Mangalam Cement Ltd.

Size: px
Start display at page:

Download "Mangalam Cement Ltd."

Transcription

1

2 Mangalam Cement Ltd. Name of the Project :- New Cement Plant Unit - III and 17.5 mw CPP-II Project Code :- Raj Clearance Letter No. :-F NO. J / 30/ IA II (I), dtd 17/07/2007 Period of Compliance Report : -April-17 to Sept-17 SPECIFIC CONDITIONS Sr. No. Conditions Compliance Status i. The gaseous emissions from various units shall conform to the standards prescribed by the State Pollution Control Board. Bag filters and Electrostatic Precipitator of highest efficiency shall be installed and particulate emissions from the cement plant shall be less than 50 mg/nm 3 and for CPP the same will be less than 100 mg/nm 3. Particulate emissions from DG house will be rejected to 40 mg/nm 3 The gaseous emission form all units are within the norms as per prescribed by state pollution control board. Every six monthly data are being send to Regional office at Lucknow, Rajasthan pollution control board at Jaipur and Central Pollution control board, Delhi MW Captive Power Plants - II (M/s Mangalam Cement Ltd.) Particulates Stack Matter Details of Stack No. Concentration 1 Main Stack Captive Power Plant - II Coal Transfer Coal Bunker-II Coal Crusher Coal Vibrating ii For the control of air emission from the captive power plant, a four chambered electro static precipitator with a stack height of 75 m shall be installed. The Raw mill and kiln and coal mill will have stacks of 112 m and 110 m respectively. The clinker cooler and cement mill will have stacks of 55 m each. Stack No. Mangalam Cement Grinding Unit (UNIT-III) Particulates Matter Concentration Details of Stack 1 Cement Mill Stack The stack height are as under: Cement Mill stack Mtrs. Power Plant stack Mtrs Stack No MW Captive Power Plants - II (M/s Mangalam Cement Ltd.) Details of Stack Particulates Matter Concentration 1 Main Stack Captive Power Plant - II Coal Transfer Coal Bunker-II Coal Crusher Coal Vibrating 15.37

3 iii Continuous on-line monitors for particulate emissions, So2 and NOx in Raw/kiln mill, clinker cooler, coal mill, cement mill etc. shall be provided and shall make necessary arrangement for submission of online real time emission data CPCB website. Interlocking facility shall be provided between pollution control equipment and the process operation so that in the event of the pollution control equipment not working the respective unit (s) is shutdown automatically. iv Low Nox burners shall be installed to control Nox emissions. v Regular Ambient air quality monitoring shall be carried out. The monitoring stations will be set up in consultation with the state pollution control board. It will be ensured that at least one monitoring station is set up in up wind & sown wind direction along with those inother directions. Online data for air emissions shall be transferred to the CPCB and RPCB regularly. The instruments used for ambient air quality monitoringshall be calibrated regularly. Stack No. Mangalam Cement Grinding Unit (UNIT-III) Particulates Matter Concentration Details of Stack 1 Cement Mill Stack We have provided all monitoring system to monitor dust and gaseous emissions. We will install low Nox burners to control emissions. Ambient air quality-monitoring stations are provided at the periphery of our existing premises for the monitoring of ambient air quality. The locations of these stations were decided in consultation with R.O.Kota. Sr No 17.5MW Power Plant-II M/S Mangalam Cement Ltd. Ambient Air Quality Monitoring Results Location Parameter s Norms (µg/m3) Near Railway Gate Near Securit y Gate Near Rack Loading Area Near Work Shop 1 PM PM So NOx CO Stack No. Mangalam Cement Grinding Unit (UNIT-III) Particulates Matter Concentration Details of Stack 1 Cement Mill Stack 15.65

4 vi vii viii ix Raw material will be stored in covered yards and clinker shall be stored in silos or in adame with all round high sidewalls to control fugitive emissions fugitive emissions from cement mill packing area and coal yard shall also be controlled. Dust collectors and extraction system (suction apparatus) shall be installed to control fugitive dust emissions at coal and lime stone unloading points, at all the transfer point s stockpiles to arrest free release of dust. Materials will be transported in tippers, covered trucks, covered containers, covered rail wagons etc. Windbreakers will be installed to restrict fugitive dust x Water sprinkling arrangement should be made in the raw material stack yard and dust collectors in cement bag loading areas. xi Total water requirement shall be met form mine sump and shall not exceed 1310m3/d. 40 KLD will be sourcedfrom the groundwater and 36kld from other sources, permission from the ground water board will be submitted as soon as received. xii Minimum cycle of concentration (COC) for the CPP will be 5.0 xiii The wastewater form CPP and domestic activities shall be treated in effluent treatment plant (ETP) and sewage water reclamation plant (SWRP) respectively and recycled /reused in cement plant for make up in CPP for cooling dust suppression other plant related activities and green belt development no wastewater will be released outside the premises. Zero discharge shall be strictly adopted. During monsoon the wastewater will be stored in the mine pit. All raw materials are stored in covered yard. Fly ash is coming from Kota and other place in the closed containers. Water spray system is available to control vehicular emissions. Cement Grinding Unit III & 17.5MW Power Plant-II Results of Fugitive Emission S.No. Location SPM (500 µg/m³) 1 Near Coal Storage (CPP-I & II) Near Packing Plant Near Cement Mill-III Dust collectors and extraction system (suction apparatus) have been installed. All incoming raw materials coming from deferent places in the closed containers. We shall complied with the conditions. We have installed water spray system in all raw material hoppers & dust collectors in cement bag loading areas. Total water requirement being met form mine sump only. We are maintaining COC less than 5.0. Industrial waste water is being recycled and zero discharge is being maintained. STP treated water is being used for plantation.

