1 ADDENDUM TO THE STORMWATER POLLUTION PREVENTION PLAN For the Jamestown Public Schools Bush Elementary Addition and Alterations Jamestown, New York Chautauqua County February, 2014 Clark Patterson Lee DESIGN PROFESSIONALS
2 ADDENDUM TO THE STORMWATER POLLUTION PREVENTION PLAN FOR THE JAMESTOWN PUBLIC SCHOOLS BUSH ELEMENTARY ADDITION AND ALTERATIONS The following sections are updated per the revised plans developed in February of2014, which includes a larger classroom addition (0.13 ac to 0.17 acre) and a parent parking lot within the drop-off loop (0.11 acre of additional impervious in lieu of lawn). 4.0 HYDROLOGIC ANALYSIS OF PROPOSED CONDITIONS 4.1 Proposed Conditions Proposed Subarea #1 consists of open space and miscellaneous sidewalk areas. The total pervious and impervious areas are 1.39 acres and 0.09 acre, respectively. Stormwater runoff begins as sheet flow over lawns and impervious areas where it is collected by the existing diversion swale, which discharges directly to the wooded tree line. Proposed Subarea #2 consists of the building addition rooftop. The total impervious area is 0.17 acre. Stormwater runoff begins as sheet flow and is collected by the rooftop drains and conveyed to the underground stormwater management facility, which ultimately discharges to the wooded tree line. Proposed Subarea #3 consists of open space, the paved drop-off loop and parking area, and miscellaneous sidewalk areas. The total pervious and impervious areas are acre and 0.76 acre, respectively. Stormwater runoff generally begins as sheet flow over lawn and impervious areas where it is collected by the proposed storm drainage system and conveyed to the underground stormwater management facility, which ultimately discharges to the wooded tree line. 4.2 Proposed Conditions - Hydrologic Analysis Results The following table, Table 3, summarizes the peak flow generated from the proposed drainage areas for the various storm events (see Appendix). STORMWATER POLLUTION PREVENTION PLAN ADDENDUM JAMESTOWN PUBLIC SCHOOLS -1 - BUSHElEMADDmONSANDALTERATlONS
3 TABLE 3 RUNOFF - PROPOSED CONDITIONS I-YEAR 10-YEAR 100-YEAR PROPOSED STORM STORM STORM SUBAREA EVENT EVENT EVENT Pr Subarea # cfs 1.78 cfs 3.16 cfs Pr Subarea # cfs 0.78 cfs 1.06 cfs Pr Subarea # cfs 3.79 cfs 5.86 cfs Pr Subarea # cfs 0.38 cfs 0.63 cfs The following table, Table 4, summarizes the peak runoff rates for existing and proposed conditions for the various design storm events. Under proposed conditions, the stormwater runoff from the drainage areas have been hydrologically added and routed through the proposed stormwater management facilities to allow for comparison of the existing and proposed stormwater runoff within this project area. computer calculations and results): The results are as follows (see Appendices for TABLE 4 OUTLFOW - EXISTING vs. PROPOSED CONDITIONS Peak Flow (cfs) ANALYSIS YEAR YEAR YEAR CONDITION POINT # STORM STORM STORM EVENT EVENT EVENT Woods Existing Proposed English Existing Street Proposed As a result of a properly sized stormwater management facility and designed outlet structure, the peak stormwater runoff rates have decreased under proposed conditions. STORMW ATER POLLUTION PREVENTION PLAN JAMESTOWN PUBLIC SCHOOLS BUSHELEMADDillONSANDALTERATlONS
4 5.0 STORM WATER MANAGEMENT FACILITY HYDRAULIC SUMMARY 5.1 Stormwater Management Facility Results The proposed stormwater management facility is an underground infiltration basin, located in the southwest corner of the site. After performing the infiltration test, a peak infiltration rate of 0.90 inlhr was incorporated into the design, refer to Appendix I for infiltration testing results. The infiltration basin consists of approximately 120 underground stormwater chambers. This basin has a peak storage capacity of ac-ft and elevation of '. The peak outflows during the 10-year and 100-year storm events are 1.34 cfs and 2.26 cfs with a peak storage elevation of ' and ', respectively. The peak storage capacity during the lo-year storm event is acre-feet and acre-feet, during 100-year storm event. The outfall structure consists of a 5' diameter precast concrete manhole with weir wall. The structure has a rim elevation of ' with a 12" outlet pipe at an elevation of '. The outlet controls in the weir wall consist ofa 3" orifice at an elevation of ', a 7" orifice at an elevation of ', and a level weir wall at an elevation of The outlet pipe discharges directly to the wooded tree line. 6.0 STORMWATER QUALITY MANAGEMENT 6.2 Stormwater Quality Analysis Data The proposed stormwater management facility was designed to temporarily store and treat or infiltrate the required water quality volume associated with this project. The required water quality volume for the new construction is acre-feet and redevelopment area is acrefeet (see proposed WQv Calculations in Appendix H). For the new construction, the required pretreatment volume for the infiltration practice is 25%, since the infiltration rate is below 2 inlhr, of the required water quality volume, which calculates to acre-feet. Since proprietary flow through devices are proposed for the pretreatment of the new construction and treatment of the redevelopment area, the water quality volume needed to be converted to a flow rate. The calculated required flow rates are 0.22 cfs for the new construction and 1.23 cfs for the STORMW ATER POLLUTION PREVENTION PLAN JAMESTOWN PUBLIC SCHOOLS BUSH ELEM. ADDmONSAND ALTERATIONS
