1 Draft revisio to the approved baselie ad moitorig methodology AM0038 Methodology for improved electrical eergy efficiecy of a existig submerged electric arc furace used for the productio of silico ad ferro alloys SiM I. SOURCE AND APPLICABILITY Source This baselie ad moitorig methodology is based o the followig proposed ew methodology: NM0146 Baselie methodology for improved electrical eergy efficiecy of a existig submerged electric arc furace used for the productio of Alloy SiM. submitted by Trasalloys Divisio of the Highveld Steel ad Vaadium Corporatio Ltd. This methodology also refers to the latest approved versios of the followig tools: Tool to calculate the emissio factor for a electricity system, to calculate the grid emissio factor; Tool to determie the remaiig lifetime of equipmet. For more iformatio regardig the proposed ew methodologies ad the tools as well as their cosideratio by the Executive Board please refer to < Baselie Approach Selected from Paragraph 48 of the CDM Modalities ad Procedures Existig actual or historical emissios, as applicable. Applicability This methodology is applicable if the followig coditios are met: Submerged electrical arc furaces is are used for productio of silicomagaese (SiM)the same type of product Alloy both i the project case ad baselie; The alloy(s) produced i the electric arc furace is ferrosilico, ferromagaese, silicomagaese, silico metal or ferrochrome; The electricity cosumed both i the project case ad the baselie, by the submerged electric arc furace is sourced from the grid ad ot by o-site geeratio. The geographic ad system boudaries for the relevat electricity grid ca be clearly idetified ad iformatio o the characteristics of the grid is available; The quality 1 of the raw material ad SiM products Alloy produced is ot affected by the project activity ad remais uchaged; The local regulatios/programs do ot cap the level of grid electricity that ca be procured by the SiM productio facility where the project activity is implemeted; Data for at leastthe most recet three years precedig the implemetig the implemetatio of the project activity is available to estimate the baselie emissios. 1 Quality is defied as remaiig the same if the compositio (elemetary aalysis) remais i the same rage. 1/24

2 Emissio reductio credits shall be claimed oly util the ed of the lifetime of the equipmet, as determied usig the Tool to determie the remaiig lifetime of equipmet ; The project activity does ot result i a icrease of i the productio capacity of the SiM productio facility, where the project is implemeted, durig the creditig period. The followig approaches should be take ito accout to estimate the remaiig lifetime of the existig equipmet or its parts: (a) The typical average techical lifetime of the equipmet, takig ito accout commo practices i the sector, e.g., based o idustry surveys, statistics, techical literature, etc. (b) The practices regardig replacemet schedules, e.g. based o historical replacemet records for similar equipmet. The lifetime of the equipmet will be documeted ad validated by the DOE. The remaiig lifetime of the existig equipmet should be chose i coservative maer, i.e., the smallest value of remaiig lifetime should be chose i cases where the life time estimated as a time rage rather tha sigle value. If the project activity is implemeted i a umber of electric arc furaces, which produce SiM the alloy, as part of a program, the methodology is applicable to the program as a whole. However all of the requiremets (baselie determiatio, additioality, etc.) shall be applied to ad should be fulfilled by each idividual electric arc furace covered uder the program. II. BASELINE METHODOLOGY Project Boudary The project boudary comprises of the followig two compoets: The electricity grid from which the electricity used i the project activity is purchased, as defied i the latest versio of Tool to calculate emissio factor for a electricity system ; The physical structure of the submerged electric arc furace, as described i figure below (Figure 1). 2/24

3 Or e Fl ux es Re du ct a ts Electrode paste Grid electricity Exhaust to Filter plat Project boudary Waste slag to dump SiM castig SiM trasport to customers Figure 1: Spatial extet of the project boudary (excludig the grid geeratio capacity accordig to the latest versio of Tool to calculate emissio factor for a electricity system ) Figure 1: Spatial extet of the project boudary (excludig the grid geeratio capacity accordig to the latest versio of Tool to calculate emissio factor for a electricity system ). Emissios sources The emissios sources icluded i the project boudary are defied i the table 1 below. Figure 1: Spatial extet of the project boudary (excludig the grid geeratio capacity accordig to the latest versio of Tool to calculate emissio factor for a electricity system ) 3/24

4 Emissios sources The emissios sources icluded i the project boudary are defied i table 1 below. Table 1: Emissios sources icluded i or excluded from the project boudary Baselie Project Activity Source Gas Icluded? Justificatio / Explaatio CO 2 Icluded! Oly CO 2 emissios associated with the Grid electricity geeratio Emissios from the cosumptio of reductats electricity cosumptio of the submerged arc electric furace; based o most recet 3 year historic data CH 4 Excluded N 2 O Excluded CO 2 Icluded! Although some part of the carbo will ed up i the ed product it is assumed that 100% will be emitted to the air via the exhaust gases. Carbo cotet is measuredbased o the most recet 3 year historic average reductat cosumptio CH 4 Excluded! No CH 4 emissios N 2 O Excluded! N 2 O emissios are excluded for simplificatio a CO 2 Icluded! Based o the most recet 3 year historic average electrode paste cosumptio CH 4 Excluded! No CH 4 emissios Emissios from the cosumptio of electrode paste N 2 O Excluded! N 2 O emissios are excluded for simplificatio a Grid electricity geeratio Emissios from the cosumptio of reductats CO 2 Icluded! Oly CO 2 emissios associated with the utilisatio of the submerged arc electric furace will be couted;! The combied margi method as described i the latest versio of Tool to calculate emissio factor for a electricity system should be used CH 4 Excluded N 2 O Excluded CO 2 Icluded! Although some part of the carbo will ed up i the ed product it is assumed that 100% will be emitted to the air via the exhaust gases. Reductio cosumptio is moitored durig project CH 4 Excluded! No CH 4 emissios N 2 O Excluded! N 2 O emissios are excluded for simplificatio a CO 2 Icluded! Electrode paste cosumptio is moitored Emissios from durig the project the CH 4 Excluded! No CH 4 emissios cosumptio of electrode paste N 2 O Excluded! N 2 O emissios are excluded for simplificatio a Note a : N 2 O emissios are excluded for simplificatio. 4/24

5 Idetificatio of baselie sceario The baselie sceario shall be determied usig the followig steps: Step 1: Idetify techically feasible optios to icrease eergy efficiecy withi the project boudary The project propoet shall cosider at least the followig baselie alteratives: (a) Complete replacemet of furace; (b) Cotiued use of istalled furace techology; (c) The project activity, istallatio of ew-build desig, ot implemeted as a CDM project; (d) All other plausible ad credible alteratives to the project activity that provide eergy efficiecy improvemet to the furace which are techically feasible to implemet with comparable quality, properties ad applicatio areas. Step 2: Idetify baselie alteratives that do ot comply with legal or regulatory requiremets The project propoet shall cosider the followig: Idetify all the legal or regulatory requiremets that may ifluece the choice of baselie optios ad evidece should be provided that all such requiremets have bee documeted; The baselie alterative should also be evaluated i the cotext of sector treds, ad icorporate the effects of ay legislatio ad govermet policies that may affect this tred. For example, if eergy efficiecy stadards are beig itroduced by the atioal govermet, they should be icorporated i the available baselie alterative. If a baselie alterative does ot comply with all applicable legislatio ad regulatios, the show that, based o a examiatio of curret practice i the coutry or regio i which the law or regulatio applies, those applicable legal or regulatory requiremets are systematically ot eforced ad that o-compliace with those requiremets is widespread i the coutry. If this caot be show, the elimiate the baselie alterative from further cosideratio. Step 3: Elimiate baselie alteratives that face prohibitive barriers Scearios that face prohibitive barriers should be elimiated by applyig step 3 of the latest versio of the Tool for demostratio ad assessmet of additioality agreed by the CDM Executive Board. Establish a complete list of barriers that would prevet baselie alteratives to occur i the absece of the CDM. Sice the proposed project activity ot beig registered as a CDM project activity shall be oe of the cosidered baselie alteratives, ay barrier that may prevet the project activity to occur shall be icluded i that list. Show which baselie alteratives are preveted by at least oe of the barriers previously idetified ad elimiate those alteratives from further cosideratio. All alteratives shall be evaluated for a commo set of barriers. If there is oly oe baselie alterative that is ot preveted by ay barrier the this alterative is idetified as the baselie sceario. Where more tha oe baselie alteratives remais, project participats shall, as a coservative assumptio, use the alterative baselie sceario that results i the lowest baselie emissios as the most likely baselie sceario, or coduct a ivestmet aalysis (Step 4). 5/24

6 Step 4: Compare ecoomic attractiveess of the remaiig alteratives The et preset value (NPV) aalysis shall be used to compare the ecoomic attractiveess, without reveues from CERs, for all baselie alteratives that are remaiig after step 3. Explicitly state the followig parameters: Ivestmet requiremets (icl. break-up ito major equipmet cost, required costructio work, istallatio); A discout rate appropriate to the coutry ad sector (Use govermet bod rates, icreased by a suitable risk premium to reflect private ivestmet i the specific project type, as substatiated by a idepedet (fiacial) expert); Curret price ad expected future price (variable costs) of eergy, raw materials ad other products (Note: As a default assumptio the curret prices may be assumed as future prices. Where project participats ited to use future prices that are differet from curret prices, the future prices have to be substatiated by a public ad official publicatio from a govermetal body or a itergovermetal istitutio); Other operatig costs for each alterative; Lifetime of the project, equal to the remaiig lifetime of the existig facility; ad Other operatio ad maiteace costs. The NPV calculatio should take ito accout the residual value of the ew equipmet at the ed of the lifetime of the project activity. 2 The iformatio o all the above factors as well as assumptios shall be explicitly stated i the CDM-PDD. Compare the NPV of the differet baselie alteratives ad select the most cost-effective alterative (i.e. with the highest NPV) as the baselie sceario. Iclude a sesitivity aalysis applyig Sub-step 2d of the latest versio of the Tool for demostratio assessmet ad of additioality agreed by the CDM Executive Board. The most cost-effective sceario is the baselie sceario if the sesitivity aalysis cosistetly supports (for a realistic rage of assumptios) this coclusio. I case the sesitivity aalysis is ot fully coclusive, select the baselie sceario alterative with least emissios amog the alteratives that are the most ecoomically attractive accordig to the ivestmet aalysis ad the sesitivity aalysis. This methodology is oly applicable if the cotiuatio of use of istalled furace techology throughout the creditig period is the most plausible baselie sceario. Additioality The assessmet of additioality comprises of three steps: Step 1: Ivestmet & sesitivity aalysis Demostrate that the project activity udertake without the CDM is ecoomically less attractive tha the most plausible baselie sceario, by followig the istructios give i step 4 of the chapter Idetificatio of the baselie sceario above. Iclude a sesitivity aalysis applyig Sub-step 2d of the latest versio of the Tool for demostratio assessmet ad of additioality as agreed by the 2 Note that NPV values may be egative. 6/24

