REQUEST FOR PROPOSALS: 1800 WALNUT TIER 1 MEP, FRAMING/DRYWALL, & GLAZING. Questions & Answers

Size: px
Start display at page:

Download "REQUEST FOR PROPOSALS: 1800 WALNUT TIER 1 MEP, FRAMING/DRYWALL, & GLAZING. Questions & Answers"

Transcription

1 REQUEST FOR PROPOSALS: 800 WALNUT TIER MEP, FRAMING/DRYWALL, & GLAZING Q Hw lng has this infrmatin been available? A: Nvember 22, 208 Questins & Answers Q: Wuld like fr yu t cnsider extending the RFP t December 2 th. This will help ensure that the bid dcuments get the prper review and budget pricing it deserves. A: Please review the scpes and scpe dcuments as prvided. We will take a bid extensin int cnsideratin and prvide feedback. Q: Will this jb require bnding? A: Each bid shuld include its firms bnding capacity. Each scpe will be cnsidered independently n final bnd requirements. Q: I m a subcntractr lking at this prject and am a little cnfused abut wh I m suppsed t send questins t regarding the scpe f wrk and drawings/specs PrtKC r Burns & McDnnell? Prt KC s RFP says t submit questins t them, and BMcD s RFP says t submit questins t them. Can yu help me with this? A: Please submit all inquiries in writing t inf@prtkc.cm. Metal Framing & Drywall Bidder: PCI Q: The suth wall f 36 Elec. Meter/IDF is 0 hur rated (S2BA) and nrth wall is nt called ut. The life safety drawings shw /2 hur walls at this rm. Can the plans be updated with the crrect wall types? A: See attached A03, this will apply t flrs 3 3. Q: The nrth at east walls f 34 St. are called ut as S2AA which des nt shw a rating, but the life safety drawings shw these t be hur rated. Can the plans be updated with the crrect wall types? A: See attached A03, this will apply t flrs 3 3. Q: On each f the partitin types n sheets AG0 and AG02 reference head and base details n the same sheets respectively, but there are n head/base details n these sheets. Can these be prvided? A: See attached AG05 sheet. Q: Accrding t sheet M400 there are 2 hur laundry exhaust duct risers at the laundry rms f the units. This is nt called as a 2 hur shaft wall n the architectural r life safety drawings. Can the plans be updated with the crrect wall types? A: The duct itself achieves the 2 hur ratings. Therefre, the walls d nt need t meet this requirement.

2 Q: Can the wall types fr the walls inside the units be prvided? A: All unit plan walls are t be S2AA unless therwise nted. Q: Can a wall type be prvided at X5 Trash? A: See attached A03, this will apply t flrs 3 3. Q: The Framing/Drywall scpe f wrk lists Exterir Stud Framing but there are n specs r ntes n the structural drawings fr exterir framing. Are specs ging t be prvided? A: N specs, need framing/drywall sub t engineer the 6 metal stud system t meet cde and wind lad requirements. Q: Sectin Gypsum Bard Assemblies 2.2 G 2.e lists type C drywall but type C drywall isn t list in the schedule f interir gypsum wallbard in 2.4. Can this be clarified? A: Type C bard is nt a requirement fr the assembly specified in Sectin 2.2 G 2.e, see attached updated specificatin, changes are indicated in bld. Q: On the typical unit plans, it appears that there is n ceiling in the laundry rms. Hw des the gyp ceiling transitin at these areas and hw des it wrk with the dr fr the laundry rm? A: The gyp ceiling will need t return up t meet the expsed cncrete slab abve. The laundry rm dr will be hung frm this header. Q: On the typical unit plans, the elevatins f the kitchens call ut a sffit at the cabinet area but there is n sffit shwn n the unit RCP. Shuld a sffit be assumed at these lcatins? A: Yes, at 8 0 AFF Q: Are there any details fr the bathrm and laundry rm drs in the units? A: Nt at this time. Q: Sheet A09 references t enlarged plan views n sheets A40 and A50. I dn t see thse sheets included in this set. Can thse sheets be prvided? A: Nt at this time, please see updated A09 with wall types defined. Q: Life safety plan LS4 shws what lks like a 2 hur shaft utside the west side f Stair S2 but this isn t shwn n A09. Can this be clarified? A: Shaft is nt Up t date n the LS drawings, see updated A09 with wall types. Q: There are n RCP s fr the public/cmmn areas. Can these be prvided? A: Nt at this time. Q: /A3 shws a detail f the typical exterir wall. There is insulatin shwn nly at the windw jambs, but it als describes filling the framing with insulatin. Is insulatin required thrughut the whle wall r just at the jambs? 2

3 A: Since we are using 3 insulated metal wrap, the batt insulatin shuld nly be at the jambs as shwn n the detail and nt the entire stud cavity. Q: Is the curb at the edge f the rf shwn in details 5 and 8 n A30 framed with metal studs? A: Yes, filled with batt insulatin. Q: Details n A30 shw and G describe the ceiling at the bttm f the cncrete slab that ccurs in the apartments. A: See attached updated specificatin that indicated apartment ceiling assemblies, changes are indicated in bld. Q: Is this ceiling required nly at the areas shwn with 9 AFF ceiling heights, r shuld it ccur at the entire apartment, including abve and cncealed by the ceilings that are at 8 0 AFF? A: This is nly required where there is a 9 ceiling. Lwer ceilings will suspended, see updated Spec. Q: The details n A30 shw the ceiling belw the rf areas. Is this type f ceiling required at lcatins where there is a rf abve and nt ccupied space? A: That detail is a similar, but in this case, n ceiling is required fr the 4 th flr. This will be taken care f in a future buildut f that space. Q: Details n A30 shw the acustical ceiling belw Level 3 at the Level 2 parking area. Is sme kind f insulatin required in this plenum r at the bttm f the Level 3 slab? A: Yes, please prvide 3 mineral wl batt insulatin. Bidder: E&K Q: In terms f in wall blcking the general ntes, indicate ¾ FT plywd where partitin nte 2/AG00 seems t indicate 20 GA strapping. Is there a crrect preference r is it cntractr s ptin? A: Cntractr s ptin Q: Wh will be installing the FRP nted in Architectural General nte 9 n AG003? A: Metal Framing & Drywall Cntractr Q: Please clarify the sequence f installing the islatin ceiling thrughut each flr with the rated and nn rated walls. I will call t discuss further. A: All walls g t deck Q: I d nt see where the walls within each unit (bedrm, bathrm, and kitchen) are marked. I am assuming these t be S2AA, S2BA, r SAA as required. Please clarify. A: All unit plan walls are t be S2AA unless therwise nted. 3

4 Q: Can yu give sme mre clarificatin n the sliding drs that separate mst bathrms and washer/dryer rms in terms f hw the drs are supprted and what ur verhead framing elements wuld be? A: Nt at this time. Q: The units adjacent t the exterir edge n the nrth and suth sides seem t indicate a sffit that is nt hatched, r the ceiling stps shrt f the exterir in line with the clumns. Please clarify. A: There is a thickened cncrete slab edge at this lcatin, which aligns with the clumns, s the ceilings stp at the cncrete slab edge shrt f the exterir glazing. Q: Sectin 2.2.G.2.a.e indicates the ceiling assembly t have type C bard but there is n specificatin fr type C bard. This is nt a huge issue I just want t make sure that everyne is bidding type C bard at the ceilings. If type X bard wuld nt affect the STC test, very much we may be able t save a bit frm the type C. A: As nted abve, Type C gypsum bard is nt a requirement fr the ceiling assembly in apartments, and the spec is updated. In an effrt t save csts, eliminate sectin 2.4.D per attached updated specificatin. Q: Sectin 2.3.B. calls fr a minimum f 33 mil studs fr all walls and sffits. I wuld cnsider this verkill fr the majrity f flrs were the deck height is less than 0 save walls bearing tile r cabinetry. Based n allwable limiting heights by the manufacturer I d nt see why 9 mil studs wuld nt be sufficient fr mst walls, which wuld prvide a significant savings. My cmpetitrs may be taking this assumptin in their base bid, s I just want t make sure we are all bidding the same either way. Thughts? A: Attached specificatin has been amended t allw alternate thickness as lng as they meet ASTM C 645 requirements. Q: Sectin 3.3.D. says all single layered cnstructin t be framed n 6.c. but plans indicate 24.c. per STC test. (see AG00 Partitin nte 8) Which is crrect? A: Wall type nte is crrect, riginal specificatin indicates unless therwise indicated, n changes are required. Q: General SOW line 20 states t prvide temp lighting fr ur wrk. Is this crrect r will the electrician be prviding temp lighting fr all trades during the majrity f the buildut? A: Yes, temp lighting will be prvided by thers. Q: General SOW line 22 states a 7:00 t 5:30 Wrk day. I just want t make sure yu are requesting the whle prject t be perfrmed n a 0 hur shift as ppsed t the usual 8 hur shift. Please cnfirm. A: Wrk shuld be perfrmed n 8 hur shifts. This line item is saying the jb site will be pen t perfrm the 8 hur shift during this windw. Q: SOW line 5 has us prviding sealants at head f wall. Will the plans be updated in an addendum t shw the required head f wall details r are yu needing a recmmendatin frm us n wat UL t use? Can yu cnfirm that we are t exclude 4

5 MEP penetratins? Plans indicate a bttm f wall jint and I am assuming we will als have wall t wall jints; are we t accunt fr these as well? A: See attached AG05 fr tp and bttm f wall details. UL designs fr the rated walls are listed in the wall partitin type schedule. Q: Regarding SOW line 9 wh will be prviding the attachments fr each frame? A: Attachments fr each frame prvided by Metal Framing & Drywall Cntractr. Q: Is SOW line 3 exclusive t in wall blcking fr wall munted items r are yu wanting us t prvide all blcking shwn n dcuments? A: Prvide all blcking as shwn n dcuments. Bidder: Allied Cnstructin Q: Page A304 East Side, Between clumn lines 3 4, where the slab cantilevers, they shw what resembles a sffit? Please advise if Light Gauge Metal Framing will be required r if the Metal Panel sub has this cnditin cvered. A: We will likely need metal framing at these sffit cnditins as the finish f the metal panel is apprximately 4 frm the underside f slab. This cnditin will need min 3 f rckwl insulatin at the underside f slab and metal is hung this lw t accmmdate detailing at Nrth and Suth ends where metal wraps a thickened slab edge beam. Q: What are the Wall Types within the units/apartments? A: All unit plan walls are t be S2AA unless therwise nted. Q: Page A3/Details & 2 says t insulate the Exterir Metal Stud Framing. Is this required even thugh the Metal Panels are insulated? Shuld the Exterir Metal Framing need t be insulated. If s, which type f insulatin shuld be used? Spec Sectin Insulatin Materials, calls ut fr a Faced Glass Fiber Blanket and an Unfaced Glass Fiber Blanket. Part 3, under executin, paragraph C, mentins Mineral Fiber Blankets. Which is it? A: Current directin is t prvide all R value in insulated metal panel enclsure system, in which case the nly insulatin within the exterir stud cavity will need t be at windw jamb cnditins t prevent thermal bridging. Cnsider this t be unfaced bats. Q: Page A30/Details 4 8, shw the Drywall Ceilings. Spec Sectin Gypsum Bard Assemblies under paragraph 2.2 Steel Suspended Ceiling and Sffit Framing, Sectin G, calls ut fr an RSIC prduct. I ve attached the prduct fr yur apprval. I intend t have the Resilient Sund Islatin Clip tapcnned t the cncrete deck abve. This is a bit mre labr intensive but it will ensure that the Islatin Clip will be fastened t the Structural Cncrete with n wrries. I believe using a cncrete pin will nt be the crrect applicatin. Please let me knw if this cnditin is line with yur thughts. A: The attached pdf des nt indicate yur prpsed alternate installatin methd, the alternate will need t meet the perfrmance criteria indicated in the specificatin. 5

