1 64th Meeting of SEAC-3 SEAC Meeting number: 64 Meeting Date March 23, Subject: Environment Clearance for New Construction Project Is a Violation Case: No 1.Name of Project 2.Type of institution 3.Name of Project Proponent 4.Name of Consultant 5.Type of project 6.New project/expansion in existing project/modernization/diversification in existing project 7.If expansion/diversification, whether environmental clearance has been obtained for existing project 8.Location of the project 9.Taluka 10.Village 11.Area of the project 12.IOD/IOA/Concession/Plan Approval 13.e on the initiated work (If ) 14.LOI / NOC / IOD from MHADA/ Other approvals (If ) Hollyhock City Private Mr. Vivek Chimanrao Kate Ultra-Tech (Environment Consultancy & Laboratory) Housing New Project S. no. 68/3, Lohegaon Haveli Lohegaon 15.Total Plot Area (sq. m.) 22, Deductions 3, Net Plot area 19, (a).proposed Built-up Area (FSI & Non-FSI) 18 (b).approved Built up area as per DCR 19.Total ground coverage (m2) 4, Ground-coverage Percentage (%) (e: Percentage of plot not open to sky) Grampanchayat Lohgaon IOD No. PRH/SR/370/2011 dated 13/12/2011 IOD/IOA/Concession/Plan Approval : PRH/SR/370/2011 Approved Built-up Area: Work under progress of Wing A, B, C, G, H & proposed site office as per Collector approval no. PRH//SR/370/2011 dtd and as per PMRDA approval no. BHA/1702/16-17/vill. Lohegaon/S.No.68/3 dated Approved by PMRDA vide Office Order no. BHA/1702/16-17/Vill. Lohegaon/S. NO. 68/3 Dtd a) FSI area (sq. m.): 19, b) Non FSI area (sq. m.): 12, c) Total BUA area (sq. m.): Approved FSI area (sq. m.): Approved Non FSI area (sq. m.): Date of Approval: Estimated cost of the project number 22. of buildings & its configuration Building Name & number of floors Height of the building (Mtrs) 1 BLDG.1 WING A Parking BLDG.1 WING B Parking BLDG.1 WING C Parking BLDG.2 WING D Parking BLDG.5 WING E Parking BLDG.3 WING G1 TO G4 Ground Page 1 of 59 SEAC-

2 7 23. of tenants and shops 24. of expected residents / users 25.Tenant density per hectare 26.Height of the building(s) 27.Right of way (Width of the road from the nearest fire station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all around the building excluding the width for the plantation 29.Existing structure (s) if any 30.Details of the demolition with disposal (If ) BLDG.4 WING G5 TO G9 & H1 TO H3 356 Tenements 1780 Residents Tenement / hectare Ground Yerawada Fire Station 8.04 km away from proposed site. Width of the existing road from the nearest fire station to the proposed building is 12m Turning radius for easy access of fire tender movement from all around the building is 9 m. Work under progress of Wing A, B, C, G & H & Site Office 31.Production Details Product Existing (MT/M) Proposed (MT/M) Total (MT/M) 1 Dry season: Source of water 32.Total Water Requirement Fresh water (CMD): Recycled water - Flushing (CMD): Recycled water - Gardening (CMD): Swimming pool make up (Cum): From Lohegaon Grampanchayat (World Bank, PMC) m3/day m3/day m3/day -- Total Water Requirement (CMD) : Fire fighting - Underground water tank(cmd): Fire fighting - Overhead water tank(cmd): m3/day 200m3/day 80 m3/day Excess treated water m3/day Page 2 of 59 SEAC-

3 Wet season: Details of Swimming pool (If any) Particula rs Water Require ment Fresh water requireme nt Source of water Fresh water (CMD): Recycled water - Flushing (CMD): Recycled water - Gardening (CMD): Swimming pool make up (Cum): Total Water Requirement (CMD) : Fire fighting - Underground water tank(cmd): Fire fighting - Overhead water tank(cmd): From Lohegaon Grampanchayat (World Bank, PMC) m3/day m3/day 00 m3/day m3/day 200m3/day 80 m3/day Excess treated water m3/day 33.Details of Total water consumed Consumption (CMD) Loss (CMD) Effluent (CMD) Existing Proposed Total Existing Proposed Total Existing Proposed Total Domestic Gardening Rain Water Harvesting (RWH) Level of the Ground water table: Size and no of RWH tank(s) and Quantity: Location of the RWH tank(s): Quantity of recharge pits: Average 9.4m-17.6m Size of recharge pits : (Capital cost) : (O & M cost) : Details of UGT tanks if any : mx1.2mx1.2m (LWB) Rs. 4.8 Lakhs Rs. 2.0 Lakhs/Annum Domestic UG tank Capacity:245m3/day Flushing UG tank Capacity:145m3/day Fire fighting: 250m3/day Page 3 of 59 SEAC-

4 35.Storm water drainage Natural water drainage pattern: Quantity of storm water: Sloping from North to South m3/hr Size of SWD: Ø600mm having slope 1:150 Sewage and Waste water Waste generation in the Pre Construction and Construction phase: Waste generation in the operation Phase: Mode of Disposal of waste: Area requirement: (Capital cost and O&M cost): Sewage generation in KLD: STP technology: Capacity of STP (CMD): Location & area of the STP: (Capital cost): (O & M cost): Waste generation: m3/day SMBR 265 m3/day South Waste corner of Plot Rs Lakhs Rs. 6.65Lakhs/Annum 36.Solid waste Management Disposal of the construction waste debris: Dry waste: Wet waste: Hazardous waste: Biomedical waste (If ): STP Sludge (Dry sludge): Others if any: Dry waste: Wet waste: Hazardous waste: Biomedical waste (If ): STP Sludge (Dry sludge): Others if any: 9,494m3 to be used on site for filling This material shall be used for back filling and levelling of plot. 356 kg/day 534 kg/day Negligible Applicable 31 kg/day Applicable Handed over to SWaCH Smart Organic waste composter Handed over to authorised dealer as and when required Applicable Used as manure Applicable Parameters Location(s): Area for the storage of waste & other material: Area for machinery: Capital cost: O & M cost: North East Corner of Plot 15 m2 60 m2 Rs Lakhs Rs Lakhs/Annum 37.Effluent Charecterestics Unit Inlet Effluent Charecterestics Outlet Effluent Charecterestics Effluent discharge standards (MPCB) Page 4 of 59 SEAC-

5 1 Amount of effluent generation (CMD): Capacity of the ETP: Amount of treated effluent recycled : Amount of water send to the CETP: Membership of CETP (if require): e on ETP technology to be used Disposal of the ETP sludge 38.Hazardous Waste Details Description Cat UOM Existing Proposed Total Method of Disposal 1 Section & units 39.Stacks emission Details Fuel Used with Quantity Stack No. Height from ground level (m) Internal diameter (m) Temp. of Exhaust Gases 1 125KVA Diesel 22.7 l/hr C KVA Diesel 19.7 l/hr C 40.Details of Fuel to be used Type of Fuel Existing Proposed Total 1 Diesel Source of Fuel 42.Mode of Transportation of fuel to site 43.Green Belt Development Total RG area : Authorized dealer By road No of trees to be cut : of trees to be planted : List of proposed native trees : 2, m Given Timeline for completion of plantation : Before project completion 44. and list of trees species to be planted in the ground Name of the plant Common Name Quantity 1 Artocarpusheterophyllus Fanas 16 Characteristics & ecological importance Deciduous, Irregular to Round Shape; Spread -15m to 20m, Height- 12m to 18m, Fruit Tree Page 5 of 59 SEAC-

6 2 Azadirachtaindica Neem/ Kadunimb 39 3 Bauhinia purpurea Apta/ Rakt Kanchan 13 4 Cassia fistula Bahava 16 5 Cassia siamea Kassod 12 6 Emblica officinalis Awala/ Amla 16 7 Lagerstroemia speciose Tamhan 10 8 Micheliachampaka Piwala Chapha 55 9 Milingtoniahortensis Booch Mutingiacalabura Cherry Pterospermumacerifolium Muchkund Saracaindica Sita Ashok 05 Sub-Deciduous, Irregular to Round, Medium to Large Ht. (12m -18m) Spread 15m to 21m,survive in moderately dry climate, all types of soil, Excellent shade tree, planted along roads and parks; for afforestation, ornamental and canal plantation (dry areas); fruit causes litter, Medicinal Value Plant, Hardy & Drought resistant Almost Evergreen, Round to Conical, Small to Medium Ht. (9m -12m) Spread 10m to 13m, survives in wide range of climatic conditions and any well-drained soil, Planted along medium avenues, parks, gardens and around temples Deciduous, Irregular crown, Small to Medium Ht. (10m -13m) Spread 9m to 13m, Drought resistant with no specific soil requirement,, Butterfly-host plant Medium sized Evergreen tree often growing upto a height of 18 m. Excellent Shade tree Small to medium size tree (ht- 1m to 8m), Fruit tree Deciduous, Showy, Spreading, Round or Irregular crown, Small to Medium Ht. (6m -15m) Spread 5m to 9m,, State flower tree of Maharashtra Evergreen, Conical to Narrow Columnar crown, Tall Ht. (9m -15m) Spread 7m to 10m,, Butterfly host plant Large tree, reaching up to a height of 18 to 25m and spreading up to 11m, Flowering Tree Small Tree 7-12m tall with drooping branches, Fruit Tree Evergreen, Tall tree, Conical crown, Large Ht. (15m -20m) Spread 9m to 13m,grows in Wide range of conditions Evergreen, Round to spreading compact crown, Medium Ht. (7m -9m) Spread 7m to 9m, grows in a variety of climatic conditions 13 Terminalia arjuna Arjun Mimusopselengi Bakul Total quantity of plants on ground Sub-Deciduous, Broad Irregular columnar to conical crown, Large Stately Ht. (18m -24m) Spread 12m to 18m, Excellent shade tree Evergreen, Round crown with spreading branches, Medium to Large Ht. (12m 15m) Spread 12m 15m, Drought resistant, Shade Tree Page 6 of 59 SEAC-

