1 PLYMOUTH ROAD, PLYMPTON, PLYMOUTH. FLOOD RISK ASSESSMENT On Behalf of Lidl UK Date: Our Ref: JER6216 RPS 34 Lisbon Street Leeds West Yorkshire LS1 4LX Tel: (0)

2 Quality Management Prepared by: Jonathan Morley Senior Consultant Reviewed by: Dr Paul Hardwick Associate Authorised by: Dr Paul Hardwick Associate Date: Revision: Project Number: Document Reference: JER6216 JER Lidl, Plymouth Rd, Plympton, Plymouth COPYRIGHT RPS The material presented in this report is confidential. This report has been prepared for the exclusive use of Lidl UK and shall not be distributed or made available to any other company or person without the knowledge and written consent of Lidl UK or RPS. JER6216 i rpsgroup.com/uk

3 1 This report contains only that available factual data for the site which was obtained from the sources described in the text. These data were related to the site on the basis of the location information made available to RPS and its sub-consultants by the client. 2 The assessment of the site is based on information supplied by the client and on-site inspections by RPS and its sub-consultants. Relevant information was also obtained from other sources. 3 The report reflects both the information provided to RPS and its sub-consultants in documents made available for review and the results of observations and consultations by RPS staff and its sub-consultants. 4 Where data have been supplied by the client or other sources, including that from previous site audits or investigations, it has been assumed that the information is correct but no warranty is given to that effect. While reasonable care and skill has been applied in review of this data no responsibility can be accepted by RPS for inaccuracies in the data supplied. 5 This report is prepared and written in the context of the proposals stated in the introduction to this report and its contents should not be used out of context. Furthermore new information, developing practices and changes in legislation may necessitate revised interpretation of the report after its original submission. 6 The copyright in the written materials shall remain the property of the RPS Company but with a royalty-free perpetual licence to the client deemed to be granted on payment in full to the RPS Company by the client of the outstanding amounts. 7 The report is provided for sole use by the addressees and is confidential to them and their professional advisors. No responsibility whatsoever for the contents of the report will be accepted to any person other than the Addressees. JER6216 ii rpsgroup.com/uk

4 Amendment Record Revision No. Date Reason for Change Authors Initials JER6216 iii rpsgroup.com/uk

5 Executive Summary S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 RPS has undertaken a Flood Risk Assessment (FRA) in accordance with the requirements of the National Planning Policy Framework (NPPF) and Planning Practice Guidance for the proposed commercial development off Plymouth Road, Plympton, Plymouth. The entire development site is presently located within EA and SFRA Flood Zone 1 classified with a low probability of flooding from fluvial sources. There is no historical evidence of flooding at the site. The site is at negligible to low susceptibility to surface water flooding. The susceptibility to groundwater flooding is low. The risk of flooding from infrastructure failure is considered to be low. The risk of flooding from reservoir failure has been assessed as low. The commercial elements of the proposed development are defined as less vulnerable in the NPPF and Planning Practice Guidance, and are deemed appropriate for the present flood zone and the zone including climate change. As development types have been steered to sequentially appropriate areas there is no requirement for either a Sequential or Exceptions Test. There will be a 2,591 m 2 (0.259ha) or 21% decrease in low permeability cover. Surface runoff will need to be controlled at an agreed runoff rate. This FRA and supporting documentation shows that the proposed development at this location meets the requirements of the NPPF and associated Planning Practice Guidance. JER6216 iv rpsgroup.com/uk

6 Contents 1 Scope of Work Background Project Scope Source of Information Introduction Legislation and Guidance Climate Change Site Setting Site Location Existing Development Proposed Development Fluvial and Tidal Flooding Flood defences Flooding from rising / high groundwater Source Protection Zones Reservoir Failure Assessment Sewer/Water Main Failure Assessment Surface water flooding Historical flood events Flood Risk Vulnerability Classification Current Flood Risk Drainage Surface Water and Drainage Legislative background Existing Drainage System Current Runoff Rate Proposed Runoff Rate Runoff Calculations Summary and Conclusions Summary Flood Risk Conclusion...15 JER6216 v rpsgroup.com/uk

7 Tables and Figures Tables Table 1- Information sources consulted during preparation of the report Table 2 - Flood Risk Vulnerability and Flood Zone Compatibility...11 Table 3 - Runoff characteristics Figures Figure 1 - EA reservoir flood map Figure 2 - EA surface water map JER6216 vi rpsgroup.com/uk

8 Drawings Drawing 1 Drawing 2 Drawing 3 Drawing 4 Drawing 5 Site location plan Existing site layout Proposed site layout Environment Agency Flood Zones Plymouth City Council SFRA Mapping JER6216 vii rpsgroup.com/uk

9 Appendices Appendix 1 RPS Flood Risk Assessment May 2014 Appendix 2 Correspondence Environment Agency and Plymouth City Council Appendix 3 Topographical Survey Appendix 4 Drainage plans Appendix 5 WinDes calculations JER6216 viii rpsgroup.com/uk

10 1 Scope of Work 1.1 Background At the request of Lidl UK, RPS Planning and Development Ltd (RPS) has updated a sitespecific Flood Risk Assessment (FRA) produced in May 2014 (Appendix 1) to support a planning application for the construction of a commercial use development site on an rectangular shaped parcel located off Plymouth Road, Plympton, Plymouth Planning consent was provided for the initial proposal in 20 th January 2015, Ref 14/01281/FUL. However, Lidl has now instructed RPS to revise the FRA to take into account alterations to the proposed development layout This FRA will form part of the planning application Developments that are designed without regard to flood risk may endanger lives, damage property, cause disruption to the wider community, damage the environment, be difficult to insure and require additional expense on remedial works. Current guidance on development and flood risk identifies several key aims for a development to ensure that it is sustainable in flood risk terms. These aims are as follows: The development should not be at a significant risk of flooding and should not be susceptible to damage due to flooding; The development should not be exposed to flood risk such that the health, safety and welfare of the users of the development, or the population elsewhere, is threatened; Normal operation of the development should not be susceptible to disruption as a result of flooding; Safe access to and from the development should be possible during flood events; The development should not increase flood risk elsewhere; The development should not prevent safe maintenance of watercourses or maintenance and operation of flood defences; The development should not be associated with an onerous or difficult operation and maintenance regime to manage flood risk. The responsibility for any operation and maintenance required should be clearly defined; Future users of the development should be made aware of any flood risk issues relating to the development; The development design should be such that future users will not have difficulty obtaining insurance or mortgage finance, or in selling all or part of the development, as a result of flood risk issues; The development should not lead to degradation of the environment; and The development should meet all of the above criteria for its entire lifetime, including consideration of the potential effects of climate change. JER rpsgroup.com/uk

11 1.1.5 The FRA is undertaken with due consideration of these sustainability aims The key objectives of the FRA are: To assess the flood risk to the proposed development and to demonstrate the feasibility of appropriately designing the development such that any residual flood risk to the development and users would be acceptable; To assess the potential impact of the proposed development on flood risk elsewhere and to demonstrate the feasibility of appropriately designing the development such that the development would not increase flood risk elsewhere; and To satisfy the requirements of NPPF and Planning Practice Guidance which require FRAs to be submitted in support of planning applications for development over 1 ha in area. 1.2 Project Scope This FRA has the following structure: Section 2 identifies the sources of information that have been consulted in preparation of the report. Section 3 provides a hydrological review off the site and undertakes a flood risk assessment of the proposed development scheme. Section 4 describes the sites vulnerability status in line with the NPPF and Planning Practice Guidance. Section 5 describes the flood risk management measures that should be applied to the site, where required. Section 6 provides a summary and conclusion to the report. JER rpsgroup.com/uk