6 Bidder: KD Christian Q: I d nt find any infrmatin n the exterir studs framing gauge r size r wall make up? Des it require sheathing and insulatin r des the metal panels take care f sheathing and insulatin? A: Metal panels will take care f the sheathing and insulatin. Q: The wall types indicated that we shuld have head f wall details but knwn are called ut r shwn? A: See attached AG05 Q: It appears there are sme exterir sffits but n details shwn? A: Yes, sffits n west elevatin at cantilevered slabs. Framing will be required t suspend metal panel apprximately 4 belw slab t accmmdate N/S detailing at thickened slab edge. Min. 3 rckwl insulatin t be applied t underside f slab at these cnditins. Q: There are number f walls that wall tags are blank, that we need inf n? A: See attached A03 and A09 fr mre infrmatin. A03 shuld be used fr flrs 3 3. Q: Will a buck hist and trash chute be prvided? A: Yes. Q: We need a sectin cut thru the hr exterir cnstructin at suth end f building? A: At Lvl 3 and 4 filled penings n the Suth, cnsider 5/8 gyp n 6 stud with 3 insulated panel as enclsure and finish. Q: What is the schedule fr the prject? A: Schedule t be issued in next Bid Addendum. Q: Are the cncrete walls at the elevatr frnts and stair twer left expsed? A: Yes Glazing Bidder: The Wilsn Grup Q: Sheet A200 and A20 nte Operable Glass Wall System. The table f cntents in the specs has Flding Glass Panel Partitins but the spec is nt actually in the bk. What glazing prduct is intended fr these penings? We will price as windw wall with duble drs centered in the pening unless instructed therwise. A: The perable glass wall system is shwn acrss the full pening, hwever, please price a fixed windw wall system fr half f the pening (2 8 ) and an perable, flding/stacking glass wall system fr the remainder f the pening (2 8 ). The perable glass shuld stack against the living rm side clumn and the finish n the frames shuld match the windw wall frame finish as specified (black andized). We are pen t alternates, such as sliding glass wall systems prvided that the clear pen is similar t that indicated abve. 6

7 Q: Sheet A200 and A20 nte Glass Guardrail System n the same penings there is n spec fr these railing systems and the glass schedule within the glazing spec des nt appear t have anything applicable. The Glazing Scpe f Wrk sheet makes n mentin f this scpe. Wh is suppsed t pick up this wrk? Withut any current clear indicatin, we will exclude this wrk unless instructed therwise. A: The glass guardrail basis f design is a CR Laurence base she with drain blck. As an add alternate, please prvide a base she cladding piece t match the windw wall black andized frames. See attached GuardRail.zip file fr basis f design base she prducts. Q: Sheet A20 indicates the tp flr pening t be Open t Beynd. The A300 sheets d nt indicate any enclsure. Similarly, A203 has a Beynd instructin fr the tp flr which is clarified n Sheet A302 with defined penings and wall types. Is there any glazing intended fr the penings within the A20 Open t beynd sectin? We will exclude any glazing within this area unless instructed therwise. A: A20 shws a glass guardrail, which shuld be included parallel t grid J (running E/W, between exterir clumns). As shwn in A09 flr plan, there is a glass strefrnt system with an perable glass dr between the utdr rf terrace and the interir crridr space. Please include this in yur pricing. Q: Sheet A60 is nted n AG00 within the Architectural Sheet List but is nt actually included in the drawings. There is a blank sheet A602 that is nt listed. A60 is suppsed t include dr and hardware schedules critical fr pricing. Will this be prvided? We cannt accurately price this scpe withut this infrmatin. A: Dr hardware is nt currently finalized s it will nt be prvided at this time. Bidder: AGP Q: We will need t knw the verall deflectin as it ccurs between flrs at the edge f slab. A: The belw are estimated values based upn the nrmal lading schemes and verall deflectin ccurring ver time as the pst tensin frces will relax. Typical levels with n cantilever /4" 4 cantilever area /4" 8 cantilever area 3/8 2 cantilever area /2. Bidder: Frman Frd 7

8 Q: In ging thrugh the specs we didn t see any specificatin fr the Glazed Flding Walls? It is listed in the table f cntents hwever was nt in the actual spec bk. Can yu please advise? A: Flding Glass Panel Partitins Specificatin was unintentinally left ut, please see attached pdf. Q: Wh are the electrical bidders? A: American Bridge Cmpany Black and McDnald Bruner Cntracting Bulk Strage Inc Burns & McDnnell Capital Electric Centric Prjects Enerfab Midwest JE Dunn KAW Valley Mark One Electric McCarthy Building Cmpanies, Inc. McClan Cnstructin, LLC Merit General Cntractrs Inc. MW Builders Neighbrs Cnstructin C., Inc. Newkirk Nvak Cnstructin Partners, LLC PKC Cnstructin PrCircuit R.F. Fisher Electric Cmpany, LLC The Krte Cmpany The Whiting Turner Cntracting Cmpany Shaw Electric Cmpany Infinite Energy Cnstructin Ryan Cmpanies US, Inc Stac Electric Cnstructin, C Q: Can yu tell me hw many cntractrs PrtKC has prequalified under Div 22? And under Div 03? A: Div prequalified cntractrs; Div prequalified cntractrs Metal Framing & Drywall Bidder: PCI Q: The Framing/Drywall scpe f wrk lists Exterir Sheathing & Vapr Barrier but I dn t see a spec fr sheathing r a vapr barrier and I dn t see either called ut in the drawings. Can this be clarified? A: The exterir skin will be primarily prvided by the Metal Panel installer. Hwever, there may be certain areas requiring sheathing & vapr barrier. Please be prepared t discuss these areas. If yu anticipate this being needed, please prvide breakut pricing in yur prpsal. 8

9 Q: On the architectural flr plans it appears that there is exterir metal stud wall framing at the east side f the elevatr shaft, Stair S and Stair S2. On the structural drawings it des nt appear that there is any structure (CIPC, steel) t supprt these walls. If these are stud framed walls: Hw are they supprted? Will drywall be required n the inside f the framing in the elevatr shaft? Hw shuld we assume accessing this wrk? A: Prvide breakut pricing fr these walls t be metal stud framed. Supprting steel beam by thers. Drywall n inside. Wrk can be perfrmed after stairwell installatin. Q: Is the ACT in the parking garage n level 2 nt part f this bid package? It s nt included in the Framing/Drywall scpe and it desn t have its wn scpe. A: Please include ACT ceiling n underside f 3 rd flr as specified in the Metal Framing & Drywall SOW. Q: Regarding the Rf Structure, can details be given fr the rf area abve the rf terrace (see belw)? The CIPC Level 5 rf structure stps just suth f gridline H and there desn t appear t be any infrmatin abut the pen t belw areas r what appear t be sme kind f parapets. 9

10 A: There will be apprximately 2 metal framed parapets at the tp f each wall that will prvide the necessary slpe fr strm drainage. All walls t be cvered in metal panel. Q: Regarding the Rf Terrace area at the Suth end f Level 4, what is the finish n the inside face f the nrth, east and west exterir walls inside the rf terrace area? A: This will be metal paneling prvided by thers. Q: Regarding the Rf Terrace area at the Suth end f Level 4, What is the finish n the ceiling f the rf terrace? A: This will be metal paneling prvided by thers. 0

11 Q: In the last rund f Q&A a questin was asked abut the rating f the wall arund the laundry exhaust risers. The respnse was that the duct achieves the rating and that the walls d nt need t meet this requirement. Hwever, since these shaft lcatins ccur at the unit separatin at least at the X02 X08 units wuldn t at least ne side f this shaft need t be rated since it is separating tw units? Als, accrding t the life safety plans these walls are hur rated. Can the plans be updated with the crrect wall types? A: These walls shuld be the same wall type as the rest f the walls separating the units. Q: In the last rund f Q&A a questin was asked abut insulatin at the plenum area f the Level 2 parking area and the respnse was t prvide 3 mineral wl insulatin. Shuld this insulatin just be laid n tp f the ACT, r des it need t be attached t the bttm f the slab abve? A: Prvide as lay in insulatin n tp f ACT. Q: Scpe f Wrk item 9 in the Framing & Drywall scpe says t install HM dr frames prvided by thers. Des this include frames lcated in CIPC and masnry walls? A: Dr frames in cncrete & masnry walls t be installed by thers. Bidder: E&K Q: Architectural General nte 22 says t seal jints at exterir and interir sides f exterir walls. I just want t make sure I understand what will be required frm us t seal the inside face f the wall prperly and that we are all bidding the same. Please clarify. A: Prvide sealant arund metal stud walls prir t drywall. Q: Regarding SOW line 0 can yu prvide mre clarificatin n framed penings in rated walls? A: Dr frames in cncrete walls t be installed by thers. Q: Please clarify the blank hatch adjacent r abve each W/D space in the enlarged plans. A: There is n gyp. ceiling in this lcatin. Gyp ceilings will need t turn up and terminate int cncrete abve. Q: Please cnfirm that the wall east f Elev. & 2 and Stair is t be metal stud. Please als clarify all elements f wall cnstructin and hw it will bear n/attach t the building structure. What is the intended methd f accessing the elevatr side f the wall? A: Yes, these walls are metal stud. There will be additinal misc. steel at the flr lines t carry the metal studs. Since this wall is the exterir wall, there is n fire rating requirements fr the wall r structure. Q: Please cnfirm that the east wall f Stair 2 is t be cncrete.

12 A: N, it is currently metal stud backup. Q: Please cnfirm that the crridrs are t receive a typical gypsum ceiling with layer f ½ r 5/8 gypsum bard n suspended metal framing. Please als identify the height f ceiling in crridrs. A: The crridr ceiling will be the suspended ceiling that was submitted in the last rund f bidders questins. The height is 8 0 aff. Q: Shuld the suth side f Stair and nrth side f Stair 2 be furred ut with gypsum bard? A: N. Q: Please clarify if a rated ceiling will be required in Stairs and 2. A: N. Cncrete will prvide the rating. Q: Please prvide Page A40. A: Nt prviding this page. Q: Wh will be respnsible fr installing access drs in gypsum bard? A: Metal Framing & Drywall Cntractr. Q: Fr install f hllw metal frames, wuld we just be installing frames in metal stud partitins r wuld this include drs in cncrete and masnry walls t? A: Frames in cncrete & masnry walls will be installed by that trade. Q: Hw will we deliver peple and materials t each flr n a day t day basis? A: Man Hist. Use f Twer Crane can als be scheduled. Bidder: KD Christian Q: Is there a reflective ceiling fr the crridrs and underside f 3rd flr parking garage? A: N, these sheets will nt be included in this package. Crridr ceilings will be gypsum, and the underside f Parking Garage will be ACT. Q: Sheet A60 is listed n the plan schedule and we d nt have it. Is there a Dr Schedule? A: Dr schedule A60 is attached. Metal Framing & Drywall cntractr t include installatin f all metal frames. Frames in rated wall and inside units t be installed by thers. Q: What all is t be included in the rugh carpentry? In Wall blcking? What will be required? A: Rugh carpentry t include all in wall blcking & strapping as shwn n the drawings. 2

13 Q: There are a number f sheets referenced that we dn't have. Sheet A40 & A402 fr example. A: Nt prviding these pages. Q: What is the cnstructin make up f the exterir wall at the elevatr shaft and stair shaft? A: Prvide breakut pricing fr this wall t be metal stud framed with supprt steel by thers. Q: Need detail f head cnditin f perable windws n nrth elevatin? is a header required r they anchring t cncrete beam? A: Anchring t cncrete beam. Bidder: Midwest Drywall Q: We are missing a few plan pages, is there any way yu can tell me if these will be cming ut in an addendum? Please let me knw. Pages: A20, A60, 3 0, & S3 02 A: Nt prviding these pages. Q: There are many references n the architectural drawings t plan page A40 and A402, hwever they are nt included in the title page. D these pages exist? A: Nt prviding these pages. Glazing Bidder: The Wilsn Grup Q: Can yu elabrate n the difference between subcntractr and tiered subcntractr experience? These items are within the Tier RFP dcument, under Evaluatin ntes 3e and 3f. A: Subcntractr is cmpany BMCD will be cntracting directly t; tiered subcntractr is any cmpany underneath cntracted cmpany. Plumbing Bidder: Rdriguez Mechanical Q: In the plumbing scpe f wrk, line item 0, says t prvide and install shwer flr pan. On drawing P603, Plumbing Fixture Schedule SH has a flr drain t be installed. Please cnfirm that a flr drain is t be prvided and that pan/waterprf membrane is t be by thers. A: Bth the flr drain and the shwer pan is t be prvided by the Plumbing Cntractr. See specificatin n shwer pan. Q: In the plumbing scpe f wrk f exclusins, grease interceptrs are t be by thers. With specificatins fr grease interceptrs included in divisin 22 and with drawing P604 plumbing fixture schedule including a SEP 2 grease interceptr. Please 3

