1 THE ODAN/DETECH GROUP INC SOUTH SERVICE ROAD, BURLINGTON, ONTARIO L7L 5K2 TELEPHONE: (905) FACSIMILE: (905) PROJECT No. : FUNCTIONAL SERVICING REPORT FOR PROPOSED RESIDENTIAL DEVELOPMENT 2267 LAKESHORE ROAD, BURLINGTON, ON CLIENT: MILLINGTON & ASSOCIATES JOHN KRPAN, M.S.C.E., P.Eng. December 10, 2013 DATE ORIGINAL: December 10, 2013 _ UPDATED: _ File No Lakeshore Road FSR (Rev0)

2

3 FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT 2267 LAKESHORE ROAD, BURLINGTON, ON TABLE OF CONTENTS DESCRIPTION Page 1.0 INTRODUCTION Site Description DESIGN CONSIDERATIONS 2.1 SANITARY WASTE WATER DISPOSAL WATER DISTRIBUTION STORMWATER DRAINAGE & STORMWATER MANAGEMENT Allowable Flows Post Development Flow Analysis Water Quality CONCLUSION 10 APPENDIX A Figure 1 Pre Development Tributary Plan (City of Burlington Drainage Plan MDR-312) Figure 2 Post Development Tributary Plan Inlet Control Device Graph Post Development Visual OTTHYMO Input & Output (5 and 100 Storm Events) Underground Storage System Sizing Calculations StormCeptor Design PROJECT No File No Lakeshore Road FSR (Rev0).doc THE ODAN/DETECH GROUP INC.

4

5 - 1 - PROPOSED RESIDENTIAL DEVELOPMENT 2267 LAKESHORE ROAD BURLINGTON, ONTARIO FUNCTIONAL SERVICING REPORT 1.0 INTRODUCTION The Odan/Detech Group Inc. has been retained by the Owner/Developer, Millington & Associates, to prepare a Storm Water Management Report for the proposed Residential Development located at 2267 Lakeshore Road, Burlington, ON. 1.1 Site Description The property under study is located at 2267 Lakeshore Road, Burlington, ON. It is bounded by existing residential lands and Newbold Court to the north, existing residential to the east and west and Lakeshore Road to the south. At the present time, the site is comprised of an existing Residential home with grass and asphalt driveway. The land generally slopes from west to east and north to south towards an existing storm sewer system and headwall connected to the existing storm sewer system located on Lakeshore Road. It is proposed to develop the site for medium density residential. Refer to the Architectural site plan for further information regarding the proposed layout of the site including the building locations, asphalt, and concrete curbing, landscaping etc. Refer to the topographic survey by prepared by MacKay, MacKay, Peters for existing surface conditions. PROJECT No File No Lakeshore Road FSR (Rev0).doc THE ODAN/DETECH GROUP INC.

6 DESIGN CONSIDERATIONS: 2.1 SANITARY DISPOSAL: SANITARY SEWER SERVICING: EXISITNG SITE CONDITIONS: The existing site is currently occupied by single family residential home. The sanitary sewer discharges to Lakeshore Road West via an existing lateral service which connects to the existing 200 dia. trunk main located within an easement to the east of the property. The sanitary sewer located within the easement discharges to the existing sanitary sewer located on Lakeshore Road. PROPOSED SITE CONDITIONS: The proposed site will consist of 5 Town homes with driveway access and landscaping. The sanitary sewer will discharge to the existing sanitary sewer located within the sanitary easement to the east. A new sanitary lateral will replace the existing lateral service which will discharge further to the south of the current location. There are no other connections available for the existing and proposed development. Proposed Flows: Based on Region of Halton Design Criteria for Sanitary Sewers the proposed development will have a Density of single family residential with a Population/Hectare of 55 persons per hectare. Based on the above criteria the total proposed flow from the site will be 0.28 L/sec, refer to Table below for additional information. PROJECT No File No Lakeshore Road FSR (Rev0).doc THE ODAN/DETECH GROUP INC.

7 - 3 - PROJECT No File No Lakeshore Road FSR (Rev0).doc THE ODAN/DETECH GROUP INC.

8 WATER DISTRIBUTION: Based on the above sanitary review the domestic water demand is very small << 1 L/sec. thus domestic flow is not an issue. Refer to the spread sheets below for the fire flow requirements. The exact house construction has not been determined. We are assuming ordinary construction. The analysis is based on the FUS (Fire Underwriters Survey) 1999 manual. There is one supply point surrounding the subject Site and is described below: 1) Lakeshore Road West has a 300 mm water-main on the south side of the R.O.W. and is connected to a well gridded network; Hydrants are located on the south side of Lakeshore Road. It is proposed to remove the existing water service and replace it with a new 150 mm main which will be extended into the site with a new hydrant added. The pressures and volumes must be sufficient for Peak hour conditions and under fire conditions as established by the Ontario Building Code The minimal residual pressure under fire conditions is 140 kpa. (or 20.3 psi). Based on the size of the feeder main these pressures and flows should be achieved. According to the MOE criteria the allowable pressures are as follows: Condition Allowable Pressures (kpa) min. max. 1) Min. Hour ) Peak Hour ) Peak Day + Fire Flow Fire flow demand 83 L/sec 1316 usgm (worst case) Based on the analysis below and proposed buildings a minimum of 83 L/sec would be required for fire flows. Therefore we believe the existing system can deliver this flow at the required pressure. A flow test will be performed to determine the available pressures and flows. PROJECT No File No Lakeshore Road FSR (Rev0).doc THE ODAN/DETECH GROUP INC.

9 - 5 - The following spread sheets are the FUS 1999 fire flow calculations for specified units. WATER SUPPLY FOR PUBLIC FIRE PROTECTION, FIRE UNDERWRITERS SURVEY GUIDE FOR DETERMINATION OF REQUIRED FIRE FLOWS F = 220 x C x A UNIT 1 Where: F = required fire flow in liters per minute C= Coefficient related to the type of construction A = the total floor area in square meters (excluding basements) in the building considered LOCATION: 2267 Lakeshore Road, Burlington PROJECT: Millington & Associates OBC OCCUPANCY: Residential PROJECT No BUILDING FOOT PRINT (m2): 310 Contents Charge # OF STOREYS 2 SINGLE FAMILY CONDO UNITS Non Combustible 25% limited Combustible 15% Combustible 0% CONSTRUCTION CLASS: ORDINARY Free Burning 15% AUTOMATED SPRINKLER PROTECTION Credit Total NFPA 13 sprinkler standard no 0% Standard Water Supply no 0% 0% Fully Supervised System no 0% 0% ` Rapid Buring 25% CONTENTS FACTOR: Non Combustible CHARGE: 20% Seperation Charge EXPOSURE 1 (south) residential Distance to Exposure Building (m) m 25% 0% Length Height m 20% EXPOSURE 2 (east) Distance to Exposure Building (m) m 15% 20% Length Height m 10% EXPOSURE 3 (west) Distance to Exposure Building (m) % 15% Length Height > 45 m 0% Total: EXPOSURE 4 (north) Distance to Exposure Building (m) 2.4 Length Height 25% 60% no more than 75% ARE BUILDINGS CONTIGUOUS: no 8000 L/min (minimum) FIRE RESISTANT BUILDING Are vertical openings and exterior vertical communications protected with a minimum one (1) h CALCULATIONS C = 1 ORDINARY A = 310 m2 () STOREY AREAS m2 F = 3873 L/min 155 Round to Nearest 1000 L/min F = 4000 L/min must be > 2000 L/min CORRECTION FACTORS: OCCUPANCY 800 L/min FIRE FLOW ADJUSTED FOR OCCUPANCY 3200 L/min REDUCTION FOR SPRINKLER 0 L/min EXPOSURE CHARGE 1920 L/min REQUIRED FIRE FLOW F = 5120 L/min Round to Nearest 1000 L/min F = 5000 L/min 1321 usgm F = 83 L/sec PROJECT No File No Lakeshore Road FSR (Rev0).doc THE ODAN/DETECH GROUP INC.

