1 Executive Summary 1. INTRODUCTION Maihar Cement is a unit of M/s Century Textiles and Industries Ltd. located at Sarla Nagar near Maihar in district Satna (M.P). Maihar Cement Unit has come into operation in the year The Present production capacity of Cement plant is 5.0 Million Ton Cement per Annum, and 35 MW of power generation for captive purposes. Apart from this, company has two more cement plants namely Century Cement at Baikunth, Dist. Raipur in the State of Chhattisgarh and Manikgarh Cement at Gadchandur, Dist. Chandrapur, Maharashtra. All Cement plants are equipped with captive power plants, which is not only ensure an uninterrupted power supply, but also help company substantially on power cost, as the own generated power is quite economical as compared to grid power. The demand and supply of electricity in this region is seen huge deficit in supply of electricity. In order to cope up with the demand, utilizing the available infrastructural facilities, has proposed another captive Thermal Power Plant of 60 MW. 1.1 Proposed Project: is already having TPP of 5 MW, 15 MW and New 15 MW CPP for captive use. As the power supply from the grid is of poor quality and causing no of interruption hence, it has been proposed to have another power plant of 60 MW to ensure the uninterrupted power supply for the colony, mines and cement plant. The quality and reliability of power from the CPP is much better compared to Grid supply. Also it is much more economical as compared to the grid tariff of MPPKVVCO ltd The implementation of the project would reduce MAIHAR CEMENT s energy bill, thereby improving the overall profitability. M/s Creative Enviro Services, Bhopal ES: 1
2 1.2 Objective of the study: This Environmental Impact Assessment (EIA) study is prepared for obtaining the Environmental Clearance (EC) from Ministry of Environment and Forests (MoEF), for the proposed 60 MW Coal based Power Plant. Environmental Impact Assessment report has been prepared along with Environment Management Plan (EMP) for various environmental components, which may be affected due to the proposed Power Plant. This EIA Report covers the primary data collected during the period 15 th March to 14 th June 2010 covering Pre monsoon season. M/s Creative Enviro Services, Bhopal have prepared Rapid Environmental Impact Assessment (REIA) report for the proposed 60 MW Coal based Power Plant. The report contains detailed description of the following, a. Detailed characterization of status of environment with in an area of 10 km radius from the proposed plant site for major environmental components including air, water, noise, soil, flora, fauna and socio-economic environment. b. Assessment of air emissions, liquid waste and solid waste from the proposed project along with the noise level assessment. c. Pollution control measures proposed to be adopted. 1.3 Environmental Setting: The environmental setting of the proposed plant is given in Table-1. Table-1 - Environmental Setting of the proposed site S. No. Particulars Details 1 Latitude 24 o N 2 Longitude 80 o E 3 Height above mean sea level 392AMSL 4 Nearest City Maihar-8 km 5 Nearest Railway Station Maihar-8 Km 6 Nearest Airport Khajuraho-120 km 7 Nearest Highway NH- 7-8km 8 Nearest Villages Sangmaniya -1.5km 9 Hills/Valley Kaimur Hill range 10 Ecological Sensitive Zone None in 10 km radius 11 Historical Place Ma Sharda temple- 12 Km 12 Nearest River Tamas km in WNW M/s Creative Enviro Services, Bhopal ES: 2
3 Direction 13 Annual Climatic Conditions Max. Temperature - 47 o C Min Temperature 6 o C Average Rainfall 1200 mm 2. DETAILS ABOUT THE PROJECT SITE The applied area is located at a distance of 53km south of Satna. Satna to Maihar is 45km, south of Satna by metalled tar district road via Uchehara (part of the road is national highway no. 7) Maihar to Sarlanagar is 8km south of Maihar by metalled tar road. 2.1 RAW MATERIALS The following will be the raw material requirement for the proposed power plant. Calorific Value of Coal kcal/kg (Avg ) Heat rate 2359 Kcal/KWH Total Fuel Requirement 2359 X60000 = X10 6 KCal/hour Requirement of Coal (3270GCV) [( X )/3270]= kg/hr Per day requirement of Coal 1039 TPD All the raw materials will be transported through Road under covered trucks and through Rail Transport only. 2.2 Process Flow of the Power Plant The coal is fed mechanically to the boiler. The coal is then fed to the boiler furnace in the fluidized state with the support of combustion air fed by the forced draught fan (FD Fan). The flue gas thus formed finally evacuated from the boiler to atmosphere through one 90 meter high chimney by the induced draught fan (ID Fan). In the process, the Hybrid Filter is interposed in the flue gas path before it escapes through the chimney. The dust in the flue gas is separated in the Hybrid Filter hoppers and disposed off pneumatically. The emission level through the chimney is maintained at less than 50 mg/nm 3 level at all times. The high pressure high temperature steam from the boiler is sent to one 60.0 MW Steam Turbo generator Set (TG Set) where the heat energy is converted in mechanical energy which in turn gets converted to electrical power by driving the generator. M/s Creative Enviro Services, Bhopal ES: 3
