1 SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING AUGUST 9, 2018 Updated August 3, 2018 LACKAWANNA COUNTY SR 8031(WWR) # Moved to 8/9/18 from 7/26/18, orig 7/12/18 PROPOSAL:$14.40 PLANS 8.5x11:$4.80 For the rehabilitation and improvement of certain sections of Varies STATE HIGHWAYS in Lackawanna and Luzerne Counties, in varies municipalities, Commonwealth of Pennsylvania, STATE ROUTE 8031, SECTION WWR. The project consists of the installation of wrong way signing, delineation and pavement markings on varies ramps throughout Lackawanna and Luzerne Counties in District 4-0. Other work includes temporary traffic control and the miscellaneous construction associated with the installation or upgrade of these systems as indicated in the approved bid package. LYCOMING COUNTY SR 44(082) # PROPOSAL:$21.12 PLANS:$ X18:$ X36:$ Ex St:$ x18:$ x36:$ The description and location of the project is as follows: Emergency project for replacement of accident damaged bridge beam and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 44, SECTION 082, from approximately 0.66 miles northeast of State Route 3028 at segment 0454 offset 0668 NB/segment 0455 offset 0647 SB to approximately 0.0 miles southwest of State Route 220 at segment 0454 offset 1188 NB/segment 0455 offset 1167 SB in PIATT TOWNSHIP and PORTER TOWNSHIP, LYCOMING COUNTY. INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING AUGUST 9, 2018 Updated July 23, 2018 ALLEGHENY COUNTY SR 7119(0) #88418 PROPOSAL:$21.72 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$23.40 Ex St:$ x18:$ x36:$ The description and location of the project is as follows: For the bridge replacement, bituminous pavement, drainage, guide rail, signing and pavement marking, and other miscellaneous construction, all within a length of linear feet (0.052 miles), as indicated on the drawings approved in the bid package for ROBINSON RUN BRIDGE NO. 4 (STATE ROUTE 7119 a.k.a. Station Street), in ALLEGHENY COUNTY, NORTH FAYETTE and SOUTH FAYETTE TOWNSHIPS, Commonwealth of Pennsylvania. This project being situated as follows: From a point approximately 200 feet east of Noblestown Road (H287) at Station to a point approximately 500 feet west of Cemetery Hill Road at Station MIFFLIN COUNTY SR 2002(A01) #4643 PROPOSAL:$61.92 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$62.40 The description and location of the project is as follows: For the improvement of a certain section of STATE HIGHWAY in MIFFLIN COUNTY, BURNHAM BOROUGH, Commonwealth of Pennsylvania, STATE ROUTE 2002, SECTION A01. The project being situated as follows: On State Route 2002 from Segment 0012/Offset 0000 to Segment 0012/Offset 0100, along Freedom Avenue approximately 0.3 miles East of the intersection with SR 1005 Logan Boulevard. For the removal of the existing Single Span Reinforced Concrete Deck Arch Structure and construction of its replacement Single Span Composite Steel Plate Girder Bridge, approach work consisting of superpave asphalt mixture designs for the base and wearing course, guide rail, concrete sidewalk and curb, pavement markings, and miscellaneous construction for a total construction length of approximately 930 feet (0.176 miles) as indicated on the approved drawings. 1

2 WARREN COUNTY SR 3005(683) # PROPOSAL:$15.24 PLANS 8.5x11:$2.04 For overlay of a two lane road with either a high RAP Superpave Warm Mix Binder OR a virgin mix Superpave Warm Mix Binder and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 3005, SECTION 683, in WARREN COUNTY, PLEASANT TOWNSHIP from approximately 40 feet south of the intersection with Lenhart Road at segment 0290 offset 2941 to approximately 200 feet south of the intersection with Box Lane at segment 0370 offset CAMBRIA COUNTY SR 56(036) # PROPOSAL:$27.36 PLANS:$ X18:$ X36:$ This project is for pavement preservation of SR 0056 in the City of Johnstown, Cambria County. Work consists of mill and overlay with guide rail upgrades, signing, ADA curb ramps, pavement markings, traffic signal upgrades and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0056, SECTION 036, in CAMBRIA COUNTY, CITY OF JOHNSTOWN. BEDFORD COUNTY SR 2029(04B) #88128 PROPOSAL:$26.40 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$35.10 This project is for the replacement of the existing structure carrying SR 2029 over a tributary to the Raystown branch of the Juniata River in Bedford County. The existing structure will be replaced with a 12'-0 x 4'-6" R.C. Box Culvert and includes minor roadway approach work, sewer line relocation and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 2029, SECTION 04B in BEDFORD COUNTY, EAST PROVIDENCE TOWNSHIP at the following location: STATION TO STATION SEGMENT 0300, OFFSET 1933 TO SEGMENT 0300, OFFSET 2635 CARBON COUNTY SR 1003(03B) # PROPOSAL:$33.00 PLANS:$ X18:$ X36:$93.60 Ex St:$ x18:$ x36:$39.00 Bridge Preservation activities include Type 2 and 3 concrete deck repairs, Type 2 concrete substructure repairs, scarification and hydro-demolition on the bridge deck, latex concrete deck overlay, deck compression seal replacement, slope wall repair, approach roadway reconstruction, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 1003, SECTION 03B, in CARBON COUNTY, KIDDER TOWNSHIP from approximately segment 0070 offset 0000 to approximately segment 0070 offset CARBON COUNTY SR 0534(M89) # PROPOSAL:$18.00 PLANS 8.5x11:$1.44 The project involves base replacement, milling, scratch course, wearing course, guide rail, pavement markings, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 534, SECTION M89, in CARBON COUNTY KIDDER & PENN FOREST TOWNSHIP from segment 292 offset 0000 to segment 382 offset CENTRE COUNTY SR 99(161) # PROPOSAL:$12.36 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: For the improvement of a certain section of STATE HIGHWAY in CENTRE COUNTY, VARIOUS TOWNSHIPS AND BOROUGHS, Commonwealth of Pennsylvania, STATE ROUTE 0099, SECTION 161. This project being situated as follows: This project being situated on State Route 0099 (Northbound) from Segment 0556 Offset 0000 to Segment 0700 Offset 0000 and State Route 0099 Southbound from Segment 0557 Offset 0000 to Segment 0701 Offset Also State Route 0322 from (eastbound) Segment 0250 Offset 0000 to Segment 0282 Offset 3771 and (westbound) Segment 0251 Offset 0000 to Segment 0283 Offset Also on SR 3014, SR 3042, and related ramp-ways. For roadway repair using Accelerated Concrete Pavement Patching, longitudinal joint cleaning and sealing, and miscellaneous construction as indicated on the approved drawings included in the bid package. 2

