1 (ADDENDUM COVER SHEET) PURCHASING DIVISION BOARD OF COUNTY COMMISSIONERS BROWARD COUNTY, FLORIDA A D D E N D U M NO. 2 BROWARD COUNTY MAIN LIBRARY WIND MITIGATION (NON-SHELTERED MARKET) TO ALL PROSPECTIVE BIDDERS: DATE OF ADDENDUM: November 9, 2010 PLEASE NOTE THE FOLLOWING CHANGES, QUESTIONS & ANSWERS: 1. The bid due date remains the same; all bids are due by Wednesday, November 17, 2010 at 2:00 pm at the location listed in the bid document. The following are submitted written questions and answers: 2. Question: Will the Owner allow payment for off site stored materials for the new curtain wall, windows, aluminum and glass for the project? Background Info: Since there is limited on site storage and that the project schedule dictates that materials must be available early to be off the critical path to not put the building in jeopardy of weather related issues, the materials must be ordered far in advance of delivery and installation. Answer: Requirements for payment of stored materials is defined in Section "Contract", Article 6.3 "Payment for Stored Materials and Equipment". 3. Question: What is the minimum information you require submitted to get an RFI approval for use of our system? Answer: See Addendum No. 1 dated 11/01/10, for requirements. 4. Question 4-a: A8.0 door schedule calls for hardware group #11 on door 113 (automatic sliding entrance). Specification 3.7 K denotes #11 as being "Exterior Double Doors Auditorium". Please confirm if door 113 should be hardware group #1, not #11 as indicated. Answer 4-a: On Drawing Sheet A8.0 revise Hardware Group for Door #113 to read "#1", in lieu of that shown. Question 4-b: A8.0 door schedule calls for hardware group #6 on door 115. Sheet A1.1 denotes "staff entrance with card reader". Please confirm basis of design for the card reader so that proper pricing can be obtained. Page 1 of 10

2 Answer 4-b: For Door #115, the Card Reader is to be relocated from the existing door #113. On Drawing Sheet D1.1 at South Lobby doors add existing Card Reader (CR) on east side of door and add note "Remove and Relocate Card Reader to New Door #115, see A1.1." Question 4-c: Zone 4 and 5 wind load designations are shown in both the architectural and structural drawings. There are some discrepancies between the two, so please confirm which wind load designations will govern. Answer 4-c: Follow the Zone 5 locations shown on the structural drawings with one correction. On Structural Drawing Sheet S2.4 4 th Floor Plan at grid line B5 corner of glazing, add "Zone 5, 17'-0" Wide on both the north and east faces of the corner." 5. Question 5-a: Instructions to Bidders: Item 3, Submission of Sealed Bids states that one (1) compact disk of scanned bid document is to be submitted at the time of bid. Please confirm it would be acceptable to submit this CD within 48 hours of the bid deadline. Answer 5-a: No, the CD electronic copy should be submitted with the original bid submittal prior to the bid deadline. Question 5-b: Instruction to Bidders: Please advise whether or not we are required to submit a construction schedule with our bid. Answer 5-b: A construction schedule is not required to be submitted with the bid documents. Refer to Section "Contract, paragraph 2.1" for requirements of submitting the project schedule. Question 5-c: Instructions to Bidders: Please advise if both the bidder and the bidder s glass and glazing sub-contractor shall fill out the Questionnaire portion of the bid form and include in the Bid Package. Answer 5-c: The Questionnaire shall be filled out by the Bidder. If the Prime Contractor cannot satisfy the Qualifications and Experience requirements of the project, then those requirements shall be met by the glazing subcontractor. Question 5-d: Instruction to Bidders: Please confirm whether or not we are to include the cost of sales tax and usage tax for materials in our bid. Answer 5-d: Yes, the Contractor shall pay all applicable sales, use and other taxes, as indicated in Section 00800, Article 27 "Taxes". Question 5-e: Demolition Plans: Temporary construction barrier wall layouts shown on the demolition plans are shown to conflict with existing library book shelves. Please confirm that it is the Contractor s responsible to relocation and move back in place the bookshelves for installation of the temporary walls. Answer 5-e: Yes, the Contractor shall relocate furniture and equipment as required for installation of the temporary walls and move the same back in place when temporary walls are removed. Refer to "Furniture and Equipment Relocation" notes on Drawing Sheet A0.1 and D1.0 for additional information and requirements. Page 2 of 10

3 Question 5-f: Demolition Drawings: Temporary wall layout shown on Demolition drawings do not take into account that phases will have to be encapsulated during construction of each phase. Please confirm additional temporary construction barriers are to be added as necessary so each phase is encapsulated from the public where possible. Answer 5-f: On Drawing Sheet D1.0 under "Construction Barrier Notes" add the following note: "7. Construction Barrier shall encapsulate each phase of the work by running the construction barrier to an existing fixed building element, including a vertical mullion in the existing or new glazing system, or a column, wall, beam, etc. The construction barrier returns are not necessarily shown on the drawings. The Contractor shall include such construction barrier returns in his work, when installing the temporary walls. Question 5-g: A0.1, Spec 01270, Unit Price Schedule: Existing Note 3 on sheet A0.1 states that if during wire brushing the existing tube steel if more than 25% material occurs, then steel is to be replaced. However, this seems to conflict with the Unit Price schedule with states an exact quantity of structural repairs to include in your base bid. Please confirm that we are only to include the quantities found in Specification and listed in items 31, 32 and 33 of the Unit Price schedule in our bid. Answer 5-g: There is no conflict. Note #3 under "Existing Building" on Drawing Sheet A0.1 and the Unit Prices listed in the Unit Price Schedule in Section "Unit Prices" are exclusive of one another. Also, replace Specification Section "Unit Prices" with updated Section 01270R "Unit Prices" dated 11/08/10 attached to this Addendum. Page 3 of 4 was missing and is now included in the attached section. Question 5-h: Spec 01560: Specification section E states that it is only highly recommended that the Contractor employ a security guard to patrol the exterior construction zones and that they shall be present at least overnight and weekends when construction personnel are not present. Please be definitive and confirm that we are to include the costs for a security guard during all off hours for the duration of our project in our base bid. Answer 5-h: Section E is only a recommendation. If the Contractor elects to hire a security guard to patrol the exterior construction areas, the cost are solely the Contractors. Also, in Section 01560, add the following paragraph in 1.8 to read: "F. INTERIOR SECURITY a. During those hours the library is closed and the Contractor is performing work on the interior of the library, the Contractor shall hire a security guard to patrol the interior construction areas of the library. b. While it is not a requirement, it is suggested the security guard hired for the interior patrols be provided by the same vendor as the security guards hired by the library at the time of construction activities because they are most familiar with the library's procedures and policies. c. The cost of the interior security guard shall be borne entirely by the Contractor. Page 3 of 10

4 d. The library does have a security guard present in the security office located on the 1 st floor, 24 hours a day, 7 days a week, but they may not leave their post to patrol areas." Question 5-i: Demolition Drawings: Please advise if it is acceptable to the Library if the asbestos abatement work at Stair #1 occur during normal business hours, or if it will be required off-hours. Answer 5-i: No, per Drawing Sheet D1.0, "Asbestos Removal" notes, note #5d. The asbestos abatement work must be performed when the library is closed. Question 5-j: Demolition Drawings: Please provide the logic of the temporary construction barrier numbering system, i.e. CB-5 and what it refers to. These numbers don t appear to relate at all to phases A, B, C, etc Answer 5-j: The construction barrier numbers refer to the type of barrier which are listed in the "Construction Barrier Legend" shown on demolition drawings. Question 5-k: LS-2: Regarding the construction sign shown on sheet LS-2, please advise if we are to provide a specific amount of these signs, or just one by the main entrance. Answer 5-k: Provide one (1) Construction Sign shown on Drawing Sheet LS-2 and locate it along Andrews Avenue near the "Proposed Construction Staging Area" shown on Sheet SP1.0. Question 5-l: Spec 08441: Please confirm is the curtain wall test mock-up can also be reviewed and approved for visual acceptance by the architect. Answer 5-l: Yes, the test mock-up can also be reviewed and approved for visual acceptance by the Architect provided: 1. Test mock-up represents all the conditions and configurations required by the Architect for review and approval. 2. Test mock-up must be installed in strict accordance with the requirements of the project Specification. 3. Additional configurations of the mock-up may be required by the Architect for review and approval. Additional configurations may be used not only to confirm the system meets the project requirements, but set the standard for quality workmanship and the basis for final appearance. Question 5-m: A4.0 through A4.7: Please confirm if the curtain wall and sloped glazing mullion profiles shown on the drawings are to be strictly adhered. Answer 5-m: New glazing mullions shall have a 3" face width. The mullion depth is not a fixed dimension. Question 5-n: S4.3 and S4.4: Temporary wall details are shown on sheets S4.3 and S4.4. However, these details do not state address the following: a. Should the exterior of the wall be waterproofed? If so, please provide details and acceptable products to be used. Page 4 of 10

