CONSULTATION ON THE SCOPE OF WORKS AND CONTRACTING STRATEGY FOR THE RENOVATION OF THE PALAIS DES NATIONS
|
|
- Alaina Daniels
- 5 years ago
- Views:
Transcription
1 CONSULTATION ON THE SCOPE OF WORKS AND CONTRACTING STRATEGY FOR THE RENOVATION OF THE PALAIS DES NATIONS Presented by: UNOG/PTS and UNOG/SHP Date: June 2017
2 INTRODUCTION David Mc Cuaig Project Director, UNOG/SHP
3 Agenda 9h 10h Presentation 10h 11h Site Visit 11h 12h Q/A Session PREGNY A15 You are here Room XI A17 E40 PLACE DES NATIONS C6 CHEMIN DE FER
4 OVERVIEW
5 Location New Pernament Building (ongoing) Pregny Palais des Nations Ariana Park Place des Nations Chemin de Fer
6 Palais des Nations S C A D E B Ariana Park Second largest UN Office after the UN Headquarters in New York The most active centre for multilateral diplomacy relating to Peace, Human Rights and Well-being in the world
7 Palais des Nations today Ariana Park: 46 hectares Total floor area of main buildings: 150,000+ m2 Conference rooms: 35+ Delegates: 75,000+/year Visitors: 100,000+/year Meetings: 12,000+/year Original Buildings Constructed : Assembly Rooms (A+AB+AC) Library & Archives (B) Council Chamber Area (C) Secretariat Offices (S1+S2) Extension Building Constructed : Offices (D) Additional Building Constructed : Conference Building (E)
8 Renovation S C D B1 Archive B Ariana Park Renovation Works: Approx. 150,000+ m2 E A B2 Offices E2 Office Tower E1 Conferences Dismantling E2 Office Tower Approx. 20,700 m2
9 Strategic Heritage Plan
10 SHP Project Team (a) Project Management: dedicated UN Project Team (composed by architects, engineers and specialists) teaming with: Hill International (Programme Management Firm) Oger International (Technical Support Services) MACE (Risk Management) (b) Design Consultants: SOM / Burckhardt+Partner (Architects) G&T (Cost Consultant) Ingeni (Structural engineering) Rapp (MEP)
11 Key SHP Benefits Safer buildings for occupants More functional and modern conference facilities Accessibility and new technologies for persons with disabilities Reduced operating cost through greater energy efficiencies and lower long-term maintenance costs Termination of commercial leases outside of the Palais des Nations Additional, more flexible workplaces including collaboration spaces 25% office space efficiency gains (700 additional staff on site) Preservation of the historic site
12 SCOPE OF WORKS
13 Renovation Scope of Works Main actuations: - 33 Conference Rooms to renovate or upgrade - Office space to be transformed into modern workplace - Amenities: cafeteria extension, support nodes creation, Press Bar remodeling, new commercial areas relocation - MEP upgrade: electricity, HVAC, AV/IT, plumbing - Security compound: system upgrade
14 Renovation Scope of Works Approx. 50% of the estimated renovation budget comprises mechanical, electrical and plumbing installation works 2% 11% 43% 10% 8% 14% 12% 8% 10% 11% 2% 43% 14% 12% Asbestos and Demolition Superstructure (Frame / windows / roof) Internal Finishes Furnishings and Equipment Plumbing and Electrics Internal Alteration Works Management Costs / Overheads
15 Renovation Some Figures Behind the scenes, we re replacing and installing an estimated Air handling units Cabling: Low voltage IT voice & data Internal clock system CCTV and other security systems Electrical panels Pipework: Chilled water Heating Sanitary Domestic water km 700+ km 5+ km 10+ km km 3+ km 1+ km 2.5+ km
16 Renovation Major Intrusion Surveys Performed by SHP to confirm scope of Works as Risk Mitigation measure. Electrical Cabling Survey / Survey of Ceiling Electrical Networks: Update of Electrical Network Plans Existing in ground floor of the Building E Intrusive survey of the screed (or sub-floor): Intrusive survey of the screed to establish the thickness of the existing screed and its composition Ceiling survey / Surveying of the false ceiling: verification of the structure of the building for the implementation of the leak tightness for the Health and Safety code compliance 3D Laser Survey: scanning of the spaces in 3D for the 3D modeling of the building. Heritage Surface Survey in indicative locations to determinate different layer of heritage elements
17 TIMELINE
18 Project Timeline Phase 1 - New Construction: Phase 2 - Renovation: Key color legend: Construction New Permanent Building Renovation A Building (conference) Renovation D Building (offices) Renovation B Building (historical archives) Renovation S Building (offices) Original Timeline Renovation B Building (offices & library) Renovation E Building (conference) Revised Timeline Renovation C Building (offices & conference) Dismantling E Building (office tower) Achieved Timeline
