FLOOD CONSEQUENCE ASSESSMENT FOR A PROPOSED RESIDENTIAL DEVELOPMENT SITE ADJACENT TO GLANDULAS FARM, NEWTOWN, POWYS

Size: px
Start display at page:

Download "FLOOD CONSEQUENCE ASSESSMENT FOR A PROPOSED RESIDENTIAL DEVELOPMENT SITE ADJACENT TO GLANDULAS FARM, NEWTOWN, POWYS"

Transcription

1 FOR A PROPOSED RESIDENTIAL DEVELOPMENT SITE ADJACENT TO GLANDULAS FARM, NEWTOWN, POWYS Report Reference: 218/FCA Draft: Version D1 July 2016 Report prepared for: Berry Brothers Willow House East Shrewsbury Business Park SHREWSBURY Shropshire SY2 6LG B a r k e r s C h a m b e r s B a r k e r S t r e e t S h r e w s b u r y U n i t e d K i n g d o m S Y 1 1 S B T : F : E : i n f h a f r e n w a t e r. c o m

2 GENERAL NOTES Title of report: Flood Consequence Assessment for a proposed residential development Site: Site adjacent to Glandulas Farm, Report ref: 218/FCA Date: July 2016 Version Date Issued to Draft version D1 July 2016 Berry Brothers Author: Reviewer: Rebecca John BSc FGS Chris Leake BSc MSc FGS This report has been prepared by Hafren Water Ltd for the named Client, with reasonable skill, care and diligence within the agreed scope and terms of contract. Hafren Water Ltd disclaims any responsibility to the client and others in respect of any matters outside the agreed scope of work. This report has been prepared for use by the client and others acting on their behalf. The report may be passed to regulators. This report does not constitute legal advice or opinion. This report does not represent advice to third parties and no reliance is offered to third parties. No liability is accepted with regard to third parties. Reliance required by any specific Third Party must be agreed in writing with Hafren Water Ltd. P:\Projects\ (218)\Reports\FCA\Draft\218-FCA vn D1 (Jul 16).docx July 16 Page i

3 CONTENTS 1 INTRODUCTION Background Data sources Technical Advice Note 1 (TAN1) Development and Flood Risk Local policy Regulatory requirement for this assessment BASELINE CONDITIONS Location and setting Topography Hydrology Watercourses Waterbodies Culverts Ground conditions Proposed development APPROACH TO THE FLOOD RISK ASSESSMENT Flood risk Climate change Flood receptors Receptors internal to the site Receptors external to the site Design events and flooding pathways MODELLING CARRIED OUT BY THE LEAD LOCAL FLOOD AUTHORITY... FLOOD RISK TO SITE Background Fluvial flooding Surface water flooding Groundwater flooding Flooding from sewers and water mains FLOOD RISK FROM THE SITE TO THE SURROUNDING AREA Fluvial flooding Surface water flooding MITIGATION MEASURES Background Methodology for calculation of run-off and storage volume Greenfield run-off rates Run-off rates for the developed site Mitigation measures Surface water run-off: external receptors Adherence to Local Policy Objectives Natural Resources Wales flood warning service July 16 Page i

4 8 SUMMARY AND CONCLUSIONS TABLES 218/FCA/T1: Recommended increases in rainfall parameters due to climate change /FCA/T2: Rational method run-off co-efficient values /FCA/T3: Site surface areas /FCA/T4: Run-off volumes and attenuation storage DRAWINGS 218/FCA/01 218/FCA/02 218/FCA/03 218/FCA/04 Site location plan Water features TAN1 Development Advice Map: Flood Map Natural Resources Wales surface water flood map APPENDICES 218/FCA/A1 218/FCA/A2 Indicative development layout Run-off calculations July 16 Page ii

5 1 INTRODUCTION 1.1 Background A Planning Application has been prepared for a proposed residential development at a site adjacent to Glandulas Farm in. The site comprises 2 areas; one to the north of the A489 and one to the south. The location of the site is shown on Drawing 218/FCA/01. The Application Area has a total area of approximately 6.2 hectares (ha); the northern area being 1.34 ha and the southern 4.89 ha. The Technical Advice Note 1 (TAN1) Development Advice Map (DAM) shows that the Application Area is located mostly within Flood Zone A, where land is considered to be at little or no risk of fluvial or tidal/coastal flooding. The eastern boundary of both parts of the site (north and south) is adjacent to the Mochdre Brook and there is an area adjacent to this classified as Flood Zone C2; this being defined as floodplain without significant flood defence infrastructure. However, it should be noted that all of the proposed development is located within Flood Zone A. Hafren Water has been commissioned to undertake this Flood Consequence Assessment (FCA) as part of the Planning Application. 1.2 Data sources The following data sources were used in this assessment: Berry Brothers Indicative site layout Ordnance Survey (OS) (emapsite for digital maps) 1:2,000 and 1:0,000 series mapping British Geological Survey (BGS) Geological information (BGS website) Natural Resources Wales (NRW)/Environment Agency (EA) Flood risk maps (NRW website) for flooding from rivers and surface water Development Advice Maps (DAM) Cranfield Soil and Agrifood Institute (ukso.org/maps website) Soils map July 16 Page 1

6 Powys County Council (PCC) Strategic Flood Consequence Assessment Stage 1 (March 2012) Strategic Flood Consequence Assessment Stage 2 (September 2013) 1.3 Technical Advice Note 1 (TAN1) Development and Flood Risk This FCA has been undertaken with due regard to the statutory requirements of TAN1 in relation to development and flood risk, to ensure that flood risk is taken into account at all stages of the planning process and to avoid inappropriate development in areas potentially at risk of flooding. TAN1 classifies the flood risk vulnerability of sites used for residential developments as highly vulnerable development. 1.4 Local policy Powys County Council (PCC) is the Lead Local Flood Authority (LLFA) and local Planning Authority for the site. The PCC Stage 2 Strategic Flood Consequence Assessment (SFCA) states in Section 6.2: The following policy objectives are recommended for all sites that may come forward for development within Powys: Ensure no increase in flood risk elsewhere Development may increase run-off and/or reduce the existing storage capacity afforded by pre-development topography. The aim should therefore be to ensure that a development does not increase flood risk elsewhere. This would ordinarily be assessed via a site-specific flood consequence assessment. Identify opportunities to reduce existing flood risk In areas identified at risk of flooding (fluvial, surface water) or where a watercourse has insufficient channel capacity opportunities to improve existing flood risk by using SuDS, wetlands or other agreed and appropriate measures as well as reducing run-off rates should be investigated and implemented wherever possible. A sequential approach and use of the Justification Test - Use the principles of TAN1, taking a sequential approach to steer development to Flood Zone A. Where this is not always possible, the Justification Test will need to be applied. July 16 Page 2

7 Protect the functional floodplain (in greenfield and previously developed areas) Avoid development in the greenfield functional floodplain in the first instance. Identify opportunities for making space for water on previously developed areas by reinstating the functional floodplain. Site layout - Apply a sequential approach within the development site by locating the most vulnerable elements of a development in the lowest flood risk / hazard areas in the first instance. The use of Flood Zones C2 areas should be primarily retained for recreation, amenity and environmental purposes, which can also provide an effective means of flood risk management as well as providing connected green spaces with consequent social and environmental benefits. Set development back from watercourses - Any developments located adjacent to a watercourse should leave an appropriate undeveloped buffer strip, maintaining the watercourse and the immediate riparian zone as an enhancement feature and allowing for routine maintenance. The width of any buffer strip should be agreed with the relevant authorities on a site by site basis. Reduce surface water run-off from new developments Any development must ensure that post development run-off volumes and peak flow rates are maintained at either the Greenfield rate (for greenfield sites) or deliver a 0% reduction to surface water run-off rates for brownfield sites (up to and including the 1 in 100-year event inclusive of an appropriate allowance for climate change for both development scenarios). SuDS should also be a requirement for all new development and space should be specifically set aside for SuDS and used to inform the overall site layout. Hardstanding areas should be kept to a minimum and infiltration techniques and the re-use of water should be considered before attenuation devices in accordance with the SuDS hierarchy. SuDS will need to have a maintenance strategy to ensure they are maintained and working efficiently. Subject to commencement of the relevant Schedule of the Flood and Water Management Act 2010, the Lead Local Flood Authority as SuDS approval body, should be consulted to confirm the appropriate requirements and specification of SuDS components that are to be adopted. The policies outlined above have been reviewed and the FCA and recommendations therein have been compiled in accordance with the relevant objectives. July 16 Page 3

8 1. Regulatory requirement for this assessment The site is mostly classified as Zone A as defined in TAN1 and shown on Welsh Government s DAM, where the probability of fluvial flooding in any one year is less than 1 in 1,000 (Annual Exceedance Probability, AEP <0.1%). A smaller area of the site along the eastern edge is bounded by Mochdre Brook, and is designated as Flood Zone C2. This is an area where the probability of fluvial flooding in any one year is 1:100 (AEP 1%). An FCA is required in accordance with TAN1. July 16 Page 4

9 2 BASELINE CONDITIONS 2.1 Location and setting The Application Area ( the site ) is situated approximately 1.6 km southwest of the centre of. It has a total area of approximately 6.2 ha and is bisected by the A489 trunk road. The centre of the site is located at National Grid Reference (NGR) SO (Drawing 218/FCA/01). The site is currently used to graze livestock, with surrounding land used for agriculture, a caravan park and an industrial estate. 2.2 Topography The site lies within the valley of the River Severn and is generally low-lying, with an elevation of between 120 and 2 metres Above Ordnance Datum (maod). Land to the north declines towards the River Severn, which is situated at an elevation of approximately 0 maod. The south area of the site is bisected by a field boundary; comprising a 2 m wide hedgerow. Ground to the west of the hedgerow, where the proposed development will be sited, is higher than that to the east. To the east of the hedgerow the ground is undulating, but overall gently decreases in elevation to the Mochdre Brook. 2.3 Hydrology The hydrological characteristics of the site and its environs have been derived from a site visit (8 th July 2016), Ordnance Survey maps, the Natural Resources Wales (NRW) website and GoogleEarth aerial imagery. Water features are shown on Drawing 218/FCA/ Watercourses The Mochdre Brook forms the eastern boundary of the north and south areas of the site (see Drawing 218/FCA/02). It is an incised stream that flows northwards to its confluence with the River Severn. The River Severn flows in a broadly eastern direction approximately 16 m north of the northern area. The Llyfnant Brook flows eastwards to join the Mochdre Brook 900 m to the southwest and upstream of the site. Further to the southwest the Cwm-y-rhiwdre Brook flows northwards to join the Mochdre Brook upstream of the site, some 1.4 km distant. July 16 Page