14 cnfirm grease interceptr is by thers and that the plumbing scpe is nly t include the sand il interceptr. A: Grease interceptr & Sand Oil interceptr is by thers. Bidder: LMG Q: What is the plan fr transprtatin up the building? A: Duble Man hist will be prvided. Crdinatin f use will be required fr majr material deliveries. Q: Will there be rm fr strage n site? A: Limited area fr strage will be available. Crdinatin f use will be determined by GC. Q: Is there a staging plan in place yet? A: Site Lgistics plan attached. Q: Is there a plan fr parking? A: Subcntractr t address as needed. Q: Will there be any BIM/Revit crdinatin required? A: Yes, BIM crdinatin will be required. Q: The scpe f wrk states that the plumbing cntractr is prviding cring fr the fire suppressin riser. Please clarify. A: This is incrrect; Plumbing Cntractr nly respnsible fr Plumbing related cring. Q: It states n cring is allwed. Please clarify in relatin t the questin abve. A: The building is a PT slab; cring is nt recmmended. If required, each trade is respnsible fr prviding GPR services prir t drilling. Each trade shuld crdinate sleeving befre slab pur if pssible. Q: In the parking garage, there lks t be pressurized strm pipe and detentin tanks. Please prvide further clarificatin n what the plumber will carry and what the utilities will carry. Please clarify pressurized pipe type. A: Utilities cntractr t prvide Strm Detentin system & pipe t 2 AFF stub up. Q: Heat trace is nrmally carried by the electrical cntractr. Please clarify. A: Please prvide cst t include this scpe f wrk. 4

15 Q: There is cnsiderable gas pipe running befre the meter. Will Spire be prviding and installing this up t and including the meter? A: Yes. 5

16 Acustical Surfaces, Inc. We identify and Yur Nise Prblems Sund Transmissin Obscuring Prducts Sundprfing, Acustics, Nise & Vibratin Cntrl Specialists Acustical Surfaces, Inc. SOUNDPROOFING, ACOUSTICS, NOISE & VIBRATION CONTROL SPECIALISTS 23 Clumbia Curt Nrth Suite 20 Chaska, MN 5538 (952) Fax (952) (800) Visit ur Website: We Identify and S.T.O.P. Yur Nise Prblems RESILIENT SOUND ISOLATION CLIPS Fr Wall & Flr Ceiling Assemblies RSIC- Resilient Sund Islatin Clip Furring Channel Islatin Clip RSIC- Islatin Clip Sundprfing Prducts SnexTM Ceiling & Wall Panels Sund Cntrl Curtains Equipment Enclsures Acustical Baffles & Banners Slid Wd & Veneer Acustical Ceiling & Wall Systems Prfessinal Audi Acustics Vibratin & Damping Cntrl Fire Retardant Acustics Hearing Prtectin Misture & Impact Resistant Prducts Flr Impact Nise Reductin Sund Absrbers Nise Barriers Fabric Wrapped Wall Panels Acustical Fam (Egg Crate) Acustical Sealants & Adhesives Outdr Nise Cntrl Assistive Listening Devices OSHA, FDA, ADA Cmpliance On-Site Acustical Analysis Acustical Design & Cnsulting Large Inventry Fast Shipment N Prject t Large r Small Majr Credit Cards Accepted

17 Acustical Surfaces, Inc. We identify and Yur Nise Prblems Sund Transmissin Obscuring Prducts Sundprfing, Acustics, Nise & Vibratin Cntrl Specialists Acustical Surfaces, Inc. SOUNDPROOFING, ACOUSTICS, NOISE & VIBRATION CONTROL SPECIALISTS 23 Clumbia Curt Nrth Suite 20 Chaska, MN 5538 (952) Fax (952) (800) Visit ur Website: We Identify and S.T.O.P. Yur Nise Prblems Drywall Furring Channel Stud Islatin Clip Furring Channel Islatin Clip Walls: One and Tw layers f 5/8" Gypsum Bard Resilient Sund Islatin Clip (RSIC-) shall be 48 inches maximum n center. (hrizntal) Fasten the Resilient Sund Islatin Clip (RSIC-) t the the substrate with a fastener apprved fr a minimum pull-ut and sheer f 20 lbs. Ensure the internal metal ferrell is tight t the substrate. Lcate the first rw f RSIC- clips within 3 inches frm the flr and within 6 inches frm the ceiling. Snap in the drywall furring channel (hat track) int the RSIC- clips (hrizntal fr walls). (see page 2 fr splice details). Place /4 (minimum) shim n flr t fully supprt the gypsum bard. Install the gypsum bard frm the bttm up leaving a /4 min. gap arund perimeter. ONLY remve the shims after ALL the gypsum bard is cmpletely screwed t ALL the drywall furring channels. Make sure every screw (flr t ceiling and wall t wall) is installed as required by the assembly design, in every layer f gypsum bard befre remving the sims at the flr. The shims are critical t ensure best results. Caulk arund the entire perimeter f the gypsum bard. Use fire and smke rated acustical sealant where required. Ceilings One and Tw Layers f 5/8" Gypsum Bard Resilient Sund Islatin Clips (RSIC-) shall be 48 inches maximum n center. Fasten the Resilient Sund Islatin Clip (RSIC-) t the substrate with a fastener apprved fr a minimum pull-ut and sheer f 20 lbs. Ensure the internal metal ferrell is tight t the substrate. Lcate the first rw f RSIC- clips within 8 inches f the wall at each end f a run. Snap in the drywall furring channel (hat track) int the RSIC- clips. Install the gypsum bard leaving a /4 min. gap arund the gypsum bard. Caulk arund the entire perimeter f the gypsum bard. Use fire and smke rated acustical sealant where required. General Infrmatin: Refer t fr cmplete installatin details n all fire resistive assembly designs. Resilient Sund Islatin Clip (RSIC-), furring channel (hat track) and gypsum bard shall nt carry heavy lads such as cabinets r bkshelves. Splice furring channel (hat track) with 6 inch verlap in mid span, secure with 8 ga. tie wire r with tw framing screws (7/6 ). Seal all ptential air leaks with nn-hardening acustical caulking t achieve best nise cntrl results. Use fire rated sealant where required. When attaching the RSIC- clips t a steel stud the minimum allwable thickness is 20 ga. (0.030). Sundprfing Prducts Snex TM Ceiling & Wall Panels Sund Cntrl Curtains Equipment Enclsures Acustical Baffles & Banners Slid Wd & Veneer Acustical Ceiling & Wall Systems Prfessinal Audi Acustics Vibratin & Damping Cntrl Fire Retardant Acustics Hearing Prtectin Misture & Impact Resistant Prducts Flr Impact Nise Reductin Sund Absrbers Nise Barriers Fabric Wrapped Wall Panels Acustical Fam (Egg Crate) Acustical Sealants & Adhesives Outdr Nise Cntrl Assistive Listening Devices OSHA, FDA, ADA Cmpliance On-Site Acustical Analysis Acustical Design & Cnsulting Large Inventry Fast Shipment N Prject t Large r Small Majr Credit Cards Accepted

18 Acustical Surfaces, Inc. We identify and Yur Nise Prblems Sund Transmissin Obscuring Prducts Sundprfing, Acustics, Nise & Vibratin Cntrl Specialists Acustical Surfaces, Inc. SOUNDPROOFING, ACOUSTICS, NOISE & VIBRATION CONTROL SPECIALISTS 23 Clumbia Curt Nrth Suite 20 Chaska, MN 5538 (952) Fax (952) (800) Visit ur Website: We Identify and S.T.O.P. Yur Nise Prblems Drywall Furring Channel: Minimum Requirements: 25 gauge, hemmed edge detail required n all 25 gauge furring channel. Meets r exceeds SSMA requirements. Optinal: 22 gauge (n hemmed edge required with 22 gauge). Depth: 7/8 inch. Width Bttm: 2-/2 inch wide minimum. Width Tp: -/4 inch wide. Splice drywall furring channel (hat track) with 6 inch verlap in mid-span (between tw clips) secure with 8 ga tie wire, r tw 7/6" framing screws. Resilient Sund Islatin Clip (RSIC-): Maximum Spacing: 48 inches n center. Maximum Acustical Design Lad: 36 lbs. Fasteners: RSIC- t Wd: #8 x 2-/2 inch minimum size carse thread screw. (Recmmended #2 r 0 x 2-/2 inch hex head). RSIC- t Steel: #8 x -5/8 inch minimum size fine thread screw. (Recmmended #2 r #0 x -5/8 inch hex head). DO NOT fasten Resilient Sund Islatin Clips (RSIC-) t framing members with nails. Use nly apprved screws. RSIC- Dimensins: RSIC- clip 3" tall RSIC- clip -/4" deep RSIC- and drywall furring channel -5/8" deep Average Labr Rates: RSIC-: 72 clips per man hur Drywall Furring Channel: 550 LF per man hur Sundprfing Prducts Snex TM Ceiling & Wall Panels Sund Cntrl Curtains Equipment Enclsures Acustical Baffles & Banners Slid Wd & Veneer Acustical Ceiling & Wall Systems Prfessinal Audi Acustics Vibratin & Damping Cntrl Fire Retardant Acustics Hearing Prtectin Misture & Impact Resistant Prducts Flr Impact Nise Reductin Sund Absrbers Nise Barriers Fabric Wrapped Wall Panels Acustical Fam (Egg Crate) Acustical Sealants & Adhesives Outdr Nise Cntrl Assistive Listening Devices OSHA, FDA, ADA Cmpliance On-Site Acustical Analysis Acustical Design & Cnsulting Large Inventry Fast Shipment N Prject t Large r Small Majr Credit Cards Accepted

19 Acustical Surfaces, Inc. We identify and Yur Nise Prblems Sund Transmissin Obscuring Prducts Sundprfing, Acustics, Nise & Vibratin Cntrl Specialists Acustical Surfaces, Inc. SOUNDPROOFING, ACOUSTICS, NOISE & VIBRATION CONTROL SPECIALISTS 23 Clumbia Curt Nrth Suite 20 Chaska, MN 5538 (952) Fax (952) (800) Visit ur Website: We Identify and S.T.O.P. Yur Nise Prblems RSIC- Usage Chart, 24" n Center with 48".c. W I D T H O R H E I G H T Field Cnditins May Effect Quantity Required LENGTH ' Nte: Add 4 RISC- at each Drywall Butt Jint Cnditin fr ptimum Acustical UL Fire Resistive Assembly cmpliances. See UL Fire Resistive Design Specificatins. Sundprfing Prducts Snex TM Ceiling & Wall Panels Sund Cntrl Curtains Equipment Enclsures Acustical Baffles & Banners Slid Wd & Veneer Acustical Ceiling & Wall Systems Prfessinal Audi Acustics Vibratin & Damping Cntrl Fire Retardant Acustics Hearing Prtectin Misture & Impact Resistant Prducts Flr Impact Nise Reductin Sund Absrbers Nise Barriers Fabric Wrapped Wall Panels Acustical Fam (Egg Crate) Acustical Sealants & Adhesives Outdr Nise Cntrl Assistive Listening Devices OSHA, FDA, ADA Cmpliance On-Site Acustical Analysis Acustical Design & Cnsulting Large Inventry Fast Shipment N Prject t Large r Small Majr Credit Cards Accepted

