SUPPLEMENTAL ECMS ADVANCED INFORMATION MAY 24, 2012 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Size: px
Start display at page:

Download "SUPPLEMENTAL ECMS ADVANCED INFORMATION MAY 24, 2012 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)"

Transcription

1 Update May 8, 2012 ALLEGHENY COUNTY SR 3048(A16) #74333 PROPOSAL:$44.88 PLANS:$ X18:$ X6:$ X-SEC:$ X18:$ X36:$11.70 The description and location of the project is as follows: For the bituminous pavement, drainage, guide rail, pavement marking, box culvert replacement, and other miscellaneous construction, all within a length of linear feet (0.043 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 3048, SECTION A16 (Noblestown Road), in ALLEGHENY COUNTY, OAKDALE BOROUGH, NORTH FAYETTE TOWNSHIP, Commonwealth of Pennsylvania. This project being situated as follows: From a point on T-878 (Noblestown Road) approximately 500 feet north of Linden Lane at Station to a point approximately 50 feet east of Gormley Avenue at Segment 0060 Offset 0189 (Station ). MBE 3%, WBE 3%, Anticipated Notice to Proceed , Required Completion BEAVER COUNTY SR 376(B05) #94644 PROPOSAL:$16.92 PLANS:$ X18:$ X36:$89.70 EXSTRUCT:$ X18:$ X36:$ The description and location of the project is as follows: For the bridge preservation including expansion dam replacement, painting structural steel, concrete substructure repair, bituminous approach milling and resurfacing, drainage, guide rail, temporary concrete barrier, pavement marking, and other miscellaneous construction, all within a length of 300 linear feet (0.06 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 0376, SECTION B05 (Beaver Valley Expressway), in BEAVER COUNTY, HOPEWELL TOWNSHIP, Commonwealth of Pennsylvania. This project being situated as follows: From a point 250 feet south of Bryson Road (SR 3024) at Segment 0460/0461 Offset 2384/2270 (Station ) to a point approximately 250 feet north of Bryson Road (SR 3024) at Segment 0460/0461 Offset 1884/1770 (Station ). MBE 2%, WBE 3%, Anticipated Notice to Proceed , Required Completion ALLEGHENY COUNTY SR 0(TEH) #77212 PROPOSAL:$41.04 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: For the excavation, limestone select material surfacing, landscaping, signage and other miscellaneous construction, all within a length of 1, linear feet (0.235 miles) as indicated on the approved drawings included in the bid package for FRICK PARK TRAIL, EXTENSION 9 MILE in ALLEGHENY COUNTY, CITY OF PITTSBURGH, Commonwealth of Pennsylvania. This project is situated as follows: From Old Browns Hill Road at STA to a point approximately 1240 feet north of Old Browns Hill Road at STA DBE 8%, Anticipated Notice to Proceed , Required Completion Update May 3, 2012 ARMSTRONG COUNTY #95392 PROPOSAL:$6.00 PLANS:$1.92 The description and location of the project is as follows: For the microsurfacing and miscellaneous in Armstrong and Indiana COUNTIES, Mahoning, Wayne, and South Mahoning TOWNSHIPS epair/replacement of guiderail throughout Indiana County. MBE 1%, WBE 1%, Anticipated Notice to Proceed , Required Completion

2 MCKEAN COUNTY SR 246(A01) #82197 PROPOSAL:$10.80 PLANS:$ X18:$ X36:$74.10 The description and location of the project is as follows: This work is the furnishing and placement of a 14'-0" x 5'-6" precast reinforced concrete box culvert and inlet and outlet sections over Tributary to Kendall Creek at a Department prepared site all within a length of 120 linear feet (0.023 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 0246, SECTION A01 from approximately miles east of the intersection with State Route 0046 at Segment 0580 Offset 0000 in FOSTER TOWNSHIP, MCKEAN COUNTY. MBE 1%, WBE 2%, Anticipated Notice to Proceed , Required Completion INDIANA COUNTY SR 217(SC2) #95371 PROPOSAL:$4.32 PLANS:$3.12 The description and location of the project is as follows: For the Seal Coating of various State Routes in Indiana County, various municipalities and other miscellaneous construction. MBE 3%, WBE 3%, Anticipated Notice to Proceed , Required Completion ARMSTRONG COUNTY - #90574 PROPOSAL:$5.40 PLANS:$2.88 This is an ECMS project. All Addenda will be electronically posted. Place for delivery of diskette bid before 11:00 a.m. prevailing local time on the scheduled let date: PENNDOT CONTRACT AWARDS ROOM, 7TH FLOOR; COMMONWEALTH KEYSTONE BUILDING; 400 NORTH STREET; HARRISBURG PA MBE 0%, WBE 0%, Anticipated Notice to Proceed , Required Completion BUTLER COUNTY - #90575 PROPOSAL:$5.40 PLANS:$2.76 The description and location of the project is as follows: For the repair/replacement of guiderail throughout Butler County. MBE 0%, WBE 0%, Anticipated Notice to Proceed , Required Completion CLARION COUNTY - #90676 PROPOSAL:$5.40 PLANS:$2.76 The description and location of the project is as follows: For the repair/replacement of guiderail throughout Clarion County. MBE 0%, WBE 0%, Anticipated Notice to Proceed , Required Completion INDIANA COUNTY - #90577 PROPOSAL:$5.52 PLANS:$3.00 The description and location of the project is as follows: For the repair/replacement of guiderail throughout Indiana County. MBE 0%, WBE 0%, Anticipated Notice to Proceed , Required Completion JEFFERSON COUNTY - #90578 PROPOSAL:$5.28 PLANS:$ X18:$ X36:$74.10 The description and location of the project is as follows: For the repair/replacement of guiderail throughout Jefferson County. MBE 0%, WBE 0%, Anticipated Notice to Proceed , Required Completion Update April 30, 2012 TIOGA COUNTY SR 4007(003) #7263 PROPOSAL:$11.52 PLANS:$ X18:$ X36:$89.70 X-SEC:$ X18:$ X36:$54.60 The description and location of the project are as follows: The work is the furnishing and installation of a 24-0 x 7-3 1/2 precast rigid frame culvert and inlet and outlet wing sections over California Brook at a Department prepared site all within a length of linear feet (0.076 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 4007, SECTION 003 from approximately 0.25 miles north of the intersection with State Route 49 at Segment 0010 Offset 1320 to approximately 0.35 miles north of the intersection with State Route 49 at Segment 0010 Offset 1872 in WESTFIELD TOWNSHIP, TIOGA COUNTY. MBE 1%, WBE 1%, Anticipated Notice to Proceed , Required Completion