19 Indicative Phasing Current BUILDING D BUILDING A BUILDING E BUILDING B BUILDING S BUILDING C Year of Construction Gross Internal Area (m 2 in 2016 / current) BUILDING A ,746 BUILDING B ,757 BUILDING C ,325 BUILDING D ,088 BUILDING E ,725 BUILDING S , ,314
20 Indicative Phasing 2017 NEW PERMANENT BUILDING [NPB] (under construction) INDICATIVE CONSTRUCTION PHASING ( ) New area under Construction (m2) 22,371 22,371 22, Existing areas progressively under Refurbishment (m2) - 37,626 37,626 54,086 97,962 70,919 59,101 Existing area being dismantled (m2) (20,624) (20,624) - GRAND TOTAL (m2) 22,371 59,997 59,997 54,086 97,962 70,919 59,101
21 Indicative Phasing 2018 BUILDING B ARCHIVES NEW PERMANENT BUILDING (under construction) BUILDING A CAFETERIA AND CONFERENCE ROOMS INDICATIVE CONSTRUCTION PHASING ( ) New area under Construction (m2) 22,371 22,371 22, Existing areas progressively under Refurbishment (m2) - 37,626 37,626 54,086 97,962 70,919 59,101 Existing area being dismantled (m2) (20,624) (20,624) - GRAND TOTAL (m2) 22,371 59,997 59,997 54,086 97,962 70,919 59,101
22 Indicative Phasing 2019 BUILDING B ARCHIVES NEW PERMANENT BUILDING (under construction) BUILDING A CAFETERIA AND CONFERENCE ROOMS INDICATIVE CONSTRUCTION PHASING ( ) New area under Construction (m2) 22,371 22,371 22, Existing areas progressively under Refurbishment (m2) - 37,626 37,626 54,086 97,962 70,919 59,101 Existing area being dismantled (m2) (20,624) (20,624) - GRAND TOTAL (m2) 22,371 59,997 59,997 54,086 97,962 70,919 59,101
23 Indicative Phasing 2020 Approx 550 Staff move permanently into new building BUILDING D BUILDING A OFFICES Remainder of staff move in to new building temporarily in phases during renovation BUILDING S BUILDING C INDICATIVE CONSTRUCTION PHASING ( ) New area under Construction (m2) 22,371 22,371 22, Existing areas progressively under Refurbishment (m2) - 37,626 37,626 54,086 97,962 70,919 59,101 Existing area being dismantled (m2) (20,624) (20,624) - GRAND TOTAL (m2) 22,371 59,997 59,997 54,086 97,962 70,919 59,101
24 Indicative Phasing 2021 Staff move back into renovated areas on completion BUILDING E PARTIAL DEMOLITION BUILDING D BUILDING A OFFICES BUILDING B BUILDING E RENOVATION Remainder of staff move in to new building temporarily in phases during renovation BUILDING S BUILDING C INDICATIVE CONSTRUCTION PHASING ( ) New area under Construction (m2) 22,371 22,371 22, Existing areas progressively under Refurbishment (m2) - 37,626 37,626 54,086 97,962 70,919 59,101 Existing area being dismantled (m2) (20,624) (20,624) - GRAND TOTAL (m2) 22,371 59,997 59,997 54,086 97,962 70,919 59,101
25 Indicative Phasing 2022 Staff move in phases temporarily to new building during renovation BUILDING E PARTIAL DEMOLITION BUILDING B BUILDING E RENOVATION Staff move back into renovated areas on completion INDICATIVE CONSTRUCTION PHASING ( ) New area under Construction (m2) 22,371 22,371 22, Existing areas progressively under Refurbishment (m2) - 37,626 37,626 54,086 97,962 70,919 59,101 Existing area being dismantled (m2) (20,624) (20,624) - GRAND TOTAL (m2) 22,371 59,997 59,997 54,086 97,962 70,919 59,101
26 Indicative Phasing 2023 Staff move back into renovated areas on completion BUILDING E RENOVATION Remaining staff from off site locations move into new building on completion of project INDICATIVE CONSTRUCTION PHASING ( ) New area under Construction (m2) 22,371 22,371 22, Existing areas progressively under Refurbishment (m2) - 37,626 37,626 54,086 97,962 70,919 59,101 Existing area being dismantled (m2) (20,624) (20,624) - GRAND TOTAL (m2) 22,371 59,997 59,997 54,086 97,962 70,919 59,101
27 Final Situation 2023 BUILDING D NEW BUILDING H BUILDING A BUILDING B BUILDING E BUILDING S BUILDING C Year of Construction Gross Internal Area (m 2 in 2016 / current) Gross Internal Area (m 2 in 2023 / after construction) BUILDING A ,746 39,746 BUILDING B ,757 15,757 BUILDING C ,325 15,325 BUILDING D ,088 5,088 BUILDING E ,725 59,101 BUILDING S ,673 23,673 NEW BUILDING H , , ,061
28 Next Steps New Building Construction Works started in 2017 Renovation (Historic Buildings) Contract Expression of Interest (EOI) Feb 2018 Request for Proposal (RFP) Sep 2018 Contract Award May 2019 Start on Site May 2019 Renovation (1970 s Buildings) Contract Expression of Interest (EOI) Dec 2020 Request for Proposal (RFP) Feb 2021 Contract Award Sep 2021 Start on Site Oct 2021
29 SHP OBJECTIVES