4 The fly ash produced is carried along with the flue gases. Hybrid Filter is interposed in the flue gas path where the fly ash is separated from flue gases, collected in hoppers and then pneumatically transported to Fly ash storage silo. 2.3 Water and Waste Water: Water Requirement and Source Total raw water requirement for the plant has been estimated at 800 M 3 /day including Domestic consumption. This includes water for Make-up water for Cooling tower Make-up for Boiler water, Resin Regeneration water, dust suppression, and domestic water. Water requirement for the proposed project will be met from the water reservoir made by project proponent. Table-2 -Water Consumption Sr. No. Items Water Consumption M 3 /day 1. Domestic Boiler Cooling + WTP Others 50 Total Waste Water Generation: The total quantity of effluents generated from the proposed project will be 291 M3/day. The following is the break-up of the wastewater generation from the proposed project. Table-3- Effluent Generation: Sr. No. Item Effluent Generation (M 3 / Day) Treatment and disposal A. Domestic 135 Treated through STP B. Boiler 96 Will be collected in collection/settling tank and transferred to STP C. Cooling 60 Will be collected in collection/settling tank and transferred to STP D. Others - - E. Total M/s Creative Enviro Services, Bhopal ES: 4
5 2.4 Ash Handling & Disposal The Ash collected in Hoppers is pneumatically conveyed to Silo having capacity of 1000 MT or temporary storage afterwards the ash will be transported to fly ash silos (4 no.) with capacity of 2000 MT each silo. It is proposed to use the fly ash for manufacturing of cement in existing Cement plant. 3.0 SOURCE OF POLLUTION & CONTROL MEASURES 3.1 AIR POLLUTION The flue gases coming from Boilers will pass through state-of-the art Hybrid Filter. The particulate matter at the outlet of all the Hybrid Filter will be less than 50 mg/nm 3 as per CREP recommendations. These treated gases will be let out into the atmosphere through stack of 90 m height for effective dispersion of pollutants into the atmosphere. The following measures will be taken for control of fugitive emissions Dust extraction system with bag filters & Water Sprinkling system will be provided at material handling & raw material storage areas. All Conveyors will be fully covered with GI sheets to prevent the fugitive emissions. 3.2 Water Pollution The total wastewater generated will be 291 M 3 /day. The generated effluent will be treated in well-designed treatment system and treated effluent will be fully recycled within plant premises. No effluent will be discharged outside the plant premises. Effluent Treatment Scheme The effluent generated from the proposed project will be treated in the following manner. The Cooling Tower Blowdown, Boiler Blow Down and DM plant regeneration will be collected in settling tank and from where the effluent will be transferred to the existing STP and treated along with the domestic effluent. A dedicated pipe distribution network will be provided for using the treated effluent for ash conditioning, dust suppression & green belt development. The characteristics of the treated effluent will be in accordance with the MPPCB Standards. Hence there will not be any impact on ground water quality / surface water due to the proposed Project. M/s Creative Enviro Services, Bhopal ES: 5
6 3.3 Solid Waste After combustion of coal, the fly ash from the flue gases from the different zones like furnace, bank tube, economizer and Hybrid filter has been collected and conveyed to a common silo by dense phase conveying system. The daily fly ash generation from proposed power plant is 436 MT. It is proposed to use the fly ash for manufacturing of cement in existing Cement plant. 3.0 BASELINE DATA 3.1 Ambient air quality Ambient air quality was monitored for PM10, SPM, SO2 & NOx at 08 stations including project site for one season as per MOEF guidelines. The following are the concentrations of various parameters at the monitoring stations. SPM to µg/m 3 PM to µg/m 3 SO to 7.98µg/m 3 NOx to µg/m Water quality Ground water samples were collected at 4 stations along with 3 surface water samples and analysed for various Pysico-Chemical parameters. The Ground water samples show that they are suitable for potable purposes. 3.3 Noise levels Noise levels were measured at 8 locations during daytime & nighttime. The ambient noise level at rural area varied from dba to 54.7 dba. 4.0 PREDICTION OF IMPACTS 4.1 Prediction of impacts on Air Environment: The proposed emission from proposed project has been considered for prediction of GLC s. The predicted maximum incremental rise in SPM concentrations (24 hourly) will be 12.8 µg/m 3 which occur at a distance of 1.8 km from the origin stack in the down wind direction in SW direction over the baseline concentrations. The net resultant Ground Level Concentrations of avg. SPM during operation will be to µg/m 3. The net resultant concentrations of SPM, SO2 and NOX are well within the National Ambient Air Quality Standards (NAAQS) after project M/s Creative Enviro Services, Bhopal ES: 6
7 commences the operation. Thus, it can be safely stated that due to the proposed plant there will be no adverse impact on the existing ambient air quality. 4.2 Prediction of impacts on water quality The effluent generated from the proposed project will be treated in well-designed effluent treatment scheme and will be used for dust suppression, ash conditioning & green belt development after ensuring the compliance of MPPCB standards. Hence there will not be any adverse impact on ground water/ surface water due the proposed project. 4.3 Prediction of impacts on noise quality Noise generating sources of the Thermal Power Plant are mainly Boiler, Turbine etc. But no person is required to remain constantly at the above mentioned units and will go occasionally to check the systems. All basic equipments and various machineries should be kept well maintained. Green belts are good noise barriers and same will be developed around the plant. The sufficient green belt has already been development to control noise levels. 