10 2.3.2 Waterbodies Waterbodies are not present within the site boundaries. The nearest waterbody to the site is located 00 m to its north. This is a small pond adjacent to houses at Bryn-hyfryd. A second small pond is located approximately 720 m to the south of the site. It has an outflow that joins Mochdre Brook to its east Culverts A concrete culvert (Culvert 1) is located on the east side of Mochdre Brook, adjacent to Mochdre Industrial Estate. Due to its location it is assumed that this culvert discharges surface water run-off from the adjacent Mochdre Industrial Estate to the Mochdre Brook. 2.4 Ground conditions The solid geology beneath the site comprises the Nantglyn Flags Formation consisting of mudstone, siltstone and sandstone of Silurian age. Information from a borehole within the vicinity of the site (information from online BGS Geology Viewer) describes the local geology as medium black/grey shale. The Nantglyn Formation is understood to be designated as a Secondary aquifer; these are predominately lower permeability layers which may store and yield limited amounts of groundwater due to localised features such as fissures, thin permeable horizons and weathering. The superficial geology on-site comprises Alluvial/Fan deposits (Quaternary) which consist of sand, gravel and clays adjacent to the Mochdre Brook. These deposits are understood to be designated as a Secondary aquifer; these are permeable layers capable of supporting water supplies at a local rather than strategic (regional) scale, and in some cases forming an important source of base flow to rivers. According to the classifications given by the Cranfield National Soils Resources Institute, the predominant soil on-site is free-draining, slightly acid, loamy floodplain soils. July 16 Page 6

11 2. Proposed development The proposed development comprises a residential development of 89 houses, with associated landscaped public open space and areas of tree planting. Within the northern parcel of land it is proposed to build 30 houses and within the southern area it is proposed to build 9 houses. Further details of the proposed development are included elsewhere within the Planning Application. July 16 Page 7

12 3 APPROACH TO THE FLOOD RISK ASSESSMENT 3.1 Flood risk The FCA considers the likelihood of flooding, the associated hazards and the vulnerability of the flood receptor using a mixture of quantitative and qualitative methods. These factors are combined to produce the single measure, flood risk. Requirements for assessment of flood risk are addressed by due consideration of TAN1, DAM maps and components of flood Management Strategy (see Section 1.4 of this report) as required by Powys County Council (the LLFA). 3.2 Climate change Within the UK, projections of future climate change indicate that there will be more frequent, short duration, high intensity rainfall events and periods of long duration rainfall. TAN1 recommends that the effects of climate change are incorporated into Flood Consequence Assessments. Recommended precautionary sensitivity ranges for peak rainfall intensities and peak river flows are outlined in the Environment Agency document, Adapting to climate change: Advice for flood and coastal erosion risk management authorities (April 2016) and are summarised in Table 218/FCA/T1, below. 218/FCA/T1: Recommended increases in rainfall parameters due to climate change Peak rainfall intensity - applies across all of England 2020s (201 to 2039) Years 200s (2040 to 2069) 2080s (2070 to 2) Upper estimate +10% +20% +40% Central estimate +% +10% +20% Appendix 2 of TAN1 suggests a 20% increase in the 100-year return period flood peak discharge. As such, a precautionary sensitivity range for peak rainfall intensities of 20% for climate change has been used to calculate run-off rates and volumes for the site, given the lifetime of the development (see calculation sheets in Appendix 218/FCA/A2). 3.3 Flood receptors Receptors internal to the site At present the Application Area is used for agricultural purposes to graze livestock. The flood vulnerability class of these areas, as defined in the TAN1, is less vulnerable. July 16 Page 8

13 The proposed site s use will be for residential development, and therefore post-development the site would be classified as highly vulnerable Receptors external to the site Glandulas Farm is located immediately to the south of the site. Glandulas Caravan Park borders the southern area to the west. Glan Hafren Hall is located approximately 21 m to the northwest of the northern area. These properties form the highly vulnerable receptors within the locality of the site. This level of vulnerability increases the potential severity of the consequences of flooding for these receptors. The overall degree of flood risk may thus be higher for such receptors for a given severity of flood event. To the east of the site, on the opposite side of Mochdre Brook is Mochdre Industrial Estate comprising light industrial use. This area forms a less vulnerable receptor. Other receptors outside the site, comprising roads and agricultural fields, are all classed as less vulnerable. 3.4 Design events and flooding pathways As required by TAN1, the return period to be considered for fluvial and rainfall events is 100 years and the effects of climate change will be factored in as described in Section 3.2 of this report. This design event is referred to as the climate-changed, 1% AEP event where AEP means Annual Exceedance Probability. This FCA considers the following hydrological components: Fluvial flow Surface water run-off Groundwater flow Sewer and/or water mains leakage Pathways for flooding may involve two or more such components in sequence, such that the type of flow at the source or site of perturbation is not the same as that delivering flooding to the receptor. Within this FCA, flood risk to both internal and external receptors is assessed with reference to interactions between the development site and the hydrological components itemised July 16 Page 9

14 above. For internal receptors this gives information on the degree of flood hazard and hence the degree of flood risk. In the case of external receptors, flood hazard and hence flood risk during the design events is not evaluated. Instead the potential for the development to qualitatively increase or decrease flood risk at external receptors is assessed so that targeted measures to ensure a qualitative reduction can subsequently be taken, if necessary. July 16 Page 10

15 4 MODELLING CARRIED OUT BY THE LEAD LOCAL FLOOD AUTHORITY Powys County Council has carried out a Stage 2 Strategic Flood Consequences Assessment (SFCA) that builds on work carried out in their Stage 1 SFCA. The Stage 2 SFCA provides an overview of the level of flood risk for a number of Candidate Sites considered for development and inclusion within the Powys County Council (PCC) Local Development Plan (LDP). The Level 2 SFCA provides evidence to inform PCC (the Local Planning Authority (LPA)) of the potential consequences of flooding to development, and allow a sequential and risk based approach to site development. Of the 30 Candidate Sites (CS) that were considered, CS 92 is adjacent to the northern part of the site being considered as part of this FCA. As such, it is pertinent to outline findings of the Stage 2 SFCA flood modelling for CS 92 in relation to this Planning Application. Both the Application Area and CS 92 area are located mostly in Flood Zone A, with a smaller margin of Flood Zone C2. Flood modelling for CS 92 was carried out for the following flood return periods: 1 in 20, 1 in 100, 1 in 100 (+ climate change) and the 1000-year event. Using these flood return events allows modelling results to be correlated with DAM and TAN1 information. The hydraulic (fluvial) model comprised a new 2D TUFLOW model and enabled flood hazard mapping of the floodplain to be completed. Results from modelling indicate that the area of Zone C2 flood risk along the eastern boundary of the Application Area is affected by the 1 in 20, 1 in 100, 1 in climate change and 1 in 1000-year return period. The recommendations for CS 92 are: Acceptable management of flood consequences to be demonstrated in a site-specific FCA. Access to the site - even for areas outside of the modelled flood extents needs to be carefully considered. The LPA will need to be satisfied that access/egress to the site can be achieved in line with guidance set out in TAN1. Recommend consultation with Emergency Services/ Emergency Planners re: access/egress. July 16 Page

16 FLOOD RISK TO SITE.1 Background The risk of flooding at the site has been assessed by examining the likelihood of flooding, the hazard caused if it were to flood and the site s vulnerability. This has been undertaken for a range of likely mechanisms using both quantitative and qualitative methods. In terms of TAN1 Flood Risk Vulnerability Classification, the proposed site use of residential development comprises highly vulnerable flood classification..2 Fluvial flooding The Application Area (north and south area) is mostly situated within Flood Zone A, as shown on the Welsh Government s DAM indicative flood map. Flood Zone A is classified as very low flood risk with a 1 in 1,000-year or less (<0.1%) annual probability of fluvial flooding (Drawing 218/FCA/03). The eastern boundary of both north and south areas is adjacent to Mochdre Brook. In the northern area, the eastern boundary borders Flood Zone C2; classified as floodplain without significant flood defence infrastructure. Proposed development within the northern area is therefore limited to the low risk Flood Zone A area, and is not sited within the C2 Zone. The southern area is divided by a hedgerow (as previously described). To the west of the hedgerow the site is entirely contained within Flood Zone A, and as such the fluvial flood risk is very low. The area east of the hedge is partially within Flood Zone C2, however no development is proposed for this area. The overall risk of fluvial flooding for proposed development within the northern and southern areas of the site is considered to be low and mitigation measures are therefore not required. Within Figure 2 of the TAN1, this style of development is appropriate for this flood classification..3 Surface water flooding Surface water flooding may occur when rainwater does not drain away through the normal drainage systems or percolate to ground, but lies on or flows over the ground surface. Natural Resources Wales Risk of Flooding from Surface Water map indicates that the northern area, and the majority of the southern area are considered to be at low risk. This means that in a year, the area has a chance of flooding of less than 1 in 1000 (<0.1%). July 16 Page 12

