1 ENGINEERING DEPARTMENT CITY OF PARKLAND CITYWIDE MOBILITY UPDATE OCTOBER 21, 2015

2 CITYWIDE MOBILITY UPDATE Introduction and Purpose Provide update on the recommended projects from the Citywide Mobility Needs Assessment Plan as well as ongoing mobility related projects

3 LOXAHATCHEE ROAD IMPROVEMENTS Proposed project includes redesign of Loxahatchee Road from SR7 to the Conservation area Includes design and coordination funding with FDOT, Broward MPO and Broward County Current status: Survey in progress (Broward County) Next step: Proposed design(summer 2016), Joint Participation Agreement (January 2016) Anticipated Project Completion: 2021

4 PARKSIDE DRIVE AND LOX ROAD Per Keith and Schnars approved Citywide Mobility Assessment intersection at Level of Service F by year Consultant recommended annual monitoring of the intersection for traffic signal installation City requested all-way stop for the intersection which was not approved by the County. Current status: Commission approved funding for annual monitoring with the FY16 budget Next step: Select consultant for traffic study at intersection during the peak season

5 HILLSBORO BOULEVARD AND UNIVERSITY DRIVE Intersection improvement as a result of the University Drive extension project. Currently temporary all way stop signs in place Long term solution is a traffic signal for the intersection Next step: Coordination with Broward County regarding a traffic signal at the location. Letter of credit in place for the intersection from Toll Brothers and Lennar. Approach would be similar to the Nob Hill/Heron Bay Boulevard Traffic signal.

6 87 TH AVENUE SIDEWALK Proposed project provides for sidewalk connection from Ranch Road to Holmberg Road Includes the installation of crosswalk on Holmberg Road at the intersection of 87 th Avenue with Pedestrian crossing devices City Pilot safety program with Broward County for crosswalk Current status: Survey and design Next step: Construction April 2016 at the completion of the Farmers Market Anticipated Completion: September 2016

7 OLD CLUB ROAD LEFT TURN LANE Proposed project includes the installation of a left turn lane at the intersection of University Drive and Old Club Road (PGCC Entrance) to reducing traffic stacking and improve movement at the intersection. Includes leaving the existing northbound and southbound stop signs in place Requires Broward County approval as the City s Traffic representative Current status: Broward County review Next step: Broward County traffic field study by end of November Anticipated Completion: To be determined

8 EMERGENCY TRAFFIC SIGNALS Project entails the installation of emergency traffic signals at the City s three fire stations (#42 City Hall,#97 Holmberg Road,#109 Hillsboro Boulevard). Signals will serve to stop traffic as Fire-Rescue vehicles exit the respective station Includes approval from Broward County for installation Station #109 (Hillsboro Boulevard) does not have the required traffic flow for the signal. Required for noise nuisance abatement, further coordination required with the County. Current status: City s Consultants (Stanley Consultant) coordinating warrant studies for approval of the location by Broward County Next step: Design plans for the approved location Anticipated Completion: Approved locations is expected to be completed and operational by end of fiscal 2016

9 TRAFFIC PREEMPTION DEVICE Installation of traffic signal preemption devices that will enable emergency response vehicle to preempt the normal traffic signal sequence to expedite response time. Intersection for installation includes; University Drive and Holmberg Road Nob Hill Road and Heron Bay Boulevard/Parkland Reserve Boulevard Pine Island Road and Trails End Boulevard Pine Island Road and Holmberg Road Current status: Approved by the Fire Chief s Association of Broward County Next Step: Broward County Approval, Contract procurement. Anticipated Completion: Completed and operational by end of fiscal 2016

10 NOB HILL ROAD TRAFFIC SIGNAL Project involves the installation of a traffic signal at the intersection of Nob Hill Road and Heron Bay Boulevard/Parkland Reserve Boulevard to improve vehicular movement at the intersection. Current status: Signal installed and approved by Broward County Next Step: All way left turn signal installation as approved by Broward County Anticipated Completion: Completed and operational by end of December 2015

11 CITYWIDE LIGHTING PROJECT Project involves the installation of street lighting along roadways identified in the approved Citywide Lighting Plan Loxahatchee Road Current status: Lights Installed from Parkside Drive to Nob Hill Road Next Step: Nob Hill Road Intersection, Nob Hill Road west to conservation Area, Parkside Drive to SR7 Anticipated Completion: January 2016

12 CITYWIDE LIGHTING PROJECT Nob Hill Road Project involves the installation of LED street lighting from Heron Bay Boulevard to Loxahatchee Road Current status: Currently under design review by FPL Next Step: Broward County plan review and permitting Anticipated Completion: To be Determined

13 CITYWIDE LIGHTING PROJECT University Drive Project involves the installation of LED street lighting from Holmberg Road to Loxahatchee Road Current status: Currently under design review by FPL Next Step: Broward County plan review and permitting Anticipated Completion: To be Determined

14 RIVERSIDE DRIVE BIKE LANE Broward County Project that entails the installation of bicycle lanes along both sides of Riverside Drive from the Sawgrass Expressway to Holmberg Road Current status: Plan review and development Next Step: Broward County presentation to the City in January

