TIRUCHIRAPALLI QUESTION WITH ANSWERS

Size: px
Start display at page:

Download "TIRUCHIRAPALLI QUESTION WITH ANSWERS"

Transcription

1 MAHALAKSMI ENGINEERINGCOLLEGE TIRUCHIRAPALLI QUESTION WITH ANSWERS DEPARTMENT: CIVIL IV SUB.CODE/ NAME: CE 2033 / Ground Improvement Techniques SEMESTER:VII Unit II - DRAINAGE AND DEWATERING Part A 1. Define dewatering? Dewatering or construction dewatering are terms used to describe the action of removing groundwater or surface water from a construction site. Normally dewatering process is done by pumping or evaporation and is usually done before excavation for footings or to lower water table that might be causing problems during excavations. Dewatering can also be known as the process of removing water from soil by wet classification. 2. What is the need for drainage and dewatering? To provide suitable working surface of the bottom of the excavation. To stabilize the banks of the excavation thus avoiding the hazards of slides and sloughing. To prevent disturbance of the soil at the bottom of excavation caused by boils or piping. Such disturbances may reduce the bearing power of the soil. Lowering the water table can also be utilized to increase the effective weight of the soil and consolidate the soil layers. Reducing lateral loads on sheeting and bracing is another way of use. 3. What are the various methods of dewatering? Surface water control like ditches, training walls, embankments. Simple methods of diverting surface water, open excavations. Simple pumping equipment. Gravity drainage.relatively impermeable soils. Open excavations especially on sloping sites. Simple pumping equipment. Sump pumping Wellpoint systems with suction pumps. Shallow (bored) wells with pumps. Deep (bored) wells with pumps. Eductor system 8. Drainage galleries. Removal of large quantities of water for dam abutments, cutoffs, landslides etc. Large quantities of water can be drained into gallery (small diameter tunnel) and disposed of by conventional large scale pumps. 9. Electro-osmosis. Used in low permeability soils (silts, silty clays, some peats) when no other method is suitable. Direct current electricity is applied from anodes (steel rods) to cathodes (well-points, i.e. small diameter filter wells) 4. How are sumps and ditches used in dewatering? A sump is merely a hole in the ground from which water is being pumped for the purpose

2 of removing water from the adjoining area.they are used with ditches leading to them in large excavations. Up to maximum of 8m below pump installation level; for greater depths a submersible pump is required. 5. What are the advantages of sumps and ditches in dewatering? It is the most widely used and economical of all methods of ground water lowering. This method is also more appropriate in situations where boulders or other massive obstructions are met in the ground. 6. What is a well point system? This type of dewatering system is effective in soils constituted primarily of sand fraction or other soil containing seams of such materials. In gravels spacing required may be too close and impracticable. In clays it is also not used because it is too slow. 7. What are the different types of well point systems? single stage well point multistage well point well points in braced excavations deep well drainage 8. When are deep wells used for dewatering? (AUC NOV /DEC 2012) Deep well systems are of use in gravels to silty fine sands and in water bearing rocks. They are priority or use with deep excavations and where artesian water is present below an impermeable stratum. If this type of installation is to be designed economically the ground permeability must be assessed from full scale pumping tests. 9. What is the principle behind vacuum dewatering? Gravity methods, such as well points and deep wells are not much effective in the finegrained soils with permeability in the range of x 10-3 mm/s. Such soils can be dewatered satisfactorily by applying a vacuum to the piping system 10. What is electro-osmotic dewatering? When an external electro motive force is applied across a soild liquid interface the movable diffuse double layer is displaced tangentially with respect to the fixed layer. this is electro osmosis. As the surface of fine grained soil particles causes negative charge, the positive ions in solution are attracted towards the soil particles and concentrate near the surfaces 11. What are the various types of drains? open drains closed drains horizontal drains foundation drains blanket drains interceptor drains 12. Define permeability and seepage. Permeability of soil its capacity to transmit a fluid to pass through its interconnected void spaces. K = v/i V= the discharge velocity I = hydraulic gradient Water flows through the voids in a soil which are interconnected. This flow may be called seepage, since the velocities are very small. 13. What are the requirements of drains should be satisfy. (AUC NOV /DEC 2010) Sand drains consist of a column of pervious sand placed in a cased hole, either driven or drilled through the soil, with the casing subsequently removed. The ca-pacity of sand drains can be significantly increased by installation of a slotted 1% or 2-inch pipe inside the sand drain to conduct the water down to the more per-vious stratum.

3 14. Define sensitive clay (AUC NOV /DEC 2010) Clay whose shear strength is decreased to a fraction of its former value on remolding at constant moisture content. 15. How the dewatering carried out for the construction of the bored tunnel. (AUC MAY/JUNE 2013) Groundwater Engineering provides complete dewatering solutions: Design of dewatering systems Well drilling and installation Pumping tests Equipment sales and rental Monitoring systems On-site operation and maintenance 16. What are the problems occurred to seepage of water (AUC MAY/JUNE 2012) Common causes of water seepage : 1. Leakage in the drainage pipes of the upper, adjacent or your own flat. 2. Leakage in the water supply pipes of the upper, adjacent or your own flat. 3. Deteriorated waterproofing of floor slabs or bath-tub seals. 4. Seepage of waste water or rain water through roof / external wall 17. State the advantages and disadvantages of dewatering. (AUC NOV /DEC 2012) ADVANTAGES Reduces the amount of sediment leaving the site Allows for a more in-depth site assessment additional necessary erosion control measures may be identified DISADVANTAGES o Must abide by multiple government laws and standards and obtain appropriate permits o Requires frequent maintenance o May be costly 18. Define Cutoffs. Cutoff curtains can be used to stop or minimize seepage into an excavation where the cutoff can be installed down to an impervious formation. Such cutoffs can be constructed by driving steel sheet piling, grouting existing soil with cement or chemical grout, excavating by means of a slurry trench and backfilling with a plastic mix of betonies and soil, in-stalling a concrete wall, possibly consisting of overlap-ping shafts, or freezing. 19. what are the types of drainage? Land Drainage: This is large scale drainage where the objective is to drain surplus water from a large area by such means as excavating large open drains, erecting dykes and levees and pumping. Such schemes are necessary in low lying areas and are mainly Civil Engineering work ii) Field Drainage This is the drainage that concerns us in agriculture. It is the removal of excess water fromthe root zone of crops. 20. State electro osmotic consolidation Due to the applied electric potential the electrolysis of water occurs at the electrodes 2H2O -> O2 (g) + 4H+ +4e- oxidation (anode) 4H2O + 4e- -> 2H2 (g) + 4OH- reduction (cathode) The clay particles have a â œve charge. These â œve charge produce an electro static surface property known as the double layer which creates a net abundance of cations

