1 From Kyle Seale Pkwy to Camp Bullis Rd BEXAR COUNTY Babcock Rd Phase V Reconstruction of Babcock Rd to include two travel lanes and four-foot shoulders. Roadway reconstruction will provide unflooded access to this segment of roadway and will include the construction of three bridges. Preliminary Design 3 Consultant: TEDSI Infrastructure Total Project Cost: $8,190,000 Advertise Date: 3 Q 2010 Construction Start Date: TBD Thursday, November 19, 2009 Page 1 of 27

2 Big Country Phase V Include, Blue Mesa, Fort Wayne, Black River, Hatchet Pass, Jarbo Pass, Cache Path, Yurba Trail, Two Wells, Fish Springs, Olney Springs, Potter Valley, Crescent Peak, Mud Lake. Reconstruction of these (approximately 10,447 l.f.) residential roadways will consist of full depth pavement restoration, ADA compliant sidewalks and wheelchair ramps, curbs and any necessary drainage. Existing ROW is 50'. Consultant Selection 3 Consultant: TBD Funded for Construction: No Total Project Cost: $6,000,000 Advertise Date: TBD Construction Start Date: TBD Thursday, November 19, 2009 Page 2 of 27

3 Blanco Rd (Glade Crossing to West Oak Estates) From Glade Crossing to West Oak Estates Dr Reconstruct Blanco Road to include two lanes in each direction, center median, turn lanes at major intersections, curbs, sidewalks, and necessary drainage. Bike lanes will be included in this project. In Construction 3 Consultant: C P & Y Contractor: Capital Excavation Total Project Cost: $29,873,343 Advertise Date: March 2008 Construction Start Date: June 2008 Construction End Date: June 2010 Thursday, November 19, 2009 Page 3 of 27

4 Boerne Stage Road From Cross Mountain Trail to Intersection of IH 10. City Section: San Antonio City limits to IH 10 Reconstruction of a portion of Boerne Stage Road to include two travel lanes, four-foot shoulders and a continuous center left turn median. Roadway reconstruction will provide unflooded access (25 Years Storm Event) to the area residents and businesses. Project will require additional right-ofway. Final Design 3 Consultant: AECOM Total Project Cost: $5,493,669 Advertise Date: 3 Q 2010 (Estimate) Construction Start Date: TBD Thursday, November 19, 2009 Page 4 of 27

5 Borgfeld Road Phase II From Timberline Dr. to FM 2696 including Old Blanco Rd. south of Borgfeld Rd. The project will include design and road reconstruction providing two 12 ft. travel lanes, two 4 ft. shoulders, and drainage as necessary. Final Design 3 Consultant: CDS/Muery Services Funded for Construction: No Total Project Cost: $9,300,000 Advertise Date: TBD Construction Start Date: TBD Thursday, November 19, 2009 Page 5 of 27

6 Borgfeld Road Phase I From Timberline Dr. to US Hwy 281 Reconstruct approximately 14,300 linear feet of Borgfeld Road to a Secondary Arterial Type A street and to reconstruct drainage culverts. Street section will consist of a 56- foot wide pavement, including four 12-foot lanes and 4-foot wide shoulders, with roadside ditches. Final Design 3 Consultant: Jacobs Total Project Cost: $7,963,135 Advertise Date: 2Q 2010 Construction Start Date: 4Q 2010 Construction End Date: 4Q 2011 Thursday, November 19, 2009 Page 6 of 27

7 Bulverde Rd at Evans Rd BEXAR COUNTY Bulverde / Evans (Intersection) Reconstruct the intersection to include two lanes in each direction and center turn lanes. Final Design 3 Consultant: Pape Dawson Total Project Cost: $3,650,000 Advertise Date: 2Q 2010 Construction Start Date: 2Q 2010 Construction End Date: 4Q 2010 Thursday, November 19, 2009 Page 7 of 27

8 Bulverde Road - Phase I From US Hwy 281 to Smithson Valley Rd. Reconstruction of Bulverde Road to include two lanes of traffic in each direction, turn lanes and 4 foot shoulders. Project will remove roadway from the 100 year floodpalin. Final Design 3 Consultant: HDR Total Project Cost: $4,000,000 Advertise Date: 4Q 2009 Construction Start Date: 1Q 2010 Construction End Date: 4Q 2010 Thursday, November 19, 2009 Page 8 of 27

9 Bulverde Road Phase IV Expansion of Bulverde Road from Marshall Road to approximately 6,300' north. Project will expand the existing two lane rural roadway section to an urban roadway section consisting of two 12 foot travel lanes in each direction with a 14 foot center median/turn lane within an 86' ROW (Typical). Consultant Selection 3 Consultant: TBD Funded for Construction: No Total Project Cost: $7,500,000 Advertise Date: TBD Construction Start Date: TBD Thursday, November 19, 2009 Page 9 of 27

10 Camelot Subd Phase II Include next streets, Breacon, Mallow, Cork, Swinford, Langport, Oldhamm (East of Winsford), Bridleway, Broadwick, Sarepto. Reconstruction of these (approximately 6,267 l.f.) residential roadways will consist of full depth pavement restoration, ADA compliant sidewalks and weelchair ramps, curbs and necessary drainage. Existing ROW is 50'. Consultant Selection 4 Consultant: TBD Funded for Construction: No Total Project Cost: $3,500,000 Advertise Date: TBD Construction Start Date: TBD Thursday, November 19, 2009 Page 10 of 27