17 The only areas potentially affected by surface water flooding are located immediately adjacent to Mochdre Brook and a low-lying channel which crosses the southeastern part of the site, east of the proposed development (see Drawing 218/FCA/04). Based on the above, current surface water flood risk for development at the site is considered to be low..4 Groundwater flooding Powys County Council s Preliminary Flood Risk Assessment (SFRA) contains no records of groundwater flooding within the area. The proposed development will be sited on Alluvial and fan deposits as confirmed during the site visit. It is highly likely that good hydraulic connectivity exists between the Mochdre Brook and the shallow sands and gravels hence groundwater levels will be closely linked with river water levels. Modelling carried out by Natural Resources Wales has been used to inform local flood risk mapping. Peak water levels for model node points in the vicinity of the site may be used to further inform peak water flood levels. The nearest node, RS21A, is 170 m downstream of the site and has a peak water level for the 1 in 100-year event + 20% climate change of 2 maod. If this water level is assumed to be constant upstream of node RS21A, ie within Mochdre Brook, the peak flood water adjacent to the site would be 2 maod. The elevations of the areas for development are in excess of 3 maod in the north area and in excess of 6 maod in the south area. It is therefore considered that the risk posed by groundwater flooding (due to hydraulic conductivity with the Mochdre Brook) is low, and mitigation measures are not necessary.. Flooding from sewers and water mains Information from a previous report carried out by Hafren Water for Glandulas Caravan Site (Drainage Report, April 2010) indicates that pipework associated with foul drainage for part of the adjacent caravan site may be present beneath the southern area of the site. Although manhole covers and a pipe outfall on Mochdre Brook were observed during the site visit (see Drawing 218/FCA/02), further investigation would be required during detailed design stage to identify the location and nature of this infrastructure. July 16 Page 13

18 However, due to the relatively small size of the caravan site, it is assumed that discharge volumes would be small. As such, flood risk posed by site interaction with sewers and water mains is not considered significant for any internal receptors. July 16 Page 14

19 6 FLOOD RISK FROM THE SITE TO THE SURROUNDING AREA 6.1 Fluvial flooding The area to the west of the site is located within Flood Zone A on the Welsh Government s DAM indicative flood map. This is classified as very low flood risk (less than 1 in 1,000-year (<0.1%) annual probability of fluvial flooding). The area to the east of the site is adjacent to Mochdre Brook and is classified as Flood Zone C2, which is classified as high flood risk (1 in 100-year or greater (10%) annual probability of fluvial flooding). It is not proposed to discharge surface water off-site. Drainage features will be designed for infiltration and attenuation; hence the flood risk to neighbouring land due to the proposed development is considered to be very low. Given the proposed surface water management system (SuDs-based), the likelihood of fluvial flooding to the external receptors is considered to be low, hence the overall risk is low. 6.2 Surface water flooding The proposed development will result in changes to run-off characteristics of the site due to the proposed increase in impermeable surfaces. Surface water from the proposed site will run-off to the proposed sustainable drainage system that will be designed as part of the development works. In order to prevent impact on external receptors it will be necessary to ensure that these features are sized to accommodate the required volume generated in a significant rainfall event. Greenfield run-off rates have been calculated together with runoff rates for the existing site and the proposed development and are provided in Appendix 218/FRA/A2. Location and sizing of proposed attenuation features is discussed under mitigation measures in Section 7 below. There is currently an overall low risk of surface water flooding in the areas of proposed development (see Section.3) and this is not expected to change as a result of the development. It is considered therefore that with an appropriately sized sustainable drainage system the development will not increase the flood risk to external receptors. July 16 Page 1

20 7 MITIGATION MEASURES 7.1 Background The proposed development will result in some changes to the run-off characteristics of the existing site. Greenfield run-off rates have been calculated, together with run-off rates for the proposed development and are provided in Appendix 218/FCA/A Methodology for calculation of run-off and storage volume Greenfield run-off rates The peak run-off rate from the greenfield site (ie pre-development) has been estimated using the IH124 method (Equation 7.1, Institute for Hydrology Report N o 124, 1994). The method to estimate mean annual peak flow (QBAR) is of the form: QBAR(rural) = AREA 0.89 SAAR 1.17 SOIL 2.17 Where: QBAR(rural) AREA mean annual flood, with a return period of 2.3 years (m³/s) catchment area (km²) SAAR(4170) Standard Average Annual Rainfall (1941 to 1970) (mm) SOIL soil index This method does not account for slope or storm duration and provides a conservative estimate of the peak greenfield run-off rate. QBAR(rural) can be multiplied using the UK Flood Studies Report regional growth curves to produce peak flood flows for any return period. The greenfield run-off rate for the Application Area is provided in Table 218/FCA/T Run-off rates for the developed site Peak run-off rates for the completed residential development have been estimated. The peak run-off rate for the 1 in 100-year event and storm duration of 6-hours has been estimated using the Rational Method. The Rational Method to give peak flows (Qp) is of the form: Qp = 2.78 CiA Where: C = run-off co-efficient (dimensionless) i = rainfall intensity (mm/hr) A = catchment area (ha) July 16 Page 16

21 The run-off co-efficient, C, varies for different surfaces. The C values used for this assessment are consistent with the Wallingford Procedure for design and analysis of urban storm drainage (HR Wallingford, 1981) and other published research and can be summarised as follows: 218/FCA/T2: Rational method run-off co-efficient values Description of area Run-off coefficient Impermeable (roof) C = 0.9 Impermeable (concrete or hard surface) C = 0.80 Permeable (grass, garden, open space) C = 0.40 Rainfall intensities at the site were obtained from the Flood Estimation Handbook (FEH) CD- ROM, Version 3. Rainfall intensity is dependent on storm duration, representing the likely critical duration for the receiving drainage system. For this assessment, a 6-hour storm duration has been used. The effect of climate change on rainfall intensities has been taken into account in accordance with TAN1 and Planning Policy Guidance (PPG), assuming that the development lifetime will be 7 to 100 years; the maximum period under current provisions. Areas of the differing surface types are tabulated below. It is assumed that run-off from external source areas will not enter the site. 218/FCA/T3: Site surface areas Zone Proposed development Area (m²) Northern area: Impermeable (roof) 1,712 Impermeable (concrete or hard surface) 3,81 Permeable (grass, garden, open space) 7,846 Total 13,409 Southern area: Impermeable (roof) 2,737 Impermeable (concrete or hard surface) 7,863 Permeable (grass, garden, open space) 38,238 Total 48,838 July 16 Page 17

22 Calculations in Appendix 218/FCA/A2 provide estimates of the greenfield and postdevelopment run-off values from the site, using the IH124 and Rational Method. Key information from these calculations is summarised in Table 218/FCA/T4. 218/FCA/T4: Run-off volumes and attenuation storage Phase of development Method Return period Run-off rate (l/s) Run-off volume (m 3 ) Northern area of site Greenfield Post-development IH124 Rational 1 in 2 years in 100 years in 100 years in 100 years (+CC 20%) Southern area of site Greenfield Post-development CC = Climate Change IH124 Rational 1 in 2 years in 100 years in 100 years 71 1, 1 in 100 years (+CC 20%) 86 1,866 Total run-off volume for site 2,470 1 For a critical storm duration of 6-hours As summarised above, run-off for a 1 in 100-year return period (excluding climate change) for the north area of the proposed development increases from 207 m³ to approximately 04 m³ post-development. Including the allowance of 20% for climate change, run-off from the post-development site increases to approximately 60 m 3. For the south area, run-off for a 1 in 100-year return period (excluding climate change) increases from 76 m³ to approximately 1, m³ post-development. With the allowance for 20% climate change, run-off from the post-development site will increase to approximately 1,866 m 3. Mitigation measures are outlined below. The increased run-off will be accommodated through the implementation of a Sustainable Urban Drainage Scheme (SuDS); the details of which are outlined in Section Mitigation measures Surface water run-off: external receptors Run-off characteristics for the site will be altered as a result of the proposed development. In accordance with Powys County Council s policies, SuDS will be used in order to reduce flood risk. July 16 Page 18

23 Run-off calculations have been completed for the 1 in 100-year event, for a storm duration of 6-hours, in accordance with TAN1 and CIRIA SuDS Manual (C697). The total postdevelopment attenuation storage required for the 1 in 100-year event + climate change 20%, with critical storm duration of 6-hours, is approximately 2,470 m 3. To reduce the risk of surface water flooding, the proposed SuDS system will include ephemeral retention basins and infiltration areas. The attenuation features will be of sufficient capacity to provide adequate storage to retain water generated by the design storm event. It is planned to construct the SuDS features on land to the east of the hedgerow in the southern area, adjacent to the C2 Flood Zone. This places it within the proposed area of Public Open Space of the development. Attenuation feature dimensions will be confirmed before construction. If swales are located across topographic contours check dams will be installed to prevent erosion. All SuDS features will be located outside areas of flood risk. The site occupier will be responsible for future maintenance of the SuDS system. In the pre-development site, run-off discharged directly onto surrounding land and into Mochdre Brook. However, all run-off post-development will be directed into the SuDS system, reducing the risk of flooding to external receptors and increasing the capacity of Mochdre Brook. 7.4 Adherence to Local Policy Objectives With regard to the objectives set out by Powys County Council in the Stage 2 SFCA the following section describes how the proposed development meets these criteria (policy objectives in bold). Ensure no increase in flood risk elsewhere Evidence from run-off calculations and Sustainable Urban Drainage Design (SuDS) indicates that the proposed development does not increase flood risk for external receptors. Identify opportunities to reduce existing flood risk It is likely that existing flood risk will be reduced through the use of SuDS as part of the proposed development. A sequential approach and use of the Justification Test The principles of TAN1 have been used to steer development away from high risk flood areas and in to Flood Zone A. July 16 Page 19