5 xiv The entire domestic effluent generated from the colony will be reused after treatment in the cement plant for cooling / plantation/ gardening purpose. The treated water and sludge will also be used for green belt development. xv Solid waste generated shall be 100 % recycled and reutilized in the process itself and no solid waste shall be disposed off outside the plant premises. 150 TPD fly ash from captive power plant will be used in the cement manufacturing process along with bottom ash the sludge generated from the sewage treatment plant will be 10 TPM. Which will be used as manure waste oil sludge shall be reused in the plant and finally burnt in the kiln or sold to authorizedrecyclers / re processors. xvi The company shall strictly follow all the recommendations mentioned in the charter on corporate responsibility for environmental protection (CREP). xvii As agreed green belt shall be developed in 12 ha area in consultation with DFO and it will be as per CPCB guidelines. xviii The company shall harvest surface as well as rainwater from the rooftops of the buildings proposed in the expansion project and storm water drains to recharge the ground water and use the same water for the various activities of the project to conserve fresh water. Industrial waste water is being recycled and zero discharge is being maintained. STP treated water and sludge is being used for plantation. All solid waste quantity is being used in the plant 1. Fly ash / bottom ash from CPP for PPC cement. 2. STP sludge as manure 3. Burnt oil sludge being sold to authorized recycler / re processors. These will be complied as per recommendations mentioned in the charter on corporate responsibility for environmental protection (CREP). We are developing 33 % green belt area in & around of our cement plant, as per the CPCB guidelines. Sr. No. Cement Grinding Unit-III M/S Mangalam Cement Ltd. Year Wise Tree Plantation Year Plant Names Numbers Neem, Karanj, Sheesam, Sirus, Bad, Peepal, Palash, Khejri, Upto Sept-17 Chareel, Mango, Jamphaletc 566 To recharge ground water, rain harvesting system is being implemented.

6 xix The company will have a occupational health and safety programme and regular medical checkups shall be undertaken for the employees and workers. Company is taking utmost care for community development& welfare progress. GENERAL CONDITIONS i The project authority shall adhere to the stipulations made by State Pollution Control Board (SPCB) and State Government. ii No further expansion or modification of the plant shall be carried out without prior approval of this Ministry. Weshall adhere to the stipulations made by State Pollution Control Board (SPCB) and State Government. Expansion or modification of the plant we shall take prior approval of the Ministry. iii iv v vi Adequate number of influent and effluent quality monitoring stations shall be set up in consultation with CPCB regular monitoring shall be carried out for relevant parameters. The project proponent shall also comply with all the environmental protection measures and safeguards recommended in the EIA/ EMP report. Industrial wastewater shall be properly collected and treated so as to conform to the standards prescribed under GSR 422 (E) dated 19 th May st December 1993 and as mended from time to time. The treated wastewater shall be utilized for plantation purpose. The overall noise levels in and around the plant area shall be limited within the prescribed standards (85 dba) by providing noise control measures including acoustic hoods silencers enclosures etc. on all sources of noise generation. Adequate numbers of quality monitoring stations shall be set up in consultation with CPCB for regular monitoring shall be carried out of relevant parameters. We are comply with all the environmental protection measures and safeguards recommended in the EIA/ EMP report. Industrial waste water are being collected and treat as per GSR 422 (E) dtd. 19th May 1993 guidelines and used for plantation purpose after treatment. Noise is being checked on regularly basis as per standard& limited within the prescribed standards. Annexure-V Cement Grinding Unit-III (M/S Mangalam Cement Ltd.) Results of Noise Sr. Ambient Air Noise Results (db) No Location Day. Night 1 Near Security Gate Near Railway Gate 3 Near Rack Loading Area 4 Near Work Shop

7 vii Proper housekeeping and adequate occupational health programmes shall be taken up. Regular occupational health surveillance programme shall be carried and records shall be maintained properly for at least years. The programme shall include lung function and sputum tests once in six months. Sufficient preventive measures shall be adopted to avoid direct exposure to dust etc. viii A separate environment management cell with full fledge laboratory facilities to carry out various management and monitoring functions shall be set up under the control of senior executive. ix Adequate funds shall be earmarked to meet the capital cost and recurring cost / annum for the environmental protection measures shall be used judiciously to implement the conditions stipulated by the ministry of environment and forests as well as the state government. The funds as provided shall not be diverted for any other purpose. Good house keepings maintained & Regular occupational health surveillance programme shall be carried and records shall be maintained as per guidelines. We have well equipped Environmental lab. Withwell-educated staff. This Environmental Lab. headed by VP (P&QA) Earmark capital for environmental projects will be used exclusively for its implementations as maintained in EIA / EMP Reports. Mangalam Cement Ltd Environmental expenditure incurred during the period from April-17 to Sept-17for environment protection measures. S. No. Department Total Cost (In Rs.) 1. Total Expenditures (Rs.) 48,42, x The concerned Regional office of this ministry / state pollution control board / central pollution control board shall monitor the implementation of the stipulated conditions. Six monthly compliance status report and monitoring data along with statistical interpretation shall be submitted to them regularly and will be placed on the web site of the company. Compliance report being sent to the all authorities regularly.

