1 O U T L I N E S P E C I F I C A T I O N S DATE: March 29 th, 2017 PREPARED FOR: Industrial Property Trust 4675 MacArthur Court, Suite 625 Newport Beach, CA (949) KG Investment Properties SE 6 th Street, Suite 215 Bellevue, WA (425) PREPARED BY: Contact: Tyler Lyons or Kathy Craft-Reich 2505 Third Avenue, Suite 324 Seattle, WA (206)

2 PART 1 CRITERIA 1.1 BUILDING SIZE A. Per plans 1.2 SITE A. Per plans 1.3 BUILDING DIMENSIONS A. Per plans 1.4 DOCK HEIGHT A. 48-inch standard dock height 1.5 OCCUPANCY A. Office (B) B. Warehouse (S-1) 1.6 CLEAR HEIGHT A. Building A 32 clear minimum from the 1 st column plus 6 in from the speed bays B. Building B 36 clear minimum from the 1 st column plus 6 in from the speed bays 1.7 WALL HEIGHT A. Building A Approximately 36 high along the dock sides and 40 high at the ends of building B. Building B Approximately 40 high along the dock sides and 44 high at the ends of building 1.8 BAY SPACING A. Building A Per plans B. Building B Per plans 1.9 PARKING A. Per city requirement. See plans 1.10 CONSTRUCTION TYPE A. Concrete tilt-up walls, steel truss hybrid roof structure with wood deck (Type III-B construction) 1.11 SIGNAGE A. Handicap sign per code and regulations B. Fire Department signs per code and regulations C. Building address per City s standards D. Provide minimum address numbers at all speculative office locations PART 2 SITE 2.1 GRADING- A. Import or export dirt, as necessary, to build dock high pad. Export of material is included within an allowance. B. Subgrade to be re-compacted, non-expansive native material C. Erosion control and SWPPS to be included. Site to drain

3 2.2 PAVING A. Minimum 4" thick standard concrete sidewalks per the geotechnical report to be provided for pedestrian/ada circulation B. Cast-in-place concrete curb shall be provided, including integral gutter section where required for proper drainage C. Cast-in-place or tilt-up concrete retaining walls to be provided as required to create truck ramps D. Truck aprons adjacent to all elevated truck docks consisting of minimum 6 thick, 3,000 psi, non-reinforced concrete with 3/4 diameter smooth dowels 12 o.c. at construction joints extending 60 feet from the face of the building- Aprons will be 6 with fiber mesh reinforcement ( #1 per yard). E. The required asphalt paving sections will be traffic index 5-3 paving over 3 base for cars and traffic index paving over 6 base for truck areas. (To be verified by soils report) Asphalt sections included per the soils report. Sections will incorporate CTB and a leveling course. F. Entire truck yard to be concrete - consisting of 6 thick, 3,000 psi non-reinforced concrete with 3/4 diameter, 18 long smooth dowels at 12 o.c. at construction joints for the entire truck yard. See Item D. G. Provide 6 high curbs in car parking and 12 high curb in truck yard H. ADA parking stalls are to be concrete 2.3 FENCING A. Truck yards to be secured with a 6-foot high fence. The drive aisle gate to be manual and open to truck yard side. Conduit to be stubbed to ramp side for future motorized gate controller. Provide alternate for wrought iron. Conduit to be provided for future guard shack. 2.4 UTILITIES: A. Sewer service: 6 lateral B. Water service: 2 meter set with 2 ½ line to building C. Irrigation meter. 1 ½ meter set with 2 line D. Telephone service. 2-4 stub E. Electric power. See electrical section F. Provide 6-inch, 48-inch-high concrete filled bollards to protect sprinkler risers, PIV's, fire hydrants, interior roof drains, and exterior stairs and ramp walls within the truck yard G. Provide fire main service(s) loop and double detectors as required per code and ESFR sprinkler system 2.5 LANDSCAPING A. The landscaped area will meet minimum city requirements and will have automatic sprinklers. Improvements for indigenous landscaping with low water consumption and automatic irrigation system shall be provided in conformance with municipal requirements, specific plan and conceptual landscaping plan 2.6 DOORS A. 9-0 x 10 truck doors with vision windows, manual vertical lift, sectional, 24 gauge min. standard grade. Provide one vision window, door jamb protection, and wind seal. Provide minimum 5-foothigh galvanized 3/16 bent metal plate at each side of all dock doors. Provide z guard door track protection at each door. Conform to local wind load requirements B. 12 x14 high drive-in truck doors, sectional, 24 gauge min. standard grade. Provide bollards on the inside and outside of each jamb and 5-foot-high galvanized 3/16 bent metal plate at each side of door. Provide 6 concrete filled bollard on each side of the door jamb. Conform to local wind load requirements

