Charbonneau Consolidated Infrastructure Improvement Plan 2017 APWA OREGON CHAPTER SPRING CONFERENCE SEASIDE, OREGON APRIL 12, 2017

Size: px
Start display at page:

Download "Charbonneau Consolidated Infrastructure Improvement Plan 2017 APWA OREGON CHAPTER SPRING CONFERENCE SEASIDE, OREGON APRIL 12, 2017"

Transcription

1 Charbonneau Consolidated Infrastructure Improvement Plan 2017 APWA OREGON CHAPTER SPRING CONFERENCE SEASIDE, OREGON APRIL 12, 2017

2 Presentation Outline This presentation includes: History of Charbonneau development Consolidated Infrastructure Improvement Planning Program Funding Implementation of the Plan Lessons Learned / Takeaways Questions

3 Where is Charbonneau?

4 Charbonneau Development Planned Community City within a City Annexed into Wilsonville 1971 Development begins in 1972, continues through 1980 s Managed by HOA 3500 residents (15% population) 27-hole golf course Swimming/tennis club Commercial area

5 Challenges: Charbonneau Infrastructure Unique Design Concept Lack of Oversight Material Selection Narrow Roadways Lots of Trees

6 Charbonneau Infrastructure 1998 Agreement reached designating public/private infrastructure

7 Charbonneau Infrastructure Utility Master Plans: Pavement Management Program Wastewater Collection Master Plan Stormwater Master Plan Water System Master Plan Utility Condition: Utility video inspection Repair history

8 Need a Plan Infrastructure Repair Plan Clearly identify and prioritize all utility deficiencies Devise efficient infrastructure repair plan Identify infrastructure repair costs to help guide utility rate analysis 20 year time frame

9 Wastewater System

10 Storm Drainage System

11 Potable Water System

12 Public Street System

13 Infrastructure Repair

14 Infrastructure Repair Projects What gets fixed first? Create project areas Repair all utilities under same project. Most cost effective Minimize impacts to residents Priority Utility 1 Sewer - Class 1 2 Storm - Class 1 3 Streets - Class 1 4 Sewer - Class 2 5 Storm - Class 2 6 Streets - Class 2 7 Streets - Class 3 8 Water

15 Infrastructure Repair Projects 38 Project Areas Challenges Class 1 Sewer - 5 years to fix Class 1 Storm - 15 years to fix How do we speed up repairs?

16 Infrastructure Spot Repair Projects

17 Infrastructure Spot Repair Projects 15 Spot Repair Projects Solutions Class 1 Sewer - 2 years to fix Class 1 Storm - 8 years to fix Impacts Additional construction Separate Projects by 5 years Less cost effective (a little) Project Rank Project Location Sewer Storm SR Block of Fairway Dr. X X SR-2 Estates Post Road X X SR-3 Molalla Bend SE X X SR-4 French Prairie Del Monte X SR & 7500 Block of Fairway Dr. X SR-6 Armitage Road South X SR-7 Middle Greens Road X SR-8 Country View Loop X SR-9 Boones Bend Road X SR-10 Arbor Lake Drive X SR-11 Armitage Road North X SR-12 Lake Drive X SR-13 Country View Lane X SR-14 Juliette Drive X SR-15 Louvonne Drive X

18 Infrastructure Repair Costs

19 Infrastructure Repair Plan $44.5M Investment Need Public Meeting in Charbonneau City Council Adoption August or more year plan Guide utility rate analysis Utility Sewer Storm Streets Water Total Estimated Repair Cost $6.8 Million $19.6 Million $10.1 Million $8.0 Million $44.5 Million

20 Funding Strategy Did you say $19.6M for storm in Charbonneau? Water, sewer, and street utilities have more capacity Storm capital summary: Master plan plus outfall projects = $13.9M Storm is smallest water utility FY : $5.25/ERU (2,750 sf impervious area) $1.5M revenue; $120,000 EFB Very low year-end balance dire conditions Total CIP over 20-year forecast = $33.4M SDC-eligible capital costs = $8.4M Net rate requirement = $25M Charbonneau Utility Sewer Storm Streets Water Estimated Repair Cost $6.8 Million $19.6 Million $10.1 Million $8.0 Million

21 Funding Strategy Charbonneau residents to foot the bill? City-wide public reaction? Council reaction? Infrastructure reliability vs. ability and desire to pay How do we compare with others? Council needs a palatable strategy Need a good rate model/forecast (Shaun Pigott)

22 Rate Modeling - Considerations Project list and schedule Cost escalation at 3% 20, 25, 30-year CIP schedule Debt financing Interfund loan for capital -.54% interest rate (LGIP) 20-year revenue bond - 4.5% interest rate Operating revenues and expenses Policy: Operating reserve no less than 20% annual expenses 5.5% cost escalation for personal services ERUs 1.74% annual growth

23 Assumptions Preliminary Rate Forecast 25 Years Cash flow for initial planned projects Years 1-5 = $7.3M (inflated) $2M inter-fund loan from General Fund (10 vs. 5-year payback) $5.3M revenue bond Years Use rate adjustments to cash fund CIP Add Small Works CIP = $200,000 per year Add to O&M Expenses FY add Civil Engineer FY add Utility Worker

24 Rate Profile Preliminary Rate Forecast 25-Year Case $16.00 Forecast of Monthly Stormwater Rates $ per Equivalent Residential Unit (ERU) $14.00 $12.00 $11.80 $11.85 $11.94 $11.99 $12.29 $12.39 $12.48 $12.56 $12.68 $12.78 $12.88 $13.00 $13.12 $13.24 $13.38 $12.47 $10.00 $8.00 $8.73 $8.71 $8.44 $8.52 $8.60 $6.00 $5.39 $5.26 $4.00 $2.00 $

