1 Boiler cleaning ATTACHMENT-B Ref.No.- NFVP/PROD/CP&O/nit boiler/2011 Name of work :- Removing of deposits from Eleven Boilers under CP&O group of Plants, Ammonia-I Ammonia-II and Urea-II and getting these Eleven Boilers passed through Director of Boilers (M.P.) for steaming. 2.0 DETAILS OF WORK: 2.1 There are totally 11 boilers in NFL, out of which 05 boilers are required to be passed through Director of Boilers yearly and the remaining 06 boilers are required to be passed once in two years, through Director of boilers. Four boilers I.e. package boiler, HRU- I, HRU-II & HRU-III are located in CP&O group of plant; Two boilers I.e.R.G. boiler and loop boiler located in Ammonia-I. Three boilers I.e. GT/PAC HRU, R.G. Boiler and loop boiler are located in Ammonia- II and finally 31E-5 and 41E-5(HP carbamate condenser) are located in urea-ii. 2.2 The job is stagerred throughout the year. 2.3 The contractor will have to make arrangements and remove the deposits from the boiler area in a specified time (9 days total). The tentative time schedule of inspection for each boiler is as under. Sr.No.Boiler Month/year Frequency of inspection 1. HRU -I(CPP) : NOV,2012 YEARLY 2. HRU-II(CPP) : DEC,2012 YEARLY 3. HRU-III(CPP) : JAN,2013 YEARLY 4. PACKAGE BOILER(CPP) : NOV,2012 YEARLY 5. HRU-(GT) AMM.-II : APRIL,2013 YEARLY 6. 31E-5 (HP CARBAMATE : APRIL,2013 ONCE IN 2 YEARS UREA-II (CONDENSER) 7. 41E-5 (HP CARBAMATE : APRIL,2013 ONCE IN 2 YEARS UREA-II (CONDENSER) 8. R.G. BOILER (AMMONIA-II): APRIL,2013 ONCE IN 2 YEARS 9. LOOP BOILER (AMMONIA-II): APRIL,2013 ONCE IN 2 YEARS 10 R.G. BOILER (AMMONIA-I) : MARCH,2013 ONCE IN 2 YEARS 11.LOOP BOILER (AMMONIA-I) : MARCH,2013 ONCE IN 2 YEARS 2.4 The above job can be split in two or more contractors at the sole descretion of NFL. 3.0 SCOPE OF WORK: For the first five boilers.(sr.no.01 to 05) 3.1 Scaffolding and platforms have to be raised in the boiler wherever required so as to provide approach at all elevations for carrying out the job as well as inspection by Director of Boilers(OIB). Material for scaffolding and planks will be issued free of cost on returnable basis by NFL.

2 3.2 Removal of deposits from furnace, super heater tubes, steam and mud drum,pent house, economizer zone etc. for presenting it to Director of Boilers. 3.3 After successful hydraulic testing & permission for running boilers, all the scaffoldings have to be removed and all the left over material is to be removed from inside the furnace. 3.4 Separate rates should be quoted for each boiler. N.B. All these jobs are to be carried out under Safety work permit. 3.5 Total job of inspection of boiler will be completed in 09 nine days. The job includes shifting of scaffolding material from store, fixing and removal of deposits from boiler parts and making ready for inspection. 4.0 SCOPE OF WORK: For the remaining 06 boilers (Sr. No ) 4.1 These boilers require minor cleaning. The cleaning requires removal of deposits/scaling. After cleaning, these boilers are to be passed by Director of boilers. It is the responsibility of the contractor to get these boilers passed by director of boilers for steaming.

3 Chemical handling 1. Name of work :- 1.Assistance in Chemical handling& Safety &Pollution control measures, Lubrication and up keeping. ( Schdule A) 2. Removal of sludge from different lagoons/pits in CP&O group of Plants ( Sch-B). SCOPE OF WORK 1.0 The detailed scope of work for schedule-a are as follows: 1.1 HANDLING OF CHEMICALS: Preparation of solution of chemicals like Lime, Alum, FeSO4, TSP, Bleaching powder& Poly Aluminum Chloride etc. as per Plant requirement. Operation of valves, cleaning of filters, collecting samples, shifting of chemicals etc. as per Plant requirement. Approximate quantity of chemicals handled per day will be from 0.75 to 3.0 MT approx. The quantity of chemicals may vary from time to time and as per Plant requirement. During rainy season it may increase to 3 ~ 4 MT per day. Monthly payment will be released as per actual quantity of chemicals dozed in the Plant. The job of dissolving the chemicals is intermittent. However, it may be carried out in three shifts, as and when required. 1.2 SAFETY AND POLLUTION CONTROL FACILITIES: Details of jobs required to be carried out under above operation are: a) Handling of safety appliances within the Plant area including shifting of same to different locations every fifteen days frequency or as and when required. b) Fixing/removal of hoses on service air, service water, Nitrogen and low pressure steam etc. as and when required. c) Blocking the Plant drains in case of escape of effluents causing pollution within Plant area as and when required. d) Dosing of lime, ferrous sulphate,acid into the drains/pits to neutralize the effluents as and when required. All the above jobs shall form one operation. 1.3 Lubrication of machinery and other Plant activities. (Apprx.75 Ltr.oil and 25 kg grease is being handled in each month). The details of work done under the above operation will be: a) Lubrication of rotating equipments in CP&O group of Plants. This will include shifting of filled/empty oil and grease drums from individual plant oil store to concerned field equipments. b) Maintenance of filters in workable condition in the Plant.

4 : 7 : c) Keeping of Plant area around machinery free from oil and other spillages. This operation require on daily basis. All the above jobs shall form one operation. 1.4 Maintenance of strainers in canal and raw water sump in good conditions/removing and refilling of resins from different vessels in D.M.Plant. The details of work under the above operation will be: a) The mesh provided at the inlet of canal in Raw Water Plant is to be kept free from suspended material like vegetation and other floating materials. b) The material collected at the suction sump of the pump house should be kept free from floating material. This material is required to be lifted manually and shifted to a distant place as informed by Engineer-in-charge. c) Removal and refilling of resins from different vessels in D.M.Plant as per the requirement given by Engineer-in-charge. All the above jobs shall form one operation. 2.0 The detailed scope of work for schedule-b are as follows; 2.1 SLUDGE LAGOONS IN PTP( 3 NOS.): Removal of sludge from each lagoon, one by one as released by Engineer-in-charge. Keeping in view the exigency of Plant, the disposal of removed sludge to be lifted after the sludge gets dried to any one or more than one points located within NFL premises as per instructions of EIC. Approximate quantity of sludge within lagoons will be 3000 m3.sludge may be dry/wet containing varying amount of moisture. The availability for cleaning of each lagoon is expected between 4 to 6 weeks. Gap between release of one lagoon to other lagoon may vary between 2 to 4 months. Payment shall be considered strictly as per actual quantities of sludge handled. 2.2 RAW WATER PUMP'S SUCTION SUMP: The sump receives Raw Water from GKS canal at the northern end. 5 Nos. of vertical pumps are located on the Southern end where it receives water from Raw Water sump & from Raw Water Reservoir also. Accumulation of sludge is likely to be maximum towards northern end. Total quantity of sludge, weeds, wild growth etc. is expected to be 1500 m3. Snakes, fish etc. are also likely to be present. Sludge would be absolutely saturated with water and has to be handled by using buckets etc. manually. Job is likely to be released any time when flow stopped in Gopi Krishan Sagar canal. However, southern end of the sump is likely to remain in service at a low level so that contractor could take up said job in about 75% area of the sump towards north.

