1 Welcome! Please sign in on your mobile device: WINNER 100% Design Complete/Construction Kickoff Community Meeting Ivey Lane Elementary School May 18, 2016

2 Ivey Lane Elementary School Meeting Agenda May 18, 2016: Ivey Lane Elementary School Cafeteria, 6:00pm Introductions Welcome Kathleen Kat Gordon, School Board Member Project Update Facilities Meeting Organizer Architect: Harvard Jolly Architects Construction Manager: Gilbane Building Company Questions and Answers Adjournment 2

3 Ivey Lane Park Play Field Basketball Court Playground Silverton St Hard Court Retention Pond Existing Building to be Demolished Covered Play Tennis Court Play Field Teresa Blvd N Existing School Aerial 3

4 Project Data Capacity 650 Student Stations Building Area 74,415 Gross SF Parent/Staff Silverton St Existing Playground Parent Drop Off Bike Admin Media Center Covered Play Multi Purpose Kitchen 2-Story room Playfield CEP Tennis Ct Dry Pond Hardcourt Parking Provided 150 Spaces (131 spaces required) Car Queuing Provided 108 Cars (89 cars required) Bus Canopy 76 ft Parent Canopy 220 ft Dry Pond Portables Bike Tot Lot Gate Service Bus Teresa Blvd Site Area +/ Acre Bus Drop Off N Site Plan 4

5 Double Fence Bldg 4 Phase 1 7/2016 5/2017 Construct: New Building New Parent Canopy New Bus Drive New Bus Canopy New Covered Play New Tennis Court Sitework and Pond Demo Existing Bldg 4 Silverton St Phase 1 (7/2016-5/2017) Construction Entrance Teresa Blvd N Phasing Plan 5

6 Phase 2 Summer 2017 Demo Existing Bldg Construct: New Tot Lot New Parking and Drives Silverton St Phase 2 (Summer 2017) Phase 1 (7/2016-5/2017) Phase 2 Construction Entrance Teresa Blvd N Phasing Plan 6

7 Phase 3 6/ /2017 Complete: Parking and Drives Sitework and Pond Silverton St Phase 2 (Summer 2017) Phase 1 (7/2016-5/2017) Phase 3 (6/ /2017) Phase 2 Teresa Blvd N Phasing Plan 7

8 CEP Stage Ruby Blair s Cafetorium Kitchen Admin Lobby Music Science Computer Art Res Teacher Planning Media Center Resource First Floor Plan 8

9 Res Resource Second Floor Plan 9

10 Rendering at Main Entry 10

11 Aluminum Walkway Canopies Thin Brick Veneer over Tilt-Up Concrete Panel Painted Tilt-Up Concrete Panels West Elevation Painted Tilt-Up Concrete Panels Screen Wall at Central Energy Plant North Elevation Central Plant Kitchen Multi-Purpose Stage Admin Building Section Exterior Elevations and Building Section 11

12 Ivey Lane Elementary School is designed to meet Green Globes sustainable building standards Sustainable Features include: Site Native/low water landscaping reduced water consumption Low Impact Design (LID) stormwater design Building 10% more energy efficient than ASHRAE 90.1 standard High Efficient Chillers (8% energy reduction) Light colored roof reduces heat gain and improves energy efficiency Energy Star rated equipment Water saving toilets, faucets and fixtures All general classrooms have daylighting Over 75% of ALL spaces have daylighting Thermal efficient windows/glazing Fully automated building control system Sustainability 12

13 Interactive Flat Panel 13

14 Example Reception 14

15 Orange County Public Schools Example room 15

16 Orange County Public Schools Example Media Center 16

17 Orange County Public Schools Example Cafeteria & Multi-Purpose Room 17

18 Example Kitchen 18

19 Orange County Public Schools Example Tot Lot and Covered Play 19

20 2017 Design Phase Feb 12 Apr 28 Phase 1 Feb 12 Feb 25 Phase 2 Feb 26 Mar 21 Phase 3 Mar 22 Apr 28 Permitting Apr 29 May 30 Bidding/GMP Apr 29 Jul 1 Construction Jul 01, 2016 Nov 03, 2017 Project Schedule 20

21 QUESTIONS? 21

LECKIE ELEMENTARY SCHOOL

LECKIE ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 471 ENROLLMENT 2008 321 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan LECKIE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

School Without Walls

School Without Walls INITIAL YEAR BUILT 1938 BUILDING AREA 59,400 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 276 WARD 1 PROPOSED PROGRAM CAPACITY 400 SCHOOL WITHOUT WALLS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

LANSDOWNE HIGH SCHOOL RENOVATION PRELIMINARY DESIGN PRESENTATION. The Board of Education of Baltimore County Verletta White, Interim Superintendent

LANSDOWNE HIGH SCHOOL RENOVATION PRELIMINARY DESIGN PRESENTATION. The Board of Education of Baltimore County Verletta White, Interim Superintendent RENOVATION PRELIMINARY DESIGN PRESENTATION The Board of Education of Baltimore County Verletta White, Interim Superintendent AGENDA 2 Project Location General Information Existing Conditions Structural