15 QUESTIONS AND COMMENTS

TAMPA BAY NEXT MAJOR PROJECTS UPDATE

TAMPA BAY NEXT MAJOR PROJECTS UPDATE TAMPA BAY NEXT MAJOR PROJECTS UPDATE Marshall Hampton, FDOT District Seven Tampa Bay Next Program Manager January 18, 2019 1 2 Program Overview Funding Priorities Fiscal Year 2018 2019 2020 2021 2022 2023

More information

Palm Beach MPO Board Meeting December 7, 2015

Palm Beach MPO Board Meeting December 7, 2015 Palm Beach MPO Board Meeting December 7, 2015 Overview 1 Background and History 3 Public and Agency Engagement Strategy 2 Overview of Scope and Schedule for the Study 4 Next Steps 2 1 Background and History

More information

Stakeholder Interview Information Packet December 14-17, 2015

Stakeholder Interview Information Packet December 14-17, 2015 Stakeholder Interview Information Packet December 14-17, 2015 Overview 1 Background and History 4 Public and Agency Engagement Strategy 2 Overview of Scope and Schedule for the Study 5 Decision-making

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four DISTRICT FOUR PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Four. In fiscal years 2014 and 2015, current Turnpike projects total over $127

More information

Final Air Quality Report

Final Air Quality Report Florida Department of TRANSPORTATION Final Air Quality Report PD&E Study From East of Babcock Street (SR 507) to US 1 Brevard County, Florida Financial Project ID: 430136-1-22-01 ETDM Project Number: 13026

More information

I-290 Construction Approach. April 2016

I-290 Construction Approach. April 2016 I-290 Construction Approach April 2016 1 AGENDA Project Process - Phase I, II, & III Overall guiding principles I-290 construction approach I-290 construction schedule Construction mitigation Best Practices

More information

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS SECTION PAGE NO. SECTION TITLE NO. EXECUTIVE SUMMARY -------------------------------------------------------------------- ES-1 1.0 INTRODUCTION

More information

I-90 ALLSTON INTERCHANGE

I-90 ALLSTON INTERCHANGE I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT TASK FORCE MEETING March 10, 2016 FIORENTINO COMMUNITY CENTER 1 Meeting Agenda Welcome & Introductions Urban Interchange Concept 3K-4c with

More information

Transportation Services

Transportation Services RE:EX12.2u Transportation Services Service Level Review Public Works Infrastructure Committee Presentation June 17, 2015 Overview Recommended Service Levels by Program Program Map Service Levels and Service

More information

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida November 7, 2014 SUBMITTED BY: Dewberry Bowyer-Singleton 520 South

More information

Chapter 4: Transportation and Circulation

Chapter 4: Transportation and Circulation Chapter 4: Transportation and Circulation 4.1 Introduction Circulation improvements constructed for the West Valley Logistics Center will improve the functional efficiency of the circulation system in

More information

AIR QUALITY TECHNICAL MEMORANDUM

AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM GOLDEN GLADES INTERCHANGE PD&E STUDY Miami-Dade County, Florida Financial Management Number: 428358-1-22-01 Efficient Transportation Decision

More information

CHARTING PROGRESS TO 2040 RESULTS OF MINI-SURVEYS

CHARTING PROGRESS TO 2040 RESULTS OF MINI-SURVEYS CHARTING PROGRESS TO RESULTS OF MINI-SURVEYS A series of mini-surveys was released between May and July, to collect input on investment strategies for Charting Progress to, the Boston Region s long-range

More information

DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS

DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS Construction Impact Mitigation Strategy Guidelines for Major Developments The District of North Vancouver

More information

Pinellas County Capital Improvement Program, FY FY2016 Project Summary Report

Pinellas County Capital Improvement Program, FY FY2016 Project Summary Report Function : Transportation Activity : Road & Street Facilities Category : Arterial Roads Pinellas County Capital Improvement Program, FY2011 - FY2016 Project No: 1618 Title: 118th Avenue Expressway Cost

More information

Grottoes. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Grottoes. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation 2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration

More information

Final Recommendations Identification of Improvements, Strategies, and Solutions

Final Recommendations Identification of Improvements, Strategies, and Solutions Identification of Improvements, Strategies, and Solutions Prepared by: December 2015 TABLE OF CONTENTS 1. Introduction... 1 1 2. Freight Policy Recommendations... 2 1 3. Freight Infrastructure Recommendations...

