SERVICING AND STORM WATER MANAGEMENT REPORT

Size: px
Start display at page:

Download "SERVICING AND STORM WATER MANAGEMENT REPORT"

Transcription

1 The Odan/Detech Group Inc. P: (905) F: (905) SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 PROPOSED MASTERMIND TOYS RETAIL BUILDING PLACE D ORLEANS MALL CITY OF OTTAWA, ONTARIO SERVICING AND STORM WATER MANAGEMENT REPORT Prepared For: PRIMARIS MANAGEMENT INC. June 2016 Revised September 22 nd, 2016 Revised November 16 th, 2016

2 PROPOSED MASTERMIND TOYS RETAIL AT PLACE D ORLEANS, OTTAWA SERVICING & STORM WATER MANAGEMENT REPORT i TABLE OF CONTENTS DESCRIPTION page 1.0 BACKGROUND SCOPE OF WORK DESIGN CONSIDERATIONS... 2 A) Sanitary Waste Water Disposal... 2 B) Water Distribution... 6 C) Stormwater Management CONCLUSIONS Note: This report should be read in conjunction with the Site Servicing & Grading Plans prepared by The Odan/Detech Group Inc. APPENDIX A Aerial Photo of Site Site Plan prepared by SMV Architects Inc. APPENDIX B Sanitary Flow Calculation (OBC) Proposed/Existing Sanitary Sewer Design Sheet APPENDIX C Fire Underwriters Survey - Fire flow calculation APPENDIX D Pre-Development Storm Drainage Plan Post-Development Storm Drainage Plan Visual OTTHYMO Model Output Pre-Development Visual OTTHYMO Model Output Post-Development Detailed Stage/Storage/Discharge relationship for proposed IPEC Tempest ICD orifice Existing Site Servicing Plan Place D Orleans Mall Roof Drain Flow Control Form by Structural Engineer

3 PROPOSED MASTERMIND TOYS RETAIL AT PLACE D ORLEANS, OTTAWA SERVICING & STORM WATER MANAGEMENT REPORT BACKGROUND The property under study is a portion of the existing Place D Orleans Shopping Mall which is proposed to be redeveloped as a single-storey retail building, Mastermind Toys. The existing Place D Orleans Shopping Mall is located in the City of Ottawa and is bordered by Promenade Place D Orleans Drive to the north, east and west. The subject of this report, the proposed retail building, is located at the site s north frontage, at the southeast corner of Champlain Street and Place D Orleans Drive. Refer to the architectural site plan by SMV Architects in Appendix A for the site s proposed layout including building location, asphalt and concrete curbing etc. This report will evaluate the serviceability of the site with respect to sanitary, water and storm services and also evaluate the stormwater management (SWM) strategy that will be implemented to meet the City standards. 2.0 SCOPE OF WORK The Odan/Detech Group Inc. was retained by the Owner, Primaris Management Inc., to review the site and provide a Servicing & Stormwater Management Report for the subject Retail Development in support of a Site Plan Control application.

4 PROPOSED MASTERMIND TOYS RETAIL AT PLACE D ORLEANS, OTTAWA SERVICING & STORM WATER MANAGEMENT REPORT DESIGN CONSIDERATIONS A) SANITARY WASTE WATER DISPOSAL The Place D Orleans Mall has two existing sanitary service connections. The first, which will serve as the outlet for the subject building, is an existing 250mm sanitary sewer at 5.1% which drains to an existing 450mm municipal sanitary sewer flowing north in easement at the mall s northeast corner. The second service connection is a 300mm sanitary sewer at 0.5% which drains to a municipal sanitary sewer beneath Promenade Place D Orleans Drive at the site s western frontage. Both presently provide sanitary drainage to the main mall building; refer to the Site Servicing Plan by The Odan/Detech Group Inc. and the mall s existing Servicing Plan in Appendix D for the subject sanitary service connection location. To serve the subject retail building, an internal 200mm at 0.50% sanitary sewer will be constructed which drains to the existing 200mm service connection to the northeast. Refer to the Site Servicing Plan for the proposed layout and Appendix B for a design sheet. The subject retail building will not generate significant sanitary flows. Sanitary flows from the proposed Mastermind Toys retail building are shown as follows in Table 1, based on municipal design criteria. Refer to the following page for detailed sanitary calculations. The retail/commercial GFA on which these calculations are based is 427m 2 in accordance with the architectural plans in Appendix A. Detailed sanitary unit flow statistics are provided in Appendix 4-A of the City of Ottawa s Sewer Design Guidelines (2012). Appendix 4-A.5 states that retail stores with washrooms will produce 5 L/day of sanitary wastewater per square meter of store area. The City s Sewer Design Guidelines, Figure 4.3, states that the peaking factor to use for all commercial land uses is 1.5. Infiltration was calculated based on a unit flow rate of 0.28 L/s/ha. Table 1 Calculated Sanitary Sewage Flows for Proposed Commercial Development From Land Use (L/s) From Infiltration (L/s) Total (L/s) Proposed Commercial Further, the sanitary flow calculation based on the OBC calculation table in Appendix B shows that the peak sanitary flow rate will be 0.03 L/s, which is less than the above noted flow.

5 PROPOSED MASTERMIND TOYS RETAIL AT PLACE D ORLEANS, OTTAWA SERVICING & STORM WATER MANAGEMENT REPORT 3

6 PROPOSED MASTERMIND TOYS RETAIL AT PLACE D ORLEANS, OTTAWA SERVICING & STORM WATER MANAGEMENT REPORT 4 The existing sanitary flow rate into the existing 250mm sanitary sewer at 5.1% is conservatively calculated to be L/s as per Table 2, as follows. Detailed statistics for the existing mall s interior are not available, therefore the existing sanitary floor calculation is based on the malls existing a GFA of ha; it is conservatively assumed that 100% of the mall s existing sanitary flows drain via the subject 250mm sanitary service connection to the northeast. It was similarly assumed that 100% of the infiltration originating from the mall s ha lot area may be attributed to the northeast sanitary service connection. GFA and lot area statistics for the existing mall appear in the architectural plans in Appendix A. Refer to the detailed sanitary flow calculation on the following page. The above scenario assumes the worst condition that all sanitary waste water discharges to the north east sanitary sewer outlet, however, we know this is not true and that a portion of sanitary waste water discharges to the west outlet location. Table 2 Calculated Sanitary Sewage Flows from Existing Commercial Development From Land Use (L/s) From Infiltration (L/s) Total (L/s) Existing Commercial Post-Development A sanitary sewer design sheet for the proposed internal sanitary sewer, and the length of existing internal sanitary sewer which will provide drainage for the proposed CRU, is provided in Appendix B. The design sheet confirms that all internal sanitary sewer segments will be flowing within their capacity post-development.

7 PROPOSED MASTERMIND TOYS RETAIL AT PLACE D ORLEANS, OTTAWA SERVICING & STORM WATER MANAGEMENT REPORT 5

8 PROPOSED MASTERMIND TOYS RETAIL AT PLACE D ORLEANS, OTTAWA SERVICING & STORM WATER MANAGEMENT REPORT 6 B) WATER DISTRIBUTION There is an internal looped water main which services the existing Place D Orleans Mall. This water main is serviced from Place D Orleans west side and from St. Joseph s Blvd. to the south east. It is proposed to provide a new domestic water service to the proposed Retail Building from the water main located beneath the mall s private driveway. Refer to the Site Servicing Plan. The building will not have a fire service and is thus not sprinklered. Fire protection will be provided by an existing internal hydrant south of the building. The pressures and volumes must be sufficient for Peak hour conditions and under fire conditions as established by the Ministry of Environment and the Fire Underwriters Survey booklet (1999). The minimal residual pressure under fire conditions is 140 kpa (20.3 psi). According to the MOEE criteria the allowable pressures are as follows: Condition Allowable Pressures (kpa) min. max. 1) Min. Hour 275 (40psi) 700 (101psi) 2) Peak Hour 275 (40 psi) 700 (101 psi) 3) Peak Day + Fire Flow 140 (20 psi) 700 (101 psi) The domestic water demand of the proposed Retail Development is as follows: a) Average Day domestic demand (Refer to OBC Calculation Appendix B) 0.03 L/s b) Peak day demand x daily demand 0.05 L/s c) Peak hour demand x daily demand 0.06 L/s d) Fire flow for retail space as per FUS 1999 manual 67.0 L/s The Fire Underwriters Survey fire flow demand calculation can be found in Appendix C. Table 3, as follows, is a summary of the total water demand for the proposed retail development only. It is assumed that the existing Mall is covered as per the original design by others. Table 3 Total Water Demand for Proposed Commercial Development L/s USGM Peak Day Demand Fire Flow Demand Total Water Demand

9 PROPOSED MASTERMIND TOYS RETAIL AT PLACE D ORLEANS, OTTAWA SERVICING & STORM WATER MANAGEMENT REPORT 7 The water boundary conditions were provided by the City of Ottawa using the water demand and fire flow demand of the proposed toy store. The head at the connection point of the analysis using the maximum day and fire flow demand of the proposed store is 109.1m at a pressure of 56.3 psi. This is acceptable. Refer to the Boundary Conditions report by the City of Ottawa in Appendix C.

10 PROPOSED MASTERMIND TOYS RETAIL AT PLACE D ORLEANS, OTTAWA SERVICING & STORM WATER MANAGEMENT REPORT 8 C) STORM WATER MANAGEMENT The larger commercial development (Place D Orleans Mall) of which the proposed retail pad (Mastermind Toys) is part presently drains via two storm service connections. The subject retail pad is located within the tributary catchment area of an existing 900mm at 0.18% storm service connection near the site s northeast corner. This existing storm sewer connection drains to an existing 1050mm municipal storm sewer which flows easterly adjacent to the site s north boundary, beneath Place D Orleans Drive. TABLE 4 Existing Site Storm Service Connections Subject Development Catchment ID EX-A & EX-B; A,B,C,D,E (Northeast Portion of Mall) Location Downstream of EX STM MH 18 Ex Controls None Existing Specifications 900mm at 0.18% Capacity 768 L/s Receiving Municipal Storm Sewer Ex 1050mm STM Sewer Place D Orleans There are no existing stormwater management controls implemented in the existing storm drainage system. It is not within the scope of the proposed retail pad construction to implement stormwater management controls for the entire development, however controls will be provided as practical where modifications to the existing system are proposed. The existing internal storm sewer network, storm service connection and receiving municipal storm sewer appear on the Site Servicing Plan (drawing 1 of 2). Also refer to the Place D Orleans Centre Site Servicing Plan in Appendix D. The proposed development falls within the tributary catchment areas of two upstream branches of this storm service connection (EX-A and EX-B). The differential impact of the proposed development on these two tributary catchment areas is quantified as follows. Design storm data for the City of Ottawa 5-year and 100-year storms are shown below. I 5 = / ( t) I 100 = / ( t) When time of concentration, t, is 10 minutes, the 5-year and 100-year rainfall intensities are as follows. I 5 =104.4 mm/hr I 100 = mm/hr