5 redevelopment area. The minimum runoff reduction volume for this site is 30% based on the HSG rating ofc. 6.3 Stormwater Management Facilities Water Quality Design Feature The proposed underground infiltration basin provides a water quality treatment volume of acre-feet utilizing infiltration. The pretreatment for the infiltration basin is provided utilizing a VortSentry HS36 that provides a treatment rate of 0.55 cfs, which is greater than the 0.22 cfs required. The treatment for the redevelopment area is provided utilizing a VortSentry VS50 that provides a treatment rate of 1.71 cfs, which is greater than the 1.23 cfs required. The runoff reduction is provided by the infiltration basin. According to the design manual, 90% of the volume infiltrated can be applied toward the runoff reduction. That results in acre-feet being reduced from the acre-feet of required water quality volume. This results in an 81% reduction which is greater than the minimum of 30% required for HSG C. STORMWATER POLLUTION PREVENTION PLAN JAMESTOWN PUBLIC SCHOOLS BUSHELEM. ADDmONSAND ALTERATIONS
6 g Q) z.t "0 ;JI.. I jj '" a. j;;.q.le 0 " WATER RESERVO;!? ::;: Q. N 0: i 0 0 1;; Q Q) 8 I I I I 'f "0 Q. Q. Q) ;;;., B i5 «i5 «V c C>.,3 " E 8l.s; i5.g Q) CD E c: 0 0 ' z V; NO. O r O U CD 0 () Z..'" " REV ISIONS DAlE" BY HKED DESCRlPTION CLARK PATTERSON LEE DESIGN PROFESSIONALS 1279 NORTH MAIN STREET JAMESTOWN, NEW YORK TEL (716) FAX (716) EXISTING SCHOOL BUILDING 1 Sty BRlCI( JAMESTOWN PUBLIC SCHOOLS CITY O F JAMESTOWN C HAUTAUQUA C OUNTY NEW YORK STATE DATE: 02/04/14 DRAWN: NJV DESIGNED: NJV CHECKED: NJV SCAlf: 1 "= 100', o BUSH ELEMENTARY SCHOOL PROPOSED DRAINAGE CONDITIONS PROJECT NUMBER I DRAWING NUMBER I FIG-031
7 BY N"S"V DATE "1\ III \ I Clark Patterson Lee DE SIGN PROFE SS IONALS CHECKED BY DATE PROJECT Us.). 'S e.1.j CALC. NO. REV. SUBJECT VVt..o--tuS1.-t:) \NAc:...J; JO B NO. SHEET NO. (C SUI'-S) - \ c. r :) ) \00'. <!. O. C;-1.. ), ) D N(4 U"ro- J J-, 8"c? (2., 1;;/. 'fyl -V;b..::2 o.-k Ac:vtb (rz;.ju.rr..e..o A'0 1J1 7, o.j) 0.11 /1-'\'1' - 0.'7 \f-"\f> - Q c Gtr- 0.7 C, L A \J cf o. )M.f' - 0.0::< LA - O. 1(0 - \ '- Y'\ - 0.:2. \ QU' )
8 Job File: J:\PROJECTS\Jamestown PSD\Bush Elem\D Design\D08 CAD\AutoCAD\Civil\CO\PondPack\P Rain Dir: J:\PROJECTS\Jamestown PSD\Bush Elem\D Design\D08 CAD\AutoCAD\Civil\CO\PondPack\ JOB TITLE Project Date: 4/16/2013 Project Engineer: nvoit Project Title: Watershed Project Comments: SiN: Bentley Systems, Inc. Bentley PondPack ( ) 1:48 PM 2/4/2014
9 Table of Contents i Table of Contents ********************** MASTER SUMMARY ********************** Watershed... Master Network Summary ********************** CN CALCULATIONS ********************* PR SUBAREA Runoff CN-Area 2.01 PR SUBAREA Runoff CN-Area 2.02 PR SUBAREA Runoff CN-Area 2.03 ******************** OUTLET STRUCTURES ********************* Outlet Outlet Input Data SIN: Bentley PondPack ( ) 1:48 PM Bentley Systems, Inc. 2/4/2014
10 Type... Master Network Summary Page 1.01 Name... Watershed File... J:\PROJECTS\Jamestown PSD\Bush Elem\D Design\D08 CAD\AutoCAD\Civil\CO\PondPack\Pr MASTER DESIGN STORM SUMMARY Network Storm Collection: Chautauqua Count Total Depth Rainfall Return Event in Type RNF ID Synthetic Curve Type II 24hr Synthetic Curve Type II 24hr Synthetic Curve Type II 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Qpeak Qpeak Node ID Type Event ac-ft Trun hrs cfs CHAMBERS IN POND CHAMBERS IN POND CHAMBERS IN POND CHAMBERS OUT POND CHAMBERS OUT POND CHAMBERS OUT POND Max Max WSEL Pond Storage ft ac-ft *ENGLISH ST JCT *ENGLISH ST JCT *ENGLISH ST JCT PR SUBAREA 1 AREA PR SUBAREA 1 AREA PR SUBAREA 1 AREA PR SUBAREA 2 AREA PR SUBAREA 2 AREA PR SUBAREA 2 AREA SIN: Bentley PondPack ( ) 1:48 PM Bentley Systems, Inc. 2/4/2014
11 Type... Master Network Summary Page 1.02 Name... Watershed File.... J:\PROJECTS\Jamestown PSD\Bush Elem\D Design\D08 CAO\AutoCAO\Civil\CO\PondPack\Pr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Oiversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Qpeak Qpeak Node 10 Type Event ac-ft Trun hrs cfs PR SUBAREA 3 AREA PR SUBAREA 3 AREA PR SUBAREA 3 AREA Max Max WSEL Pond Storage ft ac-ft PR SUBAREA 4 AREA PR SUBAREA 4 AREA PR SUBAREA 4 AREA *WOODS JCT *WOODS JCT *WOOOS JCT SIN: Bentley PondPack ( ) 1:48 PM Bentley Systems, Inc. 2/4/2014