7 CDM Executive Board. The ivestmet aalysis provides a valid argumet i favour of additioality oly if it cosistetly supports (for a realistic rage of assumptios) the coclusio that the project activity is ulikely to be the most fiacially attractive. Step 2: Commo practice aalysis Demostrate that the project activity is ot a commo practice i the coutry ad sector by applyig Step 4 of the latest versio of the Tool for demostratio assessmet ad of additioality as agreed by the CDM Executive Board. Step 3: Impact of CDM registratio Describe the impact of the registratio of the project activity by applyig Step 5 of the latest versio of the Tool for demostratio assessmet ad of additioality as agreed by the CDM Executive Board. If all 3 steps are satisfied, the the project is cosidered additioal. Baselie Emissios Emissios associated with SiMalloy productio i the baselie sceario are determied as follows: 3 Note: Subscript y idicates years durig the creditig period ad subscript i is used for years precedig the start of the project activity. BE = BE + BE (1) y y,offsite y, osite Where: BE y = Baselie emissios (tco 2 e i year y) BE y,off-site = Off-site baselie (grid) electricity emissios associated with the electricity cosumptio of the submerged arc furace (tco 2 e i year y) BE y, o-site = O-site baselie emissios associated with the cosumptio of Reductat (Coal ad Coke) ad electrode paste durig the productio of SiMthe alloy (tco 2 e i year y) Off-site baselie emissios are calculated accordig to: BE y, offsite = QP sec EF (2) y, max b y, offsite Where: BE y, off-site = Off-site baselie (grid) electricity emissios associated with the electricity cosumptio of the submerged arc furace (tco 2 e i year y) QP y, max = Value of SiMalloy productio i year y (tsimt alloy/y) as estimated usig equatio 3. This value is used i both the baselie ad the project emissio calculatios sec b = Historic (at least a three year vitage period) average grid specific electricity cosumptio per toe of SiMalloy produced i the baselie situatio (MWh/tSiMt alloy) EF y, off-site = Grid electricity emissios factor, estimated usig the latest versio of the Tool to calculate emissio factor for a electricity system (tco 2 e/mwh) 7/24

8 The SiMalloy productio is limited to a historic average level as follows: m QPy, max = mi of (QPy, moitored, QPhistoric) (3) Where: QP y, max = Value of SiMalloy productio used for estimatig baselie ad project emissios for year y (tsimt alloy/y) QP y, moitored = Moitored productio of SiMalloy i year y durig the project activity (tsimt alloy /y) QP historic = Historic (at least a three year vitage period) average aual productio of SiMalloy (tsimt alloy /y) The historic average productio of SiMalloy is calculated accordig to: QP historic i= = 1 QP i (4) Where: QP historic = Historic (at least a three year vitage period) average aual quatity of SiMalloy productio (tsimt alloy /y) QP i = Aual SiMalloy productio for the i th years precedig the project activity (tsimt alloy) = Number, at least three years, of historic year data used for estimatig historic aual average productio The average electricity cosumptio per toe of SiMalloy produced i the baselie situatio is calculated as follows: s ec historic i= 1 = i= 1 EC QP i i (5) Where: Sec historic = Historic (at least a three year vitage period) average grid specific electricity cosumptio per toe of SiMalloy produced i the baselie situatio (MWh/ tsimt alloy) QP i = Aual SiMalloy productio for the at least three years precedig the project activity (tsimt alloy produced i year i) EC i = Aual grid electricity cosumptio by the submerged electric arc furace for the at least three years precedig the project activity (MWh cosumed i year i) The o-site emissios are calculated usig the followig equatios: BE y, osite QPy, max EFb, osite = (6) 8/24

9 Where: BE y, o-site = O-site baselie emissios associated with the cosumptio of reductat (Coal ad Coke) ad electrode paste i the productio of SiMalloy (tco 2 e i year y) QP y, max = Value of SiMalloy productio used for estimatig baselie ad project emissios for year y (tsimt alloy /y) EF b, o-site = Baselie emissio factor associated with the (o-site) cosumptio of reductat (Coal ad Coke) ad electrode paste i the productio of per toe of SiMalloy (tco 2 e/ tsimt alloy). The average o-site emissios are based o historic (at least a three year vitage period) average aual cosumptio as calculated i equatio 7 The o-site emissio factor is determied as follows: EF EF b, osite b, osite Where: EF b, o-site Q bcoal, i EF bcoal Q bcoke, i EF bcoke Q bcoal,i bcoal bcoke,i i = 1 i = 1 = Q + + Q i = 1 QP i bcoke + i = 1 bcoal,i bcoal bcoke,i bcoke i = 1 i = 1 i = 1 = Q + i = 1 Q Q QP bpaste,i bpaste,i i bpaste bpaste + i = 1 Q breductother,i breductother = Baselie emissio factor associated with the (o-site) cosumptio of reductat (Coal ad Coke) ad electrode paste i the productio of per toe of SiMalloy (tco 2 e/ tsimt alloy). The average o-site emissios are based o historic (at least a three year vitage period) = Average historic (most recet three yearsat least a three year vitage period (i)) aual cosumptio of coal used as reductat i the submerged electric arc furace i toes of coal per year (tcoal cosumed i year i). This value shall be take ito accout whe assessig the overall ucertaity for o-site emissios usig project specific values = Emissios factor applied for the coal cosumed as reductat. This factor ca be calculated o a project specific basis or a default IPCC value ca be applied. If project specific values are used this factor shall be take ito accout whe assessig the overall ucertaity for o-site emissios. If IPCC values are used the coservative ed of the ucertaity rage shall be applied = Average historic (most recet three yearsat least a three year vitage period) aual cosumptio of coke used as reductat i the submerged electric arc furace i toes of coke per year (tcoke cosumed i year i). This value shall be take ito accout whe assessig the overall ucertaity for o-site emissios usig project specific values = Emissios factor applied for the coke cosumed as reductat. This factor ca be calculated o a project specific basis or a default IPCC value ca be applied. If project specific values are used this factor shall be take ito accout whe assessig the overall ucertaity for o-site emissios. If IPCC values are used, the coservative ed of the ucertaity rage shall be applied (7) 9/24

10 Q bpaste, i EF bpaste Q breductother, i EF breductother = Average historic (most recet three yearsat least a three year vitage period) aual cosumptio of electrode paste used as Electrode i the submerged electric arc furace i toes of electrode paste per year (t paste cosumed i year i). This value shall be take ito accout whe assessig the overall ucertaity for o-site emissios usig project specific values = Emissios factor applied for the electrode paste cosumed as electrode, usig the relevat emissios factor (tco 2 ) for the carbo paste as specified by the maufacturer applicable for the vitage period. If maufacturer s specificatios are used, the lower value of the ucertaity rage provided by the maufacturer will have to be adopted. Alteratively, a coservative but ot real default factor of 0 tco 2 /t of Carbo paste ca be used (based o the assumptio that the paste is 0% carbo) = Average historic (most recet three years) aual cosumptio of other materials used as reductat i the submerged electric arc furace i toes of reductat per year (t Other Reductat cosumed i year i). This value shall be take ito accout whe assessig the overall ucertaity for o-site emissios usig project specific values = Emissios factor applied for the other materials cosumed as reductats. This factor ca be calculated o a project specific basis or a default IPCC value ca be applied. If project specific values are used, this factor shall be take ito accout whe assessig the overall ucertaity for o-site emissios. If IPCC values are used the coservative ed of the ucertaity rage shall be applied Whe IPCC values are used to determie the emissio factors for calculatig o-site emissios, a ucertaity coefficiet shall be defied based o the most recet versio of the IPCC guidelies o Natioal Greehouse Gas Ivetories ad the most recet coutry specific iformatio reported o the basis thereof. 4 Where project specific values are used, the overall ucertaity of the o-site emissios will be assessed based o the measuremets of activity data ad emissio factors. The ucertaity will be assessed i lie with the Europea Commissio guidelies o moitorig ad reportig of GHG emissios i iro ad steel productio ad take ito accout whe calculatig the o-site emissios. 5 If charcoal is used as a reductat istead of coal, oly the o-site emissios of the charcoal will be take ito accout. Ay offset of emissios due to replacig coal by reewable reductats will ot be take ito accout uder this methodology as it cocers a chage of fossil to reewable cosumables which does ot fit ito the scope of improved electrical efficiecy. Project Emissios Estimates of the emissios associated with SiMalloy productio i the project sceario are determied as follows: PE = PE (offsite) PE (osite) (8) y y + y 4 Latest versio of IPCC Guidelies for Natioal Greehouse Gas Ivetories: Reportig Istructios. 5 Commissio Decisio of 29 Jauary 2004 establishig guidelies for the moitorig ad reportig of greehouse gas emissios pursuat to Directive 2003/87/EC of the Europea Parliamet ad of the Coucil. 10/24