25 Graduated Rate Increase Scenario 25 Year Case Date Monthly Rate Increase Per ERU New Rate Percent Increase Current Rate n/a $5.25 n/a Apr. 1, 2015 $1.70 $ % Jan. 1, 2016 $1.70 $ % Jan. 1, 2017 $0.65 $9.30 8% Jan. 1, 2018 $0.65 $9.95 7% Jan. 1, 2019 $0.65 $ % Jan. 1, 2020 $0.65 $ % Jan. 1, 2021 $0.65 $ %

26 Resolution No City Council authority to adopt rate increases Path to restore fund stability First 5 years use debt to get cash Years 6 through 25 pay as you go Future rate adjustments may be needed New MS4 permit requirements New information on conditions Public outreach; articles; letters to 100 largest customers

27 Plan Implementation Wallis Engineering contracted June 2015 for design services for 15 Storm and Sanitary repair project in 3 phases. Emergency water line repair added to Phase 1 scope in December Scope included: Investigation Project Phasing Public Involvement Design Construction support

28 Investigation Phase Mainline and Lateral Video Inspection Manhole Inspection Smoke and Dye Testing Topographic Survey Condition Assessment Maps

29 Mainline Inspection Defects Broken Pipe Severe Offset Joint

30 Mainline Inspection Defects Corroded Pipe Lateral Intrusion

31 Mainline Inspection Defects Squashed Pipe Root Intrusion

32 Mainline Inspection Defects Collapsed Pipe Utility conflicts

33 Manhole Inspection Defects Sedimentation and Poor channelization Spalling

34 Condition Assessment Maps

35 Improvement Alternatives Cured In Place Pipe (CIPP) Inflating resin filled liner into pipe and curing Low cost and impact Will correct many structural issues, but not grade issues Pipe Bursting Expanding the host pipe and pulling new pipe into its place Can be used to upsize pipe and correct structural, moderate grades Surface heaving shallow pipe; requires some excavation Difficult with corrugated metal pipe Open Excavation and Replacement High cost and impact (relatively) Typically needed to correct deficiencies prior to CIPP or pipe bursting Will correct all deficiencies and grades

36 Phasing Three phase approach Highest urgency first

37 Public Involvement phase

38 What to Expect with Open Excavation Project areas will be closed to through traffic during the week day. Access to properties will be maintained, but expect delays. Garbage and deliveries will be maintained. On-street parking will be restricted during the day. Contractor will be required to provide notice and contact information. Water and sanitary sewer will be maintained (typically). Materials will be stock-piled on the street. Expect noise, dust and an occasional portable toilet near you. Come to us for concerns, special access needs or deliveries, or complaints.

39 Open Excavation

40 What to Expect with CIPP Project areas will be closed to through traffic during the week day. Access to properties will be maintained, but expect delays. Garbage and deliveries will be maintained. On-street parking will be restricted during the day. Contractor will be required to provide notice and contact information. Water service will be maintained; sanitary service will be restricted. Work proceeds quickly ~ 800 LF / day. Expect noise, steam, and styrene odor during curing process (not harmful). Come to us for concerns, special access needs or deliveries, or complaints.

41 CIPP

42 Construction Phase 1 Construction began April 2016 Awarded to Canby Excavating - $900,000 Phase 2 Construction to begin May 2017 Awarded to Moore Excavation - $970,000 Phase 3 Construction planned for 2018

43 Design and Construction Challenges Utility Conflicts

44 Design and Construction Challenges Private Property Impacts

45 Design and Construction Challenges Tree impacts

46 Design and Construction Challenges HOA and Golf Course Coordination

47 Design and Construction Challenges Open Trench Installation Impacts

48 Design and Construction Challenges Spot repairs to enable CIPP lining CIPP Lateral Connections

49 Lessons Learned Importance of inspection and standards Use of appropriate materials Proper installation Importance of design Design for access, long term maintenance and replacement Sustainable Funding Stable operations, maintenance, and capital resources

50 Questions?

Newberg Inflow and Infiltration Study WES 2017 PETER OLSEN, PE EMILY FLOCK, EI 1

Newberg Inflow and Infiltration Study WES 2017 PETER OLSEN, PE EMILY FLOCK, EI 1 Newberg Inflow and Infiltration Study WES 2017 PETER OLSEN, PE EMILY FLOCK, EI 1 What is Infiltration and Inflow? Infiltration and inflow (I/I) represent extraneous groundwater and storm water runoff that

More information

MWRD Infiltration and Inflow Control Program Compliance Update. Committee of the Whole Meeting April 3, 2018

MWRD Infiltration and Inflow Control Program Compliance Update. Committee of the Whole Meeting April 3, 2018 MWRD Infiltration and Inflow Control Program Compliance Update Committee of the Whole Meeting April 3, 2018 Presentation Outline Background on MWRD s Watershed Management Ordinance Wastewater, Infiltration

More information

INFLOW & INFILTRATION CORRECTION VIA LATERAL LINE DITCH LEAK REPAIRS

INFLOW & INFILTRATION CORRECTION VIA LATERAL LINE DITCH LEAK REPAIRS 1 of 5 8/1/2013 2:10 PM INFLOW & INFILTRATION CORRECTION VIA LATERAL LINE DITCH LEAK REPAIRS Project Location and Description Glen Mayberry, Project Manager Roy F. Weston, Houston, TX The project is in

More information

Key I/I Reduction Plan Components

Key I/I Reduction Plan Components MARCH 24, 2015 Brad D. Werner, P.E. Key I/I Reduction Plan Components Understanding of the Collection System Developing solid Ordinances and Policies Long-Range Plan Development Capital Project Implementation

More information

SURFACE WATER UTILITY FEE

SURFACE WATER UTILITY FEE The Surface Water Utility Fee section of the FY2014 Budget Message provides background, impacts and actions associated with the County s prior and new surface water level of service in the unincorporated

