TRANSPORTATION OFF SYSTEM POST PROJECT MAINTENANCE AGREEMENT BETWEEN FLORIDA DEPARTMENT OF TRANSPORTATION AND CITY OF NAPLES
|
|
- Rodney Johnathan Murphy
- 5 years ago
- Views:
Transcription
1 FPID # POST-PROJECT MAINTENANCE AGREEMENT: City of Naples Page 1 of 3 TRANSPORTATION OFF SYSTEM POST PROJECT MAINTENANCE AGREEMENT BETWEEN FLORIDA AND CITY OF NAPLES This is an Agreement, by and between the DEPARTMENT OF TRANSPORTATION (hereinafter, the "DEPARTMENT") and City of Naples (hereinafter, "LOCAL AGENCY") for the maintenance of off system post-project transportation enhancements described below. W I T N E S S E T H 1. WHEREAS, pursuant to Fla. Stat , and the Moving Ahead for Progress in the 21 st Century (MAP-21), the DEPARTMENT is authorized to undertake a project within the LOCAL AGENCY geographical limits; and 2. WHEREAS, said project is identified and known to the parties as Financial Project # which will benefit the LOCAL AGENCY; and 3. WHEREAS, in accordance with Title 23, U.S. Code, Section 11 and Federal Highway Administration regulations issued pursuant thereto, there must be an agreement from the LOCAL AGENCY to maintain the project; and. WHEREAS, the LOCAL AGENCY by Resolution No., dated, a copy of which is attached hereto and made a part hereof as Exhibit A, has consented to and approved the Agreement and has authorized its Chairperson or designee to execute said Agreement. NOW, THEREFORE, in consideration of the premises, the parties agree as follows: 1. The DEPARTMENT has undertaken the project and obtained approval for federal participation on the sidewalk construction at the following location. Construct a five foot wide sidewalk along the west side of 3 rd Street North from Central Avenue to 7 th Avenue North; as shown in the attachment labeled Exhibit B. 2. It is understood and agreed by the parties that upon completion of the project, the LOCAL AGENCY shall be responsible, at its costs, for maintenance of said project in accordance with the following federally accepted state standards: (a) Manual of Uniform Minimum Standards for Design, Construction and Maintenance for Streets and Highways (), as amended. 3. This document incorporates and includes all prior negotiations, correspondence, conversations, agreements or understandings applicable to the matters contained herein and the parties agree that there are no commitments, agreements or understanding concerning the subject matter of this Agreement that are not contained in this document. Accordingly, it is agreed that no deviation from the terms hereof shall be predicated upon any prior representation or agreements
2 FPID # POST-PROJECT MAINTENANCE AGREEMENT: City of Naples Page 2 of 3 whether oral or written. This Agreement shall be governed, interpreted and construed according to the laws of the State of Florida. THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK
3 FPID # POST-PROJECT MAINTENANCE AGREEMENT: City of Naples Page 3 of 3 IN WITNESS WHEREOF, the City of Naples has caused this Agreement to be executed in its behalf through its Chairperson or designee, and THE FLORIDA DEPARTMENT OF TRANSPORTATION has caused this Agreement to be executed in its behalf through its District Secretary for District One, as indicated below. This Agreement shall become effective on: Department to enter date. ATTEST BY: CITY OF NAPLES, FLORIDA BY: CHAIRPERSON, OR DESIGNEE PRINT NAME PRINT NAME TITLE CITY OF NAPLES LEGAL REVIEW: BY: Jim Fox, Esq. ATTEST BY: PRINT NAME BY: DISTRICT ONE SECRETARY OR DESIGNEE PRINT NAME TITLE TITLE FLA. DEPT. OF TRANS. LEGAL REVIEW: BY:
4 Airport Rd. COMPONENTS OF CONTRACT PLANS SET ROADWAY PLANS EXHIBIT B THIS PROJECT TO BE LET TO CONTRACT WITH FINANCIAL PROJECT ID CHIPLEY CONTRACT PLANS PENSACOLA FORT WALTON BEACH PANAMA CITY TALLAHASSEE 295 LAKE CITY GAINESVILLE JACKSONVILLE ST AUGUSTINE OCALA DAYTONA BEACH A DETAILED INDEX APPEARS ON THE KEY OF EACH COMPONENT FINANCIAL PROJECT ID DELAND (FEDERAL FUNDS) NEW PORT RICHEY 75 ORLANDO BEE LINE EXPRESSWAY MELBOURNE - COCOA INDEX OF ROADWAY PLANS 1 KEY 2 SIGNATURE 3 SUMMARY OF PAY ITEMS TYPICAL SECTION 5-7 TYPICAL SECTIONS DETAILS SQ-1 - SQ- SUMMARY OF QUANTITIES SUMMARY OF DRAINAGE STRUCTURES 9 OPTIONAL MATERIALS TABULATION PROJECT NOTES 11-1 ROADWAY PLAN 17-1 DRAINAGE STRUCTURES CROSS SECTIONS 3 TEMPORARY TRAFFIC CONTROL PLAN 37-2 UTILITY ADJUSTMENTS 3 TABULATION OF QUANTITIES - 9 SIGNING AND PAVEMENT MARKING CTL-1 - CTL-3 PROJECT CONTROL DEVELOPMENTAL DESIGN STANDARDS (DDS): END PROJECT NONE STA BEGIN PROJECT STA GOVERNING DESIGN STANDARDS: Florida Department of Transportation, FY17-1 Design Standards ebook (DSeB) and applicable Design Standards Revisions (DSRs) at the following website: APPLICABLE DSRs: NONE GOVERNING STANDARD SPECIFICATIONS: Florida Department of Transportation, January 17 Standard Specifications for Road and Bridge Construction at the following website: T-9-S T-50-S Doctors Pass COLLIER COUNTY (000) BONITA SPRINGS Venetian Moorings Gordon Pass Bay Bay 2 Moring : LineDr. TO 3 NAPLES 9 1 Rd. Goodlete NAPLES 3RD STREET NORTH Pop. 19, Naples Bay Gordon R NAPLES MUNICIPAL AIRPORT 35 Rock WYE Cr Collier Co. Tower East Naples 13 R-25-E R-2-E Davis Blvd. R-25-E R-2-E FORT MYERS 19 7 TO HAMMOCK RATTLESNAKE Naples TO MARCO ISLAND 75 Golden Gate FT. LAUDERDALE T-9-S T-50-S TO KEY N LOCATION OF PROJECT PHASE IV SUBMITTAL FEBRUARY 17, 17 TAMPA ST PETERSBURG 275 SARASOTA - BRADENTON ROADWAY PLANS ENGINEER OF RECORD: MARK ANTHONY BAYER, P.E. P.E. : 5525 W. CYPRESS STREET TAMPA, FLORIDA CONTRACT C9E15 VENDOR F CERTIFICATE OF AUTHORIZATION NO: 5 FDOT PROJECT MANAGER: RYAN WEEKS LAKELAND CONSTRUCTION CONTRACT FLORIDA'S TURNPIKE BARTOW 75 FT PIERCE 95 WEST PALM BEACH FT MYERS FT LAUDERDALE NAPLES MIAMI KEY WEST FISCAL YEAR THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. T :3:05 PM H:\319\331151\roadway\KEYSRD01.DGN
5 THIS DOCUMENT HAS BEEN DIGITALLY SIGNED AND SEALED BY: THIS DOCUMENT HAS BEEN DIGITALLY SIGNED AND SEALED BY: THIS DOCUMENT HAS BEEN DIGITALLY SIGNED AND SEALED BY: LICENSE ALAN S.ELDRDI GE LICENSE PATRC I AI LVIAK LICENSE No M ARK A NTHONY BAYER No 7707 No 009 PRO FESS OI NALENG STATE OF FLO RID A NI EER PRO FESS OI NALENG STATE OF FLO RID A NI EER PRO FESS OI NALENG STATE OF FLO RID A NI EER PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED. THE SIGNATURE MUST BE VERIFIED ON THE ELECTRONIC DOCUMENTS. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED. THE SIGNATURE MUST BE VERIFIED ON THE ELECTRONIC DOCUMENTS. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED. THE SIGNATURE MUST BE VERIFIED ON THE ELECTRONIC DOCUMENTS. FALLER, DAVIS & ASSOCIATES, INC TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : FALLER, DAVIS & ASSOCIATES, INC TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 ALAN S. ELDRIDGE, P.E. : 7707 FALLER, DAVIS & ASSOCIATES, INC TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 PATRICIA LIVAK, P.E. : 009 THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR THE FOLLOWING S IN ACCORDANCE WITH RULE 1G , F.A.C. THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR THE FOLLOWING S IN ACCORDANCE WITH RULE 1G , F.A.C. THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR THE FOLLOWING S IN ACCORDANCE WITH RULE 1G , F.A.C. ROADWAY PLANS ROADWAY PLANS ROADWAY PLANS SQ-1 - SQ CTL-1 - CTL-3 KEY SIGNATURE SUMMARY OF PAY ITEMS TYPICAL SECTION TYPICAL SECTION DETAILS SUMMARY OF QUANTITIES PROJECT NOTES ROADWAY PLAN CROSS SECTIONS TEMPORARY TRAFFIC CONTROL PLAN UTILITY ADJUSTMENTS PROJECT CONTROL SIGNATURE SUMMARY OF DRAINAGE STRUCTURES OPTIONAL MATERIALS TABULATION DRAINAGE STRUCTURES SIGNATURE TABULATION OF QUANTITIES SIGNING AND PAVEMENT MARKING TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER SIGNATURE 2 :27:39 PM H:\319\331151\roadway\SIGNRD01.DGN
