Bexar County Flood Warning System. Curtis Beitel, PE, CFM, Anthony Henry and Wayne Tschirhart, PE, PMP
|
|
- Abigail Fisher
- 6 years ago
- Views:
Transcription
1 Bexar County Flood Warning System Curtis Beitel, PE, CFM, Anthony Henry and Wayne Tschirhart, PE, PMP
2 Software Overview 2 Processes Hydrometric DB Event Manager Automatic Low = Every 6 hours High = Every 15 minutes 24/7 Runs InfoWorks RS InfoWorks CS InfoWorks SD Source: FloodWorks Version 13.0 Users Manual, Innovyze, July 2012 Bexar County Flood Warning System May
3 Future Rainfall System Overview NEXRAD 15 min from NWS Rain Gages Level Gages SAOEM EOC NWS Hydrometric Database Western Configuration FloodWorks Server at SARA office Website Central Configuration XML Website Parser Eastern Configuration SARA Web Server Bexar County Flood Warning System May
4 Warning Locations Selected by SAOEM based on historic operations Upper San Antonio River 46 locations Leon Creek 30 locations Medina River 20 locations Cibolo Creek 13 locations Salado Creek update 14 pilot + 19 new locations Total of 142 locations Upper San Antonio River Scoping Map Bexar County Flood Warning System May
5 RS model available (at 74 locations) Elevation / Depth Flow Velocity Location Map Inundation Map No RS Model (at 68 locations) Flow only Location Map Warning Locations Bexar County Flood Warning System May
6 Hydrology 2 Processes Probability Distributed Model Simplified Runoff Model Probability Distributed Model Estimates soil moisture from gaging station Simplified Runoff Model Uses soil moisture to generate runoff hydrographs at ungaged locations Runoff Rainfall and Potential Evaporation Probability Distributed Model (PDM) Routing Reaches (Olmos Watershed) Soil Moisture Simplified Runoff Model (SRM) Runoff RS Hydraulic Model (SAR Watersheds) Rainfall Bexar County Flood Warning System May
7 Hydrology - PDM Calibration Developed by CEH Wallingford Requires real time gaging station Estimates soil moisture Rainfall Evaporation Direct Runoff Surface Runoff Probability Distributed Soil Moisture Storage Surface Storage Recharge Groundwater Storage Baseflow Total Stream Flow Upper San Antonio River Gages Bexar County Flood Warning System May
8 1/1/1998 7/2/1998 1/1/1999 7/2/1999 1/1/2000 7/1/ /31/2000 7/1/ /31/2001 7/1/ /31/2002 7/1/ /31/2003 6/30/ /30/2004 6/30/ /30/2005 6/30/ /30/2006 6/30/ /30/2007 6/29/ /29/2008 6/29/ /29/2009 6/29/ /29/2010 6/29/ /29/2011 6/28/ /28/2012 Daily Mean Discharge (cfs) Hydrology PDM Calibration 18,000 16,000 14,000 USGS Discharge Data SAR Lower SAR Upper Olmos Calibration Event 12,000 10,000 8,000 6,000 4,000 2,000 0 Date Bexar County Flood Warning System May
9 Discharge (cfs) Rainfall Rate (in/hr) Hydrology PDM Calibration 9, ,000 7,000 6,000 Observed Flow (cfs) Computed Flow (cfs) Rainfall Rate (in/hr) ,000 4,000 3,000 2, , Date / Time Olmos Creek at Dresden Drive - September 2010 Event Bexar County Flood Warning System May
10 Discharge (cfs) Rainfall Rate (in/hr) Hydrology PDM Calibration 16, ,000 12,000 Observed Flow (cfs) Computed Flow (cfs) Rainfall Rate (in/hr) , , ,000 4,000 2, Date / Time San Antonio River at Mitchell Street - September 2010 Event Bexar County Flood Warning System May
11 Discharge (cfs) Rainfall Rate (in/hr) Hydrology PDM Calibration 70, ,000 50,000 Observed Flow (cfs) Computed Flow (cfs) Rainfall Rate (in/hr) , , , , Date / Time San Antonio River at Loop September 2010 Event Bexar County Flood Warning System May
12 Hydrology - Simplified Runoff Model Generates runoff hydrographs for each basin Basin average rainfall Effective rainfall Based on soil moisture deficit Converts to runoff Q Q input into InfoWorks RS At a point Distributed over reach Upper San Antonio River Subbasins Bexar County Flood Warning System May
13 Hydraulics - Overview Upper San Antonio River 72 miles Leon Creek 66 miles Medina River 19 miles Cibolo Creek 0 miles Salado Creek 24 miles Total = 181 miles Upper San Antonio River Main RS Bexar County Flood Warning System May