4 C. Code required hollow metal exterior exit/fire Department access doors for high pile storage at 100 feet max spacing. If a variance is required, local fire authority needs to give approval D. Exterior hollow metal doors will include key cylinder and locking hardware at tenant office areas and truck docks. Exterior hardware at balance of exit doors to include lock guard Hardware to meet city and state regulations for exiting and fire/life safety. All locks shall be keyed to allow one master key. Final keying shall be provided at the completion of the project 2.7 GLASS AND GLAZING A. Provide 1 insulated glazed medium performance glass anodized aluminum storefront system designed to withstand wind load per City's requirement 2.8 SKYLIGHTS/SMOKE HATCHES A. Skylights are provided per the project documents. 2.9 ROOFING A. Class A, 60 mil TPO mechanically fastened roof system with twenty-year, no dollar limit warranty and two-year labor guarantee. Design to comply with FM I-90 requirements. B. Provide one interior and roof access hatch metal ladder to meet OSHA requirement 2.10 ROOF STRUCTURE A. Building A - 50 or 40 by 52 typical bay spacing (60 feet at staging area) B. Building B 50 by 56 typical bay spacing (65 feet at staging area) C. Panelized roof system D. Open web steel truss joist and girders with grey primer E. Plywood/OSB sheathing F. Roof structure to meet all current applicable codes for earthquake and wind loads. Where additional lateral support is required in addition to perimeter walls, this element shall be a tube steel chevron brace 2.11 ROOF DRAINAGE A. The warehouse roof will drain through exterior PVC downspouts with 24 gauge overflow scuppers B. Drainage system shall be designed per local jurisdiction s requirements C. Provide interior roof drains at office areas PART 3 FLOOR SLAB 3.1 WAREHOUSE SLAB A. 7 thick 4,000 psi. Concrete. Building A will have a 7 slab and Building B will have an 8 slab. B. Provide epoxy patch at floor slab. At tilt-up pin holes. C. Concrete pour strip at dock doors to be free and clear of all underground piping, conduits, etc. to allow for future recessed dock levelers (minimum 10 wide). All conduits, chases and venting will run a minium of 30 below F.F. D. Provide alternate for mm-80 joint filler at all joints in loading dock speed bays. See Alternates 3.2 SUBGRADE A. To be re-compacted native material. The compaction will be 95% for the top 12 inches of the pad. This is to be above and beyond the recommendation of the soils report

5 3.3 CURING A. Seven days wet curing. Where moisture sensitive flooring occurs, consult with architect for appropriate curing methods. Slab can be flooded if weather allows. Typically we install cure and seal or bond breaker. 3.4 JOINTS A. All construction joints are to have 1-inch dia., 18 long, smooth greased dowels at 24 inches on center. Closure joint will have rebar dowels per the Structural Engineer. Construction joint will utilize diamond dowels. 1. All control joints are to have 1-inch dia., 18 long, smooth dowels at 12 inches on center placed in dowel baskets. Control Joints at the perimeter of the building will have reinforcing if required by the Structural Engineer of Record. PNA dowel baskets will be used at all other control joints. 2. Joints to be spaced per ACI standards maximum 3x slab thickness. For 6 inch thick slab max 18 OC. (3 joints in 50 and 52 bays and 4 joints in 6 bay) P=15 OC max. 3.5 VAPOR BARRIER A. Vapor barrier is 15 mil Stego Wrap will be provided at the future office areas 3.6 FINISH A. Finish with smooth, dense hard trowel (burnished) finish B. Floor flatness numbers of not less than FF-50 specified overall value C. Floor levelness numbers not less than FL-35 specified overall value D. Level with laser screed 3.7 SEALER A. Seal concrete floors with one coat of spray-on sealer. Paul M. Wolff Floor Sure Seal sealer or Lapidolith or equal 3.8 FOUNDATION A. To be a minimum reinforced 2,500 psi concrete continuous footings 3.9 SIDEWALK A. Minimum 4 thick, 2,500 psi, over compacted grade as required by soils report, medium broom finish PART 4 MISCELLANEOUS 4.1 WAREHOUSE INSULATION A. Provide white scrim foil at underside of roof deck (hold foil back for joist hanger) 4.2 DOCK EQUIPMENT A. Provide 2 dock bumpers at each dock hi loading position B. Dock leveler packages T.B.D. 4.3 PAINTING A. The exterior concrete walls will have one coat of primer and one finish coat of paint. All exposed metals (except roof structure) to have primer. Exterior paint to be elastomeric. B. All exterior hollow metal doors and dock doors to have one coat exterior primer and two coats latex paint to match adjacent surface color. Pipe steel handrails, where provided, shall have two coats of latex paint C. Pipe bollard shall have two coats of enamel hazard yellow paint D. Provide alternate to paint interior columns/brace frame safety yellow paint at 10 H

6 PART 5 PLUMBING 5.1 WAREHOUSE A. Provide 6 sewer under floor slab to each potential future office area. Gravity sewer in these areas will go to a grinder pump and force main to discharge from the building. B. Provide 2 ½ water line stubbed to the building at main office area C. Gas future, provide conduit 5.2 OFFICE A. Future PART 6 HVAC 6.1 WAREHOUSE A. Provide minimum code air change 6.2 OFFICE A. Future PART 7 ELECTRICAL 7.1 ELECTRICAL A. One 4,000 amp, 277/480-volt, 3-phase, 4-wire underground pull section with one 400 amp house meter and panel. Provide future transformer pad only at opposite side. The manufacturer will be Square D or equal B. Site lighting: Provide one foot candle average per city requirements. Provide five foot candles at office entry. Uniformity ratio shall not exceed 4:1. Lighting type shall be metal halide. Light pole bases in truck yard to be on 48 high concrete bases. Light pole bases in automobile parking to be on 24 high concrete bases. Where possible, lights shall be mounted to the building. In no case shall lighting levels be lower than local jurisdictions permit. Sight lighting has been included as LED. C. Provide power for HVAC as well as telephone and irrigation receptacles D. Provide combination illuminated exit signs/emergency lights at all exterior man doors E. Provide conduit to all PIV's and double detector checks F. Stub conduit for future monument signs PART 8 FIRE PROTECTION 8.1 FIRE SPRINKLER A. A complete ESFR automatic fire prevention sprinkler system designed to provide protection in accordance with NFPA requirements and local jurisdiction regulations shall be provided B. Fire protection shall be designed per NFPA 13 and calculated per NFPA 231C for ESFR system. Temperature rating of fire sprinkler heads to be 212 degrees (F) C. Riser assemblies shall include mechanical alarm valves. System control valves shall either be riser mounted with wall post extensions or exterior post indicator valves as required by the local authority. All required devices for central station alarm system interface shall be provided D. Fire hoses, hose cabinets, and extinguishers, as required by code, for unoccupied shell construction E. Fire pump and pump house room located in the middle of each building.