6 0 11:3:33 AM 0 11:3:33 AM FLORIDA PROJECT SUMMARY OF PAY ITEMS FOR PROJECT: LEAD PROJECT : DISTRICT : 01 COUNTY/SECTION : FLORIDA PROJECT SUMMARY OF PAY ITEMS FOR PROJECT: LEAD PROJECT : DISTRICT : 01 COUNTY/SECTION : PROJECT(S) : LS COUNTY : COLLIER PROJECT(S) : LS COUNTY : COLLIER 00 SUMMARY OF ROADWAY 00 SUMMARY OF SIGNING SPC ALT ITEM NUMBER ITEM UNIT LS QUANTITY TOTAL SPC ALT ITEM NUMBER ITEM UNIT LS QUANTITY TOTAL MOBILIZATION LS LS SINGLE POST SIGN, F&I GROUND MOUNT, UP TO SF AS MAINTENANCE OF TRAFFIC LS (LS) SINGLE POST SIGN, RELOCATE AS WORK ZONE SIGN ED CHANNELIZING DEVICE- TYPES I, II, DI, VP, DRUM, OR LCD ED SEDIMENT BARRIER LF THERMOPLASTIC, STANDARD, WHITE, SOLID, " FOR CROSSWALK AND ROUNDABOUT THERMOPLASTIC, STANDARD, WHITE, SOLID, 2" FOR STOP LINE AND CROSSWALK LF LF INLET PROTECTION SYSTEM EA CLEARING & GRUBBING LS (LS) MAILBOX, F&I SINGLE EA REGULAR EXCAVATION CY EMBANKMENT CY INLETS, DT BOT, TYPE C,<' EA MANHOLES, P-7, PARTIAL EA MANHOLES, J-7, <' EA PIPE CULVERT,OPTIONAL MATERIAL,ROUND, 15"S/CD LF PIPE CULVERT, OPT MATERIAL, ROUND, "S/CD LF PVC PIPE FOR BACK OF SIDEWALK, " LF CONCRETE SIDEWALK AND DRIVEWAYS, " THICK SY DETECTABLE WARNINGS SF PERFORMANCE TURF, SOD SY M THERMOPLASTIC, REMOVE EXISTING THERMOPLASTIC PAVEMENT SF MARKINGS: NON-CONFLICTING ONLY LUMP SUM CONTRACT: ALL OTHER PAY ITEM NUMBERS SHOWN IN THE CONTRACT PLANS ARE PROVIDED ONLY FOR THE PURPOSE OF DESCRIBING THE WORK TO BE PERFORMED. PAY ITEM S ARE FOUND IN THE DEPARTMENT'S BASIS OF ESTIMATES MANUAL. THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER SUMMARY OF PAY ITEMS 3 :27:39 PM H:\319\331151\roadway\CESSRD01.DGN
7 R/W R/W Natural Ground VARIES 1: TYP. LEVEL TYP. 1: MAX. DESIGN HOUR T = N/A SOD VARIES 2'-" MIN. TRAFFIC DATA DESIGN SPEED = 25 MPH VARIES ESTIMATED DESIGN YEAR = N/A STANDARD CLEARING AND GRUBBING 5' CONC. SW (" TK) 1' TYP. K = N/A D = N/A T = N/A (2 HOUR) LIMITS OF CONSTRUCTION 0.02 MAX. CURRENT YEAR = 17 AADT = 7,000 ESTIMATED OPENING YEAR = 17 AADT = 7,000 1' SOD VARIES 2'-" MIN. SEE ROADWAY PLAN S FOR ELEVATION 1:3 MAX. 1: MAX. ' STANDARD LIMITS OF CONSTRUCTION 11' 11' TYPICAL SECTION 3RD STREET NORTH SIDEWALK STA TO STA ' STANDARD Natural Ground ROADWAY PAVEMENT RESTORATION STA TO STA LT. STA TO STA LT. (MIN. PAVEMENT DESIGN) OPTIONAL BASE GROUP 1 (TYPE B-.5 ONLY) WITH TYPE SP STRUCTURAL COURSE (TRAFFIC B) (1") NOTES: 1. NEW SIDEWALK SURFACE CONNECTING TO EXISTING SIDEWALK, TURNOUTS AND ROADWAYS SHALL THE EXISTING SURFACE ELEVATION. 2. WHEN SIDEWALK SHIFTS AWAY FROM THE R/W LINE AT SIDESTREETS, CONSTRUCT A MINIMUM OF 2'-" SOD STRIP ALONG BOTH SIDES OF THE SIDEWALK. THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER TYPICAL SECTION :27:1 PM H:\319\331151\roadway\TYPSRD01.DGN
8 R/W VARIES R/W VARIES STANDARD CLEARING AND GRUBBING STANDARD CLEARING AND GRUBBING VARIES 5' CONC. VARIES 2' MIN. 11' 1' 5' CONC. VARIES 2'-" MIN. 11' SOD SW (" TK) SOD SOD SW (" TK) SOD 1' EXIST. HEDGE TO REMAIN SEE ROADWAY PLAN S FOR ELEVATION EXIST. HEDGE TO REMAIN Natural Ground Natural Ground 1:3 MAX. DEPTH AND WIDTH VARY SEE CROSS SECTIONS 1' SOD 1: MAX. STANDARD CLEARING AND GRUBBING * 5' CONC. SW (" TK) 1' 0.02 MAX. MAX. 1: 1:3 MAX. VARIES 2'-" MIN. SOD 1:3 MAX. 1: MAX. SEE ROADWAY PLAN S FOR ELEVATION SEE ROADWAY PLAN S FOR ELEVATION 0.02 MAX MIN. PARTIAL DETAIL (1) 3RD STREET NORTH SIDEWALK STA TO STA STA TO STA STA TO STA R/W VARIES PARTIAL DETAIL (2) 3RD STREET NORTH SIDEWALK STA TO STA STA TO STA STA TO STA STA TO STA ' * UNLESS OTHERWISE SHOWN IN PLANS Natural Ground Natural Ground 1: MAX MAX. 1' 1: MAX. STANDARD CLEARING AND GRUBBING 1' 1: DEPTH AND WIDTH VARY SEE CROSS SECTIONS VARIES 2'-" MIN. SOD R/W VARIES 5' CONC. SW (" TK) 0.01 SLOPE VARIES 1: PARTIAL DETAIL (3) 3RD STREET NORTH SIDEWALK STA TO STA : MAX. VARIES 2' MIN. SOD SEE ROADWAY PLAN S FOR ELEVATION PARTIAL DETAIL () 3RD STREET NORTH SIDEWALK STA TO STA ' THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER TYPICAL SECTION DETAILS (1) 5 :27:2 PM H:\319\331151\roadway\TYPSRD01.DGN
9 (POINT OF REFERENCE) (POINT OF REFERENCE) (POINT OF REFERENCE) EXIST. PALM TREE (TO REMAIN) 0.02 EXIST. PALM TREE (TO REMAIN) EXIST. PALM TREE (TO REMAIN) 1.5' (MIN.) FROM BACK OF SIDEWALK TO FACE OF COCONUT PALM TREE TRUNK BACK OF SIDEWALK SEE ROADWAY PLANS FOR STATION AND OFFSET PC 1.5' (MIN.) FROM BACK OF SIDEWALK TO FACE OF COCONUT PALM TREE TRUNK 1.5' (MIN.) FROM BACK OF SIDEWALK TO FACE OF COCONUT PALM TREE TRUNK 25' R 25' R SOD VARIES SEE ROADWAY PLANS FOR STATION AND OFFSET PT ' CONC. SW (" TK) SOD VARIES PRC Natural Ground PRC 3' R 3' R SOD VARIES 2'-" MIN. CLEARING AND GRUBBING 1' TYP. VARIES 1:3 MAX. LEVEL TYP. 1: MAX. ' CONC. SW (" TK) EDGE OF PAVEMENT STANDARD 5' CONC. SW (" TK) 1' TYP MAX. SOD VARIES 2'-" MIN. PRC R/W VARIES SEE ROADWAY PLAN S FOR ELEVATION VARIES 1: TYP. LEVEL TYP. 1: MAX. PRC SIDEWALK DETAIL AT COCONUT PALM TREE NTS STA TO STA (M AX.) 11' ' CONC. SW (" TK) PARTIAL DETAIL (5) 3RD STREET NORTH SIDEWALK STA TO STA STA TO STA PRC 3' R PRC ' CONC. SW (" TK) SOD VARIES THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER TYPICAL SECTION DETAILS (2) :27:2 PM H:\319\331151\roadway\TYPSRD01.DGN
10 SEE ROADWAY PLANS FOR STATION AND OFFSET PC BACK OF SIDEWALK 5' CONC. SW (POINT OF REFERENCE) 1.5' (MIN.) FROM BACK OF SIDEWALK TO FACE OF COCONUT PALM TREE TRUNK SEE BELOW FOR PC STATION OFFSET = EXIST. PALM TREE (TO REMAIN) SEE BELOW FOR PT STATION OFFSET = 1' SOD PRC PRC 5' CONC. SW 3' R (" TK) 5' CONC. SW (" TK) EXIST. FACE OF HEDGE (" TK) SOD VARIES 25' R EDGE OF PAVEMENT TRIM HEDGE TO 1' BEYOND BACK OF SW EXIST. PALM TREE (TO REMAIN) PRC (POINT OF REFERENCE) 1' (M AX.) 7' R PRC 25' R SIDEWALK DETAIL AT COCONUT PALM TREE NTS STA TO STA STA TO STA STA TO STA EXIST. HEDGE SEE ROADWAY PLANS FOR STATION AND OFFSET PT 5' CONC. SW (" TK) SOD VARIES FACE OF COCONUT PALM TREE TRUNK 1' SOD 1.5' (MIN.) FROM FRONT OF SIDEWALK TO BACK OF SIDEWALK EDGE OF PAVEMENT (M AX.) SIDEWALK DETAIL AT COCONUT PALM TREE PC STA PC STA PC STA PC STA PC STA PC STA NTS TO TO TO TO TO TO PT STA PT STA PT STA PT STA PT STA PT STA SOD VARIES THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER TYPICAL SECTION DETAILS (3) 7 :27:2 PM H:\319\331151\roadway\TYPSRD01.DGN
11 SUMMARY OF LUMP SUM ITEMS PAY ITEM PAY ITEM QUANTITY P F DESIGN NOTES CONSTRUCTION REMARKS 01 1 MOBILIZATION 1 PAY ITEM PAY ITEM SUMMARY OF TEMPORARY TRAFFIC CONTROL PLAN ITEMS UNIT PHASE I DURATION QUANTITY TOTAL DAYS P P 02 1 MAINTENANCE OF TRAFFIC LS WORK ZONE SIGN ED CHANNELIZING DEVICE, TYPES I, II, DI, VP, DRUM, & LC ED DESIGN NOTES CONSTRUCTION REMARKS THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER SUMMARY OF QUANTITIES (1) SQ-1 5:1:0 PM H:\319\331151\roadway\SUMQRD01.DGN
12 SUMMARY OF EROSION AND SEDIMENT CONTROL DEVICES LOCATION SIDE AREA ID SEDIMENT BARRIER INLET PROTECTION SYSTEM DESIGN NOTES CONSTRUCTION REMARKS STA. TO STA. LF EA P F P F to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to 2+9. LT to LT to +.3 LT to +. LT.. +. to +5.5 LT to LT to LT to +.01 LT to LT to LT to LT to LT to LT to LT. 1 THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER SUMMARY OF QUANTITIES (2) SQ-2 :27:3 PM H:\319\331151\roadway\SUMQRD01.DGN