12 Type... Runoff CN-Area Page 2.01 Name... PR SUBAREA 1 File... J:\PROJECTS\Jamestown PSD\Bush E1em\D Design\D08 CAD\AutoCAD\Civi1\CO\PondPack\Pr RUNOFF CURVE NUMBER DATA Soil/Surface Description CN Area acres Impervious Adjustment %C %UC Adjusted CN Open space (Lawns,parks etc.) - Goo 74 Impervious Areas - Paved parking COMPOSITE AREA & WEIGHTED CN ---> (75) SiN: Bentley PondPack ( ) 1:48 PM Bentley Systems, Inc. 2/4/2014
13 Type... Runoff CN-Area Page 2.02 Name... PR SUBAREA 2 File... J:\PROJECTS\Jamestown PSD\Bush Elem\D Design\D08 CAD\AutoCAD\Civil\CO\PondPack\Pr RUNOFF CURVE NUMBER DATA ""."... """... ".. """".. "... "".. ".""""".. """"""",,.,,.,,.. """,,.,,""",,",,""",,.,,.. "".".. ".. "".""""""""""".. ""." "... "... "".. "... " " """"."..,,...,,",,.... Soil/Surface Description CN Area acres Impervious Adjustment %C %UC Adjusted CN Impervious Areas - Paved parking COMPOSITE AREA & WEIGHTED CN ---> (98) ".""""."."""".... "."""""".. "" "... " "".. """ ""."""".,,.,, """"",,.,,",,.,,,,... "... ".. ". """".". ".. """"".".... ".. ".. """... "... ". " "."... "".,,""",,...,,."". SIN: Bentley PondPack ( ) 1: 48 PM Bentley Systems, Inc. 2/4/20l4
14 Type... Runoff CN-Area Page 2.03 Name.... PR SUBAREA 3 File.... J:\PROJECTS\Jamestown PSD\Bush Elem\D Design\D08 CAD\AutoCAD\Civil\CO\PondPack\Pr RUNOFF CURVE NUMBER DATA o Soil/Surface Description CN Area acres Impervious Adjustment %C %UC Adjusted CN Open space (Lawns,parks etc.) - Goo 74 Impervious Areas - Paved parking COMPOSITE AREA & WEIGHTED CN ---> (85) SIN: Bentley PondPack ( ) 1: 48 PM Bentley Systems, Inc. 2/4/2014
15 Type... Outlet Input Data Page 3.01 Name... Outlet 1 File... J:\PROJECTS\Jamestown PSD\Bush E1em\D Design\D08 CAD\AutoCAD\Civil\CO\PondPack\Pr REQUESTED POND WS ELEVATIONS: Min. Elev.= Increment = Max. E1ev.= ft.25 ft ft ********************************************** OUTLET CONNECTIVITY ********************************************** ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) <---> Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft Orifice-Circular 00 -> CO Orifice-Circular > CO Weir-Rectangular WO ---> co Culvert-Circular CO ---> TW TW SETUP, OS Channel SIN: Bentley PondPack ( ) 1:48 PM Bentley Systems, Inc. 2/4/2014
16 Type.... Outlet Input Data Page 3.02 Name.... Outlet 1 File... J:\PROJECTS\Jamestown PSD\Bush Elem\D Design\D08 CAD\AutoCAD\Civil\CO\PondPack\Pr OUTLET STRUCTURE INPUT DATA Structure ID Structure Type # of Openings Invert Elev. Diameter Orifice Coeff. = 00 = Orifice-Circular ft.2500 ft.600 Structure ID Structure Type # of Openings Invert Elev. Diameter Orifice Coeff. = 01 = Orifice-Circular ft.5833 ft.600 Structure ID Structure Type # of Openings Crest Elev. Weir Length Weir Coeff. Weir TW effects = WO = Weir-Rectangular ft 4.00 ft (Use adjustment equation) SiN: Bentley PondPack ( ) 1:48 PM Bentley Systems, Inc. 2/4/2014
17 Type.... Outlet Input Data Page 3.03 Name... Outlet 1 File... J:\PROJECTS\Jamestown PSD\Bush Elem\D Design\D08 CAD\AutoCAD\Civil\CO\PondPack\Pr OUTLET STRUCTURE INPUT DATA Structure ID Structure Type No. Barrels Barrel Diameter Upstream Invert Dnstream Invert Roriz. Length Barrel Length Barrel Slope = CO = Culvert-Circular ft ft ft ft ft ft/ft OUTLET CONTROL DATA... Mannings n Ke Kb Kr RW Convergence (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft INLET CONTROL DATA... Equation form Inlet Control K Inlet Control M Inlet Control c Inlet Control Y T1 ratio (RW/D) T2 ratio (RW/D) Slope Factor Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and interpolate between flows at T1 & T2... At Tl Elev ft ---> Flow At T2 Elev = ft ---> Flow = submerged inlet control, 2.75 cfs 3.14 cfs Structure 10 Structure Type = TW = TW SETUP, OS Channel FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 40 Min. TW tolerance.01 ft Max. TW tolerance.01 ft Min. RW tolerance.01 ft Max. HW tolerance.01 ft Min. Q tolerance.00 cfs Max. Q tolerance.00 cfs SIN: Bentley PondPack ( ) 1: 48 PM Bentley Systems, Inc. 2/4/2014
18 Appendix A A-1 Index of Starting Page Numbers for ID Names Outlet , 2.01, 2.02, W ---- Watershed SiN: Bentley PondPack ( ) 1: 48 PM Bentley Systems, Inc. 2/4/2014
19 STORMWATER MANAGEMENT CALCULATIONS Project Name: Date: By: Design Stonns Bush Elementary School 2/4/2014 (Revised) NJV 1-YEAR (in).1 10-YEAR (in) YEAR (in) 4.9 WATER QUALITY DESIGN 1. COMPUTE WATER QUALITY VOLUME (WQv) - PRETREATMENT with PROPRIETARY SMP RUNOFF COEFFICIENT (Rv) = 0.05+(1)(0.009) -- I VALUE = I 531(% IMPERVIOUS COVER) Rv= WQv = «P)(Rv)(A»/12 P VALUE = RvVALUE = A VALUE = WQv = 25% required for pretreabnent _ I (FROM FIG. 4.1 OF NYSDEC MANUAL) _.5_27... I(FROM CALCULATION ABOVE) _.8... HAREA IN ACRES) o_.o_17...1iacre-feet OF STORAGE REQUIRED cUBIC FEET OF STORAGE Jamestown Public Schools Bush Elementary Addition and Alterations 2/4/2014
