1 USAID Damage Assessment Abyan, Aden & Lahj Governorates September December Presentation Agenda 1. Assessment Overview 2. Achievements 3. Key Findings 4. Master Tracker 5. Assessment Database 6. Questions?? 2 1

2 Assessment Overview - Purpose To assess and map the extent of damage to public buildings (schools, health facilities, main access roads, markets, electricity) in Abyan governorate and IDP Schools in Aden and Lahj governorates. Create a central web-based data repository to be used by USAID, other donors and the ROYG in the planning, implementation and monitoring of reconstruction efforts. Establish baseline data for USAID and other donor-funded rehabilitation initiatives. 3 Assessment Overview - Process September 2012: Met with the Abyan Governor to discuss the Assessment goals, request permission to travel within the governorate and to request introductions to key Abyan Ministries (Health, Education, Public Works and Highways, Electricity) September 2012: Asked the Governor, MOPIC and key Ministries for a list of prioritized facilities needing to be assessed in Abyan October 2012: Met with OCHA, UNICEF, WHO, UNHCR and key INGOs working in Abyan to coordinate Assessment, share data and identify priorities October & November 2012: Conducted the Assessment of 164 total structures in Abyan: schools, markets, health facilities, roads, electricity networks December 2012: Shared the Assessment results and database access with USAID, ROYG, other donors and INGOs 4 2

3 # Infrastructure Objects Assessed: Public Schools/Abyan Public Health/Abyan Public Markets/Abyan Primary Roads/Abyan Electrical Power Lines/Abyan IDP Schools/Aden IDP Schools/Lahj 5 Assessment Key Findings- Abyan Schools 114 schools assessed in Abyan / 98 entries in the Assessment database 12 / 114 schools assessed in Abyan remain occupied by IDPs 4 / 114 schools were assessed as having major damage (75% damage or more) including the GEO Office in Zingibar and the DEO Office in Khanfir 23 / 114 schools were assessed as having moderate damage (25-75%) 5 schools in Zingibar already rehabilitated by USAID/CLP (Oct-Nov 2012) 6 additional schools in Zingibar and Khanfir to commence USAID/CLP rehabilitation in Dec 2012 A number of rural schools in Abyan remain unfinished, poorly constructed and are poorly equipped. This is a good opportunity for donor assistance, despite not being directly impacted by the conflict. 6 3

4 Location of Schools Assessed in Abyan 7 Assessment Key Findings - Abyan Schools 8 4

5 Assessment Key Findings - Abyan Schools External damage to schools in Zingibar, Abyan 9 Assessment Key Findings - Abyan Schools External damage to schools in Zingibar, Abyan 10 5

6 Assessment Key Findings - Abyan Schools Substantial structural damage to schools in Zingibar 11 Assessment Key Findings - Abyan Schools Internal damage to schools and school equipment in Zingibar, Abyan 12 6

7 Assessment Key Findings - Abyan Schools Example of unfinished school in rural Abyan district, requiring rehabilitation 13 Assessment Key Findings - Abyan Schools Example of school under construction in rural Abyan district, with classes taking place in at-risk conditions for children 14 7

8 Assessment Key Findings - Abyan Schools Example of unfinished basic school structure in remote Abyan district, requiring rehabilitation and equipping 15 Assessment Key Findings - Abyan Schools Example of an unfinished school in a rural Abyan district, requiring rehabilitation and equipping 16 8

9 Assessment Key Findings - Abyan Health Facilities 37 health facilities in Abyan assessed / 34 entries in Assessment database 2 / 37 health facilities in Zinjibar remain occupied by IDPs 0 / 37 health facilities in Abyan assessed as having major damage (more than 75%) 2 / 37 health facilities assessed as having moderate damage (25-75% damage or more) 2 out of the health facilities in Zinjibar and Khanfir with moderate damage are proposed by USAID / CLP for rehabilitation 2 of the health facilities assessed were comprehensively rehabilitated recently by WHO and ICRC 5 of the health facilities assessed were rehabilitated or equipped by USAID / OTI within the past 2 years Small Health Units in Abyan are poorly equipped and would benefit greatly from assistance 17 Locations of Health Facilities Assessed in Abyan 18 9

10 Assessment Key Findings - Abyan Health Facilities Zingibar Hospital that sustained extensive damage during the conflict 19 Assessment Key Findings - Abyan Health Facilities Zingibar Hospital showing damage to internal rooms and damage to the hospital s water tank, requiring rehabilitation 20 10

11 Assessment Key Findings - Abyan Health Facilities Rehabilitation of health facilities in Zingibar is slowly starting to take place. This is the Zingibar Maternal and Child Health Center, recently rehabilitated by WHO. 21 Assessment Key Findings - Abyan Health Facilities Example of rural Health Unit in Khanfir, Abyan that is non functional and needs to be equipped and rehabilitated 22 11

12 Assessment Key Findings - Abyan Roads Abyan s ROYG Director of Public Works and Highways provided the Assessment team with 7 major roads priorities in Abyan needing to be assessed. Over 400km of major highways was assessed in 7 sections per ROYG request. Most conflict-related damage to roads in Abyan has already been repaired by the ROYG (i.e. filling holes in the roads) Most remaining road damage resulted from seasonal rains that have washed out barriers and shoulders. Medians and walkways in Zingibar also require extensive repair. 23 Locations of Roads Assessed in Abyan 24 12

13 Assessment Key Findings - Abyan Roads Examples of conflict-related damage to roads in Abyan that have already been repaired by the Yemen government 25 Assessment Key Findings - Abyan Roads Dangerous road damage due to erosion on major highway in Abyan and an example of ongoing road maintenance 26 13

14 Assessment Key Findings - Abyan Roads Examples of commonly occurring damage to walkways and median strips in urban areas in Abyan 27 Assessment Key Findings - Abyan Roads Examples of common damage to walkways and median strips in Abyan urban areas and looting of paving bricks 28 14