3 SNYDER COUNTY SR 522(49E) #87127 PROPOSAL:$17.64 PLANS:$ X18:$ X36:$ Construct sidewalks, curb ramps, and install traffic control devices, etc., as part of this Safe Routes to School Project, sponsored by the Selinsgrove Area School District. DBE 3%, Anticipated Notice to Proceed , Required Completion CHESTER COUNTY SR (081) #94827 PROPOSAL:$14.40 The description and location of the project is as follows: The milling and resurfacing with bituminous material, ADA curb ramps and general maintenance of various state roadways throughout Chester County, Engineering District 6-0, Commonwealth of Pennsylvania. MBE 4%, WBE 5%, Anticipated Notice to Proceed , Required Completion CLARION COUNTY SR 80(MS2) #95223 PROPOSAL:$8.40 PLANS:$2.52 The description and location of the project is as follows: Patching, microsurface treatment and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 80, SECTION MS2, in Clarion COUNTY Clarion TOWNSHIP and Jefferson COUNTY Union TOWNSHIP from approximately (Clarion County) segment 0624 offset 1167 to segment 0720 offset 2430 EB and segment 0625 offset 0864 to segment 0721 offset 2351 WB and (Jefferson County) from segment 0724 offset 0000 to segment 0724 offset 0100 EB and segment 0725 offset 0000 to segment 0725 offset 0100 WB. DBE 4%, Anticipated Notice to Proceed , Required Completion MIFFLIN COUNTY SR 2002(A04) #85298 PROPOSAL:$10.20 PLANS:$ X18:$ X36:$70.20 The description and location of the project is as follows: This work is the furnishing and placement of a 11'-0" x 4'-6" precast reinforced concrete box culvert and inlet and outlet sections over Trib. Jacks Creek at a Department prepared site, the paving of 114 feet and the furnishing and placement of guide rail all within a length of 153 linear feet (0.029 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 2002, SECTION A04, in MIFFLIN COUNTY, DECATUR TOWNSHIP from approximately miles west of SR 2001 segment 0060 offset 1447 at approximately segment 0290 offset 1660 to approximately segment 0290 offset MBE 1%, WBE 2%, Anticipated Notice to Proceed , Required Completion Update April 24, 2012 FRANKLIN COUNTY SR 4007(009) #63172 PROPOSAL:$15.60 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$46.80 The proposed work consists of the replacement of the single-lane two-span closed spandrel masonry arch bridge carrying SR 4007 (Back Road) over the Narrows Branch of the Tuscarora Creek with a two-lane, two-span precast concrete arch structure. Additional work includes reconstruction of approximately 315 linear feet of roadway on the south approach and 265 linear feet of roadway on the north approach, overlaying of approximately 545 linear feet of roadway on the north approach to the intersection with PA 75, guide rail & drainage improvements, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 4007, SECTION 009, in FRANKLIN COUNTY, FANNETT TOWNSHIP, from Segment 0130 Offset 2137 to the intersection with PA 75 at Segment 0130 Offset 3432, for an overall project length of linear feet (0.230 mile). DBE 6%, Anticipated Notice to Proceed , Required Completion MONTGOMERY COUNTY SR 73(M11) #93442 PROPOSAL:$18.36 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: Repair of four (4) bridges, including design/build permitting, unforseen bridge repairs, and othre miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 73 SECTION M11 (2 locations), STATE ROUTE 152 SECTION M11 and STATE ROUTE 1022 SECTION M11 in MONTGOMERY COUNTY. MBE 4%, WBE 4%, Anticipated Notice to Proceed , Required Completion

4 HUNTINGDON COUNTY SR 7206(SMB) #92121 PROPOSAL:$18.96 PLANS:$ X18:$ X36:$93.60 X-SEC:$ X18:$ X36:$7.80 The description and location of the project is as follows: This project involves the rehabilitation of Huntingdon County Bridge No. 8 (St. Mary s Bridge) over Shade Creek in order to prolong the life of the bridge while maintaining the historical aesthetics of the structure. This project includes sandblasting and painting of the existing steel beams and other exposed rusted steel superstructure components. The deteriorated timber components will be replaced and all the remaining timber components will be cleaned and painted. The entire timber wearing surface, the timber curb, and the nail laminated deck will also be replaced. Also, any loose tin roof sheets will be secured and a tar coating applied to the entire roof. Any cracks in the existing substructure will be repaired by pressure mortar pointing and the anchor rods will be tightened or replaced. The contractor will be required to jack-up the structure to repair/replace the bearings at both abutments and repair a sag in the truss. Roadway work will be limited to milling the existing approach roadway and laying a new layer of bituminous wearing surface for a distance of 10 feet from both ends of the bridge and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 7206, SECTION SMB, in HUNTINGDON COUNTY, CROMWELL TOWNSHIP at the following locations: STATION TO STATION DBE 7%, Anticipated Notice to Proceed , Required Completion CHESTER COUNTY SR 29(AL2) #70227 PROPOSAL:$26.16 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ The description and location of the project is as follows: Improvements at three signalized intersections along Morehall Road. The roadway is proposed to be widened to allow for two through lanes and auxiliary turn lanes to accommodate the PA Turnpike Slipramp Project and projected future volumes. Project includes new stormwater management facilities, drainage and guide rail improvements and other miscellaneous construction within a length of 5491 linear feet all as indicated on the drawings approved on December 21, 2011 for STATE ROUTE 0029, SECTION AL2, in CHESTER COUNTY Charlestown and East Whiteland Townships from approximately 500 ft south of Yellow Springs Rd at segment 0060 offset 0621 to approximately 1500 north of Phoenixville Pike at segment 0080 offset WBE 5%, WBE 5%, Anticipated Notice to Proceed , Required Completion Update April 23, 2012 FRANKLIN COUNTY SR 533(003) #19406 PROPOSAL:$15.12 PLANS;$ X18:$ X36:$ X-SEC:$ X18:$ X36:$35.10 EXSTRUCT:$ X18:$ X36:$11.70 This project involves the replacement of the existing three-span steel bridge over Muddy Run with a two-span prestressed concrete bridge and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0533, SECTION 003, in FRANKLIN COUNTY, SOUTHHAMPTON TOWNSHIP, from Segment 0140 Offset 1438 to Segment 0150 Offset 0764, for an overall project length of 1, linear feet (0.193 mile). MBE 3%, WBE 3%, Anticipated Notice to Proceed , Required Completion MCKEAN COUNTY - #87152 PROPOSAL:$11.28 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ The description and location of the project is as follows: For the replacement of sidewalks along several local streets in McKEAN COUNTY, CITY OF BRADFORD, Commonwealth of Pennsylvania, SCHOOL STREET, SECTION BRD. The project being situated as follows: In the City of Bradford along School Street, North Center Street, Howard Street, Merrow Avenue, Pearl Street, Bank Street and Mechanic Street for a construction length of approximately 3904 feet (0.739 miles). Construction involves installation of cement concrete sidewalks, Superpave Asphalt Mixture Designs for the base and wearing courses, concrete curb, 12 inch pipe, an inlet, and miscellaneous construction as indicated on the approved drawings included in the bid package. DBE 3%, Anticipated Notice to Proceed , Required Completion