4 Part B 1. Explain in detail with a neat sketch the method of dewatering using sumps and ditches stating its advantages and disadvantages. (Or) How the dewatering is carried out during the construction in detail (AUC NOV /DEC 2010)(AUC MAY/JUNE 2012) (AUC MAY/JUNE 2013).Sumps and sump pumping: A sump is merely a hole in the ground from which water is being pumped for the purpose of removing water from the adjoining area (Fig 9.1). They are used with ditches leading to them in large excavations. Up to maximum of 8m below pump installation level; for greater depths a submersible pump is required. Shallow slopes may be required for unsupported excavations in silts and fine sands. Gravels and coarse sands are more suitable. Fines may be easily removed from ground and soils containing large percent of fines are not suitable. If there are existing foundations in the vicinity pumping may cause settlement of these foundations. Subsidence of adjacent ground and sloughing of the lower part of a slope (sloped pits) may occur. The sump should be preferably lined with a filter material which has grain size gradations in compatible with the filter rules. prolonged pumping the sump should be prepared by first driving sheeting around the sump area for the full depth of the sump and installing a cage inside the sump made of wire mesh with internal strutting or a perforating pipe filling the filter material in the space outside the cage and at the bottom of the cage and withdrawing the sheeting. Two simple sumping details are shown in Figures 2 and 3. For

5 OPEN SUMPS AND DICTHES: The essential feature of this method is a sump below the ground level of the excavation at one or more corners or sides.. a small ditch is cut around the bottom of the excavation, falling towards the sump. It is the most widely used and economical of all methods of ground water lowering. This method is also more appropriate in situations where boulders or other massive obstructions are met with the ground. There is also a disadvantage that the groundwater flows towards the excavation with a high head or a steep slope and hence there is a risk of collapse of the sides. 2. Explain in detail the well point system of dewatering. (AUC MAY/JUNE 2013).WellPoint systems A wellpoint is cm diameter metal or plastic pipe 60 cm 120 cm long which is perforated and covered with a screen. The lower end of the pipe has a driving head with water holes for jetting (Fig 9.4.a,b). Wellpoints are connected to cm diameter pipes known as riser pipes and are inserted into the ground by driving or jetting. The upper ends of the riser pipes lead to a header pipe which, in turn, connected to a pump. The ground water is drawn by the pump into the wellpoints through the header pipe and discharged (Fig 9.5). The wellpoints are usually installed with 0.75m 3m spacing (See Table 1). This type of dewatering system is effective in soils constituted primarily of sand fraction or other soil containing seams of such materials. In gravels spacing required may be too close and impracticable. In clays it is also not used because it is too slow. In silts and silt clay mixtures the use of well points are aided by upper (0.60m 0.90m long) compacted clay seals and sand-filtered boreholes (20cm 60cm diameter). Upper clay seals help to maintain higher suction (vacuum) pressures and sand filters increase the amount of

6 discharge. 9.6.a,b,c,d,e) Filtered boreholes are also functional in layered soil profiles (Figures

7 9-5

8 Table 9.1 Typical spacings for some common soil types and the approximate time required for effective drawdown Soil Typical Spacing (m) Time (days) Silty sand (Could be longer) Clean fine to coarse sand and sandy gravel Fine to coarse gravel The header pipe (15-30 cm diameter, connecting all wellpoints) is connected to a vacuum (Suction assisted self priming centrifugal or piston) pump. The wellpoints can lower a water level to a maximum of 5.5 m below the centerline of the header pipe. In silty fine sands this limit is 3-4 m. Multiple stage system of wellpoints are used for lowering water level to a greater depth. Two or more tiers (stages) are used. (Fig 9.7). More pumps are needed and due to the berms required the excavation width becomes wider. A single wellpoint handles between 4 and 0.6 m 3 /hr depending on soil type. For a 120 m length (40 at 3 m centers) flow is therefore between 160 and 24 m 3 /hr. Nomograms for selecting preliminary wellpoint spacing in clean uniform sand and gravel, and stratified clean sand and gravel are shown in Figures 9.8 and 9.9.

9 9-7

10 Horizontal wellpoints are used mainly for pipeline water. They consist of perforated pipes laid horizontally in a trench and connected to a suitable pump. Shallow Wells Shallow wells comprise surface pumps which draw water through suction pipes installed in bored wells drilled by the most appropriate well drilling and or bored piling equipment. The limiting depth to which this method is employed is about 8 m. Because wells are prebored, this method is used when hard or variable soil conditions preclude the use of a wellpoint system. These wells are used in very permeable soils when wellpointing would be expensive and often at inconveniently close centers. The shallow well can be used to extract large quantities of water from a single hole. On congested sites use of smaller number dewatering points is preferred (no hiderance to construction operations) hence shallow wells may be preferred to wellpoints. Since the initial cost of installation is more compared to wellpoints it is preferred in cases where dewatering lasts several months or more. application is the silty soils where correct filtering is important. Another field of 3. What is a deep well? When is it adopted? What are its merits and demerits? (AUC NOV /DEC 2010) (AUC MAY/JUNE 2013) Deep Wells When water has to be extracted from depths greater than 8 m and it is not feasible to lower the type of pump and suction piping used in shallow wells to gain a few extra meters of depth the deep wells are such and submersible pumps installed within them. A cased borehole can be sunk using well drilling or bored piling rigs to a depth lower than the required dewatered level. The diameter will be mm larger then the well inner casing, which in turn is sized to accept the submersible pump. The inner well casing has a perforated screen over the depth requiring dewatering and terminates below in 1 m of unperforated pipe which may serve as a sump for any material which passes the filter. After the slotted PVC or metal well screen (casing) has been installed it is surrounded by backfill over the unperforated pipe length and with graded filter material over the perforated length as the outer casing progressively withdrawn (Fig 9.10). As with the shallow wells the initial pumping may involve twice the volumes when equilibrium is achieved.

11 Deep well systems are of use in gravels to silty fine sands and in water bearing rocks. They are priority or use with deep excavations and where artesian water is present below an impermeable stratum. If this type of installation is to be designed economically the ground permeability must be assessed from full scale pumping tests. Because of their depth and the usually longer pumping period these installations are more likely to cause settlement of nearby structures, and the use of recharge methods may have to be considered. 4. Explain in brief the principle, equipment used, installation and operation and precaution adopted in electro-osmotic dewatering. (AUC NOV /DEC 2012) Dewatering by electro osmosis When an external electro motive force is applied across a soild liquid interface the movable diffuse double layer is displaced tangentially with respect to the fixed layer. this is electro osmosis. As the surface of fine grained soil particles causes negative charge, the positive ions in solution are attracted towards the soil particles and concentrate near the surfaces. Upon application of the electro motive force between two electrodes in a soil medium the positive ions adjacent to the soil particles and the water molecules attached to the ions are attracted to the cathode and are repelled by the anode. The free water in the interior of the void spaces is carried along to the cathode by viscous flow. By making the cathode a well, water can be collected in the well and then pumped out.