5 : 8 : Southern end is expected to be cleared as such maintaining low level in that portion. Time available for the job is estimated to be approximate Eight days. Disposal of the removed sludge is to be lifted after the sludge gets dried at one or more points decided by E.I.C. Payment shall be considered strictly on actual quantities of sludge handled. Bidder has to quote his best rates per m3.keeping above possibilities in mind. 2.3 SA-4, SA-5, SA-6 IN ETP: Job belong to ETP and the sludge is likely to be soft to hard deposit from place to place. Approximate quantity is estimated to be 300 m3 and removal shall be accomplished by handling wet sludge in buckets etc. and then transferring the same on a trolley/trailer for disposal to a point within factory as per instruction of EIC. The available time for completion is expected to be 7 days (max.) Payment shall be considered strictly on actual quantity of sludge handled. Bidder has to quote his best rates per m3 keeping above possibilities in mind. 2.4 GUARD POND-A NEAR 132 KV SUB-STATION: Wet / dry sludge which may contain some chemicals, having foul smell is to be removed from Guard Pond-A and to be disposed after the sludge gets dried within factory premises as decided by Engineer-in-charge. Quantity of sludge to be removed is approximately 300 m3. However, payment will be released as per the actual quantity handled. 2.5 MISCELLANEOUS POINTS LIKE: a) B/W channels around gravity sand filter(apprx. quantity of sludge shall be 12 MT.) b) B/W sump in PTP(3 time in a year)(apprx. quantity of sludge shall be 18 Te in one time cleaning.) c) Clarifier sludge sump in PTP (3 times in a year)(apprx.quantity of sludge shall be 15 MT) d) 12 SR-6 in ETP(Apprx. quantity of sludge shall be 25 MT). e) Air stripper sump in ETP (Apprx. quantity of sludge shall be 15 Te). 2.6 REMOVAL & REFILLING OF SAND: Removal, disposal and refilling of sand in 10 gravity sand filters of pre-treatment Plant. Activities involved are scrapping of old fine sand & disposal to suitable place within the Plant area decided by EIC. Also shifting of new sand after sieving from a distance of about 50 mtr. at the ground level and filling in filters.

6 : 9 : Area of the beds are approx. 7.5 X 10 mtr. and depth of filter is about 3 mtr. This job is time bound and to be completed within specified time given by EIC as the delay may cause limitation in operation of the Plant. If the job shall not be completed within stipulated period then Rs.2/m3/day penalty shall be imposed on the contractor. 2.7 REMOVAL & REFILLING OF ACTIVATED CARBON: There are 12 Carbon filters in D.M.Plant. The approximate quantity of activated carbon is m3 in 4 vessels and 7 m3 in 8 vessels each. At the bottom of the vessels below the Carbon apprx. 7-9 m3 of gravel is also there. The job involves removal of Carbon and gravel from the vessels one by one into drums/bags and charging back after cleaning. If fresh carbon is to be charged old carbon is to be shifted or dumped as decided by EIC. Any number of vessels or all the vessels can be offered for emptying and charging. 2.8 REMOVAL AND DISPOSAL OF SLUDGE FROM NEW FIRE WATER TANK: There is one new firewater tank above the ground located at North East of PTP. It receives clarified water from clarifiers. The sludge keeps on collecting at the bottom of the firewater tank. Total quantity of sludge, is likely to be around 700 M 3. Sludge would be saturated with water and has to be handled by using buckets, shovels etc., manually. job shall be handed over after isolating and emptying the fire water tank. Time available for the job is around 15 days. Since the firewater tank is critical to the plant, the job should be completed strictly as per the time schedule. After removal of sludge from the fire water tank, the disposal is to be done after the sludge gets dried as decided by E.I.C. Payment shall be considered on actual quantities of sludge handled. 2.9 REMOVAL AND DISPOSAL OF SLUDGE FROM WEST SIDE LAGOON: West side lagoon is located west side of ETP/RO plant. The plant storm water drain is connected to west side lagoon. The sludge keeps on collecting at the bottom of the west side lagoon. The dimension of the lagoon is 50X30X3M. Since the lagoon is connected with the plant drain, the job is to be completed within the time schedule i.e. 21 days. So sufficient manpower tools and tackles is to be deployed so that the job is completed within the time schedule. When once the job is released the inlet to the west side lagoon is to be blocked with sand bags. Dewatering pump is to be shifted for dewatering the water. The accumulated sludge is to be removed manually by employing buckets and small drums. Disposal of the removed sludge is to be shifted after the sludge gets dried at the designated place as decided by E.I.C. Payment shall be considered strictly on actual quantities of sludge handled. 3.0 REMOVAL OF PALL RINGS, CLEANING/DESCALING AND PUTTING IT BACK IN STEAM STRIPPER-III. Steam stripper-iii is located at southeast corner of ETP. Pall rings are filled in steam stripper-iii as a packing material. In the normal course of time scale formation develops in and around pall rings and stripper

7 shell. Due to scale formation stripper efficiency comes down. The quantity of pall rings is M 3. The scope of work includes: 1. Empting out of tower packing i.e. pall rings. : 10 : 2. Descaling of pall rings by chipping and acid wash. 3. Descaling of tower shall & descaling of stripper storage. 4. Descaling and cleaning of head exchanger tube (Total 250 Nos.) 5. Reloading of pall rings. The job shall be completed within 15 days from the date of handing over of steam stripper No.-III. The job should be completed strictly as per the time schedule. The job shall be released after isolating and draining and slip plating the vessel. Sufficient manpower, tools and tackles shall be deployed so that the job is completed within the time schedule. NOTES: 1. NFL reserves the right to delete any of the above mentioned jobs as per exigencies prevailing from time to time during tenure of the contract. 2. Quantities shown above are indicative only and no commitment for maximum/minimum quantities whatsoever. 3. Contractor has to use his own tools and tackles like shovels buckets, rope etc. However, special tools/fixtures as considered conducive to the speedy progress of work may be provided by Engineer-in-charge without any kind of binding upon NFL. 4. Contractor may like to use his own pump after taking permission from Engineer-in-charge. NFL may consider providing sludge pump on free basis. However, contractor is advised not to consider the same as any kind of commitment. Electrical connections and electricity will be given free of cost. 5. Payments shall be released on completion of one of the lagoon at Sl.No.2.1 and on completion of individual jobs at 2.2 to The above rates should be adequate to meet the minimum wages and all other statutory requirements of employees, working under the contract, failing which, the tender shall be summarily rejected.

8 Naphtha unloading Name of work:-providing services for i) smooth manning/ operation of Naphtha/NGL storage area and (ii) Unloading of Naphtha / NGL from Rail tankers/road tankers. SCOPE OF WORK SCHEDULE-I: Unloading of Naphtha/NGL from wagons. SCHEDULE-II: Operation of Naphtha/NGL storage and transfer area will be as per our requirement. Maintaining proper working condition in the entire work area is the responsibility of contractor. SCHEDULE-I: NAPHTHA/NGL UNLOADING FROM WAGONS/ROAD TANKERS: a) Measurement of quantity of Naphtha/NGL in the wagon by taking dip of the wagons. b) Check the position of level in the main storage tanks. Request the operator to adjust the valves openings as per the filling requirement in the storage tanks. c) Earthing connections should be ensured from each wagon hose connection for handling Naphtha/NGL. Buckets/drum placed under the leakage should also be earthed. After ensuring the proper connections valves should be opened. d) Road tanker - To connect/disconnect the suction of pump nozzle with road tanker using hose provided by NFL. e) Rail tanker -To connect/disconnect the suction header of the Naphtha/ NGL unloading pumps to rail tanker out let nozzles with hoses provided by NFL.(one rake of Naphtha/NGL may consist of 45 to 75 wagons depending on size & type of rake.) f) To open the suction strainers of the above pumps, cleaning of filter elements and boxing up it back. g) The naphtha spillage in the plant area especially, in CPP plant, Ammonia-II and naphtha storage area are collected in drums. The filled drums are shifted in Naphtha unloading area. When the drums are shifted, you are requested to empty out the drums to the unloading header immediately. Sufficient manpower to be supplied for emptying the drums. NOTES: 1. All tools and tackles including special tools required for above work has to be arranged by the contractor.