4.4 Prediction of Impacts on Land Environment Quality The proposed plant is to be accommodated within the existing cement plant. There is no solid waste dumping site within the close vicinity of the site. Thus the existing land environment is relatively pollution free. Only additional quantity of fly ash will be generated from the proposed thermal power plant as a solid waste. Fly Ash handling and storage system is totally enclosed. Fly ash has been collected from the hybrid filter and it has been conveyed to a common conveying system. Then fly ash is being utilised for manufacturing of cement. By this way whole fly ash will be utilized for manufacturing of cement in eco-friendly manner. 4.5 Biological Environment Since there are no notified endangered species in the area, which will be effected due to the plant operational activities, therefore the biological environment would not effect. The impact due to negligible amount dust generation on the biological environment is minimized by well developed green belt in and around plant. M/s Creative Enviro Services, Bhopal ES: 7
8 So far, Till date 10,67,151 plants has been in survival stage at colony, plant and mine premises. Out the same, about 7.53 lacs plants have been existed at plant premises and 3.13lac plants have been existed in mine premises. 4.6 Socio - Economic Environment Though Maihar Cement is carrying out the number of socio economic activities through the trust namely Maihar Cement registered a trust named Maihar Cement Seva Trust on 19 December The trust started its activities from July The activities of the Seva Trust may be categorized in the following area: Vocational Training Centre Seva Trust Hospital Eye Camps Yoga and Naturopathy Camps Heart Care camps Family Planning Camp Drinking Water Booths Medical Camp at Sharda Devi Temple During Navratra Mela Nimbu Pani Booths at Navratra Mela Renovation of Wells and Bawlies Reconstruction of Second Flight of Steps of Sharada Devi Temple Literacy Programme Mahila Samradhi Yojna Establishment of Youth Clubs Fire Brigade Services Education etc 5.0 ENVIRONMENT MANAGEMENT PLAN 5.1 Air Pollution Management Air Pollution Control Equipment - Proposed Power Plant It is proposed to installed Hybrid Filter having efficiency to reduce particulate emission below 50 mg/ NM 3 M/s Creative Enviro Services, Bhopal ES: 8
9 Fugitive Emissions To control the fugitive emissions, the following measures are proposed: All the conveyors will be fully covered and hoods to offset any trapping of material in wind stream. The height of the chutes at each of the transfer points and the slope of chutes to be considered to avoid dust generation; High efficiency pulse jet type bag filters are considered to arrest the air borne dust at all the locations where transfer of material from one conveyor to other takes place; Unloading of coal from trucks/rail will be carried out with proper care avoiding dropping of the materials from height. It is advisable to moist the material by sprinkling water while unloading; The sprinkling of water will be done along the internal roads in the plant in order to control the dust arising due to the movement of vehicular traffic; All the workers and officers working inside the plant will be provided with disposable dust masks; Thick greenbelt will be developed around the plant to arrest the fugitive emissions. Air Pollution Control Schemes Adequate and efficient control equipment will be installed in the proposed plant to keep the dust emission at a minimum. The following measures shall be taken: Advance type of Boiler will be installed for the generation of Power, which will control the emissions of SO2 and Low NOx burners will be installed. Further, chimney of 90m height is proposed for adequate dispersion of pollutants. Generation of NOx gases depends to a great extent on the combustion temperature. A well-designed burner system will be installed which limits the temperature to a reasonably low value of NOx generation. 5.2 Noise Pollution Management The extensive expansion of greenbelt is proposed around the boundary of the plant will attenuate the noise emitted by the various sources in the plant. Earplugs will be M/s Creative Enviro Services, Bhopal ES: 9
10 provided for the personnel working close to the noise generating units as a part of the safety policy. Apart from this, some of the design features provided to ensure low noise levels are as follows: Walls and ceilings of the concerned buildings shall be lined with sound absorbing materials. Properly insulated enclosures shall be provided to staff working close to the high noise sources. Noise attenuating devices like ear plugs and ear muffs shall be provided to the workers exposed to high noise level. The siren for shift change should be adjusted to different levels during day and night i.e. the sound level difference between day and night shall be a minimum of 10 db(a). Sufficient green belt shall be maintained around the plant. Regular monitoring of noise level shall be carried out and corrective measures in concerned machinery should be adopted accordingly. Silencers shall be provided in the areas generating high noise. 5.3 Water Pollution Management The total quantity of water consumed towards the manufacturing process, and domestic uses and other industrial activities is 800m 3 /day. The major water pollution may be expected from the proposed TPP in the following areas: Cooling water blow down Boiler blow down Rinsing water from D.M. Plant Except boiler blow down water all the effluents are free from any pollutants. For treatment of Domestic Water from the Office, Power house and residential colony, Sewage Treatment Plant (800 cum per day) has already been provided. While Boiler blow down, CT blow down will be collected in settling tank and transferred to the STP for treatment and will be reused in Plant Process/Horticulture activity/ash conditioning/dust suppression M/s Creative Enviro Services, Bhopal ES: 10