12 EFFECT OF ELECTRO OSMOTIC TECHINQUE IN CONSOLIDATION OF SOIL full report EFFECT OF ELECTRO OSMOTIC TECHINQUE IN CONSOLIDATION OF SOIL INTRODUCTION Electro osmotic consolidation means the consolidation of soft clays by the application of electric current. It was studied and applied for the first time by Casagrande. It is inherent that fine grained clay particles with large interfacial surface will consolidate and generate significant settlement when loaded. The settlement creates problem in the foundation engineering. Electro osmosis was originally developed as a means of dewatering fine grained soils for the consolidation and strengthening of soft saturated clayey soils. Electro osmotic dewatering essentially involves applying a small electric potential across the sediment layer. It is the process where in positively charged ions move from anode to cathode. ie. Water moves from anode to cathode where it can be collected and pumped out of soil Electro osmotic flow depends on soil nature, water content, ph and on ionic type concentration in the pore water. ELECTRO OSMOTIC CONSOLIDATION Due to the applied electric potential the electrolysis of water occurs at the electrodes 2H2O -> O2 (g) + 4H+ +4e- oxidation (anode) 4H2O + 4e- -> 2H2 (g) + 4OH- reduction (cathode) The clay particles have a â œve charge. These â œve charge produce an electro static surface property known as the double layer which creates a net abundance of cations

13 in pore space. Electro osmotic transfer of water through a clay is a result of diffuse double layer cations in the clay pores being attracted to a negatively charged electrode or cathode. When electrodes are placed across a saturated clay mass and direct current is applied,water in the clay pore space is transported towards cathode by electro osmosis. In addition frictional drag is created by the motion of ions as they move through the clay pores helping to transport additional water. The flow generated by the electric gradient is called electro osmotic flow. EVALUATION OF ELECTRO OSMOTIC CONSOLIDATION Determination of parameters Electrical operation systems for field application Materials Spacing between electrodes Cost of electrodes and installation cost CASE STUDY 1 ELECTRO OSMOTIC DEWATERING OF DREDGED SEDIMENTS :- BENCH SACLE INVESTIGATION AT INDIANA HARBOUR (USA) The Indiana Harbour has not been dredged for over 20 years due to lack of an acceptable disposal site It resulting in the accumulation of large amount of highly contaminated sediments The main problem with the disposal of sediment to the CDP was slow consolidation of sediment due to its very high water content. This study investigated the feasibility of using an electro osmotic dewatering technology to accelerate dewatering and consolidation of the sediment there by allowing more rapid disposal of sediment in to the CDP. MATERIAL (SOIL SAMPLE) Samples were obtained by dredging from the Indiana Harbour.The sediments were tested for water content, optimum moisture content and ph CASE STUDY 2 EFFECT OF USING ELECTRO CONDUCTIVE PVD IN THE CONSOLIDATION OF RECONSTITUTED ARIAKE CLAY

14 The deposits of Ariake clay consolidate generate significant settlement when loaded which causes problems in foundation engineering. The low permeability of clay results in longer duration to achieve primary consolidation. To shorten the consolidation time vertical drains are installed to shorten the drainage path. The induced consolidation of reconstituted Ariake clay was conducted using electro conductive PVD as electrodes and the results were compared with an ordinary PVD MATERIAL (SOIL SAMPLE) The soil sample used was leached marine Ariake clay collected at Saga Plain in Saga Japan. The sample excavated at about 2m depth was generally a very soft gray silty clay (about 66% clay, 26% silt, 8% fine sand) with natural water content of about 110% ⠜ 120% ADVANTAGES The consolidation period can be reduced by electro osmotic consolidation technique. The process is very efficient in low permeability clays in which the electro osmotic permeability is greater than the hydraulic permeability. Electro osmotic permeability was 200 to 1000 times greater than the hydraulic permeability. This method is suitable for local application on small volumes or for impermeable barrier construction. After treatment water content decreases and shear strength increases and it was more than what was expected just from dewatering. DISADVANTAGES The ph of soil will increase to as high as 11 or 12 at the cathode and decrease to almost 2 at the cathode. Metal anodes will corrode. The applied voltage and electric current generates heating. The heating effect increases power consumption. CONCLUSION Dewatering of sediment can be enhanced by the electro osmosis induced by the

15 application of an electric potential Incorporating electro kinetic item in the properties of PVD is very useful in dewatering highly compressible and low permeability clay Faster rate of settlement was achieved using electro conductive drains Significant rate of increase in strength of EO-treated soils was achieved as a consequence of decrease in water content formation of menisci in the soil voids and bonding of soil particles by insoluble chemical precipitates as a result of the complex chemical reactions generated and ion re-exchange which altered the plasticity of clay. Application of electric potential will result in energy consumption. 5. What are the various components, stages and methods of drainage? Explain in detail. Drainage means the removal of excess water from a given place. Two types of drainage can be identified: i) Land Drainage: This is large scale drainage where the objective is to drain surplus water from a large area by such means as excavating large open drains, erecting dykes and levees and pumping. Such schemes are necessary in low lying areas and are mainly Civil Engineering work ii) Field Drainage This is the drainage that concerns us in agriculture. It is the removal of excess water fromthe root zone of crops.

16 Water in Soil After Heavy Rain The main aims of Field drainage include: To bring soil moisture down from saturation to field capacity. At field capacity, air is available to the soil and most soils are mesophites ie. like to grow at moisture less than saturation. ii) Drainage helps improve hydraulic conductivity: Soil structure can collapse under very wet conditions and so also engineering structures. iii) In some areas with salt disposition, especially in arid regions, drainage is used to leach excess salt. iv) In irrigated areas, drainage is needed due to poor application efficiency which means that a lot of water is applied. v) Drainage can shorten the number of occasions when cultivation is held up waiting for soil to dry out. Two types of drainage exist: Surface and Sub-surface drainage. DESIGN OF SURFACE DRAINAGE SYSTEMS: Surface drainage involves the removal of excess water from the surface of the soil. This is done by removing low spots where water accumulates by land forming or by excavating ditches or a combination of the two. Surface Drainage

17 Land forming is mechanically changing the land surface to drain surface water. This is done by smoothing, grading, bedding or leveling. Land smoothing is the shaping of the land to a smooth surface in order to eliminate minor differences in elevation and this is accomplished by filling shallow depressions. There is no change in land contour. Smoothing is done using land levelers or planes Land grading is shaping the land for drainage done by cutting, filling and smoothening to planned continuous surface grade e.g. using bulldozers or scrapers. Design of Drainage Channels or Ditches Estimation of Peak Flows: This can be done using the Rational formula, Cook's method, Curve Number method, Soil Conservation Service method etc. Drainage coefficients (to be treated later) are at times used in the tropics used in the tropics especially in flat areas and where peak storm runoff would require excessively large channels and culverts. This may not apply locally because of high slopes. The Rational FormulaIt states that: qp = (CIA)/360 where qp is the peak flow (m 3 /s); C is dimensionless runoff coefficient; I is the rainfall intensity for a given return period. Return period is the average number of years within which a given rainfall event will be expected to occur at least once. A is the area of catchment (ha). Using the Rational Method Obtain area of catchment by surveying or from maps or aerial photographs. ii) Estimate intensity using the curve in Hudson's Field Engineering, page 42. iii) The runoff coefficient C is a measure of the rain which becomes runoff. On a corrugated iron roof, almost all the rain would runoff so C = 1, while in a well drained soil, nine-tenths of the rain may soak in and so C = The table (see handout) from Hudson's Field Engineering can be used to obtain C value. Where the catchment has several different kinds of characteristics, the different values should be combined in proportion to the area of each. b) Cook's Method