11 Comal Street Commerce St to W Martin St Reconstruct Comal street (Starting on Commerce St to W Martin St ). In Construction 2 Consultant: PBS & J Contractor: E.E. Hood Total Project Cost: $274,534 Advertise Date: July 17, 2009 Construction Start Date: 4 Q 2009 Construction End Date: 4 Q 2009 Thursday, November 19, 2009 Page 11 of 27

12 Culebra rd From Loop 410 to FM 471. BEXAR COUNTY Culebra Rd (Loop 410 to FM 471) Recontruct Culebra Road Pass from Loop 410 to FM 471. Project includes, widening of the existing pavement and the provision of drainage improvements. In Construction 1 Consultant: PBS & J Contractor: E.E. Hood Total Project Cost: $20,804,482 Advertise Date: March 2008 Construction Start Date: 1Q 2009 Construction End Date: 4Q 2010 Thursday, November 19, 2009 Page 12 of 27

13 Foster Road - Phase II From 350 North of Binz Engleman to FM 78 Reconstruction of Foster Rd to include 2 lanes in each direction with continuous center left turn lane, curbs, sidewalks and necessary drainage facilities. Final Design 4 Consultant: S & B Infrastructure Ltd Total Project Cost: $6,852,783 Advertise Date: IQ 2010 Construction Start Date: 1Q 2010 Construction End Date: 1Q 2011 Thursday, November 19, 2009 Page 13 of 27

14 Foster Road at Lakeview Drive Traffic Signal Foster Rd at Lakeview Design traffic signal that will be installed at the Foster Road and Lakeview Drive intersection. Signal will interact with the existing signals at Binz-Engleman, Candlemeadow and Summer Fest. In Construction 4 Consultant: S & B Infrastructure Ltd Advertise Date: 2 Q 2009 Contractor: E Z Bel Construction LLC Construction Start Date: 2Q 2009 Construction End Date: 4Q 2009 Total Project Cost: $153,385 Thursday, November 19, 2009 Page 14 of 27

15 Galm Rd From FM 1560 to Government Canyon State Natural Area Reconstruct Galm Road from FM 1560 to Government Canyon State Natural Area and elevate the roadway outside the 100 year floodplain. Project will require additional right-of-way. Final Design 2 Consultant: HNTB Total Project Cost: $7,000,000 Advertise Date: 3Q 2010 Construction Start Date: 3Q 2010 Thursday, November 19, 2009 Page 15 of 27

16 Heritage Park Phase II Include, Sandy Field Dr, Bluff Fields Dr, Birch Filed Dr, Misty Plain (Echo Plain to Quiet Plain Dr). Design and fully reconstruct the roadway infrastructure including pavement, curbs, 4-foot sidewalks and drainage as necessary. (1.25 miles aprox) Final Design 1 Consultant: LNV Engineering Total Project Cost: $3,100,000 Advertise Date: 1Q 2010 Construction Start Date: 1Q 2010 Thursday, November 19, 2009 Page 16 of 27

17 Heritage Park Phase III Include, Echo Plain, Cedar Plain, Coastal Plain, Beech Plain, Moss Plain, Quiet Plain (Raven Field to Misty Pain), Misty Plain (Quiet Plain to end ) Design and fully reconstruct the roadway infrastructure including pavement, curbs, 4 foot sidewalks and drainage as necessary. Intermediate Design 1 Consultant: LNV Engineering Funded for Construction: No Total Project Cost: $2,908,000 Advertise Date: TBD Construction Start Date: 3Q 2010 Thursday, November 19, 2009 Page 17 of 27

18 Kriewald Road From Hwy 90 at the east end of Kriewald to 300 feet west of Pue Rd Full reconstruction of the roadway with 44-feet of pavement (one travel lane in each direction), curbs, five-foot sidewalks and necessary drainage. This improvement will benefit the surrounding developing neighborhoods and Kriewald Road Elementary School located in the Southwest Independent School District In Construction 1 Consultant: GGC Engineers Advertise Date: 4Q 2008 Contractor: Silverado Brothers Const. Construction Start Date: 1Q 2009 Construction End Date: 1Q 2010 Total Project Cost: $5,050,563 Thursday, November 19, 2009 Page 18 of 27

19 Raven Field Dr From Pue Rd to Quiet Plain Dr The project will include design and reconstruction of existing roadway within the existing 60 ft. right-ofway to include pavement, curbs, sidewalks and drainage as necessary. In Construction 1 Consultant: HDR / Claunch & Miller Contractor: Pronto Sandblasting Total Project Cost: $2,845,737 Advertise Date: August 2007 Construction Start Date: 3Q 2009 Construction End Date: 1Q 2010 Thursday, November 19, 2009 Page 19 of 27

20 Shaenfield Rd From Loop 1604 to FM 1560 Full reconstruction of roadway with two travel lanes in each direction and a 14-foot curbed center median, curbs on the outside lanes, 6-foot sidewalks, and necessary drainage. This improvement will benefit the surrounding developing neighborhoods and the North Side Independent School District. In Construction 2 Consultant: Pape Dawson Contractor: E.E. Hood Total Project Cost: $5,181,749 Advertise Date: August 7, 2009 Construction Start Date: 4Q 2009 Construction End Date: 4Q 2011 Thursday, November 19, 2009 Page 20 of 27

21 BEXAR COUNTY Traffic Signal (New World and Miller Rd) Intersection of New World Rd and Miller Rd. Signalize intersection to control anticipated traffic on New World Rd and Miller Rd. Intermediate Design 4 Consultant: ARCADIS Funded for Construction: No Total Project Cost: $300,000 Advertise Date: 1Q 2010 Construction Start Date: 2Q 2010 Thursday, November 19, 2009 Page 21 of 27

