Brahmaputra Cracker and Polymer Limited SCHEDULE OF RATES

Size: px
Start display at page:

Download "Brahmaputra Cracker and Polymer Limited SCHEDULE OF RATES"

Transcription

1 SCHEDULE OF RATES NAME OF WORK: EXECUTION PACKAGE I (Part-A: Earthwork in Railway Formation & Part-B: Laying of Railway Track), FOR RAIL INFRASTRUCTURE OF BRAHMAPUTRA CRACKER AND POLYMER LIMITED (BCPL) AT LEPETKATA, DIBRUGARH (ASSAM). BIDDING DOCUMENT NO. 6907/28/OT/R/RITES-EIL/EXECUTION/PKG-I/ P a g e

2 SCHEDULE OF RATES FOR PART-A (EARTHWORK IN RAILWAY FORMATION) 2 P a g e

3 TABLE OF CONTENTS SL. NO. PART-A; DESCRIPTION. of SHEETS 1. SCHEDULE OF RATES-TOP SHEET & TABLE OF CONTENTS 3 2. PREAMBLE TO SCHEDULE OF RATES 1 3. SUMMARY OF PRICE (FORM-SP0) PART-A 1 4. SCHEDULE OF RATES (FORM-SP1) PART-A 8 5. EXTENDED STAY COMPENSATION-PART-A (FORM-SP2) 1 3 P a g e

4 PREAMBLE TO SCHEDULE OF RATES ( PART-A) 1.0 The shall be read in conjunction with all other sections of this Bidding Document. 2.0 The CONTRACTOR is deemed to have studied the drawings, specifications and details of works to be done within the Time Schedule and should have acquainted himself of the conditions prevailing at site. 3.0 The quantities shown against the various items are only approximate and may vary to any extent individually subject to conditions given in General Conditions of Contract/Special Conditions of Contract. 4.0 claim shall be entertained during currency of this Contract towards any items due to the above including where the CONTRACTOR has quoted low/ high rates. 5.0 EIL/BCPL/RITES reserves the right to interpolate or extrapolate the rates for any new item of work not covered in from the similar items already available in schedule of rates. In case any activity though specifically not covered in schedule of rates descriptions but the same is covered under scope of work/ scope of supply/specification/ drawings etc. no extra claim on this account shall be entertained, since is to be read in conjunction with all other documents forming part of the Contract. 6.0 All items of work mentioned in the shall be carried out as per the specifications, drawings and instructions of EIL/BCPL/RITES and the rates are deemed to be inclusive of material, consumable, labour, supervision, tools & tackles and detailing of construction/fabrication drawings, isometric wherever required as called for in the detail specification and conditions of the Contract. 7.0 EIL/BCPL/RITES reserves the right to cancel/ delete/ curtail any item or group of work if necessary. Such a step shall not be construed as reason for changing the rates. 8.0 Bidders shall quote their prices as percentage variation on total prices. This percentage variation as quoted by the bidder will apply to all work items during execution. 9.0 Bidder shall indicate only the Increase/Decrease on total estimated value in terms of percentage upto 2 decimal places in the Summary of Prices (Form SP-0) sheet. Bidder shall not change the filled rate/ amount indicated in (Form SP-1) The rate for Extended Stay Compensation shall be filled up by Bidder in Form SP Bidder s quoted price/ rates shall be inclusive of all taxes and duties including Service Tax and Educational Cess for Part-A on composition scheme basis (current rate 4.94%) as Service Tax Rules P a g e

5 FORM SP 0 SUMMARY OF PRICE (PART- A) NAME OF WORK : EXECUTION PACKAGE I (Part-A: Earthwork in Railway Formation & Part-B: Laying of Railway Track), FOR RAIL INFRASTRUCTURE OF BRAHMAPUTRA CRACKER AND POLYMER LIMITED (BCPL) AT LEPETKATA, DIBRUGARH (ASSAM). BIDDING DOCUMENT NO. 6907/28/OT/R/RITES-EIL/EXECUTION/PKG-I/2012 Sl.. PART-A Description Amount (Rs.) A. SCH. A - Railway Formation Work. 3,44,42, B. SCH. B Minor Bridges. 1,39,25, C. SCH. C - Gate 1,08, D. Total Estimated Price of the work (Part-A) of SCH. (A+B+C) E. Percentage Increase / Decrease on Total Estimated Price of the work (ie. on D above), which will be applicable uniformly on all items of. F. Total Amount after considering Percentage Increase / Decrease as given above at sl.. E. (In Fig.) 4,84,75, % (In words) percent only (Refer te-1) (In Fig) (In words) only te: 1. Bidder shall indicate the Percentage Increase/Decrease under Sl.. E and Total amount after considering percentage increase/decrease under Sl.. F in Price bid only (and not in techno-commercial bid). In case of discrepancy between +/- percentage quoted against Sl.. "E and total amount quoted against Sl.. "F"; then the percentage quoted against Sl.. E" will prevail. 2. Bidder shall indicate (+) for increase and (-) for decrease. For no increase/decrease, NIL shall be indicated. 3. The percentage should be quoted upto 2 decimal places. 5 P a g e

6 SCHEDULE OF RATES (FORM - SP 1) 6 P a g e

7 SCHEDULE OF RATES (PART A) Schedule-A, (Railway Formation Work). 1. Felling trees of girth (measured at a height of 1 mtr. above ground level) Each including lead and stacking of materials within 100 mtr. a)girth over 30 cm and upto 60 cm. 2. Earth Work in filling in embankment guide bunds, around buried type abutments bridge gaps trolley refuges rain bunds if provided platforms etc. with earth excavated from outside railway boundary entirely arranged by the contractor at his own cost as per Cum RDSO's latest guide line and specifications and special condition of contract including all lead, royalty, lifts, ascents, descents, crossing of nallahs, or any other obstructions. The rates shall include all dressing of bank to final profile, demarcation and setting out of profile site clearance, removing of shrubs, roots of vegetations growth, heavy grass, benching of existing slope of old bank, all handling and rehandling, taxes, octroi and royalty etc. as a complete job. Cut trees shall be property of railways and to be deposited in the railway godown unless specified otherwise in the special condition of contract. 3. Earth Work in filling in Rly. formation as Cum per drawing and specifications including leading out and filling in formation in layers with available suitable excavated/dumped earth within the BCPL's railway siding area. The rate includes all charges towards excavation, handling, rehandling, loading, unloading and leading out, spreading in layers and dressing etc up to the required profile as per RDSO guide lines, all labour and material as a complete job. Compaction charges will be paid separately under the item of mechanical compaction sl. no. 4 below. 7 P a g e

8 4. Extra for mechanical compaction of Cum earth/blanketing materials filled in embankment with contractor's rollers of suitable capacity, type and size to achieve specified density as per specification, testing as per IS Code including cost of water, T & P consumable materials and all labour as a complete job. The work is to be executed as per Latest Edition of "Guidelines for Earthwork in Railway Projects" issued by RDSO, Lucknow 5. Turfing/planting, including all lead and lift, and watering as required until properly rooted, with. te- Initially payment of only 40% will be made. Balance 60% will be paid only after 3 months of maintenance period if the turfing is properly rooted. Turfing with sods, 10 cm thick and 20 cm square closely laid. Sqm 6. Supplying and spreading of blanketing material over the embankment as per RDSO Guide Line. The rate shall include the cost of material with all leads, lift, loading, unloading, royalty, taxes, tools, Cum and plants, labour and materials required, dressing of bank to final dimension as required to achieve the required thickness. Layers not exceeding 30cm each as per direction of Engineer in charge including extra quantity of voids. If required blending of two or more materials available locally is to be done to attain the specified grade ratio of grain sizes or quality as required and detailed in RDSO's latest Guide lines. 7. Any other unforeseen items which are LS LS Please not covered by the above items of work will be operated as per the available items in NFR, SOR Basic rate Rs quote. % age At per / Above / Below. (Please strike out whichever not applicable) Total in SCH. A Rs P a g e

9 Schedule-B, (Minor Bridges). 1 Earth work in excavation for foundation and floors of the bridges, retaining walls etc., including setting out dressing of sides, ramming of bottom, getting out of excavated materials, bailing out of cum water, back filling in layers with available good excavated earth / approved materials and consolidation of layers by ramming and watering etc. including all lift, disposal of surplus soils upto a lead of 300m, all types of shoring and shuttering with all labour and materials complete as per drawing and technical specification as directed by Engineer in charge. 2 Supplying and filling sand in plinth and cum under floors including watering, ramming, consolidating and dressing complete. 3 Providing & laying 1:2:4 cement cum concrete (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size). Rate includes costs of all material, labour, equipments, placing of concrete in position etc. in all complete. 4 Providing and laying in position (with or without reinforcement) machine mixed, cum machine vibrated and machine batched Design mixed cement concrete M-20 grade (cast in situ) using 20mm graded crushed stone aggregate and coarse sand of approved quality as per specification and direction of Engineer in charge. Payment for reinforcement & shuttering shall be paid extra. 5 Centering and shuttering including strutting, propping etc. and removal of form for : a) Foundations, footings, bases of columns, raft foundation of washable aprons, pile caps, footings of FOB etc. b) Walls (any thickness) including attached plasters, buttresses, plinth and string course etc. 9 P a g e sqm sqm