18 Three factors are considered: Vegetation, Soil permeability and Slope. These are the catchment characteristics. For each catchment, these are assessed and compared with Table 3.4 of Hudson's Field Engineering A catchment may be heavy grass (10) on shallow soils with impeded drainage(30) and moderate slope(10). Catchment characteristics (CC) is then the sum of the three ie. 50. The area of the catchment is then measured, and using the Area, A and the CC, the maximum runoff can be read from Table 3.5 (Field Engineering, pp. 45). Surface Drainage Channels The drainage channels are normally designed using the Manning formula (see Chapter 6). The required capacity of a drainage channel is calculated from the summation of the inflowing streams (See Note) The bed level of an open drain collecting flow from field pipe drains should be such as to allow free fall from the pipe drain outlets under maximum flow conditions, with an allowance for siltation and weed growth. 300 mm is a reasonable general figure Surface Ditch Arrangements The ditch arrangement can be random, parallel or cross- slope. Random ditch system: Used where only scattered wet lands require drainage. Parallel ditch system: Used in flat topography. Ditches are parallel and perpendicular to the slope. Laterals, which run in the direction of the flow, collect water from ditches. DESIGN OF SUB-SURFACE DRAINAGE SYSTEMS Sub-surface drainage is the removal of excess groundwater below the soil surface. It aims at increasing the rate at which water will drain from the soil, and so lowering the water table, thus increasing the depth of drier soil above the water table. Sub-surface drainage can be done by open ditches or buried drains.

19 Sub-Surface Drainage Using Ditches Sub-Surface Drainage Using Ditches Ditches have lower initial cost than buried drains; There is ease of inspection and ditches are applicable in some organic soils where drains are unsuitable. Ditches, however, reduce the land available for cropping and require more maintenance that drains due to weed growth and erosion. Sub-Surface Drains Using Buried DrainsSub-Surface Drainage Using Buried DrainsBuried drains refer to any type of buried conduits having open joints or perforations, which collect and convey drainage water. They can be fabricated from clay, concrete, corrugated plastic tubes or any other suitable material. The drains can be arranged in a parallel, herringbone, double main or random fashion. Sub-Surface Drainage Designs The Major Considerations in Sub-surface Drainage Design Include: Drainage Coefficient; Drain Depth and Spacing; Drain Diameters and Gradient; Drainage Filters. Drainage Coefficient This is the rate of water removal used in drainage design to obtain the desired protection of crops from excess surface or sub-surface water and can be expressed in mm/day, m/day etc. Drainage is different in Rain-Fed Areas and Irrigated Areas

20 6. Compare the various dewatering systems suitability, uses, merits and demerits. 1. Open sump ditches 2. Well point systems Deep well systems with answers. 7. Explain in brief the various steps for designing a dewatering system. (AUC NOV /DEC 2010) Objectives In this section you will learn the following Subsoil investigation Source And Water Table Details Distance of well points from the source of seepage Effective Wall Radius r u Discharge computations Design steps for dewatering systems Design of a dewatering system requires the determination of the number, size, spacing, and penetration of wells or well points and the rate at which water must be removed from the pervious strata to achieve the required groundwater lowering or pressure relief. The size and capacity of pumps and collectors also depend on the required discharge and drawdown. The essential steps involved in the designing of the dewatering system are given below: Subsoil investigation The characteristics of the soils adjacent and beneath the excavation should be investigated well. Grain size distribution and permeability are the two parameters to be determined. Indian Standard recommends a field pumping test for this case. Source And Water Table Details Source of seepage and knowledge of the water table at a particular site are the most important factors to be considered while designing a dewatering system. The source of seepage depends on the geological features of the area, nearby streams or water bodies and amount of drawdown. A flow may be from an aquifer being drained the distance to which is known as the radius of influence. It can be estimated from the draw down curve established from a field pumping test. Distance of well points from the source of seepage - If the radius of influence R is large compared to the radius of the well, only an approximate estimation of R may be sufficient since the discharge is not much sensitive to the value of R - An accurate estimation of the distance L from the well to the river should be made for a particular dewatering system, since the discharge is inversely proportional to the value of L. Effective Wall Radius r u The effective wall radius is decided based on the installation of the wells with or without filter. If a well is installed without gravel or a sand filter the effective radius can be taken as one half the outer diameter of the well screen. If a filter is used, the well radius is taken as one half the outside diameter of the filter. Discharge computation The discharge Q of the well is then calculated using the formula given below:

21 where Q is the discharge, k is the permeability, H is the depth of strata, h is the height of water in the well, r is the radius of well, R is the radius of influence. 8. Explain the vacuum dewatering systems in neat sketch. (AUC NOV /DEC 2010) Gravity methods, such as well points and deep wells are not much effective in the fine-grained soils with permeability in the range of x 10-3 mm/s. Such soils can be dewatered satisfactorily by applying a vacuum to the piping system. A vacuum dewatering system requires that the well-point screens, and rise a pipe be surrounded with filter sand extending to within a few metres of the ground surface This method is most suitable in layered or stratified soils with coefficient of permeability of the range x 10-4 cm/s. A typical vacuum dewatering system in a stratified is shown in fig. In this system the well points should be placed closer than the conventional system. it is common to use suction pump in the system and practical maximum height off lift is about 3 to 6m.

22 9. Explain the properties and application of flow net in detai. (AUC MAY/JUNE 2013)\ Flow of Water in Soil Permeability and Seepage Water flows through the voids in a soil which are interconnected. This flow may be called seepage, since the velocities are very small Water flows from a higher energy to a lower energy and behaves according to the principles of fluid mechanics An Energy Equation from Fluid Mechanics An Energy Equation for Water Flow in Soils The velocities of water flowing through the voids in a soil are very small, and the velocity head in the previous equation may be neglected. Therefore, for flow of water in soil the equation is:

23 Calculation of Heads Basic Principles Total Head = Pressure Head + Elevation Head The pressure head is zero at a water surface. The head loss in the water is assumed to be zero. All head loss occurs in the soil Elevation, pressure and total head Pore pressure at a given point (e.g. point A in the diagram) can be measured by the height of water in a standpipe located at that point. The height of the water column is the pressure head (hw) hw = u w or hw = P w The elevation head (hz) of a point is its height above the datum line. The height above the datum of the water level in the standpipe is the total head (h). h = hz + hw Energy Loss Equation Water is flowing in the direction indicated in the figure. Energy Loss Equation

24 Darcy's law The rate of flow of water q (volume/time) through cross sectional area A is found to be proportional to hydraulic gradient i according to Darcy's law:

25 Darcy's law v = q = k.ii = Dh Ads q=va The value of the coefficient of permeability k depends on the average size of the pores and is related to the distribution of particle sizes, particle shape and soil structure. Coefficient of Permeability The notation for coefficient of permeability is k. It is sometimes called hydraulic conductivity. Typical Values

26 10. Define filter and discuss filter requirements in detail. (AUC NOV /DEC 2012)

Ground Improvement Techniques

Ground Improvement Techniques GRD Journals Global Research and Development Journal for Engineering Recent Advances in Civil Engineering for Global Sustainability March 2016 e-issn: 2455-5703 Ground Improvement Techniques 1 Nimisha