More information

Metropolitan St. Louis Sewer District. Rate Proposal Overview

Metropolitan St. Louis Sewer District. Rate Proposal Overview Metropolitan St. Louis Sewer District Rate Proposal Overview MSD Rate Commission First sewers built in the 850s in response to the 849 cholera outbreak Prior to 954, the area was covered by 79 separate

More information

CHAPTER 12: SANITARY SEWER SYSTEM

CHAPTER 12: SANITARY SEWER SYSTEM CHAPTER 12: SANITARY SEWER SYSTEM Chapter 12 includes the following information: 1. System Overview 2. On Site Sewage Treatment 3. Inter Community Services 4. Future Demand Forecast 5. Infiltration and

More information

CHAPTER 12: SANITARY SEWER SYSTEM

CHAPTER 12: SANITARY SEWER SYSTEM CHAPTER 12: SANITARY SEWER SYSTEM Chapter 12 includes the following information: 1. System Overview 2. On-Site Sewage Treatment 3. Inter-Community Services 4. Future Demand Forecast 5. Infiltration and

More information

Infiltration and Inflow. Michael Sassaman Phone

Infiltration and Inflow. Michael Sassaman Phone Infiltration and Inflow Michael Sassaman msassaman@entecheng.com Phone 610-373-3345 Inflow and Infiltration PA DEP Learning Objectives Do you have Excessive I/I? Sources of Inflow and Infiltration I/I

More information

ENVIRONMENTAL ASSESSMENT

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT Project Identification Project: Cleveland E. 185 th Street & Marcella Road Relief Sewer (Phase 1) Applicant: Robert L Davis, Director of Public Utilities City of Cleveland 12302

More information

Building the City of West Palm Beach s Stormwater Infrastructure Rehab Program June 15, 2018

Building the City of West Palm Beach s Stormwater Infrastructure Rehab Program June 15, 2018 Building the City of West Palm Beach s Stormwater Infrastructure Rehab Program June 15, 2018 2018 HDR, Inc., all rights reserved. Data Evaluation and Literature Review Presentation Outline Condition Assessment

More information

2008 Street and Utility Improvement Project West Golden Lake Road. Public Informational Meeting January 3, 2008

2008 Street and Utility Improvement Project West Golden Lake Road. Public Informational Meeting January 3, 2008 2008 Street and Utility Improvement Project West Golden Lake Road C P Public Informational Meeting January 3, 2008 Presentation Summary Project Location Existing Conditions Proposed Improvements Project

More information

City of Tacoma Stormwater Management Program Assessment. Attachment B3

City of Tacoma Stormwater Management Program Assessment. Attachment B3 City of Tacoma Stormwater Management Program Assessment Attachment B3 Attachment B3. City of Tacoma Stormwater Management Program Assessment The following discussion includes an assessment of the appropriateness

More information

SSES Implementation and SSES Pilot Study Program Large-Scale Rehabilitation in Multiple Towns

SSES Implementation and SSES Pilot Study Program Large-Scale Rehabilitation in Multiple Towns SSES Implementation and SSES Pilot Study Program Large-Scale Rehabilitation in Multiple Towns Jason F. Waterbury, P.E. The Metropolitan District 555 Main Street Hartford, CT 06142 Katelyn M. Biedron, P.E.

More information

Feasibility Report for City of Worthington, Minnesota West Gateway Drive Area Sewer & Water Extensions November 17, 2017

Feasibility Report for City of Worthington, Minnesota West Gateway Drive Area Sewer & Water Extensions November 17, 2017 Feasibility Report for City of Worthington, Minnesota West Gateway Drive Area Sewer & Water Extensions November 17, 2017 Prepared By: Introduction The purpose of this report is to determine the feasibility

More information

Building a Smart Utility Management Program. Joliet s 5-Yr Sewer Program. Sewer Water Storm. Developing a Comprehensive Sewer Program for CIP and O&M

Building a Smart Utility Management Program. Joliet s 5-Yr Sewer Program. Sewer Water Storm. Developing a Comprehensive Sewer Program for CIP and O&M Building a Smart Utility Management Program Joliet s 5-Yr Sewer Program Developing a Comprehensive Sewer Program for CIP and O&M Allison Swisher, P.E. & Joe Sullivan Sewer Water Storm Joliet Sanitary Sewer

More information

SSO- WDR Compliance Workshop Electronic Reporting: Reporting Requirements & Tips. Sewer System Management Plan Chapter

SSO- WDR Compliance Workshop Electronic Reporting: Reporting Requirements & Tips. Sewer System Management Plan Chapter Chapter Contents Introduction SSMP Requirements and Suggested Content SSMP Preparation Deadlines Introduction This chapter provides a brief overview of the GWDR requirements for an SSMP and provides some

More information

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number) EXHIBIT A CONTRACTOR'S COMPENSATION SCHEDULE FOR ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / 50103-000-4150 (Budget Account Number) ITEM NO. P-S-F DESCRIPTION QTY

More information

Stormwater Advisory Committee

Stormwater Advisory Committee 1 Agenda Introductions & Background Project Approach & Progress Review of Gaps and Development of Priorities & Strategies Funding Strategies Questions / Conclusion Stormwater Advisory Committee Name Representative

More information

PROPERTY OWNERS MEETING SEWER SERVICE RATES

PROPERTY OWNERS MEETING SEWER SERVICE RATES PROPERTY OWNERS MEETING SEWER SERVICE RATES Fair Oaks Sewer Maintenance District (District) Garfield School 3600 Middlefield Road North Fair Oaks May 9, 2017 6:30 P.M. Department of Public Works OVERVIEW

More information

Project Need and Evaluation

Project Need and Evaluation City of Brooklyn Center 2011 Palmer Lake East Street and Utility Reconstruction Project Public Hearings February 14, 2011 Public Improvement Hearing: Special Assessments Local public improvements to the

More information

Goals of today s presentation

Goals of today s presentation Fast-tracked Fircrest Pipe Bursting Project Leads to Success Darrel Frame, P.E. - Civil Engineer - Murray, Smith and Associates, Inc. Goals of today s presentation Review of City of Fircrest Pipe Bursting