10 - 6 - WATER SUPPLY FOR PUBLIC FIRE PROTECTION, FIRE UNDERWRITERS SURVEY GUIDE FOR DETERMINATION OF REQUIRED FIRE FLOWS F = 220 x C x A UNIT 5 Where: F = required fire flow in liters per minute C= Coefficient related to the type of construction A = the total floor area in square meters (excluding basements) in the building considered LOCATION: 2267 Lakeshore Road, Burlington PROJECT: Millington & Associates OBC OCCUPANCY: Residential PROJECT No BUILDING FOOT PRINT (m2): 310 Contents Charge # OF STOREYS 2 SINGLE FAMILY CONDO UNITS Non Combustible 25% limited Combustible 15% Combustible 0% CONSTRUCTION CLASS: ORDINARY Free Burning 15% AUTOMATED SPRINKLER PROTECTION Credit Total NFPA 13 sprinkler standard no 0% Standard Water Supply no 0% 0% Fully Supervised System no 0% 0% CONTENTS FACTOR: Non Combustible CHARGE: 20% ` Rapid Buring 25% Seperation Charge EXPOSURE 1 (south) residential Distance to Exposure Building (m) m 25% 15% Length Height m 20% EXPOSURE 2 (east) Distance to Exposure Building (m) m 15% 10% Length Height m 10% EXPOSURE 3 (west) Distance to Exposure Building (m) % 25% Length Height > 45 m 0% Total: EXPOSURE 4 (north) Distance to Exposure Building (m) 15 Length Height 15% 65% no more than 75% ARE BUILDINGS CONTIGUOUS: no 8000 L/min (minimum) FIRE RESISTANT BUILDING Are vertical openings and exterior vertical communications protected with a minimum one (1) h CALCULATIONS C = 1 ORDINARY A = 310 m2 () STOREY AREAS m2 F = 3873 L/min 155 Round to Nearest 1000 L/min F = 4000 L/min must be > 2000 L/min CORRECTION FACTORS: OCCUPANCY 800 L/min FIRE FLOW ADJUSTED FOR OCCUPANCY 3200 L/min REDUCTION FOR SPRINKLER 0 L/min EXPOSURE CHARGE 2080 L/min REQUIRED FIRE FLOW F = 5280 L/min Round to Nearest 1000 L/min F = 5000 L/min 1321 usgm F = 83 L/sec PROJECT No File No Lakeshore Road FSR (Rev0).doc THE ODAN/DETECH GROUP INC.

11 STORM WATER DRAINAGE & STORMWATER MANAGEMENT Storm water management for the site will be established based on current site conditions and City of Burlington area drainage map, MDR-312 as provided by the City of Burlington. Refer to Appendix A for copy of MDR-312. Presently, storm drainage from the site outlets to an existing storm sewer and headwall outlet located at the south east corner of the development. Flow to this sewer includes a portion of existing lands to the north, east and west which is conveyed via an existing drainage ditch located along the east side of the property. This drainage ditch will remain and will continue to convey flows to the Lakeshore Road storm sewer Allowable Flows Pre Development Flows: The pre-development allowable flows were based on the following: Design storm data for the City of Burlington is as follows: 5 Year Storm: I 5 = /(t c +5) where t c = 10min. I 5 = 88.1 mm/hr 100 Year Storm: I 100 = /(t c +5) where t c = 10min. I 100 = mm/hr Thus the following allowable flow rates have been established based on the Rational Method as per City of Burlington design standards for Design Flows: TABLE 1 - Allowable Discharge Design Storm Area (ha) C Composite Intensity (mm/hr) Q ( l/s ) 5 YEAR YEAR A tc = 10min. was chosen due to the location of the site, size of the development and proximity to existing infrastructure. PROJECT No File No Lakeshore Road FSR (Rev0).doc THE ODAN/DETECH GROUP INC.

12 Post Development Flow Analysis For the purposes of post development analysis the site will be considered in detail See following Table 2 for description and characteristics of the post development system. TABLE 2 Area ID Catchment Descriptions for the Post-Developed Site Description 1 Roof tributary area, controlled flow via storm sewer and underground storage. 2 Landscape tributary area, controlled flow via storm sewer and underground storage. 3 Asphalt tributary area, controlled flow via storm sewer and underground storage. 4 Landscape tributary area, uncontrolled flow to headwall. For drainage areas with significant imperviousness the calculation of effective rainfall in Visual OTTHYMO is accomplished using the Standhyd method. This method is used in urban watersheds to simulate runoff by combining two parallel standard unit hydrographs resulting from the effective rainfall intensity over the pervious and impervious surfaces. For pervious surfaces, losses are calculated using the SCS modified CN method. The following Table 3 summarizes the parameters used in Visual OTTHYMO to characterize each catchment. TABLE 3 Catchment Characteristics for the Post-Developed Site Area No. Area (ha) Hydrograph Method % impervious imperviousness directly connected % Loss Method for Pervious Area CN for Pervious Area Initial Abstraction for Pervious Area (mm) Time to Concentration (hr) 1, 2, Standhyd SCS NASHYD - - SCS TOTAL Refer to Figure 2 in Appendix A for post-development tributary areas. In order to maintain post development flows at or below the levels of 34.3 l/s-5 year, 48.3 l/s- 100 Year, orifice controls will be required. The stage/storage/discharge properties used to model the flow controls for this site are shown in the Table below. This information, along with the surface characteristics of the areas will be used in the Visual OTTHYMO software program to determine the storage requirements and discharge from the orifice controlled area. The ICD is sized using the orifice equation based on the head (m) and the allowable discharge in (l/s). This will limit the amount of flow that is released into the storm sewer. The stage is PROJECT No File No Lakeshore Road FSR (Rev0).doc THE ODAN/DETECH GROUP INC.

13 - 9 - representative of the maximum head on a 100-year storm within the underground storage tanks. Therefore the stage will be the difference in elevation of the maximum 100-year ponding elevations and the invert of the proposed orifice. Refer to the Visual OTTHYMO Schematic Model and the detailed output file in Appendix A for further details. TABLE 4 Post Development Flows Post Development Flows Design Storm (l/s) Pre-development Flows (l/s) 5 Year Year YEAR - The total discharge from the development will be limited to 22 l/s which is less than 34 l/sec allowable. 100 YEAR - The total discharge from the development will be limited to 31 l/s which is less than 34 l/s (5 Year), allowable and 48 l/sec (100 Year). Therefore, there is sufficient storage capacity on site to store the 100 year storm event from the 5 year pre-development levels to 5 Year post development. In order to achieve the required storage an underground storage tank/bed capable of storing 40m 3 will be required. Refer to Appendix A for additional calculations on the underground storage system. Calculations within were based on Cultec Recharger V8 System; however, an underground system capable of similar stage-storage-discharge characteristics is considered an acceptable alternative. Alternative designs and drawings are to be approved by Odan/Detech for conformance to the design, further review by the approval authority may be required. PROJECT No File No Lakeshore Road FSR (Rev0).doc THE ODAN/DETECH GROUP INC.

14 Water Quality The MOE Stormwater Management Practices Planning and Design Manual, 1994 requires 70% TSS removal for Level 2 protection as requested by The City of Burlington. The following analysis is based on continuous simulation for a period of approximately 10 years. TABLE 5 Location Prop OIL/GRIT MH 1 Stormceptor Sizing Stormceptor Model Annual Flow Capture (%) Annual TSS Removal (%) STC Using software provided by Stormceptor Canada Inc. using fine particle distribution the above Stormceptor models were chosen. See output file from Stormceptor in Appendix A. The Stormceptors to be used will contain 100% of oil spills that occur during a normal storm event and will meet MOE Level 1 Protection as per the MOE Stormwater Management Practices Planning and Design Manual, Maintenance/Clean Out Frequency of Water Quality Manhole Oil/Grit Separators Based on the Manufacturers recommendations, the Stormceptor manhole oil/grit separator should be inspected twice a year. The inspection should look for the following: a) The amount of sediment in the bottom (Should be monitored by measurement). b) Check to see if oil is visible. In addition check to see if trash is visible. If an oil or industrial spill has occurred, the Stormceptor manhole oil/grit separator should be cleaned immediately. Sediment should be removed annually, or whenever the accumulation reaches approximately 15 % of the operating depth as measured from base to the drain invert. Vacuum trucks are used to remove the sediment and oil from the Stormceptor. A licensed waste management firm should remove levels of oil greater than 2.5 cm immediately. 3.0 CONCLUSIONS The site is favourable for the proposed use and is serviceable with storm, sanitary and water mains available. There is gas and hydro available on Lakeshore Road for the proposed development. PROJECT No File No Lakeshore Road FSR (Rev0).doc THE ODAN/DETECH GROUP INC.