15 Assessment Key Findings - Abyan Roads Mountainous roads in Abyan have different maintenance requirements, mostly weather-related erosion 29 Assessment Key Findings - Abyan Roads Mountainous roads in Abyan showing barrier damage and mountain erosion on main highway 30 15

16 Assessment Key Findings - Abyan Roads The major bridges in Abyan did not sustain damage during the conflict and do not require rehabilitation. 31 Assessment Key Findings - Abyan Markets Abyan s Director of Public Works and Highways provided the USAID Assessment team with a request for the assessment of 5 key public markets in Zingibar and Ja ar. 2 Fish, Vegetable and Meat markets in Zinjibar were determined to be operational despite having significant damage (specifically the fish market) and poor maintenance of the facilities. 3 other public markets in Khanfir require minor or moderate repair to the facilities to improve commercial standard, but are also operational in their current state. The Zinjibar and Ja ar qat markets are privately owned facilities and were, therefore, not assessed

17 Locations of Markets Assessed in Abyan 33 Assessment Key Findings - Abyan Markets The Fish Market in Zingibar sustained heavy damage during the conflict in Abyan and requires complete rehabilitation. The market is currently operating in temporary stalls outside the main facility

18 Assessment Key Findings - Abyan Markets The Ja ar Central Market did not sustain damage in the Abyan conflict but is in a bad state of disrepair and requires substantial maintenance and rehabilitation. This market is also currently operating in temporary stalls outside the main facility. 35 Assessment Key Findings - Abyan Markets Examples of temporary stalls operating outside the main Abyan public market facilities

19 Assessment Key Findings - Abyan Electricity At the request of the Abyan Director of Electricity, the USAID Assessment team focused on assessing one major electrical line from the border of Aden governorate to Al Koud in Zingibar. The 43km power line from Khur Makser District in Aden to Zingibar District (Al Koud) in Abyan encountered severe damage during the conflict. More than 100 kilometers of copper power cables were cut and looted along the highway. 14 transformers and more than 100 electricity poles were also stolen or damaged. The Assessment team collected and mapped the grid coordinates of each of the damage locations for this 43km power line. The total estimated cost to repair is approximately US$10 million. 37 Location of Assessed Electrical Line - Abyan 38 19

20 Assessment Key Findings - Abyan Electricity Electrical cables and poles were extensively damaged and/or looted during the Abyan conflict 39 Assessment Key Findings - Abyan Electricity Further examples of looted electrical parts and a stolen electricity transformer on the Aden to Zingibar N2 Highway 40 20

21 Assessment Key Findings - Abyan Electricity Damaged electrical insulators and highway lighting along the N2 Highway 41 Assessment Key Findings - IDP Schools in Aden 78 IDP schools in Aden were assessed. 20 / 78 schools were occupied by IDPs at time of the assessment in November By December 5, 2012 only 7 schools in Aden remain occupied by IDPs. Some IDP schools are operating classes simultaneous to IDP occupation in some of the adjacent rooms. Total number of student double desks required = 14,878 Significant looting by IDPs of school equipment and fixtures (electrical, doors, windows, fans, toilets) has occurred Damage to the structure of these IDP schools is related to IDP occupation and is minor to moderate: painting, tiling, replacement of fixtures, windows and doors and repair of WASH facilities

22 Locations of Assessed IDP Schools in Aden 43 Assessment Key Findings - IDP Schools in Aden The external structures in Aden IDP schools were not damaged by the occupation. The majority of damage to these IDP schools was in the interior classrooms and major looting of school equipment and fixtures

23 Assessment Key Findings - IDP Schools in Aden IDP schools in Aden are largely overcrowded and lack student desks and basic education equipment. Classes are ongoing, despite these challenges. 45 Assessment Key Findings - IDP Schools in Aden During the November 2012 assessment of the IDP schools in Aden, 20 of the 78 schools assessed remained occupied by IDPs. According to the MoE in Aden by December 5, 2012 this number has been reduced to 7 IDP-occupied schools

24 Assessment Key Findings - IDP Schools in Aden Examples of the state of the Aden schools following departure of IDPs. Damage to the school interiors and looting of plumbing and electrical fixtures is common. 47 Assessment Key Findings - IDP Schools in Aden Examples of Aden IDP schools showing looting of electrical fixtures and removal of previously installed windows and doors

25 Assessment Key Findings - IDP Schools in Aden Aden IDP schools require 14,878 double student desks. These photos depict examples of locally produced student double desks showing two different models and quality. 49 Assessment Key Findings - IDP Schools in Lahj 39 IDP schools were assessed No schools remained occupied by IDPs at time of the assessment Total number of student double desks required = 4,810 Significant looting by IDPs of school equipment and fixtures (electrical, doors, windows, fans, toilets) has occurred. Damage to the structure of these IDP schools is related to IDP occupation and is minor to moderate (painting, tiling, replacement of fixtures, windows and doors and repair of WASH facilities. Two of the IDP schools were considered major damage due to poor construction of original structures and significant disrepair. A number of rural schools in Abyan remain unfinished, poorly constructed and are poorly equipped. This is a good opportunity for USAID assistance, despite not being directly impacted by the conflict

26 Locations of Assessed IDP Schools in Lahj 51 Assessment Key Findings - IDP Schools in Lahj Examples of conflict-related damage in IDP schools in Lahj. Conditions in these schools are similar to those of the Aden IDP schools and require both rehabilitation and equipping

27 Assessment Key Findings - IDP Schools in Lahj The 39 schools in Lahj are now fully vacated of IDPs but lack basic educational equipment and desks required for a normal learning environment. Lahj IDP schools require 4,810 double student desks. 53 Assessment Key Findings - IDP Schools in Lahj Examples of the state of the Lahj schools following IDP departure. The WASH facilities in general were badly damaged or looted and require rehabilitation

28 Assessment Key Findings - IDP Schools in Lahj Major support to the education facilities in Yemen is needed to assist both teachers and students to function in an improved learning environment. 55 Assessment Master Tracker 56 28

29 Assessment Database 57 Assessment Database 58 29

30 Thank You Questions? Yemen Monitoring and Evaluation Project 59 30

MINISTRY OF EDUCATION YEMEN SECONDARY EDUCATION DEVELOPMENT AND GIRLS ACCESS PROGRAM (SEDGAP) ENVIRONMENTAL MANAGEMENT PLAN (EMP) November 27, 2008.

