1 Xstrata Cal Suth Africa Generic Hydrcarbn Management Xstrata Cal Suth Africa Generic Hydrcarbn Management Guideline HSEC E GDL 006 April 2012 Revisin N. 003 Date: April 2012 Review Date: April f 25 Dcument ID: HSEC/E/GDL/006 Prepared by: Grup E&C Sectin

2 Xstrata Cal Suth Africa Generic Hydrcarbn Management Apprval, wnership and cntrl Dcument Owner Apprved By NAME TITLE SIGNATURE E Webb N Dge Grup Envirnmental Manager General Manager : E&C Recrd f changes/amendments DOCUMENT HISTORY Revisin N. Page Revisin Details Date Apprved By 000 All First frmal issue January 09 General Manager: E&C 001 All Reviewed and updated April 09 General Manager: E&C 002 All Reviewed and updated May 11 General Manager: E&C 003 All Dcument title page changed, Frmat f dcument changed April 2012 General Manager: E&C Recrd f Amendments All changes t this Dcument must be apprved by Grup HSEC Department and apprved by the Xstrata Cal Suth Africa General Manager : Envirnment and Cmmunity. This Dcument is subject t strict quality cntrl guidelines as per dcument cntrl prcedure. When any part f the Dcument is updated, the General Manager: Envirnment and Cmmunity needs t sign ff n the dcument and amendments must be made using the apprved Dcument Cntrl Prcedure. Revisin N. 003 Date: April 2012 Review Date: April f 25 Dcument ID: HSEC/E/GDL/006 Prepared by: Grup E&C Sectin

3 Xstrata Cal Suth Africa Generic Hydrcarbn Management Revisin N. 003 Date: April 2012 Review Date: April f 25 Dcument ID: HSEC/E/GDL/006 Prepared by: Grup E&C Sectin

4 Xstrata Cal Suth Africa Generic Hydrcarbn Management TABLE OF CONTENTS 1 Definitins 4 2 Purpse 5 3 Strage Of Hydrcarbns 5 4 Legal Requirements 6 5 Surface Tanks Basic Designing And Cnstructin Principles Fr Tanks 7 6 Bunds Bund Capacity Bund Materials Bund Wall, Flr And Other 9 7 Cmmissining And Operatinal Management Of Hydrcarbn Handling, Strage And Treatment Facilities 8 Lcatin Of Hydrcarbn Handling, Strage And/Or Treatment Facilities 9 Handling Of Hydrcarbn (Use & Dispsal) General Wrkshps And Outside Areas Maintenance Of Hydrcarbn Management Facilities Mnitring And Reprting Spills Management Spills n Cncrete & Nn-Tarmac Surfaces Spills On Tarmac Surfaces Spills Of Sil/Land Spills Ont Water Supprting Dcuments Appendix 1: Characteristics f the bilgical degreaser, OT References Revisin N. 003 Date: April 2012 Review Date: May f 25 Dcument ID: HSEC/E/GDL/006 Prepared by: Grup E&C Sectin

5 Xstrata Cal Suth Africa Generic Hydrcarbn Management 1. DEFINITIONS BTA bulk t agriculture tank, abvegrund, hrizntal strage tank, L in vlume, installed n lw cncrete r steel supprts. BTF bulk t farmer tank, abvegrund tank, L in vlume, installed n high r lw prefabricated stands. Bund Wall wall designed t cnfine prduct spillage t the bunded area Bunded Area area bunded by cnturs that cnfine spillage, r an area surrunded by bund walls Class f petrleum prduct is, subject t any lcal authrity bylaws cntaining different definitins, based n the fllwing classificatin in accrdance with SANS 10131:2004: Class I: liquids subdivided as fllws: Class IA: liquids that have a clse-cup flash pint f belw 23 C and a biling pint f belw 35 C Class IB: liquids that have a clse-cup flash pint f belw 23 C and a biling pint f 35 C r abve Class IC: liquids that have a clse-cup flash pint f 23 C r abve, but belw 38 C Class II: liquids that have a clse-cup flash pint f 38 C r abve, but belw 60,5 C Class IIIA: liquids that have a clse-cup flash pint f 60,5 C r abve, but belw 93 C Class IIIB: liquids that have a clse-cup flash pint f 93 C r abve Cmpetent Persn is a persn wh is qualified by virtue f his knwledge, training, skills and experience t perfrm certain wrk and evaluate perfrmance. Such a persn is familiar with all the relevant regulatins and prcedures t be fllwed when perfrming the wrk and has been trained t recgnize any ptential r actual nn-cmpliance related t the wrk. Cnsumer is any entity r persn wh handles petrleum prducts fr his r her wn use r fr the purpse f resale. MDALA Mpumalanga Department f Agriculture and Land Administratin. DEAT - Department f Envirnmental Affairs and Turism. DWAF - Department f Water Affairs and Frestry. EIA - Envirnmental Impact Assessment is the prcess f examining the envirnmental effects f a specific develpment. Revisin N. 003 Date: April 2012 Review Date: May f 25 Dcument ID: HSEC/E/GDL/006 Prepared by: Grup E&C Sectin

6 Xstrata Cal Suth Africa Generic Hydrcarbn Management Fuel includes any petrleum prduct cmpsed f liquid hydrcarbns derived frm a petrchemical prcess (such as petrl, diesel). Hydrcarbn a cmpund f hydrgen and carbn such as il, grease, brake fluid, clant cnditiner mixtures, diesel, petrl etc. that des nt require strage in a pressure vessel. Hydrcarbn handling, strage and/r treatment facility includes any tank used fr string any hazardus substance r any handling, strage r treatment facility fr hazardus substances (such as il, grease, fuel r any hazardus substance cntaminated silt traps, wash bays, il separatrs, hydrcarbn biremediatin areas, hydrcarbn strage tanks, bulk hydrcarbn strage in drums and flammable liquid stres. Respnsible Engineer engineer wh is registered with the Engineering Cuncil f Suth Africa and wh is cmpetent. SANS - Suth African Natinal Standards. Service Tank is an auxiliary tank used fr the strage f petrleum prducts, which a capacity nt exceeding 1000 L. Skid Tank abvegrund tank (9000 L, L r L in vlume) n skids, which can be dragged ver shrt distances and nrmally used n cnstructin sites. The Act means the Natinal Water Act, 1998 (Act N. 36 f 1998) Water System includes any dam, any ther frm f impundment, canal, wrks, pipeline, and any ther structure r facility cnstructed fr the retentin r cnveyance f water. 2. PURPOSE The bjective f this guideline is t utline the management f hydrcarbns within XCSA peratins in rder t: Meet relevant legal requirements; Prevent the pllutin f sil and water during strage, use and dispsal and Ensure that all relevant persnnel are aware f their respnsibilities and hw hydrcarbn management shuld be carried ut. 3. STORAGE OF HYDROCARBONS Hydrcarbns can nly be stred in designated areas where ptential spillages culd be cntained t prevent pllutin f the envirnment e.g. use f permanent bunding and/r drip trays with sufficient capacity. The purpse f bunding is t limit, cntain, divert, minimise, and manage the impact f spillages and fires. Bunding is furthermre required t islate dirty Revisin N. 003 Date: April 2012 Review Date: May f 25 Dcument ID: HSEC/E/GDL/006 Prepared by: Grup E&C Sectin

7 Xstrata Cal Suth Africa Generic Hydrcarbn Management areas with a view t maximising clean run-ff areas. Within XCSA, all facilities used t transfer, stre r treat hydrcarbns shuld be cntained either by means f permanent bunding r remvable such as drip trays, depending n the requirement. Examples f such facilities include: Old surface tanks still cntaining residues f hydrcarbns such as il and fuel. All current peratinal bulk fuel and il strage tanks. Old and/r current electrical transfrmers cntaining transfrmer il; All equipment cntaining any frm f hydrcarbns (il, grease r fuel) waiting fr maintenance r stred fr salvage; All hydrcarbn drum strage areas (including flammable liquid stres); All bulk fuel and il ff-lading areas; Surface and undergrund wrkshps; Plant wrkshps, discard dump wrkshps, vehicle wash bays (including il separatrs); Undergrund sectins; garage and transprt areas and Opencast areas where hydrcarbns are used. 4. LEGAL REQUIREMENTS When string hydrcarbns, in mst cases, the facilities (such as bulk fuel and il fflading areas, strage areas and stres), cntainment structures (bund walls, tanks) and placement r lcality f the facilities are subjected t legal requirements. Cmpliance with the relevant SANS fr the Petrleum Industry des nt grant immunity frm cmplying with ther relevant legal requirements, such as basic assessment in terms f the NEMA prcess and municipal and ther bylaws. Thus, XCSA peratins need t make regular reference t their respective legal registers t ensure cntinuus cmpliance with current and new requirements. 5. SURFACE TANKS Revisin N. 003 Date: April 2012 Review Date: May f 25 Dcument ID: HSEC/E/GDL/006 Prepared by: Grup E&C Sectin

8 Xstrata Cal Suth Africa Generic Hydrcarbn Management Where the relevant apprving Authrity requires installatin plans fr abvegrund tanks, a prperly qualified engineer shall design the plans. In case f a temprary installatin, BTAs, BTFs and skid tanks shuld nt be installed fr perids lnger than six mnths and the installatins shall be apprved by the lcal authrity. Where surface tanks are erected in a public place, a security fence shuld adequately prtect it. 5.1 Basic design and cnstructin principles fr tanks The cnstructin f surface tanks and bulk strage facilities (using drums) shall be accrding t the Hazardus Substances Act, 1973 (Act n 15 f 1973) and the applicable SANS fr petrleum prducts. All designs t be apprved by a prperly qualified engineer cmpetent t d s and wh thereby certifies that such plans cmply with the requirements f the applicable SANS fr petrleum prducts. Fr mre technical specificatins, refer t the SANS fr petrleum prducts cited in this reprt. N brickwrk shuld be used as supprt material in the design and cnstructin f elevated surface tanks. BTA, BTF and skid tanks shuld nly be used t stre class II and class III liquids. The name f the prduct shall be clearly indicated n the shell f the tank. Only class II and Class III liquids can be stred in tanks in chambers and basements. Service tanks shuld be designed t have a maximum capacity f 1000 L and shuld be prvided with a vent pipe that terminates in the pen air. The minimum safety distances fr abvegrund tanks that cntain Class I, II and IIIA stable liquids shuld be adhered t. The minimum hrizntal distance between an LPG cntainer and a class I, II r III liquid surface strage tank shall be at least 6 m. Fuel resistant hses (petrleum prduct resistant neprene lining) shuld be installed n fuel tanks. Tanks may nt be turned n the stand in such a way t have the utlet at the bttm. 6. BUNDS Revisin N. 003 Date: April 2012 Review Date: May f 25 Dcument ID: HSEC/E/GDL/006 Prepared by: Grup E&C Sectin

