1 PRELIMINARY DESIGN PRESENTATION The Board of Education of Baltimore County Verletta White, Interim Superintendent

2 Agenda 2 Project Information Project Goals Site Conditions Building Organization Renderings and 3D Animation Project Schedule Overview Questions

3 Project Information 3 Chadwick Elementary School 74,834 SF Replacement School Evolution of Prototype Chadwick E.S. (Mays Chapel, Lansdowne, Dundalk) Enrollment Information Existing SRC Current Enrollment Projected Enrollment Proposed SRC Existing Site acres Regional Programs No programs at this time. Vicinity Map Chadwick E.S. Images Google

4 Project Goals 4 Support 21 st Century Learning Techniques Integrated technology Flexible classroom clusters Collaborative spaces Multiple spaces, conveniently located Easily supervised Flexible Spaces for hands on learning Maker space Learning commons

5 Project Goals 5 Sustainable Design LEEDv4 Silver Certification (Leadership in Energy and Environmental Design) Shared spaces for community use Energy conservation-geothermal heat pump system Recycled and regional materials Low water-use plumbing fixtures Vegetative roof School as teaching tool - outdoor learning area

6 Project Goals 6 Safety and Security Safety Separate pedestrians from vehicles Separate cars from buses Public areas within the building can be secured from academic areas Security Building lighting and landscaping are designed to maximize visibility and security Security camera and card reader system: 50+ cameras Locations selected in consultation with principal and school and security administration Exterior cameras cover full perimeter, fields, parking and entry Security Vestibule with two points of verification Command Center located with in the building

7 Project Location 7 Millford Mill Academy H.S. Winfield E.S. Bedford E.S. Sudbrook Magnet M.S. 2 MILES Windsor Mill M.S. Hebbville E.S. Woodmoor E.S. Campfield E.S. Woodlawn M.S. 1 MILE Dogwood E.S. Chadwick E.S. Featherbed Lane E.S. Woodlawn H.S. Baltimore City Woodbridge E.S. Johnnycake E.S. Howard County Westowne E.S. Regional Location Map

8 Project Location 8 Dogwood E.S. Chadwick E.S. Neighborhood Location Map

9 Site Conditions 9 Original Construction: 1964 Portable Classrooms: 9 Modular Addition: 1995

10 Existing Site Conditions 10

11 Proposed Site Design 11

12 Evolution of the Prototype 12 Mays Chapel OPENED 2014 Lansdowne OPENING 2018 Dundalk OPENING 2019 Chadwick OPENING 2020

13 Building Organization 13 RECREATION AND PARKS ENTRANCE First Floor Plan MAIN ENTRANCE

14 Building Organization 14 Second Floor Plan

15 Exterior Renderings 15 Main Entrance

16 3D Animation 16

17 Interior Animation 17

18 Interior Renderings 18 Cafeteria

19 Interior Renderings 19 Gymnasium

20 Interior Renderings 20 Learning Commons

21 Interior Renderings 21 Collaboration Space

22 Interior Renderings 22 Classroom

23 Project Schedule Overview 23 Phase/Activity Date Design Start December 2017 Contract Award February 2019 Construction Start March 2019 Building Construction Completion July 2020 Site Restoration Completion August 2021

LANSDOWNE HIGH SCHOOL RENOVATION PRELIMINARY DESIGN PRESENTATION. The Board of Education of Baltimore County Verletta White, Interim Superintendent

LANSDOWNE HIGH SCHOOL RENOVATION PRELIMINARY DESIGN PRESENTATION. The Board of Education of Baltimore County Verletta White, Interim Superintendent RENOVATION PRELIMINARY DESIGN PRESENTATION The Board of Education of Baltimore County Verletta White, Interim Superintendent AGENDA 2 Project Location General Information Existing Conditions Structural

More information

CORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan. Community Information Meeting

CORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan. Community Information Meeting CORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan Community Information Meeting October 2017 AGENDA Meeting Objectives Draft Plan Overview School Improvements for specific site Feedback/Listening

More information

Peter Kirk Elementary School Modernization vs. New-in-lieu of Modernization Report

Peter Kirk Elementary School Modernization vs. New-in-lieu of Modernization Report Peter Kirk Elementary School Modernization vs. New-in-lieu of Modernization Report January 2016 Summary In consideration for a potential 2016 Bond measure for the Capital Facilities Program, Kirk Elementary

More information

POTENTIAL NEW DECORAH ELEMENTARY SCHOOL. Information and Planning

POTENTIAL NEW DECORAH ELEMENTARY SCHOOL. Information and Planning POTENTIAL NEW DECORAH ELEMENTARY SCHOOL Information and Planning EXTENSIVE PROBLEMS WITH EXISTING ELEMENTARY FACILITIES There are not enough classrooms to accommodate six sections per grade. The classrooms

More information

Architect and Engineer: Friar Associates inc.