20 RUNOFF CURVE NUMBER (CN) AND RUNOFF (Q) Project Name: Date: By: Design Storms Bush Elementary School Feb-14 NJV 1-YEAR (in).1 2-YEAR (in) YEAR (in) YEAR (in) 4.9 COMPUTE RUNOFF (Q) 1. THE CN VALUE HAS BEEN DETERMINED USING THE COMPUTER PROGRAM POND PACK RUNOFF CURVE NUMBER (CN) = 2. DETERMINE THE RUNOFF (Q) VALUE RAINFALL, P (24-HOUR) P VALUE = I 0.90 inl S = 1000/CN - 10 S VALUE = I Using P and S values determine Q Q = (P -0.2S)2 1 (P+0.8S) Q VALUE =1..._ 0_ Jamestown Public Schools Bush Elementary Addition and Alterations 2/4/2014
21 STREAM CHANNEL PROTECTION VOLUME, Cpv CALCULATIONS Project Name: Date: By: Design Storms Bush Elementary School Feb-14 NJV 1-YEAR (in) 2.1 I YEAR (in) YEAR (in)i YEAR (in)... 4_.9... COMPUTE PEAK DISCHARGE FOR WATER QUALITY VOLUME 1. DETERMINE THE VALUE OF THE UNIT PEAK DISCHARGE (qu) USING TR-55 AND TYPE III RAINFALL DISTRIBUTION AREA (A) = 1.76 acresl SQ. MI RUNOFF CURVE NUMBER (CN) = INITIAL ABSTRACTION (Ia) FOR CN = la = (200/CN - 2) la VALUE = lalp lalp VALUE = Time of Concentration Tc VALUE = 0.29 hrs.hfrom POND PACK CALCULATION) Using above data and Exhibit 4-11 from TR-55 (NRCS, 1986), qu = WQv = Use volume from previous calculation = WQv = in watershed inches = Qp = peak discharge in cfs =qu xaxwqv 680 csm/inl ac-ftl inl 0.22 cfsl Jamestown Public Schools Bush Elementary Addition and Alterations 2/4/2014
22
23
Summary of Detention Pond Calculation Canyon Estates American Canyon, California
July 15, 2015 Bellecci & Associates, Inc Summary of Detention Pond Calculation Canyon Estates American Canyon, California 1. Methodology: Method: Unit Hydrograph Software: Bentley Pond Pack Version 8i
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or any
More informationAppendix C.1. Design Example 1 Shallow Wetland (W-1)
Appendix C.1 Design Example 1 Shallow Wetland (W-1) Design Example 1 Shallow Wetland (W-1) The following example demonstrates the process for the design of a shallow wetland (W-1) BMP. Site Specific Data
More informationExample 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond)
Chapter 10 Design Examples Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond) Example 2: Filter Design in a commercial development
More informationRETENTION BASIN EXAMPLE
-7 Given: Total Tributary Area = 7.5 ac o Tributary Area within Existing R/W = 5.8 ac o Tributary Area, Impervious, Outside of R/W = 0.0 ac o Tributary Area, Pervious, Outside of R/W = 1.7 ac o Tributary
More informationRhode Island Stormwater Design and Installations Standards Manual
Rhode Island Stormwater Design and Installations Standards Manual Public Workshop Required Management Volume Calculations and Redevelopment Considerations March 22, 2011 Presentation Outline Recap of How
More informationDetention Pond Design Considering Varying Design Storms. Receiving Water Effects of Water Pollutant Discharges
Detention Pond Design Considering Varying Design Storms Land Development Results in Increased Peak Flow Rates and Runoff Volumes Developed area Robert Pitt Department of Civil, Construction and Environmental
More informationEnvironmental Design Group
SEDIMENT CONTROL DURING CONSTRUCTION, STORMWATER MANAGEMENT AND POST CONSTRUCTION BMP REPORT for Hudson Salt Storage and Bus Garage 5810 Hudson Drive HUDSON, OHIO SUMMIT COUNTY Prepared by Environmental
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part 257.82 PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part
More informationHydrologic Study Report for Single Lot Detention Basin Analysis
Hydrologic Study Report for Single Lot Detention Basin Analysis Prepared for: City of Vista, California August 18, 2006 Tory R. Walker, R.C.E. 45005 President W.O. 116-01 01/23/2007 Table of Contents Page
More informationBMP Design Aids. w w w. t r a n s p o r t a t i o n. o h i o. g o v. Equations / Programs
BMP Design Aids 1 Equations / Programs Outlet Discharge Equations Hydrograph and Pond Routing Programs USGS StreamStats 2 Ohio Department of Transportation 1 Training Intent Introduction and overview of
More informationINITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257
INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 HUFFAKER ROAD (PLANT HAMMOND) PRIVATE INDUSTRIAL LANDFILL (HUFFAKER ROAD LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion
More informationFinal Drainage Report
Thornton Electric Substation Project Final Drainage Report December 14, 2016 DRAFT Prepared for: Xcel Energy, 1800 Larimer Street, Suite 400, Denver, Colorado 80202 Prepared by: 350 Indiana Street, Suite
More informationAPPENDIX K OPERATIONS AND FINAL COVER SURFACE WATER MANAGEMENT SYSTEM DESIGN
ONONDAGA LAKE SEDIMENT CONSOLIDATION AREA CIVIL & GEOTECHNICAL FINAL DESIGN APPENDIX K OPERATIONS AND FINAL COVER SURFACE WATER MANAGEMENT SYSTEM DESIGN PARSONS P:\Honeywell -SYR\44483 - Lake Detail Design\9
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationDesign Example Residential Subdivision
Design Example Residential Subdivision Rhode Island Stormwater Design and Installation Standards Manual December 2010 Public Training March 22, 2010 Richard Claytor, P.E. 508-833-6600 Appendix D: Site
More informationPre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015
Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015 Urban Runoff Background How we got here What Problem?? Provenance of the Problem Unified Sizing Criteria What
More informationHydrologic and Hydraulic Analysis Report Mountaineer Plant Bottom Ash Pond Complex New Haven, West Virginia
Hydrologic and Hydraulic Analysis Report Mountaineer Plant Bottom Ash Pond Complex New Haven, West Virginia September 2015 Terracon Project Number: N4155129 Prepared for: American Electric Power 1 Riverside
More informationDrainage Analysis. Appendix E
Drainage Analysis Appendix E The existing and proposed storm drainage systems have been modeled with Bentley CivilStorm V8 computer modeling software. The peak stormwater discharge was determined for
More informationSITE DESIGN ENGINEERING, LLC. 11 Cushman Street, Middleboro, MA P: F:
INTRODUCTION This drainage report was prepared for the proposed site re-development at in Burlington, Massachusetts. The project site is approximately 1.05± acres consisting of approximately 70% impervious
More informationINITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257
INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 PLANT BOWEN PRIVATE INDUSTRY SOLID WASTE DISPOSAL FACILITY (ASH LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals
More information9220 Wightman Road, Suite 120 Montgomery Village, Maryland Phone Fax
9220 Wightman Road, Suite 0 Montgomery Village, Maryland 20886-79 Engineers Planners Landscape Architects Surveyors Phone 301.670.0840 Fax 301.948.0693 www.mhgpa.com STORMWATER MANAGEMENT SUMMARY Project:
More informationUPDATED SITE DESIGN NARRATIVE AND CALCULATIONS
UPDATED SITE DESIGN NARRATIVE AND CALCULATIONS Burlington Summit The Gutierrez Company One Wall Street, Burlington, MA July, Prepared by, Symmes Maini & McKee Associates Cambridge, MA SMMA No. PROJECT
More informationAugust Chapter 1: Introduction to the Manual
Chapter 1: Introduction to the Manual Section 1.1 Purpose of the Manual The purpose of this manual is threefold: 1. To protect the waters of the State of New York from the adverse impacts of urban stormwater
More informationGreen Station CCR Surface Impoundment
Green Station CCR Surface Impoundment Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule Hydrologic and Hydraulic Capacity Assessment and Initial Inflow Design Flood Control
More informationAPPENDIX G HYDRAULIC GRADE LINE
Storm Drainage 13-G-1 APPENDIX G HYDRAULIC GRADE LINE 1.0 Introduction The hydraulic grade line is used to aid the designer in determining the acceptability of a proposed or evaluation of an existing storm
More informationRETAIL UNITS GUELPH. November Prepared For: File No Engineering Report.docx F: (905) P: (905) BURLINGTON, ONTARIO
The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED COMMERCIAL RETAIL UNITS GUELPH LINE AND UPPER MIDDLE
More informationJanuary 20, Nate Hatleback Project Manager, City of Thornton Development Engineering 9500 Civic Center Drive Thornton, CO (303)
January 20, 2017 Nate Hatleback Project Manager, City of Thornton Development Engineering 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7694 RE: Riverdale Five Retail Drainage Conformance Letter
More informationINITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR
INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR 257.82 EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part 257 and Part
More informationInflow Design Flood Control System Plan
Inflow Design Flood Control System Plan For Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Valmont Station - CCR Surface Impoundments Public Service Company of Colorado Denver, Colorado
More informationAppendix E.2 Preliminary Hydrology Report
Appendix E.2 Preliminary Hydrology Report PRELIMINARY HYDROLOGY STUDY HARVARD WESTLAKE SCHOOL PARKING STRUCTURE 3700 Coldwater Canyon North Hollywood, CA 91604 KPFF Job # 109046 August 12, 2013 CLIENT:
More informationExtended Detention Basin Design
Extended Detention Basin Design 1 Extended Detention 2 Ohio Department of Transportation 1 Extended Detention Basin L&D Vol. 2 Section 1117.3 Provides quality and quantity treatment 3 Extended Detention
More informationRunoff Hydrographs. The Unit Hydrograph Approach
Runoff Hydrographs The Unit Hydrograph Approach Announcements HW#6 assigned Storm Water Hydrographs Graphically represent runoff rates vs. time Peak runoff rates Volume of runoff Measured hydrographs are
More informationRun-on and Run-off Control System Plan
Run-on and Run-off Control System Plan CCR Temporary Storage Pad Lewis and Clark Station Prepared for Montana-Dakota Utilities Co. October 2016 Paul T. Swenson 2016.10.13 18:30:03-05'00' 234 West Century
More informationGENERAL AND FLOODING STANDARDS SUBMISSION BRUNSWICK LAYOVER FACILITY BRUNSWICK, MAINE PREPARED FOR:
APPENDIX H GENERAL AND FLOODING STANDARDS SUBMISSION BRUNSWICK LAYOVER FACILITY BRUNSWICK, MAINE PREPARED FOR: NORTHERN NEW ENGLAND PASSENGER RAIL AUTHORITY (NNEPRA) 75 WEST COMMERCIAL STREET, SUITE 104