5 WYOMING COUNTY SR 6(791) #70153 PROPOSAL:$9.72 PLANS:$ X18:$ X36:$74.10 For the improvement of a certain section of STATE HIGHWAY in WYOMING COUNTY, TUNKHANNOCK BOROUGH, Commonwealth of Pennsylvania, STATE ROUTE 0006, SECTION 791. This project is the building of a park and ride lot in Tunkhannock Borough. Work includes bituminous pavement, drainage, sidewalk with ada ramps and line painting, all contained within an overall project length of linear feet as indicated on the approved drawings included in the bid package. DBE 5%, Anticipated Notice to Proceed , Required Completion LUZERNE COUNTY SR (PH2) #90129 PROPOSAL:$13.08 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: This project is for THE DELAWARE & LEHIGH NATIONAL HERITAGE CORRIDOR D&L TRAIL PHASE II in DENNISON TOWNSHIP, LUZERNE COUNTY, in the COMMONWEALTH OF PENNSYLVANIA. This project involves the conversion of the previous alignment of a railroad into a pedestrian trail. The work includes bituminous pavement, split rail fencing and landscaping. DBE 4%, Anticipated Notice to Proceed , Required Completion LUZERNE COUNTY SR 2041(351) #67451 PROPOSAL:$16.56 PLANS:$ X18:$ X36:$50.70 This is a Design\ Build Project. For the rehabilitation and improvement of a certain section of STATE HIGHWAY in LUZERNE COUNTY, DENNISION TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 2041, SECTION 351. The project being situated as follows: From a point approximately 8.5 miles Southwest of the intersection with SR 0115 at Segment 0040/ Offset 2325 (Station ) to a point approximately 2 miles Northeast from the intersection with SR 0940 at Segment 0050/ Offset 0295 (Station ), along SR This is a Design\ Build project consisting of the Steel Superstructure replacement over the Wright Creek. Other proposed work includes the Design\ Build of Roadway, Design\ Build of Traffic Control, bridge removal, temporary excavation & support and other miscellaneous construction & bridge repair for a total length of 525 ft., (0.099 mi.) as indicated on the approved plans included in the bid package. MBE 2%, WBE 2%, Anticipated Notice to Proceed , Required Completion BERKS COUNTY SR 0(COR) #74545 PROPOSAL:$8.52 PLANS:$2.04 The description and location of the project is as follows: The proposed project consist of roadway rehabilitation (mill and overlay and some other miscellaneous construction), as indicated on the approved drawings included in the bid package for the City of Reading, in BERKS COUNTY, of North 6th Street from Amity Street to Heister's Lane, and Bern Street from 5th to 6th Streets for a total approximate length of 2, feet (0.501 miles). DBE 2%, Anticipated Notice to Proceed , Required Completion BERKS COUNTY SR 12(POC) #94520 PROPOSAL:$8.04 PLANS:$1.44 The description and location of the project is as follows: [describe the various construction activities involved including number of lanes and number of spans as appropriate. Try to keep the total number of characters to 300.] and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 12, SECTION POC1D, in BERKS COUNTY, MUHLENBERG TOWNSHIP and the CITY OF READING from approximately WYOMISSING BORO. LINE at segment 10/11 offset 0398/0398 to approximately NORFOLK & WESTERN RR OVERPASS at segment 60/61, offset 0900/0821. A distance of approximately 18,273 feet (3.46 miles). MBE 2%, WBE 4%, Anticipated Notice to Proceed , Required Completion

6 Update April 19, 2012 WASHINGTON COUNTY SR 4030(A10) #76076 PROPOSAL:$61.80 PLANS:$ X18:$ X36:$ X-SEC;$ X18:$ X36:$19.50 EXSTRUCT:$ X18:$ X36:$27.30 The description and location of the project is as follows: This is a Design/Build Modified Turnkey project for the full replacement of a structurally deficient existing four span prestressed concrete spread box beam bridge carrying State Route 4030 (Sheffield Street) over Interstate 70 at Jessop Street Exit (Exit 16). The new structure is anticipated to be constructed on the existing horizontal alignment with only minor adjustments to the vertical alignment. Traffic will be detoured during construction. The scope for this project is for the design, demolition, and replacement of the existing structure to accommodate two twelve (12) foot lanes with eight (8) foot shoulders left and right along with minimal approach roadway work. The roadway rehabilitation will consist of bridge approach slabs, drainage enhancements, approach roadway work necessary to tie-in the new structure, maintenance and protection of traffic, guide rail, signing, pavement markings and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 04030, SECTION A10 in WASHINGTON COUNTY, CANTON TOWNSHIP from station 4+50 to station a length of 324 feet (0.061 miles). Project is a state bridge on local road. Limits of S.R are from segment 0010 offset 0000 to segment 0010 offset MBE 4%, WBE 4%, Anticipated Notice to Proceed , Required Completion CENTRE COUNTY SR 26(ST1) #91099 PROPOSAL:$15.36 PLANS:$ X18:$ X36:$62.40 The description and location of the project is as follow: For the improvement of certain sections of STATE HIGHWAYS in CENTRE & CLINTON COUNTIES, VARIOUS TOWNSHIPS and BOROUGHS, Commonwealth of Pennsylvania, Group 2-12-ST1. For the improvement to 10 State Routes having a combined construction length of approximately 224,654 linear feet (42.5 miles); involving various combinations of milling, scratch and resurfacing, using various Superpave Asphalt Mixture Designs or Warm Mix Asphalt for binder and wearing courses, various pavement markings and legends, and miscellaneous construction as indicated on the approved drawings included in the bid package. MBE 1%, WBE 2%, Anticipated Notice to Proceed , Required Completion Update April 17, 2012 UNION COUNTY SR 304(10M) #82381 PROPOSAL:$13.44 PLANS:$ X18:$ X36:$54.60 The description and location of the project are as follows: For resurfacing including, superpave asphalt mixture design (WMA) scratch and wearing courses, pavement markings, guide rail, and other miscellaneous construction within an overall length of 8,088 linear feet (1.53 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 304, SECTION 10M in UNION TOWNSHIP, UNION COUNTY from approximately 0.09 miles north east of the intersection with Supplee Mill Road (T-458) at Segment 0260 Offset 0500 to approximately 0.09 miles north east of the intersection with State Route 2009 at Segment 0300 Offset MBE 1%, WBE 1%, Anticipated Notice to Proceed , Required Completion WESTMORELAND COUNTY SR 19(0) #92659 PROPOSAL:$6.84 PLANS:$ X18:$ X36:$35.10 The description and location of the project is as follows: District wide guide rail safety improvements at bridge connections on various state routes in various locations and municipalities in Fayette, Greene, Washington and Westmoreland Counties all as indicated on the approved drawings for GR. MBE 0%, WBE 0%, Anticipated Notice to Proceed , Required Completion

7 ERIE COUNTY SR 3003(B12) #95146 PROPOSAL:$11.28 PLANS:$ X18:$ X36:$23.40 EXSTRUCT:$ X18:$ X36:$19.50 For the construction or improvement of a certain section of STATE HIGHWAY in ERIE COUNTY, CONNEAUT TOWNSHIP Commonwealth of Pennsylvania, STATE ROUTE 3003, SECTION B12. This project is situated as follows: From approximately 2851 feet north of the intersection with T-303 (Wickwire Rd.) at Segment 0030 Offset 2851 (Station ) then north to approximately 1614 feet south from the intersection with T-341 (Carter Rd.) at Segment 0030 Offset 3291 (Station ). For the bridge roof replacement of bridge structure over West Branch of Conneaut Creek having an overall length of 72'-0"; all within a project length of feet (0.046 mile) as indicated on the approved drawings. MBE 2%, WBE 4%, Anticipated Notice to Proceed , Required Completion BERKS COUNTY SR 176(002) #58174 PROPOSAL:$29.64 PLANS:$ X18:$ X36:$1, X-SEC:$ X18:$ X36:$ This S.R. 176 project section (002) begins just south of the Norfolk-Southern bridges and extends to just south of the S.R. 422 interchange ramp bridge in Cumru Township, Berks County. The project involves full depth reconstruction and a slight horizontal and vertical realignment of the existing roadway to meet current design criteria and provide the lane configuration to accommodate the anticipated future traffic volumes. The limit of reconstruction is approximately from Sta to , beginning Segment 104, Offset 1747 Northbound and Segment 105 Offset 1743 Southbound and ending Segment 110 Offset 1872 Northbound and Segment 111 Offset 1866 Southbound. The project length is 2,583 ft. (0.49 mile). The proposed six-lane configuration will require construction of a considerably shorter and wider single span bridge with the remaining void of the existing structure backfilled with suitable embankment material. Partial reconstruction of the S.R. 422 ramps will be required at the northern limit and to the south, temporary pavement widening will be required. ALSO I-176/SR 422 BRIDGE REHABILITATION PROJECT WILL BE PART OF THIS PROJECT AS CHILD PROJECT, SCOPE IS AS FOLLOW Bridge superstructure replacement carrying SR 0176 over SR 0422 in BERKS County, Cumru Township. Work is to be performed in multiple construction stages which will maintain one lane in each direction. Removal of existing and erection of new concrete beams will require short term closures of SR 0422 and will be completed in night work. Miscellaneous construction will repair the concrete surfaces of the existing abutments and wingwalls, furnish and install new signage, guide rails, reflectors, delineators, pavement markings and rumble strips on existing pavements as shown on the approved drawings included in the bid package for STATE ROUTE 176, SECTION 01B, in BERKS COUNTY, CUMRU TOWNSHIP from approximately the east bound ramps between SR 176 and SR 0422 at SR 176 segment 0110 offset 0246 to approximately the westbound ramps between SR 176 and SR 0422 at SR 422 segment 0431 offset DBE 7%, Anticiapted Notice to Proceed , Required Completion DELAWARE COUNTY SR 3003(NPT) #50520 PROPOSAL:$22.20 PLANS:$ X18:$ X36:$85.80 The description and location of the project is as follows: Replacement of sidewalks, upgraded ADA compliant curb ramps, new curbing, a 250-foot long retaining wall, and crosswalks and other miscellaneous construction, all as indicated on the drawings for STATE ROUTE 3003, SECTION NPT, in Delaware COUNTY Nether Providence TOWNSHIP along Turner Road (S.R. 3003) from south of Westbury Road to Rodgers Lane, Rodgers Lane (SR 2012) just west of Turner Road and Possum Hollow Road from Church Road to Turner Road. DBE 6%, Anticipated Notice to Proceed , Required Completion