Architect and Engineer: Friar Associates inc. Architect and Engineer: Friar Associates inc. BACKGROUND In June, after soliciting and interviewing several professional firms, Friar Associates was hired to perform an Existing Conditions Survey and Facilities

More information

ROD Grant Round 4 Presentation June 9, 2014

ROD Grant Round 4 Presentation June 9, 2014 ROD rant Round 4 Presentation June 9, 2014 713 Creek Road Bellmawr, NJ 08031 Telephone (856) 396-6200 Facsimile (856) 396-6205 Please visit us on the web at www.garrisonarch.com 2 Agenda NJDOE Application

More information

WINNER. Orange County Public Schools. 100% Design Complete/Construction Kickoff Community Meeting Ivey Lane Elementary School May 18, 2016

WINNER. Orange County Public Schools. 100% Design Complete/Construction Kickoff Community Meeting Ivey Lane Elementary School May 18, 2016 Welcome! Please sign in on your mobile device: http://communitymeeting.ocps.net/ WINNER 100% Design Complete/Construction Kickoff Community Meeting Ivey Lane Elementary School May 18, 2016 Ivey Lane Elementary

More information

HIDDEN VALLEY ELEMENTARY SCHOOL

HIDDEN VALLEY ELEMENTARY SCHOOL SCHOOL DATA Address: 3435 Bonita Vista Santa Rosa, CA 95404 Established: 975 Permanent Classrooms: 29 Portable Classrooms: 8 Building Area: Site Area: Satellite Building Area: Satellite Site Area: 48,802

More information

Darien Public Schools. Master Plan Discussion Review of Elementary Schools Board of Education Meeting March 14, 2018

Darien Public Schools. Master Plan Discussion Review of Elementary Schools Board of Education Meeting March 14, 2018 Darien Public Schools Master Plan Discussion Review of Elementary Schools Board of Education Meeting March 14, 2018 BACKGROUND MASTER PLAN REPORT SUBMITTED DECEMBER 2016 DOCUMENTED DISTRICT-WIDE INFRASTRUCTURE

More information

PROJECT UPDATE SEPTEMBER 11, 2014

PROJECT UPDATE SEPTEMBER 11, 2014 PROJECT UPDATE SEPTEMBER 11, 2014 Information shown above was provided to district tax payers and stakeholders prior to May bond election. ELEMENTARY SCHOOL #8 $ 34,000,000 Bond Allocation BOND 2013 PROJECT

More information

Crockett Elementary School Renovations

Crockett Elementary School Renovations We are your future. We are EPISD. August 7, 07 August 9, 07 Existing Conditions August 9, 07 Existing Conditions SITE PLAN 7 7 7 EXISTING DROP-OFF AREA CREATES CONGESTION AND BUS DROP-OFF IS NOT DEFINED.

More information

FACILITIES LIFE CYCLE ANALYSIS

FACILITIES LIFE CYCLE ANALYSIS FACILITIES LIFE CYCLE ANALYSIS Scottsdale Unified School District Governing Board Study Session September 8, 2016 Terry Worcester A.I.A. COCHISE Elementary School 1991 Media Center 2001 Classrooms, Administration

More information

Madison School District. Strategic Five-Year Facility Maintenance Plan

Madison School District. Strategic Five-Year Facility Maintenance Plan Madison School District Strategic Five-Year Facility Maintenance Plan 2016 2020 Dear Madison Stakeholder, Throughout the past twenty years, Madison School District has experienced tremendous growth. Since

More information

Design Advisory Committee Meeting #5. December 19, 2017

Design Advisory Committee Meeting #5. December 19, 2017 Design Advisory Committee Meeting #5 December 19, 2017 1 Meeting Agenda 1. Agenda / Attendance Sheet 5 minutes 2. BEST Grant Recap 3. Review Funding Options additional information 4. Master Plan Summary

More information

Gwinnett County Public Schools. Jim Steele Chief Operations Officer

Gwinnett County Public Schools. Jim Steele Chief Operations Officer Gwinnett County Public Schools Jim Steele Chief Operations Officer Water Conservation Measures Presented to Governor s Environmental Advisory Council July 11, 2006 FO 7/11/06 1 FO 7/11/06 2 Our M&O budget

More information

Upper Adams School District Facility Study Presentation Part 2 November 17, 2016

Upper Adams School District Facility Study Presentation Part 2 November 17, 2016 Upper Adams School District Facility Study Presentation Part 2 November 17, 2016 Providing a Client Oriented Approach to Architecture Crabtree, Rohrbaugh & Associates, Architects Agenda Part 1 Current

