply including De-watering Systems of HQ Building, Preet Vihar, Delhi-110092 Sir, The CBSE intends to assign the AMC for O & M

More information

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Division Office,Jamla, 220 kv Sub-Station Compound

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Division Office,Jamla, 220 kv Sub-Station Compound GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Division Office,Jamla, 220 kv Sub-Station Compound Website : www.gseb.com Phone No. 02764 280551 E-mail : eetrjamla.getco@gebmail.com TENDER NO : JTD 14 Technical

More information

Installation Manual. Orion. TL-3 Steel Barrier. VHD (v2)

Installation Manual. Orion. TL-3 Steel Barrier. VHD (v2) Installation Manual Orion TL-3 Steel Barrier VHD (v2) 300914 Table of Contents Orion Introduction.......... 3 Limitations & Warnings. 4 Before Installation..... 3 System Design & Design Considerations

More information

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) SECTION 13125 ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

INSTITUTE OF PHYSICS (AN AUTONOMOUS RESEARCH INSTITUTION OF DEPARTMENT OF ATOMIC ENERGY GOVERNMENT OF INDIA) P.O. SAINIK SCHOOL, BHUBANESWAR

INSTITUTE OF PHYSICS (AN AUTONOMOUS RESEARCH INSTITUTION OF DEPARTMENT OF ATOMIC ENERGY GOVERNMENT OF INDIA) P.O. SAINIK SCHOOL, BHUBANESWAR INSTITUTE OF PHYSICS (AN AUTONOMOUS RESEARCH INSTITUTION OF DEPARTMENT OF ATOMIC ENERGY GOVERNMENT OF INDIA) P.O. SAINIK SCHOOL, BHUBANESWAR-751005 QUOTATION CALL NOTICE FOR Carpentry Materials Page 1

More information

COUNCIL OF SCIENTIFIC & INUDSTIRAL RESEARCH NEW DELHI NIT

COUNCIL OF SCIENTIFIC & INUDSTIRAL RESEARCH NEW DELHI NIT COUNCIL OF SCIENTIFIC & INUDSTIRAL RESEARCH NEW DELHI NIT Tenders are hereby invited for the work of SITC OF SOLAR WATER HEATING SYSTEM at Guest Houses of CSIR Complex, Science Centre & MBSA Ashram Chauk,

More information

CONSTRUCTION AND REHABILITATION OF FENCE AT GPL'S VERSAILLES COMPOUND

CONSTRUCTION AND REHABILITATION OF FENCE AT GPL'S VERSAILLES COMPOUND BILL Nr1 - PRELIMINARIES 1.0 PRELIMINARY PARTICULARS 1.1 Funding The funding shall be provided by the Guyana Power & light Inc., of 40 Main street, North Cummingsburg, Georgetown. 1.2 Engineer The Engineer

More information

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT SECTION 230548 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Elastomeric Isolation pads. 2. Elastomeric Isolation mounts. 3. [Freestanding] [Restrained] [Freestanding and restrained]

More information

CITY OF FARGO SPECIFICATIONS SIGNING

CITY OF FARGO SPECIFICATIONS SIGNING SIGNING PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of furnishing all labor, material and accessories necessary to complete

More information

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

1. Vertical reciprocating conveyor, Hydraulic straddle VRC.

1. Vertical reciprocating conveyor, Hydraulic straddle VRC. PART 1: GENERAL 1.01 Section Includes: 1. Vertical reciprocating conveyor, Hydraulic straddle VRC. a. Machine, controller, platform, structural steel hoist frame. b. Wire mesh enclosure and gates. Related

More information

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017 SECTION 055213 - PIPE AND TUBE RAILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Planning and installation instructions

Planning and installation instructions Planning and installation instructions Stofix Oy Ahlmaninkatu 2 E 40100 Jyväskylä Finland stofixgroup@stofix.com www.stofix.com 2 PLANNING AND INSTALLATION INSTRUCTIONS... 1 1 General... 3 2 Project Design...

More information

PAVING SLABS ON A CONCRETE BASE

PAVING SLABS ON A CONCRETE BASE SECTION 32 14 13.16 PAVING SLABS ON A CONCRETE BASE (1995 MasterFormat Section 02784) Note: This guide specification for the U.S. is for paving slabs on a sand bed over concrete for pedestrian applications.