7 PART 9 LEED F. Provide standpipes per Fire Department s conditions of approval 9.1 LEED A. Refer to LEED score card for identified LEED mandatory points and desired points B. Provide all related LEED documentation for LEED certification process 9.2 EXCLUDED A. Racking system B. Corporate identities signage END OF DOCUMENT

AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7

AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7 AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7 www.airwayscrossing.ca Excellent access to Barlow Trail/McKnight Blvd. Bays starting at 4,000 sq. ft. Surface loading T5 lighting

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

TRANSLINK LOGISTICS CENTRE

TRANSLINK LOGISTICS CENTRE TENANT SPECIFICATIONS IN TRANSLINK LOGISTICS CENTRE AT THE GLOBAL TRANSPORTATION HUB WAREHOUSE BUILDING 1B REGINA, SASKATCHEWAN October 30, 2013 2 SITE Municipal Address Site Area 12206 Ewing Avenue, Regina,

More information

TRANSLINK LOGISTICS CENTRE

TRANSLINK LOGISTICS CENTRE TENANT SPECIFICATIONS IN TRANSLINK LOGISTICS CENTRE AT THE GLOBAL TRANSPORTATION HUB WAREHOUSE BUILDING 2A REGINA, SASKATCHEWAN October 30, 2013 SITE Municipal Address Site Area 12202 Ewing Avenue, Regina,

More information

LogisticsCentre IV Distribution Center

LogisticsCentre IV Distribution Center KCI Intermodal BusinessCentre LogisticsCentre IV LogisticsCentre IV Distribution Center Modern Warehouse/Distribution Space Ranging From 108,000± SF to 432,000± SF 10221 NW Transcon Drive 112th Street

More information

PRELIMINARY OUTLINE SPECIFICATIONS for Neelytown Road, Montgomery, NY

PRELIMINARY OUTLINE SPECIFICATIONS for Neelytown Road, Montgomery, NY PRELIMINARY OUTLINE SPECIFICATIONS for Neelytown Road, Montgomery, NY The Project This outline specification prepared by Panattoni Construction Incorporated (Contractor), defines the preliminary and base

More information

Section X - Miscellaneous

Section X - Miscellaneous Section X - Miscellaneous A. Introduction This section provides design criteria, specific requests/recommendations and preferences related to specifying and constructing systems and materials used in HRSD

More information

Section 32 - Miscellaneous

Section 32 - Miscellaneous Section 32 - Miscellaneous A. Introduction This section provides design criteria, specific requests/recommendations and preferences related to specifying and constructing systems and materials used in

More information

201,500 SF ON ACRES

201,500 SF ON ACRES 201,500 SF ON 15.15 ACRES, LOT B, PA BUILD-TO-SUIT SITE WITH BUILDING RENDERING GREAT ACCESS TO I-81 & I-80! DIRECTIONS TO : Traveling North on I-81 - Take Exit 143 for Rt. 924 toward Hazleton. At the

More information

CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE 01. GENERAL ADMINISTRATION 3 % Project Administration 3%

CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE 01. GENERAL ADMINISTRATION 3 % Project Administration 3% CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE EXAM ID: I6 80 multiple-choice questions 3-1/2-hour time limit Open book 01. GENERAL ADMINISTRATION 3 % 0101. Project Administration 3% Verify that plans,

More information

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO. 2017-26R Stone Group Architects Project No. 1731 ADDENDUM DATE: September 14, 2017 BID DATE: September 18, 2017 2:00 P.M. C.S.T. SCOPE OF THIS ADDENDUM:

More information

Expanding Your Development & Investment Perspectives 159,000 SF Building Profile

Expanding Your Development & Investment Perspectives 159,000 SF Building Profile Expanding Your Development & Investment Perspectives 159,000 SF Building Profile Metal & EIFS Exterior Finish 150,000 SF Production/Warehouse 4,500 SF Office & 4,500 SF Mezzanine 50 x 50 Bays, 24 Clear

More information

RESIDENTIAL BUILDING PLAN REQUIREMENTS

RESIDENTIAL BUILDING PLAN REQUIREMENTS CITY OF MANSFIELD BUREAU OF BUILDING AND CODES 30 NORTH DIAMOND STREET 3RD FLOOR MANSFIELD, OHIO 44902 Phone (419) 755-9688 Fax (419) 755-9453 www.ci.mansfield.oh.us RESIDENTIAL BUILDING PLAN REQUIREMENTS

More information

Inspection of New One- and Two- Family Dwellings

Inspection of New One- and Two- Family Dwellings Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: permitservices@opkansas.org Inspection of New One- and Two- Family Dwellings Planning and Development

More information

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist This checklist is a convenient reference to the 2012 Michigan Building Code. The checklist

More information

260,000 SF Building Profile

260,000 SF Building Profile Expanding Your Development & Investment Perspectives 260,000 SF Building Profile Precast & Brick Exterior Finish 245,000 SF Production/Warehouse 7,500 SF Office & 7,500 SF Mezzanine 50 x 50 Bays, 24 Clear

