1 V C A E N G I N E E R S, INC. C I V I L S T R U C T U R A L M B E D B E S B E LOW IMPACT DEVELOPMENT CALCULATION Washington WASHINGTON BLVD. CULVER CITY, CA March 11, 2016 PREPARED FOR: PLATFORM HAYDEN TRACT III, LLC 9900 CULVER BOULEVARD, 1A CULVER CITY, CA (310) S. Garfile d Av e., Suit e 2 10, Alh am bra, C A M ichelso n Dr. # 24 2, Irv i ne, C A
2 V C A ENGINEER S, INC. CIVIL STRUCTURAL MBE DBE SBE 1 Table of Contents 1.0 Introduction Project Site Site Description Project Area Tributary Drainage Area Description Project Area Soil Type LID Design Criteria and Calculations LID Design Criteria Stormwater Infiltration Capture and Release Calculations Peak Mitigated Flow Rate Design Capture Volume Summary of Calculations Conclusion... 4 APPENDIX I... 5 APPENDIX II... 8 APPENDIX III... 9 APPENDIX IV APPENDIX V S Garf i el d Av e #21 0, Al ha mbra CA M ichelso n Dr. # 24 2, Irv i ne, C A
3 V C A ENGINEER S, INC. CIVIL STRUCTURAL MBE DBE SBE Introduction The report demonstrates that the proposed drainage system will adequately meet the drainage needs of the project site including Low Impact Development (LID) requirements. 2.0 Project Site 2.1 Site Description Project Area The project site is located at 8888 Washington Blvd, Culver City CA, located in the jurisdiction of Culver City. The project site is comprised of 24,777.8 sf (0.57 acres) and will have 9,500 sf (0.22 acres) of green roof. The site is bounded by Landmark St to the North-East, Washington Blvd to the North-West, Higuera St to the South-West, and Lindblade St to the South-East. The pre-development imperviousness at the site is currently around 99% where most of the site s storm water is draining out to the street. The post-development imperviousness of the new project area is around 62% where storm water will be mitigated and released through a catch basin Tributary Drainage Area Description The project site is located in the Ballona Creek watershed and discharges into the Upper Franklin Canyon Reservoir, Ballona Creek, Franklin Canyon Reservoir, Hollywood Reservoir, Ivanhoe Reservoir, and Powena Reservoir as determined by the EPA Discharge Mapping Tool. The project site has two existing tributary areas while a more conservative approach was taken for the proposed site and analyzed as one tributary area as shown in the LID Calculation Plan in Appendix I Project Area Soil Type As per the Soils Report from Feffer Geological Consulting, Inc., the site is underlain by artificial fill and Quaternary alluvial deposits. Artificial fill was encountered in the field explorations to a max depth of 2 feet which generally consists of gray brown to brown silty and sandy clay. This artificial fill is characterized as medium dense to firm, moist. The alluvium soils on site consist of silty and clayey fine grained sands that are primarily medium dense to dense varying from brown to gray-green brown orangebrown and brown, moist. Groundwater was not encountered during excavations to a depth of 51.5 feet below grade. Historically the highest groundwater in this area is around 20 feet below ground surface S Garf i el d Av e #21 0, Al ha mbra CA M ichelso n Dr. # 24 2, Irv i ne, C A
4 V C A ENGINEER S, INC. CIVIL STRUCTURAL MBE DBE SBE LID Design Criteria and Calculations 3.1 LID Design Criteria Design criteria and sizing calculations follow the City of Los Angeles Low Impact Development Handbook, June Calculations Stormwater Infiltration Infiltration was considered but determined to be unfeasible due to the following reasons: Per the soils report by the Feffer Geological Consulting, Inc., The high historic groundwater level is located at or slightly above the proposed base of the foundations. The foundation retaining walls below a depth of 20 feet are required to be designed to resist hydrostatic pressure. The building should be designed to resist uplift due to a potential groundwater elevation of 20 feet. Applicable pages from the 2015 Geotechnical report are included in Appendix III Capture and Release Instead, the stormwater collected from roof drains, area drains, and downspouts will be routed through a filtration system (Contech 8 x6 StormFilter) that utilizes cartridges for filtration. The stormwater will then be pumped up and released through a 10 pipe that connects to a proposed catch basin (to replace existing catch basins) located along Washington Blvd. As a result, the existing lateral will have to be upsized for the new flow being introduced to the system and extruded as the proposed catch basin will be affected by street widening. See Appendix IV for plans Peak Mitigated Flow Rate Calculation for peak mitigated flow rate (Q mitigated = 0.18 cfs) for the total drainage area was based on Tc calculator from City of Los Angeles and 85 th percentile, 24- hour rainfall data. Q peak was determined to be 1.47 cfs based on 25-year storm frequency. Calculations are included in Appendix II Design Capture Volume Required cartridges needed for the StormFilter was determined using the Cartridge treatment flow rate per Contech specs. At 0.05 cfs (22.5 gpm) per cartridge, the number required would be 4, 27 cartridges. The rainfall depth was determined from the 85 th Percentile 24-hour rainfall, rainfall data is included in Appendix II. The Design Capture Volume was sized to capture and treat 110% of the design capture volume based from post developed conditions of the site. Calculations and tables are shown in Appendix IV S Garf i el d Av e #21 0, Al ha mbra CA M ichelso n Dr. # 24 2, Irv i ne, C A