8 xi xii The Project Proponent should advertise in at least two local newspapers widely circulated in the region around the project one of which shall be in the vernacular language of the locality concerned informing that the project has been accorded environmental clearance by the Ministry and copies of the clearance letter are available with the Rajasthan State Pollution Control Board / Committee and may also be seen at Website of the Ministry of Environment and Forests at The advertisement should be made within seven days from the date of issue of the clearance letter and a copy of the same should be forwarded to the Regional office at Bhopal. The project authorities shall inform the regional office as well as the ministry the date of financial closure and final approval of the project by the concerned authorities and the date of start of land development work. We had advertised information of Environmental clearance letter in two local newspapers in local language of the locality concerned and same copy sent to the Rajasthan Pollution Control Board, Jaipur and the Regional office at Lucknow. We will inform the regional office as well as to the ministry the date of financial closure and final approval of the project.

9 EXISTING PLANT CAPTIVE POWER PLANT CCR BUILDING PACKING PLANT AREA

10 RAIN WATER STORAGE AT MINES GARDEN CPP PLANT VIEW NEAR PLANT VIEW COLONY VIEW CENTRAL GARDEN VIEW

11 PLANTATION IN MANDIR AREA RAIN WATER HARVESTING PLANTATION IN MINES AREA PLANTATION NEAR CRUSHER PLANTATION NEAR CRUSHER WATER SPRINKLING ON ROAD

12 Crusher MATERIAL TRANSFER BELT COAL TRANSFER BELT COVER RACK LOADING AREA CLINKER TRANSFER BELT GYPSUM YARD RAW MATERIAL TRANSFER BELT

13 Annexure-I 17.5 MW Captive Power Plants - II (M/s Mangalam Cement Ltd.-Unit-III) Stack No. Details of Stack Stack Attached with Height (Mtrs.) Dia (Mtrs.) Particulates Matter Concentration (mg/nm 3 ) April-17 to June-17 July-17 to Sept-17 1 Main Stack Power plant - II ESP Coal Transfer Bag House Coal Bunker - II Bag House Coal Crusher Bag House Coal Vibrating Bag House

14 Mangalam Cement Ltd. (UNIT-III) Annexure-II Ambient Air Quality Monitoring Results Sr No Location Parameters Near Railway Gate Near Security Gate Near Rack Loading Area Near Work Shop April-17 to June-17 July-17 to Sept-17 April-17 to June-17 July-17 to Sept-17 April-17 to June-17 July-17 to Sept-17 April-17 to June-17 July-17 to Sept-17 1 PM10 (µg/m3) PM2.5 (µg/m3) So 2 (µg/m3) NOx (µg/m3) CO (µg/m3)

15

16 Mangalam Cement Ltd. Annexure-III Cement Grinding unit III &17.5 MW Power Plant II Results of Fugitive Emission Sr. No. Location April-17 to June-17 SPM (µg/m 3 ) July-17 to Sept-17 1 Near Coal Storage (CPP-I & II) Near Packing Plant Near Cement Mill-III

17 Annexure-IV Mangalam Cement Grinding (Unit III) Stack No. Details of Stack Stack Attached with Height (Mtrs) Dia (Meter) Particulates Matter Concentration mg/nm 3 April-17 to June-17 July-17 to Sept-17 1 Cement Mill Stack Bag House

18 Annexure-V Cement Grinding unit III (M/S Mangalam Cement Ltd.) Results of Noise Ambient Air Noise Results (Db)A Sr. No. Location April-17 to June-17 July-17 to Sept-17 Day Night Day Night Day Night 1 Near Security Gate Near Railway gate Near Rack loading area Near Work Shop

19 Eakxye~ lhesavfyfevsmesafujarjmrltzudhfuxjkuhgsrq 11 midj.kksadksrspcbvksjcpcblstksmj[kk A Annexure-VI

20 Cement Grinding unit III M/s Mangalam Cement Ltd. Annexure-VII Year Wise Tree Plantation Sr. No. Year Plant Names Numbers Survival Rate Location Total Plant Area Area (hector) Total 33 % Plantation area to be developed Neem, Sheesham, Kuchanar, Kurunu, Kaner, Bounganvilla, Gulmohar, Siras, Churrel, Casswiasumea, Komta, Rose, Amrood, Papya, Amla,Belpetra, Shegtoot % 70% 70% Plant & Colony Plant & Colony Plant & Colony % Plant & Colony Upto % Plant & Colony

21 Annexure-VIII MANGALAM CEMENT LIMITED (Unit-III) CSR Expenditure for the period from April-17 to Sept-17 S.No. Particulars of CSR Activities AMOUNT 1. Morak Gram Panchayat HiriayaKhedi Gram Panchayat Budhkan Gram Panchayat Chechat Gram Panchayat Vocational Skill Development program (Tailoring Classes) Vocational Skill Development Program (Driving ) Total Amount Rs /-

22 Annexure-IX

23 Annexure-X Cement Grinding Unit-III (M/s Mangalam Cement Ltd.) Details of Water Harvesting:- Sr. No. Location Roof Area 1. Engineering Building 725 m 2 2. Load Center Building 1458 m 2 3. Store Building 1620 m 2 4. Captive Power Plant I 1200 m 2

24 Annexure-XI Mangalam Cement Ltd Environmental expenditure incurred during the period from April-17 to Sept-17 for environment protection measures. (Unit III & CPP II) S. No. Department Total Cost (In Rs.) 1. Total Expenditures 48,42,

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server. Environmental Clearance Point Wise Half Yearly Compliance Report (October 2014 to March 2015) Cement Plant - EC No: F.No. J-11011/450/2007-IA II(I) Dated: 24 th March 2008 A. SPECIFIC CONDITIONS : S.NO.