9 2. It would be the responsibility of the contractor to complete the unloading operation within the free time given by railways. I.e. the unloading of rake should be competed within 5.00 hrs. or as applicable from time to time as per railway schedule. 3. Spillage of liquid fuel, if any, is to be collected in buckets, transferring the same to barrels and then shifting to the suitable place as per the instructions of Engineer-in-charge. 4. After disconnecting the rubber/s.s. hoses subsequent to unloading of rail tankers, any Naphtha/ NGL left over in pipes are to be decanted by the contractor. 5. It would be contractor's responsibility to follow all the safety rules and regulations. SCHEDULE-II: OPERATION OF NAPHTHA/NGL STORAGE AND TRANSFER AREA AS PER OUR REQUIREMENT: NFL is having 6 Naphtha/NGL storage tanks, 4 of 4500 KL/3240 MT capacity each and 2 of 2200 KL/1584 each along with pumping facility tanks. There are four transfer pumps PC-3A/B/C/D in the area. 1. Pumps to be run as per the requirement to maintain adequate level in Captive power Plant Day tanks and Ammonia Day Tank. 2. Contractor will have to maintain required parameters, log book/log sheet supplied by NFL and follow all instructions of Shift-In-charge to entire satisfaction of the E.I.C. He has to report to Shift Engineer in shifts. 3. Pump operation will be in all the three shifts. If the area is left unmanned then contractor will be liable to penalty which can be up to Rs.200/- per shift. GENERAL: a) Management of operation and maintenance of the entire unloading shall be in the Contractor's scope. b) The Contractor is required to start normal operation within a week of receipt of work order/loi. c) Contractor shall depute his representative for communication regarding unloading operations which may start at any time during the day as per the availability of the wagons/road tankers. The representative should preferably have minimum ' B.Sc./Diploma in Engg. qualification and/or of sufficient experience to discuss technical/commercial requirements with the Engineer-in-charge or his appointed representative.

10 d) Contractor shall coordinate with the Engineer-in-charge. e) Employees engaged by contractor will not be allowed to carry lighter / match sticks/cigarette/bidi etc. in the working area. f) Contractor should keep close liaison with railways & transportation department of NFL to keep himself informed of the latest position of incoming NGL/Naphtha rakes. It shall be the duty of Contractor to depute a responsible person to survey the unloading area daily in General shift hours and also in the night depending upon requirement. Patrolling should be done daily and report should be submitted. g) At the time of unloading of NGL/Naphtha rake contractor's representative shall be required to be present along with sufficient number of persons so that rake could be unloaded in free time including connection /disconnection of hoses. Contractor has to plan his activities so that the rake is unloaded within free time of 5.00 Hrs. h) Naphtha/NGL rail tankers are to be emptied out within free time allowed by railways. That is the unloading of rake should be competed within the free time of 5.00 Hrs. or as applicable from time to time as per railway schedule. Any demurrage paid by NFL to Railways due to delay in unloading on the part of Contractor will be recoverable from him.

TECHNICAL SCOPE OF WORK

TECHNICAL SCOPE OF WORK TECHNICAL SCOPE OF WORK Tenderer may inspect the Plant, Machinery & Pumps, sumps and locations of work under Item A to E jobs and acquaint themselves with the work before quoting the rates. Item A (i)

More information

SCOPE OF WORK Contract of Work involving (A) Preparation /testing of Bag samples &sundry jobs (B) Supply of Samples to Labs

SCOPE OF WORK Contract of Work involving (A) Preparation /testing of Bag samples &sundry jobs (B) Supply of Samples to Labs SCOPE OF WORK Contract of Work involving (A) Preparation /testing of Bag samples &sundry jobs (B) Supply of Samples to Labs 1.0 SCHEDULE-A( 2917 OPERATIONS PER YEAR) Part I(1978 OPERATIONS PER YEAR) Name

More information

Annual maintenance of Afforestation works in van-vihar area. (B) Same item No. 7, but in disintegrated rock(copra) CUM 60.

Annual maintenance of Afforestation works in van-vihar area. (B) Same item No. 7, but in disintegrated rock(copra) CUM 60. PART-A Annual maintenance of Afforestation works in van-vihar area. 1 Maint. of teenager plants/shrubs/ fruit plants of Van-vihar approx. (17000Nos.) as per directions of engineer in-charge & including

More information

TCN - 01 Ref: PSER:SCT:MRW-B1052:TCN-01 Date: VOL.ID SCC Unloading from railway wagon 50% SHALL BE READ AS :

TCN - 01 Ref: PSER:SCT:MRW-B1052:TCN-01 Date: VOL.ID SCC Unloading from railway wagon 50% SHALL BE READ AS : Bharat Heavy Electricals Limited (A Government of India Undertaking) Power Sector Eastern Region Plot No. 9/1, Block-DJ, Salt Lake City, Kolkata 700 091 (INDIA) Phone no. 033-2321 1691 Fax : 033-2321 1960

More information

TENDER DOCUMENT N.I.T. NO. TMD Labour supply for Transportation, Preparation and Charging of Raw materials in Mill division of Turamdih FOR

TENDER DOCUMENT N.I.T. NO. TMD Labour supply for Transportation, Preparation and Charging of Raw materials in Mill division of Turamdih FOR TENDER DOCUMENT FOR N.I.T. NO. TMD - 704 Labour supply for Transportation, Preparation and Charging of Raw materials in Mill division of Turamdih 1 URANIUM CORPORATION OF INDIA LIMITED (A GOVT. OF INDIA

More information

Deaerator vessel is installed at the top of BFW Section, which handles BFW at about 2.0 Kg/Cm2 at C.

Deaerator vessel is installed at the top of BFW Section, which handles BFW at about 2.0 Kg/Cm2 at C. NATIONAL FERTILIZERS LIMITED (TECHNICAL SCOPE OF WORK) Page 1 of 8 Annexure-1 SD-1103 SUB: 1. Inspection of Trays of ADA 203. 2. Inspection of Trays of ADA 204. 3. Demister inspection of (i) ADA 202, (ii)

More information

Energy Saving Efforts in Indian Ammonia Urea Plants

Energy Saving Efforts in Indian Ammonia Urea Plants Energy Saving Efforts in Indian Ammonia Urea Plants M A NISH G OSWAMI Deputy c h ief (Technical) Fertiliser association of India New Delhi, India tech@faidelhi.org Capacity & Production Of Fertiliser Products

More information

ADDITIONAL DETAILS OF THE PROJECT

ADDITIONAL DETAILS OF THE PROJECT EXISTING CETP UNITS DETAIL ADDITIONAL DETAILS OF THE PROJECT SR.NO NAME OF THE AREA NOS. AREA (IN METER) 1. Equalization tanks I 01 15.00 x 10.00 x 3.00 + 0.50 FB 2. Equalization tanks II 01 9.00 x 10.00

More information

NATIONAL INSTITUTE OF RURAL DEVELOPMENT & PANCHAYATI RAJ NORTH EASTERN REGIONAL CENTRE, Jawaharnagar, Khanapara, Guwahati