5 V C A ENGINEER S, INC. CIVIL STRUCTURAL MBE DBE SBE Summary of Calculations Table 1. Mitigated Run-off Discharge (Qmitigated) I.D. Area (SF) Area (acres) % Pervious % Impervious L (ft.) Slope Qmit (cfs) Vol.peak (ac-ft.) A Conclusion The municipal stormwater program requires the preparation of LID (Low Impact Development) to address runoff pollution from post-development projects. The LID should identify Best Management Practices (BMPs) that are appropriate for the watershed pollutants of concern and especially the water constituents that would be generated from the designated project. The goal for the design is to capture and mitigate the volume of runoff produced from the 85 th Percentile for 24-hr rainfall storm event. As demonstrated in this report VCA concludes and recommends that the Contech StormFilter system is more than adequate to handle the minimum design flow required for treatment of the LID peak mitigated flow rate and volume and the flow generated by a 25-year frequency storm S Garf i el d Av e #21 0, Al ha mbra CA M ichelso n Dr. # 24 2, Irv i ne, C A
6 V C A ENGINEER S, INC. CIVIL STRUCTURAL MBE DBE SBE 5 APPENDIX I Tributary Area (LID Calculation Plan) 1041 S Garf i el d Av e #21 0, Al ha mbra CA M ichelso n Dr. # 24 2, Irv i ne, C A
7 V C A ENGINEER S, INC. CIVIL STRUCTURAL MBE DBE SBE S Garf i el d Av e #21 0, Al ha mbra CA M ichelso n Dr. # 24 2, Irv i ne, C A
8 V C A ENGINEER S, INC. CIVIL STRUCTURAL MBE DBE SBE S Garf i el d Av e #21 0, Al ha mbra CA M ichelso n Dr. # 24 2, Irv i ne, C A
9 V C A ENGINEER S, INC. CIVIL STRUCTURAL MBE DBE SBE 8 APPENDIX II Tc Calculations 1041 S Garf i el d Av e #21 0, Al ha mbra CA M ichelso n Dr. # 24 2, Irv i ne, C A
10 Peak Flow Hydrologic Analysis File location: Z:/VCA Projects 4/1365 to XXX/ Washington Blvd/Calcs/LID References/8888 Washington Blvd - Entire Site-25yr.pdf Version: HydroCalc Input Parameters Project Name 8888 Washington Blvd Subarea ID Entire Site Area (ac) 0.57 Flow Path Length (ft) Flow Path Slope (vft/hft) yr Rainfall Depth (in) 5.5 Percent Impervious 0.62 Soil Type 2 Design Storm Frequency 25-yr Fire Factor 0 LID False Output Results Modeled (25-yr) Rainfall Depth (in) Peak Intensity (in/hr) Undeveloped Runoff Coefficient (Cu) Developed Runoff Coefficient (Cd) Time of Concentration (min) 5.0 Clear Peak Flow Rate (cfs) Burned Peak Flow Rate (cfs) Hr Clear Runoff Volume (ac-ft) Hr Clear Runoff Volume (cu-ft)
11 Peak Flow Hydrologic Analysis File location: Z:/VCA Projects 4/1365 to XXX/ Washington Blvd/Calcs/LID References/8888 Washington Blvd - Entire Site-0.75 inch.pdf Version: HydroCalc Input Parameters Project Name 8888 Washington Blvd Subarea ID Entire Site Area (ac) 0.57 Flow Path Length (ft) Flow Path Slope (vft/hft) inch Rainfall Depth (in) 0.75 Percent Impervious 0.62 Soil Type 2 Design Storm Frequency 0.75 inch storm Fire Factor 0 LID True Output Results Modeled (0.75 inch storm) Rainfall Depth (in) 0.75 Peak Intensity (in/hr) Undeveloped Runoff Coefficient (Cu) Developed Runoff Coefficient (Cd) Time of Concentration (min) 21.0 Clear Peak Flow Rate (cfs) Burned Peak Flow Rate (cfs) Hr Clear Runoff Volume (ac-ft) Hr Clear Runoff Volume (cu-ft)
12 Peak Flow Hydrologic Analysis File location: Z:/VCA Projects 4/1365 to XXX/ Washington Blvd/Calcs/LID References/8888 Washington Blvd - Entire Site-85th percentile.p Version: HydroCalc Input Parameters Project Name 8888 Washington Blvd Subarea ID Entire Site Area (ac) 0.57 Flow Path Length (ft) Flow Path Slope (vft/hft) th Percentile Rainfall Depth (in) 1.15 Percent Impervious 0.62 Soil Type 2 Design Storm Frequency 85th percentile storm Fire Factor 0 LID True Output Results Modeled (85th percentile storm) Rainfall Depth (in) 1.15 Peak Intensity (in/hr) Undeveloped Runoff Coefficient (Cu) Developed Runoff Coefficient (Cd) Time of Concentration (min) 14.0 Clear Peak Flow Rate (cfs) Burned Peak Flow Rate (cfs) Hr Clear Runoff Volume (ac-ft) Hr Clear Runoff Volume (cu-ft)
13 V C A ENGINEER S, INC. CIVIL STRUCTURAL MBE DBE SBE 9 APPENDIX III Excerpts from Feffer Geological Consulting Inc. Proposed Four-Story Mixed Use Building Over One Subterranean Level Soils Report 1041 S Garf i el d Av e #21 0, Al ha mbra CA M ichelso n Dr. # 24 2, Irv i ne, C A
14 November 11, 2015 File No Platform Hayden Tract III, LLC 9900 Culver Boulevard, 1A Culver City, California Subject: GEOTECHNICAL INVESTIGATION Proposed Four-Story Mixed Use Building Over One Subterranean Level 8888 W Washington Boulevard, Culver City, CA Dear Joseph Miller: As requested, Feffer Geological Consultants performed a geotechnical investigation at the subject site. The purpose of this investigation was to evaluate the geotechnical conditions at the site in the areas of the proposed construction and to provide geotechnical parameters for design and construction. Based on our investigation, it is our opinion that the proposed construction is feasible from a geotechnical standpoint provided the recommendations contained herein are incorporated into the project plans and specifications. This report should be reviewed in detail prior to proceeding further with the planned development. When final plans for the proposed construction become available, they should be forwarded to this office for review and comment. We appreciate the opportunity to be of service. Should you have any questions regarding the information contained in this report, please do not hesitate to contact us. Sincerely, FEFFER GEOLOGICAL CONSULTING, INC. Joshua R. Feffer Dan Daneshfar Principal Engineering Geologist Principal Engineer C.E.G P.E Distribution: Addressee (1)