13 SUMMARY OF CLEARING AND GRUBBING & REMOVAL ITEMS PAY ITEM PAY ITEM SECONDARY UNITS LOCATION AREA QUANTITY SIDE LENGTH WIDTH UNITS (IF LUMP SUM) ID STA. TO STA. AREA (AC) P F DESIGN NOTES CONSTRUCTION REMARKS CLEARING & GRUBBING +9. to LT LS to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to 3+. LT to LT to LT to LT to LT to LT to LT to LT REMOVAL OF EXISTING CONCRETE to LT STATION SIDE LT LT LT LT. 1 SUMMARY OF MAILBOXES QUANTITY (EA) P F DESIGN NOTES CONSTRUCTION REMARKS THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER SUMMARY OF QUANTITIES (3) SQ-3 :27:3 PM H:\319\331151\roadway\SUMQRD01.DGN
14 SUMMARY OF EARTHWORK PAY ITEM PAY ITEM P CY F DESIGN NOTES CONSTRUCTION REMARKS PAY ITEM PAY ITEM 00 1 ROADWAY EXCAVATION EMBANKMENT 1 STA. TO STA. LOCATION SUMMARY OF PAVEMENT SIDE AREA ID LENGTH WIDTH UNIT QUANTITY OPTIONAL BASE, BASE GROUP to LT. 931 SY 35.0 TYPE B-.5 ONLY DESIGN NOTES to LT. 13. TYPE B-.5 ONLY SUPERPAVE ASPHALTIC CONCRETE (B) to LT TN to LT. 0.7 P F CONSTRUCTION REMARKS THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER SUMMARY OF QUANTITIES () SQ- :27:3 PM H:\319\331151\roadway\SUMQRD01.DGN
15 SUMMARY OF SIDEWALK & DETECTABLE WARNINGS LOCATION STA. TO STA. SIDE AREA ID LENGTH WIDTH CONC. SIDEWALK " PAVERS, ARCH. SIDEWALK DETECTABLE WARNINGS SY SF SF P F P F P F DESIGN NOTES CONSTRUCTION REMARKS to LT to LT TURNOUT to +.5 LT to +52. LT to +72. LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT TURNOUT to LT to LT to LT to LT to LT to LT to LT to LT RESET to +.5 LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to 2+5. LT to LT to LT to LT to 3+. LT to LT to LT THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER SUMMARY OF QUANTITIES (5) SQ-5 :27: PM H:\319\331151\roadway\SUMQRD01.DGN
16 SUMMARY OF PERFORMANCE TURF SUMMARY OF PERFORMANCE TURF LOCATION STA. TO STA. SIDE AREA ID PERFORMANCE TURF (SOD) P SY F DESIGN NOTES CONSTRUCTION REMARKS LOCATION STA. TO STA. SIDE AREA ID PERFORMANCE TURF (SOD) P SY F DESIGN NOTES CONSTRUCTION REMARKS +9. to LT to LT to LT to +0.7 LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to LT to +03. LT to LT to LT to LT to LT to LT to LT to LT to LT to 3+. LT to LT to LT to LT to LT to LT to LT to LT THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER SUMMARY OF QUANTITIES () SQ- :27: PM H:\319\331151\roadway\SUMQRD01.DGN
17 QUANTITY STR. STATION SIDE BARRELS BACK OF SIDEWALK DRAINAGE ROUND SHAPE STORM AND CROSS DRAIN DITCH BOTTOM INLETS MANHOLES ROUND SHAPE C P-7 J-7 " 15" " <' PARTIAL <' REMARKS LF LF LF EA. EA. EA. P NA LT. BACK OF SW DRAIN 2 25 MITERED END CLASS I CONC., FL BK. = 7.9, FL AH. = 7. F P NA LT. BACK OF SW DRAIN 2 2 MITERED END CLASS I CONC., FL BK. = 7., FL AH. = 7. F P NA LT. BACK OF SW DRAIN 2 22 MITERED END CLASS I CONC., FL BK. = 7.3, FL AH. = 7. F P NA LT. BACK OF SW DRAIN 2 2 MITERED END CLASS I CONC., FL BK. = 7., FL AH. = 7.7 F P NA LT. BACK OF SW DRAIN 2 2 MITERED END CLASS I CONC., FL BK. = 7.9, FL AH. =.0 F P NA LT. BACK OF SW DRAIN 2 22 MITERED END CLASS I CONC., FL BK. =.3, FL AH. =. F P S LT. MH TOP 1 1 MANHOLE TOP ONLY F P S LT. DBI, PIPE F P S LT. MH, PIPE 1 1 CONC. JACKET, 5' X ', CAST IN PLACE F THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. FALLER, DAVIS & ASSOCIATES, INC TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 ALAN S. ELDRIDGE, P.E. : 7707 ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER SUMMARY OF DRAINAGE STRUCTURES :27: PM H:\319\331151\roadway\SUMDRD01.DGN
18 STRUCTURE SIZE (INCHES) MATERIAL PLOTTED AS BUILT REMARKS S-2 15 SRCP (CLASS II) NRCP (CLASS II) X S-3 BOS DRAINAGE SRCP (CLASS II) NRCP (CLASS II) PVC CAST IRON PIPE X X THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. FALLER, DAVIS & ASSOCIATES, INC TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 ALAN S. ELDRIDGE, P.E. : 7707 ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER OPTIONAL MATERIALS TABULATION 9 :27:5 PM H:\319\331151\roadway\DROMRD01.DGN
19 PROJECT NOTES ============= 1. BENCHMARK ELEVATIONS SHOWN ON THE PLANS ARE NORTH AMERICAN VERTICAL DATUM OF 19 (NAVD 19). 2. TREES WITHIN THE LIMITS OF THIS PROJECT THAT ARE ADJACENT TO THE PROPOSED SIDEWALK SHALL HAVE THE BRANCHES EXTENDING OVER THE SIDEWALK TRIMMED TO GIVE A CLEAR HEIGHT OF TEN FEET. 3. PRIOR TO CLEARING AND GRUBBING, COORDINATE WITH THE ENGINEER AND ANDY HOLLAND, CITY OF NAPLES TO CONFIRM THE REMOVAL OF EXISTING LANDSCAPING.. CONTRACTOR MUST CONTACT THE PROPERTY OWNERS PRIOR TO RESETTING DECORATIVE STONES. 5. NOTIFY THE PROPERTY OWNERS TWO WEEKS PRIOR TO CLEARING AND GRUBBING TO ALLOW TIME FOR THE RELOCATION/REMOVAL OF EXISTING SPRINKLER SYSTEMS, SIGNS OR LANDSCAPING WITHIN THE PROJECT LIMITS.. ALL PROPOSED DETECTABLE WARNING DEVICES WITHIN THE LIMITS OF CONSTRUCTION SHALL BE THE COLOR BRICK RED. TREE PROTECTION ==================== 1. ALL COCONUT PALM TREES WITHIN THE LIMITS OF CONSTRUCTION SHALL REMAIN UNLESS OTHERWISE NOTED. COCONUT PALM TREE SHALL INCLUDE A TREE PROTECTION BARRICADE, SEE DESIGN STANDARDS INDEX 52. THE ESTIMATED QUANTITY FOR TREE PROTECTION BARRICADES ARE INCLUDED IN THE SUMMARY OF EROSION CONTROL. SIGNING AND PAVEMENT MARKING GENERAL NOTES =============================================== 1. MEASURE CROSSWALK WIDTHS FROM INSIDE TO INSIDE OF " STRIPES. THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER PROJECT NOTES :27:5 PM H:\319\331151\roadway\GNNTRD01.DGN
20 (<50 kv) (<50 kv) " RCP 3RD STREET NORTH N 1"= 0' BRICK PAVERS BRICK PAVERS PEA GRAVEL GUTTER CENTRAL AVE. GUTTER BACK FLOW 2"RCP GUTTER GUTTER BRICK PAVERS 2" RCP BACK FLOW PEA GRAVEL ASPHALT ALLEY ASPHALT ALLEY BACK BACK FLOW FLOW 2.' LT. "PVC " PVC " PVC REMOVE EXIST. SW CURB CENTRAL AVE ' LT. PC ' LT ' LT ' R PT ' LT. EL ' RT. EXIST. R/W LINE CONST. SW CURB BEGIN PROJECT +5.95,.2' LT BEGIN CONSTRUCTION 29.25' LT. EL ' LT. EL. 15' CONC. TURNOUT (" TK) ' R (" TK) STA ' LT ' LT. PRC ' LT. PC ' LT ' RT ' LT ' RT ' LT. ' R PC ' LT..2' LT. PRC PT ' LT. PT ' LT. EL ' LT. (" TK) CONST. ' CONC. SW (" TK) EXIST. R/W LINE CONST. LF OF DBL. " PIPE CENTERED IN SWALE WITH MES (INDEX 22) SEE SUMMARY OF DRAINAGE STRUCTURES ' LT ' LT. REMOVE EXIST. CLUMP OF (3) PALM TREES (" TK) PT ' LT. PRC ' LT. PC ' LT. EL PT ' LT. EL ' R 29.75' RT ST AVE. N "RCP 1ST AVE. N ' R PC +9.2 EL..00 " RCP " RCP PEA GRAVEL CONST. LF OF DBL. " PIPE CENTERED IN SWALE WITH MES (INDEX 22) SEE SUMMARY OF DRAINAGE STRUCTURES 29.0' RT. +5..' LT. PRC ' LT. BRICK PAVERS PRC ' LT. ' R PT ' LT ' LT ' LT. 29.'.' (" TK) COCONUT PALM TREES TO BE REMOVED DETECTABLE WARNING THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER ROADWAY PLAN (1) 11 :27: PM H:\319\331151\roadway\PLANRD01.dgn
21 (<50 kv) (<50 kv) 3RD STREET NORTH N 1"= 0' (" TK) PRC '.' +.50 ' R PC ' LT. EL ' LT. BRICK PAVERS ' R PRC ' LT ' LT EL..32 PT ' LT. (" TK) ' RT. ASPHALT ALLEY ASPHALT ALLEY ' LT ' LT TILE " PVC ROCK 15" CMP " PVC ' LT. ' R ' RT. CONST. 5' CONC. SW (" TK) REMOVE EXIST. SHRUB EXIST. R/W LINE EL ' LT. DPI DPI ' LT. EL ' LT. SPECIAL DT. LT ' RT. (-)2.7% " PVC " PVC +3.2 "RCP 2ND AVE. N 2ND AVE. N " RCP PC +.71 EL. 7.3 " RCP " RCP DPI ' LT. EL. 7.2 SPECIAL DT. LT ' LT. BRICK +5.3 (+)0.3% DPI ' LT. EL. 7. PRC ' LT. PAVERS 29.91' RT. PT ' LT ' LT. ' R (" TK) ' LT. PRC +.3.3' LT. 5' R PRC ' LT. EXIST. R/W LINE PC EL.. (" TK) PC ' LT. EL ' LT PT +9.2 EL.. PRC +91..' LT. PT ' LT. EL..5 CONST. 11 LF OF DBL. " PIPE CENTERED IN SWALE WITH MES (INDEX 22) SEE SUMMARY OF DRAINAGE STRUCTURES ' RT. ASPHALT ALLEY ASPHALT ALLEY ' R (" TK) ' LT ' LT. EL ' RT. PC ' LT. PRC ' LT. PT ' LT. EL..59 EXIST. R/W LINE.03' 29.91' COCONUT PALM TREES TO BE REMOVED DETECTABLE WARNING THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER ROADWAY PLAN (2) :27:7 PM H:\319\331151\roadway\PLANRD02.dgn