8 ECMS ADVANCED INFORMATION MAY 24, 2012 Update April 13, 2012 UNION COUNTY SR 304(10M) #82381 PROPOSAL:$13.44 PLANS:$ X18:$ X36:$54.60 The description and location of the project are as follows: For resurfacing including, superpave asphalt mixture design (WMA) scratch and wearing courses, pavement markings, guide rail, and other miscellaneous construction within an overall length of 8,088 linear feet (1.53 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 304, SECTION 10M in UNION TOWNSHIP, UNION COUNTY from approximately 0.09 miles north east of the intersection with Supplee Mill Road (T-458) at Segment 0260 Offset 0500 to approximately 0.09 miles north east of the intersection with State Route 2009 at Segment 0300 Offset MBE 1%, WBE 1%, Anticipated Notice to Proceed , Required Completion WESTMORELAND COUNTY SR 19(0) #92659 PROPOSAL:$6.84 PLANS:$ X18:$ X36:$35.10 The description and location of the project is as follows: District wide guide rail safety improvements at bridge connections on various state routes in various locations and municipalities in Fayette, Greene, Washington and Westmoreland Counties all as indicated on the approved drawings for GR. MBE 0%, WBE 0%, Anticipated Notice to Proceed , Required Completion GREENE COUNTY SR 79(13M) #91138 PROPOSAL:$10.20 PLANS:$ X18:$ X36:$54.60 EXSTRUCT:$ X18:$ X36:$ The description and location of the project is as follows: This is a Bridge Preservation Project, consisting of concrete pier repair and encasement, spot/zone painting of the existing structural steel, strip/compression seal repair, pavement relief joint repair, concrete pedestal repair, concrete deck crack sealing, and wing erosions repair, as well as other associated bridge preservation activities, as indicated on the approved drawings included in the bid package for STATE ROUTE 0079, SECTION 13M, in GREENE COUNTY FRANKLIN TOWNSHIP on the dual structure at segment 0138 offset 0000 and at segment 0139 offset MBE 3%, WBE 3%, Anticipated Notice to Proceed , Required Completion BRADFORD COUNTY SR 6(M34) #87983 PROPOSAL:$14.16 PLANS:$ X18:$ X36:$70.20 The description and location of the project are as follows: For resurfacing including, superpave asphalt mixture design (HMA) binder, scratch, and wearing courses, base repairs, guide rail, and other miscellaneous construction within an overall length of 17,412 linear feet (3.29 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 6, SECTION M34 in BURLINGTON TOWNSHIP, BRADFORD COUNTY from approximately 0.04 miles south west of the intersection with State Route 4013 at Segment 0370 Offset 1511 to approximately 0.63 miles west of the intersection with Cemetery Road (T-556) at Segment 0440 Offset MBE 1%, WBE 1%, Anticipated Notice to Proceed , Required Completion

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION Updated November 17, 2008 PHILADELPHIA COUNTY SR 30(ADA) PROPOSAL:$14.40 The description and location of the project is as follows: For the design and construction of ADA compliant concrete curb ramps

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated June 27, 2016 BEAVER COUNTY SR 7446(LBB) #92912 PROPOSAL:$54.72 PLANS:$42.46 12X18:$52.11 24X36:$752.70 EXSTRUCT:$48.62 12X18:$59.67 24X36:$861.90 The description and location of the project is

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MARCH 1, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MARCH 1, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) As of February14, 2018 SNYDER COUNTY SR 2007(012) #93607 PROPOSAL:$16.56 PLANS:$4.40 12X18:$5.40 24X36:$78.00 The description and location of the project are as follows: The work is the furnishing and

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated May 4, 2018 FULTON COUNTY SR 0000(FMC) #109343 PROPOSAL:$21.36 PLANS:$9.02 12X18:$11.07 24X36:$159.90 X-SEC:$7.48 12X18:$9.18 24X36:$132.60 This project involves

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION JUNE 5, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION JUNE 5, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated on May 19, 2014 VENANGO COUNTY SR 308(DOI) #96906 PROPOSAL:$13.44 PLANS:$3.96 For the bituminous milling and resurfacing of various state routes throughout VENANGO COUNTY, Commonwealth of Pennsylvania,

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 Updated June 30, 2014 LUZERNE COUNTY SR 309(W02) #102354 PROPOSAL:$25.20 PLANS:$6.24 The description and location

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 22, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 22, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 22, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated December 5, 2016 SCHUYLKILL COUNTY SR 4027(M89) #99482 PROPOSAL:$21.60 PLANS:$1.68

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION AUGUST 10, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION AUGUST 10, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated July 21, 2017 ALLEGHENY COUNTY SR 0000 #109397 PROPOSAL:$28.56 The description and location of the project is as follows: This work is the 3-year term maintenance if intelligent transportation

More information

CENTRE COUNTY SR 26(ST1) # PROPOSAL:$21.00 PLANS:$ X18:$ X36:$70.20

CENTRE COUNTY SR 26(ST1) # PROPOSAL:$21.00 PLANS:$ X18:$ X36:$70.20 Updated January 25, 2016 CENTRE COUNTY SR 26(ST1) #104647 PROPOSAL:$21.00 PLANS:$3.96 12X18:$4.86 24X36:$70.20 The description and location of the project is as follows: For the improvement of certain

More information

BEAVER COUNTY SR 68(B38) # PROPOSAL:$26.64 PLANS:$ X18:$ X36:$222.30

BEAVER COUNTY SR 68(B38) # PROPOSAL:$26.64 PLANS:$ X18:$ X36:$222.30 ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MARCH 29, 2018 Update March 13, 2018 CHESTER COUNTY SR 23(ELV) #107680 PROPOSAL:$22.80 PLANS:$32.56 12X18:$39.96 24X36:$577.20