7 46. and list of shrubs and bushes species to be planted in the podium RG: Name C/C Distance Area m2 1 Applicable Applicable Applicable Power requirement: Source of power supply : During Construction Phase: (Demand Load) DG set as Power back-up during construction phase During Operation phase (Connected load): During Operation phase (Demand load): Transformer: DG set as Power back-up during operation phase: Fuel used: Details of high tension line passing through the plot if any: 47.Energy MSEDCL 30 KW 40 KVA 1713 KW KVA 630 KVA(3 No) 125 KVA (1 No), 82.5 KVA (1 No) Diesel Applicable 48.Energy saving by non-conventional method: Light Fitting for common areas i.e. Bldg. Parking, Staircases, Passage, and Terrace Floor. Shrub Lighter Light Fitting for landscape Area Bollard Light Light Fitting for landscape Area Solar Street Light Fitting Pole Light on road side Street Light on the Bldg Energy Saving by Solar Hot Water System 1 49.Detail calculations & % of saving: Energy Conservation Measures Saving % Light Fitting for common areas i.e. Bldg. Parking, Staircases, Passage, and Terrace Floor KWH 2 Shrub Lighter Light Fitting for landscape Area 0.48KWH 3 Bollard Light Light Fitting for landscape Area 0.7KWH 4 Solar Street Light Fitting Pole Light on road side 7.5KWH 5 Street Light on the Bldg 7.2KWH 6 Energy Saving by Solar Hot Water System 1290KWH 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed STP Capacity 265m3 OWC Total Area 75m2 Page 7 of 59 SEAC-

8 DG Set 125 KVA (1 No), 82.5 KVA (1 No) (Capital cost and O&M cost): Capital cost: O & M cost: Rs Lakhs Rs Lakhs/Annum 51.Environmental Management plan Budgetary Allocation 1 Air 2 Water a) Construction phase (with Break-up): Attributes Parameter Total Cost per annum (Rs. In Lacs) Water For Dust Suppression,air and noise monitoring Tanker water for construction, water monitoring 3 Land Site Sanitation Biological Gardening Socio-Economic Component Safety, First Aid, Health Hygiene Facilities, Disinfection at site, Health Check Up, Crèches for children, Personal Protective Equipment, CFL lamps for labour hutments b) Operation Phase (with Break-up): Description Capital cost Rs. In Lacs Operational and Maintenance cost (Rs. in Lacs/yr) 1 Water STP Rain Water Harvesting RWH Pits and Piping Solid waste OWC Environmental monitoring Land Gardening Energy conservation Solar water heating Storage of chemicals (inflamable/explosive/hazardous/toxic substances) Description Status Location No Information Available Storage Capacity in MT Maximum Quantity of Storage at any point of time in MT 52.Any Other Information 53.Traffic Management Consumption / Month in MT Source of Supply Means of transportation Page 8 of 59 SEAC-

9 Parking details: Nos. of the junction to the main road & design of confluence: and area of basement: and area of podia: Project will confluent on 12m and 06 wide road Total Parking area: 6,825m2 Area per car: 12.8m2 Area per car: 12.8m2 of 2- Wheelers as approved by competent authority: of 4- Wheelers as approved by competent authority: Public Transport: Width of all Internal roads (m): CRZ/ RRZ clearance obtain, if any: Distance from Protected Areas / Critically Polluted areas / Eco-sensitive areas/ inter-state boundaries Category as per schedule of EIA ification sheet Court cases pending if any Other Relevant Informations Have you previously submitted Application online on MOEF Website Nearest bus stop Wagholi (5km) 12m 8a (B2) No Date of online submission - SEAC DISCUSSION ON ENVIRONMENTAL ASPECTS Summorised in brief information of Project as below. Brief information of the project by SEAC Environment Clearance for New Construction Project Hollyhock City at S. no. 68/3, Lohegaon,Tal- Haveli by Hollyhock City. Page 9 of 59 SEAC-

10 DECISION OF SEAC PP stated that the project was already recommended by SEAC-3 committee in its 40 th meeting, hence committee decided to transfer the project to SEIAA dashboard online. Specific Conditions by SEAC: FIL RECOMMENDATION SEAC-III have decided to recommend the proposal to SEIAA for Prior Environmental clearance subject to above conditions Page 10 SEAC-

11 64th Meeting of SEAC-3 SEAC Meeting number: 64 Meeting Date March 23, Subject: Environment Clearance for Expansion of Residential project Is a Violation Case: No General Information: Time: 10:00 am onwards Venue: Maharashtra Economic Development Council,Board Room, 3rd Floor, Y. B. Chavan Centre, Gen. Jagannathrao Bhosale Marg, Near Mantralaya, Mumbai Name of Project 2.Type of institution 3.Name of Project Proponent 4.Name of Consultant 5.Type of project 6.New project/expansion in existing project/modernization/diversification in existing project 7.If expansion/diversification, whether environmental clearance has been obtained for existing project 8.Location of the project 9.Taluka 10.Village 11.Area of the project 12.IOD/IOA/Concession/Plan Approval 13.e on the initiated work (If ) 14.LOI / NOC / IOD from MHADA/ Other approvals (If ) Grandeview7 Private M/s Chirag Developers M/s. Ultra-Tech (Environmental Consultancy & Laboratory) Housing Expansion Yes Sr. No. 5/6, Near Ashok Leyland Co, Ambegaon (Bk), Pune haveli 15.Total Plot Area (sq. m.) 42, Deductions Ambegaon (Bk) Pune Metropolitan Regional Development Authority Applied for proposed expansion order NO.PRH//SR/670/2010.Dt order No.PRH //SR/739/2013. Dt IOD/IOA/Concession/Plan Approval : Applied for proposed expansion order NO.PRH//SR/670/2010.Dt order No.PRH //SR/739/2013. Dt Approved Built-up Area: We have constructed wing A, B, C, D,E,H& Club House 1. As part of previous EC Environment letter No.2009/374/ CR.84/TC.1 dated 31st August, 2010 Applicable 17.Net Plot area 33, (a).proposed Built-up Area (FSI & Non-FSI) 18 (b).approved Built up area as per DCR 19.Total ground coverage (m2) Ground-coverage Percentage (%) (e: Percentage of plot not open to sky) Deductions :- (R. P. Road Widening) 3, m2 Gross plot area - 38, m2 Deductions (Amenity 15%) 5, m2 a) FSI area (sq. m.): 43, b) Non FSI area (sq. m.): c) Total BUA area (sq. m.): Approved FSI area (sq. m.): Approved Non FSI area (sq. m.): Date of Approval: Estimated cost of the project number 22. of buildings & its configuration Building Name & number of floors Height of the building (Mtrs) 1 A P M 2 B P M Page 11 SEAC-

12 3 C P M 4 D P M 5 E P M 6 H P M 7 CLUB HOUSE Ground floor 5.32M 8 F P M 9 G P M 10 I P M 11 J P M 12 K P M 13 Commercial 1 B+G M 14 Commercial 2 G M 15 Commercial 3 B+G M 16 Commercial 4 G M 23. of tenants and shops 24. of expected residents / users 25.Tenant density per hectare 26.Height of the building(s) 27.Right of way (Width of the road from the nearest fire station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all around the building excluding the width for the plantation 29.Existing structure (s) if any 30.Details of the demolition with disposal (If ) Existing Tenements 217 Proposed Tenements No shops -24, Cultural Hall-4, Library-2, Gymnasium-2, Pathology Lab-2, Dispensary-2 Existing: 1085 Proposed: 2555 Total Residential Users = 3640 Total users of Amenity =244 Total Users = Nearest Fire StationKatraj-& Width of the road from the nearest fire station to the proposed building - 60m wide road of Katraj bypass highway & 24 m wide DP road 9M We have constructed wing A, B, C, DE, H& Club House 1. As part of previous EC Environment letter No.2009/374/ CR.84/TC.1 dated 31st August, 2010 any 31.Production Details Product Existing (MT/M) Proposed (MT/M) Total (MT/M) 1 Page 12 SEAC-

13 Dry season: Wet season: Details of Swimming pool (If any) Particula rs Water Require ment Fresh water requireme nt Source of water 32.Total Water Requirement PMC Fresh water (CMD): 335 Recycled water - Flushing (CMD): Recycled water - Gardening (CMD): Swimming pool make up (Cum): Total Water Requirement (CMD) : Fire fighting - Underground water tank(cmd): Fire fighting - Overhead water tank(cmd): Excess treated water 100 Source of water PMC Fresh water (CMD): 335 Recycled water - Flushing (CMD): Recycled water - Gardening (CMD): Swimming pool make up (Cum): Total Water Requirement (CMD) : Fire fighting - Underground water tank(cmd): Fire fighting - Overhead water tank(cmd): Excess treated water 160 Dimension of Swimming Pool: 12.50m x6.50m X1.20m Kids Pool: 3.0 m (Dia) X 0.6m Total water Requirement in KLD:102 Water requirement for makeup in KLD: Details of Total water consumed Consumption (CMD) Loss (CMD) Effluent (CMD) Existing Proposed Total Existing Proposed Total Existing Proposed Total Domestic Gardening Page 13 SEAC-

14 34.Rain Water Harvesting (RWH) 35.Storm water drainage Sewage and Waste water Waste generation in the Pre Construction and Construction phase: Waste generation in the operation Phase: Level of the Ground water table: Size and no of RWH tank(s) and Quantity: Location of the RWH tank(s): Quantity of recharge pits: Size of recharge pits : (Capital cost) : (O & M cost) : Details of UGT tanks if any : Natural water drainage pattern: Quantity of storm water: Size of SWD: Sewage generation in KLD: STP technology: Capacity of STP (CMD): Location & area of the STP: (Capital cost): (O & M cost): 88 to 10M Applicable Applicable 24 Nos. 2mt X 2mt. X 2m 26.1Lacs 1.30 Lacs Residential Domestic UG tank Capacity(CMD):495 Flushing UG tank Capacity(CMD):247 Fire fighting (CMD):600 Commercial: Domestic UG tank Capacity(CMD):7.74 Flushing UG tank Capacity(CMD):15.47 Fire fighting (CMD): Considered in residential S to N m3/hr mm 487 MBBR 177 & 325KL STP-1 : Near C -Wing STP- 2 : Near I -Wing Lacs Lacs Waste generation: 36.Solid waste Management Disposal of the construction waste debris: Dry waste: Wet waste: Hazardous waste: Biomedical waste (If ): STP Sludge (Dry sludge): 37 kg/day back filling 520 kg/day 1212kg/day negligible 10kg/day 100kg/day SEAC Meeting No: 64 Meeting any Date: March 23, Others if any: Page 14 SEAC-