More information

Agenda. Introductions & Background Project Approach & Progress Review of Gaps Development of Priorities & Strategies Funding Strategies Conclusions

Agenda. Introductions & Background Project Approach & Progress Review of Gaps Development of Priorities & Strategies Funding Strategies Conclusions 1 Agenda Introductions & Background Project Approach & Progress Review of Gaps Development of Priorities & Strategies Funding Strategies Conclusions Background Challenges in stormwater management place

More information

4.1 Sewer System Mapping

4.1 Sewer System Mapping A preventive and proactive Operations and Maintenance (O&M) Program is the basis of a well-run sewer collection system. It describes what work is done on a regular basis to the collection system mains,

More information

The environment Water pollution Flooding, drainage, combined sewers Aging infrastructure New mandated and unfunded EPA regulations General fund

The environment Water pollution Flooding, drainage, combined sewers Aging infrastructure New mandated and unfunded EPA regulations General fund City of Lima, Ohio The environment Water pollution Flooding, drainage, combined sewers Aging infrastructure New mandated and unfunded EPA regulations General fund pressures Funding sources Petitioned/Assessed

More information

Method One: Liner/Bladder Assembly-Inversion Method.

Method One: Liner/Bladder Assembly-Inversion Method. CIPP Sectional/Point Repairs Critical Factors Finally Explained By: Shaun M. Flanery Abstract A 1999 report from the American Society of Civil Engineers indicated at that time that the nation s 500,000

More information

A CASE STUDY IN CURED-IN-PLACE PIPE (CIPP) FOR STORMWATER PIPE REPAIR. By John Featherstone, P.E

A CASE STUDY IN CURED-IN-PLACE PIPE (CIPP) FOR STORMWATER PIPE REPAIR. By John Featherstone, P.E A CASE STUDY IN CURED-IN-PLACE PIPE (CIPP) FOR STORMWATER PIPE REPAIR By John Featherstone, P.E The author has served the City of Shoreline, WA, as Surface Water Engineer since 2014 This paper will be

More information

Water Resources Protection Program Advisory Committee Report November 15, 2012

Water Resources Protection Program Advisory Committee Report November 15, 2012 Water Resources Protection Program Advisory Committee Report November 15, 2012 SUMMARY REPORT In January 2009, the Charlottesville City Council considered a proposal to implement a stormwater user fee

More information

Stormwater Funding Information Briefing. Mark A. Johnson, P.E.-Director of Public Works December 4, 2018

Stormwater Funding Information Briefing. Mark A. Johnson, P.E.-Director of Public Works December 4, 2018 Stormwater Funding Information Briefing Mark A. Johnson, P.E.-Director of Public Works December 4, 2018 Discussion Points History/Overview of the Stormwater Fund Stormwater Fee Debt Five Year Forecast

More information

Utility Characteristics: 340,000 Number of Customers (approximately 2 million people) Number of Taps

Utility Characteristics: 340,000 Number of Customers (approximately 2 million people) Number of Taps PRIVATE LATERAL PROGRAM QUESTIONNAIRE The WEF Collection System Committee is primarily interested in successfully operating programs for work performed on the privately-owned portion of the lateral line;

More information

Section 8 System Evaluation and Capacity Assurance Plan (SECAP)

Section 8 System Evaluation and Capacity Assurance Plan (SECAP) System Evaluation and Capacity Assurance Plan (SECAP) The WDR requires owners and operators of sewer collection systems to have a (SECAP). This component involves preparing and implementing a Capital Improvement

More information

Mokapu CIPP Case Study & Innovations in Trenchless Technologies for Wastewater System Rehabilitation

Mokapu CIPP Case Study & Innovations in Trenchless Technologies for Wastewater System Rehabilitation Mokapu CIPP Case Study & Innovations in Trenchless Technologies for Wastewater System Rehabilitation Presented by Mike York, Insituform Technologies, Inc. Trenchless v. Dig and Replace What is CIPP? Developed

More information

Cured-in-Place Pipe (CIPP) for Pressure Pipe. Presented by: Mike Moore

Cured-in-Place Pipe (CIPP) for Pressure Pipe. Presented by: Mike Moore Cured-in-Place Pipe (CIPP) for Pressure Pipe Presented by: Mike Moore CIPP Proven Technology Introduced over 45 years ago Most used trenchless technology for the rehabilitation of gravity flow pipeline

More information

Stormwater Utility Feasibility Study. City of Geneva City Council Presentation: October 16, 2017

Stormwater Utility Feasibility Study. City of Geneva City Council Presentation: October 16, 2017 Stormwater Utility Feasibility Study City of Geneva City Council Presentation: October 16, 2017 Stormwater Feasibility Study Overview Overview of Current Program Stormwater System Needs Stormwater Utility

More information

Stormwater Utility. Frequently Asked Questions. January 2019 CITY OF NORTH RIDGEVILLE Avon Belden Road North Ridgeville, Ohio 44039

Stormwater Utility. Frequently Asked Questions. January 2019 CITY OF NORTH RIDGEVILLE Avon Belden Road North Ridgeville, Ohio 44039 Stormwater Utility Frequently Asked Questions January 2019 CITY OF NORTH RIDGEVILLE 7307 Avon Belden Road North Ridgeville, Ohio 44039 General Stormwater Information/Education 1. What is stormwater runoff?