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationDesign of Stormwater Wetlands
Hydraulic & Hydrologic Stormwater Engineering Design of Stormwater Wetlands Jon Hathaway, EI Extension Associate NCSU Bio. And Ag. Engineering 6 Step Process 1. Watershed Analysis (Runoff Volume and Peak
More informationWinSLAMM v Program Modifications Final, 3/16/19
WinSLAMM v 10.4.1 Program Modifications Final, 3/16/19 1. Printing Set up a printing option for.pdf files for input data and output summary data. 2. Added the Pipe input data to the printing input data
More informationSAN GORGONIO PASS CAMPUS - PHASE I
SAN GORGONIO PASS CAMPUS - PHASE I Banning, CA DRAINAGE STUDY June 16, 2010 Reference 106-195 PREPARED BY: Encompass Associates, Inc. 5699 Cousins Place Rancho Cucamonga, CA 91737 909-684-0093 Fax-909-586-6979
More information100-yr Design Runoff (cfs) Basin ID 103b A a B B C Totals
PROPOSED DEVELOPMENT The drainage for this site has been designed to be less than the maximum allowable runoff from each basin as stated in the Overall Rigden Farm drainage plan. Table 1 compares the actual
More informationOverview of NRCS (SCS) TR-20 By Dr. R.M. Ragan
Overview of NRCS (SCS) TR-20 By Dr. R.M. Ragan TR-20 is a computer program for the simulation of runoff occurring from a single storm event. The program develops flood hydrographs from runoff and routes
More informationSubmittal Requirements. Post Construction Verification Document Plan Requirements
Submittal Requirements Post Construction Verification Document survey plan in accordance with the items of this Checklist Supporting calculations in accordance with the items of this Checklist A copy of
More informationProposed Retail Development
Drainage Report Proposed Retail Development Rochester, New Hampshire Prepared for G.B. New England 2, LLC 14 Breakneck Hill Road, Suite 101 Lincoln, Rhode Island 02865 401 721 1600 Prepared by /Vanasse
More informationPRELIMINARY DRAINAGE STUDY
PRELIMINARY DRAINAGE STUDY For 34 th & J Residences 3402 J St. San Diego, CA 92102 A.P.N 545-250-08 Prepared By: Kenneth J. Discenza, P.E. Site Design Associates, Inc. 1016 Broadway, Suite A El Cajon,
More informationAPPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY)
APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY) Hydromodification design criteria for the North Orange County permit area are based on the 2- yr, 24-hr
More informationSTORMWATER HYDROLOGY
..CHAPTER.. STORMWATER HYDROLOGY 3.1 Introduction to Hydrologic Methods Hydrology is the science dealing with the characteristics, distribution, and movement of water on and below the earth's surface and
More informationIntroduction to Storm Sewer Design
A SunCam online continuing education course Introduction to Storm Sewer Design by David F. Carter Introduction Storm sewer systems are vital in collection and conveyance of stormwater from the upstream
More informationPeak discharge computation
Ia/P 4 Peak Dischage Method Graphical Peak Discharge Method This chapter presents the Graphical Peak Discharge method for computing peak discharge from rural and urban areas. The Graphical method was developed
More informationResults shown on 'Detailed Summary' tab
Fill in site's Pre Development parameters on 'Pre' tab (Site Area, Drainage Area, Impervious Area, CNpre, tc) Prior to using BSD or BMP practices, fill in site's Post Development parameters on 'Post' tab
More informationStormwater Review Part 2. Rainfall and Runoff. Tom Seybert, PE and Andy Bennett, PE. Pennsylvania Surveyors Conference 2019
Stormwater Review Part 2 Rainfall and Runoff Tom Seybert, PE and Andy Bennett, PE Pennsylvania Surveyors Conference 2019 1 Topics Covered 1. Rainfall characteristics and sources 2. Watershed characteristics
More informationInflow Design Flood Control System Plan
Inflow Design Flood Control System Plan For Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Cherokee Station - CCR Surface Impoundments Public Service Company of Colorado Denver, Colorado
More informationInflow Design Flood Control System Plan
Inflow Design Flood Control System Plan Scrubber Ponds Lewis and Clark Station Prepared for Montana-Dakota Utilities Co. October 2016 Paul T. Swenson 2016.10.14 17:54:29-05'00' 234 West Century Avenue
More informationHYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR
HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR 1 INTRODUCTION 1.1 Project Description and Location Isabella Ocean Residences is a residential development to be constructed
More informationWinSLAMM v Program Modifications Final, 12/12/17
WinSLAMM v 10.3.4 Program Modifications Final, 12/12/17 1. Corrected an error in the Biofilter caused by an improperly defined variable that caused an overflow during very long model runs. 2. Corrected
More informationThe site slopes generally from the southwest to northeast at approximately 3.7 percent.