NATIONAL INSTITUTE OF RURAL DEVELOPMENT & PANCHAYATI RAJ NORTH EASTERN REGIONAL CENTRE, Jawaharnagar, Khanapara, Guwahati NATIONAL INSTITUTE OF RURAL DEVELOPMENT & PANCHAYATI RAJ NORTH EASTERN REGIONAL CENTRE, Jawaharnagar, Khanapara, Guwahati-781022 Notice Inviting Tender Sealed tenders are invited from the competent firms

More information

NUCLEAR POWER CORPORATION OF INDIA LTD TECHNICAL SPECIFICATION ON SUBMERSIBLE PUMPS PAGE NO: 1 OF 4 REV NO : 0 DATA SHEET A

NUCLEAR POWER CORPORATION OF INDIA LTD TECHNICAL SPECIFICATION ON SUBMERSIBLE PUMPS PAGE NO: 1 OF 4 REV NO : 0 DATA SHEET A TECHNICAL SPECIFICATION ON SUBMERSIBLE PUMPS PAGE NO: 1 OF 4 DATA SHEET A ANNEXURE - A Sr. Item Description Sr. Item Description A. GENERAL DATA B. PUMP DUTY PARAMETERS 1. System Name 1. Rated capacity,

More information

Talwandi Sabo Power Limited Tender document for Design & Engineering, Supply and Erection of Slurry pumping system from Plant to Ash Dyke

Talwandi Sabo Power Limited Tender document for Design & Engineering, Supply and Erection of Slurry pumping system from Plant to Ash Dyke Techno commercial offers are invited from the competitive bidders for the EPC contract i.e. Design, Engineering, Manufacture/Supply, Civil and Structural, Erection, Testing, Commissioning, Demonstration

More information

NATIONAL INSTITUTE OF RURAL DEVELOPMENT & PANCHAYATI RAJ

NATIONAL INSTITUTE OF RURAL DEVELOPMENT & PANCHAYATI RAJ No. 357/NIRDPR-NERC/2017/Admn./ Date: 24-05-2017 INVITATION FOR BIDS (FOR ANNUAL REPAIR AND PAINTING WORKS OF THE INSTITUTE BUILDING OF NIRDPR-NERC, GUWAHATI) Sealed quotations are invited from competent

More information

STEAM TURBINE-GENERATOR & AUXILLIARY SYSTEMS Presentation by: RANA NASIR ALI General Manager, Power Plants Projects, at PITCO November 02, 2017

STEAM TURBINE-GENERATOR & AUXILLIARY SYSTEMS Presentation by: RANA NASIR ALI General Manager, Power Plants Projects, at PITCO November 02, 2017 STEAM TURBINE-GENERATOR & AUXILLIARY SYSTEMS Presentation by: RANA NASIR ALI General Manager, Power Plants Projects, at PITCO November 02, 2017 CO-GENERTATION POWER PLANT CONCEPT For dimensioning, design

More information

Schedule-1 Overall Project BOQ

Schedule-1 Overall Project BOQ Schedule-1 Overall Project BOQ Sl. No. Item/Description Quantity Unit Total Price excluding GST 1 2 3 4 5 Lot 1 Design and Detailed Engineering 1 Lot Lot 2 Intake works 1 Lot Lot 3 Raw water reservoir

More information

Description of the Work

Description of the Work Description of the Work Construction,Supplying of Electro Mechanical equipment, pipe fittings, erection, installation, testing and commissioning MBBR technology Sewage Treatment Plant ( 300 KLD) at kh.no.54,city

More information

TENDER FOR SUPPLY OF PAPER CORES

TENDER FOR SUPPLY OF PAPER CORES AFD:PUR:SK:CORE:2017:2 27.08.2018 TENDER FOR SUPPLY OF PAPER CORES Subject: - Tender enquiry for Paper cores for PFP unit, Amulfed Dairy, Gandhinagar. Contract Period : 01.10.2018 to 31.03.2019. We invite

More information

BELLARY THERMAL POWER PROJECT PROJECT INFORMATION

BELLARY THERMAL POWER PROJECT PROJECT INFORMATION BELLARY THERMAL POWER PROJECT PROJECT INFORMATION 1.0 Owner / BHEL : Karnataka Power Corpn. Ltd., Shakthi Bhavan No. 82 Race Course Road, Bangalore 560 001, Karnataka, India. 2.0 Owner / BHEL s Consultant

More information

AFD: PUR: CPK: C&F: July 13, 2017

AFD: PUR: CPK: C&F: July 13, 2017 AFD: PUR: CPK: C&F: 17-18 July 13, 2017 To, Subject: Tender for Loading/ Unloading and C&F activity for milk products like 25 Kg SMP bags, 20 Kg Amulya Bags, 15 Kg Sagar bags, 190 Kg Butteroil, 15 Kg Ghee

More information

PRASAR BHARATI (Broadcasting Corporation of India) DOORDARSHAN KENDRA : THIRUVANANTHAPURAM 43. :: :: No. 11(1) /DKT/STORES/ Dated, 21/08/2012

PRASAR BHARATI (Broadcasting Corporation of India) DOORDARSHAN KENDRA : THIRUVANANTHAPURAM 43. :: :: No. 11(1) /DKT/STORES/ Dated, 21/08/2012 By Speed Post PRASAR BHARATI (Broadcasting Corporation of India) DOORDARSHAN KENDRA : THIRUVANANTHAPURAM 43. :: :: No. 11(1)2012-13/DKT/STORES/ Dated, 21/08/2012 Sub:-Quotation for Maintenance of Air-conditioning

More information

SCHEDULE-A MODIFIED CLAUSES/ PAGE NUMBERS: Vol. No. Section/ Description SECTION IA/ ANNEXURE XII :INPUT DRAWINGS (PT plant) Clause no of 920

SCHEDULE-A MODIFIED CLAUSES/ PAGE NUMBERS: Vol. No. Section/ Description SECTION IA/ ANNEXURE XII :INPUT DRAWINGS (PT plant) Clause no of 920 Page 1 of 10 The following modifications/ amendment with respect to Technical Specification for BHEL s Technical specification no PE-TS-421-158-A001 shall apply. Bidder to note that existing clauses/ details

More information

TENDER DOCUMENT FOR OVERHAULING OF IRON REMOVAL PRESSURE FILTERATION PLANT AND ANNUAL MAINTENANCE CONTRACT 9B, QUEEN S PARK, KOLKATA

TENDER DOCUMENT FOR OVERHAULING OF IRON REMOVAL PRESSURE FILTERATION PLANT AND ANNUAL MAINTENANCE CONTRACT 9B, QUEEN S PARK, KOLKATA TENDER DOCUMENT FOR OVERHAULING OF IRON REMOVAL PRESSURE FILTERATION PLANT AND ANNUAL MAINTENANCE CONTRACT AT 9B, QUEEN S PARK, KOLKATA-700 09 RESIDENTIAL COMPLEX OF BALMER LAWRIE &CO. LTD. Tender No.