15 Mode of Disposal of waste: Area requirement: (Capital cost and O&M cost): Parameters Dry waste: Wet waste: Hazardous waste: Biomedical waste (If ): STP Sludge (Dry sludge): Others if any: Location(s): Area for the storage of waste & other material: Area for machinery: Capital cost: O & M cost: Handed over to authorized recyclers Mechanical composting unit Handed over to authorized recyclers Handed over to authorized recyclers Used as Manure any OWC-1 :- Near E -Wing OWC- 2 :- Near J -Wing 20m2 70m lacs 4.0Lacs 37.Effluent Charecterestics Unit Inlet Effluent Charecterestics Outlet Effluent Charecterestics Effluent discharge standards (MPCB) 1 Ph, B mg/l BOD, mg/l = 10 3 COD mg/l = 30 4 TSS mg/l = 10 5 Fical coliform 6 Total coliform Amount of effluent generation (CMD): Capacity of the ETP: Amount of treated effluent recycled : Amount of water send to the CETP: 0 Membership of CETP (if require): e on ETP technology to be used Disposal of the ETP sludge Nos/ 100ml Nos/ 100ml 20KLD 2 nos x 10 KLD 19 AOP Ozone/UV used as manure 10 rest to 6/100 Nil 10 rest to 7/100 Nil 38.Hazardous Waste Details Description Cat UOM Existing Proposed Total Method of Disposal 1 Section & units 39.Stacks emission Details Fuel Used with Quantity Stack No. Height from ground level (m) Internal diameter (m) Temp. of Exhaust Gases KVA DIESEL C KVA DIESEL C Page 15 SEAC-

16 KVA DIESEL C 4 50 KVA DIESEL C 5 35 KVA DIESEL C 40.Details of Fuel to be used Type of Fuel Existing Proposed Total 1 DIESEL DIESEL DIESEL DIESEL 41.Source of Fuel 42.Mode of Transportation of fuel to site Authorized dealer By road 43.Green Belt Development Total RG area : No of trees to be cut : of trees to be planted : List of proposed native trees : Timeline for completion of plantation : any Till the completion of the project 44. and list of trees species to be planted in the ground Name of the plant Common Name Quantity Characteristics & ecological importance 1 Ailanthus Excelsa Maharukh 39 Deciduous tree 2 Azadirachta indica Neem 34 Deciduous tree 3 Bauhinia racemosa Apta 34 flower bearing evergreen tree 4 Cassia fistula Bahava 38 flower bearing Deciduous tree 5 Lagerstromia flos- Regineae Tamhan 42 flower bearing Deciduous tree 6 Michelia champaca Son Chafa 35 flower bearing Deciduous tree 7 Magnifera indica Mango 49 Fruit bearing evergreen tree 8 Acrus sapata Chickoo 31 Fruit bearing evergreen tree 9 Phyllanthus emblica Awala 31 flower bearing Deciduous tree 10 Silver oak Silver oak 8 evergreen palm 11 Samania saman Rain Tree 8 flower bearing Deciduous tree 12 Khaya Mohagany 6 flower bearing Deciduous tree 13 Plumeria alba Chafa 43 flower bearing Deciduous tree 14 Tabebula rosea Tabebula 6 flower bearing Deciduous tree 15 Delonix regia Gulmohar 11 flower bearing Deciduous tree 16 Ficus bengalensis Vad 1 evergreen tree 17 Acaccia catechu Khair 2 Fruit bearing evergreen tree 18 Coradia sebeshina Bhokar 1 Fruit bearing evergreen tree 19 Shurb-Fox tail palm Shurb-Fox tail palm 16 evergreen Palm 45.Total quantity of plants on ground 46. and list of shrubs and bushes species to be planted in the podium RG: Page 16 SEAC-

17 Name C/C Distance Area m2 1 Applicable Applicable Applicable Power requirement: Source of power supply : During Construction Phase: (Demand Load) DG set as Power back-up during construction phase During Operation phase (Connected load): During Operation phase (Demand load): Transformer: DG set as Power back-up during operation phase: Fuel used: Details of high tension line passing through the plot if any: 47.Energy MSEDCL 33 KW KVA KW KVA 630 KVA 2 Nos., 315 KVA 1 Nos For Residential 160 KVA. FOR AMENITY AREA AMENITY 1= 62.5 KVA, AMENITY 2 =40 KVA AMENITY 3=100 KVA, AMENITY 4 = 50 KVA HSD Yes 48.Energy saving by non-conventional method: Timers and contactors will be used to switch on / off common area & external landscape and facade lighting Light Emitting Diode (LED) will be used for corridors, Lobbies and common areas. Energy efficient led lamps which give approx. 30% more light output for the same watts consumed and therefore require less nos. Of fixtures and corresponding lower point wiring costs All cables will be derated to avoid heating during use. This also indirectly reduces losses and improves reliability. To achie 1 49.Detail calculations & % of saving: Energy Conservation Measures Saving % Timers and contactors will be used to switch on / off common area & external landscape and facade lighting Light Emitting Diode (LED) will be used for corridors, Lobbies and common areas. Energy efficient led lamps which give approx. 30% more light output for the same watts consumed and therefore require less nos. Of fixtures and corresponding lower point wiring costs All cables will be derated to avoid heating during use. This also indirectly reduces losses and improves reliability. To achie 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed Waste water Solid waste STP OWC 25% STP OWC Page 17 SEAC-

18 (Capital cost and O&M cost): Capital cost: O & M cost: Lacs 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Attributes Parameter Total Cost per annum (Rs. In Lacs) 1 Air Environment 2 Water Environment 3 Land Environment Biological Environment Socio- Economic Environment Component Environmental Monitoring Water For Dust Suppression Air & Noise monitoring Tanker water for construction Water monitoring Site Sanitation Maintenance Biological Environment Gardening Disinfection- Pest Control First Aid Facilities Health Check Up Creche for children Personal protective equipment b) Operation Phase (with Break-up): Description Ambient Air quality, Noise Level, Exhaust from DG Set, Drinking Water, Sewage from STP, As per EP act, Manure Capital cost Rs. In Lacs MoEF approved laboratory Operational and Maintenance cost (Rs. in Lacs/yr) 2 RWH No. of pits STP Waste water treatment Electrical Energy saving Swimming pool 6 Solid waste Water quality monitoring For solid waste treatment Storage of chemicals (inflamable/explosive/hazardous/toxic substances) Description Status Location Storage Capacity in MT Maximum Quantity of Storage at any point of time in MT 52.Any Other Information Consumption / Month in MT Source of Supply Means of transportation Page 18 SEAC-

19 No Information Available Parking details: Nos. of the junction to the main road & design of confluence: and area of basement: and area of podia: 53.Traffic Management Traffic generated from this project will confluent on 12 m wide road. 02 nos, m2 Total Parking area: Area per car: 30 Area per car: 30 of 2- Wheelers as approved by competent authority: of 4- Wheelers as approved by competent authority: Public Transport: Width of all Internal roads (m): CRZ/ RRZ clearance obtain, if any: Distance from Protected Areas / Critically Polluted areas / Eco-sensitive areas/ inter-state boundaries Category as per schedule of EIA ification sheet Court cases pending if any Other Relevant Informations Have you previously submitted Application online on MOEF Website. No of Podia:01 Area of Podia: Nearest Bus Stop: Ambegaon 6m & 7.50m driveways any Applicable 8(a) Applicable Applicable Date of online submission No - SEAC DISCUSSION ON ENVIRONMENTAL ASPECTS Summorised in brief information of Project as below. Brief information of the project by SEAC Page 19 SEAC-

20 Proposed residential Project at S.No.6/4,6/5,6/6,6/7,6/8,6/12,6/13,6/14 & 6/15, Village Ambegaon (BK), Tehsil Haveli, District Pune.(Compliance case) PP submitted their application for prior Environment Clearance for total plot area of Sq.Mtrs., Total BUA of Sq. Mtrs and FSI area of Sq. Mtrs. PP proposes to construct 11 nos. of residential buildings, having maximum height of 44.50Mtrs, 4 commercial buildings including 24 shops, Four cultural halls, Two libraries, Two pathology laboratories, Two dispensaries and Two gymnasiums. PP has obtained earlier EC vide letter No. 2009/374/CR 84 / TC 1 dated for the plot area of , BUA of including total 9 buildings out of which five buildings P + 7floors and four buildings P + 9 floors having total 326 tenements. From the drawings submitted by PP it was observed that PP has changed the orientation of building H for which PP has not obtained permission from SEIAA; SEIAA is requested to look into the same before issuing the Environmental Clearance. The case was earlier considered in 19 th meeting of SEAC III held from 28 th to 31 st October 2014 and 21 st meeting of SEAC III held from 18 th to 21 st November 2014,when PP remained absent. The case was again considered in the 25 th meeting of SEAC III held from 17 th to 20 th February 2015 and 33 rd meeting of SEAC III held from 8 th to 11 th September, 2015 Now the the case discussed on the basis of the documents submitted and presentation made by the proponent. All issues relating to environment, including air, water, land, soil, ecology, biodiversity and social aspects were examined. The proposal is appraised as category 8 (a) B2. The committee took up the compliance report and other documents submitted by the Project Proponent for examination. All compliance are found satisfactory DECISION OF SEAC SEAC decided to recommend the proposal for prior environmental Clearance. Specific Conditions by SEAC: FIL RECOMMENDATION SEAC-III have decided to recommend the proposal to SEIAA for Prior Environmental clearance subject to above conditions Page 20 SEAC-

21 64th Meeting of SEAC-3 SEAC Meeting number: 64 Meeting Date March 23, Subject: Environment Clearance for Environmental clearance for Proposed Data Center Is a Violation Case: No 1.Name of Project 2.Type of institution 3.Name of Project Proponent 4.Name of Consultant 5.Type of project 6.New project/expansion in existing project/modernization/diversification in existing project 7.If expansion/diversification, whether environmental clearance has been obtained for existing project Proposed Data Center Green Building Mr.Vidya k Sagar M/s. Ultra-Tech (Environmental Consultancy & Laboratory) BET certificate no: BET/EIA/1417/SA0011 Data Center New Project 8.Location of the project Plot No. 13/10A, 28 9.Taluka 10.Village 11.Area of the project 12.IOD/IOA/Concession/Plan Approval 13.e on the initiated work (If ) 14.LOI / NOC / IOD from MHADA/ Other approvals (If ) Mulshi Hinjewadi MIDC Applied for Sanction IOD/IOA/Concession/Plan Approval : Applied for sanction Approved Built-up Area: No work is initiated on the proposed project site under consideration for Environment Clearance. 15.Total Plot Area (sq. m.) Deductions 0 17.Net Plot area (a).proposed Built-up Area (FSI & Non-FSI) 18 (b).approved Built up area as per DCR 19.Total ground coverage (m2) Ground-coverage Percentage (%) (e: Percentage of plot not open to sky) a) FSI area (sq. m.): b) Non FSI area (sq. m.): c) Total BUA area (sq. m.): Approved FSI area (sq. m.): Approved Non FSI area (sq. m.): Date of Approval: 38.89% 21.Estimated cost of the project number 22. of buildings & its configuration Building Name & number of floors Height of the building (Mtrs) 1 Data Center Building, 1 number B+G Office Building, 1 number G Security Cabin 1, 1 number G Security Cabin 2, 1 number G GIS Panel Room, 1 number G 4.0 Page 21 SEAC-