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 1, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 1, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated November 15, 2016 BEAVER COUNTY SR 588(B18) #91922 PROPOSAL:$22.80 PLANS:$18.04 12X18:$22.14 24X36:$319.80 X-SEC:$3.52 12X18:$4.32 24X36:$62.40 The description and location of the project is as

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JULY 12, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JULY 12, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated July 9, 2018 BUCKS COUNTY SR 1017(SC1) #15341 PROPOSAL:$22.80 This project is for the applying of seal coat to existing bituminous roadway on various state routes (32.33 segment miles) in Bucks

More information

SCHUYLKILL COUNTY SR 125(JFR) # PROPOSAL:$20.76 PLANS 8.5X11:$1.20

SCHUYLKILL COUNTY SR 125(JFR) # PROPOSAL:$20.76 PLANS 8.5X11:$1.20 SCHUYLKILL COUNTY SR 125(JFR) #111844 PROPOSAL:$20.76 PLANS 8.5X11:$1.20 The emergency project consists of rock protection and underpinning of the piers to prevent future scouring and other miscellaneous

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION APRIL 6, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION APRIL 6, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated March 20, 2017 ALLEGHENY COUNTY SR 3088(05) #106380 PROPOSAL:$23.40 PLANS:$11.88 12X18:$14.58 24X36:$210.60 EXSTRUCT:$3.08 12X18:$3.78 24X36:$54.60 The description and location of the project is

More information

14, 2019 MERCER COUNTY SR 173(491) # PROPOSAL:$11.40 PLANS:$5.40 X-SEC:$ X18:$ X36:$39.00

14, 2019 MERCER COUNTY SR 173(491) # PROPOSAL:$11.40 PLANS:$5.40 X-SEC:$ X18:$ X36:$39.00 Updated January 14, 2019 MERCER COUNTY SR 173(491) #100019 PROPOSAL:$11.40 PLANS:$5.40 X-SEC:$2.20 12X18:$2.70 24X36:$39.00 For the construction or Improvement of a certain section of STATE HIGHWAY in

More information

3, 2018 LACKAWANNA COUNTY SR 8031(WWR)

3, 2018 LACKAWANNA COUNTY SR 8031(WWR) SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING AUGUST 9, 2018 Updated August 3, 2018 LACKAWANNA COUNTY SR 8031(WWR) #109012 Moved to 8/9/18 from 7/26/18, orig 7/12/18 PROPOSAL:$14.40 PLANS 8.5x11:$4.80

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION SEPTEMBER 11, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION SEPTEMBER 11, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated August 27, 2014 LEHIGH COUNTY SR 78(GSR) #91957 PROPOSAL:$22.56 PLANS:$24.20 12X18:$29.70 24X36:$429.00 The description and location of the project is as follows: This project is the replacement

More information

11, 2019 MONTOUR COUNTY SR 2006(026) # PROPOSAL:$16.56 PLANS:$ X18:$ X36:$19.50

11, 2019 MONTOUR COUNTY SR 2006(026) # PROPOSAL:$16.56 PLANS:$ X18:$ X36:$19.50 Updated February 11, 2019 MONTOUR COUNTY SR 2006(026) #112211 PROPOSAL:$16.56 PLANS:$1.10 12X18:$1.35 24X36:$19.50 The description and location of the project are as follows: Emergency repairs due to flood

More information

GREENE COUNTY - SR 221(J10) # PROPOSAL:$11.76 PLANS:$ X18:$ X36:$47.10

GREENE COUNTY - SR 221(J10) # PROPOSAL:$11.76 PLANS:$ X18:$ X36:$47.10 ASSOCIATED PENNSYLVANIA CONSTRUCTORS Update January 3, 2018 GREENE COUNTY - SR 221(J10) #105392 PROPOSAL:$11.76 PLANS:$4.18 12X18:$5.13 24X36:$47.10 The description and location of the project is as follows:

More information

4, 2011 VENANGO COUNTY SR 428(SLD) #92815 PROPOSAL:$17.40 PLANS;$ X18:$ X36:$31.20 X-SEC:$ X18:$ X36:$50.

4, 2011 VENANGO COUNTY SR 428(SLD) #92815 PROPOSAL:$17.40 PLANS;$ X18:$ X36:$31.20 X-SEC:$ X18:$ X36:$50. ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated May 4, 2011 VENANGO COUNTY SR 428(SLD) #92815 PROPOSAL:$17.40 PLANS;$1.76 12X18:$2.16 24X36:$31.20 X-SEC:$2.86 12X18:$3.51 24X36:$50.70 For the construction

More information

DELAWARE COUNTY - SR 13(DD9) # PROPOSAL:$28.80

DELAWARE COUNTY - SR 13(DD9) # PROPOSAL:$28.80 ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING DECEMBER 21, 2017 Updated December 8, 2017 DELAWARE COUNTY - SR 13(DD9) #109039 PROPOSAL:$28.80 The description and location

More information

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION Updated January 30, 2018 ALLEGHENY COUNTY SR 1037(A03) #107983 PROPOSAL:$23.28 PLANS:$4.84 12X18:$5.94 24X36:$85.80 X-SEC:$4.40 12X18:$5.40 24X36:$78.00 24x36:$81.90 The description and location of the

More information

21, 2010 ALLEGHENY COUNTY SR 910(A24) #82614 PROPOSAL:$14.88 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$62.

21, 2010 ALLEGHENY COUNTY SR 910(A24) #82614 PROPOSAL:$14.88 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$62. Updated May 21, 2010 ALLEGHENY COUNTY SR 910(A24) #82614 PROPOSAL:$14.88 PLANS:$6.82 12X18:$8.37 24X36:$120.90 X-SEC:$3.52 12X18:$4.32 24X36:$62.40 The description and location of the project is as follows:

More information

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION Updated April 13, 2018 ALLEGHENY COUNTY SR 376(A65) #110880 PROPOSAL:$15.96 PLANS 8.5x11:$2.04 The description and location of the project is as follows: For the milling, resurfacing, pavement marking,

More information

BEAVER COUNTY SR 2012(EMP) #97889 PROPOSAL:$17.04 PLANS:$ X18:$ X36:$179.40

BEAVER COUNTY SR 2012(EMP) #97889 PROPOSAL:$17.04 PLANS:$ X18:$ X36:$179.40 Updated on April 28, 2014 BEAVER COUNTY SR 2012(EMP) #97889 PROPOSAL:$17.04 PLANS:$10.12 12X18:$12.42 24X36:$179.40 The description and location of the project is as follows: For milling, resurfacing,

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JULY 26, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JULY 26, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated July 23, 2018 LACKAWANNA COUNTY SR 8031(WWR) #109012 Moved to 7/26/18 from 7/12/18 PROPOSAL:$14.40 PLANS 8.5x11:$4.80 For the rehabilitation and improvement of certain sections of Varies STATE

More information

PennDOT District 11. Constructors Association of Western Pennsylvania March 5, Cheryl L. Moon-Sirianni, P.E. District Executive

PennDOT District 11. Constructors Association of Western Pennsylvania March 5, Cheryl L. Moon-Sirianni, P.E. District Executive PennDOT District 11 Constructors Association of Western Pennsylvania March 5, 2018 Cheryl L. Moon-Sirianni, P.E. District Executive Anticipated 2018 Lettings 118 Projects anticipated to be let in 2018

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JUNE 22, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JUNE 22, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated June 6, 2017 LEHIGH COUNTY SR 1025(POC) #109335 PROPOSAL:$16.80 PLANS:$0.96 Project includes bituminous overlay, pavement markings, and other miscellaneous construction, as indicated on the approved