30 SHP Project Objectives a) Health and life safety b) Accessibility for persons with disabilities c) Reduced energy costs d) Upgrade IT, broadcast and congress systems e) Flexible, functional, optimized interior and conference spaces f) Heritage preservation g) Business and operational continuity h) Deliver within budget and on schedule
31 Objectives a) Health and life safety - Correction of fire safety deficiencies - Hazardous material removal Current conditions, examples
32 Objectives b) Accessibility for persons with disabilities - Outdoor accessibility - Priority to pedestrian pathways Lev. 02 and 03, example - Indoor pathways
33 Objectives c) Reduced energy costs - 25% energy cost reduction - Replacement of outdated MEP equipment
34 Objectives d) Upgrade IT, broadcast and congress systems A.426 A.426 to remain active during works Fot. Johannes Marburg R19 Operator booth, Room XVIII
35 Objectives e) Flexible, functional, optimized interior and conference spaces OFFICES & COLLABORATION NODES - small meeting rooms - informal meeting lounges - pantries - technology rooms - print rooms Current conditions, examples Proposed, under design
36 Objectives e) Flexible, functional, optimized interior and conference spaces Room XII: proposed renovation CONFERENCE ROOMS Room XII: current Proposed: 44 accessible conference rooms & 21 conference rooms with accessible interpretation booths
37 Objectives f) Heritage preservation Room XI: interior wooden door and leather pannels Room XI: furniture designed by Charlotte Perriand Room XII: wall painting Room III Hall 14: staircase
38 Objectives g) Business and operational continuity Conference Rooms Usage Chart (Department of Conferences Management) Conference Centre in continuous operation
39 Objectives g) Business and operational continuity SECTION OF WORK each Section must be designed, supplied, constructed, commissioned, and tested by the Contractor reaching substantial completion by the corresponding timeframe. Example: In picture number 1, Cafeteria and adjacent workshops, highlighted in yellow, are defined as a section in SHP Phasing Baseline (picture number 2). Meaning that from July 2020 till April 2021 the area will be under renovation. After completion of works, there will be a handover process to the client (stakeholder). Picture 1 3D Sections of work Picture 2 Phasing Baseline
40 Objectives h) Deliver within budget and on schedule
41 PROPOSED PROCUREMENT STRATEGY
42 Design Development Current DESIGN PHASES BUILDING FEASIBILITY CONCEPT DESIGN DETAIL DESIGN TECHNICAL DESIGN CONSTRUCTION A B1 B2 C D E S SHP CONSULTANT: SOM/B+P DESIGN AND BUILD CONTRACTOR
43 Possible strategies Model of Contract Traditional Lump Sum UNOG Contract SHP / Renovation Design and Build Management Contracting Employer Employer Employer Feasability Design Employer Representatives Employer Representatives Employer Representatives SOM/B+P SOM / B+P SOM/B+P Contractor Build Contractor Contractor Sub-Contractor 1 Sub-Contractor 2 Sub-Contractor 3 Sub-Contractor n Risk Analisis - PROJECT 20 Employer Employer Employer 50 - COST Contractor Employer / Contractor 80 Employer - QUANTITIES 80 Contractor Employer / Contractor Employer 50 - TIME Contractor Contractor 20 Contractor
44 Possible strategy Other considerations: - Open book? - SOM/B+P Employers Representatives - Scope of Works o Furniture, Move? UNO SHP - Renovation DESIGN COMPLETION AND CONSTRUCTION SHP PROJECT / RENOVATION Design Level 1 Buildings: A, B1 Design Level 2 Buildings: B2, C, D, S, E Developed Design Developed Design X Design Technical Design X Technical Design RIBA Construction Drawings Construction Drawings Plan of Work Shop Drawings Shop Drowings As Build Drawings As Build Drawings Costs BOQ X Prelims Cost Plan X Overhead + Profit (%) Contractor Risk (%) GMP fixed price cost + profit price X existing at tender stage GMP Guaranteed Maximum Price Construction INCENTIVISATION PAIN / GAIN SHARE (-/+) Timeline
45 SITE VISIT
46 Site Visit PREGNY PLACE DES NATIONS C A15 You are here Room XI 1 A E CHEMIN DE FER 1. Building A, Room XI (Conferencing, Heritage) 2. Building E, outside (Demolition E2 Office Tower) 3. Building E, Hallway Lev.-01 (Fire) 4. Building B, Library Main Stairs (Fire, Heritage) 5. Building B, Library Archive (Fire) 6. Building S, Offices (Workplan) 7. Building A, A.13, Lev.00 (Business Continuity) 8. Building A, Plant Room, Lev.01 (Asbestos, Energy, Fire) 9. Building A, Assembly Hall (Conferencing, Fire) 10. Building A, Entrance A.14 (Accessibility) 11. Building A, Pas Perdus (Heritage, Cafeteria extension) Fire = Fire Code Compliance