20 Acustical Surfaces, Inc. We identify and Yur Nise Prblems Sund Transmissin Obscuring Prducts Sundprfing, Acustics, Nise & Vibratin Cntrl Specialists Acustical Surfaces, Inc. SOUNDPROOFING, ACOUSTICS, NOISE & VIBRATION CONTROL SPECIALISTS 23 Clumbia Curt Nrth Suite 20 Chaska, MN 5538 (952) Fax (952) (800) Visit ur Website: We Identify and S.T.O.P. Yur Nise Prblems RSIC- Usage Chart, 6" n center with 48".c. Field cnditins may effect quantity required LENGTH W I D T H O R H E I G H T ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' Nte: Add 4 RISC- at each Drywall Butt Jint Cnditin fr Optimum Acustical UL Fire Resistive Assembly Cmpliances. See UL Fire Resistive Design Specificatins. Sundprfing Prducts Snex TM Ceiling & Wall Panels Sund Cntrl Curtains Equipment Enclsures Acustical Baffles & Banners Slid Wd & Veneer Acustical Ceiling & Wall Systems Prfessinal Audi Acustics Vibratin & Damping Cntrl Fire Retardant Acustics Hearing Prtectin Misture & Impact Resistant Prducts Flr Impact Nise Reductin Sund Absrbers Nise Barriers Fabric Wrapped Wall Panels Acustical Fam (Egg Crate) Acustical Sealants & Adhesives Outdr Nise Cntrl Assistive Listening Devices OSHA, FDA, ADA Cmpliance On-Site Acustical Analysis Acustical Design & Cnsulting Large Inventry Fast Shipment N Prject t Large r Small Majr Credit Cards Accepted

21 Acustical Surfaces, Inc. We identify and Yur Nise Prblems Sund Transmissin Obscuring Prducts Sundprfing, Acustics, Nise & Vibratin Cntrl Specialists Acustical Surfaces, Inc. SOUNDPROOFING, ACOUSTICS, NOISE & VIBRATION CONTROL SPECIALISTS 23 Clumbia Curt Nrth Suite 20 Chaska, MN 5538 (952) Fax (952) (800) Visit ur Website: We Identify and S.T.O.P. Yur Nise Prblems Estimated RSIC Clip Usage fr Walls and Ceilings, Wd r Steel Framed. (Spacing at 24" x 48" O.C.) ' Nte: Add 4 RISC- at each Drywall Butt Jint Cnditin fr Optimum Acustical UL Fire Resistive Assembly Cmpliances. See UL Fire Resistive Design Specificatins. Sundprfing Prducts Snex TM Ceiling & Wall Panels Sund Cntrl Curtains Equipment Enclsures Acustical Baffles & Banners Slid Wd & Veneer Acustical Ceiling & Wall Systems Prfessinal Audi Acustics Vibratin & Damping Cntrl Fire Retardant Acustics Hearing Prtectin Misture & Impact Resistant Prducts Flr Impact Nise Reductin Sund Absrbers Nise Barriers Fabric Wrapped Wall Panels Acustical Fam (Egg Crate) Acustical Sealants & Adhesives Outdr Nise Cntrl Assistive Listening Devices OSHA, FDA, ADA Cmpliance On-Site Acustical Analysis Acustical Design & Cnsulting Large Inventry Fast Shipment N Prject t Large r Small Majr Credit Cards Accepted

22 Acustical Surfaces, Inc. We identify and Yur Nise Prblems Sund Transmissin Obscuring Prducts Sundprfing, Acustics, Nise & Vibratin Cntrl Specialists Acustical Surfaces, Inc. SOUNDPROOFING, ACOUSTICS, NOISE & VIBRATION CONTROL SPECIALISTS 23 Clumbia Curt Nrth Suite 20 Chaska, MN 5538 (952) Fax (952) (800) Visit ur Website: We Identify and S.T.O.P. Yur Nise Prblems Estimated RSIC Clip Usage fr Walls and Ceilings, Wd r Steel Framed. (Spacing at 6" x 48" O.C.) ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' Nte: Add 4 RISC- at each Drywall Butt Jint Cnditin fr Optimum Acustical UL Fire Resistive Assembly Cmpliances See UL Fire Resistive ' Design Specificatins ' ' ' ' Sundprfing Prducts Snex TM Ceiling & Wall Panels Sund Cntrl Curtains Equipment Enclsures Acustical Baffles & Banners Slid Wd & Veneer Acustical Ceiling & Wall Systems Prfessinal Audi Acustics Vibratin & Damping Cntrl Fire Retardant Acustics Hearing Prtectin Misture & Impact Resistant Prducts Flr Impact Nise Reductin Sund Absrbers Nise Barriers Fabric Wrapped Wall Panels Acustical Fam (Egg Crate) Acustical Sealants & Adhesives Outdr Nise Cntrl Assistive Listening Devices OSHA, FDA, ADA Cmpliance On-Site Acustical Analysis Acustical Design & Cnsulting Large Inventry Fast Shipment N Prject t Large r Small Majr Credit Cards Accepted

23 Acustical Surfaces, Inc. We identify and Yur Nise Prblems Sund Transmissin Obscuring Prducts Sundprfing, Acustics, Nise & Vibratin Cntrl Specialists Acustical Surfaces, Inc. SOUNDPROOFING, ACOUSTICS, NOISE & VIBRATION CONTROL SPECIALISTS 23 Clumbia Curt Nrth Suite 20 Chaska, MN 5538 (952) Fax (952) (800) Visit ur Website: We Identify and S.T.O.P. Yur Nise Prblems Applicatin Recmmendatins fr Walls and Ceilings, Wd r Steel Framing INSTALLING RESILIENT SOUND ISOLATION CLIPS (RSIC-) RSIC CLIPS AT 6" O.C. RSIC- Wall r Ceiling System Framing at 24".c. RSIC- clips at 6" x 48".c. 3 Layers f 5/8" Gypsum Bard 7/8" Drywall Furring Channel 6" RSIC- clips 6" x 48".c. Wd r Steel Framing at 24".c. RSIC- Wall r Ceiling System Framing at 6".c. RSIC- clips at 6" x 48".c. 3 Layers f 5/8" Gypsum Bard 7/8" Drywall Furring Channel 6" 6" 3" t 6" 48" 24" RSIC- clips 6" x 48".c. 6" Wd r Steel Framing at 6".c. 3" t 6" 48" 6" Sundprfing Prducts Snex TM Ceiling & Wall Panels Sund Cntrl Curtains Equipment Enclsures Acustical Baffles & Banners Slid Wd & Veneer Acustical Ceiling & Wall Systems Prfessinal Audi Acustics Vibratin & Damping Cntrl Fire Retardant Acustics Hearing Prtectin Misture & Impact Resistant Prducts Flr Impact Nise Reductin Sund Absrbers Nise Barriers Fabric Wrapped Wall Panels Acustical Fam (Egg Crate) Acustical Sealants & Adhesives Outdr Nise Cntrl Assistive Listening Devices OSHA, FDA, ADA Cmpliance On-Site Acustical Analysis Acustical Design & Cnsulting Large Inventry Fast Shipment N Prject t Large r Small Majr Credit Cards Accepted

24 Acustical Surfaces, Inc. We identify and Yur Nise Prblems Sund Transmissin Obscuring Prducts Sundprfing, Acustics, Nise & Vibratin Cntrl Specialists Acustical Surfaces, Inc. SOUNDPROOFING, ACOUSTICS, NOISE & VIBRATION CONTROL SPECIALISTS 23 Clumbia Curt Nrth Suite 20 Chaska, MN 5538 (952) Fax (952) (800) Visit ur Website: We Identify and S.T.O.P. Yur Nise Prblems Applicatin Recmmendatins fr Walls and Ceilings, Wd r Steel Framing INSTALLING RESILIENT SOUND ISOLATION CLIPS (RSIC-) RSIC CLIPS AT 24" O.C. RSIC- Wall r Ceiling System Framing at 24".c. RSIC- clips at 24" x 48".c. r 2 Layers f 5/8" Gypsum Bard 6" 7/8" Drywall Furring Channel RSIC- clips 24" x 48".c. Wd r Steel Framing at 24".c. 3" t 6" RSIC- Wall r Ceiling System Framing at 6".c. RSIC- clips at 24" x 48".c. r 2 Layers f 5/8" Gypsum Bard 7/8" Drywall Furring Channel 6" RSIC- clips 24" x 48".c. 24" 24" 48" 24" 3" t 6" 48" 6" Wd r Steel Framing at 6".c. Sundprfing Prducts Snex TM Ceiling & Wall Panels Sund Cntrl Curtains Equipment Enclsures Acustical Baffles & Banners Slid Wd & Veneer Acustical Ceiling & Wall Systems Prfessinal Audi Acustics Vibratin & Damping Cntrl Fire Retardant Acustics Hearing Prtectin Misture & Impact Resistant Prducts Flr Impact Nise Reductin Sund Absrbers Nise Barriers Fabric Wrapped Wall Panels Acustical Fam (Egg Crate) Acustical Sealants & Adhesives Outdr Nise Cntrl Assistive Listening Devices OSHA, FDA, ADA Cmpliance On-Site Acustical Analysis Acustical Design & Cnsulting Large Inventry Fast Shipment N Prject t Large r Small Majr Credit Cards Accepted

25 Acustical Surfaces, Inc. Sundprfing, Acustics, Nise & Vibratin Cntrl Specialists 23 Clumbia Curt Nrth Suite 20 Chaska, MN 5538 (952) Fax (952) (800) Visit ur Website: We Identify and S.T.O.P. Yur Nise Prblems The Nise S.T.O.P. RSIC- Resilient Sund Islatin Clip RISC- Wall Assemblies vs. Generic Wall Assemblies The RSIC- wall systems give yu a higher perfrming wall, while saving yu mney and reducing the wall thickness. The RSIC- wall systems are the highest perfrming wall systems per dllar spent. RISC- Wd Wall Assemblies & 2 Hur: 2x4 stud wall, RSIC-, Drywall furring channel, R-9 insulatin, 2 layers ne side, 3 layers ther side 5/8" gypsum bard. UL U30, U 305, U309, U3, U33, U334 2x4 stud wall, RSIC-, Drywall furring channel, R-9 insulatin, 2 layers 5/8" gypsum bard, each side UL U30, U305 U309 U3 U33 U334 2x4 stud wall, RSIC-l, Drywall furring channel, R-l9 insulatin, layer 5/8" gypsum bard, 2 layers 5/8" gypsum bard UL 305 U309 U3 U33 2 x 4 stud wall, RSIC-, Drywall furring channel, 3.5" insulatin, layer 5/8" gypsum bard each side UL U305 U309 U3 U33 STC 63 STC 62 STC 60 STC 56 GENERIC WOOD WALL SYSTEM 2x4 duble stud wall, 3.5" insulatin, 2 layers 5/8" gypsum bard each side STC 59 2x4 duble stud wall, 3.5" insulatin, I layer 5/8" gypsum bard each side 2x4 stagger stud wall, RC- l channel, 3.5" insulatin, layer 5/8" gypsum bard each side 2x4 stagger stud wall, 3.5" insulatin, layer 5/8" gypsum bard each side 2x4 stud wall, RC- channel, 3.5" insulatin, layer 5/8" gypsum bard each side 2x4 stud wall, 3.5" insulatin, layer 5/8" gypsum bard each side STC 56 STC 5 STC 47 STC 46 STC 36 Sundprfing Prducts SnexTM Ceiling & Wall Panels Sund Cntrl Curtains Equipment Enclsures Acustical Baffles & Banners Slid Wd & Veneer Acustical Ceiling & Wall Systems Prfessinal Audi Acustics Vibratin & Damping Cntrl Fire Retardant Acustics Hearing Prtectin Misture & Impact Resistant Prducts Flr Impact Nise Reductin Sund Absrbers Nise Barriers Fabric Wrapped Wall Panels Acustical Fam (Egg Crate) Acustical Sealants & Adhesives Outdr Nise Cntrl Assistive Listening Devices OSHA, FDA, ADA Cmpliance On-Site Acustical Analysis Acustical Design & Cnsulting Large Inventry Fast Shipment N Prject t Large r Small Majr Credit Cards Accepted