15 November 11, 2015 File No: Page W Washington Boulevard 1.0 INTRODUCTION 1.1 PURPOSE The purpose of this investigation was to evaluate the existing geotechnical conditions at the subject site and to provide design and construction criteria for the proposed mixed use development. 1.2 SCOPE OF S The scope of work performed during this investigation involved the following; Research and review of available pertinent geotechnical literature; Subsurface exploration consisting of the drilling of two borings (B1, B2); Sampling and logging of the subsurface soils; Laboratory testing of selected soil samples collected from the subsurface exploration to determine the engineering properties of the underlying earth materials; Engineering and geologic analysis of the field and laboratory data; and Preparation of this report presenting our findings, conclusions, and recommendations for the proposed construction. 1.3 SITE DESCRIPTION The project site is located between on the south side of Washington Boulevard on a relatively flat pad in Culver City, CA (Figure 1). The site is currently occupied by one-story commercial building and associated parking lot (Figure 2). The subject site is surrounded by small businesses and commercial/retail properties. A recent aerial photograph of the site is shown as Figure 3. Surface drainage is by sheet flow to the north or front of the property. 1.4 PROPOSED CONSTRUCTION Based on the information provided to us, the project will consist of construction a new four-story mixed use building over one subterranean parking level. The existing one story commercial building will be removed from the site. A Site Plan and Cross Sections showing the proposed development are included in Appendix C.
16 November 11, 2015 File No: Page W Washington Boulevard 3.0 SITE GEOLOGY, SEISMICITY, POTENTIAL HAZARDS 3.1 SITE GEOLOGY Regional Geologic Maps 1 and the subsurface exploration indicated that the property is underlain by Quaternary Age Alluvium (Qa) (Figure 4) overlain by fill. Descriptions of the materials encountered in our exploratory borings are described below Fill-Af The fill consists of fine grained silty and sandy clay. The color varies from gray-brown, to brown. The fill is moist medium dense to firm. Fill was found in all borings down to a depth of approximately two feet Alluvium-Qa The alluvium consists of silty and clayey fine grained sands which vary from brown to graygreen brown orange-brown and brown. The alluvium was moist, medium dense to dense, containing occasional shells. The alluvium is generally weakly horizontally layered with no significant structural planes. Generally, the alluvium becomes more granular with depth Lakewood Formation At a depth of 25 to 27.5 feet below the ground surface, shells were encountered in the borings that are indicative of a marine environment. The material at and below these depths is part of the Pleistocene age Lakewood Formation which is Pleistocene in age and over-consolidated Groundwater Groundwater was not encountered during the recent excavations to a depth of 51.5 feet. Historically highest groundwater in this area of Culver City is estimated to be 20 feet below the ground surface (Plate 1.2, Historically Highest Groundwater Contours and Borehole Log Data Locations, Beverly Hills 7½ Minute Quadrangle in Seismic Hazard Zone Report, SHZR-023). 1 Yerkes, T.W., 1991 Geologic Map of the Beverly Hills and Van Nuys (south ½) Quadrangles, Los Angeles County, Dibblee Geological Foundation Map DF-31
17 November 11, 2015 File No: Page W Washington Boulevard 5.4 EARTHWORK General If the proposed construction will require grading of the site; it should be done in accordance with good construction practice, minimum code requirements and recommendations to follow. Grading criteria are included within Appendix D Site Preparation and Grading Based on our understanding of the proposed development, we recommend that footings be founded in alluvium below a depth of five feet. Prior to the start of grading operations, utility lines within the project area, if any, should be located and marked in the field so they can be rerouted or protected during site development. All debris and perishable material should be removed from the site. Although currently not anticipated, all permanent cut and fill slopes should not be constructed steeper than 2:1. If fill is to be placed the upper six to eight inches of surface exposed by the excavation should be scarified; moisture conditioned to two to four percent over optimum moisture content, and compacted to 90 percent relative compaction 2. If localized areas of relatively loose soils prevent proper compaction, over-excavation and re-compaction will be necessary Excavation Characteristics The borings did not encounter hard earth materials. Difficult excavation conditions are not anticipated. However, the soil at the site has considerable amounts of sand and gravel and caving may occur in some excavations Groundwater and Associated Design Groundwater was not encountered during the recent excavations at a depth of 51.5 feet. Wet conditions and actual groundwater may be encountered due to seasonal fluctuations. If groundwater is encountered, dewatering may be required and should be designed by a dewatering contractor and engineer. The high historic groundwater level is located at or slightly above the proposed base of the foundations. The foundation retaining walls below a depth of 20 feet are required to be designed to resist hydrostatic pressure. The building should be designed to resist uplift due to a potential groundwater elevation of 20 feet. Slab subdrainage and associated pumps are not required for this project. A mat foundation may be required to provide appropriate waterproofing and resistance to uplift. Recommendations for a mat foundation are provided below. 2 Relative compaction refers to the ratio of the in-place dry density of soil to the maximum dry density of the same material as obtained by the "modified proctor" (ASTM D ) test procedure.