5 b. Should the exposed portion of the slab created after the removal of the existing curtain wall systems be waterproofed? c. Please advise if the interior drywall layer is to be painted. d. Please confirm how the interior drywall layer is to be painted. Answer 5-n: On Drawing Sheet D1.0, Detail #2/D1.0 "Zip Wall Containment Detail" shows the exterior side of the temporary partition to be painted and the interior drywall to be left unpainted. Also, on Detail #2/D1.0 add the following: 1. On the exterior side of the temporary partition install 6 MIL Visqueen vapor barrier to cover the plywood and all joints, taping it to adjacent surfaces. "Shiplap" pieces so to allow water to shed off the wall. 2. On portions of the concrete floor exposed on the exterior side of the construction barriers install 6 MIL Visqueen vapor barrier on floor, up the barrier wall at least 6 inches and draped over edge of floor slab. Over the Visqueen install 3/4" exterior grade plywood sheathing as a walking surface, anchored to the concrete floor below to prevent plywood from lifting up or from moving. Be careful to miss under-floor electrical duct in the concrete slab where it occurs. 3. When area is finished, remove plywood and Visqueen and patch holes in concrete slab to match. Question 5-o: S4.4: Please refer to section 1/S4.4 6 th Floor Terrace. Installation of the temporary construction barrier at the atrium will require scaffolding down to the 4 th Floor, between below, and require temporary closure of that portion of the library. Please advise if heavy duty debris netting can be installed in lieu of the structural steel and metal framed & sheathed temporary construction barrier. Answer 5-o: The Contractor is required to provide a barrier of sufficient strength around the scaffolding on the 4 th Floor to protect building occupants in adjacent areas from falling objects and from walking into the scaffolding. Question 5-p: S4.4: Detail 1/S4.4 shows plywood sheathing on the exterior side of the temporary construction barrier framing. However, since the plywood is directly the behind the curtain wall and the intent is for this wall to be installed prior to removal of the curtain wall, it will be impossible to install this plywood. Answer 5-p: We have two suggestions: Either assemble the temporary partition with the plywood attached prior to installing the partition in place - or - install the plywood on the interior side of the partition instead of the drywall. Question 5-q: S4.4: Please refer to detail 2/S4.4, which shows support angles welded to drywall framing track, both at the floor and ceiling conditions. For ease of removal and relocation, please advise if these angles can be bolted to the drywall framing. Answer 5-q: On Sheet S4.4 Section 2/S4.4 shows the head of the frame bolted and not welded to the support angle. Refer to details on Drawing Sheet S4.3 for additional information. Page 5 of 10

6 Question 5-r: S4.4: Please confirm what is referenced as steel channel at the base of wall on detail 2/S4.4 is actually light gage metal framing. Answer 5-r: Please refer to the temporary wall details #3, #4, #5 and #6 on Drawing Sheet S4.3 which specify the channel sizes and other specifics about the temporary walls. Question 5-s: Please confirm it will be acceptable to temporarily close off the area on the 4 th floor between column lines G and H and 4 and 5 for installation of scaffolding necessary for the construction of the atrium temporary construction barrier on floors 6 through 8. Answer 5-s: Yes, it is acceptable to temporarily close-off a portion of the 4 th Floor under the 6 th Floor South Terrace glazing for installation of scaffolding. Question 5-t: Since it is possible that scaffolding or equipment at the 4 th floor atrium floor will be required, please have the structural engineer provide the maximum allowable dead load per square foot for this slab. Answer 5-t: The maximum floor allowable deadload for the 5 th Floor area is 100 pounds per square foot (100 PSF). Question 5-u: Since it is possible that equipment will be required at both the exterior terraces, in particular the 6 th floor terrace on the south side, please have the structural engineer provide the maximum allowable dead load per square foot for this slab. Answer 5-u: The maximum allowable floor deadload for the terraces if 100 pounds per square foot (100 PSF). Question 5-v: A1.3, A1.4: At the south offices on the 3 rd and 4 th floors between column lines 3 and 4, the full height partitions as labeled as drywall partitions. From review on site, these partitions seem to be composed of a perimeter hollow metal framing with infill framing and drywall, which is not typical and will not be practical to cut /splice and match existing. Considering that approx. 6 sections of these partitions will have to be removed for installation of the temporary walls, please provide details of the finished wall extensions. Answer 5-v: Details for the partitions in questions are provided on Drawing Sheet A5.0, Details #1 through #7. 6. Question 6-a: Measurements of 1 0 for head and sill and 5 4 for enclosure panel on detail 5 / A4.1 seem to be incorrect. The proposed system profile is noted elsewhere as 3, not 1. This is probably just a typographic error on the Architectural drawings. Please clarify desired dimensions. Answer 6-a: Yes, dimensions (1'-0" and 5'-4") indicated on Sheet A5.1, Detail 5/A4.1 are typos; revise them to read 3", 11"±, 3". Question 6-b: Atrium where elevation W is located has interior return walls noted that Zone 5 is not required. By similar reasoning, are the returns beneath the canopy on the Northeast entrance considered Zone 4 walls? Please confirm that all alcove walls and similar recessed terraces are to be considered Zone 4 conditions. Page 6 of 10

7 Answer 6-b: I believe the reference is actually about the south side glazing on the 6 th Floor at the atrium glass wall. On the south side of the building the alcove walls are required to be Zone 4, nor Zone 5. Also, at the one alcove on the north side of the 4 th Floor between grid lines 3 and 4 at grids B and C the walls are to be Zone 5. The corner at grid A3 is required to be Zone 5 as shown on S2.4. Question 6-c: Per Elevation 3 / A4.5, the automatic sliding doors on the First and Second Floor Northeast Entrances are noted as partially being in Zone 4. The wind load in this Zone 5 condition is -108 PSF per the tributary area and chart. Currently the maximum wind load available on an automatic slider with a current Miami-Dade NOA is +80 / -80 PSF. Please advise. Answer 6-c: The doors in question, #103 and #203 at the northeast entrance are actually swinging doors, not sliding doors. Question 6-d: The specified glass manufacturer has noted that they are unable to warranty against breakage, as there are many causes for breakage outside of their control. Please advise. Answer 6-d: We agree. Specification 08800, 1.11 does not ask for a warranty against breakage. However, the glass manufacturer should provide a written review of the glazing Contractor's shop drawings. Review to include, but not limited to the application of their glass for the proposed application, ability of their glass to meet the performance requirements and ability of the system to protect their glass from delamination or stress cracks. Question 6-e: Viracon has noted they cannot meet glass deflection that will meet L/50 times the short side or 1 minimum stipulation universally, as deflection is dependent on glass size, construction and loads. Viracon does not have control over these factors in the project. Please advise. Answer 6-e: Provide structural calculations, signed and sealed by a Professional Engineer registered in the State of Florida, to note conditions, if any, that cannot meet this project requirements for Architect's review and consideration. Question 6-f: Viracon now uses 100% silicone (base polymer) setting/side blocks for all applications. Due to the variety of components and suppliers it is not possible for Viracon to provide compatibility testing. They note that the sealant manufacturer should perform testing of the compatibility of sealants in order to insure proper sealant selection. Answer 6-f: Agreed. However, sealant manufacturer must be provided with samples in sufficient time to provide an evaluation of the compatibility of the materials. Question 6-g: Viracon has noted they can provide information on float glass from suppliers but they cannot provide test reports from a qualified testing agency. Their insulating glass units are an engineered product and they will provide solar and optical performance data, based on LBL Window 5.2 program methodology. Their units meet IGCC CBA and IGCC E2190 level certification, which supersedes IGCC CBA but Viracon takes exception to providing additional reports from certifying agencies. No test reports are available for tinted/coated glass products. Viracon s published performance values are determined per Page 7 of 10