15 APPENDIX A Figure 1 Pre Development Tributary Plan (City of Burlington Drainage Plan MDR-312) Figure 2 Post Development Tributary Plan Inlet Control Device Graph Post Development Visual OTTHYMO Input & Output (5 and 100 Storm Events) Underground Storage System Sizing Calculations StormCeptor Design PROJECT No File No Lakeshore Road FSR (Rev0).doc THE ODAN/DETECH GROUP INC.

16

17 Figure 1 - Pre Development Tributary Plan CITY DRAINAGE PLAN - MDR-312 PROJECT No File No Lakeshore Road FSR (Rev0).doc THE ODAN/DETECH GROUP INC.

18

19 Flow Parameters Head (m) 2 Flow (Lps) 30 Input desired parameters in green boxes at left and then refer to graphs below for corresponding flow curves. If your design criteria fall outside the maximum parameters of this flow curve calculator please contact your IPEX representative for your TEMPEST design. Head (m) TEMPEST VORTEX ICD CHARACTERISTICS WATER FLOW RATE (lps) AGAINST HEAD (m) TEMPEST LMF flow curve #1 3.0 VORTEX ICD OPENING SIZE Head (m) Flow rate (Lps)

20 Vortex Vortex ICD ICD Flow (Lps) Model Head TEMPEST (m) Model HF, HF Sump & MHF flow curve ICD plate sizing k= Q= gpm H= 6.56 ft openingd 4.06 in = 103 mm Model to use: in mm ICD Orifice 0 mm equivalent LMF Q (Lps) H (m) Q (Lps) H (m) Q (Lps) H (m) Model to use: #N/A mm (Head priority) Model to use: 105 mm (Flow priority) ICD Vortex #N/A Q (Lps) H (m) #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1.6 Flow rate (Lps) #N/A #N/A #N/A #N/A Head (m) (For flow rates <30 Lps) # TEMPEST HF flow curve # Q (Lps) d (m) Std or A

21 Head (m) Flow rate (Lps) NOTE: GRAPH #3 IS AN EXPANDED VERSION OF GRAPH #2 TO BE USED FOR FLOW RATES ABOVE 30 Lps. The following results are best estimates and subject to change upon review by an IPEX design representative.

22 POST DEVELOPMENT VISUAL OTTHYMO INPUT AND OUTPUT 1 Area 1,2, 3, 4 AREA = 0.23 PeakFlow = Rear Yd/Ditch AREA = 0.12 PeakFlow = IPEX PLUG TYPE A AREA = 0.23 PeakFlow = Lakeshore Road AREA = 0.35 PeakFlow = PROJECT No File No Lakeshore Road FSR (Rev0).doc THE ODAN/DETECH GROUP INC.

23 ======================================================================================== =================== V V I SSSSS U U A L V V I SS U U A A L V V I SS U U AAAAA L V V I SS U U A A L VV I SSSSS UUUUU A A LLLLL CALIB NASHYD (0004) Area (ha)=.12 Curve Number (CN)= 80.0 ID= 1 DT= 5.0 min Ia (mm)= 5.00 # of Linear Res.(N)= U.H. Tp(hrs)=.20 Unit Hyd Qpeak (cms)=.023 OOO TTTTT TTTTT H H Y Y M M OOO O O T T H H Y Y MM MM O O O O T T H H Y M M O O OOO T T H H Y M M OOO Developed and Distributed by Clarifica Inc. Copyright 1996, 2007 Clarifica Inc. All rights reserved. ***** D E T A I L E D O U T P U T ***** Input filename: C:\Program Files (x86)\visual OTTHYMO 2.3.3\voin.dat Output filename: p:\2013\13233\swm\otthymo SET A\Post Development (Controlled).out Summary filename: p:\2013\13233\swm\otthymo SET A\Post Development (Controlled).sum PEAK FLOW (cms)=.005 (i) TIME TO PEAK (hrs)= RUNOFF VOLUME (mm)= TOTAL RAINFALL (mm)= RUNOFF COEFFICIENT =.322 (i) PEAK FLOW DOES NOT INCLUDE BASEFLOW IF ANY RESERVOIR (0005) IN= 2---> OUT= 1 DT= 5.0 min OUTFLOW STORAGE OUTFLOW STORAGE (cms) (ha.m.) (cms) (ha.m.) DATE: 12/6/2013 USER: TIME: 4:25:08 PM AREA QPEAK TPEAK R.V. (ha) (cms) (hrs) (mm) INFLOW : ID= 2 (0001) OUTFLOW: ID= 1 (0005) COMMENTS: PEAK FLOW REDUCTION [Qout/Qin](%)= TIME SHIFT OF PEAK FLOW (min)= 5.00 MAXIMUM STORAGE USED (ha.m.)= **************************** ** SIMULATION NUMBER: 1 ** **************************** CHICAGO STORM IDF curve parameters: A= Ptotal= mm B= C=.764 used in: INTENSITY = A / (t + B)^C Duration of storm = 4.00 hrs Storm time step = min Time to peak ratio =.33 TIME RAIN TIME RAIN TIME RAIN TIME RAIN hrs mm/hr hrs mm/hr hrs mm/hr hrs mm/hr CALIB STANDHYD (0001) Area (ha)=.23 ID= 1 DT= 5.0 min Total Imp(%)= Dir. Conn.(%)= IMPERVIOUS PERVIOUS (i) Surface Area (ha)= Dep. Storage (mm)= Average Slope (%)= Length (m)= Mannings n = NOTE: RAINFALL WAS TRANSFORMED TO 5.0 MIN. TIME STEP TRANSFORMED HYETOGRAPH ---- TIME RAIN TIME RAIN TIME RAIN TIME RAIN hrs mm/hr hrs mm/hr hrs mm/hr hrs mm/hr Max.Eff.Inten.(mm/hr)= over (min) Storage Coeff. (min)= 1.53 (ii) (ii) Unit Hyd. Tpeak (min)= Unit Hyd. peak (cms)= *TOTALS* PEAK FLOW (cms)= (iii) TIME TO PEAK (hrs)= RUNOFF VOLUME (mm)= TOTAL RAINFALL (mm)= RUNOFF COEFFICIENT = ADD HYD (0003) = 3 AREA QPEAK TPEAK R.V (ha) (cms) (hrs) (mm) ID1= 1 (0005): ID2= 2 (0004): ================================================== ID = 3 (0003): NOTE: PEAK FLOWS DO NOT INCLUDE BASEFLOWS IF ANY **************************** ** SIMULATION NUMBER: 2 ** **************************** CHICAGO STORM IDF curve parameters: A= Ptotal= mm B= C=.761 used in: INTENSITY = A / (t + B)^C Duration of storm = 4.00 hrs Storm time step = min Time to peak ratio =.33 TIME RAIN TIME RAIN TIME RAIN TIME RAIN hrs mm/hr hrs mm/hr hrs mm/hr hrs mm/hr CALIB STANDHYD (0001) Area (ha)=.23 ID= 1 DT= 5.0 min Total Imp(%)= Dir. Conn.(%)= IMPERVIOUS PERVIOUS (i) Surface Area (ha)= Dep. Storage (mm)= Average Slope (%)= Length (m)= Mannings n = NOTE: RAINFALL WAS TRANSFORMED TO 5.0 MIN. TIME STEP TRANSFORMED HYETOGRAPH ---- TIME RAIN TIME RAIN TIME RAIN TIME RAIN hrs mm/hr hrs mm/hr hrs mm/hr hrs mm/hr ***** WARNING: STORAGE COEFF. IS SMALLER THAN TIME STEP! (i) CN PROCEDURE SELECTED FOR PERVIOUS LOSSES: CN* = 85.0 Ia = Dep. Storage (Above) (ii) TIME STEP (DT) SHOULD BE SMALLER OR EQUAL THAN THE STORAGE COEFFICIENT. (iii) PEAK FLOW DOES NOT INCLUDE BASEFLOW IF ANY. Max.Eff.Inten.(mm/hr)= over (min) Storage Coeff. (min)= 1.27 (ii) 6.06 (ii) Unit Hyd. Tpeak (min)= Unit Hyd. peak (cms)= *TOTALS* PEAK FLOW (cms)= (iii) TIME TO PEAK (hrs)= PROJECT No File No Lakeshore Road FSR (Rev0).doc THE ODAN/DETECH GROUP INC.