More information

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004 Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private

More information

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

Sr.No Condition Status A. SPECIFIC CONDITIONS:

Sr.No Condition Status A. SPECIFIC CONDITIONS: J.K. CEMENT WORKS, MANGROL (RAJ.) Compliance report of Mangrol Lime stone mine (For the period from April 2011 to September 2011) Sub:- Conditions of Environment Clearance from MOEF, New Delhi Letter No.

More information

THE RAMCO CEMENTS LIMITED

THE RAMCO CEMENTS LIMITED 1 P a g e 2 P a g e THE RAMCO CEMENTS LIMITED (Formerly Madras Cements Ltd.) COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE JAYANTHIPURAM NORTH BAND MINING LEASE 2.0 MILLION TPA CAPACITY EC Lr. No. : J-11015/377/2006-IA.II

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

Monitoring the Implementation of Environmental Safeguards

Monitoring the Implementation of Environmental Safeguards Monitoring the Implementation of Environmental Safeguards Ministry of Environment & Forest Western Region, Regional Office, Bhopal MONITORING REPORT PART I DATA SHEET RASHTRIYA CHEMICAS AND FERTILISERS

More information

Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated (Period April 2016 to September 2016)

Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated (Period April 2016 to September 2016) Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated 06.09.2012 (Period April 2016 to September 2016) Sr. No. Conditions Compliance status A. Specific Conditions A.1 Water 1. The fresh

More information

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED HALF YEARLY PROGRESS REPORT ON IMPLEMENTATION OF ENVIRONMENTAL CLEARANCE CONDITION BY MoEF (PERIOD FROM OCTOBER 13 TO MARCH 14) HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED SIX MONTHLY

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN COMPLIANCE STATUS OF ENVIRONMENT CLEARANCE LETTER NO.: J-11011/981/2008-IA-II (I) dated: February 27, 2010

SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN COMPLIANCE STATUS OF ENVIRONMENT CLEARANCE LETTER NO.: J-11011/981/2008-IA-II (I) dated: February 27, 2010 SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN COMPLIANCE STATUS OF ENVIRONMENT CLEARANCE LETTER NO.: J-11011/981/2008-IA-II (I) dated: February 27, 2010 A Specific Conditions Compliances status (i) (ii) (iii)

More information

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report Status of Compliance of stipulated conditions of the Environment Clearance J- 01 It is noted that total water consumption will increase from 1000-1200 m 3 /day to 1200-1300 m 3 /day. Fresh water requirement

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial

More information

No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests

No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests Paryavaran Bhavan, C.G.O. Complex, Lodi Road, New Delhi-110 003. Dated the 28th June, 2013 To, M/ s Arbind Kumar Singh

More information

The mine is opened on The reasons for delay for starting mining operations are:

The mine is opened on The reasons for delay for starting mining operations are: 1 P a g e 2 P a g e THE RAMCO CEMENTS LIMITED (Formerly known as Madras Cements Ltd.) COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE BUDAWADA LIMESTONE MINE - 1.10 MILLION TPA CAPACITY EC Lr. No : J-11015/150/2008-IA.II

More information

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area.

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area. 1. INTRODUCTION Executive Summary 1.1 Background: M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area. 1.2 Proposed Project:

More information

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

More information

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) HINAUTI LIMESTONE MINE Mine Lease area 378.261 ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Sidhi Cement

More information

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu Compliance Report for Environmental Clearance No.11.63/2005.1A.III dated 19.12.2005 Specific Conditions

More information

Max. building height (m)

Max. building height (m) Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

Subject: Environmental and CRZ clearance for expansion of Karaikal Port (Phase-II) at Puducherry by MIs. Karaikal Port Pvt. Ltd. - Reg.

Subject: Environmental and CRZ clearance for expansion of Karaikal Port (Phase-II) at Puducherry by MIs. Karaikal Port Pvt. Ltd. - Reg. No. 10-42/2009-IA.III Government of India Ministry of Environment & Forests (IA Division) Paryavaran Bhawan, CGO Complex, Lodhi Road, New Delhi - 110003. I i I I I Dated: 22 nd September, 2009. To MIs.

More information

ENVIRONMENTAL MONITORING PROGRAMME

ENVIRONMENTAL MONITORING PROGRAMME Stage-I (2x800 MW) Page 1 5 CHAPTER - VI ENVIRONMENTAL MONITORING PROGRAMME 6.0 OBJECTIVES Regular monitoring program the environmental parameters is essential to take into account the changes in the environment.

More information

No. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29)

No. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29) 1 By: Speed-Post State Level Expert Appraisal Committee (Formed as per S.O. no. 1533 dated 14 th Sept 2006 of Government of India, Ministry of Environment & Forests) PARYAWARAN PARISAR, E-5, ARERA COLONY,

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The Groups cement facilities are located in

More information

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE ANDHRA PRADESH POLLUTION CONTROL BOARD Paryavarana Bhavan, A-III, Industrial Estate, Sanathnagar, Hyderabad-500 018 Phone : 040-23887500, Website : www.appcb.ap.nic.in RED CATEGORY CONSENT & AUTHORIZATION

More information

AMBUJA CEMENTS LIMITED

AMBUJA CEMENTS LIMITED Page 1 of I II FORM V (See Rule 14) Environmental Statement for the Financial Year Ending on 31 st March 17 Name & Address of the Owner/Occupier of the Industry PART A Industry Category Primary ( STC Code)

More information

.in Dated 9th August, Sharma ;

.in Dated 9th August, Sharma  ; F. No. J-11011/151/2010-IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi -110 003.. To, Ankleshwar E-mail: pb.rastoai@nic.in

More information

MAJHIGAWAN LIMESTONE MINE Mine Lease area ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.