8 National Fenestration Rating Council (NFRC) 300 methodology and they are certified by the NFRC, but the NFRC does not issue test reports. Please advise if this is acceptable. Answer 6-g: Providing performance levels based on LBL's Window and certifications from IGCC and NFRC should be acceptable in lieu of the test reports. Question 6-h: Viracon makes every effort to provide glass from a consistent supplier for each project. Viracon notes that they reserve the right to utilize additional suppliers to ensure delivery commitments are met. In addition, Viracon has incoming specifications on all products. If warranted, Viracon will make necessary representation. Due to scope of work, however, Viracon notes that regular scheduled inspections are impractical. Please advise if this is acceptable. Answer 6-h: We are unaware of the referenced "regular scheduled inspection" requirement. Further, the intent of the single source requirement is for the glazing system manufacturer to use a single source such as Viracon. Question 6-i: Viracon has noted that their warranty term begins from date of manufacture only. Extended warranties are available at additional cost. Their warranties also cover defective material and workmanship only. Terms are 10 years for high performance coatings, 10 years for insulated glass, and 5 years for laminated glass. Please advise if this is acceptable. Answer 6-i: All warranties start at substantial completion of the project, not when products are manufactured or shipped. Warranty requirements are noted in Specification Section Glazing, paragraph 1.11 Warranty". 7. Drawing Sheet A0.1 and Sheet D1.0, refer to "Furniture and Equipment Relocation" notes. Add the following note to read: "7. Furniture and equipment encountered which is to be relocated by the Contractor when construction activities begin, may be different than what is shown on the Drawings herein. Library may have moved furniture and equipment in the time period between completion of the Drawings and start of construction. The Contractor is responsible to relocate furniture and equipment present in the areas of construction work at the time construction starts in each area whether or not that furniture and equipment is the same as depicted on the Drawings, at no additional cost to the Owner." 8. Drawing D1.0, refer to General Demolition Notes. Add the following note to read: "20. Contractor is responsible to provide protection on the interior of the freight elevator while moving construction materials and personnel. The freight elevator was recently refurbished with all new stainless interior. Any damage to the elevator resulting from moving construction materials and personnel shall be repaired at the Contractor's expense to the Owner's satisfaction." 9. Permitting Clarification: The following is a list of known required permits, their status and fees. Page 8 of 10

9 Permit and Agency Review and Approval Requirements a. Broward County Development and Environment Regulation Division: Building Permit Review: completed and permit received. Fee paid by the County. Tree Removal/Relocation License: License No. TP was issued on 9/22/10 and expires 9/22/12. Fee paid by the County. Asbestos Removal: According to Broward County "Environmental and Growth" website, the fee appears to be $ for removal of 421 to 3,000 square feet or linear feet of asbestos. Contractor shall verify the amount prior to submitting a permit. b. City of Fort Lauderdale, Building Department: Building Permit: Permit applied for and under review. Permit number: County paid a deposit of the permit fee in the amount of $2, There is a known balance of $10, due prior to issuance of this building permit. There may be additional permits required by the Fort Lauderdale Building Department for which we are not aware. Maintenance of Traffic Plans: The Contractor is responsible to obtain and pay for this permit from the Building Department. The fee is based on the amount of work to be performed and will be determined at the time of application. c. Contractor is responsible to verify all permitting requirements and apply for same in accordance with all applicable codes, ordinances, etc. 10. Drawing Sheet A0.1: Refer to "Order of Construction Notes" Add the following note to read: "16. As each phase or area of the work is completed and ready to be turned over to the library, the Architect and Owner will perform a punch list inspection of each area, thus providing the Contractor with a list of items to be addressed prior to returning that area to the library. The Contractor shall make such corrections noted on the phase punch list prior to turning the area back over to the library." 11. Question 11-a: Please advise who will be responsible to pay permit fee? If the owner is responsible to pay for all permit fees, its fine, otherwise it is better to establish an Allowance for Permits. Answer 11-a: Per Specification Section 00405, Broward County pays all County permits, licenses and fees and as per Specification Section 00800, 11.1, the Contractor pays all Non-County permits, licenses and fees. The Bidder is responsible to verify the permits and fees required and include those costs in their Bid. Question 11-b: Please clarify who will be responsible to pay the cost for Inspections and Testing? Answer 11-b: Refer to Specification Section "Quality Control", paragraph 1.7 "Inspection and Testing Laboratory Services". Question 11-c: As per specification section Summary of Work, Paragraph 1.5 regarding Security Requirements, Construction cannot be reproduced nor they can be shared or issued publically. Please advise how can we get the cost of different trades from our subcontractors without sharing and reproducing the project Documents. Page 9 of 10

10 Answer 11-c: Paragraph A of section 01110, 1.5 is revised as follows so as to delete restrictions against reproduction of documents: The revised paragraph A might be as follows: A. Contractor has been provided Construction Documents for the Broward County Main Library depicting Interior Partitions, Room Names and Department Areas. In doing so, it must be established that the issuance of all drawings presents a security threat. The Construction Documents provided cannot be reproduced nor can they be issued publicly. Chapter , Florida State Statues presents exemptions from inspecting or copying of Public Records. Section (3)(B), (3)(C) exempt Building Plans, Blueprints, Schematic Drawings from the "Public Record". The plans provided are shared in the strictest of confidence and may not be reproduced only for the purpose of bidding the project in any manner. Upon completion of the Contract Administration, the Broward County respectfully requests the return of the Plans issued as a part of this Contract. Returns shall be made to the office of the Architect. 12. Question: By reviewing the plans and scope of work for the above subject project it reveals the complexity of the project. The building is state-of-the art and because of it s uniqueness it is very important to Bid the project with great planning. Additionally, because of the security requirements as per specification section 01110, paragraph 1.5 it s very hard, difficult and time consuming to coordinate with subcontractors to get the pricing. We as a General Contractor believe that time given to prepare & submit bid document is not sufficient. In order to get the best value of the project and analyzed thoroughly Additional Time is required. This is also in the interest of the Owner to get a well analyzed, responsible and responsive bid. Therefore, I would like to request you to please extend bid due date for additional 2 weeks. I will really appreciate if you could please extend the Bid due date. 13. Answer: The bid due date remains the same; all bids are due by Wednesday, November 17, 2010 at 2:00 pm at the location listed in the bid document. This addendum SHOULD be acknowledged on the Bid Tender Form or returned with your invitation for Bid due Wednesday, November 17, 2010 at 2:00 pm. All "must" documents are considered a matter of responsiveness and shall be submitted at the time of bid. Failure of a Bidder to return the documents shall be cause for rejection of the bid. All other terms, conditions and specifications remain unchanged for. NAME OF COMPANY: Page 10 of 10

11 SECTION 01270R UNIT PRICES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Measurement and payment criteria applicable to portions of the Work performed under a unit price payment method. B. Defect assessment and non-payment for rejected work. 1.2 AUTHORITY A. Measurement methods delineated in the individual specification sections complement the criteria of this section. In the event of conflict, the requirements of the individual specification section govern. B. Take all measurements and compute quantities. The Project Consultant and Owner will verify measurements and quantities. C. Assist by providing necessary equipment, workers, and survey personnel as required. 1.3 UNIT QUANTITIES SPECIFIED A. Contractor shall provide The Project Consultant and Owner with quantities indicated in paragraph 1.8 Schedule of Unit Prices, herein, and the Contractor shall enter the amounts on the Bid Tender Form, Section 00400, Article 00407, Schedule of Prices Bid. All materials and labor to be used in the project shall be accounted for and submitted before the start of construction. These Unit Quantities are for bidding and contract purposes only. Quantities and measurements supplied or placed in the Work and verified by the Project Consultant and Owner determine payment. B. If the actual Work requires more or fewer quantities than those quantities indicated, provide the required quantities at the unit sum/prices contracted. 1.4 MEASUREMENT OF QUANTITIES A. Measurement Devices: 1. Weigh Scales: Inspected, tested and certified by the applicable Florida or The Broward County Board of County Commissioners within the past year. 2. Platform Scales: Of sufficient size and capacity to accommodate the conveying vehicle. Wind Mitigation Broward County Main Library UNIT PRICES 01270R SMA # REVISED NOVEMBER 8, 2010 PMIS # August 23, 2010, Fort Lauderdale, FL 1 of 4