12 2 Source of Information 2.1 Introduction Table 1 below lists the information sources consulted during preparation of this report. Table 1- Information sources consulted during preparation of the report. Data Source Notes Site setting and hydrology. Geology. Environment Agency. Local Planning Authority (LPA). Water Utility Company. Flood Risk Assessment and Planning Guidance. Reports. OS Mapping 1: Sheet 201: Plymouth and Launceston. Environment Agency. BGS 1: Sheet 348: Plymouth EA data holdings, customer service and engagement team. Plymouth City Council. South West Water. National Planning Policy Framework (NPPF). Planning Practice Guidance. Plymouth City Council SFRA, Level 1. Plymouth City Council SFRA, Level 2. Plymouth City Council, Plympton SFRA, Level 2. Environment Agency, Tamar Catchment Flood Management Plan. Plymouth City Council Preliminary Flood Risk Assessment Report. Area information, rivers and other watercourses, general site environs, built environment, catchment Information. Site and area geology. Current flood risk, local flood defences, flood levels, supplementary geology and groundwater information. Flood Zoning Local Development Framework. Water and sewerage assets in the vicinity of the site. Flood zoning for the site as used by the EA in England. Plymouth City Council, Plymouth Level 1 Strategic Flood Risk Assessment, July Plymouth City Council, Plymouth Level 2 Strategic Flood Risk Assessment, January Plymouth City Council, Plymouth Strategic Flood Risk Assessment Level 2 Plympton, May Environment Agency, Tamar Catchment Flood Management Plan, Summary Report June Plymouth City Council, Preliminary Flood Risk Assessment Report, 10 th June JER rpsgroup.com/uk

13 2.2 Legislation and Guidance Plymouth Core Strategy , adopted April The document sets out detailed planning policies and proposals for Plymouth City Council The Core Strategy is a strategic document providing broad guidance on the scale and distribution of development and the provision of supporting infrastructure. It contains higher level policies for delivering the spatial vision, guiding broad patterns of development and constraint. It also contains policies setting out the criteria to be taken into account by the Local Planning Authority in determining proposals for development and the use of land and buildings The policies relevant to hydrology and flood risk are outlined below; Policy CS20 - Sustainable Resource Use The Council will actively promote development which utilises natural resources in as an efficient and sustainable a way as possible. This will include: Meeting high water efficiency standards, and incorporating new technologies to recycle and conserve water resources. Policy CS21 - Flood Risk The Council will support development proposals that avoid areas of current or future flood risk, and which do not increase the risk of flooding elsewhere. This will involve a risk based sequential approach to determining the suitability of land for development. Development in high risk flood areas will only be permitted where it meets the following prerequisites: 1) It can be demonstrated that the development provides wider sustainability benefits to the community that outweigh flood risk. 2) The development should be on previously developed land; if not, there must be no reasonable alternative sites on developable previously developed land. 3) A flood risk assessment has demonstrated that the development will be safe, without increasing flood risk elsewhere In addition development will be required to incorporate Sustainable Drainage Systems (SuDS) to manage surface water drainage Climate Change The effects of future climate change over the next few decades are predicted to result in milder wetter winters and hotter drier summers in the UK (UKCP09). An increased frequency of heavy, intense precipitation leading to increased peak river flows in combination with rising sea levels will have a major impact on the potential for future flooding. The UK Climate Projections (UKCP) project provides advice on indicative sensitivity ranges for the predicted impacts of climate change. Based on a high emissions scenario for the South West region of England, sea JER rpsgroup.com/uk

14 levels may be up to m higher in 2080 than in 1990, and winter mean precipitation intensity could be up to 31% higher than current levels in The Planning Practice Guidance to the NPPF notes that peak river flow could be 30% higher than current levels For the purposes of this report the Planning Practice Guidance 30% climate change allowance has been adapted for use in the development attenuation calculations. JER rpsgroup.com/uk

15 3 Site Setting 3.1 Site Location The site is located on the Erril Retail Park at NGR , 56510, approximately 5 km east of Plymouth City centre. The site is bordered to the north by the B3416 and to the south by a rail line with commercial units of the Valley Road Industrial Estate beyond (Drawing 1) Access to the site is gained via Cot Hill road. 3.2 Existing Development The site (Drawing 2) consists of a rectangular shaped parcel of land covering c.1.25 ha encompassed a vacant single storey warehouse style building, previously utilised as a bowling alley, which has recently been demolished. The remainder of the site is under hardstanding as surface car parking and also landscaping. The site is characterised by the following footprints: Building 4,264 m 2 ; Hardstanding 4,611 m 2 ; and Landscaping 3,603 m The ground falls from approximately 5.8 maod on the northern edge of the site to approximately 5.4 maod along the southern boundary. 3.3 Proposed Development It is understood that the application is for the development of a commercial facility comprising; Retail food store (2,544 m 2 ); Car parking and associated facilities (3,659 m 2 ); and Landscaping and permeable surfacing (6,249 m 2 ) The application includes for a new vehicular exit from the site onto Plymouth Road, and for the existing access/egress onto Cot Hill to be changed to allow for left in vehicle movements only The proposed site layout plan can be found in Drawing Fluvial and Tidal Flooding The closest watercourse to the proposed development is Tory Brook, which flows westerly in an open channel immediately north of the site. The Brook joins the northward flowing River Plym c.800 m to the west of the site Long Brook, a further tributary of the River Plym flows in a westerly direction c.200 m to the south of the site There are no other significant water features within 500 m of the proposed development. JER rpsgroup.com/uk

16 3.4.4 The Environment Agency s (EA) flood map (Drawing 4) indicates that the site lies within Flood Zone 1 and therefore has a low probability (less than 1 in 1,000 years) annual probability of flooding EA Flood Hazard Mapping (Appendix 2) shows the flood extents for a 1 in 100, 1 in 100 plus climate change and a 1 in 1,000 year event should a breach in flood defence occur. During all the modelled events the proposed application site is shown to be flood free The EA also provided modelled flood levels extracted from their Plympton Model The closest modelled in-channel node to the site (TB-00955b.1) located in Tory Brook recorded a 1 in 1,000 year flood level of 4.77 maod (Appendix 2). A comparison against the site surface level (Appendix 3) indicates that the site is located over 1 m higher that the modelled flood level and is therefore at low risk of fluvial flooding during a 1 in 1,000 year event. The site is also not subject to flooding from the watercourse to the south Plymouth City Council SFRA mapping (2010) also shows that that the site is located beyond the 1 in 100 year flood extents including climate change. The model generated to inform the SFRA flood extents also included a complete blockage of the Cot Hill road culvert c.230 m southwest of the site. 3.5 Flood defences EA and Plympton SFRA mapping shows a stretch of flood defences on the right and left banks of Tory Brook. The defences comprise a mix of raised and maintained channel defences which stretch for the entire length of the Brook from junction of Newnham Road and Torbridge Road to the Brooks confluence with the River Plym EA and SFRA records specify that the flood defences are privately maintained providing a 1 in 50 year standard of flood protection with a downstream crest level of 5.78 maod and upstream crest of 6.72 maod. The EA has assigned the defences with a Condition Grade 3 or fair rating. 3.6 Flooding from rising / high groundwater BGS online mapping (Accessed June 2014) indicates that the site is underlain by Superficial Deposits comprising river alluvium (sands silts and clays). British Geological Survey (BGS) bedrock mapping (sheet 348 Plymouth) shows that the superficial deposits below the site are underlain by Upper Devonian Slates comprising metamorphosed sedimentary mudstones and subordinate fine to medium grained sandstones and siltstones. The Wearde Sandstone member sub crops to the west and may extend below site but this is not certain The slates are classified by the EA under the Water Framework Directive as a Secondary A Aquifer, defined as permeable layers capable of supporting water supplies at a local rather than strategic scale, and in some cases forming an important source of base flow to rivers. These are generally aquifers formerly classified as minor aquifers. JER rpsgroup.com/uk

17 3.6.3 Although there are considerable alluvial deposits the EA note that there is no evidence of groundwater issuing at the surface in the area around the site. However, the watercourse that runs adjacent to the site is likely to be in hydraulic continuity with groundwater in the bedrock No groundwater levels within the immediate site area have been made available Based on the information outlined above the potential for groundwater flooding is considered to be low to moderate. 3.7 Source Protection Zones EA mapping shows the site is not located within a Source Protection Zone (SPZ). 3.8 Reservoir Failure Assessment EA mapping shows that the site is at risk of reservoir flooding from a complete failure of the dam at Burrator reservoir, NGR , The EA mapping shows the largest area that might be flooded following complete failure. Consequently it is unlikely that any actual flood would be this large. Moreover the EA state that reservoir flooding is extremely unlikely and UK reservoir safety legislation ensures that reservoirs are well maintained and inspected. Site Figure 1 - EA reservoir flood map. JER rpsgroup.com/uk