24 RUNOFF VOLUME (mm)= TOTAL RAINFALL (mm)= RUNOFF COEFFICIENT = ***** WARNING: STORAGE COEFF. IS SMALLER THAN TIME STEP! (i) CN PROCEDURE SELECTED FOR PERVIOUS LOSSES: CN* = 85.0 Ia = Dep. Storage (Above) (ii) TIME STEP (DT) SHOULD BE SMALLER OR EQUAL THAN THE STORAGE COEFFICIENT. (iii) PEAK FLOW DOES NOT INCLUDE BASEFLOW IF ANY CALIB NASHYD (0004) Area (ha)=.12 Curve Number (CN)= 80.0 ID= 1 DT= 5.0 min Ia (mm)= 5.00 # of Linear Res.(N)= U.H. Tp(hrs)=.20 Unit Hyd Qpeak (cms)=.023 PEAK FLOW (cms)=.011 (i) TIME TO PEAK (hrs)= RUNOFF VOLUME (mm)= TOTAL RAINFALL (mm)= RUNOFF COEFFICIENT =.459 (i) PEAK FLOW DOES NOT INCLUDE BASEFLOW IF ANY RESERVOIR (0005) IN= 2---> OUT= 1 DT= 5.0 min OUTFLOW STORAGE OUTFLOW STORAGE (cms) (ha.m.) (cms) (ha.m.) AREA QPEAK TPEAK R.V. (ha) (cms) (hrs) (mm) INFLOW : ID= 2 (0001) OUTFLOW: ID= 1 (0005) PEAK FLOW REDUCTION [Qout/Qin](%)= TIME SHIFT OF PEAK FLOW (min)= MAXIMUM STORAGE USED (ha.m.)= ADD HYD (0003) = 3 AREA QPEAK TPEAK R.V (ha) (cms) (hrs) (mm) ID1= 1 (0005): ID2= 2 (0004): ================================================== ID = 3 (0003): NOTE: PEAK FLOWS DO NOT INCLUDE BASEFLOWS IF ANY FINISH ======================================================================================== =================== PROJECT No File No Lakeshore Road FSR (Rev0).doc THE ODAN/DETECH GROUP INC.

25 PREPARED FOR: CULTEC Recharger V8 Stormwater System Calculations v PROJECT INFORMATION: PROJECT NUMBER: Proposed Residential Development 2267 Lakeshore Road West Burlington, Ontario CALCULATED BY: DATE: 11/11/13 Square Bed Information Proposed bed layout of INPUT 3 Rows x 5 No. of Units per Row Given: INPUT Storage required 0 CF 40 m 3 total of two beds Stone base 6 inches mm Stone above 6 inches mm Chamber Spacing 6 inches mm No. of HVLV F110x4 Feed Connectors 10 units Stone Porosity 40 % Stone Border Width 1 feet m Assumptions Model Name Recharger V8IHD Intermediate Recharger V8 SHD Starter Recharger V8 EHD End HVLV F110x4 Feed Connectors Chamber Height Design Unit Height General Given Information Chamber Width Chamber Spacing Design Unit Width Chamber Volume per Linear Foot Design Unit Volume Installed Chamber Length inches feet inches inches feet cu. ft/ft cu. ft/ft feet mm m mm mm m cu. m/m cu. m/m m English Metric English Metric English Metric English 18 n/a 27.5 n/a n/a n/a Metric n/a n/a n/a n/a Calculated by: CULTEC, Inc. PO Box 280 Brookfield, CT PH: FX: tech@cultec.com

26 STORAGE PROVIDED WITHIN CULTEC RECHARGER V8HD AND HVLV V8HD STORMWATER CHAMBERS AND HVLV F-110X4 FEED CONNECTORS - not including stone Number of Recharger V8 IHD Intermediates by design = 9 pcs 9 pcs x 7.5 = feet m Number of Recharger V8 SHD Starters by design = 3 pcs 3 pcs x = feet m Number of Recharger V8 EHD Ends by design = 3 pcs 3 pcs x = feet m Number of HVLV F-110x4 Feed Connectors = 10 pcs 10 pcs x = 5.00 feet m Total footage of V8 chambers = feet m Total footage of HVLV F-110x4 Feed Connectors = 5.00 feet 1.52 m Storage provided within V8 chambers = CF m 3 Storage within HVLV F-110x4 Feed Connectors = 9.84 CF 0.28 m 3 Total Storage within CULTEC V8 chambers and feed connectors = CF m 3 STORAGE PROVIDED WITHIN ENTIRE CULTEC STORMWATER SYSTEM - including stone Bed width feet 5.49 m Bed length feet m Effective Bed depth (not including additional cover) 3.67 feet 1.12 m Total Area sq. ft m 2 Volume of Effective Excavation (not including additional cover) CF m 3 Min. Installed Depth (including min. cover) 4.67 feet 1.42 m Perimeter of Bed feet m Total Min. Excavation (including min. cover) 2828 CF m 3 Total Storage within CULTEC V8 chambers and feed connectors 834 CF m 3 Total Stone Required 1388 CF m 3 51 CY 72 tons Storage provided within stone CF m 3 Total Storage within CULTEC Stormwater System = 1390 CF m 3 Req. storage attained. CULTEC MATERIALS LIST MODEL Recharger V8 SHD Starter Heavy Duty Recharger V8 IHD Intermediate Heavy Duty Recharger V8 EHD End Heavy Duty HVLV F110x4 Feed Connectors CULTEC No. 410 Filter Fabric 7.5' W x 300' L (2.29 m W x m L) CULTEC No. 20L Polyethylene Liner Total Stone Call CULTEC for cost estimates and system design. Quantity Unit of Measure 3 pcs 9 pcs 3 pcs 10 pcs 1 rolls 72 feet 22 m 72 tons 39 cubic meters This calculator program is for estimation purposes only and should not take the place of a comprehensive engineering design. System calculations do not include materials required conventional pipe manifolds. The successful application and use of this software product is dependent on the application of skilled engineering judgment supplied by the user and/or their consultant. The user of this software must select input values suitable to describe their specific engineering situation. The information presented in the computer output is for review, interpretation, application, and approval by a qualified engineer who must assume full responsibility for verifying that all output is appropriate and correct. Any implied or expressed warranties covering this software program or user manual including warranties of merchantability or fitness for any particular purpose are expressed excluded. CULTEC, Inc. and any of its affiliates shall not be held liable for any special, incidental, consequential, indirect or other similar damages resulting from the use of this software. Use of this program constitutes acceptance of this liability agreement by the user. Reconfiguring the bed layout may effect actual storage provided. Contact CULTEC Technical Assistance at or for further assistance. Copyright CULTEC, Inc. All rights reserved. Last updated: Calculated by: CULTEC, Inc. PO Box 280 Brookfield, CT PH: FX: tech@cultec.com

27 Created on: 12/11/2013 Job # The following information is based on a CULTEC Recharger V8 Stormwater System with these parameters: 40 stone void (%) 3 number of rows sq. ft. area m ft. of chambers m 5 ft. of feed connectors 1.52 m The system includes the following components: 3 pcs of HVLV V8SHD Starter Units 3 pcs of HVLV V8EHD End Units 9 pcs of Recharger V8IHD Intermediate Units 10 pcs of HVLV F110x4 Feed Connectors INCREMENTAL STORAGE FOR CULTEC RECHARGER V8 SYSTEM STONE ABOVE STONE BASE ELEVATION Top of System inches BOTTOM OF SYSTEM Chamber Volume per inch HVLV F110 Volume per inch Stone Volume per inch Cumulative Storage per inch Total Cumulative Storage per inch Total Cumulative Storage per m inches cu. ft. cu. ft. cu. ft. cu. ft. cu. ft. cu. ft m 3 m 3 m 3 m 3 m 3 m 3 Incremental Elevation m you will need to manually add to stone base if it is other than 6" by inserting rows above the 6 and copying up the formulas. Calculated by: CULTEC, Inc. PO Box 280 Brookfield, CT PH: FX: tech@cultec.com