9 Xstrata Cal Suth Africa Generic Hydrcarbn Management The design f bund walls shuld cnsider the ptimisatin f the installatin and size f the bunded area in cnjunctin with the firefighting requirements f the installatin. The design shuld als cnsider the risk f pllutin t surface and grund water, sil and the envirnment. SANS fr petrleum prducts specify that surface tanks lcated n sites in urban areas require bunding. Surface tanks installed in rural areas will als require bunding. 6.1 Bund Capacity The fllwing (nt all-inclusive) are examples f specificatins fr bund cnstructin as per SANS fr petrleum prducts. Fr detailed specificatins, please refer t the relevant SANS fr petrleum prducts. The vlumetric capacity f the bunded area fr surface facilities shuld take accunt f allwances t cpe with the maximum strm rainwater f the area (fr example 100 mm rainfall in ne hur). The SANS 10131:2004 and SANS :2003 specify minimum requirements fr the vlumetric capacity f the bunded area arund tanks. It shall nt be less than: the greatest vlume f the prduct that can be released frm the largest tank in the bunded area, assuming that the tank is full; t allw fr the vlume cntained by mre than ne tank, the capacity f the bunded area where the bund wall enclses mre than ne tank, shall be calculated after the vlume f all tanks (ther than the largest tank) belw the height f the bund wall has been deducted. SANS :2003 implies a design capacity f 110% f the capacity f the tank when ne tank is within the enclsed area t be used, unless therwise specified by the lcal by-laws f the area. SANS :2003 als specifies specific intermediate bunding requirements fr certain prducts (such as class I liquid) whenever tw r mre tanks are enclsed in a cmmn bunded area. It is thus recmmended that whenever bunding requirements are designed fr petrleum prducts, the respnsible engineer shuld cnsult all the applicable SANS fr Petrleum prducts. Service tanks shall be prvided with drip trays r bunds and where service tanks are lcated in buildings, the drip tray r bund capacity shall be equivalent t that f the service tank. SANS :2003 specifies intermediate bund wall heights f at least 0,5 m. Since specificatins fr intermediate bund wall heights in the Revisin N. 003 Date: April 2012 Review Date: May f 25 Dcument ID: HSEC/E/GDL/006 Prepared by: Grup E&C Sectin

10 Xstrata Cal Suth Africa Generic Hydrcarbn Management varius SANS fr petrleum prducts differ fr different tanks, prducts and situatins, it is recmmended that a respnsible engineer be cnsulted. Bund walls fr surface tanks shuld have a minimum height f 350mm and maximum f 1,8 m (SANS 10131:2003 and SANS :2003). Hwever bund walls fr classes II and III liquids shall be permitted t be higher than the general maximum f 1,8 m (t a maximum f 3,6) where adequate prvisins are made fr nrmal access fr the necessary emergency access t tanks, valves and ther requirements. 6.2 Bund materials The bund walls and flrs are usually cnstructed f slid masnry, cncrete r brickwrk, with vertical sides r near vertical sides, depending n the type f tank and prduct cntained. Bricks used fr cnstructin f lad-bearing structures shall be f specific quality (such as burnt clay bricks) in accrdance with SANS It shuld be free f cracks, flaws, stnes and lumps f raw materials. Under n circumstances, may prus, cement blck bricks be used. When required, bund walls f steel may be used. These shuld be in accrdance with SANS 19131:2004 and shuld prevent spills, in case f a fire. The bund walls and flr must be designed t be liquid-tight. The main bund walls shuld be able t withstand a full hydrstatic head f water when filled. 6.3 Bund wall, flr and ther The bund flr shuld be f sund cncrete cnstructin and slpe at least 1:100 away frm the tank twards the lwest pint f the bund area where the drain sump shuld be lcated. In case f tanks that cntain class I, II r III liquids, and that are situated n prus sils, bunded areas shuld receive special treatment. Permeable bund flr shuld be restricted t a cefficient f permeability nt exceeding 10 6 cm/s (in situ). The area within the bund wall surrunding the tank r drums must be entirely free and unccupied (must nt be used as a strage area). Allwance must be made fr the trajectry/spurt f a leak frm a full tank with an elevated pint f leakage. The minimum distance between the surface tank and the te f an interir bund wall shall be at least 1,5m n all sides. N electric mtr must be placed where it can cme in cntact with flammable liquid r its vapur, unless such mtr is flameprf. Revisin N. 003 Date: April 2012 Review Date: May f 25 Dcument ID: HSEC/E/GDL/006 Prepared by: Grup E&C Sectin

11 Xstrata Cal Suth Africa Generic Hydrcarbn Management High bund walls shuld have steps fr quick escape and/r t facilitate easy access frm the utside. Restrictins exist n the maximum height f bund walls. Vent pipes must be fitted t tanks. A drainpipe and bleed ff facility situated at the frnt f the bunded area shuld be present. All pipes penetrating the bund wall must be suitably sealed t prevent crrsin and leakage f the prduct. A drainage sump shall be prvided inside the bund area fr all tanks with capacity exceeding 1000 L. If prvisin has nt been made fr an il r water separatr dwnstream f the bund drain valve, the sump shall have an underflw arrangement. Bund drain valves/stpccks shuld be: leak prf; able t cntinue t functin in a fire; able t be pened manually; kept lcked in the clsed psitin, unless in use; the pen and clsed psitins n the valve must be indicated and bvius and nly steel valves that are fire safe, allwed inside bunded areas. Areas where fuel/il is dispensed/refuelled must have bunded facilities t cllect leaks and spills and means f cllecting and dispsing f these wastes in a way that will nt cause sil r water pllutin. 7. COMMISSIONING AND OPERATIONAL MANAGEMENT OF HYDROCARBON HANDLING, STORAGE AND TREATMENT FACILITIES After installatin and befre cmmissining r each repair, adjustment r mdificatin t bulk strage hydrcarbn tanks, it needs t be inspected and tested by a cmpetent persn in accrdance with relevant SANS fr petrleum prducts and requirements f the lcal authrities and applicable bylaws. Each installatin shall be registered with the lcal authrity befre being cmmissined and the installatin ges int prductin. The apprpriate symblic signs shall be displayed at the varius hydrcarbn facilities in accrdance with the requirements f SANS The tank number, tank size and prduct t be stred must be stenciled nt the filler end f the tank. Revisin N. 003 Date: April 2012 Review Date: May f 25 Dcument ID: HSEC/E/GDL/006 Prepared by: Grup E&C Sectin

12 Xstrata Cal Suth Africa Generic Hydrcarbn Management Minimum symblic signage shuld include: Danger Flammable Liquid, N Smking, N Naked Flame, N Cell phnes. The capacity f the bund wall shuld als be indicated in an easy readable psitin. Lcal site emergency numbers must be displayed and if pssible, the fllwing emergency (lcal) numbers shuld als be displayed: The Fire Department; The Plice; Dctr; Ambulance Service; the Department f Agriculture and Land Administratin; the Department f Water Affairs and Frestry. Whenever a bund wall has been cracked, damaged r breached, the gap shuld be fixed as sn as pssible and nt left unrepaired vernight while the tank cntains prduct. Under n circumstances shuld any mdificatins t tanks r stands be made withut apprval f the respnsible engineer and/r applicable fuel/il cntracting cmpany. Repsitining/relcatin f tanks shuld nt ccur, withut prir cnsent f the applicable cntracting il/fuel cmpany, MDALA, the relevant XCSA Envirnmental Department r withut a new EIA applicatin fr the new psitin. Surface strage tanks and bulk strage facilities need t be visually inspected n a regular basis fr structural integrity (including the stands) fr rust, bent r missing cmpnents and apprpriate inspectin recrds kept. Tanks shuld nt be used where the bracing r legs have been bent. Re-use and dispsal f hydrcarbn-cntaminated tanks shuld be in accrdance with applicable legislatin and the plicy f the applicable Oil/Fuel Cmpany frm which the tanks were purchased. Redundant hydrcarbn-cntaminated tanks must be filled with sand r liquid cncrete (and a Fire Officer frm the lcal municipality shuld sign t cnfirm this) r remved. If the tanks are t be sld t scrap metal dealers, it is imprtant t ensure that infrmatin f the dealer s premises and prcesses is btained befrehand t ensure that the required perating licences are in place. 8. LOCATION OF HYDROCARBON HANDLING, STORAGE AND/ OR TREATMENT FACILITIES Revisin N. 003 Date: April 2012 Review Date: May f 25 Dcument ID: HSEC/E/GDL/006 Prepared by: Grup E&C Sectin

13 Xstrata Cal Suth Africa Generic Hydrcarbn Management In principal, each hydrcarbn handling, strage and/r treatment facility shall be lcated in an area with the least risk t the safety f peple in the event f fire (including adjacent prperties), the least ptential envirnmental impact in case f a spillage, but als practical fr management and maintenance purpses. Thus befre installatin f any facility used fr strage f a hazardus substance r cnstructin f any strage, handling, treatment r prcessing facility fr any such hazardus substance, alternative sites need t be cnsidered as part f the required envirnmental impact assessment prcess. When cnsidering varius alternative sites, specific reference needs t be made t restrictins n lcality stipulated in the: Relevant applicable lcal authrity and municipal by-laws (e.g. sme bylaws exist n flammable substance strage and prhibit abve grund strage). Regulatins fr use f water fr mining and related activities aimed at the prtectin f water resurces f 4 June 1999 (Gvernment Ntice N. 704). SANS :2003 Part 1. The petrleum industry. Strage and distributin f petrleum prducts in abvegrund bulk installatins, Editin 4.1. SANS 10131: 2004 Abve-grund strage tanks fr petrleum prducts, Editin 1. The fllwing are sme examples (nt all-inclusive) f restrictins n lcality. Fr mre technical detail, please refer t the abve-mentined SANS fr petrleum prducts. The lcatin is largely dependant n lcal cnditins such as the presence f drainage systems, especially where these systems need t link up with the drainage system f the lcal authrity. (Nte that interference r mdificatins f the municipal sewers are nt allwed withut the apprval f updated drainage plans by the lcal authrity). Avid fr example lw-lying areas that are liable t flding r that are subject t a seasnal high water table. The fall f the grund in relatin t residential areas r ther risk areas that culd be expsed in the event f an accidental large-scale spillage. Surface tanks shuld be installed n level and firm grund. D nt allw tanks t be installed n slping, sft, r caving grund. Revisin N. 003 Date: April 2012 Review Date: May f 25 Dcument ID: HSEC/E/GDL/006 Prepared by: Grup E&C Sectin