More information

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project

More information

LEWIS ELEMENTARY SCHOOL

LEWIS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1962 BUILDING AREA 49,500 SF CURRENT PROGRAM CAPACITY 550 ENROLLMENT 2008 288 WARD 1 PROPOSED PROGRAM CAPACITY 450 Site Plan LEWIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING PROPOSED MAIN ENTRY - EXTERIOR RENDERING EXISTING SITE AERIAL PHOTOGRAPH 6TH STREET NW PEDESTRIAN ACCESS School access to existing alley leads students through vehicular path CHAIN LINK ENCLOSED PARKING

More information

PLUMMER ELEMENTARY SCHOOL

PLUMMER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

ORANGE VISTA HIGH SCHOOL PHASE I

ORANGE VISTA HIGH SCHOOL PHASE I 975 W. Morgan Street Perris, CA 92571 ORANGE VISTA HIGH SCHOOL PHASE I Monthly Project Progress Report January 2015 Prepared by: 9339 Feron Blvd. Rancho Cucamonga, CA 91730 I. Project Location and Description

More information

ORANGE VISTA HIGH SCHOOL PHASE I

ORANGE VISTA HIGH SCHOOL PHASE I 975 W. Morgan Street Perris, CA 92571 ORANGE VISTA HIGH SCHOOL PHASE I Monthly Project Progress Report February 2015 Prepared by: 9339 Feron Blvd. Rancho Cucamonga, CA 91730 I. Project Location and Description

More information

Montrose Community Recreation Center Update & MRD Outdoor Facility Plan

Montrose Community Recreation Center Update & MRD Outdoor Facility Plan Montrose CRC and Park Montrose Community Recreation Center Update & MRD Outdoor Facility Plan September 23 rd, 2015 Trails, Pickleball Courts, Playgrounds, Natural Areas, Picnic Areas, Water Play, Tennis,

More information

*Additional Projects were not part of the voter-approved 2006 Bond. They were able to be completed due to savings from other projects.

*Additional Projects were not part of the voter-approved 2006 Bond. They were able to be completed due to savings from other projects. SECONDARY SCHOOLS Kirby Middle School Demolish 300, 400, and 500 buildings partial Change in total rebuild design New academic building - 33 classrooms *Rent portables for temporary classrooms partial

More information

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS

More information

Cheldelin Middle School

Cheldelin Middle School Facility Information Address: 987 NE Conifer Blvd Corvallis Site Size: Building Area: Construction Date: Improved Parking: Grade Levels Served: Regular Classrooms: Portable Classrooms: Sept. 2007 Enrollment:

More information

LASALLE - BACKUS EDUCATION CAMPUS

LASALLE - BACKUS EDUCATION CAMPUS INITIAL YEAR BUILT 1957 BUILDING AREA 63,000 SF CURRENT PROGRAM CAPACITY 406 ENROLLMENT 2008 349 WARD 4 PROPOSED PROGRAM CAPACITY 425 Site Plan LASALLE - BACKUS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Scripps Ranch High School

Scripps Ranch High School Scripps Ranch High School 10410 Treena St. San Diego, CA 92131 Sub-district: B Cluster: Scripps Ranch Year School Opened: 1993 Grades: 9-12 4 3 1 2 1 2 3 4 Sustainable Technologies Buildings Synthetic

More information

Mount Vernon Elementary School Grades PK 5

Mount Vernon Elementary School Grades PK 5 Barbour County Schools Comprehensive Educational Facilities Plan 2010-2020 Mount Vernon Elementary School Grades PK 5 Blackwood Associates, Inc. / MSES consultants, Inc. / Roy Blizzard and Associates Mount

More information

Revised Central Scheme 1 Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 100% Three Story Academic Additi

Revised Central Scheme 1 Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 100% Three Story Academic Additi Original Central Scheme 1 Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 75% Three Story Academic Addition with CTE Gymnasium Addition: Multi-court gym 3 courts

More information

LOVEJOY Independent School District

LOVEJOY Independent School District Long-Range Facilities Planning Projected Bond Sale Project Series 2014 Series 2018 Series 2023 Total (2013 Cost) (with 6% Yearly Inflation) 1. Hart Elementary $ 6,716,424 $ 6,168,802 $ 1,200,121 $ - $

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope

More information

Crockett Elementary School Renovations

Crockett Elementary School Renovations We are your future. We are EPISD. August 7, 07 August 9, 07 Existing Conditions August 9, 07 Existing Conditions SITE PLAN 7 7 7 EXISTING DROP-OFF AREA CREATES CONGESTION AND BUS DROP-OFF IS NOT DEFINED.

More information

FAC 1 PROJECT DESIGN AND CONSTRUCTION PART E EXHIBITS

FAC 1 PROJECT DESIGN AND CONSTRUCTION PART E EXHIBITS FAC 1 PROJECT DESIGN AND CONSTRUCTION PART E EXHIBITS HDHQ FAC-1 PROJECT DESIGN & CONSTRUCTION - EXHIBITS 1 of 18 EXHIBIT DRAWINGS & SELECTED ILLUSTRATIONS HDHQ FAC-1 PROJECT DESIGN & CONSTRUCTION - EXHIBITS

More information

JASPER SHARED SCHOOL FACILITY

JASPER SHARED SCHOOL FACILITY JASPER SHARED SCHOOL FACILITY A BRIDGING PERSPECTIVE Robert Rabinovitch M.Arch., Architect, AAA, SAA, MRAIC History Jasper Junior / Senior High School Originally constructed in 1952 with additions in 1958,

