REPORT OF GEOTECHNICAL EXPLORATION PUBLIC WORKS SITE SAVANNAH, GEORGIA FOR CHATHAM CO. DEPT. OF PUBLIC WORKS & PARK SERVICES

Size: px
Start display at page:

Download "REPORT OF GEOTECHNICAL EXPLORATION PUBLIC WORKS SITE SAVANNAH, GEORGIA FOR CHATHAM CO. DEPT. OF PUBLIC WORKS & PARK SERVICES"

Transcription

1 REPORT OF GEOTECHNICAL EXPLORATION PUBLIC WORKS SITE SAVANNAH, GEORGIA FOR CHATHAM CO. DEPT. OF PUBLIC WORKS & PARK SERVICES MAY 5, 2009 ECS PROJECT NO. 23:2081

2 i ~", " -. _., I ~~ ECS SOUTHEAST, LLC r -- - ~ Geotechnical- Construction Materials - Environmental- Facilities Mr. Robert Drewry Chatham Co. Dept. of Public Works & Park Services P.O. Box 8161 Savannah, GA May 5, 2009 Reference: Report of Geotechnical Exploration Public Works Site Savannah, Georgia ECS Project No. 23:2081 Dear Mr. Drewry: ECS Southeast, LLC (ECS) is pleased to submit our report of geotechnical exploration for the above referenced project. The attached report presents an introduction of the proposed project, results of our exploration, subsurface conditions, and our recommendations. The work was completed in general accordance with our Proposal No. PSG-1855 as authorized by Purchase Order We appreciate the opportunity of working with you on this project and look forward to our continued association. Should you have questions regarding our findings or need additional consultations, please do not hesitate to contact our office at (912) Respectfully, ECS Southeast, LLC represented by: David B. Bradley, P.G. Geotechnical Department Manager ~ge Geotechnical Project Manager 1306Heidt Avenue, Suite A, Savannah, GA (912) FAX (912) Atlanta, GA - Bluff ton - Hilton Head, SC* - Buford, GA - Nashville, TN - Savannah, GA *testing services only

3 REPORT OF GEOTECHNICAL EXPLORATION PUBLIC WORKS SITE SAVANNAH, GEORGIA TABLE OF CONTENTS INTRODUCTION 2 PAGE General 2 Project Information 2 Site Conditions 2 Purposes of Exploration 2 FIELD AND LABORATORY EXPLORATION 2 Subsurface Exploration 2 Laboratory Testing Program 3 SUBSURFACE CONDITIONS 3 Regional Geology and Soils 3 Soil Conditions 4 Groundwater Conditions 5 EVALUATIONS AND RECOMMENDATIONS 5 General 5 Dewatering 6 Subgrade Preparation 6 Recommended Earthwork Specifications 7 Foundation Recommendations 8 Seismic Parameters 8 Additional Considerations 10 CLOSING 11 APPENDIX I. Figure 1 Site Vicinity Map Figure 2 Boring Location Plan II. Unified Soil Classification System Reference Notes for CPT Soundings Reference Notes for Boring Logs CPT Sounding Logs (7) Hand Auger Logs (8) Geoprobe Logs (1) Laboratory Testing Summary Liquefaction Analysis Seismic Hazard Deaggregation III. ASFE Important Information About Your Geotechnical Report

4 INTRODUCTION General This report presents the results of our geotechnical exploration for the Public Works Site project in Savannah, Chatham County, Georgia. The work was completed in general accordance with our Proposal No. PSG-1855 as authorized by Purchase Order Project Information The information presented in this report is based on our site reconnaissance and our understanding of the proposed project. If the information in this section is incorrect or changes, the applicability of the report should be reviewed. Based on plans provided of the proposed project and conversations with the project team we understand the following: The site is located off Varnedoe Road in Savannah, Chatham County, Georgia. A site vicinity map is included in the Appendix as Figure 1. The proposed project consists of the construction of three single story buildings (an administration, field services, and vehicular storage building) with associated infrastructure and parking. No loading information has been provided. We have assumed maximum isolated interior column loads will not exceed 30 kips and that maximum wall loads will not exceed 3 kips per linear foot. No grading information has been provided. We have assumed minimal fill will be required to bring the site to finished construction grade. Site Conditions The existing ground elevation of the site is approximately 20 feet above mean sea level (MSL). A representative of ECS visited the project site on April 24, The site was developed with an existing gym and stadium. There was evidence of transients inhabiting the site near HA-5 and HA-6 in the form of a tent, clothes, and recently used bottles and plates. The upland area landscape was relatively flat. Standing water was observed in the vicinity of HA-5 and HA-6 at the time of our visit. The site is bordered to the west by Varnedoe Drive and to the north by Scott Drive. Asphalt, apparently from a previously existing roadway, was observed at the surface in the vicinity of HA-3. Purposes of Exploration The purposes of this study were to explore the soil and groundwater conditions at the site and to develop engineering recommendations to guide design of the proposed project.

5 Public Works Site ECS Project No. 23:2081 Page 2 We accomplished the purposes of the study by: 1. Reviewing the available publications concerning local geology of the site and performing a general site reconnaissance; 2. Drilling borings/soundings to explore the subsurface soil and groundwater conditions; 3. Performing laboratory tests on selected representative soil samples from the borings to evaluate pertinent engineering properties; 4. Evaluating the field, laboratory, and background data to develop appropriate engineering recommendations. Subsurface Exploration FIELD AND LABORATORY EXPLORATION To explore the soil and groundwater conditions at this site a total of seven (7) Cone Penetration Test (CPT) soundings, one (1) continuous soil sample (Geoprobe), and eight (8) hand auger borings were performed at select locations across the site. The CPT soundings were performed to termination depths of 30 to 38.5 feet below existing grade in the proposed building pad areas. The Geoprobe was performed to a depth of 20 feet below existing grade adjacent to a CPT sounding. The hand auger borings were performed to depths of 5 feet below existing grade at select CPT sounding locations and in proposed parking areas. The approximate boring/sounding locations are shown on the attached Boring Location Plan (Figure 2). All borings were located in the field based on existing site features. In the CPT sounding procedure (ASTM D5778), an electronically instrumented cone penetrometer is hydraulically advanced through the soil to measure point resistance, pore water pressure, and sleeve friction. These values are recorded continuously as the cone is pushed to the desired depth. Stratification lines on the CPT sounding logs represent approximate boundaries between soil behavior types. Soil behavior types are calculated based on empirical relationships between cone penetrometer tip resistance, sleeve friction, and pore water pressure. In the Geoprobe procedure, an acetate tube inside a thin-walled tube sampler is advanced through the soil to collect continuous five-foot section samples of the subsurface material. The acetate tubes are removed from the thin-wall sampler and logged. Representative samples are sealed and returned to our laboratory in Savannah, Georgia. The hand auger borings were conducted in general accordance with ASTM Specification D1452. In this procedure, the auger boring is made by rotating and advancing an auger to the desired depths while periodically removing the auger from the hole to clear and examine the

6 Public Works Site ECS Project No. 23:2081 Page 3 auger cuttings. Representative portions of the auger cuttings were then sealed and returned to our laboratory in Savannah, Georgia for further visual examination and laboratory testing. Stratification lines shown on the hand auger boring logs represent approximate boundaries between physical soil types. Groundwater levels in the CPT soundings were recorded during hydraulic advancement of the cone penetrometer. Groundwater levels in the hand auger borings were checked after boring completion. Laboratory Testing Program Representative soil samples were selected and tested in our laboratory to check field classifications and to determine pertinent engineering properties. The laboratory testing program included visual classifications of soil samples, natural moisture content, and wash No. 200 sieve analysis. Each soil sample was classified on the basis of visual texture and plasticity in accordance with the Unified Soil Classification System. The various soil types were grouped into the major zones noted on the boring logs. The stratification lines designating the interfaces between materials on the boring logs are approximate; in-situ, the transitions may be gradual. The soil samples will be retained in our laboratory for a period of 60 days, after which, they will be discarded unless otherwise instructed. Regional Geology and Soils SUBSURFACE CONDITIONS The site is located within Georgia s Coastal Plain Geologic Province. The soils of the Southern Coastal Plain Physiographic Province of Georgia are primarily composed of Pleistocene to Holocene age deposits. The soils in the coastal plain are the result of sediment deposition in a former marine environment during a time when sea level was much higher than at present. The Pleistocene-Holocene deposits are generally composed of alternating sands, silts, and clays, which correspond to fluctuations in sea-level and migrations of river channels over several million years. Based on the 1974 Soil Survey of Bryan and Chatham Counties, Georgia, as prepared by the US Department of Agriculture Soil Conservation Service, a summary of the predominant soil types (within the upper 5 feet below existing grade) at the site and their characteristics is included in the following table:

7 Public Works Site ECS Project No. 23:2081 Page 4 Table 1: Soil Survey Summary Soil Type Constituents Internal Drainage Chipley Fine Sand (Cm) Ellabelle Loamy Sand (El) Fine Sand Loamy Sand, Sandy Clay Loam Moderately Well Drained Seasonal High Water Table (inches) 24 to 36 Very Poorly Drained 0 to 6 Lakeland Sand (Lp) Sand Excessively Drained > 80 The shallow groundwater table in the coastal region can fluctuate several feet with seasonal rainfall. Seasonal high groundwater levels are typically found at shallow depths in the flood plains with a reasonable probability of flooding in winter and spring. Seasonal high groundwater can be found at the surface in poorly draining areas. The groundwater table can exhibit some distortions due to differences in vertical and lateral permeability. Soil Conditions Data from the subsurface exploration is included in the Appendix. The subsurface conditions discussed in the following paragraphs and those shown on the sounding and boring logs represent an estimate of the subsurface conditions based on interpretation of the data using normally accepted geotechnical engineering judgments. We note that the transition between soil strata is usually less distinct than those shown on the sounding and boring logs. The CPT soundings conducted for this exploration recorded similar soil behavior types across the site. The soundings generally recorded layers of Sand underlain by Silty Sand and Clay soil behavior types to sounding termination depths of 30 to 38.5 feet below existing grade. A layer of fine grained material (Clay) was recorded in the CPT soundings from approximately 26 feet to sounding termination depth of 38.5 feet below existing grade. The hand auger borings encountered up to 16 inches of topsoil at the surface. Below the surficial material, the hand auger borings encountered slightly clayey Sand (SP-SC) and clayey Sand (SC) to boring termination depths of 5 feet below existing grade. The Geoprobe encountered approximately 3 inches of topsoil at the surface. Below the surficial material, the Geoprobe generally encountered slightly clayey Sand (SP-SC) to sampling termination depth of 20 feet below existing grade.