March 3, 2017 Nate Hatleback Project Manager, City of Thornton Development Engineering 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7694 RE: Riverdale Five Retail Drainage Conformance Letter Dear
More informationTechnical Memorandum
Tucson Office 3031 West Ina Road Tucson, AZ 85741 Tel 520.297.7723 Fax 520.297.7724 www.tetratech.com Technical Memorandum To: Kathy Arnold From: Greg Hemmen, P.E. Company: Rosemont Copper Company Date:
More informationApplying the Water Quality Volume
Applying the Water Quality Volume Justin Reinhart, PE Division of Surface Water Northeast Ohio Stormwater Training Council Cleveland, Ohio & Richfield, Ohio July 12, 2018 July 25, 2018 Post-Construction
More informationTreatment Volume: Curve Numbers. Composite CN or Not? Treatment Volume: Curve Numbers. Treatment Volume: Calculation. Treatment Volume: Calculation
Stormwater Engineering Bioretention Design Bill Hunt, PE, Ph.D. Extension Specialist & Assistant Professor NCSU-BAE www.bae.ncsu.edu/stormwater Bioretention Design Six Step Process 1 Determine Volume to
More informationAPPENDIX C - FACILITY SIZING CALCULATIONS
APPENDIX C - FACILITY SIZING CALCULATIONS Organization of Data in this Appendix Table UD-1 UD-2 UD-2A UD-2B UD-2C UD-2D UD-2E UD-2F Description SSF sizing calculations CN Weighing and WQv 90%volume calculation
More informationAppendix B. Storm Drain System Data
MENIFEE VALLEY CAMPUS MASTER PLAN FINAL EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT Appendix Appendix B. Storm Drain System Data June 2017 MENIFEE VALLEY CAMPUS MASTER PLAN FINAL EIR MT. SAN JACINTO
More informationSan Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons and
San Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons 2011-12 and 2012-13 Project Overview San Francisco State University (SFSU) has implemented several green
More informationDecatur, Georgia Stormwater Management Policy Guidelines. DRAFT November 5, 2014
Decatur, Georgia Stormwater Management Policy Guidelines Stormwater Management Policy Guidelines Decatur, Georgia STORMWATER MANAGEMENT POLICY GUIDELINES 1.0 Introduction... 3 2.0 Determining Predevelopment
More informationFORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview
Chapter 5: Hydrology Standards Contents 1.0 Overview... 1 1.1 Storm Runoff Determination... 1 1.2 Design Storm Frequencies... 1 1.3 Water Quality Storm Provisions... 2 1.4 Design Storm Return Periods...
More informationHydrology Study. For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021
Hydrology Study For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021 Prepared for Daryl Priest - Priest Development Corporation 124 West Main Street,
More informationNovember 21, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report
November 21, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report
More informationCRITERIA FOR STORMWATER DESIGN
..CHAPTER.. CRITERIA FOR STORMWATER DESIGN 2.1 Integrated Site Design Approach 2.1.1 Introduction This chapter represents the requirements, policies and other guidance for stormwater management design
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationPART V - STORM DRAIN DESIGN CRITERIA
PART V - STORM DRAIN DESIGN CRITERIA A. Hydrology Studies and Hydraulic Analyses 1. Drainage area master plans and calculations are to be submitted with all subdivision improvement plans, permit improvement
More informationPART V - STORM DRAIN DESIGN CRITERIA
PART V - STORM DRAIN DESIGN CRITERIA A. Hydrology Studies and Hydraulic Analyses 1. Drainage area master plans and calculations are to be submitted with all subdivision improvement plans, permit improvement
More informationHydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated)
Hydrology Study Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated) Prepared for San Mateo Real Estate & Construction March 9, 21 Rev. 1 11-8-211 Rev.
More informationModeling the Hydrologic Impacts of Control Structures Utilizing LiDAR, ICPR, and GIS Technologies
Modeling the Hydrologic Impacts of Control Structures Utilizing LiDAR, ICPR, and GIS Technologies Keanan Bell NorthStar June 12, 2015 Project began in 2010 as a Hydrology Assessment and Conceptual Restoration
More informationSTORMWATER MANAGEMENT REPORT FOR. Chick-Fil-A S Ferdon Blvd, Crestview FL. February 10 th, 2017
STORMWATER MANAGEMENT REPORT FOR Chick-Fil-A 3000 S Ferdon Blvd, Crestview FL February 10 th, 2017 PROJECT #010014-01-047 954.712.7482 www.bowmanconsulting.com Table of Contents Introduction.1 Project
More informationJacobi, Toombs, and Lanz, Inc.
Area 5: Blackiston Mill Road at Dead Man's Hollow Flooding Assessment Jacobi, Toombs, and Lanz, Inc. This document summarizes an assessment of drainage and flooding concerns and provides recommendations
More informationAppendix H Amanda Estates Drainage Study
Appendix H Amanda Estates Drainage Study Hunsaker & Associates 2015 Contents 1 Scope... 1 2 Existing Conditions... 1 3 Project Description... 3 4 Methodology... 5 4.1 Hydrology... 5 4.2 Hydraulics...