22 23. of tenants and shops 24. of expected residents / users 25.Tenant density per hectare 26.Height of the building(s) 27.Right of way (Width of the road from the nearest fire station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all around the building excluding the width for the plantation 29.Existing structure (s) if any 30.Details of the demolition with disposal (If ) Commercial: m MIDC road from Hinjewadi Fire Station Minimum 9 m Existing Concrete Structure Dimensions 43 m x 23 m 1600 cum of demolition of existing structure. Concrete Debris will be Segregated & stacked in Designated areas The Concrete debris generated due to the demolition of the existing structure will be used for leveling (if suitable) at project site. 31.Production Details Product Existing (MT/M) Proposed (MT/M) Total (MT/M) 1 Dry season: Source of water 32.Total Water Requirement MIDC Fresh water (CMD): Domestic:6+HVAC:400= 406 Recycled water - Flushing (CMD): Recycled water - Gardening (CMD): Swimming pool make up (Cum): Total Water Requirement (CMD) : 11 Gardening:10+HVAC:50= 60 Fire fighting - Underground water tank(cmd): Fire fighting - Overhead water tank(cmd): Excess treated water Office :10 Data Centre : 20 Page 22 SEAC-

23 Wet season: Details of Swimming pool (If any) Particula rs Water Require ment Source of water Fresh water (CMD): Recycled water - Flushing (CMD): Recycled water - Gardening (CMD): Swimming pool make up (Cum): Total Water Requirement (CMD) : Fire fighting - Underground water tank(cmd): Fire fighting - Overhead water tank(cmd): MIDC Domestic:6+HVAC:400= Gardening 0+ HVAC :50= Excess treated water Office :10 Data Centre : Details of Total water consumed Consumption (CMD) Loss (CMD) Effluent (CMD) Existing Proposed Total Existing Proposed Total Existing Proposed Total Domestic Fresh water requireme nt Gardening Cooling tower & thermopa ck Page 23 SEAC-

24 34.Rain Water Harvesting (RWH) 35.Storm water drainage Sewage and Waste water Waste generation in the Pre Construction and Construction phase: Waste generation in the operation Phase: Level of the Ground water table: Size and no of RWH tank(s) and Quantity: Location of the RWH tank(s): Quantity of recharge pits: Size of recharge pits : (Capital cost) : (O & M cost) : Details of UGT tanks if any : Natural water drainage pattern: Quantity of storm water: Size of SWD: Sewage generation in KLD: STP technology: Capacity of STP (CMD): Location & area of the STP: (Capital cost): (O & M cost): Waste generation: 4-6 m BGL 1 RWH tank having 140 m3 capacity As per services layout Rs. 60 Lakhs Rs. 2 Lakhs/annum Fresh Water Tank : 450 Cum Fire Fighting Tank : 200 Cum From North to south m3/sec 1000 mm (W) x 750(D) mm Sewage : 15 KLD HVAC Blowdown : 65 KLD RO Reject : 23 KLD Sewage : Packaged STP based on Ultrafiltration System HVAC Blowdown : RO Followed by MEE RO Reject : MEE 1. STP : 17 KL 2.RO : Three Stages of RO,RO Stage 1 : 400 KLD RO Stage 2 :120 KLD RO Stage 3 : 56 KLD 3. MEE : 30 KLD As per the services Layout Rs. 8 Lakhs Rs. 0.5 Lakhs/annum 36.Solid waste Management Disposal of the construction waste debris: 15 Kg This material will be used for back filling and leveling of the plot and remaining will be disposed to authorized sites. Dry waste: Wet waste: Hazardous waste: Biomedical waste (If ): STP Sludge (Dry sludge): Others if any: 9 kg/day 6 kg/day Salt generated from MEE : 5 Cum/day 2 Kg /day E-waste:1800 tonnes after five years of project cycle Page 24 SEAC-

25 Mode of Disposal of waste: Area requirement: (Capital cost and O&M cost): Parameters Dry waste: Wet waste: Hazardous waste: Biomedical waste (If ): STP Sludge (Dry sludge): Others if any: Location(s): Area for the storage of waste & other material: Area for machinery: Capital cost: O & M cost: 1 Amount of effluent generation (CMD): Capacity of the ETP: Amount of treated effluent recycled : Amount of water send to the CETP: Membership of CETP (if require): e on ETP technology to be used Disposal of the ETP sludge Will be disposed off from site through external agency on daily basis. Shall be treated in Vermi Composting Pits Salt generated from MEE :Shall be disposed to Common Hazardous Waste Management & Disposal Facility. Will be used as manure for landscaping E-waste:will be handled by authorized E-waste management partner As per the services layout. 64 m2 Vermi Composting : 0.16 Lakhs Vermi Composting :0.03 Lakhs E Waste : 0.63 Lakhs after five years of project cycle 37.Effluent Charecterestics Unit Inlet Effluent Charecterestics Outlet Effluent Charecterestics Effluent discharge standards (MPCB) 38.Hazardous Waste Details Description Cat UOM Existing Proposed Total Method of Disposal 1 Spent Oil 5.1 Cum/day 2 Salt generated from MEE Section & units 1 DG set 37.3 Cum/day 50ml/day/DG set 50ml/day/D G set 5 5 Will be handed over to authorised vendor Shall be disposed to Common Hazardous Waste Management & Disposal Facility 39.Stacks emission Details Fuel Used with Quantity Diesel 480 lit/hr/ht DG set Stack No. Height from ground level (m) 40.Details of Fuel to be used Internal diameter (m) Temp. of Exhaust Gases degree C Page 25 SEAC-

26 Type of Fuel Existing Proposed Total 1 Diesel 480 lit/hr/ht DG set 17,280 lit/hr 41.Source of Fuel 42.Mode of Transportation of fuel to site Authorized Vendor By Road 43.Green Belt Development Total RG area : No of trees to be cut : of trees to be planted : List of proposed native trees : Timeline for completion of plantation : 237 As mentioned in the list below Till the completion of the project. 44. and list of trees species to be planted in the ground Name of the plant Common Name Quantity 1 Mangifera indica Mango Tree 15 Characteristics & ecological importance Shady tree. Noise reduction tree. Bird attractive tree. 2 Saraca asoca Ashoka Tree 18 Evergreen medicinal plant 3 Syzygium cumini Jamun Tree 28 4 Plumeria acutifolia Champa Tree 19 5 Polyalthia longifolia Ashoka Tree 154 Fruit bearing and birds attracting tree Evergreen flower bearing plant, ornamental. evergreen tree, native to India, commonly planted due to its effectiveness in alleviating noise pollution 6 Total Total quantity of plants on ground 46. and list of shrubs and bushes species to be planted in the podium RG: Name C/C Distance Area m2 1 Cassia tora 17 Avg Ziziphusmauritiana- 11 Avg Stachytarpheta sp-17 Avg Energy Page 26 SEAC-

27 Power requirement: Source of power supply : During Construction Phase: (Demand Load) DG set as Power back-up during construction phase During Operation phase (Connected load): During Operation phase (Demand load): Transformer: DG set as Power back-up during operation phase: Fuel used: Details of high tension line passing through the plot if any: MSEDCL 186 kw 1 No. of 320kVA Mobile DG 37.8 MV 29.5 MV 2 Nos. 40 MVA Each HT DG Sets : 2250 kva each: 32 nos. HSD Energy saving by non-conventional method Lighting: Interior Lighting: 1. LED Light are considered 2. LPD 0.6 W/Sq.ft 3. Occupancy Sensor for Server area and toilet areas 48.Energy saving by non-conventional method: Exterior Lighting: 1. LED Lighting are considered 2. Timer Based automated control system are considered. HVAC: 1. High Efficient Chiller Meeting with ASHRAE Regulation. 2. VFD Driven Air cooled Chiller Detail calculations & % of saving: Energy Conservation Measures Saving % Lighting : Interior Lighting : 1. LED Light are considered 2. LPD 0.6 W/Sq.ft 3. Occupancy Sensor for Server area and toilet areas kwhr 36.7% Exterior Lighting: 1. LED Lighting are considered 2. Timer Based automated control system are considered. HVAC: 1. High EffiecientChiller Meeting with ASHRAE Regulation. 2. VFD Driven Air cooled Chiller kwhr 25.3% 10% Saving 4 Solar PV Panel 0.05% KWhr 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed STP 17 m3 DG sets 32 Nos. of Stacks of DG Set with height 30 m each Page 27 SEAC-

28 (Capital cost and O&M cost): 1 Capital cost: O & M cost: Rs 564 lakhs/annum Rs 5.64 lakhs/annum 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Attributes Parameter Total Cost per annum (Rs. In Lacs) Environmental monitoring 2 Air Environment 3 Air Environment 4 Water Environment PM10, PM2.5, SO2, NOx, CO, Equivalent noise level, Analysis of water for physical, chemical, biological parameters. Water For Dust Suppression Air & Noise monitoring Tanker water for construction Water Environment Water monitoring Land Environment Site Sanitation 19 7 Land Environment Gardening Socio- Economic Environment Socio- Economic Environment Socio- Economic Environment Socio- Economic Environment Disinfection- Pest Control First Aid Facilities 7.0 Health Check Up 9.0 Personal protective equipment Total Component Environmental Monitoring b) Operation Phase (with Break-up): Description Ambient Air quality, Noise Level, Exhaust from DG Set, Drinking Water, Sewage from STP, As per EP act, Manure Capital cost Rs. In Lacs 62.0 Operational and Maintenance cost (Rs. in Lacs/yr) Water RWH Water STP Energy Solar PV Cells Land Environment Gardening Solid waste Solid waste management Solid waste E-waste management 0.63 after 5 years of project cycle 8 RO Water from MIDC MEE RO reject Total Page 28 SEAC-

29 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances) Description Status Location Diesel No Information Available Parking details: Shall be stored in Tanks In HSD yard Nos. of the junction to the main road & design of confluence: and area of basement: and area of podia: Total Parking area: Area per car: Area per car: of 2- Wheelers as approved by competent authority: of 4- Wheelers as approved by competent authority: Public Transport: Width of all Internal roads (m): Storage Capacity in MT 6 Nos. 45 KLD : 240 Cum Maximum Quantity of Storage at any point of time in MT 240 in Cum 52.Any Other Information 53.Traffic Management Single Consumption / Month in MT 408 ( Considered as 23 hrs EB supply is available) 1 no of Basement having area 424 sqm Open : 1290 sqm 25 sqm 25 sqm m Source of Supply Local Vendors CRZ/ RRZ clearance obtain, if any: Distance from Protected Areas / Critically Polluted areas / Eco-sensitive areas/ inter-state boundaries Category as per schedule of EIA ification sheet 8a(B) Means of transportation By Road Page 29 SEAC-