More information

3. DATA COLLECTION 3.1 DATA COLLECTION 3.2 DATA COLLECTION AGENCIES

3. DATA COLLECTION 3.1 DATA COLLECTION 3.2 DATA COLLECTION AGENCIES 3. DATA COLLECTION 3.1 DATA COLLECTION Systematic data collection helps for effective outcome of research work. Record of the data helps to identify the characteristics of the selected plant. In the present

More information

HAZOP Checklist for Sewage Treatment Plant

HAZOP Checklist for Sewage Treatment Plant HAZOP Checklist for Sewage Treatment Plant CHECKLIST 1.0 Overall Layout of Treatment Plant 1.1 General Layout Property are fenced and gated and the fence height. State where these problems/impacts occur

More information

Government Center Water Treatment Plant Kamphaeng Phet Province, Thailand

Government Center Water Treatment Plant Kamphaeng Phet Province, Thailand Government Center Water Treatment Plant Kamphaeng Phet Province, Thailand 1. Background information Kamphaeng Phet is a province in the lower north of Thailand. The Ping River (main tributary of the Chao

More information

Get the water you want, where you want it, using the power of the wind, free, for life!

Get the water you want, where you want it, using the power of the wind, free, for life! Get the water you want, where you want it, using the power of the wind, free, for life! Fill tanks, ponds and lakes. Irrigate fields, or drain flooded lands. Get the water you want for farm, ranch, village

More information

F-84/MAINT./W.S./

F-84/MAINT./W.S./ F-84/MAINT./W.S./2017 20.03.2017 Sub.: Limited tender for O & M of Water-Supply including De-watering Systems of HQ Building, Preet Vihar, Delhi-110092 Sir, The CBSE intends to assign the AMC for O & M

More information

M/s.KITCO Limited, P.B.No.1820, Ravipuram, M.G.Road, Cochin NOTICE INVITING TENDER

M/s.KITCO Limited, P.B.No.1820, Ravipuram, M.G.Road, Cochin NOTICE INVITING TENDER M/s.KITCO Limited, P.B.No.1820, Ravipuram, M.G.Road, Cochin 682 016. NOTICE INVITING TENDER Dated: 23.12.2011 Sealed tenders are invited on behalf of the Chairman, Cochin Special Economic Zone Authority

More information

ADDENDUM No. 2. ITB No WTP LIME RESIDUAL REMOVAL CONTRACT No. 2 DREDGING AND HAULING

ADDENDUM No. 2. ITB No WTP LIME RESIDUAL REMOVAL CONTRACT No. 2 DREDGING AND HAULING ADDENDUM No. 2 ITB No. 4561 WTP LIME RESIDUAL REMOVAL CONTRACT No. 2 DREDGING AND HAULING Bids Due: February 4, 2019 at 2:00 P.M. (Local Time) The following changes, additions, and/or deletions shall be

More information

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan ENVIRONMENTAL MANAGEMENT PLAN Of Hotel Project for Mohamed Ilyas & Ms. Alamzahan at Khasra No. 269Ga, 269Kh, 266Kh & 270 Village Majra, Tehsil Central Doon, District Dehradun (Uttarakhand) GENERAL ENVIRONMENTAL

More information

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers

More information

PRESENTATION OF CONDENSATE TREATMENT

PRESENTATION OF CONDENSATE TREATMENT Via Pietro Nenni, 15-27058 VOGHERA ITALY Tel. +39 0383 3371 Fax +39 0383 369052 E-mail: info@idreco.com PRESENTATION OF CONDENSATE TREATMENT THE CONDENSATE TREATMENT The absence of impurities in feed water

More information

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers

More information

Sorbtive Vault Operations & Maintenance Manual

Sorbtive Vault Operations & Maintenance Manual Media Sorbtive Vault Operations & Maintenance Manual Overview These instructions provide a description of the operation, inspection and maintenance aspects of Sorbtive Vault. Safety Notice Jobsite safety

More information

Civil/Info - Tower/2018

Civil/Info - Tower/2018 Civil/Info - Tower/2018 Sub: Civil & Tiles Work at 304, 3 rd Highway, Ahmedabad. Quotation Floor of GNFC Info-Tower, Bodakdev, Gandhinagar Sarkhej Dear Sir, We invite your most competitive rates for Civil

More information

Study and Modification of Sewage Treatment Plant, at Jaspur

Study and Modification of Sewage Treatment Plant, at Jaspur IJIRST International Journal for Innovative Research in Science & Technology Volume 4 Issue 10 March 2018 ISSN (online): 2349-6010 Study and Modification of Sewage Treatment Plant, at Jaspur Arnab Biswas

More information

Subsection or plan to be revised: 7-1, 7-8, , On page(s): 27-31(2006), 48-49(2003)

Subsection or plan to be revised: 7-1, 7-8, , On page(s): 27-31(2006), 48-49(2003) Proposed Revision To: Standard Specifications For Public Works Construction Standard Plans For Public Works Construction Public Works Standards, Inc. AGC Southern California Regional Office 1906 West Garvey

More information

UNSATURATED POLYESTER RESIN

UNSATURATED POLYESTER RESIN PROJECT REPORT ON UNSATURATED POLYESTER RESIN BY AQUA CHEM INDUSTRIES Survey No. 50/2, Jodhpar (Nadi), Morbi - 363641, Gujarat. I N D E X Sr. No. Contents Page No. 1 Introduction 3 2 Project Description

More information

INFRASTRUCTURE & OPERATION

INFRASTRUCTURE & OPERATION SECTION C: INFRASTRUCTURE & OPERATION Advice on completing this section is provided in the accompanying Guidance Note. C.1 Operational Information Requirements Provide a description of the plant, process

More information

Plot No. 1-7/B, Laxmi Co-op Industrial Estate, Hatkanangale , Kolhapur Dist. TENDER NO D5

Plot No. 1-7/B, Laxmi Co-op Industrial Estate, Hatkanangale , Kolhapur Dist. TENDER NO D5 ICHALKARANJI POWERLOOM MEGA CLUSTER LTD., ICHALKARANJI. TAL- HATKANANGLE, DIST- KOLHAPUR. Plot No. 1-7/B, Laxmi Co-op Industrial Estate, Hatkanangale 416 109, Kolhapur Dist. Website www. ichmegacluster.com

More information

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) HINAUTI LIMESTONE MINE Mine Lease area 378.261 ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Sidhi Cement

More information

PURCHASE SPECIFICATION Rev. 02 Erection & Supply of Valves. Piping & Testing Dt.30/07/10 For the Pump Test Rig (Refer Dwg. No RD DG )

PURCHASE SPECIFICATION Rev. 02 Erection & Supply of Valves. Piping & Testing Dt.30/07/10 For the Pump Test Rig (Refer Dwg. No RD DG ) PRE QUALIFICATION: The Vendor should have earlier experience in carrying out such Jobs and should give reference for the same. The work is to be done in BHEL R&D premises. The responsibility of safety

More information

TENDER FOR " Work for 24 x 7 Water Supply System under Smart City Mission in ABD area of VMC including

TENDER FOR  Work for 24 x 7 Water Supply System under Smart City Mission in ABD area of VMC including VADODARA SMART CITY DEVELOPMENT LIMITED VADODARA SMART CITY DEVELOPMENT LIMITED TENDER FOR " Work for 24 x 7 Water Supply System under Smart City Mission in ABD area of VMC including Refurbishment of existing

More information

Akiki Engineering Est.

Akiki Engineering Est. Akiki Engineering Est. Water & Steam Experts 3.1. Wastewater Treatment Catalogue October 7, 2010 Contents Rectangular Plant, Extended Aeration......................... 3 Circular Plant, Extended Aeration...........................