47 ANY THOUGHTS?
48 Thank you Reminder: register as vendor in the UNGM at
Information Session Strategic Heritage Plan. Madrid 30 November 2016
Information Session Strategic Heritage Plan Madrid 30 November 2016 Agenda Introduction Palais des Nations Strategic Heritage Plan SHP New Office Building Building H Renovation of the Palais de Nations
More informationAttachment 2 Levels of Intervention
Attachment 2 Levels of Intervention Renovation of the Historical Buildings (Buildings A, B, C, D and S) at the Palais des Nations in Geneva, Switzerland Attachment 2 Page 1 of 5 FACILITATING WORKS AND
More informationREQUEST FOR EXPRESSION OF INTEREST (EOI)
Office des Nations Unies à Genève United Nations Office at Geneva Section des achats et des transports, Services centraux d appui, Division de l administration Purchase and Transportation Section, Central
More informationLUFacilities Policy Service Level Agreement v1.1
PURPOSE The Service Level Agreement (SLA) for University provides a detailed list of services offered by the LU Department. The SLA identifies which services are funded by the approved Lehigh University
More informationSTATE UNIVERSITY CONSTRUCTION FUND Concept Phase Checklist
STATE UNIVERSITY CONSTRUCTION FUND Concept Phase Checklist The following checklist shows the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the
More informationCORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan. Community Information Meeting
CORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan Community Information Meeting October 2017 AGENDA Meeting Objectives Draft Plan Overview School Improvements for specific site Feedback/Listening
More informationdate: 10 july 2012 the pennsylvania state university: burrowes building
the pennsylvania state university: burrowes building. faculty/staff committee project overview introductions goals of the renovation critical considerations exterior envelope mechanical systems interior
More informationFACILITIES PROJECTS UPDATE BOARD OF EDUCATION. August 11, 2015
FACILITIES PROJECTS UPDATE BOARD OF EDUCATION August 11, 2015 AGENDA Measure R Bond Projects Fund 40 Capital Projects Maintenance Projects MEASURE R BOND PROJECTS KINDERGARTEN MODERNIZATIONS PROGRAM BUDGET:
More informationOffice of Planning, Design and Construction. Capital Program Update May 10, 2017
Office of Planning, Design and Construction Capital Program Update May 10, 2017 Projects Under Construction Translational Research Center Translational Research Center Phase I Site work Status: Completed
More informationHUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014
HUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014 1. Upgrade Video Security and Surveillance Systems - Replace with New a. Existing
More informationCompleted. Project. Melbourne High School. Comprehensive Additions and Renovations
Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project
More informationMain Contractor Pre-Qualification Questionnaire. French consulate Guangzhou relocation project. 4 th Nov 2016
Main Contractor Pre-Qualification Questionnaire French consulate Guangzhou relocation project 4 th Nov 2016 1 Contents 1. Introduction 1 2. Project Information 1 2.1 Background 1 2.2 Site 1 2.3 Scope of
More informationReport For Class D Construction Cost Estimate
Report For Class D Construction Cost Estimate Douglas McNeill Director Jon Gilford Senior Cost Manager Turner & Townsend 170 Laurier Avenue West Suite 604 Ottawa Ontario K1P 5V5 t: +1 (613) 221 9560 e:
More informationStephen F. Austin State University Board of Regents - Building and Grounds Committee Construction Update July 23, 2018
Stephen F. Austin State University Board of Regents - Building and Grounds Committee Construction Update July 23, 2018 TABLE OF CONTENTS Description Page Construction Summary 1 1 - Residence Life Operations
More informationSTATE UNIVERSITY CONSTRUCTION FUND
STATE UNIVERSITY CONSTRUCTION FUND The following checklist show the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the Schedule B of the Consultant
More informationSchool Assessment Report
School Assessment Report School: Sutton Middle School (Powers Ferry) Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:32:59 AM FOR OFFICIAL USE ONLY Final School
More informationRetail and Office Design and Fit out June 2018
Retail and Office Design and Fit out June 2018 This document lays out tender guidelines for prospective companies to bid for the services of designing and fitting out new offices for Practical Action Publishing
More informationSection 6 - Bill of Quantities Bill Nr. 1 Preliminaries
Bill Nr. 1 Preliminaries Bill Nr. 1 PRELIMINARIES NOTES : (1) The work shall be done during day time and night time according to CAM/ADA requirements. (2) If CAM decides to cancel any s listed in the Bills
More informationSchool Assessment Report
School Assessment Report School: KIPP Vision Report: Dec 15, 14 Condition Assessment: Suitability Assessment: Generated: 12/15/14 12:33:33 PM Final School Assessment Report - Charter Schools, KIPP Vision
More informationREQUEST FOR PREQUALIFICATION SUBMISSION (RFPQS) Revision 2 [ Expression of Interest (EOI) ]
United Nations Nations Unies UNITED NATIONS OFFICE AT GENEVA SWITZERLAND REQUEST FOR PREQUALIFICATION SUBMISSION (RFPQS) Revision 2 [ Expression of Interest (EOI) ] This notice is placed on behalf of United
More informationSchool Assessment Report
School Assessment Report School: Carver High School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:37:23 AM FOR OFFICIAL USE ONLY Final School Assessment Report
More informationTABLE OF CONTENTS. Calgary School District No. 19 March Page. Executive Summary. Facility Profile and Summary 1. Section 1 Site Conditions 4
TABLE OF CONTENTS Executive Summary Page i Facility Profile and Summary 1 Section 1 Site Conditions 4 Section 2 Building Exterior 7 Section 3 Building Interior 11 Section 4 Mechanical Systems 14 Section
More informationFinance & Administration. Policy Number: FA Approved By: Richard R. Rush Effective Date: 2/26/08 President Page 1 of 7
President Page 1 of 7 PURPOSE: Operations, Planning, and Construction (OPC) is responsible for the maintenance and operations of the campus grounds and facilities funded by operating fund budget allocation.