3 SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING AUGUST 9, 2018 Updated July 11, 2018 WAYNE COUNTY SR 4017(FDR) # PROPOSAL:$15.00 PLANS 8.5X11:$1.32 This project is for the full depth reclamation of an approximate total of 3.10 miles of existing bituminous roadway on the following STATE ROUTE: S.R Segment 0010 Offset 1700 to Segment 0100 Offset 2782 (3.10 MI) IN WAYNE COUNTY IN MOUNT PLEASANT TOWNSHIP in the COMMONWEALTH OF PENNSYLVANIA. MONROE COUNTY SR 191(04B) #11872 PROPOSAL:$34.32 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ Ex St:$ x18:$ x36:$ The description and location of the project is as follows: This project is the full replacement of the bridge located on SR 0191 over Paradise Creek. The project includes bridge replacement, approach pavement reconstruction, concrete repairs, guide rail installation and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 191, SECTION 04B, in MONROE COUNTY, STROUD TOWNSHIP AND POCONO TOWNSHIP from approximately 1.30 miles south of the intersection with SYLVAN CASCADE ROAD at segment 0250 offset 0295 to approximately 0.30 miles north of the intersection with SR 447 at segment 0240 offset CLARION COUNTY SR 68(375) #24890 PROPOSAL:$64.80 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ `For safety and intersection improvements, including additional traffic and turning lanes, signal replacements, drainage upgrades and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 68, SECTION 375, in Clarion COUNTY Monroe and Clarion TOWNSHIPS from approximately the I80 eastbound on/off ramp at EB segment 0560 offset 0679 and WB segment 0561 offset 0679 to approximately 1.3 miles south of Clarion at segment 0580 offset CENTRE COUNTY SR 445(A04) #88346 PROPOSAL:$15.48 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$27.30 The description and location of the project is as follows: For the improvement of certain sections of STATE HIGHWAY in CENTRE COUNTY, MILES TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 0445 SECTION A04. The project is situated as follows: On State Route 0445 from Segment 0050/Offset 3764 to Segment 0060/Offset 0331 approximately 2.0 miles North of the Village of Millheim. For the removal of the existing Single-Span Concrete Encased Steel I-Beam bridge and construction of its replacement Single Cell Precast Concrete Box Culvert, approach work consisting of superpave asphalt mixture designs for the binder and wearing course, guide rail, pavement markings, and miscellaneous construction for a construction length of approximately 425 feet (0.080 miles) as indicated on the approved drawings. ERIE COUNTY SR 19(15M) #98333 PROPOSAL:$21.24 PLANS:$ X18:$ X36:$93.60 For the construction or improvement of a certain section of STATE HIGHWAY in ERIE COUNTY, CITY OF ERIE, Commonwealth of Pennsylvania, STATE ROUTE 0019, SECTION 15M. This project being situated as follows, From the intersection with State Route 4016 (38 St.) at Segment 0390 Offset 0000 (Station ) then north to the intersection with State Route 0020 (26 St.) at Segment 0410 Offset 1685 (Station ). For the bituminous milling and resurfacing of a 4-lane roadway with Superpave Asphalt Mixture WMA Designs 52' to 58' in width, also for concrete curb, curb ramps, drainage, traffic signal, signs, and pavement markings all within a project length of 5, feet (1.043 miles) as indicated on the approved drawings. 3

4 SCHUYLKILL COUNTY SR 4034(M89) # PROPOSAL:$14.76 PLANS 8.5X11:$0.96 The project involves a bituminous overlay, cross slope correction, flexible base replacement, pavement markings and other miscellaneous items, as indicated on the approved drawings included in the bid package for SR 4034, Section M89, in Schuylkill County, Union Township from segment 0010 offset 0000 to segment 0060 offset The total construction distance is 2.59 miles (13,656 LF). ALLEGHENY COUNTY SR 0000(---) #99652 PROPOSAL:$22.56 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: This is a full Design Build roadway project. Design activities are limited to: Concrete curb ramps and utility coordination. For the detectable warning surface, bituminous pavement patching, curb and sidewalk, traffic signals, signing and pavement marking, and other miscellaneous construction, all within a length of 29,868 linear feet (5.656 miles), as indicated on the approved drawings included in the bid package for the 2018 ADA CURB RAMP PROJECT, in ALLEGHENY, BEAVER and LAWRENCE COUNTIES, VARIOUS MUNICIPALITIES, Commonwealth of Pennsylvania. This project being situated as follows: At various locations throughout Allegheny, Beaver and Lawrence Counties. MONTGOMERY COUNTY SR 3020(510) # Moved to 8/9/18 (orig 1/25/18, 2/15/18, 3/15/18, 4/12/18, 5/10/18, 6/7/18, 7/12/18) PROPOSAL:$ PLANS:$ X18:$ X36:$2, X-SEC:$ X18:$ X36:$ This project involves the reconstruction and widening of Markley Street (SR 3020) from south of Main Street to Elm Street, replacement of two bridges over Stony Creek with a single bridge, rehabilitation of the Markley Street/Elm Street stone arch bridge over Stony Creek, widening and reconstruction of Main Street (municipal road) between Water Street and Barbadoes Street, streetscaping on Main Street, widening of Marshall Street (municipal road) between Corson Street and Markley Street, railroad grade crossings upgrades at Main Street and Marshall Street including new gates and signals, new traffic signals at three intersections, Traffic Adaptive Signal Control Systems at seven traffic signals on Markley Street between Main Street and Johnson Highway (SR 3017), installation of ITS network elements on Markley Street and SR 0202 from Norristown Municipality to Lower Gwynedd Township, post construction stormwater management facilities, drainage improvements, sanitary sewer installation/relocation, concrete curb, concrete sidewalk, ADA curb ramps, pavement markings, signing, landscape plantings, highway lighting, and other miscellaneous construction, all as indicated on the drawings approved for STATE ROUTE 202, SECTION 510, in MONTGOMERY COUNTY Norristown Municipality from approximately 1550 feet south of the intersection of Main Street at segment 0030 offset 1715 to approximately the intersection of Johnson Highway (SR 3017) at segment 0080 offset SUSQUEHANNA COUNTY SR 1016(570) #9580 PROPOSAL:$33.96 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$46.80 Ex St:$ x18:$ x36:$39.00 For the rehabilitation and improvement of a certain section of STATE HIGHWAY in SUSQUEHANNA COUNTY, New Milford Township, Commonwealth of Pennsylvania, STATE ROUTE 1016, SECTION 570. The project being situated as follows: From a point approximately one (1) mile East from the intersection with US Route 11 (SR 0011) at Station 10+75, Bridge at Segment 0012/ Offset 0000 (STA ) to Segment 0012/ Offset 0066 ( ) and Culvert at Segment 0016 Off 0000 (STA ) to Segment 0016 Offset 0012 (STA ) to a point approximately one (1) mile West from the intersection with SR 0081 (I-81) at Station 18+50, along Montrose Street. The proposed project consists of an existing single span, steel girder bridge being replaced with a Single Span, Steel Plate Girder Bridge over the Norfolk Southern Railway. Also, Concrete Arch Culvert Rehabilitation work over Meylert Creek. Other proposed work includes roadway approach full depth bituminous paving, bituminous paving overlay, excavation, guiderail, landscaping, signing, pavement markings, temporary traffic control, temporary detour signing, E & S Control measures, bridge removal, miscellaneous concrete repair work and other miscellaneous construction for a total length of 725 ft., (0.137 mi.) as indicated on the approved plans included in the bid package. 4