More information

Completed projects. Projects in progress. Program developments

Completed projects. Projects in progress. Program developments 1 Completed projects Projects in progress Program developments 2 Relocation of District administrative offices Interim housing (classrooms and PE facilities) at Cupertino and Lawson Middle Schools Site

More information

PROPOSED PLAN DEVELOPMENT 2501 WEST HOMER STREET. Guardian Properties, LLC. September 9, 2015

PROPOSED PLAN DEVELOPMENT 2501 WEST HOMER STREET. Guardian Properties, LLC. September 9, 2015 PROPOSED PLAN DEVELOPMENT 2501 WEST HOMER STREET Guardian Properties, LLC September 9, 2015 2501 W Homer Zoning Map Scale: 1:080 Project Site 2501 W Homer Aerial Scale: 1:048 Project Site 2501 W Homer

More information

RE: Letter of Intent Land Use Application for Plan Commission and UDC Initial/ Final Approval Request

RE: Letter of Intent Land Use Application for Plan Commission and UDC Initial/ Final Approval Request TO: City of Madison Planning Division 126 S. Hamilton Street Madison, WI 53701 Jessica Vaughn Department of Planning & Development City of Madison 126 S. Hamilton Street Madison, WI 53701 RE: Letter of

More information

MONTGOMERY COUNTY PUBLIC SCHOOLS BETHESDA-CHEVY CHASE MIDDLE SCHOOL #2 SAMAHA ASSOCIATES, PC

MONTGOMERY COUNTY PUBLIC SCHOOLS BETHESDA-CHEVY CHASE MIDDLE SCHOOL #2 SAMAHA ASSOCIATES, PC FEASIBILITY STUDY ELEMENTS SITE DESIGN 13.38 Acre site Location of building Location of bus loading (20 max) Location of staff parking (125 max) Location of playfields Location of tennis courts (6 max)

More information

Easthampton High School Building Project. Public Information Forum #3

Easthampton High School Building Project. Public Information Forum #3 Building Project Public Information Forum #3 May 4, 2010 CAOLO & BIENIEK ASSOCIATES, INC. Architecture Planning Interior Design Presentation Agenda Introduction - Michael Buehrle, Chair EHS Building Committee

More information

Landscape elements will be completed between now and Spring Break by UCO Contractor should have resolved parking lot lighting issues

Landscape elements will be completed between now and Spring Break by UCO Contractor should have resolved parking lot lighting issues February 24, 2017 CAPITAL PROJECT AND PLANNING UPDATE OLD NORTH Phase III and West Campus Entry: Three major components: Bid Set I and II (Interiors) Start Date: Aug. 2014 Completion: Feb. 2017 Size: 41,803

More information

SACRAMENTO CITY UNIFIED SCHOOL DISTRICT Sustainable Facilities Master Plan

SACRAMENTO CITY UNIFIED SCHOOL DISTRICT Sustainable Facilities Master Plan Albert Einstein Albert Einstein Campus Entry Student Centered Education School Mission Statement EXORE, DISCOVER, CREATE Mirandy Drive Site Plan of Campus Narrative Summary The site is just over 20.5 acres

More information

LETTER OF INTENT Steamfitters Local 601 Training Facility March 23 rd, 2016

LETTER OF INTENT Steamfitters Local 601 Training Facility March 23 rd, 2016 LETTER OF INTENT Steamfitters Local 601 Training Facility To: Re: City of Madison Planning Department and Plan Commission 215 Martin Luther King Jr. Blvd. LL110 Madison, WI 53703 Major Amendment to Approved

More information

PROJECT INFORMATION REPORT INFORMATION. Date: February 25, Owner s Rep: Alrich Lynch. 123 Project Address Drive, Savannah GA 31404

PROJECT INFORMATION REPORT INFORMATION. Date: February 25, Owner s Rep: Alrich Lynch. 123 Project Address Drive, Savannah GA 31404 LDG Consulting Providing Orientation, Direction, and Execution to the Design, Construction, and Real Estate Industries REPORT INFORMATION Date: February 25, 2015 Owner s Rep: Alrich Lynch Electronic Copy:

More information

Case Study: Element PROJECT DESCRIPTION

Case Study: Element PROJECT DESCRIPTION Case Study: Element PROJECT DESCRIPTION Project type: Project gross SF: Number of keys: Location: Hotel (Hospitality), extended-stay prototype Varies, prototypical SF: 79,035 SF gross Varies, prototypical:

More information

ECOLE NATIONAL MIXTE DE DESSOURSES de LEOGANE SCHOOL PROPOSAL

ECOLE NATIONAL MIXTE DE DESSOURSES de LEOGANE SCHOOL PROPOSAL ECOLE NATIONAL MIXTE DE DESSOURSES de LEOGANE SCHOOL PROPOSAL Country: Location: Sponsor: Haiti Léogâne Area Cruz Roja Española [Spanish Red Cross] Design Firm: Schools for the Children of the World School

More information

SECTION ALTERNATES

SECTION ALTERNATES SECTION 01 23 00 - ALTERNATES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

6502 MILWAUKEE STREET

6502 MILWAUKEE STREET LOCATION MAP PROJECT SITE NEIGHBORING CONTEXT NEIGHBORING CONTEXT PROJECT SITE PROJECT SITE PROJECT DESCRIPTION: The site is currently zoned PD as part of the Metrotech Neighborhood (2002). Originally

More information

Introduction. Massing and Overall Form. Catalina. Catalina is a 111 lot, single-family home community by Costain Arizona, Inc.