11 5.4 Solid Waste Management Only ash will be generated from the proposed power plant as a solid waste. Ash handling and storage system is total enclosed and ash will be collected from the Hybrid Filter of material from One rotary air lock pocket feeder is provided below the ash for every hopper. The ash collected at Hybrid Filter hoppers is continuously discharged through the rotary feeders to a screw feeder, which is located underneath the rotary feeders. Then ash will be discharged to Cement Plant for manufacturing of Cement. 5.5 Greenbelt Development Good green belt is already in existence within and outside of the plant premises. So far, Till date 10,67,151 plants has been in survival stage at colony, plant and mine premises. Out the same, about 7.53 lacs plants have been existed at plant premises and 3.13lac plants have been existed in mine premises. Due care will be taken to ensure further enhancement of greenbelt in and around the plant. The extensive tree plantation with broad leaf plant species all around the factory premises and in the open areas available within factory premises shall be carried out. 5.6 Health and Safety Occupation safety and health is very closely related to productivity and good employer-employee relationship. The main factors of occupational health in plant are fugitive dust and noise. Safety of employee during operation and maintenance of equipment and handling of materials are proposed to be taken care of as per regulations. To avoid any adverse affects on the health of workers due to dust, heat, and noise sufficient measures have been provided in the project. is conscious of its moral and legal obligation to prevent hazards and to provide healthy working environments. They are proposed to continue the following activities: Provision of rest shelters for workers/staff with amenities like drinking water, fans, toilets etc. Provision of personal protection devices to the workers; Rotation of workers exposed to noise premises; M/s Creative Enviro Services, Bhopal ES: 11
12 Dust suppression of road; and First-aid facilities in the plant area. The management should make annual budget for the safety and health of their employees and provide sufficient facilities in order to effectively implement the health and safety measures. The management shall carry out periodical audit of safety and health with view to ascertaining the effective implementation of policy. Regular medical examination shall be conducted for the employees. The Medical Officers renders timely advice to the Management on preventive measures and safe guards. Safety Committee under MP Factory Rule 1962, under the chairmanship of the Vice President (Mech.). Emergency Plan duly approved by the Director, Industrial Health and Safety shall be prepared and will be updated periodically. M/s Creative Enviro Services, Bhopal ES: 12
M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area.
1. INTRODUCTION Executive Summary 1.1 Background: M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area. 1.2 Proposed Project:
More informationDistrict: Chhindwara (MP)
Executive Summary 1. INTRODUCTION 1.1 Background: Pandhurna industrial area consist of nearly 34 small and large units which basically consist of Cotton ginning & Processing, Food Processing, Copper Wire,
More informationEXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT
EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged
More informationHind Energy & Coal Beneficiation (India) Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to
More informationEIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.)
EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.) 1. PROJECT DESCRIPTION: Ambuja Cement Eastern Ltd. (ACEL) has the cement
More informationHind Energy & Coal Beneficiation (India) Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh
More informationM/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA
1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which
More informationMars Power & Steel Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Mars Power & Steel Ltd. Village : Baihamura Tehsil : Ghargoda District : Raigarh Submitted to: Page 1 CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Executive
More informationEXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION
EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,
More informationM/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh
M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25
More informationAccord Energy Corporation India Pvt. Ltd.
Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II
More informationM/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola
0 1.0 INTRODUCTION M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola Village, Kotma Tehsil, Annupur District, Madhya Pradesh. 10.29 Acres of land is envisaged for
More informationJ-11011/45/2009- IA II (I)
SL SPECIFIC CONDITIONS STATUS 1 Continuous stack monitoring facilities to monitor gaseous emissions from all the stacks shall be provided. The particulate emissions shall be controlled within 50 mg/nm
More informationINSPIRE INDUSTRIES PVT. LTD.