More information

System Evaluation and Capacity Assurance Plan

System Evaluation and Capacity Assurance Plan City of Cedar Hills System Evaluation and Capacity Assurance Plan The City of Cedar Hills believes that one of the keys to preventing sanitary sewer overflows is to evaluate system capacity and to monitor

More information

Infiltration & Inflow

Infiltration & Inflow Infiltration & Inflow Understanding How Stormwater & Groundwater Increase Sewer Treatment Costs Presented by Southeast Pipe Survey, Inc. Infiltration & Inflow Defined Infiltration groundwater that enters

More information

CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - STORM DRAINAGE SYSTEM. M - Page 25 of 37. Proposed CIP

CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - STORM DRAINAGE SYSTEM. M - Page 25 of 37. Proposed CIP 20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STORM DRAINAGE SYSTEM Project: Gulf Terrace Sec 1, Acre Homes Area M410007 Drainage and Paving Project Description Provides ROW acquisition,

More information

Rehabilitation of Sanitary Sewer Collection Systems. Dan Beauchamp, P.E.

Rehabilitation of Sanitary Sewer Collection Systems. Dan Beauchamp, P.E. Rehabilitation of Sanitary Sewer Collection Systems Dan Beauchamp, P.E. 1 Part 41, Sewerage Systems, of the Natural Resources and Environmental Protection Act, PA 451 as amended (NREPA) 2 R 299.2933 Rule

More information

WASTEWATER ASSET MANAGEMENT PLAN

WASTEWATER ASSET MANAGEMENT PLAN Must be kept on file and available upon request until 2032 (per 2014 MDEQ/SAW grant requirements) WASTEWATER ASSET MANAGEMENT PLAN CITY OF NORTON SHORES, MI May 2017 Where we re going: System Goals INTRODUCTION

More information

2019 Annual Review of Sewer Rates and Environmental Updates Under the Sewer & Watercourse By-law

2019 Annual Review of Sewer Rates and Environmental Updates Under the Sewer & Watercourse By-law ADMINISTRATIVE REPORT Report Date: November 27, 2018 Contact: Daniel Roberge Contact No.: 604.873.7360 RTS No.: 12725 VanRIMS No.: 08-2000-20 Meeting Date: December 11, 2018 TO: FROM: SUBJECT: Vancouver

More information

CHAPTER 8 CAPITAL IMPROVEMENT PLAN

CHAPTER 8 CAPITAL IMPROVEMENT PLAN INTRODUCTION CHAPTER 8 CAPITAL IMPROVEMENT PLAN This chapter presents 6-, 10-, and 20-year Capital Improvement Plans (CIPs) in accordance with the requirements of WAC 26-290. Water system capital improvements

More information

Rainfall Comparison Summary

Rainfall Comparison Summary Review of the July 12, 2017 Storm/Flooding Event Rainfall Comparison Summary 2010 2013 2014 2017 Event Date May 11 13 April 17 18 May 12 13 July 12-13 Rainfall Total 5.55 4.95 3.31 6.70 Basement Flooding

More information

Water and Wastewater Capital Improvement Plan Options and Revenue Requirements

Water and Wastewater Capital Improvement Plan Options and Revenue Requirements Water and Wastewater Capital Improvement Plan Options and Revenue Requirements The Master Plan s objectives are to assess our needs and recommend Capital Improvement Plans that address the following: Infrastructure

More information

Appendix E Description of Cost Estimating Assumptions

Appendix E Description of Cost Estimating Assumptions Appendix E Description of Cost Estimating Assumptions EXCERPT FROM TECH MEMO 2 AUGUST 29th, 2016 COST ESTIMATING ASSUMPTIONS [WITH CHANGES AND ADDITIONS SUBSEQUENT TO TECH MEMO 2] For purposes of capital

More information

SEWER TELEVISING & REPAIRS. Adam Tierney Business Development Manager Northern Pipe, Inc.

SEWER TELEVISING & REPAIRS. Adam Tierney Business Development Manager Northern Pipe, Inc. SEWER TELEVISING & REPAIRS Adam Tierney Business Development Manager Northern Pipe, Inc. AGENDA Purpose of CCTV Inspections Equipment NASSCO (National Association of Sewer Service Companies) Inspection

More information

Municipal Separate Storm Sewer Systems (MS4) Implementation. Craig Carson Montgomery County Department of Environmental Protection

Municipal Separate Storm Sewer Systems (MS4) Implementation. Craig Carson Montgomery County Department of Environmental Protection Montgomery County Maryland Municipal Separate Storm Sewer Systems (MS4) Implementation Craig Carson Montgomery County Department of Environmental Protection Montgomery County, Maryland 500 sq. miles 970,000

More information

Workshop #2 Agenda March 30, :30pm to 7:30pm Introductions (5 minutes) Overview of Workshop #1 (10 minutes) The Cost of a Stormwater Program (30

Workshop #2 Agenda March 30, :30pm to 7:30pm Introductions (5 minutes) Overview of Workshop #1 (10 minutes) The Cost of a Stormwater Program (30 Workshop #2 Stormwater Utility Study City of Hays, Kansas March 30, 2010 Workshop #2 Agenda March 30, 2010 5:30pm to 7:30pm Introductions (5 minutes) Overview of Workshop #1 (10 minutes) The Cost of a

More information

INFRASTRUCTURE FINANCING PLAN FOR THE WOODGLEN SPECIFIC PLAN

INFRASTRUCTURE FINANCING PLAN FOR THE WOODGLEN SPECIFIC PLAN FINAL REPORT INFRASTRUCTURE FINANCING PLAN FOR THE WOODGLEN SPECIFIC PLAN Prepared for: City of Modesto Prepared by: Willdan Financial Services Approved by Modesto City Council on July 9, 2013 Resolution

More information

You can help protect our water from pharmaceuticals and personal care products! Tel. 1-800-666-0206 Fax. 1-703-684-2492 www.wef.org a Printed on 100% recycled paper. HS1802 6/2008 You can help protect

More information

2018 Utility & Street Reconstruction

2018 Utility & Street Reconstruction 2018 Utility & Street Reconstruction Public Hearing On Proposed Special Assessments/Hookup Fees for Installation and Construction of Public Improvements Introduction of the Village technical staff Laura

More information

Sanitary Sewer Fees 101. November 27, 2018

Sanitary Sewer Fees 101. November 27, 2018 Sanitary Sewer Fees 101 November 27, 2018 Background The City of Sausalito owns and operates a sewer collection system conveying wastewater to the Sausalito Marin-City Sanitary District (SMCSD) for treatment

More information

CITY OF FALL RIVER STORMWATER UTILITY AND THE CSO PROGRAM. OCTOBER 22, 2015 Terrance Sullivan Administrator of Community Utilities

CITY OF FALL RIVER STORMWATER UTILITY AND THE CSO PROGRAM. OCTOBER 22, 2015 Terrance Sullivan Administrator of Community Utilities CITY OF FALL RIVER STORMWATER UTILITY AND THE CSO PROGRAM OCTOBER 22, 2015 Terrance Sullivan Administrator of Community Utilities HISTORY The Stormwater Utility was implemented in 2008.. (WITH GREAT DIFFICULTY).