MINISTRY OF EDUCATION YEMEN SECONDARY EDUCATION DEVELOPMENT AND GIRLS ACCESS PROGRAM (SEDGAP) ENVIRONMENTAL MANAGEMENT PLAN (EMP) November 27, 2008. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized MINISTRY OF EDUCATION YEMEN SECONDARY EDUCATION DEVELOPMENT AND GIRLS ACCESS PROGRAM

More information

Oxfam Yemen Situation Report # 12 OXFAM RESPONSE HUMANITARIAN UPDATE

Oxfam Yemen Situation Report # 12 OXFAM RESPONSE HUMANITARIAN UPDATE Oxfam Yemen Situation Report # 12 21st December 15 YEMEN HUMANITARIAN HEADLINES 2.5 million people internally displaced 21.2 million in need of assistance OCHA OXFAM RESPONSE In response to the current

More information

The Ministry of Public Works and Highways. Yemen. The Rural Access Program (RAP) Transforming Life in Rural Yemen Through RAP.

The Ministry of Public Works and Highways. Yemen. The Rural Access Program (RAP) Transforming Life in Rural Yemen Through RAP. The Ministry of Public Works and Highways Yemen The Rural Access Program (RAP) Transforming Life in Rural Yemen www.rapyemen.org Yemen-Background Geography People Economy Access Transforming Life in

More information

Guideline for Collective Shelter and Small Shelter Units in Lebanon

Guideline for Collective Shelter and Small Shelter Units in Lebanon Guideline for Collective Shelter and Small Shelter Units in Lebanon United Nations High Commissioner for Refugees, 2012. These guidelines are based on the Collective Center Guidelines which have been prepared

More information

USAID Environmental Compliance and Environmental Procedures Workshop. Virtual Field Visit Instructions

USAID Environmental Compliance and Environmental Procedures Workshop. Virtual Field Visit Instructions Virtual Field Visit Instructions Your group will play the role of a Mission sector team that is in the process of adding a significant new program component not covered by an existing Initial Environmental

More information

MCER Study for Little Powder K-8

MCER Study for Little Powder K-8 MCER Study for Little Powder K-8 CCSD #1 Little Powder K-8 Weston, WY Wyoming School Facilities Department Cheyenne, WY TSP, Inc. Sheridan, WY May 16, 2016 Table of Contents Introduction 3 Goals and Objectives

More information

Yemen Joint Market Monitoring Initiative December 2018

Yemen Joint Market Monitoring Initiative December 2018 Yemen Joint Market Monitoring Initiative 018 Data collection 11-18 018 1 Participating partners Districts assessed 39 Vendor KIs surveyed Parallel market Parallel market 018 7.0% KEY PRICE FIGURES The

More information

YEMEN PROJECTS. Relief usa WORKING TOGETHER FOR A BETTER WORLD. Updated: april 2015

YEMEN PROJECTS. Relief usa WORKING TOGETHER FOR A BETTER WORLD. Updated: april 2015 YEMEN PROJECTS DONOR REPORT 2015 Islamic Relief usa WORKING TOGETHER FOR A BETTER WORLD. Updated: april 2015 current situation A long-running conflict in Yemen escalated on March 19. According to UNOCHA,

More information

Minnesota Healthcare Engineers Association, Fall Conference. Bob Dehler, P.E. Engineering Program Manager September 14, 2017

Minnesota Healthcare Engineers Association, Fall Conference. Bob Dehler, P.E. Engineering Program Manager September 14, 2017 Minnesota Healthcare Engineers Association, Fall Conference Bob Dehler, P.E. Engineering Program Manager September 14, 2017 Categories of Rehabilitation Work in Healthcare Facilities Bob Dehler, P.E. robert.dehler@state.mn.us

More information

Yemen Joint Market Monitoring Initiative October 2018

Yemen Joint Market Monitoring Initiative October 2018 Yemen Joint Market Monitoring Initiative October 01 INTRODUCTION The Yemen Joint Market Monitoring Initiative (JMMI) was launched by REACH in collaboration with the Water, Sanitation and Hygiene (WASH)

More information

Capital Projects Update

Capital Projects Update Issaquah School District Issaquah High School Reconstruction March 2010 Installation of exterior masonry and siding panels continues on the classroom wings. Library windows are complete. Window and storefront

More information

Madison's Home Inspections

Madison's Home Inspections Cover Page Madison's Home Inspections Property Inspection Report my street, Clarksville TN, 37043 Inspection prepared for: Gary Mann Agent: gary mann - Madison's Inspection Date: 0/4/2009 Time: 12 pm Age:

More information

Hartsville Area Schools - Building Evaluations

Hartsville Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 8, 2012 Hartsville Area Schools - Building Evaluations School Name: Southside Early Childhood Observed By: Cannon/Carter Principal: Grade

More information

Dr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018

Dr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018 G2 Gordon + Gordon Architecture. LLC Dr. Edward Livingston Trudeau Building 118 Main Street, Saranac Lake, NY Building Systems Report June 24, 2018 Harry Gordon, FAIA 164 Otter Slide Road Saranac Lake

More information

MCKINLEY INSTITUTE OF TECHNOLOGY BRAILSFORD & DUNLAVEY RGM AND ASSOCIATES MEASURE T BOND

MCKINLEY INSTITUTE OF TECHNOLOGY BRAILSFORD & DUNLAVEY RGM AND ASSOCIATES MEASURE T BOND MCKINLEY INSTITUTE OF TECHNOLOGY N E I G H B O R H O O D M E E T I N G A P R I L 2 4, 2 0 1 7 1 1 LPA MASTER PLAN 2 PHASE 1 SCOPE Blue Line 3 PHASE 1 SCOPE Blue Line 4 BOND T REVISED PROGRAM SCOPE 1 Modernize