26 Acustical Surfaces, Inc. Sundprfing, Acustics, Nise & Vibratin Cntrl Specialists 23 Clumbia Curt Nrth Suite 20 Chaska, MN 5538 (952) Fax (952) (800) Visit ur Website: We Identify and S.T.O.P. Yur Nise Prblems The Nise S.T.O.P. RSIC- Resilient Sund Islatin Clip RISC- STEEL WALL ASSEMBLIES & 2 HOUR: 3-5/8" steel stud wall, RSIC-, drywall furring channel, R-9 insulatin, 2 layers 5/8" bard RSIC- side, 3 layers ther side 5/8" bard UL U49, U /8" steel stud wall, RSIC-, Drywall furring channel, R-9 insulatin, 2 layers 5/8" bard each side UL U49, U /8" steel stud wall, RSIC-, Drywall furring channel, R-9 insulatin, layer 5/8" bard RSIC side, 2 layers 5/8" gypsum bard ther side UL U49, U /8" steel stud wall, RSIC-, Drywall furring channel, R-9 insulatin, layer 5/8" bard each side UL U49, U /8" duble steel stud wall, R- insulatin, 2 layers 5/8" gypsum bard each side STC 63 STC 62 STC 60 STC 56 GENERIC STEEL WALL SYSTEMS: STC /8" duble steel stud wall, R- insulatin, layer 5/8" gypsum each side STC /8" steel stud wall, R- insulatin, 2 layers 5/8" gypsum each side STC 5 3-5/8" steel stud wall, R- insulatin, layer 5/8" gypsum each side STC 46 RISC- WALL Sundprfing Prducts SnexTM Ceiling & Wall Panels Sund Cntrl Curtains Equipment Enclsures Acustical Baffles & Banners Slid Wd & Veneer Acustical Ceiling & Wall Systems Prfessinal Audi Acustics Vibratin & Damping Cntrl Fire Retardant Acustics Hearing Prtectin Misture & Impact Resistant Prducts Flr Impact Nise Reductin Sund Absrbers Nise Barriers Fabric Wrapped Wall Panels Acustical Fam (Egg Crate) Acustical Sealants & Adhesives Outdr Nise Cntrl Assistive Listening Devices OSHA, FDA, ADA Cmpliance On-Site Acustical Analysis Acustical Design & Cnsulting Large Inventry Fast Shipment N Prject t Large r Small Majr Credit Cards Accepted

27 Acustical Surfaces, Inc. Sundprfing, Acustics, Nise & Vibratin Cntrl Specialists 23 Clumbia Curt Nrth Suite 20 Chaska, MN 5538 (952) Fax (952) (800) Visit ur Website: We Identify and S.T.O.P. Yur Nise Prblems The Nise S.T.O.P. RSIC- Resilient Sund Islatin Clip RISC- WOOD FLOOR CEILING ASSEMBLIES & 2 HOUR: UL L528, L542, L532, L523, L54, L53 Carpet STC 6 IIC 74 Hard Wd STC 6 IIC 55 Tile STC 6 IIC 53 UL L547 L58 Carpet STC 6 IIC 74 Hard Wd STC 6 IIC 55 Tile STC 6 IIC 53 FIIC test with tile flr FIIC 63 RISC- STEEL FLOOR CEILING ASSEMBLIES & 2 HOUR: UL L58 Carpet STC 60 IIC 70 Hard Wd STC 60 IIC 53 Tile STC 60 IIC 50 RISC- CONCRETE FLOOR CEILING ASSEMBLIES & 2 HOUR: UL L945 Carpet STC 60 IIC 84 Hard Wd STC 60 IIC 74 Tile STC 60 IIC 70 Bare STC 60 IIC 5 RISC- CEILING Sundprfing Prducts SnexTM Ceiling & Wall Panels Sund Cntrl Curtains Equipment Enclsures Acustical Baffles & Banners Slid Wd & Veneer Acustical Ceiling & Wall Systems Prfessinal Audi Acustics Vibratin & Damping Cntrl Fire Retardant Acustics Hearing Prtectin Misture & Impact Resistant Prducts Flr Impact Nise Reductin Sund Absrbers Nise Barriers Fabric Wrapped Wall Panels Acustical Fam (Egg Crate) Acustical Sealants & Adhesives Outdr Nise Cntrl Assistive Listening Devices OSHA, FDA, ADA Cmpliance On-Site Acustical Analysis Acustical Design & Cnsulting Large Inventry Fast Shipment N Prject t Large r Small Majr Credit Cards Accepted

28 Acustical Surfaces, Inc. Sundprfing, Acustics, Nise & Vibratin Cntrl Specialists 23 Clumbia Curt Nrth Suite 20 Chaska, MN 5538 (952) Fax (952) (800) Visit ur Website: We Identify and S.T.O.P. Yur Nise Prblems The Nise S.T.O.P. RSIC- Resilient Sund Islatin Clip The RSIC- Wall Systems THE RSIC- Flr/Ceiling System STC 56 STC 57 IIC 63 Wd STC 60 STC 62 STC 6 IIC 53 Wd STC 63 STC 60 IIC 74 Steel STC 56 STC 60 STC 60 IIC 72 Steel STC 62 STC 60 IIC 50 STC 63 STC 60 IIC 5 Cncrete STC 53 STC 60 IIC 72 Cncrete STC 60 STC 60 IIC 62 Sundprfing Prducts SnexTM Ceiling & Wall Panels Sund Cntrl Curtains Equipment Enclsures Acustical Baffles & Banners Slid Wd & Veneer Acustical Ceiling & Wall Systems Prfessinal Audi Acustics Vibratin & Damping Cntrl Fire Retardant Acustics Hearing Prtectin Misture & Impact Resistant Prducts Flr Impact Nise Reductin Sund Absrbers Nise Barriers Fabric Wrapped Wall Panels Acustical Fam (Egg Crate) Acustical Sealants & Adhesives Outdr Nise Cntrl Assistive Listening Devices OSHA, FDA, ADA Cmpliance On-Site Acustical Analysis Acustical Design & Cnsulting Large Inventry Fast Shipment N Prject t Large r Small Majr Credit Cards Accepted

29 Acustical Surfaces, Inc. Sundprfing, Acustics, Nise & Vibratin Cntrl Specialists 23 Clumbia Curt Nrth Suite 20 Chaska, MN 5538 (952) Fax (952) (800) Visit ur Website: We Identify and S.T.O.P. Yur Nise Prblems The Nise S.T.O.P. RSIC- Resilient Sund Islatin Clip Field Impact Islatin Class (FIIC) 63 CONSTRUCTION: Ceramic tile -/4" lt. wt. Gypsum Cncrete /4" acustical mat -/8" T & G plywd deck 22" deep beam Cellulse insulatin RSIC- Drywall Furring Channel 2 layers 5/8" gypsum bard FIIC Impact Insulatin Class FSTC Sund Transmissin Class FIIC 63 FSTC 57 Sund Transmissin Class (STC) rating f 56, a full 9 STC pts greater than similar wall assemblies withut RSIC-. (RAL Reprt 208) 2-/2" screw x #8 curse thread screw (minimum -/2" penetratin n wd framing numbers). Experience with the RSIC- has recrded remarkable imprvements f up t an additinal 20 STC pts n walls. Nt nly is the RSIC- silencing the cmpetitin with nise eliminatin, the RSIC- is apprved fr UL Classificatin in ver 40 Fire Resistive Design Assemblies. Up t 4 (fur) hur Rated Systems. Quiet and safe what a nice cmbinatin TEST STC Reprt N. TL Reprt N. TL Reprt N. TL Reprt N. TL Reprt N. TL Furring Channel (hat track) 7/8" x 25 ga. (8 mil) galvanized, hemmed edge. Sundprfing Prducts SnexTM Ceiling & Wall Panels Sund Cntrl Curtains Equipment Enclsures Acustical Baffles & Banners Slid Wd & Veneer Acustical Ceiling & Wall Systems Prfessinal Audi Acustics Vibratin & Damping Cntrl Fire Retardant Acustics Hearing Prtectin Misture & Impact Resistant Prducts Flr Impact Nise Reductin Sund Absrbers Nise Barriers Fabric Wrapped Wall Panels Acustical Fam (Egg Crate) Acustical Sealants & Adhesives Outdr Nise Cntrl Assistive Listening Devices OSHA, FDA, ADA Cmpliance On-Site Acustical Analysis Acustical Design & Cnsulting Large Inventry Fast Shipment N Prject t Large r Small Majr Credit Cards Accepted

REQUEST FOR PROPOSALS: 1800 WALNUT TIER 1 MEP, FRAMING/DRYWALL, & GLAZING. Questions & Answers

REQUEST FOR PROPOSALS: 1800 WALNUT TIER 1 MEP, FRAMING/DRYWALL, & GLAZING. Questions & Answers REQUEST FOR PROPOSALS: 800 WALNUT TIER MEP, FRAMING/DRYWALL, & GLAZING Questins & Answers Q Hw lng has this infrmatin been available? A: Nvember 22, 208 Q: Wuld like fr yu t cnsider extending the RFP t

More information

RESILIENT SOUND ISOLATION CLIPS

RESILIENT SOUND ISOLATION CLIPS RESILIENT SOUND ISOLATION CLIPS For Wall & Floor Ceiling Assemblies RSIC-1 Resilient Sound Isolation Clip Isolation Clip RSIC-1 Isolation Clip Soundproofing Products SonexTM Ceiling & Wall Panels Sound

More information

Cleves Pump Station Stabilization, Project ID Date Issued: August 6, 2012

Cleves Pump Station Stabilization, Project ID Date Issued: August 6, 2012 Cleves Pump Statin Stabilizatin, Prject ID 10210020 Date Issued: August 6, 2012 ADDENDUM NO. 2 This addendum will nly be distributed via e-mail, but will remain available fr viewing n the MSDGC website

More information

BROCHURE # 50 DOES MY BUILDING DESIGN NEED ENGINEERING?

BROCHURE # 50 DOES MY BUILDING DESIGN NEED ENGINEERING? BROCHURE # 50 DOES MY BUILDING DESIGN NEED ENGINEERING? Overview Building cnstructin has becme increasingly cmplex during the last tw decades. Buildings are larger and use new materials and cnstructin

More information

Building Permit Application Accessory Buildings/ Detached Garages

Building Permit Application Accessory Buildings/ Detached Garages Parkland Cunty 53109A Hwy 779 Parkland Cunty, Alberta T7Z 1R1 Phne: (780) 968-8888 Fax: (780) 968-3225 Tll Free: 1-888-880-0858 Email: safetycdest@parklandcunty.cm Building Permit Applicatin Accessry Buildings/

More information

RSIC-V. Acoustical Surfaces, Inc. RSIC-V Sound Isolation Clip RSIC V INSTALLATION GUIDE. We Identify and S.T.O.P. Your Noise Problem

RSIC-V. Acoustical Surfaces, Inc. RSIC-V Sound Isolation Clip RSIC V INSTALLATION GUIDE. We Identify and S.T.O.P. Your Noise Problem A Master Distributor for PAC INTERNATIONAL, INC. RSIC V INSTALLATION GUIDE RSIC-V Page 1 Furring Channel: Minimum requirements: 25 gauge, hemmed edge detail required on all 25 gauge furring channel. Meets

More information

DECK PERMIT INFORMATION

DECK PERMIT INFORMATION DECK PERMIT INFORMATION REQUIRED INFORMATION: 1) A Plt Plan shwing the prpsed deck with the distances t the side rear and frnt f prperty lines. Als, shw lcatins f existing structures and septic system

More information

#G X With Bonus Storage By SDS-CAD Specialized Design Systems

#G X With Bonus Storage By SDS-CAD Specialized Design Systems 12'-" 3'-0" 3030 12'-" 30 year dimensinal shingles and virticle structural panel siding. Nailing schedule is " n ends 12" n centers d nails. Trusses are engineered attic trusses n 2".c. and framing is

More information

Chapter 20 - Drywall

Chapter 20 - Drywall Chapter 20 - Drywall Cntents Chapter 20 - Drywall... 20-1 Timing & Prerequisites... 20-2 Organizing Materials / Areas... 20-3 Prepare fr Drywall... 20-4 Mark the Interir Electrical Bxes (Vlunteers)...

More information

Chapter 20 - Drywall

Chapter 20 - Drywall Chapter 20 - Drywall Cntents Chapter 20 - Drywall... 20-1 Timing & Prerequisites... 20-2 Organizing Materials / Areas... 20-3 Prepare fr Drywall... 20-4 Mark the Interir Electrical Bxes (Vlunteers)...