14 Xstrata Cal Suth Africa Generic Hydrcarbn Management The facilities (e.g. tanks, etc.) may nt be installed within a hrizntal distance f 100 m, r within the 1:100 year fld-line (whichever are the greatest), f any watercurse (including pans, wetlands, streams and rivers), brehle r well (excluding mnitring brehles). The facilities (e.g. tanks, etc.) may nt be lcated n waterlgged grund r n grund likely t becme waterlgged, undermined, unstable r cracked. There shuld be n verhead cables, rubble r ther hazards within 3 metres f any BTF tank lcatin. The facilities (e.g. tanks, etc.) shuld preferably be lcated s that there is n need fr the bulk delivery vehicle t reverse when the delivery is made. Shuld reversing be abslutely necessary, adequate space shuld be made available t carry ut the maneuvre safely. Nte that the lading and unlading facilities fr packed gds must cnfrm t the requirements f SANS 10263, and fr bulk carges t the requirements f SANS The access rad shuld be in a gd cnditin and have a minimum clearance f 3,5 metres verhead t allw free bulk vehicle access. Tanks shuld be lcated at least 3 m frm buildings, bundaries, drains and any cmbustible materials. Tanks shall be lcated in secure areas. In urban areas, a maximum f 2 BTF tanks may be installed at any ne lcatin; thereafter BTA tanks shall be used. In rural areas, a maximum f 3 BTF tanks may be installed in any ne lcatin, thereafter BTA tanks shall be used, depending n the lcal authrities and their requirements. Fr permanent installatins in urban areas r sensitive areas, the BTF tanks are t be installed n brick cradles r as per the lcal authrities and their requirements and t have a bund wall that will cntain 110% f the prduct. Fr temprary installatins (nt exceeding 3 mnths) in areas that are envirnmentally sensitive, the bund wall arund BTF tanks may be cnstructed frm earth that will cntain 110% f the prduct, in case f a spill. Surface tanks are nt t be installed where the sides r tp are bstructed. Access needs t be prvided t dip and deliver int the tank(s). Revisin N. 003 Date: April 2012 Review Date: May f 25 Dcument ID: HSEC/E/GDL/006 Prepared by: Grup E&C Sectin

15 Xstrata Cal Suth Africa Generic Hydrcarbn Management BTF tanks may nt be installed in buildings fr reasn f fire and pssible risk f cntaminatin frm spills and/r leaks. Service tanks cntaining Class I liquid shall nt be lcated inside buildings. The tanks must be lcated at least 1,5m away frm the bundary f the premises. The distance between a service tank and any pening int a building shuld be at least 1,5m. When cnsidering the lcatin f facilities (e.g. tanks, etc.), it shuld be ensured that cattle r pedestrian grids, bridges, undergrund pipes, ducting etc. are able t withstand the weight and width f the bulk delivery vehicle(s). The apprpriate symblic signs shall be displayed at the varius hydrcarbn facilities in accrdance with the requirements f SANS The capacity f the bund wall shuld als be indicated in an easy readable psitin. Whenever a bund wall has been cracked, damaged r breached, the gap shuld be fixed as sn as pssible and nt left un-repaired vernight while the tank cntains prduct. Lading and fflading f hydrcarbns shuld be dne accrding t the relevant wrk instructins, which need t be aligned with GN R 225 f the Natinal Rad Traffic Act, and SANS These wrk instructins must be available at the stres. Any spillage f hydrcarbns needs t be cleaned up The site arund the hydrcarbn strage facilities shall be kept free frm bstructins and cmbustible rubbish. Vegetatin that is likely t dry ut and becme a fire hazard shall be kept shrt and cuttings immediately remved. Hydrcarbn strage facilities need t be visually inspected n a regular basis fr structural integrity (including the stands) fr rust, bent r missing cmpnents and apprpriate recrds kept. Revisin N. 003 Date: April 2012 Review Date: May f 25 Dcument ID: HSEC/E/GDL/006 Prepared by: Grup E&C Sectin

16 Xstrata Cal Suth Africa Generic Hydrcarbn Management 9. HANDLING OF HYDROCARBONS (USE AND DISPOSAL) 9.1 General Apprpriate facilities must be available t dispse f any hydrcarbn waste, including thse liquid wastes remved frm the bund areas. The XCSA Hydrcarbn spill management prcedure must be fllwed fr any hydrcarbn spillages, abve and undergrund, n the premises f XCSA peratins. After rainfall events, all bunds must be emptied as sn as pssible t maintain a full capacity. Cntaminated water r waste prducts must nt be dispsed f in a way that will pllute the envirnment. All hydrcarbn waste (slid r liquid) generated n the premises f XCSA peratins (n surface and undergrund) shall be transferred n a regular basis t designated strage tanks fr peridic cllectin and dispsal by an authrised cntractr. The designated respnsible persn will make arrangements fr cllectin f the hydrcarbns frm main dedicated hydrcarbn and/r il cllectin tanks by a reputable cntractr fr dispsal r recycling, whatever applicable. Backup tanks/cntainers must be identified fr use when the main hydrcarbn cllectin tank in the area is full. Any hydrcarbn strage cntainer must be sealed immediately t ensure that accidental spillage cannt ccur if the cntainer is disturbed. All current dedicated hydrcarbn strage tanks/areas (n surface and undergrund) t be identified n an inspectin register and plan as part f a site perating standard. Under n circumstances may any hydrcarbns be released directly int the grund. N hydrcarbns shall be allwed t run int any undergrund /abvegrund water drain. Revisin N. 003 Date: April 2012 Review Date: May f 25 Dcument ID: HSEC/E/GDL/006 Prepared by: Grup E&C Sectin

17 Xstrata Cal Suth Africa Generic Hydrcarbn Management 9.2 Wrkshps and utside areas All wrkshps must be equipped with spill kits and specially marked hydrcarbn hlding r waste cntainers (slid and liquid) as per Generic Waste Management Guideline (HSEC E GDL). When wrk requires that cmpnents shuld be drained r filled, it must be dne accrding t site-specific wrk instructins fr each area t prevent spillage and pllutin. If n wrk instructins are available, the fllwing will apply: An empty cntainer with suitable capacity and dedicated clur cding shuld be used fr draining requirements. A grid shuld be placed n tp fr filters t be drained. All filters remved frm equipment shuld, after being drained, be dispsed int a suitable cntainer, marked fr this purpse. If equipment r vehicles are serviced, drip trays shuld be used t cntain all hydrcarbns and spillage. The drip trays shuld have sufficient capacity fr the cmpnents being drained. Drip trays must be emptied and cleaned n a regular basis. A special cntainer shuld be available fr hydrcarbn-cntaminated sil requiring biremediatin, if nt treated in situ. All hydrcarbns cllected in the varius cntainers shuld be dispsed When sending equipment t the salvage yard it shuld be ensured that all hydrcarbns are drained t prevent pllutin. 10. MAINTENANCE OF HYDROCARBON MANAGEMENT FACILITIES Within XCSA peratins the fllwing shuld be taken int accunt regarding maintenance f hydrcarbn strage facilities and equipment: All vehicles, machinery and equipment using fuel and il must be n a dcumented preventative maintenance schedule. Maintenance f bunded areas will include the fllwing: The drain valve is kept clsed and lcked; The key must be available t be pened and clsed, especially in emergency cnditins; The bund wall is intact and impervius t the liquids it cntains; The pipe wrk, valves and ther equipment in the bund are rutinely maintained. Revisin N. 003 Date: April 2012 Review Date: May f 25 Dcument ID: HSEC/E/GDL/006 Prepared by: Grup E&C Sectin

18 Xstrata Cal Suth Africa Generic Hydrcarbn Management Maintenance f cncrete areas will be dne by using absrbent materials and bilgical cleaners as leaks appear. This will significantly reduce the risk f plluting rainwater that may cllect in the bunded area. Undergrund tanks are t be remved; hwever where they are in the prcess f remval, structural integrity tests n the undergrund tanks shuld be included n a planned maintenance schedule. All transfer lines (particularly jints) shuld be regularly inspected and immediately repaired shuld they shw signs f failure. A qualified persn must examine all the electrical earth cnnectins n a regular basis. Dcumented recrds f all inspectins must be kept n the mine. 11. MONITORING AND REPORTING Befre strage tanks are filled, readings must be taken f the level f fuel r il in the tank (as per stres receiving) t: Prevent verfilling and enable recnciliatin f fuel/il (hydrcarbns) Where hydrcarbns are stred in drums, the hydrcarbn balance is based n the units received and issued. Mnitring brehles n the perimeter f the site and fissure analysis will track any increase in hydrcarbn cntent f the grundwater which culd pssibly be attributed t hydrcarbn strage and use. Any nncnfrmance will be investigated and actined. If any undergrund strage tanks are remved, sil samples shuld be cllected frm the surrunding area and analysed fr ptential hydrcarbn pllutin. The results shuld be kept n file. If any pllutin is fund, the sil shuld be treated in situ, r remved fr treatment in the Biremediatin Facility. Any spills r leaks (including at refuelling pints) must be reprted immediately as per incident reprting prcedure. All areas using fuel r il, as far as practically pssible are t keep recnciliatin recrds f fuel/il used and dispsed f. This will allw fr the drawing up f a hydrcarbn balance fr the specific site as sustainability data reprting requirements. Inspectins f all areas will take place as per the site specific standard. Revisin N. 003 Date: April 2012 Review Date: May f 25 Dcument ID: HSEC/E/GDL/006 Prepared by: Grup E&C Sectin