More information

PART 5 WATER SYSTEMS

PART 5 WATER SYSTEMS PART 5 WATER SYSTEMS Abbreviations and Symbols Plan 501 Abbreviations and symbols for water... 205 Concrete Boxes and Hardware 502 27" Frame and cover... 207 503 38" Frame and cover... 209 505 Concrete

More information

Minimum Standards for Construction of Aircraft Hangars MINIMUM STANDARDS FOR CONSTRUCTION OF AIRCRAFT HANGARS

Minimum Standards for Construction of Aircraft Hangars MINIMUM STANDARDS FOR CONSTRUCTION OF AIRCRAFT HANGARS Minimum Standards for Construction of Aircraft Hangars ARTICLE 1. MINIMUM STANDARDS FOR CONSTRUCTION OF AIRCRAFT HANGARS Section 1. - Purpose Section 2. - Goals Section 3. General Provisions Section 4.

More information

A. Prepare formwork shop drawings using qualified professional engineer. Include detail of fabrication, assembly, and support of formwork.

A. Prepare formwork shop drawings using qualified professional engineer. Include detail of fabrication, assembly, and support of formwork. DIVISION 03 CONCRETE 03 0100 MAINTENANCE OF CONCRETE 03 0505 UNDER SLAB VAPOR BARRIER A. Sheet vapor retarder shall be polyethylene sheet, ASTM D 4397, 10 mils thick minimum. Consult with Facilities Management

More information

APPENDIX 1 PROJECT REQUIREMENTS

APPENDIX 1 PROJECT REQUIREMENTS APPENDIX 1 PROJECT REQUIREMENTS I) Scope of Work This section contains a general summary of the work the Contractor shall perform under this contract. If any conflict exists between the work described

More information

March 2018 Progress. Work Completed, Week Ending 3/23/18:

March 2018 Progress. Work Completed, Week Ending 3/23/18: March 2018 Progress Work Completed, Week Ending 3/23/18: Continued draft curtains and liner panels. Continued running power to hangar doors. Continued installation of bath accessories in the gang bathrooms.

More information

ADDENDUM 2 - JULY 14, 2015

ADDENDUM 2 - JULY 14, 2015 7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures

More information

MINIMUM SPECIFICATIONS

MINIMUM SPECIFICATIONS MINIMUM SPECIFICATIONS A) GREENHOUSE STRUCTURE: (EDUCATOR) 30 X 96 Galvanized Steel Frame Consisting of: A. Column Post: Allied 2 x 4 Rectangle 6 Spacing B. Bows: Allied 2 x 3 Rectangle 6 Spacing C. Trusses:

More information

&02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections & and &

&02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections & and & &01 GENERAL To be developed. All of the exceptions have to be coordinated. &02 SPECIAL USE AND OCCUPANCY &02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections &02.1.1 and &02.1.2.

More information

City of Westerville Guide to Commercial Inspections

City of Westerville Guide to Commercial Inspections City of Westerville Guide to Commercial Inspections FOOTINGS - After the excavation, with the form work and any required reinforcing steel in place. All footings shall have loose soil removed, reinforcing

More information

NORTHPORT LOGISTICS CENTER New Berlin Road Jacksonville, Florida 32226

NORTHPORT LOGISTICS CENTER New Berlin Road Jacksonville, Florida 32226 11530 New Berlin Road Jacksonville, Florida 32226 FOR FOR LEASE LEASE ALTA RD NORTHPORT LOGISTICS FAYE RD 9-A NEW BERLIN RD PROPOSED HANJIN MITSUI 9-A HECKSCHER DR JAXPORT BLOUNT ISLAND TERMINAL 872,627

More information

The facility is approximately 439,350 square feet, located on a acre parcel on Wood Dale Road in Wood Dale, Illinois. 439,350 Square Feet

The facility is approximately 439,350 square feet, located on a acre parcel on Wood Dale Road in Wood Dale, Illinois. 439,350 Square Feet 1.0 DESIGN SPECIFICATIONS 1.1 Size of Building and Tract: The facility is approximately 439,350 square feet, located on a 21.86-acre parcel on Wood Dale Road in Wood Dale, Illinois. 1.2 Size of Building

More information

Exhibit A Library Shell Construction

Exhibit A Library Shell Construction Exhibit A Library Shell Construction Library Component Building Requirements Approximately 15,000-17,000 square feet plus 900 square feet for mechanical room and additional space on roof for installation

More information

Section 7: Specifications

Section 7: Specifications Section 7: Specifications 29 31 Building Boundary of Clear Area See Note # 1 8' Shrubs 8' Concrete Pad Equipment 8' TRAVELED WAY M Meter Pedestal 8' Curb Protective Vehicle Posts (Bollards) If Required

More information

186 TH AIR REFUELING WING KEY FIELD, MERIDIAN, MS ADDENDUM #1 PERFORMANCE WORK STATEMENT

186 TH AIR REFUELING WING KEY FIELD, MERIDIAN, MS ADDENDUM #1 PERFORMANCE WORK STATEMENT 186 TH AIR REFUELING WING KEY FIELD, MERIDIAN, MS PROJECT NUMBER MDVL092051 Renovate Vehicle Maintenance Facility Bldg 200 23 June 2017 ADDENDUM #1 PERFORMANCE WORK STATEMENT 1.0 SCOPE. This addendum to

More information

Overall Existing Conditions Summary

Overall Existing Conditions Summary September 12, 2002 Overall Executive Summary: The multi-use project on 250 West Street is a 7-story building with space for offices, retail, storage and parking. The project is a small part of the development