More information

Construction Documents Checklist

Construction Documents Checklist Construction Documents Checklist The following must be completed prior to final approval of site development plans (Construction Documents) by the Town: Final Drainage Report signed by engineer-of-record

More information

All Cracked Up! Condition Assessment Protocols for Stormwater Infrastructure

All Cracked Up! Condition Assessment Protocols for Stormwater Infrastructure 2014 HDR Architecture, 2014 HDR, Inc., all rights reserved. Matthew Gustis, PE Charlotte-Mecklenburg Storm Water Services Ron Geiger, PE HDR, Inc. All Cracked Up! Condition Assessment Protocols for Stormwater

More information

Sanitary Sewer Collection System Annual Performance Report 2018 WDR R

Sanitary Sewer Collection System Annual Performance Report 2018 WDR R Sanitary Sewer Collection System Annual Performance Report 218 WDR R3-22-78 January 31, 219 Sanitary Sewer Collection System Performance Report State of California Water Quality Control Board. WDR R3-22-78

More information

Preliminary Engineering Report. For the. Foxglove Trail. Prepared for: The City of Moore. Prepared By:

Preliminary Engineering Report. For the. Foxglove Trail. Prepared for: The City of Moore. Prepared By: Preliminary Engineering Report For the Foxglove Trail Prepared for: The City of Moore Prepared By: Certificate of Authorization No. CA#5714 Expires June 30, 2016 CE Project #264 May 2016 City of Moore

More information

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions City Utilities operates the largest municipally-owned wastewater collection and treatment system in Indiana. The system serves 161 square miles and includes 1,014 miles of sanitary sewer lines, 365 miles

More information

SWIMMING IN SUCCESS, NOT I/I WHAT MADE IT WORK CLEVELAND, TENNESSEE S SCOPE 10 PROGRAM

SWIMMING IN SUCCESS, NOT I/I WHAT MADE IT WORK CLEVELAND, TENNESSEE S SCOPE 10 PROGRAM SWIMMING IN SUCCESS, NOT I/I WHAT MADE IT WORK CLEVELAND, TENNESSEE S SCOPE 10 PROGRAM Travis E. Wilson, PE 1, Greg Clark, PE 2 twilson@smeinc.com 1 S&ME, Inc., Murfreesboro, Tennessee 2 Cleveland Utilities,

More information

NJ Future CSO Permittee Meeting

NJ Future CSO Permittee Meeting NJ Future CSO Permittee Meeting 1 Best Practices Carter Strickland, JD HDR 2 Getting the Best LTCP CSO controls will be expensive Include Best Practices to Maximize visible and tangible benefits Create

More information

Rehabilitating a 105-inch Interceptor Innovations and Lessons Learned

Rehabilitating a 105-inch Interceptor Innovations and Lessons Learned Rehabilitating a 105-inch Interceptor Innovations and Lessons Learned Pipe User Group Northern California March 13, 2018 Tim Karlstrand and Gary Warren Agenda System Overview Project Need Video Lessons

More information

Rowlett Cottonwood Transfer Sewer: 60" RCP Sanitary Sewer Rehabilitation Project. TACWA Meeting

Rowlett Cottonwood Transfer Sewer: 60 RCP Sanitary Sewer Rehabilitation Project. TACWA Meeting Rowlett Cottonwood Transfer Sewer: 60" RCP Sanitary Sewer Rehabilitation Project TACWA Meeting September 25, 2009 North Texas Municipal Water District Project Background 1. Rowlett-Cottonwood Transfer

More information

Stormwater Management Program Review

Stormwater Management Program Review Stormwater Management Review Comprehensive Stormwater Management Mission Statement The mission of the CSMP is to develop and maintain a comprehensive watershed and stormwater infrastructure management

More information

Calendar Year capital improvement. Program

Calendar Year capital improvement. Program Calendar Year 2010 capital improvement Program Important Notice: The information found in this file concerning the 2010 Capital Improvements Program, has been extracted from the San Antonio Water System

More information

Engineering & Capital Improvements. Shore Acres Civic Association August 21 st, 2017

Engineering & Capital Improvements. Shore Acres Civic Association August 21 st, 2017 Engineering & Capital Improvements Shore Acres Civic Association August 21 st, 2017 40 th Avenue N Bridge 34 th Avenue NE Storm Drainage Improvements Resiliency Planning Continued Maintenance 40 th Avenue

More information

This policy will generally explain the following in regards to the City sewerage collection systems:

This policy will generally explain the following in regards to the City sewerage collection systems: CITY OF SACO POLICY ON SEWER AND STORMWATER BACK-UPS PURPOSE The purpose of this policy is to explain how and why sewer or stromwater backups occur, what to do in the event a homeowner has a backup, and

More information

1. INTRODUCTION 1.1 Contents of Engineering Specifications The Engineering Specifications contains the following sections:

1. INTRODUCTION 1.1 Contents of Engineering Specifications The Engineering Specifications contains the following sections: Schedule H to Bylaw 7452, Subdivision Bylaw Page 1 1. INTRODUCTION 1.1 Contents of Engineering Specifications 1.1.1 The Engineering Specifications contains the following sections: 1. Introduction 2. General