5 BUCKS COUNTY SR 0000(B01) # PROPOSAL:$14.16 The description and location of the project is as follows: The milling and resurfacing with bituminous material, general maintenance of two local roadways (Township Line Road and Potter Lane) in Plumstead Township, Bucks County, Engineering District 6-0, Commonwealth of Pennsylvania. CLEARFIELD COUNTY SR 879(P28) # PROPOSAL:$34.56 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$54.60 The description and location of the project is as follows: For the improvement to bridges in CLEARFIELD COUNTY, CHEST, MORRIS, DECATUR, HUSTON, BURNSIDE, BRADFORD AND PIKE TOWNSHIPS, CHESTER HILL BOROUGH, Commonwealth of Pennsylvania, SR 0879-P28. For the preservation of seven bridges involving Type 2 and Type 3 deck repairs, rebar installation, concrete repairs, bridge joint sealing, neoprene strip seal dam replacement, and epoxy surface treatments for bridge decks. Work also includes Superpave Asphalt Mixture Designs for the base, binder and wearing courses, guide rail, pavement markings and miscellaneous construction for a total construction length of approximately 10,697 feet (2.03 miles) as indicated on the approved drawings included in the bid package. INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION ECMS ADVANCED INFORMATION LETTING AUGUST 9, 2018 WASHINGTON COUNTY SR 2011(000) #31091 PROPOSAL:$11.16 PLANS:$ X18:$ X36:$54.60 The description and location of the project is as follows. The design, fabrication, and delivery of a 12'-6" x 5'-0" Precast R.C. Box Culvert, at a department prepared site, as indicated on the approved drawing (S-34751) included in the bid package for STATE ROUTE 2011 SEGMENT 0230 OFFSET 0000 in WEST BETHLEHEM TOWNSHIP, WASHINGTON COUNTY. CHESTER COUNTY SR 322(CDB) #92733 PROPOSAL:$31.20 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ Ex St:$ x18:$ x36:$11.70 The description and location of the project is as follows: the replacement of the 2 span steel thru-girder structure with a 2 span concrete bulb tee beam structure on a new alignment. Project includes intersection improvements, signal upgrades, wetland mitigation, trail head improvements, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0322, SECTION CDB, in CHESTER COUNTY East and West Bradford Townships from approximately Sugars Bridge intersection at segment 0430 offset 1796 to approximately Skelp Level Road at segment 0440 offset MONTGOMERY COUNTY SR 3016(218) #96218 PROPOSAL:$57.00 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: This project includes traffic signal upgrades including, new signal standards, mast arms, video detection, emergency pre-emption equipment, traffic signal heads, pedestrian signal heads, and pedestrian push buttons including, signage, striping, and the construction of ADA curb ramps at various intersections along SR 3016 (Fayette Street) and SR 3013/3058 (Elm Street), and other miscellaneous construction, as indicated, on the approved drawings included in the bid package for STATE ROUTE 3016, SECTION 218, in MONTGOMERY COUNTY, CONSHOHOCKEN BOROUGH from approximately W. Elm Street at segment 0050 offset 2686 to approximately Eleventh Avenue at segment 0077 offset

6 MERCER COUNTY SR 318(B04) #1817 PROPOSAL:$18.96 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$23.40 The description and location of the project is as follows: For the Superstructure replacement over Little Neshannock Creek, Also for construction of new roadway approaches using Superpave Asphalt Mixture Designs, guiderail, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0318, SECTION B04, in MERCER COUNTY, LACKAWANNOCK and EAST LACKAWANNOCK TOWNSHIP from segment 0230 offset 2559 to segment 0240 offset ALLEGHENY COUNTY SR 3017(A04) # PROPOSAL:$28.68 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$39.00 The description and location of the project is as follows: For the bridge rehabilitation, deck replacement, substructure repairs, painting structural steel, bituminous approach, drainage, guide rail, pavement marking, and other miscellaneous construction, all within a length of linear feet (0.082 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 3017, SECTION A04 (Gill Hall Road), in ALLEGHENY COUNTY, JEFFERSON HILLS BOROUGH, Commonwealth of Pennsylvania. This project being situated as follows: From a point approximately 485 feet east of Piney Fork Road (SR 3014) at Segment 0030 Offset 2797 (Station 70+95) to a point approximately 50 feet west of Piney Fork Road (SR 3014) at Segment 0040 Offset 0060 (Station 76+30). ELK COUNTY SR 255(A02) #85153 PROPOSAL:$18.00 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$70.20 The description and location of the project is as follows: For the improvement of a certain section of STATE HIGHWAY in ELK COUNTY, CITY OF SAINT MARYS, Commonwealth of Pennsylvania, STATE ROUTE 0255, Section A02. The project being situated as follows: On State Route 0255 at the intersection with W. Joseph Road over Silver Run, from Segment 0360 offset 1358 to segment 0360 offset 0758 for a total construction length of approximately 400 feet (0.08 miles). Construction includes replacing the existing concrete arch culvert with a 14'-0" x 12'-6" single cell precast concrete box culvert. Construction involves usage of bituminous base, binder, and wearing course, guide rail installation, piping installation, pavement markings and miscellaneous construction as indicated on the approved drawings included in the bid package. MONTGOMERY COUNTY SR 0000(LBT) # PROPOSAL:$21.84 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$11.70 The description and location of the project is as follows: Construction of a bituminous multiuse trail and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0000, SECTION LBT, in MONTGOMERY COUNTY LANSDALE BOROUGH from approximately Main Street and Railroad Avenue to approximately the Andale Green Development property line. FRANKLIN COUNTY SR 696(013) #91001 PROPOSAL:$20.40 PLANS:$ X18:$ X36:$ Construction activities include pavement resurfacing, milling, guiderail updates, signing & pavement marking updates, minor drainage updates, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for: STATE ROUTE 0533, SECTION 005, in FRANKLIN and CUMBERLAND COUNTIES, SOUTHAMPTON TOWNSHIP, ORRSTOWN & SHIPPENSBURG BOROUGHS, from Campbell Circle at Segment 0100 Offset 1306 to 1,450 feet west of Muddy Run at Segment 0140 Offset 0527, and from west of Westover Road at Segment 0210 Offset 0386 to W. King Street (SR 0011) at Segment 0010 Offset 1338, for an overall length of 11, linear feet (2.099 miles). Also included in the Bid Package is: STATE ROUTE 0696, SECTION 013, in FRANKLIN and CUMBERLAND COUNTIES, SOUTHAMPTON & SHIPPENSBURG TOWNSHIPS, SHIPPENSBURG BOROUGH, from 850 feet west of United Drive (Sheetz) at Segment 0090 Offset 1930 to W. King Street (SR 0011) at Segment 0020 Offset 1109, for an overall length of 15, linear feet (2.955 miles). The overall total length is 26, linear feet (5.055 miles). 6