22 (<50 kv).0' RDW Y PAVT. RESTORATION +., 25.00' LT. (<50 kv) (<50 kv) 3RD STREET NORTH N 1"= 0' (" TK) 5' R 1.5' LT. PC ' LT. PT ' LT. PRC ' LT. PRC ' 29.91' ELEC RESIDENTIAL LOT UNDER CONSTRUCTION " PVC "PVC " RCP 1" RCP ASPHALT ALLEY ASPHALT ALLEY PT PRC ' LT ' LT. PC ' LT. EL..29 EXIST. R.W LINE CONST. LF OF DBL. " PIPE CENTERED IN SWALE WITH MES (INDEX 22) SEE SUMMARY OF DRAINAGE STRUCTURES +7.9 ' R.09' RT. 3RD AVE. N 3RD AVE. N DPI ' LT. EL (+)0.7% 29.90' RT. CONST. 5' CONC. SW (" TK) +33. DPI ' LT. EL (+)0.23% PC ' R PRC +.77.' LT ' LT. PT ' LT. EL ' LT. EL..00 (<50 kv) DPI ' LT. CONST. 5' CONC. SW (" TK) EL.. EL DPI ' LT. PT ' LT. ' R PRC ' LT. PC ' LT ' LT. CONST. 5' CONC. SW (" TK) ' RT. CONST. LF OF DBL. " PIPE CENTERED IN SWALE WITH MES (INDEX 22) SEE SUMMARY OF DRAINAGE STRUCTURES 25' R ' LT ' LT ' LT ' RT ' LT. ' R PRC ' LT. PT ' LT. EL..0 PC ' LT. EL ' LT (" TK).03' LT. PRC ' LT. PRC ' LT. PC ' LT. EL PT ' LT. EL..3 ' R ' R ' RT. ASPHALT PARKING TH AVE. N TH AVE. N SAN ' LT. ROADWAY PAVEMENT RESTORATION COCONUT PALM TREES TO BE REMOVED DETECTABLE WARNING THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER ROADWAY PLAN (3) 13 :27: PM H:\319\331151\roadway\PLANRD03.dgn
23 (<50 kv) 1.0' CONC. TURNOUT +3.,.13' LT. 3RD STREET NORTH N 1"= 0' ' LT ' LT PC ' LT. EL..70 ' R ' RT. PRC ' LT ' LT ' LT. EL CONST. 11 LF OF DBL. " PIPE CENTERED IN SWALE WITH MES (INDEX 22) PRC +.55 SEE SUMMARY OF.52' LT. DRAINAGE STRUCTURES PT PC ' LT. EL PT ' LT. 23.2' LT. EL ASPHALT ALLEY SAN SHELL BRICK PAVERS CONCRETE CONCRETE ' R (" TK) ' LT ' LT. PC ' LT. ' R PRC ' LT. EL PT ' LT. EL (" TK) 21.0' LT. REMOVE EXIST. SAW PALMETTOS PT ' LT. EL..0 PRC ' LT. PC ' LT. EL..77 CONST. '-" CONC. SW (" TK) (<50 kv) ' R ' RT. 5TH AVE. N ' LT ' LT. REMOVE SHRUBS CONST. 5' CONC. SW (" TK) ' LT..03' RT ' LT. 21.0' LT. (" TK) ASPHALT SHELL MAILBOX MAILBOX (2) (" TK) ' LT. PC ' LT. PRC ' LT. PT ' LT. ' R.02'.15' COCONUT PALM TREES TO BE REMOVED DETECTABLE WARNING THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER ROADWAY PLAN () :27:9 PM H:\319\331151\roadway\PLANRD0.dgn
24 3RD STREET NORTH N 1"= 0' ' LT ' LT. EXIST. R/W LINE.02'.15' SAN +1.3 DECORATIVE STONE SAN (<50 kv) S LAKE DR..1' LT ' LT. EXIST. YARD DRAIN TO REMAIN REMOVE EXIST. ALEXANDRIA PALM CLUSTER (<50 kv) (" TK) REMOVE EXIST. OAK TREE EXIST. YARD DRAIN TO REMAIN ' LT ' LT. (<50 kv) (<50 kv) RESET DECORATIVE STONES TO SW SURFACE ' LT ' LT. (" TK) ' R PRC ' LT. PC ' LT. EL..3 PT ' LT. EL..0 ELEC PC ' LT. EL..77 (<50 kv) ' R PRC ' LT. PT ' LT. EL.. EXIST. FENCE TO REMAIN (" TK) 1" PVC 32" RCP 32" RCP SD 1" PVC 32" RCP 32" RCP "CMP DETECTABLE WARNING ' R PRC ' LT. PC ' LT. EL.. PT ' LT. EL..0 BACK FLOW.00'.31' THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER ROADWAY PLAN (5) 15 :27:50 PM H:\319\331151\roadway\PLANRD05.dgn
25 3RD STREET NORTH N 1"= 0' BACK FLOW BACK FLOW 2" CMP " RCP 2" CMP 0 SAN BROAD AVE. N BRICK PAVERS 2"CMP (ASSUMED) CONCRETE (PRINTED BRICK) (<50 kv) NOTES 11 PC +9.92, 1.35' LT. ' R 13 PRC +7.,.9' LT. 15 PCC +.1, 2.92' LT. 1.00'.31' ' RT. 13 S-1 15 (" TK) (" TK) ' LT ' LT ' LT. (" TK) REMOVE MAGNOLIA TREE ' RT..00' RT ' LT. 25' R PC ' LT. 1.02' LT. 17.9' LT. 25' R PRC ' LT. PRC BRICK PAVERS BRICK PAVERS 2" RCP N LAKE DR ' R MAILBOX PT ' LT PC ' LT. EL.. INDEX ' LT. EL..15.' LT. PRC ' LT. PT ' LT. CONST. CONC. JACKET PI STA = 02 52' 2" LT ' R CONST. LF OF 2" PIPE 5.1' LT ' LT. CONST. 11 LF OF 15" PIPE 15'R 15'R ' LT. SAN 15'R ' LT. PC ' LT. 25' R PRC +. 2.' LT ' LT. ' R 25' R END PROJECT PT ' LT ' LT. (" TK) END CONSTRUCTION REMOVE EXIST. TREE 17 PRC +9.9,.9' LT. 1" PVC STA PT , 1.35' LT. PRC ' LT. ' R FORM SW AROUND FIRE HYDRANT ' WIDE SW MIN. (<50 kv) (<50 kv) S-2 S-3 (<50 kv) REMOVE ' LT. EXIST. TREE 5' R ' LT. PT ' LT. PC ' LT. EL ' RT. ELEC 1" RCP SD GUTTER 2"RCP GUTTER 7TH AVE. N BACK FLOW 15"RCP 7TH AVE. N SAN GUTTER GUTTER SD BRICK PAVERS SD 15"RCP BRICK PAVERS EXIST. R/W LINE ' LT EXIST. R/W LINE.05' 29.95' EXIST. R/W LINE.03' RT. RESTORATION EXIST. R/W LINE ROADWAY PAVEMENT DETECTABLE WARNING THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER ROADWAY PLAN () 1 :27:51 PM H:\319\331151\roadway\PLANRD0.dgn
26 NOTES: 1. SPECIAL ATTENTION IS DIRECTED TO THE FACT THAT PORTIONS OF SOME DRAINAGE STRUCTURES EXTEND INTO THE STABILIZED PORTION OF THE ROADBED AND EXTREME CAUTION WILL BE NECESSARY IN STABILIZATION OPERATIONS AT THESE LOCATIONS ALL DRAINAGE PIPES HAVE OPTIONAL MATERIALS. THE OPTIONAL MATERIALS TABULATION SHOWS ALL MATERIALS ALLOWED AND INDICATES WHICH MATERIAL IS PLOTTED IN THE PLANS AND USED AS THE BASIS FOR PAY QUANTITIES. VERIFY EXISTING STRUCTURE FLOW LINES AND PIPE SIZES. NOTIFY THE ENGINEER OF ANY DISCREPANCIES BEFORE ANY SHOP DRAWINGS ARE SUBMITTED. FROM S-3 TO S-3 1: CONST. 2" PIPE S-2 STA , 2.' LT. CONST. DBI TYPE C GRATE EL. 5. S-2 FL 3. INDEX 0, 1, 232 CONST. 15" PIPE CONST. CONC. JACKET INDEX TO S-1 1: FROM S-3 TO EXIST. CROSS DRAIN EXIST. STRUCTURE (TO BE REMOVED) EXIST. 2" CMP (TO REMAIN) EXIST. 2" CMP (TO REMAIN) 7.0 EXIST. " CMP (TO REMAIN) EXIST. 2" CMP (TO REMAIN) STA , 17.3' LT. CONST. MANHOLE TYPE P-7 (PARTIAL) RIM EL..1 FL 1.71 (EXIST.) (ASSUMED, NO ACCESS TO EXIST. STRUCTURE) INDEX 0, S-1 S-1 SCALE: HORZ. 1" = ' THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. FALLER, DAVIS & ASSOCIATES, INC TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 ALAN S. ELDRIDGE, P.E. : 7707 ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER DRAINAGE STRUCTURES (1) 17 :27:51 PM H:\319\331151\roadway\DRXSRD01.DGN
27 5 0 0 CONST. 15" PIPE FROM 1:3 0.50" DBC CATV STA FROM EXIST. DRAINAGE STRUCTURE S-2 TO S-1 EXIST. 2" RCP (TO REMAIN) CONST. 2" PIPE STA , 1.3' LT. CONST. MANHOLE TYPE J-7 (5'x') (CAST IN PLACE) RIM EL..39 FL 3.3 (BK. LT.) FL 2.1 (BK. RT. & AH.) (EXIST.) (ASSUMED, NO ACCESS TO EXIST. STRUCTURE) INDEX 0, S-3 S-3 SCALE: HORZ. 1" = ' THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. FALLER, DAVIS & ASSOCIATES, INC TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 ALAN S. ELDRIDGE, P.E. : 7707 ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER DRAINAGE STRUCTURES (2) 1 :27:52 PM H:\319\331151\roadway\DRXSRD01.DGN
28 BEGIN PROJECT BEGIN CONSTRUCTION BEGIN EARTHWORK STA SCALE: HORZ. 1" = ' SCALE: HORZ. 1" = ' THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER CROSS SECTIONS (1) 19 :27:52 PM H:\319\331151\roadway\RDXSRD01.dgn
29 : WM BE 1: SCALE: HORZ. 1" = ' : WM SCALE: HORZ. 1" = ' THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER CROSS SECTIONS (2) :27:52 PM H:\319\331151\roadway\RDXSRD01.dgn
30 WM WM SCALE: HORZ. 1" = ' SCALE: HORZ. 1" = ' THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER CROSS SECTIONS (3) 21 :27:52 PM H:\319\331151\roadway\RDXSRD01.dgn
31 1 1 1: SCALE: HORZ. 1" = ' 0 1 1: ' 1: SCALE: HORZ. 1" = ' 0 THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER CROSS SECTIONS () 22 :27:53 PM H:\319\331151\roadway\RDXSRD01.dgn
32 : SCALE: HORZ. 1" = ' SCALE: HORZ. 1" = ' 0 THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER CROSS SECTIONS (5) 23 :27:53 PM H:\319\331151\roadway\RDXSRD01.dgn