More information

Building Excellence IV Capital Levy Projects Under Construction

Building Excellence IV Capital Levy Projects Under Construction Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary

More information

One and Two Family Additions

One and Two Family Additions One and Two Family Additions An addition to a house, duplex, garage, or an accessory structure requires a building permit prior to performing any construction. Building Department & Permit Office Mon-Fri

More information

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings Building Safety Department 400-2 nd Street South St. Cloud, MN 56301 (320) 255-7239 A building permit is required for any accessory

More information

Screen & 3-Season Porches

Screen & 3-Season Porches Screen & 3-Season Porches PERMIT SUBMITAL CHECKLIST : City of New Prague Building Inspections Department 118 Central Ave N New Prague, MN 56071 (952) 758-4401 Fax (952) 758-1149 Signed completed Building

More information

CODE COMPLIANCE PLAN REVIEW PROCEDURES

CODE COMPLIANCE PLAN REVIEW PROCEDURES CODE COMPLIANCE PLAN REVIEW PROCEDURES 1. All construction for state agencies on state-owned or state leased-purchased properties or facilities are to submit design documents for code compliance plan reviews

More information

APPLICATION AND CERTIFICATE FOR PAYMENT

APPLICATION AND CERTIFICATE FOR PAYMENT AND CERTIFICATE FOR PAYMENT TO OWNER: MASTER TEMPLATE - SAVE PROJECT FILE 1 DATE: 10/5/2012 PERIOD TO: ARCHITECT: PROJECT NO: CONTRACTOR'S FOR PAYMENT Application is made for payment, as shown below, in

More information

Overview. Investors Group. ONE Properties

Overview. Investors Group. ONE Properties Overview Great Plains Industrial Park is southeast Calgary s newest, state-of-the-art industrial campus. The development consists of three buildings totaling 1.1 million square feet. Each building has

More information

Residential Building Inspections

Residential Building Inspections Residential Building Inspections Foundations, Grade Beams, Pile Caps, Foundation Pads 1. All trenches or excavations and formwork shall be in accordance with the size(s) and configuration(s) as per approved

More information

SECTION SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS. Display hidden notes to specifier. (Don't know how?

SECTION SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS. Display hidden notes to specifier. (Don't know how? SECTION 08360 SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Glazed Aluminum

More information

ADDENDUM NO. 2 Consisting of 3 pages and Attachments

ADDENDUM NO. 2 Consisting of 3 pages and Attachments 10404-125 Street, Edmonton, AB. T5N 1T2 Tel: 780.455.5975 Fax: 780.454.2397 info@cdyarchitect.com ADDENDUM NO. 2 Consisting of 3 pages and Attachments PROJECT: Maina Centre Ville Phase II, Beaumont, Alberta

More information

COMMERCIAL PROJECT PLAN REVIEW PROCESS

COMMERCIAL PROJECT PLAN REVIEW PROCESS COMMERCIAL PROJECT PLAN REVIEW PROCESS Complete construction documents, which contain all of the required information will speed the plan review process. The following checklist establishes minimum guidelines

More information

Certificate of Use Application Package

Certificate of Use Application Package Certificate of Use Application Package Steps for Obtaining a Certificate of Use All Business must obtain a Certificate of Use prior to occupying or doing business within the space. Home Businesses do not

More information

ADDENDUM A CONSTRUCTION SPECIFICATIONS

ADDENDUM A CONSTRUCTION SPECIFICATIONS ADDENDUM A Description of Improvements: CONSTRUCTION SPECIFICATIONS The Improvements shall consist of constructing an approximate square foot single-family residence including car garage on the real property

More information

City of Santa Monica Building and Safety Division

City of Santa Monica Building and Safety Division This is to be used as a general checklist; it is not inclusive of all code requirements and inspection criteria. GENERAL REQUIREMENTS Approved plans and inspection card to be on job site. (CBC 106.4.2

More information

TABLE OF CONTENTS Public Safety Building

TABLE OF CONTENTS Public Safety Building DOCUMENT 00 01 10 - TABLE OF CONTENTS VOLUME I DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 00 31 32 Geotechnical Data DIVISION 01 GENERAL REQUIREMENTS 01 10 00 Summary

More information

Port KC RFP NORTHLAND PARK BUILDING V

Port KC RFP NORTHLAND PARK BUILDING V Port KC RFP NORTHLAND PARK BUILDING V 1. The RFP refers to landscaping plans. However, it does not appear that the landscaping plans were issued with the rest of the RFP. Will these be issued with an addendum?

More information

CIRCLE K SUB-CONTRACTOR BID FORM

CIRCLE K SUB-CONTRACTOR BID FORM CIRCLE K SUB-CONTRACTOR BID FORM Store No: 3308 Address: 8985 Will Clayton Pkwy Date: Bid Due September 17, 2014 Sub Contractor: Trade CONSTRUCTION TAX Construction Tax EXCAVATION / DIRT WORK Cut / Fill

More information

SECTION SECTIONAL OVERHEAD DOORS 416 SERIES SECTIONAL STEEL DOORS

SECTION SECTIONAL OVERHEAD DOORS 416 SERIES SECTIONAL STEEL DOORS SECTION 08 36 00 SECTIONAL OVERHEAD DOORS 416 SERIES SECTIONAL STEEL DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word click on

More information

AGILITAS Property Development

AGILITAS Property Development Hartmann Commons offered by For Infomation and Leasing Mr. Seth T. McDowell 1614 16th Avenue South Nashville, Tennessee 37212 Voice 615-327-8788 Fax 615-327-8789 Hartmann Commons Agilitas Property Development