More information

RSIC-1 THE REVOLUTION IN NOISE CONTROL

RSIC-1 THE REVOLUTION IN NOISE CONTROL RSIC-1 THE REVOLUTION IN NOISE CONTROL CHECK OUR WEBSITE FOR THE NEWEST INFORMATION AND ADDITIONS TO OUR PRODUCT LINE VER 0604 OVER 150 DESIGNS WE DON T BUILD BUILDINGS - WE MAKE THEM QUIET RSIC-1 wall

More information

ESOL Skills for Life RQF Level: Entry 3 Assessor Booklet - Speaking and Listening Sample Version

ESOL Skills for Life RQF Level: Entry 3 Assessor Booklet - Speaking and Listening Sample Version ESOL Skills fr Life RQF Level: Entry 3 Assessr Bklet - Speaking and Listening Sample Versin INSTRUCTIONS FOR CENTRES: This assessment takes apprximately 25 minutes t cmplete. Each task can be undertaken

More information

Premium-6 Hexagonal Wire Netting for roofing applications

Premium-6 Hexagonal Wire Netting for roofing applications CONTENTS SUMMARY OF FEATURES... 2 TECHNICAL INFORMATION... 2 Prduct Descriptin... 2 Applicatins... 2 Prduct Infrmatin... 2 Handling & Strage... 4 Technical Data... 4 Installatin infrmatin... 4 Size Range

More information

NEW LAWS REGARDING BUILDING PRODUCTS (QLD)

NEW LAWS REGARDING BUILDING PRODUCTS (QLD) BUILDING SERVICES Ref: LEG 17-05 Current at Nvember 2017 NEW LAWS REGARDING BUILDING PRODUCTS (QLD) Frm 1 Nvember new laws regarding nn-cnfrming building prducts apply t all building prjects in Queensland.

More information

You can also click Jobs in the left hand navigation bar and then select Create Job toward the right hand corner.

You can also click Jobs in the left hand navigation bar and then select Create Job toward the right hand corner. T pst a jb n Handshake: 1. Start by clicking Pst a Jb frm yur hme dashbard: Yu can als click Jbs in the left hand navigatin bar and then select Create Jb tward the right hand crner. Yu will nw be asked

More information

ENGINEERING EVALUATION

ENGINEERING EVALUATION PRIEST & ASSOCIATES CONSULTING, LLC ENGINEERING EVALUATION Fire Resistance Evaluatin f Nichiha Fiber Cement Cladding in Fire Rated Exterir Wall Assemblies Prject N. 10500 Prepared fr: David Hhenstern NICHIHA

More information

Extended Inventory Items

Extended Inventory Items Extended Inventry Items Using the Item Number SmartFinder buttn Extended Inventry Items Extended Inventry Items is an enhanced replacement fr the Sage I/C Items screen. It prvides yu with mre functinality

More information

RSIC-1 SOUND ISOLATION SYSTEMS RSIC-1 INSTALLATION GUIDE

RSIC-1 SOUND ISOLATION SYSTEMS RSIC-1 INSTALLATION GUIDE RSIC-1 INSTALLATION GUIDE PAC International, Inc. Tel: (866) 774-2100 Technical: (866) 649-2710 Web Site: www.pac-intl.com RSIC is a registered Trade Mark of PAC International, Inc. Page 1 Drywall Furring

More information

Questions and Answers

Questions and Answers Questins and Answers Fr: Instructr Led and Online Training Supprt Blanket Purchase Agreement Issued by: Insight Systems Crpratin (hereinafter PRIME r Insight) In supprt f: The Feed the Future Knwledge-Driven

More information

DINÉ COLLEGE Request for Proposals (RFP)

DINÉ COLLEGE Request for Proposals (RFP) DINÉ COLLEGE Request fr Prpsals (RFP) PROJECT NAME: Tsaile Security Department Mdular Stucc Prject PROJECT NUMBER: TS1819SDM1 RFP Submitted By: Hereinafter referred t as Cnstructin Cntractr : crpratin,

More information

ABLE Commission Q&A Q&A Regarding Licensing and Application

ABLE Commission Q&A Q&A Regarding Licensing and Application ABLE Cmmissin Q&A Q&A Regarding Licensing and Applicatin When can the interim licenses applicatins be submitted? They can be submitted between nw and September 30, 2018, hwever; the Able Cmmissin wuld

More information

Version 4.0 LineDesign Engineering 11/1/04

Version 4.0 LineDesign Engineering 11/1/04 Ple Lading Prgram (Transverse, Vertical, Guying & Buckling) User's Guide Versin 4.0 LineDesign Engineering 11/1/04 Cntents Intrductin 3 Descriptin f Tabs 4-7 Ple Data 7 Wire Data 8-9 Inputs, Drives & Flders.....

More information

RSIC-1. RSIC-1, the Low Cost, High Performance, Noise control Solution. RSIC-1 specifications:

RSIC-1. RSIC-1, the Low Cost, High Performance, Noise control Solution. RSIC-1 specifications: RSIC-1 The RSIC-1 is designed for use with any wood framed, steel framed, CMU, or concrete wall and ceiling system where noise control is needed. The RSIC-1 assembly decouples and isolates the gypsum board

More information

Do Sonex Rondo Baffles meet any fire rating standards? o. Sonex Rondo Baffles are class 1 fire rated meaning that the foam

Do Sonex Rondo Baffles meet any fire rating standards? o. Sonex Rondo Baffles are class 1 fire rated meaning that the foam Hw are Snex Rnd Baffles installed? Snex Rnd Baffles can be installed vertically r hrizntally. Snex Rnd is ideal fr a brad range f interir spaces, including cnference rms, receptin areas, libraries, prductin

More information

PROFESSIONAL SERVICES BULLETIN 17-3 ADDENDUM 2

PROFESSIONAL SERVICES BULLETIN 17-3 ADDENDUM 2 PROFESSIONAL SERVICES BULLETIN 17-3 ADDENDUM 2 ADDENDUM 2 des nt change the due date r time. STATEMENTS OF INTEREST are due by 4:30:00 p.m. (lcal time) Due Date: May 4, 2017 Successful Offerrs will be

More information

RSIC-1-INSTALALTION GUIDE RSIC-1 SOUND ISOLATION CLIP

RSIC-1-INSTALALTION GUIDE RSIC-1 SOUND ISOLATION CLIP RSIC-1 Drywall Furring Channel: Minimum Requirements: 25 gauge, hemmed edge detail required on all 25 gauge furring channel. Meets or exceeds SFIA requirements. Depth: 7/8 inch Width Bottom: 2-9/16 to

More information

Customer best practices

Customer best practices Custmer dcument Custmer best practices Recmmendatins fr new Basware transactin services custmers Basware Crpratin Cpyright Basware Crpratin All rights reserved 1 (11) 1 Intrductin Our best advice This

More information

Permit Application Guide For a Garage, Gazebo, Sauna, Pump House or Shed

Permit Application Guide For a Garage, Gazebo, Sauna, Pump House or Shed Permit Applicatin Guide Fr a Garage, Gazeb, Sauna, Pump Huse r Shed The fllwing pages cntain the permit applicatin, as well as ther frms that may be required fr yur permit applicatin. Apprvals required:

More information

RSIC-V RSIC-V INSTALLATION GUIDE RSIC-V SOUND ISOLATION CLIP

RSIC-V RSIC-V INSTALLATION GUIDE RSIC-V SOUND ISOLATION CLIP RSIC-V INSTALLATION GUIDE RSIC-V PAC International, Inc. Tel: (866) 774-2100 Fax: (866) 649-2710 Web Site: www.pac-intl.com Furring Channel: Minimum requirements: 25 gauge, hemmed edge detail required

More information

CSI Student Information and FAQ Guide

CSI Student Information and FAQ Guide CSI Student Infrmatin and FAQ Guide 2013 Welcme t CSI! As a student f ne f CSI s academic partners, yu can benefit frm discunted pricing at CSI. Please read thrugh this dcument carefully, it cntains imprtant

More information

PERMIT REQUIREMENTS. City of West Park Permit Application (signed and notarized by the owner and contractor)

PERMIT REQUIREMENTS. City of West Park Permit Application (signed and notarized by the owner and contractor) CITY OF WEST PARK ROOF AND REROOF PERMIT PACKAGE PERMIT REQUIREMENTS City f West Park Permit Applicatin (signed and ntarized by the wner and cntractr) Cntract signed between wner and cntractr *All cntracts

More information

Ministere des Transports

Ministere des Transports Ministry f Transprtatin Plley and Planning Divisin Transprtatin Planning Branch 30 1 h Flr 777 Bay Street Trnt ON M7A 2J8 Tel.: 416-585-7238 Fax: 416-585-7324 Ti ja. Dirks@ ntari.ca Ministere des Transprts

More information

RSIC-V INSTALLATION GUIDE RSIC-V SOUND ISOLATION CLIP. PAC International, Inc. Tel: (866) Fax: (866) Web Site:

RSIC-V INSTALLATION GUIDE RSIC-V SOUND ISOLATION CLIP. PAC International, Inc. Tel: (866) Fax: (866) Web Site: RSIC-V INSTALLATION GUIDE RSIC-V Furring Channel: Minimum requirements: 25 gauge, hemmed edge detail required on all 25 gauge furring channel. Meets or exceeds SFIA min. requirements. (25 Ga furring channel

More information

AAM Direct Suppliers AAM Supplier Portal Basic External Pull Usage

AAM Direct Suppliers AAM Supplier Portal Basic External Pull Usage August 25, 2006 T: Subject: AAM Direct Suppliers AAM Supplier Prtal Basic External Pull Usage The purpse f this guide is t present a walkthrugh f the new AAM Supplier Prtal fr meeting External Pull requirements.

More information

MONOPOUR PREFAB SYSTEM

MONOPOUR PREFAB SYSTEM Enter Prject Name Enter Prject Number (Nte t Specifier: This dcument has been prepared fr Fab-Frm Industries Ltd. (Fastft prduct) in accrdance with the Cnstructin Specificatins Institute (CSI) Sectin Frmat.

More information

The BLOOM Performance Review Decision Guide

The BLOOM Performance Review Decision Guide The BLOOM Perfrmance Review Decisin Guide Intrductin Planning yur perfrmance review prcess needs careful cnsideratin. Sme questins yu might be cnsidering are: 1. Hw ften will the rganizatin cmplete frmal

More information

Pickup Request Process Update Non-Deposit Bulk Pesticide Containers

Pickup Request Process Update Non-Deposit Bulk Pesticide Containers Pickup Request Prcess Update Nn-Depsit Bulk Pesticide Cntainers Dear retail cllectin partner, Please be advised that the prcess fr requesting a pick-up f nn-depsit bulk pesticide cntainers is changing

More information

Buildertrend/Xero Integration Guidelines. Buildertrend/Xero integration guidelines v1.0 February 2018 pg. 1

Buildertrend/Xero Integration Guidelines.   Buildertrend/Xero integration guidelines v1.0 February 2018 pg. 1 Buildertrend/Xer Integratin Guidelines www.luckman.c.nz Buildertrend/Xer integratin guidelines v1.0 February 2018 pg. 1 Cntents Xer Integratin... 3 Prcess Xer Integratin... 4 Buildertrend Training Vides

More information

INTERMEDIATE WORD PROCESSING (205)

INTERMEDIATE WORD PROCESSING (205) Page 1 f 6 Cntestant Number: Time: Rank: INTERMEDIATE WORD PROCESSING (205) REGIONAL 2017 Prductin Prtin: Jb 1: Letter Jb 2: Mem Jb 3: Table Jb 4: Title Page (100 pints) (100 pints) (100 pints) (100 pints)

More information

Digital Advisory Services Professional Service Description Software Defined Networking Strategy and Roadmap

Digital Advisory Services Professional Service Description Software Defined Networking Strategy and Roadmap Digital Advisry Services Prfessinal Service Descriptin Sftware Defined Netwrking Strategy and Radmap 1. Descriptin f Services. 1.1 Sftware Defined Netwrking Strategy and Radmap. Verizn will prvide Sftware

More information

IESBA Meeting (March 2013) Agenda Item

IESBA Meeting (March 2013) Agenda Item Agenda Item 7-A Backgrund Lng Assciatin f Senir Persnnel (Including Partner Rtatin) with an Audit Client Matters fr Cnsideratin 1. Paragraph 290.150 f the IESBA Cde f Ethics fr Prfessinal Accuntants (the

More information

How it works. The following pages provide step by step instructions on the main stages of the MYOB Integration Module.