8 Public Works Site ECS Project No. 23:2081 Page 5 The generalized subsurface conditions are summarized in the following table: Table 2: Generalized Soil Conditions Depth (feet) Soil Behavior Type Average q c (tsf) Relative Density/Consistency Geoprobe Log (0-20 feet) USCS Classification 0-11 Sand to Silty Sand Silty Sand to Sandy Silt Silty Sand to Sandy Silt Medium Dense to Very Dense Slightly Clayey SAND SP-SC Medium Dense Slightly Clayey SAND SP-SC Medium Dense to Dense Clay to Silty Clay Medium Stiff to Stiff N/A N/A N/A N/A Groundwater Conditions Based on pore water pressure measurements, groundwater was apparent in the CPT soundings at depths ranging from approximately 4 to 6.5 feet below existing grade at the time of sounding. Groundwater was observed in hand auger borings HA-1, HA-2, HA-4, and CPT-6 at a depth of approximately 4 feet below existing grade at the time of boring. Groundwater was observed in hand auger borings HA-5 and HA-6 at a depth of approximately 2 feet below existing grade at the time of boring. Groundwater was observed in the Geoprobe at a depth of approximately 5 feet below existing grade at the time of sampling. Please note that groundwater levels in coastal geology fluctuate with tidal, seasonal, and climatic variations, and may be significantly different at other times. The groundwater levels should be checked prior to construction to assess its effects on grading operations and other activities. EVALUATIONS AND RECOMMENDATIONS General The following engineering recommendations are based on our understanding of the proposed construction, the data obtained in the soil test borings/soundings performed, our site reconnaissance, and our experience with soils and subsurface conditions similar to those encountered at this site. We recommend that the proposed structure be supported on conventional shallow spread or continuous footing foundations, provided the criteria in the following sections entitled Subgrade Preparation and Recommended Earthwork Specifications are met. Detailed evaluations and recommendations in the following sections should be read in full.

9 Public Works Site ECS Project No. 23:2081 Page 6 Dewatering Groundwater levels should be checked immediately prior to any earthwork operations. Based on groundwater levels encountered during our geotechnical exploration and our understanding of the proposed project, the potential for required dewatering operations is moderate. If groundwater is found within 3 feet of final construction grade prior to earthwork operations, remedial dewatering may be necessary. The remedial dewatering operations may consist of installing a well point system, perimeter rim ditches and, if necessary, secondary rim-ditches to withdraw groundwater. Temporary dewatering will not only help lower the natural moisture content of the subgrade soils but will also allow heavy construction equipment to gain access to portions of the site. The groundwater table should be controlled at least 3 feet below the compacted or excavated elevations. Groundwater levels may fluctuate during tidal cycles due to the site s proximity to tidal water. Subgrade Preparation The subgrade preparation should consist of stripping all vegetation, rootmat, topsoil, and any other soft or unsuitable material from the building and pavement areas. We recommend earthwork clearing be extended a minimum of 10 feet beyond the building and 5 feet beyond pavement limits. Stripping limits should be extended an additional 1 foot for each foot of fill required at the building areas exterior edge. This would include the removal of any abandoned utilities or existing structure foundations. Depending on planned finished grades, any unsuitable existing material should be demucked or over-excavated as to allow for a minimum 2 foot cushion of suitable material in the building and pavement areas. The cushion is understood to extend from below the building slab granular base material (if needed), or below roadway graded aggregate base material. Unsuitable soil materials are defined as those complying with ASTM D2487 soil classification groups ML, MH, CH, CL, OL, OH and PT. Additionally, soil materials defined as those complying with ASTM D2487 soil classification groups SC or SM may be deemed unusable during subgrade evaluation due to the natural moisture content, consistency, or fines content of the material. The unsuitable or unusable material should be replaced with approved structural fill as defined in the following section Recommended Earthwork Specifications. After stripping, demucking, or over-excavating to the desired grade, and prior to fill placement, the exposed surface should be observed by an experienced geotechnical engineer or his authorized representative. For building and pavement areas, the subgrade should be densified with a large vibratory roller to achieve a uniform subgrade. In areas with minimal fill planned (less than 2 feet), the existing subgrade should consist of suitable soils such as those defined by ASTM D2487 soil classification groups GW, GP, GM, SC, SM, SW, SP-SC, and SP.

10 Public Works Site ECS Project No. 23:2081 Page 7 After the completion of densification, proofrolling using a loaded dump truck having an axle weight of at least 10 tons should be used to aid in identifying localized soft or unsuitable material. Any soft or unsuitable materials encountered during this proofrolling should be removed and replaced with an approved backfill compacted to the criteria given below. ECS can provide alternative options such as using geogrid and/or geotextile to stabilize the subgrade at the time of construction, if necessary. Generally, the existing surficial material onsite appears suitable as subgrade material for building pad and pavement areas. Recommended Earthwork Specifications Fill in structural areas should be placed over a stable subgrade. Soils used for structural fill shall have a PI (Plasticity Index) of less than 10, and a LL (Liquid Limit) of less than 30. The soils to be used as structural fill in the building pad areas and below the top 2 feet in pavement areas should be inorganic, non-plastic granular soil containing less than 25 percent fines passing the No. 200 sieve. The soils to be used as structural fill within the top 2 feet below pavement areas should be inorganic, non-plastic granular soil containing less than 15 percent fines passing the No. 200 sieve. The structural fill depths are understood to extend from below the building slab granular base material (if needed) or roadway graded aggregate base material. The existing surficial material generally appears suitable for re-use as structural fill in the proposed building pad and pavement areas. The structural fill should be placed in level lifts not exceeding 12 inches in loose thickness and compacted to at least 95% of the maximum dry density obtained in accordance with ASTM Specification D1557, Modified Proctor Method. Fill placed within the top 24 inches in pavement areas should be compacted to at least 98% of the maximum dry density obtained in accordance with ASTM Specification D1557, Modified Proctor Method. In-place density tests shall be performed by an experienced engineering technician working under the direction of a licensed geotechnical engineer with a minimum of 1 test per 2,500 square feet of fill area for each lift of fill placed. The elevation and location of the tests should be clearly identified and recorded at the time of fill placement. The moisture content of the fill at the time of placement shall be within +/- 3% (wet or dry) of the optimum moisture content, as determined by the appropriate proctor compaction tests. Moisture contents may be controlled by disking or other approved chemical or mechanical means to achieve the desired moisture content and density specification.

11 Public Works Site ECS Project No. 23:2081 Page 8 Foundation Recommendations No structural loading or grading information was available at the time this report was published. We assume the maximum interior isolated column loads to be 30 kips and the maximum exterior wall loads to be 3 kips per linear foot. We have assumed minimal fill will be required to bring the site to finished construction grade. We recommend that the proposed structures be supported on conventional shallow spread or continuous footing foundations, provided the criteria in the previous sections entitled Subgrade Preparation and Recommended Earthwork Specifications are met. We recommend foundations be designed for a net allowable soil bearing pressure of 2,000 pounds per square foot (psf). For footings constructed in accordance with the requirements outlined in this report, maximum total settlement is expected to be less than 1 inch. Maximum differential settlement between adjacent columns is expected to be half the total settlement. To reduce the risk of foundation bearing failure and excessive settlement due to local shear or "punching" action, we recommend that continuous footings have a minimum width of 1.5 feet and that isolated column footings have a minimum lateral dimension of 2.5 feet. For this site, we recommend footing bottoms be placed at a minimum depth of 1.5 feet below lowest adjacent finished grade. These recommendations are based on our engineering experience with similar soil conditions and the anticipated structural loading. Seismic Parameters From site-specific test boring data, the Site Class was determined from Table of the IBC The data used to determine the Site Class typically includes soil test borings to determine Standard Penetration resistances (N-values). Based on estimated average N- values in the upper 100 feet of soil profile, we calculated an N bar. The results of the seismic evaluation are as follows: Latitude: , Longitude: S = 38.5%g, s S = 11.9%g * 1 F = 1.492, a F = v S MS = 57.5%g, S M1 = 27.6%g S DS = 38.3%g, S D1 = 18.4%g Site Class = D *The spectral accelerations were determined from USGS 2002 National Seismic Hazard Maps. The software application LiquefyPro was used to analyze the soils encountered at the site for potential liquefaction induced failure. Liquefaction can result in settlement, loss of bearing

12 Public Works Site ECS Project No. 23:2081 Page 9 capacity, and lateral spreading of the ground surface during earthquake induced ground motions. A liquefaction analysis was performed using site-specific probabilistic earthquake magnitude and peak ground acceleration (PGA) data obtained from the USGS and CPT sounding data obtained from our subsurface exploration. Sounding CPT-7 was thought representative of potentially liquefiable soils on the site and was chosen for test data. Based on our calculations, experience in the area, and depth to potentially liquefiable soils, it is our opinion that the potential for failure or collapse of soils is low. The detailed results of the liquefaction analysis are included in the Appendix. Pavement Recommendations Based on information provided, a typical minimum pavement section is shown below. We understand the following: 1. California Bearing Ratio (CBR) samples were not obtained for the proposed subgrade soils at these sites. Our pavement design analyses are based on assumed CBR values. 2. Our pavement design analysis is based on assumed traffic information. 3. We assume that the top 24 inches of the proposed roadway subgrade will consist of suitable material as defined by select material containing less than 15% passing the No. 200 sieve or as approved by the Geotechnical Engineer or his authorized representative after subgrade inspection. 4. If approved subgrade material consists of material containing more than 15% passing the No. 200 sieve, we recommend the installation of an underdrain system to aid in drainage beneath pavement sections and mitigate the potential saturation of the existing subgrade. 5. We assume that the top 24 inches of the proposed roadway subgrade will be compacted to at least 98% of maximum dry density in accordance with ASTM D1557, Modified Proctor Method. 6. We assume that criteria from our previous sections entitled Subgrade Preparation and Recommended Earthwork Specifications will be followed. 7. We assume a minimum separation of 24 inches between the base course material and the high groundwater table.