Introduction. Massing and Overall Form. Catalina. Catalina is a 111 lot, single-family home community by Costain Arizona, Inc. Introduction Catalina is a 111 lot, single-family home community by Costain Arizona, Inc. Massing and Overall Form This neighborhood comprises single-story, asymmetrical plan homes with asymmetrical facades.

More information

SCHOOL BASED ASSESSMENT RESULTS - QUESTION RESPONSES

SCHOOL BASED ASSESSMENT RESULTS - QUESTION RESPONSES SCHOOL BASED ASSESSMENT RESULTS QUESTION RESPONSES ANDREW JACKSON MIDDLE APOLLO ASTRONAUT SENIOR HIGH ATLANTIS AUDUBON BAYSIDE SENIOR HIGH CAMBRIDGE CAPE VIEW CENTRAL MIDDLE CHALLENGER 7 CHRISTA MCAULIFFE

More information

University of Colorado Design Review Board Meeting Notes

University of Colorado Design Review Board Meeting Notes University of Colorado Design Review Board Meeting Notes Date: Thursday, October 13, 2016 Time: 10:00 a.m. 2:00 p.m. Location: First Floor Conference Room, 1800 Grant Street, Denver, Colorado DRB members

More information

CAMBRIDGE PUBLIC LIBRARY

CAMBRIDGE PUBLIC LIBRARY PROJECT Cambridge, MA SIZE Total: 103,900 sqft Addition: 76,700 sqft Renovation: 27,200 sqft CLIENT City of Cambridge ARCHITECT WILLIAM RAWN ASSOCIATES ASSOCIATE ARCHITECT ANN BEHA ARCHITECTS LANDSCAPE

More information

SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION

SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION CITY OF GENEVA, NEW YORK The purpose of the site plan and architectural review process is to secure compliance with the City s Zoning Ordinance and to promote

More information

CITY OF NOVI. Police Department

CITY OF NOVI. Police Department CITY OF NOVI Police Department Indoor Gun Range and Training Facility Assessment Analysis with Master Plan for Novi Police Department at Community Build Out Field Services Complex Facility Needs Master

More information

Creative Performing Media Arts Middle School

Creative Performing Media Arts Middle School Dawne St Kilkee St Enelra Pl Creative Performing Media Arts Middle School 5050 Conrad Ave. San Diego, CA 92117 Sub-district: A Cluster: Madison Year School Opened: 2002 Grades: 6-8 Arlene Pl 3 2 Conrad

More information

DAT MEETING NOTES # 3

DAT MEETING NOTES # 3 DAT MEETING NOTES # 3 MOA ARCHITECTURE Design Advisory Team 821 17 th Street, Suite 400 Denver, Colorado 80202 303.308.1190 Phone 303.308.1197 Fax Project: Superior Elementary School Date: 16 December

More information

Certificate of Appropriateness Monthly Issuance Report

Certificate of Appropriateness Monthly Issuance Report Certificate of Appropriateness Monthly Issuance Report January 2008 Historic Preservation Office COA Report January 2008 Date 1/3/2008 3000 E. 7th St., Long Beach, CA 90804 Castle Croydon 1/7/2008 953

More information

Facility Improvements

Facility Improvements CA-SI-01 ACCESSIBLE PARKING STALL ADDITIONS CA-SI-07 BASEBALL & SOFTBALL INFIELD IMPROVEMENTS Additional parking stalls and signage needed for disabled individuals and to meet ADA requirements. Installation

More information

SITE AND HOME DESIGN AND CONSTRUCTION GUIDELINES

SITE AND HOME DESIGN AND CONSTRUCTION GUIDELINES SITE AND HOME DESIGN AND CONSTRUCTION GUIDELINES FOR ARCHITECTURAL REVIEW BOARD (ARB) Completed for Phases 1, 3.2 and 4. Additional Phases will be added as developed. April 13, 2012 GALLATIN, TENNESSEE

More information

04/05/2014. Introductions. Agenda. Heritage Adaptive Reuse: A Catalyst for Revitalization

04/05/2014. Introductions. Agenda. Heritage Adaptive Reuse: A Catalyst for Revitalization Heritage Adaptive Reuse: A Catalyst for Revitalization Susan Spencer Lewin, OAA, CS&P Architects Scott Weir, OAA, ERA Architects Introductions Susan Spencer Lewin, CS&P Architects Scott Weir, ERA Architects

More information

denver, colorado Client Scope First Patient Cost Architecture: Interior Design: Denver Health and hospital authority 212,000 s.f.

denver, colorado Client Scope First Patient Cost Architecture: Interior Design: Denver Health and hospital authority 212,000 s.f. Project Information Client Denver Health and Hospital Authority Scope 212,000 s.f. First Patient August 2006 Cost $58 million Architecture: Boulder Associates and Gresham Smith and Partners Interior Design:

More information

Facilities Construction

Facilities Construction NORTHSIDE INDEPENDENT SCHOOL DISTRICT Facilities Construction January 2017 Leroy San Miguel ASSIST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta EXECUTIVE DIRECTOR CONSTRUCTION & ENGINEERING

More information

AVID Intelligent Home Plans

AVID Intelligent Home Plans Home Builder Rental Equipment Landscaping, Sprinklers Gutters & Downspouts Insulation, Rough electrical, lighting, appliances Engineered lumber, Joist Trusses, Sheathing Plywood, Lumber Roofing, siding,

More information

Exhibit A Declaration of Restrictions Development and Design Standards For Ridge Park Estates

Exhibit A Declaration of Restrictions Development and Design Standards For Ridge Park Estates Exhibit A Declaration of Restrictions Development and Design Standards For Ridge Park Estates Spokane County, Washington For All Property Owners The following Development and Design Standards shall be

More information

Canal Winchester. Town Hall 10 North High Street Canal Winchester, OH Meeting Minutes. Monday, November 13, :00 PM

Canal Winchester. Town Hall 10 North High Street Canal Winchester, OH Meeting Minutes. Monday, November 13, :00 PM Canal Winchester Town Hall 10 North High Street Canal Winchester, OH 43110 Meeting Minutes Monday, November 13, 2017 7:00 PM Planning and Zoning Commission Bill Christensen Chairman Michael Vasko Vice

More information

Forney Fire Station No. 2

Forney Fire Station No. 2 Forney Fire Station No. DUNHILL F M 548 FAIRFIELD DIAMOND CREEK VISTA RIDGE HAVENROCK DON T-CATES GATEWWAY REEDER LOST MAPLES REEDER Legend For location reference purposes only City Limits 60'-0" R.O.W.

More information

223 QUAKER ROAD. 7:30 AM - 8:30 AM Breakfast & Networking 8:30 AM - 10:00 AM All Star Panelists 10:00 AM - 10:30 AM Post Panel Networking

223 QUAKER ROAD. 7:30 AM - 8:30 AM Breakfast & Networking 8:30 AM - 10:00 AM All Star Panelists 10:00 AM - 10:30 AM Post Panel Networking PHARMACEUTICAL R&D, MANUFACTURING, & WAREHOUSE FACILITY FOR SALE AGENDA TIME ACTIVITY 7:30 AM - 8:30 AM Breakfast & Networking 8:30 AM - 10:00 AM All Star Panelists 10:00 AM - 10:30 AM Post Panel Networking

More information

Architectural Guidelines

Architectural Guidelines Architectural Guidelines 1 Table of Contents General Information Page 3 Building Architectural Design Requirements Page 3 Landscape Architectural Design Requirements Page 4 Submission Requirements Page

More information

BOWIE LEARNING CENTER

BOWIE LEARNING CENTER BOWIE LEARNING CENTER Bowie Learning Center BUILDING DATA BOWIE LEARNING CENTER 900 North Elm St., Weatherford, TX 76086 Year Built 1936 No. of Buildings No. of Portables 0 Approx. Total Square Footage

More information

Facilities Construction

Facilities Construction NORTHSIDE INDEPENDENT SCHOOL DISTRICT Facilities Construction December 2017 Leroy San Miguel ASST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta EXECUTIVE DIRECTOR OF CONSTRUCTION & ENGINEERING

More information

Conceptual Plan Study for Bryant Elementary School. 240 Student Classroom Addition. March 27, Prepared for: Seattle Public Schools.

Conceptual Plan Study for Bryant Elementary School. 240 Student Classroom Addition. March 27, Prepared for: Seattle Public Schools. Conceptual Plan Study for Bryant Elementary School 240 Student Classroom Addition March 27, 2013 Prepared for: Seattle Public Schools By: HARTHORNE HAGEN ARCHITECTS 1725 8th Avenue N Seattle, WA 98109

More information

THE NEW MIDDLE SCHOOL AIKEN COUNTY PUBLIC SCHOOLS

THE NEW MIDDLE SCHOOL AIKEN COUNTY PUBLIC SCHOOLS THE NEW L E AV E L L E M C C A M P B E L L MIDDLE SCHOOL AIKEN COUNTY PUBLIC SCHOOLS S C H E M AT I C D E S I G N S U B M I T TA L SCHEMATIC DESIGN SUBMITTAL TABLE OF CONTENTS: DESIGN STATEMENT PAGE 1

More information

One That is Already Built.