18 V C A ENGINEER S, INC. CIVIL STRUCTURAL MBE DBE SBE 10 APPENDIX IV Utility and Storm Filter Plans 1041 S Garf i el d Av e #21 0, Al ha mbra CA M ichelso n Dr. # 24 2, Irv i ne, C A
19 D WASHINGTON BOULEVARD C L N 54 19'00" E F 1 PL FUTURE DEVELOPMENT PL 9 LANDMARK STREET C L N 35 43'28" W A B C A WASHINGTON BLVD SHEET NOTE: POST DEVELOPMENT IMPERVIOUS AREA PERVIOUS AREA PRE DEVELOPMENT 0.35 ACRES 0.22 ACRES IMPERVIOUS AREA 0.57 ACRES PERVIOUS AREA 0 ACRES 8888 WASHINGTON BLVD LID UTILITY PLAN PROJECT NO: REVISIONS VERTIGO OFFICE BUILDING 8888 WASHINGTON BOULEVARD CULVER CITY, CA ARCHITECTS
20
21 V C A ENGINEER S, INC. CIVIL STRUCTURAL MBE DBE SBE 11 APPENDIX V Pipe Sizing Calculations 1041 S Garf i el d Av e #21 0, Al ha mbra CA M ichelso n Dr. # 24 2, Irv i ne, C A
22 VCA Engineers, Inc. Storm Drain Pipe Sizing Client: PLATFORM HAYDEN TRACT III, LLC Job No Project: 8888 Washington Blvd Date: 3/16/ Washington Blvd Culver City CA, Engineer: VCA Pipe Sizing Calculations Pipe Capacity (d/d) is 75-85% to be conservative Pipe ID: P cfs Calculations for Velocity and Discharge D = ft Diameter of Pipe n = Manning's Roughness Coefficient S = ft/ft 0.50 % Slope of Pipe d = 7.5 inches 0.63 ft Flow Depth d/d = 0.75 Proportional Depth of Flow theta = radians Angle of Flow a = 0.44 sq.ft Area of Flow p = 1.75 ft Wetted Perimeter r = 0.25 ft Hydraulic Radius Using Manning's Equation, for pipe at flow depth 'd' v = 3.81 fps Flow Velocity Q = cfs Flow Rate
LOW IMPACT DEVELOPMENT (LID) 8777 Washington Boulevard Culver City, CA February 2017 PREPARED FOR: PREPARED BY:
LOW IMPACT DVLOPMNT (LID) 8777 Washington Boulevard Culver City, CA 90232 February 2017 PRPARD FOR: Vitruvian Culver City, LLC 5822 Washington Boulevard Culver City, CA 90232 PRPARD BY: Kimley-Horn & Associates,
More informationAppendix E.2 Preliminary Hydrology Report
Appendix E.2 Preliminary Hydrology Report PRELIMINARY HYDROLOGY STUDY HARVARD WESTLAKE SCHOOL PARKING STRUCTURE 3700 Coldwater Canyon North Hollywood, CA 91604 KPFF Job # 109046 August 12, 2013 CLIENT:
More informationDESIGN DEVELOPMENT HYDROLOGY REPORT & LOW IMPACT DEVELOPMENT PLAN (LID PLAN)
DESIGN DEVELOPMENT HYDROLOGY REPORT & LOW IMPACT DEVELOPMENT PLAN ( PLAN) ALAMITOS BEACH CONCESSION BUILDING 780 E. SHORELINE DRIVE LONG BEACH, CALIFORNIA Prepared For: Long Beach Public Works 333 W. Ocean
More informationAppendix L. Drainage Report
Appendix L Drainage Report 2nd Street and Pacific Coast Highway Retail Project City of Long Beach County of Los Angeles, CA DRAINAGE REPORT April 5, 2017 DRAINAGE REPORT For: 2nd Street and Pacific Coast
More informationPROJECT NO A. ISSUED: February 29, 2016
INTERPRETIVE REPORT FOR INFILTRATION SYSTEM DESIGN, PROPOSED VILLA VERONA APARTMENT COMMUNITY, ASSESSOR S PARCEL NUMBERS 311-040-015, 311-040-021, 311-040-024, 311-040-026 AND 311-040-013, LOCATED ON THE
More information5.0 SITE CONDITIONS. 5.1 Surface Conditions
5.0 SITE CONDITIONS 5.1 Surface Conditions The project site is located at approximately along Ashdown Forest Road and Nichols Canyon Road in the Fiddlers Canyon Area of Cedar City, Utah. At the time of
More informationSubject: Mt. San Antonio College- Measure RR Updated Hydrology Study
To: Cc: Mike Klein Mt. San Antonio College Sidney Lindmark, AICP Mt SAC Environmental Consultant From: Alysen Weiland, PE - Psomas Date: May 6, 2016 Subject: Mt. San Antonio College- Measure RR Updated
More informationPreliminary Stormwater Quality Mitigation Report
Preliminary Stormwater Quality Mitigation Report MGA Chatsworth Campus 20000 Prairie Street Chatsworth, CA TUSTIN 17782 17th Street Suite 200 Tustin, CA 92780-1947 714.665.4500 Fax 714.665.4501 LOS ANGELES
More informationAPPENDIX F RATIONAL METHOD
7-F-1 APPENDIX F RATIONAL METHOD 1.0 Introduction One of the most commonly used procedures for calculating peak flows from small drainages less than 200 acres is the Rational Method. This method is most
More informationPreliminary Drainage Analysis
Preliminary Drainage Analysis Tanimura and Antle Employee Housing Town of Spreckels County of Monterey, California LIB150205 May 29, 2015 Prepared For: Tanimura and Antle Produce Prepared By: 9699 Blue
More informationWater Resources Management Plan
B u r n s v i l l e M i n n e s o t a Water Resources Management Plan - Volume Control / Infiltration Worksheet This Appendix contains a worksheet and related information that can be used for evaluating
More informationResults of Onsite Percolation Testing Ellis Commons Senior Housing Development APN City of Perris, California
Lansing Companies 12671 High Bluff Drive, Suite 150 San Diego, California 92130 April 18, 2017 Project No. 11607.001 Attention: Subject: References: Mr. Casey Malone Results of Onsite Percolation Testing
More information3.2 INFILTRATION TRENCH
3.2 INFILTRATION TRENCH Type of BMP Priority Level Treatment Mechanisms Infiltration Rate Range Maximum Drainage Area LID Infiltration Priority 1 Full Retention Infiltration, Evapotranspiration (when vegetated),