More information

Transportation Demand Management (TDM) Plan 2075 Broadway, Redwood City, CA

Transportation Demand Management (TDM) Plan 2075 Broadway, Redwood City, CA Transportation Demand Management (TDM) Plan 2075 Broadway, Redwood City, CA Prepared For: Lane Partners, LLC Prepared By: SANDIS 644 Menlo Avenue, Second Floor 636 9 th Street Menlo Park, CA 94025 Oakland,

More information

OVERVIEW. Work Progress to Date Action Items Follow Up Community Relations Update Construction Phasing

OVERVIEW. Work Progress to Date Action Items Follow Up Community Relations Update Construction Phasing OVERVIEW Work Progress to Date Action Items Follow Up Community Relations Update Construction Phasing Construction Liaison Group Nov 7th, 2013 1 WORKS IN PROGRESS Construction Liaison Group Nov 7 th, 2013

More information

CRYSTAL CITY, POTOMAC YARD, AND PENTAGON CITY TAX INCREMENT FINANCING AREA

CRYSTAL CITY, POTOMAC YARD, AND PENTAGON CITY TAX INCREMENT FINANCING AREA CRYSTAL CITY, POTOMAC YARD, AND PENTAGON CITY TAX INCREMENT FINANCING AREA Our Mission: To provide a supplemental financial mechanism for the revitalization of Crystal City, Potomac Yard, and Pentagon

More information

Broward County Urban Freight/Intermodal Mobility Study Executive Summary

Broward County Urban Freight/Intermodal Mobility Study Executive Summary Broward County Urban Freight/Intermodal Mobility Study Executive Summary 2007/08 executive summary Urban Freight/Intermodal Mobility Study prepared for Broward MPO prepared by 110 East Broward Boulevard,

More information

LOCATION HYDRAULIC REPORT

LOCATION HYDRAULIC REPORT Draft LOCATION HYDRAULIC REPORT Florida Department of Transportation District One US 41 at Fruitville Road (CR 780) Intersection Improvements - PD&E STUDY Sarasota County, Florida Financial Project ID

More information

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 WELCOME IL 47 Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 MEETING PURPOSE MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Process/Schedule

More information

Environmental Setting

Environmental Setting Section 5.2 Environmental Justice This section describes the potential of the proposed changes to the approved project to result in disproportionately high and adverse health or environmental effects on

More information

Existing vs. Proposed Ramp Noise Sensitivity Analysis Austin Boulevard Interchange

Existing vs. Proposed Ramp Noise Sensitivity Analysis Austin Boulevard Interchange I-290 Phase I Study West of US 45 (Mannheim Road) to Racine Avenue Existing vs. Proposed Ramp Noise Sensitivity Analysis Austin Boulevard Interchange Technical Memorandum Prepared By: Huff & Huff, Inc.

More information

Construction Engineering and Inspection Services Pembroke Road from Dykes Road to Silver Shores Boulevard Broward County, FL

Construction Engineering and Inspection Services Pembroke Road from Dykes Road to Silver Shores Boulevard Broward County, FL Construction Engineering and Inspection Services to Silver Shores Boulevard Broward County, FL R L I N O. R 2 11 4 0 8 0 P 1 I. Experience and Qualifications with Roadway Construction a. Eisman & Russo

More information

Congestion Management Plan Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

Congestion Management Plan Update. Public Works and Infrastructure Committee. General Manager, Transportation Services PW1.4 STAFF REPORT ACTION REQUIRED Congestion Management Plan 2014-2018 Update Date: December 9, 2014 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation

More information

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1 PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road STAFFING MATRIX Construction Engineering and Inspection-Wiles Road JAMES JEFFERS, P.E. Senior Project Engineer Years of Experience:

More information

University of Virginia Master Planning Committee November 17 th Charlottesville Albemarle Metropolitan Planning Organization

University of Virginia Master Planning Committee November 17 th Charlottesville Albemarle Metropolitan Planning Organization University of Virginia Master Planning Committee November 17 th 2010 Charlottesville Albemarle Metropolitan Planning Organization 1 Who are we? What is an MPO A Metropolitan Planning Organization is a

More information

NOISE TECHNICAL MEMORANDUM. Inland Rail Trail Project Cities of San Marcos and Vista, San Diego County DISTRICT 11 SD CML 5381(003)

NOISE TECHNICAL MEMORANDUM. Inland Rail Trail Project Cities of San Marcos and Vista, San Diego County DISTRICT 11 SD CML 5381(003) NOISE TECHNICAL MEMORANDUM Inland Rail Trail Project Cities of San Marcos and Vista, San Diego County DISTRICT 11 SD CML 5381(003) Attention: Kevin Hovey, Environmental Branch Chief, Caltrans District

More information

PINELLAS COUNTY MOBILITY PLAN SUMMARY REPORT

PINELLAS COUNTY MOBILITY PLAN SUMMARY REPORT PINELLAS COUNTY MOBILITY PLAN SUMMARY REPORT In September, 2013, the Pinellas County Mobility Plan Report was approved by the Metropolitan Planning Organization (MPO). This action endorsed a countywide

More information

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION MAINTENANCE OF TRAFFIC NOTES 431606 - MOT Notes - Addendum 1.dwg; 10/22/15-3:25pm MAINTENANCE OF TRAFFIC MAINTENANCE OF TRAFFIC SEQUENCE: THESE PLANS ARE BASED ON THE FOLLOWING SUGGESTED SEQUENCE OF CONSTRUCTION.