More information

DEL MAR UNION SCHOOL DISTRICT BOND PROJECT DESCRIPTION

DEL MAR UNION SCHOOL DISTRICT BOND PROJECT DESCRIPTION DEL MAR UNION SCHOOL DISTRICT TECHNOLOGY & 21 ST -CENTURY LEARNING INITIATIVE BOND PROJECT DESCRIPTION The Board of Trustees of Del Mar Union School District ("District") has evaluated the need to acquire,

More information

43. CONSERVATORY. Conservatory. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle

43. CONSERVATORY. Conservatory. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle Classification: Cluster: Location: Total Area: No. of Stories Acreage Owned: Acquired: 1904 Most Recent Improvements: THE CONSERVATORY Conservatory Close to junction of Inselrhue and Loiter Way, Belle

More information

ACCESS TO IMPROVED WATER SOURCES IN YEMEN

ACCESS TO IMPROVED WATER SOURCES IN YEMEN ACCESS TO IMPROVED WATER SOURCES IN YEMEN Secondary Data Review, July 2017 WASH Cluster BACKGROUND Yemen is among the most water-stressed countries in the world, due to a naturally dry climate, regional

More information

New Ringgold Middle School. Project Slideshow August 26, 2017

New Ringgold Middle School. Project Slideshow August 26, 2017 New Ringgold Middle School Project Slideshow August 26, 2017 Aerial Photo from West Provided by Hudson Group Taken 8.16.2017 Aerial Photo from North Provided by Hudson Group Taken 8.16.2017 Aerial Photo

More information

Facilities Feasibility Study Frederick Douglass HS Condition Assessment

Facilities Feasibility Study Frederick Douglass HS Condition Assessment Summary of Findings The Frederick Douglass HS Facility located at 2301 Gwynns Falls Parkway in Baltimore, Maryland, was built in 1927. It comprises 194,249 gross square feet. The total current deficiencies

More information

Building Excellence IV Capital Levy Projects Under Construction

Building Excellence IV Capital Levy Projects Under Construction Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary

More information

Oconomowoc Area School District Facility Construction Update July 27, 2018

Oconomowoc Area School District Facility Construction Update July 27, 2018 Oconomowoc Area School District Facility Construction Update July 27, 2018 IXONIA ELEMENTARY SCHOOL The exterior of Ixonia Elementary School looks more complete every day! Concrete work for the exterior

More information

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School HILLSIDE ELEMENTARY SCHOOL Overview: The is located at 98 Belmont Drive and consists of a two-story building which has had a number of additions added to it over the years, the latest of which was a two-story

More information

Syrian Arab Republic Crop and Food Security Assessment Mission

Syrian Arab Republic Crop and Food Security Assessment Mission Wo r k i n g t o g e t h e r t o s a v e l i v e s a n d l i v e l i h o o d s Syrian Arab Republic Crop and Food Security Assessment Mission May 2017 Methodology Meetings in Damascus Ministries Agriculture

More information

2018 HONDURAS SCHOOL CONSTRUCTION WITH SCHOOL SUPPLIES

2018 HONDURAS SCHOOL CONSTRUCTION WITH SCHOOL SUPPLIES www.foodforthepoor.org 2018 HONDURAS SCHOOL CONSTRUCTION WITH SCHOOL SUPPLIES Honduras Project Goal Enhance the learning experience of impoverished students in Honduras by constructing a new school building.

More information

Country Presentation (Afghanistan)

Country Presentation (Afghanistan) Presentation issued without formal editing FOR PARTICIPANTS ONLY 14 March 2017 ENGLISH ONLY UNITED NATIONS CENTRE FOR REGIONAL DEVELOPMENT In collaboration with Ministry of Public Works and Transport,

More information

Building Excellence IV Capital Levy Projects Under Construction

Building Excellence IV Capital Levy Projects Under Construction Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee Hill Elementary

More information

2011 Enterprise Green Communities Criteria Checklist

2011 Enterprise Green Communities Criteria Checklist 2011 Enterprise Green Communities Criteria Checklist This checklist provides an overview of the technical requirements within the Enterprise Green Communities Criteria. To achieve Enterprise Green Communities

More information

A SOURCE OF WATER, A SOURCE OF HOPE

A SOURCE OF WATER, A SOURCE OF HOPE A SOURCE OF WATER, A SOURCE OF HOPE in the Democratic People s Republic of Korea i WATER IN THE DEMOCRATIC PEOPLE S REPUBLIC OF KOREA Today in the Democratic People s Republic of Korea (DPR Korea) access

More information

PROPERTY OVERVIEW PROPERTY HIGHLIGHTS. 2,340 SF Convenience Store. 3,508 SF Three Unit Strip Center. U-Haul Business. Sunoco Branded Gas Station

PROPERTY OVERVIEW PROPERTY HIGHLIGHTS. 2,340 SF Convenience Store. 3,508 SF Three Unit Strip Center. U-Haul Business. Sunoco Branded Gas Station RETAIL FOR SALE 5990 Asheville Highway, Hendersonville, NC 28791 OFFERING SUMMARY SALE PRICE: $1,350,000 LOT SIZE: 0.75 Acres YEAR BUILT: 1980 BUILDING SIZE: 5,848 SF RENOVATED: 2018 C-2 Commercial ZONING:

More information

E. CONSTRUCTION PROCEDURES

E. CONSTRUCTION PROCEDURES E. CONSTRUCTION PROCEDURES The Project facilities would be constructed in accordance with established electric utility practices, best management practices, final engineering plans, CL&P s specifications

More information

Subdivision 1 Responsibility of the Owner

Subdivision 1 Responsibility of the Owner Subdivision 1 Responsibility of the Owner 13.3.1. 1. Owner Liability Neither the issuance of a permit under this Part nor the acceptance or review of plans, drawings, specifications or supporting documents,

More information

Health Life Safety Survey and Master Facilities Plan

Health Life Safety Survey and Master Facilities Plan Health Life Safety Survey and Master Facilities Plan Community Presentation Board Meeting June 22, 2015 June 22, 2014 Board Presentation Overview and Summary of the Health Life Safety Survey and Master

More information

Estimated Cost Ranges for Completing Residential Flood Protection Projects

Estimated Cost Ranges for Completing Residential Flood Protection Projects Estimated Ranges for Completing Residential Flood Protection Projects Introduction to the Home Flood Protection Program The Home Flood Protection Program is an educational service designed to help homeowners

More information

Architect and Engineer: Friar Associates inc.