18 3.9 Sewer/Water Main Failure Assessment South West Water asset plans (Appendix 4) show the following drainage assets located within and in the near vicinity of the site: 450 mm Public Sewer crossing the western edge of the site conveying flows southward; and 500 mm surface water pipe running immediately adjacent to the western boundary of the site No cover levels or invert levels for the drainage assets have been provided The sewers will have been designed to industry standards (e.g. Sewers for Adoption ) however; the most common causes of flooding from sewers are; inadequate flow capacity, blockages, pumping station failures, burst water mains, water inflow from rivers or the sea, tide locking, siltation, fats/greases, and sewer collapse. Should any of these events occur there is a risk of flooding by surcharge where the flood is in excess of the sewer capacity (usually 1 in 30 year event or greater) Under the DG 5 register requirements all water companies are obliged to keep a record of properties that have been affected by sewer flooding. The Plympton SFRA mapping, which includes DG5 register information, indicates that the site has not been affected by flooding from artificial sources Taking into account the above and absence of any historical sewer flooding the overall risk of flooding via artificial drainage system to the site has been assessed to be low Surface water flooding EA surface water flood mapping (Figure 2 below) indicates that the majority of the site is at very low risk. Two localised areas of the site are shown to be at low risk of surface water flooding defined as areas with a probability of flooding of between 1 in 1,000 (0.1%) and 1 in 100 (1%) Overall, the site is assessed as of negligible to low susceptibility to surface water flooding. JER rpsgroup.com/uk

19 Site Figure 2 - EA surface water map Historical flood events The EA has provided details of a number of historical flood events that affected the Plympton area. The EA historical flood mapping (Appendix 2) and extents specific to an extreme event in 2012 indicates that the site has always been flood free No historical flood information was provided in the Plympton SFRA (2010). JER rpsgroup.com/uk

20 4 Flood Risk Vulnerability Classification In accordance with the Flood Risk Vulnerability Classification in Table 2 of the Planning and Practice Guidance Flood Risk and Coastal Change, a commercial facility is classified as a Less Vulnerable development in flood risk terms Table 3 of Planning Practice Guidance (Table 2 of this report) indicates that Less Vulnerable uses are appropriate for locations in Flood Zone 1. Table 2 - Flood Risk Vulnerability and Flood Zone Compatibility Flood Risk Vulnerability classification (see Table 3 of Planning Practice Guidance) Essential Infrastructure Water Compatible Highly Vulnerable More Vulnerable Less Vulnerable Zone 1 Yes Yes Yes Yes Yes Zone 2 Yes Yes Exception test required Yes Yes Zone 3a Zone 3b Functional Floodplain Exception test required Exception test required Yes No Exception test required Yes Yes No No No Key: Yes: Development is appropriate, No: Development should not be permitted. 4.2 Current Flood Risk The site is at low risk of fluvial flooding. The main flood risk is surface water flooding from direct rainfall on the site or upslope in the vicinity as indicated on the surface water flood map (Figure 2 in the main body of the report above). JER6216 rpsgroup.com/uk

21 5 Drainage 5.1 Surface Water and Drainage The sustainable management of surface water is an essential element of reducing future flood risk to the site and its surroundings Undeveloped sites generally rely on natural drainage to convey or absorb rainfall, the water soaking into the ground or flowing across the surface into watercourses The effect of development is generally to reduce the permeability of at least part of the site, which markedly changes the site s response to rainfall. Without specific measures to manage surface water the volume of water and peak flow rate are likely to increase. Inadequate surface water drainage arrangements can threaten the development itself and increase the risk of flooding to others Surface water arising from a developed site should as far as is practicable be managed in a sustainable manner to mimic the surface water flows arising from the site prior to the proposed development while reducing the risk of flooding at the site and elsewhere, taking climate change into account. 5.2 Legislative background Following the implementation of the Flood and Water Management Act 2010 local flood risk has become the responsibility of the Local Planning Authority. The Act places new duties on upper tier Councils, by designating them as Lead Local Flood Authorities (LLFAs) for the coordination of local flood risk management in their respective administrative areas The Act establishes a SuDS Approving Body (the SAB) at county or unitary local authority levels. The SAB has responsibility for the approval of proposed drainage systems in new developments and redevelopments. Approval must be given before any developer can commence construction. In order to be approved, the proposed drainage system would have to meet national standards for sustainable drainage The SAB is also responsible for adopting and maintaining SuDS which serve more than one property, which they have approved. The Highways Authorities will be responsible for maintaining SuDS in public roads to National Standards The National Standards set out the criteria by which the form of drainage appropriate to any particular site or development can be determined, as well as requirements for the design, construction, operation and maintenance of SuDS Additional guidance for the use of SuDS is provided via CIRIA and BRE in the following: C522 Sustainable Drainage Systems- Design Manual for England and Wales C523 Sustainable Drainage Systems- Best practice JER6216 rpsgroup.com/uk

22 C156 Infiltration Drainage Manual of Good practice BRE365 Soakaway design 5.3 Existing Drainage System Details of the current on site drainage system and discharge locations have not been made available. 5.4 Current Runoff Rate The site is presently covered by a mix of low permeability hardstanding, and more permeable soft landscaping. 5.5 Proposed Runoff Rate Section B7 of the National Standards for sustainable drainage systems (2011) indicates that for previously developed sites the flow rate discharged from the site must not exceed that prior to the proposed development for the: 1 in 1 year event; 1 in 30 year event; and 1 in 100 year event. 5.6 Runoff Calculations An assessment of the current and proposed runoff rates was undertaken to determine the surface water attenuation requirements for the site The rates of runoff were determined using the current industry best practice guidelines as outlined in the Interim Code of Practice for SuDS. The Defra/EA recommended methodology for sites up to 50 hectares in area is the Institute of Hydrology Report 124 method (IoH 124). The runoff rates were calculated using the Micro Drainage WinDes software suite The following parameters were incorporated into the existing site runoff calculations: Catchment Area: 1.25 ha (assume 30% permeable (landscaping) and 70% low permeable surfacing (hardstanding/buildings); Average Annual Rainfall (SAAR): 1309 mm/year; Soil: 0.300; Region No: The following parameters were incorporated into the proposed development runoff calculations: Catchment Area: 1.25 ha (assume 50% permeable (landscaping) and 50% low permeable surfacing (hardstanding/buildings)); Average Annual Rainfall (SAAR): 1309 mm/year; Soil: 0.300; JER6216 rpsgroup.com/uk

23 Region No: Table 3 summarises the results of the runoff calculations and shows that following the construction of the proposed development that there will be a decrease in surface water runoff from the site due to the c.20% reduction in low permeability area. Table 3 - Runoff characteristics. Annual Probability (Return Period, years) Current Runoff (l/s) Proposed Runoff (l/s) Reduction in runoff (l\s) 100% (1) QBAR urban % (30) % (100) % + Climate Change Note: 30% added to rainfall data to account for long-term climate change The WinDes calculation (Table 3) indicate that following construction of the proposed development there will be a reduction in the rate at which surface water is discharged from the Site as a consequence of the decrease in low permeable surfacing. Therefore, as the proposed development demonstrates a betterment in the surface water flow rates no additional surface water attenuation measures are required. JER6216 rpsgroup.com/uk