More information

4.12 Public and Emergency Services

4.12 Public and Emergency Services 4.12 Public and Emergency Services Public services include schools, community centers, cemeteries, and social service providers. Emergency services include fire and police stations and services, hospitals,

More information

Dale Mabry Pedestrian Overpass Technical Feasibility Analysis. March 2017

Dale Mabry Pedestrian Overpass Technical Feasibility Analysis. March 2017 Dale Mabry Pedestrian Overpass Technical Feasibility Analysis March 2017 Overview Two Part Study: 1. Feasibility of Alternatives for a Pedestrian Overpass Across Dale Mabry Hwy Near I 275 2. Walk/Bike

More information

Final Air Quality Report

Final Air Quality Report Florida Department of Transportation - District VII County Line Road (C.R. 578) Project Development and Environment Study From U.S. 19 (S.R. 55) to U.S. 41 (S.R. 45) Work Program Item Segment Number: 257298

More information

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No. Palm Beach County, Florida Palm Beach Metropolitan Planning Organization April 217 Project Study Area LIMITS: SR 9/I-95: from S of 45th Street to N of 45th Street 45th Street: From Village Boulevard to

More information

Conceptual Design Report

Conceptual Design Report Conceptual Design Report I-244/Arkansas River Multimodal Bridge Tulsa, Oklahoma Prepared for the Oklahoma Department of Transportation Prepared by: August 2009 I-244 / ARKANSAS RIVER MULTIMODAL BRIDGE

More information

Revenues and expenditures increase based on the tax district increase due to increases in real estate assessments in CY 2016 compared to CY 2015.

Revenues and expenditures increase based on the tax district increase due to increases in real estate assessments in CY 2016 compared to CY 2015. CRYSTAL CITY, POTOMAC YARD, AND PENTAGON CITY TAX INCREMENT FINANCING AREA Our Mission: To provide a supplemental financial mechanism for the revitalization of Crystal City, Potomac Yard, and Pentagon

More information

Appendix F 2008 Travel Demand Modeling

Appendix F 2008 Travel Demand Modeling Appendix F 2008 Travel Demand Modeling TRAVEL DEMAND MODELING Purpose: The Jackson/Teton County Comprehensive Plan Update is revisiting land use and transportation planning policies to ensure they can

More information

I-95/US 322 Interchange Improvement Project. Website Update

I-95/US 322 Interchange Improvement Project. Website Update I-95/US 322 Interchange Improvement Project Website Update The following is an outline of the I-95/US 322 website showing the primary pages and then sub-pages within the primary pages. The outline indicates

More information

Alternatives Evaluation Methodology

Alternatives Evaluation Methodology Alternatives Evaluation Methodology www.vision54 56.com B 1 Phase 2 Alternatives Evaluation Methodology PASCO COUNTY METROPOLITAN PLANNING ORGANIZATION 8731 Citizens Drive New Port Richey, FL 34654 Ph

More information

Town of Moraga Canyon Road Bridge Replacement Project October 10, 2018 Town Council Presentation

Town of Moraga Canyon Road Bridge Replacement Project October 10, 2018 Town Council Presentation Town of Moraga Canyon Road Bridge Replacement Project October 10, 2018 Town Council Presentation OVERVIEW History of Events 2018 Bridge Redesign Construction Schedule 2 ACRONYMS AND TERMINOLOGY FHWA =

More information

Project Initiation Form

Project Initiation Form Meeting Date: The Project Initiation Form should be completed in conjunction with the Level 2 Screening Form. Process Leads and/or Planners should complete the Project Initiation Form to document coordination

More information

CITY OF MARIANNA MUNICIPAL DEVELOPMENT DEPARTMENT Post Office Box 936 Marianna, FL (850)

CITY OF MARIANNA MUNICIPAL DEVELOPMENT DEPARTMENT Post Office Box 936 Marianna, FL (850) CITY OF MARIANNA MUNICIPAL DEVELOPMENT DEPARTMENT Post Office Box 936 Marianna, FL 32447 (850) 482-2786 TRANSPORTATION CONCURRENCY ANALYSIS CITY OF MARIANNA CONCURRENCY MANAGEMENT SYSTEM (CMS) This form

More information

GUIDE FOR THE PREPARATION OF TRAFFIC IMPACT STUDIES

GUIDE FOR THE PREPARATION OF TRAFFIC IMPACT STUDIES GUIDE FOR THE PREPARATION OF TRAFFIC IMPACT STUDIES Adopted by Town Council on November 25, 2008 Prepared By: HNTB Engineering Department Planning Department TABLE OF CONTENTS I. INTRODUCTION... 1 II.

More information

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501 SR 874/Don Shula Expressway Ramp Connector Project Development & Environment (PD&E) Study PUBLIC HEARING December 8, 2011 MDX Contract #: RFP-09-04 MDX Work Program #: 87410.011 ETDM #: 11501 1 This Public

More information

Pensacola Bay Bridge Replacement Design Build. Industry Forum. Kerrie Harrell, P.E. District 3 Consultant Project Management Engineer

Pensacola Bay Bridge Replacement Design Build. Industry Forum. Kerrie Harrell, P.E. District 3 Consultant Project Management Engineer Pensacola Bay Bridge Replacement Design Build Industry Forum Kerrie Harrell, P.E. District 3 Consultant Project Management Engineer Project Location 2 GENERAL PROJECT INFORMATION Replacement of the structurally