11 PROPOSED MASTERMIND TOYS RETAIL AT PLACE D ORLEANS, OTTAWA SERVICING & STORM WATER MANAGEMENT REPORT 9 i) Pre-Development Release Rate The proposed retail pad and it s associated parking lot reconstruction is located within two existing catchment areas. Refer to the Pre-Development Storm Drainage Plan in Appendix D for the extents of the existing catchment areas. They are described as follows. TABLE 5 Existing Catchment Areas Existing Catchment ID Proposed Catchment ID Ex. Area (ha) Catchment Surface Receiving Structure Ex. SWM Controls Downstream Outlet EX-A A,C,D,E Asphalt Ex CB 3 None Ex. 900mm STM EX-B B Asphalt Ex CB 5 None Service at Ex. MH 18 The existing peak runoff rate in 5-year and 100-year storms from each of the catchment areas impacted by the proposed development is calculated as follows. Refer to the Pre-Development Storm Drainage Plan in Appendix D for the catchment areas. TABLE 6 Pre-Development Runoff Rate (Q=2.78CiA) Existing Catchment Proposed Catchment Ex. Area (ha) Intensity (mm/hr) (t = 10 min) Q = 2.78 CiA ( l/s ) C 5-Year 100-Year 5-Year 100-Year EX-A A,C,D,E L/s L/s B (C=1.00 in EX-B L/s 71.2 L/s 100Y STM) Total Area L/s L/s Further, the 5-year and 100-year pre-development runoff rates are calculated as follows using a Visual OTTHYMO Model. Refer to the pre-development model (below) and output in Appendix D. TABLE 7 Pre-Development Runoff Rate (Visual OTTHYMO) Existing Catchment Proposed Catchment Ex. Area (ha) Method % imperv % imperv directly connected Q ( l/s ) 5-Year 100-Year EX-A A,C,D,E StandHYD 67 L/s 117 L/s 90% 90% EX-B B StandHYD 39 L/s 68 L/s Total Site 106 L/s 186 L/s 1 Catchment EX-A AREA = Y Discharge = PeakFlow = Catchment EX-B AREA = Y Discharge = PeakFlow = Pre Dev Site Dis PeakFlow =

12 PROPOSED MASTERMIND TOYS RETAIL AT PLACE D ORLEANS, OTTAWA SERVICING & STORM WATER MANAGEMENT REPORT 10 ii) Post-Development Catchment Areas The post-development catchment areas into which the existing catchment areas (EX-A and EX- B) will be divided are as follows. Refer to the Post-Development Storm Drainage Plan in Appendix D for the catchment areas. Tables 7 and 8 provide the detailed statistics and drainage conveyances and stormwater management controls applied to each of the proposed catchment areas. TABLE 8 Post-Development Catchment Areas and Descriptions Watershed Description Area (ha) % imperv % imperv directly connected Imperv Length(m) perv imperv Losses perv Catchment A Parking SEE INPUT STANDHYD SCS Catchment B Parking SEE INPUT STANDHYD SCS Catchment C Parking SEE INPUT STANDHYD SCS Catchment D Retail Pad Roof SEE INPUT STANDHYD SCS Catchment E Landscaping SEE INPUT NASHHYD SCS Total Site Catchment Area The above catchment area statistics appear in the Visual OTTHYMO Model, below, and output in Appendix B. The downstream conveyances, controls and storage associated with each catchment area are as follows. TABLE 9 Post-Development Catchment Areas and Conveyances Watershed Description Ex. Area (ha) Prop. Area (ha) Drainage Conveyances, Controls & Storage Catchment A Prop CB 2 (Ipex Tempest CB ICD); Prop STM MH 1; Ex CBMH 1 Catchment C Prop CB 1; Ex CBMH 1 Catchment D (EX-A) Roof drain controls Catchment E Ex CB 3 Catchment B (EX-B) Total Site Catchment Area Ex CB 5

13 PROPOSED MASTERMIND TOYS RETAIL AT PLACE D ORLEANS, OTTAWA SERVICING & STORM WATER MANAGEMENT REPORT 11 iii) Controlled Discharge Rate By the proposed rooftop controls and proposed Ipex Tempest ICD at PROP CB 2, discharge from the subject catchment area will be controlled to 83 L/s. The post-development Visual OTTHYMO Model is as follows, showing flows in a 5-year storm. Refer to the output in Appendix C. 1 Catchment A AREA = PeakFlow = Catchment D RET ROOF AREA = PeakFlow = PROP CB2 IPEX TEMPEST ICD PeakFlow = Controlling Rf Drains PeakFlow = Catchment C AREA = PeakFlow = Catchment E AREA = PeakFlow = PeakFlow = AREA = Catchment B AREA = PeakFlow = Site Discharge PeakFlow = Figure 1 Post-Development 100-Y Storm Visual OTTHYMO Model As shown above, stormwater quantity controls are provided for runoff from Catchment A (draining to PROP CB 2) and Catchment D (proposed building rooftop). It is not practical to control runoff from catchment areas B and C, which drain to EX CB 5 and PROP CB 1 respectively, because of the grading surrounding the respective receiving catchbasins. The grading slopes down easterly across EX CB 5, meaning all ponding storage would simply flow easterly before ponding above the catchbasins. Similarly, the grading generally falls west to east across PROP CB 1, thus it is not practical to provide ponding storage. The stage/storage/discharge relationship for the proposed Ipex Tempest HF ICD at PROP CB 2 is as follows. Refer to the detailed relationship in Appendix C, and the ponding area on the Grading Plan. Ponding storage will be provided to a max 150mm elevation above the rim of PROP CB 2, when it will spillover out of the site to the Right of Way. The Ipex Tempest HF ICD has been designed such that in a 5-year storm, there will be no surface ponding above PROP CB 2. Note that in the ponding storage reservoir (Reservoir 0006) in the Visual OTTHYMO Output in Appendix C, the peak outflow is larger than the peak inflow. In a 100-year storm, runoff will be controlled by the orifice. Further, in a 100-year storm, 7m 3 of storage is required, yet there is 4m 3 of storage in the CB and in ponding, therefore water will spillover off the site.

14 PROPOSED MASTERMIND TOYS RETAIL AT PLACE D ORLEANS, OTTAWA SERVICING & STORM WATER MANAGEMENT REPORT 12 TABLE 10 Proposed Catchment A/ PROP CB 2 Stage / Storage / Discharge Relationship for Prop. Ipex Tempest CB ICD Head (m) Elevation (m) Provided Volume (m 3 ) Discharge (l/s) Description Invert of ICD (Ipex Tempest) Prop CB 2 rim elevation m pond depth m pond depth m pond depth Total Discharge: 5 Year = 28 l/s 100 Year = 38 l/s The required and provided storage volume above PROP CB 2 is as follows. Note that storage is provided in and above PROP CB 2 beyond a 5-year storm to a 100-year storm. In a 5-year storm, 1m 3 of storage is required, and 4m 3 is provided. In a 100-year storm, 7m 3 of storage would be required, however given that only 4m 3 is available, the volume will spillover onto Champlain Street as per the Grading Plan. Refer to the output for Reservoir 0006, which is the CB 2 ponding, in the Visual OTTHYMO 5-year and 100-year outputs in Appendix A. TABLE 11 Stormwater Storage Summary for PROP CB 2 Ipex Tempest ICD Storm Required Volume (m 3 ) Provided Ponding & Below-Grade Storage Volume (m 3 ) 5-Year 1 (OTTHYMO rounding up; in reality <1m 3 ) Year 7 4 The Stage/Storage/Discharge relationship for the proposed retail pad s roof is as follows.

15 PROPOSED MASTERMIND TOYS RETAIL AT PLACE D ORLEANS, OTTAWA SERVICING & STORM WATER MANAGEMENT REPORT 13 In a 5-year storm, the controlled discharge rate from the controlling roof drains will be 2 L/s and 10m 3 of the available 21.3m 3 of rooftop storage will be utilized. In a 100-year storm, the controlled discharge rate will be 4 L/s and 18m 3 of the available 21.3m 3 of available rooftop storage will be used. Rooftop ponding will pond to a maximum depth of 150mm. By the foregoing measures, the site (catchment areas A through E) discharge rate in a 5-year storm is reduced from 106 L/s (Table 4) to 91 L/s (Visual OTTHYMO). Refer to Table 10, below. Beyond a 5-year storm, to a 100-year storm, the system will be surcharged and runoff will flow via overland flow off the site to the Right of Way.

16 PROPOSED MASTERMIND TOYS RETAIL AT PLACE D ORLEANS, OTTAWA SERVICING & STORM WATER MANAGEMENT REPORT 14 TABLE 12 Post-Development Discharge/Release Rate (Visual OTTHYMO) Existing Catchment EX-A Proposed Catchment Prop. Area (ha) Method % imperv % imperv directly connected 5-Year Discharge Rate A StandHYD L/s C StandHYD L/s D StandHYD L/s E NashHYD See Input 2 L/s EX-B B StandHYD L/s Total Site 91 L/s 100-Year Discharge Rate Overland Flow 146 L/s

17 PROPOSED MASTERMIND TOYS RETAIL AT PLACE D ORLEANS, OTTAWA SERVICING & STORM WATER MANAGEMENT REPORT CONCLUSIONS The foregoing report has demonstrated that there are existing mains available to provide sanitary, storm and water service to the subject retail development. Stormwater management calculations are provided to show that the post-development release rate will be controlled to a 5-year storm at a C-value of TABLE 12 - Summary Information Post-Development Peak Sanitary Flow (L/s) Total Fire-Domestic Flow Required (US GPM) Pre-Development 5-Year Runoff Rate 106 L/s Post-Development 5-Year Release Rate 91 L/s Respectfully Submitted; The Odan Detech Group Inc. November 16 th, 2016 Daniel Bancroft,EIT John Krpan, M.S.C.E., P.Eng. DATE

18 APPENDIX A Aerial Photo of Existing Site Site Plan by SMV Architects Inc.

19 Aerial Photo of Existing Site Entire Place D Orleans Mall PROPOSED BUILDING EXTENTS OF PLACE D ORLEANS MALL

20 Aerial Photo of Existing Site Location of Proposed Retail Building PROPOSED BUILDING

21

22 APPENDIX B Sanitary Flow Calculation (OBC) Proposed/Existing Sanitary Sewer Design Sheet

23

24

25 APPENDIX C Fire Underwriters Survey - Fire flow calculation

26

27 Information Provided: Date provided: 20 October 2016 Boundary Conditions at 110 Place de Orleans Criteria Demand (L/s) Average Demand 0.03 Maximum Daily Demand 0.05 Peak Hourly Demand 0.06 Fire Flow Demand 67 Maximum Daily + Fire Flow Demand Location:

28 Results: Connection 1: Criteria Head (m) Pressure (psi) Max HGL PKHR MXDY + Fire Flow (67 L/s) Connection 2: Criteria Head (m) Pressure (psi) Max HGL PKHR MXDY + Fire Flow (67 L/s) Note: The connection location locating on the provided drawing is on the private watermain. City is prohibited to provide boundary conditions on a private watermain. Therefore, the nearest two suitable connections are chosen to generate BC for this site. Disclaimer The boundary condition information is based on current operation of the city water distribution system. The computer model simulation is based on the best information available at the time. The operation of the water distribution system can change on a regular basis, resulting in a variation in boundary conditions. The physical properties of watermains deteriorate over time, as such must be assumed in the absence of actual field test data. The variation in physical watermain properties can therefore alter the results of the computer model simulation. Fire Flow analysis is a reflection of available flow in the watermain; there may be additional restrictions that occur between the watermain and the hydrant that the model cannot take into account.