More information

BUREAU OF INDIAN STANDARDS

BUREAU OF INDIAN STANDARDS POSTED UNDER POSTAL CERTIFICATE BUREAU OF INDIAN STANDARDS Phone : 23721442, 28394955, 28394956, 28396324 FAX : 28398841 BIS BANGALORE LABORATORY Peenya Industrial Area 1 st Stage, Tumkur Road Bangalore

More information

CHAPTER 5 SEWAGE PUMPS AND LIFT STATIONS

CHAPTER 5 SEWAGE PUMPS AND LIFT STATIONS 15 October 1973 FM 5-163 CHAPTER 5 SEWAGE PUMPS AND LIFT STATIONS 5-1. General Pumps for lifting sanitary sewage, storm water, and plant-unit effluents are usually high-capacity, low-head types with large

More information

BUREAU OF INDIAN STANDARDS CENTRAL TESTING & CALIBRATION CENTRE PLOT NO. 20/9, SAHIBABAD INDUSTRIAL AREA, SAHIBABAD DISTRICT GHAZIABAD (UP)

BUREAU OF INDIAN STANDARDS CENTRAL TESTING & CALIBRATION CENTRE PLOT NO. 20/9, SAHIBABAD INDUSTRIAL AREA, SAHIBABAD DISTRICT GHAZIABAD (UP) BUREAU OF INDIAN STANDARDS CENTRAL TESTING & CALIBRATION CENTRE PLOT NO. 20/9, SAHIBABAD INDUSTRIAL AREA, SAHIBABAD 201010 DISTRICT GHAZIABAD (UP) Tender document No. CL/Admn/77 (2014-15) Subject : Tender

More information

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management ANNEXURES Annexure No. Description 1 Google image showing proposed project site 2 Plant Lay-Out 3 Manufacturing process details 4 Details of hazardous waste management 5 Details of Effluent Treatment Plant

More information

GOVERNMENT OF RAJASTHAN EXECUTIVE ENGINEER PHED DISTRICT (RURAL) DIVISION I, JAIPUR

GOVERNMENT OF RAJASTHAN EXECUTIVE ENGINEER PHED DISTRICT (RURAL) DIVISION I, JAIPUR GOVERNMENT OF RAJASTHAN EXECUTIVE ENGINEER PHED DISTRICT (RURAL) DIVISION I, JAIPUR To be submitted in envelop A Name of Work Annual rate contract of Leakage repairing of various make and size of pipe

More information

Index Number District II Primary Clarifier #2 and #3 Rehabilitation Project Definition FINAL

Index Number District II Primary Clarifier #2 and #3 Rehabilitation Project Definition FINAL T E C H N I C A L M E M O R A N D U M DISTRICT II PRIMARY CLARIFIER #2 AND #3 REHABILITATION PROJECT DEFINITION Index Number 129-15 and #3 Rehabilitation Project Definition FINAL PREPARED FOR: JEA Capital

More information

Domestic Waste Water (Sewage): Collection, Treatment & Disposal

Domestic Waste Water (Sewage): Collection, Treatment & Disposal Domestic Waste Water (Sewage): Collection, Treatment & Disposal Sanitary sewers Storm water sewers Combined sewers Types of sewers: Types of collection system Building sewer/building connections:connected

More information

Operation manual. Kalkwasserreaktor

Operation manual. Kalkwasserreaktor Operation manual Kalkwasserreaktor Reactor for the supply of reef aquariums with Kalkwasser. With the purchase of this unit you have selected a top quality product. It has been specifically designed for

More information

Water supplied by Marafiq does not meet the process requirements.

Water supplied by Marafiq does not meet the process requirements. WATER TREATMENT In Industries Water is used for: a. Drinking b. Cleaning c. Cooling d. Producing Steam e. Process requirement Why we need to treat water? For human consumption a. Water to be purified (Make

More information

SIEMEX OIL SEPARATOR MAINTAINANCE MANUAL SIEMEX OIL SEPARATOR MAINTAINANCE MANUAL. SIEMEX (M) Sdn Bhd

SIEMEX OIL SEPARATOR MAINTAINANCE MANUAL SIEMEX OIL SEPARATOR MAINTAINANCE MANUAL. SIEMEX (M) Sdn Bhd SIEMEX OIL SEPARATOR MAINTAINANCE MANUAL SIEMEX (M) Sdn Bhd LOCATION 23, JALAN PJU 3/45 SUNWAY DAMANSARA 47810 PETALING JAYA SELANGOR CONTACT info@siemex.com.my WEBSITE www.siemex.com.my GENERAL SIEMEX

More information

Sub: E- Screen printing; Fork Lift operation & miscellaneous job works

Sub: E- Screen printing; Fork Lift operation & miscellaneous job works SBU : Greases & Lubricants Division, Manali, Chennai 600 068. Phone:044-25941433/6621/628, Fax No: 044-25941436, email: srinivas.pcs@balmerlawrie.com,www.balmerlawrie.com =============================================================

More information

OF WORK TO BE DONE BY CONTRACTOR

OF WORK TO BE DONE BY CONTRACTOR . SCHEDULE A Total 1 For Consignment received through various Tpt. Companies and booking under "Small" Clearance of goods(including payment of dues, if any, including freight mentioned in the GRs) from

More information

Technical Paper Aluminum Wire Drawing Filtration Presented By Joseph F. Scalise, President, Filtertech, Inc. U.S.A.

Technical Paper Aluminum Wire Drawing Filtration Presented By Joseph F. Scalise, President, Filtertech, Inc. U.S.A. Technical Paper Aluminum Wire Drawing Filtration Presented By Joseph F. Scalise, President, Filtertech, Inc. U.S.A. FT 100C LIQUID FILTRATION WASTE DISPOSAL The paper is an overview of the process, component

More information

Lecture 23. Nitrophosphate Fertilizers Part 1

Lecture 23. Nitrophosphate Fertilizers Part 1 Lecture 23 Nitrophosphate Fertilizers Part 1 Introduction Nitrophosphate is the generally accepted term for any fertilizer that is produced by a process involving treatment of phosphate rock with nitric

More information

Supply of Earthing -Kit for the special type earthing of Distribution transformer centres at Ranuj Sub-divisions Under Division Office Patan.

Supply of Earthing -Kit for the special type earthing of Distribution transformer centres at Ranuj Sub-divisions Under Division Office Patan. 1 ADVERTISED TENDER P.R NO 145427 RFQ NO 20415 TO, M/s Name of Work Supply of Earthing -Kit for the special type earthing of Distribution transformer centres at Ranuj Sub-divisions Under Division Office

More information

No. D-31014/01/15-Estate Cell/ November, 2015

No. D-31014/01/15-Estate Cell/ November, 2015 No. D-31014/01/15-Estate Cell/ November, 2015 IRCS Website Subject: Replacement of damaged doors of the toilets of Class-1V Staff Quarters at 1-Red Cross Road, New Delhi. Dear Sir, Enclosed please find

More information

Updated Method Statement for Sand Filling of φ3.0m Steel Tubular Piles (Rev.3)

Updated Method Statement for Sand Filling of φ3.0m Steel Tubular Piles (Rev.3) Doc. No. : PMBP-MBEC-MS-GZ008 Rev. No.: 3 Date: 24 May 2016 Updated Method Statement for Sand Filling of φ3.0m Steel Tubular Piles (Rev.3) 3 24 May 2016 XSK Third Issue XPA PJ LJH 2 07 May 2016 XSK Second

More information

SEPTIC TANK CONSTRUCTION GUIDELINES

SEPTIC TANK CONSTRUCTION GUIDELINES SEPTIC TANK CONSTRUCTION GUIDELINES Septic tank for this airport will be designed/ built by the general contractor of the building facilities. At the time of the project design, availability of a septic

More information

GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION DHUVARAN TPS Telephone: FAX:

GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION DHUVARAN TPS Telephone: FAX: GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION DHUVARAN TPS 388 610. Telephone: 02698 242618 FAX: 02698-242619 RFQ NO. 19049 Interested bidders are requested to download tender documents

More information

PREQUALIFICATION FOR INTEGRATED REFINERY MAINTENANCE SERVICES AT VL, LANJIGARH

PREQUALIFICATION FOR INTEGRATED REFINERY MAINTENANCE SERVICES AT VL, LANJIGARH PREQUALIFICATION FOR INTEGRATED REFINERY MAINTENANCE SERVICES AT VL, LANJIGARH Annual Turn Over of more than one hundred crores report. Top 5 Clients Details. At least 5 years of experience of O&M in a

More information

SARDAR VALLABHBHAI NATIONAL INSTITUTE OF TECHNOLOGY,SURAT

SARDAR VALLABHBHAI NATIONAL INSTITUTE OF TECHNOLOGY,SURAT SARDAR VALLABHBHAI NATIONAL INSTITUTE OF TECHNOLOGY,SURAT TENDER NOTICE Sealed tenders are invited in duplicate from the supplier/manufacturer/distributor/vendor for the supply of the following items.