19 Xstrata Cal Suth Africa Generic Hydrcarbn Management Dispsal f all fuel and il cntaminated hazardus waste shall be dcumented as per XCSA Generic Waste Management Guideline (HSEC E GDL). 12. SPILLS MANAGEMENT All spills n the prperty f XCSA peratins shuld be reprted as per XCSA prcedure fr Incident Management. Chemical spills and large hydrcarbn spills shuld be cleaned up by reputable HAZMAT cmpany. All plluted sites n XCSA peratins will be remediate r the sil remved and dispsed f as per applicable legislative requirements. All sil plluted by hydrcarbns during prspecting, drilling r smallscale mining peratins must either be remved frm the area, r remediate in situ. All hydrcarbn handling, strage and treatment facilities are subject t cntainment requirements. The methd used t clean up a hydrcarbn spill depends n the type f surface cntaminated. The principles f any clean-up peratin is t: prevent the spreading f the hydrcarbn spill by immediate temprary cntainment; remve the surce f the hydrcarbn spill by clsing taps, valves r plugging hles r penings, where applicable; recver as much f the spilled hydrcarbns as pssible; clean up and if necessary; rehabilitate the envirnment. In all instances Persnal Prtective Equipment (PPE) must be wrn when handling hydrcarbns during cleanup. Spill kits equipped with inter alia hydrcarbn-absrbent bms and fibres shuld be made available at, r in the immediate vicinity f all hydrcarbn handling, string and/r treatment facilities n all XCSA peratins. The use f chemicals t absrb/emulsify il shuld be avided. N hydrcarbn spill shuld be rinsed int any drain, trench r strm water canal. Sawdust shuld nt be used t mp up hydrcarbn spillages. Apart frm creating a fire hazard in areas stred, the hydrcarbns (especially il) d nt remain absrbed in the wd fibres and are slwly released, Revisin N. 003 Date: April 2012 Review Date: May f 25 Dcument ID: HSEC/E/GDL/006 Prepared by: Grup E&C Sectin

20 Xstrata Cal Suth Africa Generic Hydrcarbn Management cntaminating the envirnment again if nt effectively sealed in a nnleak cntainer. Hydrcarbn absrbent prducts are ligtrphic ( il attracting ) and mst have a lw fire hazard. N saturated absrbents may simply be left in an area after a spill and shuld be dispsed f as per XCSA General Waste Management Prcedure (HSEC E PROC 012). The used fibre, fibre bms and any cntaminated rags, etc. must be placed int a 210-litre drum and when the drum is full, it must be remved as hazardus waste by a cntractr as indicated in the XCSA Generic Waste Management Guideline (HSEC E GDL). Fuel tankers and service vehicles in the field shuld carry drip trays and hydrcarbn absrbent prduct fr emergency use in the field in the event f a spill Spills n cncrete and ther nn-tarmac surfaces If a spill ccurs utside f a bunded area, the spill must immediately be cntained t as small an area as pssible. The spread f the spill must be prevented. The surce f the spill must be identified and remved by clsing taps, valves r plugging hles r penings (whatever is applicable); If large spills ccur and hydrcarbn-absrbent bms prve nt t be sufficient t cntain the spill, sil bunds r pre-packed sand bags may be used. All entrances t surface drains, trenches and strm water canals shuld be blcked using pre-packed sand filled bags and/r hydrcarbnabsrbent bms r, if applicable, sil bms r diversin trenches shuld be created using spades frm the spill-kits. All excess spillage shuld be pumped, scped r mpped up and Generic Waste Management Guideline (HSEC E GDL). In cases f smaller spills where cntainment with bms are nt necessary, suitable hydrcarbn-absrbent fibres frm the spill kits culd immediately be used t absrb the remaining spillage frm the cncrete r ther nn-tarmac surfaces. A bilgical degreaser (e.g. OT 8) shuld be used t remve traces f the hydrcarbn spill frm the cncrete r ther nn-tarmac surface. The used fibre, fibre bms and any cntaminated rags, etc. must be placed int a 210-litre drum and when the drum is full, it must be remved as hazardus waste by a cntractr as indicated in the XCSA Generic Waste Management Guideline (HSEC E GDL). Revisin N. 003 Date: April 2012 Review Date: May f 25 Dcument ID: HSEC/E/GDL/006 Prepared by: Grup E&C Sectin

21 Xstrata Cal Suth Africa Generic Hydrcarbn Management Any recvered hydrcarbns shuld be pumped, stred r transferred frm the hlding cntainers t either hydrcarbn waste cntainers, specially marked fr this purpse r hydrcarbn cllectin tanks until remved by a reputable waste r recycling cntractr (whatever applicable). All hydrcarbn spillages (especially il/diesel) that cntain water must be fed thrugh an il separatr befre strage in the waste cntainers r cllectin tanks Spills n tarmac surfaces Spills shuld be cleaned immediately because hydrcarbns (il and diesel) sften the tar surface. If a spill ccurs utside f a bunded area, the spill must immediately be cntained t as small an area as pssible. The spread f the spill must be prevented. The surce f the spill must be identified and remved by clsing taps, valves r plugging hles r penings (whatever is applicable); If large spills ccur and hydrcarbn-absrbent bms prve nt t be sufficient t cntain the spill, sil bunds r pre-packed sand-filled bags may be used. All entrances t surface drains, trenches and strm water canals shuld be blcked using pre-packed sand filled plastic bags and/r hydrcarbn-absrbent bms r, if applicable, sil bms r diversin trenches shuld be created using spades frm the spill-kits. All excess spillage shuld be pumped, scped r mpped up and ntainer as per the XCSA Generic Waste Management Guideline (HSEC E GDL). In cases f smaller spills where cntainment with bms are nt necessary, suitable hydrcarbn-absrbent fibres frm the spill kits culd immediately be used t absrb the remaining spillage frm the cncrete r ther nn-tarmac surfaces. A bilgical degreaser (e.g. OT 8) shuld be used t remve traces f the hydrcarbn spill. The used fibre, fibre bms and any cntaminated rags, etc. must be placed int a 210-litre drum and when the drum is full, it must be remved as hazardus waste by a cntractr as indicated in the XCSA Generic Waste Management Guideline (HSEC E GDL). Revisin N. 003 Date: April 2012 Review Date: May f 25 Dcument ID: HSEC/E/GDL/006 Prepared by: Grup E&C Sectin

22 Xstrata Cal Suth Africa Generic Hydrcarbn Management Any recvered hydrcarbns shuld be pumped, stred r transferred frm the hlding cntainers t either hydrcarbn waste cntainers, specially marked fr this purpse r hydrcarbn cllectin tanks until remved by a reputable waste r recycling cntractr (whatever applicable). All hydrcarbn spillages (especially il/diesel) that cntain water must be fed thrugh an il separatr befre strage in the waste cntainers r cllectin tanks Spills n sil/land Hydrcarbn spills n land shuld be cntained and cleaned up as quickly as pssible t prevent infiltratin int the sil and cntaminatin f grundwater. If a spill ccurs utside f a bunded area, the spill must immediately be cntained t as small an area as pssible. The spread f the spill must be prevented. The surce f the spill must be identified and remved by clsing taps, valves r plugging hles r penings (whatever is applicable); If large spills ccur and hydrcarbn-absrbent bms prve nt t be sufficient t cntain the spill, sil bunds r pre-packed sand-filled bags may be used. All entrances t surface drains, trenches and strm water canals shuld be blcked using pre-packed sand filled plastic bags and/r hydrcarbn-absrbent bms r, if applicable, sil bms r diversin trenches shuld be created using spades frm the spill-kits. All excess spillage shuld be pumped, scped r mpped up and placed in Generic Waste Management Guideline (HSEC E GDL). Cntaminated sil t be taken t a biremediatin site (if ne exists) r treated in-situ with biremediatin agents. If n biremediatin is t be undertaken, the cntaminated sil must be placed int a 210-litre drum and when the drum is full, it must be remved as hazardus waste by a cntractr as per the XCSA Generic Waste Management Guideline (HSEC E GDL). Revisin N. 003 Date: April 2012 Review Date: May f 25 Dcument ID: HSEC/E/GDL/006 Prepared by: Grup E&C Sectin

23 Xstrata Cal Suth Africa Generic Hydrcarbn Management 12.4 Spills nt water If a spill ccurs utside f a bunded area, the spill must immediately be cntained t as small an area as pssible. The spread f the spill must be prevented. The surce f the spill must be identified and remved by clsing taps, valves r plugging hles r penings (whatever is applicable); Flating hydrcarbn absrbent bms shuld be used t cntain the spill t as small an area as pssible n the water surface. If practical, scp as much spilled hydrcarbns as pssible frm the water surface int suitable hlding cntainers. Suitable bidegradable absrbents shuld be applied nt the spill in the water, which shuld manually be remved nce the spill substance has been absrbed. The used fibre, fibre bms and any cntaminated rags, etc. must be placed int a 210-litre drum and when the drum is full, it must be remved as hazardus waste by a cntractr as per the XCSA Generic Waste Management Guideline (HSEC E GDL). Any recvered hydrcarbns shuld be pumped, stred r transferred frm the hlding cntainers t either hydrcarbn waste cntainers, specially marked fr this purpse r hydrcarbn cllectin tanks until remved by a reputable waste r recycling cntractr (whatever applicable). All hydrcarbn spillages (especially il/diesel) that cntain water must be fed thrugh an il separatr befre strage in the waste cntainers r cllectin tanks. 13. SUPPORTING DOCUMENTS Appendix 1: Characteristics f the bilgical degreaser, OT8 OT8 is a unique, bilgical prduct that cntains bidegradable surfactants, enzymes and bacteria. The surfactants release il stains frm even the mst prus surfaces while the enzymes and bacteria digest the released il. OT8 is a bilgical il stain remver that: remves and digests il stains quickly; penetrates and lifts il frm prus surfaces effectively; is withut risk t the envirnment. Revisin N. 003 Date: April 2012 Review Date: May f 25 Dcument ID: HSEC/E/GDL/006 Prepared by: Grup E&C Sectin