More informationSchool Assessment Report
School Assessment Report School: Morningside Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:29:07 AM FOR OFFICIAL USE ONLY Final School Assessment
More informationCONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS
CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS (August 28, 2018) PIERCE HALL IMPROVEMENTS PROJECT NO. 950511-950532 UNIVERSITY OF CALIFORNIA, RIVERSIDE PREQUALIFICATION PROCESS ALL
More informationShow how a KM database impacts: cost, time, and quality. Demonstrate how Parametric Design could be used to save time, money, and improve quality
Executive Summary: Thesis Proposal Final Draft The following pages contain a final draft of the thesis proposal for the South Baltimore District Court House. The basic layout consists of focusing on Knowledge
More informationRFP Feasibility Design Services: Clinical Education & Assessment Center Expansion Questions & Answers: February 13 th, 2018
Question & Answer: #1 The RFP calls for a survey of the building to gain a comprehensive understanding of the existing building, utilities, building systems, occupancies and all existing conditions as
More informationRegional Study & Resource Centers (RSRC s) pre-bid meeting: OSHAKATI HELAO NAFIDI
Regional Study & Resource Centers (RSRC s) pre-bid meeting: OSHAKATI HELAO NAFIDI CLIENT: MCA NAMIBIA USER CLIENT: NLAS TEAM CONSULTANTS: SE[ARCH] TEAM Nina Maritz Architect: Principal Agent De Leeuw Namibia:
More informationSchool Assessment Report
School Assessment Report School: Morningside Elementary School Report: Dec 15, 2014 Condition Assessment: Suitability Assessment: Generated: 12/15/2014 12:11:31 PM FOR OFFICIAL USE ONLY Final School Assessment
More informationRPS (Conics) Building Project type: Commercial
RPS (Conics) Building Project type: Commercial Location: 135 Abbott Street, Cairns, Queensland, Australia Year Completed: 2009 Dilapidated commercial structure transformed into modern professional offices
More informationUpper Adams School District Facility Study Presentation Part 2 November 17, 2016
Upper Adams School District Facility Study Presentation Part 2 November 17, 2016 Providing a Client Oriented Approach to Architecture Crabtree, Rohrbaugh & Associates, Architects Agenda Part 1 Current
More informationHealth Life Safety Survey and Master Facilities Plan
Health Life Safety Survey and Master Facilities Plan Community Presentation Board Meeting June 22, 2015 June 22, 2014 Board Presentation Overview and Summary of the Health Life Safety Survey and Master
More informationDeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016
DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition Summary
More informationBorough President and City Council Capital Funding Requests FY 2009
Borough President and City Council Capital Funding Requests FY 2009 CIP Number Phase* Request $ Aronow Theater Upgrades CC-1002070748 DC $1,433,000 Aaron Davis Interior Upgrades CC-1207051505 DC $1,261,000
More informationInvitation to Bid. RLS Construction Group requests your firm to submit a quotation on the following project:
RLS CONSTRUCTION GROUP Phone: 717-502-6680 Fax: 717-502-6681 www.rlscg.com Invitation to Bid RLS Construction Group requests your firm to submit a quotation on the following project: Project: Location:
More informationSchool Assessment Report
School Assessment Report School: Humphries Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:35:17 AM FOR OFFICIAL USE ONLY Final School Assessment
More informationGoverning Body 322nd Session, Geneva, 30 October 13 November 2014
INTERNATIONAL LABOUR OFFICE Governing Body 322nd Session, Geneva, 30 October 13 November 2014 Programme, Financial and Administrative Section Programme, Financial and Administrative Segment GB.322/PFA/3
More informationBuildings Construction Procurement Strategy
Buildings Construction Procurement Strategy Update March 2012 Disclaimer: This presentation is given for information only and cannot be considered as binding Ref. F4E_D_24Y2K9 Agenda 1. Overview of the
More informationBOARD OF TRUSTEES OCTOBER 13, 2014
Measure E BOARD OF TRUSTEES OCTOBER 13, 2014 FACILITIES UPDATE Measure Q 1 RECENTLY COMPLETED PROJECTS Santa Ana College Perimeter Site Improvements Building G Renovation Artesia Street Improvements Property
More informationPRESENTATION JANUARY 24, 2017
4918 HOVENKAMP DRIVE DALLAS, TEXAS 75227 PRESENTATION JANUARY 24, 2017 RGM ARCHITECTS OCTOBER 25, 2016 1 2 COMMUNITY INPUT DESIGN DOCUMENT PROCUREMENT CONSTRUCTION PD SD DD CD BD CA PROJECT PROCESS 3 Construction
More information10 Year Plan. Facilities Planning Guide. December 15, 2014
10 Year Plan Facilities Planning Guide December 15, 2014 October 21, 2014 Facilities Study Session o Existing funding sources established relating to facilities Routine Restricted Maintenance Account (RRMA)
More informationPRESENTATION CENTER SURREY, BC CANADA
PRESENTATION CENTER SURREY, BC CANADA 1 VIEW OF THE PROPOSED OPTIMA 3 TOWERS (AFTER OBTAINING THE HIGH DENSITY THAT IS UNDER STUDY) ALONG WEST WHALLEY RING ROAD 2 3 IHI WILL BUILD THE OPTIMA PRESENTATION
More informationTechnology Transforms Existing Building Into 21st Century Workspace
Project Overview Technology Transforms Existing Building Into 21st Century Workspace The Northwestern Mutual - Van Buren Office Building project included the complete remodel of a seven-story, 162,087-square-foot
More informationSchool Assessment Report
School Assessment Report School: Cascade Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:37:55 AM FOR OFFICIAL USE ONLY Final School Assessment