More information

TECHNICAL SPECIFICATIONS FOR DIGESTER CLEANING

TECHNICAL SPECIFICATIONS FOR DIGESTER CLEANING TECHNICAL SPECIFICATIONS FOR DIGESTER CLEANING 1. SCOPE 1.1 This section covers the cleaning and sludge dewatering for digesters, containing sludge anaerobically digested to Class B Levels. 1.2 These areas

More information

(A GOVT. OF WEST BENGAL UNDERTAKING) H.O. & R. O.: 2, DurgaCharan Doctor Lane, Kolkata

(A GOVT. OF WEST BENGAL UNDERTAKING) H.O. & R. O.: 2, DurgaCharan Doctor Lane, Kolkata Ph No.(033)2265-0001/2/3, Fax033-22658537 (Under Health & Family Welfare Department) Tender Form Tender Ref.No NIT/PT- 18/17-18 Dated.09.09.2017. Supply of MasterCartons As perannex-1. Last Date of Submission

More information

SECTION COOLING TOWER

SECTION COOLING TOWER PART 1 GENERAL 1.1 SECTION INCLUDES A. Mechanical induced draft Cooling Tower B. Controls C. Ladder and handrails 1.2 REFERENCES SECTION 23 65 00 COOLING TOWER A. ANSI/AFBMA 9 - Load Rating and Fatigue

More information

TCN Ref: PSER:SCT:FKK-M717:TCN-01 Date:

TCN Ref: PSER:SCT:FKK-M717:TCN-01 Date: TCN - 01 Ref: PSER:SCT:FKK-M717:TCN-01 Date: 29-01-2007 Sub Tender change notice (TCN) 01. Job Material management package of boiler and aux, piping, TG & aux, C&I and other misc items for 1x500 MW unit

More information

6.5 Filtration General

6.5 Filtration General 6.5 Filtration 6.5.1 General Turbidity and algae are removed from raw waters by screens, gravel filters and slow sand or rapid gravity filters. The difference between slow and rapid sand filtration is

More information

PERC-RITE DRIP DISPERSAL DESIGN SUBMITTAL American Manufacturing Company, Inc

PERC-RITE DRIP DISPERSAL DESIGN SUBMITTAL American Manufacturing Company, Inc PERC-RITE DRIP DISPERSAL DESIGN SUBMITTAL American Manufacturing Company, Inc. 1-800-345-3132 www.americanonsite.com ASD152-S122 ASD153-S124 ASD154-S124 ASD153-D124 ASD154-D124 2 ZONE DRIP W/ SIMPLEX 2

More information

Environmental Management Plan

Environmental Management Plan (Operational Sites) 1 P a g e A. Introduction An is a written document with the purpose to provide mitigation measures and principles for the management of sites in order to reduce potential impacts to

More information

Cleaning Services. Conventional or non-entry tanks, whatever the contents, Mantank has the expertise to clean them.

Cleaning Services. Conventional or non-entry tanks, whatever the contents, Mantank has the expertise to clean them. Cleaning Services Conventional or non-entry tanks, whatever the contents, Mantank has the expertise to clean them. Our professional project planning team will formulate the best strategy with you to minimise

More information

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018)

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018) Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018) Reference: Environment clearance to CFG3 Project vides MOEF letter.no. J-11011/664/2008-IAII

More information

INSTALLATION OF A STEP-SCREEN & VORTEX GRIT REMOVAL SYSTEM AT THE GRIFFITH SEWAGE TREATMENT PLANT. Peter Shanahan. Griffith City Council

INSTALLATION OF A STEP-SCREEN & VORTEX GRIT REMOVAL SYSTEM AT THE GRIFFITH SEWAGE TREATMENT PLANT. Peter Shanahan. Griffith City Council INSTALLATION OF A STEP-SCREEN & VORTEX GRIT REMOVAL SYSTEM AT THE GRIFFITH SEWAGE TREATMENT PLANT Paper Presented by : Peter Shanahan Author: Peter Shanahan, Senior Wastewater Operator, Griffith City Council

More information

Waste Water Treatment Equipment

Waste Water Treatment Equipment APEC PUMP ENTERPRISE CORP. Waste Water Treatment Equipment APEC Separator APEC Separator Compared with a sedimentation basin, the APEC separator offers a 90% saving in terms of surface area. This means

More information

PCI AFRICA RANGE OF PRE-ENGINEERED WATER TREATMENT PLANTS

PCI AFRICA RANGE OF PRE-ENGINEERED WATER TREATMENT PLANTS PCI AFRICA Paterson Candy International (SA) (PTY) Limited t/a PCI AFRICA Company Registration Number 53/001821/07 T +27 11 794 5004 F +27 11 794 6357 P O Box 308, North Riding, 2162, RSA 11 Ridge Road,

More information

ANNEXURE I OFFER FOR CLEARING THE CARGO OF MMTC - SCHEDULE OF WORK -

ANNEXURE I OFFER FOR CLEARING THE CARGO OF MMTC - SCHEDULE OF WORK - ANNEXURE I OFFER FOR CLEARING THE CARGO OF MMTC - SCHEDULE OF WORK - MMTC imports NF Metals like Tin, Zinc and Lead ingots, Nickel Squares, Silicon etc out of which Tin, Lead and Zinc are packed with steel

More information

Tannery Wastewater Treatment

Tannery Wastewater Treatment Tannery Wastewater Treatment Tanning means converting animal skin in to leather. Oldest industry in India. This wastewater is characterized by strong colour, high BOD, high ph, high TDS. Manufacturing

More information

Product Profile. Annexure A. Annexures to Form - I & PFR. MT/ M Consented Ultimate. Crude OBA AND/ OR Standardized OBA liquid/ powder 190 AND/ OR 2600

Product Profile. Annexure A. Annexures to Form - I & PFR. MT/ M Consented Ultimate. Crude OBA AND/ OR Standardized OBA liquid/ powder 190 AND/ OR 2600 Annexure A Product Profile Sr. No. 1 Product Crude OBA AND/ OR Standardized OBA liquid/ powder MT/ M Consented Ultimate 525 190 AND/ OR 2600-23 - Annexure - B Details of Raw Materials Qty (Kg/ Kg) Qty/

More information

5. ENVIRONMENT MANAGEMENT PLAN

5. ENVIRONMENT MANAGEMENT PLAN 5. ENVIRONMENT MANAGEMENT PLAN The environmental management plan consist of the set of mitigation measures, management and, monitoring measures to be taken during construction and operation phase to eliminate

More information

WATER WORKS SECTION भ रत य प र द य स स थ खड़गप र Indian Institute of Technology, Kharagpur TENDER NOTICE