12 3. Metering Devices: Inspected, tested and certified by the applicable Florida department within the past year. B. Measurement by Weight: Concrete reinforcing steel, rolled or formed steel or other metal shapes will be measured by handbook weights. Welded assemblies will be measured by handbook or scale weight. C. Measurement by Volume: Measured by cubic dimension using mean length, width and height or thickness. D. Measurement by Area: Measured by square dimension using mean length and width or radius. E. Linear Measurement: Measured by linear dimension, at the item centerline or mean chord. F. Stipulated Sum/Price Measurement: Items measured by weight, volume, area, or linear means or combination, as appropriate, as a completed item or unit of the Work. 1.5 PAYMENT A. Payment Includes: Full compensation for all required labor, Products, tools, equipment, plant, transportation, services and incidentals; erection, application or installation of an item of the Work; overhead and profit. B. Final payment for Work governed by unit prices will be made on the basis of the actual measurements and quantities accepted by the Project Consultant multiplied by the unit sum/price for Work which is incorporated in or made necessary by the Work. 1.6 DEFECT ASSESSMENT A. Replace the Work, or portions of the Work, not conforming to specified requirements. B. If, in the opinion of the Project Consultant and Owner, it is not practical to remove and replace the Work, the Project Consultant will direct one of the following remedies: 1. The defective Work may remain, but the unit sum/price will be adjusted to a new sum/price at the discretion of the Owner. 2. The defective Work will be partially repaired to the instructions of the Project Consultant, and the unit sum/price will be adjusted to a new sum/price at the discretion of the Owner. C. The individual specification sections may modify these options or may identify a specific formula or percentage sum/price reduction. D. The authority of the Project Consultant and Owner to assess the defect and identify payment adjustment, is final. Wind Mitigation Broward County Main Library UNIT PRICES 01270R SMA # REVISED NOVEMBER 8, 2010 PMIS # August 23, 2010, Fort Lauderdale, FL 2 of 4

13 1.7 NON-PAYMENT FOR REJECTED PRODUCTS A. Payment will not be made for any of the following: 1. Products wasted or disposed of in a manner that is not acceptable. 2. Products determined as unacceptable before or after placement. 3. Products not completely unloaded from the transporting vehicle. 4. Products placed beyond the lines and levels of the required Work. 5. Products remaining on hand after completion of the Work. 6. Loading, hauling and disposing of rejected Products. 1.8 UNIT PRICES A. Unit Price No 1: Structural repair of existing steel curtain wall mullion supports along the first floor slab edge. 1. Description: Removal and replacement of structural steel curtainwall mullion support angles along the first floor slab edge, including removal and replacement of interior concrete floor topping and terrazzo finish. Drawing reference Detail #6 "Unit Pricing Typical Angle Fix" shown on Drawing Sheet S Unit of Measurement: a. Two (2) linear feet of steel angles ad detailed on Sheet S4.2, Detail "Unit Pricing Typical Angle Fix" with repairs shown. b. Interior concrete slab topping with terrazzo finish for an area approximately 5'-0" by 2'-6" and following the existing terrazzo floor pattern. Replacement terrazzo floor finish shall match existing in all respects. See details on Sheet A Quantity Allowance: Contractor shall include a total of twelve (12) curtainwall mullion supports repairs for this Unit Price, No. 1. The Unit Price shall be the difference in cost between Detail #6 on Sheet S4.2 and Detail #2 on Sheet S4.0. B. Unit Price No. 2: Structural repair of existing steel curtainwall mullion support at first floor planters and first floor pool. 1. Description: Removal and replacement of steel curtainwall mullion supports at first floor, including a portion of cast-in-place concrete wall and removal and replacement of ceramic tile finishes on both sides of the wall. Drawing reference Detail #7 "Unit Price Typical Planter Fix" shown on Drawing Sheet S Unit of Measurement: Approximately 2'-6" wide by 1'-10" tall section of steel, concrete wall and ceramic tile finishes. Replacement ceramic tile finsh shall match existing ceramic tile in all respects. 3. Quantity Allowance: Contractor shall include a total of twelve (12) curtainwall mullion supports at planter walls and pool wall for this Unit Price No. 2. The Unit Price shall be the difference in cost between Detail #7 on Sheet S4.2 and Detail #5 on Sheet S4.0. Wind Mitigation Broward County Main Library UNIT PRICES 01270R SMA # REVISED NOVEMBER 8, 2010 PMIS # August 23, 2010, Fort Lauderdale, FL 3 of 4

14 C. Unit Price No. 3: Replacement repair of existing horizontal steel tube member supports at the Pedestrian Bridge. 1. Description: Removal and replacement of horizontal steel tube members supports at the Pedestrian Bridge including all connections to column tubes, other steel tubes between pieces, etc. Drawing reference Sheet S2.0 and photographs P9, P10 and P11 shown on Drawing Sheet S Unit of Measurement: A single 4 x3 x3/8 x10-0 long steel tube support with all connections. Wire brushing and painting of existing steel tube members is included in the base bid. 3. Quantity Allowance: Contractor shall include a total of ten (10) 4 x3 x3/8 x10-0 long steel tube supports including connections, etc. at Pedestrian Bridge for this Unit Price No. 3. Wire brushing and painting of existing steel tube members is included in the base bid. PART 2 - PRODUCTS ## Not Used ## PART 3 - EXECUTION ## Not Used ## END OF SECTION Wind Mitigation Broward County Main Library UNIT PRICES 01270R SMA # REVISED NOVEMBER 8, 2010 PMIS # August 23, 2010, Fort Lauderdale, FL 4 of 4

MATERIAL ALLOWANCES AND UNIT PRICES

MATERIAL ALLOWANCES AND UNIT PRICES PART 1 - GENERAL 1.1 SECTION INCLUDES ADDITIONS AND RENOVATIONS TO WEST YORK AREA HIGH SCHOOL - #1231 SECTION 012200 MATERIAL ALLOWANCES AND UNIT PRICES A. Measurement and payment criteria applicable to

More information

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS SECTION 01 00 00 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Summary of Work: 1. General 2. Contract. B. Contract Considerations: 1. Schedule of values. 2. Applications for payment. 3.

More information

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows: ADDENDUM NO. 1 TO THE DRAWINGS AND SPECIFICATIONS FOR THE New Dishman-McGinnis Elementary School Bowling Green Independent Schools Bowling Green, Kentucky BG 12-256 RTA 1209 March 11, 2013 To All Plan

More information

SECTION METAL FRAMED SKYLIGHT. A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system.

SECTION METAL FRAMED SKYLIGHT. A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system. SECTION 08625 METAL FRAMED SKYLIGHT PART 1 GENERAL 1.01 SECTION INCLUDES: A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system. B. Fabrication

More information

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING

More information

SECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 SECTION 08 32 20 EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 SECTION 08 32 20 CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS [OR WOOD] PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

SECTION STAINLESS STEEL WALL PANELS

SECTION STAINLESS STEEL WALL PANELS SECTION 07400 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Dry joint, Rainscreen stainless steel wall panel system. 2. Accessories including attachments, clips, sub girts, shims, and fasteners 3.