How it works. The following pages provide step by step instructions on the main stages of the MYOB Integration Module. Integrating MYOB with TimePr With TimePr s MYOB Integratin Mdule, yu can imprt TimePr time recrds int MYOB fr invice prcessing r payrll integratin. These recrds are then used t generate: Sales Invices,

More information

STEEL BUILDINGS AND STRUCTURES, INC. THE BEST PRACTICES GUIDE TO SELL SBS PRODUCTS

STEEL BUILDINGS AND STRUCTURES, INC. THE BEST PRACTICES GUIDE TO SELL SBS PRODUCTS STEEL BUILDINGS AND STRUCTURES, INC. THE BEST PRACTICES GUIDE TO SELL SBS PRODUCTS Cntents Best Practices Guide t Sell SBS Prducts... 4 Best Practices when Assisting Custmers that are Buying Carprts...

More information

RSIC-1-LOW PROFILE SOUND ISOLATION CLIP RSIC-1-LOW PROFILE INSTALLATION GUIDE RSIC-1 LOW PROFILE. For use in conjunction with the RSIC-1 clip

RSIC-1-LOW PROFILE SOUND ISOLATION CLIP RSIC-1-LOW PROFILE INSTALLATION GUIDE RSIC-1 LOW PROFILE. For use in conjunction with the RSIC-1 clip RSIC-1 LOW PROFILE For use in conjunction with the RSIC-1 clip Resilient Sound Isolation Clip (RSIC-1-LOW PROFILE) Spacing: maximum 48 inches on center Maximum acoustical design load: 18 lbs RSIC-LOW PROFILE

More information

RSIC-1-LOW PROFILE SOUND ISOLATION CLIP RSIC-1-LOW PROFILE INSTALLATION GUIDE RSIC-1 LOW PROFILE. For use in conjunction with the RSIC-1 clip

RSIC-1-LOW PROFILE SOUND ISOLATION CLIP RSIC-1-LOW PROFILE INSTALLATION GUIDE RSIC-1 LOW PROFILE. For use in conjunction with the RSIC-1 clip RSIC-1 LOW PROFILE For use in conjunction with the RSIC-1 clip Resilient Sound Isolation Clip (RSIC-1-LOW PROFILE) Spacing: maximum 48 inches on center Maximum acoustical design load: 36 lbs RSIC-LOW PROFILE

More information

LRFD Bridge Design Manual. Bridge Office MINNESOTA DEPARTMENT OF TRANSPORTATION MANUAL

LRFD Bridge Design Manual. Bridge Office MINNESOTA DEPARTMENT OF TRANSPORTATION MANUAL MANUAL 5-392 MINNESOTA DEPARTMENT OF TRANSPORTATION Bridge Office LRFD Bridge Design Manual MnDOT BRIDGE OFFICE LRFD Bridge Design Manual Minnesta Department f Transprtatin 3485 Hadley Avenue Nrth Mail

More information

In this fact sheet we answer the four most common questions new clients ask:

In this fact sheet we answer the four most common questions new clients ask: Wrking With Federal Prpsals Intrductin In this fact sheet we answer the fur mst cmmn questins new clients ask: What tasks d yu perfrm and what d yu need frm us? Hw d we use the Virtual War Rms? Hw much

More information

RSIC-1-LOW PROFILE INSTALLATION GUIDE

RSIC-1-LOW PROFILE INSTALLATION GUIDE For use in conjunction with the RSIC-1 clip Resilient Sound Isolation Clip (RSIC-1-LOW PROFILE) Spacing: maximum 48 inches on center Maximum acoustical design load: 18 lbs RSIC-LOW PROFILE is designed

More information

REQUEST FOR PROPOSAL KITCHEN FOOD SERVICE EQUIPMENT NEW ORANGEBURG COUNTY DETENTION CENTER ORANGEBURG, SOUTH CAROLINA REQUISITION NO: FY

REQUEST FOR PROPOSAL KITCHEN FOOD SERVICE EQUIPMENT NEW ORANGEBURG COUNTY DETENTION CENTER ORANGEBURG, SOUTH CAROLINA REQUISITION NO: FY REQUEST FOR PROPOSAL KITCHEN FOOD SERVICE EQUIPMENT FOR NEW ORANGEBURG COUNTY DETENTION CENTER ORANGEBURG, SOUTH CAROLINA REQUISITION NO: FY18-0424 ISSUED APRIL 9, 2018 RESPONSE DUE TUESDAY, APRIL 24,

More information

Completing a 90 Day Evaluation Review Using the Online Performance Appraisal System Standard Form

Completing a 90 Day Evaluation Review Using the Online Performance Appraisal System Standard Form Cmpleting a 90 Day Evaluatin Review Using the Online Perfrmance Appraisal System Standard Frm Step One: Cmpleting Perfrmance Expectatins Standard Frm Yu will receive an email frm HR Manager alerting yu

More information

Your available balance is displayed on the lower left-hand side of the myprintcenter, as highlighted below.

Your available balance is displayed on the lower left-hand side of the myprintcenter, as highlighted below. Using the LSC Pay-t-Print myprintcenter Website LSC Students, Faculty and Staff and HCPL r MCML Library Card hlders What can I d with the myprintcenter? With myprintcenter (Standard) yu can: Check available

More information

M. Conner Name: A 1/60 scale model truss bridge is to be designed and built using standard file folders.

M. Conner Name: A 1/60 scale model truss bridge is to be designed and built using standard file folders. M. Cnner Name: Date: Perid: Prblem Statement: A 1/60 scale mdel truss bridge is t be designed and built using standard file flders. Design Requirements: The scale mdel must be a truss with a ttal span

More information

OWNER S MANUAL. MODEL FE (ALL) Serial number

OWNER S MANUAL. MODEL FE (ALL) Serial number VESTIL MANUFACTURING CORP. 2999 N. Wayne St., Angla, IN 46703 Ph: 260-665-7586 Fax: 260-665-1339 E-mail: sales@vestil.cm www.vestil.cm Rutine Maintenance & Safety Checks 2 Operatin Instructins... 2 10/05

More information

[Note to Engineer: Choose one below. Confirm with your geotech if you need further compaction.]

[Note to Engineer: Choose one below. Confirm with your geotech if you need further compaction.] 2-06 SUBGRADE PREPARATION (******) 2-06.3 Cnstructin Requirements 2-6.3(1) Subgrade fr Surfacing This sectin is supplemented with the fllwing: The subgrade must be suitable, as determined by the Engineer,

More information

Birmingham Airport Response REDACTED (for external use)

Birmingham Airport Response REDACTED (for external use) The aim f the questins belw is t allw us t understand hw yu cnducted the recent pen tender prcesses. The questins frm a brad guide t ur areas f interest. We request that as well as either written r ral

More information

Penn Manor Graduation Project. Name:

Penn Manor Graduation Project. Name: Penn Manr Graduatin Prject Career Cruising Lg-In Instructins Name: G t http://blgs.pennmanr.net/highschl and Imprtant links career cruising link in the right hand clumn. Purpse f the Graduatin Prject:

More information

Safety and Security Checks for Tank Container HSE CoP 613. Safety and Security Checks for Tank Container. HSE Code of Practice 613

Safety and Security Checks for Tank Container HSE CoP 613. Safety and Security Checks for Tank Container. HSE Code of Practice 613 Safety and Security Checks fr Tank Cntainer HSE Cde f Practice 613 Table f Cntents 1. Purpse... 3 2. Definitins... 3 3. Scpe... 3 4. Mandatry principles r standards... 3 4.1 Legal... 4 4.2 Prcess requirements...

More information

Compliance with Canadian Data Protection Laws: Are Retailers Measuring Up?

Compliance with Canadian Data Protection Laws: Are Retailers Measuring Up? Cmpliance with Canadian Data Prtectin Laws: Are Retailers Measuring Up? EXECUTIVE SUMMARY The Persnal Infrmatin Prtectin and Electrnic Dcuments Act ( PIPEDA ) was intrduced in 2001 t prtect Canadians frm

More information

ADDENDUM 1. RFP# , Local and Long Distance Service for Coin and Coin less (Inmate) Telephones

ADDENDUM 1. RFP# , Local and Long Distance Service for Coin and Coin less (Inmate) Telephones Cunty f El Pas Purchasing Department 500 East San Antni, Rm 500 El Pas, Texas 79901 (915) 546-2048 / Fax: (915) 546-8180 ADDENDUM 1 T: Frm: All Interested Prpsers Linda Gnzalez Date: August 3, 2007 Subject:

More information

CCE Application Guidelines

CCE Application Guidelines CCE Applicatin Guidelines - 2017 General This dcument cntains infrmatin n hw t cmplete and submit yur CCE applicatin. If yu have any questins, please cntact Susan McGuire at smcguire@acce.rg. Tips befre

More information

9 Things QuickBooks Users Should Know About Microsoft Dynamics 365

9 Things QuickBooks Users Should Know About Microsoft Dynamics 365 9 Things QuickBks Users Shuld Knw Abut Micrsft Dynamics 365 www.intellitecslutins.cm The past few years has brught extrardinary changes t the way we d business. Web-based business applicatins have matured,

More information

White Paper on Distributor Inventory Why distributors have too much Inventory

White Paper on Distributor Inventory Why distributors have too much Inventory 2014 White Paper n Distributr Inventry Why distributrs have t much Inventry Since 2007 the United States has been In and wrking its way ut f a recessin In 2013-14 Whlesalers are finding that THINGS are

More information

CCE Application Guidelines

CCE Application Guidelines CCE Applicatin Guidelines - 2018 General This dcument cntains infrmatin n hw t cmplete and submit yur CCE applicatin. If yu have any questins, please cntact Susan McGuire at smcguire@acce.rg. Tips befre

More information

RSIC-1 RSIC-1 INSTALLATION GUIDE RSIC-1 SOUND ISOLATION CLIP CONCRETE CMU

RSIC-1 RSIC-1 INSTALLATION GUIDE RSIC-1 SOUND ISOLATION CLIP CONCRETE CMU RSIC-1 INSTALLATION GUIDE RSIC-1 SOUND ISOLATION CLIP CONCRETE CMU RSIC-1 Drywall Furring Channel: Minimum Requirements: 25 gauge with hemmed edge required. Meets or exceeds SSMA requirements. Depth: 7/8

More information

Personal Computing Services FAQ s

Personal Computing Services FAQ s What s cvered under the PCS cntract? PCS will generally cver all f the Break/Fix services n the Cre Hardware that is lcated at the schls. Cre Hardware cnsists f: DESKTOPS, LAPTOPS, SERVERS, and PRINTERS.