11 Where: PE y PE y (off-site) PE y (o-site) = Project emissios i year y = Off-site project (grid) electricity emissios associated with the electricity cosumptio of the submerged arc furace (tco 2 e i year y) = O-site project emissios associated with the cosumptio of reductat (Coal ad Coke) ad electrode paste durig the productio of SiMalloy (tco 2 e i year y) Off-site emissios i the project sceario are determied accordig to: PE y (off-site) = QP y, max * sec p, y y (off-site) (9) Where: QP y, max = Value of SiMalloy productio used for estimatig baselie ad project emissios for year y (tsimt alloy /y), estimated usig equatio 3 i the baselie emissio sectio PE y (off-site) = Off-site project (grid) electricity emissios associated with the electricity cosumptio of the submerged arc furace (tco 2 e i year y) sec p, y = Grid specific electricity cosumptio per toe of SiMalloy produced i the project situatio (MWh/ tsimt alloy) i year y EF y (off-site) = Grid electricity emissios factor (tco 2 e/mwh) estimated by usig the latest versio of Tool to calculate emissio factor for a electricity system The average electricity cosumptio per toe of SiMalloy produced i the project situatio is calculated as follows: sec p, y = EC y / QP y, moitored (10) Where: sec p, y EC y = Grid specific electricity cosumptio per toe of SiMalloy produced i the project situatio (MWh/ tsimt alloy) i year y = Aual grid electricity cosumptio by the submerged electric arc furace i year y (MWh/y) The o-site emissios for the project sceario are calculated usig the followig equatios: PE y (o-site) = QP y, max x EF p, y (o-site) (11) Where: PE y (o-site) QP y, max = O-site project emissios associated with the cosumptio of reductat (Coal ad Coke) ad electrode paste durig the productio of SiMalloy (tco 2 e i year y) = Value of SiMalloy productio used for estimatig baselie ad project emissios for year y (tsimt alloy /y) EF p, y (o-site) = Project emissio factor associated with the (o-site) average cosumptio of reductat (Coal ad Coke) ad electrode paste durig the productio per to SiMalloy i year y (tco 2 e/ tsimt alloy) as calculated i equatio 12 The o-site emissio factor i the project sceario are calculated as follows: EF p, osite Q = pcoal,i pcoal + Q pcoke,i QP y pcoke + Q ppaste,i ppaste 11/24

12 EF p, y, osite Where: EF p, y(o-site) Q pcoal, y EF pcoal,y Q pcoke, y EF pcoke,y Q ppaste, y EF ppaste,y QP y moitored Q breductother,y EF breductother,y Q = pcoal,y pcoal, y + Q pcoke,y pcoke, y + Q ppaste,y QP y ppaste, y + i = 1 Q breductother,i,y = Project emissio factor associated with the (o-site) average cosumptio of reductat (Coal ad Coke) ad electrode paste i the productio per to SiMalloy i year y (tco 2 e/ tsimt alloy) as calculated i equatio 12 = Cosumptio of coal used as reductat i the submerged electric arc furace i toes of coal per year (tcoal/y). This value shall be take ito accout whe assessig the overall ucertaity for o-site emissios usig project specific values = Emissios factor applied for the coal cosumed as reductat. This factor ca be calculated o a project specific basis or a default IPCC value ca be applied. If project specific values are used this factor shall be take ito accout whe assessig the overall ucertaity for o-site emissios. If IPCC values are used the coservative ed of the ucertaity rage shall be applied = Cosumptio of coke used as reductat i the submerged electric arc furace i toes of coke per year (tcoke/y). This value shall be take ito accout whe assessig the overall ucertaity for o-site emissios usig project specific values = Emissios factor applied for the coke cosumed as reductat. This factor ca be calculated o a project specific basis or a default IPCC value ca be applied. If project specific values are used this factor shall be take ito accout whe assessig the overall ucertaity for o-site emissios. If IPCC values are used the coservative ed of the ucertaity rage shall be applied = Cosumptio of electrode paste used as electrode i the submerged electric arc furace i toes of electrode paste per year (tpaste/y). This value shall be take ito accout whe assessig the overall ucertaity for o-site emissios usig project specific values = Emissios factor applied for the electrode paste cosumed as electrode, usig the relevat emissios factor (tco 2 ) for the carbo paste as specified by the maufacturer i year y. If maufacturer s specificatios are used, the lower value of the ucertaity rage provided by the maufacturer will have to be adopted. Alteratively, a default factor of 3.67 tco 2 /t of carbo paste ca be take (based o the assumptio that the paste is 100% carbo which is the same as 44/12 tco 2 eq) = Quatity of SiMalloy productio i year y durig the project activity (tsimt alloy /y) = Cosumptio of other materials used as a reductat i the submerged electric arc furace i toes of reductat per year. This value shall be take ito accout whe assessig the overall ucertaity for o-site emissios usig project specific values = Emissio factor applied for the other materials cosumed as reductats. This factor ca be calculated o a project specific basis or a default IPCC value ca be applied. If project specific values are used this factor shall be take ito accout whe assessig the overall ucertaity for o-site emissios. If IPCC values are used the coservative ed of the ucertaity rage shall be applied breductother, i, y (12) 12/24

13 Whe IPCC values are used to determie the emissio factors for calculatig o-site emissios a ucertaity coefficiet shall be defied based o the most recet versio of the IPCC guidelies o Natioal Greehouse Gas Ivetories ad the most recet coutry specific iformatio reported o the basis thereof. 6 Where project specific values are used the overall ucertaity of the o-site emissios will be assessed based o the measuremets of activity data ad emissio factors. The ucertaity will be assessed i lie with the EC guidelies o moitorig ad reportig of GHG emissios i iro ad steel productio ad take ito accout whe calculatig the o-site emissios. 7 Leakage The methodology does ot aticipate ay other measurable forms of leakage attributable to the project activity. This assumptio should be verified whe a project is developed. to validate this assumptio The leakages metioed i the Tool to calculate the emissio factor for a electricity system too shall be assessed. A project activity is likely to result i a decrease i emissios outside the project boudary ad these, which will ot be take ito accout i the calculatio. This The decrease may occur due to followig reasos: The project activity will improve the SiM recovery efficiecy of alloy productio from the Magaese orerelevat raw materials ad cosequetly reduce the rate of depletio of thisthese oreewable magaese ore resourceresources. Cosequetly this reduces the athropogeic GHG emissios associated with the activities upstream of the SiMalloy productio process. The emissios associated with a reductio i the miig of oreextractio of raw materials ad the reduced trasport of orematerials to the SiMalloy plat occur outside the project boudary thusad therefore, it caot be cosidered as a compoet of emissios reductio. I additio the above-metioed icrease i SiM recoverythe efficiecy of alloy productio, the project will result i the productio of less slag i relatio to the same amout of SiMalloy produced. 8 The dowstream athropogeic GHG emissios associated with the hadlig of this slag (e.g. crushig ad trasportatio to the dump) will be reduced as a result. These emissios occur outside the boudary ad hece, caot be cosidered as a compoet of emissios reductio. Emissio reductios The emissio reductios (ER y ) of the project activity durig a give year y is the differece betwee the baselie, project emissios ad emissios due to leakage, as expressed i the formula equatio below: ER y = BE y PE y L y (13) Where : ER y BE y PE y L y = Emissios Reductios (t CO 2 e) i year y = Emissios i the baselie sceario (t CO 2 e) i year y = Emissios i the project sceario (t CO 2 e) i year y = Leakage (t CO 2 e) i year y 6 Latest versio of IPCC Guidelies for Natioal Greehouse Gas Ivetories: Reportig Istructios 7 Commissio Decisio of 29 Jauary 2004 establishig guidelies for the moitorig ad reportig of greehouse gas emissios pursuat to Directive 2003/87/EC of the Europea Parliamet ad of the Coucil 8 These reductios may ot occur i processes that do ot produce slag as a by-product. 13/24

14 Data ad Parameters ot moitored QP i Toes of SiMalloy /year Aual SiMalloy productio for years precedig the project activity, at least three years The aual SiMalloy productio for years precedig the project activity will be recorded at the start of the project activity ad is used to calculate QP historic Historic calibratio ad maiteace reports may serve to demostrate QA/QC procedures ad access ucertaities EC i MWh/year Aual grid electricity cosumptio by the submerged electric arc furace for years precedig the project implemetatio, at least three years data should be used. The aual electricity cosumptio for at least three years precedig the project activity will be recorded at the start of the project activity This data will be double checked with bills from grid operator to esure cosistecy. Electricity meter historic calibratio ad maiteace reports may serve to demostrate QA/QC procedures ad access ucertaities Q bcoal, I Toes of coal/year Historic aual cosumptio of coal used as reductat i the submerged electric arc furace The aual coal cosumptio for at least three years precedig the project activity will be recorded at the start of the project activity Load cells historic calibratio ad maiteace reports may serve to demostrate QA/QC procedures ad access ucertaities Q bcoke, I Toes of coke/year Historic aual cosumptio of coke used as reductat i the submerged electric arc furace The aual coke cosumptio for at least three years precedig the project activity will be recorded at the start of the project activity 14/24

15 Load cells historic calibratio ad maiteace reports may serve to demostrate QA/QC procedures ad access ucertaities Q bpaste, I Toes of paste/year Historic aual cosumptio of electrode paste used as electrode i the submerged electric arc furace The aual paste cosumptio for at least three years precedig the project activity will be recorded at the start of the project activity Load cells historic calibratio ad maiteace reports may serve to demostrate QA/QC procedures ad access ucertaities Q breductother, I Toes of reductat/year Historic aual cosumptio of other materials used as reductat i the submerged electric arc furace The aual other reductat cosumptio for most recet three years precedig the project activity will be recorded at the start of the project activity Load cells historic calibratio ad maiteace reports may serve to demostrate QA/QC procedures ad access ucertaities EF bcoal tco 2 / t coal Emissio factor applied for the coal cosumed as reductat based o carbo cotet Carbo cotet furished by the supplier or idepedet laboratory or IPCC values Historic laboratory reports A estimated project-specific value for three years precedig the project activity is preferred to IPCC value. 15/24

16 EF bcoke tco 2 / t coke Emissio factor applied for the coke cosumed as reductat based o carbo cotet Carbo cotet furished by the supplier or idepedet laboratory or IPCC values A estimated project-specific value for three years precedig the project activity is preferred to IPCC value EF bpaste tco 2 / t of carbo paste Emissio factor applied for the electrode paste cosumed as electrode based o carbo cotet Carbo cotet furished by the supplier or idepedet laboratory or IPCC values Based o the maufacturer s specificatios for the paste used i the three years precedig the project activity, a value will be determied. Alteratively, a factor of 0 tco 2 / t of carbo paste ca be applied oly for the baselie EF breductother tco 2 / t Other Material Emissio factor applied for the other material cosumed as reductat based o carbo cotet Carbo cotet furished by the supplier or idepedet laboratory or IPCC values A estimated project-specific value for three years precedig the project activity is preferred to IPCC value Quality of Coal b Mass fractio of each compoet (%m/m) Quality of Coal based o elemetary aalysis ad other relevat properties Supplier To esure cosistecy ad, if applicable, calculate EF coal The quality shall be moitored. Quality will be established o the basis of historic data for stadard grades ad carbo cotet. 16/24