24 Xstrata Cal Suth Africa Generic Hydrcarbn Management Hw t use OT8? 1 litre f OT8 will be sufficient t treat square feet f il stains, depending n the surface prsity. Befre use, shake the cntainer t put the bacteria int suspensin. Lightly wet the cntaminated area with water and pur OT8 acrss the il stain. Brush OT8 int the il stain fr ne r tw minutes, until the prduct changes clur frm white t chclate brwn. Leave fr minutes t sak in, then rinse ff with water. A secnd applicatin may be required n prus surfaces, where il stains may re-appear as OT8 s bilgical activity brings the ingrained il t the surface. (Please nte: OT8 is nt suitable fr tarmac surfaces). The fllwing OT8 prducts are available: Rad Bi (Oil cntaminatin) il spill clean up agent fr rad spills (tarmac friendly); OT8 Bilgical Oil Stain Remver bilgical il stain remver that wrks in minutes t remve hard surface il stains; Bi Gel Bilgical Oil Stain Remver bilgical il stain remver fr cleaning il cntaminated gravel and prus surfaces; S-Oil treatment - fr biremediatin f cntaminated sils; Fr further infrmatin, the fllwing website shuld be cnsulted: REFERENCES XCSA SD Framewrk and Strategy XCSA SD Plicy XCSA Legal Register XCSA Aspects Registers XCSA Incident Reprting Prcedure SANS ISO SANS : 2003 (Part 1) SANS : 2003 (Part 3) SANS 10131: 2004 SANS (Part 1) Revisin N. 003 Date: April 2012 Review Date: May f 25 Dcument ID: HSEC/E/GDL/006 Prepared by: Grup E&C Sectin

25 Xstrata Cal Suth Africa Generic Hydrcarbn Management Revisin N. 003 Date: April 2012 Review Date: May f 25 Dcument ID: HSEC/E/GDL/006 Prepared by: Grup E&C Sectin

Draft Hazardous Substances and Spill Management Plan

Draft Hazardous Substances and Spill Management Plan Page 1 Draft Hazardus Substances and Spill Management Plan Cntents 1 Intrductin... 2 1.1 Purpse... 2 1.2 Scpe... 2 2 Hazardus Substances... 2 3 Persnnel and Respnsibilities... 3 4 Methdlgies... 3 4.1 Strage

More information

Safety and Security Checks for Tank Container HSE CoP 613. Safety and Security Checks for Tank Container. HSE Code of Practice 613

Safety and Security Checks for Tank Container HSE CoP 613. Safety and Security Checks for Tank Container. HSE Code of Practice 613 Safety and Security Checks fr Tank Cntainer HSE Cde f Practice 613 Table f Cntents 1. Purpse... 3 2. Definitins... 3 3. Scpe... 3 4. Mandatry principles r standards... 3 4.1 Legal... 4 4.2 Prcess requirements...

More information

WETLAND AND RIVER CROSSINGS: GENERIC CROSSING PROCEDURE

WETLAND AND RIVER CROSSINGS: GENERIC CROSSING PROCEDURE METHOD STATEMENT Wetland and River Crssings METHOD STATEMENT WETLAND AND RIVER CROSSINGS: GENERIC CROSSING PROCEDURE 0 02.07.2012 Issued fr Review Semane Jnes & Wagener Rev. Date Reasn fr Issue Prepared

More information

FREQUENTLY ASKED QUESTIONS REMEDIATION TECHNOLOGIES WORKSHOP

FREQUENTLY ASKED QUESTIONS REMEDIATION TECHNOLOGIES WORKSHOP FREQUENTLY ASKED QUESTIONS REMEDIATION TECHNOLOGIES WORKSHOP Objectives Q1. What are the bjectives f the Remediatin Technlgies prjects? A1. Kuwait Oil Cmpany is cmmitted t a sustainable remediatin slutin

More information

Asbestos Policy. Inmind Reference CO20. Version 1.2 Policy Review Team Group Operations Director Director of Nursing and Quality Hospital Directors

Asbestos Policy. Inmind Reference CO20. Version 1.2 Policy Review Team Group Operations Director Director of Nursing and Quality Hospital Directors Asbests Plicy Plicy Name Asbests Plicy Inmind Reference CO20 Categry Operatinal Versin 1.2 Plicy Review Team Grup Operatins Directr Directr f Nursing and Quality Hspital Directrs Lead Officer Directr f

More information

PS ACID SULPHATE MATERIALS

PS ACID SULPHATE MATERIALS PS ACID SULPHATE MATERIALS PURPOSE AND SCOPE The purpse f this primary standard is t eliminate r minimise risk f envirnmental harm caused by acid sulphate materials including acid sulphate sils and acid

More information

Instructions for Conducting Sampling During Underground Storage Tank Closure

Instructions for Conducting Sampling During Underground Storage Tank Closure Instructins fr Cnducting Sampling During Undergrund Strage Tank Clsure Permitting and Cmpliance Assistance Prgram Divisin f Waste Management Flrida Department f Envirnmental Prtectin April 2016 [Incrprated

More information

ESH Standard Corporate. VA Lockout/Tagout

ESH Standard Corporate. VA Lockout/Tagout Page 1/5 Lckut/Tagut 1 Objective 2 Scpe 3 Validity 4 Definitin f terms Lckut/tagut (LOTO) is an essential safety-regulatin fr the wrk n r arund equipment with the gal f reducing any hazards t emplyees

More information

[Note to Engineer: Choose one below. Confirm with your geotech if you need further compaction.]

[Note to Engineer: Choose one below. Confirm with your geotech if you need further compaction.] 2-06 SUBGRADE PREPARATION (******) 2-06.3 Cnstructin Requirements 2-6.3(1) Subgrade fr Surfacing This sectin is supplemented with the fllwing: The subgrade must be suitable, as determined by the Engineer,

More information

Draper City SWPPP Checklist

Draper City SWPPP Checklist Draper City SWPPP Checklist FOR PROJECTS LESS THAN 1 ACRE AND NOT PART OF A COMMON PLAN OF DEVELOPMENT TABLE OF CONTENTS I. Submittal requirements II. Review/Prvide at time f initial SWPPP Inspectin: III.

More information

ABLE Commission Q&A Q&A Regarding Licensing and Application

ABLE Commission Q&A Q&A Regarding Licensing and Application ABLE Cmmissin Q&A Q&A Regarding Licensing and Applicatin When can the interim licenses applicatins be submitted? They can be submitted between nw and September 30, 2018, hwever; the Able Cmmissin wuld

More information

Packaging regulations

Packaging regulations Packaging regulatins This guidance applies t yu if yu wn, manage r wrk fr a business that prduces, uses r handles packaging r packaging materials. Prducer Respnsibility Obligatins - What yu must d! If

More information

9.0 Water Use and Conservation

9.0 Water Use and Conservation 9.0 Water Use and Cnservatin Many explratin activities require a surce f ptable and nn-ptable water. As explratin prgrams mve frm early t advanced stage, expect an increase in demand fr water and additinal

More information

MEDICINES CONTROL COUNCIL

MEDICINES CONTROL COUNCIL MEDICINES CONTROL COUNCIL GUIDELINE FOR MEDICAL DEVICE QUALITY MANUAL This guideline is intended t prvide recmmendatins t applicants wishing t submit applicatins fr a licence t manufacture, imprt, distribute

More information

Waste Water Discharge

Waste Water Discharge Plicy 1102 1102.1 PURPOSE AND SCOPE The practices detailed in this plicy are intended t minimize run-ff releases assciated with firefighting, fire training, emergency scene spills and discharges, trauma

More information

NEW LAWS REGARDING BUILDING PRODUCTS (QLD)

NEW LAWS REGARDING BUILDING PRODUCTS (QLD) BUILDING SERVICES Ref: LEG 17-05 Current at Nvember 2017 NEW LAWS REGARDING BUILDING PRODUCTS (QLD) Frm 1 Nvember new laws regarding nn-cnfrming building prducts apply t all building prjects in Queensland.

More information

Company Policy Buying Additional Annual Leave

Company Policy Buying Additional Annual Leave Cmpany Plicy Buying Additinal Annual Leave Dcument Cntrl Table Dcument title: Buying Additinal Annual Leave Versin number: 2.3 Date apprved: 22.11.17 Apprved by: D Wythe Date f last review: 22.11.17 Departments

More information

TOWN OF PAYSON WATER DEPARTMENT BACKFLOW PREVENTION PROGRAM CUSTOMER INFORMATION PACKAGE

TOWN OF PAYSON WATER DEPARTMENT BACKFLOW PREVENTION PROGRAM CUSTOMER INFORMATION PACKAGE TOWN OF PAYSON WATER DEPARTMENT BACKFLOW PREVENTION PROGRAM CUSTOMER INFORMATION PACKAGE TOWN OF PAYSON Backflw Preventin Prgram Develpers, Cntractrs and Paysn Residents: An apprved backflw preventin assembly

More information

Cloud services Information and records management considerations

Cloud services Information and records management considerations Clud services Infrmatin and recrds management cnsideratins December 2018 Part f the Department f Internal Affairs Dcument details Dcument Identifier: 18/G15 Versin Date Descriptin Revisin due 0.1 Oct 2018

More information

ICP Linking and Fusing Service Enquiry Procedure

ICP Linking and Fusing Service Enquiry Procedure UK Pwer Netwrks ICP Linking and Fusing Service Enquiry Prcedure Owner Name Title Neil Clarke Head f Highway Services Signature Date 03 April 2018 Authriser Name Title Kevin Newnham Majr Prgrammes & ICP

More information

MARINE CONSENTS GUIDANCE

MARINE CONSENTS GUIDANCE MARINE CONSENTS GUIDANCE FEBRUARY 2008 CONTROLLED DOCUMENT STATUS PROJECT TITLE DOCUMENT TITLE DOCUMENT REF BR Marine Cnsents Guide.dc REVISION RECORD STATUS DATE SUMMARY OF CHANGES CHECKED APPROVED 0

More information

PEPA CHECKLIST FOR WASTE MANAGEMENT INFRASTRUCTURE TO ASSESS THE STATUS OF PLANNING/PROGRAMMING OF THE PROJECT PIPELINE

PEPA CHECKLIST FOR WASTE MANAGEMENT INFRASTRUCTURE TO ASSESS THE STATUS OF PLANNING/PROGRAMMING OF THE PROJECT PIPELINE _ PEPA CHECKLIST FOR WASTE MAAGEMET IFRASTRUCTURE TO ASSESS THE STATUS OF PLAIG/PROGRAMMIG OF THE PROJECT PIPELIE te: The starting pint fr an accessin-driven envirnmental investment prgramme is a systematic

More information

Project: Sydney Metro - Utility in stigations, Application Title:

Project: Sydney Metro - Utility in stigations, Application Title: Sydney Metr Integrated Management System (IMS) (Uncntrlled when printed) Iv' sydney METRO Pre-Cnstructin Minr Wrks Apprval Frm Minr Wrks are defined as any lw impact activities that are undertaken prir

More information

What You Should Know About GDPR. What is the GDPR?