Architect and Engineer: Friar Associates inc. Architect and Engineer: Friar Associates inc. BACKGROUND In June, after soliciting and interviewing several professional firms, Friar Associates was hired to perform an Existing Conditions Survey and Facilities

More information

Saginaw Historic Preservation Benefits, Requirements and Guidelines

Saginaw Historic Preservation Benefits, Requirements and Guidelines Saginaw Historic Preservation Benefits, Requirements and Guidelines The Corning Mansion Saginaw, Michigan Purpose of Historic Preservation The Purpose of historic preservation in the city of Saginaw is

More information

SUBSTANTIAL IMPROVEMENT

SUBSTANTIAL IMPROVEMENT SUBSTANTIAL IMPROVEMENT General Discussion The following discussion addresses several of the issues surrounding the NFIP regulations concerning substantial improvement and substantial damage. The attached

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 1A-1 Issue date: March 2012 PHASE REPORTS FOR SMALLER PROJECTS 1. This Directive was developed to identify general requirements for the following project types. Review the referenced directives

More information

Building Excellence IV Capital Levy Projects Under Construction

Building Excellence IV Capital Levy Projects Under Construction Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary

More information

School Without Walls

School Without Walls INITIAL YEAR BUILT 1938 BUILDING AREA 59,400 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 276 WARD 1 PROPOSED PROGRAM CAPACITY 400 SCHOOL WITHOUT WALLS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

P Timor-Leste Education Sector Support Project Additional Financing 2012 Safeguard Policy Issues

P Timor-Leste Education Sector Support Project Additional Financing 2012 Safeguard Policy Issues Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized P128178 Timor-Leste Education Sector Support Project Additional Financing 2012 Safeguard

More information

Facility Improvements

Facility Improvements AL-SI-02 ASPHALT PLAY AREA UPGRADE AL-SI-09 CURB RAMP ADDITIONS Asphalt improvements needed around building and playshed to provide a safe play area. Curb ramps needed to provide wheelchair access and

More information

The following uses are permitted subject to the issuance of a Conditional Use Permit:

The following uses are permitted subject to the issuance of a Conditional Use Permit: 8. B-1 Central Business A. Intent It is the intent of the B-1 Central Business District to create an area which will serve as the focal point of community interest and as a focal point of commercial, financial,

More information

Project of 250 Flats - 2BHK Flats 200 and 3 BHK Flats 50 (app.) Situated within the PCMC at Tathwade / Punawale limits

Project of 250 Flats - 2BHK Flats 200 and 3 BHK Flats 50 (app.) Situated within the PCMC at Tathwade / Punawale limits PROJECT DETAILS Project of 250 Flats - 2BHK Flats 200 and 3 BHK Flats 50 (app.) Situated within the PCMC at Tathwade / Punawale limits Within 5 km (10 min. drive) from the Hinjewadi IT Park Convenient

More information

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment Summary of Findings The Matthew A. Henson ES Facility located at 1600 N. Payson Street in Baltimore, Maryland, was built in 1964. It comprises 75,228 gross square feet. The total current deficiencies for

More information

Lemm Elementary. Restoring the Heart of the Community. Klein Independent School District

Lemm Elementary. Restoring the Heart of the Community. Klein Independent School District Lemm Elementary Restoring the Heart of the Community Target Date: August 2018 June Work Update - Project is on schedule Exterior brick is ongoing in Area A addition Area A walls have been covered Main

More information

Facility Services Update Joint Conference Committee October 8, 2013

Facility Services Update Joint Conference Committee October 8, 2013 Facility Services Update Joint Conference Committee October 8, 2013 14 major buildings on 14 acres Approximately 1.5 million gross sq. ft. 42 Elevators More than150 miles of piping More than 2,000 plumbing

More information

SITE AND BUILDING INSPECTION CHECKLIST

SITE AND BUILDING INSPECTION CHECKLIST PARISH BUILDING Page 1 of 6 SITE AND GROUNDS DATE INIT COMMENTS DATE INIT COMMENTS Ramps & Provisions for Handicap Designated parking spaces for Handicap Has soil dropped or heaved Is there standing water

More information

Facility Assessment Report, Montgomery Independent School District

Facility Assessment Report, Montgomery Independent School District ATHLETIC FACILITY CAMPUS DATA ATHLETIC FACILITY 22628 Hwy 105 West, Montgomery TX 77356 1 MASTER PLAN 2 CIVIL - SITE General Existing Conditions and Deficiencies Overall concrete site paving: Good Overall

More information

Noise Abatement Guidelines. Regional Official Plan Guidelines

Noise Abatement Guidelines. Regional Official Plan Guidelines Noise Abatement Guidelines Regional Official Plan Guidelines Halton Region Official Plan Guidelines The Regional Official Plan (ROP) is Halton s guiding document for land use planning. It contains policies

More information

Residencial Las Américas - Edificio California C/ Sierra de Gredos,

Residencial Las Américas - Edificio California C/ Sierra de Gredos, Don t you think it s time to change your life? Then, bear this in mind! One more step in the creation of one of the best urban developent conceptions in Almería: Residencial Las Américas. Edificio Californi