7 WAYNE COUNTY SR 590(603) #57868 PROPOSAL:$13.56 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$58.50 For the rehabilitation and improvement of a certain section of STATE HIGHWAY in WAYNE COUNTY, Salem Township, Commonwealth of Pennsylvania, STATE ROUTE 0590, SECTION 603. The project consists of the improving of safety at the intersection which includes trucks turning at the intersection. Also, the adding of a turning lane to improve traffic congestion. Other work includes bituminous pavement, drainage and pavement markings, all work contained within an overall project length of 1485 linear feet (0.281 mile) as indicated on the approved drawings included in the bid package. CUMBERLAND COUNTY SR 581(013) # PROPOSAL:$26.64 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ This project consists of widening the shoulder and travel lanes, installing two traffic signals at the top of the ramps, new storm water basins, earthwork, minor utility work, updated guiderail, ADA ramps, pavement markings, signs, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0581, SECTION 013, in CUMBERLAND COUNTY, HAMPDEN TOWNSHIP, from Segment 0020 Offset 0000 to Segment 0021 Offset 2640, for an overall project length of 2, linear feet (0.473 mile). LUZERNE COUNTY SR 0000(LOC) #8606 PROPOSAL:$16.44 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ For the rehabilitation and improvement of a certain section of HIGHWAY in LUZERNE COUNTY, JACKSON TOWNSHIP, Commonwealth of Pennsylvania, CHASE ROAD County Rd 13, SECTION LOC. The project being situated as follows: From the intersection with SR 1005 NORTHEAST along County Road #13 5, linear feet (1.059 mile) to the intersection with Hillside Road. The scope of work includes the widening of the existing cartway, milling, replacing existing guiderail, the cleaning of existing cross pipes with the addition of new end sections, cleaning of existing ditches, and driveway / side road adjustments. It is miles of roadway. MPT will be comprised of multiple flagging operations. INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION 7

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JULY 12, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JULY 12, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated July 9, 2018 BUCKS COUNTY SR 1017(SC1) #15341 PROPOSAL:$22.80 This project is for the applying of seal coat to existing bituminous roadway on various state routes (32.33 segment miles) in Bucks

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated May 4, 2018 FULTON COUNTY SR 0000(FMC) #109343 PROPOSAL:$21.36 PLANS:$9.02 12X18:$11.07 24X36:$159.90 X-SEC:$7.48 12X18:$9.18 24X36:$132.60 This project involves

More information

11, 2019 MONTOUR COUNTY SR 2006(026) # PROPOSAL:$16.56 PLANS:$ X18:$ X36:$19.50

11, 2019 MONTOUR COUNTY SR 2006(026) # PROPOSAL:$16.56 PLANS:$ X18:$ X36:$19.50 Updated February 11, 2019 MONTOUR COUNTY SR 2006(026) #112211 PROPOSAL:$16.56 PLANS:$1.10 12X18:$1.35 24X36:$19.50 The description and location of the project are as follows: Emergency repairs due to flood

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated June 27, 2016 BEAVER COUNTY SR 7446(LBB) #92912 PROPOSAL:$54.72 PLANS:$42.46 12X18:$52.11 24X36:$752.70 EXSTRUCT:$48.62 12X18:$59.67 24X36:$861.90 The description and location of the project is

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MARCH 1, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MARCH 1, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) As of February14, 2018 SNYDER COUNTY SR 2007(012) #93607 PROPOSAL:$16.56 PLANS:$4.40 12X18:$5.40 24X36:$78.00 The description and location of the project are as follows: The work is the furnishing and

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION JUNE 5, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION JUNE 5, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated on May 19, 2014 VENANGO COUNTY SR 308(DOI) #96906 PROPOSAL:$13.44 PLANS:$3.96 For the bituminous milling and resurfacing of various state routes throughout VENANGO COUNTY, Commonwealth of Pennsylvania,

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 Updated June 30, 2014 LUZERNE COUNTY SR 309(W02) #102354 PROPOSAL:$25.20 PLANS:$6.24 The description and location

More information

BEAVER COUNTY SR 68(B38) # PROPOSAL:$26.64 PLANS:$ X18:$ X36:$222.30

BEAVER COUNTY SR 68(B38) # PROPOSAL:$26.64 PLANS:$ X18:$ X36:$222.30 ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MARCH 29, 2018 Update March 13, 2018 CHESTER COUNTY SR 23(ELV) #107680 PROPOSAL:$22.80 PLANS:$32.56 12X18:$39.96 24X36:$577.20

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 1, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 1, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated November 15, 2016 BEAVER COUNTY SR 588(B18) #91922 PROPOSAL:$22.80 PLANS:$18.04 12X18:$22.14 24X36:$319.80 X-SEC:$3.52 12X18:$4.32 24X36:$62.40 The description and location of the project is as

More information

GREENE COUNTY - SR 221(J10) # PROPOSAL:$11.76 PLANS:$ X18:$ X36:$47.10

GREENE COUNTY - SR 221(J10) # PROPOSAL:$11.76 PLANS:$ X18:$ X36:$47.10 ASSOCIATED PENNSYLVANIA CONSTRUCTORS Update January 3, 2018 GREENE COUNTY - SR 221(J10) #105392 PROPOSAL:$11.76 PLANS:$4.18 12X18:$5.13 24X36:$47.10 The description and location of the project is as follows:

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION AUGUST 10, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION AUGUST 10, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated July 21, 2017 ALLEGHENY COUNTY SR 0000 #109397 PROPOSAL:$28.56 The description and location of the project is as follows: This work is the 3-year term maintenance if intelligent transportation

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JULY 26, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JULY 26, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated July 23, 2018 LACKAWANNA COUNTY SR 8031(WWR) #109012 Moved to 7/26/18 from 7/12/18 PROPOSAL:$14.40 PLANS 8.5x11:$4.80 For the rehabilitation and improvement of certain sections of Varies STATE

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 22, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 22, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 22, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated December 5, 2016 SCHUYLKILL COUNTY SR 4027(M89) #99482 PROPOSAL:$21.60 PLANS:$1.68

More information

SCHUYLKILL COUNTY SR 125(JFR) # PROPOSAL:$20.76 PLANS 8.5X11:$1.20

SCHUYLKILL COUNTY SR 125(JFR) # PROPOSAL:$20.76 PLANS 8.5X11:$1.20 SCHUYLKILL COUNTY SR 125(JFR) #111844 PROPOSAL:$20.76 PLANS 8.5X11:$1.20 The emergency project consists of rock protection and underpinning of the piers to prevent future scouring and other miscellaneous

More information

CENTRE COUNTY SR 26(ST1) # PROPOSAL:$21.00 PLANS:$ X18:$ X36:$70.20

CENTRE COUNTY SR 26(ST1) # PROPOSAL:$21.00 PLANS:$ X18:$ X36:$70.20 Updated January 25, 2016 CENTRE COUNTY SR 26(ST1) #104647 PROPOSAL:$21.00 PLANS:$3.96 12X18:$4.86 24X36:$70.20 The description and location of the project is as follows: For the improvement of certain