What You Should Know About GDPR. What is the GDPR? What Yu Shuld Knw Abut GDPR What is the GDPR? The Eurpean Unin s General Data Prtectin Regulatin ( GDPR), effective May 25, 2018, is a far-reaching regulatin applicable t rganizatins with Eurpean Ecnmic

More information

What You Should Know About GDPR. What is the GDPR?

What You Should Know About GDPR. What is the GDPR? What Yu Shuld Knw Abut GDPR What is the GDPR? The Eurpean Unin s General Data Prtectin Regulatin ( GDPR), effective May 25, 2018, is a far-reaching regulatin applicable t rganizatins with Eurpean Ecnmic

More information

ENVIRONMENTAL POLICY

ENVIRONMENTAL POLICY ENVIRONMENTAL POLICY Pride Pint, Ashcrft Rad, Knwsley Industrial Park Nrth, Liverpl, L33 7TW Tel: 0151 546 9995 Fax: 0151 546 9996 Email: freddy.peacck@acnw.uk.cm REVIEWED BY THE MANAGING DIRECTOR 1 Envirnmental

More information

TG 19 SOUTH AUSTRALIAN WATER CORPORATION

TG 19 SOUTH AUSTRALIAN WATER CORPORATION TG 19 SOUTH AUSTRALIAN WATER CORPORATION TECHNICAL GUIDELINE Checklist: Water Netwrk Requirements fr Land Develpment Applicatins Issued by: Principal Engineer Water & Wastewater Netwrks Issue Date: SA

More information

STAFF REPORT. Peter Zielsdorf

STAFF REPORT. Peter Zielsdorf STAFF REPORT Applicatin: Cnstruct a new septic drainfield t replace the existing drainfield apprximately 64 feet frm Mink Lake (min. 75 ft required). Applicant: Agenda Item: 4(a) Peter Zielsdrf Backgrund

More information

Worker Protection Standard for Agricultural Pesticides

Worker Protection Standard for Agricultural Pesticides Wrker Prtectin Standard fr Agricultural Pesticides Principles f the Wrker Prtectin Standard (WPS) In September f 2005, the Envirnmental Prtectin Agency (EPA) revised the Wrker Prtectin Standard (WPS) (40

More information

City of Vancouver Planning By-law Administration Bulletins

City of Vancouver Planning By-law Administration Bulletins City f Vancuver Planning By-law Administratin Bulletins Planning, Urban Design and Sustainability Department 453 West 12th Avenue, Vancuver, BC V5Y 1V4 tel: 3-1-1, utside Vancuver 604.873.7000 fax: 604.873.7100

More information

Flaw indications in the reactor pressure vessels of Doel 3 and Tihange 2

Flaw indications in the reactor pressure vessels of Doel 3 and Tihange 2 Flaw indicatins in the reactr pressure vessels f Del 3 and Tihange 2 1. Cntext Technical infrmatin nte 2013.02.01 Del 3 and Tihange 2 are tw f the seven Belgian nuclear reactrs perated by Electrabel, a

More information

Instructions Fee Schedule

Instructions Fee Schedule City f Lndn Tree Prtectin By-Law C.P.-1515-228 Tree Prtectin Area Permit Applicatin Frestry Management Planning Services - Urban Frestry 267 Dundas Street, 3rd Flr Lndn, Ontari N6A 1H2 Telephne: 519-661-CITY

More information

Our Intent. We are committed to safeguarding the privacy of users to our website and we will only use the information we collect about you lawfully.

Our Intent. We are committed to safeguarding the privacy of users to our website and we will only use the information we collect about you lawfully. PRIVACY NOTICE LGfL GENERAL OVERVIEW Our Intent. We are cmmitted t safeguarding the privacy f users t ur website and we will nly use the infrmatin we cllect abut yu lawfully. Changes t Data Prtectin Legislatin.

More information

PFAS PRELIMINARY INVESTIGATION

PFAS PRELIMINARY INVESTIGATION PRELIMINARY INVESTIGATION July 2018 PRELIMINARY INVESTIGATION What is? Per-and Ply-fluralkyl Substances () are a grup f man-made chemicals that have been widely used since the 1950s in husehld and industrial

More information

New Product Approval Process

New Product Approval Process New Prduct Apprval Prcess 1. Scpe T prvide an assessment f the suitability f a new prduct fr prcurement and use by Manitba Infrastructure (MI). Manitba Infrastructure may require updates, resubmissin f

More information

Environment Agency Advice position during exceptional weather Slurry and milk spreading on agricultural land

Environment Agency Advice position during exceptional weather Slurry and milk spreading on agricultural land Envirnment Agency Advice psitin during exceptinal weather Slurry and milk spreading n agricultural land Land spreading f slurry r milk in exceptinal weather cnditins (see belw) can present a serius risk

More information

Environmental Conditions Food and Beverage Manufacturing Group

Environmental Conditions Food and Beverage Manufacturing Group GBR N. 4 Envirnmental Cnditins Fd and Beverage Manufacturing Grup The Envirnment and Resurce Authrity (ERA) regulates the envirnmental impact f enterprises thrugh tw key mechanisms. Smaller scale activities

More information

Table of Contents. London BRT Transit Project Assessment Process Draft Environmental Project Report

Table of Contents. London BRT Transit Project Assessment Process Draft Environmental Project Report Lndn BRT Transit Prject Assessment Prcess Draft Envirnmental Prject Reprt Table f Cntents 6 Permits and Apprvals... 6-1 Federal... 6-2 Prvincial... 6-2 Municipal... 6-3 Utilities... 6-3 Institutins...

More information

Guidelines for Designing Backflow Prevention Assembly Installations

Guidelines for Designing Backflow Prevention Assembly Installations Guidelines fr Designing Backflw Preventin Assembly Installatins Supplement t the 1981 Crss Cnnectin Cntrl Manual - January 1992 Purpse The purpse f these guidelines is t augment and/r clarify thse guidelines

More information

VENDOR DISPLAY SERVICE LEVEL AGREEMENT

VENDOR DISPLAY SERVICE LEVEL AGREEMENT OBJECTIVE: T ensure Vendr prvided displays are maintained in a fully functinal state by the Vendr fr life f display in Best Buy retail stres. It is in the best interest f bth Vendrs and Best Buy t ensure

More information

WATERFORD COUNTY COUNCIL

WATERFORD COUNTY COUNCIL WATERFORD COUNTY COUNCIL BYELAWS FOR THE COLLECTION, STORAGE AND PRESENTATION OF HOUSEHOLD WASTE AND CERTAIN RELATED WASTE MANAGEMENT MATTERS. The Mayr f Waterfrd Cunty and the cuncillrs f Waterfrd Cunty

More information

DRAFT Sampling Protocol For the LEED Canada for Homes Program Applicable to production builders (Balloted Version)

DRAFT Sampling Protocol For the LEED Canada for Homes Program Applicable to production builders (Balloted Version) DRAFT Sampling Prtcl Fr the LEED Canada fr Hmes Prgram Applicable t prductin builders (Ballted Versin) This dcument prvides guidance n using the Sampling Prtcl t verify LEED Hmes. It includes infrmatin

More information

World-Class, Lean Performance Tutorials and Case Studies - Tutorial 05 scrap yard operations - scrap cans processing

World-Class, Lean Performance Tutorials and Case Studies - Tutorial 05 scrap yard operations - scrap cans processing Wrld-Class, Lean Perfrmance Tutrials and Case Studies - Tutrial 05 scrap yard peratins - scrap cans prcessing THE PRESENT STATUS: A Scrap Yard Business cllects and prcesses scrap cl-drinks-cans fr subsequent

More information

BIRMINGHAM CITY COUNCIL STRATEGY FOR OPEN DATA

BIRMINGHAM CITY COUNCIL STRATEGY FOR OPEN DATA What we are trying t achieve BIRMINGHAM CITY COUNCIL STRATEGY FOR OPEN DATA This strategy sets ut hw Birmingham City Cuncil will prvide regular cmprehensive releases f public pen data and hw it will use

More information

References to we, our or us in this privacy notice are to MIDLANDS NORDIC WALKING

References to we, our or us in this privacy notice are to MIDLANDS NORDIC WALKING Midlands Nrdic Walking PRIVACY NOTICE FOR OUR GROUP MEMBERS We are cmmitted t respecting yur privacy. This ntice is t explain hw we may use persnal infrmatin we cllect befre, during and after yur membership

More information

Specification Dry Good Packaging and Delivery Requirements SU-009 version 1

Specification Dry Good Packaging and Delivery Requirements SU-009 version 1 Prepared By: Vinpac Internatinal s Quality Assurance Team Date f Issue: 30 May 2016 This is a cmpliance dcument fr circulatin t custmers, manufacturers and suppliers. Please make sure the apprpriate peple

More information

Mersham Sports Club Flood Street, Mersham, Ashford, Kent, TN25 6NX

Mersham Sports Club Flood Street, Mersham, Ashford, Kent, TN25 6NX Mersham Sprts Club Fld Street, Mersham, Ashfrd, Kent, TN25 6NX www.mershamsprtsclub.cm PRIVACY NOTICE FOR VOLUNTEERS We are cmmitted t respecting yur privacy. This ntice is t explain hw we may use persnal