For Proposed 0.999 MTPA Coal Washery At Village: Bhelai, Tehsil: Baloda, District: Janjgir-Champa, Chhattisgarh Envirotech East (P) Limited An ISO 9001:2008, 14001:2004 & OHSAS:18001:2007 Company Laboratory
More informationSimran Industries Pvt. Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Patharra Village Bemetara Tehsil Durg District Chhattisgarh Submitted to: CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Raipur, Chhattisgarh 1.0 INTRODUCTION
More informationANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI
M/s. JANANY CEMENT INDUSTRIES PRIVATE LIMITED SURVEY NO 462, INDUSTRIAL PARK, GUNTAKINDAPALLI VILLAGE, SRIKALAHASTI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY M/s.Janany Cement
More informationTHE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2
THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2.6 MILLION TPA CEMENT & THERMAL POWER PLANT 36 MW EC Lr. No. : J-11011/403/2006-IA-II
More informationClearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004
Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:
More informationDheeru Powergen Private Limited.
Executive Summary Of The Proposed 2 x 300 MW Dhanras Thermal Power Station At Dhanras Village Katgora Taluk, Korba District, Chhattisgarh. Implemented By Dheeru Powergen Private Limited. Submitted to CHHATTISGARH
More informationEnvironment protection measures / technology
Sr. No. Conditions A. Specific Conditions: i. The gaseous and particulate matter emissions from various units should conform to the standards prescribed by the State Pollution Control Board. At no time,
More informationPre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance]
Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance] Project Proposal: Expansion of Cement Plant capacity from 1.5 to 2.20 MTPA of Clinker and
More informationEnvironmental Clearance Compliance Half Yearly Report
Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated
More informationMangalam Cement Ltd.(Unit I)
Mangalam Cement Ltd.(Unit I) Name of the Project :- Expansion of cement Project Code :- grinding capacity from 1.3 MTPA to 1.7 MTPA Clearance Letter No. : - F NO. J - 11011 /119 /2012 - IA II (I), dtd
More informationEXECUTIVE SUMMARY 1. INTRODUCTION
EXECUTIVE SUMMARY 1. INTRODUCTION M/s. Indsil Energy & Electro Chemical Ltd plant is situated in Urla Industrial Estate, Raipur, Chhattisgarh. The company is manufacturing Ferro Alloys. Due to massive
More informationRoquette Riddhi Siddhi Private Limited
SUMMARY ON DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Roquette Riddhi Siddhi Private Limited (Expansion of co-generation power plant from 6MW to 18 MW) at Gokak Village & Taluk, Belagavi District,
More informationSUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Village : Taraimal, Tehsil : Gharghoda District : Raigarh
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Village : Taraimal, Tehsil : Gharghoda District : Raigarh Submitted to: CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Raipur, Chhattisgarh 1.0 INTRODUCTION
More informationSTATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA
OPERATING GUIDELINES FOR PROCESSING OF CONSENT TO ESTABLISH APPLICATION FOR ESTABLISHMENT OF COAL WASHERIES IN THE STATE OF ORISSA STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII,
More informationMangalam Cement Ltd. (Unit-II) Stack No.
Mangalam Cement Ltd. (Unit-II) Name of the Project :- Expansion of cement grinding capacity from 1.7 MTPA to 2.3 MTPA Project Code :- Clearance Letter No. : - F NO. J - 11011 /110 /2012 - IA II (I), dtd
More informationD:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx
COMPLIANCE STATUS OF ENVIRONMENT CLEARANCE EC letter no. J-11011/79/2007-IA II (I) Dated 16.04.2009 A. Specific Conditions : SN Condition Compliance 1. Continuous stack monitoring facilities to monitor
More informationSix Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013
Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013 Ref.: Environmental Clearance no. J-11011/754/2007-IA II
More informationPART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan
Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10
More informationEnvironmental Clearance Compliance Half Yearly Report
Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2017 March 2018 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,
More informationScanned by CamScanner
Scanned by CamScanner ENVIRONMENT STATEMENT (FORM V) Udaipur Cement Works Limited Daroli Limestone Mine-1 YEAR 2017-18 Udaipur Cement Works Limited SHRIPATINAGAR, P.O. CFA: DABOK, DISTRICT UDAIPUR (RAJASTHAN)-313021
More informationName of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)
J.K. Cement Works, Village- Muddapur, Taluka- Mudhol, Distt.- Bagalkot, Karnataka MoEF Letter No. F.No. J-11011/263/2009-IA II (I) dated 21-06-2010 Name of Project: J.K. Cement Works (Unit: J.K. Cement
More informationEnvironmental Clearance Compliance Half Yearly Report
Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2017 - Sept 2017 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,
More informationHINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)
HINAUTI LIMESTONE MINE Mine Lease area 378.261 ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Sidhi Cement
More informationINDUSTRIAL VISIT TATA THERMAL POWER PLANT PROJECT MANAGEMENT BATCH ( )