More information

MILITARY MARKING (MIL-STD-129P)

MILITARY MARKING (MIL-STD-129P) Prject Cde Shelf-life MILITARY MARKING (MIL-STD-129P) Marking permits ready identificatin f military supplies and equipment fr shipment and strage. Marking is required t assist ur dept persnnel srt shipments

More information

GM In-Dealership Digital Network (IDDN)

GM In-Dealership Digital Network (IDDN) GM In-Dealership Digital Netwrk (IDDN) Dealer Pre-installatin & Installatin Day Requirements and Checklist Cntents Installatin Overview... 1-3 Crdinatin... 1 Day f Installatin... 2 Equipment, Safety, and

More information

Flood Water Barriers Inflow Protection. Flood Protection Barriers Flood Protection Walls. Blobel Environmental Engineering 3

Flood Water Barriers Inflow Protection. Flood Protection Barriers Flood Protection Walls. Blobel Environmental Engineering 3 Fld Water Barriers Inflw Prtectin Fld Prtectin Barriers Fld Prtectin Walls Blbel Envirnmental Engineering 3 Blbel Envirnmental Engineering Blbel Envirnmental Engineering State f the Art Fld Prtectin Systems

More information

New Website Design Brief Considerations

New Website Design Brief Considerations New Website Design Brief Cnsideratins A gd website isn t ging t be designed fr yu it s ging t be designed fr yur target audience. If yu have a website already, knwing a bit mre abut it can help the web

More information

Guidance notes for completing the International Start-up Form

Guidance notes for completing the International Start-up Form Guidance ntes fr cmpleting the Internatinal Start-up Frm These guidance ntes are designed t supprt yu in cmpleting the Internatinal start-up frm. Yu will als need t refer t a) yur Stage 2 applicatin frm

More information

Eagle Scout Notebook Golden Eagle District (October 22, 2012)

Eagle Scout Notebook Golden Eagle District (October 22, 2012) Eagle Scut Ntebk Glden Eagle District (Octber 22, 2012) Purpse The purpse f this dcument is guide the Eagle Scut candidate thugh the prcess f creating the Eagle Scut Ntebk that is t be submitted t the

More information

Family Support Service Provider Quick Reference Guide to CYBER

Family Support Service Provider Quick Reference Guide to CYBER Welcme Page: Family Supprt Service Prvider Quick Reference Guide t CYBER Links t Mnitr Regularly: Authrizatin Current: Will list all currently pen authrizatins; shuld include nly thse yuth currently receiving

More information

SOURCE INSPECTION QUALITY MANAGEMENT PLAN

SOURCE INSPECTION QUALITY MANAGEMENT PLAN SOURCE INSPECTION QUALITY MANAGEMENT PLAN Campus Parkway / State Rute 140 Prject BAR REINFORCEMENT APPENDIX I Table f Cntents 1 GENERAL... 3 1.1 Certificatins... 3 1.1.1 Black Bar Reinfrcement... 3 1.1.2

More information

ADDENDUM #1 MODIFICATIONS TO DRAWINGS AND SUPPLEMENTAL INFORMATION

ADDENDUM #1 MODIFICATIONS TO DRAWINGS AND SUPPLEMENTAL INFORMATION deca ARCHITECTURE.INC Page- ADDENDUM # May 6, 04 This Addendum to the Bid Documents is issued to clarify, correct, and supplement the Drawings issued as "ZENGER FARM URBAN GRANGE BID SET" dated May 5,

More information

Your visits have NOT been prescheduled.

Your visits have NOT been prescheduled. Pied Piper Facility Ratings.cm Evaluatr Instructin Guide Crdinating Yur Visit Yur visits have NOT been prescheduled. Once yu have accepted the assignment nline yu will need t schedule the date and time

More information

Managing Exceptions in Time & Labor A Guide for Approvers and Department Processors

Managing Exceptions in Time & Labor A Guide for Approvers and Department Processors Instructin Guide Managing Exceptins in Time & Labr A Guide fr Apprvers and Department Prcessrs Exceptins are prblems which prevent time and labr frm prcessing crrectly. It is imprtant that yu view exceptins

More information

DESIGN STEPS USING ADAPT FLOOR-PRO 1

DESIGN STEPS USING ADAPT FLOOR-PRO 1 Technical Nte Structural Cncrete Sftware System TN230_PT_design_prcedure_FP_12 053007 DESIGN STEPS USING ADAPT FLOOR-PRO 1 Bijan O Aalami 2 This Technical Nte utlines the steps that yu have t fllw in designing

More information

Company Policy Buying Additional Annual Leave

Company Policy Buying Additional Annual Leave Cmpany Plicy Buying Additinal Annual Leave Dcument Cntrl Table Dcument title: Buying Additinal Annual Leave Versin number: 2.3 Date apprved: 22.11.17 Apprved by: D Wythe Date f last review: 22.11.17 Departments

More information

TOWN OF PAYSON WATER DEPARTMENT BACKFLOW PREVENTION PROGRAM CUSTOMER INFORMATION PACKAGE

TOWN OF PAYSON WATER DEPARTMENT BACKFLOW PREVENTION PROGRAM CUSTOMER INFORMATION PACKAGE TOWN OF PAYSON WATER DEPARTMENT BACKFLOW PREVENTION PROGRAM CUSTOMER INFORMATION PACKAGE TOWN OF PAYSON Backflw Preventin Prgram Develpers, Cntractrs and Paysn Residents: An apprved backflw preventin assembly

More information

Design Standard Structural Design Guidelines

Design Standard Structural Design Guidelines Versin 1.2015.0921 Design Standard Structural Design Guidelines Purpse The fllwing Structural Design Guidelines establish basic design parameters fr the East Side Unin High Schl District with the gal f

More information

Mats Inc. Installation and Maintenance Instructions

Mats Inc. Installation and Maintenance Instructions Mats Inc. Installatin Instructins fr Mats Inc. Carpet Matting 4000, 5000, 6500, 8850 Page 1 f 5 Mats Inc. Installatin and Maintenance Instructins fr Mats Inc. Carpet Matting 4000, 5000, 6500, 8850 These

More information

Mats Inc. Installation and Maintenance Instructions for 3M Nomad Carpet Matting 4000, 5000, 6500, 8850

Mats Inc. Installation and Maintenance Instructions for 3M Nomad Carpet Matting 4000, 5000, 6500, 8850 Mats Inc. Installatin Instructins fr 3M Nmad Carpet Matting 4000, 5000, 6500, 8850 Page 1 f 5 Mats Inc. Installatin and Maintenance Instructins fr 3M Nmad Carpet Matting 4000, 5000, 6500, 8850 These instructins

More information

SOCIAL MEDIA GUIDANCE

SOCIAL MEDIA GUIDANCE SOCIAL MEDIA GUIDANCE SHARING THIS IS PLASTICS CONTENT ON SOCIAL MEDIA This resurce empwers yu t prmte the psitive impact f plastics. By sharing infrmatin yu find n ThisIsPlastics.cm n scial media, yu

More information

Revision Date: May Paragraph Table of Contents Page. 1.0 Scope Purpose Overview of Steps Approving an MRA Document 5

Revision Date: May Paragraph Table of Contents Page. 1.0 Scope Purpose Overview of Steps Approving an MRA Document 5 f 6 Dcument Owner: Justin Lee Owners Department: Supply Chain Management Paragraph Table f Cntents Page.0 Scpe 3 2.0 Purpse 3 3.0 Respnsibilities 3 4.0 MRA Term Definitins 3 5.0 Overview f Steps Apprving

More information

RSIC-1EXT04 SOUND ISOLATION CLIP RSIC-1EXT04 INSTALLATION GUIDE

RSIC-1EXT04 SOUND ISOLATION CLIP RSIC-1EXT04 INSTALLATION GUIDE RSIC-1EXT04 SOUND ISOLATION CLIP RSIC-1EXT04 INSTALLATION GUIDE PAC International, Inc. Tel: (866) 774-2100 Technical: (866) 649-2710 Web Site: www.pac-intl.com Furring Channel: Minimum requirements: 25

More information

PUBLIC WORKS DEPARTMENT Resource Recovery & Recycling Division CONSTRUCTION & DEMOLITION (C&D) WASTE MANAGEMENT PLAN

PUBLIC WORKS DEPARTMENT Resource Recovery & Recycling Division CONSTRUCTION & DEMOLITION (C&D) WASTE MANAGEMENT PLAN PUBLIC WORKS DEPARTMENT Resurce Recvery & Recycling Divisin CONSTRUCTION & DEMOLITION (C&D) WASTE MANAGEMENT PLAN Plan Check #: 1. GENERAL PROJECT INFORMATION: Over-the-Cunter Permit Yes N City-Spnsred

More information

Commercial Tax Abatement

Commercial Tax Abatement A cnfirmatin letter is issued by the City upn receipt f this applicatin. This applicatin is nt effective and nt cnsidered filed until the cnfirmatin letter has been issued. Filing des nt assure the apprval

More information

ALABAMA STATE PORT AUTHORITY REQUEST FOR PROPOSAL

ALABAMA STATE PORT AUTHORITY REQUEST FOR PROPOSAL ALABAMA STATE PORT AUTHORITY REQUEST FOR PROPOSAL PROFESSIONAL SERVICE CONTRACT PIER B SOUTH REHABILITATION RFQ Number: ASPA-TS-2018-02 MARCH 2018 REQUEST FOR QUALIFICATIONS (RFQ) FOR ENGINEER DESIGN &

More information

EAGLE SCOUT CANDIDATE PREPARATION GUIDE. The Eagle Scout Service Project

EAGLE SCOUT CANDIDATE PREPARATION GUIDE. The Eagle Scout Service Project September 2018 ~ Previus versins nt valid Sufflk Cunty Cuncil By Scuts f America EAGLE SCOUT CANDIDATE PREPARATION GUIDE T maintain the high standards f excellence recgnized in thse wh have achieved the

More information

BrainQuest 2011 Darul Arqam North

BrainQuest 2011 Darul Arqam North BrainQuest 2011 Darul Arqam Nrth The Tthpick Bridge Challenge The cmpetitin is pen t all students in grades 4 thrugh 12. Students are invited t build a structure using nly rund wden tthpicks and glue that:

More information

Agenda. 1. Introduce the Contract Request Form & Process. 2. Learn how to initiate & submit Contract Requests

Agenda. 1. Introduce the Contract Request Form & Process. 2. Learn how to initiate & submit Contract Requests WELCOME EPIC Cntract Request Training Agenda In this sessin we will : 1. Intrduce the Cntract Request Frm & Prcess Definitins When d I use? 2. Learn hw t initiate & submit Cntract Requests The Frm vs.

More information

Fiber Reinforced Polymer Upgrades for Large Pipelines. Anna Pridmore, PhD Vice President- Pipeline Solutions Structural Technologies

Fiber Reinforced Polymer Upgrades for Large Pipelines. Anna Pridmore, PhD Vice President- Pipeline Solutions Structural Technologies Fiber Reinfrced Plymer Upgrades fr Large Pipelines Anna Pridmre, PhD Vice President- Pipeline Slutins Structural Technlgies Agenda Inspectin Methds evlutin Repair Optins analysis Carbn Fiber technical

More information

My Webvantage How to Setup blue

My Webvantage How to Setup blue My Webvantage Hw t Setup blue THE WORKSPACE Webvantage is the brwser-based prtal that rganizes yur wrk, cnnects everyne in yur cmpany, and prvides the infrmatin yu need t make imprtant and time-sensitive

More information

Facilities Study Report

Facilities Study Report Wellhead Pwer Cltn, LLC Facilities Study Reprt Revised May 15, 2014 Prepared by: Edgar Ramirez Rger Salas, P.E. Distributin Field Engineering Apprved by: Rger Salas Distributin Field Engineering Manager

More information

Usability Testing Notes: Participant 3

Usability Testing Notes:   Participant 3 Usability Testing Ntes: http://gettyimages.cm Participant 3 Nte taker: Marlie Date April 15 th 2016 Lcatin: Participant Hme Office Participant: # 3, Prduct Manager, Krista Web Site: www.gettyimages.cm

More information

Completing an Introductory Review Using the Online Performance Appraisal System Standard Form

Completing an Introductory Review Using the Online Performance Appraisal System Standard Form Cmpleting an Intrductry Review Using the Online Perfrmance Appraisal System Standard Frm Step One: Cmpleting Perfrmance Expectatins Standard Frm Yu will receive an email frm HR Manager alerting yu that

More information

Redeployment Due to Ill Health

Redeployment Due to Ill Health Redeplyment Due t Ill Health Guide fr managers This guide utlines steps t fllw when managing an emplyee thrugh the redeplyment prcess due t ill health Main tpic areas Overview General principles The prcess

More information

Procurement Gateway & I Want Doc User Guide https://gateway.procurement.cornell.edu/

Procurement Gateway & I Want Doc User Guide https://gateway.procurement.cornell.edu/ Prcurement Gateway & I Want Dc User Guide https://gateway.prcurement.crnell.edu/ Prcurement Gateway Once yu lg int the Prcurement Gateway, the system will identify wh yu are and yur primary FTC/BSC yu

More information

M. Conner Name: A 1/60 scale model truss bridge is to be designed and built using standard file folders.

M. Conner Name: A 1/60 scale model truss bridge is to be designed and built using standard file folders. M. Cnner Name: EA2: Truss Design Assignment Date: Perid: Prblem Statement: A 1/60 scale mdel truss bridge is t be designed and built using standard file flders. Design Requirements: The scale mdel must

More information