10 Sl Description of item Unit Qty. Rate Amount (Rs.) c) Suspended floors, roofs, landings, sqm balconies, FOB slabs, walkway slabs and access platform 6 Providing and laying in position (with or without reinforcement) machine mixed, cum machine vibrated and machine batched Design mixed cement concrete M-35 grade (cast in situ) using 20mm graded crushed stone aggregate and coarse sand of approved quality in RCC raft, walls, deck slab etc. of bridges including finishing, using admixtures in recommended proportions (As per IS- 9103) if approved in mix design to accelerate or retard setting of concrete and or improve workabilities without impairing strength and durability complete as per specification and direction of Engineer in charge. Payment for shuttering, reinforcement shall be paid extra. 7 Supplying reinforcement for RCC Work Kg including straightening, cutting, bending, placing, in position and binding all complete. a) Thermo-Mechanically Treated bars 8 Providing Stone pitching hand packed with surface leveled off to the correct section with hammer dressing with directional slope at bridge floor / bank with joints thoroughly filled with cement mortar 1:3 (1 cement: 3 coarse sand) along the return wall as per approved plan including all labour and materials, supply, leading, loading, taxes, royalty cum and placing in position etc. all complete with stone boulders of mm thick. 9 Providing boulder backing behind bridge wall, wing wall, return wall, retaining wall with hand packed boulders & cobbles with smaller size boulders towards the back including all cost of materials, tools & tackles, all lead, lift, labour, taxes, royalties & other incidental charges as complete works in all respect as directed by Engineer- In-Charge. Stone boulder weighing minimum 35 kg each. cum P a g e

11 10 Providing & Laying filter material as per cum RDSO specifications underneath pitching in slopes complete as per technical specification 11 Providing and laying of filter media cum consisting of granular materials of GW. GP. SW groups as per IS in required profile behind boulder filling of abutments, wing walls / return walls etc above bed level with all labour and materials complete job as per drawing and technical specification of RDSO guidelines. 12 Supplying, providing & fixing weep RM holes of 100 mm dia. PVC pipe in bridge walls, return wall, wing wall etc as per the design & drawings. Rate includes costs of all materials, labours, tools & tackles, lead, lift etc. in all complete as per the direction of Engineer-In-Charge. 13 Providing and applying two coats tar or sqm bitumen conforming to IS on the top and sides of RCC 1.70 kgs/sqm after cleaning the surface with all labour and materials complete job as directed by Engineer in charge. 14 Any other unforeseen item which are LS LS Please not covered by the above items of work will be operated as per NFR, SOR Basic cost Rs quote. % age At per / Above / Below. (Please strike out whichever not applicable) Total in SCH. B Rs P a g e

12 Schedule-C. (Gate). 1 Earth work in excavation for foundation and floors of the bridges, retaining walls etc., including setting out dressing of sides, ramming of bottom, getting out of excavated materials, back filling in layers with approved materials and consolidation of layers by ramming and watering etc. including all lift, disposal of surplus soils upto a lead of 300m, all types of shoring and shuttering with all labour and materials complete as per drawing and technical specification as directed by Engineer in charge. All kinds of soils cum Providing & laying 1:3:6 cement concrete (1 cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size). Rate includes costs of all material, labour, equipments, placing of concrete in position etc. in all complete. 3 Providing & laying 1:1.5:3 cement concrete (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) with or without reinforcement. Rate includes costs of all material, labour, equipments, placing of concrete in position etc. in all complete. Reinforcement & shuttering will be paid separately. cum cum Structural steel work in single section including cutting, bending, straightening, drilling, welding, riveting, bolting, hoisting, fixing & fastening, locking arrangements in position, supply of all materials, labours, equipments, lead, lift etc., including applying a priming coat of approved steel primer, complete in all respect - upto 6m height above GL a) In RSJ, tees, angles and channels Kg b) In flats, plates, round or square bar. Kg P a g e

13 5 Supplying reinforcement for RCC Work Kg including straightening, cutting, bending, placing, in position and binding all complete. a)thermo-mechanically Treated bars 6 Centering and shuttering including strutting, propping etc. and removal of form for : a) Foundations, footings, bases of columns..etc. sqm b) Columns, pillars, posts and struts etc. sqm Painting with synthetic enamel paint of approved brand and manufacturer to give an even shade: a) Two or more coats on new steel works. 8 Any other unforeseen items which are not covered by the above items of work will be operated as per the available items in NFR, SOR Basic rate Rs sqm LS LS Please quote.. % age At per / Above / Below. (Please strike out whichever not applicable) Total in SCH. C Rs P a g e

14 FORM-SP2 NAME OF WORK: EXECUTION PACKAGE I ((Part-A: Earthwork in Railway Formation & Part-B: Laying of Railway Track) FOR RAIL INFRASTRUCTURE OF BRAHMAPUTRA CRACKER AND POLYMER LIMITED (BCPL) AT LEPETKATA, DIBRUGARH (ASSAM). BIDDING DOCUMENT NO.: 6907/28/OT/R/RITES- EIL/ EXECUTION/ PKG-I/2012 EXTENDED STAY COMPENSATION (PART-A) SL. NO. DESCRIPTION 1. Rate of Extended Stay Compensation per Month beyond the Time Schedule and grace period mentioned in Bidding Document for reasons solely attributable to Owner. RATE IN RUPEES (Rs.) Rs. Per Month 14 P a g e

15 SCHEDULE OF RATES FOR PART-B (LAYING OF RAILWAY TRACK) 15 P a g e

16 TABLE OF CONTENTS SL. NO. PART-B DESCRIPTION. of SHEETS 1. SCHEDULE OF RATES-TOP SHEET & TABLE OF CONTENTS 2 2. PREAMBLE TO SCHEDULE OF RATES 1 3. SUMMARY OF PRICE (FORM-SP0) - PART-B 2 4. SCHEDULE OF RATES (FORM-SP1) PART-B EXTENDED STAY COMPENSATION -PART-B(FORM-SP2) 1 16 P a g e

17 PREAMBLE TO SCHEDULE OF RATES 1.0 The shall be read in conjunction with all other sections of this Bidding Document. 2.0 The CONTRACTOR is deemed to have studied the drawings, specifications and details of works to be done within the Time Schedule and should have acquainted himself of the conditions prevailing at site. 3.0 The quantities shown against the various items are only approximate and may vary to any extent individually subject to conditions given in General Conditions of Contract/Special Conditions of Contract. 4.0 claim shall be entertained during currency of this Contract towards any items due to the above including where the CONTRACTOR has quoted low/ high rates. 5.0 EIL/BCPL/RITES reserves the right to interpolate or extrapolate the rates for any new item of work not covered in from the similar items already available in schedule of rates. In case any activity though specifically not covered in schedule of rates descriptions but the same is covered under scope of work/ scope of supply/specification/ drawings etc. no extra claim on this account shall be entertained, since is to be read in conjunction with all other documents forming part of the Contract. 6.0 All items of work mentioned in the shall be carried out as per the specifications, drawings and instructions of EIL/BCPL/RITES and the rates are deemed to be inclusive of material, consumable, labour, supervision, tools & tackles and detailing of construction/fabrication drawings, isometric wherever required as called for in the detail specification and conditions of the Contract. 7.0 EIL/BCPL/RITES reserves the right to cancel/ delete/ curtail any item or group of work if necessary. Such a step shall not be construed as reason for changing the rates. 8.0 Bidders shall quote their prices as percentage variation on total prices. This percentage variation as quoted by the bidder will apply to all work items during execution. 9.0 Bidder shall indicate only the Increase/Decrease on total estimated value in terms of percentage upto 2 decimal places in the Summary of Prices (Form SP-0) sheet. Bidder shall not change the filled rate/ amount indicated in (Form SP-1) The rate for Extended Stay Compensation shall be filled up by Bidder in Form SP Bidder s quoted price/ rates shall be inclusive of all taxes and duties including Service Tax and Educational Cess at full rate (current rate 12.36%) as per Service Tax Rules Contractor shall not opt for works contract (composition scheme for payment of service tax) for Part-B as per Service Tax Rules P a g e

18 FORM SP 0 SUMMARY OF PRICE (PART- B) NAME OF WORK : EXECUTION PACKAGE I (Part-A: Earthwork in Railway Formation & Part-B: Laying of Railway Track), FOR RAIL INFRASTRUCTURE OF BRAHMAPUTRA CRACKER AND POLYMER LIMITED (BCPL) AT LEPETKATA, DIBRUGARH (ASSAM). BIDDING DOCUMENT NO. 6907/28/OT/R/RITES-EIL/EXECUTION/PKG-I/2012 Sl.. PART-B Description Amount (Rs.) A SCH. A P. Way Execution & Supply A1 Sch.- A1 P. Way Execution including supply 2,32,29, of ballast. A2 Sch. A2 Supply of P. Way Fittings. 31,67, B SCH. B - Concrete Apron, Laying of Ballastless track & Supply of P. Way materials B1 Sch.-B1 - Concrete Apron including Drain. 1,46,38, B2 Sch.-B2-P.Way Execution Ballast less Track. 6,89, B3 Sch-B3,-P. Way Supply for Ballast Less Track 8,95, C D E Total Estimated Price of the work (Part-B) [A1+A2+B1+B2 +B3 above] Percentage Increase / Decrease on Total Estimated cost of the work (i.e. on C above), which will be applicable uniformly on all items of Total Amount after considering Percentage Increase / Decrease as given above at sl.. D (In Fig.) % 4,26,19, (In words) percent only (Refer te-1) (In Fig. (In words) only 18 P a g e

19 te: 1. Bidder shall indicate the Percentage Increase/Decrease under Sl.. D and Total amount after considering percentage increase/decrease under Sl.. E in Price bid only (and not in techno-commercial bid). In case of discrepancy between +/- percentage quoted against Sl.. "D and total amount quoted against Sl.. "E"; then the percentage quoted against Sl.. D" will prevail. 2. Bidder shall indicate (+) for increase and (-) for decrease. For no increase/decrease, NIL shall be indicated. 3. The percentage should be quoted upto 2 decimal places. 19 P a g e