More information(T022) Level 3. Design economics and cost planning
(T022) Level 3 Design economics and cost planning The areas of competencies expected by RICS APC Pathway Economics of design - site density, wall / floor ratio, storey heights, room sizes, letable / non-letable
More information/ Policy Number: Policy Name: Capital Planning and Development Processes Definitions
Page 1 7-101 Definition A. Alternative Construction Delivery Methods: Building Delivery Processes that vary from the more standard Design-Bid-Build model. These may include Construction Manager-At-Risk
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 Y DATE: December 6-8, 2016 ****************************************************************************** SUBJECT: SDSU Student Wellness
More informationMIAMI DADE COLLEGE WOLFSON CAMPUS REMODEL & RENOVATION PROJECT FOR THE DAVID W. DYER FEDERAL BUILDING AND UNITED STATES COURTHOUSE MIAMI, FLORIDA
MIAMI DADE COLLEGE WOLFSON CAMPUS REMODEL & RENOVATION PROJECT FOR THE DAVID W. DYER FEDERAL BUILDING AND UNITED STATES COURTHOUSE MIAMI, FLORIDA General Scope of Work The total approximate area to be
More informationDarien Public Schools. Master Plan Discussion Review of Elementary Schools Board of Education Meeting March 14, 2018
Darien Public Schools Master Plan Discussion Review of Elementary Schools Board of Education Meeting March 14, 2018 BACKGROUND MASTER PLAN REPORT SUBMITTED DECEMBER 2016 DOCUMENTED DISTRICT-WIDE INFRASTRUCTURE
More informationInterior Architects, P.C REV 2 CONCEPTUAL ESTIMATE. Brooklyn Heights Library, Brooklyn Public Library, Brooklyn, NY GARDINER AND THEOBALD INC FOR: AT:
REV 2 CONCEPTUAL ESTIMATE FOR: Interior Architects, P.C Brooklyn Heights Library, Brooklyn Public Library, Brooklyn, NY AT: BY: GARDINER AND THEOBALD INC Issued: 6/20/2013 BROOKLYN HEIGHTS LIBRARY, BROOKLYN
More informationPROJECT INFORMATION REPORT INFORMATION. Date: February 25, Owner s Rep: Alrich Lynch. 123 Project Address Drive, Savannah GA 31404
LDG Consulting Providing Orientation, Direction, and Execution to the Design, Construction, and Real Estate Industries REPORT INFORMATION Date: February 25, 2015 Owner s Rep: Alrich Lynch Electronic Copy:
More informationUnderstanding Consultants Needed for Your Building Project By Amy Green, Owner, Architect, Interior Designer & LEED AP of amy green design 579 W
Understanding Consultants Needed for Your Building Project By Amy Green, Owner, Architect, Interior Designer & LEED AP of amy green design 579 W 177th St. #51, NYC, NY 10033 amy@amygreendesign.com 503.438.5411
More informationHIDDEN VALLEY ELEMENTARY SCHOOL
SCHOOL DATA Address: 3435 Bonita Vista Santa Rosa, CA 95404 Established: 975 Permanent Classrooms: 29 Portable Classrooms: 8 Building Area: Site Area: Satellite Building Area: Satellite Site Area: 48,802
More informationMATERIALS AND RESOURCES
MATERIALS AND RESOURCES MR- P1: STORAGE AND COLLECTION OF RECYCLABLES To reduce the waste that is generated by building occupants and hauled to and disposed of in landfills. PREREQUISITE REQUIREMENTS Provide
More informationTECHNICAL QUESTIONS FOR ITB-DOT-17/ LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE
TECHNICAL QUESTIONS FOR ITB-DOT-17/18-7004LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE Question 1: Question 2: Question 3: Question 4: Question 5: Question 6: When area configurations
More informationAddendum #3 To Request for Proposal For Rackham Relocations: Project / Dated December 13, 2018
Division of Finance and Business Operations Procurement & Strategic Sourcing 5700 Cass Avenue, suite 4200 Detroit, Michigan 48202 (313) 577-3734 FAX (313) 577-3747 January 11, 2019 Addendum #3 To Request
More informationCULLINAN STUDIO CULLINAN STUDIO HANDBOOK CDM. Part Three Project Management. Contents: 1. Introduction. 2. Practice Policy
Revision register rev date author reviewed description of revision issued by F 14/01/16 WQ CR Document consolidation Contents: 1. Introduction 2. Practice Policy 3. Implementation by the Practice 4. Work
More informationLLANO ISD SCHOOL BOARD MEETING. January 2016
LLANO ISD SCHOOL BOARD MEETING January 2016 LLANO ELEMENTARY AREAS A & C STUCTURAL STEEL AND EXTERIOR WALLS ARE IN PLACE INSTALLATION OF HVAC DUCT WORK IS ON- GOING ELECTRICAL AND PLUMBING ROUGH-IN IS
More informationCupertino Union School District
Cupertino Union School District Update For Citizens Bond Oversight Committee September 21, 2016 WORK IN PROGRESS 1 STEVENS CREEK KINDERGARTEN CLASSROOM STEVENS CREEK KINDERGARTEN CLASSROOM 2 STEVENS CREEK
More information38% 62% Project Funding. TPS Systems and Infrastructure needs
TPS Systems and Infrastructure needs Project Funding Roof replacements (BGP, TMS) Plumbing upgrades Boiler replacements Code compliant systems, PA, Fire Alarm, Area of Refuge Concrete repair Floor repair
More informationBerryessa Union School District Measure L Bond Construction Program
Berryessa Union School District Measure L Bond Construction Program Board of Trustees Update December 8, 2015 Introduction The following presentation is intended to provide the Board of Trustees with an
More informationCity Of Mendota Construction Procedures
City Of Mendota Construction Procedures Building Permit Application: A permit shall be obtained prior to commencing work of any type. Failure to do so may result in doubling the permit fees. At the time
More informationTech Assignment 1 University Medical Center of Princeton. Plainsboro Road, Township of Plainsboro, New Jersey