More information

IH 30/IH 35E Reconstruction Project Pegasus Final Technical Memorandum - Evaluation of Conceptual Alternatives Task 7.5

IH 30/IH 35E Reconstruction Project Pegasus Final Technical Memorandum - Evaluation of Conceptual Alternatives Task 7.5 MEMO TO: Timothy Nesbitt, P.E. DATE: August 26, 2002 FROM: SUBJECT: Sandy Wesch-Schulze, P.E., AICP IH 30/IH 35E Reconstruction Project Pegasus Final Technical Memorandum - Evaluation of Conceptual Alternatives

More information

LONG ISLAND RAIL ROAD EXPANSION PROJECT FROM FLORAL PARK TO HICKSVILLE DRAFT ENVIRONMENTAL IMPACT STATEMENT

LONG ISLAND RAIL ROAD EXPANSION PROJECT FROM FLORAL PARK TO HICKSVILLE DRAFT ENVIRONMENTAL IMPACT STATEMENT LONG ISLAND RAIL ROAD EXPANSION PROJECT FROM FLORAL PARK TO HICKSVILLE DRAFT ENVIRONMENTAL IMPACT STATEMENT Project Name: Project Location: Lead Agency & Contact Person: SEQRA Classification: Project Sponsors:

More information

CITY OF DEERFIELD BEACH SCOPE OF WORK

CITY OF DEERFIELD BEACH SCOPE OF WORK CITY OF DEERFIELD BEACH SCOPE OF WORK Deliverable 1: Data Compilation and Map Preparation 1.1: Recipient shall prepare a compendium of existing data and information necessary to produce the Complete Streets

More information

Alternatives Assessment for the Quebec Street Improvements, Denver County

Alternatives Assessment for the Quebec Street Improvements, Denver County Memorandum To: Alan Eckman, AECOM Date: January 22, 2015 Company: Pinyon Environmental, Inc. Phone: 303.980.5200 From: Amy Kennedy Pinyon Project #: 1/13-507-01 Delivery Method: Email at Alan.Eckman@aecom.com

More information

Future Build Alternative Traffic Forecasts and Level of Service Analysis

Future Build Alternative Traffic Forecasts and Level of Service Analysis 4.2.10 Future Build Alternative Traffic Forecasts and Level of Service Analysis For the five Build Alternatives, study intersections within one mile of potential station locations were analyzed, as it

More information

GENERAL PLAN UPDATE. Joint Study Session April 13, 2017

GENERAL PLAN UPDATE. Joint Study Session April 13, 2017 GENERAL PLAN UPDATE Joint Study Session April 13, 2017 Interrelated Issues and Topics Property Owner Requests Mobility: Efficiency and Safety Land Use Plan (in the City) Light Rail/ Transit Jobs/ Housing

More information

INFORMATION REQUIRED FOR PROBABLE CATEGORICAL EXCLUSION (SECTION (d))

INFORMATION REQUIRED FOR PROBABLE CATEGORICAL EXCLUSION (SECTION (d)) Grant Applicant: Proposed Project: Date: August 03, 2010 Northern Virginia Transportation Commission, Arlington County Government, and Washington Metropolitan Area Transit Authority Crystal City/Potomac

More information

INTERCHANGE MODIFICATION REPORT

INTERCHANGE MODIFICATION REPORT INTERSTATE 75 AND STATE ROAD 884 (COLONIAL BOULEVARD) INTERCHANGE LEE COUNTY, FLORIDA INTERCHANGE MODIFICATION REPORT Prepared for: Florida Department of Transportation District One May 2017 Interchange

More information

4.11 TRANSPORTATION AND CIRCULATION

4.11 TRANSPORTATION AND CIRCULATION 4.11 TRANSPORTATION AND CIRCULATION 4.11.1 INTRODUCTION This section addresses the potential for the Proposed Project to impact traffic and circulation. Information in this section is summarized from the

More information

Exit 73 I-29 Interchange Modification Justification Study

Exit 73 I-29 Interchange Modification Justification Study xit 73 I-29 Interchange Modification Justification tudy Introduction Figure 1 shows the location of xit 73. This interchange is proposed to be the connecting point of the ast and West Corridors to I-29.

More information

6.2.2 Environmental Consequences and Mitigation Measures

6.2.2 Environmental Consequences and Mitigation Measures 6.2 6.2.1 Introduction The existing conditions, regulatory setting, and methods of analysis for transportation under CEQA are described in Chapter 3, NEPA and CEQA Analysis. Impacts that would result from

More information

2016/2017 Organizational Chart. Effective 7/1/2016 Budgeted 29 FTE Positions Budgeted 1 Part-Time Position Budgeted 4 Intern Positions

2016/2017 Organizational Chart. Effective 7/1/2016 Budgeted 29 FTE Positions Budgeted 1 Part-Time Position Budgeted 4 Intern Positions 2016/2017 Organizational Chart Effective 7/1/2016 ed 29 FTE Positions ed 1 Part-Time Position ed 4 Intern Positions Ricardo Sandoval Administrative Secretary (1) Transportation/Land Development Project

More information

Appendix O Level of Service Standard and Measurements

Appendix O Level of Service Standard and Measurements July 8, 2016 Appendix O. Appendix O Standard and Measurements Definition Level of service (LOS) is a mechanism used to determine how well a transportation facility is operating from a traveler s perspective.