More information

Rail anchoring systems Introduction Bottom-up post-installed method Top-down cast-in method. Rail anchoring systems

Rail anchoring systems Introduction Bottom-up post-installed method Top-down cast-in method. Rail anchoring systems Rail anchoring systems Rail anchoring systems Introduction Bottom-up post-installed method Top-down cast-in method 09 / 2014 These pages are part of the Anchor Fastening Technology Manual issue September

More information

801-MORD Mordred FIXING: Ground. ORDER No: CUSTOMER: Complied by Date AB 30/06/15 ISSUE ECN DATE SIGN /07/15 AB

801-MORD Mordred FIXING: Ground. ORDER No: CUSTOMER: Complied by Date AB 30/06/15 ISSUE ECN DATE SIGN /07/15 AB CUSTOMER: 0-MORD Mordred ORDER No: FIXING: Ground Complied by Date 0/0/5 ISSUE ECN DATE SIGN 0 7 0/07/5 CUSTOMER: 0-MORD Mordred ORDER No: FIXING: Ground Low tower.m single slide Low scramble net High

More information

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General DESIGN STANDARDS Division 02 Existing Conditions- Site Work General I. This Division includes: A. Demolition B. Clearing and Grubbing C. Excavation, Backfill and Compaction D. Pavement Base E. Paving and

More information

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings SECTION 32 12 36 SEAL COATS PART 1 GENERAL 1.1 RELATED WORK A. Section 31 10 00: Site Preparation B. Section 32 12 00: Flexible Paving C. Section 32 17 23 01: Traffic Striping and Pavement Markings 1.2

More information

Protective Capony RTC-16

Protective Capony RTC-16 Protective Capony RTC-16 ASSEMBLY AND OPERATION MANUAL Protective Canopy RTC-16 Assembly and Operation Manual CONTENT: 1 APPLICATION...3 2 OPERATION CONDITIONS...3 3 TECHNICAL SPECIFICATIONS...3 4 DELIVERY

More information

BILL OF MATERIALS Name of the work: F.T.S Modernisation Work

BILL OF MATERIALS Name of the work: F.T.S Modernisation Work 1 BILL OF MATERIALS Name of the work: F.T.S Modernisation Work Erection,Testing and commissioning of Converter transformer 3 PH,11 KV/2 X 1800 V,4000 KVA outdoor Transformer size of 3150 L X 2800 D X 3200

More information

Smarter. Safer. Leaner.

Smarter. Safer. Leaner. Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter

More information

PATHWAYS FOR COMMUNICATIONS SYSTEMS

PATHWAYS FOR COMMUNICATIONS SYSTEMS 270528 PATHWAYS FOR PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all labor, materials, and equipment for the complete installation of work called for in the Contract Documents. 1.2 SCOPE OF WORK A. This

More information

Technical Specifications of 8 M and 9 M PCC Poles (F.O.S.-2.5) with working load 200 Kg.

Technical Specifications of 8 M and 9 M PCC Poles (F.O.S.-2.5) with working load 200 Kg. DAKSHIN HARYANA BIJLI VITRAN NIGAM LIMITED Specification No. S-95/DD-177 Technical Specifications of 8 M and 9 M PCC Poles (F.O.S.-2.5) with working load 200 Kg. Chief Engineer/P&D, DHBVN, Hisar. Issue

More information

NEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal) Project Management Directorate

NEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal) Project Management Directorate (An Undertaking of Government of Nepal) Project Management Directorate GRID SUBSTATION CAPACITY EXPANSION PROJECT A component of SASEC: Power System Expansion Project BIDDING DOCUMENT FOR Procurement of

More information

Table of Contents. List of Drawings

Table of Contents. List of Drawings SCOPE OF WORK Hastings Stadium Exhibition Park, 81 London Road, Guelph, Ontario Structural and Maintenance Remedial Work Prepared For City of Guelph City Hall, 1 Carden Street, Guelph, ON N1H 3A1 Prepared

More information

ITEM 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)

ITEM 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL) ITEM 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL) 686.1. Description. This Item shall govern for designing, fabricating, furnishing and erecting steel traffic signal pole assemblies of the various types

More information

SECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories.

SECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories. SECTION 02830 CHAIN LINK FENCES AND GATES (GALVANIZED) 1.0 GENERAL 1.1 Section Includes A. Fence framework, fabric, gates, and accessories. B. Excavation for post bases; concrete footing for posts. C.

More information

TCN - 01 Ref: PSER:SCT:MRW-B1052:TCN-01 Date: VOL.ID SCC Unloading from railway wagon 50% SHALL BE READ AS :

TCN - 01 Ref: PSER:SCT:MRW-B1052:TCN-01 Date: VOL.ID SCC Unloading from railway wagon 50% SHALL BE READ AS : Bharat Heavy Electricals Limited (A Government of India Undertaking) Power Sector Eastern Region Plot No. 9/1, Block-DJ, Salt Lake City, Kolkata 700 091 (INDIA) Phone no. 033-2321 1691 Fax : 033-2321 1960

More information

SCAFFOLDING RUNWAY SYSTEM

SCAFFOLDING RUNWAY SYSTEM SCAFFOLDING RUNWAY SYSTEM HANDBOOK 07/2017.3 i) Further information and detailed component information can be found in the: C1 Conveyor Systems Technical Catalogue. ii) Call or e-mail Niko Ltd for any

More information

TENDER INVITATION FOR CONSTRUCTION OF 06 NOS. FOUR MULTI PURPOSE SHEDS MULTI PURPOSE SHEDS AT DIFFERENT BEEJ NIGAM FARMS UNDER RKVY.

TENDER INVITATION FOR CONSTRUCTION OF 06 NOS. FOUR MULTI PURPOSE SHEDS MULTI PURPOSE SHEDS AT DIFFERENT BEEJ NIGAM FARMS UNDER RKVY. M.P.RAJYA BEEJ EVAM FARM VIKAS NIGAM (An ISO 9001:2008 certified Organization) (MP Govt. Undertaking) 36, BEEJ BHAWAN MOTHER TERESA MARGARERA HILLS BHOPAL Phone:0755-2775048, 2571368 FAX: 0755-2775042

More information

TECHNICAL SPECIFICATION FOR PRESTRESSED CEMENT CONCRETE POLES ( F.O.S. 2.5) FOR 11 KV AND LT LINES ( REC SPECIFICATION NO.

TECHNICAL SPECIFICATION FOR PRESTRESSED CEMENT CONCRETE POLES ( F.O.S. 2.5) FOR 11 KV AND LT LINES ( REC SPECIFICATION NO. TECHNICAL SPECIFICATION FOR PRESTRESSED CEMENT CONCRETE POLES ( F.O.S. 2.5) FOR 11 KV AND LT LINES ( REC SPECIFICATION NO. 15 / 1979) MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LTD. PAGE 1 OF 7

More information

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 5 REINFORCING STEEL. 5.1 General Certification Fabrication...

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 5 REINFORCING STEEL. 5.1 General Certification Fabrication... SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 5 REINFORCING STEEL TABLE OF CONTENTS 5.1 General...5-1 5.2 Certification...5-1 5.3 Fabrication...5-1 5.4 Handling and Storage...5-1 5.5 Field Repair of Epoxy

More information

TECHNICAL SPECIFICATION DANTECO HERMANNS. CONTAINER FOR BULK POWDER Equipped with HERMANNS Aeration and Conveyance Device

TECHNICAL SPECIFICATION DANTECO HERMANNS. CONTAINER FOR BULK POWDER Equipped with HERMANNS Aeration and Conveyance Device TECHNICAL SPECIFICATION DANTECO HERMANNS CONTAINER FOR BULK POWDER Equipped with HERMANNS Aeration and Conveyance Device 6058(20') x 2438(8') x 2591(8'6") MODEL NO. : CX09-20SNX1 SPEC. NO : CX09-20SNX1-S3

More information

***************************************************************************************************************

*************************************************************************************************************** 02720 STORM DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 40 00. ***************************************************************************************************************

More information

Com-Tray. Under Floor

Com-Tray. Under Floor Com-Tray Chalfant, a leading supplier of cable trays and systems for utilities, industrial plants, and commercial service, offers Com-Tray, a unique modular, cost-saving system for routing and protecting