20 SCHEDULE OF RATES (PART-B) (FORM - SP 1) 20 P a g e

21 SCHEDULE OF RATES (PART B) Schedule 'A'- (P. Way Execution & Supply). Schedule 'A-1'- (P. Way Execution). 1 Laying B.G., straight or curve track Track with 60kg rails on pre-stressed Meter concrete sleeper (M+7 density) 1540 sleeper for conversion into 3 Rail SWR & curve track of 5º & above with 60Kg single Rail on pre-stressed concrete sleeper (M+7 density) with an additional sleeper to be provided at mid staggard joint and standard fittings ensuring correct spacing of sleepers, fixing & tightening of Fish bolts & nuts and maintaining proper gauge, alignment, level (both cross & longitudinal), expansion gap at rail joints, super elevation where necessary and with one initial through packing. The rate should be inclusive of dekinking of rails as required, cutting of rails as required on straight and curve track for squaring of joints & staggard joints for curve track of 5º & above, drilling holes on web of rail square to rail surface by using proper template for fish plated joints champhering of drilled holes, greasing and oiling of fish plates & fish bolts and nuts and at fishing zone of the rail ends including supply of grease, oil etc. Sleeper spacing, versine, super elevation etc shall be marked by the contractor with white paint at his own cost. The work has to be carried out as laid down in IRPWM and as per direction of the Engineer-in- Charge at site. The unit of track metre consists laying of both sides rails, sleepers and all other fittings required thereof. (NOTE: Rails will be issued from RITES/Client s Store, free of cost, within a distance of up to 10 km. The rate should be inclusive of all cost of carrying from the store to site of work with all lead, lift, ascent, descent crossing road/ Rly line if necessary.) 2 Drilling holes 28mm dia. in rails 60Kg/52 kg/rails section for fish bolts outside track. 21 P a g e each

22 3 Cutting rails 60 kg/52 Kg (New/SH) rails section for fish bolts outside/inside track by Rail cutting equipment. each Supply & delivery of Machine crushed stone ballast of 65 mm size clean angular, hard and durable track ballast as per RDSO specification and stacking the same on cess of the formation or toe of the bank or at suitable place as directed by Engineer-in-Charge at site. The rate includes all cost of lead, lift, royalty, sales tax & other tax and duties and all incidental charges complete as applicable. Tools, plants and screens of approved mesh & dimensions required for inspection and passing at the time of measurement are to be arranged by the contractor. The rate also includes leveling of ground, if necessary, where the ballast are to be stacked. te: 90% payment shall be released on the net quantity accepted and balance 10% shall be released after spreading the same as per item no. 5 below. cum a) 5 b) Handling, lifting and leading of ballast from stacks with all lead, lift etc which have been duly measured and spreading the ballast on formation to ensure uniform and compact ballast cushion under the sleepers. The rate shall include spreading of ballast as per specified line and level and maintaining approved profile as provided in the technical specifications. Spreading of ballast on formation will be done only after supply is completed for a particular stretch as decided by Engineer in charge and ballast stacks have been released for spreading. Leading of ballast for every additional lead of 30 metre by contractors diplorry/ head lead etc. cum cum P a g e

23 6 Through packing of any kind of sleepers with stone ballast to maintain correct alignment cross and longitudinal level as required for maintaining track gauge, versine, super elevation etc. on both straight and curve track laid with contractor's tools and labour inclusive of all charges as per IRPWM and as directed by Engineer-in-charge. a) 1st through packing Track Metre b) 2nd through packing Track Metre c) 3rd through packing Track Metre d) 4th through packing Track Metre Dismantling of Existing Track or any section of rails with any kind of sleepers and fittings and fastening. The rate should be inclusive of cutting of rails, fishplates, bolts and nuts by gas cutter if necessary, for dismantling of track. Dismantled materials should be segregated and are to be kept separately by the side of track upto a free lead of 30m as per direction Engineer- In- Charge. TM P a g e

24 8 Assembling, linking and laying in position B.G. Standard 60 kg turn-outs on P.S.C. sleepers including approach & exit PSC sleeper portion to correct alignment & gauge. This includes switches lead rails, stock rails both straight and curve, crossing with 60 kg rails and standard fittings ensuring correct spacing of sleepers fixing & tightening of Fish bolts & nuts and maintaining proper gauge, expansion gap at rail joints and with one initial through packing. The rate should be inclusive of dekinking of rails as required, bending stock rails, cutting of rails to required standard size and drilling holes on web of rails square to rail surface by using proper template (for fixing fishplates, distance block, stretcher bars), greasing and oiling of fish plates & fish bolts and nuts and at fishing zone of the rail ends including supply of grease, oil etc. complete in all respects. The rate should also be inclusive of carrying and spreading of rails, sleepers, switches, crossings, fittings & fastenings with all lead, lift, ascent, descent crossing Road/Rly line if necessary from RITES Store Depot to Site of work within a distance of 10 km. Sleeper spacing shall also be marked by the contractor with white/yellow paint at his own cost. The work has to be carried out as laid down in IRPWM and as per direction of the Engineer-in- Charge at site. a) 1 in 8.1/2 (Fan shaped) Turn Out. Set b) 1 in 12 (Fan shaped) Turn Out. Set c) 1in 8.5 Derailing Switch. Set P a g e

25 9 Through packing of 1 in 8½ Turn-out on any kind of sleepers with stone ballast to maintain correct alignment cross and longitudinal level as required for maintaining track gauge, versine, super elevation etc. on both straight and curve track laid with contractor's tools and labour inclusive of all charges as per IRPWM and as directed by Engineer-in-charge. a) 1st through packing set b) 2nd through packing set c) 3rd through packing set d) 4th through packing set Through packing of 1 in 12 Turn-out on any kind of sleepers with stone ballast to maintain correct alignment cross and longitudinal level as required for maintaining track gauge, versine, super elevation etc. on both straight and curve track laid with contractor's tools and labour inclusive of all charges as per IRPWM and as directed by Engineer-in-charge. a) 1st through packing set b) 2nd through packing set c) 3rd through packing set d) 4th through packing set P a g e

26 11 Through packing of 1 in 8.5 Derailing Switch on any kind of sleepers with stone ballast to maintain correct alignment cross and longitudinal level as required for maintaining track gauge, versine, super elevation etc. on both straight and curve track laid with contractor's tools and labour inclusive of all charges as per IRPWM and as directed by Engineer-in-charge. a) 1st through packing set b) 2nd through packing set c) 3rd through packing set d) 4th through packing set Cutting metal liners as per enclosed drawing for use at Fish plated joints. Each Making and fixing in position cement concrete (1:2:4) Fouling Mark as per enclosed drawing with proper painting and lettering as per directives of the Engineer-in-Charge of the work. The rate is inclusive of all materials like cement, stone aggregates, sand and paints etc., earth work in excavation and all incidental works required for fixing in position complete in all respects. 14 Construction of Concrete Buffer as per RITES drawing including supply of bolts & nuts, washer, cement Buffer, wooden sleeper ( 2.75 m x m x m ) and all other materials. The rate should also including painting of Buffer, wooden sleeper with approved quality red paint. The rate should also inclusive of digging of foundation trenches shuttering & forma finishing with all lead, lift, ascent, descent etc complete as per RITES drawing. each each P a g e

27 15 Welding of Rail joints 60Kg from single to 3 rail panel by SKV process with Contractors supply of portion approved by RDSO, dry mould including supplying Skilled/artisan staff like welder, moulder chipper cutter aligner, hamerman & each adequate s of Semi Skilled & Unskilled labour and supplying required quantities of petrol for facilitating welding works on track by shifting the joint sleeper on either side providing suitable gap of about 23mm to 26mm for welding fixing the petrol tank & heating the rail ends by contractors equipments & chipping the excess materials if required aligning levelling etc. complete including filing after welding. The work is to carried out as per alumino Thermit Welding Manual and as per Specification IRS-T The rate should be also inclusive of pulling back of rails for providing required gaps at rail joints for thermit welding & USFD TEST of Welding Joints.(te: Payment for linking of track will be made under item 1 above.) 16 Manufacturing, supply, installation & delivery of glued joints (G-3L) as per RDSO drg no. T-671 from 52/60 Kg rails of 6.5 mtr each length. The rate should be exclusive of supply of 52/60 Kg rails which will be available in RITES stores located at a distance upto 5 km. The Glued joints are to be properly cured for adequate period, tested, fit for use in track circuit area and fit certificate should be issued by the Competent Inspecting Authority. The quality should be as per Rly standard. The rate should be inclusive of cutting of rails, true to the square vertically & horizontally, handling of rails, transporting with necessary lead, lift, ascent, descent & crossing road / Rly lines. This rate should also be exclusive of cost of 52/60 Kg rail required for Glued joints and inclusive of cost of HT bolts & other materials such as polymer, resin base compound etc. each P a g e

28 17 a) Trolleying of released materials e.g. Rail, Points & Crossings, C. I. / S. T / Wooden / PSC Sleeper etc upto a dist MT of 1Km by contractors dip lorry/transport including loading, unloading and staking at nominated place as-per-direction of Engineer-In- Charge with all lead, lift, handling etc Complete. b) Trolleying of released materials e.g. MT Rail, Points & Crossings, C. I. / S. T. / Wooden / PSC Sleeper etc for every additional 0.5 Km (up to 8 leads) by contractors dip lorry/transport as-perdirection of Engineer-In-Charge 18 Trolleying /Transporting of new Rails, MT Points & Crossings, PSC Sleepers & Fittings, fastenings from RITES site store to place of work including handling, loading, unloading, and spreading at site. The rate is inclusive of all lead, lift, ascent, descent, crossing road/rly lines if necessary complete in all respect upto a distance of 1 Km. 19 Trolleying new Rail, Points & Crossings, PSC Sleeper every additional 0.5 Km (up to 8 leads) by contractors dip MT lorry/transport as-per-direction of Engineer-In-Charge. 20 Any other unforeseen items which will LS LS Please not cover under items of work (Sl.. 1 to 19 above) will be operated as per N F Rly SOR, Basic Cost Rs quote.. % age At per / Above / Below. (Please strike out whichever not applicable) Total in SCH. A1 Rs P a g e