24 Protect the functional floodplain (in greenfield and previously developed areas) Development has been moved away from the greenfield functional floodplain within the southern area of the site and in to Flood Zone A. Site layout - A sequential approach has been taken within the development site by locating the most vulnerable elements of the development (ie the houses) in the lowest flood risk/hazard areas. This has been achieved through ensuring that all housing is within Flood Zone A. Land use in Flood Zone C2 has been limited to recreation and environmental purposes, as well as to facilitate flood risk management. Set development back from watercourses Development at the site has been designed to allow a suitably wide undeveloped buffer strip between the watercourse and the proposed housing. Reduce surface water run-off from new developments Calculations for the proposed development show that run-off volumes and peak flow rates are maintained at either the greenfield rate (up to and including the 1 in 100-year event +20% climate change. Development space has been set aside for SuDS features. Flood risk designations have informed the overall site layout. With regard to modelling carried out by Powys County Council for Candidate Sites within the county, the recommendations for CS 92 have been addressed: The LPA will need to be satisfied that access/egress to the site can be achieved in line with guidance set out in TAN1 Access and egress from the area of proposed development will be from higher ground to the west. This area is designated as Flood Zone A and is considered to provide safe access and egress from the site. 7. Natural Resources Wales flood warning service The Application Area is located within a Natural Resources Wales Flood Alert Area (Upper Severn in Powys). The NRW flood warning service in Powys issues warnings by telephone, mobile, , text message and by fax. Registration can be completed on the NRW website or by contacting the Floodline on It is recommended that the site be registered with the NRW flood warning service in order to allow preparatory action to be taken and reduce residual flood risk. July 16 Page 20

25 8 SUMMARY and CONCLUSIONS An assessment has been undertaken of flood risk in and around the proposed development of 89 residential properties in. The Application Area covers approximately 6.2 hectares (ha) and is centred on National Grid Reference (NGR) SO The proposed development is located within Flood Zone A as defined in TAN1 and shown on Welsh Government s DAM, where the probability of fluvial flooding in any one year is less than 1 in 1,000 (AEP <0.1%). A smaller area along the eastern boundary of the site is designated as Flood Zone C2 where the probability of fluvial flooding in any one year is 1:100 (AEP 1%). An FCA is required in accordance with TAN1. Risks of flooding have been considered for fluvial, surface water, groundwater and sewers/mains. Risks from fluvial, groundwater and sewers/mains flooding are low for the site and surrounding area. There is a risk of surface water flooding to the surrounding area as a result of the development. Mitigation measures in terms of surface water storage (attenuation features) have been proposed. The total post-development attenuation storage required for the 1 in 100-year event (plus climate change) is 2,470 m 3. The proposed SuDS scheme will reduce surface water flood risk to external receptors. Drainage features will be designed for infiltration and attenuation, hence the flood risk to external receptors will be significantly reduced. As mitigation of the associated residual risk, it is recommended that the site should be registered with Natural Resource Wales flood warning service and to make contact with the local flood warden. In light of the above, the Application Area is considered to satisfy the flood risk requirements of TAN1 and associated technical guidance. July 16 Page 21

26 DRAWINGS July 16

27

28

29

30

31 APPENDIX 218/FCA/A1 Indicative site layout July 16

32 ED Bd OS Mapping obtained from Promap Licence No Reproduced by Berrys under OS Licence No y EP 0.96 SP N T191 river bank T190 approx size only T T T ST T T370 SR10A SP9 P/W mh EP ge D id Br hedge 1mw MS T water markers 4.6 WSV WO WSV 3.9 T T hedge 2mw MS T SP IC cl IC cl IC cl 6.32 hd hedge 2mw T3 mh 1.0 P/R R P/ Pl 6.9 G T MS T346 MS T N MS no tag 14 P/ R traffic calming T T SP N 7.32 T199 WO MS 0 trees and shrubs G W P/ G 7.48 MS T h 0m STW h 2m hedge mw T344 MS no.77 tag 6.09 SP Roa d Adop table N g traffic calming G tin an Amendments: 4.9 hedge 6mw water lev post 7. 0m h shrubs G IC cl trees and shrubs h T N 8.84 Project: TP Project Glandulas Drawing: Drawing piers not shown gravel SN piers not shown DPC level FL m MS approx size unable to tag 8.19 mh P/W 1.0 trees and shrubs LP concrete P/W 9.43 Client rid 8.27 h 2m 1. Client: 9.84 water trough piers not shown bitmac notice board 8.74 R P/ approx CL only 9.92 ST SR IC cl IC cl IC cl G Caravan Park Tel: Fax: e stone ret wall wider at base SN Lin pe Willow House East Shrewsbury Business Park Shrewsbury SY2 6LG Pi SN ca ble G N 9.98 ge erh ea d hedge foliage water lev ov enu ned av MS T192 Tree li P/ 7 typical tree size T s landula G g in t e fron h 0m 7.6 G edge of foliage P/ W mh post T typical tree size W BERRYS mh post 29022N 9.34 P/R SN T MS no tag 8 trees and shrubs traffic calming MS T19 G T W P/ DK 8.27 SP trees and shrubs post DK T T30 T T32 T ee.73 0mh W P/ water lev Tr h m BT exposed electrical cable ST T33 Landscaped Public Open Space stay wire line of marker flags h.0m P/W 29032N EP borehole MS T overhead cable SP T stone ret wall notice boards 6.61 NO TAG edge of sm trees e ag stone ret wall foli ST T to N e du all T utm 6.07 Sta k m oo Br post 300 square post 300 square MS T MS T BT RS mh water marker IC cl 6.48 hedge 2mw IC cl P/R e Tre ting n Pla dense overgrowth JOI re N El Sub line of marker flags ST h 2.2m S/S 2 6.m 2.92 oc water lev T361 river approx il MS headwall soffit IC cl 6.38 meter M.0.48 hedge 3.mw 6.32 CS N MS T ST IC cl 3.23 WSV WO WSV 3.3 WSV EP 3.81 dense overgrowth N P/W 1.0mh Wilmar 4 is a l u hedge foliage N 6.9 hedge 1mw IC cl A/B footpath sign 4.3 FM Depot G IC cl post /B A IC cl h 30 8 A hedge.mw DK 1 29 P/W G IC cl m G 4.10 il 3. 10mm pipe 4.68 stile edge of concrete 1.70 ducts top edge of bridge deck water marker P/ R edge of concrete 2m BT h G.49 B A/ BT 0 il 3.67 edge of concrete mm pipe water marker ST4.8 IC cl hedge 2mw EP dense overgrowth.3.36 all.17 m 1.0 hedge foliage h water marker 2m R P/ WSVs edge of bridge deck sh me hedge foliage edge of concrete water lev.1.70 B MS T368 A/ hedge 2.mw hedge 4mw SP sparse 4.4 footpath post water marker 1.77 MS T P/W 1.0mh o Ad pta ble hedge 2mw WSV N 4.46 DK ad Ro 4.4 edge of foliage 4.4.2mh P/R WO tree foliage water marker 3.6 h m 1.2 R P/ hedge 2mw and trees SR N water lev hedge 1mw N N rid g window head e1 26 window head window head window head Drawing Number: Drawing Rev. Scale 1:70 Paper Drawn By: AB A1 Date:

33 APPENDIX 218/FCA/A2 Run-off calculations July 16

34 Greenfield Runoff Estimate for Application Area (north) Parameters Results Area km 2 QBAR(rural) 3.7 l/s SAAR 1007 Q (1in1yr)* 3.2 l/s SOIL 0.30 FSR region 4 QBAR 2.8 l/s/ha Return period 2 Q (1in1yr) 2.4 l/s/ha Growth curve factor 0.89 Q (1in100yr) 7.2 l/s/ha NB: calculation based on 0. km2 and then scaled down to actual catchment size. The IH124 methodology is designed for sites > 0. km2 but can be linearly interpolated to represent smaller catchments. Q (1in1yr)*: approximate calculation using a ratio of 0.8 (R&D Technical Report W-074/A Preliminary Rainfall Runoff Management For Developments. Revision D - January 2012) Return period (yr) Q (l/s/ha) Q (l/s) Barkers Chambers Barker Street Shrewsbury, Shropshire SY1 1SB UK Tel: Client: Berry Brothers Willow House East Shrewsbury Business Park Shrewsbury SY2 6LG Title: Greenfield run-off rates from Application Area_North area, using IH124 formula Project: Calc Sheet: 1 of 6 Date: Jul-16 P:\Projects\ (218)\Working\Runoff Newtown_North area v2/greenfield_field C_IH124

35 Storage Volumes vs Storm Duration (1-in-100-year storm) for North area Roofs Impermeable (road, diveway) Permeable (garden, tree planting, publoc open space) Contribution Coefficient Area Ha Climate change (% rainfall increase) 0 % IH124 Estimate of 0% AEP Greenfield Discharge 0.0 l/s Groundwater Inflow Rate (-ve for Outflow) 0.0 l/s Duration Rainfall* 2 Rainfall intensity 100 year event Accretion Rate from Roofs * 3 Accretion Rate from Impermeable surfaces * 3 Accretion Rate from Permeable surfaces * 3 Accretion Rate Accretion Rate from from Net Accretion Groundwater * 3 Watercourse * 3 Rate in Storage Net Accretion Volume in Storage hours mm mm/hr l/s l/s l/s l/s l/s l/s m Barkers Chambers Barker Street Shrewsbury, Shropshire SY1 1SB UK Tel: Client: Title: Runoff rates and retention volumes for north area, Post development Berry Brothers Willow House East Shrewsbury Business Park Shrewsbury SY2 6LG Project: Calc Sheet: 2 of 6 Date: Jul-16 * 2 Obtained from FEH CD-ROM v3 * 3 Climate change factored into rainfall intensity at this stage P:\Projects\ (218)\Working\Runoff Newtown_North area v2/post Dev RUNOFF