One That is Already Built. Montgomery County Planning Board 2009 Growing Smarter Speaker Series Thursday, February 12 th, 2009 Green Building: Today s Practices Tomorrow s Challenges Carl Elefante, FAIA, LEED AP Principal Director

More information

Penns Valley Area School District

Penns Valley Area School District Penns Valley Area School District Table of Contents District Overview... Tab 1/Page 1 Educational Program Overview... Tab 2/Page 3 Existing Conditions Analysis... Tab 3/Page 7 Enrollment Report... Tab

More information

BULLARD STREET HEYWOOD AVENUE 40' PUBLIC R/W 40' PUBLIC R/W MARKED CROSSWALK FUTURE B.O.C. LANDSCAPE SCREENING (USDG U-03 RESIDENTIAL WIDE)

BULLARD STREET HEYWOOD AVENUE 40' PUBLIC R/W 40' PUBLIC R/W MARKED CROSSWALK FUTURE B.O.C. LANDSCAPE SCREENING (USDG U-03 RESIDENTIAL WIDE) DEVELOPMENT STANDARDS A. General Provisions 1. These Development Standards form a part of the Rezoning Plan associated with the Rezoning Petition filed by CapRock, LLC ( Petitioner ) to accommodate the

More information

HOLDER CONSTRUCTION COMPANY Superintendents Weekly Activity Report #92 Douthit Hills Student Community, Clemson University Project Joe Jett

HOLDER CONSTRUCTION COMPANY Superintendents Weekly Activity Report #92 Douthit Hills Student Community, Clemson University Project Joe Jett SAFETY» Total Man Hours Worked This Week: 19935» Total Man Hours on Project: 689727» Crafts On Project This Week: 24» OSHA Recordable Rate: 0 November 13, 2016 Page 1 CURRENT CONSTRUCTION ACTIVITIES East

More information

GREEN PASTURES - RESIDENTIAL ARCHITECTURAL REVIEW GUIDELINES

GREEN PASTURES - RESIDENTIAL ARCHITECTURAL REVIEW GUIDELINES GREEN PASTURES - RESIDENTIAL ARCHITECTURAL REVIEW GUIDELINES Guideline Areas Traditional Guidelines All homes on Palm Drive, Eagle Court, Emmaus Road, Calvary Road, Wilderness Road, & Sparrow Road. Neighborhood

More information

SCHEDULE PALO ALTO HS MEETING SCHEDULE AND AGENDA

SCHEDULE PALO ALTO HS MEETING SCHEDULE AND AGENDA SCHEDULE PALO ALTO HS MEETING SCHEDULE AND AGENDA 25 August 2009 All meetings are at 3:15 p.m. unless otherwise noted. Meeting dates are scheduled in advance and dates without agendas may or may not be

More information

BROADWAY TOWER 1455 SW BROADWAY, PORTLAND PROJECT OVERVIEW. Kevin Joshi Senior Vice President, Partner

BROADWAY TOWER 1455 SW BROADWAY, PORTLAND PROJECT OVERVIEW. Kevin Joshi Senior Vice President, Partner PROJECT OVERVIEW BROADWAY 1455 SW BROADWAY, PORTLAND Owned/Developed by Exclusively Represented by Kevin Joshi Senior Vice President, Partner 503.221.2282 kjoshi@kiddermathews.com Josh Schweitz Senior

More information

COOLIDGE SENIOR HIGH SCHOOL

COOLIDGE SENIOR HIGH SCHOOL INITIAL YEAR BUILT 1940 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1240 ENROLLMENT 2008 652 WARD 4 PROPOSED PROGRAM CAPACITY 1100 Site Plan COOLIDGE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Operational Services Facility Innovation & Readiness Stakeholder Team

Operational Services Facility Innovation & Readiness Stakeholder Team Operational Services Facility Innovation & Readiness Stakeholder Team A great place for kids to learn. A great place for employees to work. A place our community can be proud of. 21 st Century School District!

More information

2 Main School Building BLDG-124A Building Purpose Building Area Administrative, Classrooms, Cafeteria and Gymnasium 61,905 SF Inspection Date June 28-

2 Main School Building BLDG-124A Building Purpose Building Area Administrative, Classrooms, Cafeteria and Gymnasium 61,905 SF Inspection Date June 28- 1 Metz Elementary School Site Summary Address 84 Robert Martinez Jr. Austin, TX 78702 Number of Permanent Campus Facilities 1 Original Year of Construction 1993 Total Campus Building Area (combined) 61,905

More information

Low-Hanging Fruit Simple Steps Toward Energy Effective Building Operations

Low-Hanging Fruit Simple Steps Toward Energy Effective Building Operations Low-Hanging Fruit Simple Steps Toward Energy Effective Building Operations Roger Ebbage Northwest Water / Energy Education Institute Lane Community College May 7-9 Enzian Inn - Leavenworth, Washington

More information

OUTLINE SPECIFICATIONS MATERIAL AND FINISH COMPONENTRY SPECS. ANDALUSIA NEW CONSTRUCTION+REHAB ITEM MANUFACTURER FINISH/COLOR LEED COMPLIANT 24 HR EMERGENCY CALL SWITCH NOT APPLICABLE NOT APPLICABLE NA

More information

Madison School District. Strategic Five-Year Facility Maintenance Plan

Madison School District. Strategic Five-Year Facility Maintenance Plan Madison School District Strategic Five-Year Facility Maintenance Plan 2016 2020 Dear Madison Stakeholder, Throughout the past twenty years, Madison School District has experienced tremendous growth. Since

More information

Retrofit of an Existing Californian Hospital to Immediate Occupancy Standards One Year Later Again R. Jay Love, S.E.