More information

DRAINAGE & DESIGN OF DRAINAGE SYSTEM

DRAINAGE & DESIGN OF DRAINAGE SYSTEM Drainage on Highways DRAINAGE & DESIGN OF DRAINAGE SYSTEM P. R.D. Fernando Chartered Engineer B.Sc.(Hons), M.Eng. C.Eng., MIE(SL) Drainage Requirement of Highway Drainage System Introduction Drainage means

More information

COPYRIGHTED MATERIAL. Contents PART ONE: THEORY...1. Preface to the Third Edition xiii. About the Authors xv. Acknowledgements xvii

COPYRIGHTED MATERIAL. Contents PART ONE: THEORY...1. Preface to the Third Edition xiii. About the Authors xv. Acknowledgements xvii Preface to the Third Edition xiii About the Authors xv Acknowledgements xvii Contents PART ONE: THEORY...1 1. Groundwater in Construction...3 1.1 Groundwater in the Hydrologic Cycle 3 1.2 Origins of Dewatering

More information

Misan University - College of Engineering Civil Engineering Department

Misan University - College of Engineering Civil Engineering Department CHAPTER 2 Soil and Excavations Soil investigation including two phases: surface investigation and subsurface investigation Surface investigation involves making a preliminary judgment about the site s

More information

Construction Dewatering

Construction Dewatering Construction Dewatering Dr. P. NANJUNDASWAMY Professor of Civil Engineering S J College of Engineering Mysuru 570 006 Contact : 94492 64365 pnswamy@yahoo.com Outline Dewatering What & Why Consequences-Improper

More information

Groundwater Control for Design & Construction

Groundwater Control for Design & Construction PDH Course C587 (2 PDH) Groundwater Control for Design & Construction Instructor: T. E. McLaughlin, P.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088

More information

Lecture 11. WATER PUMPING EQUIPMENT and DEWATERING SYSTEM

Lecture 11. WATER PUMPING EQUIPMENT and DEWATERING SYSTEM Lecture 11 WATER PUMPING EQUIPMENT and DEWATERING SYSTEM TSP-308 MPK Ferdinand Fassa dewatering The purpose is to remove water from an excavation without causing instability in either the side slopes or

More information

Grouting Bilfinger Spezialtiefbau GmbH

Grouting Bilfinger Spezialtiefbau GmbH Grouting Bilfinger Spezialtiefbau GmbH Goldsteinstrasse 114 D-60528 Frankfurt Phone: +49 69 6688-345 Fax: +49 69 6688-277 Email: info.spezialtiefbau@bilfinger.com www.foundation-engineering.bilfinger.com

More information

Design and performance of a 15m deep excavation for a wagon tippler

Design and performance of a 15m deep excavation for a wagon tippler Design and performance of a deep excavation for a wagon tippler S.R. Gandhi Professor in Dept. of Civil Engineering Indian Institute of Technology Madras, India srg@civil.iitm.ernet.in bstract: s a part

More information

Groundwater 3/16/2010. GG22A: GEOSPHERE & HYDROSPHERE Hydrology

Groundwater 3/16/2010. GG22A: GEOSPHERE & HYDROSPHERE Hydrology GG22A: GEOSPHERE & HYDROSPHERE Hydrology Definitions Groundwater Subsurface water in soil or rock that is fully saturated. Aquifer Contains enough saturated material to yield significant quantities of

More information

D.G.S.W. Pitakumbura Manager (Groundwater Studies) Groundwater Section NWS&DB. Groundwater recharge or deep drainage or

D.G.S.W. Pitakumbura Manager (Groundwater Studies) Groundwater Section NWS&DB. Groundwater recharge or deep drainage or Groundwater Recharge and Extraction Techniques D.G.S.W. Pitakumbura Manager (Groundwater Studies) Groundwater Section NWS&DB What is Groundwater Recharge Groundwater recharge or deep drainage or deep percolation

More information

Comparison of dewatering schemes for foundation pits under complex hydrogeological conditions

Comparison of dewatering schemes for foundation pits under complex hydrogeological conditions IOP Conference Series: Earth and Environmental Science PAPER OPEN ACCESS Comparison of dewatering schemes for foundation pits under complex hydrogeological conditions To cite this article: H M Wu et al

More information

Construction Technology B (CON4313)

Construction Technology B (CON4313) 3 - Basement 1 Quick Revision 1.1 Problems arising from basement construction a. Excavation method. b. Surface and ground water control c. Lateral stability of basement excavation. d. Stability of adjoining

More information

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

General Groundwater Concepts

General Groundwater Concepts General Groundwater Concepts Hydrologic Cycle All water on the surface of the earth and underground are part of the hydrologic cycle (Figure 1), driven by natural processes that constantly transform water

More information

ENGINEERING HYDROLOGY

ENGINEERING HYDROLOGY ENGINEERING HYDROLOGY Prof. Rajesh Bhagat Asst. Professor Civil Engineering Department Yeshwantrao Chavan College Of Engineering Nagpur B. E. (Civil Engg.) M. Tech. (Enviro. Engg.) GCOE, Amravati VNIT,

More information

Water Well Decommissioning Guidelines

Water Well Decommissioning Guidelines Water Well Decommissioning Guidelines Approval Date: June 1, 2007 Effective Date: September 10, 2007 Approved By: Gerard MacLellan Version Control: This is a new guideline I. Introduction The Water Well

More information

Surface flow - above ground

Surface flow - above ground SAICE (R&H) - Short Course: Drainage II Surface Flow May 2011 Surface flow - above ground 1 A Proper Surface Drain System Should: 1. Prevent or restrict water from entering substructure 2. Discharge water

More information

Civil Engineering Construction I (CBE5031)

Civil Engineering Construction I (CBE5031) Civil Engineering Construction I (CBE5031) Basement 1 1 Quick Revision 1.1 Problems arising from basement construction a) Excavation method. b) Surface and ground water control c) Lateral stability of

More information

BLOCKING AND FILLING SURFACE DRAINAGE DITCHES

BLOCKING AND FILLING SURFACE DRAINAGE DITCHES MINNESOTA WETLAND RESTORATION GUIDE BLOCKING AND FILLING SURFACE DRAINAGE DITCHES TECHNICAL GUIDANCE DOCUMENT Document No.: WRG 4A-1 Publication Date: 10/14/2015 Table of Contents Introduction Application

More information

Ponds: planning, design, and construction

Ponds: planning, design, and construction Ponds: planning, design, and construction Ponds for many purposes: Fish Production Recreation Water Supply Esthetics Wildlife Habitat Natural ponds: Formed in natural depressions in the landscape Not man-made

More information

CE 6012 Ground Improvement Techniques Question Bank

CE 6012 Ground Improvement Techniques Question Bank CE 6012 Ground Improvement Techniques Question Bank Unit I INTRODUCTION Role of ground improvement in foundation engineering - methods of ground improvement Geotechnical problems in alluvial, laterite

More information

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations. Item Excavation and Backfill for Structures 1. DESCRIPTION 2. MATERIALS Excavate for placement and construction of structures and backfill structures. Cut and restore pavement. Use materials that meet

More information

Atterberg limits Clay A Clay B. Liquid limit 44 % 55% Plastic limit 29% 35% Natural water content 30% 50%