More information

DENNIS TOWNSHIP FEASIBILITY STUDY

DENNIS TOWNSHIP FEASIBILITY STUDY DENNIS TOWNSHIP FEASIBILITY STUDY October 29, 2015 TABLE OF CONTENTS I. INTRODUCTION II. EXECUTIVE SUMMARY III. GENERAL FACILITY DATA A. Primary School B. Elementary / Middle School IV. FACILITIES ASSESSMENT

More information

Revised Central Scheme 1 Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 100% Three Story Academic Additi

Revised Central Scheme 1 Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 100% Three Story Academic Additi Original Central Scheme 1 Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 75% Three Story Academic Addition with CTE Gymnasium Addition: Multi-court gym 3 courts

More information

Lansdowne Elementary Community Boundary Study

Lansdowne Elementary Community Boundary Study Lansdowne Elementary Community Boundary Study Committee Meeting 4 November 8, 2017 Presented by: Baltimore County Public Schools Baltimore County Public Schools, November 8, 2017 1 Tonight s Goals & Agenda

More information

School Assessment Report

School Assessment Report School Assessment Report School: Morningside Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:29:07 AM FOR OFFICIAL USE ONLY Final School Assessment

More information

Superintendent Proposed Capital Improvements Program. Fiscal Years

Superintendent Proposed Capital Improvements Program. Fiscal Years Superintendent Proposed Capital Improvements Program Fiscal Years 2016-2025 TABLE OF CONTENTS Summary Page 1 Capital Projects Pages 2-7 Capital Projects Description Pages 8-16 SUPERINTENDENT PROPOSED CAPITAL

More information

Edmonton Public School District No. 7

Edmonton Public School District No. 7 EXECUTIVE SUMMARY 1. Overall Impressions The 1966 non-core school has actively pursued an ongoing maintenance and upgrade program to improve a number of past problem areas within the school. Extensive

More information

CESAR CHAVEZ LANGUAGE ACADEMY

CESAR CHAVEZ LANGUAGE ACADEMY SCHOOL DAA Address: 2570 West Steele Lane Santa Rosa, CA 95403 Established: Campus - 1972, CCLA - 2013 Permanent Classrooms: 14 Portable Classrooms: 4 Building Area: Site Area: 17,000 sq. ft. 24.08 acres

More information

Edmonton Public School District No. 7

Edmonton Public School District No. 7 EXECUTIVE SUMMARY 1. Overall Impressions Sherwood Elementary School resides in a quiet residential neighborhood with a shared parking area adjacent to the community league on the north and a generous play

More information

TWIN RIVERS UNIFIED SCHOOL DISTRICT 2015 LONG-RANGE FACILITY MASTER PLAN Steering Committee Meeting No. 4 \\ April 13, 2015

TWIN RIVERS UNIFIED SCHOOL DISTRICT 2015 LONG-RANGE FACILITY MASTER PLAN Steering Committee Meeting No. 4 \\ April 13, 2015 2015 LONG-RANGE FACILITY MASTER PLAN Steering Committee Meeting No. 4 \\ April 13, 2015 AGENDA I. LRFMP BRANDING UPDATE II. LRFMP FOCUS GROUP UPDATE III. ENROLLMENT PROJECTIONS / DEMOGRAPHICS IV. FINALIZE

More information

Subject: Elementary Boundary Adjustment Proposal #2: Nancy Ryles and South Cooper Mountain Planning Area Developments

Subject: Elementary Boundary Adjustment Proposal #2: Nancy Ryles and South Cooper Mountain Planning Area Developments June 2, 2017 Subject: Elementary Boundary Adjustment Proposal #2: Nancy Ryles and South Cooper Mountain Planning Area Developments Overview A portion of the South Cooper Mountain planning area is already

More information

FREMONT UNIFIED. Thornton Middle School Conversion S C H O O L D I S T R I C T. Quattrocchi Kwok Architects. Sept 26, 2018

FREMONT UNIFIED. Thornton Middle School Conversion S C H O O L D I S T R I C T. Quattrocchi Kwok Architects. Sept 26, 2018 FREMONT UNIFIED S C H O O L D I S T R I C T Thornton Middle School Conversion Quattrocchi Kwok Architects Sept 26, 2018 1 Transforming Thornton Incoming 6 th graders in year 2021/22 Student population

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 163 82% Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 92 92% 2.3 Structural 0 91 91% 2.4 Building Envelope 0 84 84% 2. Interior

More information

Exhibit B TOWSON WEST ELEMENTARY SCHOOL BALTIMORE COUNTY PUBLIC SCHOOLS. September 9, Design Collective Project Number

Exhibit B TOWSON WEST ELEMENTARY SCHOOL BALTIMORE COUNTY PUBLIC SCHOOLS. September 9, Design Collective Project Number Exhibit B SCHEMATIC DESIGN BRIEFING for Dr. JOE A. HAIRSTON TOWSON WEST ELEMENTARY SCHOOL BALTIMORE COUNTY PUBLIC SCHOOLS September 9, 2008 Design Collective Project Number 149-08 Towson West Elementary