Retrofit of an Existing Californian Hospital to Immediate Occupancy Standards One Year Later Again R. Jay Love, S.E. Retrofit of an Existing Californian Hospital to Immediate Occupancy Standards One Year Later Again R. Jay Love, S.E. Degenkolb Engineers MCEER 2006 Annual Meeting Diagnostic & Treatment Building Designed

More information

CITY OF WINTER PARK SETBACK/COVERAGE WORKSHEET GUIDE FOR SINGLE FAMILY ZONING

CITY OF WINTER PARK SETBACK/COVERAGE WORKSHEET GUIDE FOR SINGLE FAMILY ZONING CITY OF WINTER PARK SETBACK/COVERAGE WORKSHEET GUIDE FOR SINGLE FAMILY ZONING See Setback/Coverage Worksheet & Criteria: Pages 1-4 & Accessory Structure Guide Step 1 Step 2 Step 3 Step 4 Step 5 Step 6

More information

Thesis Proposal. Nasser Marafi. Center & Facility Service Building. St. Joseph Hospital of Orange Patient Care. Proposal

Thesis Proposal. Nasser Marafi. Center & Facility Service Building. St. Joseph Hospital of Orange Patient Care. Proposal St. Joseph Hospital of Orange Patient Care Center & Facility Service Building Proposal Professor Andres Lepage STRUCTURAL OPTION December 17th 2007 Executive Summary Thesis Proposal During the upcoming

More information

MANHATTAN COLLEGE STUDENT COMMONS

MANHATTAN COLLEGE STUDENT COMMONS MANHATTAN COLLEGE STUDENT COMMONS BUDGET CHECK USING GILBANE S COSTADVISOR MODEL OCTOBER 29, 2010 Introduction: Gilbane developed this CostAdvisor Model of the proposed new Manhattan College Student Commons

More information

Highland Park. Exceptional Interiors (cont.) Green Technology. Designer Kitchen Features. Distinctive Exterior Features

Highland Park.  Exceptional Interiors (cont.) Green Technology. Designer Kitchen Features. Distinctive Exterior Features unit 2 HOMES 650 Mill Valley Parkway 2332 Sq.Ft. 3-Car 4/3 $542,800 6 Mt. Shasta Views 643 Mill Valley Parkway 2332 Sq.Ft. 3-Car 4/3 $552,800 8 Mt. Shasta Views Under construction 945 Rollingview Raised

More information

Family Health Centers - Estero

Family Health Centers - Estero 19701 South Tamiami Trail, 33908 Table of Contents Cover Sheet Site Photos Architectural Elevations - West & East Architectural Elevations - North & South Labeled Architectural Elevation Architectural

More information

ARCHITECTURE IMPROVEMENT APPLICATION

ARCHITECTURE IMPROVEMENT APPLICATION ST. FRANCIS COURT HOMEOWNERS ASSOCIATION ARCHITECTURE IMPROVEMENT APPLICATION Return two completed applications to: Curtis Management Company 5050 Avenida Encinas Suite 160 Carlsbad, CA 92008 Robert Walsh,

More information

SUSTAINABLE DEVELOPMENT CEB RPI The Challenges of Urban Development

SUSTAINABLE DEVELOPMENT CEB RPI The Challenges of Urban Development SUSTAINABLE DEVELOPMENT CEB RPI The Challenges of Urban Development Sheri Bonstelle Jeffer, Mangels, Butler & Marmaro, LLP October 5, 2007 SUSTAINABLE DEVELOPMENT DEFINITIONS Sustainable Development is

More information

ADEC S SUSTAINABLE FUTURE SCHOOLS PROGRAM

ADEC S SUSTAINABLE FUTURE SCHOOLS PROGRAM APRIL 2012 ADEC S SUSTAINABLE FUTURE SCHOOLS PROGRAM Abu Dhabi Education Council Infrastructure and Facilities Division Jyoti Sharma, Senior Architect, Design Section WHY SUSTAINABILITY IS IMPORTANT UAE

More information

CINCINNATI UNION TERMINAL

CINCINNATI UNION TERMINAL CINCINNATI UNION TERMINAL AGENDA CUT History & Context Defining the Problem & Crafting a Plan Delivering the Promise 1930 Cincinnati Context of Train Stations C&O Fourth Street Station Central Union Depot,

More information

Please find attached a copy of our Traffic Memo for the proposed dental clinic at 3012 St. Joseph Blvd.

Please find attached a copy of our Traffic Memo for the proposed dental clinic at 3012 St. Joseph Blvd. April 5, 203 Drs. George Barlas, Marc Beaupre, John Kokkinakis, Pierre Maranger Place D Orleans Dental Office 0 Place D Orleans Drive Orleans, Ontario KC 2L9 Dear Dr. Barlas, Dr. Beaupre, Dr. Kokkinakis,

More information

ALL STEEL SHED FRAMES

ALL STEEL SHED FRAMES ALL STEEL SHED FRAMES ABOVE DISPLAY IS AN 8X8 PORTABLE STEEL SHED FRAME WITH FLOOR STRUTS ON 2 FT CENTER SPACING USING QUICK BUILD CONNECTORS - 3 DOOR IS PLACED IN SHORT WALL (configuration of steel may

More information

Baffled Openings at Chain Link Fencing: Design shall consist of two end-posts set 4 feet apart, and a 10 foot wide chain-link fence panel equal in height as the adjacent fence. Chain link fence panel shall

More information

Expedited Local Partnership Program (ELPP)