13 Public Works Site ECS Project No. 23:2081 Page 10 Typical Flexible Pavement Section Material Type AC Surface Course HMA Superpave 9.5mm AC Base Course HMA Superpave 12.5mm Graded Aggregate Base (GAB) Parking Stalls and Driveways Heavy Duty Truck Driveways 2.0 inches 1.0 inch inches 6.0 inches 8.0 inches All aggregate material used as base course must comply with the gradation requirements established by the GDOT. When using Group 1 or Group 2 aggregate as specified by GDOT, material should be compacted to at least 98 percent and 100 percent, respectively, of maximum dry density in accordance with ASTM D1557, Modified Proctor Method. The flexible pavement specifications used in roadways and parking stalls may not be adequate for a trash compactor/dumpster pick-up area due to the heavy loads anticipated. We recommend that a rigid concrete pavement section be provided for those areas. The concrete section should be at least 6 inches thick and should consist of concrete having a minimum 28- day compressive strength of 4,000 pounds per square inch (psi). A minimum of 4 inches of compacted graded aggregate base should be placed beneath all rigid concrete pavements. For dumpster storage areas, the concrete slab area should be large enough to support both the dumpster and the truck used to unload the dumpster. An important consideration with the design and construction of pavements is surface and subsurface drainage. Where standing water develops, either on the pavement surface or within the base course layer, softening of the subgrade and other problems related to the deterioration of the pavement can be expected. Furthermore, good drainage should minimize the risk of the subgrade materials becoming saturated over a long period of time. Additional Considerations Positive site drainage should be maintained during earthwork operations, which should help maintain the integrity of the soil. Placement of fill on the near surface soils, which have become saturated, may be very difficult. When wet, these soils will degrade quickly with disturbance from contractor operations and will be extremely difficult to stabilize for fill placement. The surficial soils contain fines, which are considered moderately erodible. All erosion and sedimentation shall be controlled in accordance with Best Management Practices and current County requirements. At the appropriate time, we would be pleased to provide a proposal for NPDES monitoring and construction materials testing related services.

14 Public Works Site ECS Project No. 23:2081 Page 11 CLOSING Our professional services have been performed, our findings obtained, and our recommendations prepared in accordance with generally accepted geotechnical engineering principles and practices. ECS is not responsible for the conclusions, opinions or recommendations made by others based on these data. No third party is given the right to rely on this report without express written permission. The scope of services for this study does not include environmental assessment or investigation for the presence or absence of wetlands, hazardous or toxic materials in the soil or groundwater within or beyond the site studied. Any statements in this report regarding odors, staining of soils, or other unusual conditions observed are strictly for the information of our client.

15 APPENDIX I

16 Approximate Site Location SITE VICINITY MAP feet N Approximate Report of Geotechnical Exploration Public Works Site Savannah, Georgia Scale: See Scale Bar Project No.: 23:2081 Reference: Google Earth Figure No.: 1

17 HA-3 CPT-7 CPT-6 HA-4 CPT-5 CPT-4 HA-1 HA-2 HA-5 CPT-3 CPT-2 HA-6 CPT-1 - CPT Sounding/ Hand Auger Boring - Hand Auger Boring BORING LOCATION PLAN N Approximate Report of Geotechnical Exploration Public Works Site Savannah, Georgia. Scale: NTS Project No.: 23:2081 Reference: Chatham Co. Public Works & Park Services Received: 3/31/2009 Figure No.: 2

18 APPENDIX II

19 Unified Soil Classification System (ASTM Designation D-2487) Major Division Group Symbol Typical Names Classification Criteria Coarse-grained soils More than 50% retaining on No. 200 sieve Gravels More than 50 % of coarse fraction retained on No. 4 sieve Sands More than 50 % of coarse fraction passes No. 4 sieve GW GP GM GC SW SP SM SC Well-graded gravels and gravel-sand mixtures, little or no fines Poorly graded gravels and gravel-sand mixtures, little or no fines Silty gravels, gravel-sand-silt mixtures Clayey gravels, gravel-sand-clay mixtures Well-graded sands and gravelly sands, little or no fines Poorly graded sands and gravelly sands, little or no fines Silty sands, sand-silt mixtures Clayey sands, sand-clay mixtures Classification on basis of percentage of fines GW, GP, SW, SP, GM, GC, SM, SC Borderline classification requiring use of dual symbol Less than 5% Pass No. 200 sieve More than 12% Pass No. 200 sieve 5% to 12% Pass No. 200 sieve C U =D 60/D 10 Greater than 4 2 C =(D ) /(D xd ) Between 1 and 3 Z Not meeting both criteria for GW Atterberg limits plot below "A" line or plasticity index less than 4 Atterberg limits plot above "A" line and plasticity index greater than 7 C =D /D Greater than 6 U C =(D ) /(D xd ) Between 1 and 3 Z Not meeting both criteria for SW Atterberg limits plot below "A" line or plasticity index less than 4 Atterberg limits plot above "A" line and plasticity index greater than 7 Fine grained soils 50% or more passing No. 200 sieve Silts or Clays Liquid limit 50% or less Silts or Clays Liquid limit greater than 50 % ML CL OL MH CH OH Inorganic silts, very fine sands, rock flour, silty or clayey fine sands Inorganic clays of low to medium plasticity, gravelly clays, sandy clays, silty clays, lean clays Organic silts and organic silty clays of low plasticity Inorganic silts, micaceous or diatomaceous fine sands or silts, elastic silts Inorganic clays of high plasticity, fat clays Organic clays of medium to high plasticity PLASTICITY INDEX (PI) Note: U-line represents approximate upper limit of LL and PI combinations for natural soils (empirically determined). ASTM-D CL - ML 20 CL or OL ML or OL LIQUID LIMIT (LL) CH or OH "U" LINE "A" LINE Plasticity chart for the classification of fine-grained soils. Tests made on fraction finer than No. 40 sieve. MH or OH Highly organic soils Pt Peat, muck and other highly organic soils Fibrous organic matter; will char, burn, or glow UNIFIED SOIL CLASSIFICATION SYSTEM

20 REFERENCE NOTES FOR CONE PENETRATION TEST (CPT) SOUNDINGS In the CPT sounding procedure (ASTM-D-5778), an electronically instrumented cone penetrometer is hydraulically advanced through soil to measure point resistance (q c ), pore water pressure (U 2 ), and sleeve friction (f s ). These values are recorded continuously as the cone is pushed to the desired depth. CPT data is corrected for depth and used to estimate soil classifications and intrinsic soil parameters such as angle of internal friction, preconsolidation pressure, and undrained shear strength. The graphs below represent one of the accepted methods of CPT soil behavior classification (Robertson, 1990). 1. Sensitive, Fine Grained 6. Clean Sands to Silty Sands 2. Organic Soils-Peats 7. Gravelly Sand to Sand 3. Clays; Clay to Silty Clay 8. Very Stiff Sand to Clayey Sand 4. Clayey Silt to Silty Clay 9. Very Stiff Fine Grained 5. Silty Sand to Sandy Silt The following table presents a correlation of corrected cone tip resistance (q c ) to soil consistency or relative density: SAND SILT/CLAY Corrected Cone Tip Relative Density Corrected Cone Tip Relative Density Resistance (q c ) (tsf) Resistance (q c ) (tsf) <20 Very Loose <5 Very Soft Loose 5-10 Soft Medium Dense Firm Stiff Dense Very Stiff <200 Very Dense Hard <60 Very Hard

21 REFERENCE NOTES FOR BORING LOGS I. Drilling and Sampling Symbols: SS Split Spoon Sampler RB Rock Bit Drilling ST Shelby Tube Sampler BS Bulk Sample of Cuttings RC Rock Core: NX, BX, AX PA Power Auger (no sample) PM Pressuremeter HSA Hollow Stem Auger WOH Sample Advanced w/ Wt. of Hammer & Rods MR Mud Rotary N/A Not Applicable WS Wash Sample Standard Penetration Test Blow Count (Blows/Ft) refers to the blows per foot of a 140lb. hammer falling 30 inches on a 2 inch O.D. split spoon sampler, as specified in ASTM D The blow count is commonly referred to as the N-value. II. Correlation of Penetration Resistance to Soil Consistency: Sands Cohesive Soils - Silts & Clays SPT Consistency SPT Consistency Unconfined N Value N Value Compressive Strength, Qp, tsf 0-3 Very Loose 0-2 Very Soft Loose 3-4 Soft Medium Dense 5-8 Medium Stiff Dense 9-16 Stiff Very Dense Very Stiff Partially Weathered Rock Hard Very Hard > Partially Weathered Rock III. Unified Soil Classification Symbols: GP Poorly Graded Gravel ML Low Plasticity Silt GW Well Graded Gravel MH High Plasticity Silt GM Silty Gravel CL Low Plasticity Clay GC Clayey Gravel CH High Plasticity Clay SP Poorly Graded Sand OL Low Plasticity Organics SW Well Graded Sand OH High Plasticity Organics SM Silty Sand CL-ML Dual Classification (Typical) SC Clayey Sand Modifiers: slightly = 5% to 12% IV. Water Level Measurement Symbols: WL Water Level AC After Completion WS While Sampling WCI Wet Cave In WD While Drilling DCI Dry Cave In NGE No Groundwater Encountered The water levels are those water levels actually measured in the borehole at the times indicated by the symbol. The measurements are relatively reliable when augering, without adding fluids, in a granular soil. In clays and plastic silts, the accurate determination of water levels may require several days for the water level to stabilize. In such cases, additional methods of measurement are generally applied.