30 Court cases pending if any Other Relevant Informations Have you previously submitted Application online on MOEF Website. Date of online submission No -- Yes SEAC DISCUSSION ON ENVIRONMENTAL ASPECTS Summorised in brief information of Project as below. Brief information of the project by SEAC Environmental clearance for Proposed Data Center Plot No. 13/10A, 28, Hinjewadi Tal- Mulshi Dist-Pune. DECISION OF SEAC PP stated that the have obtained the EC from local Authority and request committee to delist the project from SEAC-3 dashboard. Hence the committee decided to delist the proposal. Specific Conditions by SEAC: FIL RECOMMENDATION Kindly find SEAC decision above. Page 30 SEAC-

31 64th Meeting of SEAC-3 SEAC Meeting number: 64 Meeting Date March 23, Subject: Environment Clearance for Environment Clearance for Modernization, Retrofitting, Augmentation and Expansion of Mall Wing of Existing Commercial Building into IT/ITES Offices at S.No. 206-A/1, 206B, 206C, 206D, 206E, 217/2,Final plot no. 88 & Sub plot no. 04, Pune Nagar Road, Yerwada, Pune by M/s. Regal Buildtech Pvt. Ltd, GCPL and IHHR. Is a Violation Case: No 1.Name of Project 2.Type of institution 3.Name of Project Proponent 4.Name of Consultant 5.Type of project 6.New project/expansion in existing project/modernization/diversification in existing project 7.If expansion/diversification, whether environmental clearance has been obtained for existing project 8.Location of the project 9.Taluka 10.Village Correspondence Name: Modernization, Retrofitting, Augmentation and Expansion of Mall Wing of Existing Commercial Building into IT/ITES Offices at S.No. 206-A/1, 206B, 206C, 206D, 206E, 217/2,Final plot no. 88 & Sub plot no. 04, Pune Nagar Road, Yerwada, Pune by M/s. Regal Buildtech Pvt. Ltd, GCPL and IHHR. Private M/s. Regal Buildtech Pvt. Ltd., GCPL and IHHR. VK environmental LLP Others (IT/ITES Offices) Expansion in existing project and modernization and conversion of existing mall in to IT/ITEScommercial building Yes (EC vide no /006.ia.iii dated ) S.No. 206-A/1, 206B, 206C, 206D, 206E, 217/2, Final plot no. 88 & Sub plot no. 04, Pune Nagar Road, Yerwada, Pune, Maharashtra. Haweli Yerwada Room : 48/2 Floor: Building Name: Road/Street Name: Locality: City: 11.Area of the project 12.IOD/IOA/Concession/Plan Approval 13.e on the initiated work (If ) 14.LOI / NOC / IOD from MHADA/ Other approvals (If ) Sanjiv Trehon / Nipun Jain Commercial Centre Malcha Marg Chanakyapuri New Delhi Pune Municipal Corporation Project already built in The expansion plans for modernization, retrofitting, augmentation and expansion are already applied for in Pune Municipal Corporation IOD/IOA/Concession/Plan Approval : Already applied for plans revision to Pune Municipal Corporation( earlier approved - cc/096/2015 dated Approved Built-up Area: work was completed as earlier EC granted. Modernization and expansion will be initiated after getting approval from Authority. Already applied for plans revision to Pune Municipal Corporation( earlier approved - cc/096/2015 dated Total Plot Area (sq. m.) Deductions Net Plot area (a).proposed Built-up Area (FSI & Non-FSI) 18 (b).approved Built up area as per DCR 19.Total ground coverage (m2) a) FSI area (sq. m.): b) Non FSI area (sq. m.): c) Total BUA area (sq. m.): Approved FSI area (sq. m.): Approved Non FSI area (sq. m.): Date of Approval: Page 31 SEAC-

32 20.Ground-coverage Percentage (%) (e: Percentage of plot not open to sky) 21.Estimated cost of the project number of buildings & its configuration Building Name & number of floors Height of the building (Mtrs) 1 Hotel and Office 23. of tenants and shops 24. of expected residents / users 25.Tenant density per hectare 26.Height of the building(s) 27.Right of way (Width of the road from the nearest fire station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all around the building excluding the width for the plantation 29.Existing structure (s) if any 30.Details of the demolition with disposal (If ) No of rooms in Hotel: 209 rooms no of offices -20 approx Hotel 400 and Office mts 9 mts Hotel wing is 2 B + LG +G+7 + service + Mezzanine and Commercial Mall Wing is 2B + LG + GF mt (Hotel wing) and mt (Commercial mall wing) An existing building of hotel and mall exists on the site. Hotel wing of the building continues to operate, while Mall wing of the building has been closed down and will now be converted into Offices. Demolition of 2000 sqm of existing area in Mall Building will be done. 31.Production Details Product Existing (MT/M) Proposed (MT/M) Total (MT/M) 1 32.Total Water Requirement Page 32 SEAC-

33 Dry season: Wet season: Details of Swimming pool (If any) Particula rs Water Require ment Source of water Fresh water (CMD): Recycled water - Flushing (CMD): Recycled water - Gardening (CMD): Swimming pool make up (Cum): Total Water Requirement (CMD) : Fire fighting - Underground water tank(cmd): Fire fighting - Overhead water tank(cmd): Excess treated water Source of water Fresh water (CMD): Recycled water - Flushing (CMD): Recycled water - Gardening (CMD): Swimming pool make up (Cum): Total Water Requirement (CMD) : Fire fighting - Underground water tank(cmd): Fire fighting - Overhead water tank(cmd): Excess treated water Pune Municipal Corporation / water tankers Hotel Wing: 97 KLD & Proposed Office Wing: 100 KLD Hotel Wing: 41KLD & Proposed Office Wing: 98 KLD Hotel Wing: 3 KLD & Proposed Office Wing: 10 KLD 5-6 KLD Hotel Wing: 201 KLD & Proposed Office Wing: 323 KLD Hotel: 400,000 liters; Office: 20,000 liters Hotel: 100,000 liters; Office: 30,000 liters HVAC water requirement will be met from recycled water in an attempt to achieve zero liquid discharge. Pune Municipal Corporation / water tankers Hotel Wing: 97 KLD & Proposed Office Wing: 100 KLD Hotel Wing: 41KLD & Proposed Office Wing: 98 KLD Hotel Wing: 3 KLD & Proposed Office Wing: 0 KLD 2-3 KLD Hotel Wing: 201 KLD & Proposed Office Wing: 313 KLD Hotel: 400,000 liters; Office: 20,000 liters Hotel: 100,000 liters; Office: 30,000 liters 25 mts x 9 mts average dimension [Hotel Wing] HVAC water requirement will be met from recycled water in an attempt to achieve zero liquid discharge. 33.Details of Total water consumed Consumption (CMD) Loss (CMD) Effluent (CMD) Existing Proposed Total Existing Proposed Total Existing Proposed Total Domestic Page 33 SEAC-

34 34.Rain Water Harvesting (RWH) 35.Storm water drainage Sewage and Waste water Waste generation in the Pre Construction and Construction phase: Waste generation in the operation Phase: Level of the Ground water table: Size and no of RWH tank(s) and Quantity: Location of the RWH tank(s): Quantity of recharge pits: Size of recharge pits : (Capital cost) : (O & M cost) : Details of UGT tanks if any : Natural water drainage pattern: Quantity of storm water: Size of SWD: Sewage generation in KLD: STP technology: Capacity of STP (CMD): Location & area of the STP: (Capital cost): (O & M cost): Waste generation: 23 m 5 (For Hotel: 3 (Existing) & Office: 2 (Proposed)) Size 1x1x1 m South side of the plot 25 cum Size 1x1x1 m Rs 5.0 Lacs Rs 50,000 per year 45,000 liters x 1 50,000 liters x 1 45,000 liters x 2 1,02,000 liters x 2 Overflow/surplus water from the recharge pit will be discharged into storm water drainage 450 mm Waste water from Hotel :119 KLd waste water from proposed office 185 KLD Hotel Wing: MBBR and Mall / Office Wing: SMBR For Hotel: 230 KLD (existing). For Proposed Office wing Existing STP of 115 KLD capacity will be enhanced to 185 KLD Basement (already existing on site) Solid waste Management Disposal of the construction waste debris: During the construction, around 2000 sq. mt. area will be demolished Dry waste: Wet waste: Hazardous waste: Biomedical waste (If ): STP Sludge (Dry sludge): Others if any: Will be disposed to government approved C&D site. Existing for Hotel :35 Kg/day and Proposed for Office: 600 kg/day Existing for Hotel: 65 Kg/day and Proposed for Office: 400 kg/day approx. used oil -82 l/month Existing for hotel 4-5 kg/ day and for proposed office 30 kg/ day E-waste- 4-6 kg/day Page 34 SEAC-

SEIAA-AGENDA

SEIAA-AGENDA 112th SEIAA Meeting Agenda SEIAA Meeting number: 112 Meeting Date July 27, Discussion Item: 01 Open Exhibition Centre and Parkland at Sector 5&8, PCNTDA, Pune : The Development Plan of Pimpri- Chinchwad

More information

Environment Clearance for Proposed Inland Water Transport along East Coast of Mumbai.

Environment Clearance for Proposed Inland Water Transport along East Coast of Mumbai. To, Maharashtra Maritime Board at Ferry Wharf (Bhaucha Dhakka), Nerul and Mandwa Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:April 10, 2017 Subject: Sir,

More information

CRZ Clearance for Proposed Construction of RO RO Jetties at Narangi-Kharawadashri, Tal. & Dist. palghar by MMB

CRZ Clearance for Proposed Construction of RO RO Jetties at Narangi-Kharawadashri, Tal. & Dist. palghar by MMB Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:August 2, 2017 To, Chief Executive Officer,Maharashtra Maritime Board,Indian Mercantile Chambers,3rd Floor,Ramjibhai

More information

CRZ Clearance for Proposed construction of Ghodbundar Jetty, Thane by MMB

CRZ Clearance for Proposed construction of Ghodbundar Jetty, Thane by MMB Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:August 9, 2017 To, Chief Executive Officer,Maharashtra Maritime Board,Indian Mercantile Chambers,3rd Floor,Ramjibhai

More information

SEIAA Meeting 111 ( Day 1) SEIAA Meeting number: Meeting Number 111 Meeting Date May 11, 2017 Subject: Environment Clearance for Proposed Residential & Commercial Project â??ambika estateâ?? At survey

More information

Consolidated Statement on various Environmental Aspects for Construction Project

Consolidated Statement on various Environmental Aspects for Construction Project Consolidated Statement on various Environmental Aspects for Construction Project S.N. Particular 1 Name of Project Development of IKEA Store in Navi Mumbai, India 2 Name, contact number & address of proponent