INDUSTRIAL VISIT TATA THERMAL POWER PLANT PROJECT MANAGEMENT BATCH (2015-17) On the, the DEPARTMENT of Project Management, National Institute of Industrial Engineering organized an industrial visit in
More informationEnvironmental Clearance Compliance Half Yearly Report
Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2015 to March 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,
More informationEnvironmental Clearance Compliance Half Yearly Report
Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2016 Sept. 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,
More informationEnvironmental Impact Assessment
Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar Introduction EIA is a formal process to predict the environmental consequences
More informationCORPORATE OFFICE BUILDING, C-11, URBAN ESTATE-II CITY CENTRE SECTOR 29, GURUGRAM, HARYANA
ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan () would consist of all mitigation measures for each component of the environment due to the activities increased during the, operation and the
More information2 NECESSITY OF THE PROPOSED PROJECT
Executive Summary 1 INTRODUCTION M/s. Prosperous Energy Private Limited (PEPL), a wholly owned subsidiary of Videocon Industries Limited has proposed the 2X660MW Coal based supercritical Thermal Power
More informationSUMMARY. for New Standalone Cement Grinding Unit. proposed at
SUMMARY of ENVIRONMENT IMPACT ASSESSMENT REPORT for New Standalone Cement Grinding Unit ( 2 x 1.0 million tons per annum) proposed at Gaithulapalem, Tallapalem & Narasapuram Villages, Kasimkota Mandal,
More informationTelefax: 011: Dated:10 th May, 2013
F. No. J-11011/41/2011-IA-II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail:vp.upadhyay@nic.in Telefax: 011:
More informationPRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:
PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.
More information2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.
Environmental Clearance Point Wise Half Yearly Compliance Report (October 2014 to March 2015) Cement Plant - EC No: F.No. J-11011/450/2007-IA II(I) Dated: 24 th March 2008 A. SPECIFIC CONDITIONS : S.NO.
More informationRapid Environmental Impact Assessment Study for the Proposed Cement Plant at Majhgawan, District Sidhi, Madhya Pradesh
1.0 Project Description 1.1 Background Jaiprakash Associates Limited (JAL) formerly known as Jaypee Cement Limited is the well diversified conglomerate of Jaypee Group. Its cement division has 3 modern,
More informationProposed Terms of Reference for EIA studies
Proposed Terms of Reference for EIA studies M/s Maithan Steel and Power Ltd. is located at: At/PO- Bonra, PS- Neturia in Purulia district of WB with latitude:23 0 37 53.85 Nand longitude 86 0 50 08.10
More informationSUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Chandu Cattle Feeds 10 KLPD Ethanol & 50 TPD Cattle Feed Unit Plot no. 31 & 30 B of Sy. No. 432/2 P, APIIC Industrial park, Kakuturu village, Venkatachalam
More informationCOMPLIANCE STATUS REPORT
COMPLIANCE STATUS REPORT Sona Alloys Pvt. Ltd. Additional Director (IA) Ministry of Environment & Forests, Paryavaran Bhavan, CGO Complex, Lodhi Road, New Delhi 11003 Date: 08.02.2014 Sub: Compliance Status
More informationDESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT
DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for CDR & Revamp Reference: J-11011/272/2007-IA,
More informationV.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN
V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite
More informationM/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.
Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,
More informationMangalam Cement Ltd.
Mangalam Cement Ltd. Name of the Project :- New Cement Plant Unit - III and 17.5 mw CPP-II Project Code :- Raj- 80-600 - 2008 Clearance Letter No. :-F NO. J - 11011 / 30/2006 - IA II (I), dtd 17/07/2007
More informationEnvironmental Clearance Compliance Half Yearly Report
Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to Sept. 2015 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,
More informationSUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at
SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT for 380 MW Gas Based Combined Cycle Power Plant at Vijaipur, District: Guna MADHYA PRADESH NOVEMBER 2011 1 CONTENTS 1.0 Project Description Page 3 2.0 Description
More informationJAYPEE NIGRIE SUPER THERMAL POWER PLANT
JAYPEE NIGRIE SUPER THERMAL POWER PLANT (A Division of M/s Jaiprakash Power Ventures Limited) Village: Nigrie, Tehsil: Sarai District: Singrauli 2015 2016 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL
More informationM/s Deccan Cements Limited, Bhavanipuram,Janaphad, Palakeedu, Suryapet. Telangana MoEF No: J-11011/572/2007-IA II(I) Dated
1 Status of Environmental Clearances received from MOEF vide MoEF No.J- 1101/572/2007-IA II(I) dated 27.12.2007- Cement Plant and CPP, April - 2017. i) Compliance report is enclosed herewith for all the
More informationJAYPEE NIGRIE SUPER THERMAL POWER PROJECT
JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)
More informationNorth East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial
More informationTHE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2
THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2.6 MILLION TPA CEMENT & THERMAL POWER PLANT 36 MW EC Lr. No. : J-11011/403/2006-IA-II
More informationHigh efficient ESP s has been provided to maintain an emission level below 100mg/Nm 3 in CPP. Modification of ESPs and.