More information

Building Excellence IV Capital Levy Projects Under Construction

Building Excellence IV Capital Levy Projects Under Construction Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary

More information

SECTION SECTIONAL OVERHEAD DOORS 424 SERIES SECTIONAL STEEL DOORS

SECTION SECTIONAL OVERHEAD DOORS 424 SERIES SECTIONAL STEEL DOORS SECTION 08 36 00 SECTIONAL OVERHEAD DOORS 424 SERIES SECTIONAL STEEL DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word click on

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

ST. CLOUD, MN 316,000 Square Feet Situated on Acres

ST. CLOUD, MN 316,000 Square Feet Situated on Acres ST. CLOUD, MN 316,000 Square Feet Situated on 49.56 Acres For additional information contact: Gerald P. Norton Tel: 952.831.1993 E mail: gnorton@binswanger.com B. Andrew Lubinski Tel: 952.831.1931 E mail:

More information

4.1.3 Project Manual

4.1.3 Project Manual 4.1.3 Project Manual (*Section requires Filed Sub-Bid) PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP Division 00 Procurement and Contracting Requirements Section 00 01 03 Project Directory Section 01

More information

0103 Plan Reading 4% Read plans to verify the project conforms with the code, approved plans, and construction documents.

0103 Plan Reading 4% Read plans to verify the project conforms with the code, approved plans, and construction documents. Certification: Commercial Building Inspector Exam ID: B2 Scope: A Commercial Building Inspector will be responsible for performing inspections of structures to determine compliance with the various Building

More information

General: Exterior walks and paved areas constructed in conjunction with new building projects shall conform to the requirements of these guidelines.

General: Exterior walks and paved areas constructed in conjunction with new building projects shall conform to the requirements of these guidelines. General: Exterior walks and paved areas constructed in conjunction with new building projects shall conform to the requirements of these guidelines. Snow Removal Considerations: The requirement for snow

More information

EXPRESS PERMIT INFORMATION

EXPRESS PERMIT INFORMATION VILLAGE OF PALATINE DIVISION OF BUILDING PERMITS AND INSPECTIONS 200 East Wood Street Palatine, IL 60067-5339 Telephone (847) 359-9042 Fax (847) 776-4733 www.palatine.il.us EXPRESS PERMIT INFORMATION ASPHALT

More information

Property Offering. Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711

Property Offering. Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711 Property Offering Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711 Executive Summary We are pleased to present an outstanding cold storage opportunity in Evansville, Indiana. Built in

More information

SECTION ROOF ACCESSORIES

SECTION ROOF ACCESSORIES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 07 72 00 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable

More information

Overview. Walton. ONE Properties

Overview. Walton. ONE Properties Overview Encompassing 238 acres, Henday Industrial Park will feature high-end, attractively designed buildings in a park setting with architectural controls. The Park s state-of-the-art buildings will

More information

Nassau County Building Department

Nassau County Building Department July 6, 2018 Nassau County Building Department Inspection Types ALL INSPECTION REQUESTS ARE REQUIRED TO BE INITIATED BY THE PERMIT HOLDER, ALL INSPECTION REQUESTS SHALL SUPPLY THE PERMIT NUMBER FOR EACH

More information

BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME: CALLED BID. Sample

BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME: CALLED BID. Sample BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS Project Name: Address: Owner: Phone/Fax/Email: Architect / General Contractor Name: : BID DEADLINE DATE: SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME:

More information

Central Dartmouth Section Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Dartmouth, NS

Central Dartmouth Section Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Dartmouth, NS Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Part 1 General 1. RELATED SECTIONS 1. Section 07 92 10 Joint Sealing 2. Section 08 71 00 Door Hardware 2. REFERENCES 1. American Society

More information

Overview. Walton. ONE Properties

Overview. Walton. ONE Properties Overview Encompassing 238 acres, Henday Industrial Park will feature high-end, attractively designed buildings in a park setting with architectural controls. The Park s state-of-the-art buildings will

More information

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST Village of Vernon Hills Community Development Department - Building Division 290 Evergreen Drive, Vernon Hills, IL 60061 Phone 847-367-3704 - Fax 847-367-2541 - http://www.vernonhills.org INSPECTION TIMING

More information

4. Number of drawings required: ( ) Locations of nearest streets

4. Number of drawings required: ( ) Locations of nearest streets CITY OF MANSFIELD BUREAU OF BUILDING AND CODES 30 NORTH DIAMOND STREET 3RD FLOOR MANSFIELD, OHIO 44902 Phone (419) 755-9688 Fax (419) 755-9453 www.ci.mansfield.oh.us COMMERCIAL BUILDING PLAN REQUIREMENTS

More information

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested. Purpose 355 West Queens Road Single Family New Construction Required Inspection Stages Master Requirement GEN 110 Building Department: 604-990-2480, building@dnv.org, fax: 604-984-9683 The following procedure

More information

A. Product Data shall be provided for each type of product indicated.

A. Product Data shall be provided for each type of product indicated. 32 31 13 CHAIN LINK FENCES AND GATES SECTION 1 GENERAL 1.1 SUMMARY This Section includes the following: 1. Chain Link Fences 2. Gates for Chain Link Fences. See electrical specifications for electrical

More information

SECTION SECTIONAL OVERHEAD DOORS 418 SERIES INSULATED STEEL DOORS

SECTION SECTIONAL OVERHEAD DOORS 418 SERIES INSULATED STEEL DOORS SECTION 08 36 00 SECTIONAL OVERHEAD DOORS 418 SERIES INSULATED STEEL DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word click on