Atterberg limits Clay A Clay B. Liquid limit 44 % 55% Plastic limit 29% 35% Natural water content 30% 50% CE 6405 SOIL MECHANICS UNIT I INTRODUCTION Part A 1. Distinguish between Residual and Transported soil. 2. Give the relation between γ sat, G, γ w and e 3. A compacted sample of soil with a bulk unit weight

More information

SOURCES OF WATER SUPPLY GROUND WATER HYDRAULICS

SOURCES OF WATER SUPPLY GROUND WATER HYDRAULICS SOURCES OF WATER SUPPLY GROUND WATER HYDRAULICS, Zerihun Alemayehu GROUNDWATER Groundwater takes 0.6% of the total water in the hydrosphere 0.31% of the total water in the hydrosphere has depth less than

More information

Suggested Stormwater Management Practices For Individual House Lots

Suggested Stormwater Management Practices For Individual House Lots Suggested Stormwater Management Practices For Individual House Lots These practices are necessary to satisfy the water quantity and water quality criteria of the Rappahannock Stormwater Ordinance. These

More information

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels

More information

ARMY TM NAVY NAVFAC P-418 AIR FORCE AFM 88-5, Chap 6 DEWATERING AND GROUNDWATER CONTROL

ARMY TM NAVY NAVFAC P-418 AIR FORCE AFM 88-5, Chap 6 DEWATERING AND GROUNDWATER CONTROL ARMY TM 5-818-5 NAVY NAVFAC P-418 AIR FORCE AFM 88-5, Chap 6 DEWATERING AND GROUNDWATER CONTROL DEPARTMENTS OF THE ARMY, THE NAVY, AND THE AIR FORCE NOVEMBER 1983 REPRODUCTION AUTHORIZATION/RESTRICTIONS

More information

Dewatering Fly Ash for Remediation: Two Approaches

Dewatering Fly Ash for Remediation: Two Approaches 2015 World of Coal Ash (WOCA) Conference in Nasvhille, TN - May 5-7, 2015 http://www.flyash.info/ Dewatering Fly Ash for Remediation: Two Approaches Gregory M. Landry, P.E. Moretrench American Corporation,

More information

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management Husam Al-Najar Storm water management : Collection System Design principles The Objectives

More information

SURFACE DRAINAGE SYSTEM FOR ROADS. Components of Surface Drainage System

SURFACE DRAINAGE SYSTEM FOR ROADS. Components of Surface Drainage System Lecture Hour-49 UNIT 8 10CV755 HGD SURFACE DRAINAGE SYSTEM FOR ROADS Components of Surface Drainage System The surface water from the roadway and the adjoining land is to be collected and then disposed

More information

Construction Dewatering. Lecture 11. Construction Dewatering

Construction Dewatering. Lecture 11. Construction Dewatering Construction Dewatering Lecture 11 Construction Dewatering The purpose of construction dewatering is to control the surface and subsurface hydrologic environment in such a way as to permit the structure

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Diversion Channels DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] The design of permanent

More information

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST

More information

CHAPTER 8 SEEPAGE CONTROL IN EMBANKMENTS

CHAPTER 8 SEEPAGE CONTROL IN EMBANKMENTS CHAPTER 8 SEEPAGE CONTROL IN EMBANKMENTS 8-1. General. All earth and rock-fill dams are subject to seepage through the embankment, foundation, and abutments. Seepage control is necessary to prevent excessive

More information

Chapter A-10 GEOTECHNICAL ANALYSIS NORTH KANSAS CITY - LOWER (NATIONAL STARCH AREA)

Chapter A-10 GEOTECHNICAL ANALYSIS NORTH KANSAS CITY - LOWER (NATIONAL STARCH AREA) Kansas Citys, Missouri and Kansas Flood Damage Reduction Feasibility Study (Section 216 Review of Completed Civil Works Projects) Engineering Appendix to the Interim Feasibility Report Chapter A-10 GEOTECHNICAL

More information

C. Foundation stabilization for pipe and utility structures.

C. Foundation stabilization for pipe and utility structures. PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization

More information

WASTEWATER & STORM WATER COLLECTION AND REMOVAL

WASTEWATER & STORM WATER COLLECTION AND REMOVAL CVE 471 WATER RESOURCES ENGINEERING WASTEWATER & STORM WATER COLLECTION AND REMOVAL Assist. Prof. Dr. Bertuğ Akıntuğ Civil Engineering Program Middle East Technical University Northern Cyprus Campus CVE

More information

SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE SEMBODAI BACHELOR OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING QUESTION BANK

SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE SEMBODAI BACHELOR OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING QUESTION BANK SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE SEMBODAI - 614809 BACHELOR OF ENGINEERING Sub.Code: CE6405 DEPARTMENT OF CIVIL ENGINEERING QUESTION BANK Branch/Year/SEM: CIVIL/II/ IV Sub.Name: Soil Mechanics

More information

Compaction and Jet Grouting

Compaction and Jet Grouting Compaction and Jet Grouting Alan Ringen, PE Senior Vice President Breakthroughs in Tunneling Short Course August 16, 2017 Grouting Principles Geotechnical Grouting: The injection of pumpable fluid materials

More information

CHAPTER 13 OUTLINE The Hydrologic Cycle and Groundwater. Hydrologic cycle. Hydrologic cycle cont.

CHAPTER 13 OUTLINE The Hydrologic Cycle and Groundwater. Hydrologic cycle. Hydrologic cycle cont. CHAPTER 13 OUTLINE The Hydrologic Cycle and Groundwater Does not contain complete lecture notes. To be used to help organize lecture notes and home/test studies. Hydrologic cycle The hydrologic cycle is

More information

PE Exam Review - Geotechnical

PE Exam Review - Geotechnical PE Exam Review - Geotechnical Resources and Visual Aids Item Page I. Glossary... 11 II. Parameters... 9 III. Equations....11 IV. Tables, Charts & Diagrams... 14 1. Module 1 - Soil Classification... 14

More information

Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) DRAFT

Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) DRAFT Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) Activity: Infiltration Systems PLANNING CONSIDERATIONS: Design Life: Short IS Acreage

More information

C-1. Infiltration System

C-1. Infiltration System C-1. Infiltration System Design Objective An infiltration system captures surface stormwater runoff and allows it to infiltrate into the soil. This SCM is typically the work horse of a runoff volume match

More information

HIGHWAY DRAINAGE.