More information

TG Structural Steel Superstructure

TG Structural Steel Superstructure TG07.1 - Structural Steel Superstructure Questions are numbered in the order received. Numbers missing in the sequence either have been answered in a previous response set or will be included in a future

More information

Series B450 Guide Specification

Series B450 Guide Specification Boyd Aluminum Manufacturing Company P.O. Box 1565 3248 E. Division Street Springfield, MO 65801-1565 800-737-2800 417-862-1232 fax boydaluminum.com STOREFRONT SERIES B450 Shear Block Air Infiltration:

More information

603 Summit Avenue, Suite 102 Greensboro, N.C Voice/FAX (336)

603 Summit Avenue, Suite 102 Greensboro, N.C Voice/FAX (336) Ricky L. Loman, AIA Architect 603 Summit Avenue, Suite 102 Greensboro, N.C. 27405-7700 Voice/FAX (336) 273-7999 ADDENDUM: Number 1 ISSUED: March 14, 2017 SUBJECT: New Agriculture & Equipment Storage Barn

More information

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

SECTION ALUMINUM WINDOWS

SECTION ALUMINUM WINDOWS SECTION 08520 ALUMINUM WINDOWS PART 1 - GENERAL 1.01 SUMMARY A. Section includes: 1. Storefront systems and aluminum framed glass doors. 2. Hardware, fasteners, accessories, filler pieces, etc., required

More information

TOWN OF LABRADOR CITY FORM OF TENDER TLC SUPPLY & INSTALLATION OF CONCRETE FLOOR

TOWN OF LABRADOR CITY FORM OF TENDER TLC SUPPLY & INSTALLATION OF CONCRETE FLOOR TOWN OF LABRADOR CITY FORM OF TENDER TLC-04-18 SUPPLY & INSTALLATION OF CONCRETE FLOOR Tenderer Address Telephone # The undersigned bidder has carefully examined the Form of Tender, Instructions to Bidders,

More information

Cardinal Commercial Products ALUMINUM STOREFRONT SYSTEM SERIES CF450 GUIDE SPECIFICATIONS SECTION ALUMINUM ENTRANCES AND STOREFRONT SYSTEMS

Cardinal Commercial Products ALUMINUM STOREFRONT SYSTEM SERIES CF450 GUIDE SPECIFICATIONS SECTION ALUMINUM ENTRANCES AND STOREFRONT SYSTEMS Cardinal Commercial Products ALUMINUM STOREFRONT SYSTEM SERIES CF450 GUIDE SPECIFICATIONS SECTION 08410 ALUMINUM ENTRANCES AND STOREFRONT SYSTEMS This suggested guide specification has been developed using

More information

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including: Page 1 of 8 SECTION 083919 WATERTIGHT DOORS **Note to Specifier** This specification contains component and configuration options. Where indicated, choose the appropriate choice for your specific project

More information

ATTACHMENT A. Bid # 6793

ATTACHMENT A. Bid # 6793 ATTACHMENT A SCOPE OF WORK TECHNICAL SPECIFICATIONS AND CONTRACT DRAWINGS STORAGE SHED INSTALLATION AT THE SAN JOAQUIN COUNTY HOUSEHOLD HAZARDOUS WASTE FACILITY Bid # 6793 Department of Public Works Solid

More information

1.1 THE ARCHITECT S SPECIFICATIONS AND DRAWINGS 1.2 THE BIDDING CONTRACTORS

1.1 THE ARCHITECT S SPECIFICATIONS AND DRAWINGS 1.2 THE BIDDING CONTRACTORS GENERAL The commercial bidding process is a well-defined path of positioning oneself to be the successful bidder amongst a group purporting to offer the same quality materials and labor. There are certain

More information

SECTION ALUMINUM STORM WINDOWS

SECTION ALUMINUM STORM WINDOWS PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 08 51 69.11 ALUMINUM STORM WINDOWS SPEC WRITER NOTES: 1. Delete between // // if not applicable to project. 2. Also delete any other item or paragraph not applicable

More information

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including: Page 1 of 8 SECTION 083921 PEDESTRIAN FLOOD DOORS AND FRAMES **Note to Specifier** This specification contains component and configuration options. Where indicated, choose the appropriate choice for your

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1 SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1 PROJECT: 300 Seneca New Academic Campus DATE: September 23, 2013 300 Seneca Ave., S.F.,

More information

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK DIVISION 5 - STRUCTURAL STEEL AND IRON WORK SECTION 05100 STRUCTURAL METAL FRAMING PART 1.00 GENERAL 1.01 SCOPE OF WORK A. Work Included: 1. 2. Structural steel complete in place. Steel joists complete

More information

ADDENDUM NO. 1 FOR RENOVATIONS TO LINCOLN ANIMAL SHELTER RFP # February 1, 2018

ADDENDUM NO. 1 FOR RENOVATIONS TO LINCOLN ANIMAL SHELTER RFP # February 1, 2018 ADDENDUM NO. 1 FOR RENOVATIONS TO LINCOLN ANIMAL SHELTER RFP #2018-09-01 NOTICE TO PROSPECTIVE BIDDERS February 1, 2018 Prospective bidders are hereby informed of the following corrections, additions,

More information

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including: Page 1 of 7 SECTION 083925 MECHANICAL ROOM FLOOD DOORS AND FRAMES **Note to Specifier** This specification contains component and configuration options. Where indicated, choose the appropriate choice for

More information

SECTION BID PROPOSAL FORM. Telephone NO: ( ) Facsimile NO: ( ) Oklahoma License NO:

SECTION BID PROPOSAL FORM. Telephone NO: ( ) Facsimile NO: ( ) Oklahoma License NO: ISSUE DATE: MARCH 21, 2012 (REVISION 2-08/31/12) PROJECT: CNB BUILDINGS 2 AND 3 CATOOSA, OKLAHOMA OWNER: BID TO: (Mail & Fax) CHEROKEE NATION BUSINESSES 777 WEST CHEROKEE STREET CATOOSA, OKLAHOMA 74015

More information

BOONE COUNTY PUBLIC LIBRARY (859) 342-BOOK (2665)

BOONE COUNTY PUBLIC LIBRARY (859) 342-BOOK (2665) ROOF Boone County Public Library is seeking competitive sealed bids to replace an existing Shingle Roof and EPDM membrane roof on the Florence Branch located at 7425 U.S. 42, Florence, KY 41042. The successful

More information

SUBSTITUTION REQUEST (After the Bidding/Negotiating Phase)

SUBSTITUTION REQUEST (After the Bidding/Negotiating Phase) SUBSTITUTION REQUEST (After the Bidding/Negotiating Phase) Project: Substitution Request Number: From: To: Date: A/E Project Number: Re: Contract For: Specification Title: Section: Page: Description: Article/Paragraph:

More information

SECTION U.S. ALUMINUM SERIES BAL-350 HURRICANE RESISTANT BALCONY/TERRACE DOOR

SECTION U.S. ALUMINUM SERIES BAL-350 HURRICANE RESISTANT BALCONY/TERRACE DOOR Page 1 of 6 SECTION 08 39 80 U.S. ALUMINUM SERIES BAL-350 HURRICANE RESISTANT BALCONY/TERRACE DOOR U.S. Aluminum has designed one of the most demanding air and water protection products, the BAL- 350 Small

More information

March 6, Subject: Addendum No. 2 Invitation for Bid No Toyota Park Transit Center Phase II. Ladies and Gentlemen:

March 6, Subject: Addendum No. 2 Invitation for Bid No Toyota Park Transit Center Phase II. Ladies and Gentlemen: March 6, 2018 Subject: Addendum No. 2 Toyota Park Transit Center Phase II Ladies and Gentlemen: This Addendum No. 2 is being issued to provide responses to questions submitted by potential bidders and

More information

SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651

SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651 SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651 PART 1 GENERAL 1.1 DESCRIPTION A. Work Included: 1. Furnish all labor and materials to complete the fabrication of detention windows

More information

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO. 2017-26R Stone Group Architects Project No. 1731 ADDENDUM DATE: September 14, 2017 BID DATE: September 18, 2017 2:00 P.M. C.S.T. SCOPE OF THIS ADDENDUM:

More information

Corium Brick Rainscreen System Specifications

Corium Brick Rainscreen System Specifications CORIUM BRICK RAINSCREEN SYSTEM PART 1 - GENERAL 1.1 SUMMARY A. Work Included: The Work of this Section shall include but not be limited to the following: 1. Corium brick plates 2. Galvanized and coated