More information

Series - 1

Series - 1 SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word

More information

CONTRACT ADDENDUM # 1

CONTRACT ADDENDUM # 1 date: January 5, 09 project: Bear River Bleachers CONTRACT ADDENDUM # by: Design West Architects subject: Revisions The Work shall be carried out in accordance with the following supplemental instructions

More information

ARTICLE 12 INTERNATIONAL RESIDENTIAL CODE 2012 International Residential Code Modification Summary (Statutory Authority: 1976 Code Section )

ARTICLE 12 INTERNATIONAL RESIDENTIAL CODE 2012 International Residential Code Modification Summary (Statutory Authority: 1976 Code Section ) 8-1200. International Residential Code. ARTICLE 12 INTERNATIONAL RESIDENTIAL CODE 2012 International Residential Code Modification Summary (Statutory Authority: 1976 Code Section 6-9-40) NOTE-This article

More information

TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS

TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS AIA General Conditions... GC-1 to GC-44 Amendments to General Conditions... AM-1 to AM-2 Supplements to General Conditions... SU-1 to SU-7 00200 Instructions To Bidders... 1 3 00201 Contractor s Bidding

More information

Entellus 75 NORTH STREET MERRILL SHERIFF CONSTRUCTION. 181 North 200 West, Suite #4. Bountiful, UT Phone

Entellus 75 NORTH STREET MERRILL SHERIFF CONSTRUCTION. 181 North 200 West, Suite #4. Bountiful, UT Phone Entllus DUMPSTER PAD AND REPLACE WITH NEW BETWEEN THESE TWO POINTS SAWCUT ALONG DEMO LINE REMOVE PARKING SPOTS CURB, GUTTER, ASPHALT AND LANDSCAPING, WITHIN HATCHED AREA FOR NEW ADDITION CURB & GUTTER

More information

SECTION SECTIONAL OVERHEAD DOORS 422 SERIES INSULATED STEEL DOORS

SECTION SECTIONAL OVERHEAD DOORS 422 SERIES INSULATED STEEL DOORS SECTION 08 36 00 SECTIONAL OVERHEAD DOORS 422 SERIES INSULATED STEEL DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word click on

More information

SECTION SECTIONAL OVERHEAD DOORS 432 SERIES INSULATED STEEL DOORS

SECTION SECTIONAL OVERHEAD DOORS 432 SERIES INSULATED STEEL DOORS SECTION 08 36 00 SECTIONAL OVERHEAD DOORS 432 SERIES INSULATED STEEL DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word click on

More information

CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST

CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST Check off each item that is included within the submitted Contract Documents Review Package. Provide a written explanation for any omissions. The following items,

More information

OUTLINE SPECIFICATIONS

OUTLINE SPECIFICATIONS Nelson Town Facilities- Town hall PROJECT NO. 1130 SPECIFICATIONS DIVISION 0 CONTRACT REQUIREMENTS 005 Form of Agreement: The contract for this project will be AIA Document A121CMc, Standard Form of Agreement

More information

Engineering Design Center. Standard Drawings. 1st Edition -January 2016

Engineering Design Center. Standard Drawings. 1st Edition -January 2016 Engineering Design Center Standard Drawings 1st Edition -January 2016 Golden State Water Company Standard Drawings 1/11/2016 Table of Contents PART A STANDARD DRAWINGS Section I Pipeline Construction P-1

More information

UCC Permit Application Procedures

UCC Permit Application Procedures How do I apply for a permit? UCC Permit Application Procedures 1. Please complete the CodeMaster Pan Review Application 2. Please provide the scope of work description and/or construction documents/plans.

More information

INSPECTION REQUIREMENTS Page 1 of 5. JOB SITE ADDRESS posted during entire construction process.

INSPECTION REQUIREMENTS Page 1 of 5. JOB SITE ADDRESS posted during entire construction process. INSPECTION REQUIREMENTS Page 1 of 5 JOB SITE ADDRESS posted during entire construction process. JOB PLACARD POSTED IN PLAIN SIGHT: GREEN Placard - Building, ORANGE Placard Electrical, BLUE Placard - HVAC,

More information

ST. CLOUD, MN. 316,000 Square Feet Situated on Acres. For additional information contact:

ST. CLOUD, MN. 316,000 Square Feet Situated on Acres. For additional information contact: ST. CLOUD, MN 316,000 Square Feet Situated on 49.56 Acres For additional information contact: Gerald P. Norton Tel: 952.831.1993 E-mail: gnorton@binswanger.com B. Andrew Lubinski Tel: 952.831.1931 E-mail:

More information

CITY OF ANDERSON BUILDING AND CODES 601 South Main Street

CITY OF ANDERSON BUILDING AND CODES 601 South Main Street CITY OF ANDERSON BUILDING AND CODES 601 South Main Street Plan Review Notes (STREET ADDRESS) ANDERSON, SC Plan Review Number: Building Plans prepared by: Plans Signed by: Project Name: Plans Received:

More information

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1%

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1% CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE EXAM ID: I1 80 multiple-choice questions 3-1/2-hour time limit Open book 01. GENERAL ADMINISTRATION 6% 0101. Project Administration 1% Verify that

More information

SECTION SECTIONAL OVERHEAD DOORS

SECTION SECTIONAL OVERHEAD DOORS SECTION 08360 SECTIONAL OVERHEAD DOORS PART 1 GENERAL 1.1 SECTION INCLUDES A. Aluminum Doors B. Track and Framing 1.2 RELATED SECTIONS A. Section 04810 - Unit Masonry Assemblies: Prepared opening in masonry.