More information

Hartsville Area Schools - Building Evaluations

Hartsville Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 8, 2012 Hartsville Area Schools - Building Evaluations School Name: West Hartsville Elementary Observed By: Cannon/Carter Principal:

More information

Sustainable Design A DIVISION OF SHIVE-HATTERY

Sustainable Design A DIVISION OF SHIVE-HATTERY Sustainable Design A DIVISION OF SHIVE-HATTERY our transition to sustainability must be a deliberate choice to leave the linear surge of an extractive economy and enter a circulating, renewable one. Janine

More information

Cherry Hill School District Building Project Summary. August 8, 2018

Cherry Hill School District Building Project Summary. August 8, 2018 Cherry Hill School District Building Project Summary August 8, 2018 Progress Update: Bond Referendum 2018 As of August 8, 2018, the Cherry Hill Public School District has not yet received approval from

More information

PUBLIC HEARINGS June 6 & 7, 2018

PUBLIC HEARINGS June 6 & 7, 2018 PUBLIC HEARINGS June 6 & 7, 2018 STUDENT HOUSING WEST AGENDA & OUTLINE FOR THIS EVENING Agenda Present Student Housing West Project information. Present information specific to the Student Housing West

More information

School Assessment Report

School Assessment Report School Assessment Report School: Carver High School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:37:23 AM FOR OFFICIAL USE ONLY Final School Assessment Report

More information

PERMITTED USES: Within the B-4 Planned Arterial Business District the following uses are permitted:

PERMITTED USES: Within the B-4 Planned Arterial Business District the following uses are permitted: 6.17 - B-4 PLANNED ARTERIAL BUSINESS DISTRICT 6.17.1 INTENT: The B-4, Planned Arterial Business District is designed to encourage a unified development approach along the major highway corridors. The principal

More information

Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director of Planning and Capital Division

Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director of Planning and Capital Division Date: August 5, 2015 To: Through From: Subject: Recreation and Park Commission Capital Committee Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director of Planning and Capital Division Karen Mauney-Brodek,

More information

Referendum Implementation

Referendum Implementation SPACE Net Gain (new) Classrooms Claremont = +47 Hillcrest & Elizabeth = +20 Utilization Gain SGS = +25 at 6-8 MS level SAFETY Annex Connection To Franklin Park Repair Parking Lots, Sidewalks & Outdoor

More information

School Assessment Report

School Assessment Report School Assessment Report School: Morningside Elementary School Report: Dec 15, 2014 Condition Assessment: Suitability Assessment: Generated: 12/15/2014 12:11:31 PM FOR OFFICIAL USE ONLY Final School Assessment

More information

SACRAMENTO CITY UNIFIED SCHOOL DISTRICT Sustainable Facilities Master Plan

SACRAMENTO CITY UNIFIED SCHOOL DISTRICT Sustainable Facilities Master Plan Albert Einstein Albert Einstein Campus Entry Student Centered Education School Mission Statement EXORE, DISCOVER, CREATE Mirandy Drive Site Plan of Campus Narrative Summary The site is just over 20.5 acres

More information

School Board Work Session Dec. 13, 2016

School Board Work Session Dec. 13, 2016 School Board Work Session Dec. 13, 2016 POPULATIONS AND FACILITIES USE ASSESSMENT Dinwiddie High School Dinwiddie Middle School Dinwiddie Elementary School Midway Elementary School Southside Elementary

More information

BOND CONSTRUCTION UPDATE

BOND CONSTRUCTION UPDATE BOND CONSTRUCTION UPDATE March 31, 2015 PROJECTS: 1. CIBOLO VALLEY ELEMENTARY SCHOOL BOND 2013 2. STEELE HIGH SCHOOL ADDITIONS & RENOVATIONS BOND 2013 3. DOBIE MIDDLE SCHOOL ADDITIONS & RENOVATIONS BOND

More information

JASPER SHARED SCHOOL FACILITY

JASPER SHARED SCHOOL FACILITY JASPER SHARED SCHOOL FACILITY A BRIDGING PERSPECTIVE Robert Rabinovitch M.Arch., Architect, AAA, SAA, MRAIC History Jasper Junior / Senior High School Originally constructed in 1952 with additions in 1958,

More information

PRESENTATION JANUARY 24, 2017

PRESENTATION JANUARY 24, 2017 4918 HOVENKAMP DRIVE DALLAS, TEXAS 75227 PRESENTATION JANUARY 24, 2017 RGM ARCHITECTS OCTOBER 25, 2016 1 2 COMMUNITY INPUT DESIGN DOCUMENT PROCUREMENT CONSTRUCTION PD SD DD CD BD CA PROJECT PROCESS 3 Construction