More information

14, 2019 MERCER COUNTY SR 173(491) # PROPOSAL:$11.40 PLANS:$5.40 X-SEC:$ X18:$ X36:$39.00

14, 2019 MERCER COUNTY SR 173(491) # PROPOSAL:$11.40 PLANS:$5.40 X-SEC:$ X18:$ X36:$39.00 Updated January 14, 2019 MERCER COUNTY SR 173(491) #100019 PROPOSAL:$11.40 PLANS:$5.40 X-SEC:$2.20 12X18:$2.70 24X36:$39.00 For the construction or Improvement of a certain section of STATE HIGHWAY in

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION APRIL 6, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION APRIL 6, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated March 20, 2017 ALLEGHENY COUNTY SR 3088(05) #106380 PROPOSAL:$23.40 PLANS:$11.88 12X18:$14.58 24X36:$210.60 EXSTRUCT:$3.08 12X18:$3.78 24X36:$54.60 The description and location of the project is

More information

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION Updated November 17, 2008 PHILADELPHIA COUNTY SR 30(ADA) PROPOSAL:$14.40 The description and location of the project is as follows: For the design and construction of ADA compliant concrete curb ramps

More information

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION Updated April 13, 2018 ALLEGHENY COUNTY SR 376(A65) #110880 PROPOSAL:$15.96 PLANS 8.5x11:$2.04 The description and location of the project is as follows: For the milling, resurfacing, pavement marking,

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION SEPTEMBER 11, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION SEPTEMBER 11, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated August 27, 2014 LEHIGH COUNTY SR 78(GSR) #91957 PROPOSAL:$22.56 PLANS:$24.20 12X18:$29.70 24X36:$429.00 The description and location of the project is as follows: This project is the replacement

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION MAY 24, 2012 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION MAY 24, 2012 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Update May 8, 2012 ALLEGHENY COUNTY SR 3048(A16) #74333 PROPOSAL:$44.88 PLANS:$7.26 12X18:$8.91 24X6:$128.70 X-SEC:$0.66 12X18:$0.81 24X36:$11.70 The description and location of the project is as follows:

More information

DELAWARE COUNTY - SR 13(DD9) # PROPOSAL:$28.80

DELAWARE COUNTY - SR 13(DD9) # PROPOSAL:$28.80 ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING DECEMBER 21, 2017 Updated December 8, 2017 DELAWARE COUNTY - SR 13(DD9) #109039 PROPOSAL:$28.80 The description and location

More information

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION Updated January 30, 2018 ALLEGHENY COUNTY SR 1037(A03) #107983 PROPOSAL:$23.28 PLANS:$4.84 12X18:$5.94 24X36:$85.80 X-SEC:$4.40 12X18:$5.40 24X36:$78.00 24x36:$81.90 The description and location of the

More information

4, 2011 VENANGO COUNTY SR 428(SLD) #92815 PROPOSAL:$17.40 PLANS;$ X18:$ X36:$31.20 X-SEC:$ X18:$ X36:$50.

4, 2011 VENANGO COUNTY SR 428(SLD) #92815 PROPOSAL:$17.40 PLANS;$ X18:$ X36:$31.20 X-SEC:$ X18:$ X36:$50. ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated May 4, 2011 VENANGO COUNTY SR 428(SLD) #92815 PROPOSAL:$17.40 PLANS;$1.76 12X18:$2.16 24X36:$31.20 X-SEC:$2.86 12X18:$3.51 24X36:$50.70 For the construction

More information

BEAVER COUNTY SR 2012(EMP) #97889 PROPOSAL:$17.04 PLANS:$ X18:$ X36:$179.40

BEAVER COUNTY SR 2012(EMP) #97889 PROPOSAL:$17.04 PLANS:$ X18:$ X36:$179.40 Updated on April 28, 2014 BEAVER COUNTY SR 2012(EMP) #97889 PROPOSAL:$17.04 PLANS:$10.12 12X18:$12.42 24X36:$179.40 The description and location of the project is as follows: For milling, resurfacing,

More information

21, 2010 ALLEGHENY COUNTY SR 910(A24) #82614 PROPOSAL:$14.88 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$62.

21, 2010 ALLEGHENY COUNTY SR 910(A24) #82614 PROPOSAL:$14.88 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$62. Updated May 21, 2010 ALLEGHENY COUNTY SR 910(A24) #82614 PROPOSAL:$14.88 PLANS:$6.82 12X18:$8.37 24X36:$120.90 X-SEC:$3.52 12X18:$4.32 24X36:$62.40 The description and location of the project is as follows:

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 7, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 7, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated November 21, 2017 BEDFORD COUNTY - SR 000071 #106779 PROPOSAL:$13.92 PLANS:$6.82 12X18:$8.37 24X36:$120.90 The description and location of the project is as follows: This project is for the construction

More information

$600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000

$600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000 $600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000 $- Other Programs Highway Program $800,000,000 $700,000,000 $600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000

More information

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc. 2004 Specifications CSJ 0299-04-049, Etc. SPECIAL PROVISION 000---979 Detours, Barricades, Warning Signs, Sequence of Work, etc. 1. Description of Project. A. General. This project provides for the construction

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JUNE 22, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JUNE 22, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated June 6, 2017 LEHIGH COUNTY SR 1025(POC) #109335 PROPOSAL:$16.80 PLANS:$0.96 Project includes bituminous overlay, pavement markings, and other miscellaneous construction, as indicated on the approved

More information

Bridge Asset Management City of Battle Creek Planning and Projects

Bridge Asset Management City of Battle Creek Planning and Projects Bridge Asset Management City of Battle Creek Planning and Projects Michigan Bridge Conference, March 20, 2013 Gregory B. Rickmar P.E., Public Works Department, City of Battle Creek Alan Halbeisen, P.E.

More information

PennDOT District 11. Constructors Association of Western Pennsylvania March 5, Cheryl L. Moon-Sirianni, P.E. District Executive

PennDOT District 11. Constructors Association of Western Pennsylvania March 5, Cheryl L. Moon-Sirianni, P.E. District Executive PennDOT District 11 Constructors Association of Western Pennsylvania March 5, 2018 Cheryl L. Moon-Sirianni, P.E. District Executive Anticipated 2018 Lettings 118 Projects anticipated to be let in 2018

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA Central, Contract 3 DBNUM: 15419 / UPC: 154190 This contract will bring projects into compliance with current ADA design requirements that could

More information

Blueprint for One of the Nation s Largest SCM Maintenance Programs

Blueprint for One of the Nation s Largest SCM Maintenance Programs Blueprint for One of the Nation s Largest SCM Maintenance Programs PA Department of Transportation Hydrologic & Hydraulic Studies Waterway Permitting Stormwater Design & Permitting Technical Course Development

More information

LEVEL 1 ASSESSMENT FORM

LEVEL 1 ASSESSMENT FORM COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF SAFE DRINKING WATER LEVEL 1 ASSESSMENT FORM I. General Information PWS Name: PWSID #: Contact Name: Phone #: PWS Address: E-mail:

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM NY Susquehanna and Western Rail Line Bicycle/Pedestrian Path DBNUM: NS9803 / UPC: 058018 The 4.8 mile New York, Susquehanna, and Western Railway (NYS&W)

More information

Lehigh Valley Transportation Study

Lehigh Valley Transportation Study ITEM: IV-A Lehigh Valley Transportation Study SUBJECT: PA 33 Preservation SR 22-Belfast COUNTY... Northampton FED.-AID SYSTEM... On-NHS S.R./SEC.... 33/07M DECADE OF INVESTMENT... No A.D.T.... 25,463 CAPITAL

More information

Year Pre Total County Debt (Bonds & BANS) Mitigation Fees

Year Pre Total County Debt (Bonds & BANS) Mitigation Fees CR 9 (Bradt Hollow Road) Over Fox Creek Bridge Replacement Project Replacement of a 156 ft. long x 32ft. wide, 3 span pre stressed concrete box beam bridge over Fox Creek in the Town of Berne. The bridge

More information

City of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH)

City of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH) City of St. Catharines Standard Drawings SEPTEMBER 2018 Revised September 6, 2018 TES-ENG (SH) Roads Dwg No. Revision Standard Sidewalk Detail 110-2001 2 Monolithic Curb-Faced Sidewalk 110-2002 3 Sidewalk

More information

Straight Line Diagram. Montour 47. January 2019

Straight Line Diagram. Montour 47. January 2019 Straight Line Diagram Montour 47 January 2019 This document was produced by the Pennsylvania Department of Transportation (PENNDOT) as an internal management tool for State maintained highways and is not

More information

Straight Line Diagram. Cameron 12. January 2018

Straight Line Diagram. Cameron 12. January 2018 Straight Line Diagram Cameron 12 January 2018 This document was produced by the Pennsylvania Department of Transportation (PENNDOT) as an internal management tool for State maintained highways and is not

More information

Highway Construction Program

Highway Construction Program Highway Construction Program Monthly Delivery Progress Report Watch List October 2018 This report focuses on Capital Highway Program projects, which have, or may have significant changes in scope, schedule,

More information

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA 2008/09 $52.0 M 85% SELF-PERFORMED Widen 12 miles of Interstate 10 to six lanes including the reconstruction

More information

PROCEDURES FOR REVISIONS TO NATIONAL HIGHWAY SYSTEM CONNECTIONS TO MAJOR INTERMODAL FACILITIES

PROCEDURES FOR REVISIONS TO NATIONAL HIGHWAY SYSTEM CONNECTIONS TO MAJOR INTERMODAL FACILITIES PROCEDURES FOR REVISIONS TO NATIONAL HIGHWAY SYSTEM CONNECTIONS TO MAJOR INTERMODAL FACILITIES Pennsylvania Department of Transportation Transportation Planning Division April 2014 (Revised March 2018)

More information

PCL Definitions for the Local Program J01 3R Policy J04 3P Policy J06 Local Bridges and Township Bridge Program Bridge Work Activities

PCL Definitions for the Local Program J01 3R Policy J04 3P Policy J06 Local Bridges and Township Bridge Program Bridge Work Activities PCL Definitions for the Local Program Projects that are administered by the Central Bureau of Local Roads. Engineering, utilities and land acquisition are coded with the PCL for the type of construction

More information

PUBLIC INFORMATION MEETING June 24, 2015

PUBLIC INFORMATION MEETING June 24, 2015 Gallows Road (RTE. 650) over Arlington Boulevard (RTE. 50) Fairfax County Bridge Rehabilitation, Preventive Maintenance and Pier Repairs Phase 1 - Project No. 0650-029-235; UPC 106956, Pier Repair Phase

More information

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units)

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units) 10/16/2014 Construction Cost Estimation Preparation Manual for Preliminary Design (English Units) July 2002 Prepared by Construction Cost Estimating Unit Program Support Services 10/16/2014 Table of Contents

More information

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 2004 Specifications CSJ: 0932-01-076 SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 1.0 Description of Project 1.1. General. This project provides for the widening of

More information

GENERAL PERMIT NUMBER WMGR114

GENERAL PERMIT NUMBER WMGR114 Description: The approval herein granted is limited to: 1. the processing of spent polyethylene glycol slurry containing silicon and silicon carbide or diamond ( waste ) for beneficial use in fresh slurry

More information

NJTPA Transportation Improvement Program Fiscal Years

NJTPA Transportation Improvement Program Fiscal Years Routes Name: CR 571 Mileposts: 4.85 DBNUM: N1127 County Route 571/County Route 527, Reconstruction, Toms River Township This project is for intersection improvements at CR 571 and CR 527 in Tom s River

More information

Annual CSAH Needs Update for 2017

Annual CSAH Needs Update for 2017 Annual CSAH Needs Update for 2017 MnDOT - State Aid for Local Transportation CSAH Needs Unit These instructions provide guidance for updating CSAH Needs segments and project data using the SANeeds system.

More information

Annual CSAH Needs Update for 2018

Annual CSAH Needs Update for 2018 Annual CSAH Needs Update for 2018 MnDOT - State Aid for Local Transportation CSAH Needs Unit These instructions provide guidance for updating CSAH Needs segment and project data using the SANeeds system.

More information

PAVEMENT DESIGN MEMORANDUM

PAVEMENT DESIGN MEMORANDUM PAVEMENT DESIGN MEMORANDUM FOR SR 70 (15TH STREET EAST) ROUNDABOUT MANATEE COUNTY FINAL SUBMITTAL FPID 435090-1-52-01 PREPARED FOR: FLORIDA DEPT. OF TRANSPORTATION DISTRICT 1 FEBRUARY 16, 2018 PREPARED

More information

Construction Cost Estimation Preparation Manual (Metric Units)

Construction Cost Estimation Preparation Manual (Metric Units) 07/25/2001 Construction Cost Estimation Preparation Manual (Metric Units) July 2001 Prepared by Cost Estimating Unit Program Support Services 07/25/2001 Table of Contents Section Page 1.0 Introduction

More information

Conceptual Design Report

Conceptual Design Report Conceptual Design Report I-244/Arkansas River Multimodal Bridge Tulsa, Oklahoma Prepared for the Oklahoma Department of Transportation Prepared by: August 2009 I-244 / ARKANSAS RIVER MULTIMODAL BRIDGE

More information

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Electrical Work. NOV Embankments Over Swamps and Compressible Soils GENERAL & CONSTRUCTION S OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 100 OPS General Conditions of Contract DIVISION 1 - GENERAL S 106 Electrical Work 120 180 The Use of Explosives General Specification

More information

NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INST

NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INST NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INSTALL MANHOLE LIDS FLUSH WITH EXISTING GROUND SURFACE.