24 6 Summary and Conclusions 6.1 Summary A updated site-specific Flood Risk Assessment (FRA) in accordance with the NPPF and Planning Practice Guidance has been undertaken for the proposed c.1.25 ha commercial use development on Plymouth Road, Plympton, Plymouth. 6.2 Flood Risk EA and Plymouth City Council SFRA mapping shows that the site is entirely located in Flood Zone 1 and is consequently at low risk of flooding There is no historical evidence of flooding at the site The site is at negligible to low susceptibility to surface water flooding The susceptibility to groundwater flooding is low to medium The risk of flooding from infrastructure failure is considered to be low The risk of flooding from reservoir failure has been assessed as low The proposed development is appropriate for the present flood zone and the zone including climate change There is no requirement for either a Sequential or Exceptions Test There will be a c.20% decrease in low permeability cover. Surface runoff will need to be controlled at an agreed runoff rate It is advised that South West Water are consulted to ascertain available capacity and any recommendation incorporated into the development drainage design scheme. 6.3 Conclusion This FRA and supporting documentation illustrates that the proposed development is at low risk of flooding and appropriate to the location, meeting the requirements of the NPPF and Planning Practice Guidance. JER6216 rpsgroup.com/uk

25 References Amey, June Plymouth City Council, Preliminary Flood Risk Assessment Report. BGS (1977), 1:50,000 Geological Sheet 348 Plymouth and south-east Cornwall area, Keyworth Nottingham. Capita Symonds, May Plymouth City Council, Plymouth Strategic Flood Risk Assessment Level 2 Plympton, Final Report. CIRIA Report C532. Control of Water Pollution from Construction Sites. CIRIA Report C502 Environmental Good Practice on Site. CIRIA Report C697 (2007) The SuDS manual. Communities and Local Government, March National Planning Policy Framework. DEFRA, October Flood and Coastal Defence Appraisal Guidance FCDPAG4 Economic Appraisal Supplementary, Note to Operating Authorities Climate Change Impacts. DEFRA, December National Standards for sustainable drainage systems. Designing, constructing, operating and maintaining drainage for surface runoff. Environment Agency, July Fluvial Design Guide. Environment Agency, June Tamar Catchment Flood Management Plan, Summary Report. JBA Consulting, January Plymouth City Council, Plymouth Level 2 Strategic Flood Risk Assessment, Final Report. Ordnance Survey Explorer (2012) 1:50,000 Map 201: Plymouth and Launceston. Ordnance Survey 1:10,000 Scale Electronic Data Mapping for assessment area. Pell Frischmann, July Plymouth City Council, Strategic Flood Risk Assessment, R02701R001, Final Draft. UK Climate Projections science report: Climate change projections, Version 3, updated December JER6216 rpsgroup.com/uk

26 Drawings JER6216 rpsgroup.com/uk

27 Appendices JER6216 rpsgroup.com/uk

28 Appendix 1 RPS Flood Risk Assessment May 2014 JER6216 rpsgroup.com/uk

29 Appendix 2 Correspondence Environment Agency and Plymouth City Council JER6216 rpsgroup.com/uk

30 Appendix 3 Topographic Survey JER6216 rpsgroup.com/uk

31 Appendix 4 Drainage plans JER6216 rpsgroup.com/uk

32 Appendix 5 WinDes calculations JER6216 rpsgroup.com/uk

33 Pre Development runoff rate Region QBAR (l/s) Q (2yrs) (l/s) Q (1 yrs) (l/s) Q (30 yrs) (l/s) Q (100 yrs) (l/s) Region Region Region Region Region Region 6/Region Region Region Region Ireland National Ireland East Ireland South Ireland West Ireland Greater Dublin Post Development runoff rate Region QBAR (l/s) Q (2yrs) (l/s) Q (1 yrs) (l/s) Q (30 yrs) (l/s) Q (100 yrs) (l/s) Region Region Region Region Region Region 6/Region Region Region Region Ireland National Ireland East Ireland South Ireland West Ireland Greater Dublin JER6216 rpsgroup.com/uk

34 JER6216 rpsgroup.com/uk

Rising Sun. Scaffold Hill. Flood Risk Assessment

Rising Sun. Scaffold Hill. Flood Risk Assessment Rising Sun Scaffold Hill Flood Risk Assessment August 2010 Contents 1.0 Introduction... 4 2.0 Site Description... 5 3.0 Legislative Framework... 6 4.0 Flood Risk... 10 5.0 Surface Water Drainage... 11

More information

Luton Level 1 SFRA Update. February 2013

Luton Level 1 SFRA Update. February 2013 Luton Level 1 SFRA Update February 2013 Quality Management Job No Title Location CS/060431 Luton Level 1 SFRA update Luton Borough Council Document Ref N/A Issue / Revision Final Date 8 February 2013 Prepared

More information

This document was endorsed by Cambridgeshire County Council (CCC) in its capacity as Lead Local Flood Authority on 14 July 2016.

This document was endorsed by Cambridgeshire County Council (CCC) in its capacity as Lead Local Flood Authority on 14 July 2016. Note to the reader Note to the reader This document was endorsed by Cambridgeshire County Council (CCC) in its capacity as Lead Local Flood Authority on 14 July 2016. Once adopted as a Supplementary Planning

More information

Surface Water Drainage Pro-forma for major developments

Surface Water Drainage Pro-forma for major developments Surface Water Drainage Pro-forma for major developments We advise that developers complete this form and submit it to the Local Planning Authority with their planning application, referencing from where

More information

Flood Consequence Assessment. Proposed Commercial Development, Tank Farm Way, Sully

Flood Consequence Assessment. Proposed Commercial Development, Tank Farm Way, Sully Flood Consequence Assessment Proposed Commercial Development, Tank Farm Way, Sully Client O Reilly Concrete Group Larchfield Kingscourt County Cavan Ireland By RVW Consulting 6 Neptune Court Vanguard Way

More information

Attachment 12 Stage 1 Flood Risk Assessment (IE RP-0001)

Attachment 12 Stage 1 Flood Risk Assessment (IE RP-0001) IE0311133-22-RP-0001, Issue A 17/10/2013 Attachment 12 Stage 1 Flood Risk Assessment (IE0311133-30-RP-0001) IE0311133-22-RP-0001_A_02.DOC Flood Risk Assessment Celebrating 40 Years in Business Jazz Pharmaceuticals

More information

Presentation structure

Presentation structure www.gov.uk/hs2 Presentation structure HS2 overview Design vision Policy drivers Flood risk management aims and approach Case study from Phase 2a (Fradley to Crewe) Integrated assessment and design approach

More information

SWMPs and SFRAs Sa S m m W ingfifeld

SWMPs and SFRAs Sa S m m W ingfifeld SWMPs and SFRAs Sam Wingfield Introduction 1. Introduction to the Cumbria SWMP. Impact on future development and types of actions that will be proposed. 2. Flood risk mitigation options for future development

More information

Environment Agency Guidance on Requirements for Land Contamination Reports. July 2005

Environment Agency Guidance on Requirements for Land Contamination Reports. July 2005 Environment Agency Guidance on Requirements for Land Contamination Reports July 2005 ENVIRONMENT AGENCY GUIDANCE ON REQUIREMENTS FOR LAND CONTAMINATION REPORTS Context Who is this guidance aimed at? Developers,

More information

Phase 1 FLOOD RISK ASSESSMENT REPORT

Phase 1 FLOOD RISK ASSESSMENT REPORT Phase 1 FLOOD RISK ASSESSMENT REPORT PREPARED FOR: REFERENCE #: 1916 MS Power Projects Ltd DATE: February 2014 Page 1 of 24 AMBIENTAL TECHNICAL SOLUTIONS LTD. DOCUMENT ISSUE RECORD PROJECT: PHASE 1 FLOOD

More information

YORKSHIRE WATER SERVICES. Humbercare Sewerage Network Analysis

YORKSHIRE WATER SERVICES. Humbercare Sewerage Network Analysis YORKSHIRE WATER SERVICES Humbercare Sewerage Network Analysis Page 1 July 2008 1 Summary 1.1 Introduction 1.1.1 Following flooding in Hull in June 2007 we have been asked by Ofwat to investigate, model