More informationAppendix G Preliminary Hydrology Study
Appendix G Preliminary Hydrology Study Preliminary Hydrology Study VESTING TTM 72608 Long Beach, CA Prepared for: The Long Beach Project, LLC 888 San Clemente, Suite 100 New Port Beach, CA May 28, 2014
More informationDetermination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities
Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities 1 Introduction This document, developed by the San Francisco Public Utilities Commission
More informationStormwater Treatment Measure Sizing and Design Considerations SMCWPPP C.3 Workshop June 21, 2017
Stormwater Treatment Measure Sizing and Design Considerations SMCWPPP C.3 Workshop June 21, 2017 Jill Bicknell, P.E., EOA, Inc. Presentation Overview Sizing/Design of Self Treating and Self Retaining Areas
More informationAugust 15, 2006 (Revised) July 3, 2006 Project No A
August 15, 2006 (Revised) July 3, 2006 Project No. 01-05-0854-101A Mr. David Reed, P.E. Protean Design Group 100 East Pine Street, Suite 306 Orlando, Florida 32801 Preliminary Soil Survey Report Polk Parkway
More informationIV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY
IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY ENVIRONMENTAL SETTING The project site is located in the Wilshire community of the City of Los Angeles and is bound by S. Wetherly Drive to
More informationREPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA
REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA AREHNA PROJECT NO. B-15-008 March 11, 2015 Prepared For: City of Tampa Stormwater Division 306 W. Jackson Street, 6N Tampa, Florida
More information100-yr Design Runoff (cfs) Basin ID 103b A a B B C Totals
PROPOSED DEVELOPMENT The drainage for this site has been designed to be less than the maximum allowable runoff from each basin as stated in the Overall Rigden Farm drainage plan. Table 1 compares the actual
More informationRe: Geotechnical Consultation for Storm Infiltration Robert Louis Stevenson ES Modernization th Avenue San Francisco, California
Date: August 4, 2015 Project No.: 608-4-2 Prepared For: Mr. Sajeev Madhaven, AIA SAN FRANCISCO UNIFIED SCHOOL DISTRICT 135 Van Ness Avenue - Room 207a San Francisco, California 94102 Re: Geotechnical Consultation
More information0.0. Pervious CN = 40. (Unconnected impervious) (Total impervious) Total impervious area (percent) Composite CN
Figure 2-3 Composite CN with connected impervious area. 100 Composite CN 90 80 70 60 Pervious CN = 90 80 70 60 50 40 50 40 0 10 20 30 40 50 60 70 80 90 100 Connected impervious area (percent) Figure 2-4
More informationFile No Supplemental November Geotechnical and Environmental Consulting Engineers
Supplemental Information & Geotechnical Recommendations Proposed New Solar Valley Location B (East of Building No. 7) Cañada Community College 4200 Farm Hill Boulevard Submitted to: Mr. Peter Hempel Construction
More informationDrainage Analysis. Appendix E
Drainage Analysis Appendix E The existing and proposed storm drainage systems have been modeled with Bentley CivilStorm V8 computer modeling software. The peak stormwater discharge was determined for
More informationIntroduction to Storm Sewer Design
A SunCam online continuing education course Introduction to Storm Sewer Design by David F. Carter Introduction Storm sewer systems are vital in collection and conveyance of stormwater from the upstream
More informationPRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY
PRELIMINARY DRAINAGE REPORT FOR THE NEWCASTLE FIRE STATION OLD STATE HIGHWAY PREPARED FOR THE NEWCASTLE FIRE PROTECTION DISTRICT JULY 2014 BY ROSEVILLE DESIGN GROUP, INC. ROSEVILLE DESIGN GROUP, Inc Established
More informationHYDROLOGY STUDY LA MIRADA BOULEVARD La Mirada, California
HYDROLOGY STUDY 12000 LA MIRADA BOULEVARD La Mirada, California TTM 73119 Prepared for: The Olson Company 3010 Old Ranch Parkway, Suite 100 Seal Beach, CA 90740 Contact: Mr. Aaron Orenstein (562) 370-9531
More informationGeotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS
Highway 99 and Kelly Street TABLE OF CONTENTS PROJECT INFORMATION... 1 FIELD EXPLORATION... 1 SITE CONDITIONS... 2 Surface Conditions:... 2 Subsurface Conditions:... 2 FILL.... 2 Topsoil.... 2 Clay Alluvium....
More informationSizing Calculations and Design Considerations for LID Treatment Measures
SCVURPPP C.3 Workshop December 18, 2012 Sizing Calculations and Design Considerations for LID Treatment Measures Jill Bicknell, P.E., EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program
More informationORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA
PRELIMINARY GEOTECHNICAL STUDY ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA November 9, 2015 Prepared For: Ms. Diane H. Crews, A.A.E. Sanford Airport Authority 1200 Red Cleveland
More informationGEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO
GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST
More informationM E M O R A N D U M. Date: January 31, Bjorn Schrader, Abramson Teiger Architects. Kimley-Horn and Associates, Inc.