28

29

30

31

32

33

34

35

36

37

38

RETAIL UNITS GUELPH. November Prepared For: File No Engineering Report.docx F: (905) P: (905) BURLINGTON, ONTARIO

RETAIL UNITS GUELPH. November Prepared For: File No Engineering Report.docx F: (905) P: (905) BURLINGTON, ONTARIO The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED COMMERCIAL RETAIL UNITS GUELPH LINE AND UPPER MIDDLE

More information

PROPOSED FOOD STORE 150 TORONTO STREET SOUTH MARKDALE, ONTARIO. Job No ENGINEERING REPORT. Prepared For:

PROPOSED FOOD STORE 150 TORONTO STREET SOUTH MARKDALE, ONTARIO. Job No ENGINEERING REPORT. Prepared For: PROPOSED FOOD STORE 150 TORONTO STREET SOUTH Job No. 16227 ENGINEERING REPORT Prepared For: MAVERICK DEVELOPMENT CORPORATION 150 Woodbine Avenue Suite 3005 Toronto, Ontario Prepared By: The Odan/Detech

More information

SERVICING AND STORM WATER MANAGEMENT REPORT

SERVICING AND STORM WATER MANAGEMENT REPORT The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED MASTERMIND TOYS RETAIL BUILDING PLACE D ORLEANS

More information

SERVICING AND STORM WATER MANAGEMENT REPORT

SERVICING AND STORM WATER MANAGEMENT REPORT The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED BANK PLACE D ORLEANS MALL OTTAWA, ONTARIO SERVICING

More information

PROPOSED COMMERCIAL DEVELOPMENT 217 TORONTO STREET SOUTH MARKDALE, ONTARIO. Job No ENGINEERING REPORT. Prepared For:

PROPOSED COMMERCIAL DEVELOPMENT 217 TORONTO STREET SOUTH MARKDALE, ONTARIO. Job No ENGINEERING REPORT. Prepared For: PROPOSED COMMERCIAL DEVELOPMENT 217 TORONTO STREET SOUTH MARKDALE, ONTARIO Job No. 17232 ENGINEERING REPORT Prepared For: 219 Toronto Street South Developments Inc. 150 Woodbine Avenue Suite 3005 Toronto,

More information

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT REPORT

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT REPORT RESIDENTIAL DEVELOPMENT 174 LAKESHORE ROAD WEST TOWN OF OAKVILLE FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT REPORT Prepared For: BIDDINGTON GROUP Original June 16, 2017 Revised September 12, 2017 Revised

More information

Functional Servicing Report

Functional Servicing Report Functional Servicing Report 4063 UPPER MIDDLE ROAD CITY OF BURLINGTON January 2017 SLA File: 16115 3228 South Service Road, Suite 105, East Wing Burlington, Ontario L7N 3H8 Tel. (905) 631-6978 Fax (905)

More information

P: (905) F: (905) PROPOSED BANK. Prepared For: ENT INC. JUNE Rev 0.docx

P: (905) F: (905) PROPOSED BANK. Prepared For: ENT INC. JUNE Rev 0.docx The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED BANK PLACE D ORLEANS MALL OTTAWA, ONTARIO SERVICING

More information

PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG ROAD OTTAWA, ONTARIO ENGINEERING REPORT SHOPPERS DRUG MART. January 2016

PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG ROAD OTTAWA, ONTARIO ENGINEERING REPORT SHOPPERS DRUG MART. January 2016 The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG

More information

FUNCTIONAL SERVICING REPORT

FUNCTIONAL SERVICING REPORT PROPOSED DEVELOPMENT HIGHWAY 401 AND CONCESSION ROAD 7 PUSLINCH, ONTARIO FUNCTIONAL SERVICING REPORT Prepared For: FARHI HOLDINGS CORPORATION c/o ZELINKA PRIAMO Ltd Original February 12, 2016 Revised September

More information

THE ODAN/DETECH GROUP INC.

THE ODAN/DETECH GROUP INC. 5230 SOUTH SERVICE ROAD, BURLINGTON, ONTARIO L7L 5K2 TELEPHONE: (905) 632-3811 FACSIMILE: (905) 632-3363 Email: detech@odandetechcom PROJECT No : 10232 FUNCTIONAL SERVICING REPORT FOR BOLTON DISTRIBUTION

More information

SOVEREIGN STREET TOWNHOUSES

SOVEREIGN STREET TOWNHOUSES SOVEREIGN STREET TOWNHOUSES Functional Servicing and Stormwater Management Report Project Location: 2286-2298 Sovereign Street Oakville, Ontario Prepared for: MB1 Development Consulting Inc. 1489 Abbeywood

More information

Site Servicing & Stormwater Management Report for Site Plan Control Application. Proposed New Multi-Unit Development 284 Presland Road Ottawa, Ontario

Site Servicing & Stormwater Management Report for Site Plan Control Application. Proposed New Multi-Unit Development 284 Presland Road Ottawa, Ontario Site Servicing & Stormwater Management Report for Site Plan Control Application Proposed New Multi-Unit Development 284 Presland Road Ottawa, Ontario Prepared for: Martin Clement Attention: Mr. Martin

More information

STORM WATER REPORT. Proposed Row House Complex Clare and Hilson 566 Hilson Ave. & 148 Clare St. Ottawa, Ontario PREPARED FOR:

STORM WATER REPORT. Proposed Row House Complex Clare and Hilson 566 Hilson Ave. & 148 Clare St. Ottawa, Ontario PREPARED FOR: Civil Geotechnical Structural Environmental 210 Prescott Street, Unit 1 (613) 860-0923 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 STORM WATER REPORT Proposed Row House Complex Clare and

More information

HALTON REGION PUBLIC WORKS YARD

HALTON REGION PUBLIC WORKS YARD HALTON REGION PUBLIC WORKS YARD Stormwater Management Report Project Location: 2195 North Service Road, Oakville, ON Prepared for: The Region of Halton 690 Dorval Drive Oakville, ON Prepared by: MTE Consultants

More information

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario Site Servicing and Stormwater Management Report By Mohamad Salame, P.Eng. Kamco Technique Ltee. 60 Grand Avenue North Cambridge, Ontario N1S

More information

6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON

6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON 6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON STORM WATER MANAGEMENT DESIGN BRIEF NEW DEVELOPMENT DRAINAGE SYSTEM REV 0 August 29, 2017 PREPARED BY: HALLEX PROJECT #170532 HALLEX NIAGARA HALLEX HAMILTON

More information

CENTRE POINT SOUTH RESIDENTIAL DEVELOPMENT

CENTRE POINT SOUTH RESIDENTIAL DEVELOPMENT CENTRE POINT SOUTH RESIDENTIAL DEVELOPMENT Municipality of Grey Highlands Stormwater Management Report prepared by: C.C. Tatham & Associates Ltd. 115 Sandford Fleming Drive, Suite 200 Collingwood, ON L9Y

More information

Orleans Gardens Starbucks Drive Through Servicing and Stormwater Management Design Brief

Orleans Gardens Starbucks Drive Through Servicing and Stormwater Management Design Brief Report File #: 34197-5.2.2 Orleans Gardens Starbucks Drive Through Servicing and Stormwater Management Design Brief Prepared for North American Development Group by IBI Group June 2015 IBI GROUP REPORT

More information

PROPOSED THREE-STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 19 R-PLAN ROCKINGHAM AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT

PROPOSED THREE-STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 19 R-PLAN ROCKINGHAM AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT PROPOSED THREE-STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 19 R-PLAN 149 1162 ROCKINGHAM AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT REPORT No. R-815-41 T. L. MAK ENGINEERING CONSULTANTS LTD. JUNE 2015

More information

Dunpar Developments Inc.