29 Schedule- 'A-2' (Supply of P. Way Fittings) 1 Elastic Rail clips with flat toe (MK.III) to RDSO Drg..T-3701 (Alt.3) conforming to specifications IRS-T-31/1989. s Elastic rail clips type 'J' for use at fish plated joints as per RDSO Drg.. T conforming to IRS Specification. 3 Metal Liners to RDSO Drg..T-3740 (upto date Alteration) conforming to specification IS:226/1975 for use with Mark III flat toe ERC ( Drg.. T-3701) 4 GFN66 Insulating Liner for 60Kg rail & 60Kg sleeper to RDSO drg Each each each Grooved Rubber Sole Plate to RDSO Drg..T-3711 (upto date Alteration) conforming to IRS Specification for 6 mm thick grooved rubber sole plates (Provisional) 1987 revised Fish Plates 60 kg to RDSO Drg..T-1898 with upto date alteration conforming to IRS Specification. T-1. 7 Fish Bolts and nuts as per RDSO Drg..T-1899 Alt-2 of size 25 mm dia and 140 mm long conforming to IRS Specification.T-23/ Kg joggled Fish plate, with clamp to RDSO drg -T4016 s pairs each Set Comb. Fish plate 52 Kg- 60Kg as per Set RDSO drg. no. T -696 to 699 with upto date alt. and conforming to IRS-T-6 (1 set = 2 pair) 10 Bolts & nuts (25mm X 190mm) as per each RDSO Drg.. T , IRS T-23 and Steel round up to 63 mm conforming to IS-1875 Total in SCH. A2 Rs TOTAL in SCH. A (i.e. A1+A2) = Rs P a g e

30 Schedule-'B'. Schedule-B1 (Concrete Apron including Drain). 1 Earthwork in excavation as per cum approved drawings and dumping at embankment site or spoil heap, within railway land/owners land, including 50 mtr. lead and 1.5 mtr. lift, the lead to be measured from the centre of gravity of excavation to centre of gravity of spoil heap: the lift to be measured from natural ground level and paid for in layers of 1.5 mtr. each, including incidental work, as per specifications-in a) All kind of soils. 2 Supplying and filling sand over formation including watering ramming consolidating and dressing complete cum Providing and laying in position cement concrete 1:3:6(1 cement: 3 sand: 6 graded stone aggregate 20mm nominal size). Rate includes costs of all materials, labour, equipments. Placing of concrete in position etc. in all complete. cum Providing and laying in position machine mixed, machine vibrated and machine batched Design Mix Cement Concrete M-25 grade (cast-in-situ) using 20 mm graded crushed stone aggregate and coarse sand of approved quality in RCC raft foundation etc. including finishing, using admixtures in recommended proportions (as per IS:9103), if approved in Mix Design to accelerate, retard setting of concrete and or improve workability without impairing strength and durability complete as per specifications and direction of Engineer-In-Charge. Payment for reinforcement & shuttering shall be paid extra. cum P a g e

31 5 Providing & laying 1:1.5:3 cement concrete (1 cement: 1.5 coarse sand: 3 cum graded stone aggregate 20 mm nominal size) with or without reinforcement. Rate includes costs of all material, labour, equipments, placing of concrete in position etc. in all complete as per the drawing and as directed by Engineer-In-Charge. Reinforcement & shuttering will be paid separately. 6 Providing & laying 1:2:4 cement concrete (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size) with or without reinforcement. Rate includes costs of all material, labour, equipments, placing of concrete in position etc. in all complete as per the drawing and as directed by Engineer-In-Charge. Reinforcement & shuttering will be paid separately. 7 Providing & Laying of cement mortar 1:4 (1 cement: 4 coarse sand) between the gaps of PSC Sleepers & RCC. cum cum Providing and laying in position bitumen hot sealing compound for expansion joints etc. using grade 'A' sealing compound. The rate includes cost of all material, labour, laying, fixing etc. in all complete as per the specification and as directed by Engineer-In-Charge. per cm width per cm dept h / Mtr Providing and fixing Groove Rubber Pad of size (1000 mm x 270 mm x 10 mm) below sleepers. The rate includes cost of all materials, labours, fittings & fixings in position, all taxes etc. in all complete as directed by Engineer-In- Charge. 10 Supplying reinforcement for RCC Work including straightening, cutting, bending, placing, in position and binding all complete. Of Thermo- Mechanically Treated bars 31 P a g e s Kg

32 Sl Description of item Unit Qty. Rate Amount (Rs.) 11 Centering and shuttering including sqm strutting, propping etc. and removal of form for: a) Foundations, footings, bases of columns, raft foundation of washable aprons, pile caps, Footings of FOB, drains etc. 12 Any other unforeseen items which are not covered by the above items of work will be operated as per the available items in NFR, SOR Basic rate Rs LS LS Please quote. % age At per / Above / Below. (Please strike out whichever not applicable) Total in SCH. B1 Rs P a g e

33 Schedule-B2, (P. Way - Ballast Less Track Linking) 1 Laying B.G., straight or curve track Track with 60kg 90 UTS 1st quality rails on prestressed concrete sleeper (M+4 density) Meter 1540 sleeper for conversion into 3 Rail SWR & curve track of 5º & above with 60Kg single Rail on pre-stressed concrete sleeper (M+7 density) with an additional sleeper to be provided at mid staggard joint and standard fittings ensuring correct spacing of sleepers, fixing & tightening of Fish bolts & nuts and maintaining proper gauge, alignment, level (both cross & longitudinal), expansion gap at rail joints, super elevation where necessary and with one initial through packing. The rate should be inclusive of dekinking of rails as required, cutting of rails as required on straight and curve track for squaring of joints & staggard joints for curve track of 5º & above, drilling holes on web of rail square to rail surface by using proper template for fish plated joints champhering of drilled holes, greasing and oiling of fish plates & fish bolts and nuts and at fishing zone of the rail ends including supply of grease, oil etc. Sleeper spacing, versine, super elevation etc shall be marked by the contractor with white paint at his own cost. The work has to be carried out as laid down in IRPWM and as per direction of the Engineer-in- Charge at site. The unit of track metre consists laying of both sides rails, sleepers and all other fittings required thereof. (NOTE: Rails will be issued from RITES Store, free of cost) 2 Drilling holes 28mm dia. in rails 60Kg/52 kg/rails section for fish bolts outside track. 3 Cutting rails 60 kg/52 Kg (New/SH) rails section for fish bolts outside/inside track by Rail cutting equipment. 4 Cutting metal liners as per enclosed drawing for use at Fish plated joints. each each Each P a g e

34 Sl 5 a) 5 b) Description of item Unit Qty. Rate Amount (Rs.) Trolleying/Transporting of new Rails, Points & Crossings, PSC Sleepers & Fittings, fastenings from RITES site store to place of work including handling, loading, unloading, and spreading at site. The rate is inclusive of all lead, lift, ascent, descent, crossing road/rly lines if necessary complete in all respect upto a distance of 1 Km. MT Trollying new Rail, Points & Crossings, MT PSC Sleeper every additional 0.5 Km by contractors dip lorry/transport as-perdirection of Engineer-In-Charge. Total in SCH. B2 Rs P a g e

35 Schedule-B3, (P. Way Supply for Ballast Less Track). 1 Elastic Rail clips with flat toe (MK.III) to RDSO Drg..T-3701 (Alt.3) conforming to specifications IRS-T-31/1989. s Elastic rail clips type 'J' for use at fish plated joints as per RDSO Drg.. T conforming to IRS Specification. 3 Metal Liners to RDSO Drg..T-3740 (upto date Alteration) conforming to specification IS:226/1975 for use with Mark III flat toe ERC ( Drg.. T-3701) 4 Grooved Rubber Sole Plate to RDSO Drg..T-3711 (upto date Alteration) conforming to IRS Specification for 6 mm thick grooved rubber sole plates (Provisional) 1987 revised Fish Plates 60 kg to RDSO Drg..T-1898 with upto date alteration conforming to IRS Specification. T-1. 6 Fish Bolts and nuts as per RDSO Drg..T-1899 Alt-2 of size 25 mm dia and 140 mm long conforming to IRS Specification.T-23/67. 7 Supply of Thermocol sheet (750 mm X 270 mm X 10 mm) Each each s pairs each each Total in SCH. B3 Rs TOTAL IN SCH. B (i.e. B1+B2+B3) = Rs P a g e

36 FORM-SP2 NAME OF WORK: EXECUTION PACKAGE I (Part-A: Earthwork in Railway Formation & Part-B: Laying of Railway Track), FOR RAIL INFRASTRUCTURE OF BRAHMAPUTRA CRACKER AND POLYMER LIMITED (BCPL) AT LEPETKATA, DIBRUGARH (ASSAM). BIDDING DOCUMENT NO. : 6907/28/OT/R/RITES-EIL/ EXECUTION/ PKG-I/2012 EXTENDED STAY COMPENSATION (PART B) SL. NO. DESCRIPTION 1. Rate of Extended Stay Compensation per Month beyond the Time Schedule and grace period mentioned in Bidding Document for reasons solely attributable to Owner. RATE IN RUPEES (Rs.) Rs. Per Month NOTE: 1. Extended Stay Compensation shall be loaded on the quoted prices as per clause no of Special Conditions of Contract. 2. In case no rate for Extended Stay Compensation is stipulated, it will be considered that Extended Stay Compensation is not required by the Bidder and the rates quoted by them shall be valid till completion of works in all respects. 36 P a g e

SCHEDULE OF RATES BIDDING DOCUMENT NO. 6907/106/OT/RITES-EIL/EXECUTION/PKG-I/ P a g e Signature of the bidder Under seal of the firm

SCHEDULE OF RATES BIDDING DOCUMENT NO. 6907/106/OT/RITES-EIL/EXECUTION/PKG-I/ P a g e Signature of the bidder Under seal of the firm EXECUTION PACKAGE I FOR RAIL INFRASTRUCTURE INCLUDING LAYOUT OF NAPHTHA UNLOADING YARD SCHEDULE OF RATES NAME OF WORK: EXECUTION PACKAGE I, FOR RAIL INFRASTRUCTURE INCLUDING LAYOUT OF NAPHTHA UNLOADING

More information

S E C L TENDER NOTICE NO.RITES/GM/NGP/ T DATED 22/04/2014

S E C L TENDER NOTICE NO.RITES/GM/NGP/ T DATED 22/04/2014 S E C L TENDER NOTICE NO.RITES/GM/NGP/ T-19-2014DATED 22/04/2014 Name of work: Complete Track renewal/ renovation and other improvement works atchirimiri Railway Siding in Chirimiri area of M/s SECL (C.G).