17 Quality of Coke b Mass fractio of each compoet (%m/m) Quality of Coke based o elemetary aalysis ad other relevat properties or a third party laboratory (ca be the supplier) To esure cosistecy ad, if applicable, calculate EF coke the quality shall be moitored. Quality will be established o the basis of historic data for stadard grades ad carbo cotet Historic data obtaied from aalysis reports to be compared with IPCC rage of values Quality of electrode paste b based o elemetary aalysis ad other relevat properties Mass fractio of each compoet (%m/m) Quality of electrode paste or a third party laboratory (ca be the supplier) or IPCC values To esure cosistecy ad, if applicable, calculate EF paste the quality shall be moitored. Quality will be established o the basis of maufacturer s iformatio for the paste used i the past three years Historic data obtaied from aalysis reports to be compared with IPCC rage of values Quality of Other Reductat b Mass fractio of each compoet (%m/m) Quality of other material used as a reductat, based o relevat properties or a third party laboratory (ca be the supplier) To esure cosistecy ad, if applicable, calculate EF reductother the quality shall be moitored. Quality will be established o the basis of historic data for stadard grades ad carbo cotet Historic data obtaied from aalysis reports to be compared with IPCC rage of values 17/24

18 Quality of SiM b alloy b based o elemetary aalysis ad other relevat properties Text Quality of alloysim or a third party laboratory or IPCC values. The quality of the alloysim (defied by certai specificatios for M, C, Si, P, S as appropriate) 9 for the three years precedig the project activity will be recorded at the start of the project activity based o historic samplig aalysis data Historic data obtaied from aalysis reports to be compared with referece data Quality of OreRaw Materials 10 based o elemetary aalysis ad other relevat properties Text Quality of OreRaw Materials or a third party laboratory or IPCC values. The quality of the OreRaw Materials (defied by certai specificatios for Fe, M, C, Si, P, S etc as appropriate) for the three years precedig the project activity will be recorded at the start of the project activity based o historic samplig aalysis data Historic data obtaied from aalysis reports to be compared with referece data Quality of fluxes 11 based o elemetary aalysis ad other relevat properties Text Quality of fluxes The quality of the fluxes (defied by elemetary aalysis ad otherrelevat properties) for the three years precedig the project activity will be recorded at the start of the project activity based o historic samplig aalysis data. Fluxes are oly moitored whe the specified alloy productio processes requires their use 9 As i Table 4.5 of the 2006 IPCC Guidelies for Natioal Greehouse Gas Ivetories, Chapter 4, pg Raw materials are defied as those materials which cotribute the major compoets to the fial alloy, for istace i SiM productio raw materials are Magaese Ore ad Quartz, i FeSi productio raw materials are mill scale (or other source of iro) ad Quartz. 11 For the avoidace of doubt, fluxes are defied to be a mieral added to the furace charge for the purpose of removig impurities (Coal & Steel Report, World Coal Istitute, 2009). 18/24

19 III. MONITORING METHODOLOGY Overview of Parameters to be Moitored The methodology is devised to moitor emissios as a result of both baselie ad project activities arisig from project implemetatio. The methodology moitors the o-site ad off-site emissios i the baselie ad the project sceario. Some of the baselie parameters are defied as costat values sice they ca o loger be separately measured after implemetatio of the project. These costat values are based o actual historic measuremets ad iterpreted i a coservative maer. Data for estimatig grid electricity emissio factor should be moitored as defied i the latest versio of Tool to calculate emissio factor for a electricity system. IPCC emissio factors are used for coal, ad coke ad other reductats i case local data is ot available. Maufacturer s emissio factor is used for electrode paste. The methodology requires moitorig of the cosumptio of electricity, coal, coke, other reductats ad electrode paste, SiMalloy productio ad project-specific quality ad emissio factors for coal, coke, other reductats ad electrode paste. Moitorig of baselie ad project parameters QP y moitored Toes of SiMalloy /year Quatity of SiMalloy productio i year y durig the project activity The SiMalloy productio is weighed o a platform scaleweighig istrumet as it is trasferred to the castig machie or castig bed Per productio ru equipmet used at the plat site should be subject to a regular maiteace ad testig regime (icl. calibratio) to esure accuracy EC y MWh/year Aual grid electricity cosumptio by the submerged electric arc furace The quatity of electricity cosumed from a grid will be metered, ad double-checked with the bills from the electricity supplier Measured cotiuously, recorded mothly This data will be double checked with bills from grid operator to esure cosistecy. Electricity meter will be calibrated i lie with maufacturer s recommedatios 19/24

20 Q pcoal, y Toes of Coal/year Cosumptio of coal used as reductat i the submerged electric arc furace The coal is weighedloaded ito hoppersdispesers equipped with load cells uder themmass measurig devices to determie the mass fed ito the furace Daily equipmet used at the plat site should be subject to a regular maiteace ad testig regime (icludig calibratio) to esure accuracy Q pcoke, y Toes of Coke/year Cosumptio of coke used as reductat i the submerged electric arc furace i toes of coke per year The coke is weighedloaded ito hoppersdispesers equipped with load cells uder themmass measurig devices to determie the mass fed ito the furace Daily equipmet used at the plat site should be subject to a regular maiteace ad testig regime (icludig calibratio) to esure accuracy Q ppaste, y Toe of paste/year Cosumptio of electrode paste used as electrode i the submerged electric arc furace i toes of electrode paste per year Based o the ivetory of paste cyliders at the facilities ad the mass per cylider as measured upo arrival at the plat Mothly equipmet (load cells) used at the plat site should be subject to a regular maiteace ad testig regime (icludig calibratio) to esure accuracy 20/24

21 Q preductother, y Toes of Reductat/year Cosumptio of other material used as reductat i the submerged electric arc furace i toes of reductat per year The material is loaded ito dispesers equipped with mass measurig devices to determie the mass fed ito the furace Daily equipmet used at the plat site should be subject to a regular maiteace ad testig regime (icludig calibratio) to esure accuracy EF pcoal, y tco 2 / t coal Emissio factor applied for the coal cosumed as reductat Carbo cotet furished by the supplier or idepedet laboratory. Laboratory aalysis Mothly Compare ay measuremet results with the rage of default emissio factors Calculated project-specific value is preferred to IPCC value EF pcoke, y tco 2 / t coke Emissio factor applied for the coke cosumed as reductat Carbo cotet furished by the supplier or idepedet laboratory Laboratory aalysis Mothly Compare ay measuremet results with the rage of default emissio factors. Calculated project-specific value is preferred to IPCC value EF ppaste, y tco 2 / t of carbo paste Emissio factor applied for the electrode paste cosumed as electrodereductat Carbo cotet furished by the supplier or idepedet laboratory Laboratory aalysis Mothly Compare maufacturer s iformatio with alterative coservative factor. Specified by the maufacturer. Alteratively, a coservative factor of 3.67 tco 2 / t of carbo paste ca be applied for the project activity sceario 21/24

22 EF preductother, y tco 2 / t Reductat Emissio factor applied for the other materials cosumed as reductat Carbo cotet furished by the supplier or laboratory Laboratory aalysis Mothly Compare ay measuremet results with the rage of default emissio factors Calculated project-specific value is preferred to IPCC value Quality of Coal p Mass fractio of each compoet (%m/m) Elemetary aalysisquality of Coal based o relevat properties or a third party laboratory (ca be the supplier) Laboratory aalysis Mothly Lab aalyses will be udertake to atioal or iteratioal stadard to esure accuracy ad cosistecy. To esure cosistecy ad, if applicable, calculate EF coal The quality shall be moitored. Quality will be established o the basis of stadard grades ad carbo cotet. Quality of Coke p Mass fractio of each compoet (%m/m) Quality of Coke based o elemetary aalysis ad other relevat properties or a third party laboratory (ca be the supplier) To esure cosistecy ad, if applicable, calculate EF coke The quality shall be moitored. Quality will be established o the basis of historic data for stadard grades ad carbo cotetlaboratory aalysis Mothly Lab aalyses will be udertake to atioal or iteratioal stadard to esure accuracy ad cosistecy To esure cosistecy ad, if applicable, calculate EF coke, the quality shall be moitored. Quality will be established o the basis of stadard grades ad carbo cotet Quality of electrode paste p Mass fractio of each compoet (%m/m) Quality of Paste based o relevat properties or a third party laboratory (ca be the supplier) Laboratory aalysis At the time of purchase 22/24

23 Compare ay measuremet results with a rage of factors supplied by other suppliers or IPCC To esure cosistecy ad, if applicable, calculate EF paste the quality shall be moitored. Quality will be established o the basis of maufacturer s iformatio Quality of Other Reductat p Mass fractio of each compoet (%m/m) Quality of Other Reductat based o relevat properties or a third party laboratory (ca be the supplier) Laboratory aalysis Mothly Lab aalyses will be udertake to atioal or iteratioal stadard to esure accuracy ad cosistecy To esure cosistecy ad, if applicable, calculate EF reductother The quality shall be moitored. Quality will be established o the basis of stadard grades ad carbo cotet EF y (off-site) tco 2 /MWh Grid emissios factor Established accordig to the latest versio of Tool to calculate emissio factor for a electricity system. Accordig to the latest versio of Tool to calculate emissio factor for a electricity system QA/QC procedures specified i the latest versio of Tool to calculate emissio factor for a electricity system will be followed As resultig from the latest versio of Tool to calculate emissio factor for a electricity system Quality of SiM p Alloy p Text Quality of SiMAlloy or a third party laboratory A sample will be lab aalysed periodically to esure that the quality remais betwee pre-determied specificatios for M, C, Si, P, S. Daily Lab aalyses will be udertake to atioal or iteratioal stadard to esure accuracy ad cosistecy 23/24