14 Hydraulics Development DFIRM RAS models As detailed as possible Steady peak flow rate Focused on 100-year 1D flow Hydrologic routing English units InfoWorks RS models Match RAS within 0.5 feet Unsteady, Full range of flows Balanced focus (low & high) 1D with multiple flow paths Dynamic channel routing Metric units Bexar County Flood Warning System May
15 Hydraulics - Development Simplified RS models Run within 15 minute window Starts with DFIRM RAS Review / refinement Delete unnecessary sections Import into RS Steady RS (low flows) Unsteady RS (HMS hydrographs) Add structures 1 at a time Compare RAS vs. RS Optimization Bexar County Flood Warning System May
16 Hydraulics - Capabilites Complex split flow areas Martinez Creek Bexar County Flood Warning System May
17 Hydraulics - Capabilities Apache Creek Undersized storm drains 10-year flow in storm drain Rest of 100-year overland Bexar County Flood Warning System May
18 Hydraulics - Capabilities Concepcion Creek 100-year flow is completely contained in a large box culvert system Bexar County Flood Warning System May
19 Hydraulics - Capabilities Flow through neighborhoods Apache Creek Concepcion Creek Series of storage areas in InfoWorks RS Bexar County Flood Warning System May
20 Hydraulics - Capabilities Flood Control Tunnel Operations San Pedro Creek Tunnel San Antonio River Tunnel Bexar County Flood Warning System May
21 Warning Thresholds Established for each location At least 1.0 foot between threshold elevations Stage-discharge rating curve at locations without RS models Bexar County Flood Warning System May
22 Warning Thresholds - Elevations At locations with RS model Used DFIRM RAS models at each location Depth = Elevation Datum (flowline) Detailed spreadsheets to document Bexar County Flood Warning System May
23 Warning Thresholds - Flows Only flows at locations without RS models Stage-discharge rating curve to relate flow and elevation Detailed analysis for San Antonio and Leon Creek watersheds Upper San Antonio River: 100 year - Routing Location Number Location Name HEC-RAS MODEL Threshold Elevation Threshold Discharge Watch Minor Major Watch Minor Major SAN012 D/S of N McCullough Ave & Barbara Dr Tributary A to Airport Tributary SAN044 Babcock Rd & Northill Dr Alazan Unamed Tributary SAN011 N McCullough Ave & Jackson Keller Rd Olmos Creek Lower SAN006 Avondale Ave & Hillje St State Hospital Creek SAN015 West Ave & Jackson-Keller Rd Olmos Creek Lower SAN039 Senisa Dr & Seeling Blvd Alazan Unamed Tributary SAN043 Overdale Pl & Laddie Pl East Woodlawn Ditch SAN007 School St & Monroe St Rockwood_Creek_LimDetail SAN014 Cornwall Dr & Thames Dr Tributary A to Airport Tributary SAN010 Rosemary Ave & N New Braunfels Ave BroadwayDrain_Detailed SAN009 Barilla Pl & Broadway St BroadwayDrain_Detailed Point in O Poor RS to Bexar County Flood Warning System May
24 Warning Thresholds Dam Safety Value added for dam safety in Martinez-B watershed Discharge thresholds Based on SARA design rating curves for pool elevations Q Outflow at Q Outflow at Q Outflow at Aux Spillway 3 feet < Top of Dam Top of Dam Watch Minor Major Martinez 1 Martinez 2 Martinez 3 Martinez 4 Martinez 5 Martinez 6a Rehab 65 2,066 8, , , ,359 10, ,624 14, ,181 51, Bexar County Flood Warning System May
25 Future Rainfall Quantitative Precipitation Forecasts 1 hour to 5 days GIS-based spatial/volume input Forecast information from NWS/NOAA Private sector Wanted to use NWS QPF product 2 total for May 25, 2013 event Actual total = 10 on San Pedro Creek Established flexible procedure with NWS Utilizes NWS WFO s judgment Applied USGS SIR Bexar County Flood Warning System May
26 SAOEM call with NWS WFO in New Braunfels NWS meteorologist discusses storm type, total rainfall and timing SAOEM requests SARA to add Library of profiles in FloodWorks from USGS SIR Future Rainfall Bexar County Flood Warning System May
27 Widespread Future Rainfall - General 6, 12 and 24 hour profiles 6 Hour Distribution Source: USGS Scientific Investigations Report Hour Distribution Bexar County Flood Warning System May