More information

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures Cumberland Viaduct Rehabilitation Project Contract No. AL4095180R Presenter Bob Bofinger MDSHA Office of Structures Project Justification & Improvements Condition State The deck, superstructure and substructure

More information

Project Type: Drainage and Storm Systems

Project Type: Drainage and Storm Systems 580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install

More information

Methodology for Defining Workforce Regions in the State System s Gap Analysis

Methodology for Defining Workforce Regions in the State System s Gap Analysis CLARION UNIVERSITY Methodology for Defining Workforce Regions in the State System s 2016-2026 Gap Analysis The purpose of this document is to lay out the methodology for defining the University Workforce

More information

LEVEL 2 ASSESSMENT FORM

LEVEL 2 ASSESSMENT FORM COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF SAFE DRINKING WATER LEVEL 2 ASSESSMENT FORM I. General Information PWS Name: PWSID #: Contact Name: Phone #: PWS Address: E-mail:

More information

Review of Plans and Specs from a Constructability Perspective

Review of Plans and Specs from a Constructability Perspective Review of Plans and Specs from a Constructability Perspective The Executive Regional Manager and the Project Manager, with approval of the Director of Project Management, may request the Constructability

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA Central, Contract 1 DBNUM: 15417 / UPC: 154170 This contract will bring projects into compliance with current ADA design requirements that could

More information

City of St. Catharines Standard Drawings JULY Revised July 21, 2017 TES-ENG (SH)

City of St. Catharines Standard Drawings JULY Revised July 21, 2017 TES-ENG (SH) City of St. Catharines Standard Drawings JULY 2017 Revised July 21, 2017 TES-ENG (SH) Roads Dwg No. Revision Standard Sidewalk Detail 110-2001 1 Monolithic Curb-Faced Sidewalk for Concrete Road 110-2002

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) Route 3, Route 46, Valley Road and Notch/Rifle Camp Road Interchange, Contract B DBNUM: 059B / UPC: 123020 From Notch/Rifle Camp Road to just east of the Valley Road Intersection, Route 46 will be widened

More information

STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS. 3 East Pulteney Square Bath, New York 14810

STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS. 3 East Pulteney Square Bath, New York 14810 STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS 3 East Pulteney Square Bath, New York 14810 County Route 22 over Canisteo River Bridge Replacement Project BIN 3333290 D035511 PIN 6755.06 ADDENDUM #1 October

More information

Information for File # RJH

Information for File # RJH Information for File #2011-01629-RJH Applicant: Matthew Ternes Corps Contact: Ryan Huber, U. S. Army Corps of Engineers, 211 North Broadway, Suite 221, Green Bay, Wisconsin 54303; ryan.j.huber@usace.army.mil;

More information

5/11/2016 SR 15 SECTION 088 CSVT SOUTHERN SECTION SR 15 SECTION 088 CSVT SOUTHERN SECTION AGENDA

5/11/2016 SR 15 SECTION 088 CSVT SOUTHERN SECTION SR 15 SECTION 088 CSVT SOUTHERN SECTION AGENDA PUBLIC OFFICIALS MEETING MAY 11, 2016 AGENDA I. INTRODUCTIONS V. CURRENT PROJECT STATUS VI. PROJECT SCHEDULE VII. UPCOMING ACTIVITIES VOPEN DISCUSSION & QUESTIONS IX. ACTION ITEMS 1 A. Bridge Lighting

More information

3.6 Construction Methods

3.6 Construction Methods Exhibit 144: Birchmount Stop Layout West Don River Bridge - Girders are adequate to accommodate LRT right-of-way and required deck widening. Supplementary support or deck strengthening may be required

More information

AUTOMATED PAVEMENT CONDITION SURVEY FIELD MANUAL PUBLICATION 336 APRIL 2017 PUB 336 (4-17)

AUTOMATED PAVEMENT CONDITION SURVEY FIELD MANUAL PUBLICATION 336 APRIL 2017 PUB 336 (4-17) AUTOMATED PAVEMENT CONDITION SURVEY FIELD MANUAL PUBLICATION 336 APRIL 2017 PREPARED BY: BUREAU OF MAINTENANCE AND OPERATIONS ASSET MANAGEMENT DIVISION P.O. Box 3437 HARRISBURG, PENNSYLVANIA 17105-3437

More information

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 29, Resurfacing of Aldrich Road West Contract # 11-06

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 29, Resurfacing of Aldrich Road West Contract # 11-06 TOWNSHIP OF HOWELL DEPARTMENT OF COMMUNITY DEVELOPMENT & LAND USE 4567 Route 9 North, 2 nd Floor Phone: (732) 938-4500 x2300 Post Office Box 580 Fax: (732) 414-3243 Howell, NJ 07731-0580 Web: www.twp.howell.nj.us

More information

Hosted by: M Squared Engineering on behalf of the Illinois Department of Transportation Thursday, February 9, 2012 Eiger Lab, Rockford, IL

Hosted by: M Squared Engineering on behalf of the Illinois Department of Transportation Thursday, February 9, 2012 Eiger Lab, Rockford, IL Hosted by: M Squared Engineering on behalf of the Illinois Department of Transportation Thursday, February 9, 2012 Eiger Lab, Rockford, IL TECHNICAL SUPPORTIVE SERVICES IN IDOT DISTRICTS 2 & 3 FOR CERTIFIED

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 57, Bridge over Branch Lopatcong Creek DBNUM: 16345 / UPC: 163450 Problem Statement submitted by BMS for Tier 1 Screening. It is recommended for

More information

BID ITEM WORKBOOK COSTARS-8 Maintenance, Repair, & Operation Equipment & Supplies ("MRO") BIDDER/CONTRACTOR DATA

BID ITEM WORKBOOK COSTARS-8 Maintenance, Repair, & Operation Equipment & Supplies (MRO) BIDDER/CONTRACTOR DATA COSTARS-8 Maintenance, Repair, & Operation Equipment & Supplies ("MRO") BIDDER/CONTRACTOR DATA BIDDER/CONTRACTOR'S LEGAL NAME: D/B/A NAME, IF APPLICABLE: BIDDER ADDRESS: COUNTY LOCATED IN: PA Legislative

More information

BID ITEM WORKBOOK COSTARS-6 Packaged Software BIDDER/CONTRACTOR DATA

BID ITEM WORKBOOK COSTARS-6 Packaged Software BIDDER/CONTRACTOR DATA BIDDER/CONTRACTOR DATA BIDDER/CONTRACTOR'S LEGAL NAME: D/B/A NAME, IF APPLICABLE: BIDDER ADDRESS: COUNTY LOCATED IN: 1102 15th Street SW, Suite 102 Auburn, WA 98001 King PA Legislative House District Number

More information

CLA /10.54, PID Project Description:

CLA /10.54, PID Project Description: Project Description: The proposed project will consist of widening IR 70 to three lanes from Enon Road (SLM 06.75) to the US 68 interchange ramps (SLM 10.55). IR 70 is a component of the Strategic Highway

More information

THE GOVERNOR GOVERNOR S OFFICE. Amendment to Proclamation

THE GOVERNOR GOVERNOR S OFFICE. Amendment to Proclamation 5346 THE GOVERNOR GOVERNOR S OFFICE September 18, 2004 in Allegheny, Armstrong, Butler and Washington Counties due to widespread and unusually severe storms, heavy rain, high winds and general population

More information

If so, you should reconsider your grazing management!