More informationDRAINAGE PLAN AND REPORT OLD DENVER ROAD
DRAINAGE PLAN AND REPORT 16140 OLD DENVER ROAD PART OF THE NW1/4 SEC. 28, T.11S., R.67W., 6 th P.M. EL PASO COUNTY February 3, 2017 Revised January 5, 2018 Prepared for All About Outdoor Storage Oliver
More informationCHAPTER 3 Water Quality Standards
Table of Contents CHAPTER 3 Water Quality Standards 3.1 Water Quality Protection Approach... 3-1 3.2 General Policies... 3-2 3.3 Water Quality Management... 3-2 3.3.1 Minimum Standard and General Policies...3-2
More informationChapter H. Introduction to Surface Water Hydrology and Drainage for Engineering Purposes
Chapter H. Introduction to Surface Water Hydrology and Drainage for Engineering Purposes As seen in Figure H.1, hydrology is a complex science that deals with the movement of water between various stages
More information526 & 528 Boston Post Road Redevelopment Sudbury, MA
PRELIMINARY STORMWATER MANAGEMENT MASTER PLAN 526 & 528 Boston Post Road Redevelopment Sudbury, MA PREPARED FOR BPR Sudbury Development LLC c/o National Development 2310 Washington Street Newton Lower
More informationStorm Sewer Design. Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg
Storm Sewer Design Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Major floods are dramatic and water flow routes must be recognized when minor drainage systems fail. These types
More informationReport. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI
Report Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,
More informationDRAINAGE DESIGN REPORT
Scannell Properties Development Sales Distribution Center Drainage Design Report DRAINAGE DESIGN REPORT JUNE 2018 SALES DISTRIBUTION CENTER SCHODACK, NEW YORK RENSSELAER COUNTY 1 Scannell Properties Development
More informationPEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION
US Army Corps of Engineers Philadelphia District PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION CECIL COUNTY MARYLAND STORMWATER MANAGEMENT PLAN NARRATIVE INITIAL SUBMISSION JUNE 2014 1 PEARCE CREEK
More informationPRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY
PRELIMINARY DRAINAGE REPORT FOR THE NEWCASTLE FIRE STATION OLD STATE HIGHWAY PREPARED FOR THE NEWCASTLE FIRE PROTECTION DISTRICT JULY 2014 BY ROSEVILLE DESIGN GROUP, INC. ROSEVILLE DESIGN GROUP, Inc Established
More informationWELSH POWER PLANT ASH LANDFILL. Run-on and Run-off Control System Plan
WELSH POWER PLANT ASH LANDFILL Run-on and Run-off Control System Plan SEPTEMBER 27, 2016 PREPARED BY: MTG TEXAS FIRM REGISTRATION NUMBER: 354 MTG PROJECT NUMBER: 167003 WELSH POWER PLANT - ASH LANDFILL
More informationWater Resources Management Plan
P L Y M O U T H M I N N E S O T A Appendix D: The developed a to analyze and minimize the impact of existing and future development on the City s natural resources. It is important to the City to have
More informationDESIGN DEVELOPMENT HYDROLOGY REPORT & LOW IMPACT DEVELOPMENT PLAN (LID PLAN)
DESIGN DEVELOPMENT HYDROLOGY REPORT & LOW IMPACT DEVELOPMENT PLAN ( PLAN) ALAMITOS BEACH CONCESSION BUILDING 780 E. SHORELINE DRIVE LONG BEACH, CALIFORNIA Prepared For: Long Beach Public Works 333 W. Ocean
More informationAPPENDIX J-3. Orcem Stormwater Management and Treatment Facilities Design Summary
APPENDIX J-3 Orcem Stormwater Management and Treatment Facilities Design Summary Stormwater Management & Treatment Facilities Design Summary INTRODUCTION KPFF Consulting Engineers has compiled this report
More informationGwinnett County Stormwater System Assessment Program
Gwinnett County Stormwater System Assessment Program Jonathan Semerjian, PE Dept. of Water Resources Stormwater Management Sam Fleming, PE Dewberry Presentation Overview Project Background Drivers Enhanced
More informationDesign Example Handouts. DURANGO DETENTION WORKBOOK LUNCH AND LEARN CITY OF DURANGO Meeting Date: February 7, 2017
Design Example Handouts DURANGO DETENTION WORKBOOK LUNCH AND LEARN CITY OF DURANGO Meeting Date: February 7, 2017 Design Example 1 Residential Infill Development Durango Detention Sheet: Basin Structure
More informationHYDROLOGY STUDY PREPARED FOR: MARKHAM PERRIS LLC 302 WEST FIFTH STREET, SUITE 103 SAN PEDRO, CA (310) FOR THE PROJECT:
HYDROLOGY STUDY PREPARED FOR: MARKHAM PERRIS LLC 302 WEST FIFTH STREET, SUITE 103 SAN PEDRO, CA 90731 (310) 241-2992 FOR THE PROJECT: PERRIS VALLEY COMMERCE CENTER BUILDING PERRIS, CALIFORNIA PROJECT NUMBER:
More informationDETENTION BASIN DESIGN USING RATIONAL HYDROGRAPHS
DETENTION BASIN DESIGN USING RATIONAL HYDROGRAPHS By Thomas F. Smith, P.E., P.L.S. Bercek and Smith Engineering, Inc. www.bercekandsmith.com tfsmith2@bercekandsmith.com 1 Topics Covered: 2 1 Attributed
More informationDRAFT. Technical Memorandum. Whitney Road Drainage & Safety Enhancements Phase III Hydraulic Update. Prepared For:
DRAFT Technical Memorandum Whitney Road Drainage & Safety Enhancements Phase III Hydraulic Update Prepared For: Pinellas County Department of Environment and Infrastructure Division of Engineering and
More informationAppendix G Preliminary Hydrology Study
Appendix G Preliminary Hydrology Study Preliminary Hydrology Study VESTING TTM 72608 Long Beach, CA Prepared for: The Long Beach Project, LLC 888 San Clemente, Suite 100 New Port Beach, CA May 28, 2014
More informationRunoff Calculations. Time of Concentration (T c or t c ) from one location to another within a watershed. Travel
Runoff Calculations Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Time of Concentration and Travel Time (based on Chapter 3 of TR-55) Time of Concentration (T c ): time required
More informationInflow Design Flood Control System Plan
Inflow Design Flood Control System Plan Scrubber Ponds Lewis & Clark Station Prepared for Montana-Dakota Utilities Co. November 2018 234 West Century Avenue Bismarck, ND 58503 701.255.5460 www.barr.com
More informationSurface Skimmer and Baffle Sediment Basins, Modeling the Benefits
Surface Skimmer and Baffle Sediment Basins, Modeling the Benefits J.P. Johns, PE Woolpert Ray Vaughan Stormwater Manager SCDOT Brandon Wagner -Woolpert Background o SCDOT sediment basin design required
More informationStormwater Management Impacts Resulting from the Volumetric Abstraction of Runoff from Frequent Storms per PADEP CG-1. Geoffrey A. Cerrelli 1, P.E.
Stormwater Management Impacts Resulting from the Volumetric Abstraction of Runoff from Frequent Storms per PADEP CG-1 Geoffrey A. Cerrelli 1, P.E. 1 Hydraulic Engineer USDA/NRCS, One Credit Union Place,
More information