WATER WORKS SECTION भ रत य प र द य स स थ खड़गप र Indian Institute of Technology, Kharagpur TENDER NOTICE WATER WORKS SECTION भ रत य प र द य स स थ खड़गप र Indian Institute of Technology, Kharagpur TENDER NOTICE No. : IIT/WW/2017-18/ 35 Dt. : 19.01.2018 The Sr. Executive Engineer (Water Works), IIT Kharagpur

More information

SECTION 813 SEWER FLOW CONTROL

SECTION 813 SEWER FLOW CONTROL SECTION 813 SEWER FLOW CONTROL 813-1 DESCRIPTION: Sewer flow control is a set of methods to adjust the flow in the sewer system to allow for inspection, maintenance, repair or replacement. This is accomplished

More information

Tender No: DAFFPL/MOD/FF/ /06 15 th July, 2015

Tender No: DAFFPL/MOD/FF/ /06 15 th July, 2015 Tender No: DAFFPL/MOD/FF/2015-16/06 15 th July, 2015 Dear Sirs, Sealed offer is invited by Delhi Aviation Fuel Facility Private Limited for the work as detailed below: 1. Name of the work : Construction

More information

TECHNICAL BID. Name of the party :

TECHNICAL BID. Name of the party : TENDER FORM FOR QUOTED RATE FOR THE SUPPLY OF. TENDER FORM II TECHNICAL BID Name of the party : --------------------------------------- Address : ---------------------------------------- ----------------------------------------

More information

Groundwater Treatment Facility Operations Martin State Airport August 2018 Chuck Trione, Project Lead

Groundwater Treatment Facility Operations Martin State Airport August 2018 Chuck Trione, Project Lead Groundwater Treatment Facility Operations Martin State Airport August 2018 Chuck Trione, Project Lead 1 Martin State Airport Groundwater Treatment Plant The recently completed 10,200 square foot building

More information

EPA Waste Water Discharge Licence Application

EPA Waste Water Discharge Licence Application Duleek Waste Water Treatment Works EPA Waste Water Discharge Licence Application ARTICLE 16 COMPLIANCE REQUIREMENTS Meath County Council EPA Document Ref: D0133-01 Section A: Non-Technical Summary Update

More information

WEST BENGAL ELECTRONICS INDUSTRY DEVELOPMENT CORPORATION LIMITED (WEBEL) TENDER DOCUMENTS

WEST BENGAL ELECTRONICS INDUSTRY DEVELOPMENT CORPORATION LIMITED (WEBEL) TENDER DOCUMENTS WEST BENGAL ELECTRONICS INDUSTRY DEVELOPMENT CORPORATION LIMITED (WEBEL) TENDER DOCUMENTS Supply, installation, testing and commissioning of 5 HP Pump set along with Electrical & Pipe line work at Webel

More information

Radioactive Water Treatment at a United States. John C Beckman, US Army Corps of Engineers, Baltimore District, Baltimore, MD 21201

Radioactive Water Treatment at a United States. John C Beckman, US Army Corps of Engineers, Baltimore District, Baltimore, MD 21201 ABSTRACT Radioactive Water Treatment at a United States Environmental Protection Agency Superfund Site - 12322 John C Beckman, US Army Corps of Engineers, Baltimore District, Baltimore, MD 21201 A water

More information

SCOPE OF WORKS COOLING TOWER & CWTP PACKAGE (PLOT PLAN & WATER) SCOPE OF WORKS BEARING COOLING TOWER & CWTP PACKAGE

SCOPE OF WORKS COOLING TOWER & CWTP PACKAGE (PLOT PLAN & WATER) SCOPE OF WORKS BEARING COOLING TOWER & CWTP PACKAGE SCOPE OF WORKS A918-160-17-44-SOW-8710 Rev. 5 Page 1 of 5 SCOPE OF WORKS BEARING COOLING TOWER & CWTP PACKAGE PROJECT : GTU PROJECT UNIT No. : 160 OWNER : M/s BPCL, MUMBAI LOCATION : MUMBAI, INDIA PMC

More information

AFPM 2018 Operations & Process Technology Summit

AFPM 2018 Operations & Process Technology Summit GASOLINE PROCESSES Alkylation 1 What are the benefits of alumina treating in sulfuric acid alkylation and HF alkylation? Has this technology been proven commercially? 2 What metallurgy works well and does

More information

Wastewater treatment for single houses. D. O Dowd

Wastewater treatment for single houses. D. O Dowd Wastewater treatment for single houses 1 * In rural settings, connection to the local authority main sewer is not always possible, so each house has its own separate wastewater treatment system for the

More information

Construction of Rapid Sand Filters i) Media

Construction of Rapid Sand Filters i) Media Filtration Process The flow of clarified water through a bed of granular media Purpose is to remove any particulate matter left over after flocculation and sedimentation Process operates based on 2 principles

More information

Spillage and Material Handling Systems. By Hugros Inc.

Spillage and Material Handling Systems. By Hugros Inc. Spillage and Material Handling Systems By Hugros Inc. Our Profile is a technology solution provider for industries for all their requirements to keep a safer and green work environment. We offer engineering

More information

Lowering The Total Cost Of Operation

Lowering The Total Cost Of Operation Lowering The Total Cost Of Operation The system removes more solids than conventional clarification, so filters can run longer between backwash cycles. Fewer backwash cycles means less backwash water,

More information

Experimental Study on Heat Recovery from Continuous Blow down Water And Reduced Feed Water Consumption By Utilizing It In CFBC Boiler

Experimental Study on Heat Recovery from Continuous Blow down Water And Reduced Feed Water Consumption By Utilizing It In CFBC Boiler RESEARCH ARTICLE OPEN ACCESS Experimental Study on Heat Recovery from Continuous Blow down Water And Reduced Feed Water Consumption By Utilizing It In CFBC Boiler Kiran G. Gayakwad 1, Prof.V.H.Patil 2,

More information

20/06/2011 Seminar on Geothermal Exploitation Santiago de Chile

20/06/2011 Seminar on Geothermal Exploitation Santiago de Chile Contents Power Plants Steam Power plants Binary Power plants Geothermal Power Plants Single flash systems Binary systems 1 Equipment Well head Gathering piping system Steam separators and moisture separators

More information

VOLUME-III PRICE SCHEDULE, REV-01

VOLUME-III PRICE SCHEDULE, REV-01 Design, engineering, manufacturing, supply, erection & commissioning, etc of one (1) No. IDCT cooling tower Pkg for 3x660 MW units at North PREAMBLE 1 This preamble forms part of tender document and schedule

More information

Bushy Park Industrial Complex Bushy Park, South Carolina

Bushy Park Industrial Complex Bushy Park, South Carolina Utilities Availability - Electrical Power Available at site via SCE&G (distributed by Cooper River - Natural Gas - Available at site via South Carolina Electric & Gas (SCE&G) - Steam Available (6 bar and

More information

Odor Control: working in your neighborhood to protect public health and the environment

Odor Control: working in your neighborhood to protect public health and the environment Odor Control: working in your neighborhood to protect public health and the environment The Woonsocket Regional Wastewater Commission (WRWC) protects public health and the environment by treating 8 to

More information

INSTALLATION OF NEW FURNACE CALCINER 2

INSTALLATION OF NEW FURNACE CALCINER 2 SITE INFORMATION INSTALLATION OF NEW FURNACE CALCINER 2 The tenderer should, in his own interest, do a MANDATORY SITE VISIT ON 25 TH JANAUARY 2017 to familiarize with the site conditions before tendering.

More information