More information

Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai Date:June 1, 2018

Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai Date:June 1, 2018 To, Mr. Sunil Goyal at Plot No. F-18 & F-19, Additional MIDC Area, Jalna-431203 Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:June 1, 2018 Subject: Sir, Environment

More information

Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai Date:November 6, 2018

Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai Date:November 6, 2018 To, Mr. Anil Mane at Plot No. 113/114 MIDC Dhatav Industrial Estate. Dhatav village, Roha Taluka, Raigad Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:November

More information

SEAC-AGENDA

SEAC-AGENDA 149th Meeting of State Expert Appraisal Committee (SEAC-1) SEAC Meeting number: 149th Day-2 Meeting Date Subject: Environment Clearance for Installation of Sponge Iron Pant of capacity 190 TPD, Captive

More information

Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai Date:September 18, 2018

Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai Date:September 18, 2018 To, Maharashtra State Road Development Corporation (Ltd.) at Ahmednagar and Nashik District, Maharashtra Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:September

More information

SEAC-AGENDA

SEAC-AGENDA 154th Meeting of State Level Expert Appraisal Committee (SEAC-1) SEAC Meeting number: 154th,day-3 Meeting Date Subject: Environment Clearance for EXPANSION OF MS BILLETS MANUFACTURING UNIT (EXISTING MANUFACTURING

More information

Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai Date:February 16, 2018

Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai Date:February 16, 2018 To, Ideal Chemi Plast Pvt. Ltd. at Plot no. A1/A2, MIDC Badlapur, Kulgaon, Thane-421 503 Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:February 16, 2018 Subject:

More information

Environment Clearance for Mumbai Pune Expressway Missing Link from Khopoli Exit on YCEW to Sinhagad Institute in Lonavala inn Pune District

Environment Clearance for Mumbai Pune Expressway Missing Link from Khopoli Exit on YCEW to Sinhagad Institute in Lonavala inn Pune District To, Maharashtra State Road Development Corporation (Ltd.) at Raigad and Pune District, Maharashtra Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:September 18,

More information

SEAC-AGENDA

SEAC-AGENDA 155th Meeting of State Level Expert Appraisal Committee (SEAC-1) SEAC Meeting number: 155th Meeting Date Subject: Environment Clearance for Uma Barrage Project Is a Violation Case: No General Information:

More information

SEAC-AGENDA

SEAC-AGENDA 154th Meeting of State Level Expert Appraisal Committee (SEAC-1) SEAC Meeting number: 154th,Day-4 Meeting Date Subject: Environment Clearance for Establishment of Common Biomedical Waste Treatment Facility

More information

Max. building height (m)

Max. building height (m) Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project

More information

SEAC-AGENDA

SEAC-AGENDA 58th meeting of SEAC-3 SEAC Meeting number: 58th meeting Meeting Date Subject: Environment Clearance for Construction Project 1.Name of Project 2.Type of institution 3.Name of Project Proponent Ivory Private

More information

SEAC-AGENDA

SEAC-AGENDA Agenda 70th Meeting of SEAC-3 (Day-3) SEAC Meeting number: 70 Meeting Date September Subject: Environment Clearance for Proposed Building Construction Project (PARK XPRESS) Is a Violation Case: No 1.Name

More information

SEAC-AGENDA

SEAC-AGENDA Agenda of 69 th Meeting of SEAC-3 SEAC Meeting number: 69 Meeting Date August 29, Subject: Environment Clearance for Project by M/s S.O.L Developers Is a Violation Case: No 1.Name of Project 2.Type of

More information

Check list for construction Project of EC [Category 8(a)]:

Check list for construction Project of EC [Category 8(a)]: Check list for construction Project of EC [Category 8(a)]: Provide authenticated (with stamp & Signature) hard copy of this check-list during submission of hard copy of ToR application. Sr. no. Checklist

More information

Environment Clearance for Amendment and Expansion in Residential cum Commercial project

Environment Clearance for Amendment and Expansion in Residential cum Commercial project Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:May 17, 2018 To, Mr. Abhishek Singh, Maad Realtors & Infra Ltd. at S. No. 91 (Old) 52 (New) & 92 (Old) 54(New)

More information

Subject: Sir, Proposed Slum Rehabilitation Scheme Private m/s. Sahyog Homes Limited M/s. Enviro Analysts And Engineers Pvt Ltd. SRA Scheme.

Subject: Sir, Proposed Slum Rehabilitation Scheme Private m/s. Sahyog Homes Limited M/s. Enviro Analysts And Engineers Pvt Ltd. SRA Scheme. Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:April 26, 2018 To, m/s. Sahyog Homes Limited at CTS no. 1/C(3) (pt), 397, 397 1 to 12, 398, 398(1), 399 (pt),

More information

SEAC-AGENDA

SEAC-AGENDA SEAC-II Meeting SEAC Meeting number: 53rd Meeting Date May 4, Subject: Environment Clearance for Expansion of VICINIA Residential project by M/s. Forbes And Company Ltd General Information: 1.Name of Project

More information

Environment Clearance for Proposed ESW Mass housing Scheme S. No. 86,95,133 Shirdhon, Taluka Kalyan (Phase I)

Environment Clearance for Proposed ESW Mass housing Scheme S. No. 86,95,133 Shirdhon, Taluka Kalyan (Phase I) To, Shri. Pradip Sahadeo Savant at Survey No. 86,95,133 Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:March 12, 2018 Subject: Sir, Environment Clearance for

More information

Environment Clearance for Category of 5(f) B, Synthetic organic chemicals industry

Environment Clearance for Category of 5(f) B, Synthetic organic chemicals industry To, M/s. Ipca Laboratories Ltd. (Unit II) at Plot No. G-4 to G-7. MIDC Waluj Industrial Area. Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:June 1, 2018 Subject:

More information

SEAC-AGENDA

SEAC-AGENDA Agenda of 64 th SEAC2 Meeting SEAC Meeting number: 64 Meeting Date July 31, Subject: Environment Clearance for Expansion and Amendment of Proposed Residential Development Is a Violation Case: No 1.Name

More information

Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai Date:May 12, 2017

Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai Date:May 12, 2017 To, Mr.Veer Bharti Koul - Xrbia developers Ltd. at S.No.24(P),25(P), Village Khadyachapada,Taluka- Karjat,Raigad,Maharashtra. Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai-

More information

Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai Date:May 12, 2017

Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai Date:May 12, 2017 To, Mr. B.P.Singh from M/s. Omkar Realtors & Developers Pvt Ltd. at C.S. No.1/362 (pt), of Matunga Division at 18.30 mtr. Sheikh Mishree Road, Antop Hill, Wadala Mumbai Subject: Sir, Environment department,

More information

SEAC-AGENDA

SEAC-AGENDA 63 rd meeting of SEAC-2 SEAC Meeting number: 63 Meeting Date June 29, Subject: Environment Clearance for C.S.No.20/1,20/2,31/4,30/7(pt),30/8(pt) village Ghodbandar Miraroad East Thane. Is a Violation Case:

More information

Details of the proposed project as presented before the committee are tabulated below:

Details of the proposed project as presented before the committee are tabulated below: Shrungal Homes Block No. 141, F.P.No.42, O.P.No.42, T.P.S.No.58 (Bamroli), Choryasi, Surat. Screening & scoping / appraisal. Details of the proposed project as presented before the committee are tabulated

More information

Environment Clearance for Amendment in Environmental Clearance for AMRUT MANTHAN + SHREE MAHALAXMI & PRIMUS RESIDENCES at Santacruz, Mumbai.

Environment Clearance for Amendment in Environmental Clearance for AMRUT MANTHAN + SHREE MAHALAXMI & PRIMUS RESIDENCES at Santacruz, Mumbai. Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:March 12, 2018 To, M/s. GURUKRUPA DEVELOPERS at Plot bearing C.T.S. No. 4091, 4091/1 to 37 (New CTS no. 4091A,

More information

SEAC-2016/C.R.424/TC-1

SEAC-2016/C.R.424/TC-1 SEAC-2016/C.R.424/TC-1 Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:July 3, 2017 To, Amendment in Environment Clearance PROPOSED COMMERCIAL DEVELOPMENT on

More information

BRIEF SUMMARY OF THE PROJECT

BRIEF SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT Office Complex at Plot No. 5A & 5B, Shopping Mall, Vasant Kunj Phase - II, New Delhi Developed by M/s Oil and Natural Gas Corporation Limited BRIEF DESCRIPTION OF THE PROJECT

More information

SEAC-AGENDA

SEAC-AGENDA State Expert Appraisal Committee (SEAC-1) SEAC Meeting number: 150th (Day 1) Meeting Date Subject: Environment Clearance for Common Municipal Solid Waste Management Facility (CMSWMF) at Sector 3, Village

More information

Environment Clearance for ATLANTIS PROPOSED DEVELOPMENT SCHEME ATPlot bearing c.t.s no. 320, t.p.s no 1, panchpakhadi, thane (w)

Environment Clearance for ATLANTIS PROPOSED DEVELOPMENT SCHEME ATPlot bearing c.t.s no. 320, t.p.s no 1, panchpakhadi, thane (w) To, Ashwamedh Builders & Developers at Plot bearing CTS No. 320, TPS No 1, panchpakhadi, thane (w) Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:June 21, 2017

More information

Harman Finochem Limited Private Mr. Bhupinder Singh Manhas sd engineering services pvt. ltd. Others

Harman Finochem Limited Private Mr. Bhupinder Singh Manhas sd engineering services pvt. ltd. Others To, Mr. Bhupinder Singh Manhas at Plot No. N-24, Additional Patalganaga, MIDC, Panvel, Dist. Raigad Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:August 9,

More information

No construction activity started

No construction activity started Sr. Particulars Details No. 1. Proposal is for New Project 2. Type of Project Residential Flats and Shops 3. Project / Activity No. 8(a) [8(a) or 8(b)] 4. Name of the project Kaveri Soham Vistara 5. Name

More information

Subject: Sir, Environment Clearance for Hotel and Beach Resort Project

Subject: Sir, Environment Clearance for Hotel and Beach Resort Project Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:May 4, 2017 To, Mr. Saranjit Singh Bawa (Authorized Signatory) at Village Sagartirth: 2, HISSA no. 3 B 4, HISSA

More information

The Proposed Expansion of Existing ARTEMIS HOSPITAL at Sector-51, Gurgaon (Haryana). In CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT

The Proposed Expansion of Existing ARTEMIS HOSPITAL at Sector-51, Gurgaon (Haryana). In CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT ABOUT PROJECT The Proposed Expansion of Existing ARTEMIS HOSPITAL at Sector-51, Gurgaon (Haryana). In earlier project planning the total plot area

More information

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS Annexure No - 13 SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS File No : Name of the Project: Proposed Commercial project called Bagmane Tech Park RIO Campus of M/s. Bagmane Developers

More information

CONECPTUAL PLAN. w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire. M/s Kalpataru Limited December, 2016

CONECPTUAL PLAN. w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire. M/s Kalpataru Limited December, 2016 CONECPTUAL PLAN w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire at of J.V.P.D scheme of Vile Parle (W), by December, 2016 GRASS ROOTS RESEARCH & CREATION INDIA (P) LTD. (An ISO 9001:2008 Certified

More information

Total Built Up Area. Quantum Of Water Required Quantity Of Wastewater Generation 332kld

Total Built Up Area. Quantum Of Water Required Quantity Of Wastewater Generation 332kld DETAILS OF PROJECT The project proponent, P N Memorial Neurocentre & Research Institute Limited, is developing a Hospital Building at Premises No.-720, Anandapur, Ward. Kolkata- 700 107, KMC, Ward No.