More information

Gensler 2014/06/16 Hertz Global Headquarters ISSUE FOR BUILDING PERMIT Estero, Florida SECTION

Gensler 2014/06/16 Hertz Global Headquarters ISSUE FOR BUILDING PERMIT Estero, Florida SECTION SECTION 072700 VAPOR PERMEABLE AIR BARRIER LIQUID MEMBRANE PART 1 GENERAL 1.1 GENERAL REQUIREMENTS A. The Work of this Section, as shown or specified, shall be in accordance with the requirements of the

More information

SECTION MISCELLANEOUS METALS

SECTION MISCELLANEOUS METALS PART 1 GENERAL 1.1 WORK OF THIS SECTION A. Contractor shall provide all labor, materials, equipment and incidentals as shown, specified and required to furnish and install all miscellaneous metal fabrications

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 052100 - STEEL JOISTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections

More information

Residential Building Inspections

Residential Building Inspections Residential Building Inspections Foundations, Grade Beams, Pile Caps, Foundation Pads 1. All trenches or excavations and formwork shall be in accordance with the size(s) and configuration(s) as per approved

More information

Rytec Corporation One Cedar Parkway Jackson, WI GO-RYTEC (262)

Rytec Corporation One Cedar Parkway Jackson, WI GO-RYTEC (262) Rytec Corporation One Cedar Parkway Jackson, WI 53037 1-888-GO-RYTEC (262) 677-9046 WWW.Rytecdoors.com Pharma-Swing Model Number PSW12002 SECTION 08300 HIGH PERFORMANCE FIBERGLASS SWING DOOR PAIR PART

More information

RESPONSES TO QUESTIONS and/or RFI s Date: 26 January 2017

RESPONSES TO QUESTIONS and/or RFI s Date: 26 January 2017 MPA Project No. M574-C1 Project Title: Black Falcon Cruise Terminal Façade Repairs and Coating Location: Black Falcon Cruise Terminal, South Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 26 January

More information

FL200 13/4 x41/2 GUIDE SPECIFICATION. Non-Thermal Storefront

FL200 13/4 x41/2 GUIDE SPECIFICATION. Non-Thermal Storefront Manufacturer: Coral Architectural Products 3010 Rice Mine Road Tuscaloosa, AL. 35406 Voice: (800) 772-7737 Fax: (800) 443-6261 SECTION 08410 ALUMINUM ENTRANCES AND STOREFRONT SYSTEMS This suggested guide

More information

SECTION ALUMINUM STORM WINDOWS

SECTION ALUMINUM STORM WINDOWS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 08 51 69.11 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

SECTION ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

SECTION ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS SECTION 08 4113 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Aluminum entrance doors and frames. 2. Glass infill panels. 3. Door hardware. B. Related Sections:

More information

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including: Page 1 of 7 SECTION 083925 MECHANICAL ROOM FLOOD DOORS AND FRAMES **Note to Specifier** This specification contains component and configuration options. Where indicated, choose the appropriate choice for

More information

GUIDE SPECIFICATIONS CURA ADJUSTABLE REROOF FRAMING SYSTEMS SECTION REROOFING ADJUSTABLE FRAMING SYSTEM

GUIDE SPECIFICATIONS CURA ADJUSTABLE REROOF FRAMING SYSTEMS SECTION REROOFING ADJUSTABLE FRAMING SYSTEM - --- -- ----..-------~------------------------------------ GUIDE SPECIFICATIONS CURA ADJUSTABLE REROOF FRAMING SYSTEMS SECTION 07415 REROOFING ADJUSTABLE FRAMING SYSTEM PART 1 - GENERAL 1.01 SCOPE A.

More information

SERIES SA30 STEEL/ALUMINUM FIXED DETENTION WINDOWS SECTION 08651

SERIES SA30 STEEL/ALUMINUM FIXED DETENTION WINDOWS SECTION 08651 SERIES SA30 STEEL/ALUMINUM FIXED DETENTION WINDOWS SECTION 08651 PART 1 GENERAL 1.1 DESCRIPTION A. Work Included: 1. Furnish all labor and materials to complete the fabrication of detention windows as

More information

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS SECTION 13096 MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS Prepared by: NELCO 125 Chenoweth Lane, Ste. 206 Louisville, KY 40207 (502) 899-3726 13096-1 MODULAR GALVANIZED RF SHIELDING SYSTEM PART

More information

RFP CULVER CITYBUS STOP IMPROVEMENT PROGRAM: BUS SHELTER, BENCH, TRASH RECEPTACLE PROCUREMENT, REMOVAL AND INSTALLATION

RFP CULVER CITYBUS STOP IMPROVEMENT PROGRAM: BUS SHELTER, BENCH, TRASH RECEPTACLE PROCUREMENT, REMOVAL AND INSTALLATION RFP 1589 - CULVER CITYBUS STOP IMPROVEMENT PROGRAM: BUS SHELTER, BENCH, TRASH RECEPTACLE Note: Answers are in blue font. 1. With reference to, Page 1 Item II Objective, 2. exchange them at locations (number

More information

See attached answers to questions and requests for clarification received.

See attached answers to questions and requests for clarification received. Office of the Vice President 971 Elmore Drive and Chief Financial Officer PO Box 115250 Procurement Services Gainesville, FL 32611-5250 http://procurement.ufl.edu/ (352) 392-1331 Fax 352-392-8837 June

More information

Aluminum Storefront Systems SERIES 200, 300 and 500 DOORS GUIDE SPECIFICATIONS

Aluminum Storefront Systems SERIES 200, 300 and 500 DOORS GUIDE SPECIFICATIONS Aluminum Storefront Systems SERIES 200, 300 and 500 DOORS GUIDE SPECIFICATIONS SECTION 08410 ALUMINUM ENTRANCES AND STOREFRONTS This suggested guide specification has been developed using the current edition

More information

All subcontractor bidders are responsible for assuring that their subcontractors and vendors are properly apprised of the contents of this Addendum.

All subcontractor bidders are responsible for assuring that their subcontractors and vendors are properly apprised of the contents of this Addendum. ADDENDUM NUMBER: 2 PROJECT: UNC Charlotte Residence Hall Phase XIV - Elevator Bid Package DATE: May 28, 2015 OWNER: UNC Charlotte ARCHITECT: FWA Group NOTICE TO BIDDERS: This addendum is issued prior to

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2 MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2 OFS:MJF 1 of 10 APPR:JAB:POJ:09-29-18 FHWA:APPR:10-01-18 a. Description. This work consists of

More information

ALL PROSPECTIVE CONTRACTORS, PLAN ROOMS AND SUPPLIERS

ALL PROSPECTIVE CONTRACTORS, PLAN ROOMS AND SUPPLIERS Architect: Studio 2H Design, LLC 1721 4 th Avenue North, Suite 101 Birmingham, Alabama 35203 (205) 264-9988 July 26, 2018 ADDENDUM NO. 5 UA Project No.: 712-17-1081 EDA Investment No.: 04-79-07154 B.C.

More information

SECTION Motor Operated Horizontal Sliding Sound Control Door

SECTION Motor Operated Horizontal Sliding Sound Control Door SECTION 08 34 73 Motor Operated Horizontal Sliding Sound Control Door PART 1 GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and general provisions of the Contract, including general and Supplementary Conditions

More information

RENOVATION OF THE VIA BUILDING FOR THE GUELPH TRANSIT TERMINAL FROM THE PRE- QUALIFIED GENERAL CONTRACTORS Reference Number:

RENOVATION OF THE VIA BUILDING FOR THE GUELPH TRANSIT TERMINAL FROM THE PRE- QUALIFIED GENERAL CONTRACTORS Reference Number: RENOVATION OF THE VIA BUILDING FOR THE GUELPH TRANSIT TERMINAL FROM THE PRE- QUALIFIED GENERAL CONTRACTORS Reference Number: 13-146 A D D E N D U M NO. 1 The following shall form part of the tender documents

More information

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING Peel & Roof

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING Peel & Roof SECTION 07550 MODIFIED BITUMINOUS MEMBRANE ROOFING Peel & Roof This section is based on the products of MFM Building Products Corp., which is located at: 525 Orange St. P. O. Box 340 Coshocton, OH 43812

More information

TECHNICAL QUESTIONS FOR ITB-DOT-17/ LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE

TECHNICAL QUESTIONS FOR ITB-DOT-17/ LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE TECHNICAL QUESTIONS FOR ITB-DOT-17/18-7004LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE Question 1: Question 2: Question 3: Question 4: Question 5: Question 6: When area configurations

More information

Revised Drawings A, E, and M dated 11/13/18 (that include additional specifications)

Revised Drawings A, E, and M dated 11/13/18 (that include additional specifications) Addendum No. 1 To: All Prospective Bidders Description: Holocaust Resource Center Expansion Stockton University Galloway, New Jersey 08205 Bid Number: B190003 Date: November 19, 2018 Pursuant to N.J.S.A.