22 Traffic Signal (Wilderness Oak & Canyon Golf Rd) Intersection of Wilderness Oak Rd and Canyon Golf Rd. Signalize intersection to control anticipated traffic on Wilderness Oak and Canyon Golf Rd. Intermediate Design 3 Consultant: ARCADIS Funded for Construction: No Total Project Cost: $300,000 Advertise Date: 1Q 2010 Construction Start Date: 2Q 2010 Thursday, November 19, 2009 Page 22 of 27

23 Traffic Signal (Wiseman Blvd and Talley Rd) Talley Rd & Wiseman Blv Signalize intersection to control anticipated traffic due to new development and school on Wiseman Rd. Final Design 2 Consultant: ARCADIS Funded for Construction: No Total Project Cost: $300,000 Advertise Date: 1Q 2010 Construction Start Date: 2Q 2010 Thursday, November 19, 2009 Page 23 of 27

24 Trainer Hale Woman Hollering Creek. BEXAR COUNTY Trainer Hale Drainage Structures Four barrel corrugated metal pipe drainage structure needing replacement with upgraded structure. Current configuration is both in poor repair and unable to safely pass stormwater runoff from significant rainfall events. Consultant Selection 4 Consultant: TBD Funded for Construction: No Total Project Cost: $800,000 Advertise Date: TBD Construction Start Date: TBD Thursday, November 19, 2009 Page 24 of 27

25 BEXAR COUNTY Ventura Subdivision Phase IX and X Estrid Trl Dr, Mescal Trl Dr, Justino Trl Dr, Shadow Trl Dr, Roveen Trl Dr, Ludlow Trl Dr, Seldom Trl Dr, Cinnabar Trl, Foss Meadow, Oval Meadow, Pepper Trl, Wayside Trl, & Wayword Trl (Elm Trl to, Sunlit Trl). Design and fully reconstruct the roadway infrastructure including pavement, curbs, 4-foot sidewalks and drainage as necessary. Bexar Metropolitan Water District will also be doing water main improvements with this project. Final Design 4 Consultant: San Antonio Design Group Total Project Cost: $4,620,000 Advertise Date: 1Q 2010 Construction Start Date: 1Q 2010 Thursday, November 19, 2009 Page 25 of 27

26 Includes Sunshine Tower Dr., Trail Village Dr., Wistful Trail, Myrtle Trail, Radford Trail, Millers Trail, Corona Ridge, and Sonny Ridge (aprox 1.13 miles) BEXAR COUNTY Ventura Subdivision Phase VIII The proposed project includes but not limited to: Design and fully reconstruct the roadway infrastructure including pavement, curbs, 4-foot sidewalks and drainage as necessary. In Construction 4 Consultant: Unintech Advertise Date: July 10, 2009 Contractor: Silverado Brothers Const. Construction Start Date: 3Q 2009 Construction End Date: 3Q 2010 Total Project Cost: $1,694,259 Thursday, November 19, 2009 Page 26 of 27

27 W Military Road Bridge Ext West Military Bridge Extension. Construction of a 32' X 400' (approximate) bridge on West Military Drive over Medio Creek in Western Bexar County. Section currently exists as a single two lanes bridge structure at this location, tying into a Secondary Arterial Type A roadway (86' ROW) on either side. Consultant Selection 1 Consultant: TBD Funded for Construction: No Total Project Cost: $1,700,000 Advertise Date: TBD Construction Start Date: TBD Thursday, November 19, 2009 Page 27 of 27

For Public Input Period

For Public Input Period 20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: Kingwood Drive N100011 Loop 494 to Woodland Hills Project Description Project provides for the ROW acquisition,

More information

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 ADOT Yuma District Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 Active Construction Projects SR 95@ Bill Williams River NWR Rd CAP Intersection US 95, Castle

More information

King County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds

King County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds News Release Contact: Al Sanders 206-477-1016 August 31, 2015 Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds The Flood Control District

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM NY Susquehanna and Western Rail Line Bicycle/Pedestrian Path DBNUM: NS9803 / UPC: 058018 The 4.8 mile New York, Susquehanna, and Western Railway (NYS&W)

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision Plat Name: Location Description/ Nearest Intersection: Acreage:

More information

City of Denton On-system Project Status Report Prepared by ITS

City of Denton On-system Project Status Report Prepared by ITS City of Denton On-system Project Status Report Prepared by ITS December 2017 PROJECTS FM 2181 North-South... page 2 US 377/Fort Worth Drive... page 3 FM 2499, Section 5... page 5 IH-35E/Mayhill/FM 2499

More information

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects SEPTEMBER 1989 Arkansas State Highway and Transportation Department GEOMETRIC DESIGN CRITERIA for Non-freeway

More information

CITY OF SAFETY HARBOR ENGINEERING

CITY OF SAFETY HARBOR ENGINEERING CITY OF SAFETY HARBOR ENGINEERING The Engineering Department provides the city with technical services including design of construction and maintenance projects, review of development plans, field surveys,

More information

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 WELCOME IL 47 Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 MEETING PURPOSE MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Process/Schedule

More information

PIMA COUNTY REGIONAL ACCESS MANAGEMENT PLAN (RAMP) LOCAL AND NON-LOCAL ACCESS MANAGEMENT PROGRAMS DELIVERABLE 1B

PIMA COUNTY REGIONAL ACCESS MANAGEMENT PLAN (RAMP) LOCAL AND NON-LOCAL ACCESS MANAGEMENT PROGRAMS DELIVERABLE 1B PIMA COUNTY REGIONAL ACCESS MANAGEMENT PLAN (RAMP) LOCAL AND NON-LOCAL ACCESS MANAGEMENT PROGRAMS DELIVERABLE 1B April 2008 Prepared by: Curtis Lueck & Associates 5460 West Four Barrel Court Tucson, AZ