MAJHIGAWAN LIMESTONE MINE Mine Lease area ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M. MAJHIGAWAN LIMESTONE MINE Mine Lease area 362.68 ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Sidhi Cement

More information

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF

More information

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi PRE FEASIBILITY REPORT For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS Of M/s. M.K. DRUGS F-10, Industrial Area, Focal Point, Tehsil: Derabassi Dist: Mohali, Punjab INTRODUCTION M/s. M.K. Drugs is

More information

STANDARD OPERATING PROCEDURE

STANDARD OPERATING PROCEDURE STANDARD OPERATING PROCEDURE Consent to Established/Operate Procedural Guidelines Consent to Establish NOC Check List Consent to Operate NOC Check List Renewal to Consent to Operate Check List Time Frame

More information

ENVIRONMENTAL CLEARANCE COMPLIANCE OF CLUSTER-XIII (GRANTED VIDE LETTER NO.J-11015/10/2010-IA.II(M) DATED

ENVIRONMENTAL CLEARANCE COMPLIANCE OF CLUSTER-XIII (GRANTED VIDE LETTER NO.J-11015/10/2010-IA.II(M) DATED ENVIRONMENTAL CLEARANCE COMPLIANCE OF CLUSTER-XIII (GRANTED VIDE LETTER NO.J-11015/10/2010-IA.II(M) DATED 06.06.2013 (Oct.,2013 to March,2014) Sl. No. A. Specific Conditions by MOEF: Compliance i. ii No

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

ZZH/CLAB-KSPCB/04/ Environmental Officer,

ZZH/CLAB-KSPCB/04/ Environmental Officer, ZZH/CLAB-KSPCB/04/ 21273 08-12-2014 Environmental Officer, Regional Office, Karnataka State Pollution Control Board Parisara Bhavan, LIG II, B 217 B-1, Main Road, A-16 th Cross Near Hari Om Trust, Habbuwada

More information

Activity Aspects Impacts/ Nuisances Construction phase - Site preparation. - Generation of excavated soil, debris and construction wastes

Activity Aspects Impacts/ Nuisances Construction phase - Site preparation. - Generation of excavated soil, debris and construction wastes MINISTRY OF ENVIRONMENT AND NDU ENVIRONMENTAL GUIDELINE No. 31 Asphalt Plant Set Up Temporarily For The Purposes Of A Project By A Public Department 1.0 Purpose of guideline This environmental guideline

More information

Page# The Top soil generation is very less and it is being simultaneously utilized.

Page# The Top soil generation is very less and it is being simultaneously utilized. Page# 1 Name of Project : Belkapahar Mine of Wolkem Industries Ltd. Project Code: 226/336/-2005 Clearance Letter No. : J-11015/23/2004-IA.II (M) dated 31.03.2005 Period of Compliance Report : October,

More information

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area. PROJECT BRIEF PROJECT LOCATION: - Pahar Kua Marble Range Mining Project Q L No 235 is located near village Pahar Kua, Tehsil Makrana., District Nagaur Rajasthan. Project is approachable from national highway.

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

2 NECESSITY OF THE PROPOSED PROJECT

2 NECESSITY OF THE PROPOSED PROJECT Executive Summary 1 INTRODUCTION M/s. Prosperous Energy Private Limited (PEPL), a wholly owned subsidiary of Videocon Industries Limited has proposed the 2X660MW Coal based supercritical Thermal Power

More information

N.H. 6 is 50 km away from the proposed plant boundary; in N direction;

N.H. 6 is 50 km away from the proposed plant boundary; in N direction; 1.1 INTRODUCTION Godawari Power & Ispat Limited (GPIL) has an existing Iron Ore Crushing plant of 12,00,000 MTPA capacity at Gidhali, Village Kusumkasa, Tehsil - Balod, District - Durg (Chhattisgarh) and

More information

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited)

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited) Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited) Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The groups cement facilities are located

More information

Visakhapatnam Steel Plant Rashtriya Ispat Nigam Ltd.

Visakhapatnam Steel Plant Rashtriya Ispat Nigam Ltd. Visakhapatnam Steel Plant Rashtriya Ispat Nigam Ltd. Half yearly Environment Compliance Report in respect of stipulated conditions while issuing Environmental Clearance Rashtriya Ispat Nigam Limited -

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar Introduction EIA is a formal process to predict the environmental consequences

More information

iii Implementation of Action Plan on the issues raised during the Public Hearing held on The proponent shall complete all the tasks as per

iii Implementation of Action Plan on the issues raised during the Public Hearing held on The proponent shall complete all the tasks as per Name & Location of the Project : Bhatkotari Limestone Mine with enhancement of production capacity from 3.75 million TPA to 9.10 million TPA (ROM) by M/s Wonder Cement Ltd., located near Village (s) Bhatkotari,

More information

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT Annexure B Land Possession letters & N.A. permission letters Annexure C Photograph of the Site Annexure D Details of Buildings Area Calculation Annexure 1 Topo Sheet Annexure 2 Soil Analysis Report Annexure

More information

ENVIRONMENTAL CLEARANCE COMPLIANCE OF CLUSTER-II (GRANTED VIDE: J-11015/35/2011-IA II CM), dated ( to )

ENVIRONMENTAL CLEARANCE COMPLIANCE OF CLUSTER-II (GRANTED VIDE: J-11015/35/2011-IA II CM), dated ( to ) ENVIRONMENTAL CLEARANCE COMPLIANCE OF CLUSTER-II (GRANTED VIDE: J-11015/35/2011-IA II CM), dated 06.02.13 (01.10.13 to 31.03.14) Sl. no. A. Specific Conditions by MOEF: Compliance i The maximum production