36 Storage Volumes vs Storm Duration (1-in-100-year storm) for North area Roofs Impermeable (road, diveway) Permeable (garden, tree planting, publoc open space) Contribution Coefficient Area Ha Climate change (% rainfall increase) 20 % IH124 Estimate of 0% AEP Greenfield Discharge 0.0 l/s Groundwater Inflow Rate (-ve for Outflow) 0.0 l/s Duration Rainfall* 2 Rainfall intensity 100 year event Accretion Rate from Roofs * 3 Accretion Rate from Impermeable surfaces * 3 Accretion Rate from Permeable surfaces * 3 Accretion Rate Accretion Rate from from Net Accretion Groundwater * 3 Watercourse * 3 Rate in Storage Net Accretion Volume in Storage hours mm mm/hr l/s l/s l/s l/s l/s l/s m Barkers Chambers Barker Street Shrewsbury, Shropshire SY1 1SB UK Tel: Client: Berry Brothers Willow House East Shrewsbury Business Park Shrewsbury SY2 6LG Title: Runoff rates and retention volumes for north area + 20% Climate Change, Post development Project: Calc Sheet: 3 of 6 Date: Jul-16 * 2 Obtained from FEH CD-ROM v3 * 3 Climate change factored into rainfall intensity at this stage P:\Projects\ (218)\Working\Runoff Newtown_North area v2/post Dev RUNOFF +20%CC

Rising Sun. Scaffold Hill. Flood Risk Assessment

Rising Sun. Scaffold Hill. Flood Risk Assessment Rising Sun Scaffold Hill Flood Risk Assessment August 2010 Contents 1.0 Introduction... 4 2.0 Site Description... 5 3.0 Legislative Framework... 6 4.0 Flood Risk... 10 5.0 Surface Water Drainage... 11

More information

Surface Water Guidance for Developers

Surface Water Guidance for Developers Surface Water Guidance for Developers Contents Overview of Sustainable Drainage Systems (SuDS)... 2 Information Required in a Flood Risk Assessment or Drainage Strategy... 3 Outline Planning Applications...

More information

Flood Risk and Drainage Assessment.

Flood Risk and Drainage Assessment. Flood Risk and Drainage Assessment. Change of Use off land to Leisure Complex At, Caersws, Powys, SY17 5SB October 2018 Statement prepared for: Mr T Bebb By Woodsyde Developments Ltd Woodsyde Developments

More information

Barton Farm Winchester. Outline Planning Application A New Suburb for Winchester. Flood Risk Assessment prepared by Parsons Brinckerhoff

Barton Farm Winchester. Outline Planning Application A New Suburb for Winchester. Flood Risk Assessment prepared by Parsons Brinckerhoff Barton Farm Winchester Outline Planning Application A New Suburb for Winchester Flood Risk Assessment prepared by Parsons Brinckerhoff November 2009 BARTON FARM WINCHESTER FLOOD RISK ASSESSMENT May 2009

More information

Isle of Wight Strategic Flood Risk Assessment MK2. Appendix P Newport

Isle of Wight Strategic Flood Risk Assessment MK2. Appendix P Newport Isle of Wight Strategic Flood Risk Assessment MK2 Appendix P June 2010 Isle of Wight Strategic Flood Risk Assessment Overview Please review this discussion in conjunction with the mapping provided in this

More information

Refer to Chapter 3.0 (Description of Development) for a detailed site and development description.

Refer to Chapter 3.0 (Description of Development) for a detailed site and development description. 7. WATER: HYDROGEOLOGY & HYDROLOGY 7.1 Introduction This chapter of the EIAR comprises of an assessment of the likely impact of the proposed development on the surrounding surface water and hydrogeological

More information

Isle of Wight Strategic Flood Risk Assessment MK2. Appendix E West Wight

Isle of Wight Strategic Flood Risk Assessment MK2. Appendix E West Wight Isle of Wight Strategic Flood Risk Assessment MK2 Appendix E June 2010 Isle of Wight Strategic Flood Risk Assessment Overview The RDA is comprised of the towns of Totland and Freshwater and is classified

More information

Foul Drainage Assessment and Surface Water Management Plan Land at Mill Lane Hawkinge CT18 7BY

Foul Drainage Assessment and Surface Water Management Plan Land at Mill Lane Hawkinge CT18 7BY Foul Drainage Assessment and Surface Water Management Plan Land at Mill Lane Hawkinge CT18 7BY RMB Consultants (Civil Engineering) Ltd March 2015 RMB Consultants (Civil Engineering) Ltd 39 Cossington Road

More information

Flood Consequence Assessment. Proposed Commercial Development, Tank Farm Way, Sully

Flood Consequence Assessment. Proposed Commercial Development, Tank Farm Way, Sully Flood Consequence Assessment Proposed Commercial Development, Tank Farm Way, Sully Client O Reilly Concrete Group Larchfield Kingscourt County Cavan Ireland By RVW Consulting 6 Neptune Court Vanguard Way

More information

Respond! Housing Association. Residential Development at Flinters Field, Athy, Co. Kildare. Engineering Report. Job No. : Date: April 2017

Respond! Housing Association. Residential Development at Flinters Field, Athy, Co. Kildare. Engineering Report. Job No. : Date: April 2017 Job No. : 16036 Date: April 2017 Respond! Housing Association Residential Development at Flinters Field, Athy, Co. Kildare Engineering Report 2B Richview Office Park Clonskeagh Dublin 14 Contents Amendment

More information

Foul Water Drainage Strategy Monkton Road Minster CT12 4EE

Foul Water Drainage Strategy Monkton Road Minster CT12 4EE 66-68 Monkton Road Minster CT12 4EE RMB Consultants (Civil Engineering) Ltd May 2016 RMB Consultants (Civil Engineering) Ltd 39 Cossington Road Canterbury Kent CT1 3HU Tel 01227 472128 www.rmbconsultants.co.uk

More information

Developers Guide for Surface Water Management.

Developers Guide for Surface Water Management. Developers Guide for Surface Water Management www.southwark.gov.uk Contents 1. Introduction... 2 2. Requirements for Flood Risk Assessments and Drainage Strategies... 3 2.1 Planning Applications... 3 2.2

More information

Drainage Strategy Report

Drainage Strategy Report CONSULTING ENGINEERS Report No: Date: C1014 Aug 2017 Project: Drainage Strategy Report Danygraig Works, Risca Client: P.D. Edenhall This report is provided for the benefit only of the party to whom it

More information

Flood Risk Assessment

Flood Risk Assessment Temporary Shale Gas Exploration Roseacre Wood, Lancashire PNR_PL_ June 2014 Contents 1 Introduction 1 2 Development Description and Location 2 Page 2.1 Location 2 2.2 Existing Site Characteristics 3 2.3

More information

Land North East of Blandford

Land North East of Blandford Land North East of Blandford On behalf of Savills Plc Project Ref: 36965/4001 Rev: B Date: February 2016 Office Address: Lakeside House, Blackbrook Business Park, Blackbrook Park Avenue, Taunton TA1 2PX

More information

Flood Risk Assessment. for. Proposed Residential Development at Bentletts Scrap Yard Claygate Road Collier Street Kent

Flood Risk Assessment. for. Proposed Residential Development at Bentletts Scrap Yard Claygate Road Collier Street Kent Flood Risk Assessment for Proposed Residential Development at Bentletts Scrap Yard Claygate Road Collier Street Kent 1129-1008 February 2016 RCD Consultants Ltd Proposed Residential Development Bentletts

More information

FORMER SHEEP PEN MILL LANE WELSHPOOL FLOOD CONSEQUENCES ASSESSMENT LIDL UK GMBH FOR. September Our Ref: RCEF R

FORMER SHEEP PEN MILL LANE WELSHPOOL FLOOD CONSEQUENCES ASSESSMENT LIDL UK GMBH FOR. September Our Ref: RCEF R FORMER SHEEP PEN MILL LANE WELSHPOOL FLOOD CONSEQUENCES ASSESSMENT FOR LIDL UK GMBH Our Ref: RCEF32271-002 R RPS Health, Safety & Environment Unit 12 Watersedge Business Park Modwen Rd, Salford Quays M5

More information

DOUGHTY ROAD, GRIMSBY Flood Risk Assessment and Surface Water Drainage Strategy DECEMBER 2017

DOUGHTY ROAD, GRIMSBY Flood Risk Assessment and Surface Water Drainage Strategy DECEMBER 2017 Flood Risk Assessment and Surface Water Drainage Strategy DECEMBER 2017 CONTACTS SARAH DEMETRIOU Graduate Flood Modeller dd 0117 313 6152 e sarah.demetriou@arcadis.com Arcadis. 2 Glass Wharf Temple Quay

More information

FLOOD RISK ASSESSMENT

FLOOD RISK ASSESSMENT Firth Buildings, 99-101 Leeds Road, Dewsbury, WF12 7BU t 01924 464342 f 01924 450662 e trevor.haigh@haighhuddleston.co.uk FLOOD RISK ASSESSMENT ON LAND AT BUTT LANE SNAITH WEST YORKSHIRE FOR HARRON HOMES

More information

PLYMOUTH ROAD, PLYMPTON, PLYMOUTH. FLOOD RISK ASSESSMENT. On Behalf of. Lidl UK.