More information

ENTRY FORM. DVASE 2018 Excellence in Structural Engineering Awards Program

ENTRY FORM. DVASE 2018 Excellence in Structural Engineering Awards Program ENTRY FORM DVASE 2018 Excellence in Structural Engineering Awards Program PROJECT CATEGORY (check one): Buildings under $5M Buildings Over $100M Buildings $5M - $15M Other Structures Under $1M Buildings

More information

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements % 8/13/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 64 64% 2.2 Accessibility 0 66 66% 2.3 Structural 0 77 77% 2.4 Building Envelope 0 4 4% 2. Interior

More information

FRIDLEY SCHOOL DISTRICT West Moore Lake Drive Fridley, MN REVIEW AND COMMENT DOCUMENT

FRIDLEY SCHOOL DISTRICT West Moore Lake Drive Fridley, MN REVIEW AND COMMENT DOCUMENT FRIDLEY SCHOOL DISTRICT 14 6000 West Moore Lake Drive Fridley, MN 55432 REVIEW AND COMMENT DOCUMENT For submission to Minnesota Department of Education June 20, 2012 SUMMARY The Fridley Public Schools

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope

More information

Mills Elementary School Site Summary

Mills Elementary School Site Summary 1 Mills Elementary School Site Summary Address 6201 Davis Lane Austin, TX 78749 Number of Permanent Campus Facilities 1 Original Year of Construction 1998 Total Campus Building Area (combined) 81,368 SF

More information

MASSEY HOFFMAN ARCHITECTS

MASSEY HOFFMAN ARCHITECTS Green is Simply Good Practice How Good Design Strategies and Construction Practices can Achieve a LEED for Homes Certification Often it seems that the motivation for building green comes from the desire

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 82 82% 2.3 Structural 0 7 7% 2.4 Building Envelope 0 47 47% 2. Interior

More information

Agenda Item 4 Southeast Corner Everett and Waukegan Roads Waterway Car Wash, Gas and Convenience Store

Agenda Item 4 Southeast Corner Everett and Waukegan Roads Waterway Car Wash, Gas and Convenience Store Agenda Item 4 Southeast Corner Everett and Waukegan Roads Waterway Car Wash, Gas and Convenience Store Consideration of a request for approval of demolition of the existing commercial building and approval

More information

Board Work Session Feasibility Study. January 9, 2017

Board Work Session Feasibility Study. January 9, 2017 Board Work Session Feasibility Study January 9, 2017 1 Process Staff Input Sessions at all schools What can you tell us about your building, your site, your space? Group collaboration exercise looking

More information

PROJECT INFORMATION SESSION May 30 & 31, 2018

PROJECT INFORMATION SESSION May 30 & 31, 2018 PROJECT INFORMATION SESSION May 30 & 31, 2018 STUDENT HOUSING WEST ABOUT THE PROPOSED PROJECT Project Transaction Structure Key RFP Project Performance Goals Master plan, develop and operate approximately

More information

Becker Morgan Group, Inc. (architectural and site systems) Gipe Associates, Inc. (mech./elec./plumbing systems) Morabito Associates, Inc.

Becker Morgan Group, Inc. (architectural and site systems) Gipe Associates, Inc. (mech./elec./plumbing systems) Morabito Associates, Inc. AGENDA REVIEW PROJECT BACKGROUND & PURPOSE REVIEW PROJECT FINDINGS REVIEW THE 4 OPTIONS DEVELOPED OPTION COMPARISONS REVIEW PROJECT SCHEDULE COMMUNITY COMMENTS / QUESTIONS TEAM Becker Morgan Group, Inc.

More information

Issue Paper # 7: Modernization Replacement Projects

Issue Paper # 7: Modernization Replacement Projects Issue Paper # 7: Modernization Replacement Projects 1. Background BSD s student population has grown since the last capital bond in 2006 and facilities have experienced normal wear and aging leading to

More information

TEMPLATE A P S S I T E M A S T E R P L A N N I N G

TEMPLATE A P S S I T E M A S T E R P L A N N I N G TEMPLATE A P S S I T E M A S T E R P L A N N I N G Albuquerque Public Schools Department of Facilities Design + Construction January 1, 2017 1 INTRODUCTION & OVERVIEW Albuquerque Public Schools develops

More information

North Middlesex Regional High School

North Middlesex Regional High School North Middlesex Regional High School Ashby, Pepperell, Townsend Schematic Design Kick-Off BUILDING COMMITTEE MISSION STATEMENT We will proactively work with the OPM, design team and the community, to develop

More information

Waverley Elementary School Feasibility Study

Waverley Elementary School Feasibility Study Waverley Elementary School Feasibility Study FREDERICK COUTY PUBLIC SCHOOLS Feasibility Study Meeting #7 February 1, 2018 1 AGEDA 1. PROJECT OVERVIEW schedule 2. SITE ISSUES ALTA survey, site constraints