More information

Highway / Utility Guide

Highway / Utility Guide Oregon Department of Transportation Highway Division Right of Way Section Highway / Utility Guide Railroad & Utilities Unit Right of Way Section STATEMENT OF PURPOSE It is important to understand that

More information

Chapter 3: Permit Procedures and Requirements

Chapter 3: Permit Procedures and Requirements Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8

More information

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report BRIDGE DISTRICT Phase 1 Infrastructure Improvement Project (for work completed thru November 2011) Cover Photo: Joint Utility Trench installation along Fifth Street just north of Bridge Street. Page 1

More information

SIDEWALK CONSTRUCTION AND REPAIR

SIDEWALK CONSTRUCTION AND REPAIR SIDEWALK CONSTRUCTION AND REPAIR Q: Why all the concern over sidewalks? A: Sidewalks are the avenues and streets of pedestrian traffic. Residents should maintain the sidewalks as best as they can. The

More information

CITY OF HAPEVILLE STORMWATER UTILITY IMPLEMENTATION. Presented by: Michael J. Moffitt, P.E. (Keck & Wood, Inc.) City Engineer.

CITY OF HAPEVILLE STORMWATER UTILITY IMPLEMENTATION. Presented by: Michael J. Moffitt, P.E. (Keck & Wood, Inc.) City Engineer. CITY OF HAPEVILLE STORMWATER UTILITY IMPLEMENTATION Presented by: Michael J Moffitt, PE (Keck & Wood, Inc) City Engineer May, 2016 What is Stormwater? Stormwater is rain or snowmelt that falls on streets,

More information

For Public Input Period

For Public Input Period 20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: Kingwood Drive N100011 Loop 494 to Woodland Hills Project Description Project provides for the ROW acquisition,

More information

QUARTERLY STORMWATER UPDATE FLOOD CONTROL PROJECTS TONI ALGER, P.E. CITY ENGINEER S OFFICE/STORMWATER ENGINEERING CENTER DECEMBER 12, 2017

QUARTERLY STORMWATER UPDATE FLOOD CONTROL PROJECTS TONI ALGER, P.E. CITY ENGINEER S OFFICE/STORMWATER ENGINEERING CENTER DECEMBER 12, 2017 QUARTERLY STORMWATER UPDATE FLOOD CONTROL PROJECTS TONI ALGER, P.E. CITY ENGINEER S OFFICE/STORMWATER ENGINEERING CENTER DECEMBER 12, 2017 D A S H B O A R D Aragona Drainage Improvements Ashville Park

More information

How to Read Your Water Bill and related topics. Tom Heikkinen, General Manager

How to Read Your Water Bill and related topics. Tom Heikkinen, General Manager How to Read Your Water Bill and related topics Tom Heikkinen, General Manager All about us INTRODUCTION Our History In The Beginning 1870s: Water from Madison s private wells and lakes was unfit to drink

More information

sewers ANd storm drains Storm Drain Under Construction, 1916

sewers ANd storm drains Storm Drain Under Construction, 1916 sewers ANd storm drains Storm Drain Under Construction, 1916 A d o p t e d C A p I t A L I M p R o V e M e N t p R o G R A M F I s C A L Y e A R 2 1 9 FY 219-223 Capital Improvement Program FY 218 FY 219

More information

Design-Build and Design-Bid-Build

Design-Build and Design-Bid-Build Design-Build and Design-Bid-Build Comparison of Overall Cost and Time Question: How does the total cost and time to deliver a $55,000,000 and 814 day design-build project compare to using design-bid-build

More information

TOWN OF BEEKMAN DOVER RIDGE WATER AND SEWER SYSTEMS. Overview and Recommendations

TOWN OF BEEKMAN DOVER RIDGE WATER AND SEWER SYSTEMS. Overview and Recommendations TOWN OF BEEKMAN DOVER RIDGE WATER AND SEWER SYSTEMS Overview and Recommendations WATER SYSTEM Water System Background Central water system constructed in 1960 s as part of the subdivision. Only 67 lots

More information

LIMITED ENVIRONMENTAL REVIEW. Bowling Green Wooster and Main Street Water Main Replacement

LIMITED ENVIRONMENTAL REVIEW. Bowling Green Wooster and Main Street Water Main Replacement LIMITED ENVIRONMENTAL REVIEW Project Identification Project: Applicant: Bowling Green Brian O Connell, Director of Utilities City of Bowling Green 304 North Church Street Bowling Green, Ohio 43402 Loan

More information

Infrastructure Evaluation. Preliminary Scope and Cost Estimates

Infrastructure Evaluation. Preliminary Scope and Cost Estimates Infrastructure Evaluation Preliminary Scope and Cost Estimates January 25, 2016 Infrastructure Evaluation Existing Conditions Street Improvements Pavement Management Street Condition Inventory Underground

More information

Project Type: Drainage and Storm Systems

Project Type: Drainage and Storm Systems 580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install

More information

GENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS USING THE THERMOFORM (PVC) PIPE LINING SYSTEM

GENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS USING THE THERMOFORM (PVC) PIPE LINING SYSTEM 1. GENERAL 1.01 DESCRIPTION GENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS USING THE THERMOFORM (PVC) PIPE LINING SYSTEM A. The Contractor shall furnish all labor, equipment and materials necessary

More information

Clean Water 2020 Program

Clean Water 2020 Program Clean Water 2020 Program INFRASTRUCTURE REHABILITATION PROGRAM (IR Program) November 2016 Updated March 2017 Table of Contents Infrastructure Rehabilitation Program 2016 List of Tables... 2 List of Figures...