22 Classification by Robertson 1990 Gravelly sand to sand (7) Gravelly sand to sand (7) Very stiff sand to clayey sand (8) Depth [ft] qc [T/ft^2] fs [T/ft^2] u2 [T/ft^2] N60 [] Very stiff sand to clayey sand (8) Clays; clay to silty clay (3) Sensitive, fine grained (1) Clays; clay to silty clay (3) Clayey silt to silty clay (4) U2 Tip area [cm2]: Cone No: 3814 NO ME Sleeve area [cm2]: 150 Location: Project Position: ID: X: 0.00 ft, Y: 0.00 ft Project Savannah, ID: Georgia Client: 23:2081 Project: Client: 2081 Public Works Site Chatham Co. Public Works & Park Services Ground Ground level: Elev.: Test Test no: No.: 0.00 CPT-1 Date: Scale: CPT-1 04/24/ : 58 Page: Date: Fig: Page.: 1/2 File: 4/24/09 1/ CPT-1 PUSH 1.CPT

23 Classification by Robertson 1990 Clayey silt to silty clay (4) qc [T/ft^2] fs [T/ft^2] u2 [T/ft^2] N60 [] Clays; clay to silty clay (3) Depth [ft] Clayey silt to silty clay (4) Clayey silt to silty clay (4) 35.0 Clayey silt to silty clay (4) Clayey silt to silty clay (4) Clays; clay to silty clay (3) 40.0 Sounding Terminated at 38.5 Feet U2 Cone No: 3814 NO ME Tip area [cm2]: 10 Sleeve area [cm2]: 150 Location: Project Position: ID: X: 0.00 ft, Y: 0.00 ft Project Savannah, ID: Georgia Client: 23:2081 Project: Client: 2081 Public Works Site Chatham Co. Public Works & Park Services Ground Ground level: Elev.: Test Test no: No.: 0.00 CPT-1 Date: Scale: CPT-1 04/24/ : 58 Page: Date: Fig: Page.: 2/2 File: 4/24/09 2/ CPT-1 PUSH 1.CPT

24 Classification by Robertson 1990 Gravelly sand to sand (7) Depth [ft] qc [T/ft^2] fs [T/ft^2] u2 [T/ft^2] N60 [] Very stiff sand to clayey sand (8) Clayey silt to silty clay (4) Clayey silt to silty clay (4) 25.0 Sounding Terminated at 30 Feet Clayey silt to silty clay (4) 30.0 U2 Cone No: 0 Tip area [cm2]: 10 Sleeve area [cm2]: 150 Location: Project Position: ID: Project Savannah, ID: Georgia Client: 23:2081 Project: Client: Public Works Site Chatham Co. Public Works & Park Services Ground Ground level: Elev.: Test Test no: No.: Date: Scale: CPT-2 1 : 58 Page: Date: Fig: Page.: 1/1 File: 4/24/09 1/ CPT-2 PUSH2.CSV

25 Classification by Robertson 1990 Gravelly sand to sand (7) Gravelly sand to sand (7) Depth [ft] qc [T/ft^2] fs [T/ft^2] u2 [T/ft^2] N60 [] Gravelly sand to sand (7) Clays; clay to silty clay (3) Clayey silt to silty clay (4) Sounding Terminated at 30 Feet Clays; clay to silty clay (3) 30.0 U2 Cone No: 3814 NO ME Tip area [cm2]: 10 Sleeve area [cm2]: 150 Location: Project Position: ID: X: 0.00 ft, Y: 0.00 ft Project Savannah, ID: Georgia Client: 23:2081 Project: Client: 2081 Public Works Site Chatham Co. Public Works & Park Services Ground Ground level: Elev.: Test Test no: No.: 0.00 CPT-3 Date: Scale: CPT-3 04/24/ : 58 Page: Date: Fig: Page.: 1/2 File: 4/24/09 1/ CPT-3 PUSH 1.CPT

26 Classification by Robertson 1990 qc [T/ft^2] fs [T/ft^2] u2 [T/ft^2] N60 [] Gravelly sand to sand (7) Depth [ft] Gravelly sand to sand (7) Very stiff sand to clayey sand (8) Clays; clay to silty clay (3) Sounding Terminated at 30 Feet Clayey silt to silty clay (4) Clays; clay to silty clay (3) 30.0 U2 Cone No: 3814 NO ME Tip area [cm2]: 10 Sleeve area [cm2]: 150 Location: Project Position: ID: X: 0.00 ft, Y: 0.00 ft Project Savannah, ID: Georgia Client: 23:2081 Project: Client: 2081 Public Works Site Chatham Co. Public Works & Park Services Ground Ground level: Elev.: Test Test no: No.: 0.00 CPT-4 Date: Scale: CPT-4 04/24/ : 58 Page: Date: Fig: Page.: 1/2 File: 4/24/09 1/ CPT-4 PUSH 1.CPT

27 Classification by Robertson 1990 Gravelly sand to sand (7) Depth [ft] qc [T/ft^2] fs [T/ft^2] u2 [T/ft^2] N60 [] Gravelly sand to sand (7) Very stiff sand to clayey sand (8) Very stiff sand to clayey sand (8) Clayey silt to silty clay (4) Clayey silt to silty clay (4) Clays; clay to silty clay (3) Clayey silt to silty clay (4) Clays; clay to silty clay (3) Sensitive, fine grained (1) U2 Tip area [cm2]: Cone No: 3814 NO ME Sleeve area [cm2]: 150 Location: Project Position: ID: X: 0.00 ft, Y: 0.00 ft Project Savannah, ID: Georgia Client: 23:2081 Project: Client: 2081 Public Works Site Chatham Co. Public Works & Park Services Ground Ground level: Elev.: Test Test no: No.: 0.00 CPT-5 Date: Scale: CPT-5 04/24/ : 58 Page: Date: Fig: Page.: 1/2 File: 4/24/09 1/ CPT-5 PUSH 1.CPT

28 Classification by Robertson 1990 Sensitive, fine grained (1) Clayey silt to silty clay (4) Clays; clay to silty clay (3) Depth [ft] qc [T/ft^2] fs [T/ft^2] u2 [T/ft^2] N60 [] Clayey silt to silty clay (4) 35.0 Sounding Terminated at 35 Feet U2 Cone No: 3814 NO ME Tip area [cm2]: 10 Sleeve area [cm2]: 150 Location: Project Position: ID: X: 0.00 ft, Y: 0.00 ft Project Savannah, ID: Georgia Client: 23:2081 Project: Client: 2081 Public Works Site Chatham Co. Public Works & Park Services Ground Ground level: Elev.: Test Test no: No.: 0.00 CPT-5 Date: Scale: CPT-5 04/24/ : 58 Page: Date: Fig: Page.: 2/2 File: 4/24/09 2/ CPT-5 PUSH 1.CPT

29 Classification by Robertson 1990 Gravelly sand to sand (7) Gravelly sand to sand (7) Depth [ft] qc [T/ft^2] fs [T/ft^2] u2 [T/ft^2] N60 [] Gravelly sand to sand (7) Gravelly sand to sand (7) Very stiff sand to clayey sand (8) Clays; clay to silty clay (3) 30.0 U2 Cone No: 3814 NO ME Tip area [cm2]: 10 Sleeve area [cm2]: 150 Location: Project Position: ID: X: 0.00 ft, Y: 0.00 ft Project Savannah, ID: Georgia Client: 23:2081 Project: Client: 2081 Public Works Site Chatham Co. Public Works & Park Services Ground Ground level: Elev.: Test Test no: No.: 0.00 CPT-6 Date: Scale: CPT-6 04/24/ : 58 Page: Date: Fig: Page.: 1/2 File: 4/24/09 1/ CPT-6 PUSH 2.002

30 Classification by Robertson 1990 qc [T/ft^2] fs [T/ft^2] u2 [T/ft^2] N60 [] Clays; clay to silty clay (3) Depth [ft] Sounding Terminated at 31 Feet U2 Cone No: 3814 NO ME Tip area [cm2]: 10 Sleeve area [cm2]: 150 Location: Project Position: ID: X: 0.00 ft, Y: 0.00 ft Project Savannah, ID: Georgia Client: 23:2081 Project: Client: 2081 Public Works Site Chatham Co. Public Works & Park Services Ground Ground level: Elev.: Test Test no: No.: 0.00 CPT-6 Date: Scale: CPT-6 04/24/ : 58 Page: Date: Fig: Page.: 2/2 File: 4/24/09 2/ CPT-6 PUSH 2.002

31 Classification by Robertson 1990 Gravelly sand to sand (7) Gravelly sand to sand (7) Depth [ft] qc [T/ft^2] fs [T/ft^2] u2 [T/ft^2] N60 [] Very stiff sand to clayey sand (8) Very stiff sand to clayey sand (8) Clays; clay to silty clay (3) Clayey silt to silty clay (4) Clays; clay to silty clay (3) 30.0 U2 Cone No: 3814 NO ME Tip area [cm2]: 10 Sleeve area [cm2]: 150 Location: Project Position: ID: X: 0.00 ft, Y: 0.00 ft Project Savannah, ID: Georgia Client: 23:2081 Project: Client: 2081 Public Works Site Chatham Co. Public Works & Park Services Ground Ground level: Elev.: Test Test no: No.: 0.00 CPT-7 Date: Scale: CPT-7 04/24/ : 58 Page: Date: Fig: Page.: 1/2 File: 4/24/09 1/ CPT-7 PUSH 1.CPT

32 Classification by Robertson 1990 qc [T/ft^2] fs [T/ft^2] u2 [T/ft^2] N60 [] Clays; clay to silty clay (3) Clayey silt to silty clay (4) Clays; clay to silty clay (3) Clays; clay to silty clay (3) Clayey silt to silty clay (4) Clayey silt to silty clay (4) Depth [ft] Sounding Terminated at 38.5 Feet U2 Cone No: 3814 NO ME Tip area [cm2]: 10 Sleeve area [cm2]: 150 Location: Project Position: ID: X: 0.00 ft, Y: 0.00 ft Project Savannah, ID: Georgia Client: 23:2081 Project: Client: 2081 Public Works Site Chatham Co. Public Works & Park Services Ground Ground level: Elev.: Test Test no: No.: 0.00 CPT-7 Date: Scale: CPT-7 04/24/ : 58 Page: Date: Fig: Page.: 2/2 File: 4/24/09 2/ CPT-7 PUSH 1.CPT

33

34

35

36

37

38

39

40

41

42 ECS SOUTHEAST, LLC Savannah, Georgia Laboratory Testing Summary Project Number: 23:2081 Project Name: Public Works Site Date: 5/5/2009 Project Engineer: JWS Principal Engineer: SB Summary By: JWS Percent Compaction Boring Sample Depth Moisture Liquid Plastic Plasticity Passing Maximum Optimum CBR Other Number Number (feet) Content USCS Limit Limit Index No. 200 Density Moisture Value (%) Sieve (pcf) (%) CPT SP-SC 6.0 HA SC 13.3 Summary Key: SA = See Attached Hyd = Hydrometer UCS = Unconfined Compression Soil NP = Non Plastic S = Standard Proctor Con = Consolidation UCR = Unconfined Compression Rock M= Modified Proctor DS = Direct Shear LS = Lime Stabilization V = Virginia Test Method GS = Specific Gravity CS = Cement Stabilization OC = Organic Content