More information

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives. 4 Goals & Objectives INTRODUCTION The 2015-2040 MTP preserves and promotes the quality of life and economic prosperity of the MAB by providing a transportation system consistent with the regional goals.

More information

3.12 TRANSPORTATION AND TRAFFIC

3.12 TRANSPORTATION AND TRAFFIC 3.12 TRANSPORTATION AND TRAFFIC This section summarizes the potential transportation and traffic impacts related to construction and operation of the proposed project. The section includes a review of

More information

NORTH I-75 MASTER PLAN Summary Report

NORTH I-75 MASTER PLAN Summary Report NORTH I-75 MASTER PLAN Summary Report Interstate 75 (SR 93) From the Florida s Turnpike Interchange to the I-10 Interchange Alachua, Bradford, Clay, Citrus, Columbia, Duval, Levy, Marion, and Sumter Counties,

More information

RE Request for FY 2018 UPWP Budget Adjustments

RE Request for FY 2018 UPWP Budget Adjustments November 30, 2017 William Eastin Southeast Georgia Branch Chief GDOT Office of Planning 600 W. Peachtree St. NW, 5th Floor Atlanta, GA 30308 RE Request for FY 2018 UPWP Budget Adjustments Dear Mr. Easton:

More information

APPENDIX Methodology Letter of Understanding (MLOU) and Agency Correspondence

APPENDIX Methodology Letter of Understanding (MLOU) and Agency Correspondence APPENDIX 21 1 Methodology Letter of Understanding (MLOU) and Agency Correspondence Question 21 Transportation This document reflects the transportation study methodology to be utilized in preparing responses

More information

Capital Investment Program CAPITAL BUDGET

Capital Investment Program CAPITAL BUDGET Capital Investment Program 2012-2014 CAPITAL BUDGET Table of Contents Page CAPITAL BUDGET FUNDING ALLOCATION 3 S Asset Management Projects Roadway Maintenance 4 Downtown ADA Ramp Upgrades 5 Storm Drain

More information

Subarea Mobility Enhancements. 5.1 Transit and Pedestrian Improvements

Subarea Mobility Enhancements. 5.1 Transit and Pedestrian Improvements Section Five Section 5: Subarea Mobility Enhancements 5.1 Transit and Pedestrian Improvements From the outset of the master planning process, one of the primary goals was to integrate transit and pedestrian-oriented

More information

TRANSPORTATION ELEMENT

TRANSPORTATION ELEMENT Goal 3.0. Establish and support within Broward County a complete public multimodal transportation system that provides, in a context sensitive fashion, safe, convenient and comfortable travel and access

More information

January 17, Ron Waldthausen Platte Valley LLC 1378 Promontory Bluff View Colorado Springs, CO 80921

January 17, Ron Waldthausen Platte Valley LLC 1378 Promontory Bluff View Colorado Springs, CO 80921 LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210 Colorado Springs, CO 80903 (719) 633 2868 FAX (719) 633 5430 E mail: lsc@lsctrans.com Website: http://www.lsctrans.com January

More information

Central Manatee Network Alternatives Analysis

Central Manatee Network Alternatives Analysis District One CMNAA Central Manatee Network Alternatives Analysis Central Manatee Network Alternatives Analysis The Florida Department of Transportation (FDOT) is conducting the Central Manatee Network

More information

ADMINISTRATIVE REPORT

ADMINISTRATIVE REPORT Item #1 Study Session ADMINISTRATIVE REPORT TO: CITY COUNCIL FROM: LARRY A. PATTERSON, CITY MANAGER PREPARED BY: PUBLIC WORKS DEPARTMENT MEETING DATE: AUGUST 18, 2014 SUBJECT: HILLSDALE/US101 PEDESTRIAN/BIKE

More information

Contra Costa Transportation Authority STAFF REPORT February 15, 2017 Page 2 of 3 Background MTC is expected to seek authorization from the State Legis

Contra Costa Transportation Authority STAFF REPORT February 15, 2017 Page 2 of 3 Background MTC is expected to seek authorization from the State Legis Contra Costa Transportation Authority STAFF REPORT Meeting Date: February 15, 2017 Subject Summary of Issues Regional Measure 3 (RM3) Candidate Projects for Submittal to the Metropolitan Transportation

More information

Hamilton Green. Draft Environmental Impact Statement (DEIS)

Hamilton Green. Draft Environmental Impact Statement (DEIS) Hamilton Green Draft Environmental Impact Statement (DEIS) June 2017 HAMILTON GREEN DRAFT ENVIRONMENTAL IMPACT STATEMENT (DEIS) June 14, 2017 Lead Agency: SEQRA Classification: City of White Plains Common

More information

I-10 KENDALL EXTENSION. Open House

I-10 KENDALL EXTENSION. Open House I-10 KENDALL EXTENSION Open House The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT

More information

FY CAPITAL IMPROVEMENT PROGRAM MID-YEAR STATUS REPORT

FY CAPITAL IMPROVEMENT PROGRAM MID-YEAR STATUS REPORT FY 15-20 CAPITAL IMPROVEMENT PROGRAM MID-YEAR STATUS REPORT Department of Public Works Robert B. Boxer, Director PROJECT MODEL PROFESSIONAL SERVICES STUDIES FEASIBILITY CLAIMS 1- PROJECT DEFINITION 2-

More information

Arterial Traffic Control: Advancing Mobility. 1980s, Now, and Beyond

Arterial Traffic Control: Advancing Mobility. 1980s, Now, and Beyond Arterial Traffic Control: Advancing Mobility 1980s, Now, and Beyond Broward MPO: Championing a Vision for Quality of Growth and Life Mobility Affects Quality Collaborative Planned Investment in Mobility

More information

CMNAA. Central Manatee Network Alternatives Analysis Alternatives Public Meeting CMNAA STUDY PROCESS. STUDY AREA 17th St. W

CMNAA. Central Manatee Network Alternatives Analysis Alternatives Public Meeting CMNAA STUDY PROCESS. STUDY AREA 17th St. W District One CMNAA Central Manatee Network Alternatives Analysis December 12, 2017 5:00 pm - 7:00 pm First Baptist Church 1306 Manatee Ave. W, Bradenton, FL 34205 Central Manatee Network Alternatives Analysis

More information

Environmental Consequences and Mitigation

Environmental Consequences and Mitigation Chapter 4 Environmental Consequences and Mitigation 4.1 Introduction This chapter provides a detailed description of the impacts (and indirect impacts where applicable) associated with the alternatives

More information

Nashville Regional Freight & Goods Movement Study Phase III

Nashville Regional Freight & Goods Movement Study Phase III Mayor Karl Dean, Chairman Nashville Regional Freight & Goods Movement Study Phase III Freight Advisory Committee Meeting #2 June 3 rd, 2015 Agenda Update on Freight Vision/Regional Truck Route Network

More information

City of Menifee. Public Works Department. Traffic Impact Analysis Guidelines

City of Menifee. Public Works Department. Traffic Impact Analysis Guidelines Public Works Department Traffic Impact Analysis Guidelines Revised: August 2015 TABLE OF CONTENTS INTRODUCTION... 3 PURPOSE... 3 EXEMPTIONS... 3 SCOPING... 4 METHODOLOGY... 5 STUDY AREA... 6 STUDY SCENARIOS...

More information

Attachment E. Logistics. Ridge Road Extension Alternatives Analysis

Attachment E. Logistics. Ridge Road Extension Alternatives Analysis Attachment E Logistics for: Ridge Road Extension Alternatives Analysis PREPARED FOR: Pasco County Engineering Services Department PREPARED BY: NV5, INC. 6989 E. FOWLER AVENUE TAMPA, FLORIDA 33617 April

More information

Coney Island/Gravesend Sustainable Development Transportation Study

Coney Island/Gravesend Sustainable Development Transportation Study Coney Island/Gravesend Sustainable Development Transportation Study NYMTC Brown Bag Presentation September 21, 2011 Commissioner Janette Sadik-Khan NYCDOT, Traffic Planning Introduction Study Background

More information

DIVISION I TRAFFIC IMPACT STUDY GUIDELINES ENGINEERING STANDARDS

DIVISION I TRAFFIC IMPACT STUDY GUIDELINES ENGINEERING STANDARDS CITY OF ALBANY DEPARTMENT OF PUBLIC WORKS DIVISION I TRAFFIC IMPACT STUDY GUIDELINES ENGINEERING STANDARDS Prepared By PUBLIC WORKS DEPARTMENT ALBANY, OREGON 97321 Telephone: (541) 917-7676 TABLE OF CONTENTS

More information

Chapter 4 Construction Effects and Mitigation

Chapter 4 Construction Effects and Mitigation Chapter 4 Construction Effects and Mitigation This chapter discusses the direct and indirect s of project related construction on the elements of the built and natural environments. Direct s are s caused

More information

Utilizing Transportation Data for Low Cost Safety Improvements

Utilizing Transportation Data for Low Cost Safety Improvements Utilizing Transportation Data for Low Cost Safety Improvements Samuel Sturtz Transportation Planner Iowa Department of Transportation samuel.sturtz@dot.iowa.gov Photo Credits: Ken West- Kenneth G. West

More information

Report Summary Functional Plan for Whitehorse Corridor Alaska Highway

Report Summary Functional Plan for Whitehorse Corridor Alaska Highway Report Summary Functional Plan for Whitehorse Corridor Alaska Highway Prepared for Government of Yukon, Highways and Public Works February 2015 Contents Section Page Background... 1 Existing Conditions

More information

SERPM8.0 TRAVEL DEMAND MODEL UPDATE DATA AVAILABILITY AND NEEDS

SERPM8.0 TRAVEL DEMAND MODEL UPDATE DATA AVAILABILITY AND NEEDS SERPM8.0 TRAVEL DEMAND MODEL UPDATE DATA AVAILABILITY AND NEEDS UPDATED JANUARY 18 2017 UPDATES IN RED DATA ITEM DESCRIPTION/COMMENTS AGENCY/DETAILS/TIMING DATA STATUS A1 A2 Geographies for development