More information

NTPC Ltd. KORBA VOLUME-II (FINANACIAL BID) Consultants

NTPC Ltd. KORBA VOLUME-II (FINANACIAL BID) Consultants NTPC Ltd. KORBA OPEN TENDER NOTICE NO.RITES/GGM/NGP/T-07-2015, DATED 05.03.2015 Name of work: Earthwork in Drain Foundation, construction of minor bridges and RCC drain, P-Way works etc for the construction

More information

FOR SINGRAULI (M.P.) LIMITED. RITES LIMITED Enterprise) OFFICE, Tender. Name of Tenderer Address of Tendererr

FOR SINGRAULI (M.P.) LIMITED. RITES LIMITED Enterprise) OFFICE, Tender. Name of Tenderer Address of Tendererr NORTHERN COALFIELDS LIMITED TENDER AND CONTRACT DOCUMENT FOR NAME OF WORK: COMPLETE TRACK RENEWAL OF SPUR SIDING, NCL, SINGRAULI (M.P.) TENDER NO. : - RITES/RPO-LKO/ /5925/NCL/CTR-SPURR PART 2 FINANCIAL

More information

Signature of the tenderer

Signature of the tenderer PART 2 FINANCIAL BID SCHEDULE (BILL) OF QUANTITIES 2 PART 2 SCHEDULE (BILL) OF QUANTITIES (PERCENTAGE RATE TENDER) ABSTRACT OF COST (PERCENTAGE TO BE QUOTED BY THE BIDDER) SCHEDULE DESCRIPTION TOTAL ESTIMATED

More information

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR AN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: EPI/WRO/CON/757/0119 FOR Construction of Boundary Wall and allied works for DHH & MCH Hospital at Kendrapara at Odisha state VOLUME III PRICE BID

More information

MEJA URJA NIGAM PVT. LIMITED

MEJA URJA NIGAM PVT. LIMITED MEJA URJA NIGAM PVT. LIMITED NAME OF WORK: TENDER AND CONTRACT DOCUMENT FOR Supply of PSC Sleepers, P-Way materials (except rails) including Points & Crossings, Laying and linking of track including Points

More information

KANTI BIJLEE UTPADAN NIGAM LIMITED (KBUNL) (A Joint Venture of NTPC Ltd. And BSEB ) SCHEDULE (BILL) OF QUANTITIES (Percentage Rate Contract)

KANTI BIJLEE UTPADAN NIGAM LIMITED (KBUNL) (A Joint Venture of NTPC Ltd. And BSEB ) SCHEDULE (BILL) OF QUANTITIES (Percentage Rate Contract) KANTI BIJLEE UTPADAN NIGAM LIMITED (KBUNL) (A Joint Venture of NTPC Ltd. And BSEB ) TENDER NO. 39/OT/R/KBUNL-MTPP/Formation /PKG- II/2013 Dated 27.08.2013 Tender and Contract document for earthwork in

More information

Scanned by CamScanner

Scanned by CamScanner JODHPUR MUNICIPAL CORPORATION G-SCHDULE NIT No. Date Sr No. Last Date of Sale :- Earnest Money : Rs... Date of Receipt :- CR No. Dated.. Copy issued to M/s STORM WATER DRAINAGE MASTER PLAN FOR THE CITY

More information

Schedule Of Works. 35 Konkan Railway Corporation Limited Signature of Tenderer

Schedule Of Works. 35 Konkan Railway Corporation Limited Signature of Tenderer Schedule Of Works 35 Konkan Railway Corporation Limited Signature of Tenderer Schedule of Works (Package II, Chainage 5/400 to 7/800 = 2400 mtrs SCHEDULE - A (CUTTING) Name of work: Limited tender for

More information

Bihar State Power Generation Company Ltd. (BSPGCL)

Bihar State Power Generation Company Ltd. (BSPGCL) Bihar State Power Generation Company Ltd. (BSPGCL) Open Tender tice. 16/OT/BSPGCL-BTPS/Rly. Siding/PKG-II/2015 Dated 06.05.2015. Tender document for the work of Earthwork in formation including blanketing,

More information

The West Bengal Power Development Corporation Limited

The West Bengal Power Development Corporation Limited The West Bengal Power Development Corporation Limited (A Government of West Bengal Enterprise) Open Tender Notice No. 38/OT/WBPDCL-KTPS/PH- IV/Tr. Linking/PKG-1/2014 Dated 03.09.2014 Laying, Linking of

More information

PRICED BILL OF QUANTITIES

PRICED BILL OF QUANTITIES Engineering Projects (dia) Limited (A Govt of dia Enterprise) Words 1 EARTH WORK 1.1 Earth work in excavation by mechanical means (Hydraulic Excavator) / Manual means over areas (exceeding 30 cm in depth,

More information

Schedule for construction of ROB Approaches no. 48, 54,55 of PKG-III (MGR) including temporary road diversion along ROB approach No 55.

Schedule for construction of ROB Approaches no. 48, 54,55 of PKG-III (MGR) including temporary road diversion along ROB approach No 55. Schedule for construction of ROB Approaches no. 48, 54,55 of PKG-III (MGR) including temporary road diversion along ROB approach No 55. QUOTED SL NO D E S C R I P T I O N OF ITEM UNIT Quantity IN Figures

More information

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI.

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI. SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST RAIGARH, MUMBAI. Tender Reference No. BL/LI/CC/TCWMUM/BOUNDARY WALL/1617/04

More information

TENDER DOCUMENT VOL - II (FINANCIAL BID) CONSTRUCTION OF BOUNDARY WALL FOR ICSI-CENTRE OF EXCELLENCE (CoE) KOLKATA

TENDER DOCUMENT VOL - II (FINANCIAL BID) CONSTRUCTION OF BOUNDARY WALL FOR ICSI-CENTRE OF EXCELLENCE (CoE) KOLKATA TENDER DOCUMENT VOL - II (FINANCIAL BID) CONSTRUCTION OF BOUNDARY WALL FOR ICSI-CENTRE OF EXCELLENCE (CoE) KOLKATA AT PLOT NO. IIA/35, ACTION AREA IIA, NEW TOWN, KOLKATA, WEST BENGAL 700 157 Pages (1 5)

More information

Drainage, Road Drainage and Collection Pit A - EXCAVATION:

Drainage, Road Drainage and Collection Pit A - EXCAVATION: 57 Drainage, Road Drainage and Collection Pit SCHEDULE OF QUANTITY Sl.N o. 1 Particulars Qty Unit Rate Amount A - EXCAVATION: Earth work in EXCAVATION IN FOUNDATION TRENCHES IN ALL KIND OF SOIL including

More information

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD TENDER FOR Construction of Stone Masonry Compound Wall for NIAB Campus at Survey No.37, Serlingampally, Hyderabad VOLUME V January 2013 HSCC

More information

BILL OF QUANTITIES. S.No Discription Unit Rate Quantity 1 Boring, Providing and installing cast in situ single under reamed piles of

BILL OF QUANTITIES. S.No Discription Unit Rate Quantity 1 Boring, Providing and installing cast in situ single under reamed piles of BILL OF QUANTITIES Name of Work: Beautification of Adalatganj Talab, Patna, Bihar S.No Discription Unit Rate Quantity 1 Boring, Providing and installing cast in situ single under reamed piles of specified

More information

KANPUR SMART CITY LIMITED

KANPUR SMART CITY LIMITED Nagar Nigam Mukhyalay, 3 rd Floor, Moti Jheel, Kanpur - 208002 Tel.: +91 512 2541258, 2546194 Email:ksclkanpur@gmail.com KANPUR SMART CTY LMTED No.: KSCL/PMC/Open Gym/01/2 Date: 17/02/2018 Reply to queries

More information

Tender Schedule for the Work "Construction of Staff qtrs. at Tainda S/S (1no.)

Tender Schedule for the Work Construction of Staff qtrs. at Tainda S/S (1no.) 1.Amount put to Tender:- Rs 7,48,024/- 2.E.M.D. Required: - R 8,000/- 3. Class of contractor :- "D" & "C" 4. Cost of Tender Paper:- R 4,200/- Sl- No Tender Schedule for the Work "Construction of Staff

More information

INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI

INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI ` INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI-110068 NOTICE INVITING QUOTATION IG/CMD/NIQ-civil/2014 Dated: - 26/06/2014 Name of work:- Construction

More information

Transit campus, Govt ITI Berhampur (2nd Floor), Engineering School Junction N.H-59, Berhampur Notice Inviting Tender

Transit campus, Govt ITI Berhampur (2nd Floor), Engineering School Junction N.H-59, Berhampur Notice Inviting Tender Transit campus, Govt ITI Berhampur (2nd Floor), Engineering School Junction N.H-59, Berhampur-760010 Sl. No-IWD / NIQ / PE / 2017-18 /07 Date:- 16.06.17 Notice Inviting Tender The Project Engineer (E),

More information

Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali

Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali FINANCIAL BID DOCUMENT Construction of Parking Shed at Main Campus,

More information

FOR. RCC Structural Works for Construction of Infectious Block Building at Kendrapara, Odisha state VOLUME III PRICE BID/BILL OF QUANTITIES

FOR. RCC Structural Works for Construction of Infectious Block Building at Kendrapara, Odisha state VOLUME III PRICE BID/BILL OF QUANTITIES AN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: WRO/CON/757/0188 FOR RCC Structural Works for Construction of Infectious Block Building at Kendrapara, Odisha state VOLUME III PRICE BID/BILL OF QUANTITIES

More information

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI 620 015 ESTATE MAINTENANCE DEPARTMENT NOTICE INVITING TENDERS NO: NITT/EMD//Civil works / 2015 TENDER NOTIFICATION Ref: NITT/EMD/ CoW/Civil Works /15-16

More information

Tender ref no: SBIIMS/BHU/AO2/ / 57 Date: PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING. Cum 15.