If so, you should reconsider your grazing management! Grazing Management Conservation solutions for your Pennsylvania farm Do you have problems with Bare ground or compacted soil in your pasture? Slow forage growth? Low quality pasture? Standing water after

More information

Berkshire Region TIP Project Data Form

Berkshire Region TIP Project Data Form BASIC INFORMATION: 1. TIP ID #: 2. MUNICIPALITY: 3. ROUTE# AND/OR NAME: Berkshire Region TIP Project Data Form 4. PROJECT TYPE (CHECK BEST DEFINITION OF PROJECT): Intersection Improvement Road Resurfacing

More information

SPECIAL CONDITIONS GENERAL PERMIT WMGM025

SPECIAL CONDITIONS GENERAL PERMIT WMGM025 A. Authorization: This general permit authorizes the grinding, shredding, crushing, screening and/or beneficial use of construction waste materials as follows: 1. Activity authorized at the permanent facility:

More information

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction Chapter 1 Bridge Design Manual General Design Information Section 1.02 Selection and Geometry Introduction Selection or Rehabilitation Report This section of the design manual provides guidance on the

More information

2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN

2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN 2016 STRUCTURE INSPECTION APPRAISAL REPORT Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN by K. SMART ASSOCIATES LIMITED 8 McIntyre Drive Kitchener ON N2R 1H6 August 2016

More information

ARCHITECT - ENGINEER QUALIFICATIONS ESCAMBIA COUNTY, FL

ARCHITECT - ENGINEER QUALIFICATIONS ESCAMBIA COUNTY, FL ARCHITECT - ENGINEER QUALIFICATIONS PART 1 - CONTRACT-SPECIFIC QUALIFICATIONS 1. TITLE AND LOCATION (City and State) Professional Services as Governed by Florida Statute 287.055 A. CONTRACT INFORMATION

More information

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017 VT 14 East Montpelier Bridge Project Informational Meeting February 22, 2017 Welcome & Introductions VTrans Mark Sargent, Project Manager Wayne Symonds, Structures Program Manager Chris Barker, Resident

More information

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013 ADDENDUM NO. 1 for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA Posting Date: June 20, 2013 BIDDERS SHALL CONFORM TO THE FOLLOWING CHANGES AS A PART OF THE BID DOCUMENTS, WHICH SHALL BECOME

More information

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016 Rt. 29 Solutions Project Delivery Advisory Panel February 18, 2016 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Feb

More information

175 th Street Quivira to Antioch (TH-1343) Preliminary Engineering Study Overland Park, KS

175 th Street Quivira to Antioch (TH-1343) Preliminary Engineering Study Overland Park, KS 175 th Street Quivira to Antioch (TH-1343) Preliminary Engineering Study Overland Park, KS June 2012 Prepared by: Public Works Department City of Overland Park, KS EXECUTIVE SUMMARY... 2 INTRODUCTION...

More information

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199))

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199)) 11060 White Rock Road, Suite 200 Rancho Cordova, CA 95670 Phone: (916) 363-4210 Fax: (916) 363-4230 M e m o r a n d u m To: Reena Gohil, Environmental Planner Date: May 30, 2017 California Department of

More information

IMPROVING I 81 IN MARYLAND

IMPROVING I 81 IN MARYLAND IMPROVING I 81 IN MARYLAND April 25, 2017 Stephen A. Bucy, P.E. Improving I 81 in Maryland Overview: Facts SHA s Comprehensive I 81 Strategy Current Phase 1 Widening Project Update Closing Improving I

More information

I-91 Viaduct Public Information Briefing

I-91 Viaduct Public Information Briefing I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 9 September 13, 2017 Agenda Welcome and Presenter Introductions Update on Construction and Demolition

More information

Northeast Bridge Preservation Partnership Meeting

Northeast Bridge Preservation Partnership Meeting Northeast Bridge Preservation Partnership Meeting Superstructure Preservation Strategies Aetna Viaduct Superstructure Repairs Route I-84 City of Hartford, CT State Project No. 63-648 David A. Cutler, P.E.

More information

8 PROJECT IMPLEMENTATION

8 PROJECT IMPLEMENTATION 8 PROJECT IMPLEMENTATION 8.1 Opinions of Costs The construction cost estimate for Grant Road Improvement Plan, based on quantities from the 30 percent construction plans is $102,120,380 in 2008 dollars.

More information

Maine Turnpike Authority

Maine Turnpike Authority PAVEMENT REHABILITATION & CLEAR ZONE IMPROVEMENTS MM 80.7 TO MM 88.6 202.121 Removing Existing Concrete (6CY) 1.00 LS 202.127 Removing of Existing Bituminous Pavement (470 SY) 1.00 LS 202.202 Removing

More information

Capital District Transportation Committee November 6, Unit Costs for Non-State Highway Reconstructions with Federal Funds

Capital District Transportation Committee November 6, Unit Costs for Non-State Highway Reconstructions with Federal Funds Capital District Transportation Committee November 6, 2018 Unit Costs for Non-State Highway Reconstructions with Federal Funds CDTC s unit costs for non-state reconstruction projects were last updated

More information

STATE AID GUIDE FOR: Updated: December 16, 2005

STATE AID GUIDE FOR: Updated: December 16, 2005 STATE AID GUIDE FOR: Updated: December 16, 2005 1. AFTER THE FACT RIGHT OF WAY DEPARTMENT OF MINNESOTA TRANSPORTATION 2. MISCELLANEOUS AFTER THE FACT Traffic Signals, Lighting, Retaining Walls, Sidewalk,

More information

Commonwealth of Pennsylvania

Commonwealth of Pennsylvania Commonwealth of Pennsylvania Date: April 1, 2016 Subject: Children's Health Insurance Program Outreach Solicitation Number: RFQ 6100037762 Opening Date/Time: April 4, 2016 5:00 PM Addendum Number: 1 To

More information

TH 25 Bituminous Mill, Full Depth Reclamation and Overlay SP &

TH 25 Bituminous Mill, Full Depth Reclamation and Overlay SP & TH 25 Bituminous Mill, Full Depth Reclamation and Overlay SP 4910-29 & 0504-14 Contract No. 1002252 Project Overview is in need of professional and technical assistance to provide detail design for State

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) Route 23, Alexander Road to Maple Lake Road DBNUM: 11424 / UPC: 114240 Initiated from the Pavement Management System, this project will resurface within the project limits. ADA upgrades and guiderail repair

More information

For Public Input Period

For Public Input Period 20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: Kingwood Drive N100011 Loop 494 to Woodland Hills Project Description Project provides for the ROW acquisition,

More information

District 2 System Preservation Projects for FY 17 and FY 18

District 2 System Preservation Projects for FY 17 and FY 18 District 2 System Preservation Projects for FY 17 and FY 18 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer Project Development Bret Hadzimichalis Assistant District