More information

APWA Project of the Year 2017 Category: Environmental, Less than $5 Million. Shoreline Drive Storm Drain Repair AWARD SUBMITTAL

APWA Project of the Year 2017 Category: Environmental, Less than $5 Million. Shoreline Drive Storm Drain Repair AWARD SUBMITTAL APWA Project of the Year 2017 Category: Environmental, Less than $5 Million C K Shoreline Drive Storm Drain Repair K, O AWARD SUBMITTAL PUBLIC WORKS PROJECT OF THE YEAR NOMINATION FORM SUBMITTAL DEADLINE:

More information

Paying for Improvement: Stormwater Utilities & Drainage Districts Eric W. Fowle, AICP

Paying for Improvement: Stormwater Utilities & Drainage Districts Eric W. Fowle, AICP Paying for Improvement: Stormwater Utilities & Drainage Districts Eric W. Fowle, AICP Executive Director STORMWATER UTILITIES What is a storm water utility? Under state law, a municipality has the authority

More information

Sidewalk Repair Program. Charter Township of Canton Engineering Services

Sidewalk Repair Program. Charter Township of Canton Engineering Services Sidewalk Repair Program Charter Township of Canton Engineering Services Sidewalk Repair Program History Canton lost a landmark case at the Michigan Supreme Court level in 1997. The Supreme Court has determined

More information

Task Order Authorization

Task Order Authorization Task Order Authorization Task Order Number: 6 Task Order Name: 2017 Small Drainage Program Hourly Rate: See attached Exhibit B Budget Not To Exceed: $79,795.00 This Task Order pertains to the On-Call Agreement

More information

Metropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems

Metropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems Metropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems 1.0 Introduction Adequate drainage in the Metropolitan St. Louis area is necessary to preserve and

More information

Illicit Discharge Detection and Elimination

Illicit Discharge Detection and Elimination Illicit Discharge Detection and Elimination Outline IDDE Program Administration Outfall Prioritization Dry Weather Sampling Catchment Investigations Wet Weather Sampling Illicit Discharge Elimination Reporting

More information

Public Works Department Five Year Capital Improvement Plan FY PROPOSED

Public Works Department Five Year Capital Improvement Plan FY PROPOSED Public Works Department Five Year Capital Improvement Plan FY 2019-2023 PROPOSED Capital Improvement Plan Summary STREET DIVISION PROJECTS 141 Asphalt Sidewalk Replacement Program Funding Source Adopted

More information

Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update

Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update February 24, 2015 Overview Wastewater Collection System Customer Base 16,276 SFR 1,968 MFR 1,364 COM/IND

More information

COUNTY OF SUFFOLK STEVEN BELLONE SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF PUBLIC WORKS

COUNTY OF SUFFOLK STEVEN BELLONE SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF PUBLIC WORKS CEE BS, Fulltime (3 positions) Posted 1/30/2017 COUNTY OF SUFFOLK STEVEN BELLONE SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF PUBLIC WORKS SUFFOLK COUNTY IS AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER

More information

Sustainable Utility Construction: Methods and Techniques

Sustainable Utility Construction: Methods and Techniques Sustainable Utility Construction: Methods and Techniques September 19, 2011 APWA Congress Denver, Colorado Murv Morehead ROW Coordinator Overland Park, Kansas Monty Zimmerman Row Manager Lenexa, Kansas

More information

STORMWATER ASSET MANAGEMENT:

STORMWATER ASSET MANAGEMENT: STORMWATER ASSET MANAGEMENT: DEFINING THE ASSETS CONDITION John Martin, City of Sylvan Lake Nicole Selais, Hubbell, Roth & Clark, Inc. Janice Lerg, Hubbell, Roth & Clark, Inc. MWEA WATERSHED & STORMWATER

More information

CITY OF AVON Chester Road Avon, Ohio Stormwater Utility Frequently Asked Questions

CITY OF AVON Chester Road Avon, Ohio Stormwater Utility Frequently Asked Questions CITY OF AVON 36080 Chester Road Avon, Ohio 44011 Stormwater Utility Frequently Asked Questions January, 2018 General Stormwater Information/Education... 3 1. What is stormwater runoff?... 3 2. What is

More information

City of Lawrence, Kansas

City of Lawrence, Kansas Table of Contents 1 EXECUTIVE SUMMARY... 1-1 1.1 General Overview... 1-1 1.2 Phase 1 Field Investigation Findings... 1-3 1.2.1 Public Sector Inflow/Infiltration Sources... 1-3 1.2.2 Private Sector Inflow/Infiltration

More information

A Happy Marriage? How Your Friends in Sewer will Save Your Stormwater

A Happy Marriage? How Your Friends in Sewer will Save Your Stormwater A Happy Marriage? How Your Friends in Sewer will Save Your Stormwater Zach Henderson Woodard & Curran Tim Haskell and Phillip Tucker York Sewer District AMERICAS WASTEWATER AND STORMWATER INFRASTRUCTURE

More information

The New Age for Sewer Planning at the City of Los Angeles

The New Age for Sewer Planning at the City of Los Angeles The New Age for Sewer Planning at the City of Los Angeles Mario Dimzon 1 * P.E., Fernando Gonzalez 1 P.E., Ali Poosti 1 PE, Adel Hagekhalil 1 PE, Erick Heath 2 P.E., Rajan Ray 2 P.E., Erin Breen 2 P.E.

More information

City Of Elyria Stormwater Utility Program Frequently Asked Questions

City Of Elyria Stormwater Utility Program Frequently Asked Questions City Of Elyria Stormwater Utility Program Frequently Asked Questions Q. Is the stormwater utility fee needed because of EPA regulations? A. Yes, the City of Elyria has implemented a stormwater fee rather

More information

Community Meeting Lisgar District Flooding Issues

Community Meeting Lisgar District Flooding Issues Community Meeting Lisgar District Flooding Issues December 14, 2011 Lisgar Middle School 6:30 pm to 8:30 pm Agenda No. Item Speaker 1 Opening Remarks Councillor McFadden Mayor McCallion Presentation: 2

More information