28 Future Rainfall - Convective Thunderstorm Most in 1 st quarter 3, 6, 12 and 24 hour profiles 3 Hour Distribution Source: USGS Scientific Investigations Report Hour Distribution Bexar County Flood Warning System May
29 Future Rainfall - Tropical Landfalling tropical systems Wide variety of historic profiles 1 st, 2 nd, 3 rd and 4 th quartile 24 hour profiles 1 st Quartile Distribution Source: USGS Scientific Investigations Report nd Quartile Distribution Bexar County Flood Warning System May
30 Future Rainfall - Tropical Landfalling tropical systems Wide variety of historic profiles 1 st, 2 nd, 3 rd and 4 th quartile 24 hour profiles 3 rd Quartile Distribution Source: USGS Scientific Investigations Report th Quartile Distribution Bexar County Flood Warning System May
31 Interactive Website at EOC Bexar County Flood Warning System May
32 Details at Warning Location Local web design firm Updated SAOEM site Current and concise data SAOEM EOC SAFD Dispatch Swift Water Rescue SAPD/Sheriff evacuations Bexar County Flood Warning System May
33 Location Maps Bexar County Flood Warning System May
34 Real Time Inundation Mapping Available at RS locations Maximum inundation in 48 hour window Road closures Evacuation limits Water Velocity Water Depth Overall Maximum Bexar County Flood Warning System May
35 Future Rainfall System Summary NEXRAD 15 min from NWS Rain Gages Level Gages SAOEM EOC NWS Hydrometric Database Western Configuration FloodWorks Server at SARA office Website Central Configuration XML Website Parser Eastern Configuration SARA Web Server Bexar County Flood Warning System May
36 BCFWS Operations Rainfall event is forecast SARA switches FloodWorks from 6 hours to 15 minutes SAOEM call with NWS WFO in New Braunfels NWS discusses type, total rainfall and timing SAOEM requests SARA to add for Western, Central, Eastern SARA adds from library of profiles in FloodWorks Provides 1 to 5 hours of lead time (NWS call & travel timing) Western Central Eastern Bexar County Flood Warning System May
Creating a Flood Forecasting System for the San Diego River Watershed
Creating a Flood Forecasting System for the San Diego River Watershed Rand Allan County of San Diego Flood Control Martin J. Teal, P.E., P.H., D.WRE WEST Consultants inc. OUTLINE San Diego River Watershed
More informationHydrologic Calibration:
Hydrologic Calibration: UPDATE OF EFFECTIVE HYDROLOGY FOR MARYS CREEK October 2010 Agenda Background Hydrologic model Calibrated rainfall Hydrologic calibration 100 year discharges, Existing Conditions
More informationTHE WATER IS RISING SCALABLE, RELIABLE, AND RELEVANT INFORMATION SUPPORTING FIRST RESPONDERS. May 3, 2017
THE WATER IS RISING SCALABLE, RELIABLE, AND RELEVANT INFORMATION SUPPORTING FIRST RESPONDERS May 3, 2017 Association of State Floodplain Managers 2017 Conference Jim Keith, PE, CFM Walter P Moore Andy
More informationTitle Advanced Hydraulic Modeling to Support Emergency Action Plans
Title Advanced Hydraulic Modeling to Support Emergency Action Plans Abstract Freese and Nichols, Inc. (FNI) developed an Emergency Action Plan (EAP) for a Levee Improvement District (LID) located in a
More informationA Hydrologic Study of the. Ryerson Creek Watershed
A Hydrologic Study of the Ryerson Creek Watershed Dave Fongers Hydrologic Studies Unit Land and Water Management Division Michigan Department of Environmental Quality May 8, 2002 Table of Contents Summary...2
More informationIntegrating HEC HMS generated flow hydrographs with FLO-2D. Nanda Meduri, PE, PMP, CFM Seth Lawler Venkata Dinakar Nimmala, CFM
Integrating HEC HMS generated flow hydrographs with FLO-2D Nanda Meduri, PE, PMP, CFM Seth Lawler Venkata Dinakar Nimmala, CFM Focus of this Presentation Introduction Methodology Challenges & Solutions
More informationSOUTHEAST TEXAS CONTINUING EDUCATION
EXAM No. 118 FLOOD - RUNOFF ANALYSIS 1. Information gained from flood - runoff analysis includes which one: A. Stage, discharge, volume. B. Measure depth, volume. C. Velocity, depth, storm occurrence.
More informationINITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR
INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR 257.82 EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part 257 and Part
More informationSan Luis Obispo Creek Watershed Hydrologic Model Inputs
Jeff Werst San Luis Obispo County Department of Public Works 1050 Monterey Street San Luis Obispo CA 93408 December 14, 2007 Subject: San Luis Obispo Creek Watershed Hydrology and Hydraulic Model Dear
More informationSECTION IV WATERSHED TECHNICAL ANALYSIS
A. Watershed Modeling SECTION IV WATERSHED TECHNICAL ANALYSIS An initial step in the preparation of this stormwater management plan was the selection of a stormwater simulation model to be utilized. It
More information5/25/2017. Overview. Flood Risk Study Components HYDROLOGIC MODEL (HEC-HMS) CALIBRATION FOR FLOOD RISK STUDIES. Hydraulics. Outcome or Impacts
HYDROLOGIC MODEL (HEC-HMS) CALIBRATION FOR FLOOD RISK STUDIES C. Landon Erickson, P.E.,CFM Water Resources Engineer USACE, Fort Worth District April 27 th, 2017 US Army Corps of Engineers Overview Flood
More informationSan Antonio Water System Mitchell Lake Constructed Wetlands Below the Dam Preliminary Hydrologic Analysis
San Antonio Water System enhancement. This recommendation was based on limited water quality data provided by SAWS and using a free-water surface constructed wetland with approximately 112 acres of wetted
More informationSECTION III: WATERSHED TECHNICAL ANALYSIS
Trout Creek Watershed Stormwater Management Plan SECTION III: WATERSHED TECHNICAL ANALYSIS A. Watershed Modeling An initial step this study of the Trout Creek watershed was the selection of a stormwater
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationHYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006
HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006 RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT TABLE OF CONTENTS
More informationThe South Carolina Extreme Rainfall Analysis-Understanding the Storm and Implications for Dam Safety
The South Carolina Extreme Rainfall Analysis-Understanding the Storm and Implications for Dam Safety Bill Kappel Applied Weather Associates Joe Bellini, PE, PH, D.WRE, CFM Aterra Solutions Dam Safety Conference,
More informationEstimating the 100-year Peak Flow for Ungagged Middle Creek Watershed in Northern California, USA
American Journal of Water Resources, 2014, Vol. 2, No. 4, 99-105 Available online at http://pubs.sciepub.com/ajwr/2/4/3 Science and Education Publishing DOI:10.12691/ajwr-2-4-3 Estimating the 100-year
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationHypothetical Flood Computation for a Stream System
US Army Corps of Engineers Hydrologic Engineering Center Hypothetical Flood Computation for a Stream System December 1968 Approved for Public Release. Distribution Unlimited. TP-12 REPORT DOCUMENTATION
More informationCase Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification
Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification Gregory J Daviero, PhD, PE, Principal Kevin Ruswick, PE, CFM, Associate May 2, 2014 Schnabel Engineering
More informationGain-Loss Study of Lower San Pedro Creek and the San Antonio River, San Antonio, Texas, May October 1999
In cooperation with the U.S. Air Force, Air Logistics Center, Kelly Air Force Base, Environmental Management Office Gain-Loss Study of Lower San Pedro Creek and the San Antonio River, San Antonio, Texas,
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part 257.82 PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part
More informationPA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN ANALYSIS
1 NEW JERSEY ASSOCIATION FOR FLOODPLAIN MANAGEMENT PRESENTATION FOR THE 10 TH ANNUAL CONFERENCE PA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN
More information2
1 2 3 4 5 6 The program is designed for surface water hydrology simulation. It includes components for representing precipitation, evaporation, and snowmelt; the atmospheric conditions over a watershed.