HIGHWAY DRAINAGE. Chapter VI HIGHWAY DRAINAGE Tewodros N. www.tnigatu.wordpress.com tedynihe@gmail.com I. INTRODUCTION Provision o of adequate drainage is an essential part of pavement design. Protection of pavement structure

More information

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad CIVIL ENGINEERING

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad CIVIL ENGINEERING INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad -00 03 CIVIL ENGINEERING QUESTION BANK Course Name : GROUND IMPROVEMENT TECHNIQUES Course Code : A012 Class : III B. Tech IISemester

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price) SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

East Maui Watershed Partnership Adapted from Utah State University and University of Wisconsin Ground Water Project Ages 7 th -Adult

East Maui Watershed Partnership Adapted from Utah State University and University of Wisconsin Ground Water Project Ages 7 th -Adult INTRODUCTION What is groundwater? Water contained in saturated soil and rock materials below the surface of the earth. It is not NEW water, but is recycled water through the hydraulic cycle. The source

More information

VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment. prof. E. Fratalocchi Environmental Geotechnics Waste and polluted sites containment

VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment. prof. E. Fratalocchi Environmental Geotechnics Waste and polluted sites containment VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment rotary drill hydro-mill backhoe Clamshell + Kelly bar VERTICAL BARRIERS SLURRY

More information

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Created by Simpo PDF Creator Pro (unregistered version)  Asst.Prof.Dr. Jaafar S. Maatooq Lect.No.9 2 nd Semester Barrages, Regulators, Dams 1 of 15 In order to harness the water potential of a river optimally, it is necessary to construct two types of hydraulic structures, as shown in Figure

More information

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction. Design Manual Chapter 3 - Sanitary Sewers 3C - Facility Design 3C-1 Facility Design A. Capacity of Pipe Pipe sizes 15 inches and smaller should carry the peak flow at a depth of no more than 0.67 of the

More information

NATURAL RESOURCES CONSERVATION SERVICE ILLINOIS URBAN MANUAL PRACTICE STANDARD SUBSURFACE DRAIN. (ft.) CODE 945

NATURAL RESOURCES CONSERVATION SERVICE ILLINOIS URBAN MANUAL PRACTICE STANDARD SUBSURFACE DRAIN. (ft.) CODE 945 NATURAL RESOURCES CONSERVATION SERVICE ILLINOIS URBAN MANUAL PRACTICE STANDARD SUBSURFACE DRAIN (ft.) CODE 945 (Source: MN Protecting Water Quality in Urban Areas) DEFINITION A conduit, such as corrugated

More information

Table of Contents 5.1 GENERAL Overview Investigation and Engineering Information

Table of Contents 5.1 GENERAL Overview Investigation and Engineering Information Table of Contents Section Page 5.1 GENERAL... 5.1-1 5.1.1 Overview... 5.1-1 5.1.2 Investigation and Engineering Information... 5.1-2 5.2 PRELIMINARY GEOTECHNCIAL REPORTS... 5.2-1 5.2.1 Preliminary Geotechnical

More information

SPECIFICATIONS FOR STRUCTURAL EXCAVATION

SPECIFICATIONS FOR STRUCTURAL EXCAVATION SPECIFICATIONS FOR STRUCTURAL EXCAVATION 1.0 DESCRIPTION The Work shall consist of:.1 Excavation and removal of material for the placement of foundations, substructure units, approach slabs, transition

More information

SPECIFICATION FOR ENGINEERED FILLS

SPECIFICATION FOR ENGINEERED FILLS SPECIFICATION FOR ENGINEERED FILLS This specification is intended to be used for the engineered fill. The specification is suitable for most purposes but there may be special conditions existing at some

More information

Landfill design General principles

Landfill design General principles Landfill design General principles Average height of a landfill should be at least 15 m Each section (cell) should accommodate waste to be landfilled during 5 years period Sections/cells should be hydraulically

More information

Inflow pipe. Drain. Drain

Inflow pipe. Drain. Drain Inflow pipe Screened overflow Drain Foul flush diverter Screened intake Manhole cover Maximum water level Seal Inspection cover Possible local drainage through screen Drain Bottom sloped Screened outlet

More information

TRENCH EXCAVATION AND BACKFILL

TRENCH EXCAVATION AND BACKFILL TRENCH EXCAVATION AND BACKFILL PART 1 - GENERAL 1.01 SECTION INCLUDES A. Trench Excavation for Pipe Systems B. Trench Foundation Stabilization C. Pipe Bedding and Backfill 1.02 DESCRIPTION OF WORK A. Excavate

More information

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination Highway Drainage Proper drainage is a very important consideration in design of a highway. Inadequate drainage facilities can lead to premature deterioration of the highway and the development of adverse

More information

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.

More information

Modular Sediment Barriers (Instream)

Modular Sediment Barriers (Instream) Modular Sediment Barriers (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows Deep Water Symbol Photo

More information

Level 6 Graduate Diploma in Engineering Hydraulics and hydrology

Level 6 Graduate Diploma in Engineering Hydraulics and hydrology 910-103 Level 6 Graduate Diploma in Engineering Hydraulics and hydrology Sample Paper You should have the following for this examination one answer book ordinary graph paper pen, pencil, ruler Work sheet

More information

Slurry Trench / Diaphragm Walls

Slurry Trench / Diaphragm Walls UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Temporary Structures Slurry Trench / Diaphragm Walls CM 420 TEMPORARY

More information

SECTION SOILS REPORT

SECTION SOILS REPORT SECTION 02300 SOILS REPORT 1. GENERAL: 1.1 All work included under this heading shall be subject to the General Conditions of the entire operation. This Contractor is required to refer especially thereto.

More information

7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by

7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by Construction Technology B (CON4313) Self Assessment Questions: Chapter 1 Prestressed Concrete 1. How does the prestressing of steel tendons in prestressed concrete offer a higher loading capacity than

More information

Water Well Screens and Well Efficiencies Designing an Efficient Well

Water Well Screens and Well Efficiencies Designing an Efficient Well A brand of Aqseptence Group Water Well Screens and Well Efficiencies Designing an Efficient Well Efficiency in any system is defined as the ratio of the effective output to the total input. In machines,

More information

SITE INVESTIGATION. Foundation Engineering

SITE INVESTIGATION. Foundation Engineering SITE INVESTIGATION Assist. Prof. Berrak TEYMUR Foundation Engineering Analysis Design Construction As a foundation engineer, you need to consider geotechnical/structural issues (involves geology, subsurface

More information

POROSITY, SPECIFIC YIELD & SPECIFIC RETENTION. Physical properties of

POROSITY, SPECIFIC YIELD & SPECIFIC RETENTION. Physical properties of POROSITY, SPECIFIC YIELD & SPECIFIC RETENTION Porosity is the the ratio of the voids to the total volume of an unconsolidated or consolidated material. Physical properties of n = porosity as a decimal

More information

THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT

THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT THE GOVERNMENT OF MALAYSIA PRIME MINISTER S DEPARTMENT ECONOMIC PLANNING UNIT THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT VOL. 5: TECHNICAL

More information

CE 240 Soil Mechanics & Foundations Lecture 4.3. Permeability I (Das, Ch. 6)

CE 240 Soil Mechanics & Foundations Lecture 4.3. Permeability I (Das, Ch. 6) CE 240 Soil Mechanics & Foundations Lecture 4.3 Permeability I (Das, Ch. 6) Outline of this Lecture 1. Permeability in Soils 2. Bernoulli s Equation 3. Darcy s Law 4. Hydraulic Conductivity 5. Hydraulic

More information

Code No: RR Set No. 1

Code No: RR Set No. 1 Code No: RR320101 Set No. 1 III B.Tech Supplimentary Examinations, Aug/Sep 2008 GEOTECHNICAL ENGINEERING (Civil Engineering) Time: 3 hours Max Marks: 80 Answer any FIVE Questions All Questions carry equal