29 APPENDIX D Pre-Development Storm Drainage Plan Post-Development Storm Drainage Plan Visual OTTHYMO Model Output Pre-Development Visual OTTHYMO Model Output Post-Development Detailed Stage/Storage/Discharge relationship for proposed IPEC Tempest ICD orifice Existing Site Servicing Plan Place D Orleans Mall Roof Drain Flow Control Form by Structural Engineer

30

31

32 Pre-Development Visual OTTHYMO Model =========================================================================================================== V V I SSSSS U U A L V V I SS U U A A L V V I SS U U AAAAA L V V I SS U U A A L VV I SSSSS UUUUU A A LLLLL OOO TTTTT TTTTT H H Y Y M M OOO O O T T H H Y Y MM MM O O O O T T H H Y M M O O OOO T T H H Y M M OOO Developed and Distributed by Clarifica Inc. Copyright 1996, 2007 Clarifica Inc. All rights reserved. ***** D E T A I L E D O U T P U T ***** Input filename: C:\Program Files (x86)\visual OTTHYMO 2.3.3\voin.dat Output filename: P:\2015\15253A\Word\ODAN Report\Servicing\SS-SWM MM Rev 1\PreDev OTTHYMO\OTTHYMO MOdel\Pre Development.out Summary filename: P:\2015\15253A\Word\ODAN Report\Servicing\SS-SWM MM Rev 1\PreDev OTTHYMO\OTTHYMO MOdel\Pre Development.sum DATE: 9/14/2016 TIME: 5:06:25 PM USER: COMMENTS: **************************** ** SIMULATION NUMBER: 1 ** **************************** CHICAGO STORM IDF curve parameters: A= Ptotal= mm B= C=.814 used in: INTENSITY = A / (t + B)^C Duration of storm = 4.00 hrs Storm time step = min Time to peak ratio =.33 TIME RAIN TIME RAIN TIME RAIN TIME RAIN hrs mm/hr hrs mm/hr hrs mm/hr hrs mm/hr CALIB STANDHYD (0002) Area (ha)=.14 ID= 1 DT= 5.0 min Total Imp(%)= Dir. Conn.(%)= IMPERVIOUS PERVIOUS (i) Surface Area (ha)= Dep. Storage (mm)= Average Slope (%)= Length (m)= Mannings n = NOTE: RAINFALL WAS TRANSFORMED TO 5.0 MIN. TIME STEP TRANSFORMED HYETOGRAPH ---- TIME RAIN TIME RAIN TIME RAIN TIME RAIN

33 hrs mm/hr hrs mm/hr hrs mm/hr hrs mm/hr Max.Eff.Inten.(mm/hr)= over (min) Storage Coeff. (min)= 1.24 (ii) 4.13 (ii) Unit Hyd. Tpeak (min)= Unit Hyd. peak (cms)= *TOTALS* PEAK FLOW (cms)= (iii) TIME TO PEAK (hrs)= RUNOFF VOLUME (mm)= TOTAL RAINFALL (mm)= RUNOFF COEFFICIENT = ***** WARNING: STORAGE COEFF. IS SMALLER THAN TIME STEP! (i) CN PROCEDURE SELECTED FOR PERVIOUS LOSSES: CN* = 85.0 Ia = Dep. Storage (Above) (ii) TIME STEP (DT) SHOULD BE SMALLER OR EQUAL THAN THE STORAGE COEFFICIENT. (iii) PEAK FLOW DOES NOT INCLUDE BASEFLOW IF ANY CALIB STANDHYD (0001) Area (ha)=.25 ID= 1 DT= 5.0 min Total Imp(%)= Dir. Conn.(%)= IMPERVIOUS PERVIOUS (i) Surface Area (ha)= Dep. Storage (mm)= Average Slope (%)= Length (m)= Mannings n = Max.Eff.Inten.(mm/hr)= over (min) Storage Coeff. (min)= 1.46 (ii) 4.34 (ii) Unit Hyd. Tpeak (min)= Unit Hyd. peak (cms)= *TOTALS* PEAK FLOW (cms)= (iii) TIME TO PEAK (hrs)= RUNOFF VOLUME (mm)= TOTAL RAINFALL (mm)= RUNOFF COEFFICIENT = ***** WARNING: STORAGE COEFF. IS SMALLER THAN TIME STEP! (i) CN PROCEDURE SELECTED FOR PERVIOUS LOSSES: CN* = 85.0 Ia = Dep. Storage (Above) (ii) TIME STEP (DT) SHOULD BE SMALLER OR EQUAL THAN THE STORAGE COEFFICIENT. (iii) PEAK FLOW DOES NOT INCLUDE BASEFLOW IF ANY ADD HYD (0003) = 3 AREA QPEAK TPEAK R.V. (ha) (cms) (hrs) (mm) ID1= 1 (0002): ID2= 2 (0001): ================================================== ID = 3 (0003): NOTE: PEAK FLOWS DO NOT INCLUDE BASEFLOWS IF ANY

34 **************************** ** SIMULATION NUMBER: 2 ** **************************** CHICAGO STORM IDF curve parameters: A= Ptotal= mm B= C=.820 used in: INTENSITY = A / (t + B)^C Duration of storm = 4.00 hrs Storm time step = min Time to peak ratio =.33 TIME RAIN TIME RAIN TIME RAIN TIME RAIN hrs mm/hr hrs mm/hr hrs mm/hr hrs mm/hr CALIB STANDHYD (0002) Area (ha)=.14 ID= 1 DT= 5.0 min Total Imp(%)= Dir. Conn.(%)= IMPERVIOUS PERVIOUS (i) Surface Area (ha)= Dep. Storage (mm)= Average Slope (%)= Length (m)= Mannings n = NOTE: RAINFALL WAS TRANSFORMED TO 5.0 MIN. TIME STEP TRANSFORMED HYETOGRAPH ---- TIME RAIN TIME RAIN TIME RAIN TIME RAIN hrs mm/hr hrs mm/hr hrs mm/hr hrs mm/hr Max.Eff.Inten.(mm/hr)= over (min) Storage Coeff. (min)= 1.00 (ii) 3.33 (ii) Unit Hyd. Tpeak (min)= Unit Hyd. peak (cms)= *TOTALS* PEAK FLOW (cms)= (iii) TIME TO PEAK (hrs)= RUNOFF VOLUME (mm)= TOTAL RAINFALL (mm)= RUNOFF COEFFICIENT = ***** WARNING: STORAGE COEFF. IS SMALLER THAN TIME STEP! (i) CN PROCEDURE SELECTED FOR PERVIOUS LOSSES: CN* = 85.0 Ia = Dep. Storage (Above) (ii) TIME STEP (DT) SHOULD BE SMALLER OR EQUAL THAN THE STORAGE COEFFICIENT. (iii) PEAK FLOW DOES NOT INCLUDE BASEFLOW IF ANY CALIB STANDHYD (0001) Area (ha)=.25 ID= 1 DT= 5.0 min Total Imp(%)= Dir. Conn.(%)= 90.00

35 IMPERVIOUS PERVIOUS (i) Surface Area (ha)= Dep. Storage (mm)= Average Slope (%)= Length (m)= Mannings n = Max.Eff.Inten.(mm/hr)= over (min) Storage Coeff. (min)= 1.18 (ii) 3.50 (ii) Unit Hyd. Tpeak (min)= Unit Hyd. peak (cms)= *TOTALS* PEAK FLOW (cms)= (iii) TIME TO PEAK (hrs)= RUNOFF VOLUME (mm)= TOTAL RAINFALL (mm)= RUNOFF COEFFICIENT = ***** WARNING: STORAGE COEFF. IS SMALLER THAN TIME STEP! (i) CN PROCEDURE SELECTED FOR PERVIOUS LOSSES: CN* = 85.0 Ia = Dep. Storage (Above) (ii) TIME STEP (DT) SHOULD BE SMALLER OR EQUAL THAN THE STORAGE COEFFICIENT. (iii) PEAK FLOW DOES NOT INCLUDE BASEFLOW IF ANY ADD HYD (0003) = 3 AREA QPEAK TPEAK R.V. (ha) (cms) (hrs) (mm) ID1= 1 (0002): ID2= 2 (0001): ================================================== ID = 3 (0003): NOTE: PEAK FLOWS DO NOT INCLUDE BASEFLOWS IF ANY FINISH ===========================================================================================================

36 Post-Development Visual OTTHYMO Model 5-Year =========================================================================================================== V V I SSSSS U U A L V V I SS U U A A L V V I SS U U AAAAA L V V I SS U U A A L VV I SSSSS UUUUU A A LLLLL OOO TTTTT TTTTT H H Y Y M M OOO O O T T H H Y Y MM MM O O O O T T H H Y M M O O OOO T T H H Y M M OOO Developed and Distributed by Clarifica Inc. Copyright 1996, 2007 Clarifica Inc. All rights reserved. ***** D E T A I L E D O U T P U T ***** Input filename: C:\Program Files (x86)\visual OTTHYMO 2.3.3\voin.dat Output filename: P:\2015\15253A\Word\ODAN Report\Servicing\SS-SWM MM Rev 2\Visual OTTHYMO\OTTHYMO MOdel\Post Development.out Summary filename: P:\2015\15253A\Word\ODAN Report\Servicing\SS-SWM MM Rev 2\Visual OTTHYMO\OTTHYMO MOdel\Post Development.sum DATE: 11/17/2016 TIME: 11:59:08 AM USER: COMMENTS: **************************** ** SIMULATION NUMBER: 1 ** **************************** CHICAGO STORM IDF curve parameters: A= Ptotal= mm B= C=.814 used in: INTENSITY = A / (t + B)^C Duration of storm = 4.00 hrs Storm time step = min Time to peak ratio =.33 TIME RAIN TIME RAIN TIME RAIN TIME RAIN hrs mm/hr hrs mm/hr hrs mm/hr hrs mm/hr CALIB STANDHYD (0005) Area (ha)=.15 ID= 1 DT= 5.0 min Total Imp(%)= Dir. Conn.(%)= IMPERVIOUS PERVIOUS (i) Surface Area (ha)= Dep. Storage (mm)= Average Slope (%)= Length (m)= Mannings n = NOTE: RAINFALL WAS TRANSFORMED TO 5.0 MIN. TIME STEP TRANSFORMED HYETOGRAPH ----