Dunpar Developments Inc. Dunpar Developments Inc. Proposed Townhouse Development 2158, 2168, 2180 and 2192 Trafalgar Road Oakville, Ontario Functional Servicing and Stormwater Management Report (in Support of a Re-Zoning and Site

More information

OHM Groups. FUNCTIONAL SERVICING REPORT 33 Arkell Road City of Guelph August 5, Prepared By:

OHM Groups. FUNCTIONAL SERVICING REPORT 33 Arkell Road City of Guelph August 5, Prepared By: Prepared By: OHM Groups FUNCTIONAL SERVICING REPORT 33 Arkell Road City of Guelph 114169 August 5, 2015 Guelph Owen Sound Listowel Kitchener Exeter Hamilton GTA 650 Woodlawn Rd. W., Block C, Unit 2, Guelph

More information

PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG ROAD OTTAWA, ONTARIO ENGINEERING REPORT SHOPPERS DRUG MART

PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG ROAD OTTAWA, ONTARIO ENGINEERING REPORT SHOPPERS DRUG MART The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG

More information

Section H - Site Plan Guidelines

Section H - Site Plan Guidelines H1 GENERAL REQUIREMENTS The following is an outline of procedures and requirements for preparation and submission of Grading Plans, Site Alteration Plans (Erosion and Sediment Control Plans), Site Servicing

More information

215 Sanders Street, Unit 1 (613) Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613)

215 Sanders Street, Unit 1 (613) Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) Civil Geotechnical Structural Environmental 215 Sanders Street, Unit 1 (613) 860-0923 210 Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 March 29, 2016 2343065 Ontario

More information

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario Site Servicing and Stormwater Management Report By Mohamad Salame, P.Eng. Kamco Technique Ltee. 60 Grand Avenue North Cambridge, Ontario N1S

More information

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY 405 TWEEDSMUIR AVENUE

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY 405 TWEEDSMUIR AVENUE FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY FOR CITY OF OTTAWA PROJECT NO.: 11-532 FOR TABLE OF CONTENTS 1.0 INTRODUCTION... 1 1.1 Existing Conditions... 2 1.2 Required Permits / Approvals...

More information

PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M BANK STREET CITY OF OTTAWA STORM DRAINAGE REPORT

PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M BANK STREET CITY OF OTTAWA STORM DRAINAGE REPORT PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M 2 7 BANK STREET CITY OF OTTAWA STORM DRAINAGE REPORT REPORT R 81 41 (REV. 2) MARCH 2017 T.L. MAK ENGINEERING CONSULTANTS LTD. JULY

More information

Contactor & Recharger Stormwater Chambers

Contactor & Recharger Stormwater Chambers CULTEC Stormwater Chambers Contactor & Recharger Stormwater Chambers Operation and Maintenance Guidelines for CULTEC Stormwater Management Systems The Founder of Plastic Chamber Technology www.cultec.com

More information

Introduction to Storm Sewer Design

Introduction to Storm Sewer Design A SunCam online continuing education course Introduction to Storm Sewer Design by David F. Carter Introduction Storm sewer systems are vital in collection and conveyance of stormwater from the upstream

More information

Site Servicing and Stormwater Management Report for Site Plan Control Application C&C Transportation 8015 Russell Road Ottawa, Ontario

Site Servicing and Stormwater Management Report for Site Plan Control Application C&C Transportation 8015 Russell Road Ottawa, Ontario Site Servicing and Stormwater Management Report for Site Plan Control Application C&C Transportation 8015 Russell Road Ottawa, Ontario Prepared for The C and C Group of Companies Attention: Mr. Bob Cousins

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. STORMWATER MANAGEMENT REPORT 22 Perkins Street Ottawa, Ontario Report No. 13030-SWM February 6, 2015 D. B. G R A Y E N G I N E E R I N G I N. Stormwater Management - Grading & Drainage - Storm & Sanitary

More information

Functional Servicing Report. 120 Huron Street City of Guelph. GMBP File: November 16, 2017

Functional Servicing Report. 120 Huron Street City of Guelph. GMBP File: November 16, 2017 Functional Servicing Report 120 Huron Street City of Guelph GMBP File: 417047 November 16, 2017 GUELPH OWEN SOUND LISTOWEL KITCHENER LONDON HAMILTON GTA 330 TRILLIUM DRIVE, UNIT D, KITCHENER ON N2E 3J2

More information

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257 INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 HUFFAKER ROAD (PLANT HAMMOND) PRIVATE INDUSTRIAL LANDFILL (HUFFAKER ROAD LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion

More information

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN 441 324 326 DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT REPORT No. R 817 79A REV. 1 MAY 2018 T. L. MAK ENGINEERING

More information

STORM WATER REPORT ASPHALT AND CONCRETE PLANTS 891 JINKINSON SIDE ROAD, ASHTON CITY OF OTTAWA, ONTARIO PREPARED FOR:

STORM WATER REPORT ASPHALT AND CONCRETE PLANTS 891 JINKINSON SIDE ROAD, ASHTON CITY OF OTTAWA, ONTARIO PREPARED FOR: Civil Geotechnical Structural Environmental 210 Prescott Street, Unit 1 (613) 860-0923 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 STORM WATER REPORT ASPHALT AND CONCRETE PLANTS 891 JINKINSON

More information

SITE SERVICING PRELIMINARY DESIGN BRIEF

SITE SERVICING PRELIMINARY DESIGN BRIEF 855 Carling Avenue Proposed Redevelopment SITE SERVICING PRELIMINARY DESIGN BRIEF March 2010 March 23, 2010 RVA 081785 Arnon Corporation 1801 Woodward Dr. Ottawa, ON K2C 0R3 Attention: Mike Casey Re: 855

More information

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR 257.82 EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part 257 and Part

More information

HOTEL KANATA 140 HEARST WAY KANATA, ONTARIO STORMWATER MANAGEMENT REPORT. Prepared for: David Johnston Architect. Prepared By:

HOTEL KANATA 140 HEARST WAY KANATA, ONTARIO STORMWATER MANAGEMENT REPORT. Prepared for: David Johnston Architect. Prepared By: HOTEL KANATA 140 HEARST WAY KANATA, ONTARIO STORMWATER MANAGEMENT REPORT Prepared for: David Johnston Architect Prepared By: BaseTech Consulting Inc. 309 Roywood Crescent Newmarket, Ontario L3Y 1A6 BCI

More information

STORM WATER REPORT ASPHALT AND CONCRETE PLANTS JINKINSON SIDE ROAD, ASHTON CITY OF OTTAWA, ONTARIO PREPARED FOR:

STORM WATER REPORT ASPHALT AND CONCRETE PLANTS JINKINSON SIDE ROAD, ASHTON CITY OF OTTAWA, ONTARIO PREPARED FOR: Civil Geotechnical Structural Environmental Industrial Health & Safety (613) 860-0923 210 Prescott Street P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 STORM WATER REPORT ASPHALT AND CONCRETE

More information

ENGINEERING REVIEW CHECKLIST City of Mount Clemens

ENGINEERING REVIEW CHECKLIST City of Mount Clemens (To be completed by the Developer s & Submitted with ing Plans) DATE: PROJECT NAME: Site Plan Approved: Date DESIGN ENGINEERING COMPANY: ing Company Contact Information: Name: Phone: Email: Owner Contact

More information

FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview

FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview Chapter 5: Hydrology Standards Contents 1.0 Overview... 1 1.1 Storm Runoff Determination... 1 1.2 Design Storm Frequencies... 1 1.3 Water Quality Storm Provisions... 2 1.4 Design Storm Return Periods...

More information

City of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development

City of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development City of Redwood City Stormwater Pollution Prevention Program Drainage Guidelines for Residential Development General Requirements A. Plot & Finished Grading Plan must be submitted with Building Permit

More information

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN 441 324 326 DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT REPORT No. R 817 79A T. L. MAK ENGINEERING CONSULTANTS LTD.

More information

CULTEC STORMWATER CHAMBER SYSTEMS

CULTEC STORMWATER CHAMBER SYSTEMS DRAINAGE SOLUTIONS SINCE 1908 CULTEC STORMWATER CHAMBER SYSTEMS RETENTION / DETENTION / INFILTRATION ENVIRONMENTAL PROTECTION COST-EFFECTIVE LAND USE EASY TO INSTALL ARMTEC.COM CULTEC STORMWATER MANAGEMENT

More information

PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M BANK STREET CITY OF OTTAWA SERVICEABILITY REPORT

PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M BANK STREET CITY OF OTTAWA SERVICEABILITY REPORT PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M 62 667 BANK STREET CITY OF OTTAWA SERVICEABILITY REPORT REPORT R 816 41A (Rev. 2) MARCH 2017 T.L. MAK ENGINEERING CONSULTANTS LTD.