33 : ' 1: SCALE: HORZ. 1" = ' : SCALE: HORZ. 1" = ' 0 THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER CROSS SECTIONS () 2 :27:53 PM H:\319\331151\roadway\RDXSRD01.dgn
34 ' 1: WM SCALE: HORZ. 1" = ' WM SCALE: HORZ. 1" = ' THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER CROSS SECTIONS (7) 25 :27:53 PM H:\319\331151\roadway\RDXSRD01.dgn
35 V BE WM SCALE: HORZ. 1" = ' SCALE: HORZ. 1" = ' 0 THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER CROSS SECTIONS () 2 :27:53 PM H:\319\331151\roadway\RDXSRD01.dgn
36 1: " DBC STA " DBC STA SCALE: HORZ. 1" = ' BFO BFO SCALE: HORZ. 1" = ' 0 THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER CROSS SECTIONS (9) 27 :27:5 PM H:\319\331151\roadway\RDXSRD01.dgn
37 CATV V V +.00 SCALE: HORZ. 1" = ' V V SCALE: HORZ. 1" = ' THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER CROSS SECTIONS () 2 :27:5 PM H:\319\331151\roadway\RDXSRD01.dgn
38 1: :3.0 0 V V SCALE: HORZ. 1" = ' V V SCALE: HORZ. 1" = ' THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER CROSS SECTIONS (11) 29 :27:5 PM H:\319\331151\roadway\RDXSRD01.dgn
39 .0 1:9 1: V V SCALE: HORZ. 1" = ' 1 V V SCALE: HORZ. 1" = ' 0 THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER CROSS SECTIONS () :27:5 PM H:\319\331151\roadway\RDXSRD01.dgn
40 V V ' 1: SCALE: HORZ. 1" = ' 0 1:3 1:3.2. 1: 1: SCALE: HORZ. 1" = ' 0 THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER CROSS SECTIONS (13) 31 :27:5 PM H:\319\331151\roadway\RDXSRD01.dgn
41 1:.3 1:.2 1: SCALE: HORZ. 1" = ' 2 2 1:.27 1: SCALE: HORZ. 1" = ' 0 THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER CROSS SECTIONS () 32 :27:55 PM H:\319\331151\roadway\RDXSRD01.dgn
42 : SCALE: HORZ. 1" = ' SCALE: HORZ. 1" = ' 0 THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER CROSS SECTIONS (15) 33 :27:55 PM H:\319\331151\roadway\RDXSRD01.dgn
43 " DBC CATV STA : SCALE: HORZ. 1" = ' CATV SCALE: HORZ. 1" = ' 0 THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER CROSS SECTIONS (1) 3 :27:55 PM H:\319\331151\roadway\RDXSRD01.dgn
44 END PROJECT END CONSTRUCTION END EARTHWORK 7.0 STA SCALE: HORZ. 1" = ' 0 SCALE: HORZ. 1" = ' THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER CROSS SECTIONS (17) 35 :27:55 PM H:\319\331151\roadway\RDXSRD01.dgn
45 3RD STREET NORTH GENERAL NOTES TEMPORARY TRAFFIC CONTROL NOTES 1. THE EXISTING SPEED LIMIT SHALL REMAIN IN EFFECT FOR ALL TEMPORARY TRAFFIC CONTROL AREAS. THE POSTED SPEED ON 3RD STREET NORTH IS 25 MPH. 1. PLACE ADVANCED WARNING SIGNS AND WARNING DEVICES UTILIZING TTCP AND DESIGN STANDARDS INDEX ' 2. LANE CLOSURES ARE ONLY PERMITTED BETWEEN THE HOURS OF 9:00 AM AND :00 PM. 3. UTILIZE DESIGN STANDARDS INDEX 0 AS NEEDED TO CLOSE SIDEWALK LOCATIONS WHERE THERE IS NO SIDEWALK CONNECTION DURING CONSTRUCTION CONSTRUCT SIDEWALK, TURNOUTS AND DRAINAGE IMPROVEMENTS UTILIZING DESIGN STANDARDS INDEX NOS. 02, 03, 05 AND 0. PLACE PAVEMENT MARKINGS UTILIZING DESIGN STANDARDS INDEX 05. ROAD WORK END G-2A SIDE STREET ROAD WORK AHEAD W-1F UNSIGNALIZED SIDE STREETS NTS 3RD STREET NORTH AHEAD WORK ROAD W-1F 150' E N D R O A D W O R K SPEEDING FINES DOUBLED WHEN WORKERS PRESENT 0' BEGIN CONSTRUCTION G-2A MOT--0 0' ADVANCE WARNING SIGN DIAGRAM NTS 0' MOT--0 3RD STREET NORTH G-2A END CONSTRUCTION 0' SPEEDING FINES DOUBLED W HEN W ORKERS END ROAD WORK PRESENT 150' W-1F ROAD W ORK AHEAD 7TH AVE. N N LAKE DR. BROAD AVE. N S LAKE DR. 5TH AVE. N TH AVE. N 3RD AVE. N 2ND AVE. N 1ST AVE. N CENTRAL AVE. N THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER TEMPORARY TRAFFIC CONTROL PLAN 3 :27:5 PM H:\319\331151\roadway\TCGNRD01.DGN
46 (<50 kv) (<50 kv) " RCP 3RD STREET NORTH N 1"= 0' BRICK PAVERS BRICK PAVERS PEA GRAVEL GUTTER CENTRAL AVE. REMOVE EXIST. SW CURB GUTTER CENTRAL AVE. BACK FLOW 2"RCP GUTTER GUTTER BRICK PAVERS 2" RCP OE / TO REMAIN FP&L BACK FLOW ' LT. PC ' LT ' LT ' R PT ' LT. EL ' RT. BEGIN PROJECT EXIST. R/W LINE CONST. SW CURB 15' CONC. TURNOUT +5.95,.2' LT EL. BEGIN CONSTRUCTION 29.25' LT. (" TK) ' R (" TK) STA ' LT. EL. PEA GRAVEL ' LT. 21.' LT. 21.' LT. PRC +9.1 PC ' LT ' RT ' LT. ' R 29.73' RT ' LT. PC ' LT..2' LT. PRC PT ' LT. ASPHALT ALLEY ASPHALT ALLEY BACK BACK FLOW FLOW PT ' LT. EL ' LT ' LT. (" TK) CONST. ' CONC. SW (" TK) EXIST. R/W LINE REMOVE EXIST. CLUMP OF (3) PALM TREES (" TK) CONST. LF OF DBL. " PIPE CENTERED IN SWALE WITH MES (INDEX 22) SEE SUMMARY OF DRAINAGE STRUCTURES ' LT ' LT PT ' LT. PRC ' LT. PC ' LT. EL PT ' LT. EL "PVC " PVC ' R 29.75' RT EL " PVC LIMITED INVESTIGATION TECHNIQUES AND SHOULD BE CONSIDERED APPROXIMATE ONLY. THE VERIFIED LOCATIONS/ELEVATIONS APPLY ONLY AT THE POINTS SHOWN. INTERPOLATIONS BETWEEN THESE POINTS HAVE NOT BEEN VERIFIED. 2. UTILITY/AGENCY OWNERS: COMPANY COMCAST TECO PEOPLES GAS CENTURYLINK 1-" CO. / TO REMAIN CENTURYLINK CITY OF NAPLES FLORIDA POWER AND LIGHT -" CO. / TO REMAIN CENTURYLINK " POTABLE WM / TO REMAIN CITY OF NAPLES OE / TO REMAIN FP&L CATV / TO REMAIN COMCAST " GRAVITY SAN. / TO REMAIN CITY OF NAPLES CONTACT MARK COOK 1-" CO. / TO REMAIN CENTURYLINK ALLYSON HOLLAND MICHAEL MARTINEZ MARILYN ALOI TONY ZAWACKY " POTABLE WM / TO REMAIN CITY OF NAPLES 1. THE LOCATION(S) OF THE UTILITIES SHOWN IN THE PLANS (INCLUDING THOSE DESIGNATED Vv, Vh, AND Vvh) ARE BASED ON EPHONE NUMBERS (239) (239) (239) (239) 9-0 (239) ST AVE. N 1ST AVE. N ' R PC +9.2 "RCP " RCP " RCP PEA GRAVEL CONST. LF OF DBL. " PIPE CENTERED IN SWALE WITH MES (INDEX 22) SEE SUMMARY OF DRAINAGE STRUCTURES 29.0' RT. +5..' LT. PRC ' LT ' LT. PRC ' R PT ' LT. BRICK PAVERS ' LT ' LT. 29.'.' (" TK) COCONUT PALM TREES TO BE REMOVED DETECTABLE WARNING THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 1G , F.A.C. TAMPA, FLORIDA CERTIFICATE OF AUTHORIZATION : 5 MARK ANTHONY BAYER, P.E. : ROAD COUNTY FINANCIAL PROJECT ID N/A COLLIER UTILITY ADJUSTMENTS (1) 37 :27:57 PM H:\319\331151\roadway\UTADRD01.dgn
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION CONTRACT PLANS FINANCIAL PROJECT ID (FEDERAL FUNDS) COLLIER COUNTY (03000) HARBOUR DRIVE
Tamiami Airport Rd. CONTRACT PLANS COMPONENTS ROADWAY PLANS CHIPLEY 75 95 CONTRACT PLANS PENSACOLA FORT WALTON BEACH PANAMA CITY TALLAHASSEE 295 LAKE CITY GAINESVILLE JACKSONVILLE ST AUGUSTINE INDEX OF
More informationPHASE II PLANS 7/16/2018
CHIPLEY 10 95 SIGNING AND PAVEMENT MARKING PLANS PENSACOLA FORT WALTON BEACH PANAMA CITY TALLAHASSEE 10 295 LAKE CITY GAINESVILLE JACKSONVILLE ST AUGUSTINE INDEX OF SIGNING AND PAVEMENT MARKING PLANS FINANCIAL
More informationSEMINOLE TRIBE OF FLORIDA PURCHASING DEPARTMENT RFB MABEL T FRANK WAY ROADWAY CONSTRUCTION BIG CYPRESS INDIAN RESERVATION
SEMINOLE TRIBE OF FLORIDA PURCHASING DEPARTMENT RFB MABEL T FRANK WAY ROADWAY CONSTRUCTION BIG CYPRESS INDIAN RESERVATION 6300 STIRLING ROAD HOLLYWOOD, FLORIDA 33024 ADDENDUM NUMBER THREE June 12, 2015
More informationPINFISH COURT DRAINAGE IMPROVEMENTS
P RAILWAY 6 COMPONENTS OF CONTRACT PLANS SET 10 CHIPLEY 95 PENSACOLA FORT WALTON BEACH TALLAHASSEE 10 LAKE 295 JACKSONVILLE PANAMA CITY CITY ST AUGUSTINE GAINESVILLE DRAINAGE IMPROVEMENTS OCALA DELAND
More informationBlack Creek Bridge Replacement FPN # USGS Topographic Quadrangle Map Clay County, Florida
LEGEND Approximate Limits of Construction - 10.33 acres ± Northern Extent Lat: 29 56' 51.37" N (29.947603 dd) Long: 81 53' 51.49" W (-81.897636 dd) Southern Extent Lat: 29 56' 14.81" N (29.937447 dd) Long:
More informationThe purpose of this addendum is to respond to RFI s submitted to the County and issue a revised SECTION BID FORM.
HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS (HCBCC) PURCHASING DEPARTMENT DATE: 6/19/15 BID NO. ITB 15-044 ADDENDUM No. 2 Project.: Owner: Lake Josephine Drive resurfacing Highlands County BCC Attn:
More informationADDENDUM #1 MARCH 10, CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF
ADDENDUM #1 MARCH 10, 2016 CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF TO: ALL PLAN HOLDERS This Addendum No. 1 to the Contract Documents for City of Winter Springs project "Central Winds
More information36 JASPER THPMAS ROAD CRAWFORDVILLE, FL.
N ARRAN RD. N US 319 CRAWFORDVILLE HWY SR 61 SHADEVILLE RD. WAKULLA HARVEY MILL ROAD US 319 PREBLE-RISH INC CIVIL SURVEYING SITE PLANNING 36 JASPER THPMAS ROAD CRAWFORDVILLE, FL. 32327 GENERAL NOTES: 1.
More informationA T L A N T I C O C E A N
39 CHIPLEY PENSACOLA 0 FORT WALTON BEACH PANAMA CITY TALLAHASSEE 0 LAKE CITY 95 95 JACKSONVILLE ST AUGUSTINE GAINESVILLE CONTRACT PLANS LOCATION OF PROJECT OCALA DELAND 4 DAYTONA BEACH NEW PORT RICHEY
More informationDOCUMENT ADDENDA AND MODIFICATIONS
DOCUMENT ADDENDA AND MODIFICATIONS PART 1 1.1 PROCEDURE GENERAL A. For filing purposes, add Addenda and Modifications to the Contract Documents following this page. Modified June 20, 2017 Addenda and Modifications
More informationTRACTOR ROAD IMPROVEMENTS HIGHLANDS COUNTY
HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS (HCBCC) PURCHASING DEPARTMENT DATE: 3/08/16 ITB NO. 16-012 ADDENDUM No. 1 Project.: TRACTOR ROAD IMPROVEMENTS HIGHLANDS COUNTY Owner: Highlands County BCC
More informationAddendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018
155 Corey Avenue St. Pete Beach, FL 33706-1839 www.stpetebeach.org Addendum 1 Valve & Valve Vault Replacement Issued June 13, 2018 Note that this Addendum does not change the bid due date and time as stated
More informationDial or (800)
GENERAL NOTES 2 EROSION CONTROL ITEMS TO BE PLACED AS SHOWN ON THE PLAN OR AS DIRECTED BY THE ENGINEER. NO TREES (AND/OR SHRUBS) ARE TO BE REMOVED WITHOUT THE APPROVAL OF THE ENGINEER. 2 EXCAVATION FOR
More informationHIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, :30 PM 600 S. Commerce Ave. Sebring, FL AGENDA
HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, 2018 5:30 PM 600 S. Commerce Ave. Sebring, FL 33870 AGENDA 1 MEETING CALLED TO ORDER: Invitation to fill out "citizens not on the agenda
More informationPAVEMENT DESIGN MEMORANDUM
PAVEMENT DESIGN MEMORANDUM FOR SR 70 (15TH STREET EAST) ROUNDABOUT MANATEE COUNTY FINAL SUBMITTAL FPID 435090-1-52-01 PREPARED FOR: FLORIDA DEPT. OF TRANSPORTATION DISTRICT 1 FEBRUARY 16, 2018 PREPARED
More informationBASE BID FORM FY 2015
BASE BID FORM FY 2015 STORMWATER TREATMENT AREA - BASE BID (FY2015) THE LUMP SUM (LS) PRICES FOR ITEMS 1-6 SHALL BE DONE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND SPECIFICATIONS AND ALL APPLICABLE
More informationENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)
EXHIBIT A CONTRACTOR'S COMPENSATION SCHEDULE FOR ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / 50103-000-4150 (Budget Account Number) ITEM NO. P-S-F DESCRIPTION QTY
More informationADDENDUM NO. 2. DATE: June 21, PROJECT NAME: Calusa Corners Park Improvements
ADDENDUM NO. 2 DATE: June 21, 2016 PROJECT NAME: Calusa Corners Park Improvements This Addendum is issued to clarify and/or modify the previously issued Invitation for Bid. All requirements not modified
More informationPublic Utilities PELICAN MARSH ELEMENTARY SCHOOL WATER SERVICE REPLACEMENT
Public Utilities PELICAN MARSH ELEMENTARY SCHOOL WATER SERVICE REPLACEMENT Prepared By: 3800 Via Del Rey Bonita Springs, FL 34134 July 2015 Table of Contents Name Section Bid Schedule Project Description
More informationADDENDUM #1 AUGUST 25, INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF
ADDENDUM #1 AUGUST 25, 2016 INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF TO: ALL PLAN HOLDERS This Addendum No. 1 to the Contract Documents for City of Winter Springs project
More informationUTILITY NOTES GENERAL CONSTRUCTION NOTES PAVING AND GRADING NOTES: TREE PROTECTION NOTES
GENERAL CONSTRUCTION NOTES PAVING AND GRADING NOTES: UTILITY NOTES PROPOSED LEGEND 66.50 66.50 GROUND SPOT ELEVATION GROUND SPOT ELEVATION (MATCH EXISTING GRADE) MATCH EXISTING GRADE MITERED END SECTION
More informationGENERAL NOTES ROADWAY CONSTRUCTION RD0001-1A ISSUED:2017 REVISED: --
ROADWAY CONSTRUCTION NOTES 1. ALL RIGHT-OF-WAY OTHER THAN ROADWAY AREAS SHALL BE SODDED. ALL SLOPE STEEPER THAN 6:1 SHALL REQUIRE SODDING. THE CITY RESERVES THE RIGHT TO REQUIRE SODDING IN SPECIAL AREAS
More informationQUANTITIES MOBILIZATION PAVT, REM EROSION CONTROL, INLET PROTECTION, FABRIC DROP 12 EA AGGREGATE BASE AGGREGATE BASE, CONDITIONING SHOULDER, CL II
7/12/18 GENERAL NOTES SPECIFICATIONS: ALL WORK AND MATERIALS, UNLESS OTHERWISE STATED IN THESE PLANS, SHALL BE IN ACCORDANCE WITH THE MICHIGAN DEPARTMENT OF TRANSPORTATION (MDOT) 2012 STANDARD SPECIFICATIONS
More informationEL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02
EL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02 Date: April 22, 2009 To: Prospective Bidders/Plan Holders From: Abraham Campos, PE on behalf of City of El
More informationUTILITY PLANS HANSON STREET EXTENSION PHASE I
Cleveland Avenue Parkway Rd. P CHIPLEY DEPARTMENT OF PUBLIC WORKS PENSACOLA FORT WALTON BEACH PANAMA CITY TALLAHASSEE 75 LAKE CITY 295 95 JACKSONVILLE ST AUGUSTINE GAINESVILLE UTILITY PLANS EXTENSION PHASE
More informationFDOT REF. ITEM DESCRIPTION
EXHIBIT B NAPLES BASIN V Stormwater Improvements BID TABULATION SUMMARY OF PAY ITEMS FDOT REF. ITEM DESCRIPTION Est. Quant. Cost 0 Mobilization LS 02 2 Maintenance of Traffic LS 3 Preconstruction Audio/Video
More informationNovember 29, CITY OF PLANT CITY Purchasing Division (813)
November 29, 2018 CITY OF PLANT CITY Purchasing Division (813) 659-4270 IFB 18-014UM-LG 12-inch Water Transmission Main-Franklin St., Hancock St. and Terrace Drive West ADDENDUM No. 3 *Bidders are required
More informationRE: Addendum No CR2297 (Cooks Bayou) Bridge Replacement. Please accept this as Addendum No. 4 for the above referenced project.