37 TIME RAIN TIME RAIN TIME RAIN TIME RAIN hrs mm/hr hrs mm/hr hrs mm/hr hrs mm/hr Max.Eff.Inten.(mm/hr)= over (min) Storage Coeff. (min)= 1.26 (ii) 4.15 (ii) Unit Hyd. Tpeak (min)= Unit Hyd. peak (cms)= *TOTALS* PEAK FLOW (cms)= (iii) TIME TO PEAK (hrs)= RUNOFF VOLUME (mm)= TOTAL RAINFALL (mm)= RUNOFF COEFFICIENT = ***** WARNING: STORAGE COEFF. IS SMALLER THAN TIME STEP! (i) HORTONS EQUATION SELECTED FOR PERVIOUS LOSSES: Fo (mm/hr)= K (1/hr)= 2.00 Fc (mm/hr)= 7.50 Cum.Inf. (mm)=.00 (ii) TIME STEP (DT) SHOULD BE SMALLER OR EQUAL THAN THE STORAGE COEFFICIENT. (iii) PEAK FLOW DOES NOT INCLUDE BASEFLOW IF ANY CALIB NASHYD (0004) Area (ha)=.04 Curve Number (CN)= 80.0 ID= 1 DT=10.0 min Ia (mm)= 5.00 # of Linear Res.(N)= 3.00 U.H. Tp(hrs)=.20 NOTE: RAINFALL WAS TRANSFORMED TO 10.0 MIN. TIME STEP TRANSFORMED HYETOGRAPH ---- TIME RAIN TIME RAIN TIME RAIN TIME RAIN hrs mm/hr hrs mm/hr hrs mm/hr hrs mm/hr Unit Hyd Qpeak (cms)=.008 PEAK FLOW (cms)=.002 (i) TIME TO PEAK (hrs)= RUNOFF VOLUME (mm)= TOTAL RAINFALL (mm)= RUNOFF COEFFICIENT =.333 (i) PEAK FLOW DOES NOT INCLUDE BASEFLOW IF ANY CALIB STANDHYD (0003) Area (ha)=.05 ID= 1 DT= 5.0 min Total Imp(%)= Dir. Conn.(%)= IMPERVIOUS PERVIOUS (i) Surface Area (ha)= Dep. Storage (mm)= Average Slope (%)= Length (m)= Mannings n = NOTE: RAINFALL WAS TRANSFORMED TO 5.0 MIN. TIME STEP.

38 ---- TRANSFORMED HYETOGRAPH ---- TIME RAIN TIME RAIN TIME RAIN TIME RAIN hrs mm/hr hrs mm/hr hrs mm/hr hrs mm/hr Max.Eff.Inten.(mm/hr)= over (min) Storage Coeff. (min)=.93 (ii) 3.81 (ii) Unit Hyd. Tpeak (min)= Unit Hyd. peak (cms)= *TOTALS* PEAK FLOW (cms)= (iii) TIME TO PEAK (hrs)= RUNOFF VOLUME (mm)= TOTAL RAINFALL (mm)= RUNOFF COEFFICIENT = ***** WARNING: STORAGE COEFF. IS SMALLER THAN TIME STEP! (i) CN PROCEDURE SELECTED FOR PERVIOUS LOSSES: CN* = 85.0 Ia = Dep. Storage (Above) (ii) TIME STEP (DT) SHOULD BE SMALLER OR EQUAL THAN THE STORAGE COEFFICIENT. (iii) PEAK FLOW DOES NOT INCLUDE BASEFLOW IF ANY CALIB STANDHYD (0002) Area (ha)=.04 ID= 1 DT= 5.0 min Total Imp(%)= Dir. Conn.(%)= IMPERVIOUS PERVIOUS (i) Surface Area (ha)= Dep. Storage (mm)= Average Slope (%)= Length (m)= Mannings n = Max.Eff.Inten.(mm/hr)= over (min) Storage Coeff. (min)=.86 (ii) 2.33 (ii) Unit Hyd. Tpeak (min)= Unit Hyd. peak (cms)= *TOTALS* PEAK FLOW (cms)= (iii) TIME TO PEAK (hrs)= RUNOFF VOLUME (mm)= TOTAL RAINFALL (mm)= RUNOFF COEFFICIENT = ***** WARNING: STORAGE COEFF. IS SMALLER THAN TIME STEP! (i) CN PROCEDURE SELECTED FOR PERVIOUS LOSSES: CN* = 85.0 Ia = Dep. Storage (Above) (ii) TIME STEP (DT) SHOULD BE SMALLER OR EQUAL THAN THE STORAGE COEFFICIENT. (iii) PEAK FLOW DOES NOT INCLUDE BASEFLOW IF ANY CALIB STANDHYD (0001) Area (ha)=.10 ID= 1 DT= 5.0 min Total Imp(%)= Dir. Conn.(%)= IMPERVIOUS PERVIOUS (i) Surface Area (ha)= Dep. Storage (mm)= Average Slope (%)= Length (m)=

39 Mannings n = Max.Eff.Inten.(mm/hr)= over (min) Storage Coeff. (min)= 1.13 (ii) 4.01 (ii) Unit Hyd. Tpeak (min)= Unit Hyd. peak (cms)= *TOTALS* PEAK FLOW (cms)= (iii) TIME TO PEAK (hrs)= RUNOFF VOLUME (mm)= TOTAL RAINFALL (mm)= RUNOFF COEFFICIENT = ***** WARNING: STORAGE COEFF. IS SMALLER THAN TIME STEP! (i) CN PROCEDURE SELECTED FOR PERVIOUS LOSSES: CN* = 85.0 Ia = Dep. Storage (Above) (ii) TIME STEP (DT) SHOULD BE SMALLER OR EQUAL THAN THE STORAGE COEFFICIENT. (iii) PEAK FLOW DOES NOT INCLUDE BASEFLOW IF ANY RESERVOIR (0007) IN= 2---> OUT= 1 DT= 5.0 min OUTFLOW STORAGE OUTFLOW STORAGE (cms) (ha.m.) (cms) (ha.m.) AREA QPEAK TPEAK R.V. (ha) (cms) (hrs) (mm) INFLOW : ID= 2 (0002) OUTFLOW: ID= 1 (0007) PEAK FLOW REDUCTION [Qout/Qin](%)= TIME SHIFT OF PEAK FLOW (min)= MAXIMUM STORAGE USED (ha.m.)= RESERVOIR (0006) IN= 2---> OUT= 1 DT= 5.0 min OUTFLOW STORAGE OUTFLOW STORAGE (cms) (ha.m.) (cms) (ha.m.) AREA QPEAK TPEAK R.V. (ha) (cms) (hrs) (mm) INFLOW : ID= 2 (0001) OUTFLOW: ID= 1 (0006) PEAK FLOW REDUCTION [Qout/Qin](%)= TIME SHIFT OF PEAK FLOW (min)=.00 MAXIMUM STORAGE USED (ha.m.)=.0001 **** WARNING : HYDROGRAPH PEAK WAS NOT REDUCED. CHECK OUTFLOW/STORAGE TABLE OR REDUCE DT ADD HYD (0008) = 3 AREA QPEAK TPEAK R.V. (ha) (cms) (hrs) (mm) ID1= 1 (0007): ID2= 2 (0006): ================================================== ID = 3 (0008): NOTE: PEAK FLOWS DO NOT INCLUDE BASEFLOWS IF ANY ADD HYD (0009) = 3 AREA QPEAK TPEAK R.V. (ha) (cms) (hrs) (mm)

40 ID1= 1 (0003): ID2= 2 (0008): ================================================== ID = 3 (0009): NOTE: PEAK FLOWS DO NOT INCLUDE BASEFLOWS IF ANY ADD HYD (0010) = 3 AREA QPEAK TPEAK R.V. (ha) (cms) (hrs) (mm) ID1= 1 (0004): ID2= 2 (0009): ================================================== ID = 3 (0010): NOTE: PEAK FLOWS DO NOT INCLUDE BASEFLOWS IF ANY ADD HYD (0011) = 3 AREA QPEAK TPEAK R.V. (ha) (cms) (hrs) (mm) ID1= 1 (0005): ID2= 2 (0010): ================================================== ID = 3 (0011): NOTE: PEAK FLOWS DO NOT INCLUDE BASEFLOWS IF ANY FINISH ===========================================================================================================

41 Post-Development Visual OTTHYMO Model 100-Year =========================================================================================================== V V I SSSSS U U A L V V I SS U U A A L V V I SS U U AAAAA L V V I SS U U A A L VV I SSSSS UUUUU A A LLLLL OOO TTTTT TTTTT H H Y Y M M OOO O O T T H H Y Y MM MM O O O O T T H H Y M M O O OOO T T H H Y M M OOO Developed and Distributed by Clarifica Inc. Copyright 1996, 2007 Clarifica Inc. All rights reserved. ***** D E T A I L E D O U T P U T ***** Input filename: C:\Program Files (x86)\visual OTTHYMO 2.3.3\voin.dat Output filename: P:\2015\15253A\Word\ODAN Report\Servicing\SS-SWM MM Rev 2\Visual OTTHYMO\OTTHYMO MOdel\Post Development.out Summary filename: P:\2015\15253A\Word\ODAN Report\Servicing\SS-SWM MM Rev 2\Visual OTTHYMO\OTTHYMO MOdel\Post Development.sum DATE: 11/17/2016 TIME: 11:59:39 AM USER: COMMENTS: **************************** ** SIMULATION NUMBER: 2 ** **************************** CHICAGO STORM IDF curve parameters: A= Ptotal= mm B= C=.820 used in: INTENSITY = A / (t + B)^C Duration of storm = 4.00 hrs Storm time step = min Time to peak ratio =.33 TIME RAIN TIME RAIN TIME RAIN TIME RAIN hrs mm/hr hrs mm/hr hrs mm/hr hrs mm/hr CALIB STANDHYD (0005) Area (ha)=.15 ID= 1 DT= 5.0 min Total Imp(%)= Dir. Conn.(%)= IMPERVIOUS PERVIOUS (i) Surface Area (ha)= Dep. Storage (mm)= Average Slope (%)= Length (m)= Mannings n = NOTE: RAINFALL WAS TRANSFORMED TO 5.0 MIN. TIME STEP TRANSFORMED HYETOGRAPH ---- TIME RAIN TIME RAIN TIME RAIN TIME RAIN

42 hrs mm/hr hrs mm/hr hrs mm/hr hrs mm/hr Max.Eff.Inten.(mm/hr)= over (min) Storage Coeff. (min)= 1.02 (ii) 3.34 (ii) Unit Hyd. Tpeak (min)= Unit Hyd. peak (cms)= *TOTALS* PEAK FLOW (cms)= (iii) TIME TO PEAK (hrs)= RUNOFF VOLUME (mm)= TOTAL RAINFALL (mm)= RUNOFF COEFFICIENT = ***** WARNING: STORAGE COEFF. IS SMALLER THAN TIME STEP! (i) HORTONS EQUATION SELECTED FOR PERVIOUS LOSSES: Fo (mm/hr)= K (1/hr)= 2.00 Fc (mm/hr)= 7.50 Cum.Inf. (mm)=.00 (ii) TIME STEP (DT) SHOULD BE SMALLER OR EQUAL THAN THE STORAGE COEFFICIENT. (iii) PEAK FLOW DOES NOT INCLUDE BASEFLOW IF ANY CALIB NASHYD (0004) Area (ha)=.04 Curve Number (CN)= 80.0 ID= 1 DT=10.0 min Ia (mm)= 5.00 # of Linear Res.(N)= 3.00 U.H. Tp(hrs)=.20 NOTE: RAINFALL WAS TRANSFORMED TO 10.0 MIN. TIME STEP TRANSFORMED HYETOGRAPH ---- TIME RAIN TIME RAIN TIME RAIN TIME RAIN hrs mm/hr hrs mm/hr hrs mm/hr hrs mm/hr Unit Hyd Qpeak (cms)=.008 PEAK FLOW (cms)=.005 (i) TIME TO PEAK (hrs)= RUNOFF VOLUME (mm)= TOTAL RAINFALL (mm)= RUNOFF COEFFICIENT =.478 (i) PEAK FLOW DOES NOT INCLUDE BASEFLOW IF ANY CALIB STANDHYD (0003) Area (ha)=.05 ID= 1 DT= 5.0 min Total Imp(%)= Dir. Conn.(%)= IMPERVIOUS PERVIOUS (i) Surface Area (ha)= Dep. Storage (mm)= Average Slope (%)= Length (m)= Mannings n = NOTE: RAINFALL WAS TRANSFORMED TO 5.0 MIN. TIME STEP.