More information

Contactor & Recharger Stormwater Chambers The Chamber with the Stripe

Contactor & Recharger Stormwater Chambers The Chamber with the Stripe Contactor & Recharger Stormwater Chambers The Chamber with the Stripe Product Booklet Retention Detention Water Conveyance Water Quality 1 CULTEC Stormwater Product Booklet Published by CULTEC, Inc. P.O.

More information

Stormwater Management Report Bachman Terrace Residential Development

Stormwater Management Report Bachman Terrace Residential Development Stormwater Management Report Bachman Terrace Residential Development Project # 160401069 Prepared for: Tega Developments Prepared by: Stantec Consulting Ltd. April 14, 2014 Sign-off Sheet This document

More information

EAGLE DRAINAGE DESIGN STANDARDS

EAGLE DRAINAGE DESIGN STANDARDS EAGLE DRAINAGE DESIGN STANDARDS November 17, 2015 City of Eagle Planning & Zoning Department P.O. Box 1520 Eagle, ID 83616 EAGLE DRAINAGE DESIGN STANDARDS A. PURPOSE 1. These standards amend the Design

More information

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257 INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 PLANT BOWEN PRIVATE INDUSTRY SOLID WASTE DISPOSAL FACILITY (ASH LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals

More information

SITE DESIGN ENGINEERING, LLC. 11 Cushman Street, Middleboro, MA P: F:

SITE DESIGN ENGINEERING, LLC. 11 Cushman Street, Middleboro, MA P: F: INTRODUCTION This drainage report was prepared for the proposed site re-development at in Burlington, Massachusetts. The project site is approximately 1.05± acres consisting of approximately 70% impervious

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. SERVICING BRIEF 406-408 Bank Street Ottawa, Ontario Report No. 10015-SB December 13, 2011 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage - Storm & Sanitary Sewers

More information

Permeable Pavement Facilities and Surfaces

Permeable Pavement Facilities and Surfaces Permeable Pavement Facilities and Surfaces This checklist is intended to highlight items critical to the performance of permeable pavement facilities and surfaces that need to be addressed in the design

More information

Summary of Detention Pond Calculation Canyon Estates American Canyon, California

Summary of Detention Pond Calculation Canyon Estates American Canyon, California July 15, 2015 Bellecci & Associates, Inc Summary of Detention Pond Calculation Canyon Estates American Canyon, California 1. Methodology: Method: Unit Hydrograph Software: Bentley Pond Pack Version 8i

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment

More information

Riverside South Block 3/4, Richcraft Group of Companies Inc., City of Ottawa SERVICING REPORT

Riverside South Block 3/4, Richcraft Group of Companies Inc., City of Ottawa SERVICING REPORT Riverside South Block 3/4, Richcraft Group of Companies Inc., City of Ottawa SERVICING REPORT Prepared by: Stantec Consulting Ltd. 1505 Laperriere Avenue Ottawa, ON K1Z 7T1 File: 160401004/83 January 17,

More information

visual otthymo version 2.0

visual otthymo version 2.0 2 visual otthymo version 2.0 R E F E R E N C E M A N U A L Visual OTTHYMO v2.0 Reference Manual July 2002 Table of Contents PROGRAM REFERENCE...1 INTRODUCTION...1 VISUAL OTTHYMO FILES...1 Project Files...1

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

SCHAEFFERS FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT LAKESHORE ROAD WEST TOWN OF OAKVILLE

SCHAEFFERS FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT LAKESHORE ROAD WEST TOWN OF OAKVILLE FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT 346 362 LAKESHORE ROAD WEST TOWN OF OAKVILLE PROJECT 2016-4442 JULY 2017 REVISED: APRIL 2017 C O N S U L T I N G E N G I N E E R S 64 Jardin

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or

More information

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 47 R PLAN CROYDEN AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT REPORT R

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 47 R PLAN CROYDEN AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT REPORT R PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 47 R PLAN 348 351 CROYDEN AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT REPORT R 817 21 T.L. MAK ENGINEERING CONSULTANTS LTD. JUNE 2017 REFERENCE

More information

HYDROLOGY CHECKLIST FOR LAND DISTURBANCE PERMITS

HYDROLOGY CHECKLIST FOR LAND DISTURBANCE PERMITS HYDROLOGY CHECKLIST FOR LAND DISTURBANCE PERMITS Project Name: Project Number: Reviewed By: Date: Telephone: Email: Address all items marked with an X Minimum Submittal Requirements 1. Conceptual Review

More information

100-yr Design Runoff (cfs) Basin ID 103b A a B B C Totals

100-yr Design Runoff (cfs) Basin ID 103b A a B B C Totals PROPOSED DEVELOPMENT The drainage for this site has been designed to be less than the maximum allowable runoff from each basin as stated in the Overall Rigden Farm drainage plan. Table 1 compares the actual

More information

CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND

CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND BMP RAM BMP Type Definitions 1 CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND USES AND OWNERSHIP STRUCTURAL BMP TYPE OTHER NAMES

More information

PRELIMINARY MUNICIPAL SERVICING REPORT NORTHWOODS SUBDIVISION. Prepared for: North Grassie Properties Inc.

PRELIMINARY MUNICIPAL SERVICING REPORT NORTHWOODS SUBDIVISION. Prepared for: North Grassie Properties Inc. PRELIMINARY MUNICIPAL SERVICING REPORT SUBDIVISION Prepared for: North Grassie Properties Inc. Prepared by: Stantec Consulting Ltd. 905 Waverley St. Winnipeg, MB R3T 5P4 July 2012 File: 116808030 SUBDIVISION

More information

DRAINAGE & DESIGN OF DRAINAGE SYSTEM

DRAINAGE & DESIGN OF DRAINAGE SYSTEM Drainage on Highways DRAINAGE & DESIGN OF DRAINAGE SYSTEM P. R.D. Fernando Chartered Engineer B.Sc.(Hons), M.Eng. C.Eng., MIE(SL) Drainage Requirement of Highway Drainage System Introduction Drainage means

More information

Hydrology Study. For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021

Hydrology Study. For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021 Hydrology Study For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021 Prepared for Daryl Priest - Priest Development Corporation 124 West Main Street,

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or any

More information

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR 1 INTRODUCTION 1.1 Project Description and Location Isabella Ocean Residences is a residential development to be constructed

More information

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1 TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SECTION TITLE PAGE 105.1. SPECIFICATIONS AND SCOPE 105.1 105.2. METHODS OF ANALYSIS 105.1 105.2.1. Rational Method

More information

FIRE FLOW REQUIREMENT CALCULATIONS

FIRE FLOW REQUIREMENT CALCULATIONS BUILDING A, 255 KANATA AVENUE, OTTAWA, ON - SITE SERVICING AND STORMWATER MANAGEMENT REPORT Appendix A Fire Flow Requirement Calculations January 19, 2017 FIRE FLOW REQUIREMENT CALCULATIONS A.1 Kanata

More information

PART 3 STORM WATER TECHNICAL MANUAL

PART 3 STORM WATER TECHNICAL MANUAL PART 3 STORM WATER TECHNICAL MANUAL A. INTRODUCTION The Storm Water Technical Manual contains requirements for land development and construction activities, as well as design criteria and guidelines for

More information

Mofan Holdings Inc. 249 Bayview Drive

Mofan Holdings Inc. 249 Bayview Drive Mofan Holdings Inc. 249 Bayview Drive Functioning Service Report Project Number 213586 Prepared By: Yousef Saigh, P. Eng. exp Services Inc. 4 Cedar Pointe Drive, Unit L Barrie, ON L4N 5R7 Canada T: +1.705.719.1100

More information

Report. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

Report. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI Report Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,

More information

WinSLAMM v Program Modifications Final, 3/16/19

WinSLAMM v Program Modifications Final, 3/16/19 WinSLAMM v 10.4.1 Program Modifications Final, 3/16/19 1. Printing Set up a printing option for.pdf files for input data and output summary data. 2. Added the Pipe input data to the printing input data

More information

STORM DRAINS AND IRRIGATION

STORM DRAINS AND IRRIGATION TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 STORM DRAINS AND IRRIGATION 105.1. STORM DRAINS... 105.1 105.2. METHODS OF ANALYSIS... 105.1 105.2.1. Rational Method... 105.1 105.2.2.