43 LIQUEFACTION ANALYSIS Public Works Site Hole No.=CPT-7 Water Depth=4.5 ft Magnitude=7 Acceleration=0.174g (ft) 0 Shear Stress Ratio 0 1 Factor of Safety Settlement 0 (in.) 10 Soil Description Slightly Clayey SAND CLAY 30 fs1=1 40 CRR CSR fs1 Shaded Zone has Liquefaction Potential Wet Dry S = 2.30 in. 50 LiquefyPro CivilTech Software USA ECS Southeast, LLC 23:2081 Liquefaction

44 Seismic Hazard Geographic Deaggregation ECS Project Name: Public Works Site ECS Project Number: 23:2081 For 0.00-s Spectral Accel, g PGA Exceedance Return Time: 2475 years Max. significant source distance 258 km. View angle is 35 degrees above horizon Gridded-source hazard accum. In 5 intervals Rock site. Average Vs=760 m/s top 30 m Source:

45 APPENDIX III

46

47

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Pavement Subgrade Survey State Highway 125 over Hudson Creek Ottawa County, Oklahoma September 23, 21 Terracon Project No. 415121 Prepared for: Guy Engineering Services,

More information

FIGURES Printed By: aday Print Date: 3/23/2011 12:48:08 PM File Name: \\geodesign.local\files\jobs\m-r\penskeauto\penskeauto-1\penskeauto-1-01\figures\cad\penskeauto-1-01-vm01.dwg Layout: FIGURE 1 VICINITY

More information

GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA JANUARY

GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA JANUARY GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA 73171 JANUARY 06 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION GEOTECHNICAL REPORT I-15

More information

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois AGI Project No. -11 Subsurface Investigation Report For the Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois Prepared for Mr. Steve Panko Key Development Partners, LLC North State Street,

More information

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois AGI Project No. 13-276 Subsurface Investigation Report For the Proposed New Retail Center 9601 South Pulaski Road Evergreen Park, Illinois Prepared for Mr. Feras Sweis FHS Design + Build LLC 2010 West

More information

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER CHAPTER 3 Site Preparation In preparation for constructing buildings on a property, the builder must consider a number of factors related to code requirements. The buildings must be located according to

More information

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1 PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes

More information

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ANALYSIS DMA TAMPA RED BRICK BUILDING TAMPA, FLORIDA FOR MRI ARCHITECTURAL GROUP, INC.

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ANALYSIS DMA TAMPA RED BRICK BUILDING TAMPA, FLORIDA FOR MRI ARCHITECTURAL GROUP, INC. REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ANALYSIS DMA TAMPA RED BRICK BUILDING TAMPA, FLORIDA FOR MRI ARCHITECTURAL GROUP, INC. JANUARY 7, 2015 January 7, 2015 Mr. Pete Ikegami MRI Architectural

More information

Typical Subsurface Profile. November 28, 2016

Typical Subsurface Profile. November 28, 2016 November 28, 2016 RSCCD Facility Planning, District Construction and Support Services 2323 N. Broadway, Suite 112, Santa Ana, CA 92706 Attn: Re: Ms. Allison Coburn Facilities Project Manager P: (714) 480-7530

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT PROJECT MINECRAFT ACCESS ROAD BOYDTON PLANK ROAD DINWIDDIE COUNTY, VIRGINIA JOB NUMBER: 37775.003 PREPARED FOR: DINWIDDIE COUNTY PO BOX 70 DINWIDDIE COUNTY, STATE 23841

More information

Site Location. Figure 1: Site Location Map US-24 and I-275 Interchange Ash Township, Monroe County, Michigan

Site Location. Figure 1: Site Location Map US-24 and I-275 Interchange Ash Township, Monroe County, Michigan Site Location 0606 1771 North Dixie Highway Monroe, Michigan 48162 Tel: 734-289-2200 Fax: 734-289-2345 www.manniksmithgroup.com Figure 1: Site Location Map US-24 and I-275 Interchange Ash Township, Monroe

More information

Earth Mechanics, Inc. Geotechnical & Earthquake Engineering

Earth Mechanics, Inc. Geotechnical & Earthquake Engineering Earth Mechanics, Inc. Geotechnical & Earthquake Engineering TECHNICAL MEMORANDUM DATE: June 3, 2009 EMI PROJECT NO: 01-143 TO: COPY: FROM: SUBJECT: John Chun, P.E. / Port of Long Beach (POLB) Jorge Castillo

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Shaw AFB East Gate Entrance Control Facility Amendment Sumter, South Carolina September 13, 2010 Terracon Project No. 73105020A Prepared for: TranSystems North Charleston,

More information

APPENDIX A DRAINAGE STUDY PHASE 2 ALTERNATIVE IMPROVEMENTS CRYSTAL LAKE ALTERNATIVE 4C IMPROVEMENTS LAKEWOOD PIRATELAND SWASH HORRY COUNTY, SC

APPENDIX A DRAINAGE STUDY PHASE 2 ALTERNATIVE IMPROVEMENTS CRYSTAL LAKE ALTERNATIVE 4C IMPROVEMENTS LAKEWOOD PIRATELAND SWASH HORRY COUNTY, SC DRAINAGE STUDY PHASE ALTERNATIVE IMPROVEMENTS CRYSTAL LAKE ALTERNATIVE C IMPROVEMENTS ` FOR: LAKEWOOD PIRATELAND SWASH HORRY COUNTY, SC APPENDIX A J-.000 Prepared by: Savannah, GA Charleston, SC Myrtle

More information

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO. 15-945E TO VILLAGE OF TIKI ISLAND TIKI ISLAND, TEXAS BY SERVICING TEXAS, LOUISIANA, NEW MEXICO, OKLAHOMA

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Milepost 210 to 218 Drainage Structure Pipe Jacking Creek County, Oklahoma July 1, 2016 Terracon Project No. 04165017 Prepared for: Benham Tulsa,

More information

GEOTECHNICAL REPORT B-1942

GEOTECHNICAL REPORT B-1942 GEOTECHNICAL REPORT TUSCARORA BRIDGE REPLACEMENT B-1942 E.A. 73561 March 2011 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION GEOTECHNICAL REPORT

More information

REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS

REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS FIGURE 3 Geotechnical Report (2) REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS RIVER TOWER RESTORATION RIVER TOWER PARK TAMPA, FLORIDA AREHNA PROJECT NO. B-13-002 February 22, 2013 Prepared

More information

Preliminary Geotechnical Exploration Armstrong Tract Rivers Avenue and Hanahan Road North Charleston, South Carolina S&ME Project No.

Preliminary Geotechnical Exploration Armstrong Tract Rivers Avenue and Hanahan Road North Charleston, South Carolina S&ME Project No. Preliminary Geotechnical Exploration Rivers Avenue and Hanahan Road S&ME Project No. 4213-16-016 Prepared for: Charleston Water System 103 Saint Phillip Street Charleston, South Carolina 29403 Prepared

More information

REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES

REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES Elizabeth City, North Carolina G E T Project No: EC14-188G May 30, 2014 PREPARED FOR: 106 Capital Trace, Unit E Elizabeth City,

More information

PD - 6 THRUST RESTRAINT DESIGN EQUATIONS AND SOIL PARAMETERS FOR DUCTILE IRON AND PVC PIPE

PD - 6 THRUST RESTRAINT DESIGN EQUATIONS AND SOIL PARAMETERS FOR DUCTILE IRON AND PVC PIPE PD - 6 THRUST RESTRAINT DESIGN EQUATIONS AND SOIL PARAMETERS FOR DUCTILE IRON AND PVC PIPE 4 3 2 1 D D C C B B A A 4 3 2 1 Thrust Restraint Design Equations and Soil Parameters These equations and soil

More information

Subsurface Investigation and Geotechnical Analysis Target Outparcel Midlothian Turnpike Richmond, Virginia. Client: Interface Properties

Subsurface Investigation and Geotechnical Analysis Target Outparcel Midlothian Turnpike Richmond, Virginia. Client: Interface Properties Subsurface Investigation and Geotechnical Analysis Target Outparcel 11309 Midlothian Turnpike Richmond, Virginia Client: Interface Properties December 5, 2017 December 5, 2017 The Heritage Group, LLC Attn:

More information

Geotechnical Testing Laboratory, Inc. Engineering and Construction Materials Testing Services

Geotechnical Testing Laboratory, Inc. Engineering and Construction Materials Testing Services Engineering and Construction Materials Testing Services February 27, 15 Central Louisiana Economic and Development Alliance P.O. Box 465 Alexandria, Louisiana 719 Attention: Mr. Rick Ranson Vice President

More information

Subsurface Investigation Report

Subsurface Investigation Report AGI Project No. 17-154 Subsurface Investigation Report For the Proposed New One-Story Building Addition 7030 West 111 th Street Worth, Illinois Prepared for T63 Development LLC 11052 Mayflow er Lane Orland

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS PROPOSED WEIRS AT STATIONS 130+00 AND 16+00 DRAINAGE IMPROVEMENTS TO THE FOUR CORNERS MSBU HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical,

More information

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink.

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink. JAHarchitects, LLC PROJECT NO. 393 RIVERCREST CDD 11560 RAMBLE CREEK DRIVE, RIVERVIEW FL ADDENDUM TO BID PROJECT: RIVERCREST CDD MULTI PURPOSE FIELD MAINTENANCE BUILDING & DOG PARK POOL & CABANNA JAH PROJECT

More information

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division

More information

PARKING LOTS 4, 7, AND 8 RECONSTRUCTION REPORT

PARKING LOTS 4, 7, AND 8 RECONSTRUCTION REPORT PARKING LOTS 4, 7, AND 8 RECONSTRUCTION REPORT Converse Project No. 15-81-177-01 Prepared For: David Evans and Associates, Inc. 17782 17th Street, Suite 200 Tustin, California 92780 Prepared By: 10391

More information

SOIL MECHANICS Assignment #2: Soil Classification Solution.