More information

EDEN WESTWOOD FLOOD RISK ASSESSMENT

EDEN WESTWOOD FLOOD RISK ASSESSMENT EDEN WESTWOOD FLOOD RISK ASSESSMENT CONSULTATION DRAFT AUGUST 2016 EDEN WESTWOOD FLOOD RISK ASSESSMENT Consultation Draft Project no: 286897A-HHC Date: August 2016 Kings Orchard 1 Queen Street Bristol

More information

LANDFORM SuDS not duds Local Authority guidance on SuDS 03/11/2010. Ciria LANDFORM event: SuDS not duds Local Authority Guidance: 3 November 2010

LANDFORM SuDS not duds Local Authority guidance on SuDS 03/11/2010. Ciria LANDFORM event: SuDS not duds Local Authority Guidance: 3 November 2010 Ciria LANDFORM event: SuDS not duds Local Authority Guidance: 3 November 2010 The Regulatory Context for Sustainable Drainage Systems (SuDS): Flood and Water Management Act 2010 Vicky Dawe Defra, Head

More information

Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell. Volume 2 NON TECHNICAL SUMMARY. December 2012 SLR Ref:

Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell. Volume 2 NON TECHNICAL SUMMARY. December 2012 SLR Ref: Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell Volume 2 NON TECHNICAL SUMMARY December 2012 SLR Ref: 419.00034.00473 INTRODUCTION 1. This Non Technical Summary (NTS) has been produced by

More information

Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until Non Technical Summary

Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until Non Technical Summary Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until 2035 Non Technical Summary SLR Consulting Limited Project Ref: 403.00079.00474

More information

The Flood Risk Implications of Strategic Development at Barnham / Eastergate / Westergate

The Flood Risk Implications of Strategic Development at Barnham / Eastergate / Westergate at Barnham / Eastergate / Westergate The Hydrological and Hydrogeological Aspects of Tidal sluice and pumping station on the Aldingbourne Rife at Felpham Richard Allitt Associates Ltd Suite 3, Forge Offices

More information

South Worcestershire Strategic Flood Risk Assessment Level 2 Update

South Worcestershire Strategic Flood Risk Assessment Level 2 Update South Worcestershire Strategic Flood Risk Assessment Level 2 Update Worcester West Site Assessment Final Report February 2015 This page is intentionally left blank 2015s2316 Worcester West Site Assessment

More information

Water Resources, Drainage and Flood Risk

Water Resources, Drainage and Flood Risk P O R T I S H E A D B R A N C H L I N E P R E L I M I N A R Y ENV I R O N M E N T A L I N F O R M A T I O N R E P O R T V O L U M E 2 C H A P T E R 17 Water Resources, Drainage and Flood Risk Table of

More information

COLDRA WOODS HOTEL BY CELTIC MANOR AND STARBUCKS DRIVE- THRU RESTAURANT Flood Consequences Assessment

COLDRA WOODS HOTEL BY CELTIC MANOR AND STARBUCKS DRIVE- THRU RESTAURANT Flood Consequences Assessment COLDRA WOODS HOTEL BY CELTIC MANOR AND STARBUCKS DRIVE- THRU RESTAURANT Flood Consequences Assessment APRIL 2017 CONTACTS JOSHUA MOORE Graduate Hydrologist dd ++44 (0) 117 372 1238 joshua.moore@arcadis.com

More information

PERMEABLE PAVEMENTS FREQUENTLY ASKED QUESTIONS

PERMEABLE PAVEMENTS FREQUENTLY ASKED QUESTIONS Question: Why should I consider using a permeable pavement? Answer: Planning for climate change is today a major driver for construction and the built environment. Environment Agency research following

More information

City Development Plan Variation No. 7 Marina Park - Pairc Ui Chaoimh

City Development Plan Variation No. 7 Marina Park - Pairc Ui Chaoimh City Development Plan Variation No. 7 Marina Park - Pairc Ui Chaoimh Strategic Environmental Assessment (SEA) Screening Report 25 th November 2011 Cork City Council Comhairle Cathrach Chorcaí Proposed

More information

Flood Risk Assessment

Flood Risk Assessment Temporary Shale Gas Exploration Roseacre Wood, Lancashire PNR_PL_ June 2014 Contents 1 Introduction 1 2 Development Description and Location 2 Page 2.1 Location 2 2.2 Existing Site Characteristics 3 2.3

More information

FLOOD CONSEQUENCE ASSESSMENT FOR A PROPOSED RESIDENTIAL DEVELOPMENT SITE ADJACENT TO GLANDULAS FARM, NEWTOWN, POWYS

FLOOD CONSEQUENCE ASSESSMENT FOR A PROPOSED RESIDENTIAL DEVELOPMENT SITE ADJACENT TO GLANDULAS FARM, NEWTOWN, POWYS FOR A PROPOSED RESIDENTIAL DEVELOPMENT SITE ADJACENT TO GLANDULAS FARM, NEWTOWN, POWYS Report Reference: 218/FCA Draft: Version D1 July 2016 Report prepared for: Berry Brothers Willow House East Shrewsbury

More information

Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications

Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications Environmental Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications Sustainable, Reliable, Affordable Stormwater Attenuation Systems Sustainable Drainage

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY

IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY ENVIRONMENTAL SETTING The project site is located in the Wilshire community of the City of Los Angeles and is bound by S. Wetherly Drive to

More information

Surface water is the rainwater that runs off roofs, roads and paved areas into the public sewerage system.

Surface water is the rainwater that runs off roofs, roads and paved areas into the public sewerage system. This standard advice note is intended to provide clear guidance for all developers, and planning authorities regarding surface water design and management. It should also be used to inform development

More information

Ryde/Binstead. Flood Investigation Report

Ryde/Binstead. Flood Investigation Report Ryde/Binstead Flood Investigation Report Flood Investigation Report Document Information Document Information Document Reference 2013-IWC-LLFA-009-13 Document Revision Report Status FINAL Date 24 June

More information

Flood risk management and land use planning in changing climate conditions Mikko Huokuna Finnish Environment Institute, SYKE

Flood risk management and land use planning in changing climate conditions Mikko Huokuna Finnish Environment Institute, SYKE 10th International Drainage Workshop of ICID 06.-11. July 2008 Flood risk management and land use planning in changing climate conditions Mikko Huokuna Finnish Environment Institute, SYKE Background hydrological

More information

Screening for Appropriate Assessment Proposed residential development at Slievekeale, Waterford City. 13 April 2018

Screening for Appropriate Assessment Proposed residential development at Slievekeale, Waterford City. 13 April 2018 Proposed residential development at City 13 April 2018 NM Ecology Ltd Consultant Ecologists 276 Harold s Grange Road, Dublin 16 Website: www.nmecology.com Email: info@nmecology.com Tel: 087 6839771 Executive

More information

Thames Water AMP6 Outcomes Reporting Policy Annex 2 Wholesale. Asset Health Control Limits & Failure Thresholds March 2015

Thames Water AMP6 Outcomes Reporting Policy Annex 2 Wholesale. Asset Health Control Limits & Failure Thresholds March 2015 Thames Water Outcomes Reporting Policy Annex 2 Wholesale Asset Health Control Limits & Failure Thresholds March 2015 Published: 31 March 2015 Contents 1 Introduction... 1 2 Wastewater Non-Infrastructure...