Tender ref no: SBIIMS/BHU/AO2/ / 57 Date: PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING. Cum 15. Tender ref no: SBIIMS/BHU/AO/08-9/ Date: 0.0.09 Sl. No. ITEM SPECIFICATION UNIT QTY RATES AMOUNT PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING Earth work in excavation of recharge

More information

Estimate FOR THE SEPTIC TANK

Estimate FOR THE SEPTIC TANK Estimate FOR THE SEPTIC TANK S.NO ITEM DESCRIPTION. 1 Excavation in soil,soft & hard murum... Qty UNIT Rate Excavation for footing, machine foundation, plinth beams, wall footing, gutters,brick wall, tanks

More information

Sl No. Rate. Hct By manual means In area of light jungle

Sl No. Rate. Hct By manual means In area of light jungle BILL OF QUANTITIES Name of Work : Extension of NH 37 from its dead end near Saikhowaghat in Assam ending near Roing in Arunachal Pradesh under Trans Arunachal Highway programme. SH: Strengthening of Shantipur

More information

ANISO9001&14001COMPANY TENDER DOCUMENT. TENDER No: NERO/CON/TU/659/325 dated FOR

ANISO9001&14001COMPANY TENDER DOCUMENT. TENDER No: NERO/CON/TU/659/325 dated FOR ANISO9001&14001COMPANY TENDER DOCUMENT TENDER No: NERO/CON/TU/659/325 dated 20.09.2018 FOR TENDER FOR CONSTRUCTION OF UPGRADATION OF CENTRAL ROAD INCLUDING LANDSCAPE LIGHTING BY MUSHROOM TYPE LED BOLLARD

More information

SAIL-RITES BENGAL WAGON INDUSTRY PVT. LTD.

SAIL-RITES BENGAL WAGON INDUSTRY PVT. LTD. SAIL-RITES BENGAL WAGON INDUSTRY PVT. LTD. Open Tender tice : 24/OT/R/SRBWIPL/New Shed-floor/2012 dated 23.05.2012 Tender and Contract document for Construction of new shed that includes supply, fabrication,

More information

Approximate estimate of renovation and extension work of faculty room in JIST, Jorhat-10 Estimate is prepared as per PWD SOR

Approximate estimate of renovation and extension work of faculty room in JIST, Jorhat-10 Estimate is prepared as per PWD SOR Approximate estimate of renovation extension work of faculty room in JIST, Jorhat-10 Estimate is prepared as per PWD SOR 2013-14 SL Description of the work No 1 DISMANTLING Unit quantity Rate Amount 1.1

More information

CIVIL WORKS Mahesh G. Nair

CIVIL WORKS Mahesh G. Nair MEASUREMENT BOOK SUNIL Date Work Order Contractor : : EARTH WORKS CIVIL WORKS Mahesh G. Nair GROUND FLOOR 1 EARTH WORKS EXCAVATION : Earth work excavation for foundation trenches in all classes of soil

More information

Amendment -1. Date: NIT No. RECPDCL/CSR/CWC/ /3368 dt:

Amendment -1. Date: NIT No. RECPDCL/CSR/CWC/ /3368 dt: Amendment -1 Date: 17.02.2017 NIT No. RECPDCL/CSR/CWC/2016-17/3368 dt: 20.01.2017 Notice Inviting Tender (Bid Invited through e Tendering mode only) From Implementing Agencies for Turnkey execution of

More information

Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali

Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali FINANCIAL BID DOCUMENT Miscellaneous Civil Work in Low Lying Area at

More information

ENGINEERING PROJECTS (INDIA) LTD. (A Govt. of India Enterprise) ADDENDUM NO. 1

ENGINEERING PROJECTS (INDIA) LTD. (A Govt. of India Enterprise) ADDENDUM NO. 1 ENGINEERING PROJECTS (INDIA) LTD. (A Govt. of India Enterprise) Tender No. NERO/MMD/57/ Date: 27..208 Tender for Construction of Border Road works from BP NO FROM 822/2S to 825/M at Panisagar sector along

More information

Construction of Shopping Complex at MNIT campus.

Construction of Shopping Complex at MNIT campus. Name of work:- Construction of Shopping Complex at MNIT campus. G-Schedule S.No Qty Items Unit Rate Amount 1 253 Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation

More information

TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI

TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI BILL OF QUANTITIES IN THREE SCHEDULES (TOTAL 10 SHEETS EXCLUDING ABSTRACT & COVER PAGE) 1 OF 7 SCHEDULE-A BOQ FOR EARTHEN DYKES

More information

SAIL-RITES BENGAL WAGON INDUSTRY PVT. LTD.

SAIL-RITES BENGAL WAGON INDUSTRY PVT. LTD. SAIL-RITES BENGAL WAGON INDUSTRY PVT. LTD. Open Tender tice : 118/OT/SRBWIPL/Roof-Retro fitting of Structure /2011 dated 21.12.2011 Tender and Contract document for Supply, fixing & erection of roof sheeting,

More information

Sub Total for Demolishing

Sub Total for Demolishing A Cleaning of Jungle Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish

More information

SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE

SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE S.NO Description Unit Total Qty EARTH WORK EXCAVATION : Earthwork in excavation at all depths for foundation, pile cap,drain, ramp,pits, etc.,

More information

PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.)

PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.) PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.) Based on. I to IV w.e.f. 10 May 2012 Length of the Road =250 m, ROW 18 m Abstract Estimate S.No. Description of Item SOR Item Cost 1

More information

SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Road

SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Road Sl.Pg.No.193 Name of Work : Construction of 20.0 m. wide road in Sector 16 under 12.5% scheme around Shelghar Village at Ulwe Node, Navi Mumbai. SCHEDULE A BILL OF QUANTITIES Part - I : Construction of

More information

NOTICE INVITING QUOTATION

NOTICE INVITING QUOTATION Page 1 of 5 CONSTRUCTION CELL NEW MARKET COMPLEX CMC BUILDING(6 TH FLOOR) 15N,NELLIE SENGUPTA SARANI KOLKATA-700 087 No.CWC/CC-Kol/NIQ-AR&MO/CW-Mohania/2015-16/ Date- 08.09.2015 NOTICE INVITING QUOTATION

More information

Notice Inviting Tender

Notice Inviting Tender No. 01/S&T/2018-19 Notice Inviting Tender Name of the work To carry out the works for renovation of existing OFC hut with CC Block masonry at 08 Stations i.e. Wadhwan City (WC), Limbdi (LM), Chuda (CDA),

More information

BHARAT COKING COAL LTD.

BHARAT COKING COAL LTD. BHARAT COKING COAL LTD. Tender Notice No.87/OT/BCCL/Maheshpur /2014 Dated24.01.2014 PART 2 FINANCIAL BID SCHEDULE (BILL) OF QUANTITIES (PERCENTAGE RATE CONTRACT) Tender and Contract Document For Construction

More information

ROAD STRECH FROM Golbazar Circle(723m), Golbazar to Ranital chowk(195m) LENGTH METERS SUMMARY SHEET

ROAD STRECH FROM Golbazar Circle(723m), Golbazar to Ranital chowk(195m) LENGTH METERS SUMMARY SHEET ROAD STRECH FROM Golbazar Circle(723m), Golbazar to Ranital chowk(195m) LENGTH - 918 METERS SUMMARY SHEET Sr No. Item Description Amount (In Rs.) 1 ROAD 44445103.80 2 UTILITY DUCT 39514269.91 3 STORM WATER

More information

DEVELOPMENT OF MANGROL FISHERY HARBOUR -PHASE-III Part-A

DEVELOPMENT OF MANGROL FISHERY HARBOUR -PHASE-III Part-A 1 DEVELOPMENT OF MANGROL FISHERY HARBOUR -PHASE-III Part-A VOLUME-II PRICE BID Downloading of tender documents (Start Date): Dt 30/05/2017 from 11.00 hrs. On line submission of tender (End Date): Dt. 01/07/2017

More information

Est. Cost : Rs.35,000/- Sl. No.

Est. Cost : Rs.35,000/- Sl. No. Note:-1) The execution of these model estimates is subjected to compliance / adherence to 60:40 : : Wage: material ratio at Grampanchayat as a UNIT 2) These model estimates shall be locally approved (technically)

More information

TENDER NO. RITES/PO-LKO/BPCL&BORL/Package-I SCHEDULE OF WORKS AND RATES PART-A BPCL WORKS

TENDER NO. RITES/PO-LKO/BPCL&BORL/Package-I SCHEDULE OF WORKS AND RATES PART-A BPCL WORKS GUIDELINES TO THE BIDDERS FOR FILLING IN SCHEDULE OF WORKS AND RATES, GENERAL NOTES & SPECIAL CONDITIONS 1. The Schedule of works & rates shall be read in conjunction with the Instructions to Bidders,

More information

C H E N N A I M E T R O R A I L L I M I T E D A D D E N D U M - 1

C H E N N A I M E T R O R A I L L I M I T E D A D D E N D U M - 1 C H E N N A I M E T R O R A I L L I M I T E D C H E N N A I M E T R O R A I L P R O J E C T P H A S E - 1 E X T E N S I O N A D D E N D U M - 1 T O B I D D I N G D O C U M E N T S for CONTRACT ATW-07 Installation,

More information

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT 325.0 957 100.130 F.L.=99.780 12205 2300 2300 2300 2720 125 EXPANSION GAP 125 EXPANSION GAP OUTER COVER PLATE 640X40X1070 938.5 1350 1350 1350 1282.5 1350 1350 1122.5 1350 1356.5 1356.5 1350 1122.5 1350

More information

Name of work Estimated cost Time allowed for completion of work 1. Construction of PVC coated Chain Link fencing at Megapode Resort. Sl. No.