More information

MCER Study for Little Powder K-8

MCER Study for Little Powder K-8 MCER Study for Little Powder K-8 CCSD #1 Little Powder K-8 Weston, WY Wyoming School Facilities Department Cheyenne, WY TSP, Inc. Sheridan, WY May 16, 2016 Table of Contents Introduction 3 Goals and Objectives

More information

Health Life Safety Survey and Master Facilities Plan

Health Life Safety Survey and Master Facilities Plan Health Life Safety Survey and Master Facilities Plan Community Presentation Board Meeting June 22, 2015 June 22, 2014 Board Presentation Overview and Summary of the Health Life Safety Survey and Master

More information

PROJECT UPDATE August 28, 2014

PROJECT UPDATE August 28, 2014 PROJECT UPDATE August 28, 2014 Information shown above was provided to district tax payers and stakeholders prior to May bond election. ELEMENTARY SCHOOL #8 $ 34,000,000 Bond Allocation BOND 2013 PROJECT

More information

Duke Sustainability Sands Parking Garage

Duke Sustainability Sands Parking Garage Duke Sustainability Sands Parking Garage Building Information Architect: Walker Parking Consultants (with design teams from Ratio Architects and Stewart Engineering) Construction: Bovis Lend Lease Purpose:

More information

4043 N. Ravenswood Suite 207 Chicago, IL

4043 N. Ravenswood Suite 207 Chicago, IL Green is Simply Good Practice A Demonstration of How Good Design Strategies and Construction Practices Can Achieve a LEED for Homes Certification Often it seems that the motivation for being green comes

More information

ELMIRA HIGH SCHOOL GYMNASIUM ANNEX NOVEMBER 19, 2015

ELMIRA HIGH SCHOOL GYMNASIUM ANNEX NOVEMBER 19, 2015 ELMIRA HIGH SCHOOL GYMNASIUM ANNEX NOVEMBER 19, 2015 TABLE OF CONTENTS PROGRAM SUMMARY DESIGN EXPLORATION EXISTING SITE PLAN - ANALYSIS DEMOLITION SITE PLAN PROPOSED SITE PLAN PROPOSED FLOOR PLANS DEMOLITION

More information

UCSD HEALTH SCIENCES NEIGHBORHOOD GRADUATE AND PROFESSIONAL HOUSING

UCSD HEALTH SCIENCES NEIGHBORHOOD GRADUATE AND PROFESSIONAL HOUSING Regents Committee on Grounds and Buildings Preliminary Review of Design November 18, 2008 UCSD HEALTH SCIENCES NEIGHBORHOOD GRADUATE AND PROFESSIONAL HOUSING Project Background 225 (2 bedroom apartment

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 X DATE: March 27-29, 2018 ****************************************************************************** SUBJECT USD North Commons Renovation

More information

RR Program Summary: Complete renovation with addition and code upgrades for a historic academic building

RR Program Summary: Complete renovation with addition and code upgrades for a historic academic building Program Summary: Complete renovation with addition and code upgrades for a historic academic building Program Statement: Damaged in Hurricane Katrina, the circa-1929 former high school in historic Marigny

More information

21 st CENTURY STUDENTS: Integrating Sustainable Design and Curriculum

21 st CENTURY STUDENTS: Integrating Sustainable Design and Curriculum 21 st CENTURY STUDENTS: Integrating Sustainable Design and Curriculum SCHOOL FACILITIES IMPACT ON LEARNING 21 st century teaching delivery includes: new tools, techniques and methods 20 th century buildings

More information

School Board Proposed Capital Improvements Program. Fiscal Years

School Board Proposed Capital Improvements Program. Fiscal Years School Board Proposed Capital Improvements Program Fiscal Years 2017-2026 TABLE OF CONTENTS Summary Page 1 Capital Projects Pages 2-8 Capital Projects Description Pages 9-14 SCHOOL BOARD PROPOSED CAPITAL

More information

Operational Services Facility Innovation & Readiness Stakeholder Team

Operational Services Facility Innovation & Readiness Stakeholder Team Operational Services Facility Innovation & Readiness Stakeholder Team A great place for kids to learn. A great place for employees to work. A place our community can be proud of. 21 st Century School District!