More information

SECTION ALTERATION PROJECT PROCEDURES

SECTION ALTERATION PROJECT PROCEDURES SECTION 013516 ALTERATION PROJECT PROCEDURES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Requirements for protection of existing facilities during construction operations. 2. Demolition and removals

More information

SECTION METAL WALL PANEL SYSTEM

SECTION METAL WALL PANEL SYSTEM CSI Format for Metal Wall Panel System Specification SECTION 07410 METAL WALL PANEL SYSTEM PART 1 GENERAL 1.1 SECTION INCLUDES A. Exterior Metal Plate Wall Panels B. Substructure and Framing C. Structural

More information

BID # College Center EXTERIOR DOOR REPLACEMENT SECTION "C" TECHNICAL SPECIFICATIONS OWNER

BID # College Center EXTERIOR DOOR REPLACEMENT SECTION C TECHNICAL SPECIFICATIONS OWNER BID # 16-15 College Center EXTERIOR DOOR REPLACEMENT SECTION "C" TECHNICAL SPECIFICATIONS OWNER Board of Trustees Middlesex County College 2600 Woodbridge Avenue P.O. Box 3050 Edison, New Jersey 08818-3050

More information

SECTION ALUMINUM WINDOWS

SECTION ALUMINUM WINDOWS SECTION 08520 ALUMINUM WINDOWS 1. PART 1 GENERAL 1.1 WORK INCLUDED: 1. Provide labor, material, equipment and services to furnish and install aluminum windows shown on drawings and specified herein. Window

More information

PART 1 / GENERAL SECTION ALUMINUM PLATE PANEL SYSTEM. ALPLY Insulated Panels. Alply TECH WALL Aluminum Plate System 2002

PART 1 / GENERAL SECTION ALUMINUM PLATE PANEL SYSTEM. ALPLY Insulated Panels. Alply TECH WALL Aluminum Plate System 2002 SECTION 07 42 13 ALUMINUM PLATE PANEL SYSTEM ALPLY Insulated Panels Alply TECH WALL Aluminum Plate System 2002 PART 1 / GENERAL 1.1 SYSTEM DESCRIPTION A. Preformed Aluminum Plate System for Screen wall

More information

ADDENDUM #4. Lanier Filter Plant Ozone System Safety Improvements BL079-14

ADDENDUM #4. Lanier Filter Plant Ozone System Safety Improvements BL079-14 September 24, 2014 ADDENDUM #4 Lanier Filter Plant Ozone System Safety Improvements BL079-14 Q1. Please clarify how many submarine doors the perimeter gaskets and gasket hardware must be replaced on. A1.

More information

COLQUITT COUNTY BOARD OF COMMISSIONERS 101 East Central Avenue

COLQUITT COUNTY BOARD OF COMMISSIONERS 101 East Central Avenue COLQUITT COUNTY BOARD OF COMMISSIONERS 101 East Central Avenue TERRY R. CLARK Chairman LUKE STRONG, JR District 1 Commissioner CHRIS HUNNICUTT District 2 Commissioner MARC DEMOTT District 3 Commissioner

More information

Phenolic Exterior Wall Cladding

Phenolic Exterior Wall Cladding Phenolic Exterior Wall Cladding SECTION 07 42 43 COMPOSITE WALL PANELS This specification includes hidden text for editing for a project. PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Phenolic wall

More information

Architectural Single-Hung Aluminum Window Series L701T SH-AW130 GUIDE SPECIFICATION

Architectural Single-Hung Aluminum Window Series L701T SH-AW130 GUIDE SPECIFICATION Architectural Single-Hung Aluminum Window Series L701T SH-AW130 GUIDE SPECIFICATION Section 08520 Aluminum Windows PART 1: WORK INCLUDED A. The conditions of the contract and applicable sections of Division

More information

SECTION COPPER/ SOLDERED RF SYSTEM SPECIFICATIONS

SECTION COPPER/ SOLDERED RF SYSTEM SPECIFICATIONS SECTION 13096 COPPER/ SOLDERED RF SYSTEM SPECIFICATIONS Prepared by: NELCO 125 Chenoweth Lane, Ste. 206 Louisville, KY 40207 (502) 899-3726 13096-1 SECTION 13096 COPPER RADIO FREQUENCY SHIELDING ENCLOSURE

More information

ADDENDUM No. 2. ITB No GEDDES DAM GATE RECOATING AND REPAIRS. Bids Due: Tuesday, February 26, 2019 at 2:00 P.M. (Local Time)

ADDENDUM No. 2. ITB No GEDDES DAM GATE RECOATING AND REPAIRS. Bids Due: Tuesday, February 26, 2019 at 2:00 P.M. (Local Time) ADDENDUM No. 2 ITB No. 4564 GEDDES DAM GATE RECOATING AND REPAIRS Bids Due: Tuesday, February 26, 2019 at 2:00 P.M. (Local Time) The following changes, additions, and/or deletions shall be made to the

More information

Addendum #1. January 22, 2018

Addendum #1. January 22, 2018 Addendum #1 January 22, 2018 Building B 8500 Public Works Drive Renovation for City of Manassas Water & Sewer Department 8500 Public Works Drive Manassas, VA 20110 Job Description Renovation of the existing

More information

This Addendum forms part of the Tender Documents and amends the Tender Documents as described below.

This Addendum forms part of the Tender Documents and amends the Tender Documents as described below. BRAMALEA SECONDARY SCHOOL ARCHITECTURAL ADDENDUM NO. 1 ADULT EDUCATION - CLASSROOM & OFFICE RENOVATIONS PEEL DISTRICT SCHOOL BOARD Tender No. L18-4165 February 23, 2018 This Addendum forms part of the

More information

BID PACKAGE #4 BID BULLETIN #4 100% Construction Documents

BID PACKAGE #4 BID BULLETIN #4 100% Construction Documents BID PACKAGE #4 BID BULLETIN #4 100% Construction Documents Date: January 4, 2018 Project: Grand Island Regional Hospital 3533 Prairieview Street (SW Corner of Hwy 281 and Hwy 34) Grand Island, NE 68803

More information

Expansion Joint Covers

Expansion Joint Covers Expansion Joint Covers 07 95 00 (079513) PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Supplementary Conditions and Division-1

More information

Expansion Joint Covers (079513)

Expansion Joint Covers (079513) Expansion Joint Covers 07 95 00 (079513) PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Supplementary Conditions and Division-1

More information

1. High bay shelving units, fabrication and installation including leveling.

1. High bay shelving units, fabrication and installation including leveling. SECTION 10 56 13 - HIGH BAY SHELVING * ALL FIELDS IN [ ] MUST BE EDITED. PART 1 - GENERAL 1.1. RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2 MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2 OFS:MJF 1 of 10 APPR:JAB:POJ:07-07-17 FHWA:APPR:07-11-17 a. Description. This work consists of

More information

Scope of Work Bid Package C-8 - West Overhead Doors

Scope of Work Bid Package C-8 - West Overhead Doors Scope of Work Bid Package C-8 - West Overhead Doors CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools,

More information

GUIDE SPECIFICATION EXETER SECURITY SHIELD SECURITY WINDOW BARRIER SYSTEM

GUIDE SPECIFICATION EXETER SECURITY SHIELD SECURITY WINDOW BARRIER SYSTEM 1 GUIDE SPECIFICATION EXETER SECURITY SHIELD SECURITY WINDOW BARRIER SYSTEM 1.01 WORK INCLUDED PART 1: GENERAL A. Provide for all labor, equipment, materials and services to furnish and install SECURITY