More information

GRIMSBY TIDAL DEFENCES: WAVE OVERTOPPING AND COASTAL FLOODING

GRIMSBY TIDAL DEFENCES: WAVE OVERTOPPING AND COASTAL FLOODING 14 May 2013 GRIMSBY TIDAL DEFENCES: WAVE OVERTOPPING AND COASTAL FLOODING EMAY TOHA B&V WATER INTRODUCTION, CONTENTS AND WHY GRIMSBY? 2 I N T R O D U C T I O N S & C O N T E N T S INTRODUCTIONS Senior

More information

7. NATURAL HAZARDS 7.1 SECTION INTRODUCTION

7. NATURAL HAZARDS 7.1 SECTION INTRODUCTION 7. NATURAL HAZARDS 7.1 SECTION INTRODUCTION 7.1.1 The Resource Management Act empowers Council to control any actual or potential effects of the use, development, or protection of land for the purpose

More information

3.0 Planning and Submittal Requirements

3.0 Planning and Submittal Requirements October 2003, Revised February 2005 Chapter 3.0, Planning and Submittal Requirements Page 1 3.0 Planning and Submittal Requirements 3.1 Drainage Studies and Drawings The City of Greenwood Village (Village)

More information

Unique ID: (from PFRA database) Location: Clonfert, Co. Galway. Stage 1: Desktop Review

Unique ID: (from PFRA database) Location: Clonfert, Co. Galway. Stage 1: Desktop Review Location: Clonfert, Co. Galway Unique ID: 252906 (from PFRA database) Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: 197134 Northing: 221731 River / Catchment / Sub-catchment Un-named minor

More information

Croxley Rail Link Environmental Statement. Appendix 14C. Water Environment and Drainage - Flood Risk Assessment. Appendix 14C

Croxley Rail Link Environmental Statement. Appendix 14C. Water Environment and Drainage - Flood Risk Assessment. Appendix 14C Croxley Rail Link Environmental Statement Appendix 14C Water Environment and Drainage - Flood Risk Assessment Appendix 14C Mouchel 2011 Flood Risk Assessment 10 December 2011 Produced for Hertfordshire

More information

WATER ENVIRONMENT 6 CONTENTS DRAWINGS

WATER ENVIRONMENT 6 CONTENTS DRAWINGS CONTENTS WATER ENVIRONMENT 6 Introduction... 6-1 Guidance and Industry Good Practice... 6-1 Policy Context... 6-2 Sources of Information... 6-2 Consultations... 6-3 Assessment Approach... 6-4 Baseline

More information

Longbridge Town Centre Planning Application

Longbridge Town Centre Planning Application Longbridge Town Centre Planning Application Non-Technical Summary of the Environmental Statement January 2011 Introduction An application for Planning Permission has been submitted to Birmingham City Council

More information

Initial Construction Costs For Various Pavement and Drainage Options

Initial Construction Costs For Various Pavement and Drainage Options Interpave Initial Construction Costs For Various Pavement and Drainage Options Final Prepared For Interpave Scott Wilson Ltd Interpave Pavement Design CONTENTS 1. Overview 2. Summary of Pavement Types

More information

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER OLD LEAKE (JUNE 2016)

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER OLD LEAKE (JUNE 2016) SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER OLD LEAKE (JUNE 2016) 1 OLD LEAKE S PLACE IN THE SPATIAL STRATEGY 1.1 Policy 2 of the South East Lincolnshire Local Plan 2011-2036 Draft for Public Consultation

More information

Powburn Flood Risk Study Powburn FRS

Powburn Flood Risk Study Powburn FRS Powburn FRS Northumberland County Council November 2011 Draft Report 9W1520 A COMPANY OF HASKONING UK LTD. COASTAL & RIVERS Marlborough House Marlborough Crescent Newcastle upon Tyne NE1 4EE United Kingdom

More information

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements 4.0 Introduction The requirements presented in this section shall be used to aid the design engineer or applicant in the preparation of drainage reports, drainage studies, and construction drawings for

More information

CLIMATE CHANGE MITIGATION AND ADAPTATION IMPLEMENTATION PLAN for the Draft South East Plan

CLIMATE CHANGE MITIGATION AND ADAPTATION IMPLEMENTATION PLAN for the Draft South East Plan CLIMATE CHANGE MITIGATION AND ADAPTATION IMPLEMENTATION PLAN for the Draft South East Plan EXECUTIVE SUMMARY What is the Purpose and Background to the Implementation Plan? The impact of climate change

More information

Preliminary Drainage Analysis

Preliminary Drainage Analysis Preliminary Drainage Analysis Tanimura and Antle Employee Housing Town of Spreckels County of Monterey, California LIB150205 May 29, 2015 Prepared For: Tanimura and Antle Produce Prepared By: 9699 Blue

More information

Understanding flood risk

Understanding flood risk Guides for Community Emergency Volunteers Understanding flood risk The Guides for Community Emergency Volunteers series has been developed in collaboration with: 2 The series has been funded through grants

More information

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton Viridor Waste Management Proposed Development of an In-Vessel Composting Facility Land at Exide Batteries, Salford Road, Bolton Non-Technical Summary January 2009 Introduction Viridor Waste Management

More information

Northumbrian Water Limited 9 March 2011

Northumbrian Water Limited 9 March 2011 Northumbrian Water Limited 9 March 2011 Flooding - The role of water companies in addressing flooding and SuDs. Les Hall New Development Manager Introduction Northumbrian Water and our sewerage role. Our

More information

Freight Street Development Strategy

Freight Street Development Strategy Freight Street Development Strategy Appendix B: Naugatuck River Floodplain Analysis Freight Street Development Strategy DECEMBER 2017 Page B-1 1.0 NAUGATUCK RIVER FLOODPLAIN AT FREIGHT STREET 1.1 Watershed

More information

CHAPTER 7. San Dieguito River Flooding Adaptation

CHAPTER 7. San Dieguito River Flooding Adaptation CHAPTER 7 San Dieguito River Flooding Adaptation This chapter includes a range of adaptation measures to address vulnerabilities from flooding along the San Dieguito River, including the river valley,

More information

Wylfa Newydd Project A5025 On-line Highway Improvements

Wylfa Newydd Project A5025 On-line Highway Improvements ENERGY WORKING FOR BRITAIN Wylfa Newydd Project Flood Consequences Assessment Wylfa Newydd Project Flood Consequence Assessment Contents 1 Introduction... 1 1.1 Purpose of this document... 1 1.2 Background...

More information

WATERFORD NORTH QUAYS STRATEGIC DEVELOPMENT ZONE

WATERFORD NORTH QUAYS STRATEGIC DEVELOPMENT ZONE WATERFORD NORTH QUAYS STRATEGIC DEVELOPMENT ZONE STRATEGIC FLOOD RISK ASSESSMENT FEBRUARY 2018 As part of the preparation of the Planning Scheme for the Waterford North Quays Strategic Development Zone

More information

Campbell River Environmental Committee 2353 Dolly Varden Road Campbell River, BC V9W 4W5 (Via ) Attention: Leona Adams

Campbell River Environmental Committee 2353 Dolly Varden Road Campbell River, BC V9W 4W5 (Via  ) Attention: Leona Adams October 17, 2016 16-27 Campbell River Environmental Committee 2353 Dolly Varden Road Campbell River, BC V9W 4W5 (Via email) Attention: Leona Adams Re: Review of Upland Excavating Landfill Application Technical

More information

Ewan Hyslop Developing a climate change risk assessment for cultural heritage sites in Scotland

Ewan Hyslop Developing a climate change risk assessment for cultural heritage sites in Scotland Ewan Hyslop ewan.hyslop@hes.scot Developing a climate change risk assessment for cultural heritage sites in Scotland Historic Environment Scotland Scottish Government Non-Departmental Public Body Direct

More information

Appendix G Preliminary Hydrology Study

Appendix G Preliminary Hydrology Study Appendix G Preliminary Hydrology Study Preliminary Hydrology Study VESTING TTM 72608 Long Beach, CA Prepared for: The Long Beach Project, LLC 888 San Clemente, Suite 100 New Port Beach, CA May 28, 2014

More information

MEMORANDUM OF UNDERSTANDING THE FLOW OF THE RIVER THROUGH CIRENCESTER

MEMORANDUM OF UNDERSTANDING THE FLOW OF THE RIVER THROUGH CIRENCESTER 1. Introduction MEMORANDUM OF UNDERSTANDING THE FLOW OF THE RIVER THROUGH CIRENCESTER 1.1 The control and distribution of fluvial flow through Cirencester is manually controlled by the operation of sluice

More information

Whiskey Creek. Groundwater Supply Assessment

Whiskey Creek. Groundwater Supply Assessment Whiskey Creek Groundwater Supply Assessment August 2012 GW Solutions Inc. 3591 Ranch Point Road Nanaimo, BC V9R 6W9 phone: (250) 756-4538 cell: (250) 713-4538 email: gwsolutions@shaw.ca RDN Whiskey Creek