More information

Particulate Emission Monitoring HN Pathak Supdtg Engr Madhya Pradesh Power Generation Co. Ltd

Particulate Emission Monitoring HN Pathak Supdtg Engr Madhya Pradesh Power Generation Co. Ltd Particulate Emission Monitoring HN Pathak Supdtg Engr Madhya Pradesh Power Generation Co. Ltd MADHYA PRADESH POWER GENERATING Co. Ltd. INTRODUCTION Satpura Thermal Power Station is an oldest running plant

More information

PROPOSED TERM OF REFERENCE

PROPOSED TERM OF REFERENCE PROPOSED TERM OF REFERENCE FOR ESTABLISHMENT OF PROPOSED MOLASSES/GRAIN BASED DISTILLERY HAVING CAPACITY: 160.0 KLD (MOLASSES BASED) OR 120.0 KLD (MOLASSES BASED) + 40.0 KLD (GRAIN BASED) ALONGWITH 7.0

More information

ENVIRONMENTAL CLEARANCE (J-11015/121/ IA.II(M) ) October 14 to March 15. INTEGRATED ASHOK WASHERY cum FBC

ENVIRONMENTAL CLEARANCE (J-11015/121/ IA.II(M) ) October 14 to March 15. INTEGRATED ASHOK WASHERY cum FBC ENVIRONMENTAL CLEARANCE (J-11015/121/2009 - IA.II(M) ) October 14 to March 15 INTEGRATED ASHOK WASHERY cum FBC (PIPARWAR AREA) CENTRAL COALFIELDS LIMITED Status of compliance of the terms and conditions

More information

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU ENVIRONMENTAL IMPACT ASSESSMENT AND YOU PARTICIPATING IN PUBLIC CONSULTATIONS FOR: COAL FUELED THERMAL POWER PLANTS C A G Citizen consumer and civic Action Group 1. What are Thermal Power Plants? Electricity

More information

Excerpt of Thermal Power Guidelines for New Plants

Excerpt of Thermal Power Guidelines for New Plants Excerpt of Thermal Power Guidelines for New Plants The following is an excerpt of the Thermal Power guidelines for New Plants, a complete version of which is found in the Pollution Prevention and Abatement

More information

Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A. Company Information

Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A. Company Information Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A Company Information Company Name : Facility Name : Person Name * : Designation * : Premise Name

More information

CCR COMPLIANCE FUGITIVE DUST CONTROL PLAN. Prepared for: Tucson Electric Power Company Springerville Generating Station Springerville, Arizona

CCR COMPLIANCE FUGITIVE DUST CONTROL PLAN. Prepared for: Tucson Electric Power Company Springerville Generating Station Springerville, Arizona CCR COMPLIANCE FUGITIVE DUST CONTROL PLAN Prepared for: Tucson Electric Power Company Springerville Generating Station Springerville, Arizona Prepared by: CB&I Environmental & Infrastructure, Inc. Pittsburgh,

More information

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PLOT No. F-1,2,3,8,9,10, ADDL. MIDC, PHASE II, AND GUT NO. 46 & 63, VILLAGE DAREGAON, TEHSIL: JALNA DIST: JALNA, MAHARASHTRA 2014-15 1. Executive

More information

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. 20. Karnavati Premier Living F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. Screening & scoping / appraisal Details of the proposed project as presented before the committee

More information

SINGHAL ENTERPRISES PRIVATE LIMITED

SINGHAL ENTERPRISES PRIVATE LIMITED SINGHAL ENTERPRISES PRIVATE LIMITED (INTEGRATED MINI STEEL & POWER PLANTS) Taraimal Village, Gharghoda Mandal, Raigarh District, Chattisgarh State. 1.0 INTRODUCTION SINGHAL ENTERPRISES PRIVATE LIMITED

More information

THERMAL ENGINEERING & TECHNOLOGY DEVELOPMENT DIVISION, CEA

THERMAL ENGINEERING & TECHNOLOGY DEVELOPMENT DIVISION, CEA New Environment Norms Issues and Challenges By: Sanjeev Kumar Kassi Director (TETD), CEA INSTALLED CAPACITY (MW) AS ON 29-02-2016 Type Capacity Share (%) Hydro 42703.42 14.79% Thermal 201360.04 69.76%

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

Annual CCR Fugitive Dust Report. TS Power Plant. Eureka County, Nevada

Annual CCR Fugitive Dust Report. TS Power Plant. Eureka County, Nevada Annual CCR Fugitive Dust Report TS Power Plant Eureka County, Nevada November 16, 2016 Prepared by: Dennis Laybourn Senior Environmental Manager Newmont Nevada Energy Investment - TS Power Plant 450 TS

More information

*** Dated: May 2,2014

*** Dated: May 2,2014 F. No.II-43/2013-IA.III Government of India Ministry of Environment & Forests (la-iii Section) Room No. 143, Paryavaran Bhawan, CGO Complex, Lodhi Road, New Delhi - 110003, To The Head-Technical Services

More information

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS 1. LAND ENVIRONMENT QUERY 1.1 Will the existing land use get significantly altered from the project that is not consistent with the surroundings? Attach Maps

More information

1. ENVIRONMENT MANAGEMENT PLAN

1. ENVIRONMENT MANAGEMENT PLAN Project : Environmental Management Plan for District E Allahabad 1. ENVIRONMENT MANAGEMENT PLAN The Environment Management Action Plan (EMP) is required to ensure sustainable development of the proposed