Purchasing Department 40 est 11 th Street, Suite 200 Panama City, FL 32401 Telephone: (0) 24-20 Fax: (0) 24-26 Board of County Commissioners March 29, 201 Prospective Bidders RE: Addendum No. 4 1-16 CR229
More informationSECTION 1500 REMOVALS
SECTION 1500 REMOVALS REMOVALS PART 1 GENERAL 1.01 Section Summary A. Removal of structures, obstructions, surfacing, and miscellaneous items. 1.02 Related Sections A. Section 1800 Excavation and Embankment
More informationADVERTISEMENT SET DECEMBER 2013
Sheet List Table GREELEY CANAL #2 WCR 21 PROJECT AREA N SH-392 ADVERTISEMENT SET DECEMBER 2013 LINE DESCRIPTION PROPOSED LINE POWER / COMMUNICATIONS EXISTING LINE LINE DESCRIPTION PROPOSED LINE BOUNDARY
More informationSTATE OF FLORIDA 10 DEPARTMENT OF TRANSPORTATION CONTRACT PLANS FINANCIAL PROJECT ID DUVAL COUNTY (72260) SR 105 / SR A1A
CONSTRUCTION CONTRACT No. E2U COMPONENTS OF CONTRACT PLANS SET 1 CHIPLEY 95 75 ROADWAY PLANS PENSACOLA FORT WALTON BEACH TALLAHASSEE 1 LAKE 295 JACKSONVILLE PANAMA CITY CITY ST AUGUSTINE GAINESVILLE CONTRACT
More informationAddendum No. 1 Issue Date: March 29, 2016
Addendum No. 1 Issue Date: Project: Bonson and Short Street Reconstruction Contract: #1-16 Owner: City of Platteville, Wisconsin Engineer: Delta 3 Engineering, Inc. Daniel J. Dreessens, P.E. 875 South
More informationSECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS
SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING
More informationCounty of Georgetown, South Carolina
County of Georgetown, South Carolina 129 Screven Street, Suite 239 Georgetown, SC 29440-3641 Post Office Box 421270, Georgetown, SC 29442-4200 (843)545-3082 Fax (843)545-3500 purch@gtcounty.org ADDENDUM
More informationM I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002)
BID TABULATION SUMMARY JOB 940094 PAGE 1 STATE PROJECT NO. 162-080-04 BIDS RECEIVED UNTIL 11:00 A.M. ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002) BETWEEN 2ND STREET NORTH AND 15 STREET NORTH IN ST.
More informationLEE COUNTY BOARD OF COUNTY COMMISSIONERS PUBLIC WORKS ADMINISTRATION DEPARTMENT OF TRANSPORTATION CONTRACT PLANS PLANS OF PROPOSED
LEE COUNTY BOARD OF COUNTY COMMISSIONERS PUBLIC WORKS ADMINISTRATION 10 CHIPLEY 95 PENSACOLA FORT WALTON BEACH TALLAHASSEE 10 LAKE 295 JACKSONVILLE CONTRACT PLANS PANAMA CITY CITY GAINESVILLE ST AUGUSTINE
More informationCITY AND COUNTY OF DENVER
2-1.1b REMOVE COMBINATION CONCRETE CURB, GUTTER AND SIDEWALK (3'-11") 2-1.2a REMOVE 6" CONCRETE CURB AND/OR GUTTER S Holly: See near STA: 25+56 S Poplar 300 LF 25 LF 2-1.4 REMOVE HANDICAP CONCRETE CURB
More informationBidder Name: ITEMIZED BID: The bidder should complete the following section in accordance with Sec 102.7. The bidder proposes to furnish all labor, materials, equipment, services, etc. required for the
More informationBID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of a Partnership consisting of an Individual doing business as. TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction
More informationHERNANDO COUNTY BOARD OF COUNTY COMMISSIONERS DEPARTMENT OF PUBLIC WORKS ENGINEERING SERVICES
F:\ENGR\bob\PIX\hccolorsea2.gif HERNANDO COUNTY BOARD OF COUNTY COMMISSIONERS DEPARTMENT OF PUBLIC WORKS UTILITY COMPANIES UTILITY COMPANY CONTACT PERSON CONTACT INFO HERNANDO COUNTY UTILITIES Brad Smith
More informationCITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION
CITY OF ALBANY Public Works Department ADDENDUM # ST-6-02 CROCKER LANE RECONSTRUCTION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and shall
More informationProject Type: Drainage and Storm Systems
580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install
More information:00 PM CST. McDonald Construction Inc of Slidell $1,002, Magee Excavation & Development LLC $1,
General Info Number: 316-00-17-47-2 Description: Lake Village Drainage Improvements - N. Pearl Mill & Overlay Deadline: 2017-7-9 2:00 PM CST Bids Business Bid Total McDonald Construction Inc of Slidell
More informationRevision 1 Dated October 2, UNIT PRICE BID SCHEDULE SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE:
Revision 1 Dated October 2, 2014 1.3.2 UNIT PRICE BID SCHEDULE SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE: PEYTON DRIVE WIDENING - PHASE 3 AND ENGLISH CHANNEL IMPROVEMENTS Project No s. S12012 & 800360
More informationSUQUAMISH WAY NE SHOULDER AND SIDEWALK IMPROVEMENT PROJECT
CALL FOR BIDS KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO. 1589 SUQUAMISH WAY NE SHOULDER AND SIDEWALK IMPROVEMENT PROJECT BID OPENING: DATE: FEBRUARY 27, 2018 TIME: 11:00 AM Sealed
More informationCITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION
CITY OF ALBANY Public Works Department ADDENDUM #1 ST-13-04-2014, MAIN STREET REHABILITATION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and
More informationCOST ESTIMATE STREET IMPROVEMENTS (Off Site)
STREET IMPROVEMENTS (Off Site) Developer: Planning Case # Engineer: TM No./PM No.: Phone No: Date: ITEM QUANTITY UNIT UNIT COST () AMOUNT 6" Curb and Gutter LF 13. 6" Curb only LF 1.5 8" Curb and Gutter
More informationPUBLIC WORKS STANDARD DETAILS
PUBLIC WORKS STANDARD DETAILS SUBSTANTIAL EFFORT HAS BEEN MADE TO ENSURE THE INFORMATION CONTAINED IN THESE STANDARDS IS ACCURATE. HOWEVER, THE CITY OF BRADENTON BEACH CANNOT ACCEPT RESPONSIBILITY FOR
More informationFor Reference Only - Not For The Purpose Of Bidding BP-1 PROPOSAL. PROPOSAL OF, a corporation a. partnership consisting of
PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction and Invitations to Bidders, the undersigned
More informationARDEN P.U.D. STATE ROAD 80 POSTED SPEED 55 MPH DESIGN SPEED 65 MPH
Plot Date: Aug. 2, 25 File: W:\627 HIGHLAND DUNES FCM\ENGINEERING\APRIL DRAWINGS\627SR8 - Copy.dwg GENERAL NOTES. INCORPORATED AS A PART OF THE GENERAL SPECIFICATIONS AND REQUIREMENTS FOR THIS PROJECT
More information} SURVEY SR 429 STANDARD CLEARING & GRUBBING LIMITS OF FRICTION COURSE 8" 8" 8" 8" 12' VARIES 24'-36' VARIES VARIES * 4' SHLDR. PAVT.
} SURVEY SR 429 { CONST. SR 429 (WEKIVA PKWY) R/W (15 MIN.) 0'-10.4' R/W (15 MIN.) STANDARD CLEARING & GRUBBING 24'-36' 24'-48' 94' BORDER (2-30.) (2-30.) 94' BORDER 10' 4' 10' NATURAL GROUND, MAX. CUT
More information2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form
2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form Project Information (\aen i vake.. F;) N0.3-7114117 Project Name Section 1 - Grading and Erosion Control BMPs Quantity Units Price Earthwork
More informationPUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR
EASEMENT NOTES:. EASEMENT LIMIT SHOWN AS PROVIDED BY. TESC NOTES:. CONTRACTOR SHALL DEVELOP TEMPORARY EROSION AND SEDIMENT CONTROL PLAN AND PROVIDE ONSITE CERTIFIED EROSION AND SEDIMENT CONTROL LEAD (CESCL)
More informationStatement of Quantities
01-21.26.01 GROUND WATER TREATMENT CONSUMABLES ALLOWANCE 1 A/A 01-52.13 ACCOUNT - PROJECT SPECIAL PROVISIONS TEMPORARY OFFICE FACILITIES 2-1.2a REMOVE 6" CONCRETE CURB AND/OR GUTTER REMOVE 780 LF 2-1.4
More information33rd Street Outfall (Curtis to Lafayette) Schedule A
01-21.23.01 ALLOWANCE ACCOUNT - SEE PROJECT SPECIAL PROVISIONS Add'l Info: For coordination and installation of power supply to upgraded traffic signals at MLK and Downing and MLK and Marion. Please see
More informationThe Contract Documents for the referenced project are hereby amended in the following particulars only, with all other conditions remaining unchanged.