43 ---- TRANSFORMED HYETOGRAPH ---- TIME RAIN TIME RAIN TIME RAIN TIME RAIN hrs mm/hr hrs mm/hr hrs mm/hr hrs mm/hr Max.Eff.Inten.(mm/hr)= over (min) Storage Coeff. (min)=.75 (ii) 3.07 (ii) Unit Hyd. Tpeak (min)= Unit Hyd. peak (cms)= *TOTALS* PEAK FLOW (cms)= (iii) TIME TO PEAK (hrs)= RUNOFF VOLUME (mm)= TOTAL RAINFALL (mm)= RUNOFF COEFFICIENT = ***** WARNING: STORAGE COEFF. IS SMALLER THAN TIME STEP! (i) CN PROCEDURE SELECTED FOR PERVIOUS LOSSES: CN* = 85.0 Ia = Dep. Storage (Above) (ii) TIME STEP (DT) SHOULD BE SMALLER OR EQUAL THAN THE STORAGE COEFFICIENT. (iii) PEAK FLOW DOES NOT INCLUDE BASEFLOW IF ANY CALIB STANDHYD (0002) Area (ha)=.04 ID= 1 DT= 5.0 min Total Imp(%)= Dir. Conn.(%)= IMPERVIOUS PERVIOUS (i) Surface Area (ha)= Dep. Storage (mm)= Average Slope (%)= Length (m)= Mannings n = Max.Eff.Inten.(mm/hr)= over (min) Storage Coeff. (min)=.70 (ii) 1.88 (ii) Unit Hyd. Tpeak (min)= Unit Hyd. peak (cms)= *TOTALS* PEAK FLOW (cms)= (iii) TIME TO PEAK (hrs)= RUNOFF VOLUME (mm)= TOTAL RAINFALL (mm)= RUNOFF COEFFICIENT = ***** WARNING: STORAGE COEFF. IS SMALLER THAN TIME STEP! (i) CN PROCEDURE SELECTED FOR PERVIOUS LOSSES: CN* = 85.0 Ia = Dep. Storage (Above) (ii) TIME STEP (DT) SHOULD BE SMALLER OR EQUAL THAN THE STORAGE COEFFICIENT. (iii) PEAK FLOW DOES NOT INCLUDE BASEFLOW IF ANY CALIB STANDHYD (0001) Area (ha)=.10 ID= 1 DT= 5.0 min Total Imp(%)= Dir. Conn.(%)= IMPERVIOUS PERVIOUS (i) Surface Area (ha)= Dep. Storage (mm)= Average Slope (%)= Length (m)= Mannings n =

44 Max.Eff.Inten.(mm/hr)= over (min) Storage Coeff. (min)=.91 (ii) 3.23 (ii) Unit Hyd. Tpeak (min)= Unit Hyd. peak (cms)= *TOTALS* PEAK FLOW (cms)= (iii) TIME TO PEAK (hrs)= RUNOFF VOLUME (mm)= TOTAL RAINFALL (mm)= RUNOFF COEFFICIENT = ***** WARNING: STORAGE COEFF. IS SMALLER THAN TIME STEP! (i) CN PROCEDURE SELECTED FOR PERVIOUS LOSSES: CN* = 85.0 Ia = Dep. Storage (Above) (ii) TIME STEP (DT) SHOULD BE SMALLER OR EQUAL THAN THE STORAGE COEFFICIENT. (iii) PEAK FLOW DOES NOT INCLUDE BASEFLOW IF ANY RESERVOIR (0007) IN= 2---> OUT= 1 DT= 5.0 min OUTFLOW STORAGE OUTFLOW STORAGE (cms) (ha.m.) (cms) (ha.m.) AREA QPEAK TPEAK R.V. (ha) (cms) (hrs) (mm) INFLOW : ID= 2 (0002) OUTFLOW: ID= 1 (0007) PEAK FLOW REDUCTION [Qout/Qin](%)= TIME SHIFT OF PEAK FLOW (min)= MAXIMUM STORAGE USED (ha.m.)= RESERVOIR (0006) IN= 2---> OUT= 1 DT= 5.0 min OUTFLOW STORAGE OUTFLOW STORAGE (cms) (ha.m.) (cms) (ha.m.) AREA QPEAK TPEAK R.V. (ha) (cms) (hrs) (mm) INFLOW : ID= 2 (0001) OUTFLOW: ID= 1 (0006) PEAK FLOW REDUCTION [Qout/Qin](%)= TIME SHIFT OF PEAK FLOW (min)=.00 MAXIMUM STORAGE USED (ha.m.)= ADD HYD (0008) = 3 AREA QPEAK TPEAK R.V. (ha) (cms) (hrs) (mm) ID1= 1 (0007): ID2= 2 (0006): ================================================== ID = 3 (0008): NOTE: PEAK FLOWS DO NOT INCLUDE BASEFLOWS IF ANY ADD HYD (0009) = 3 AREA QPEAK TPEAK R.V. (ha) (cms) (hrs) (mm) ID1= 1 (0003): ID2= 2 (0008): ==================================================

45 ID = 3 (0009): NOTE: PEAK FLOWS DO NOT INCLUDE BASEFLOWS IF ANY ADD HYD (0010) = 3 AREA QPEAK TPEAK R.V. (ha) (cms) (hrs) (mm) ID1= 1 (0004): ID2= 2 (0009): ================================================== ID = 3 (0010): NOTE: PEAK FLOWS DO NOT INCLUDE BASEFLOWS IF ANY ADD HYD (0011) = 3 AREA QPEAK TPEAK R.V. (ha) (cms) (hrs) (mm) ID1= 1 (0005): ID2= 2 (0010): ================================================== ID = 3 (0011): NOTE: PEAK FLOWS DO NOT INCLUDE BASEFLOWS IF ANY FINISH ===========================================================================================================

46

47

48

49

50

51

SERVICING AND STORM WATER MANAGEMENT REPORT

SERVICING AND STORM WATER MANAGEMENT REPORT The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED BANK PLACE D ORLEANS MALL OTTAWA, ONTARIO SERVICING

More information

RETAIL UNITS GUELPH. November Prepared For: File No Engineering Report.docx F: (905) P: (905) BURLINGTON, ONTARIO

RETAIL UNITS GUELPH. November Prepared For: File No Engineering Report.docx F: (905) P: (905) BURLINGTON, ONTARIO The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED COMMERCIAL RETAIL UNITS GUELPH LINE AND UPPER MIDDLE

More information

PROPOSED FOOD STORE 150 TORONTO STREET SOUTH MARKDALE, ONTARIO. Job No ENGINEERING REPORT. Prepared For:

PROPOSED FOOD STORE 150 TORONTO STREET SOUTH MARKDALE, ONTARIO. Job No ENGINEERING REPORT. Prepared For: PROPOSED FOOD STORE 150 TORONTO STREET SOUTH Job No. 16227 ENGINEERING REPORT Prepared For: MAVERICK DEVELOPMENT CORPORATION 150 Woodbine Avenue Suite 3005 Toronto, Ontario Prepared By: The Odan/Detech

More information

THE ODAN/DETECH GROUP INC.

THE ODAN/DETECH GROUP INC. THE ODAN/DETECH GROUP INC. 5230 SOUTH SERVICE ROAD, BURLINGTON, ONTARIO L7L 5K2 TELEPHONE: (905) 632-3811 FACSIMILE: (905) 632-3363 Email: detech@odandetech.com PROJECT No. : 13233 FUNCTIONAL SERVICING

More information

P: (905) F: (905) PROPOSED BANK. Prepared For: ENT INC. JUNE Rev 0.docx

P: (905) F: (905) PROPOSED BANK. Prepared For: ENT INC. JUNE Rev 0.docx The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED BANK PLACE D ORLEANS MALL OTTAWA, ONTARIO SERVICING

More information

PROPOSED COMMERCIAL DEVELOPMENT 217 TORONTO STREET SOUTH MARKDALE, ONTARIO. Job No ENGINEERING REPORT. Prepared For:

PROPOSED COMMERCIAL DEVELOPMENT 217 TORONTO STREET SOUTH MARKDALE, ONTARIO. Job No ENGINEERING REPORT. Prepared For: PROPOSED COMMERCIAL DEVELOPMENT 217 TORONTO STREET SOUTH MARKDALE, ONTARIO Job No. 17232 ENGINEERING REPORT Prepared For: 219 Toronto Street South Developments Inc. 150 Woodbine Avenue Suite 3005 Toronto,

More information

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT REPORT

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT REPORT RESIDENTIAL DEVELOPMENT 174 LAKESHORE ROAD WEST TOWN OF OAKVILLE FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT REPORT Prepared For: BIDDINGTON GROUP Original June 16, 2017 Revised September 12, 2017 Revised

More information

Functional Servicing Report

Functional Servicing Report Functional Servicing Report 4063 UPPER MIDDLE ROAD CITY OF BURLINGTON January 2017 SLA File: 16115 3228 South Service Road, Suite 105, East Wing Burlington, Ontario L7N 3H8 Tel. (905) 631-6978 Fax (905)

More information

PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG ROAD OTTAWA, ONTARIO ENGINEERING REPORT SHOPPERS DRUG MART. January 2016

PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG ROAD OTTAWA, ONTARIO ENGINEERING REPORT SHOPPERS DRUG MART. January 2016 The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG

More information

FUNCTIONAL SERVICING REPORT

FUNCTIONAL SERVICING REPORT PROPOSED DEVELOPMENT HIGHWAY 401 AND CONCESSION ROAD 7 PUSLINCH, ONTARIO FUNCTIONAL SERVICING REPORT Prepared For: FARHI HOLDINGS CORPORATION c/o ZELINKA PRIAMO Ltd Original February 12, 2016 Revised September

More information

THE ODAN/DETECH GROUP INC.