More information

Regulations Amending the Food and Drug Regulations (1475 Good Manufacturing Practices)

Regulations Amending the Food and Drug Regulations (1475 Good Manufacturing Practices) Canada Gazette: Vl. 147, N. 10 May 8, 2013 Registratin SOR/2013-74 April 26, 2013 FOOD AND DRUGS ACT Regulatins Amending the Fd and Drug Regulatins (1475 Gd Manufacturing Practices) P.C. 2013-420 April

More information

Stormwater NPDES Compliance Rule 5. February 23, 2017

Stormwater NPDES Compliance Rule 5. February 23, 2017 Strmwater NPDES Cmpliance Rule 5 February 23, 2017 Presenter Kathy Allen Strmwater Prgram Department f Public Wrks City f Indianaplis Kathy.Allen@indy.gv Agenda Overview EPA Audit New INDOT Requirements

More information

Cleves Pump Station Stabilization, Project ID Date Issued: August 6, 2012

Cleves Pump Station Stabilization, Project ID Date Issued: August 6, 2012 Cleves Pump Statin Stabilizatin, Prject ID 10210020 Date Issued: August 6, 2012 ADDENDUM NO. 2 This addendum will nly be distributed via e-mail, but will remain available fr viewing n the MSDGC website

More information

North Hockey Umpiring Association (NHUA) PRIVACY NOTICE FOR OUR MEMBERS

North Hockey Umpiring Association (NHUA) PRIVACY NOTICE FOR OUR MEMBERS Nrth Hckey Umpiring Assciatin (NHUA) PRIVACY NOTICE FOR OUR MEMBERS We are cmmitted t respecting yur privacy. This ntice is t explain hw we may use persnal infrmatin we cllect befre, during and after yur

More information

erosion&sedimentcontrol

erosion&sedimentcontrol Auckland Reginal Cuncil Wrks Within a Watercurse: 3 1 Wrks within watercurses have very high ptential fr ersin and discharge f sediment. This is because such wrk is undertaken in r near flwing water the

More information

CHERRYTREE FARM CAMPING WEBSITE AND MARKETING PRIVACY NOTICE

CHERRYTREE FARM CAMPING WEBSITE AND MARKETING PRIVACY NOTICE CHERRYTREE FARM CAMPING WEBSITE AND MARKETING PRIVACY NOTICE INTRODUCTION Welcme t the Cherry Tree Farm Camping's privacy ntice. Cherry Tree Farm Camping respects yur privacy and is cmmitted t prtecting

More information

PRINCIPLES OF PRTR AND AER REPORTING OF ANNUAL ENVIRONMENTAL INFORMATION

PRINCIPLES OF PRTR AND AER REPORTING OF ANNUAL ENVIRONMENTAL INFORMATION ENVIRONMENTAL PROTECTION AGENCY AER / PRTR GUIDANCE DOCUMENT N. 1: PRINCIPLES OF PRTR AND AER REPORTING OF ANNUAL ENVIRONMENTAL INFORMATION Fr use in reprting f: 1 PRTR Emissins and Waste Transfers infrmatin

More information

Los Angeles Unified School District Office of Environmental Health & Safety Tree Trimming and Removal Procedure

Los Angeles Unified School District Office of Environmental Health & Safety Tree Trimming and Removal Procedure Ls Angeles Unified Schl District Office f Envirnmental Health & Safety Tree Trimming and Remval Prcedure I. Purpse This Tree Trimming and Remval Prcedure (Prcedure) was develped t ensure the District is

More information

PROCESSING NOTICE ALUMNI

PROCESSING NOTICE ALUMNI PROCESSING NOTICE ALUMNI SUMMARY This summary is intended t cnvey essential infrmatin nly. Fr mre detailed infrmatin abut hw Ravensburne cllects, stres and prcesses yur persnal data can be fund in the

More information

Records Management Policy

Records Management Policy Recrds Management Plicy Main Authr: Cnsultatin Rute: Apprved By: Date f Issue: Applicable: Organisatinal wide Versin: 1.0 Review Date: February 2011 Versin 1.0: February 2010 Change Cntrl Versin Change

More information

of approximately 140 Catholic primary and secondary schools and colleges within the Archdiocese of Brisbane.

of approximately 140 Catholic primary and secondary schools and colleges within the Archdiocese of Brisbane. Privacy PURPOSE Brisbane Cathlic Educatin (BCE) is respnsible fr the administratin f apprximately 140 Cathlic primary and secndary schls and clleges within the Archdicese f Brisbane. This Privacy Plicy

More information

References to we, our or us in this privacy notice are to The Joanne Banks Dancers, Studio 10, Durham Street, Spennymoor, Co.

References to we, our or us in this privacy notice are to The Joanne Banks Dancers, Studio 10, Durham Street, Spennymoor, Co. The Janne Banks Dancers PRIVACY NOTICE FOR OUR CUSTOMERS AND PUPILS We are cmmitted t respecting yur privacy. This ntice is t explain hw we may use persnal infrmatin we cllect befre, during and after yur

More information

Mersham Sports Club Flood Street, Mersham, Ashford, Kent, TN25 6NX

Mersham Sports Club Flood Street, Mersham, Ashford, Kent, TN25 6NX Mersham Sprts Club Fld Street, Mersham, Ashfrd, Kent, TN25 6NX www.mershamsprtsclub.cm PRIVACY NOTICE FOR OUR MEMBERS We are cmmitted t respecting yur privacy. This ntice is t explain hw we may use persnal

More information

MEVION SOURCING STRATEGY SUPPLIER CODE OF CONDUCT

MEVION SOURCING STRATEGY SUPPLIER CODE OF CONDUCT MEVION SOURCING STRATEGY The MEVION S250, while being the mst cmpact prtn therapy system in the wrld, is still a relatively large and cmplex prduct. As such, ur supply chain utilizes a high-mix, lw vlume

More information

1 The types of personal information we collect

1 The types of personal information we collect ICBC (LONDON) PLC NEW CANDIDATE PRIVACY NOTICE As part f ur recruitment prcess, the Industrial and Cmmercial Bank f China (ICBC) cllects and prcesses persnal data relating t jb applicants. The Bank is

More information

Used Oil Processors and Re-Refiners

Used Oil Processors and Re-Refiners Divisin f Envirnmental Respnse and Revitalizatin Octber 2018 Used Oil Prcessrs and Re-Refiners THIS POLICY DOES NOT HAVE THE FORCE OF LAW Hazardus Waste Prgram This guidance dcument cntains infrmatin fr

More information

Family Support Service Provider Quick Reference Guide to CYBER

Family Support Service Provider Quick Reference Guide to CYBER Welcme Page: Family Supprt Service Prvider Quick Reference Guide t CYBER Links t Mnitr Regularly: Authrizatin Current: Will list all currently pen authrizatins; shuld include nly thse yuth currently receiving

More information

OSPAR Regional Action Plan for Prevention and Management of Marine Litter in the North-East Atlantic

OSPAR Regional Action Plan for Prevention and Management of Marine Litter in the North-East Atlantic OSPAR Cnventin fr the Prtectin f the Marine Envirnment f the Nrth-East Atlantic OSPAR Reginal Actin Plan fr Preventin and Management f Marine Litter in the Nrth-East Atlantic Summary: OSPAR Ministers had

More information

Fact Sheet: The Global Net Zero Carbon Buildings Commitment in Australia

Fact Sheet: The Global Net Zero Carbon Buildings Commitment in Australia Fact Sheet: The Glbal Net Zer Carbn Buildings Cmmitment in Australia 1 Supprting yur cmmitment t create a net zer emissins built envirnment T supprt the gals in the Paris Agreement, the Wrld Green Building

More information

Foot Protection Standard

Foot Protection Standard Ft Prtectin Standard Safety and Envirnment Systems Management System Dcumentatin Ft Prtectin Standard 1.0 PURPOSE This standard specifies the selectin, use, inspectin and care f ft prtectin at SaskPwer.

More information

Nanogate Jay Systems

Nanogate Jay Systems Nangate Jay Systems Revisin: H Page 1 1.0 Purpse The purpse f this prcedure is t prvide fr a system and instructins t give each supplier the necessary tls t prvide prduct and services that meet the expectatins

More information

Penketh Panther Netball Club

Penketh Panther Netball Club Penketh Panther Netball Club PRIVACY NOTICE FOR OUR MEMBERS We are cmmitted t respecting yur privacy. This ntice is t explain hw we may use persnal infrmatin we cllect befre, during and after yur membership

More information

o Mitigation measures are required to be identified. Soil

o Mitigation measures are required to be identified. Soil Mitigatin measures are required t be identified. Sil Pllutin f sil due t handling, use and strage f hazardus substances during cnstructin and peratin. The lss f available tp sil. Mitigatin measures are

More information

Sustainability Policy. Bupa Enterprise Policy

Sustainability Policy. Bupa Enterprise Policy Bupa Enterprise Plicy Sustainability Plicy We are cmmitted t engaging millins f peple arund the wrld in their health and wellbeing, and t having a minimal impact n the envirnment. Purpse Bupa 2020 cmmits

More information

Manual 11: Energy & Ancillary Services Market Operations Revision History

Manual 11: Energy & Ancillary Services Market Operations Revision History 2.3.4 Minimum Generatr Operating Parameters Parameter Limited Schedules Belw is the list f business rules t require units t submit schedules that meet minimum accepted parameters. Market Sellers are required

More information

Craw-Kan Telephone Cooperative Inc. CPNI / Privacy Policy

Craw-Kan Telephone Cooperative Inc. CPNI / Privacy Policy Craw-Kan Telephne Cperative Inc. CPNI / Privacy Plicy Craw-Kan Telephne Cperative Inc. is cmmitted t maintaining yur privacy. We believe that yu are entitled t knw hw Craw-Kan Telephne Cperative Inc. will

More information

Mats Inc. Installation and Maintenance Instructions

Mats Inc. Installation and Maintenance Instructions Mats Inc. Installatin Instructins fr Mats Inc. Carpet Matting 4000, 5000, 6500, 8850 Page 1 f 5 Mats Inc. Installatin and Maintenance Instructins fr Mats Inc. Carpet Matting 4000, 5000, 6500, 8850 These