M E M O R A N D U M Date: January 31, 2017 To: From: Subject: Bjorn Schrader, Abramson Teiger Architects Kimley-Horn and Associates, Inc. 8888 Washington - Utility Memorandum Introduction Kimley-Horn and
More informationHydrology Study. For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021
Hydrology Study For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021 Prepared for Daryl Priest - Priest Development Corporation 124 West Main Street,
More informationApril 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1
PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes
More informationINITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257
INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 PLANT BOWEN PRIVATE INDUSTRY SOLID WASTE DISPOSAL FACILITY (ASH LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals
More informationMarch 28, Port of Kalama Mr. Jacobo Salan 380 West Marine Drive Kalama, Washington 98625
11917 NE 95 th Street, Vancouver, Washington 98682 Phone: 360-823-2900, Fax: 360-823-2901 March 28, 2014 Port of Kalama Mr. Jacobo Salan 380 West Marine Drive Kalama, Washington 98625 Re: Construction
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationRETENTION BASIN EXAMPLE
-7 Given: Total Tributary Area = 7.5 ac o Tributary Area within Existing R/W = 5.8 ac o Tributary Area, Impervious, Outside of R/W = 0.0 ac o Tributary Area, Pervious, Outside of R/W = 1.7 ac o Tributary
More informationEXHIBIT G GEOTECHNICAL REPORT (DRAFT)
EXHIBIT G GEOTECHNICAL REPORT (DRAFT) APPENDIX 1 PROJECT SITE 'B' B-1 B-2 I-2 B-3 B-4 B-5 I-1 PROJECT LOCATION LEGEND B-1 = APPROXIMATE BORING LOCATION I-1 = APPROXIMATE INFILTRATION
More informationAPPENDIX J-3. Orcem Stormwater Management and Treatment Facilities Design Summary
APPENDIX J-3 Orcem Stormwater Management and Treatment Facilities Design Summary Stormwater Management & Treatment Facilities Design Summary INTRODUCTION KPFF Consulting Engineers has compiled this report
More informationSTORMWATER MANAGEMENT REPORT FOR. Chick-Fil-A S Ferdon Blvd, Crestview FL. February 10 th, 2017
STORMWATER MANAGEMENT REPORT FOR Chick-Fil-A 3000 S Ferdon Blvd, Crestview FL February 10 th, 2017 PROJECT #010014-01-047 954.712.7482 www.bowmanconsulting.com Table of Contents Introduction.1 Project
More informationPRELIMINARY DRAINAGE STUDY
PRELIMINARY DRAINAGE STUDY For 34 th & J Residences 3402 J St. San Diego, CA 92102 A.P.N 545-250-08 Prepared By: Kenneth J. Discenza, P.E. Site Design Associates, Inc. 1016 Broadway, Suite A El Cajon,
More informationORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA
PRELIMINARY GEOTECHNICAL STUDY ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA November 9, 2015 Prepared For: Ms. Diane H. Crews, A.A.E. Sanford Airport Authority 1200 Red Cleveland
More informationApplying the Water Quality Volume
Applying the Water Quality Volume Justin Reinhart, PE Division of Surface Water Northeast Ohio Stormwater Training Council Cleveland, Ohio & Richfield, Ohio July 12, 2018 July 25, 2018 Post-Construction
More informationG. HYDROLOGY Existing Conditions
G. HYDROLOGY Existing Conditions Surface Water Runoff This section is based on the hydrology and drainage analysis for the proposed Project, which was prepared by KPFF Consulting Engineers and is attached
More informationMay 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC
Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC. 1030 Washington Street Raleigh, NC 27605-1258 May 2, 2017 Re: Report of Subsurface Investigation Westfield Rehabilitation & Health Care Additions
More informationDesign Handbook. Low Impact Development Best Management Practices
Design Handbook for Low Impact Development Best Management Practices Prepared by: 9/2011 Riverside County Flood Control and Water Conservation District 1995 Market Street Riverside, CA 92501 TABLE OF CONTENTS
More informationFORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview
Chapter 5: Hydrology Standards Contents 1.0 Overview... 1 1.1 Storm Runoff Determination... 1 1.2 Design Storm Frequencies... 1 1.3 Water Quality Storm Provisions... 2 1.4 Design Storm Return Periods...
More informationTreatment Volume: Curve Numbers. Composite CN or Not? Treatment Volume: Curve Numbers. Treatment Volume: Calculation. Treatment Volume: Calculation
Stormwater Engineering Bioretention Design Bill Hunt, PE, Ph.D. Extension Specialist & Assistant Professor NCSU-BAE www.bae.ncsu.edu/stormwater Bioretention Design Six Step Process 1 Determine Volume to
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment
More informationApplied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois
AGI Project No. 13-276 Subsurface Investigation Report For the Proposed New Retail Center 9601 South Pulaski Road Evergreen Park, Illinois Prepared for Mr. Feras Sweis FHS Design + Build LLC 2010 West
More informationGEOTECHNICAL INVESTIGATION
GEOTECHNICAL INVESTIGATION SHEETZ CONVENIENCE STORE FREEPORT ROAD AND CALIFORNIA AVENUE NATRONA HEIGHTS, PENNSYLVANIA Prepared For: Mr. David J. Mastrostefano, P.E. Sheetz Incorporated 817 Brookfield Drive
More informationSubsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois
AGI Project No. -11 Subsurface Investigation Report For the Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois Prepared for Mr. Steve Panko Key Development Partners, LLC North State Street,
More information9220 Wightman Road, Suite 120 Montgomery Village, Maryland Phone Fax
9220 Wightman Road, Suite 0 Montgomery Village, Maryland 20886-79 Engineers Planners Landscape Architects Surveyors Phone 301.670.0840 Fax 301.948.0693 www.mhgpa.com STORMWATER MANAGEMENT SUMMARY Project:
More informationAPPENDIX K OPERATIONS AND FINAL COVER SURFACE WATER MANAGEMENT SYSTEM DESIGN
ONONDAGA LAKE SEDIMENT CONSOLIDATION AREA CIVIL & GEOTECHNICAL FINAL DESIGN APPENDIX K OPERATIONS AND FINAL COVER SURFACE WATER MANAGEMENT SYSTEM DESIGN PARSONS P:\Honeywell -SYR\44483 - Lake Detail Design\9
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part 257.82 PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part
More informationHow & Where does infiltration work? Context: Summary of Geologic History Constraints/benefits for different geologic units
Associated Earth Sciences, Inc. Associated Earth Sciences, Inc. Presented by: Matthew A. Miller, PE April 23, 2013 How & Where does infiltration work? Context: Summary of Geologic History Constraints/benefits
More informationLAKE COUNTY HYDROLOGY DESIGN STANDARDS
LAKE COUNTY HYDROLOGY DESIGN STANDARDS Lake County Department of Public Works Water Resources Division 255 N. Forbes Street Lakeport, CA 95453 (707)263-2341 Adopted June 22, 1999 These Standards provide
More informationNorthern Colorado Geotech
GEOTECHNICAL ENGINEERING REPORT PROPOSED RESIDENTIAL DEVELOPMENT MORGAN COUNTY ROADS AND P WIGGINS, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 07- JANUARY 9, 06 Prepared for: Town of Wiggins 0 Central
More informationCENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND
BMP RAM BMP Type Definitions 1 CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND USES AND OWNERSHIP STRUCTURAL BMP TYPE OTHER NAMES
More informationHydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated)
Hydrology Study Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated) Prepared for San Mateo Real Estate & Construction March 9, 21 Rev. 1 11-8-211 Rev.