Tech Assignment 1 University Medical Center of Princeton Plainsboro Road, Township of Plainsboro, New Jersey David Bodnar CM Chris Maget 10/5/2009 Table of Contents Executive Summary...3 Project Schedule
More informationRapport. Organizational Overview. Contents. About Us. Our Services. Our Approach. Our Process. Client Portfolio
Rapport Organizational Overview Contents About Us Our Services Our Approach Our Process Client Portfolio 01 Welcome Message Jeanette Grover, Director At the center of our business is rapport we develop
More informationChino Valley Unified School District Monthly Construction Update
h Construction of One Classroom Wing Cattle Elementary School Architect: WLC Architects, Inc. Contractor: Pacwest Corporation Construction Manager: Bernards Contract Amount: $2,974,000 Contract Start:
More informationHatton Drive Warehouse
DeKalb County School District/Leased/Charter Hatton Drive Warehouse Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 3 School Condition
More informationAbu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) Code of Practice
Abu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) Code of Practice CoP 20.0 Safety in Design (Construction) Version 3.0 July 2016 Table of Contents 1. Introduction... 3 2. Training and
More informationTHE CORPORATION OF THE CITY OF OWEN SOUND
THE CORPORATION OF THE CITY OF OWEN SOUND PROGRAMME AND CONCEPTUAL DESIGNS FOR A RENOVATION TO THE EXISTING OWEN SOUND CITY HALL IN OWEN SOUND, ONTARIO MAY 2, 2016 KONGATS ARCHITECTS CITY HALL DOWNTOWN
More informationConceptual Schematic Design Study Madison Municipal Building June 11, 2013 Presentation to JDS Committee
Conceptual Schematic Design Study Madison Municipal Building June 11, 2013 Presentation to JDS Committee The study will research, study, analyze and present options for the following: 1. Determine the
More informationOconomowoc Area School District Facility Construction Update July 27, 2018
Oconomowoc Area School District Facility Construction Update July 27, 2018 IXONIA ELEMENTARY SCHOOL The exterior of Ixonia Elementary School looks more complete every day! Concrete work for the exterior
More informationBUCKNELL UNIVERSITY PROCEDURES FOR RENOVATIONS AND NEW CONSTRUCTION
I. PURPOSE BUCKNELL UNIVERSITY PROCEDURES FOR RENOVATIONS AND NEW CONSTRUCTION To ensure the proper process to request and obtain approval for all renovation or new construction projects within Bucknell
More information(Continued on next page)
FULL TEXT OF BALLOT MEASURE E LONG BEACH UNIFIED SCHOOL DISTRICT REPAIR AND SAFETY MEASURE. To improve outdated classrooms/neighborhood schools by: improving technology/labs/career education classrooms/electrical
More informationEdmonton Public School District No. 7
EXECUTIVE SUMMARY 1. Overall Impressions The 1966 non-core school has actively pursued an ongoing maintenance and upgrade program to improve a number of past problem areas within the school. Extensive
More informationConstruction through innovative thinking & exacting standards
Over 30 Years Experience in Traditional & Innovative Construction Techniques Our Construction Expertise is founded on an extensive portfolio in Education, Health, Commercial & Residential Projects Construction
More informationCultural Facilities: Capital Needs Inventory and Priorities. Arts, Culture and Libraries Committee October 17, 2016
Cultural Facilities: Capital Needs Inventory and Priorities Arts, Culture and Libraries Committee October 17, 2016 Purpose To provide an overview of the buildings managed through the Office of Cultural
More informationDraft Feasibility Study for the Expansion of Southeast Library
DC public Library KH KEAST & HOOD METROPOLITAN E N G I N E E R I N G I N C S H A P I RO-O BRIEN Draft Feasibility Study for the Expansion of Southeast Library Draft Submission: November 4, 2016 1 OVERVIEW
More informationProject Scope & Budget Breakdown. Mandatory Scope Recommended Additional Scope Wish List Scope
Project Scope & Budget Breakdown Mandatory Scope Recommended Additional Scope Wish List Scope Site Plan EXISTING Site Plan PROPOSED First Floor Plan PROPOSED Basement Floor Plan PROPOSED Mandatory Scope
More informationRequest for Proposal (RFP) Building Repair and Renovation Project. Instruction to Bidders (Project Management Consultants) & Eligibility Criteria
Section -I Request for Proposal (RFP) Building Repair and Renovation Project Instruction to Bidders (Project Management Consultants) & Eligibility Criteria 1. Project Management Consultants should submit
More informationCONSTRUCTION REPORT. Zionsville Community Schools Zionsville, Indiana. October 2014 TSC NO
CONSTRUCTION REPORT TSC NO. 21319.1 October 2014 Zionsville Community Schools Zionsville, Indiana The SKILLMAN Corporation Project Administration Construction Management Zionsville Community Schools 2005
More informationREQUEST FOR PROPOSAL # SQ # ARCHITECTURAL / ENGINEERING CONSULTING SERVICES CAMPUS FACILITIES AUDIT
REQUEST FOR PROPOSAL # SQ # 10274 ARCHITECTURAL / ENGINEERING CONSULTING SERVICES CAMPUS FACILITIES AUDIT MIDDLESEX COUNTY COLLEGE 2600 WOODBRIDGE AVENUE EDISON, NEW JERSEY 08818 Prepared By: Randolph
More informationC. of O. / P.A. Program bonded. Energy Conservation bonded Science Lab Upgrades bonded Minor Repairs hard dollar
Section Contents Five-Year Capital Plan FY 2018-19 through FY 2022-23 Project Funding Type Five - Year Plan Total ( $ 000 s ) State match to existing City funding bonded $79,200 Critical Maintenance for
More informationOBJECTIVE 1.1: To establish the acceptable use and capacity of each building.