Expedited Local Partnership Program (ELPP) Building Information - Fairview Park City (43976) - Gilles-Sweet Elementary Program Type Setting Assessment Name Expedited Local Partnership Program (ELPP) Suburban Gilles-Sweet Elementary Assessment Date

More information

National Inventory of DepEd Public School Buildings Orientation

National Inventory of DepEd Public School Buildings Orientation National Inventory of DepEd Public School Buildings Orientation 1 Rationale Classrooms are built. Schools submit enrolment and inventory data in the EBEIS. Classroom allocation is formulated. Getting the

More information

CITY OF ORANGE BUILDING DIVISION 2016 Green Building Code Requirements For Residential Construction

CITY OF ORANGE BUILDING DIVISION 2016 Green Building Code Requirements For Residential Construction CITY OF ORANGE BUILDING DIVISION 2016 Green Building Code Requirements For Residential Construction In order to facilitate sustainable construction practices, all new projects* must comply with the State

More information

The courthouse exterior. Courtesy of NLA/HLM Architects. United States. Courthouse Sacramento, Robert D. McCartney, S.E.

The courthouse exterior. Courtesy of NLA/HLM Architects. United States. Courthouse Sacramento, Robert D. McCartney, S.E. The courthouse exterior. Courtesy of NLA/HLM Architects. United States Courthouse Sacramento, Robert D. McCartney, S.E. CA Modern Steel Construction / November 2001 Public entrances to courtrooms occur

More information

ENERGY EFFICIENT RETROFIT OF A HIGH-RISE MULTIFAMILY BUILDING

ENERGY EFFICIENT RETROFIT OF A HIGH-RISE MULTIFAMILY BUILDING ENERGY EFFICIENT RETROFIT OF A HIGH-RISE MULTIFAMILY BUILDING Brittany Hanam 1, Lorne Ricketts 2, Andrew Pape-Salmon 3 ABSTRACT The National Institute of Building Sciences estimates that over 70% of the

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

ACHIEVING HIGH-PERFORMANCE MULTI-UNIT RESIDENTIAL BUILDINGS: THE OPPORTUNITIES

ACHIEVING HIGH-PERFORMANCE MULTI-UNIT RESIDENTIAL BUILDINGS: THE OPPORTUNITIES ACHIEVING HIGH-PERFORMANCE MULTI-UNIT RESIDENTIAL BUILDINGS: THE OPPORTUNITIES CHALLENGES OF MURB PERFORMANCE Energy intensity of multi-unit residential buildings (MURBs) has been marginally increasing

More information

BoardDocs Pro http://www.boarddocs.com/fla/leon/board.nsf/public 1 of 2 3/9/2015 12:39 PM Agenda Item Details Meeting Mar 10, 2015 - Business Meeting Category Subject Type Budget Source 18. Items for Consideration

More information

CANNING WAREHOUSE CANNERY DISTRICT BOZEMAN, MT

CANNING WAREHOUSE CANNERY DISTRICT BOZEMAN, MT CANNING WAREHOUSE CANNERY DISTRICT BOZEMAN, MT DESIGN DEVELOPMENT CQ + MA 100% DD Set 04-28-2015 Canning Warehouse CQ + MA 04-28-2015 Canning Warehouse EXISTING CONDITIONS CQ + MA 04-28-2015 Canning Warehouse

More information

Laker Hall Program Study Intercollegiate Athletics. Preferred Concept & Project Phasing SUCF Project No

Laker Hall Program Study Intercollegiate Athletics. Preferred Concept & Project Phasing SUCF Project No Laker Hall Program Study Intercollegiate Athletics Preferred Concept & Project Phasing SUCF Project No. 101009 26 January 2017 Agenda Preferred Concept - Existing Site Plan - Existing Floor Plans - Space

More information

INSPIRE each student to develop a strong

INSPIRE each student to develop a strong DEL PASO MANOR ELEMENTARY SCHOOL Valuing a culturally and academically DIVERSE COMMUNITY, Del Paso Manor Elementary School s Mission is to EDUCATE and INSPIRE each student to develop a strong A C A D E

More information

North Carolina Public Schools Facility Survey and Recommendations Report for Duplin County Schools

North Carolina Public Schools Facility Survey and Recommendations Report for Duplin County Schools North Carolina Public Schools Facility Survey and Recommendations Report for Duplin County Schools Duplin, North Carolina October 2011 School Planning Mail address: 6319 Mail Service Center School Planning,

More information

88.2% 32% 23% WEITZ LABORATORY GOLD. PROJECT HIGHLIGHTS LEED Facts. of on-site generated construction waste was diverted from landfills.

88.2% 32% 23% WEITZ LABORATORY GOLD. PROJECT HIGHLIGHTS LEED Facts. of on-site generated construction waste was diverted from landfills. WEITZ LABORATORY GORDON MCKAY LABS BUILDING, 9 OXFORD STREET, CAMBRIDGE, MA 02138 LEED-CIV3.0 GOLD The Gordon McKay Laboratory of Applied Science (McKay) building, occupied and operated by the School of

More information

Architectural Commission Report

Architectural Commission Report City of Beverly Hills Planning Division 455 N. Rexford Drive Beverly Hills, CA 90210 TEL. (310) 285-1141 FAX. (310) 858-5966 Architectural Commission Report Meeting Date: Wednesday, March 15, 2017 Subject:

More information