More informationDecember 6, Nate Hatleback Project Manager City of Thornton 9500 Civic Center Drive Thornton, CO 80229
December 6, 2016 Nate Hatleback Project Manager City of Thornton 9500 Civic Center Drive Thornton, CO 80229 RE: Drainage Conformance Letter Hilton Garden Inn @ The Grove The Grove Filing No 1, lot 5E Thornton,
More informationPART 2D. Section 7.2 of SJRWMD Special Publication SJ93-SP10
PART 2D GEOTECHNICAL INVESTIGATION TO ESTIMATE AQUIFER PARAMETERS Note the word is estimate & not determine. Must appreciate the physical meaning of each aquifer parameter. Aquifer, in this sense, does
More informationPRELIMINARY GEOTECHNICAL INVESTIGATION UCCS ACADEMIC OFFICE BUILDING COLORADO SPRINGS, COLORADO
PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS COLORADO SPRINGS COLORADO Prepared for: UNIVERSITY OF COLORADO AT COLORADO SPRINGS Facilities Services 1420 Austin Bluffs Parkway Colorado Springs Colorado 80918
More informationINITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR
INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR 257.82 EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part 257 and Part
More informationGreen Station CCR Surface Impoundment
Green Station CCR Surface Impoundment Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule Hydrologic and Hydraulic Capacity Assessment and Initial Inflow Design Flood Control
More informationAppendix B. Storm Drain System Data
MENIFEE VALLEY CAMPUS MASTER PLAN FINAL EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT Appendix Appendix B. Storm Drain System Data June 2017 MENIFEE VALLEY CAMPUS MASTER PLAN FINAL EIR MT. SAN JACINTO
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More information3.11 Sand Filter Basin
3.11 Sand Filter Basin Type of BMP Priority Level Treatment Mechanisms Maximum Drainage Area Flow-Through Treatment Priority 3 Treatment Control BMP Filtration 25 acres Description The Sand Filter Basin
More informationJune 2017 C.3 Workshop Sizing Example. Section II.B Sizing Volume-Based Treatment Measures based on the Adapted CASQA Stormwater BMP Handbook Approach
SANTA CLARA VALLEY URBAN RUNOFF POLLUTION PREVENTION PROGRAM June 2017 C.3 Workshop Sizing Example Section II. Sizing for Volume-Based Treatment Measures Section II.B Sizing Volume-Based Treatment Measures
More informationGeotechnical Exploration and Evaluation Report
Geotechnical Exploration and Evaluation Report Nassau Reclaimed Water Main From Radio Avenue to Harts Road Nassau County, Florida CSI Geo Project No.: 71-17-329-04 Client Project No.: JEA 09302-049-01
More informationPART 1b. Section 7.2 of SJRWMD Special Publication SJ93-SP10
PART 1b GEOTECHNICAL INVESTIGATION TO ESTIMATE AQUIFER PARAMETERS Note the word is estimate & not determine. Must appreciate the physical meaning of each aquifer parameter. Aquifer, in this sense, does
More informationLAKE LABELLE ENGINEERING REPORT
154 N. Bridge Street, LaBelle, Florida 33935 -Tel: (863) 612-0011 Fax: (863) 612-0014 - email: rock@rockhendry.com LAKE LABELLE ENGINEERING REPORT PREPARED FOR Lake LaBelle, LLC March 2014 PREPARED BY:
More informationJanuary 20, Nate Hatleback Project Manager, City of Thornton Development Engineering 9500 Civic Center Drive Thornton, CO (303)
January 20, 2017 Nate Hatleback Project Manager, City of Thornton Development Engineering 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7694 RE: Riverdale Five Retail Drainage Conformance Letter
More informationmtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida
mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA 14-3001 - Construct Bin Wall at HERD Eglin AFB, Florida MTEC Project Number 2014-101 November 10, 2014 Revised: January 5, 2015 Prepared For: Peterson Engineering,
More informationGEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for Imperial Avenue, Wake Avenue, and Danenberg Drive, El Centro, California
Mr. Victor Garcia The Holt Group 1601 N. Imperial Ave. El Centro, California 92243 September 28, 2017 Project No. EC595 SUBJECT: REFERENCE: GEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for
More informationEAGLE DRAINAGE DESIGN STANDARDS
EAGLE DRAINAGE DESIGN STANDARDS November 17, 2015 City of Eagle Planning & Zoning Department P.O. Box 1520 Eagle, ID 83616 EAGLE DRAINAGE DESIGN STANDARDS A. PURPOSE 1. These standards amend the Design
More informationDEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Soil Survey Report March 29, 2015 Matthew G. Moore, P.E.