SOIL MECHANICS Assignment #2: Soil Classification Solution. Geotechnical Engineering Research Laboratory One University Avenue Lowell, Massachusetts 01854 Edward L. Hajduk, D.Eng, PE Lecturer PA105D Tel: (978) 934 2621 Fax: (978) 934 3052 e mail: Edward_Hajduk@uml.edu

More information

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota 57104 Phone 605-335-5512 Fax 605-335-0773 October 28, 2016 City of Vermillion 25 Center Street 57069 Attn:

More information

SUBSURFACE INVESTIGATION, LABORATORY TESTING PROGRAM, AND PAVEMENT RECOMMENDATIONS

SUBSURFACE INVESTIGATION, LABORATORY TESTING PROGRAM, AND PAVEMENT RECOMMENDATIONS February 7, 2017 EDR Architects, PLLC PO Box 271613 Corpus Christi, TX 78427 Attention: Ms. Emily D. Rozypal, AIA SUBJECT: SUBSURFACE INVESTIGATION, LABORATORY TESTING PROGRAM, AND PAVEMENT RECOMMENDATIONS

More information

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois AGI Project No. 13-109B Subsurface Investigation Report For the Proposed Roosevelt Middle School Site Improvements 7560 Oak Avenue River Forest, Illinois Prepared for Mr. Jerry Pilipowicz Terra Engineering,

More information

Concrete basement walls are

Concrete basement walls are DESIGNING Concrete Basement Walls Make sure the wall is strong enough to resist the lateral pressure of the soil Concrete basement walls are designed to do two main jobs. One job is supporting the house;

More information

REPORT OF SUBSURFACE EXPLORATION

REPORT OF SUBSURFACE EXPLORATION REPORT OF SUBSURFACE EXPLORATION WELDING & JOINING TECHNOLOGY FACILITY NORTH GEORGIA TECHNICAL COLLEGE CLARKESVILLE, GEORGIA S&ME PROJECT NO. 161-10-061 Prepared For: LW Engineering, P.C. Post Office Box

More information

Prepared for: HDR Engineering, Inc. 200 West Forsyth Street, Suite 800 Jacksonville, Florida Prepared by:

Prepared for: HDR Engineering, Inc. 200 West Forsyth Street, Suite 800 Jacksonville, Florida Prepared by: REPORT OF GEOTECHNICAL EXPLORATION REHABILITATE WHARF STRUCTURE AT BERTHS 6 AND ½ OF BERTH 5 TALLEYRAND MARINE TERMINAL, JACKSONVILLE, FLORIDA E&A PROJECT NO. 0756-0081 Prepared for: HDR Engineering, Inc.

More information

SUBSURFACE EXPLORATION & GEOTECHNICAL ENGINEERING EVALUATION

SUBSURFACE EXPLORATION & GEOTECHNICAL ENGINEERING EVALUATION Report of Subsurface Exploration and Geotechnical Engineering Evaluation Proposed Courtyard Marriott Phenix City, Alabama BHATE Project Number: 112263 October 9, 2012 SUBSURFACE EXPLORATION & GEOTECHNICAL

More information

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES NORTH SHORE SCHOOL DISTRICT 11 HIGHLAND PARK, ILLINOIS ECS PROJECT NO. 1:8 FOR NORTH SHORE SCHOOL DISTRICT 11 SEPTEMBER, 1 REPORT

More information

ECS PROJECT NO. 04:9974. For. Community Housing Partners c/o Mr. Lee S. Alford 4915 Radford Avenue, Suite 300 Richmond, Virginia 23230

ECS PROJECT NO. 04:9974. For. Community Housing Partners c/o Mr. Lee S. Alford 4915 Radford Avenue, Suite 300 Richmond, Virginia 23230 PRELIMINARY REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS TRANQUILITY AT THE LAKES 82 BURTON STATION ROAD VIRGINIA BEACH, VIRGINIA ECS PROJECT NO. 0:99 For Community Housing Partners

More information

You also requested information regarding a sieve analysis at each boring locations. The test results are attached.

You also requested information regarding a sieve analysis at each boring locations. The test results are attached. FORENSICS CONSULTANTS ENVIRONMENTAL GEOTECHNICAL MATERIALS October 4, 2016 Washington County Public Works 11660 Myeron Road Stillwater, MN 55082 Attn: Mr. Marc Briese Re: Additional Borings CSAH 22 (70

More information

SITE INVESTIGATION. Foundation Engineering

SITE INVESTIGATION. Foundation Engineering SITE INVESTIGATION Assist. Prof. Berrak TEYMUR Foundation Engineering Analysis Design Construction As a foundation engineer, you need to consider geotechnical/structural issues (involves geology, subsurface

More information

TRENCH EXCAVATION AND BACKFILL

TRENCH EXCAVATION AND BACKFILL SUDAS Standard Specifications Division 3 - Trench and Trenchless Construction Section 300 - Trench Excavation and Backfill TRENCH EXCAVATION AND BACKFILL PART - GENERAL.0 SECTION INCLUDES A. Trench Excavation

More information

Washtenaw Community College Design & Construction Facilities Management 4800 East Huron River Drive Ann Arbor, MI

Washtenaw Community College Design & Construction Facilities Management 4800 East Huron River Drive Ann Arbor, MI Washtenaw Community College Design & Construction Facilities Management 4800 East Huron River Drive Ann Arbor, MI 4810-4800 GEOTECHNICAL INVESTIGATION FOR Proposed Pavement Rehabilitation Parking Lots

More information

Subsurface Environmental Investigation

Subsurface Environmental Investigation Subsurface Environmental Investigation Lake Development East Lake and 21 st Avenue South February 23, 201 Terracon Project No. MP14738A Prepared for: Minneapolis Public Schools Prepared by: Terracon Consultants,

More information

Subsurface Investigations PDCA Professor s Driven Pile Institute. Loren R. Anderson Utah State University June 25, 2015

Subsurface Investigations PDCA Professor s Driven Pile Institute. Loren R. Anderson Utah State University June 25, 2015 Subsurface Investigations PDCA Professor s Driven Pile Institute Loren R. Anderson Utah State University June 25, 2015 Ralph B. Peck (1962) Subsurface engineering is an art; soil mechanics is an engineering

More information

SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL

SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL GEOTECHNICAL CONSULTANT Prepared by Checked by Approved by Mr. C Allen Dr. Derek Gay Dr. Derek Gay Signature Date Signature Date

More information

Report of Geotechnical Study

Report of Geotechnical Study Report of Geotechnical Study Baltimore Sun Consolidation Baltimore, Maryland F&R Project No. 75V0084 Prepared For: 901 Dulaney Valley Road, Suite 801 Towson, MD 21204 Prepared By: Froehling & Robertson,

More information

geotechnical and construction materials consultants

geotechnical and construction materials consultants geotechnical and construction materials consultants City of Dallas Public Works and Transportation Department 320 E. Jefferson Blvd, Room 307 Dallas, Texas 75203 ATTN: Mr. Vincent Lewis, P.E. Email: Vincent.lewis@dallascityhall.com

More information

GEOTECHNICAL INVESTIGATION MDACC GUHN ROAD FLOOD MITIGATION PROJECT 5610 GUHN ROAD HOUSTON, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION MDACC GUHN ROAD FLOOD MITIGATION PROJECT 5610 GUHN ROAD HOUSTON, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION MDACC GUHN ROAD FLOOD MITIGATION PROJECT 5610 GUHN ROAD HOUSTON, TEXAS REPORT NO. 1140189301 Reported to: URS CORPORATION Houston, Texas Reported by: GEOTEST ENGINEERING, INC.

More information

GEO TECHNICAL INVESTIGATION REPORT (1449-R2-NALANDA UNIVERSITY)

GEO TECHNICAL INVESTIGATION REPORT (1449-R2-NALANDA UNIVERSITY) GEO TECHNICAL INVESTIGATION REPORT (1449-R2-NALANDA UNIVERSITY) AT THE SITE FOR PROPOSED SITE FOR NEW CAMPUS OF NALANDA UNIVERSITY, RAJGIR, DISTT. NALANDA, FOR UNIVERSITY ENGINEER NALANDA UNIVERSITY, COUNCIL

More information

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description September 22, 2016 American Infrastructure Development, Inc. 3810 Northdale Boulevard, Suite 170 Tampa, Florida 33624 Attn: Mr. Mohsen Mohammadi, Ph.D., P.E. Senior Consultant Mob: (813) 244-6609 E-mail:

More information

Report of Geotechnical Engineering Investigation OIA SOUTH CELL LOT (W340) AID Project No. GOA16001 Orange County, Florida GEC Project No.