24 Quality of OreRaw Materials based o elemetary aalysis ad other relevat properties Text Quality of OreRaw Materials or a third party laboratory (ca be the supplier) The quality of the OreRaw Materials (defied by certai specificatios for Fe, M, C, Si, P, S etc as appropriate) will be lab aalysed periodically Mothly Historic data obtaied from aalysis reports to be compared with referece data Quality of fluxes based o elemetary aalysis ad other relevat properties Quality of fluxes based o relevat properties Text Quality of fluxes The quality of the fluxes (defied by elemetary aalysis ad other relevat properties) for the three years precedig the project activity will be recorded at the start of the project activity based o historic samplig aalysis data Mothly Lab aalyses will be udertake to atioal or iteratioal stadard to esure accuracy ad cosistecy Fluxes are oly moitored whe the specified alloy productio processes requires their use History of the documet Versio Date Nature of revisio(s) , Aex # Revisio to: 3 Jue 2011 Expad the applicability to projects which improve the efficiecy of the productio of various alloys; Take ito accout the cotets of various reductats that may be used i alloy productio, i the calculatio of the project ad baselie emissios; Add referece to the Tool to determie the remaiig lifetime of equipmet. 02 EB 35, Para 24, 19 October 2007 Revisio to icorporate the use of the Tool to calculate emissio factor for a electricity system. 01 EB 26, Aex 5, 29 September 2006 Iitial adoptio. Decisio Class: Regulatory Documet Type: Stadard Busiess Fuctio: Methodology 24/24

USING A MAP OF SHORT TERM STATISTICS IN THE PROCESS OF ORGANIZING BUSINESS SURVEYS

USING A MAP OF SHORT TERM STATISTICS IN THE PROCESS OF ORGANIZING BUSINESS SURVEYS Jacek Kowalewski Cetral Statistical Office of olad Statistical Office i ozań USING A MA OF SHORT TERM STATISTICS IN THE ROCESS OF ORGANIZING BUSINESS SURVEYS Short-term statistics (STS) ivolves collectig,

More information

Procedure Statistical Assessment of Sample Test Results

Procedure Statistical Assessment of Sample Test Results BAM - 3.2: Sectio Pressure Equipmet Pressure Receptacles; Fuel Gas Storage Systems 26 th September 204 Techical Aex Statistical Assessmet Samples (SAS) of the Cocept Additioal Tests (CAT): Procedure Statistical

More information

Brammer Standard Company, Inc.

Brammer Standard Company, Inc. Brammer Stadard Compay, Ic. Certificate of Aalysis BS 101/5 Referece Material for Basic Oxyge Furce Slag 1 Certified Estimate of Certified Values 4 Certified Estimate of Value 2 Ucertaity 3 Value 2 Ucertaity

More information

Maintaining Good Cleaning Practices

Maintaining Good Cleaning Practices Maitaiig Good Cleaig Practices Kathlee Kedrick Validatio Techology Maager NEPDA Meetig o PDA TR29 November 12, 2008 http://pdachapters.org/eweglad The Cleaig Program Life Cycle Cleaig Program Lifecycle

More information

This guide assists printers to understand the Finsbury Green Star Rating (FGSR) questionnaire by:

This guide assists printers to understand the Finsbury Green Star Rating (FGSR) questionnaire by: A GUIDE TO THE FINSBURY GREEN STAR RATING This guide assists priters to uderstad the Fisbury Gree Star Ratig (FGSR) questioaire by: clarifyig the meaig of questios outliig scorig criteria i greater detail

More information

Costing in Vaccine Planning and Programming

Costing in Vaccine Planning and Programming Costig i Vaccie Plaig ad Programmig This work is licesed uder a Creative Commos Attributio-NoCommercial-ShareAlike Licese. Your use of this material costitutes acceptace of that licese ad the coditios

More information

BaanErp5.0b Manufacturing Product Configuration (PCF)

BaanErp5.0b Manufacturing Product Configuration (PCF) BaaErp5.0b Maufacturig Product Cofiguratio (PCF) Fuctioal Release Iformatio P3096A US Documetiformatio Documet Documet code : P3096A US Documet group : Product Iformatio Documet title : Product Cofiguratio

More information

A study on copper recovery from the slag of Outokumpu direct-to-copper process

A study on copper recovery from the slag of Outokumpu direct-to-copper process A study o copper recovery from the slag of Outokumpu direct-to-copper process M. Kucharski (*), T. Sak, P. Madej, M. Wędrychowicz, W. Mróz AGH Uiversity of Sciece ad Techology, Departmet of Metallurgy

More information

Brammer Standard Company, Inc.

Brammer Standard Company, Inc. Brammer Stadard Compay, Ic. Certificate of Aalysis BS 1018 Certified Referece Material for AISI 1018 - UNS Number G10180 Certified Estimate of Certified Values 3 Certified Estimate of Value 1 Ucertaity

More information

Analysis of hybrid manufacturing systems based on additive manufacturing technology

Analysis of hybrid manufacturing systems based on additive manufacturing technology Solid Freeform Fabricatio 2017: Proceedigs of the 28th Aual Iteratioal Solid Freeform Fabricatio Symposium A Additive Maufacturig Coferece Reviewed Paper Aalysis of hybrid maufacturig systems based o additive

More information

BaanERP Distribution Item Sales Data

BaanERP Distribution Item Sales Data BaaERP Distributio Module Procedure UP028A US Documetiformatio Documet Documet code : UP028A US Documet group : User Documetatio Documet title : Editio : A Date : May 1998 Copyright 1998 Baa Developmet

More information

GHG emission estimates for road transport in national GHG inventories

GHG emission estimates for road transport in national GHG inventories sythesis article GHG emissio estimates for road trasport i atioal GHG ivetories TINUS PULLES 1 *, HONGWEI YANG 2 1 TNO, PO Box 80015, Utrecht 3508 TA, The Netherlads 2 Eergy Research Istitute, Natioal

More information

SILO SERVICE & MAINTENANCE DIVISION MAINTENANCE SPARES REPAIRS UPGRADES INSTALLATION

SILO SERVICE & MAINTENANCE DIVISION MAINTENANCE SPARES REPAIRS UPGRADES INSTALLATION SILO SERVICE & DIVISION SPARES REPAIRS UPGRADES INSTALLATION SPIROTECH-SRD GROUP LTD, ESTABLISHED DESIGNERS AND SUPPLIERS OF CONVEYING SYSTEMS AND SPECIALIST FABRICATIONS FOR ALL INDUSTRIES, OFFER A FULL

More information

Coupling Model of Energy Flow and Material Flow in SKS Lead Smelting

Coupling Model of Energy Flow and Material Flow in SKS Lead Smelting Sed Orders for Reprits to reprits@bethamsciece.ae The Ope Materials Sciece Joural, 2014, 8, 131-135 131 Ope Access Couplig Model of Eergy Flow ad Material Flow i SKS Lead Smeltig Hogcai Wag *, Zhagmig

More information

MARGINAL ABATEMENT COST CURVE AND BREAK-EVEN CARBON PRICE OF FUEL CELL TECHNOLOGIES IN BRAZIL

MARGINAL ABATEMENT COST CURVE AND BREAK-EVEN CARBON PRICE OF FUEL CELL TECHNOLOGIES IN BRAZIL PROCEEDINGS OF ECOS 2015 - THE 28 TH INTERNATIONAL CONFERENCE ON EFFICIENCY, COST, OPTIMIZATION, SIMULATION AND ENVIRONMENTAL IMPACT OF ENERGY SYSTEMS JUNE 30-JULY 3, 2015, PAU, FRANCE MARGINAL ABATEMENT

More information

Research on China s Total Energy Consumption and Energy Structure

Research on China s Total Energy Consumption and Energy Structure Mediterraea Joural of Social Scieces MCSER Publishig Rome-Italy Doi:10.5901/mjss.2013.v49p381 Abstract Research o Chia s Total Eergy Cosumptio ad Eergy Structure Gua Yeqig Associate Professor i College

More information

Design and Thermal Analysis of a Supercritical CFB Boiler

Design and Thermal Analysis of a Supercritical CFB Boiler eissn: 2487X Desig ad Thermal Aalysis of a Supercritical CFB Boiler JUKURI.RAMAKRISHNA DEPARTMENT OF MECHANICAL NEWTONS INSTITUTE OF SCIENCE & TECHNOLOGY ABSTRACT A boiler is a closed vessel i which water

More information

How to define interface patterns in model-based system engineering

How to define interface patterns in model-based system engineering How to defie iterface patters i model-based system egieerig Idraja Elžbieta Germaaitė Departmet of Iformatio Systems Kauas Uiversity of Techology Kauas, Lithuaia e-mail: idraja.germaaite@ktu.lt Prof. dr.

More information

SMALL PACKAGES FOR 1-10 KG BAGS

SMALL PACKAGES FOR 1-10 KG BAGS HAVER & BOECKER HAVER CHEMICALS FOR 1-10 KG BAGS The HAVER & BOECKER Compay HAVER & BOECKER FILLING TECHNOLOGY The fully automatic fillig machies are especially suited for fillig bulk materials i the buildig

More information

MRI Pilot Systems. Optimizing Treatment Strategies

MRI Pilot Systems. Optimizing Treatment Strategies MRI Pilot systems MRI Pilot Systems Optimizig Treatmet Strategies MRI Pilot systems P redict treatmet efficacy with MRI Pilot Systems. Meurer Research, Ic. (MRI) bega buildig products to ehace water ad

More information

MODELLING OF HVAC SYSTEM COMPONENTS FOR BUILDING DYNAMIC SIMULATION

MODELLING OF HVAC SYSTEM COMPONENTS FOR BUILDING DYNAMIC SIMULATION 13th Coferece of Iteratioal Buildig rformace Simulatio Associatio, Chambéry, Frace, August 26-28 MODELLING OF HVAC SYSTEM COMPONENTS FOR BUILDING DYNAMIC SIMULATION Luigi Schibuola, Massimiliao Scarpa,

More information

Production Order Costing

Production Order Costing BaaERP 5.0c Maufacturig Productio Order Costig Module Procedure UP127A US Documetiformatio Documet Documet code : UP127A US Documet group : User Documetatio Documet title : Productio Order Costig Applicatio/Package

More information

Analyzing the Relationship between CO 2 Emission and Economic Efficiency by a Relaxed Two-Stage DEA Model

Analyzing the Relationship between CO 2 Emission and Economic Efficiency by a Relaxed Two-Stage DEA Model AR Aerosol ad Air Quality Research, 15: 694 701, 2015 Copyright Taiwa Associatio for Aerosol Research ISSN: 1680-8584 prit / 2071-1409 olie doi: 10.4209/aaqr.2014.04.0074 Aalyzig the Relatioship betwee

More information

Chemicals legislation: Should I care? I am into the IVDR and MDR!