LD-40 /12/09 DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET Soil Survey Report March 29, 201 Matthew G. Moore, P.E. VDOT (Division) or Company Name Insert Location, Virginia Insert
More informationNCEES NCEES-PE. NCEES - PE Civil Engineering.
NCEES NCEES-PE NCEES - PE Civil Engineering https://killexams.com/pass4sure/exam-detail/ncees-pe Question: 35 Which of the following assumptions regarding the compression strength of concrete used in reinforced
More informationCity Plaza Residential (TPM ) Preliminary Hydrology Report
Hydrology Study City Plaza Residential (TPM 2016-127) Preliminary Hydrology Report Orange, Orange County, California Prepared For: Greenlaw Partners 18301 Von Karman Avenue, Suite 250 Irvine, CA 92612
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or any
More informationGeotechnical Investigation Report
Geotechnical Investigation Report Proposed,000-Gallon Water Storage Tank Fagasa Pass Tank Upper Pago Pago, American Samoa Prepared for: ASPA Water Engineering Division Tafuna, American Samoa PO Box PPB
More informationMarch 10, 2017 SITE AND PROJECT INFORMATION
March 10, 2017 Derek Hawkes, PE NASH COUNTY 120 W. Washington Street - Suite 2004 Nashville, NC 27856 Re: Report of Subsurface Investigation Middlesex Corporate Park, Lot 3 Middlesex, North Carolina GeoTechnologies
More informationCONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133
GEOTECHNICAL EXPLORATION AND ENGINEERING SERVICES REPORT CONDUCTED FOR: Immokalee Stormwater Master Plan Implementation Immokalee, Collier County, Florida PREPARED FOR: Mr. Marc Stonehouse, P. E. Project
More informationModeling Infiltration BMPs
Modeling Infiltration BMPs CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) 696-4150 www.thcahill.com Design Goals for Calculations 1. Mitigate Peak Rates 2-Year to 100-Year 2. No Volume
More informationAugust 1, 2013 Reference No S048 Page 1 of 5
August 1, 2013 Reference No. 1201-S048 Page 1 of 5 Caledon Villas Corp. 55 Blue Willow Drive Woodbridge, Ontario L4L 9E8 Attention: Mr. John Spina Re: Addendum to Soil Investigation for Proposed Residential
More informationINITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257
INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 HUFFAKER ROAD (PLANT HAMMOND) PRIVATE INDUSTRIAL LANDFILL (HUFFAKER ROAD LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion
More informationTECHNICAL GUIDANCE DOCUMENT APPENDICES
XIV.4. Harvest and Use BMP Fact Sheets (HU) HU-1: Above-Ground Cisterns Cisterns are large rain barrels. While rain barrels are less than 100 gallons, cisterns range from 100 to more than 10,000 gallons
More informationREPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO CLIENT ID: 4784
REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO. 35-55 CLIENT ID: 78 Prepared for: Construction & Engineering Services Consultants, Inc. 93 Baymeadows
More informationSUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464
SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464 PREPARED FOR: AAA DEVELOPMENT AND CONSULTING, INC GREENFIELD, INDIANA
More informationHISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 2 (AP-2) GEORGIA POWER COMPANY
HISTORY OF CONSTRUCTION 40 CFR 257.73(c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 2 (AP-2) GEORGIA POWER COMPANY (i) Site Name and Ownership Information: Site Name: Site Location: Site Address: Owner: Address:
More informationPlease include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink.
JAHarchitects, LLC PROJECT NO. 393 RIVERCREST CDD 11560 RAMBLE CREEK DRIVE, RIVERVIEW FL ADDENDUM TO BID PROJECT: RIVERCREST CDD MULTI PURPOSE FIELD MAINTENANCE BUILDING & DOG PARK POOL & CABANNA JAH PROJECT
More informationCity Market Los Angeles Technical Appendices to the Draft EIR
City Market Los Angeles Technical Appendices to the Draft EIR Appendix F Preliminary Geotechnical Engineering Investigation SASSAN Geosciences, Inc., December 2012 MR. PETER M. FLEMING THE CITY MARKET
More information3.7 Guidance for Large Bioretention/Biofiltration BMP Facilities
3.7 Guidance for Large Bioretention/Biofiltration BMP Facilities Applicability LID BMPs Large sites, multi-parcel sites, BMPs treating greater than 5 acres This fact sheet is intended to be used in combination
More informationRUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY
RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40
More informationPRELIMINARY DRAINAGE REPORT FOR THE EDI MASTER PLAN
PRELIMINARY DRAINAGE REPORT FOR THE EDI MASTER PLAN April 5, 2015 Wayne W. Chang, MS, PE 46548 Chang Civil Engineering Hydrology Hydraulics Sedimentation P.O. Box 9496 Rancho Santa Fe, CA 92067 (858) 692-0760
More informationPump Station Excavation
Pump Station Excavation SPONSORED BY THE KIEWIT CORPORATION A capstone project for the The Department of Civil & Environmental Engineering in The Ira A. Fulton College of Engineering and Technology Brigham
More informationGeotechnical Engineering Report
BIG CYPRESS SEMINOLE INDIAN RESERVATION WATER TREATMENT FACILITY October 29, 2015 Terracon Project No. HD155065 Prepared for: REISS ENGINEERING, INC. 1016 Spring Villas Pt. Winter Springs, FL 32708 Prepared
More information