More information

ROYAL ARSENAL Buildings 10, 11 and Royal Carriage Square Foul Sewage & Utilities Report

ROYAL ARSENAL Buildings 10, 11 and Royal Carriage Square Foul Sewage & Utilities Report ROYAL ARSENAL Buildings 10, 11 and Royal Carriage Square Foul Sewage & Utilities Report Submitted to Berkeley Homes (East Thames) Limited Submitted by AECOM Scott House Alençon Link Basingstoke Hampshire

More information

Willow Brook Catchment Project

Willow Brook Catchment Project Willow Brook Catchment Project Willow Brook Park Page 1 Contents 1. Introduction. 3 1.1 Background The Water Framework Directive and Drivers for Change... 3 1.2 The Willow Brook Catchment and Water Framework

More information

Defra/Environment Agency Flood and Coastal Defence R&D Programme Preliminary rainfall runoff management for developments

Defra/Environment Agency Flood and Coastal Defence R&D Programme Preliminary rainfall runoff management for developments Defra/Environment Agency Flood and Coastal Defence R&D Programme Preliminary rainfall runoff management for developments R&D Technical Report W5-074/A/TR/1 Revision D DEFRA / Environment Agency Flood

More information

What s so hard about Stormwater Modelling?

What s so hard about Stormwater Modelling? What s so hard about Stormwater Modelling? A Pugh 1 1 Wallingford Software Pty Ltd, ann.pugh@wallingfordsoftware.com Abstract A common misconception of stormwater modelling is that it is simple. While

More information

ATTACHMENT E.2 EMISSIONS TO SURFACE WATERS SITE SERVICES LAYOUT SHEET 1 OF 2 (IE DR-0021)

ATTACHMENT E.2 EMISSIONS TO SURFACE WATERS SITE SERVICES LAYOUT SHEET 1 OF 2 (IE DR-0021) ATTACHMENT E.2 EMISSIONS TO SURFACE WATERS SITE SERVICES LAYOUT SHEET 1 OF 2 (IE0310818-30-DR-0021) SITE SERVICES LAYOUT SHEET 2 OF 2 (IE0310818-30-DR-0022) LOCATION OF EMISSION TO SURFACE WATER (IE0310818-22-DR-

More information

Application for adoption of new sewers

Application for adoption of new sewers Application for adoption of new sewers Section 104 WIA 1991 This form should be used to offer proposed drainage systems for adoption by United Utilities under Section 104 of the Water Industry Act 1991.

More information

Adaptation planning at different spatial scales

Adaptation planning at different spatial scales Adaptation planning at different spatial scales Using TCPA Publication Adaptation by Design as the main source GerGerry Metcalf UKCIP UKCIP Key adaptation principles for planning UKCIP Seek opportunities

More information

CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR

CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS WATER RESOURCES MANAGEMENT DIVISION Water Investigations Section

More information

14 NATURAL HAZARDS Background Resource Management Issues

14 NATURAL HAZARDS Background Resource Management Issues 14 NATURAL HAZARDS 14.1 Background The particular geology, hydrology and topography of the Hutt Valley make Upper Hutt vulnerable to a variety of natural hazards. Earthquakes and flooding are the most

More information

LAND AT WILBURTON ROAD HADDENHAM FLOOD RISK ASSESSMENT & OUTLINE DRAINAGE STRATEGY. Prepared for:

LAND AT WILBURTON ROAD HADDENHAM FLOOD RISK ASSESSMENT & OUTLINE DRAINAGE STRATEGY. Prepared for: LAND AT WILBURTON ROAD HADDENHAM FLOOD RISK ASSESSMENT & OUTLINE DRAINAGE STRATEGY Prepared for: Gladman Developments Ltd Gladman House Alexandria Way Congleton Business Park Congleton CW12 1LB By: LK

More information

4.6 - Hydrology and Water Quality

4.6 - Hydrology and Water Quality City of Wasco - Wasco Center Walmart Hydrology and Water Quality 4.6 - Hydrology and Water Quality 4.6.1 - Introduction This section provides an evaluation of hydrology and water quality. The analysis

More information

Arcow Quarry, North Yorkshire

Arcow Quarry, North Yorkshire Arcow Quarry, North Yorkshire Non Technical Summary Planning applications for a railhead and associated development REVISION SCHEDULE Rev Date Details Prepared by Reviewed by Approved by 0 December 2013

More information

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH JULY 2013 DOCUMENT CONTROL Client: Project Name: Report Title: IBI Reference: 25528 Cityview Drive Version: JULY 2013 Digital Master: Originator: Reviewer: Authorization: [File Location] Scott MacDonald,

More information

Advice to decision maker on coal mining project

Advice to decision maker on coal mining project . Advice to decision maker on coal mining project IESC 2015-063: West Muswellbrook Project New Development Requesting agency The New South Wales Mining and Petroleum Gateway Panel Date of request 27 January

More information

LAND OFF STATION ROAD LLANDAFF NORTH CARDIFF FLOOD CONSEQUENCES ASSESSMENT LIDL FOR. May Our Ref: RCEF R Rev 1

LAND OFF STATION ROAD LLANDAFF NORTH CARDIFF FLOOD CONSEQUENCES ASSESSMENT LIDL FOR. May Our Ref: RCEF R Rev 1 LAND OFF STATION ROAD LLANDAFF NORTH CARDIFF FLOOD CONSEQUENCES ASSESSMENT FOR LIDL May 2014 Our Ref: RCEF29970-002 R Rev 1 RPS Health, Safety & Environment Unit 12 Watersedge Business Park Modwen Rd,

More information

Flood Risk Assessment. Reach Community Solar Farm

Flood Risk Assessment. Reach Community Solar Farm Flood Risk Assessment Reach Community Solar Farm Andy Rankin 4 th February 2014 Introduction 1.1 Reach is a village of approximately 100 households on the edge of the Fens. We intend to construct a small

More information

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR 1 INTRODUCTION 1.1 Project Description and Location Isabella Ocean Residences is a residential development to be constructed

More information

Alison Duffy, Brian D Arcy, Neil Berwick, Rebecca Wade, Roshni Jose (Abertay University) Drew Hill (Transport Scotland) Les Watson, Andy Hemingway

Alison Duffy, Brian D Arcy, Neil Berwick, Rebecca Wade, Roshni Jose (Abertay University) Drew Hill (Transport Scotland) Les Watson, Andy Hemingway Alison Duffy, Brian D Arcy, eil Berwick, Rebecca Wade, Roshni Jose (Abertay University) Drew Hill (Transport Scotland) Les Watson, Andy Hemingway (SEPA) Content Phases 1 and 2 Background Research Phase

More information

Application Pack 5. How to apply for a Connection to a Public Sewer/Lateral Drain

Application Pack 5. How to apply for a Connection to a Public Sewer/Lateral Drain Application Pack 5 How to apply for a Connection to a Public Sewer/Lateral Drain Guidance Notes The provisions of the Water Industry Act 1991 (WIA91) take precedence over these notes. We recommend that

More information

PRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY

PRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY PRELIMINARY DRAINAGE REPORT FOR THE NEWCASTLE FIRE STATION OLD STATE HIGHWAY PREPARED FOR THE NEWCASTLE FIRE PROTECTION DISTRICT JULY 2014 BY ROSEVILLE DESIGN GROUP, INC. ROSEVILLE DESIGN GROUP, Inc Established

More information

ARTICLE A. POST-DEVELOPMENT STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT

ARTICLE A. POST-DEVELOPMENT STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT CHAPTER 11. STORMWATER MANAGEMENT ARTICLE A. POST-DEVELOPMENT STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT DIVISION 1. GENERALLY Sec. 10-11001. FINDINGS It is hereby determined that: (1)

More information

Learning objectives. Upon successful completion of this lecture, the participants will be able to:

Learning objectives. Upon successful completion of this lecture, the participants will be able to: Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to: Describe and perform the required step for designing sewer system networks Outline Design