1700 East Iron Ave. Salina, KS 67401 785-827-0433 phone 785-827-5949 fax 6 March 2018 Arizona California Colorado Kansas Louisiana Missouri Nebraska New Mexico Texas Utah ADDENDUM NO. 2 RE: City of Kingman,
More informationCITY OF DELRAY BEACH LAKE IDA DRAINAGE IMPROVEMENTS
LAKE IDA DRAINAGE IMPROVEMENTS = LIMITS OF PROJECT AREA 1760G01.DWG SURVEY LEGEND: SURVEY SYMBOL LEGEND: PLAT LEGEND: STATEMENT OF PURPOSE: SURVEY TREE LEGEND: SITE BENCHMARKS: SURVEY PREPARED BY: DENNIS
More informationPUBLIC WORKS DEPARTMENT THORNTON ROAD WIDENING PROJECT NO. PW1428
PUBLIC WORKS DEPARTMENT BID FORMS FOR THORNTON ROAD WIDENING PROJECT NO. PW1428 DO NOT DETACH ANY OF THIS MATERIAL THIS CONSTITUTES YOUR BID PROPOSAL SUBMIT ONE ORIGINAL OF THIS BID PROPOSAL Job Walk:
More informationADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013
ADDENDUM NO. 1 for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA Posting Date: June 20, 2013 BIDDERS SHALL CONFORM TO THE FOLLOWING CHANGES AS A PART OF THE BID DOCUMENTS, WHICH SHALL BECOME
More informationRFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered
RFB for Wastewater Force Main #3 October 2, 2015 Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered The proposed force main will be required to transmit up to 1000 gallons of wastewater
More informationSECTION 1 GENERAL NOTES
ISSUE DATE NOVEMBER 1st, 2011 SECTION 1 Page List Page Number Page Title COVER COVER GN-01 PAGE 1 GN-02 PAGE 2 GN-03 PAGE 3 GN-04 PAGE 4 GN-05 PAGE 5 GN-06 PAGE 6 GN-07 PAGE 7 : 1. (CCU) STANDARD SPECIFICATIONS
More informationCOLLIER COUNTY Growth Management Department
COLLIER COUNTY Growth Management Department July 07, 2015 Josh Fruth Davidson Engineering, Inc Suite 201 4365 Radio Rd Naples, FL 34104 EMAIL - Josh@DavidsonEngineering.Com; jessica@davidsonengineering.com
More informationC. W. Matthews Contracting Co., Inc. (L)
BID TABULATION Page 1 of 5 E.R. Snell Contractor, 001 Photograph Documentation 8 MO $110.00 $880.00 $250.00 $2,000.00 $97.17 $777.36 $1,250.00 $10,000.00 002 Traffic Control Project No. F-1056 1 LS $192,000.00
More information(ENGLISH UNITS) FILE:
J u l i a R. B u e r e n, D i r e c t o r Deputy Directors Brian M. Balbas Stephen Kowalewski Steven Silveira Joe Yee Memo TO: Engineering Services Staff DATE: FROM: Warren Lai, Assistant Public Works
More informationEXHIBIT A FEE SCHEDULE
EXHIBIT A FEE SCHEDULE PERMIT FEE WORKSHEET INSTRUCTIONS: Each application for a new permit or change in status shall be accompanied by the appropriate fee as indicated below. NO PERMIT APPLICATION WILL
More informationSPECIAL SPECIFICATION. Water and Sewer System and Appurtenances
2004 Specifications CSJ 2250-01-021, etc SPECIAL SPECIFICATION 5243 Water and Sewer System and Appurtenances 1. Description. This Item governs for the furnishing of all equipment, labor and materials to
More informationGENERAL NOTES AND CONDITIONS STORM SEWER 1. ALL EARTHWORK, GRADING AND PAVING SHALL BE PERFORMED IN ACCORDANCE WITH STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION IN ILLINOIS, STATE OF ILLINOIS
More informationADDENDUM TO THE CONTRACT. for the. Switzer Creek Subdivision Contract No. E ADDENDUM NO.: FOUR CURRENT DEADLINE FOR BIDS: September 23, 2015
ADDENDUM TO THE CONTRACT for the ENGINEERING DEPARTMENT Switzer Creek Subdivision Contract No. E16-046 ADDENDUM NO.: FOUR CURRENT DEADLINE FOR BIDS: September 23, 2015 PREVIOUS ADDENDA: THREE ISSUED BY:
More informationWASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO
WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO 42 380 68 coddington ave ledbetter road shawnee creek s patton street ledbetter road wesley ave 68 starr drive 42 twist run 85 35
More informationADDENDUM. DATE: 10/12/15 BROADWAY CROSSWALKS IMPROVEMENT PROJECT CONTRACT No: BID DATE: 10/27/15 ADDENDUM No: 1
CITY OF PLACERVILLE, CALIFORNIA DEVELOPMENT SERVICES DEPARTMENT- ENGINEERING DIVISION ADDENDUM DATE: 10/12/15 PROJECT: BROADWAY CROSSWALKS IMPROVEMENT PROJECT CONTRACT No: 41506 BID DATE: 10/27/15 ADDENDUM
More informationSECTION May 17, 2013 PROPOSAL/BID FORM ADDENDUM No.1
SECTION 00301 May 17, 2013 PROPOSAL/BID FORM ADDENDUM No.1 PROJECT IDENTIFICATION: Pima Canal, Reach BW-IA, SCIDD Lateral 2-31-1 and Private Ditches Relocations. CONTRACT IDENTIFICATION (NUMBER AND DATE):
More informationSECTION MEASUREMENT AND PAYMENT
SECTION 01026 - PART 1 GENERAL 1.01 THE REQUIREMENT A. Payment for various items of the Bid Schedule, as further specified herein, shall include all compensation to be received by the CONTRACTOR for furnishing
More information18"ST 8"W 6"FM OHE T CTV 4"G 8"S RCAP LRCP CMP RCP PVC VCP DIA M.01 W.01-W.02 CROSS SECTIONS - ACCESS ROAD PROTECTION OF VEGETATION
GENERAL NOTES 1. ALL ELEVATIONS ARE STATE PLANE SOUTH. 2. REMOVE AND REPLACE ALL STREET SIGNS AS DIRECTED BY ENGINEER. COST IS INCIDENTAL TO CONSTRUCTION. 3. SHAPE ALL DITCHES TO DRAIN AFTER CONSTRUCTION.
More informationCONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:
CONSTRUCTION SURVEY PART 1 - GENERAL 1.01 SECTION INCLUDES Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: A. Construction Survey: 1. Project
More informationSECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More information3Bureau of Construction and Maintenance
Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still FAX IT TO the Estimating Section at (785) 296-0999. Any instructions not followed will result
More informationEngineer s Report Infrastructure Improvements
Gulfstream Polo Community Development District Engineer s Report Infrastructure Improvements Prepared for: Gulfstream Polo Community Development District Board of Supervisors Palm Beach County, Florida
More informationSPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.
2004 Specifications CSJ 0299-04-049, Etc. SPECIAL PROVISION 000---979 Detours, Barricades, Warning Signs, Sequence of Work, etc. 1. Description of Project. A. General. This project provides for the construction
More informationENGINEERING DESIGN & IMPROVEMENT STANDARDS
ENGINEERING DESIGN & IMPROVEMENT STANDARDS 2016 Prepared by: Engineering Division For latest edition of these Improvement Standards, refer to City of Visalia website at: www.visalia.city/engineeringdocuments
More informationPLAN PREPARATION GUIDE CHAPTER 3 QUANTITY COMPUTATIONS AND INFORMATION
PLAN PREPARATION GUIDE CHAPTER 3 QUANTITY COMPUTATIONS AND INFORMATION SECTION DESCRIPTION PAGE 1 General Quantities 3-1 2 Maintenance of Roadway and Drives 3-1 3 Liquid Asphalt Binder in Paving Mixture
More informationGeneral Water Bid Items Item No.
BID PROPOSAL PROPOSAL OF, a corporation organized and existing under the laws of the State of, a partnership consisting of, an individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More informationSECTION CONSTRUCTION SERVICES
SECTION 01100 CONSTRUCTION SERVICES PART 1 GENERAL 1.01 - Section Includes A. Mobilization. B. Construction Surveys. C. Record Documents. 1.02 Description Of Work A. Mobilization: includes the preparatory
More information~ Totals--> 4,135,
BD TABULATON Bid No.: 6997 Jungle Lake Outfall Storm Drainage mprovements Project No.: 07038-110 - -. # - - -- - - "ii' - - - - - --- tem Description Quantity Engineer's Estimate All American Concrete,
More informationCONSTRUCTION PLAN CHECKLIST
CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted
More informationMOBILIZATION CURB AND GUTTER, REM EXCAVATION, EARTH DR STRUCTURE, RECONST, CASE 1 AGGREGATE BASE, CONDITIONING COLD MILLING HMA SURFACE
7/13/18 GENERAL NOTES SPECIFICATIONS: ALL WORK AND MATERIALS, UNLESS OTHERWISE STATED IN THESE PLANS, SHALL BE IN ACCORDANCE WITH THE MICHIGAN DEPARTMENT OF TRANSPORTATION (MDOT) 01 STANDARD SPECIFICATIONS
More informationConstruction Cost Estimation Preparation Manual for Preliminary Design (English Units)
10/16/2014 Construction Cost Estimation Preparation Manual for Preliminary Design (English Units) July 2002 Prepared by Construction Cost Estimating Unit Program Support Services 10/16/2014 Table of Contents
More informationUNIT PRICE LIST January 2009
UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only
More informationCOUNTY OF SUTTER ENCROACHMENT PERMIT
COUNTY OF SUTTER ENCROACHMENT PERMIT PERMIT No. Development Services Dept. Engineering Division 1130 Civic Center Blvd Yuba City, CA 95993 (530) 822-7400 Hours: 8 AM - 5 PM Upon completion, submit application
More informationAMERA COURT RESIDENTIAL SUBDIVISION
Prepared By: LOCATION MAP N.T.S. PROJECT SITE N 000 Gulf to Bay Boulevard, Suite 0 Clearwater, FL Tel. ()- AMERA COURT RESIDENTIAL SUBDIVISION Grant Street Dunedin, Florida FEMA MAP PANEL NO. 0C-00-C FLOOD
More informationOAK MARSH PHASE II FEASIBILITY REPORT CITY OF MANKATO MINNEOSTA. January 20, 2015 Project No
PHASE II FEASIBILITY REPORT CITY MINNEOSTA January 20, 20 Project No. 14 I. INTRODUCTION Oak Marsh Phase II is a residential development on a parcel of land located in the Southern portion of the City
More informationTABULATION OF TOTAL QUANTITIES - CR 44H (BUCKHORN ROAD) (1 OF 2)
TABULATION OF TOTAL QUANTITIES - CR 44H (BUCKHORN ROAD) (1 OF 2) CONTRACT ITEM NO. CONTRACT ITEM UNIT BUCKHORN ROAD UPPER SECTION BUCKHORN ROAD LOWER SECTION PROJECT TOTALS PLAN AS CONST. PLAN AS CONST.
More informationCITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS
CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS COMPLETE THROUGH REVISION #18 April 2009 CITY STANDARD DETAILS REVISIONS Revision No. Revision Date Effective Date 2 August
More informationDodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits.
Dodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits. All private construction and/or maintenance activities which take place within the City right-of-way are subject to oversight
More informationCITY OF ROCKLIN STANDARD DRAWINGS
CITY OF ROCKLIN STANDARD DRAWINGS November 2016 Table of Contents Page # Section 1 Section 2 Section 3 General Notes and Review Boxes 01-01 Signature Blocks... 1 01-02 General Notes (Sheet 1 of 8)... 2
More informationThe following information is required when submitting a building permit application:
Dept. of Planning and Zoning Town of Greensboro PO Box 340 Greensboro, MD 21639 410-482-6222 The following information is required when submitting a building permit application: 1. A Completed building
More informationKATE HAYES ST AND EMPIRE CT SEWER REPLACEMENT
CITY OF GRASS VALLEY ENGINEERING DIVISION IMPROVEMENT PLANS FOR PROJECT NO. GRASS VALLEY SOUTH CHAPEL MILL CHURCH ATE HWY 20/49 T EA MAIN MILL COUNTY MAP 20 174 YUBA COUNTY 49 65 PLACER COUNTY VICINITY
More informationHosted by: M Squared Engineering on behalf of the Illinois Department of Transportation Thursday, February 9, 2012 Eiger Lab, Rockford, IL
Hosted by: M Squared Engineering on behalf of the Illinois Department of Transportation Thursday, February 9, 2012 Eiger Lab, Rockford, IL TECHNICAL SUPPORTIVE SERVICES IN IDOT DISTRICTS 2 & 3 FOR CERTIFIED
More informationExemption Verification Package
Exemption Verification Package Florida Department Of Transportation FPID: 436724-1-52-01, Escambia, STATE ROAD 10A (US 90/MOBILE HWY) AT COUNTY ROAD 99 (BEULAH ROAD) December 2016 Prepared by: 200 East
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO COLORADO CENTER BICYCLE/PEDESTRIAN BRIDGE OVER I-25
201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 1 EA 202-00035 Removal of Pipe 30 LF 202-00200 Removal of Sidewalk 431 SY 202-00203 Removal of Curb and Gutter 973 LF 202-00205 Removal of
More informationNOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INST
NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INSTALL MANHOLE LIDS FLUSH WITH EXISTING GROUND SURFACE.
More information