More information

Paribesh Bhavan, A / 118, Nilakantha Nagar, Unit VIII, Bhubaneswar

Paribesh Bhavan, A / 118, Nilakantha Nagar, Unit VIII, Bhubaneswar ENVIRONMENTAL STATEMENT REPORT OF BHUSHAN POWER & STEEL LIMITED VILLAGE: THELKOLOI, POST: LAPANGA TEHSIL: RENGALI, DISTT: SAMBALPUR 768232 ODISHA FOR THE FINANCIAL YEAR ENDING 31 ST MARCH 2016 SUBMITTED

More information

7.2 PUBLIC CONSULTATION

7.2 PUBLIC CONSULTATION PROPOSED GREENFIELD PROJECT OF CHLOR-ALKALI AND CAPTIVE POWER PLANT AT VILL: LANDHA, AMBALA, HARYANA CH-7: ADDITIONAL STUDIES 7.2 PUBLIC CONSULTATION An application for conduct of public hearing was made

More information

Dalmia Cement (Bharat) Limited, Kadapa 1 st Workshop on Energy Efficiency in Cement Sector 23 rd June 2015

Dalmia Cement (Bharat) Limited, Kadapa 1 st Workshop on Energy Efficiency in Cement Sector 23 rd June 2015 Dalmia Cement (Bharat) Limited, Kadapa 1 st Workshop on Energy Efficiency in Cement Sector 23 rd June 2015 Presented by :Mr. P. Kamalanathan Manager Electrical p.kamalanathan@dalmiacement.com Dalmia Cement

More information

Coke Manufacturing. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics

Coke Manufacturing. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics Multilateral Investment Guarantee Agency Environmental Guidelines for Coke Manufacturing Industry Description and Practices Coke and coke by-products (including coke oven gas) are produced by the pyrolysis

More information

Performance of Bio-medical Waste Treatment Facilities in Central Zone

Performance of Bio-medical Waste Treatment Facilities in Central Zone BIO-MEDICAL WASTE MANAGEMENT Performance of Bio-medical Waste Treatment Facilities in Central Zone In central zone, eighteen Common Bio-medical Waste Treatment Facilities (CBWTFs) have been established.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan 10.1 INTRODUCTION The Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impact of a project and ensuring the existing environmental quality.

More information

IRISH CEMENT PLATIN INVESTING IN OUR FUTURE

IRISH CEMENT PLATIN INVESTING IN OUR FUTURE IRISH CEMENT PLATIN INVESTING IN OUR FUTURE INTRODUCTION Investing in our future. The next phase of investment in Platin will see further energy efficiency improvements with on site electricity generation

More information

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any; TERMS OF REFERENCE 1.0 PROPOSED SCOPE OF WORK FOR EIA STUDY The components of the EIA study include: Determination of baseline data using primary data generation and secondary data available from various

More information

FORM I I. BASIC INFORMATION S. No. Proposed Mixed Use Development Project SPR Binny 2 S. no. in the schedule 8 (b) 1 Name of the project

FORM I I. BASIC INFORMATION S. No. Proposed Mixed Use Development Project SPR Binny 2 S. no. in the schedule 8 (b) 1 Name of the project FORM I I. BASIC INFORMATION. Item Details 1 Name of the project Proposed Mixed Use Development Project SPR Binny 2 no. in the schedule 8 (b) 3 Proposed area Area Details: Total land area: 200243.50 Sqm

More information

IAF Mandatory Document. Accreditation Assessment of Conformity Assessment Bodies with Activities in Multiple Countries. Issue 2 IAF MD 12:2016

IAF Mandatory Document. Accreditation Assessment of Conformity Assessment Bodies with Activities in Multiple Countries. Issue 2 IAF MD 12:2016 IAF Mandatory Document Accreditation Assessment of Conformity Assessment Bodies with Activities in Multiple Countries Issue 2 IAF MD 12:2016 2016 Issue 2 Accreditation Assessment of Conformity Page 2 of

More information

DR. SANJAY V. PATIL HEAD AND TECHNICAL ADVISER DEPARTMENT OF ALCOHOL TECHNOLOGY VASANTDADA SUGAR INSTITUTE, MANJARI, PUNE (INDIA)

DR. SANJAY V. PATIL HEAD AND TECHNICAL ADVISER DEPARTMENT OF ALCOHOL TECHNOLOGY VASANTDADA SUGAR INSTITUTE, MANJARI, PUNE (INDIA) DR. SANJAY V. PATIL HEAD AND TECHNICAL ADVISER DEPARTMENT OF ALCOHOL TECHNOLOGY VASANTDADA SUGAR INSTITUTE, MANJARI, PUNE (INDIA) Email: sv.patil@vsisugar.org.in AIDA Technical Seminar www.vsisugar.com

More information

Environmental Leadership Program Inspection Form Portable Asphalt Facility

Environmental Leadership Program Inspection Form Portable Asphalt Facility Environmental Leadership Program Inspection Form Portable Asphalt Facility Company Name -Name & Location of Facility: Date of Inspection: FID Number Name of Inspector: Names of Inspection Participants:

More information

LANCO ANPARA POWER PVT. LTD

LANCO ANPARA POWER PVT. LTD LANCO ANPARA POWER PVT. LTD PLOT No. 229, PHASE-I, UDYOG VIHAR, GURGAON-122016, HARYANA Ph: 0124 4691000-04, 2341625, Fax: 0124 2341627, 4691005 SUMMARY OF RAPID ENVIRONMENTAL IMPACT ASSESSMENT AND ENVIRONMENTAL

More information

Telefax : 011: Dated 1 st March, 2013

Telefax : 011: Dated 1 st March, 2013 F. No. J-11011/263/2012- IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 To, Shri Jigar Shah, Director M/s