Name of work Estimated cost Time allowed for completion of work 1. Construction of PVC coated Chain Link fencing at Megapode Resort. Sl. No. The Andaman & Nicobar Islands Integrated Development Corporation Ltd, Vikas Bhawan, Post Box. No.180, Port Blair 744 101 Phone: 232098 Fax 03192-240615 F.No. 7-37/ANIIDCO/95/1231/2018 Dated the 16 th April

More information

Sl No. Sqm Sqm Sqm Cum Cum 0.73

Sl No. Sqm Sqm Sqm Cum Cum 0.73 BOQ Name of Work: Repairing & repainting works at the adjunct room between Old block and New Extension Building in Second floor of Chemistry Department. Sl No 1 2 3 4 Desription of Item Unit Qnty Rate

More information

GOVERNMENT OF ODISHA PANCHAYTI RAJ DEPARTMENT. Construction of Culvert on Sunamudi Nalla (2 Span RCC slab)

GOVERNMENT OF ODISHA PANCHAYTI RAJ DEPARTMENT. Construction of Culvert on Sunamudi Nalla (2 Span RCC slab) BID IDENTIFICATION NO. DRDA, SBP- 10/2013-14 GOVERNMENT OF ODISHA PANCHAYTI RAJ DEPARTMENT PRICE BID DOCUMENTS FOR THE WORK (Civil works) Construction of Culvert on Sunamudi Nalla (2 Span RCC slab) ESTIMATED

More information

Providing and laying hammer dressed flat stone paving in cement mortar 1:6 on prepared bedding (excluding the cost of bedding). 40mm 22.

Providing and laying hammer dressed flat stone paving in cement mortar 1:6 on prepared bedding (excluding the cost of bedding). 40mm 22. 1 CG0001 Clearing grass including removal of rubbish within 50m of site 91.00 m² 2 EW0001 Surface dressing of ground, including removal of vegetation and inequalities < 150mm deep, disposal of rubbish

More information

SPECIAL REPAIRS TO EXTERNAL SANITARY ARRANGMENTS AND STREET LIGHTS IN ESI DISPENSARY I & II CAMPUS AT PERAMBUR

SPECIAL REPAIRS TO EXTERNAL SANITARY ARRANGMENTS AND STREET LIGHTS IN ESI DISPENSARY I & II CAMPUS AT PERAMBUR SPECIAL REPAIRS TO EXTERNAL SANITARY ARRANGMENTS AND STREET LIGHTS IN ESI DISPENSARY I & II CAMPUS AT PERAMBUR FINANCIAL BID Item DSR Item Description Qty Units No No. Total 1.1.1 Excavating trenches of

More information

Tender Document issued: From 25 April 2011 (Between 1000h and 1500h)

Tender Document issued: From 25 April 2011 (Between 1000h and 1500h) BUREAU OF INDIAN STANDARDS (Southern Regional Office) TENDER NOTICE Sealed tenders are invited from registered contractors for providing room of size 1.2m x 1.8m with aluminium section/grill for keeping

More information

TENDER DOCUMENT. TENDER No.: BHI/PI-(S)/675/1005 FOR

TENDER DOCUMENT. TENDER No.: BHI/PI-(S)/675/1005 FOR TENDER DOCUMENT TENDER No.: BHI/PI-(S)/675/1005 FOR Tender for Construction of Civil works above pile cap for 5 Nos of RCC Mixing Bins (Silos) of Storage Capacity 500MT (each) and columns, beams independent

More information

QUOTATION FOR CONSTRUCTION OF SEPTIC TANK, SOAK PIT AND INSPECTION CHAMBER AT ROIDA

QUOTATION FOR CONSTRUCTION OF SEPTIC TANK, SOAK PIT AND INSPECTION CHAMBER AT ROIDA THE ORISSA MINERALS DEVELOPMENT COMPANY LIMITED (A GOVT. OF INDIA ENTERPRISE) Regd. Office Mines Office: AG-104, Saurav Abasan, Sector-II P.O.Thakurani, Via-Barbil-758035 Salt Lake, Dist-Keonjhar (Orissa)

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price) SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

Calculation of requirement of Labour. for construction of IAY/CMRHM

Calculation of requirement of Labour. for construction of IAY/CMRHM Calculation of requirement of Labour for construction of IAY/CMRHM Total cost as per 2012 SOR = Rs 7,01,746.00 Deduct 7.5% Contractor s profit = Rs (-) 52,631.00 = Rs 6,49,115.00 Taking 1/3 as the Labour

More information

NATIONAL INSTITUTE OF TECHNOLOGY, TIRUCHIRAPPLLI ESTATE MAINTENANCE DEPARTMANT NAME OF THE CONTRACTOR / FIRM :

NATIONAL INSTITUTE OF TECHNOLOGY, TIRUCHIRAPPLLI ESTATE MAINTENANCE DEPARTMANT NAME OF THE CONTRACTOR / FIRM : NATIONAL INSTITUTE OF TECHNOLOGY, TIRUCHIRAPPLLI- 620015 ESTATE MAINTENANCE DEPARTMANT SCHDULE OF WORK Name of Work :Renovation of Geotechnical Lab and Environmental lab in Civil Engineering Departemnt

More information

Estimate for the construction of water tank24000ltrs (4mx3mx2m) with GCI sheet roofing

Estimate for the construction of water tank24000ltrs (4mx3mx2m) with GCI sheet roofing 1 2 Estimate for the construction of water tank24000ltrs (4mx3mx2m) with GCI sheet roofing Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI BILL OF QUANTITIES IN THREE SCHEDULES

TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI BILL OF QUANTITIES IN THREE SCHEDULES TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI BILL OF QUANTITIES IN THREE SCHEDULES 1 OF 7 01 Excavation for seating the dam, toe drains & appurtenant M 3 0 9110 21700 30810

More information

RITES LIMITED (A GOVERNMENT OF INDIA ENTERPRISE) PART 2 FINANCIAL BID SCHEDULE (BILL) OF QUANTITIES (PERCENTAGE RATE CONTRACT)

RITES LIMITED (A GOVERNMENT OF INDIA ENTERPRISE) PART 2 FINANCIAL BID SCHEDULE (BILL) OF QUANTITIES (PERCENTAGE RATE CONTRACT) RITES LIMITED (A GOVERNMENT OF INDIA ENTERPRISE) NIT : 07/OT/NTPC-LARA/ KRL-LARA SECTION /PKG-II C / 2016 Dated 03.08.2016 NAME OF WORK: Execution of Earthwork in formation, Construction of Minor Bridges,

More information

SCHEDULE OF ITEMS & QUANTITIES FOR CIVIL WORKS OF PROPOSED GIRLS/ BOYS TOILET BLOCK

SCHEDULE OF ITEMS & QUANTITIES FOR CIVIL WORKS OF PROPOSED GIRLS/ BOYS TOILET BLOCK Schedule-I: Civil Works EARTH WORK Section-A : DSR Items 1 2.8 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in

More information

SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Bridge

SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Bridge Sl.Pg.No.193 Name of Work : Construction of box culvert across 35 mtr. wide channel along 30 mtr. Wide road in Sector 17 & 18 at Ulwe Node. SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Bridge

More information

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY):

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): 01 Providing and Fixing of CPVC pipes confirming to ASTM standard including all CPVC fittings like tees, elbows, bends, unions, coupling, reducer

More information

SECTION 303 CULVERTS

SECTION 303 CULVERTS 303.01 Scope - This section covers the construction of pipe culverts. 303.01.01 Definitions for the purposes of this section, the following general terms are defined as follows: a) Backfilling means the

More information

GUJARAT ENERGY TRANSMISSION CORPORATION LTD TR CIRCLE OFFICE JUNAGADH. COMPLETION PERIOD.

GUJARAT ENERGY TRANSMISSION CORPORATION LTD TR CIRCLE OFFICE JUNAGADH. COMPLETION PERIOD. GUJARAT ENERGY TRANSMISSION CORPORATION LTD TR CIRCLE OFFICE JUNAGADH. COMPLETION PERIOD. Name of Work: Construction of foundation for Transformer bay, fire protection wall & ancillary civil work at 220

More information

Institute Works Department. Ref. No.: IIT(BHU)/IWD/CT/74/ /2033 Dated 12 October, 2018 QUOTATION NOTICE

Institute Works Department. Ref. No.: IIT(BHU)/IWD/CT/74/ /2033 Dated 12 October, 2018 QUOTATION NOTICE Ref. No.: IIT(BHU)/IWD/CT/74/2018-19/2033 Dated 12 October, 2018 QUOTATION NOTICE 1. Limited tender quotation are invited among UWD, BHU empanelled contractors and also those contractors who had worked

More information

INDIAN INSTITUTE OF TECHNOLOGY GUWAHATI Guwahati , Assam Phone : (0361) , : : Fax : (0361) TENDER DOCUMENT

INDIAN INSTITUTE OF TECHNOLOGY GUWAHATI Guwahati , Assam Phone : (0361) , : : Fax : (0361) TENDER DOCUMENT INDIAN INSTITUTE OF TECHNOLOGY GUWAHATI Guwahati 781 039, Assam Phone : (0361) 2582061, 2582065: : Fax : (0361) 2692771 TENDER DOCUMENT NIT NO: IITG/ENGG/17/NIT/7 Dtd. 10.03.2017 NAME OF WORK Construction

More information

ITEM 432 RIPRAP. Dry Riprap is defined as Stone Riprap of the required type with voids filled only with spalls or small stones.