More information

Lehigh Valley Transportation Study

Lehigh Valley Transportation Study ITEM: IV-A Lehigh Valley Transportation Study SUBJECT: PA 33 Preservation SR 22-Belfast COUNTY... Northampton FED.-AID SYSTEM... On-NHS S.R./SEC.... 33/07M DECADE OF INVESTMENT... No A.D.T.... 25,463 CAPITAL

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 7, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 7, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated November 21, 2017 BEDFORD COUNTY - SR 000071 #106779 PROPOSAL:$13.92 PLANS:$6.82 12X18:$8.37 24X36:$120.90 The description and location of the project is as follows: This project is for the construction

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM NY Susquehanna and Western Rail Line Bicycle/Pedestrian Path DBNUM: NS9803 / UPC: 058018 The 4.8 mile New York, Susquehanna, and Western Railway (NYS&W)

More information

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016 Rehabilitation of West Main Street Culvert and Shirley Street Bridge Town of Ayer November 22, 2016 Agenda Outline Introductions Project Goals and Objectives Existing Conditions Review Design Considerations

More information

Year Pre Total County Debt (Bonds & BANS) Mitigation Fees

Year Pre Total County Debt (Bonds & BANS) Mitigation Fees CR 9 (Bradt Hollow Road) Over Fox Creek Bridge Replacement Project Replacement of a 156 ft. long x 32ft. wide, 3 span pre stressed concrete box beam bridge over Fox Creek in the Town of Berne. The bridge

More information

Conceptual Design Report

Conceptual Design Report Conceptual Design Report I-244/Arkansas River Multimodal Bridge Tulsa, Oklahoma Prepared for the Oklahoma Department of Transportation Prepared by: August 2009 I-244 / ARKANSAS RIVER MULTIMODAL BRIDGE

More information

$600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000

$600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000 $600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000 $- Other Programs Highway Program $800,000,000 $700,000,000 $600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000

More information

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures Cumberland Viaduct Rehabilitation Project Contract No. AL4095180R Presenter Bob Bofinger MDSHA Office of Structures Project Justification & Improvements Condition State The deck, superstructure and substructure

More information

CONSTRUCTION INSPECTION APPLICATION AND QUALIFICATION FORM

CONSTRUCTION INSPECTION APPLICATION AND QUALIFICATION FORM Construction Inspection 3500 Winchester Road Suite 300 Allentown, PA 18104 610.841.2700 Fax: 610.841.2709 1500 Sycamore Road Suite 320 Montoursville, PA 17754 570.368.3040 Fax: 570.368.3166 400 Penn Center

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA Central, Contract 3 DBNUM: 15419 / UPC: 154190 This contract will bring projects into compliance with current ADA design requirements that could

More information

Highway Construction Program

Highway Construction Program Highway Construction Program Monthly Delivery Progress Report Watch List October 2018 This report focuses on Capital Highway Program projects, which have, or may have significant changes in scope, schedule,

More information

2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN

2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN 2016 STRUCTURE INSPECTION APPRAISAL REPORT Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN by K. SMART ASSOCIATES LIMITED 8 McIntyre Drive Kitchener ON N2R 1H6 August 2016

More information

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc. 2004 Specifications CSJ 0299-04-049, Etc. SPECIAL PROVISION 000---979 Detours, Barricades, Warning Signs, Sequence of Work, etc. 1. Description of Project. A. General. This project provides for the construction

More information

PCL Definitions for the Local Program J01 3R Policy J04 3P Policy J06 Local Bridges and Township Bridge Program Bridge Work Activities

PCL Definitions for the Local Program J01 3R Policy J04 3P Policy J06 Local Bridges and Township Bridge Program Bridge Work Activities PCL Definitions for the Local Program Projects that are administered by the Central Bureau of Local Roads. Engineering, utilities and land acquisition are coded with the PCL for the type of construction

More information

STRUCTURE AND BRIDGE DIVISION

STRUCTURE AND BRIDGE DIVISION Sheet 1 of 8 VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: State of Good Repair Bridge Project Selection and Eligible Work

More information

IMPROVING I 81 IN MARYLAND

IMPROVING I 81 IN MARYLAND IMPROVING I 81 IN MARYLAND April 25, 2017 Stephen A. Bucy, P.E. Improving I 81 in Maryland Overview: Facts SHA s Comprehensive I 81 Strategy Current Phase 1 Widening Project Update Closing Improving I

More information

Bridge Asset Management City of Battle Creek Planning and Projects

Bridge Asset Management City of Battle Creek Planning and Projects Bridge Asset Management City of Battle Creek Planning and Projects Michigan Bridge Conference, March 20, 2013 Gregory B. Rickmar P.E., Public Works Department, City of Battle Creek Alan Halbeisen, P.E.

More information

STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS. 3 East Pulteney Square Bath, New York 14810

STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS. 3 East Pulteney Square Bath, New York 14810 STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS 3 East Pulteney Square Bath, New York 14810 County Route 22 over Canisteo River Bridge Replacement Project BIN 3333290 D035511 PIN 6755.06 ADDENDUM #1 October

More information

Highway Bridge Structure Components

Highway Bridge Structure Components Highway Bridge Structure Components Basic Bridge Components 1 Deck and 2 Stringer 3 Bearing 4 Pedestal 5 Footing 6 Piles 7 Underpass 8 Embakment 9 Live Loading Basic Bridge Components 1-Deck & wearing

More information

PUBLIC INFORMATION MEETING June 24, 2015

PUBLIC INFORMATION MEETING June 24, 2015 Gallows Road (RTE. 650) over Arlington Boulevard (RTE. 50) Fairfax County Bridge Rehabilitation, Preventive Maintenance and Pier Repairs Phase 1 - Project No. 0650-029-235; UPC 106956, Pier Repair Phase

More information

NJTPA Transportation Improvement Program Fiscal Years

NJTPA Transportation Improvement Program Fiscal Years Routes Name: CR 571 Mileposts: 4.85 DBNUM: N1127 County Route 571/County Route 527, Reconstruction, Toms River Township This project is for intersection improvements at CR 571 and CR 527 in Tom s River

More information

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25 General Info Number: PROJECT NO. 43-17-03 Description: BRIDGE DECK REPAIR AND REHABILITATION, ARLINGTON ROAD OVER OHIO TURNPIKE M.P. 122.3, JOPPA ROAD OVER OHIO TURNPIKE M.P. 128.5, DEAN ROAD OVER OHIO

More information

Northeast Bridge Preservation Partnership Meeting

Northeast Bridge Preservation Partnership Meeting Northeast Bridge Preservation Partnership Meeting Superstructure Preservation Strategies Aetna Viaduct Superstructure Repairs Route I-84 City of Hartford, CT State Project No. 63-648 David A. Cutler, P.E.