PLYMOUTH ROAD, PLYMPTON, PLYMOUTH. FLOOD RISK ASSESSMENT. On Behalf of. Lidl UK. PLYMOUTH ROAD, PLYMPTON, PLYMOUTH. FLOOD RISK ASSESSMENT On Behalf of Lidl UK Date: Our Ref: JER6216 RPS 34 Lisbon Street Leeds West Yorkshire LS1 4LX Tel: (0)113 220 6190 Email: rpslds@rpsgroup.com Quality

More information

COLDRA WOODS HOTEL BY CELTIC MANOR AND STARBUCKS DRIVE- THRU RESTAURANT Flood Consequences Assessment

COLDRA WOODS HOTEL BY CELTIC MANOR AND STARBUCKS DRIVE- THRU RESTAURANT Flood Consequences Assessment COLDRA WOODS HOTEL BY CELTIC MANOR AND STARBUCKS DRIVE- THRU RESTAURANT Flood Consequences Assessment APRIL 2017 CONTACTS JOSHUA MOORE Graduate Hydrologist dd ++44 (0) 117 372 1238 joshua.moore@arcadis.com

More information

Phase 1 FLOOD RISK ASSESSMENT REPORT

Phase 1 FLOOD RISK ASSESSMENT REPORT Phase 1 FLOOD RISK ASSESSMENT REPORT PREPARED FOR: REFERENCE #: 1916 MS Power Projects Ltd DATE: February 2014 Page 1 of 24 AMBIENTAL TECHNICAL SOLUTIONS LTD. DOCUMENT ISSUE RECORD PROJECT: PHASE 1 FLOOD

More information

Appendix 7.A Flood Risk Assessment Pro-forma

Appendix 7.A Flood Risk Assessment Pro-forma Appendix 7.A Flood Risk Assessment Pro-forma Entec UK Limited Entec UK Limited 1 PPS25 Flood Risk Assessment Pro-forma 1. Development description and location 1a. What type of development is proposed and

More information

Flood Hazard Assessment of Potential Growth Areas Palmerston North City: Ashhurst

Flood Hazard Assessment of Potential Growth Areas Palmerston North City: Ashhurst Flood Hazard Assessment of Potential Growth Areas Palmerston North City: Ashhurst Report prepared for Palmerston North City Council by Philip Wallace River Edge Consulting Limited May 2013 Table of Contents

More information

Sustainable Drainage Design Guidance

Sustainable Drainage Design Guidance Sustainable Drainage Design Guidance Contents Introduction 3 1. Legislative and Policy Background 4 2. What are Sustainable Drainage Systems? 5 3. Designing SuDS 7 4. Maintaining SuDS 9 5. Construction

More information

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management Husam Al-Najar Storm water management : Collection System Design principles The Objectives

More information

Drainage design tools

Drainage design tools Drainage design tools Richard Kellagher This presentation Designing drainage systems > Conveyance >Storage > Infiltration > Interception > Exceedence Assessing outline designs (planning) Checking detailed

More information

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Allen County Stormwater Plan Submittal Checklist The following items must be provided when applying for an Allen County Stormwater

More information

South Worcestershire Strategic Flood Risk Assessment Level 2 Update

South Worcestershire Strategic Flood Risk Assessment Level 2 Update South Worcestershire Strategic Flood Risk Assessment Level 2 Update Worcester West Site Assessment Final Report February 2015 This page is intentionally left blank 2015s2316 Worcester West Site Assessment

More information

Preliminary Rainfall Runoff Management for Developments EA/Defra Report Procedure W5-074/A Summary Guidance for Developers and Engineers

Preliminary Rainfall Runoff Management for Developments EA/Defra Report Procedure W5-074/A Summary Guidance for Developers and Engineers Preliminary Rainfall Runoff Management for Developments EA/Defra Report Procedure W5-074/A Summary Guidance for Developers and Engineers 1. Objective of this guidance and Procedure W5-074/A is to assist

More information

NW Bicester Masterplan. Flood Risk Assessment

NW Bicester Masterplan. Flood Risk Assessment NW Bicester Masterplan Flood Risk Assessment Hyder Consulting (UK) Limited 2212959 Aston Cross Business Village 50 Rocky Lane Aston Birmingham B6 5RQ United Kingdom Tel: +44 (0)121 345 9000 Fax: +44 (0)121

More information

Surface Water Drainage Pro-forma for major developments

Surface Water Drainage Pro-forma for major developments Surface Water Drainage Pro-forma for major developments We advise that developers complete this form and submit it to the Local Planning Authority with their planning application, referencing from where

More information

Kildare County Council. Proposed Development of 77 no. Residential Units at College Wood Manor, Ballingappa Road, Clane, Co. Kildare.

Kildare County Council. Proposed Development of 77 no. Residential Units at College Wood Manor, Ballingappa Road, Clane, Co. Kildare. Job No. : 16027 SHB2-CLA-CS-MOR Date: Feb 2018 Kildare County Council Proposed Development of 77 no. Residential Units at College Wood Manor, Ballingappa Road, Clane, Co. Kildare. Engineering Report 2B

More information

Lidl, Chippenham. Flood Risk Assessment & Drainage Strategy. September 2017

Lidl, Chippenham. Flood Risk Assessment & Drainage Strategy. September 2017 September 2017 DOCUMENT VERIFICATION RECORD CLIENT: SCHEME: INSTRUCTION: Lidl UK GmbH Proposed Lidl Food store at the former Middlefield Adult Training Centre, Chippenham SN14 0JP The instruction to carry

More information

APPLICATION GUIDANCE NOTES

APPLICATION GUIDANCE NOTES APPLICATION FOR A RELAXATION OF BYELAW 10 (for any development including buildings, walls, driveways, hardstanding, land tile outfalls, services, trees, fences and landscaping across, into or within 9

More information

Appendix 8.4. Site-wide Drainage Strategy

Appendix 8.4. Site-wide Drainage Strategy Appendix 8.4 Site-wide Drainage Strategy Noble House, Capital Drive, Linford Wood, Milton Keynes MK14 6QP T +44 (0)1908 669898 F +44 (0)1908 669899 E harrisjt@rpsgroup.com W www.rpsgroup.com/design THE

More information

Sustainability Criteria for the Design of Stormwater Drainage Systems for the 21 st Century

Sustainability Criteria for the Design of Stormwater Drainage Systems for the 21 st Century Sustainability Criteria for the Design of Stormwater Drainage Systems for the 21 st Century R. Kellagher 1 and H. Udale-Clarke 1 * 1 HR Wallingford Ltd., Howbery Park, Wallingford. Oxfordshire, OX10 8BA,

More information

SITE SPECIFIC FLOOD RISK ASSESSMENT NEW STUDENT ACCOMMODATION, FASSAUGH AVENUE, CABRA, DUBLIN / F5.1 3 RD JANUARY 2018

SITE SPECIFIC FLOOD RISK ASSESSMENT NEW STUDENT ACCOMMODATION, FASSAUGH AVENUE, CABRA, DUBLIN / F5.1 3 RD JANUARY 2018 SITE SPECIFIC FLOOD RISK ASSESSMENT NEW STUDENT ACCOMMODATION, FASSAUGH AVENUE, CABRA, DUBLIN 7 26 098 / F5.1 3 RD JANUARY 2018 Issued For Distribution Revision Final Architect B 1 INTRODUCTION 1.1 It

More information

Horton Landfill, Small Dole, West Sussex. Infill of geological SSSI. Surface Water Management Assessment. Current Approved Design

Horton Landfill, Small Dole, West Sussex. Infill of geological SSSI. Surface Water Management Assessment. Current Approved Design Horton Landfill, Small Dole, West Sussex Infill of geological SSSI Surface Water Management Assessment Current Approved Design Planning Permission DC/814/07 (UB) Condition 21 (Surface Water Management)

More information

Afon Claerwen Hydropower Project. Flood Risk Assessment. February 2018

Afon Claerwen Hydropower Project. Flood Risk Assessment. February 2018 Afon Claerwen Hydropower Project Flood Risk Assessment February 2018 Hydropower Consultancy & Development Document Control Scheme Name: Client Name: Client Address: Afon Claerwen Hydropower Project Elan

More information

STORM WATER REPORT ASPHALT AND CONCRETE PLANTS JINKINSON SIDE ROAD, ASHTON CITY OF OTTAWA, ONTARIO PREPARED FOR:

STORM WATER REPORT ASPHALT AND CONCRETE PLANTS JINKINSON SIDE ROAD, ASHTON CITY OF OTTAWA, ONTARIO PREPARED FOR: Civil Geotechnical Structural Environmental Industrial Health & Safety (613) 860-0923 210 Prescott Street P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 STORM WATER REPORT ASPHALT AND CONCRETE

More information

Drainage Philosophy 15T788 Proposed Retail and Business Development, Stanley Road, South Shields 08 December 2015 Prepared By Billinghurst George & Partners www.bgp-consulting.co.uk Waterloo House, Teesdale

More information

SWMPs and SFRAs Sa S m m W ingfifeld

SWMPs and SFRAs Sa S m m W ingfifeld SWMPs and SFRAs Sam Wingfield Introduction 1. Introduction to the Cumbria SWMP. Impact on future development and types of actions that will be proposed. 2. Flood risk mitigation options for future development

More information

FLOOD RISK ASSESSMENT DAMHEAD CREEK 2 POWER STATION

FLOOD RISK ASSESSMENT DAMHEAD CREEK 2 POWER STATION FLOOD RISK ASSESSMENT DAMHEAD CREEK 2 POWER STATION Name Job Title Date Prepared Joanne Somerton Senior Consultant (Flood Risk) 14/01/2016 Checked Kerry Whalley Technical Director 04/02/2016 Technical

More information

11 HYDROLOGY, HYDROGEOLOGY AND DRAINAGE

11 HYDROLOGY, HYDROGEOLOGY AND DRAINAGE 11 HYDROLOGY, HYDROGEOLOGY AND DRAINAGE 11.1 introduction 11.1.1 The objective of this section and the statements presented is to assess the existing hydrological and hydrogeological conditions to understand

More information

Sewer Capacity Assessment

Sewer Capacity Assessment Sewer Capacity Assessment Wainlode Lane, Norton, Gloucestershire DE-1607-722 Version 2 Date: 10 th February 2017 Black & Veatch Ltd. 60 High Street Redhill Surrey RH1 1SH Sewer Capacity Assessment Summary

More information

APPENDIX E Drainage and Stormwater Management Report

APPENDIX E Drainage and Stormwater Management Report APPENDIX E Drainage and Stormwater Management Report Drainage and Stormwater Management Report Courtneypark Drive East Class EA & Preliminary Design Prepared for: City of Mississauga Prepared by: Stantec

More information

Background for: Upper Piddle Headwaters

Background for: Upper Piddle Headwaters Background for: Upper Piddle Headwaters Environment Agency Information Waterbody Upper Piddle Waterbody ID GB108044010120 Status Poor Failing elements Fish macrophytes (flows) Phytobenthos (nutrients)