More information

Case Study: Golisano Institute for Sustainability

Case Study: Golisano Institute for Sustainability Case Study: Golisano Institute for Sustainability Rochester Institute of Technology - Golisano Institute for Sustainability Sustainability Hall at Rochester Institute of Technology A001.01 (RIT) is a LEED-Platinum

More information

McGILVRA ELEMENTARY SCHOOL ADDITION. SDAT WORKSHOP #2 April 30, 2015

McGILVRA ELEMENTARY SCHOOL ADDITION. SDAT WORKSHOP #2 April 30, 2015 McGILVRA ELEMENTARY SCHOOL ADDITION SDAT WORKSHOP #2 April 30, 2015 Workshop Agenda 1. Review results from Blink Exercise Discussion 2. Review Guiding Principles of Design 3. Hope and Fears Exercise /

More information

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS

More information

BBL. Corporate Overview. National Rankings MODERN HEALTHCARE TOP DESIGN-BUILD COMPANIES 1

BBL. Corporate Overview. National Rankings MODERN HEALTHCARE TOP DESIGN-BUILD COMPANIES 1 National Rankings MODERN HEALTHCARE TOP DESIGN-BUILD COMPANIES 1 BUSINESS REVIEW TOP CONTRACTORS 1 ENR NEW YORK TOP CONTRACTORS 18 ENR TOP 100 DESIGN-BUILD FIRMS 66 ENR TOP 400 CONTRACTORS 215 Corporate

More information

Wellesley College Green Building Standards

Wellesley College Green Building Standards Wellesley College Green Building Standards Approved by Advisory Committee on Environmental Sustainability 6/2/2014 Approved by the Board of Trustees 10/30/2014 The Wellesley College Green Building Standards

More information

Case Study: Element PROJECT DESCRIPTION

Case Study: Element PROJECT DESCRIPTION Case Study: Element PROJECT DESCRIPTION Project type: Project gross SF: Number of keys: Location: Hotel (Hospitality), extended-stay prototype Varies, prototypical SF: 79,035 SF gross Varies, prototypical:

More information

The Report: Priority 1 thru 5 $ 2,124,417 Lifecycle Years 1 thru 3 ½ $ 384,097 New Construction $ 2,451,568 Less Redlined Items $ 43,534

The Report: Priority 1 thru 5 $ 2,124,417 Lifecycle Years 1 thru 3 ½ $ 384,097 New Construction $ 2,451,568 Less Redlined Items $ 43,534 Building Condition Assessment Facilities Feasibility Study 106 - Sam Houston Elementary Educational Needs $ 2,451,568 Safety & Security Needs $ 588,049 Exterior Needs $ 622,503 Interior Needs $ 703,790

More information

W. EDWARD BALMER SCHOOL

W. EDWARD BALMER SCHOOL W. EDWARD BALMER SCHOOL NORTHBRIDGE, MA SCHEMATIC DESIGN SCHOOL BUILDING COMMITTEE MEETING FEBRUARY 28, 2018 N O R T H B R I D G E PUBLIC SCHOOLS 1. SITE PLANNING UPDATE 2. BUILDING DESIGN UPDATE 3. MECHANICAL

More information

Longmeadow High School Project. Public Forum April 08, 2010 LHS Cafeteria

Longmeadow High School Project. Public Forum April 08, 2010 LHS Cafeteria 1 Longmeadow High School Project Public Forum April 08, 2010 LHS Cafeteria 2 Your School Building Committee* Bobby Barkett, Co-Chair - Select Board Christine Swanson, Co-Chair - School Committee Gwen Bruns

More information

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING PROPOSED MAIN ENTRY - EXTERIOR RENDERING EXISTING SITE AERIAL PHOTOGRAPH 6TH STREET NW PEDESTRIAN ACCESS School access to existing alley leads students through vehicular path CHAIN LINK ENCLOSED PARKING

More information

Community Liaison Committee and Neighborhood Collaborative. American University Hall of Science. August 7, 2017

Community Liaison Committee and Neighborhood Collaborative. American University Hall of Science. August 7, 2017 Community Liaison Committee and Neighborhood Collaborative American University Hall of Science August 7, 2017 Agenda 1. Why a Life Science Building? STEM Growth Obsolete Facilities 2. Options Considered

More information

Lincoln Public Schools

Lincoln Public Schools Lincoln Public Schools School Building Committee Meeting July 11, 2018 Today s Agenda Floor Plan Update Sustainable Design Features, NZE Systems & Exterior Building Envelope Project Schedule Construction

More information

DISCOVERY ELEMENTARY SCHOOL

DISCOVERY ELEMENTARY SCHOOL DISCOVERY ELEMENTARY SCHOOL COMMUNITY UPDATE #11 April 2015 COMPLETED AND ONGOING CONSTRUCTION ACTIVITIES The north half of the Discovery Elementary School (DES) building referred to below encompasses

More information

School Assessment Report

School Assessment Report School Assessment Report School: Cascade Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:37:55 AM FOR OFFICIAL USE ONLY Final School Assessment

More information

A Program Summary: Complete renovation and addition with code upgrades for a historic academic building

A Program Summary: Complete renovation and addition with code upgrades for a historic academic building Program Summary: Complete renovation and addition with code upgrades for a historic academic building Program Statement: Damaged in Hurricane Katrina, the circa-1929 former high school in the historic