More information

UNIT V RETAINING WALLS RETAINING WALL 2.5. Retaining walls are structures used to retain earth or water or other materials such as coal, ore, etc; where conditions do not permit the mass to assume its

More information

Providing proper drainage system

Providing proper drainage system Environment Friendly and Cost Effective Alternative to Conventional Graded Filters Providing proper drainage system for structures such as earth retaining structures, pavements, water front structures,

More information

CHAPTER 13 STRIP MINE RECLAMATION AND SOLID WASTE LANDFILL

CHAPTER 13 STRIP MINE RECLAMATION AND SOLID WASTE LANDFILL CHAPTER 13 STRIP MINE RECLAMATION AND SOLID WASTE LANDFILL 13-1. General. Two beneficial uses of dredged material that are still fairly new concepts have proven to be feasible in laboratory, field, and

More information

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5B

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5B Oweninny Wind Farm Oweninny Environmental Impact Statement Appendix 5B Access Tracks, Hardstanding Areas, Electrical Compounds, Borrow Pit And Cable Laying Construction Method Statement Copyright ESB International

More information

Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1

Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1 Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1 Updated: November 2010 Directive 74 Appendix C Requirement Approval: 8512D Submitted to SHELL CANADA ENERGY MRM DDA PLAN-UPDATE NOV

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

SPECIAL CONDITIONS FOR HORIZONTAL AUGER BORING (HAB) October, 2006

SPECIAL CONDITIONS FOR HORIZONTAL AUGER BORING (HAB) October, 2006 Michigan Department Of Transportation 3703B (11/06) 1 Materials SPECIAL CONDITIONS FOR HORIZONTAL AUGER BORING (HAB) October, 2006 Page 1 of 5 1.1 Pipe - Pipe used in this method includes an external steel

More information

The soil is a very. The soil can. The manure. Soil Characteristics. effective manure treatment system if manures are applied at the proper rate.

The soil is a very. The soil can. The manure. Soil Characteristics. effective manure treatment system if manures are applied at the proper rate. The soil is a very effective manure treatment system if manures are applied at the proper rate. The soil can filter pollutants and prevent them from reaching groundwater. The manure application rate should

More information

Lesson Learned. Collapse of Diaphragm Wall Trench. Case study. Suez Canal Syphon Project

Lesson Learned. Collapse of Diaphragm Wall Trench. Case study. Suez Canal Syphon Project Lesson Learned Collapse of Diaphragm Wall Trench Case study Suez Canal Syphon Project Bauer Egypt Ashraf Wahby June, 2016 List of Contents 1. Introduction 3 2. Project Description 3 3. Collapse 4 4. Known

More information

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing.

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing. SECTION 02221 TRENCHING, BACKFILLING AND COMPACTION PART 1 GENERAL 1.01 WORK INCLUDED A. Excavation for piped utility material. B. Provide necessary sheeting, shoring and bracing. C. Prepare trench bottom

More information

Block and gravel filters can be used where velocities are higher. Reduces the amount of sediment leaving the site.

Block and gravel filters can be used where velocities are higher. Reduces the amount of sediment leaving the site. INLET PROTECTION From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.state.ma.us/dep/brp/stormwtr/files/esfull.pdf Definition: A sediment filter or an excavated

More information

2.1 Backfill - General

2.1 Backfill - General 2.1 Backfill - General Excavations are made for the purpose of constructing bridge substructure elements, and consequently requiring competent backfill material. The backfill material must be adequately

More information

SC-01 Surface Outlet and Baffle Sediment Basin

SC-01 Surface Outlet and Baffle Sediment Basin Greenville County Technical Specification for: SC-01 Surface Outlet and Baffle Sediment Basin 1.0 Surface Outlet and Baffle Sediment Basin This Specification contains requirements for the design and construction

More information

4. Groundwater Resources

4. Groundwater Resources 4. Groundwater Resources 4-1 Majority (97 %) of unfrozen fresh water on earth exists as groundwater. In comparison to surface water, - groundwater is available all year around - groundwater is mostly invisible

More information

Brooks/Cole Thomson LearningiM. Fundamentals of Geotechnical Engineering. Braja M. Das. California State University, Sacramento

Brooks/Cole Thomson LearningiM. Fundamentals of Geotechnical Engineering. Braja M. Das. California State University, Sacramento Fundamentals of Geotechnical Engineering Braja M. Das California State University, Sacramento Brooks/Cole Thomson LearningiM Australia Canada Mexico Singapore Spain United Kingdom United States CHAPTER

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

Wastewater Collection System

Wastewater Collection System WASTEWATER COLLECTION SYSTEM CE 370 1 Wastewater Collection System The function of the collection system is to collect the wastewater from residential, commercial, and industrial areas within the service

More information

CONSTRUCTION PLAN CHECKLIST

CONSTRUCTION PLAN CHECKLIST CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted

More information

Dewatering of Mines-A Practical Analysis

Dewatering of Mines-A Practical Analysis SECTION2 Drainage Control for Surface Mines 9 Dewatering of Mines-A Practical Analysis by Lloyd G. Venburg, Principal Ground-Water Geologist, International Engineering Company, Inc., San Francisco, California,

More information

Building Construction

Building Construction Building Construction Shallow Foundations Module-III Introduction The foundation can be classified broadly into two types: Shallow foundations Deep foundations Shallow foundations Shallow Foundations When

More information

Groundwater Earth 9th Edition Chapter 17 Mass wasting: summary in haiku form Importance of groundwater Importance of groundwater

Groundwater Earth 9th Edition Chapter 17 Mass wasting: summary in haiku form Importance of groundwater Importance of groundwater 1 2 3 4 5 6 7 8 9 10 11 Groundwater Earth 9 th Edition Chapter 17 Geology 100 Mass wasting: summary in haiku form The grass is greener over the septic system said Erma Bombeck. Importance of groundwater

More information

GROUND WATER RECHARGE

GROUND WATER RECHARGE ST 3.4 GROUND WATER RECHARGE Version : April 2009 Published by : Foundation Connect International Autors : Henk Holtslag & John de Wolf Disclaimer This manual (ST 3.4) is part of the main manual, named

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF CONTENTS 422.01 SCOPE 422.02

More information

Chapter A-9 GEOTECHNICAL ANALYSIS NORTH KANSAS CITY - LOWER (HARLEM AREA)

Chapter A-9 GEOTECHNICAL ANALYSIS NORTH KANSAS CITY - LOWER (HARLEM AREA) Kansas Citys, Missouri and Kansas Flood Damage Reduction Feasibility Study (Section 216 Review of Completed Civil Works Projects) Engineering Appendix to the Interim Feasibility Report Chapter A-9 GEOTECHNICAL

More information

Appendix B.2. Construction Specifications for Infiltration Practices

Appendix B.2. Construction Specifications for Infiltration Practices Appendix B.2 Construction Specifications for Infiltration Practices B.2.A Infiltration Trench General Notes and Specifications An infiltration trench may not receive run-off until the entire contributing

More information

SECTION EXCAVATION AND FILL

SECTION EXCAVATION AND FILL SECTION 02315 EXCAVATION AND FILL PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, equipment, and incidentals necessary to perform excavation, backfill, grading, and slope protection required to

More information