More information

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA ASHE NATIONAL PROJECT OF THE YEAR SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA For the PENNSYLVANIA DEPARTMENT OF TRANSPORTATION Engineering District 12-0 Submitted By: January 29, 2018 AMERICAN

More information

FEBRUARY 13, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $9,000,000.00) Bids. Kokosing Construction Company, Inc. $8,623,609.96

FEBRUARY 13, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $9,000,000.00) Bids. Kokosing Construction Company, Inc. $8,623,609.96 General Info Number: PROJECT NO. 43-19-02 Description: BRIDGE DECK REPAIR AND REHABILITATION OHIO TURNPIKE OVER ABANDONED RAILROAD M.P. 34.2, OHIO TURNPIKE OVER STATE ROUTE 108 M.P. 34.5, COUNTY ROUTE

More information

Project Overview. Wilson Boulevard over Route 50 Bridge Rehabilitation. Get Involved. Public Information Meeting. Contact Information

Project Overview. Wilson Boulevard over Route 50 Bridge Rehabilitation. Get Involved. Public Information Meeting. Contact Information Get Involved VDOT representatives will review and evaluate any information received as a result of the public information meeting. The comment sheet in this brochure is provided to assist in making your

More information

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units)

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units) 10/16/2014 Construction Cost Estimation Preparation Manual for Preliminary Design (English Units) July 2002 Prepared by Construction Cost Estimating Unit Program Support Services 10/16/2014 Table of Contents

More information

Straight Line Diagram. Montour 47. January 2019

Straight Line Diagram. Montour 47. January 2019 Straight Line Diagram Montour 47 January 2019 This document was produced by the Pennsylvania Department of Transportation (PENNDOT) as an internal management tool for State maintained highways and is not

More information

Construction Forecast

Construction Forecast Construction Forecast January 14, 2016 Agenda Opening Remarks Introductions Capital Program Anticipated Bid Schedule Project Descriptions Q & A Introductions Randy Cole, Executive Director Tony Yacobucci,

More information

Straight Line Diagram. Cameron 12. January 2018

Straight Line Diagram. Cameron 12. January 2018 Straight Line Diagram Cameron 12 January 2018 This document was produced by the Pennsylvania Department of Transportation (PENNDOT) as an internal management tool for State maintained highways and is not

More information

5/11/2016 SR 15 SECTION 088 CSVT SOUTHERN SECTION SR 15 SECTION 088 CSVT SOUTHERN SECTION AGENDA

5/11/2016 SR 15 SECTION 088 CSVT SOUTHERN SECTION SR 15 SECTION 088 CSVT SOUTHERN SECTION AGENDA PUBLIC OFFICIALS MEETING MAY 11, 2016 AGENDA I. INTRODUCTIONS V. CURRENT PROJECT STATUS VI. PROJECT SCHEDULE VII. UPCOMING ACTIVITIES VOPEN DISCUSSION & QUESTIONS IX. ACTION ITEMS 1 A. Bridge Lighting

More information

I-91 Viaduct Public Information Briefing

I-91 Viaduct Public Information Briefing I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 10 December 18, 2017 Agenda Welcome Update on Construction Activities (Full Beneficial Use) Next:

More information

BRIDGE PREVENTIVE MAINTENANCE STRATEGY FOR ERIE-NIAGARA LOCAL BRIDGE OWNERS

BRIDGE PREVENTIVE MAINTENANCE STRATEGY FOR ERIE-NIAGARA LOCAL BRIDGE OWNERS BRIDGE PREVENTIVE MAINTENANCE STRATEGY Approved January 3, 2007 BLANK Purpose To maximize the non-deficient service life of local bridges in the Erie-Niagara region, members of the Greater Buffalo-Niagara

More information

SOUTH MEDFORD INTERCHANGE BRIDGES

SOUTH MEDFORD INTERCHANGE BRIDGES Eleven bridges were required for the project THe I-5 south medford Interchange by Keith Kaufman, Knife River Corporation Northwest and Daniel J. McIntier, formerly with H.W. Lochner Inc. Interstate 5 is

More information

Cochran Mill Road Bridge over Tuscarora Creek

Cochran Mill Road Bridge over Tuscarora Creek Cochran Mill Road Bridge over Tuscarora Creek July 15, 2014 Brian Morrison, P.E. NOVA District Senior Structural Engineer (703) 259-2606 brian.morrison@vdot.virginia.gov Purpose & Need Purpose Update project

More information

extent feasible. Per the and low constructability,

extent feasible. Per the and low constructability, RELEVANT PUBLIC PROJECTS AND REFERENCES TranTech is proud of its accomplishments in structural engineering. Our staff members have provided design servicess to numerous public agencies on very successful

More information

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 11/21/2014 Project 140560 Addendum No. 2 PID No. 82972 HAM IR 275

More information

Clinton Street Bridge over the Maumee River. ODOT Project DEF December 2, 2014 Stakeholder s Meeting

Clinton Street Bridge over the Maumee River. ODOT Project DEF December 2, 2014 Stakeholder s Meeting Clinton Street Bridge over the Maumee River ODOT Project DEF-15-14.77 December 2, 2014 Stakeholder s Meeting Purpose of Stakeholder Meeting Discuss the project and why it s happening Describe the process

More information

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 General Conditions of Contract DIVISION 1 GENERAL S OCT 92 102 Weighing of Materials NOV 2004 106 Electrical Work NOV 2003 120 The Use of Explosives APR 2006

More information

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017 I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017 State Project # 0064-965-264, P101, R201, C501, B616, B617, B618, B619, B620, B621, D601, D602 Federal # NHS-064-3(479),

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) ADA South, Contract 1 w/o ROW DBNUM: 15420 / UPC: 154200 This contract will bring projects into compliance with current ADA design requirements that could not be completed within original design or construction

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2018.05 EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 The bid opening date is Thursday March 15, 2018 at 11:00 a.m. The following changes

More information

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA 2008/09 $52.0 M 85% SELF-PERFORMED Widen 12 miles of Interstate 10 to six lanes including the reconstruction

More information

Rehabilitation of Highway Pavements an Engineering Challenge

Rehabilitation of Highway Pavements an Engineering Challenge Rehabilitation of Highway Pavements an Engineering Challenge G eorge W. M ca lpin Transportation Consultant Rye, New Hampshire IN T R O D U C T IO N There is no question that our country is currently confronted

More information

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3

More information

Information for File # RJH

Information for File # RJH Information for File #2011-01629-RJH Applicant: Matthew Ternes Corps Contact: Ryan Huber, U. S. Army Corps of Engineers, 211 North Broadway, Suite 221, Green Bay, Wisconsin 54303; ryan.j.huber@usace.army.mil;

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA Central, Contract 1 DBNUM: 15417 / UPC: 154170 This contract will bring projects into compliance with current ADA design requirements that could

More information

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199))

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199)) 11060 White Rock Road, Suite 200 Rancho Cordova, CA 95670 Phone: (916) 363-4210 Fax: (916) 363-4230 M e m o r a n d u m To: Reena Gohil, Environmental Planner Date: May 30, 2017 California Department of

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) Route 3, Route 46, Valley Road and Notch/Rifle Camp Road Interchange, Contract B DBNUM: 059B / UPC: 123020 From Notch/Rifle Camp Road to just east of the Valley Road Intersection, Route 46 will be widened

More information

MISENER DAM. Site Number LYNN STREET, PORT DOVER km N of Highway 6

MISENER DAM. Site Number LYNN STREET, PORT DOVER km N of Highway 6 NORFOLK COUNTY MISENER DAM Site Number 980501 LYNN STREET, PORT DOVER 0.65 km N of Highway 6 Ontario Structure Inspection Manual - Inspection Form Site Number: 980501 Inventory Structure Name Misener Dam

More information

I-91 Viaduct Public Information Briefing

I-91 Viaduct Public Information Briefing I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 9 September 13, 2017 Agenda Welcome and Presenter Introductions Update on Construction and Demolition

More information

AUTOMATED PAVEMENT CONDITION SURVEY FIELD MANUAL PUBLICATION 336 APRIL 2017 PUB 336 (4-17)