THE ODAN/DETECH GROUP INC. 5230 SOUTH SERVICE ROAD, BURLINGTON, ONTARIO L7L 5K2 TELEPHONE: (905) 632-3811 FACSIMILE: (905) 632-3363 Email: detech@odandetechcom PROJECT No : 10232 FUNCTIONAL SERVICING REPORT FOR BOLTON DISTRIBUTION

More information

PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG ROAD OTTAWA, ONTARIO ENGINEERING REPORT SHOPPERS DRUG MART

PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG ROAD OTTAWA, ONTARIO ENGINEERING REPORT SHOPPERS DRUG MART The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG

More information

SOVEREIGN STREET TOWNHOUSES

SOVEREIGN STREET TOWNHOUSES SOVEREIGN STREET TOWNHOUSES Functional Servicing and Stormwater Management Report Project Location: 2286-2298 Sovereign Street Oakville, Ontario Prepared for: MB1 Development Consulting Inc. 1489 Abbeywood

More information

HALTON REGION PUBLIC WORKS YARD

HALTON REGION PUBLIC WORKS YARD HALTON REGION PUBLIC WORKS YARD Stormwater Management Report Project Location: 2195 North Service Road, Oakville, ON Prepared for: The Region of Halton 690 Dorval Drive Oakville, ON Prepared by: MTE Consultants

More information

Site Servicing & Stormwater Management Report for Site Plan Control Application. Proposed New Multi-Unit Development 284 Presland Road Ottawa, Ontario

Site Servicing & Stormwater Management Report for Site Plan Control Application. Proposed New Multi-Unit Development 284 Presland Road Ottawa, Ontario Site Servicing & Stormwater Management Report for Site Plan Control Application Proposed New Multi-Unit Development 284 Presland Road Ottawa, Ontario Prepared for: Martin Clement Attention: Mr. Martin

More information

Riverside South Block 3/4, Richcraft Group of Companies Inc., City of Ottawa SERVICING REPORT

Riverside South Block 3/4, Richcraft Group of Companies Inc., City of Ottawa SERVICING REPORT Riverside South Block 3/4, Richcraft Group of Companies Inc., City of Ottawa SERVICING REPORT Prepared by: Stantec Consulting Ltd. 1505 Laperriere Avenue Ottawa, ON K1Z 7T1 File: 160401004/83 January 17,

More information

CENTRE POINT SOUTH RESIDENTIAL DEVELOPMENT

CENTRE POINT SOUTH RESIDENTIAL DEVELOPMENT CENTRE POINT SOUTH RESIDENTIAL DEVELOPMENT Municipality of Grey Highlands Stormwater Management Report prepared by: C.C. Tatham & Associates Ltd. 115 Sandford Fleming Drive, Suite 200 Collingwood, ON L9Y

More information

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY 405 TWEEDSMUIR AVENUE

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY 405 TWEEDSMUIR AVENUE FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY FOR CITY OF OTTAWA PROJECT NO.: 11-532 FOR TABLE OF CONTENTS 1.0 INTRODUCTION... 1 1.1 Existing Conditions... 2 1.2 Required Permits / Approvals...

More information

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario Site Servicing and Stormwater Management Report By Mohamad Salame, P.Eng. Kamco Technique Ltee. 60 Grand Avenue North Cambridge, Ontario N1S

More information

Dunpar Developments Inc.

Dunpar Developments Inc. Dunpar Developments Inc. Proposed Townhouse Development 2158, 2168, 2180 and 2192 Trafalgar Road Oakville, Ontario Functional Servicing and Stormwater Management Report (in Support of a Re-Zoning and Site

More information

OHM Groups. FUNCTIONAL SERVICING REPORT 33 Arkell Road City of Guelph August 5, Prepared By:

OHM Groups. FUNCTIONAL SERVICING REPORT 33 Arkell Road City of Guelph August 5, Prepared By: Prepared By: OHM Groups FUNCTIONAL SERVICING REPORT 33 Arkell Road City of Guelph 114169 August 5, 2015 Guelph Owen Sound Listowel Kitchener Exeter Hamilton GTA 650 Woodlawn Rd. W., Block C, Unit 2, Guelph

More information

PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M BANK STREET CITY OF OTTAWA STORM DRAINAGE REPORT

PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M BANK STREET CITY OF OTTAWA STORM DRAINAGE REPORT PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M 2 7 BANK STREET CITY OF OTTAWA STORM DRAINAGE REPORT REPORT R 81 41 (REV. 2) MARCH 2017 T.L. MAK ENGINEERING CONSULTANTS LTD. JULY

More information

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN 441 324 326 DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT REPORT No. R 817 79A REV. 1 MAY 2018 T. L. MAK ENGINEERING

More information

SITE SERVICING PRELIMINARY DESIGN BRIEF

SITE SERVICING PRELIMINARY DESIGN BRIEF 855 Carling Avenue Proposed Redevelopment SITE SERVICING PRELIMINARY DESIGN BRIEF March 2010 March 23, 2010 RVA 081785 Arnon Corporation 1801 Woodward Dr. Ottawa, ON K2C 0R3 Attention: Mike Casey Re: 855

More information

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario Site Servicing and Stormwater Management Report By Mohamad Salame, P.Eng. Kamco Technique Ltee. 60 Grand Avenue North Cambridge, Ontario N1S

More information

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN 441 324 326 DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT REPORT No. R 817 79A T. L. MAK ENGINEERING CONSULTANTS LTD.

More information

SITE SERVICING REPORT CHOICE PROPERTIES 1251 STITTSVILLE MAIN STREET

SITE SERVICING REPORT CHOICE PROPERTIES 1251 STITTSVILLE MAIN STREET 120 Iber Road, Suite 103 Ottawa, Ontario K2S 1E9 Tel. (613)836-0856 Fax (613) 836-7183 www.dsel.ca SITE SERVICING REPORT FOR CHOICE PROPERTIES 1251 STITTSVILLE MAIN STREET CITY OF OTTAWA PROJECT NO.: 17-959

More information

Functional Servicing Report. 120 Huron Street City of Guelph. GMBP File: November 16, 2017

Functional Servicing Report. 120 Huron Street City of Guelph. GMBP File: November 16, 2017 Functional Servicing Report 120 Huron Street City of Guelph GMBP File: 417047 November 16, 2017 GUELPH OWEN SOUND LISTOWEL KITCHENER LONDON HAMILTON GTA 330 TRILLIUM DRIVE, UNIT D, KITCHENER ON N2E 3J2

More information

Servicing and Stormwater Management Brief 4450 Limebank Road Residential Development

Servicing and Stormwater Management Brief 4450 Limebank Road Residential Development Servicing and Stormwater Management Brief 4450 Limebank Road Residential Development Project # 160401232 Prepared for: Urbandale Corporation Prepared by: Stantec Consulting Ltd. Submission 3: Oct. 20,

More information

PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M BANK STREET CITY OF OTTAWA SERVICEABILITY REPORT

PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M BANK STREET CITY OF OTTAWA SERVICEABILITY REPORT PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M 62 667 BANK STREET CITY OF OTTAWA SERVICEABILITY REPORT REPORT R 816 41A (Rev. 2) MARCH 2017 T.L. MAK ENGINEERING CONSULTANTS LTD.

More information

Site Servicing and Stormwater Management Report Orleans II Development Mer Bleue Road Phase 2

Site Servicing and Stormwater Management Report Orleans II Development Mer Bleue Road Phase 2 Site Servicing and Stormwater Management Report Orleans II Development - 2025 Mer Bleue Road Phase 2 Project # 160401242 Prepared for: SmartREIT (Orleans II) Inc. and Mer Bleue Shopping Centres Limited

More information

STORMWATER MANAGEMENT STRATEGIES REPORT FOR THREE SISTERS MOUNTAIN VILLAGE PROPERTIES LTD.

STORMWATER MANAGEMENT STRATEGIES REPORT FOR THREE SISTERS MOUNTAIN VILLAGE PROPERTIES LTD. STORMWATER MANAGEMENT STRATEGIES REPORT FOR THREE SISTERS MOUNTAIN VILLAGE PROPERTIES LTD. SEPTEMBER 2016 STANDARD LIMITATIONS This report was prepared by MMM Group Limited (MMM) for the account of the

More information

Silver Seven Corporate Centre Phase 1

Silver Seven Corporate Centre Phase 1 SERVICING BRIEF Silver Seven Corporate Centre Phase 1 15 & 19 Frank Nighbor Place and 737 & 777 Silver Seven Road Kanata, Ontario Report No. 12022-SB May 31, 2012 Revised October 23, 2012 D. B. G R A Y

More information

Site Servicing and Stormwater Management Report for Site Plan Control Application C&C Transportation 8015 Russell Road Ottawa, Ontario

Site Servicing and Stormwater Management Report for Site Plan Control Application C&C Transportation 8015 Russell Road Ottawa, Ontario Site Servicing and Stormwater Management Report for Site Plan Control Application C&C Transportation 8015 Russell Road Ottawa, Ontario Prepared for The C and C Group of Companies Attention: Mr. Bob Cousins

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. SERVICING BRIEF 406-408 Bank Street Ottawa, Ontario Report No. 10015-SB December 13, 2011 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage - Storm & Sanitary Sewers

More information

ÉCOLE SECONDAIRE CATHOLIQUE SECTEUR ORLÉANS 6401 RENAUD ROAD DEVELOPMENT SERVICING STUDY AND STORMWATER MANAGEMENT REPORT

ÉCOLE SECONDAIRE CATHOLIQUE SECTEUR ORLÉANS 6401 RENAUD ROAD DEVELOPMENT SERVICING STUDY AND STORMWATER MANAGEMENT REPORT ÉCOLE SECONDAIRE CATHOLIQUE SECTEUR ORLÉANS 641 RENAUD ROAD DEVELOPMENT SERVICING STUDY AND STORMWATER MANAGEMENT REPORT Prepared by: NOVATECH ENGINEERING CONSULTANTS LTD. Suite 2, 24 Michael Cowpland

More information

SCHAEFFERS FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT LAKESHORE ROAD WEST TOWN OF OAKVILLE

SCHAEFFERS FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT LAKESHORE ROAD WEST TOWN OF OAKVILLE FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT 346 362 LAKESHORE ROAD WEST TOWN OF OAKVILLE PROJECT 2016-4442 JULY 2017 REVISED: APRIL 2017 C O N S U L T I N G E N G I N E E R S 64 Jardin

More information

Longfields Subdivision, Block 7, City of Ottawa

Longfields Subdivision, Block 7, City of Ottawa Longfields Subdivision, Block 7, City of Ottawa 160400850/160401231 Prepared for: Campanale Homes Prepared by: Stantec Consulting Ltd. Table of Contents 1.0 INTRODUCTION...1.1 2.0 BACKGROUND...2.2 3.0

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. SERVICING BRIEF 2200 Prince of Wales Drive Ottawa, Ontario Report No. 11068-SB February 3, 2012 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage - Storm & Sanitary

More information

Orleans Family Health Hub

Orleans Family Health Hub Orleans Family Health Hub Stormwater Management & Servicing Report Type of Document: Site Plan Application Project Name: Orleans Family Health Hub (OFHH) Project Number OTT-00240132-A0 Prepared By: exp

More information

Stormwater Management Report Bachman Terrace Residential Development

Stormwater Management Report Bachman Terrace Residential Development Stormwater Management Report Bachman Terrace Residential Development Project # 160401069 Prepared for: Tega Developments Prepared by: Stantec Consulting Ltd. April 14, 2014 Sign-off Sheet This document

More information

Orleans Family Health Hub

Orleans Family Health Hub Orleans Family Health Hub Stormwater Management & Servicing Report Type of Document: Site Plan Application Project Name: Orleans Family Health Hub (OFHH) Project Number OTT-00240132-A0 Prepared By: exp

More information

St. Boniface Industrial Park Phase 2 Municipal Servicing Report

St. Boniface Industrial Park Phase 2 Municipal Servicing Report St. Boniface Industrial Park Phase 2 Municipal Servicing Report Prepared for: City of Winnipeg Prepared by: Stantec Consulting Ltd. File: 116809351 November 5, 2015 ST. BONIFACE INDUSTRIAL PARK PHASE 2

More information

Functional Servicing Report. Winston Park West Proposed Business Park Development Project. Infrastructure Ontario (IO) September MU1

Functional Servicing Report. Winston Park West Proposed Business Park Development Project. Infrastructure Ontario (IO) September MU1 Functional Servicing Report Winston Park West Proposed Business Park Development Project (IO) September 2011 14-11208-001-MU1 Winston Park West 2 TABLE OF CONTENTS Page 1.0 INTRODUCTION... 3 1.1 SITE DESCRIPTION...