More information

Storage requirements for rainfall runoff from greenfield development sites

Storage requirements for rainfall runoff from greenfield development sites Storage requirements for rainfall runoff from greenfield development sites R B B Kellagher Version 2 Report SR 580 March 2002 Storage requirements for rainfall runoff from greenfield development sites

More information

Sewer System Flood Reduction Measures in the Rockcliffe Area

Sewer System Flood Reduction Measures in the Rockcliffe Area PW28.6 REPORT FOR ACTION Sewer System Flood Reduction Measures in the Rockcliffe Area Date: March 26, 2018 To: Public Works and Infrastructure Committee From: General Manager, Toronto Water Wards: Ward

More information

Suffolk Downs Redevelopment. Appendix G: Stormwater Management Supporting Documentation

Suffolk Downs Redevelopment. Appendix G: Stormwater Management Supporting Documentation Suffolk Downs Redevelopment Expanded PNF Appendix G: Stormwater Management Supporting Documentation Suffolk Downs Redevelopment Phase 1 Stormwater Management Report Boston, Massachusetts 285402RP004 TABLE

More information

CORBIN AND NORDHOFF IV. ENVIRONMENTAL IMPACT ANALYSIS ENV EIR F. HYDROLOGY

CORBIN AND NORDHOFF IV. ENVIRONMENTAL IMPACT ANALYSIS ENV EIR F. HYDROLOGY F. HYDROLOGY ENVIRONMENTAL SETTING Project Site The Project Site is located at 19601 Nordhoff Street in the Chatsworth area of the City of Los Angeles, California, within the Chatsworth - Porter Ranch

More information

IMPLEMENTING WATER REFORM IN QUEENSLAND, AUSTRALIA CASE # 24

IMPLEMENTING WATER REFORM IN QUEENSLAND, AUSTRALIA CASE # 24 IMPLEMENTING WATER REFORM IN QUEENSLAND, AUSTRALIA CASE # 24 ABSTRACT Description This case describes a series of legislative and policy developments which were undertaken to reform the water sector in

More information

LICENCE APPLICANT GUIDANCE FORM D ABSTRACTIONS AND IMPOUNDMENTS

LICENCE APPLICANT GUIDANCE FORM D ABSTRACTIONS AND IMPOUNDMENTS Water Environment (Controlled Activities) (Scotland) Regulations 2011 LICENCE APPLICANT GUIDANCE ABSTRACTIONS AND IMPOUNDMENTS 1. Abstraction and impoundment activity table 2. Reasonable need 3. Abstraction

More information

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies CORPORATE REPORT NO: R236 COUNCIL DATE: November 15, 2010 REGULAR COUNCIL TO: Mayor & Council DATE: November 10, 2010 FROM: General Manager, Engineering FILE: 6520-20 (GH#2) SUBJECT: Sunnyside Heights

More information

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT INSTRUCTIONS AND INFORMATION Any project that involves the disturbance of ANY quantity of land requires the applicant to receive approval for the project

More information

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Created by Simpo PDF Creator Pro (unregistered version)  Asst.Prof.Dr. Jaafar S. Maatooq Lect.No.9 2 nd Semester Barrages, Regulators, Dams 1 of 15 In order to harness the water potential of a river optimally, it is necessary to construct two types of hydraulic structures, as shown in Figure

More information

Chapter 21 Stormwater Management Bylaw

Chapter 21 Stormwater Management Bylaw Chapter 21 Stormwater Management Bylaw SECTION 1. PURPOSE The purpose of this Bylaw is to: implement the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm

More information

STORM WATER MANAGEMENT REPORT

STORM WATER MANAGEMENT REPORT Silvercreek Junction STORM WATER MANAGEMENT REPORT Howitt Creek at the Silvercreek Parkway Site Guelph, Ontario August, 2008 TSH File 22304A-04 August 19, 2008 STORMWATER MANAGEMENT REPORT Howitt Creek

More information

Y Bwthyn Palliative Care Unit, Pontyclun

Y Bwthyn Palliative Care Unit, Pontyclun Flood Consequence Assessment (Level 1) Y Bwthyn Palliative Care Unit, Pontyclun March 2017 Prepared by: Giuliano Guadagnino BEng Reviewed by: Dimitris Linardatos BEng (Hons) MSc CEng MICE Reference: 25364

More information

SECTION 6 STORMWATER AND LAND DRAINAGE

SECTION 6 STORMWATER AND LAND DRAINAGE SECTION 6 STORMWATER AND LAND DRAINAGE Final Version, Approved September 2003 Section 6 and Land Drainage Contents 6.1 PERFORMANCE STANDARDS... 2 6.1.1 General... 2 6.2 MEANS OF COMPLIANCE... 3 6.2.1 General...

More information

Northland Regional Council. Awanui Flood Scheme Preliminary Design

Northland Regional Council. Awanui Flood Scheme Preliminary Design REPORT Northland Regional Council Awanui Flood Scheme Preliminary Design REPORT Northland Regional Council Awanui Flood Scheme Preliminary Design Report prepared for: NORTHLAND REGIONAL COUNCIL Report

More information

RMB Chivenor Flood Defence Scheme. Non-Technical Summary FINAL. Version 3.0

RMB Chivenor Flood Defence Scheme. Non-Technical Summary FINAL. Version 3.0 RMB Chivenor Flood Defence Scheme Non-Technical Summary FINAL Version 3.0 RMB CHIVENOR FLOOD DEFENCE SCHEME ENVIRONMENTAL STATEMENT CONTENTS 1 INTRODUCTION AND BACKGROUND II 2 THE PROPOSED PROJECT III

More information

Policy Statement Floods and Coastal Defence: Approved by LDC Interim Cabinet March 2001

Policy Statement  Floods and Coastal Defence: Approved by LDC Interim Cabinet March 2001 1 INTRODUCTION Policy Statement http://www.lewes.gov.uk/floodpol.htm Floods and Coastal Defence: Approved by LDC Interim Cabinet March 2001 1.1 This Policy Statement has been prepared by Lewes District

More information

Chapter 2 - Policy TABLE OF CONTENTS

Chapter 2 - Policy TABLE OF CONTENTS TABLE OF CONTENTS CHAPTER 2 - POLICY... 2-1 2.1 Overview... 2-1 2.1.1 Introduction... 2-1 2.1.2 Policy vs. Criteria... 2-1 2.1.3 Location of Policy and Criteria... 2-2 2.2 General Hydraulic Design Policies...

More information

Understanding. Hydraulics. palgrave macmillan. Les Hamill. University of Plymouth THIRD EDITION

Understanding. Hydraulics. palgrave macmillan. Les Hamill. University of Plymouth THIRD EDITION Understanding Hydraulics THIRD EDITION Les Hamill Senior Lecturer in Civil Engineering, School of Marine Science and Engineering, University of Plymouth palgrave macmillan Preface to third edition Acknowledgements

More information

Susan P. Abano Engineer IV Policy and Program Division

Susan P. Abano Engineer IV Policy and Program Division National Water Resources Board Integrated Water Resources Management Susan P. Abano Engineer IV Policy and Program Division National Water Resources Board Outline Philippines Water Resources Situationer

More information

Groundwater Protection in the UK: from source protection to integrated catchment planning

Groundwater Protection in the UK: from source protection to integrated catchment planning Groundwater Protection in the UK: from source protection to integrated catchment planning Bob Harris Environment Agency, England and Wales National Groundwater & Contaminated Land Centre www.environment-agency.gov.uk

More information

SuDS design criteria for catchment flood protection Are current criteria appropriate?

SuDS design criteria for catchment flood protection Are current criteria appropriate? SuDS design criteria for catchment flood protection Are current criteria appropriate? Richard Kellagher SuDS Drainage design for catchment flood protection All countries of UK (roughly) in alignment, BUT

More information

Economic Impacts of Increased Flood Risk Associated with Climate Change in the North West

Economic Impacts of Increased Flood Risk Associated with Climate Change in the North West Economic Impacts of Increased Flood Risk Associated with Climate Change in Report 15 September 2009 North West Development Agency Economic Impacts of Increased Flood Risk Associated with Climate Change

More information