More information

University of Colorado Colorado Springs. National Cybersecurity Center Roof Replacement Package CSNA Project Number

University of Colorado Colorado Springs. National Cybersecurity Center Roof Replacement Package CSNA Project Number ADDENDUM NUMBER 0 TO PROJECT MANUAL AND DRAWINGS August 9, 6 OWNER: ARCHITECT: University of Colorado Colorado Springs CSNA Architects PROJECT: National Cybersecurity Center Roof Replacement Package CSNA

More information

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan Brief Building Overview: 200 Minuteman Park stands as a 200,000 square foot Class A office building in Andover, Massachusetts, worth roughly $15,000,000. Although the building has a large square footage,

More information

DIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS

DIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS DIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION 02001 Bus Traffic. Separation between bus traffic, regular vehicular flow, service traffic and pedestrian traffic. Bus traffic must have adequate

More information

RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS

RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS New Construction, Addition, or Alteration All plans submitted must be prepared, sealed, and signed by a Registered Nebraska Design Professional

More information

SECTION SECTIONAL OVERHEAD DOORS 511 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

SECTION SECTIONAL OVERHEAD DOORS 511 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS SECTION 08 36 00 SECTIONAL OVERHEAD DOORS 511 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word

More information

MILLENNIUM NE UNION HILL ROAD REDMOND WA 98052

MILLENNIUM NE UNION HILL ROAD REDMOND WA 98052 MILLENNIUM C O R P O R A T E P A R K BUILDING FEATURES Class A Office BUILDING B AVAILABLE SPACE BUILDING B / SUITE 210 ± 7,992 Total SF PROPERTY FEATURES Large floor plates provide highly efficient spaces

More information

T T LEGAL DESCRIPTION: LEGEND X FOUND MONUMENT AS NOTED A.M. ~ AS MEASURED IN FIELD REC. ~ DEED OR PLAT DISTANCE PL ~ PROPERTY LINE FF ~ FINISHE

T T LEGAL DESCRIPTION: LEGEND X FOUND MONUMENT AS NOTED A.M. ~ AS MEASURED IN FIELD REC. ~ DEED OR PLAT DISTANCE PL ~ PROPERTY LINE FF ~ FINISHE T T LEGAL DESCRIPTION: LEGEND X 99.44 FOUND MONUMENT AS NOTED A.M. ~ AS MEASURED IN FIELD REC. ~ DEED OR PLAT DISTANCE PL ~ PROPERTY LINE FF ~ FINISHED FLOOR CALLED NORTH N EXIST. SPOT ELEVATION N00 04'58"W

More information

VPL-3200B Residential Vertical Platform Lift Technical Specifications

VPL-3200B Residential Vertical Platform Lift Technical Specifications Page 1 of 5 VPL-3200B Residential Vertical Platform Lift Technical Specifications MODEL NUMBER: VPL-3200B Series: Models VPL-3210B, VPL-3212B and VPL-3214B (DC-powered units) U.S. F.D.A. CLASSIFICATION:

More information

AVAILABLE FOR LEASE OR SALE

AVAILABLE FOR LEASE OR SALE AVAILABLE FOR LEASE OR SALE CLASS A OFFICE/WAREHOUSE 13124 TRINITY DRIVE, STAFFORD, TX 77477 +/- 78,465 SF YOUR SIGN HERE FOR ADDITIONAL INFORMATION, PLEASECONTACT: David Husid Director 713.599.5149 DHusid@ngkf.com

More information

NEW TO MARKET +/- 78,465 SF CLASS A OFFICE/WAREHOUSE TRINITY DRIVE, STAFFORD, TX YOUR SIGN HERE

NEW TO MARKET +/- 78,465 SF CLASS A OFFICE/WAREHOUSE TRINITY DRIVE, STAFFORD, TX YOUR SIGN HERE NEW TO MARKET CLASS A OFFICE/WAREHOUSE 13124 TRINITY DRIVE, STAFFORD, TX 77477 +/- 78,465 SF YOUR SIGN HERE FOR ADDITIONAL INFORMATION, PLEASECONTACT: David Husid Director 713.599.5149 DHusid@ngkf.com

More information

MILLENNIUM CORPORATE CENTER NE UNION HILL ROAD REDMOND WA 98052

MILLENNIUM CORPORATE CENTER NE UNION HILL ROAD REDMOND WA 98052 MILLENNIUM CORPORATE CENTER 18200 18700 NE UNION HILL ROAD REDMOND WA 98052 BUILDING FEATURES Class A Office BUILDING A AVAILABLE SPACE BUILDING A / SUITE 200 ± 11,798 Total SF BUILDING B / SUITE 210 ±

More information

One & Two Family Residential NEW CONSTRUCTION Plan Review Checklist

One & Two Family Residential NEW CONSTRUCTION Plan Review Checklist City of St. Petersburg Development Services One & Two Family Residential NEW CONSTRUCTION Plan Review Checklist (Effective Date: 5/1/03) This checklist is subject to change and improvement at any time.

More information

EAST CENTRAL REGIONAL WATER RECLAMATION FACILITY PROCESS WATER SYSTEM PROJECT

EAST CENTRAL REGIONAL WATER RECLAMATION FACILITY PROCESS WATER SYSTEM PROJECT EAST CENTRAL REGIONAL WATER RECLAMATION FACILITY PROCESS WATER SYSTEM PROJECT Addendum No. 2 Attachment B Contract Document Revisions Specifications: TABLE OF CONTENTS ADDENDUM NO. 2 Attachment B Contract

More information

Bus Facility

Bus Facility SECTION 32 31 13.53 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information