More information

J.F. Sabourin and Associates Inc. WATER RESOURCES AND ENVIRONMENTAL CONSULTANTS

J.F. Sabourin and Associates Inc. WATER RESOURCES AND ENVIRONMENTAL CONSULTANTS J.F. Sabourin and Associates Inc. WATER RESOURCES AND ENVIRONMENTAL CONSULTANTS 52 Springbrook Drive Ottawa, Ontario Canada K2S 1B9 TEL: (613) 836-3884 FAX: (613) 836-0332 WEB: www.jfsa.com August 4, 2009

More information

visual otthymo version 2.0

visual otthymo version 2.0 2 visual otthymo version 2.0 R E F E R E N C E M A N U A L Visual OTTHYMO v2.0 Reference Manual July 2002 Table of Contents PROGRAM REFERENCE...1 INTRODUCTION...1 VISUAL OTTHYMO FILES...1 Project Files...1

More information

FIRE FLOW REQUIREMENT CALCULATIONS

FIRE FLOW REQUIREMENT CALCULATIONS BUILDING A, 255 KANATA AVENUE, OTTAWA, ON - SITE SERVICING AND STORMWATER MANAGEMENT REPORT Appendix A Fire Flow Requirement Calculations January 19, 2017 FIRE FLOW REQUIREMENT CALCULATIONS A.1 Kanata

More information

WESTMINISTER WOODS EAST PHASE 10 (CLAIR/VICTORIA), GUELPH FUNCTIONAL SERVICING REPORT

WESTMINISTER WOODS EAST PHASE 10 (CLAIR/VICTORIA), GUELPH FUNCTIONAL SERVICING REPORT WESTMINISTER WOODS EAST PHASE 10 (CLAIR/VICTORIA), GUELPH FUNCTIONAL SERVICING REPORT Prepared for: West Minister Woods Ltd. R.R. #2 6783 Wellington Road #34 Cambridge ON N3C 2V4 Prepared by: Stantec Consulting

More information

HOTEL KANATA 140 HEARST WAY KANATA, ONTARIO STORMWATER MANAGEMENT REPORT. Prepared for: David Johnston Architect. Prepared By:

HOTEL KANATA 140 HEARST WAY KANATA, ONTARIO STORMWATER MANAGEMENT REPORT. Prepared for: David Johnston Architect. Prepared By: HOTEL KANATA 140 HEARST WAY KANATA, ONTARIO STORMWATER MANAGEMENT REPORT Prepared for: David Johnston Architect Prepared By: BaseTech Consulting Inc. 309 Roywood Crescent Newmarket, Ontario L3Y 1A6 BCI

More information

Summary of Detention Pond Calculation Canyon Estates American Canyon, California

Summary of Detention Pond Calculation Canyon Estates American Canyon, California July 15, 2015 Bellecci & Associates, Inc Summary of Detention Pond Calculation Canyon Estates American Canyon, California 1. Methodology: Method: Unit Hydrograph Software: Bentley Pond Pack Version 8i

More information

SITE SERVICING & STORMWATER MANAGEMENT STUDY

SITE SERVICING & STORMWATER MANAGEMENT STUDY SITE SERVICING & STORMWATER MANAGEMENT STUDY IN SUPPORT OF MAJOR ZONING BY-LAW AMENDMENT AND SITE PLAN CONTROL APPLICAITON Location: 190 Richmond Road, Ottawa, Ontario CPE Project #: 16032 City of Ottawa

More information

Orleans Gardens Starbucks Drive Through Servicing and Stormwater Management Design Brief

Orleans Gardens Starbucks Drive Through Servicing and Stormwater Management Design Brief Report File #: 34197-5.2.2 Orleans Gardens Starbucks Drive Through Servicing and Stormwater Management Design Brief Prepared for North American Development Group by IBI Group June 2015 IBI GROUP REPORT

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. STORMWATER MANAGEMENT REPORT 22 Perkins Street Ottawa, Ontario Report No. 13030-SWM February 6, 2015 D. B. G R A Y E N G I N E E R I N G I N. Stormwater Management - Grading & Drainage - Storm & Sanitary

More information

Blackstone Community Phase 4-8 Functional Servicing Report

Blackstone Community Phase 4-8 Functional Servicing Report Blackstone Community Phase 4-8 Functional Servicing Report Project #160401130 Prepared for: 2129786 Ontario Inc. Prepared by: Stantec Consulting Ltd. Sign-off Sheet This document entitled Blackstone Community

More information

PROPOSED THREE-STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 19 R-PLAN ROCKINGHAM AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT

PROPOSED THREE-STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 19 R-PLAN ROCKINGHAM AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT PROPOSED THREE-STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 19 R-PLAN 149 1162 ROCKINGHAM AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT REPORT No. R-815-41 T. L. MAK ENGINEERING CONSULTANTS LTD. JUNE 2015

More information

Marianneville Developments Ltd.

Marianneville Developments Ltd. Estates of Glenway Project No. L09-301 March 2012 Executive Summary Cole Engineering Group was retained by Marianneville Developments Limited to undertake a Functional Servicing Report in support of the

More information

968 St. Laurent Bulevard, Ottawa. Stormwater Management Report. Prepared for: Eric Haar Architect Inc.

968 St. Laurent Bulevard, Ottawa. Stormwater Management Report. Prepared for: Eric Haar Architect Inc. 968 St. Laurent Bulevard, Ottawa Stormwater Management Report Prepared for: Eric Haar Architect Inc. March 2012 968 St. Laurent Blvd. Ottawa Storm Water Management Report Table of Contents 1. Introduction...

More information

Section H - Site Plan Guidelines

Section H - Site Plan Guidelines H1 GENERAL REQUIREMENTS The following is an outline of procedures and requirements for preparation and submission of Grading Plans, Site Alteration Plans (Erosion and Sediment Control Plans), Site Servicing

More information

DESIGN BRIEF MIX-USE DEVELOPMENT ICON 505 PRESTON STREET OTTAWA, ONTARIO

DESIGN BRIEF MIX-USE DEVELOPMENT ICON 505 PRESTON STREET OTTAWA, ONTARIO CLARIDGE HOMES (PRESTON) INC. DESIGN BRIEF MIX-USE DEVELOPMENT ICON 505 PRESTON STREET OTTAWA, ONTARIO PROJECT: 31637-5.2.2 OCTOBER 2014 IBI GROUP PROJECT: 31637-5.2.2 TABLE OF CONTENTS 1. INTRODUCTION...

More information

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 47 R PLAN CROYDEN AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT REPORT R

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 47 R PLAN CROYDEN AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT REPORT R PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 47 R PLAN 348 351 CROYDEN AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT REPORT R 817 21 T.L. MAK ENGINEERING CONSULTANTS LTD. JUNE 2017 REFERENCE

More information

Rational Method vs OTTHYMO, Comparing Peak Discharge Rates By Alex Nichols, P.Eng.

Rational Method vs OTTHYMO, Comparing Peak Discharge Rates By Alex Nichols, P.Eng. Rational Method vs OTTHYMO, Comparing Peak Discharge Rates By Alex Nichols, P.Eng. Urban stormwater management for small site is becoming more complex. All of the methods rely upon statistically derived

More information

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT REPORT ONTARIO INC. TOWNSHIP OF SOUTHGATE GLENELG RESIDENTIAL DEVELOPMENT

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT REPORT ONTARIO INC. TOWNSHIP OF SOUTHGATE GLENELG RESIDENTIAL DEVELOPMENT FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT REPORT 2358737 ONTARIO INC. TOWNSHIP OF SOUTHGATE GLENELG RESIDENTIAL DEVELOPMENT PREPARED BY: C.F. CROZIER & ASSOCIATES INC. 40 HURON STREET COLLINGWOOD,

More information

STORM WATER REPORT. Proposed Row House Complex Clare and Hilson 566 Hilson Ave. & 148 Clare St. Ottawa, Ontario PREPARED FOR:

STORM WATER REPORT. Proposed Row House Complex Clare and Hilson 566 Hilson Ave. & 148 Clare St. Ottawa, Ontario PREPARED FOR: Civil Geotechnical Structural Environmental 210 Prescott Street, Unit 1 (613) 860-0923 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 STORM WATER REPORT Proposed Row House Complex Clare and

More information

Storm Sewers, Page 2

Storm Sewers, Page 2 Storm Sewers storm sewer systems are dendritic systems used to collect and direct stormwater runoff storm sewer systems are integral components of any urban infrastructure curbs, gutters and storm inlets

More information

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013.

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013. Planning Considerations for Stormwater Management in Alberta R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013 Photo Optional Purpose The purpose of urban stormwater management is to provide solutions

More information

Functional Servicing and Stormwater Management Report Appleby Mall Residential Burlington ON

Functional Servicing and Stormwater Management Report Appleby Mall Residential Burlington ON Functional Servicing and Stormwater Management Report Appleby Mall Residential Burlington ON Prepared By: R.J. Burnside & Associates Limited 1465 Pickering Parkway, Suite 200 Pickering ON L1V 7G7 Prepared

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. SERVICING BRIEF Mutchmor Public School Addition 185 Fifth Avenue Ottawa, Ontario Report No. 12073-SB February 15, 2013 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage

More information

Learning objectives. Upon successful completion of this lecture, the participants will be able to describe:

Learning objectives. Upon successful completion of this lecture, the participants will be able to describe: Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to describe: The different approaches for estimating peak runoff for urban drainage network

More information

Half Moon Bay South Draft Plan #3

Half Moon Bay South Draft Plan #3 Half Moon Bay South Draft Plan #3 SERVICING REPORT Prepared for: Mattamy Homes Ltd. Prepared by: Stantec Consulting Ltd. Sign-off Sheet This document entitled Half Moon Bay South Draft Plan #3 was prepared

More information

STORM WATER MANAGEMENT REPORT

STORM WATER MANAGEMENT REPORT Silvercreek Junction STORM WATER MANAGEMENT REPORT Howitt Creek at the Silvercreek Parkway Site Guelph, Ontario August, 2008 TSH File 22304A-04 August 19, 2008 STORMWATER MANAGEMENT REPORT Howitt Creek

More information

Stormwater Management & Servicing Report KMA Mosque and Community Centre 351 Sandhill Road, Ottawa, Ontario