Chemicals legislation: Should I care? I am into the IVDR and MDR! Should I care? I am ito the IVDR ad MDR! Jea-Marc Abbig Cosultat Chemicals maagemet, Evirometal ad Occupatioal Health Charlotte va Daele Cosultat Chemicals maagemet Pakhuis de Zwijger MDR ad IVDR implemetatio

More information

By december 2009 the 191 parties to the. Climate and Forests. Beyond Carbon Financing:

By december 2009 the 191 parties to the. Climate and Forests. Beyond Carbon Financing: WORLD RESOURCES INSTITUTE Beyod CarB o FiaC ig Climate ad Forests Policy SerieS m arch 2009 Beyod Carbo Fiacig: t he r ole of s ustaiable d evelopmet p olicies ad m easures i redd Florece Daviet ExEcutivE

More information

Innovative Solutions for Your Gas Processing Needs

Innovative Solutions for Your Gas Processing Needs Iovative Solutios for Your Gas Processig Needs A Track Record of Success More tha 250 compaies aroud the world at over 600 of their operatig facilities use Hutsma amies today for processig their sour gas.

More information

Economic assessment of a two-stage heat pump with heat exchanger to exploit low-temperature geothermal energy

Economic assessment of a two-stage heat pump with heat exchanger to exploit low-temperature geothermal energy Ecoomic assessmet of a two-stage heat pump with heat exchager to exploit low-temperature geothermal eergy SVEN H. DE CLEYN Faculty of Applied Ecoomics Uiversity of Atwerp Prisstraat 13, BE-2000 Atwerp

More information

Page 1 of 23. Approved by the Resolution of the Management Board No 126/32/17 of May 23rd effective as of May 31st 2017

Page 1 of 23. Approved by the Resolution of the Management Board No 126/32/17 of May 23rd effective as of May 31st 2017 Detailed Tradig ad Clearig Rules for CHP property rights to certificates of origi for electricity geerated i high- efficiecy combied heat ad power uits Approved by the Resolutio of the Maagemet Board No

More information

MAGNOS Analyser BROCHURE

MAGNOS Analyser BROCHURE MAGNOS Aalyser BROCHURE Advace Optima Modular cotiuous gas aalyzers Iovative modular aalyzer techology Advace Optima The measuremet of a large umber of differet gas compoets, at low cocetratios, places

More information

MOVING PEOPLE IN LOW- TO MID-RISE BUILDINGS

MOVING PEOPLE IN LOW- TO MID-RISE BUILDINGS MOVING PEOPLE IN LOW- TO MID-RISE BUILDINGS KONE MooSpace A GREAT EXPERIENCE FROM DAY ONE Twety years ago, we pioeered the revolutioary machie room-less elevator. Iovatio cotiues to drive us to improve

More information

LIMAS Analyser BROCHURE

LIMAS Analyser BROCHURE LIMAS Aalyser BROCHURE JANEIRO 2015 Advace Optima Modular cotiuous gas aalyzers Iovative modular aalyzer techology Advace Optima The measuremet of a large umber of differet gas compoets, at low cocetratios,

More information

Group Environmental Report

Group Environmental Report Scottish Leather Group Limited 1 Seedhill, Paisley, PA1 1JL, Scotlad Group Evirometal Report Year Edig 31st March 2012 Tel: +44 (0))141 847 4520 Fax: +44 (0))141 848 7246 www.scottishleathergroup.com www.lowcarboleather.com

More information

Environmental, energetic and economic life-cycle assessment from cradle to cradle (3E-C2C) of buildings assemblies

Environmental, energetic and economic life-cycle assessment from cradle to cradle (3E-C2C) of buildings assemblies Evirometal, eergetic ad ecoomic life-cycle assessmet from cradle to cradle (3E-C2C) of buildigs assemblies José Diis Silvestre Assistat Techical Uiversity of Lisbo (TUL) - IST - Departmet of Civil Egieerig,

More information

Zions Bancorporation. Data-centric Technology Transformation for Financial Institutions

Zions Bancorporation. Data-centric Technology Transformation for Financial Institutions Zios Bacorporatio Data-cetric Techology Trasformatio for Fiacial Istitutios Curret State Outdated Core Systems A Idustry-Wide Challege Icreased Risk Agig, highly customized core applicatios Regulatory

More information

OUTLIERS AND SOME NON-TRADITIONAL MEASURES OF LOCATION IN ANALYSIS OF WAGES

OUTLIERS AND SOME NON-TRADITIONAL MEASURES OF LOCATION IN ANALYSIS OF WAGES Europea Scietific Joural September 0 /SPECIAL/ editio Vol. ISSN: 857 788 (Prit) e - ISSN 857-73 OUTLIERS AND SOME NON-TRADITIONAL MEASURES OF LOCATION IN ANALYSIS OF WAGES Mila Terek, Prof., PhD Matúš

More information

Unit I Electrochemistry

Unit I Electrochemistry Uit I lectrochemistry Itroductio : Sigle lectrode Potetial: lectrode potetial is defied as the potetial developed at the iterface betwee metal ad solutio, whe it is i cotact with solutios of its ios. Or

More information

State-of-the-art technology you can build on.

State-of-the-art technology you can build on. State-of-the-art techology you ca build o. 2 Itroductio The ew productio facility a ivestmet i the future. Numerous uclear power statios ad high-efficiecy fossil-fuelled power plats with outputs of over

More information

Custom Manufacturing Solutions

Custom Manufacturing Solutions Cao Virgiia, Ic. Custom Maufacturig Solutios CONTRACT MANUFACTURING REVERSE LOGISTICS MOLD MAKING Cao Put our good ame to work for yours. C-a--o-. Five letters that are syoymous with quality the world

More information

EFFICIENT DIVERSIFICATION ACCORDING TO STOCHASTIC DOMINANCE CRITERIA

EFFICIENT DIVERSIFICATION ACCORDING TO STOCHASTIC DOMINANCE CRITERIA EFFICIENT DIVERSIFICATION ACCORDING TO STOCHASTIC DOMINANCE CRITERIA Timo Kuosmae Wageige Uiversity, Evirometal Ecoomics ad Natural Resources Group, Holladseweg 1, 6706KN Wageige, The Netherlads, Tel.

More information

Asian Economic and Financial Review

Asian Economic and Financial Review Asia Ecoomic ad Fiacial Review oural homepage: http://aessweb.com/oural-detail.php?id=5002 ESTIMATION OF URBAN-RURAL EXPENDITURE AND HOUSEHOLD SIZE ELASTICITIES OF FOOD ITEMS IN PAKISTAN:- EVIDENCE FROM

More information

Customer Journey Design for Guiding Communications Service Providers

Customer Journey Design for Guiding Communications Service Providers Customer Jourey Desig for Guidig Commuicatios Service Providers Abstract I the past, commuicatios service providers (CSPs) were focused o buildig ad ruig a superior ad ef ciet etwork with the ext priority

More information

e-profit Monitor Analysis Drystock Farms 2015

e-profit Monitor Analysis Drystock Farms 2015 Aimal & Grasslad Research ad Iovatio Programme Teagasc e-profit Moitor Aalysis Drystock Farms 2015 e-profit Moitor Aalysis Drystock Farms 2015 Teagasc e-profit Moitor Aalysis Drystock Farms 2015 Authors

More information

Modeling of the Nonlinear Physical-Technical Processes. 25 UDC INFORMATION ESTIMATION OF TECHNOLOGICAL REDISTRIBUTION AT STEEL PRODUCTION

Modeling of the Nonlinear Physical-Technical Processes. 25 UDC INFORMATION ESTIMATION OF TECHNOLOGICAL REDISTRIBUTION AT STEEL PRODUCTION Modelig of the Noliear Physical-Techical Processes. 25 UDC 57.9 INFORMATION ESTIMATION OF TECHNOLOGICAL REDISTRIBUTION AT STEEL PRODUCTION Kazhikeova S.Sh. Karagada State Uiversity amed after E.A.Buketov,

More information

Identifying Techniques to determine the Overall Benchmarking Best Practices

Identifying Techniques to determine the Overall Benchmarking Best Practices Idetifyig Techiques to determie the Overall Bechmarkig Best Practices James R. Oldham, M.S., Terry R. Collis, Ph.D., P.E., Mauel D. Rossetti, Ph.D., P.E ad Heather L. Nachtma, Ph.D. Departmet of Idustrial

More information

Hyperchill precision chilled water.

Hyperchill precision chilled water. Hyperchill precisio chilled water www.domickhuter.com 1 Idustrial Chillers Hyperchill: Precisio Chilled Water domick huter Hyperchill water chillers celebrate a presece of over 30 years o the idustrial

More information

Waterways: Working for America. Waterways transportation keeps commerce on the move, with fewer societal impacts than truck or rail.

Waterways: Working for America. Waterways transportation keeps commerce on the move, with fewer societal impacts than truck or rail. A Ilad Marie Highway for Freight America s ilad river barge system moves freight more safely ad more efficietly tha rail or truck. It is a key compoet of the trasportatio etwork ad essetial our coutry

More information

Production processes, tasks and skill requirements and their influence on the costs of apprenticeship training

Production processes, tasks and skill requirements and their influence on the costs of apprenticeship training Productio processes, tasks ad skill requiremets ad their ifluece o the costs of appreticeship traiig Reate Neubäumer (Uiversity of Koblez-Ladau) Harald Pfeifer (Federal Istitute for Vocatioal Educatio

More information

Made by Drache. Casthouse Technology worldwide.