More information

sqm. 123 kld (Landscaping - 31 kld, Dual Flushing 73 kld Car Washing - 19 kld) Quantity Of Wastewater Discharge

sqm. 123 kld (Landscaping - 31 kld, Dual Flushing 73 kld Car Washing - 19 kld) Quantity Of Wastewater Discharge DETAILS OF PROJECT The project proponent wants to develop a Residential Building with all modern amenities Premises No. 116, Roy Bahadur Road (previously known as 352, Roy Bahadur Road), Kolkata - 700053

More information

Environment Clearance for Expansion of SRA Scheme :Shivanjali Co. Op. Hsg. Soc. Ltd.

Environment Clearance for Expansion of SRA Scheme :Shivanjali Co. Op. Hsg. Soc. Ltd. To, Mr. Sanjay Pandey ; Mahakali Developers at Plot No. 366, of TPS No. 1 at village Panchpakhadi, Thane, Maharashtra. Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032.

More information

SEAC-AGENDA

SEAC-AGENDA Agenda of 73rd Meeting of SEAC-3 (DAY-1) SEAC Meeting number: 73 Meeting Date October Subject: Environment Clearance for Environmental Clearance for Proposed Residential Project at S. No. 259(P) & 1945

More information

Details of Project. Underground source

Details of Project. Underground source Details of Project The project proponent wants to develop a Residential complex with all modern amenities at R.S./L.R. Dag No - (442,447,453,454, 443,444), J.LNo-29 Of Khamar Mouja & R.S./L.R. Dag No-(99(P),101,102(P),103,105,106,107,108,109,110,111,112,113(P),114(P),115,125,126,

More information

Subject: Sir, New project. Not applicable

Subject: Sir, New project. Not applicable Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:May 11, 2018 To, Mr. Atul Jangam, Ajitnath Hi Tech Builders Pvt. Ltd. at Plot bearing S. No. 224, 225, 227, 228,

More information

CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT

CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT ABOUT PROJECT M/s. DAR Housing Ltd. Proposed Group Housing Project ATS Rhapsody, At Plot No. GH-12/1, Sector-01, Greater Noida (U.P.), having Plot

More information

TABLE OF CONTENTS. Para No. Contents Page No

TABLE OF CONTENTS. Para No. Contents Page No TABLE OF CONTENTS Para No. Contents Page No Chapter-1 Introduction 1.0 Preamble 1 1.1 Location of the project 1 1.2 Objectives of the EIA study 3 1.3 Methodology of study 3 1.4 Structure of EIA report

More information

Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai Date:January 15, 2019

Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai Date:January 15, 2019 To, Municipal Corporation of Greater Mumbai (MCGM) at At Plot bearing C. S. No. 11 of Division Sion located near Guru teg bahadur nagar railway station, Subject: Sir, Environment department, Room No. 217,

More information

Environment Clearance for Establishment of Synthetic Organic Chemical API Manufacturing facility by

Environment Clearance for Establishment of Synthetic Organic Chemical API Manufacturing facility by To, Glenmark Pharmaceuticals limited at Plot No. B- 25, MIDC Shendra, Aurangabad, 431210, Maharashtra Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:May 2, 2017

More information

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD.

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Summary For Ria Organics Private Limited, D-26/2, Kurkumbh - MIDC, Taluka - Daund Dist. Pune, Maharashtra, India. Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Accredited by QCI NABET Lab. Recognized

More information

Indicative Checklist for construction projects of EC [Category 8(a)]:

Indicative Checklist for construction projects of EC [Category 8(a)]: Indicative Checklist for construction projects of EC [Category 8(a)]: Sr. Checklist point Remark Yes/No Pg. no./ annexure 1. Covering letter signed by the applicant Yes Form-1 Page 1 page 13 2. Completed

More information

To, M/s. Larsen & Toubro Realty Ltd. at CTS. Nos. 117A, 117A/1, & 117B & 117C Village Tungwa, Saki Vihar Road, Powai, Mumbai

To, M/s. Larsen & Toubro Realty Ltd. at CTS. Nos. 117A, 117A/1, & 117B & 117C Village Tungwa, Saki Vihar Road, Powai, Mumbai To, M/s. Larsen & Toubro Realty Ltd. at CTS. Nos. 117A, 117A/1, & 117B & 117C Village Tungwa, Saki Vihar Road, Powai, Mumbai 400 072 Subject: Sir, Environment department, Room No. 217, 2nd floor, Mantralaya,

More information

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. 20. Karnavati Premier Living F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. Screening & scoping / appraisal Details of the proposed project as presented before the committee

More information

FORD GLOBAL TECHNOLOGY AND BUSINESS CENTRE FORD MOTOR PRIVATE LIMITED

FORD GLOBAL TECHNOLOGY AND BUSINESS CENTRE FORD MOTOR PRIVATE LIMITED FORD GLOBAL TECHNOLOGY AND BUSINESS CENTRE FORD MOTOR PRIVATE LIMITED Ford Motor Private Limited- Conceptual Plan 1 Contents 1 INTRODUCTION 3 1.1 BACKGROUND 3 1.2 PROJECT LOCATION 3 1.3 PROJECT FEATURES

More information

Amrut Manthan + Shree Mahalaxmi & Primus Residences by M/s Gurukrupa Developers ENVIRONMENTAL MANAGEMENT PLAN Introduction M/s Gurukrupa Developers pr

Amrut Manthan + Shree Mahalaxmi & Primus Residences by M/s Gurukrupa Developers ENVIRONMENTAL MANAGEMENT PLAN Introduction M/s Gurukrupa Developers pr ENVIRONMENTAL MANAGEMENT PLAN Introduction M/s Gurukrupa Developers proposes a Slum Rehabilitation project Amrut Manthan + Shree Mahalaxmi & Primus Residences located at C.T.S. No. 4091, 4091/1 to 37,

More information

Sr. No. 1 Name of the project M/S Shivsamarth Stone Crusher Name : M/S Shivsamarth Stone Crusher Address : Village- Vajrachounde

Sr. No. 1 Name of the project M/S Shivsamarth Stone Crusher Name : M/S Shivsamarth Stone Crusher Address : Village- Vajrachounde CONSOLIDATED STATEMENT ON VARIOUS ENVIRONEMNTAL ASPECTS FOR INDUSTRIAL PROJECTS: Important Note before filling the form: 1. Fill the form in the same format (i.e. Font: Times New Roman and font size: 12)

More information

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors 1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction

More information

Details of Project. 2 nos kva each & 2 nos. 500 kva each. Parking required 444 nos. (Car Parking 435, Bus Parking 9)

Details of Project. 2 nos kva each & 2 nos. 500 kva each. Parking required 444 nos. (Car Parking 435, Bus Parking 9) Details of Project The project proponent wants to develop a Office building at Plot No. CBD 4, Street MAR, AA II, New Town, P.S. Rajarhat, North 24 Parganas, West Bengal. The project site is a flat land

More information

SEAC-AGENDA

SEAC-AGENDA 82 Meeting Day 01 SEAC Meeting number: 82 Meeting Date February 19, 2019 Subject: Environment Clearance for Proposed Affordable Housing project under Pradhan Mantri Awas Yojana (PMAY) Scheme No. 3A, S.

More information

5. ENVIRONMENT MANAGEMENT PLAN

5. ENVIRONMENT MANAGEMENT PLAN 5. ENVIRONMENT MANAGEMENT PLAN The environmental management plan consist of the set of mitigation measures, management and, monitoring measures to be taken during construction and operation phase to eliminate

More information

Conceptual plan. Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: -

Conceptual plan. Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: - Conceptual plan Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: - Area of plot= 5293SQM, Sanctioned FAR = 10586SQM as per earlier sanctioned.(2) Sanctioned Built up Area=19480.63

More information

SEAC-AGENDA

SEAC-AGENDA 158th (A) Meeting of State Level Expert Appraisal Committee (SEAC-1) SEAC Meeting number: 158th A,Day -1 Meeting Date December 11, 2018 Subject: Environment Clearance for Proposed Expansion of Existing

More information

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell)

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell) ENVIRONMENT MANAGEMENT PLAN No. 1. Increase in water demand due to water usage for, dust suppression and for domestic purpose of workers 2. Sewage generation (9 KLD) and disposal 3. Solid waste generation

More information

Details of Project sqm sqm (39.74%) sqm (30.46%) sqm (22.99%) sqm (6.91%) KMC supply. 205 kld.

Details of Project sqm sqm (39.74%) sqm (30.46%) sqm (22.99%) sqm (6.91%) KMC supply. 205 kld. Details of Project The project proponent wants to develop a Residential cum Commercial project with all modern amenities at Plot No. 257/A Deshpran Shasmal Road, Ward No. - 094, under KMC, Kolkata 700

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Six Monthly Compliance Report June-2015 M/s Mahagun Real Estate Pvt. Ltd SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex Mahagunpuram AT VILLAGE Mehrauli, Dasna, Ghaziabad, U.P. Being developed

More information

SEAC-AGENDA

SEAC-AGENDA SEAC-1 MEETING SEAC Meeting number: 140 Meeting Date July 20, Subject: Environment Clearance for Expansion of Sugar Unit from 4000 TCD to 6000 TCD (Operating capacity of 7,200 TCD) 1.Name of Project 2.Type

More information

SIA/PB/NCP/53462/2016)

SIA/PB/NCP/53462/2016) Item No.148.08: Application for environmental clearance under EIA notification dated 14.09.2006 for the development of group housing project namely SSL Highway Towers at Chandigarh-AmbalaHighway, Dera

More information

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan Report on 1. PROJECT LOCATION & LAND USE The Ganesh Park 3 is a residential building project constructed on plot 608 to 613/5 Vil: GIDC Ankleshwar in Bharuch district of Gujarat state. The project land

More information

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan ENVIRONMENTAL MANAGEMENT PLAN Of Hotel Project for Mohamed Ilyas & Ms. Alamzahan at Khasra No. 269Ga, 269Kh, 266Kh & 270 Village Majra, Tehsil Central Doon, District Dehradun (Uttarakhand) GENERAL ENVIRONMENTAL

More information

This project does not attract EIA Notification and provisions in CRZ Notification [Clause no. 4.2 (i) (b)] also exempt preparation of EIA report.