More information

EUGENE KANSAS CITY DALLAS

EUGENE KANSAS CITY DALLAS EUGENE KANSAS CITY DALLAS BUY & HOLD INVESTING FINANCE AQUISITION $ REHAB MANAGEMENT OVERSEEING REHAB 1) Estimate Cost before Purchase 2) Get Utilities Turned On 3) Prepare Scope of Work/Budget 3) Bid

More information

FACILITY COMPONENTS - ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Five fewer bus stalls than minimum standard. Parking and Access - Service / Delivery 1.0 1.0 0.08 No delivery parking adjacent to delivery entrance. Parking

More information

Implementation Status & Results Haiti Haiti Transport and Territorial Development Project (P095523)

Implementation Status & Results Haiti Haiti Transport and Territorial Development Project (P095523) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Haiti Haiti Transport and Territorial Development Project (P095523) Operation Name: Haiti Transport

More information

JV PROPERTIES, LLC (AQUA GLASS/MASCO) 320 INDUSTRIAL ROAD ADAMSVILLE, MCNAIRY COUNTY, TN Approximately 511,807 square feet

JV PROPERTIES, LLC (AQUA GLASS/MASCO) 320 INDUSTRIAL ROAD ADAMSVILLE, MCNAIRY COUNTY, TN Approximately 511,807 square feet (AQUA GLASS/MASCO) 320 INDUSTRIAL ROAD ADAMSVILLE, MCNAIRY COUNTY, TN 38310 SIZE: GROUND: NUMBER OF BUILDINGS: NUMBER OF FLOORS: Approximately 511,807 square feet Approximately 59 acres, mostly level with

More information

Draft Noise Abatement Guidelines

Draft Noise Abatement Guidelines Document under Separate Cover refer to IMLC01-13 Draft Noise Abatement Guidelines April 2013 Legislative & Planning Services Table of Contents 1.0 Introduction...1 1.1 Key Definitions...1 2.0 Existing

More information

Humanitarian.Response

Humanitarian.Response OXFAM YEMEN Humanitarian.Response Humanitarian Facts & Oxfam Response Issue 37 15 February 2017 Bi weekly HUMANITARIAN LEAD: OXFAM GB 14.4 m in need of WaSH 17.1 m Food insecure 3 m internally displaced

More information

BRUCE-MONROE ELEMENTARY SCHOOL AT PARK VIEW MODERNIZATION HISTORIC PRESERVATION REVIEW

BRUCE-MONROE ELEMENTARY SCHOOL AT PARK VIEW MODERNIZATION HISTORIC PRESERVATION REVIEW HISTORIC PRESERVATION REVIEW submitted to: DC Historic Preservation Office Office of Planning ARCHITECTS ARCHITECTURAL NARRATIVE Bruce Monroe Elementary School at Park View is among the schools included

More information

USAID FROM THE AMERICAN PEOPLE

USAID FROM THE AMERICAN PEOPLE USAID FROM THE AMERICAN PEOPLE I. Executive Summary USAID Water and Development Country Plan for South Sudan In alignment with the Global Water Strategy and the USAID Agency Plan, USAID/South Sudan is

More information

City of Jacksonville Development Guide Building Permits

City of Jacksonville Development Guide Building Permits City of Jacksonville TX City of Jacksonville Development Guide Building Permits A publication to help understand the Building Permit process in the City Jacksonville. Building Department 2011 J Revised

More information

Building Inspection Report

Building Inspection Report Building Inspection Report Sample Commercial Inspection Report Inspection Date: Prepared For: Prepared By: Professional Property Inspection Consultants 4857 Winterset Drive Columbus, OH 43220 (614) 459-5941

More information

HISTORIC PROPERTIES COMMISSION DESIGN GUIDELINES FOR CERTIFICATE OF APPROPRIATENESS

HISTORIC PROPERTIES COMMISSION DESIGN GUIDELINES FOR CERTIFICATE OF APPROPRIATENESS HISTORIC PROPERTIES COMMISSION DESIGN GUIDELINES FOR CERTIFICATE OF APPROPRIATENESS Alamance County Planning Department March, 2009 Amended, 2014 INTRODUCTION Purpose The purpose of these design guidelines

More information

2 Project Description

2 Project Description 2 Project Description 2.1 Projects Particulars The project consists of the erection of an Asphalt Plant at St. Julien in the district of Flacq to supply of asphaltic concrete to the company for ongoing

More information

RENTAL INSPECTION CHECKLIST. Helpful Definitions: Egress: the free and unobstructed access to the exterior of a habitable space.

RENTAL INSPECTION CHECKLIST. Helpful Definitions: Egress: the free and unobstructed access to the exterior of a habitable space. CITY OF MANASSAS DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT SERVICES DIVISION 9027 Center Street, Room 201, Manassas, VA 20110 P.O. Box 560 Manassas, VA 20108 Phone: 703-257-8278 Fax: 703-257-5831

More information

MAINTENANCE OF TRAFFIC NOTES

MAINTENANCE OF TRAFFIC NOTES MAINTENANCE OF TRAFFIC NOTES GENERAL: 1. THE REGULATORY SPEED USED FOR MOT CALCULATIONS FOR EACH FACILITY ARE NOTED BELOW. MODIFICATIONS TO THE REGULATORY SPEED MAY REQUIRE RESUBMITTAL OF THE MOT PLAN.