Report of Geotechnical Engineering Investigation OIA SOUTH CELL LOT (W340) AID Project No. GOA16001 Orange County, Florida GEC Project No. Report of Geotechnical Engineering Investigation OIA SOUTH CELL LOT (W40) AID Project No. GOA16001 Orange County, Florida GEC Project No. 956G July 6, 2017 American Infrastructure Development, Inc. 7 North

More information

SECTION AGGREGATES

SECTION AGGREGATES SECTION 32 05 00 AGGREGATES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Aggregate base 2. Engineered fill 3. Backfill 4. Fine filter aggregate (non-frost susceptible fill) 5. Riprap 6. Recreational

More information

GEOTECHNICAL INVESTIGATION For PROPOSED OUTDOOR THEATER 495 Upper Park Road APN Santa Cruz, California

GEOTECHNICAL INVESTIGATION For PROPOSED OUTDOOR THEATER 495 Upper Park Road APN Santa Cruz, California GEOTECHNICAL INVESTIGATION For PROPOSED OUTDOOR THEATER 495 Upper Park Road APN 009-301-06 Santa Cruz, California Prepared For SANTA CRUZ SHAKESPEAR Santa Cruz, California Prepared By DEES & ASSOCIATES,

More information

Rock Creek Apartments Wheatland, WY

Rock Creek Apartments Wheatland, WY Subsurface Exploration and Geotechnical Engineering Report Prepared for: Rock Creek Apartments, LLC C/O Blue Line Development 1004 South Ave West Missoula, MT 59801 Rock Creek Apartments Wheatland, WY

More information

SUBSURFACE EXPLORATION, LABORATORY TESTING PROGRAM, AND FOUNDATION AND PAVEMENT RECOMMENDATIONS

SUBSURFACE EXPLORATION, LABORATORY TESTING PROGRAM, AND FOUNDATION AND PAVEMENT RECOMMENDATIONS GEOTECHNICAL ENGINEERING CONSTRUCTION MATERIALS ENGINEERING & TESTING SOILS ASPHALT CONCRETE Elsasser Architectural Inc. P.O. Box 833 Georgetown, Texas 78627 Attention: Richard Elsasser relsasser@eai-tx.com

More information

PRELIMINARY ENGINEERING DESIGN MEMORANDUM WATER TREATMENT PLANT FLOOD WALL TO PROTECT BACKWASH SETTLING BASIN CITY OF NEW BUFFALO, MI

PRELIMINARY ENGINEERING DESIGN MEMORANDUM WATER TREATMENT PLANT FLOOD WALL TO PROTECT BACKWASH SETTLING BASIN CITY OF NEW BUFFALO, MI PRELIMINARY ENGINEERING DESIGN MEMORANDUM WATER TREATMENT PLANT FLOOD WALL TO PROTECT BACKWASH SETTLING BASIN CITY OF NEW BUFFALO, MI City of New Buffalo, MI Preliminary Engineering Design Memorandum Water

More information

GENERAL SOILS EVALUATION REPORT. For

GENERAL SOILS EVALUATION REPORT. For GENERAL SOILS EVALUATION REPORT For EL PASO WATER UTILITIES (EPWU) PROPOSED AUSTIN STORMWATER POND IMPROVEMENTS NE OF ALTURA AVE. & LACKLAND ST. EL PASO, EL PASO COUNTY, TEXAS Prepared For MORENO CARDENAS

More information

A Case Study: Foundation Design in Liquefiable Site

A Case Study: Foundation Design in Liquefiable Site RESEARCH ARTICLE OPEN ACCESS A Case Study: Foundation Design in Liquefiable Site Tahar Ayadat* *(Department of Civil Engineering, College of Engineering, PMU University, P.O. Box 1664, Al-Khobar, 31952,

More information

REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES. Proposed Soundside Boardwalk Expansion Duck, North Carolina

REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES. Proposed Soundside Boardwalk Expansion Duck, North Carolina REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES Proposed Soundside Boardwalk Expansion Duck, North Carolina G E T PROJECT NO: EC10-260G November 17, 2010 Prepared for VHB, Inc.

More information

GEOTECHNICAL STUDY NEW CONSTRUCTION AT THE WESTFALL APARTMENTS VISTA DEL SOL DRIVE EL PASO, EL PASO COUNTY, TEXAS

GEOTECHNICAL STUDY NEW CONSTRUCTION AT THE WESTFALL APARTMENTS VISTA DEL SOL DRIVE EL PASO, EL PASO COUNTY, TEXAS GEOTECHNICAL STUDY NEW CONSTRUCTION AT THE WESTFALL APARTMENTS 10661 VISTA DEL SOL DRIVE EL PASO, EL PASO COUNTY, TEXAS Amec Foster Wheeler Project No. 1637192025 Submitted To: 101. S. Jennings Avenue,

More information

Memorandum. FOUNDATION ENGINEERING, INC. Professional Geotechnical Services. Date: August 13, 2012 To:

Memorandum. FOUNDATION ENGINEERING, INC. Professional Geotechnical Services. Date: August 13, 2012 To: FOUNDATION ENGINEERING, INC. Professional Geotechnical Services Memorandum Date: August 13, 2012 To: From: Subject: Project: Brett C. Martin, P.E. LEI Engineering & Surveying, LLC James K. Maitland, P.E.,

More information

GEOTECHNICAL EXPLORATION REPORT. For the. Project ID: th Avenue Vogt Drive to Decorah Road Local Street Washington County.

GEOTECHNICAL EXPLORATION REPORT. For the. Project ID: th Avenue Vogt Drive to Decorah Road Local Street Washington County. GEOTECHNICAL EXPLORATION REPORT For the Project ID: 277--9 18 th Avenue Vogt Drive to Decorah Road Local Street Washington County Prepared for: Alfred Benesch & Company 1 West Canal Street, Suite 15 Milwaukee,

More information

CERTIFICATE FOR: CADD CONSULTING ENGINEERS PVT. LTD

CERTIFICATE FOR: CADD CONSULTING ENGINEERS PVT. LTD CERTIFICATE This is to certify that the samples are collected from the proposed OPGC PROPOSED FOR SOIL INVESTIGATION WORK FOR CONSTRUCTION OF CHP AREA AT MINE S END The laboratory tests have been performed

More information

GEOTECHNICAL STUDY HIDDEN VALLEY SPORTS PARK RESTROOM FACILITY MABEL JONES DRIVE CANYON LAKE, TEXAS

GEOTECHNICAL STUDY HIDDEN VALLEY SPORTS PARK RESTROOM FACILITY MABEL JONES DRIVE CANYON LAKE, TEXAS FUGRO CONSULTANTS, INC. GEOTECHNICAL STUDY HIDDEN VALLEY SPORTS PARK RESTROOM FACILITY MABEL JONES DRIVE CANYON LAKE, TEXAS COMAL COUNTY Canyon Lake, Texas GEOTECHNICAL STUDY HIDDEN VALLEY SPORTS PARK

More information

TEAM Services. Subsurface Exploration Grant Wood Elementary Future Additions - Bettendorf, Iowa Project No November 29, 2016 TABLE OF CONTENTS

TEAM Services. Subsurface Exploration Grant Wood Elementary Future Additions - Bettendorf, Iowa Project No November 29, 2016 TABLE OF CONTENTS Subsurface Exploration Grant Wood Elementary Future Additions - Bettendorf, Iowa Project No. 1-00 November 29, 20 TEAM Services TABLE OF CONTENTS PROJECT INFORMATION... 1 SITE CONDITIONS... 1 FIELD EXPLORATION...

More information

SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING REPORT MMS OFFICE BUILDING OLATHE, KS PREPARED FOR

SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING REPORT MMS OFFICE BUILDING OLATHE, KS PREPARED FOR 1308 Adams I Kansas City, Kansas 66103 913.321.8100 I kctesting.com Su SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING REPORT MMS OFFICE BUILDING OLATHE, KS PREPARED FOR Mr. Chris Herre, AIA Rose Design

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Science & Health Careers Center Oakton Community College Des Plaines, Illinois October 4, 11 Terracon Project No. 1110 Prepared for: Oakton Community College Des Plaines,

More information

File No Supplemental November Geotechnical and Environmental Consulting Engineers

File No Supplemental November Geotechnical and Environmental Consulting Engineers Supplemental Information & Geotechnical Recommendations Proposed New Solar Valley Location B (East of Building No. 7) Cañada Community College 4200 Farm Hill Boulevard Submitted to: Mr. Peter Hempel Construction

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

Classification of Soils

Classification of Soils Classification of Soils Soils - What are they? Particulate materials - Sedimentary origins (usually) - Residual Wide range of particle sizes - larger particles: quartz, feldspar - very small particles:

More information

Utility Cut Restoration

Utility Cut Restoration Design Manual Chapter 9 - Utilities 9D - Utility Cut Restoration 9D-1 Utility Cut Restoration A. General Utility cuts are made in existing pavement sections to install a myriad of utilities and to repair

More information

August 15, 2006 (Revised) July 3, 2006 Project No A

August 15, 2006 (Revised) July 3, 2006 Project No A August 15, 2006 (Revised) July 3, 2006 Project No. 01-05-0854-101A Mr. David Reed, P.E. Protean Design Group 100 East Pine Street, Suite 306 Orlando, Florida 32801 Preliminary Soil Survey Report Polk Parkway

More information

ACKNOWLEDGMENT OF SPONSORSHIP

ACKNOWLEDGMENT OF SPONSORSHIP ACKNOWLEDGMENT OF SPONSORSHIP This work was sponsored by the American Association of State Highway and Transportation Officials, in cooperation with the Federal Highway Administration, and was conducted

More information

Geotechnical Engineering Report South Shore Carter Lake Campground Expansion Northwest of CR 31 and Cougar Run Lane Larimer County, Colorado

Geotechnical Engineering Report South Shore Carter Lake Campground Expansion Northwest of CR 31 and Cougar Run Lane Larimer County, Colorado Geotechnical Engineering Report South Shore Carter Lake Campground Expansion Northwest of CR 31 and Cougar Run Lane Larimer County, Colorado July 15, 2016 Terracon Project No. 20165057 Prepared for: Larimer

More information

Proposed DESC Warehouse

Proposed DESC Warehouse Proposed DESC Warehouse 2900 Mink Point Boulevard Beaufort, South Carolina Corporate - Columbia Branch Office 241 Business Park Boulevard Columbia, South Carolina 29203 - - - - - - - - Charleston Branch

More information

INITIAL SAFETY FACTOR ASSESSMENT EXISTING CCR IMPOUNDMENTS CCR Rule Section (e)

INITIAL SAFETY FACTOR ASSESSMENT EXISTING CCR IMPOUNDMENTS CCR Rule Section (e) INITIAL SAFETY FACTOR ASSESSMENT EXISTING CCR IMPOUNDMENTS CCR Rule Section 257.73(e) ASBURY POWER PLANT 21133 Uphill Lane Asbury, Missouri 64832 October 17, 2016 EMPIRE DISTRICT ELECTRIC COMPANY Prepared

More information

CHAPTER 7 PAVEMENT DESIGN. 1. Gradation (sieve and hydrometer analysis) 3. Moisture density relationships and curves

CHAPTER 7 PAVEMENT DESIGN. 1. Gradation (sieve and hydrometer analysis) 3. Moisture density relationships and curves CHAPTER 7 PAVEMENT DESIGN 7.0 GENERAL The purpose of this chapter is to define the requirements for design of pavement within proposed and existing roadways for new subdivision streets and secondary roads.