More information

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT EXECUTIVE SUMMARY NAGERCOIL MUNICIPALITY, KANYAKUMARI DISTRICT TWAD BOARD,SEWERAGE DIVISION,NAGERCOIL

More information

No.IA-J-11011/363/2017-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

No.IA-J-11011/363/2017-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** No.IA-J-11011/363/2017-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** Indira Paryavaran Bhavan, Vayu Wing,3rd Floor,Aliganj, Jor Bagh Road,New

More information

Electrostatic Precipitators (ESPs)

Electrostatic Precipitators (ESPs) EVE 402 Air Pollution Generation and Control Chapter #5 Lectures (Part 7) Electrostatic Precipitators (ESPs) The process of electrostatic precipitation involves The ionization of contaminated air flowing

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN FOR THE PROPOSED RESIDENTIAL APARTMENTS PROJECT OF M/s. CHJ SECURITIES (P) LTD & OTHERS AT SY NO. 978 AND 979, KUKATPALLY VILLAGE, BALANAGAR MANDAL, RANGA REDDY DISTRICT TELANGANA

More information

HINDUSTAN SHIPYARD LIMITED : : VISAKHAPATNAM (A Government of India Undertaking) *** ADVT NO.HR/ES(O)/0102/02/2016 DATED 24 AUG 2016

HINDUSTAN SHIPYARD LIMITED : : VISAKHAPATNAM (A Government of India Undertaking) *** ADVT NO.HR/ES(O)/0102/02/2016 DATED 24 AUG 2016 HINDUSTAN SHIPYARD LIMITED : : VISAKHAPATNAM 530 005 (A Government of India Undertaking) *** ADVT NO.HR/ES(O)/0102/02/2016 DATED 24 AUG 2016 HSL is the pioneer Shipbuilding and Ship repair Yard functioning

More information

Environmental Guideline for Saskatchewan Asphalt Plants

Environmental Guideline for Saskatchewan Asphalt Plants Environmental Guideline for Saskatchewan Asphalt Plants Ministry of Environment July 2015 saskatchewan.ca/environment For enquiries or reporting, please contact: Government of Saskatchewan Environmental

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

Dust Recovery Collector Systems. University of Iowa Iowa City, IA. Considerations for NAAQS & NFPA Compliance

Dust Recovery Collector Systems. University of Iowa Iowa City, IA. Considerations for NAAQS & NFPA Compliance Prepared by: Sebesta Blomberg Contact: Mike Svensk, PE 2381 Rosegate St. Paul, MN 55113 Main: 651-634-0775 Fax: 651-634-7400 email: msvensk@sebesta.com Dust Recovery Collector Systems Considerations for

More information

Environmental impact assessment of a 1600 MW thermal power plant project in Karimnagar district of Telangana

Environmental impact assessment of a 1600 MW thermal power plant project in Karimnagar district of Telangana Environmental impact assessment of a 1600 MW thermal power plant project in Karimnagar district of Telangana 1 D.V.S. Praneeth, 2 Arghajeet Saha 1,2 M.Tech. Scholar 1 Environmental Engineering, Department

More information

Annexure - 1 The summary of the Air quality monitoring from April, 2016 to March, 2017 as follows CORE ZONE BUFFER ZONE

Annexure - 1 The summary of the Air quality monitoring from April, 2016 to March, 2017 as follows CORE ZONE BUFFER ZONE . Annexure - 1 The summary of the Air quality monitoring from April, 2016 to March, 2017 as follows Location Direction & Distance PM 10 Min. Max. Mean 98%tile STD CORE ZONE. KK-1 Incline GM Office, Mandamarri

More information

RECLAMATION OF COAL MINE VOID

RECLAMATION OF COAL MINE VOID RECLAMATION OF COAL MINE VOID Reclamation of Coal Mine Void with Fly Ash Filling of mine voids with fly ash in an environmental sound process is the most viable option of bulk utilisation. This not only

More information

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations.

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations. 1. Introduction M/s. Sri Krishna Pharmaceuticals Limited, Unit-III (Formerly Sri Krishna Drugs Limited) was established in the year 1988. It is located at Sy. No. 57, Golkonda kalan, Raikunta (V), shamshabad

More information

EFFECTIVENESS OF ENVIRONMENTAL POLLUTION CONTROL MEASURES IMPLEMENTED IN STONE CRUSHING SITES LOCATED AT KADUWELA MUNICIPALITY, SRI LANKA. Sri Lanka.

EFFECTIVENESS OF ENVIRONMENTAL POLLUTION CONTROL MEASURES IMPLEMENTED IN STONE CRUSHING SITES LOCATED AT KADUWELA MUNICIPALITY, SRI LANKA. Sri Lanka. EFFECTIVENESS OF ENVIRONMENTAL POLLUTION CONTROL MEASURES IMPLEMENTED IN STONE CRUSHING SITES LOCATED AT KADUWELA MUNICIPALITY, SRI LANKA A.P.Weerakkody a, T.K.Weerasinghe b*,n.s.gamage a, R.P.P. M. Dilrukshi

More information

The Environmental Management and Protection (Saskatchewan Environmental Code Adoption) Regulations

The Environmental Management and Protection (Saskatchewan Environmental Code Adoption) Regulations ENVIRONMENTAL MANAGEMENT 1 ENVIRONMENTAL CODE ADOPTION) E-10.22 REG 2 The Environmental Management and Protection (Saskatchewan Environmental Code Adoption) Regulations being Chapter E-10.22 Reg 2 (effective

More information