More information

PROGRESS MEERUT PROJECT AS ON 22 OCT 2018 SSSEPTEMBERSEPTEMBER. in finishing internal works. Progress is being monitored closely by the Board JUNE 18

PROGRESS MEERUT PROJECT AS ON 22 OCT 2018 SSSEPTEMBERSEPTEMBER. in finishing internal works. Progress is being monitored closely by the Board JUNE 18 1. PROGRESS IN TOWERS. Satisfactory progress has been achieved in finishing internal works. Progress is being monitored closely by the Board and contractor chased for expeditingaugust the pace 18 of work

More information

TOWNSHIP OF DRUMMOND/NORTH ELMSLEY. Deck/Porch Guide & Permit

TOWNSHIP OF DRUMMOND/NORTH ELMSLEY. Deck/Porch Guide & Permit TOWNSHIP OF DRUMMOND/NORTH ELMSLEY Deck/Porch Guide & Permit New Dwelling Living Space Additions to Dwelling Living Space Summary of Building Permit Rates (calculations are based on outside dimensions)

More information

FACILITY COMPONENTS - MIDDLE SCHOOL

FACILITY COMPONENTS - MIDDLE SCHOOL SITE AREAS Parking and Access - Buses 2.0 2.0 0.30 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 1.0 3.0 0.22 Four fewer stalls

More information

Biddeford School Department

Biddeford School Department Biddeford School Department 5 Plan Buildings, Grounds & Equipment Table of Contents: John F Kennedy Memorial School Page: 1-2 Biddeford Primary School Page: 3-4 Biddeford Intermediate School Page: 5-6

More information

Inter-Agency Rapid Health Assessment. The West Aceh Picture

Inter-Agency Rapid Health Assessment. The West Aceh Picture Inter-Agency Rapid Health Assessment The West Aceh Picture Michel Roulet SDC (Swiss Agency for Development & Cooperation) & WHO Indonesian MoH and Army (TNI) WHO, WFP, UNICEF, UNHCR AusAid, USAID IRC,

More information

Uniform Construction Code

Uniform Construction Code Uniform Construction Code When the UCC Requires Permits and Inspections (A Zoning Certificate may be required even though the project does not require a UCC Building Permit.) As a general rule, the UCC

More information

MAINTENANCE OF TRAFFIC NOTES

MAINTENANCE OF TRAFFIC NOTES MAINTENANCE OF TRAFFIC NOTES GENERAL: 1. THE REGULATORY SPEED USED FOR MOT CALCULATIONS FOR EACH FACILITY ARE NOTED BELOW. MODIFICATIONS TO THE REGULATORY SPEED MAY REQUIRE RESUBMITTAL OF THE MOT PLAN.

More information

New Jersey Home Inspection - Standards of Practice

New Jersey Home Inspection - Standards of Practice New Jersey Home Inspection - Standards of Practice 13:40-15.16 Standards of Practice (a) All NJ home inspectors and associate NJ home inspectors shall comply with the standards of practice contained in

More information

Variance Requests Excerpted from Fairlington Mews Condominium Association Welcome Handbook Updated Reprinted

Variance Requests Excerpted from Fairlington Mews Condominium Association Welcome Handbook Updated Reprinted Variance Requests Excerpted from Fairlington Mews Condominium Association Welcome Handbook Updated Reprinted March 2014 A. Request Procedures 9. VARIANCES Variance requests must be submitted in writing

More information

Chenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017

Chenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017 Chenango Bridge Elementary School Phase 1 Asphalt Pavement Reconstruction Reconstruct asphalt parking located on west side of building including access drive. Sidewalk Replacement Replace cracked sections

More information

P r e s e n t a t i o n. Water Systems. Myanmar, Laos and Cambodia

P r e s e n t a t i o n. Water Systems. Myanmar, Laos and Cambodia P r e s e n t a t i o n Water Systems Myanmar, Laos and Cambodia 2 Overview Chronic fresh water scarcity and contamination are among the predominant challenges in the least-developed and remote villages

More information

ENVIRONMENTAL MANAGEMENT PLAN (EMP)

ENVIRONMENTAL MANAGEMENT PLAN (EMP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ENVIRONMENTAL MANAGEMENT PLAN (EMP) BUILDING DISASTER/CLIMATE RESILIENCE IN COMMUNITIES

More information

Darlington Area Schools - Building Evaluations

Darlington Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 2, 2012 Darlington Area Schools - Building Evaluations School Name: Brunson-Dargan Observed By: Creed/Carter Principal: Mrs. Ada O Sindab

More information

Schedule of Values Cruise Terminal 2 Expansion

Schedule of Values Cruise Terminal 2 Expansion Schedule of Values The Schedule of Values outlined below is intended to reflect the standard format that would be used in a Contractors Application for Payment. Values reflect materials and labor. General

More information

ORDER OF AN EXECUTIVE OFFICER CLOSED FOR TENANT ACCOMMODATION PURPOSES ORDER TO VACATE

ORDER OF AN EXECUTIVE OFFICER CLOSED FOR TENANT ACCOMMODATION PURPOSES ORDER TO VACATE Environmental Public Health ORDER OF AN EXECUTIVE OFFICER CLOSED FOR TENANT ACCOMMODATION PURPOSES ORDER TO VACATE To: Truong Dang the Owner And To: All Occupant(s) of the following Housing premises: 59

More information

Collins Middle School

Collins Middle School Contents Collins Middle School...2 General comments, campus capacity, and student demographics:...2 1.0 School Site...4 2.0 Building Systems and Components...5 3.0 Building Safety and Security...19 4.0

More information

10.4 LEAD-BASED PAINT REQUIREMENTS AND RESPONSIBILITIES

10.4 LEAD-BASED PAINT REQUIREMENTS AND RESPONSIBILITIES 10.4 LEAD-BASED PAINT REQUIREMENTS AND RESPONSIBILITIES Regulation Background Lead-based paint requirements were originally written to implement Section 302 of the Lead-based Paint Poisoning and Prevention

More information

Southwest Health System Construction Newsletter October 7, 2017

Southwest Health System Construction Newsletter October 7, 2017 Southwest Health System A Week in Review Patient Wing Interior sheetrock is 99% complete in the Patient Wing proper Taping and finishing is following behind sheetrock, and Nunn is preparing rooms for paint

More information

NEW MIDDLE SCHOOL PROJECT

NEW MIDDLE SCHOOL PROJECT Monthly Report September 2017 INTRODUCTION P.J. Dick Incorporated is pleased to present to the Chartiers Valley Board of School Directors the following Construction Report for the Chartiers Valley Middle