More information

GENERAL SOILS EVALUATION REPORT. For

GENERAL SOILS EVALUATION REPORT. For GENERAL SOILS EVALUATION REPORT For EPWU PROPOSED KENTUCKY DAM (DAM 5) DRAINAGE SYSTEM IMPROVEMENTS KENTUCKY ST. & ALABAMA ST. EL PASO, EL PASO COUNTY, TEXAS Prepared For MORENO CARDENAS INC. 2505 E. MISSOURI

More information

Subsurface Exploration and Foundation Analysis Proposed New Weight Room / Fieldhouse Building 429 N Highway 83 Leakey, Texas

Subsurface Exploration and Foundation Analysis Proposed New Weight Room / Fieldhouse Building 429 N Highway 83 Leakey, Texas Subsurface Exploration and Foundation Analysis Proposed New Weight Room / Fieldhouse Building 429 N Highway 83 Leakey, Texas InTEC Project No. S161639 April 18, 2016 Leakey ISD P.O. Box 1129 Leakey, Texas

More information

SITE INVESTIGATION Validation and Interpretation of data

SITE INVESTIGATION Validation and Interpretation of data SITE INVESTIGATION Validation and Interpretation of data Dr. G.Venkatappa Rao The Impact 1 The Need To determine the type of foundation To assess bearing capacity/settlement Location of Ground water table,issues

More information

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES Addendum No.1 5 th Bay Ocean View Norfolk, Virginia G E T Project No: VB15-342G November 18, 2016 PREPARED FOR: 204 Grayson Road Virginia

More information

GEOTECHNICAL INVESTIGATION REPORT. FINAL REPORT ON SOIL INVESTIGATION WORK FOR PROPOSED 2 x 25 MVA 66/11kV G-1 SUB-STATION AT DWARKA, NEW DELHI.

GEOTECHNICAL INVESTIGATION REPORT. FINAL REPORT ON SOIL INVESTIGATION WORK FOR PROPOSED 2 x 25 MVA 66/11kV G-1 SUB-STATION AT DWARKA, NEW DELHI. . GEOTECHNICAL INVESTIGATION REPORT FINAL REPORT ON SOIL INVESTIGATION WORK FOR PROPOSED 2 x 25 MVA 66/11kV G-1 SUB-STATION AT DWARKA, NEW DELHI. RAO ENGINEERING ENTERPRISES (GEOTECHNICAL CONSULTANTS &

More information

UPDATED 04 OCT GEOTECHNICAL INVESTIGATIONS

UPDATED 04 OCT GEOTECHNICAL INVESTIGATIONS 8.0 GEOTECHNICAL INVESTIGATIONS Throughout this section, reference to the Contractor simply means the entity responsible for the subject work. The same procedures and requirements generally apply to anyone

More information

GEOTECHNICAL SUBSURFACE EXPLORATION GRIC CENTRAL SUBDIVISION SEC CHOLLA ROAD AND SEED FARM ROAD SCATON, ARIZONA

GEOTECHNICAL SUBSURFACE EXPLORATION GRIC CENTRAL SUBDIVISION SEC CHOLLA ROAD AND SEED FARM ROAD SCATON, ARIZONA GEOTECHNICAL SUBSURFACE EXPLORATION GRIC CENTRAL SUBDIVISION SEC CHOLLA ROAD AND SEED FARM ROAD SCATON, ARIZONA Prepared for: GRIC Property and Supply 312 W. Casa Blanca Rd., Post Box 97 Sacaton, AZ 84257

More information

Amendment 03 Soils Report. At Air Academy High School 6910 Carlton Drive Colorado Springs, CO 80840

Amendment 03 Soils Report. At Air Academy High School 6910 Carlton Drive Colorado Springs, CO 80840 Amendment 03 Soils Report Issued: November 7, 2017 For RFP 18-KG-0928(BF) Design/Build Services for New Synthetic Turf Field At Air Academy High School 6910 Carlton Drive Colorado Springs, CO 80840 Academy

More information

BUILDING DEVELOPMENT POLICIES AND PROCEDURES ADMINISTRATIVE/GENERAL

BUILDING DEVELOPMENT POLICIES AND PROCEDURES ADMINISTRATIVE/GENERAL GEOTECHNICAL GUIDELINES FOR THE USE OF LIME DURING CONSTRUCTION Section Page 4-0X0l Applicability and Restrictions 2 4-0X02 Expansive Soil Determination 5 4-0X03 Mixture Design for Lime Stabilization of

More information

CEEN Geotechnical Engineering

CEEN Geotechnical Engineering CEEN 3160 - Geotechnical Engineering Lab Report 1 Soil Classification prepared by Student Name 1 Student Name 2 Student Name 3 Student Name 4 Tuesday Lab Time 9:30 10:45 Lab Team 1 Submission Date INTRODUCTION

More information

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities 1 Introduction This document, developed by the San Francisco Public Utilities Commission

More information

Geotechnical Investigation Report

Geotechnical Investigation Report MC Squared, Inc. Geotechnical Investigation Report City of St. Petersburg Forcemain Pinellas County, Florida Prepared for: Hazen and Sawyer 10002. Princess Palm Ave., Suite 200 Tampa, Florida 33610 Prepared

More information

PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS PARKING GARAGE STANTON STREET AND AUSTIN BLUFFS PARKWAY COLORADO SPRINGS, COLORADO

PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS PARKING GARAGE STANTON STREET AND AUSTIN BLUFFS PARKWAY COLORADO SPRINGS, COLORADO PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS PARKING GARAGE STANTON STREET AND AUSTIN BLUFFS PARKWAY COLORADO SPRINGS, COLORADO Prepared for: UNIVERSITY OF COLORADO AT COLORADO SPRINGS Facilities Services

More information

Consultant Specifications for Subsurface Investigation & Geotechnical Analysis and Design Recommendations

Consultant Specifications for Subsurface Investigation & Geotechnical Analysis and Design Recommendations Consultant Specifications for Subsurface Investigation & Geotechnical Analysis and Design Recommendations Mn/DOT Geotechnical Section - Office of Materials & Road Research http://www.mrr.dot.state.mn.us/geotechnical/foundations/tcontract.asp

More information

Experience of a Large Scale Unintentionally Long Surcharge on Organic Soils

Experience of a Large Scale Unintentionally Long Surcharge on Organic Soils Experience of a Large Scale Unintentionally Long Surcharge on Organic Soils Ying Liu, Ph.D., P.E., Senior Engineer, Group Delta Consultants, Inc., 37 Amapola Ave., Suite 212, Torrance, CA. Email: yingl@groupdelta.com

More information

November 13, IP3406. Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112

November 13, IP3406. Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112 November 13, 2015 103IP3406 Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112 Subject: Infiltration Testing Hopeland Road Valve Site Sunoco Pennsylvania Pipeline

More information

RECOMMENDED PROCEDURES FOR IMPLEMENTAION OF DMG SPECIAL PUBLICATION 117 GUIDELINES FOR ANALYZING AND MITIGATING LIQUEFACTION IN CALIFORNIA

RECOMMENDED PROCEDURES FOR IMPLEMENTAION OF DMG SPECIAL PUBLICATION 117 GUIDELINES FOR ANALYZING AND MITIGATING LIQUEFACTION IN CALIFORNIA RECOMMENDED PROCEDURES FOR IMPLEMENTAION OF DMG SPECIAL PUBLICATION 117 GUIDELINES FOR ANALYZING AND MITIGATING LIQUEFACTION IN CALIFORNIA SECTION 5.0 FIELD INVESTIGATIONS 5.0 FIELD INVESTIGATIONS Field

More information

MAPLES COMMUNITY CENTRE ADDITION GEOTECHNICAL INVESTIGATION 434 ADSUM DRIVE WINNIPEG, MANITOBA

MAPLES COMMUNITY CENTRE ADDITION GEOTECHNICAL INVESTIGATION 434 ADSUM DRIVE WINNIPEG, MANITOBA MAPLES COMMUNITY CENTRE ADDITION GEOTECHNICAL INVESTIGATION 434 ADSUM DRIVE WINNIPEG, MANITOBA Prepared for: Maples Recreation Association c / o Wolfrom Engineering Ltd. Winnipeg, Manitoba February 2014

More information

GEOTECHNICAL INVESTIGATION STUDENT HOUSING BUILDINGS UCCS SUMMIT VILLAGE COLORADO SPRINGS, COLORADO

GEOTECHNICAL INVESTIGATION STUDENT HOUSING BUILDINGS UCCS SUMMIT VILLAGE COLORADO SPRINGS, COLORADO GEOTECHNICAL INVESTIGATION STUDENT HOUSING BUILDINGS UCCS SUMMIT VILLAGE COLORADO SPRINGS, COLORADO Prepared for: UNIVERSITY OF COLORADO AT COLORADO SPRINGS Facilities Services 1420 Austin Bluffs Parkway

More information

SOILS INVESTIGATION REPORT The Sorrento Apartments Hobbs, New Mexico

SOILS INVESTIGATION REPORT The Sorrento Apartments Hobbs, New Mexico SOILS INVESTIGATION REPORT The Sorrento Apartments Hobbs, New Mexico PREPARED FOR: Ted Trout Architect & Associates, LTD. Attn: Cesar Corrales 6363 Woodway Suite 00 Houston, TX 7707 Debra P. Hicks, PE/LSI

More information

COMPACTED CLAY LINERS

COMPACTED CLAY LINERS Technical Reference Document for Liquid Manure Storage Structures COMPACTED CLAY LINERS Table of Contents SECTION 1 - PURPOSE AND SCOPE 1.1. Purpose of the Technical Reference Document 1.2. Requirement

More information

GEOTECHNICAL ENGINEERING STUDY. For

GEOTECHNICAL ENGINEERING STUDY. For GEOTECHNICAL ENGINEERING STUDY For PROPOSED RESIDENCE INN BY MARRIOTT ALONG THE SOUTH SIDE OF SPUR 54 JUST NORTH OF THE EXISTING BASS PRO SHOPS HARLINGEN, CAMERON COUNTY, TEXAS Prepared for KRISHNA HARLINGEN

More information

SOIL CLASSIFICATION BASICS Commonly based on grain size and soil consistency. Several classification systems exist:

SOIL CLASSIFICATION BASICS Commonly based on grain size and soil consistency. Several classification systems exist: SOIL CLASSIFICATION BASICS Commonly based on grain size and soil consistency. Several classification systems exist: 1. Unified System (USCS) (ASTM D2487-11). 2. American Association of State Highway and

More information