This project does not attract EIA Notification and provisions in CRZ Notification [Clause no. 4.2 (i) (b)] also exempt preparation of EIA report. The proposal under consideration, Regularization of Existing Resort at Sidheshwarwadi, Village Ubhadanda, Taluka Vengurla, Dist. Sindhudurg is located in CRZ III area having total plot area of 4000 m 2,

More information

Environmental Clearance for Proposed development at Kandivali (E), Mumbai ANNEXURES

Environmental Clearance for Proposed development at Kandivali (E), Mumbai ANNEXURES ANNEXURES 35 LIST OF ANNEXURES Annexure I : Solid Waste Management Annexure II : Water Supply & Wastewater Management Annexure III : Proposed Area Statement Annexure IV : Environmental Management Plan

More information

ANNEXURE - I AREA CALCULATION AND BREAK UP OF LAND USAGE

ANNEXURE - I AREA CALCULATION AND BREAK UP OF LAND USAGE ANNEXURE - I AREA CALCULATION AND BREAK UP OF LAND USAGE Page 1 ANNEXURE - I AREA CALCULATION AND BREAK UP OF LAND USAGE SCOPE OF BUILDING: Residential LAND ACQUIRED: 10688.00 Sqm Survey No.: 88/p-22,

More information

CONCEPTUAL PLAN. for. Submitted to: State Level Environmental Impact Assessment Authority (SEIAA), MoEF&CC, Telangana State.

CONCEPTUAL PLAN. for. Submitted to: State Level Environmental Impact Assessment Authority (SEIAA), MoEF&CC, Telangana State. CONCEPTUAL PLAN for Proposed IT Office Building - 1 Million sft Building in Survey No 124/P, Gopanapally Village, Serilingampally Mandal, Ranga Reddy District, Hyderabad, Telangana Submitted to: State

More information

Pre- feasibility Report. For. At Plot No. 242, 241, 238/2, 239, 237/1, 238/1, 247/1 of Village Sondapar, Tehsil :HingnaDistrict- Nagpur, Maharashtra.

Pre- feasibility Report. For. At Plot No. 242, 241, 238/2, 239, 237/1, 238/1, 247/1 of Village Sondapar, Tehsil :HingnaDistrict- Nagpur, Maharashtra. Pre- feasibility Report For Shiv Kailasha At Plot No. 242, 241, 238/2, 239, 237/1, 238/1, 247/1 of Village Sondapar, Tehsil :HingnaDistrict- Nagpur, Maharashtra. Proposed By M/S Om Shivam Buildcon Private

More information

Details of Project. Total Population During Construction 325 persons Total Population During Operation 2120 persons (permanent , temporary- 630)

Details of Project. Total Population During Construction 325 persons Total Population During Operation 2120 persons (permanent , temporary- 630) Details of Project The project proponent wants to develop a Residential Complex with all modern amenities at 037, Chanditala Main Road, Under KMC, Ward No. 116, Borough No. XIII, Mouza Siriti, J.L. No.

More information

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative)

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative) Six Monthly Progress Report reg. Construction of Group Housing Colony at village Sarai Aurangabad in Sector 3-A, Bahadurgarh (Distt. Jhajjar), Haryana by M/s Prabhu Shanti Real Estate Pvt. Ltd., due in

More information

PROJECT CONCEPT REPORT

PROJECT CONCEPT REPORT PROJECT CONCEPT REPORT for Proposed RESIDENTIAL BLOCK UNDER Expansion (Phase-2) of MANI CASADONA PROJECT at Plot No. IIF/04, Action Area-II, New Town, P.S. Rajarhat, New Town Kolkata Development Authority,

More information

Health and safety norms of CPWD should be followed during construction.

Health and safety norms of CPWD should be followed during construction. Status of Compliance of Conditions of the Environmental Clearance Issued to Riveria Commercial Developers Ltd. DLF Center, Sansad Marg, New Delhi 110001- Construction of "YASHWANT PLACE COMMUNITY CENTRE"

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT FOR RESIDENTIAL TOWNSHIP WITH VACATION RESORTS PROJECT AT ALIBAUG, RAIGAD, MAHARASHTRA PROPOSED TERMS OF REFERENCE Submitted to State Level Environment Impact Assessment

More information

SEAC-AGENDA

SEAC-AGENDA Agenda for 145 th SEAC-1 Meeting (DAY-2) SEAC Meeting number: 145 Meeting Date Subject: Environment Clearance for Change in composition of products (organic fine chemicals) with reduction in quantity 1.Name

More information

SEAC-AGENDA

SEAC-AGENDA 149th Meeting of State Expert Appraisal Committee (SEAC-1) SEAC Meeting number: 149th Day-4 Meeting Date Subject: Environment Clearance for Establishment of Cement Blending Plant and Captive Jetty at Village

More information

Details of Project sqm sqm (31.59%) sqm (38.11%) sqm (23.51%) sqm (24.95%)

Details of Project sqm sqm (31.59%) sqm (38.11%) sqm (23.51%) sqm (24.95%) Details of Project The project proponent wants to develop a Residential complex with all modern amenities at L.R Plot No: 900, 901, 905, 906, 897, 959, 941, 942, 943, 957, 958, 953, 955, 956, 948, 981,

More information

Promoter: Navkar Prime Developers Private Limited ENVIRONMENTAL MANAGEMENT PLAN & CER

Promoter: Navkar Prime Developers Private Limited ENVIRONMENTAL MANAGEMENT PLAN & CER ENVIRONMENTAL MANAGEMENT PLAN & CER 52 ENVIRONMENTAL & SOCIAL MANAGEMENT PLAN 1.1 INTRODUCTION: The Environmental impact can be defined as any alteration of environmental conditions, adverse or beneficial,

More information

SEAC-AGENDA

SEAC-AGENDA 153rd Meeting of State Level Expert Appraisal Committee (SEAC-1) SEAC Meeting number: 153rd (Day-3) Meeting Date Subject: Environment Clearance for Mumbai Pune Expressway Missing Link from Khopoli Exit

More information

2. The expected cost of the project is Rs.50 crores.

2. The expected cost of the project is Rs.50 crores. Subject Application for obtaining Environmental Clearance for development of an "Integrated Municipal Solid Waste Management System for Pathankot Cluster" by Municipal Council, Pathankot at Village Kalanaur,

More information

Environment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006.

Environment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006. Environment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006. Thus, EIA is not applicable for proposed project. We have derived project

More information

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF OCTOBER TO MARCH-2017

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF OCTOBER TO MARCH-2017 COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF OCTOBER - 2016 TO MARCH-2017 F.No. SEIAA 281/2014/EC/110 SUBMITTED BY- M/S. TERON CONSTRUCTION PVT. LTD MAA PADMA COMMERCIAL COMPLEX, H/N-

More information

ADDITIONAL ATTACHMENTS TO FORM-1 M/S. SDB DIAMOND BOURSE

ADDITIONAL ATTACHMENTS TO FORM-1 M/S. SDB DIAMOND BOURSE ADDITIONAL ATTACHMENTS TO FORM-1 FOR OBTAINING ENVIRONMENT CLEARANCE For Proposed Commercial Complex Surat Diamond Bourse M/S. SDB DIAMOND BOURSE Block No. 177/P, Moje- Khajod, Taluka- Surat City, District

More information

ENVIRONMENT STATEMENT

ENVIRONMENT STATEMENT ENVIRONMENT STATEMENT for the year 2015-16 M/s MUMBAI INTERNATIONAL AIRPORT PVT. LTD CHHATRAPATI SHIVAJI INTERNATIONAL AIRPORT 1 st Floor, Terminal 1-B, Santacruz (E), Mumbai - 400 099 Date: - 26 th September

More information

EXECUTIVE SUMMARY SLUM AREA REDEVELOPMENT

EXECUTIVE SUMMARY SLUM AREA REDEVELOPMENT EXECUTIVE SUMMARY SLUM AREA REDEVELOPMENT AT C.T.S. NO. 8 (PT) OF VILLAGE PARIGHAKHADI, TAL ANDHERI & C.T.S. NO. 577 (PT), 578, 579, 580 & 581 (PT) OF VILLAGE KURLA, NEAR KURLA COURT, L.B.S. MARG, KURLA

More information

SEAC-AGENDA

SEAC-AGENDA 60 th SEAC-3 Meeting - Day 1 SEAC Meeting number: 60 th SEAC-3 Meeting Meeting Date September 11, 2017 Subject: Environment Clearance for Environmental Clearance for Proposed Residential & Commercial Development.

More information

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us

More information

ASHAR IT PARK. M/s. Ashar Realtors

ASHAR IT PARK. M/s. Ashar Realtors PRESENTATION BEFORE THE EXPERT APPRAISAL COMMITTEE, MoEF & CC FOR ENVIRONMENT CLEARANCE Proposed Amendment and Expansion of Existing IT Park Project ASHAR IT PARK At Plot Bearing Survey No. 254 /(pt),

More information

PRESENTATION FOR ADDITIONAL DETAILS FOR ENVIRONMENTAL CLEARANCE TO STATE LEVEL EXPERT APPRASIAL COMMITTEE FOR

PRESENTATION FOR ADDITIONAL DETAILS FOR ENVIRONMENTAL CLEARANCE TO STATE LEVEL EXPERT APPRASIAL COMMITTEE FOR PRESENTATION FOR ADDITIONAL DETAILS FOR ENVIRONMENTAL CLEARANCE TO STATE LEVEL EXPERT APPRASIAL COMMITTEE FOR PROPOSED CONSTRUCTION BUILDING PROJECT OF NILA INFRASTRUCTURES LTD (25988.59 m 2 Built up Area)

More information

Pre-Feasibility Report. for. Educational Institute Allen Career Institute-Supath

Pre-Feasibility Report. for. Educational Institute Allen Career Institute-Supath Pre-Feasibility Report for Educational Institute Allen Career Institute-Supath at Plot No. 1, Educational Scheme, Naya Nohra & Hanuwantkhera, Kota, Rajasthan-324001 By M/s. Allen Career Institute Registered

More information

2. Member Secretary, Maharashtra Pollution Control Board, Sion, Mumbai

2. Member Secretary, Maharashtra Pollution Control Board, Sion, Mumbai 13 th February 2017 To, The Director Regional Office (West Central Zone), Ministry of Environment, Forest and Climate Change, Ground Floor, East wing, New Secretariat Building, Civil lane, Nagpur-440001

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information