More information

Sidewalk Repair Program. Charter Township of Canton Engineering Services

Sidewalk Repair Program. Charter Township of Canton Engineering Services Sidewalk Repair Program Charter Township of Canton Engineering Services Sidewalk Repair Program History Canton lost a landmark case at the Michigan Supreme Court level in 1997. The Supreme Court has determined

More information

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification 7. Introduction This chapter summarizes methods to evaluate runoff conveyance in various street cross sections and curb types in the Town of Castle Rock and identifies acceptable upper limits of street

More information

East St. Tammany Storm Surge Protection Project Request

East St. Tammany Storm Surge Protection Project Request East St. Tammany Storm Surge Protection Project Request Submitted to Coastal Protection & Restoration Authority of Louisiana (CPRA) August 2015 Contact Information: Thomas Nolan Thompson The East St. Tammany

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated June 27, 2016 BEAVER COUNTY SR 7446(LBB) #92912 PROPOSAL:$54.72 PLANS:$42.46 12X18:$52.11 24X36:$752.70 EXSTRUCT:$48.62 12X18:$59.67 24X36:$861.90 The description and location of the project is

More information

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 NAME SUBDIVISION NAME CC Williams Plant Subdivision CC Williams Plant Subdivision LOCATION CITY COUNCIL DISTRICT

More information

Airport Road from 1 km North of Mayfield Road to 0.6 km North of King Street Public Information Centre #1

Airport Road from 1 km North of Mayfield Road to 0.6 km North of King Street Public Information Centre #1 Municipal Class Environmental Assessment Airport Road from 1 km North of Mayfield Road to 0.6 km North of King Street Public Information Centre #1 Date: Thursday, June 20, 2013 Time: 6:30 p.m. 8:30 p.m.

More information

Request for Proposals No ; Various On-call Professional Design and Engineering Services Addendum No. 1 Page 2

Request for Proposals No ; Various On-call Professional Design and Engineering Services Addendum No. 1 Page 2 Addendum Number 1 Request for Proposals No. 17-001 Various On-call Professional Design and Engineering Services To all prospective firms under specifications for Request for Proposals (RFP) No. 17-001,

More information

TABLE OF CONTENTS. Background of Existing Facility 3. Proposed Work 4

TABLE OF CONTENTS. Background of Existing Facility 3. Proposed Work 4 TABLE OF CONTENTS SECTION PAGE Background of Existing Facility 3 Proposed Work 4 Objective of this Report 4 Required Data 4 Pavement Design Procedure 5 Other Data Requirements 7 Pavement Structures 8 Pavement

More information

SECTION 2 CALDWELLL COUNTY CHARACTERISTICS

SECTION 2 CALDWELLL COUNTY CHARACTERISTICS SECTION 2 CALDWELLL COUNTY CHARACTERISTICS 2.1 City Limits and ETJ Boundaries The name Caldwell was given to the county in recognition of an Indian Fighter named Matthew Caldwell, who led a group of militia

More information

A City Project Review of Eagles Edge subdivision water system and drainage improvements.

A City Project Review of Eagles Edge subdivision water system and drainage improvements. DATE: November 24, 2014 TO: FROM: Planning Commission Jonathan Lange, Planner Community Development Department FILE NO.: CSP2014 0021 PROPOSAL: A City Project Review of Eagles Edge subdivision water system

More information

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1 PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road STAFFING MATRIX Construction Engineering and Inspection-Wiles Road JAMES JEFFERS, P.E. Senior Project Engineer Years of Experience:

More information

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements SECTION 3 DRAINAGE 3-1 General All Drainage plans for proposed development shall be prepared by a Professional Engineer registered in Virginia, except as noted below. Further, their seal and signature

More information

TRANSPORTATION IMPACT STUDIES

TRANSPORTATION IMPACT STUDIES January 28, 2009 POLICIES AND PROCEDURES FOR TRANSPORTATION IMPACT STUDIES Related to Highway Occupancy Permits Pennsylvania Department of Transportation Bureau of Highway Safety and Traffic Engineering

More information

Gwinnett County Stormwater System Assessment Program

Gwinnett County Stormwater System Assessment Program Gwinnett County Stormwater System Assessment Program Jonathan Semerjian, PE Dept. of Water Resources Stormwater Management Sam Fleming, PE Dewberry Presentation Overview Project Background Drivers Enhanced

More information

Greater Cleveland Regional Transit Authority

Greater Cleveland Regional Transit Authority Greater Cleveland Regional Transit Authority CALL FOR ARTISTS - PUBLIC ART CLIFTON ENHANCEMENT PROJECT CFA NO. 1-2014 Due Date: Friday, March 14, 2014 4:00 P.M. Official Time February 14, 2014 Prospective

More information

3 PROJECT DESCRIPTION

3 PROJECT DESCRIPTION 3.1 PROJECT OVERVIEW 3 PROJECT DESCRIPTION The Rocklin 60 project (proposed project) includes the subdivision of 56.9 acres of land, construction of 179 single-family, detached dwelling units, and installation

More information

Project Need and Evaluation

Project Need and Evaluation City of Brooklyn Center 2011 Palmer Lake East Street and Utility Reconstruction Project Public Hearings February 14, 2011 Public Improvement Hearing: Special Assessments Local public improvements to the