ITEM 432 RIPRAP. Dry Riprap is defined as Stone Riprap of the required type with voids filled only with spalls or small stones. ITEM 432 RIPRAP 432.1. Description. This Item shall govern for the furnishing and placing of riprap of the type and details shown on the plans and in accordance with this Item. 432.2. General. Riprap furnished

More information

TENDER DOCUMENT FOR CIVIL WORK FOR INDIAN JUTE INDUSTRIES RESEARCH ASSOCIATION (IJIRA)

TENDER DOCUMENT FOR CIVIL WORK FOR INDIAN JUTE INDUSTRIES RESEARCH ASSOCIATION (IJIRA) TENDER DOCUMENT FOR CIVIL WORK FOR INDIAN JUTE INDUSTRIES RESEARCH ASSOCIATION (IJIRA) Content: 1. Introduction. 2. BOQ 3. Details of Tender & Tender notice. 4. General Terms and Conditions. 5. Technical

More information

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.

More information

SCHDULE OF WORKS N/w :providing Aluminium partititon and vitrified floor tiles for Chemical Engineering Department

SCHDULE OF WORKS N/w :providing Aluminium partititon and vitrified floor tiles for Chemical Engineering Department NAIONAL INSTITUTE OF TECHNOLOGY, TIRUCHIRAPPALLI - 620015 DEPARTMENT OF ESTATE MAINTRNANCE SCHDULE OF WORKS N/w :providing Aluminium partititon and vitrified floor tiles for Chemical Engineering Department

More information

Percentage BoQ. Validate Print Help. Tender Inviting Authority: S.K. Gupta, Manager (Civil)

Percentage BoQ. Validate Print Help. Tender Inviting Authority: S.K. Gupta, Manager (Civil) Validate Print Help Percentage BoQ Tender Inviting Authority: S.K. Gupta, Manager (Civil) Name of Work: Repair works at F & B outlets as K4, K6, K7, K8,K10 & Food Court-II and Hall -20 Contract No: Bidder

More information

½% % ATM 1 E.P.F. 3 UBN No.

½% % ATM 1 E.P.F. 3   UBN No. ½% % 1. ATM 03.46 02 1 E.P.F. 2 3 WWW.SPPP.Raj.nic.in UBN No. OFFICE OF THE MUNICIPAL CORPORATION, UDAIPUR TENDER"G" SCHEDULE Estimated Cost Earnest Money ½% Earnest Money 2% Tender Fee Period Date of

More information

Special Provision No. 421F01 April 2006

Special Provision No. 421F01 April 2006 RIGID PIPE CULVERTS Item No. FLEXIBLE PIPE CULVERTS Item No. CSP ARCH CULVERTS Item No. STRUCTURAL PLATE CSP Item No. CORRUGATED STEEL PIPE EXTENSIONS Item No. ROCK EXCAVATION FOR CULVERTS Item No. CLAY

More information

CENTRE FOR DEVELOPMENT OF IMAGING TECHNOLOGY (C-DIT) Chithranjali Hills, Thiruvallom, Thiruvananthapuram-27

CENTRE FOR DEVELOPMENT OF IMAGING TECHNOLOGY (C-DIT) Chithranjali Hills, Thiruvallom, Thiruvananthapuram-27 CENTRE FOR DEVELOPMENT OF IMAGING TECHNOLOGY (C-DIT) Chithranjali Hills, Thiruvallom, Thiruvananthapuram-27 RE-TENDER FOR DEMOLISHING THE EXISTING BRICK WALL OF THE WATER TANK AND FOR RECONSTRUCTING THE

More information

Consultant: Client: MINISTRY OF EXTERNAL AFFAIRS NEW DELHI IRCON INFRASTRUCTURE & SERVICES LIMITED DIMENSION DETAILS OF RCC SUPERSTRUCTURE.

Consultant: Client: MINISTRY OF EXTERNAL AFFAIRS NEW DELHI IRCON INFRASTRUCTURE & SERVICES LIMITED DIMENSION DETAILS OF RCC SUPERSTRUCTURE. NOTE:- 1. ALL DIMENSIONS ARE IN MM. WRITTEN DIMENSIONS ARE TO BE FOLLOWED. 2. THE DESIGN IS IN ACCORDANCE WITH IRC AND IS CODES.. 3. GRADE OF CONCRETE: PILE - M40 PILE CAP, ABUTMENT, DIRTWALL - M35 SEISMIC

More information

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 616 APRIL 2018 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03 DEFINITIONS

More information

ITEM 432 TUNNEL CONSTRUCTION

ITEM 432 TUNNEL CONSTRUCTION AFTER MARCH 1, 2012 ITEM 432 TUNNEL CONSTRUCTION 432.1 Description. This Item shall govern for tunnel lines under railroads, state highways, and concrete paved streets or other obstructions indicated.

More information

Requirements for Measuring and Pricing of Structural Concrete

Requirements for Measuring and Pricing of Structural Concrete Requirements for Measuring and Pricing of Structural Concrete October 2016 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible for managing

More information

Est. Cost : Rs.40,000/-

Est. Cost : Rs.40,000/- 3) Sl. No. 1 Description of Item Unit Nos. L B D Qty Rate Amount KSRB 2-1.1: Earthwork in surface excavation in ordinary soil for leveling and lowering the ground manually (other than foundation of buildings,

More information

THE NATIONAL SMALL INDUSTRIES CORPORATION LTD. (A GOVERNMENT OF INDIA ENTERPRISE) Technical Services Centre, Balitikuri, Howrah

THE NATIONAL SMALL INDUSTRIES CORPORATION LTD. (A GOVERNMENT OF INDIA ENTERPRISE) Technical Services Centre, Balitikuri, Howrah THE NATIONAL SMALL INDUSTRIES CORPORATION LTD. (A GOVERNMENT OF INDIA ENTERPRISE) Technical Services Centre, Balitikuri, Howrah-711 113. Tel: 033-2653 0304, 4280 BID/TENDER DOCUMENT Name of the work: Barbed

More information

PRICE SCHEDULE INDIGENOUS

PRICE SCHEDULE INDIGENOUS Sl No. DESCRIPTION/ [TAG NO.] QTY. UNIT SUPPLY PRICE POINT BASIS INCLUDING P & F TOTAL SUPPLY PRICE POINT INCLUDING P & F UNIT FREIGHT TOTAL FREIGHT CHARGES UPTO PROJECT SITE (INCL. SERVICE TAX + Ed. CESS

More information

Construction of fencing on sui and vershamedi side at port Navlakhi.

Construction of fencing on sui and vershamedi side at port Navlakhi. Construction of fencing on sui and vershamedi side at port Navlakhi. VOLUME-II PRICE BID Downloading of tender doents (Start Date): Dt. 7-2 -2018 from 13.00 hrs. On line submission of tender: Dt 28-2-2018

More information

Notice Inviting Quotations

Notice Inviting Quotations ALL INDIA INSTITUTE OF MEDICAL SCIENCES BHOPAL vf[ky Hkkjrh; vk;qfozkku lalfkkuk dk;kzy; dk;zikyd vfhk;ark ifj;kstuk kk[kk] LokLF;,oa ifjokj dy;k.k ea=ky; lkdsr uxj] Hkksiky&462020] nwjhkk"k % 0755&2900697

More information

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1 March 2002 No. 400 INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS 400. 1 SCOPE... 1 400. 2 REMOVING CULVERTS AND TIMBER STRUCTURES 2.1 Concrete and Metal Pipe Culverts... 1 2.2 Structural

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

SCHEDULE OF RATES. WORK : External Waterproofing for Basement at Dena Bank, Kandivali Branch SR NO PARTICULARS UNIT QUANTITY RATE AMOUNT

SCHEDULE OF RATES. WORK : External Waterproofing for Basement at Dena Bank, Kandivali Branch SR NO PARTICULARS UNIT QUANTITY RATE AMOUNT WORK : External Waterproofing for Basement at Dena Bank, Kandivali Branch SCHEDULE OF RATES SR NO PARTICULARS UNIT QUANTITY RATE AMOUNT 1 Excavation for foundation in earth all types of soils like clay,

More information

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. Beit Hanoun Emergency Water Supply Project "Beit Hanoun Emergency Water Supply Project" " Rehabilitation and Construction of Beit Hanoun Water Network " BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE Bill of Quantities PREAMBLE TO

More information

S.No Description Unit Quantity Rate (Rs) Amount (Rs)

S.No Description Unit Quantity Rate (Rs) Amount (Rs) , S.No Description Unit Quantity Rate (Rs) Amount (Rs) 1 2 Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge method and preparation

More information

AFD: Civil: Inq: April 23, 2016

AFD: Civil: Inq: April 23, 2016 AFD: Civil: Inq: 20160402 April 23, 2016 To, Sub: - Inquiry for Civil work for Granite flooring and miscellaneous repairs work at ADMN Corridor at Amulfed Dairy, Gandhinagar. We invite your most competitive

More information

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00 Description Page No Summary Amount Summary 1/7 230,694.60 22,019.25 22,642.65 2/6 96,801.30 80,150.60 114,056.00 Total Per Unit (MYR) 327,495.90 102,169.85 136,698.65 Total Unit(s) X 1 2 2 Total Per Type

More information

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 616 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03

More information

General Technical Specification

General Technical Specification GENERAL For calculating the requirements of cement in various items of work the following standards will be adopted. Over the above theoretical quantity of cement, additional allowance upto plus or minus

More information