Sl. No. CONDITIONS COMPLIANCE STATUS SPECIFIC CONDITIONS i The gaseous emissions (PM, SO 2, NO X, PAH, HC, VOCs and Fluoride) from various process units shall conform to the standards prescribed by the
More informationPART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION
Page 1 of 8 Environmental Statement for Clinker Grinding Unit of M/s Bihar Cement Plant (A Unit of Shree Cement Ltd.), situated at Jasoia Mor, BIADA, Industrial Growth Centre, Aurangabad, Tehsil & Dist.
More informationENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.
ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920
More informationINTRODUCTION ENVIRONMENTAL STATEMENT
INTRODUCTION MB Power (Madhya Pradesh) Limited (MBPMPL) is a 100% owned subsidiary of Moser Baer Power & Infrastructure Limited (MBPIL). Moser Baer group headquartered in New Delhi, is leading global technology
More informationSINGHAL ENTERPRISES PRIVATE LIMITED
SINGHAL ENTERPRISES PRIVATE LIMITED (INTEGRATED MINI STEEL & POWER PLANTS) Taraimal Village, Gharghoda Mandal, Raigarh District, Chattisgarh State. 1.0 INTRODUCTION SINGHAL ENTERPRISES PRIVATE LIMITED
More informationENVIRONMENTAL STATEMENT FOR THE YEAR
ENVIRONMENTAL STATEMENT FOR THE YEAR 2016-17 6 MTPA STEEL PLANT OF TATA STEEL AT KLAINGANAGAR INDUSTRIAL COMPLEX, ODISHA ENVIRONMENTAL DEPARTMENT TATA STEEL KALINGANAGAR Kalinga Nagar Industrial Complex,
More informationCHAPTER-10 SUMMARY AND CONCLUSION
CHAPTER-10 SUMMARY AND CONCLUSION 10.1 INTRODUCTION M/s. Shree Warad Alloys (P) Ltd., Nagpur a private limited company having its registered office at Plot No. C-1, Sharvari Apartments, 8/B, Trimurty Nagar,
More informationRajasthan State Pollution Control Board
M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and
More informationCement Grinding Plant, Madhukunda P.O. Sunuri Dist. - Purulia West Bengal
ENVIIRONMENTAL AUDIIT STATEMENT M//s.. ACC LIIMIITED Damodhar Cement Works Cement Grinding Plant, Madhukunda P.O. Sunuri 723 121 Dist. - Purulia West Bengal FOR THE YEAR 2015-2016 1 L I S T O F C O N T
More informationENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A
ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A 1. Name and address of the Owner / Occupier of the Industry
More informationParticulate Emission Monitoring HN Pathak Supdtg Engr Madhya Pradesh Power Generation Co. Ltd
Particulate Emission Monitoring HN Pathak Supdtg Engr Madhya Pradesh Power Generation Co. Ltd MADHYA PRADESH POWER GENERATING Co. Ltd. INTRODUCTION Satpura Thermal Power Station is an oldest running plant
More informationENVIRONMENTAL MANAGEMENT PLAN
INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN An environmental management plan (EMP) has been prepared for the proposed construction of commercial project to minimize negative impacts and is formed on the
More informationJanki Corp. Ltd., Six Monthly Compliance Report
Janki Corp. Ltd., Six Monthly Compliance Report Period: October 2014 to March 2015 Project: Expansion of Sponge Iron Plant (1,80,000 to 4,00,000TPA) and Installation of Iron ore Beneficiation Plant (0.6
More informationEnvironment Management Plan For B 2 Category Project
Environment Management Plan For B 2 Category Project Project Proponent Shri Alihusen Haji Mohammadali Alirajpurwala Address - N/V Kanawant, Taluka & District - Chhotaudepur Near Taluka District Area Survey
More informationProject Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006
Name of the Project: North North Naubasta Limestone Mine (ML 2) (A unit of M/s Jaiprakash Associates Limited) of Mining Capacity 1.85 MTPA at villages Naubasta, Sumeda, Atrauli and Garhwa Tehsil Huzur
More informationHINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED
HALF YEARLY PROGRESS REPORT ON IMPLEMENTATION OF ENVIRONMENTAL CLEARANCE CONDITION BY MoEF (PERIOD FROM OCTOBER 13 TO MARCH 14) HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED SIX MONTHLY
More informationEXECUTIVE SUMMARY TABLE - 1
EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Dwarkesh Energy Limited (DEL) proposes to set up a 1320 MW (2 x 660 MW) Super Critical Coal Based Thermal Power Plant at Villages Torniya, Chhippipura
More informationCompliance of Conditions laid down by MoEF for Expansion of Cement Plant (2.0 MTPA to 2.6 MTPA Clinker) at Village Suli April 2017 to September 2017
A. SPECIFIC CONDITIONS Sl. No. i ii Condition Continuous stack monitoring facilities for all stacks and adequate air pollution control systems e.g. electrostatic precipitators (ESP) to clinker cooler and
More informationOverburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.
ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked
More informationEnvironment Management Plan For B 2 Category Project
Environment Management Plan For B 2 Category Project Project Proponent - Kirtikumar Nathubhai Shah Address - N/V Damlai, Taluka- Jhagadia District - Bharuch Near Village Taluka District Area Survey No.
More informationPROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013.
STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 3 MTPA REFINERY & 3X30 MW CO-GENERATION POWER PLANT VIDE LETTER NO. J-11011/753/2007-IA II (I), DATED 29.01.2008. PROJECT NAME: UTKAL ALUMINA
More informationNaubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited
Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The Groups cement facilities are located in
More informationEXECUTIVE SUMMARY. (Approved Consultant)
ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED CAPTIVE RESIN PLANT OF 100000 TPA PRODUCTION CAPACITY AT ROUTHUSURAMALA VILLAGE, THOTTAMBEDU MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY
More informationCement Manufacturing Company Ltd. Page 1
Six Monthly Compliance status of Environment Clearance for Cement Plant (2400 TPD) at Village Lumshnong, Meghalaya July to December 2013 Ref.: Environmental Clearance no. SEIAA/Project-6/2008/23 dtd. 16.03.10.
More informationHALF YEARLY COMPLIANCE REPORT 14 15) ENVIRONMENTAL CLEARANCE (CLINKER 2.48 MTPA TO 2.78 MTPA AND CEMENT 3.30 MTPA TO 3.90 MTPA)
HALF YEARLY COMPLIANCE REPORT (Oct 14 Mar 15) ENVIRONMENTAL CLEARANCE (CLINKER 2.48 MTPA TO 2.78 MTPA AND CEMENT 3.30 MTPA TO 3.90 MTPA) Letter No. F. No. J-11011/1180/2007- IA II (I) dated 11 th June,
More informationAssessment of Air Quality of Stone Crusher Units in India. M Selvarajan, Anand Bohra, KRP Nath, N K Tiwary and A K Mishra
Assessment of Air Quality of Stone Crusher Units in India M Selvarajan, Anand Bohra, KRP Nath, N K Tiwary and A K Mishra National Council for Cement and Building Materials, India Abstract Stone crusher
More informationProposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from
More informationF. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)
To, M/s. Madras Cement Ltd. V Floor 98-A, Dr. Radhakrishnan Road Mylapore Chennai 600 004 Tamilnadu F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)
More informationApplication of Low and Non Waste Technology in the production process;
9.0 ENVIRONMENT MANAGEMENT PLAN (EMP) 9.1 INTRODUCTION Environment Management Plan is required for ensuring sustainable development. It should not affect the surrounding environment adversely. The management
More informationEIA Report for ha Bhatia Limestone Mine EXECUTIVE SUMMARY
EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 Introductions The lease area is being hold by M/s KJS Cement Ltd, and Pawan Kumar Ahluwalia is the Managing Director and correspondence address is M/s KJS
More information- 1 S. NO. PARTICULARS DETAILS
1.0 INTRODUCTION EXECUTIVE SUMMARY M/s. Lafarge India Private Ltd. (LIPL) is a subsidiary of French building materials major Lafarge. Lafarge entered in the Indian market in 1999 with acquisition of cement
More informationV: PROJECT SCOPING & METHODOLOGY
V: PROJECT SCOPING & METHODOLOGY 5.0 INTRODUCTION The scoping exercise is carried out to define the focus and scope of the EIA Study. The scoping exercise is required to understand the type of activities
More informationEXECUTIVE SUMMARY. M/s. RELIANCE CEMENT COMPANY PRIVATE LIMITED. EIA Consultant:
ENVIRONMENTAL IMPACT ASSESSMENT FOR EXPANSION OF INTEGRATED CEMENT PLANT FROM 3.6 TO 7.2 MTPA CLINKER AND 5.0 TO 10.0 MTPA CEMENT BY INSTALLATION OF LINE-II AT VILLAGES BHARAULI AND ITAHARA, TEHSIL MAIHAR,
More informationHALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS
HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private
More informationSTATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India
STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India O/O Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala 147 001 Telefax:- 0175-2215802
More informationCCR Fugitive Dust Control Plan
CCR Fugitive Dust Control Plan Mill Creek Generating Station Louisville Gas & Electric Company Jefferson County, Kentucky October 2015 CCR Fugitive Dust Control Plan - Mill Creek Generating Station Page
More information