More information

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements This checklist is to be completed and submitted with all Subdivision Applications. The Town reserves

More information

Rational Method vs OTTHYMO, Comparing Peak Discharge Rates By Alex Nichols, P.Eng.

Rational Method vs OTTHYMO, Comparing Peak Discharge Rates By Alex Nichols, P.Eng. Rational Method vs OTTHYMO, Comparing Peak Discharge Rates By Alex Nichols, P.Eng. Urban stormwater management for small site is becoming more complex. All of the methods rely upon statistically derived

More information

Learning objectives. Upon successful completion of this lecture, the participants will be able to describe:

Learning objectives. Upon successful completion of this lecture, the participants will be able to describe: Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to describe: The different approaches for estimating peak runoff for urban drainage network

More information

Run-on and Run-off Control System Plan

Run-on and Run-off Control System Plan Run-on and Run-off Control System Plan CCR Temporary Storage Pad Lewis and Clark Station Prepared for Montana-Dakota Utilities Co. October 2016 Paul T. Swenson 2016.10.13 18:30:03-05'00' 234 West Century

More information

WinSLAMM v Program Modifications Final, 12/12/17

WinSLAMM v Program Modifications Final, 12/12/17 WinSLAMM v 10.3.4 Program Modifications Final, 12/12/17 1. Corrected an error in the Biofilter caused by an improperly defined variable that caused an overflow during very long model runs. 2. Corrected

More information

St. Boniface Industrial Park Phase 2 Municipal Servicing Report

St. Boniface Industrial Park Phase 2 Municipal Servicing Report St. Boniface Industrial Park Phase 2 Municipal Servicing Report Prepared for: City of Winnipeg Prepared by: Stantec Consulting Ltd. File: 116809351 November 5, 2015 ST. BONIFACE INDUSTRIAL PARK PHASE 2

More information

255 NORTHFIELD DRIVE EAST

255 NORTHFIELD DRIVE EAST 255 NORTHFIELD DRIVE EAST Fire Flow/Water Demand Analysis Project Location: 255 Northfield Drive East Waterloo, Ontario Prepared for: Abbey Ridge Developments Inc. 22 King Street South, Suite 300 Waterloo,

More information

FUNCTIONAL SERVICING AND STORM WATER MANAGEMENT STUDY PROPOSED COMMERCIAL BUILDING 100 ENTREPRENEUR CR CITY OF OTTAWA, ONTARIO PREPARED FOR:

FUNCTIONAL SERVICING AND STORM WATER MANAGEMENT STUDY PROPOSED COMMERCIAL BUILDING 100 ENTREPRENEUR CR CITY OF OTTAWA, ONTARIO PREPARED FOR: Civil Geotechnical Structural Environmental 210 Prescott Street, Unit 1 (613) 860-0923 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 FUNCTIONAL SERVICING AND STORM WATER MANAGEMENT STUDY

More information

PRIVATE STORM DRAINAGE FACILITIES REQUIREMENTS

PRIVATE STORM DRAINAGE FACILITIES REQUIREMENTS PRIVATE STORM DRAINAGE FACILITIES REQUIREMENTS 39 AUGUST 2005 TABLE OF CONTENTS PRIVATE STORM DRAINAGE FACILITIES REQUIREMENTS PAGE SECTION 1 DESIGN CRITERIA 41 SECTION 2 SUBMITTAL 44 SECTION 3 STRUCTURES

More information

STORM DRAINAGE DESIGN MANUAL

STORM DRAINAGE DESIGN MANUAL Appendix I STORM DRAINAGE DESIGN MANUAL by: SUNGATE DESIGN GROUP, P.A. GEN ERAL DESIGN STAN DARDS AN D POLICIES 1. STREET AND LOCAL DRAINAGE Discharge estimates for specified design storms shall be calculated

More information

Green Station CCR Surface Impoundment

Green Station CCR Surface Impoundment Green Station CCR Surface Impoundment Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule Hydrologic and Hydraulic Capacity Assessment and Initial Inflow Design Flood Control

More information

PART A4 STORM DRAINAGE SYSTEM

PART A4 STORM DRAINAGE SYSTEM PART A4 STORM DRAINAGE SYSTEM DECEMBER 2015 PART A4 - STORM DRAINAGE SYSTEM Page 1 1 GENERAL... 2 2 DEFINITIONS... 2 3 SUBMISSIONS AND APPROVALS... 2 MASTER DRAINAGE PLAN... 2 SITE DRAINAGE PLAN... 3 4

More information

Water Resources Management Plan

Water Resources Management Plan P L Y M O U T H M I N N E S O T A Appendix D: The developed a to analyze and minimize the impact of existing and future development on the City s natural resources. It is important to the City to have

More information

Storm Sewers, Page 2

Storm Sewers, Page 2 Storm Sewers storm sewer systems are dendritic systems used to collect and direct stormwater runoff storm sewer systems are integral components of any urban infrastructure curbs, gutters and storm inlets

More information

Capital Hall Champagne Avenue

Capital Hall Champagne Avenue Capital Hall - 105 Champagne Avenue Site Servicing and Stormwater Management Report Type of Document Site Plan Submission Project Name Capital Hall - 105 Champagne Avenue Project Number OTT-00229902-A0

More information

Concurrent Session B: LID Design Specifications (Chapter 4 in Draft Manual)

Concurrent Session B: LID Design Specifications (Chapter 4 in Draft Manual) Concurrent Session B: LID Design Specifications (Chapter 4 in Draft Manual) Should vs. Must In Chapter 4, should means should, and must means must. Poorly Drained Soils Well-Drained Soils Flat Terrain

More information

APPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS

APPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS March 18, 2003 This page left blank intentionally. March 18, 2003 TABLES Table E.1 Table E.2 Return Frequencies for Roadway Drainage Design Rational Method

More information

CUYAHOGA COUNTY ENGINEER

CUYAHOGA COUNTY ENGINEER CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL Supplement to O.D.O.T. LOCATION and DESIGN MANUAL, Volume 2, Drainage Design, Section 1000 and 1100 May 28, 2010 Revisions to the July 29, 2009 edition are noted

More information

APPENDIX K OPERATIONS AND FINAL COVER SURFACE WATER MANAGEMENT SYSTEM DESIGN

APPENDIX K OPERATIONS AND FINAL COVER SURFACE WATER MANAGEMENT SYSTEM DESIGN ONONDAGA LAKE SEDIMENT CONSOLIDATION AREA CIVIL & GEOTECHNICAL FINAL DESIGN APPENDIX K OPERATIONS AND FINAL COVER SURFACE WATER MANAGEMENT SYSTEM DESIGN PARSONS P:\Honeywell -SYR\44483 - Lake Detail Design\9

More information

RETENTION BASIN EXAMPLE

RETENTION BASIN EXAMPLE -7 Given: Total Tributary Area = 7.5 ac o Tributary Area within Existing R/W = 5.8 ac o Tributary Area, Impervious, Outside of R/W = 0.0 ac o Tributary Area, Pervious, Outside of R/W = 1.7 ac o Tributary

More information

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS PART 3 - STANDARDS FOR SEWERAGE FACILITIES 3.3 - DESIGN OF STORM SEWERS 3.301 Design of Storm Sewers A. General Information B. Investigations and Surveys C. Special Projects 3.302 Design Criteria for Storm

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. SERVICING BRIEF 2200 Prince of Wales Drive Ottawa, Ontario Report No. 11068-SB February 3, 2012 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage - Storm & Sanitary

More information

PART V - STORM DRAIN DESIGN CRITERIA

PART V - STORM DRAIN DESIGN CRITERIA PART V - STORM DRAIN DESIGN CRITERIA A. Hydrology Studies and Hydraulic Analyses 1. Drainage area master plans and calculations are to be submitted with all subdivision improvement plans, permit improvement

More information

PART V - STORM DRAIN DESIGN CRITERIA

PART V - STORM DRAIN DESIGN CRITERIA PART V - STORM DRAIN DESIGN CRITERIA A. Hydrology Studies and Hydraulic Analyses 1. Drainage area master plans and calculations are to be submitted with all subdivision improvement plans, permit improvement

More information