Made by Drache. Casthouse Technology worldwide. Made by Drache. Casthouse Techology worldwide. Alumiium Foudry Drache Eglish versio M A D E Sice 1984 I N G E R M A N Y DRACHE QUALITY FOR OVER 30 YEARS Made by Drache. Casthouse Techology worldwide. Drache

More information

AMS Suite: Global Performance Advisor

AMS Suite: Global Performance Advisor AMS Performace Advisor AMS Suite: Global Performace Advisor Real-time equipmet performace health feedback itegrates with process automatio so you ca ru your plat with cofidece. Achieve ad maitai optimum

More information

Wind Power Potential at Benau, Savusavu, Vanua Levu, Fiji

Wind Power Potential at Benau, Savusavu, Vanua Levu, Fiji Iteratioal Joural of Eergy, Iformatio ad Commuicatios Wid Power Potetial at Beau, Savusavu, Vaua Levu, Fiji Ajal Kumar * ad Krisham Nair School of Egieerig ad Physics, Faculty of Sciece, Techology ad Eviromet,

More information

ORACLE COMMERCE CLOUD INTRODUCTION TO PROMOTIONS

ORACLE COMMERCE CLOUD INTRODUCTION TO PROMOTIONS ORACLE COMMERCE CLOUD INTRODUCTION TO PROMOTIONS INTRODUCTION Oracle Commerce Cloud makes it easy to create ad maage promotios, but we kow it takes more coordiatio creativity aalytical kow-how to deliver

More information

Operational Excellence

Operational Excellence Road Map to Operatioal Excellece i the Process Idustries This is a two ad oe half day semiar Oil ad Gas Productio for you, the Process Idustry Executive, Pipelies Plat Maager ad your Direct Reports Oil

More information

A FRAMEWORK TO ASSESS DECISION QUALITY USING INFORMATION QUALITY DIMENSIONS (Research-in-progress)

A FRAMEWORK TO ASSESS DECISION QUALITY USING INFORMATION QUALITY DIMENSIONS (Research-in-progress) A FRAMEWORK TO ASSESS DECISION QUALITY USING INFORMATION QUALITY DIMENSIONS (Research-i-progress) Mouzhi Ge Dubli City Uiversity mge@computig.dcu.ie Markus Helfert Dubli City Uiversity markus.helfert@computig.dcu.ie

More information

Evaluation of Cost Efficiency in Finnish Electricity Distribution

Evaluation of Cost Efficiency in Finnish Electricity Distribution Jue 4, 2002 Evaluatio of Cost Efficiecy i Fiish Electricity Distributio Pekka Korhoe ad Mikko Syrjäe (May 2002) Helsiki School of Ecoomics P.O. Box 1210, 00101 Helsiki, FINLAND Tel. +358-9-431 31, Fax.

More information

Assessing the value for money of OGCbuying.solutions

Assessing the value for money of OGCbuying.solutions Assessig the value for moey of OGCbuyig.solutios REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 103 Sessio 2006-2007 14 December 2006 The Natioal Audit Office scrutiises public spedig o behalf of Parliamet.

More information

A study of technology adoption gap in soybean production of Maharashtra state: A Principal Component Approach

A study of technology adoption gap in soybean production of Maharashtra state: A Principal Component Approach Natioal Academy of Agricultural Sciece (NAAS) Ratig : 3.03 Serials Publicatios A study of techology adoptio gap i soybea productio of Maharashtra state: A Pricipal Compoet Approach Sehal Datarkar 1, B.

More information

GUIDE ON SAMPLING FOR ANALYSIS OF FOODS

GUIDE ON SAMPLING FOR ANALYSIS OF FOODS No. 12 (214) Page: 1 (49) Date: February 214 GUIDE ON SAMPLING FOR ANALYSIS OF FOODS CONTENTS PREFACE... 2 1. INTRODUCTION... 3 2. DEFINITIONS... 3 3. AIM OF SAMPLING... 6 4. PROJECT DESCRIPTION INCLUDING

More information

Writing the Paris Rulebook

Writing the Paris Rulebook ISSUE 3 2017 SEPTEMBER - OCTOBER Writig the Paris Rulebook Priciples ad guardrails to keep thigs i check 4 ANALYSIS Guardrails for the Paris mechaisms Operatioalizig Article 6 ad geeratig carbo market

More information

Energy. Global Solutions

Energy. Global Solutions Eergy. Global Solutios > Fossil Fuel > Reewable Global Eergy Solutios Reold is a global egieerig group with over 130 years of experiece i the desig ad maufacture of high-quality power trasmissio products

More information

INVESTMENT IN AUTOMATION DOES NOT ALWAYS BRING IMPROVEMENT CASE STUDY OF A PRIVATE LABORATORY

INVESTMENT IN AUTOMATION DOES NOT ALWAYS BRING IMPROVEMENT CASE STUDY OF A PRIVATE LABORATORY INVESTMENT IN AUTOMATION DOES NOT ALWAYS BRING IMPROVEMENT CASE STUDY OF A PRIVATE LABORATORY Maria Routti Helsiki Uiversity of Techology, Filad maria.routti@hut.fi Jarkko Ihalaie Medix Laboratories, Filad

More information

e-profit Monitor Analysis

e-profit Monitor Analysis Aimal & Grasslad Research ad Iovatio Programme Teagasc e-profit Moitor Aalysis Drystock Farms 2016 e-profit Moitor Aalysis Drystock Farms 2016 Teagasc e-profit Moitor Aalysis Drystock Farms 2016 Authors

More information

Instruction Handbook for Installation, Operation and Maintenance.

Instruction Handbook for Installation, Operation and Maintenance. F:\LK_Chadresh_2015_BOX & MANUALS\KENT\Maual\Export\Ket Maxx Date:09-3-15 Job: XXX Double Purificatio UV+UF Istructio Hadbook for Istallatio, Operatio ad Maiteace. GOLD MEMBER March, 2015 For customer

More information

IMPACTS OF OPERATIONAL CHANGES ON LLW SCALING FACTORS

IMPACTS OF OPERATIONAL CHANGES ON LLW SCALING FACTORS WM 04 Coferece, February 9- March 4, 004, Tucso, AZ IMPACTS OF OPERATIONAL CHANGES ON LLW SCALING FACTORS D. W. James D. W. James & Associates 855 Village Ceter Drive #330 North Oaks, MN 557 ABSTRACT Sice

More information

The Accuracy Of Ore Reserves Estimation Case Study : Laterite Nickel Deposits

The Accuracy Of Ore Reserves Estimation Case Study : Laterite Nickel Deposits PROCEEDING OF 3 RD INTERNATIONAL CONFERENCE ON RESEARCH, IMPLEMENTATION AND EDUCATION OF MATHEMATICS AND SCIENCE YOGYAKARTA, 6 7 MAY 06 The Accuracy Of Ore Reserves Estimatio Case Study : Laterite Nickel

More information

Roxul ComfortBatt. Thermal Batt Insulation for Residential & Commercial Construction

Roxul ComfortBatt. Thermal Batt Insulation for Residential & Commercial Construction Thermal Batt Isulatio for Residetial & Commercial Costructio Thermal batt isulatio Superior Buildig Evelope Performace Roxul Comfortbatt is a semi-rigid batt isulatio desiged specifically for wood ad steel

More information

Advance Optima Modular continuous gas analyzers

Advance Optima Modular continuous gas analyzers Advace Optima Modular cotiuous gas aalyzers Iovative modular aalyzer techology Advace Optima The measuremet of a large umber of differet gas compoets, at low cocetratios, places exactig demads o your cotiuous

More information

A New Strategic Tool for Internal Audit of the Company Based on Fuzzy Logic

A New Strategic Tool for Internal Audit of the Company Based on Fuzzy Logic DOI: 10.2298/CSIS111201013P A New Strategic Tool for Iteral Audit of the Compay Based o uzzy Logic Aleksadar Pešić 1, Duška Pešić 2, ad Adreja Tepavčević 3 1 Busiess ad Idustrial Maagemet, Uio Uiversity,

More information

Nitrogen-Use Efficient, Water-Use Efficient and Salt-Tolerant Rice Project

Nitrogen-Use Efficient, Water-Use Efficient and Salt-Tolerant Rice Project Nitroge-Use Efficiet, Water-Use Efficiet ad Salt-Tolerat Rice Project Backgroud Sub-Sahara Africa (SSA) has for the last two decades bee experiecig a cotiuous icrease i rice cosumptio drive mostly by a

More information

Development Rate Monitoring (DRM)

Development Rate Monitoring (DRM) MCEE 505 Lithography Materials ad Processes Page 1 of 5 Developmet Rate Moitorig (DRM) Microelectroic Egieerig 1. OBJECTIVE The objective of this experimet is to uderstad ad characterize the developmet

More information

Strategic Management Checklist

Strategic Management Checklist Strategic Maagemet Checklist for LeadigAge PA Members 3 Strategic Plaig 3 3 3 Fiacial Viability Goverace Operatios/Huma Resources a associatio of ot-for-profit seior services Itroductio LeadigAge PA has

More information

Contact us. Corrosion Mapping and Monitoring. James Fisher NDT. James Fisher NDT

Contact us. Corrosion Mapping and Monitoring. James Fisher NDT. James Fisher NDT Cotact us T: +44 (0) 1244 520058 F: +44 (0) 1244 535440 E: cotact@jfdt.com W: www.jfdt.com James Fisher NDT James Fisher NDT Corrosio Mappig ad Moitorig James Fisher NDT Uit 44, First Aveue, Deeside Idustrial

More information

EVALUATION OF CONCRETE HOMOGENEITY IN MASSIVE STRUCTURAL ELEMENT OF HYDROELECTRIC POWER PLANT BY MEANS OF NONDESTRUCTIVE IMPULSE RESPONSE METHOD

EVALUATION OF CONCRETE HOMOGENEITY IN MASSIVE STRUCTURAL ELEMENT OF HYDROELECTRIC POWER PLANT BY MEANS OF NONDESTRUCTIVE IMPULSE RESPONSE METHOD Czech Society for Nodestructive Testig NDE for Safety / DEFEKTOSKOPIE October - November, - Seč u Chrudimi - Czech Republic EVALUATION OF CONCRETE HOMOGENEITY IN MASSIVE STRUCTURAL ELEMENT OF HYDROELECTRIC