More information

PROPOSED CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) TRANSPORTATION SECTION UPDATE

PROPOSED CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) TRANSPORTATION SECTION UPDATE DRAFT DOCUMENT CITY OF LOS ANGELES PROPOSED CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) TRANSPORTATION SECTION UPDATE Prepared by: Departments of City Planning (DCP) and (LADOT) 3.xx 1 DRAFT 2018 LOS ANGELES

More information

FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07

FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07 TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07 SUBJECT: APPROVAL OF A CONTRACT WITH BOND BLACKTOP, INC., IN THE AMOUNT OF $556,812 FOR PHASE 1 AND

More information

Tangerine Road Dove Mountain Boulevard to La Cañada Drive

Tangerine Road Dove Mountain Boulevard to La Cañada Drive Tangerine Road Dove Mountain Boulevard to La Cañada Drive PUBLIC MEETING The Highlands at Dove Mountain November 19, 2015 PRESENTATION OUTLINE 1. Tangerine Road Corridor in Review Project Need Project

More information

LAS VEGAS STREET RAILROAD CROSSING RR/PUC CONNECTION AND PRELIMINARY DESIGN

LAS VEGAS STREET RAILROAD CROSSING RR/PUC CONNECTION AND PRELIMINARY DESIGN LAS VEGAS STREET RAILROAD CROSSING RR/PUC CONNECTION AND PRELIMINARY DESIGN Prepared for: City of Colorado Springs Prepared by: Felsburg Holt & Ullevig 508 South Tejon Street Colorado Springs, CO 80903

More information

Engineering & Construction Services Division Standard Drawings for Road Works. T No. Revision T No. Revision Remarks All T- drawings

Engineering & Construction Services Division Standard Drawings for Road Works. T No. Revision T No. Revision Remarks All T- drawings Engineering & Construction Services Division Standard Drawings for Road Works Revision No. 9 November 4 All T- drawings New title block for each drawing is now standardized. Revision numbers now added

More information

FINAL PROJECT PRIORITIZATION PLAN FOR THE NM 599 CORRIDOR

FINAL PROJECT PRIORITIZATION PLAN FOR THE NM 599 CORRIDOR FINAL PROJECT PRIORITIZATION PLAN FOR THE NM 599 CORRIDOR PROJECT NO. WIP-599-1(102) CONTROL NO. D5SF2 APRIL 2010 Prepared for: New Mexico Department of Transportation Northern Design Bureau P.O. Box 1149

More information

Jacksonville Urban Area Metropolitan Planning Organization LONG RANGE TRANSPORTATION PLAN. Draft

Jacksonville Urban Area Metropolitan Planning Organization LONG RANGE TRANSPORTATION PLAN. Draft 2 0 4 0 Jacksonville Urban Area Metropolitan Planning Organization LONG RANGE TRANSPORTATION PLAN Draft 2040 Long Range Transportation Plan Amendment 1 DRAFT January 2018 Background The JUMPO 2040 LRTP

More information

CHAPTER 8 TRANSPORTATION ELEMENT

CHAPTER 8 TRANSPORTATION ELEMENT CHAPTER 8 TRANSPORTATION ELEMENT Section 8.01 Purpose: The purpose of this Chapter (element) is to establish the desired and projected transportation system within Niceville and to plan for future motorized

More information

Chapter 2 Transportation Element Goals, Objectives and Policies

Chapter 2 Transportation Element Goals, Objectives and Policies Chapter 2 Transportation Element Goals, Objectives and Policies City of Belleview Comprehensive Plan Adopted by Ord 2016-10 on July 5, 2016 GOALS, OBJECTIVES AND POLICIES Goal 2 Transportation...1 Objective

More information

Section 11: Transportation Strategies Toolbox

Section 11: Transportation Strategies Toolbox Section 11: Transportation Strategies Toolbox A transportation strategies toolbox was developed to provide a systematic approach to identify potential strategies that address corridor transportation needs.

More information

Executive Summary. How to Use this Document

Executive Summary. How to Use this Document How to Use this Document In the Final Environmental Impact Statement (EIS) and this Executive Summary: Text from the Draft EIS that remains substantially unchanged, including minor edits such as correction

More information

Traffic Engineering Projects. Ashley Golden, Development Services Director Jason Samonte, Traffic Engineer

Traffic Engineering Projects. Ashley Golden, Development Services Director Jason Samonte, Traffic Engineer Traffic Engineering Projects Ashley Golden, Development Services Director Jason Samonte, Traffic Engineer City 1 Council Meeting, May 10, 2016 Overview Projects: Intelligent Transportation System (ITS)

More information

City of San Angelo, Texas Capital Improvements Program. 50th Street Extension

City of San Angelo, Texas Capital Improvements Program. 50th Street Extension 50th Street Extension Responsible Division: Public Works / Engineering Services Project Manager: Clinton Bailey Years 280,000 2,000,000 11/12 Future - 2,280,000 Extension of 50th Street from Travis Street

More information