More information

INVITATION FOR BID (IFB):

INVITATION FOR BID (IFB): DATE: May 8, 2018 ADDENDUM NO. 1 INVITATION FOR BID (IFB): B180022132 RPD Furnish & Install Ballistic Glass Lobby Counters IFB #B180022132 WAS ISSUED: Wednesday April 25, 2018 RECEIPT DATE: May 23, 2018

More information

NOTICE TO BIDDERS OF RECORD

NOTICE TO BIDDERS OF RECORD NOTICE TO BIDDERS OF RECORD ADDENDUM NO. 02 ROOF REPLACEMENT: MOUNT NITTANY MIDDLE SCHOOL 656 BRANDYWINE DRIVE STATE COLLEGE, PA 16801 HLA # - March 28, 2016 This Addendum forms a part of the Contract

More information

ADDENDUM NUMBER 1: Portsmouth City Boiler Plant Improvements Project Bid Proposal # Issued: May 23, 2011

ADDENDUM NUMBER 1: Portsmouth City Boiler Plant Improvements Project Bid Proposal # Issued: May 23, 2011 ADDENDUM NUMBER 1: Portsmouth City Boiler Plant Improvements Project Bid Proposal #43-11 Issued: May 23, 2011 This Addendum forms part of the original document marked: Portsmouth City Hall Boiler Plant

More information

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 Part 1 General 1.01 Work Included A. The work under this section shall include the furnishing of all items shown on the drawings and as specified,

More information

THE HOUSING AUTHORITY OF THE BOROUGH OF HIGHLAND PARK 242 SOUTH SIXTH AVENUE, HIGHLAND PARK, NJ PHONE (732)

THE HOUSING AUTHORITY OF THE BOROUGH OF HIGHLAND PARK 242 SOUTH SIXTH AVENUE, HIGHLAND PARK, NJ PHONE (732) THE HOUSING AUTHORITY OF THE BOROUGH OF HIGHLAND PARK 242 SOUTH SIXTH AVENUE, HIGHLAND PARK, NJ 08904 PHONE (732)572-4420 February 10, 2017 Window Replacements at Samuel J Kronman Building and Park Terrace

More information

COVER SHEET ELEVATION SHEET SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY)

COVER SHEET ELEVATION SHEET SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY) COVER SHEET ELEVATION SHEET SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY) SECTION DETAILS (DOOR ASSEMBLY)

More information

[Project Name] Section [ ]

[Project Name] Section [ ] Page 1 PART 1 - GENERAL 1.1 SECTION INCLUDES 1.1.1 Design, labor, products, equipment and services necessary for interior/exterior Aluminum Facade System (AFS) work, in accordance with the Contract Documents.

More information

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12 SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING SECTION 05 40 00 COLD-FORMED METAL FRAMING SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the

More information

REQUEST FOR PROPOSALS March 4, 2010 PROJECT OVERVIEW:

REQUEST FOR PROPOSALS March 4, 2010 PROJECT OVERVIEW: Police Headquarters Project REQUEST FOR PROPOSALS March 4, 2010 PROJECT OVERVIEW: General description The objective is to renovate an approximately 18 x 24 section of the two-bay attached garage at Town

More information

Subject: Amphitheater School District Reroofing Projects Amphi High School, Building 900 Roof Evaluation SCI Project Number:

Subject: Amphitheater School District Reroofing Projects Amphi High School, Building 900 Roof Evaluation SCI Project Number: 27 June 2016 Mr. Shane Chism, AIA Breckenridge Group 4625 E. Fort Lowell Road Tucson, Arizona 85712 Subject: Amphitheater School District Reroofing Projects Amphi High School, Building 900 Roof Evaluation

More information

SOLICITATION ADDENDUM

SOLICITATION ADDENDUM CITY OF PALM BEACH GARDENS PURCHASING DEPARTMENT SOLICITATION ADDENDUM Addendum No. 7 DATE: August 22, 2018 TO: SOLICITATION NO.: TITLE: OPENING DATE: All Potential Bidders ITB2018-095RC Construction of

More information

City of Miami ADDENDUM NO. 5. January 12, 2017 INVITATION TO BID NO.: CURTIS PARK NEW SWIMMING POOL FACILITY

City of Miami ADDENDUM NO. 5. January 12, 2017 INVITATION TO BID NO.: CURTIS PARK NEW SWIMMING POOL FACILITY City of Miami ADDENDUM NO. 5 January 12, 2017 INVITATION TO BID NO.: 15-16-040 CURTIS PARK NEW SWIMMING POOL FACILITY OFFICE OF CAPITAL IMPROVEMENTS ( OCI ) PROJECT NO.: TO: ALL PROSPECTIVE BIDDERS: The

More information

ADDENDUM #1 NWIT Exterior Repainting Various Locations, New Westminster, BC

ADDENDUM #1 NWIT Exterior Repainting Various Locations, New Westminster, BC August 3, 2016 ADDENDUM #1 NWIT-16-28 Exterior Repainting Various Locations, New Westminster, BC This addendum modifies the Invitation to Tender only as noted: BID FORM Section 6.0 Separate Prices revise

More information

SECTION DETAILS (MECHANICALLY ASSEMBLY)

SECTION DETAILS (MECHANICALLY ASSEMBLY) COVER SHEET ELEVATION SHEET SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY) SECTION DETAILS (DOOR ASSEMBLY)

More information

SECTION TERRA COTTA CLAY TILE RAINSCREEN SYSTEM

SECTION TERRA COTTA CLAY TILE RAINSCREEN SYSTEM SECTION 07400 TERRA COTTA CLAY TILE RAINSCREEN SYSTEM PART 1 GENERAL 1.01 WORK INCLUDED A. The terra cotta clay tile elements and aluminum support system shall be manufactured by NBK Keramik GmbH as represented

More information

A. Remove Table of Contents and insert new attached Table of Contents.

A. Remove Table of Contents and insert new attached Table of Contents. ADDENDUM NO. 01 PROJECT Colby Glass E.S. Window Upgrades and ADA Work PROJECT NO. 16043 DATE February 07, 2018 TO: All Prime Contract Bidders and all others to whom Drawings and Specifications have been

More information

ADDENDUM #1a Page 1 of 1

ADDENDUM #1a Page 1 of 1 ADDENDUM #1a Page 1 of 1 PROJECT: Nortrax, Ottawa PROJECT NO: 1223 DATE: 5 August 2014 The following information supplements and/or supersedes the bid documents issued on 1 January 2014. This Addendum

More information

SECTION 503 TEMPORARY PAVEMENT RESTORATION

SECTION 503 TEMPORARY PAVEMENT RESTORATION SECTION 503 TEMPORARY PAVEMENT RESTORATION 503-1 DESCRIPTION: This work consists of furnishing, placing, compacting, and maintaining a temporary pavement surface suitable for driving in accordance with

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Galvanized System

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Galvanized System SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Galvanized System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF MODULAR GALVANIZED SYSTEM PART

More information

SECTION PRE-ENGINEERED METAL BUILDING

SECTION PRE-ENGINEERED METAL BUILDING SECTION 13121 PRE-ENGINEERED METAL BUILDING PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required to design, fabricate, deliver to project site, and erect

More information

SECTION STRUCTURAL STEEL

SECTION STRUCTURAL STEEL PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish and install all materials, labor, equipment and incidentals required to provide structural steel shown on the Contract Drawings and as

More information

ADDENDUM No. 1 July 11, 2013 ASBESTOS ABATEMENT SPECIFICATIONS. Crawlspace Abatement and New Beginnings Academy

ADDENDUM No. 1 July 11, 2013 ASBESTOS ABATEMENT SPECIFICATIONS. Crawlspace Abatement and New Beginnings Academy BID No. 13.01 ADDENDUM No. 1 July 11, 2013 ASBESTOS ABATEMENT SPECIFICATIONS Crawlspace Abatement and Reinsulation @ New Beginnings Academy Owner NEW BEGINNINGS ACADEMY 211 East Michigan Avenue Ypsilanti,

More information