More information

OWNER S MANUAL. MODEL FE (ALL) Serial number

OWNER S MANUAL. MODEL FE (ALL) Serial number VESTIL MANUFACTURING CORP. 2999 N. Wayne St., Angla, IN 46703 Ph: 260-665-7586 Fax: 260-665-1339 E-mail: sales@vestil.cm www.vestil.cm Rutine Maintenance & Safety Checks 2 Operatin Instructins... 2 10/05

More information

Falmouth Harbour Commissioners Vision, Aims and Objectives

Falmouth Harbour Commissioners Vision, Aims and Objectives Falmuth Harbur Cmmissiners Visin, Aims and Objectives Visin: Our purpse is t maintain an rganisatin f quality and excellence t safely manage Falmuth Harbur in rder t deliver sustainable prsperity whilst

More information

RE: ELLIOT LAKE Wastewater Treatment Plant Annual Performance Report

RE: ELLIOT LAKE Wastewater Treatment Plant Annual Performance Report March 6, 2018 Ministry f the Envirnment 70 Fster Drive, Suite 110 Sault Ste. Marie, ON P6A 6V4 ATTENTION: Safe Drinking Water Branch RE: ELLIOT LAKE Wastewater Treatment Plant Annual Perfrmance Reprt -

More information

Mats Inc. Installation and Maintenance Instructions for 3M Nomad Carpet Matting 4000, 5000, 6500, 8850

Mats Inc. Installation and Maintenance Instructions for 3M Nomad Carpet Matting 4000, 5000, 6500, 8850 Mats Inc. Installatin Instructins fr 3M Nmad Carpet Matting 4000, 5000, 6500, 8850 Page 1 f 5 Mats Inc. Installatin and Maintenance Instructins fr 3M Nmad Carpet Matting 4000, 5000, 6500, 8850 These instructins

More information

5, 7, 9, 11 ROLLER HOT DOG COOKER/GRILLERS OPERATING MANUAL

5, 7, 9, 11 ROLLER HOT DOG COOKER/GRILLERS OPERATING MANUAL Pictured: Ultra Dawg 11 Rller Ht Dg Machine 4095 Cmmercial Ht Dg Machine 5, 7, 9, 11 ROLLER HOT DOG COOKER/GRILLERS OPERATING MANUAL Cpyright 2010 DTX Internatinal B I G D A W G / T O P D A W G / M A D

More information

Treatment Operations Engineer. Service Delivery for Customers. Environmental Operations. Manager Wastewater Treatment Operations

Treatment Operations Engineer. Service Delivery for Customers. Environmental Operations. Manager Wastewater Treatment Operations Psitin Descriptin Psitin Title: Emplyment Type: Sectin: Grup: Treatment Operatins Engineer Full Time Service Delivery fr Custmers Envirnmental Operatins Salary Band: Engineering Band 3 Agreement: APESMA

More information

Shipper asset details reconciliation

Shipper asset details reconciliation UNC Wrkgrup Reprt UNC 0632S: At what stage is this dcument in the prcess? 01 Mdificatin 02 Wrkgrup Reprt Shipper asset details recnciliatin 03 04 Draft Mdificatin Reprt Final Mdificatin Reprt Purpse f

More information

Quality Hotel View is a full-service conference hotel located in Malmö, Sweden, and is a part of the hotel chain Nordic Choice Hotels.

Quality Hotel View is a full-service conference hotel located in Malmö, Sweden, and is a part of the hotel chain Nordic Choice Hotels. Privacy Plicy - Quality Htel View Quality Htel View is a full-service cnference htel lcated in Malmö, Sweden, and is a part f the htel chain Nrdic Chice Htels. This privacy plicy explains which persnal

More information

Isetan Personal Data Protection Policy (PDPP)

Isetan Personal Data Protection Policy (PDPP) Isetan Persnal Data Prtectin Plicy (PDPP) ISETAN OF JAPAN SDN BHD (IOJ) and ICJ DEPARTMENT STORE (M) SDN BHD (ICJ) are cmmitted t ensure that Custmer s privacy is prtected in accrdance t the Persnal Data

More information

The Grannies Cricket Club

The Grannies Cricket Club The Grannies Cricket Club PRIVACY NOTICE FOR OUR MEMBERS We are cmmitted t respecting yur privacy. This ntice is t explain hw we may use persnal infrmatin we cllect befre, during and after yur membership

More information

Health Safety and Environment Management System (HSE-MS)

Health Safety and Environment Management System (HSE-MS) Health Safety and Envirnment Management System (HSE-MS) Requirements t manage health, safety and envirnment activities Helps prtect emplyees Ensures cmpliance with Oman legal requirements Includes ISO

More information

CHIPPING SODBURY GOLF CLUB PRIVACY NOTICE FOR VOLUNTEERS

CHIPPING SODBURY GOLF CLUB PRIVACY NOTICE FOR VOLUNTEERS CHIPPING SODBURY GOLF CLUB PRIVACY NOTICE FOR VOLUNTEERS We are cmmitted t respecting yur privacy. This ntice is t explain hw we may use persnal infrmatin we cllect befre, during and after yur relatinship

More information

CANADIAN PROCEDURE FOR OBTAINING THE VERIFIED GROSS MASS OF PACKED CONTAINERS AS REQUIRED BY SOLAS VI/2

CANADIAN PROCEDURE FOR OBTAINING THE VERIFIED GROSS MASS OF PACKED CONTAINERS AS REQUIRED BY SOLAS VI/2 RD TP 15330 E (05/2016) CANADIAN PROCEDURE FOR OBTAINING THE VERIFIED GROSS MASS OF PACKED CONTAINERS AS REQUIRED BY SOLAS VI/2 FIRST EDITION MAY 2016 Respnsible Authrity Apprval The Executive Directr,

More information

Supplier Social Accountability Standards

Supplier Social Accountability Standards Supplier Scial Accuntability Standards Intrductin Ranir is cmmitted t d what is right and hld urselves t the highest ethical standards. We lead by example and take respnsibility fr ur actins while being

More information

The Data Processor. This eadmissions website is owned and operated by LGfL. The eadmissions support team can be contacted at:

The Data Processor. This eadmissions website   is owned and operated by LGfL. The eadmissions support team can be contacted at: PRIVACY POLICY LGfL eadmissins OVERVIEW Our Intent. We are cmmitted t safeguarding the privacy f users wh use the eadmissins website service and we will nly use the infrmatin we cllect abut yu lawfully.

More information

Aquacell Pty Ltd. Retail Supply Management Plan. EM Retail Supply Management Plan Page 1 of 8

Aquacell Pty Ltd. Retail Supply Management Plan. EM Retail Supply Management Plan Page 1 of 8 Aquacell Pty Ltd Retail Supply Management Plan EM 020-02 Retail Supply Management Plan Page 1 f 8 Cntents Dcument Creatin and Review... 3 Dcument Cntrl... 3 Retail Supply Management Plan... 4 1. Intrductin...

More information

Guidance notes for completing the International Start-up Form

Guidance notes for completing the International Start-up Form Guidance ntes fr cmpleting the Internatinal Start-up Frm These guidance ntes are designed t supprt yu in cmpleting the Internatinal start-up frm. Yu will als need t refer t a) yur Stage 2 applicatin frm

More information

ECNG Energy Group. Performance Review Plan

ECNG Energy Group. Performance Review Plan ECNG Energy Grup Perfrmance Review Plan Cntents Overview 3 Summary 3 Purpse 3 Key Phases and Timelines 4 1) Perfrmance Planning: Start f Q1 4 Setting Individual Objectives 5 2) Onging Caching and Mid-year

More information

Premium-6 Hexagonal Wire Netting for roofing applications

Premium-6 Hexagonal Wire Netting for roofing applications CONTENTS SUMMARY OF FEATURES... 2 TECHNICAL INFORMATION... 2 Prduct Descriptin... 2 Applicatins... 2 Prduct Infrmatin... 2 Handling & Strage... 4 Technical Data... 4 Installatin infrmatin... 4 Size Range

More information

ASSESSMENT PRINCIPLES MAY 2012

ASSESSMENT PRINCIPLES MAY 2012 The Sectr Skills Cuncil fr Prperty Services, Husing, Cleaning Services and Facilities Management the sectr skills cuncil fr the places where we live and wrk ASSESSMENT PRINCIPLES MAY 2012 POLICIES AND

More information

OLA Privacy Policy for Australia

OLA Privacy Policy for Australia 1. Respecting yur privacy OLA Privacy Plicy fr Australia OLA Australia Pty Limited and its related bdies crprate (including its Indian parent cmpany, ANI Technlgies Private Limited) (the OLA Grup) is cmmitted

More information

Checklist for Automatic Guided Vehicle (AGV) Systems

Checklist for Automatic Guided Vehicle (AGV) Systems Registered trade mark f PMH Checklist fr Autmatic Guided Vehicle (AGV) Systems Cmpany: Street: Pstcde/twn: Cunty/state: _ Department: Respnsibility f: Telephne: Fax: Email: 1. General infrmatin 1.1. In

More information

EID POLICY MANUAL. ADMIN Increases in Irrigation Acres, Criteria and Guidelines Revised Feb [supersedes Jan ]

EID POLICY MANUAL. ADMIN Increases in Irrigation Acres, Criteria and Guidelines Revised Feb [supersedes Jan ] Plicy Guidelines: The District has established criteria and guidelines t assist staff in evaluating and administering, and the directrs in apprving and/r rejecting, applicatins fr increases in irrigatin

More information

Initial Draft: National Water Resources Policy for the Fiji Islands

Initial Draft: National Water Resources Policy for the Fiji Islands Appendix 2: Water plicy draft Initial Draft: Natinal Water Resurces Plicy fr the Fiji Islands Backgrund and scpe f plicy This plicy has been develped in recgnitin f the increasing threats and cmpeting

More information

July 2013 and Paralympic games 2012 Policy 0.2 Title change and tracked changes removed

July 2013 and Paralympic games 2012 Policy 0.2 Title change and tracked changes removed EAST f ENGLAND AMBULANCE SERVICE NHS TRUST Dcument title First Draft Authrs: Additinal authrs/cntributrs: Jint Cllective Agreement: HR Respnse t Majr Organisatinal Change Tracey Leghrn, Barry Jarvis Ann

More information