More information

Strategic Flood Risk Assessment (SFRA) Level 2

Strategic Flood Risk Assessment (SFRA) Level 2 Strategic Flood Risk Assessment (SFRA) Level 2 (Final) South Bucks District Council Capswood Oxford Road Denham UB9 4LH (this page intentionally blank) Level 2 SFRA Background The South Bucks Level 1 SFRA

More information

MAUREEN SMITH PROPOSED RESIDENTIAL DEVELOPMENT: 121 NESS ROAD, SHOEBURYNESS, SOUTHEND ON SEA FLOOD RISK ASSESSMENT

MAUREEN SMITH PROPOSED RESIDENTIAL DEVELOPMENT: 121 NESS ROAD, SHOEBURYNESS, SOUTHEND ON SEA FLOOD RISK ASSESSMENT WARD MAUREEN SMITH PROPOSED RESIDENTIAL DEVELOPMENT: 121 NESS ROAD, SHOEBURYNESS, SOUTHEND ON SEA HOMES FLOOD RISK ASSESSMENT REPORT REF. 170090-01 PROJECT NO. 170090 APRIL 2017 121 NESS ROAD, SHOEBURYNESS

More information

STORM WATER REPORT ASPHALT AND CONCRETE PLANTS 891 JINKINSON SIDE ROAD, ASHTON CITY OF OTTAWA, ONTARIO PREPARED FOR:

STORM WATER REPORT ASPHALT AND CONCRETE PLANTS 891 JINKINSON SIDE ROAD, ASHTON CITY OF OTTAWA, ONTARIO PREPARED FOR: Civil Geotechnical Structural Environmental 210 Prescott Street, Unit 1 (613) 860-0923 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 STORM WATER REPORT ASPHALT AND CONCRETE PLANTS 891 JINKINSON

More information

Kildare County Council. Proposed Development of 74 no. Residential Units at Craddockstown Road, Cradockstown Demesne, Naas, Co. Kildare.

Kildare County Council. Proposed Development of 74 no. Residential Units at Craddockstown Road, Cradockstown Demesne, Naas, Co. Kildare. Job No. : 16027 SHB1-CRA-CS-MOR Date: April 2017 Kildare County Council Proposed Development of 74 no. Residential Units at Craddockstown Road, Cradockstown Demesne, Naas, Co. Kildare. 2B Richview Office

More information

APPENDIX C CALCULATIONS

APPENDIX C CALCULATIONS Knowle Park, Cranleigh FRA APPENDIX C CALCULATIONS - Greenfield Runoff Estimation for Site - Calculations for Wallingford Procedure and Modified Rational Method Page 2 IH124 : Greenfield Peak Runoff Catchment

More information

APPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS

APPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS March 18, 2003 This page left blank intentionally. March 18, 2003 TABLES Table E.1 Table E.2 Return Frequencies for Roadway Drainage Design Rational Method

More information

Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications

Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications Environmental Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications Sustainable, Reliable, Affordable Stormwater Attenuation Systems Sustainable Drainage

More information

8 Geology, Hydrology & Hydrogeology

8 Geology, Hydrology & Hydrogeology Inverneill Wind Farm Scoping Report Page 42 8 Geology, Hydrology & Hydrogeology 8.1 Introduction The EIA will consider the potential issues arising from the construction, operation and decommissioning

More information

Muse Developments Ltd Mile End Road Development Flood Risk and Surface Water Drainage Strategy

Muse Developments Ltd Mile End Road Development Flood Risk and Surface Water Drainage Strategy Muse Developments Ltd Mile End Road Development Flood Risk and Surface Water Drainage Strategy FRSWDS/MER Issue 1 20 October 2016 This report takes into account the particular instructions and requirements

More information

Attachment 12 Stage 1 Flood Risk Assessment (IE RP-0001)

Attachment 12 Stage 1 Flood Risk Assessment (IE RP-0001) IE0311133-22-RP-0001, Issue A 17/10/2013 Attachment 12 Stage 1 Flood Risk Assessment (IE0311133-30-RP-0001) IE0311133-22-RP-0001_A_02.DOC Flood Risk Assessment Celebrating 40 Years in Business Jazz Pharmaceuticals

More information

Project Mensa Flood Risk Assessment. Final Report 23 December 2008

Project Mensa Flood Risk Assessment. Final Report 23 December 2008 Project Mensa Flood Risk Assessment Final Report 23 December 2008 This page is left intentionally blank for double sided printing L Project Mensa Flood Risk Assessment 23 December 2008 Notice This report

More information

Flood Risk Assessment

Flood Risk Assessment Flood Risk Assessment Low Whita Swaledale Morrison Utility Services Report Reference: CLE30080/05/01 Clear Environmental Consultants July 2015 QUALITY ASSURANCE Client: Morrison Utility Services Report

More information

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR 1 INTRODUCTION 1.1 Project Description and Location Isabella Ocean Residences is a residential development to be constructed

More information

SuDS design criteria for catchment flood protection Are current criteria appropriate?

SuDS design criteria for catchment flood protection Are current criteria appropriate? SuDS design criteria for catchment flood protection Are current criteria appropriate? Richard Kellagher SuDS Drainage design for catchment flood protection All countries of UK (roughly) in alignment, BUT

More information

PRELIMINARY DRAINAGE STUDY

PRELIMINARY DRAINAGE STUDY PRELIMINARY DRAINAGE STUDY For 34 th & J Residences 3402 J St. San Diego, CA 92102 A.P.N 545-250-08 Prepared By: Kenneth J. Discenza, P.E. Site Design Associates, Inc. 1016 Broadway, Suite A El Cajon,

More information

D12 LAND DRAINAGE, WATER CONSERVATION, FOUL DRAINAGE AND SEWAGE DISPOSAL AN INTEGRATED WATER STRATEGY

D12 LAND DRAINAGE, WATER CONSERVATION, FOUL DRAINAGE AND SEWAGE DISPOSAL AN INTEGRATED WATER STRATEGY D12 LAND DRAINAGE, WATER CONSERVATION, FOUL DRAINAGE AND SEWAGE DISPOSAL AN INTEGRATED WATER STRATEGY OBJECTIVES D12/a To ensure that the development would not be at risk of flooding either from itself

More information

Reducing surface flow during floods by proposed landscape interventions at Gaythorne Hall Farm in the headwater of Scale Beck, Cumbria

Reducing surface flow during floods by proposed landscape interventions at Gaythorne Hall Farm in the headwater of Scale Beck, Cumbria Reducing surface flow during floods by proposed landscape interventions at Gaythorne Hall Farm in the headwater of Scale Beck, Cumbria Flood storage upstream of drystone wall 3c following Storm Eva 23-24

More information

Drainage Servicing Report - Terms of Reference

Drainage Servicing Report - Terms of Reference Urban Form and Corporate Strategic Development City Planning 7th Floor, Edmonton Tower 10111 104 Avenue NW Edmonton, AB T5J 0J4 edmonton.ca July 2018 1 Introduction: Drainage Servicing Reports Drainage

More information

CLAY STREET BRIDGE REPLACEMENT

CLAY STREET BRIDGE REPLACEMENT HYDROLOGY /HYDRAULICS REPORT. EL DORADO COUNTY CLAY STREET BRIDGE REPLACEMENT Prepared by: Joseph Domenichelli Domenichelli & Associates 1107 Investment Blvd., Suite 145 El Dorado Hills, California 95762

More information

CHAPTER 7 WATER RESOURCES AND DRAINAGE NORTHAMPTON GATEWAY

CHAPTER 7 WATER RESOURCES AND DRAINAGE NORTHAMPTON GATEWAY CHAPTER 7 WATER RESOURCES AND DRAINAGE NORTHAMPTON GATEWAY 7.0 7.1 WATER RESOURCES AND DRAINAGE INTRODUCTION 7.1.1 This chapter details the potential receptors and likely effects, including potential water

More information

Storm Water Management

Storm Water Management Storm Water Management Policy September 2014 2 Sustainable drainage feature designed to control and manage flows through a series of check dams 3 Document Name: Storm Water Management Controlled Copy No:

More information

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY 405 TWEEDSMUIR AVENUE

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY 405 TWEEDSMUIR AVENUE FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY FOR CITY OF OTTAWA PROJECT NO.: 11-532 FOR TABLE OF CONTENTS 1.0 INTRODUCTION... 1 1.1 Existing Conditions... 2 1.2 Required Permits / Approvals...

More information

The SuDS Manual Frequently asked questions

The SuDS Manual Frequently asked questions The SuDS Manual Frequently asked questions 1. Is source control still a requirement of the new SuDS Manual? Yes. Source control components are fundamental elements of a SuDS scheme. The benefits of source

More information

Storm water Catchment Analysis

Storm water Catchment Analysis Storm water Catchment Analysis Analysis index 1. Storm water attenuation tank sizing method 2. Consent notices for storm water attenuation tanks 3. Summary of sub catchments 4. Hydrological Analysis for

More information

DRAINAGE & DESIGN OF DRAINAGE SYSTEM

DRAINAGE & DESIGN OF DRAINAGE SYSTEM Drainage on Highways DRAINAGE & DESIGN OF DRAINAGE SYSTEM P. R.D. Fernando Chartered Engineer B.Sc.(Hons), M.Eng. C.Eng., MIE(SL) Drainage Requirement of Highway Drainage System Introduction Drainage means

More information

BEST PRACTICE FOR MODELLING SUSTAINABLE URBAN DRAINAGE SYSTEM STRUCTURES

BEST PRACTICE FOR MODELLING SUSTAINABLE URBAN DRAINAGE SYSTEM STRUCTURES BEST PRACTICE FOR MODELLING SUSTAINABLE URBAN DRAINAGE SYSTEM STRUCTURES R. Kirkham, 1 C. Rayner 2 1 Clear Environmental Consultants Ltd, Rhona.Kirkham@clearltd.com 2 Claire.Rayner@wallingfordsoftware.com