More information

Critical business need for managing J2EE performance. Performance management for the J2EE platform

Critical business need for managing J2EE performance. Performance management for the J2EE platform Ageda Performace maagemet for the platform Itroducig Borlad Optimizeit ServerTrace The importace of performace maagemet for systems Critical busiess eed for maagig performace Implemetig a effective performace

More information

Available online at ScienceDirect

Available online at  ScienceDirect Available olie at www.sciecedirect.com ScieceDirect Procedia Ecoomics ad Fiace 8 ( 2014 ) 187 193 1st Iteratioal Coferece 'Ecoomic Scietific Research - Theoretical, Empirical ad Practical Approaches',

More information

Upgrading of the management review on the basis of the EFQM excellence model

Upgrading of the management review on the basis of the EFQM excellence model Uiversity of Wollogog Research Olie Uiversity of Wollogog i Dubai - Papers Uiversity of Wollogog i Dubai 2011 Upgradig of the maagemet review o the basis of the EFQM excellece model Ato Petric TPV Bostja

More information

Location of Container Port Investment Based on Bi-level Programming Model

Location of Container Port Investment Based on Bi-level Programming Model Locatio of Cotaier Port Ivestmet Based o Bi-level Programmig Model ZHONG Mig, LIN Li Departmet of Trasportatio Plaig ad Maagemet, Dalia Maritime Uiversity, Lighai Road No., Dalia, Liaoig, Chia zhogmigdlmu@26.com

More information

5 Environmental Best Practices for Maintenance Activities

5 Environmental Best Practices for Maintenance Activities Evirometal Best Practices for Maiteace Activities 5 Evirometal Best Practices for Maiteace Activities The Evirometal Best Practices (BPs) i this documet have bee demostrated to be a effective ad practical

More information

design brief Acceptance Testing Summary contents

design brief Acceptance Testing Summary contents desig brief Acceptace Testig Summary The State of Califoria s Title 24 Buildig Eergy Efficiecy Stadards have log provided atioal leadership i improvig buildig eergy efficiecy. First itroduced i the 2005

More information

High Strength Epoxy Tested in Accordance to ICC-ES AC308

High Strength Epoxy Tested in Accordance to ICC-ES AC308 ADHESIVE ANCHORING SYSTEMS DESCRIPTION/SUGGEST SPECIFICATIONS* *Suggested Specificatios see pages RH The epoxy resi ad hardeer are completely mixed as they are dispesed from the dual cartridge through

More information

Quicker/Cheaper Stand Assessments 1

Quicker/Cheaper Stand Assessments 1 Quicker/Cheaper tad Assessmets 1 by Thomas E. Burk Jue 004 Origially Published October 1999 taff Paper eries No. 139 Revisio Departmet of Forest Resources College of Food, Agricultural ad Natural Resource

More information

Delivering for Northern Ireland... supporting the recovery

Delivering for Northern Ireland... supporting the recovery Deliverig for Norther Irelad... supportig the recovery Quarry Products Associatio NI Ageda 2013-2018 Essetial materials... sustaiable solutios Quarryig is a essetial part of our moder society ad aggregates

More information

Asbestos: The survey guide

Asbestos: The survey guide Health ad Safety Asbestos: The survey guide This is a free-to-dowload, web-friedly versio of HSG264 (Secod editio, published 2012). This versio has bee adapted for olie use from HSE s curret prited versio.

More information

Production Planning for Perishable Products with Partial Postponement Strategy

Production Planning for Perishable Products with Partial Postponement Strategy Iteratioal Joural of Computer Applicatios (975 8887) Volume 31 No.5, October 11 Productio Plaig for Perishable Products with Partial Postpoemet Strategy A. Shabradi Departmet of Idustrial Egieerig, Faculty

More information

Incentivising Renewables: A European Analysis

Incentivising Renewables: A European Analysis Icetivisig Reewables: A Europea Aalysis cotets Icetivisig Reewables: A Europea Aalysis 1 Belgium 9 Czech Republic 11 Frace 13 Germay 15 Italy 17 The Netherlads 19 Polad 21 Romaia 23 Spai 25 The Uited Kigdom

More information

Poly Series. Polymer Preparation Unit. Your Choice, Our Commitment

Poly Series. Polymer Preparation Unit. Your Choice, Our Commitment Poly Series Polymer Preparatio Uit Your Choice, Our Commitmet 02 Solutios for Water & Idustry Polymer Preparatio Uit The POlY Series of Polymer Preparatio Uits, has bee specifically desiged to provide

More information

WATERMAN: an operational soil water balance model compatible with IBSNAT data files

WATERMAN: an operational soil water balance model compatible with IBSNAT data files SoU Water Balace i the Sudao-SaheUa Zoe (Proceedigs of the Niamey Workshop, February 1991). IAHS Publ. o. 199,1991. WATERMAN: a operatioal soil water balace model compatible with IBSNAT data files INTRODUCTION

More information

Germany s Energy Journey - The German Energy Strategy in the Context of the German Green Economy Approach

Germany s Energy Journey - The German Energy Strategy in the Context of the German Green Economy Approach Materials ad processes for eergy: commuicatig curret research ad techological developmets (A. Médez-Vilas, Ed.) Germay s Eergy Jourey - The Germa Eergy Strategy i the Cotext of the Germa Gree Ecoomy Approach

More information

Analysis of Software Cost Estimation using COCOMO II

Analysis of Software Cost Estimation using COCOMO II Iteratioal Joural of Scietific & Egieerig Research Volume 2, Issue 6, Jue-2011 1 ISSN 2229-18 Aalysis of Software Cost Estimatio usig COCOMO II T.N.Sharma Abstract - COCOMO II is a objective cost model

More information

Transportation Network Vulnerability

Transportation Network Vulnerability rasportatio Network Vulerability Vulerability Scaig Methodology Applied to Multiple Logistics rasport Networks Qiaqia Du, Kuihiro Kishi, Nobuori Aiura, ad akashi Nakatsuji rasport is a fudametal part of

More information

Profit Monitor Analysis Dairy Farms 2016

Profit Monitor Analysis Dairy Farms 2016 Aimal & Grasslad Research ad Iovatio Programme Teagasc Profit Moitor Aalysis Dairy Farms 2016 Profit Moitor Aalysis Dairy Farms 2016 Profit Moitor Aalysis Dairy Farms 2016 Teagasc Profit Moitor Aalysis

More information

Single sourcing versus multiple sourcing

Single sourcing versus multiple sourcing RAND Joural of Ecoomics Vol. 39, No. 1, Sprig 2008 pp. 199 213 Sigle sourcig versus multiple sourcig Roma Iderst We show that i cotrast to results i the extat literature, sigle sourcig may ot be the optimal

More information

Everyday BEHRINGER Saw HBE Dynamic

Everyday BEHRINGER Saw HBE Dynamic INTRODUCING the Everyday BEHRINGER Saw HBE Dyamic Legedary BEHRINGER quality, power ad speed, A versatile, compact automatic saw, the NEW HBE Dyamic has a array of leadig edge features desiged to improve

More information

SMOOTH PEOPLE FLOW FOR COMMERCIAL ENVIRONMENTS. KONE TravelMaster 110

SMOOTH PEOPLE FLOW FOR COMMERCIAL ENVIRONMENTS. KONE TravelMaster 110 SMOOTH PEOPLE FLOW FOR COMMERCIAL ENVIRONMENTS KONE TravelMaster 110 YOUR TRUSTED ESCALATOR PARTNER With over 100 years of experiece ad a strog track record i safety, KONE is your trusted parter, dedicated

More information

Identification of Regional Air Pollution Characteristic and the Correlation with Public Health in Taiwan

Identification of Regional Air Pollution Characteristic and the Correlation with Public Health in Taiwan It. J. Eviro. Res. Public Health 2007 4(2) 06-0 Iteratioal Joural of Evirometal Research ad Public Health ISSN 66-7827 www.ijerph.org 2007 by MDPI Idetificatio of Regioal Air Pollutio Characteristic ad

More information

The Role of Firm Size in Training Provision Decisions: evidence from Spain

The Role of Firm Size in Training Provision Decisions: evidence from Spain The Role of Firm ize i Traiig Provisio Decisios: evidece from pai By aia Castay Uiversitat de Barceloa. AQR Research Group IREA. Avda Diagoal 690, 08034 Barceloa. Email: lcastay@ub.edu Tel: +34 93 4021824.

More information

Latent Heat of Amorphous Slags and Their Utilization as a High Temperature PCM

Latent Heat of Amorphous Slags and Their Utilization as a High Temperature PCM , pp. 1259 1264 Latet Heat of Amorphous Slags ad Their Utilizatio as a High Temperature PCM Yoshiaki KASHIWAYA, 1) Tomohiro AKIYAMA 2) ad Yutaro IN-NAMI 3) Formerly Graduate School of Egieerig, Hokkaido

More information

SHRM CUSTOMIZED PAID LEAVE BENCHMARKING REPORT

SHRM CUSTOMIZED PAID LEAVE BENCHMARKING REPORT SHRM CUSTOMIZED PAID LEAVE BENCHMARKING REPORT THANK YOU FOR ORDERING A SHRM CUSTOMIZED PAID LEAVE Your report is based o the followig criteria: SELECTION CRITERIA Idustry: Staff Size: Chemical Maufacturig

More information

6. Managing the challenges of tourism in protected areas

6. Managing the challenges of tourism in protected areas 6. Maagig the challeges of tourism i protected areas 6.1 Maagemet of risk ad safety All outdoor recreatio ivolves some level of risk. Dealig with such risk is a importat compoet of park tourism maagemet.

More information

of the power plat uits is also importat i load schedulig optimizatio formulatio. I this paper, a formulatio of UCELS optimizatio problem of Combied Cy

of the power plat uits is also importat i load schedulig optimizatio formulatio. I this paper, a formulatio of UCELS optimizatio problem of Combied Cy DYNAMIC LOAD SCHEDULING OPTIMIZATION OF POWER PLANTS S Moha Kumar* Scietist, Departmet of Research, ABB Global Idustries ad Services Ltd, Bagalore, Idia. moha.s.kumar@i.abb.com (Correspodig author) Abstract

More information