More information

NOBLESVILLE PLAN COMMISSION STAFF REPORT DECEMBER 16, 2013

NOBLESVILLE PLAN COMMISSION STAFF REPORT DECEMBER 16, 2013 #1 NOBLESVILLE PLAN COMMISSION STAFF REPORT DECEMBER 16, 2013 13W-14-2137 (6204) & 13N-15-2030 (6193) Change of zoning from A2-S Agricultural Subdivision (Hamilton County) to R-1 Low Density Single Family

More information

REQUEST FOR QUALIFICATIONS FOR DAYTON VALLEY AREA DRAINAGE MASTER PLAN

REQUEST FOR QUALIFICATIONS FOR DAYTON VALLEY AREA DRAINAGE MASTER PLAN REQUEST FOR QUALIFICATIONS FOR DAYTON VALLEY AREA DRAINAGE MASTER PLAN Statement of Qualifications due Friday, November 3, 2017 at 12:00 PM (Pacific Time) To the Carson Water Subconservancy District Office

More information

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS COMPLETE THROUGH REVISION #18 April 2009 CITY STANDARD DETAILS REVISIONS Revision No. Revision Date Effective Date 2 August

More information

Request for Proposals and Bids for Civil Engineering Services for Off-site Improvements for a Residential Neighborhood

Request for Proposals and Bids for Civil Engineering Services for Off-site Improvements for a Residential Neighborhood Request for Proposals and Bids for Civil Engineering Services for Off-site Improvements for a Residential Neighborhood The Quinault Indian Nation (QIN) is pleased to present a Request for Proposal and

More information

CITY OF GEORGETOWN, TEXAS

CITY OF GEORGETOWN, TEXAS CITY OF GEORGETOWN, TEXAS STREET MAINTENANCE TREATMENTS SUMMARY REPORT Prepared By CITY OF GEORGETOWN & KPA ENGINEERS FEBRUARY 2016 1.0 Executive Summary In 2005, the City of Georgetown implemented the

More information

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS 603.1 DESCRIPTION Determine the smoothness of the pavement surface and correct the deficiencies as specified in the Contract Documents. For the purposes of this

More information

Interchange Workshop Report (August 2004)

Interchange Workshop Report (August 2004) U.S. Highway 14 Corridor Study New Ulm to North Mankato Table of Contents Section Interchange Workshop Report (August 2004) Page 1. Introduction and Next Steps 1 2. Interchange Workshop Participants &

More information

PRINCESS ANNE DISTRICT STORMWATER PROJECTS

PRINCESS ANNE DISTRICT STORMWATER PROJECTS PRINCESS ANNE DISTRICT STORMWATER PROJECTS Topics o o o o o Sea Level Rise and the Southern Watersheds Ashville Park Sherwood Lakes Kingston Estates Drainage Operations & Maintenance in the Southern Watersheds

More information

City of San Angelo, Texas Capital Improvements Program. 50th Street Extension

City of San Angelo, Texas Capital Improvements Program. 50th Street Extension 50th Street Extension Responsible Division: Public Works / Engineering Services Project Manager: Clinton Bailey Years 280,000 2,000,000 11/12 Future - 2,280,000 Extension of 50th Street from Travis Street

More information

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards

More information

Safety, And Quality Of Life Needs

Safety, And Quality Of Life Needs The Ivey Wellpad Demands Adams County Mitigation Measures Required To Protect Critical Urban Area Health, Safety, And Quality Of Life Needs Overview Health Safety Quality of Live Citizens Support For Mitigation

More information

November 8, RE: Harrah s Station Square Casino Transportation Analysis Detailed Traffic Impact Study Review. Dear Mr. Rowe:

November 8, RE: Harrah s Station Square Casino Transportation Analysis Detailed Traffic Impact Study Review. Dear Mr. Rowe: November 8, 2006 Mr. Glenn Rowe, P.E. Pennsylvania Department of Transportation Bureau of Highway Safety and Traffic Engineering Commonwealth Keystone Building 400 North Street, 6 th Floor Harrisburg,

More information

All driveways shall have a separate site plan when the application is submitted.

All driveways shall have a separate site plan when the application is submitted. Driveway Submittal Requirements All driveways shall have a separate site plan when the application is submitted. Within 24 hours of application submittal, all proposed driveways shall: be addressed with

More information

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK COST EVALUATION FOR ROLLING HILLS AREA WATER MAIN EXTENSION PROFESSIONAL CONSULTING, LLC. Octagon 10, Office Center 1719 Route 10, Suite 225 Parsippany,

More information

Draft Noise Study Report

Draft Noise Study Report Florida Department of TRANSPORTATION PD&E Study From East of Babcock Street (SR 507) to US 1 Brevard County, Florida FPID: 430136 1 22 01 ETDM: 13026 The environmental review, consultation, and other actions

More information

Municipal Stormwater Ordinances Summary Table

Municipal Stormwater Ordinances Summary Table APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which

More information

Willamette National Forest McKenzie River Ranger District

Willamette National Forest McKenzie River Ranger District United States Department of Agriculture Forest Service Willamette National Forest McKenzie River Ranger District 57600 McKenzie HWY McKenzie Bridge, OR 97413 File Code: 1950 Date: October 8, 2008 To Interested

More information

RAIL-HWY PROJECT DEVELOPMENT GUIDE AND

RAIL-HWY PROJECT DEVELOPMENT GUIDE AND RAIL-HWY PROJECT DEVELOPMENT GUIDE AND New procedures for Railroad Right-of-Entry Agreements & Bid Documents (SP Item 007) Bridge Division Webinar - July 18, 2013 GUIDE TO RAILROAD PROJECT DEVELOPMENT

More information

2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017

2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017 2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017 2017 CBD Improvements Agenda Meeting Agenda Introduction Scope of Improvements Time frames for improvements May vary

More information

Stormwater Local Design Manual For Houston County, Georgia

Stormwater Local Design Manual For Houston County, Georgia Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.