Stormwater Management & Servicing Report KMA Mosque and Community Centre 351 Sandhill Road, Ottawa, Ontario Stormwater Management & Servicing Report KMA Mosque and Community Centre 351 Sandhill Road, Ottawa, Ontario Client: Kanata Muslim Association 351 Sandhill Road Ottawa, Ontario K2K 1X7 Project Number: OTT-00238564-A0

More information

STORM WATER REPORT ASPHALT AND CONCRETE PLANTS 891 JINKINSON SIDE ROAD, ASHTON CITY OF OTTAWA, ONTARIO PREPARED FOR:

STORM WATER REPORT ASPHALT AND CONCRETE PLANTS 891 JINKINSON SIDE ROAD, ASHTON CITY OF OTTAWA, ONTARIO PREPARED FOR: Civil Geotechnical Structural Environmental 210 Prescott Street, Unit 1 (613) 860-0923 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 STORM WATER REPORT ASPHALT AND CONCRETE PLANTS 891 JINKINSON

More information

STORMWATER DRAINAGE ASSESSMENT. 479 Line 1 Road, Niagara-on-the-Lake, Ontario

STORMWATER DRAINAGE ASSESSMENT. 479 Line 1 Road, Niagara-on-the-Lake, Ontario STORMWATER DRAINAGE ASSESSMENT 479 Line 1 Road, Niagara-on-the-Lake, Ontario November, 2015 1. Site Description Size: Location: Existing Land Use: Proposed Land Use: Soils: Stormwater Outlet: 1.38 hectares

More information

Greely Rural Subdivision Old Prescott Road Conceptual Stormwater Management Report

Greely Rural Subdivision Old Prescott Road Conceptual Stormwater Management Report Greely Rural Subdivision - 1240 Old Prescott Road Conceptual Stormwater Management Report Conceptual Stormwater Management Report Prepared for: 1384341 Ontario Ltd. Prepared by: Stantec Consulting Ltd.

More information

STORM WATER REPORT ASPHALT AND CONCRETE PLANTS JINKINSON SIDE ROAD, ASHTON CITY OF OTTAWA, ONTARIO PREPARED FOR:

STORM WATER REPORT ASPHALT AND CONCRETE PLANTS JINKINSON SIDE ROAD, ASHTON CITY OF OTTAWA, ONTARIO PREPARED FOR: Civil Geotechnical Structural Environmental Industrial Health & Safety (613) 860-0923 210 Prescott Street P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 STORM WATER REPORT ASPHALT AND CONCRETE

More information

Capital Hall Champagne Avenue

Capital Hall Champagne Avenue Capital Hall - 105 Champagne Avenue Site Servicing and Stormwater Management Report Type of Document Site Plan Submission Project Name Capital Hall - 105 Champagne Avenue Project Number OTT-00229902-A0

More information

Julia Bahen, Urban Strategies Inc.

Julia Bahen, Urban Strategies Inc. THE MUNICIPAL INFRASTRUCTURE GROUP LTD. 8800 Dufferin Street, Suite 200 Vaughan, Ontario L4K 0C5 T 905.738.5700 F 905.738.0065 www.tmig.ca TECHNICAL MEMORANDUM DATE June 13, 2017 TO CC SUBJECT FROM PROJECT

More information

A Stormwater Management Plan and Sediment Control Plan are required for all proposed developments within the City of Richmond.

A Stormwater Management Plan and Sediment Control Plan are required for all proposed developments within the City of Richmond. Engineering Page 3-1 3.0 STORM DRAINAGE 3.1 GENERAL Good drainage is vital to flat urban areas such as Lulu Island. It is essential that every storm sewer must be designed accurately minimizing conflicts

More information

CIE4491 Lecture. Quantifying stormwater flow Rational method

CIE4491 Lecture. Quantifying stormwater flow Rational method CIE4491 Lecture. Quantifying stormwater flow Rational method 27-5-2014 Marie-claire ten Veldhuis, Watermanagement Department Delft University of Technology Challenge the future Robust method stationary

More information

6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON

6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON 6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON STORM WATER MANAGEMENT DESIGN BRIEF NEW DEVELOPMENT DRAINAGE SYSTEM REV 0 August 29, 2017 PREPARED BY: HALLEX PROJECT #170532 HALLEX NIAGARA HALLEX HAMILTON

More information

FUNCTIONAL SITE SERVICING REPORT

FUNCTIONAL SITE SERVICING REPORT FUNCTIONAL SITE SERVICING REPORT 3223701 CANADA INC. LIMOGES MIXED-USE SUBDIVISION The Nation Municipality United Counties of Prescott & Russell October 2017 Prepared for: 3223701 CANADA INC. 98 Lois Street

More information

215 Sanders Street, Unit 1 (613) Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613)

215 Sanders Street, Unit 1 (613) Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) Civil Geotechnical Structural Environmental 215 Sanders Street, Unit 1 (613) 860-0923 210 Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 March 29, 2016 2343065 Ontario

More information

PRELIMINARY MUNICIPAL SERVICING REPORT NORTHWOODS SUBDIVISION. Prepared for: North Grassie Properties Inc.

PRELIMINARY MUNICIPAL SERVICING REPORT NORTHWOODS SUBDIVISION. Prepared for: North Grassie Properties Inc. PRELIMINARY MUNICIPAL SERVICING REPORT SUBDIVISION Prepared for: North Grassie Properties Inc. Prepared by: Stantec Consulting Ltd. 905 Waverley St. Winnipeg, MB R3T 5P4 July 2012 File: 116808030 SUBDIVISION

More information

Site Servicing and Stormwater Management Report Sélection Retraite - Orléans

Site Servicing and Stormwater Management Report Sélection Retraite - Orléans Site Servicing and Stormwater Management Report Sélection Retraite - Orléans Project # 160401451 November 22, 2018 Prepared for: Réseau Sélection Developpement Hors Quebec Inc. Prepared by: Stantec Consulting

More information

MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1. Precipitation

MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1. Precipitation Watershed MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1 A watershed is an area of land thaaptures rainfall and other precipitation and funnels it to a lake or stream or wetland. The area within the watershed

More information

ADEQUACY OF SERVICING REPORT St. Joseph Boulevard Orleans (Ottawa), Ontario. Report No June 8, 2016

ADEQUACY OF SERVICING REPORT St. Joseph Boulevard Orleans (Ottawa), Ontario. Report No June 8, 2016 ADEQUACY OF SERVICING REPORT 379-3809 St. Joseph Boulevard Orleans (Ottawa), Ontario Report No. 604 June 8, 06 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage - Storm

More information

Evidence-Based Policy, Programs and Design Standards in Municipal Engineering to Adapt to Extreme Weather and Climate Change

Evidence-Based Policy, Programs and Design Standards in Municipal Engineering to Adapt to Extreme Weather and Climate Change Climate Data Training Session for Municipal and Conservation Authority Engineers, Planners and Decision Makers Ontario Science Centre - April 26, 2017 Evidence-Based Policy, Programs and Design Standards

More information

Avalon Encore Stage 6 Block 236 Infrastructure Servicing Brief

Avalon Encore Stage 6 Block 236 Infrastructure Servicing Brief Avalon Encore Stage 6 Block 236 Infrastructure Servicing Brief Prepared For: Minto Communities Inc. Prepared By: Robinson Land Development Our Project No. 17099 March 19, 2018 MINTO COMMUNITIES INC. BLOCK

More information

FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview

FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview Chapter 5: Hydrology Standards Contents 1.0 Overview... 1 1.1 Storm Runoff Determination... 1 1.2 Design Storm Frequencies... 1 1.3 Water Quality Storm Provisions... 2 1.4 Design Storm Return Periods...

More information

STORMWATER MANAGEMENT REPORT. Dundas Square Gardens Inc. High Rise Residential/Commercial Development

STORMWATER MANAGEMENT REPORT. Dundas Square Gardens Inc. High Rise Residential/Commercial Development STORMWATER MANAGEMENT REPORT Dundas Square Gardens Inc. Revised: April 6, 2016 Revised: January 12, 2016 Revised: July 10, 2015 OUR FILE: 14-RE-352 June 16, 2014 TABLE OF CONTENTS PAGE 1.0 Scope of work

More information

San Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons and

San Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons and San Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons 2011-12 and 2012-13 Project Overview San Francisco State University (SFSU) has implemented several green

More information

July 21, 2017 DSEL File No.:

July 21, 2017 DSEL File No.: 120 Iber Road, Unit 103 Stittsville, Ontario K2S 1E9 Tel (613) 836-0856 Fax (613) 836-7183 www.dsel.ca July 21, 2017 DSEL File No.: 16-855 City of Ottawa Infrastructure Services and Community Sustainability

More information

SANITARY AND STORM TRUNK SEWER DESIGN BRIEF KANATA RESEARCH PARK LANDS

SANITARY AND STORM TRUNK SEWER DESIGN BRIEF KANATA RESEARCH PARK LANDS SANITARY AND STORM TRUNK SEWER DESIGN BRIEF KANATA RESEARCH PARK LANDS Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 August 8, 2014 Novatech File: 114060 Ref: R-2014-114

More information

Drainage Analysis. Appendix E

Drainage Analysis. Appendix E Drainage Analysis Appendix E The existing and proposed storm drainage systems have been modeled with Bentley CivilStorm V8 computer modeling software. The peak stormwater discharge was determined for

More information

Drainage Servicing Report - Terms of Reference

Drainage Servicing Report - Terms of Reference Urban Form and Corporate Strategic Development City Planning 7th Floor, Edmonton Tower 10111 104 Avenue NW Edmonton, AB T5J 0J4 edmonton.ca July 2018 1 Introduction: Drainage Servicing Reports Drainage

More information

PRELIMINARY DRAINAGE STUDY

PRELIMINARY DRAINAGE STUDY PRELIMINARY DRAINAGE STUDY For 34 th & J Residences 3402 J St. San Diego, CA 92102 A.P.N 545-250-08 Prepared By: Kenneth J. Discenza, P.E. Site Design Associates, Inc. 1016 Broadway, Suite A El Cajon,

More information

Learning objectives. Upon successful completion of this lecture, the participants will be able to:

Learning objectives. Upon successful completion of this lecture, the participants will be able to: Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to: Describe and perform the required step for designing sewer system networks Outline Design

More information

APPENDIX E Drainage and Stormwater Management Report

APPENDIX E Drainage and Stormwater Management Report APPENDIX E Drainage and Stormwater Management Report Drainage and Stormwater Management Report Courtneypark Drive East Class EA & Preliminary Design Prepared for: City of Mississauga Prepared by: Stantec

More information

FUNCTIONAL SERVICING AND STORM WATER MANAGEMENT STUDY PROPOSED COMMERCIAL BUILDING 128 REIS ROAD, CARP CITY OF OTTAWA, ONTARIO PREPARED FOR:

FUNCTIONAL SERVICING AND STORM WATER MANAGEMENT STUDY PROPOSED COMMERCIAL BUILDING 128 REIS ROAD, CARP CITY OF OTTAWA, ONTARIO PREPARED FOR: Civil Geotechnical Structural Environmental 210 Prescott Street, Unit 1 (613) 860-0923 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 FUNCTIONAL SERVICING AND STORM WATER MANAGEMENT STUDY

More information