More information

Name of work: Renovation of toilets in main building near molecular biology lab. Sl Rate Amount Description Quantity Unit No Rs Ps Rs Ps Schedule A

Name of work: Renovation of toilets in main building near molecular biology lab. Sl Rate Amount Description Quantity Unit No Rs Ps Rs Ps Schedule A SPECIFICATIONS AND SCHEDULE OF QUANTITIES Name of work: Renovation of toilets in main building near molecular biology lab Sl Rate Amount Schedule A 1 Demolishing concrete in cement mortar including disposal

More information

PART 920 CONSTRUCTION OF TRAM TRACKS

PART 920 CONSTRUCTION OF TRAM TRACKS PART 920 CONSTRUCTION OF TRAM TRACKS CONTENTS 1. General 2. Removal of Existing Track Work 3. Track Construction 4. Turnouts 5. Stray Current Control 6. Bonds 7. Tamping 8. Buffers 9. Signalling 10. Testing

More information

Name of Work: Interior and Furnishing Works for Second Floor of Bank of India Headquarters at H-2, Connaught Circus

Name of Work: Interior and Furnishing Works for Second Floor of Bank of India Headquarters at H-2, Connaught Circus Name of Work: Interior and Furnishing Works for Second Floor of Bank of India Headquarters at H-2, Connaught Circus S. No. Description Unit Qty. Rate Amount I. PARTITIONS AND PANELLING:- 1. Full Height

More information

Post Style with ABS Real Tuff

Post Style with ABS Real Tuff Post Style with ABS Real Tuff Mantova s patented Post Shelving with ABS Real Tuff removable shelves have been making life easier for thousands of Australian businesses for more then a decade. Removable

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 22 1316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

Redi Rock Specification and Installation Manual

Redi Rock Specification and Installation Manual Redi Rock Specification and Installation Manual 1.0 General Scope This Specification covers the Design, Materials and Installation of Redi Rock modular block Retaining and Freestanding Wall systems as

More information

REPORT OF EDUCATIONAL VISIT TO INDIAN RAILWAYS INSTITUE OF CIVIL ENGINEERIG PUNE

REPORT OF EDUCATIONAL VISIT TO INDIAN RAILWAYS INSTITUE OF CIVIL ENGINEERIG PUNE Visit to Indian railway institute of civil engineering Pune REPORT OF EDUCATIONAL VISIT TO INDIAN RAILWAYS INSTITUE OF CIVIL ENGINEERIG PUNE Class- TE (CIVIL) Date :-10 Sept. 2016 Time :- 9:30-2:00 Dr.D.Y.Patil

More information

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. SECTION 260529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. 1.2

More information

STANDARD SPECIFICATION FOR TANK PADS

STANDARD SPECIFICATION FOR TANK PADS STANDARD SPECIFICATION FOR TANK PADS STANDARD SPECIFICATION FOR TANK PADS 0.0 SCOPE The specification describes the technical requirements for the materials and construction of tank pads of murrum fill

More information

SECTION 1043 FENCE MATERIAL

SECTION 1043 FENCE MATERIAL SECTION 1043 FENCE MATERIAL 1043.1 Scope. This specification covers the material required in the construction of chainlink fence and woven wire fence. 1043.2 Basis of Acceptance. The basis of acceptance

More information

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

COCHIN SHIPYARD LIMITED INFRA PROJECTS DEPARTMENT. Corrigendum No:III. No. INFRA/CIV/70/ Sept 2017

COCHIN SHIPYARD LIMITED INFRA PROJECTS DEPARTMENT. Corrigendum No:III. No. INFRA/CIV/70/ Sept 2017 COCHIN SHIPYARD LIMITED INFRA PROJECTS DEPARTMENT Corrigendum No:III No. INFRA/CIV/70/2017 16 Sept 2017 Name of Work: Ground Improvement Works for the New Dry Dock Project A layer of nonwoven geotextile

More information

SPECIFICATION : BORING AND JACKING

SPECIFICATION : BORING AND JACKING SPECIFICATION 330524: BORING AND JACKING PART 1.0 GENERAL 1.1 DESCRIPTION 1.1.1 The work of this specification includes all labor, machinery, construction equipment and appliances required to perform in

More information