More information

Downtown Estes Loop Project Frequently Asked Questions

Downtown Estes Loop Project Frequently Asked Questions May 15 th, 2015 Project Status 1) Has Alternative 1 already been selected? Is it a done deal? Response: The NEPA process will proceed with environmental analysis of both the No Action and Alternative 1.

More information

Design-Build Capital Infrastructure Project

Design-Build Capital Infrastructure Project Design-Build Capital Infrastructure Project US$60 Million Project Duration 2012 Responsible for drainage systems and construction QA-QC oversight and project documentation and as-built review and acceptance.

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) Route 23, Alexander Road to Maple Lake Road DBNUM: 11424 / UPC: 114240 Initiated from the Pavement Management System, this project will resurface within the project limits. ADA upgrades and guiderail repair

More information

South Cooper Mountain Concept & Community Plans

South Cooper Mountain Concept & Community Plans South Concept & Community Plans Citizens Advisory Committee Meeting: April 3 2014 Hilltop: Recommendation Concept Plan Land Use Transportation Framework Future Single Family D SW 185TH AVE RIGERT RD Future

More information

PROJECT CHARTER South Coast 101 HOV Lanes Project Design Decision Phase

PROJECT CHARTER South Coast 101 HOV Lanes Project Design Decision Phase PROJECT CHARTER South Coast 101 HOV Lanes Project Design Decision Phase PRIMARY PROJECT SPONSOR Santa Barbara County Association of Governments (SBCAG) Date Prepared 03 April 2015 PROJECT PARTNERS Santa

More information

I-35W Retaining Wall Design Exhibit A - Draft Scope of Work

I-35W Retaining Wall Design Exhibit A - Draft Scope of Work Background MnDOT, Metro Transit, Hennepin County, and the City of Minneapolis are in the process of developing a project for Interstate 35W between 43 rd Street in Minneapolis and 15 th Street in Minneapolis.

More information

XI. Thornton Planning Area

XI. Thornton Planning Area XI. A. OVERVIEW The covers 120 square miles in the northwest corner of San Joaquin County. It consists primarily of low-lying Delta islands, sloughs, and large farms. The town of Thornton, a small agriculturally-based

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) Route 3, Route 46, Valley Road and Notch/Rifle Camp Road Interchange, Contract B DBNUM: 059B / UPC: 123020 From Notch/Rifle Camp Road to just east of the Valley Road Intersection, Route 46 will be widened

More information

MODEL Stormwater Local Design Manual. City of Centerville

MODEL Stormwater Local Design Manual. City of Centerville MODEL Stormwater Local Design Manual City of Centerville Adopted December 6, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 1 2.1. DETENTION REQUIREMENTS... 1 2.1.1. Discharge

More information

MONROE COUNTY ZONING OFFICE

MONROE COUNTY ZONING OFFICE MONROE COUNTY ZONING OFFICE 100 South Main Street Waterloo, IL 62298 618-939-8681 Ext. 260 mczoning@htc.net PROCEDURES FOR NEW CONSTRUCTION 1. Applicant must provide a recorded copy of deed to the property

More information

IH 820 Corridor Improvement Study Randol Mill Road To North SH 121 Interchange. Public Meeting. Thursday April 4, 2013

IH 820 Corridor Improvement Study Randol Mill Road To North SH 121 Interchange. Public Meeting. Thursday April 4, 2013 IH 820 Corridor Improvement Study Randol Mill Road To North SH 121 Interchange Public Meeting Thursday April 4, 2013 1 Project Contacts: TxDOT-Fort Worth District John R. Tillinghast, P.E. IH 820 Project

More information

Holly Swartz and Jason Shirey

Holly Swartz and Jason Shirey Chapter 105 General Permits for Stream and Wetland Impacts DEP Ch. 105 CONTACTS FOR BERKS COUNTY: Holly Swartz and Jason Shirey What DEP Regulates Under Chapter 105 Waters of the Commonwealth, which includes

More information

SUBDIVISION SECTION STREET DESIGN MANUAL

SUBDIVISION SECTION STREET DESIGN MANUAL CITY OF ANAHEIM SUBDIVISION SECTION STREET DESIGN MANUAL A. INTRODUCTION : POLICY STATEMENT B. STREET CLASSIFICATION C. STREET STANDARDS REQUIREMENTS Requirements Approval of Street Improvement Plans Widening

More information

CODE CONSOLIDATION PHASE II SUMMARY OF CHANGES Effective February 1, 2011, Ordinance s

CODE CONSOLIDATION PHASE II SUMMARY OF CHANGES Effective February 1, 2011, Ordinance s CODE CONSOLIDATION PHASE II SUMMARY OF CHANGES Effective February 1, 2011, Ordinance 2010-70s Revisions to Title 2 Administration 2.45 Land Use Advisory Commissions. Twelve individual LUAC chapters were

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Design Exceptions / Waivers SPECIFIC SUBJECT: Design Exception Request Form

More information

Keys Edge Community Development District. Engineer s Report Infrastructure Improvements