AUTOMATED PAVEMENT CONDITION SURVEY FIELD MANUAL PUBLICATION 336 APRIL 2017 PUB 336 (4-17) AUTOMATED PAVEMENT CONDITION SURVEY FIELD MANUAL PUBLICATION 336 APRIL 2017 PREPARED BY: BUREAU OF MAINTENANCE AND OPERATIONS ASSET MANAGEMENT DIVISION P.O. Box 3437 HARRISBURG, PENNSYLVANIA 17105-3437

More information

Ohio Contractor Association Annual Work Forecast Program. John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director

Ohio Contractor Association Annual Work Forecast Program. John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director Ohio Contractor Association Annual Work Forecast Program John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director John R. Kasich, Ohio Governor Jerry Wray, ODOT Director ODOT S

More information

Feasibility Assessment Study

Feasibility Assessment Study August 19, 2010 Feasibility Assessment Study Historic Sites Council Meeting Today s Agenda Historic Overview Project Overview Barrier Issues Concrete Parapet Recommendations Steel Parapet Recommendations

More information

Blueprint for One of the Nation s Largest SCM Maintenance Programs

Blueprint for One of the Nation s Largest SCM Maintenance Programs Blueprint for One of the Nation s Largest SCM Maintenance Programs PA Department of Transportation Hydrologic & Hydraulic Studies Waterway Permitting Stormwater Design & Permitting Technical Course Development

More information

SEGMENTAL BRIDGES IN INDIANA

SEGMENTAL BRIDGES IN INDIANA SEGMENTAL BRIDGES IN INDIANA W a y n e W a l t e r s Engineer of Bridge Design Indiana State Highway Commission IN T R O D U C T IO N Indiana has the reputation of being a conservative state. I think in

More information

S.R. 0070, Section T20. Engineering District ASHE National Project of the Year Award

S.R. 0070, Section T20. Engineering District ASHE National Project of the Year Award S.R. 0070, Section T20 Engineering District 12-0 ASHE National Project of the Year Award AMERICAN SOCIETY OF HIGHWAY ENGINEERS National Project of the Year Award OFFICIAL ENTRY FORM AWARD CATEGORY (Check

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $3,379,844.00 Scott Construction Corporation - Portland, ME $3,572,184.50 CPM Constructors - Freeport, ME $3,732,667.25 Page 1 of 16 Wyman

More information

Berkshire Region TIP Project Data Form

Berkshire Region TIP Project Data Form BASIC INFORMATION: 1. TIP ID #: 2. MUNICIPALITY: 3. ROUTE# AND/OR NAME: Berkshire Region TIP Project Data Form 4. PROJECT TYPE (CHECK BEST DEFINITION OF PROJECT): Intersection Improvement Road Resurfacing

More information

PENNSYLVANIA TURNPIKE COMMISSION Harrisburg, Pennsylvania

PENNSYLVANIA TURNPIKE COMMISSION Harrisburg, Pennsylvania PENNSYLVANIA TURNPIKE COMMISSION Harrisburg, Pennsylvania CONTRACT NO. A-020.00R001-3-02 FOR PAVEMENT REPAIRS FOR MID-COUNTY INTERCHANGE AT MILEPOST A-20.00 IN MONTGOMERY COUNTY SPECIAL PROVISIONS INDEX

More information

Faced with the prospect of

Faced with the prospect of RE-DECKING the M. Harvey Taylor Bridge Innovative Deck System Design Will Keep Traffic Flowing Roger B. Stanley, P.E., M.S.C.E. Fig. 1: Downstream elevation viewed looking eastward towards Harrisburg.

More information

PROJECT UPDATE SOUTH NORFOLK JORDAN BRIDGE CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA. April 2012

PROJECT UPDATE SOUTH NORFOLK JORDAN BRIDGE CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA. April 2012 PROJECT UPDATE Rendering View from the City of Chesapeake Elizabeth River Boat Landing and Park looking across the Elizabeth River at Portsmouth CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA The new 5,375

More information

6 th STREET VIADUCT SIESMIC IMPROVEMENT PROJECT

6 th STREET VIADUCT SIESMIC IMPROVEMENT PROJECT 6 th STREET VIADUCT SIESMIC IMPROVEMENT PROJECT Project Location The 6 th Street Viaduct (Bridge No. 53C-1880) and Sixth Street Overcrossing (Bridge No. 53-0595) comprise a single structure, which spans

More information

BRIDGE INSPECTION REPORT

BRIDGE INSPECTION REPORT NC DEPARTMENT OF TRANSPORTATION ATTENTION DIVISION OF HIGHWAYS BRIDGE MANAGEMENT UNIT BRIDGE INSPECTION REPORT INSPECTION TYPE: Routine Inspection COUNTY IREDELL BRIDGE NUMBER 480596 INSPECTION CYCLE 2

More information

Town of South Bruce Peninsula Bridge and Culvert Inspections OSIM Inspection Report

Town of South Bruce Peninsula Bridge and Culvert Inspections OSIM Inspection Report Town of South Bruce Peninsula OSIM Inspection Report Prepared By: R.J. Burnside and Associates Limited 3 Ronell Crescent, Collingwood L9Y 4J6 Prepared for: Town of South Bruce Peninsula January 2015 File

More information

LEVEL 1 ASSESSMENT FORM

LEVEL 1 ASSESSMENT FORM COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF SAFE DRINKING WATER LEVEL 1 ASSESSMENT FORM I. General Information PWS Name: PWSID #: Contact Name: Phone #: PWS Address: E-mail:

More information

Maine Turnpike Authority

Maine Turnpike Authority PAVEMENT REHABILITATION & CLEAR ZONE IMPROVEMENTS MM 80.7 TO MM 88.6 202.121 Removing Existing Concrete (6CY) 1.00 LS 202.127 Removing of Existing Bituminous Pavement (470 SY) 1.00 LS 202.202 Removing

More information

I-64 Capacity Improvements Segment I Financial Plan Annual Update

I-64 Capacity Improvements Segment I Financial Plan Annual Update I-64 Capacity Improvements Segment I December 1, 2016 State Project # 0064-965-264, P101, R201, C501, B616, B617, B618, B619, B620, B621, D601, D602 Federal # NHS-064-3(479), NHA-064-3(479) UPC 104905

More information

SAN ANTONIO STREET BRIDGE AT COMAL RIVER. Open House

SAN ANTONIO STREET BRIDGE AT COMAL RIVER. Open House SAN ANTONIO STREET BRIDGE AT COMAL RIVER Open House May 1, 2018 SAN ANTONIO STREET BRIDGE AT COMAL RIVER, NEW BRAUNFELS COMAL COUNTY OPEN HOUSE MAY 1, 2018 5:00 P.M 7:00 P.M. New Braunfels Civic/Convention

More information

Lesner Bridge Replacement

Lesner Bridge Replacement Lesner Bridge Replacement Rendering of the Completed Lesner Bridge Structure Construction Camera A Construction Camera has been installed to view images of the bridge construction. Images are updated on

More information

Future Programmatic Beyond 01/06/2020 Sorted By District (Subject to Departmental Changes)

Future Programmatic Beyond 01/06/2020 Sorted By District (Subject to Departmental Changes) Sorted By rict (Subject to Departmental Changes) Future Prog Beyond Prompt By Run : 1/25/2019 1 09/08/20 101082 D01 UBI FY21 Use a consultant to perform underwater bridge inspections. Consultant to perform

More information

I-35W Retaining Wall Design Exhibit A - Draft Scope of Work

I-35W Retaining Wall Design Exhibit A - Draft Scope of Work Background MnDOT, Metro Transit, Hennepin County, and the City of Minneapolis are in the process of developing a project for Interstate 35W between 43 rd Street in Minneapolis and 15 th Street in Minneapolis.

More information