GOAL 1: To implement planned and routine maintenance programs which will extend the useful life of all buildings and prevent premature capital outlay for replacement. Through managed maintenance, Facilities
More informationBorough President and City Council Capital Funding Requests FY 2008
Borough President and City Council Capital Funding Requests FY 2008 CIP Number Phase* Request $ Performing Arts Center - Phase 1 BY-1008031127 C $1,000,000 148 Ingersoll Roof Replacement BY-0928061526
More informationADDENDUM NO. 1 FOR RENOVATIONS TO LINCOLN ANIMAL SHELTER RFP # February 1, 2018
ADDENDUM NO. 1 FOR RENOVATIONS TO LINCOLN ANIMAL SHELTER RFP #2018-09-01 NOTICE TO PROSPECTIVE BIDDERS February 1, 2018 Prospective bidders are hereby informed of the following corrections, additions,
More informationIndependence Adult Center
Campus Master Plan March 15, 2004 Master Plan Contents Volume I: District Master Plan Andrew P. Hill High School Campus Master Plan Foothill High School Campus Master Plan Independence High School Campus
More informationAllowance Table for: General:
Allowance Table for: Adopting Credits from LEED Canada for New Construction and Major Renovations (NC) 2009 and LEED Canada for Core and Shell Development (CS) 2009 for LEED Canada-NC v1.0 (with or without
More informationPrestage Farms Subcontractor and Vendor Outreach Fair
Prestage Farms Subcontractor and Vendor Outreach Fair Architecture Interiors Engineering Construction December 13, 2016 www.epsteinglobal.com Agenda Epstein s Role Project Description Project Location
More informationTOWN OF BELMONT, NH - TOWN CENTER FACILITIES - CONCEPTUAL PROJECT BUDGET December 20, 2018
POLICE DEPARTMENT OPTION A - Addition/Renovation to Existing Site 6,662 S.F. Interior demolition $ 12/SF $ 79,944 Foundation and structural frame $ 35/SF $ 233,170 Thermal and moisture protection $ 30/SF
More informationOconomowoc Area School District Facility Construction Update June 29, 2018
Oconomowoc Area School District Facility Construction Update June 29, 2018 IXONIA ELEMENTARY SCHOOL Finishing touches and final cleaning has begun inside the new addition at Ixonia Elementary, and major
More informationSanta Teresa High School
Santa Teresa High School Campus Master Plan March 15, 2004 Volume II: Campus Master Plan Santa Teresa High School Master Plan Contents Volume I: District Master Plan Volume II: Campus Master Plan Andrew
More informationDESIGN AND CONSTRUCTION STANDARDS OUTLINE SPECIFICATIONS
SECTION 01 91 13 GENERAL COMMISSIONING REQUIREMENTS GENERAL The University of South Alabama is officially and formally committed to the concept of Commissioning all new buildings and major renovations.
More informationRESTRICTED NOTE BY THE DIRECTOR-GENERAL TO THE BUDGET COMMITTEE
GENERAL AGREEMENT ON RESTRICTED TARIFFS AND TRADE ffoitobs 1973 NOTE BY THE DIRECTOR-GENERAL TO THE BUDGET COMMITTEE 1. At its meetings in October 1970 (L/3454-), May 1971 (L/3527), October 1971 (Spec(7l)95)
More informationPROPOSAL FOR ARCHITECTURAL SERVICES. June 22, 2015
PROPOSAL FOR ARCHITECTURAL SERVICES June 22, 2015 FIRM BACKGROUND Dimension IV Madison Design Group is built on a vision of architecture and professional services that puts the client and users, the building
More informationA BIM STORY. Andreas Wecker BIM Management / Losinger Marazzi. Thibaut Lecoutere BIM Site Coordinator / Losinger Marazzi
A BIM STORY Andreas Wecker BIM Management / Losinger Marazzi Thibaut Lecoutere BIM Site Coordinator / Losinger Marazzi Philipp Seer Head of BIM / Burckhardt+Partner AG José Alves BIM Coordinator / Burckhardt+Partner
More informationLemm Elementary. Restoring the Heart of the Community. Klein Independent School District
Lemm Elementary Restoring the Heart of the Community Target Date: August 2018 June Work Update - Project is on schedule Exterior brick is ongoing in Area A addition Area A walls have been covered Main
More informationThe Consumer s Guide to. Basement Renovations. The Consumer s Guide to Basement Remodeling Total Renovations
The Consumer s Guide to Basement Renovations What Do I Create With My Basement s Space? Renovating your basement is a popular and cost-effective way to maximize existing square-footage. It is your blank
More information1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %
8/11/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 82 82% 2.3 Structural 0 7 7% 2.4 Building Envelope 0 47 47% 2. Interior
More informationCONTENTS. 71 Section 01352, #7 (Life Cycle Cost and Life Cycle Assessment) 2/1/12 Modified entire section 72 Section 01352, #8 (Sustainability
01352 Sustainable Design Requirements This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications
More informationHampton Township School District High School Feasibility Study. Final Feasibility Study Presentation. VEBH Architects
2018 High School Feasibility Study Final Feasibility Study Presentation January 28, 2019 1 Study Updates I. Latest HS Concepts for Academic / Wellness Redesign II. Associated Conceptual Construction Costs
More informationDisclaimer for Review of Plans
Disclaimer for Review of Plans The San Francisco Planning Code requires that the plans of certain proposed projects be provided to members of the public prior to the Cityʹs approval action on the project.
More information