More information

WELD COUNTY SCHOOL DISTRICT RE-1 04/12/2016 BUILDING ASSESSMENT INTRODUCTION

WELD COUNTY SCHOOL DISTRICT RE-1 04/12/2016 BUILDING ASSESSMENT INTRODUCTION PURPOSE OF THIS REPORT: Relationship to the Master Plan: These Building Assessments are part of a Strategic Facilities Master Plan (SFMP). H+L Architecture was hired to assist the District in creating

More information

DESIGN & CONSTRUCTION SERVICES FOR K-12 FACILITIES

DESIGN & CONSTRUCTION SERVICES FOR K-12 FACILITIES DESIGN & CONSTRUCTION SERVICES FOR K-12 FACILITIES DESIGN & CONSTRUCTION SERVICES FOR K-12 FACILITIES Photo courtesy of Crabtree, Rohrbaugh & Associates Above left: Clarke County High School Berryville,

More information

LOVEJOY Independent School District

LOVEJOY Independent School District Long-Range Facilities Planning Projected Bond Sale Project Series 2014 Series 2018 Series 2023 Total (2013 Cost) (with 6% Yearly Inflation) 1. Hart Elementary $ 6,716,424 $ 6,168,802 $ 1,200,121 $ - $

More information

Collins Middle School

Collins Middle School Contents Collins Middle School...2 General comments, campus capacity, and student demographics:...2 1.0 School Site...4 2.0 Building Systems and Components...5 3.0 Building Safety and Security...19 4.0

More information

Frost Technical Center

Frost Technical Center Frost Technical Center 1955 Greenhouses Addition Various other additions and renovations Provide site security improvements Provide improved Admin area field of view to site entrance Provide security camera

More information

GLADYS VALLEY HALL. Materials & Resources Innovation & Design Process

GLADYS VALLEY HALL. Materials & Resources Innovation & Design Process Instructional Facility VeterinaryVeterinary MedicineMedicine Instructional Facility GOING FOR GOLD Valley Hall has achieved LEED Platinum certification. The Leadership in Energy and Environmental Design

More information

10 April 10, 2013 Public Hearing APPLICANT AND PROPERTY OWNER: CHALICE CHRISTIAN CHURCH, INC.

10 April 10, 2013 Public Hearing APPLICANT AND PROPERTY OWNER: CHALICE CHRISTIAN CHURCH, INC. 10 April 10, 2013 Public Hearing APPLICANT AND PROPERTY OWNER: CHALICE CHRISTIAN CHURCH, INC. REQUEST: Conditional Use Permit for Religious Use (Church) STAFF PLANNER: Stephen J. White ADDRESS / DESCRIPTION:

More information

Fayetteville Public School Facilities

Fayetteville Public School Facilities Fayetteville Public School Facilities Asbell Asbell Elementary School Principal: Ms. LaTayna Greene Capacity: 504 Enrollment: 399 Date Constructed: 1961 Square Feet: 39,166 Acres: 19.93 Major Renovations:

More information

Stevens High School Pre Bond Presentation Claremont, NH

Stevens High School Pre Bond Presentation Claremont, NH Stevens High School Pre Bond Presentation Claremont, NH Existing Conditions Existing Conditions Existing Conditions Existing Conditions Proposed site features New main entry that is ADA accessible New

More information

STATE UNIVERSITY CONSTRUCTION FUND Concept Phase Checklist

STATE UNIVERSITY CONSTRUCTION FUND Concept Phase Checklist STATE UNIVERSITY CONSTRUCTION FUND Concept Phase Checklist The following checklist shows the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the

More information

MADISON HIGH SCHOOL // Executive Summary

MADISON HIGH SCHOOL // Executive Summary MADISON HIGH SCHOOL // Executive Summary community + wrap-around services arts courtyard arts commons courtyard commons entry Construction Cost $95,000,000 Student Design Capacity 1,700 Project Cost $145,909,717*

More information

Mecklenburg County Sustainable Facilities and Development Policy

Mecklenburg County Sustainable Facilities and Development Policy Mecklenburg County Sustainable Facilities and Development Policy The objective of this policy is to define goals, standards, and verification means for the design, construction, and future operation of

More information

Seminar 4 Energy Performance of Active Chilled Beam Installations

Seminar 4 Energy Performance of Active Chilled Beam Installations Paul Christy Superintendent Clark County Public Schools paul.christy@clark.kyschools.us Seminar 4 Energy Performance of Active Chilled Beam Installations Successful Application of Chilled Beams in a High

More information

- AIA Honor Award for Interior Architecture - ALA/IIDA Library Interior Design Awards: Best

- AIA Honor Award for Interior Architecture - ALA/IIDA Library Interior Design Awards: Best CASE STUDY #3 A SUSTAINABLE SITE & BUILDING Macy Brannan, Kiana Fannin, & Chase Muchow MCALLEN MAIN LIBRARY Located in McAllen, TX Architects: MSR Design 120,000 sq. ft. Completed in 2011 Largest single

More information