Keys Edge Community Development District. Engineer s Report Infrastructure Improvements Keys Edge Community Development District Engineer s Report Infrastructure Improvements Prepared for Keys Edge Community Development District Board of Supervisors Miami-Dade County, Florida Prepared by

More information

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION CECIL COUNTY 2018 TRANSPORTATION IMPROVEMENT PROGRAM AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION DESCRIPTION: On-going program to provide major upgrades to state owned bridges that are structurally

More information

FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS

FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS Prepared for: City and County of Denver 201 West Colfax Avenue, Department 509 Denver,

More information

GRAND NIAGARA Proposed Secondary Plan

GRAND NIAGARA Proposed Secondary Plan GRAND NIAGARA Proposed Secondary Plan Public Open House #3 January 17. 2017 scope + process BUILT Grand Niagara Secondary Plan The Grand Niagara Secondary Plan will establish a framework for the future

More information

Existing Conditions Report

Existing Conditions Report Montgomery County Highway Study Existing Conditions Report Program on Local and Intergovernmental Studies Montgomery County Efficiency Study for Shared Local and County Highway Services Existing Conditions

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432 PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION:

More information

Uintah County Land Use Plan 2010 Amended September 26, 2011 Amended November 28, 2011

Uintah County Land Use Plan 2010 Amended September 26, 2011 Amended November 28, 2011 Uintah County Land Use Plan 2010 Amended September 26, 2011 Amended November 28, 2011 Prepared by: And Table of Contents Section Page I. Introduction 4 II. Why is a Land Use Plan Needed? 4 III. Scope of

More information

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects 2.0 ROADWAYS 2.1 Road Classification 2.1.1 Standard Drawing Classification All Road Widths and Road Allowances shall be designed in accordance with the most recent Town of New Tecumseth Standards: TNT.SD

More information

HIGH SCHOOL #2 Severance, CO MANAGEMENT PLAN November,

HIGH SCHOOL #2 Severance, CO MANAGEMENT PLAN November, HIGH SCHOOL #2 Severance, CO MANAGEMENT PLAN November, 18 2016 1 VICINITY MAP Site Data Land Use Statistics o Proposed Developed Site 55 acres 22.8% o Flood Plain 6 acres 2.4% o Open Space 100.6 acres

More information

Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number:

Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number: Public Notice Applicant: City of Dallas Project No.: SWF- 2014-00151 Date: April 18, 2014 The purpose of this public notice is to inform you of a proposal for work in which you might be interested. It

More information

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application DATE: / / PERMIT # REQUEST FOR: NEW BUILDING ADDITION REMODEL PLUMBING ONLY ELECTRIC ONLY

More information

THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN. 4. Drainage Plan. a. Drainage Plan Description

THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN. 4. Drainage Plan. a. Drainage Plan Description THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN 4. Drainage Plan a. Drainage Plan Description The Specific Plan area drains naturally into two separate watersheds: approximately 6 percent of the Specific

More information

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives. 4 Goals & Objectives INTRODUCTION The 2015-2040 MTP preserves and promotes the quality of life and economic prosperity of the MAB by providing a transportation system consistent with the regional goals.

More information

1RUWKZHVW#:LFKLWD 0DMRU#,QYHVWPHQW#6WXG\

1RUWKZHVW#:LFKLWD 0DMRU#,QYHVWPHQW#6WXG\ 1RUWKZHVW#:LFKLWD 0DMRU#,QYHVWPHQW#6WXG\ Executive Summary 3UHSDUHGýIRUã 3UHSDUHGýE\ã.DQVDVý'HSDUWPHQWýRI 7UDQVSRUWDWLRQ,QýDVVRFLDWLRQýZLWKã (DUWKý7HFKý,QFï EXECUTIVE SUMMARY Introduction This Northwest

More information

I. Project Overview and Limits. Project Goal

I. Project Overview and Limits. Project Goal Scope of Work and Deliverables for Subsurface Utility Engineering (SUE) for both Underground and Overhead Utilities on T.H. 10, and its Connecting Roads under S.P. 8001-40 I. Project Overview and Limits

More information

Information for File #MVP MVM

Information for File #MVP MVM Information for File #MVP-2015-04077-MVM Applicant: Preferred Properties and Management, LLC Corps Contact: Marissa Merriman Address: 180 Fifth Street East, Suite 700, St. Paul, Minnesota 55101-1678 E-Mail:

More information

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY Guidance on restoration of City Rights-of-Way Public Works Department Directors Office 747 Market Street Suite 408 Tacoma, WA 98402 253-591-5525 Right-of-Way

More information

Highway 15 Project Hutchinson, MN

Highway 15 Project Hutchinson, MN Highway 15 Project Hutchinson, MN Adjacent Properties and Businesses Meeting Hutchinson Area Chamber of Commerce 1 Agenda Topic 1) Introduce the project scope 2) Project goals and benefits 3) Project timeline

More information

Tier 1 Recommendations October 30, 2017

Tier 1 Recommendations October 30, 2017 Tier 1 Recommendations October 30, 2017 Page Left Intentionally Blank Bristol District B.2 B.9 Need Tier 1 District Needs Need Description Within the Bristol MPO, the I-81 interchanges in Abingdon have

More information

Bexar County Flood Warning System. Curtis Beitel, PE, CFM, Anthony Henry and Wayne Tschirhart, PE, PMP

Bexar County Flood Warning System. Curtis Beitel, PE, CFM, Anthony Henry and Wayne Tschirhart, PE, PMP Bexar County Flood Warning System Curtis Beitel, PE, CFM, Anthony Henry and Wayne Tschirhart, PE, PMP Software Overview 2 Processes Hydrometric DB Event Manager Automatic Low = Every 6 hours High = Every

More information

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501 SR 874/Don Shula Expressway Ramp Connector Project Development & Environment (PD&E) Study PUBLIC HEARING December 8, 2011 MDX Contract #: RFP-09-04 MDX Work Program #: 87410.011 ETDM #: 11501 1 This Public

More information

EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA

EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA Technical Memorandum Farming in the Floodplain Project Prepared for May 2017 PCC Farmland Trust Photo credit: Google Earth TABLE OF CONTENTS Page

More information

DRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E.

DRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E. \ Memorandum SSPEED Center at Rice University Department of Civil & Environmental Engineering 6100 Main MS-317 Houston, Texas 77005-1827 sspeed.rice.edu tel: 713-348-4977 To Andy Yung, P.E. CFM; Lane Lease,

More information

TRANSPORTATION & PUBLIC WORKS DEPARTMENT TECHNICAL STANDARDS

TRANSPORTATION & PUBLIC WORKS DEPARTMENT TECHNICAL STANDARDS Athens-Clarke County Unified Government TRANSPORTATION & PUBLIC WORKS DEPARTMENT TECHNICAL STANDARDS JULY, 2009 PREFACE The technical standards presented herein reflect the current policies and practices

More information

Maine Turnpike Authority FINAL 4-year Capital Investment Plan ( )

Maine Turnpike Authority FINAL 4-year Capital Investment Plan ( ) Total preliminary Value for Project shown in initial year is for project duration. Projects have been listed in each year there are major Preliminary 4.8 Beech Ridge Road Underpass Repairs York $410,000

More information

CITY OF LOS ANGELES Sidewalk Repair Program. Amber Elton, PE

CITY OF LOS ANGELES Sidewalk Repair Program. Amber Elton, PE CITY OF LOS ANGELES Sidewalk Repair Program Amber Elton, PE Sidewalk Repair Program Civil Engineer APRIL 20, 2017 Century Plaza Towers 2029 Century Park East City s Goal BEFORE AFTER Improve Mobility in

More information

Location Drainage Study

Location Drainage Study Location Drainage Study PROJECT ROUTE: LIMITS: MUNICIPALITY/COUNTY: JOB NUMBER: IL 47 at Burlington Road 750ft NW to 750ft SE of IL 47(Burlington), & 1000ft S to 1000ft N of Burlington (IL47) Kane County

More information

Zoning Permits 11-1 ZONING PERMITS

Zoning Permits 11-1 ZONING PERMITS Zoning Permits 11-1 ZONING PERMITS (a) Building or structures shall be started, repaired, reconstructed, enlarged or altered only after a zoning permit has been obtained from the administrator and a building

More information

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: CONSTRUCTION SURVEY PART 1 - GENERAL 1.01 SECTION INCLUDES Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: A. Construction Survey: 1. Project

More information

1441 East 104 th Street, Suite 105 Kansas City, MO Tel (816) Fax (816)

1441 East 104 th Street, Suite 105 Kansas City, MO Tel (816) Fax (816) 1441 East 104 th Street, Suite 105 Kansas City, MO 64131 Tel (816) 874-4655 Fax (816) 874-4675 www.trekkdesigngroup.com November 15, 2013 Mr. Kenny Voss, P.E. Local Program Administrator - Missouri Local

More information

I-15 South, MP 0 to MP 16 Environmental Assessment. Public Hearing. August 7, :00 PM to 7:00 PM

I-15 South, MP 0 to MP 16 Environmental Assessment. Public Hearing. August 7, :00 PM to 7:00 PM I-15 South, MP 0 to MP 16 Environmental Assessment Public Hearing August 7, 2012 5:00 PM to 7:00 PM 1 PROJECT OVERVIEW The Federal Highway Administration (FHWA) and the Utah Department of Transportation

More information

INTERSTATE CORRIDOR PLANNING

INTERSTATE CORRIDOR PLANNING INTERSTATE CORRIDOR PLANNING Prioritization of Corridor Studies July 29, 2015 Importance of the Interstate System Texas is an integral part of the national interstate system. The interstate system provides

More information

ASHVILLE PARK STORMWATER UPDATE JULY 18, 2017 1 ASHVILLE PARK CHRONOLOGY 2005: Ashville Park conditionally rezoned. Consisted of Five Villages 2006-2007: Village A Wilshire Village was approved and construction

More information

TxDOT Chip Seal Over Geotextile Fabric. Research Project

TxDOT Chip Seal Over Geotextile Fabric. Research Project TxDOT Chip Seal Over Geotextile Fabric Research Project Project Background FHWA Pavement Preservation International Scanning Tour Identified potential use of Treatment in the U.S. TxDOT agrees to conduct

More information

SAWS Role In Development of the Edwards Aquifer Recharge Zone

SAWS Role In Development of the Edwards Aquifer Recharge Zone SAWS Role In Development of the Edwards Aquifer Recharge Zone Presented by Annalisa Peace and Ron Green on behalf of the Greater Edwards Aquifer Alliance to the SAWS Board Development Task Force October

More information

3.1 CITY OF POINT COMFORT WWTP

3.1 CITY OF POINT COMFORT WWTP SECTION 3: EXISTING WASTEWATER FACILITIES 3.1 CITY OF POINT COMFORT WWTP Section 3 City of Point Comfort Wastewater Treatment Plant (WWTP) is located at 800 Pease Street, at the intersection of Murrah

More information