More information

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02. L_All_Vocatinal_Ed_Construction Sector: Construction Sr. No Specialisation Page No 1 Construction and Building Technology 02 1 P a g e VOCATIONAL EDUCATIONAL QUALIFICATION FRAMEWORK (Sector - Construction

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1995 Project Name. Juba Rapid Impact Emergency Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1995 Project Name. Juba Rapid Impact Emergency Project Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1995 Project Name Juba Rapid Impact Emergency Project Region AFRICA Sector Roads and highways (50%);Human Development (50%) Project ID P099226

More information

COMPANY: CERTIFIED HOME INSPECTIONS ADDRESS: 92 NORTH RD. CITY, STATE, ZIP: NUTLEY NJ PHONE:

COMPANY: CERTIFIED HOME INSPECTIONS ADDRESS: 92 NORTH RD. CITY, STATE, ZIP: NUTLEY NJ PHONE: COMPANY: CERTIFIED HOME INSPECTIONS ADDRESS: 92 NORTH RD. CITY, STATE, ZIP: NUTLEY NJ 07110 PHONE: 973-667-3747 New Jersey Home Inspector-Standards of Practice - NJ ADC 13:40-15.16 (a) All home inspectors

More information

Property Condition Assessment. Summary Report

Property Condition Assessment. Summary Report www.real-estate-inspections.com Property Condition Assessment Summary Report Subject Property Prepared for: Client in Detroit File Number: 05-15-005 Inspector: Craig Milliken, PE CPM Real Estate Inspections,

More information

SANTA ANA COLLEGE FACILITIES COMMITTEE MEETING OCTOBER 18, 2016

SANTA ANA COLLEGE FACILITIES COMMITTEE MEETING OCTOBER 18, 2016 FACILITIES COMMITTEE MEETING OCTOBER 18, 2016 1 ACTIVE PROJECTS Santa Ana College Central Plant, Infrastructure and Mechanical Upgrades 2 COMPLETED PROJECTS Santa Ana College Perimeter Site Improvements

More information

The Report: Priority 1 thru 5 $ 2,124,417 Lifecycle Years 1 thru 3 ½ $ 384,097 New Construction $ 2,451,568 Less Redlined Items $ 43,534

The Report: Priority 1 thru 5 $ 2,124,417 Lifecycle Years 1 thru 3 ½ $ 384,097 New Construction $ 2,451,568 Less Redlined Items $ 43,534 Building Condition Assessment Facilities Feasibility Study 106 - Sam Houston Elementary Educational Needs $ 2,451,568 Safety & Security Needs $ 588,049 Exterior Needs $ 622,503 Interior Needs $ 703,790

More information

2015 International Building Code Errata (Portions of text and tables not shown are unaffected by the errata)

2015 International Building Code Errata (Portions of text and tables not shown are unaffected by the errata) SECOND PRINTING (Updated October 22, 2015) SECTION 202 [RB] GRADE FLOOR OPENING. A window or other opening located such that the sill height of the opening is not more than 44 inches (1118 mm) above or

More information

HKICEREM Pilot School Project - Carbon Footprint Report

HKICEREM Pilot School Project - Carbon Footprint Report HKICEREM Pilot School Project - Carbon Footprint Report 1. Name of the reporting entity: HKICEREM Secondary School 2. Description of the reporting entity: Building management with a single responsible

More information

EJ Industrial Spine BOA Nomination Study

EJ Industrial Spine BOA Nomination Study A. Selecting Priority Sites Section V. Redevelopment of Priority Sites Section IV of this Nomination Study presents a summary of the analyses of the Study Area and market conditions affecting the E-J BOA

More information

These Electricity Safety Rules and associated National Safety Instructions are written to safeguard personnel working for or on behalf of National

These Electricity Safety Rules and associated National Safety Instructions are written to safeguard personnel working for or on behalf of National These Electricity Safety Rules and associated National Safety Instructions are written to safeguard personnel working for or on behalf of National Grid, on or near to its electricity apparatus. National

More information

Oxfam Yemen Situation Report # th January 16 OXFAM RESPONSE HUMANITARIAN UPDATE

Oxfam Yemen Situation Report # th January 16 OXFAM RESPONSE HUMANITARIAN UPDATE YEMEN HUMANITARIAN HEADLINES 2.5 million people internally displaced 21.2 million in need of assistance OCHA OXFAM RESPONSE In response to the current crisis Oxfam has supported 714,792 individuals HUMANITARIAN

More information

In your Group MAKING IT GREEN AND SAVING ENERGY WITH NSP. Standard Approaches 9/11/ Pick a spokesperson. 2. Choose the most difficult category

In your Group MAKING IT GREEN AND SAVING ENERGY WITH NSP. Standard Approaches 9/11/ Pick a spokesperson. 2. Choose the most difficult category MAKING IT GREEN AND SAVING ENERGY WITH NSP Florida Housing Coalition Annual Conference September 2012 Efficient Light Bulbs Saving Water Air Sealing Duct Sealing Replacing Windows Improving Doors Efficient

More information

DONOR REPORT YEMEN 2017

DONOR REPORT YEMEN 2017 DONOR REPORT YEMEN 2017 ISLAMIC RELIEF USA WORKING TOGETHER FOR A BETTER WORLD. UPDATED: MAY 2017 CURRENT SITUATION March 2017 marked two years since conflict escalated in Yemen. Even before the conflict

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 163 82% Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 92 92% 2.3 Structural 0 91 91% 2.4 Building Envelope 0 84 84% 2. Interior

More information

1.040 Project Management

1.040 Project Management MIT OpenCourseWare http://ocw.mit.edu 1.040 Project Management Spring 2009 For information about citing these materials or our Terms of Use, visit: http://ocw.mit.edu/terms. WORKING THE GLOBE: Improving

More information

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project

More information