More information

Nuriootpa (Sturt Highway Service Centre) DPA The Barossa Council Appendices. Appendix C - Herriot Consulting Engineering Assessment

Nuriootpa (Sturt Highway Service Centre) DPA The Barossa Council Appendices. Appendix C - Herriot Consulting Engineering Assessment Nuriootpa (Sturt Highway Service Centre) DPA The Barossa Council Appendices Appendix C - Herriot Consulting Engineering Assessment 4th May 2018 C1803-002 Rocland Estate Lot 147 Sturt Highway, Nuriootpa

More information

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS 1500.01 GENERAL REQUIREMENTS 1500.02 NATURE OF STORM WATER FACILITIES 1500.03 DRAINAGE EASEMENTS 1500.04 STORM WATER MANAGEMENT

More information

STORM WATER REPORT. Proposed Row House Complex Clare and Hilson 566 Hilson Ave. & 148 Clare St. Ottawa, Ontario PREPARED FOR:

STORM WATER REPORT. Proposed Row House Complex Clare and Hilson 566 Hilson Ave. & 148 Clare St. Ottawa, Ontario PREPARED FOR: Civil Geotechnical Structural Environmental 210 Prescott Street, Unit 1 (613) 860-0923 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 STORM WATER REPORT Proposed Row House Complex Clare and

More information

( THE M4 CORRIDOR AROUND NEWPORT SCHEME )

( THE M4 CORRIDOR AROUND NEWPORT SCHEME ) PUBLIC INQUIRY IN THE MATTER OF THE HIGHWAYS ACT 1980 AND THE ACQUISITION OF LAND ACT 1981 AND IN THE MATTER OF: THE M4 MOTORWAY (JUNCTION 23 (EAST OF MAGOR) TO WEST OF JUNCTION 29 (CASTLETON) AND CONNECTING

More information

Flood Risk Assessment

Flood Risk Assessment 15T788 Proposed Lidl Store, Stanley Street, South Shields 07 December 2015 Prepared By Billinghurst George & Partners www.bgp-consulting.co.uk Waterloo House, Teesdale South, Thornaby, Stockton on Tees

More information

STORMWATER MANAGEMENT REPORT DRAFT PLAN OF CITY OF GUELPH

STORMWATER MANAGEMENT REPORT DRAFT PLAN OF CITY OF GUELPH Debrob Investments Limited STORMWATER MANAGEMENT REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH PRELIMINARY NOVEMBER 2, 2011 I B I G R O U P P R E L I M I N A R Y Debrob Investments Limited

More information

Flood Risk Assessment. Reach Community Solar Farm

Flood Risk Assessment. Reach Community Solar Farm Flood Risk Assessment Reach Community Solar Farm Andy Rankin 4 th February 2014 Introduction 1.1 Reach is a village of approximately 100 households on the edge of the Fens. We intend to construct a small

More information

UK Onshore Scheme. Proposed Converter Station Outline Drainage Strategy VKL G

UK Onshore Scheme. Proposed Converter Station Outline Drainage Strategy VKL G UK Onshore Scheme VKL-08-39-G500-015 August 2017 Contents 1 INTRODUCTION... 1 1.1 Introduction... 1 1.2 Scope of this Report... 1 2 SOURCES OF INFORMATION... 1 2.1 Introduction... 1 3 PLANNING POLICY,

More information

APPENDIX E ESTIMATING RUNOFF FROM SMALL WATERSHEDS

APPENDIX E ESTIMATING RUNOFF FROM SMALL WATERSHEDS ESTIMATING RUNOFF FROM SMALL WATERSHEDS June 2011 THIS PAGE LEFT BLANK INTENTIONALLY. June 2011 TABLES Table E.1 Table E.2 Return Frequencies for Roadway Drainage Design Rational Method Values June 2011

More information

Sustainable Drainage Systems (SUDS)

Sustainable Drainage Systems (SUDS) www.environment-agency.gov.uk Sustainable Drainage Systems (SUDS) a guide for developers www.environment-agency.gov.uk Surface water run-off The problem The Environment Agency is the leading public body

More information

Scottish Hydrological Group Meeting, 13 th November Surface water management plans in action Case studies in Kent.

Scottish Hydrological Group Meeting, 13 th November Surface water management plans in action Case studies in Kent. Scottish Hydrological Group Meeting, 13 th November 2013. Surface water management plans in action Case studies in Kent Paul Eccleston Topics Prioritisation and broad-scale surface water mapping Case study

More information

Engineering Services Report for. Proposed Student Housing Development. Westwood Hotel Site. Dangan, Upper Newcastle. Galway City

Engineering Services Report for. Proposed Student Housing Development. Westwood Hotel Site. Dangan, Upper Newcastle. Galway City Engineering Services Report for Proposed Student Housing Development Westwood Hotel Site Dangan, Upper Newcastle Galway City Client: NTM ROI Seed Capital LP Job No. A079 May 2018 Engineering Services Report

More information

Summary of Detention Pond Calculation Canyon Estates American Canyon, California

Summary of Detention Pond Calculation Canyon Estates American Canyon, California July 15, 2015 Bellecci & Associates, Inc Summary of Detention Pond Calculation Canyon Estates American Canyon, California 1. Methodology: Method: Unit Hydrograph Software: Bentley Pond Pack Version 8i

More information

Appendix H Water Resources, Drainage and Flood Risk Assessment

Appendix H Water Resources, Drainage and Flood Risk Assessment Blossom Street Appendix H Water Resources, Drainage and Flood Risk Assessment Replacement Environmental Statement Volume III 3461 Blossom Street Flood Risk Assessment December 2014 100 St John Street

More information

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario Site Servicing and Stormwater Management Report By Mohamad Salame, P.Eng. Kamco Technique Ltee. 60 Grand Avenue North Cambridge, Ontario N1S

More information

Hydraulic Capacity Review of the Waioho Stream and Canal

Hydraulic Capacity Review of the Waioho Stream and Canal Hydraulic Capacity Review of the Waioho Stream and Canal Prepared by Ingrid Pak, Environmental Engineer Environment Bay of Plenty October 2006 5 Quay Street P O Box 364 Whakatane NEW ZEALAND ISSN 1176-5550

More information

Screening for Appropriate Assessment Proposed residential development at Slievekeale, Waterford City. 13 April 2018

Screening for Appropriate Assessment Proposed residential development at Slievekeale, Waterford City. 13 April 2018 Proposed residential development at City 13 April 2018 NM Ecology Ltd Consultant Ecologists 276 Harold s Grange Road, Dublin 16 Website: www.nmecology.com Email: info@nmecology.com Tel: 087 6839771 Executive

More information

Hydrology for Drainage Design. Design Considerations Use appropriate design tools for the job at hand:

Hydrology for Drainage Design. Design Considerations Use appropriate design tools for the job at hand: Hydrology for Drainage Design Robert Pitt Department of Civil and Environmental Engineering University of Alabama Tuscaloosa, AL Objectives for Urban Drainage Systems are Varied Ensure personal safety

More information

Neart na Gaoithe Offshore Wind Farm

Neart na Gaoithe Offshore Wind Farm Client: Mainstream Renewable Power Neart na Gaoithe Offshore Wind Farm Outline Surface Water Drainage Strategy for Proposed Substation (Development Support) Report: 1005816 Neart na Gaoithe Offshore Wind

More information

What is runoff? Runoff. Runoff is often defined as the portion of rainfall, that runs over and under the soil surface toward the stream

What is runoff? Runoff. Runoff is often defined as the portion of rainfall, that runs over and under the soil surface toward the stream What is runoff? Runoff Runoff is often defined as the portion of rainfall, that runs over and under the soil surface toward the stream 1 COMPONENTS OF Runoff or STREAM FLOW 2 Cont. The types of runoff

More information

Environment Agency Guidance on Requirements for Land Contamination Reports. July 2005

Environment Agency Guidance on Requirements for Land Contamination Reports. July 2005 Environment Agency Guidance on Requirements for Land Contamination Reports July 2005 ENVIRONMENT AGENCY GUIDANCE ON REQUIREMENTS FOR LAND CONTAMINATION REPORTS Context Who is this guidance aimed at? Developers,

More information

Proposed Strategic Housing Development at the Former Doyles Nursery, Garden Centre and Benoni, Brennanstown Road, Cabinteely, Dublin 18

Proposed Strategic Housing Development at the Former Doyles Nursery, Garden Centre and Benoni, Brennanstown Road, Cabinteely, Dublin 18 Proposed Strategic Housing Development at the Former Doyles Nursery, Garden Centre and Benoni, Brennanstown Road, Cabinteely, Dublin 18 Flood Risk Assessment Report Vimovo Doyles Limited Project Number:

More information

Hydrologic Study Report for Single Lot Detention Basin Analysis

Hydrologic Study Report for Single Lot Detention Basin Analysis Hydrologic Study Report for Single Lot Detention Basin Analysis Prepared for: City of Vista, California August 18, 2006 Tory R. Walker, R.C.E. 45005 President W.O. 116-01 01/23/2007 Table of Contents Page

More information

Storm Sewer Design - Introduction

Storm Sewer Design - Introduction Class 4 [1] Storm Sewer Design - Introduction As urban drainage can not be expected to accommodate all rainfall events, the first step in the design procedure is to select an appropriate design storm.

More information

BS8582, Code of Practice for Surface Water Management for Development Sites

BS8582, Code of Practice for Surface Water Management for Development Sites BSI Draft Review BS8582, Code of Practice for Surface Water Management for Development Sites Code of Practice for Surface Water Management Comment: The introduction of a specific British Standard which

More information

4.2 Cherry Creek & Stillhouse Branch

4.2 Cherry Creek & Stillhouse Branch Section 4 Withlacoochee Basin 4.2 Cherry Creek & Stillhouse Branch 4.2.1 Introduction The information presented in this sub-basin plan for Cherry Creek and Stillhouse Branch is intended to provide the

More information