More informationCokato Lake (86-263) Wright County. Hydrologic Investigation
Cokato Lake (86-263) Wright County Hydrologic Investigation April 14, 2005 Cokato Lake (86-263) Wright County Hydrologic Investigation April 14, 2005 Problem Statement In recent years, heavy rainfall has
More informationHydrology and Water Management. Dr. Mujahid Khan, UET Peshawar
Hydrology and Water Management Dr. Mujahid Khan, UET Peshawar Course Outline Hydrologic Cycle and its Processes Water Balance Approach Estimation and Analysis of Precipitation Data Infiltration and Runoff
More informationBrian Rast, PE, CFM, PMP Lead Silver Jackets Coordinator, Kansas and Missouri Kris Lander, PE, CFM Hydrologist. June 4, 2015
Presentation to the Association of State Floodplain Managers Interagency Partnering for Flood Forecast Inundation Maps Brian Rast, PE, CFM, PMP Lead Silver Jackets Coordinator, Kansas and Missouri Kris
More informationAlternative Approaches to Water Resource System Simulation
US Army Corps of Engineers Hydrologic Engineering Center Alternative Approaches to Water Resource System Simulation May 1972 Approved for Public Release. Distribution Unlimited. TP-32 REPORT DOCUMENTATION
More informationCOUNTY OF KANE. Kishwaukee River Headwaters Study Stakeholder Meeting Monday, February 26, :30 am Hampshire Village Hall
COUNTY OF KANE ENVIRONMENTAL AND BUILDING MANAGEMENT Timothy Harbaugh, P.E., DEE Director County Government Center 719 Batavia Avenue Geneva, IL 60134 www.co.kane.il.us Environmental Management: (630)
More informationBMP Design Aids. w w w. t r a n s p o r t a t i o n. o h i o. g o v. Equations / Programs
BMP Design Aids 1 Equations / Programs Outlet Discharge Equations Hydrograph and Pond Routing Programs USGS StreamStats 2 Ohio Department of Transportation 1 Training Intent Introduction and overview of
More informationSuspended Sediment Discharges in Streams
US Army Corps of Engineers Hydrologic Engineering Center Suspended Sediment Discharges in Streams April 1969 Approved for Public Release. Distribution Unlimited. TP-19 REPORT DOCUMENTATION PAGE Form Approved
More informationComputer Determination of Flow Through Bridges
US Army Corps of Engineers Hydrologic Engineering Center Computer Determination of Flow Through Bridges July 1970 Approved for Public Release. Distribution Unlimited. TP-20 REPORT DOCUMENTATION PAGE Form
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or
More informationA&M WATERSHED MODEL USERS MANUAL WATER RESOURCES ENGINEERING
TWRI Special Report 90-1 A&M WATERSHED MODEL USERS MANUAL by: Wesley P. James Phillip W. Winsor, John F. Bell Melvin G. Spinks, Alfred J. Garcia Dan Pridal, John Warinner Kelly Kaatz, Veronica Morgan Mike
More informationChapter 1 Introduction
Engineering Hydrology Chapter 1 Introduction 2016-2017 Hydrologic Cycle Hydrologic Cycle Processes Processes Precipitation Atmospheric water Evaporation Infiltration Surface Runoff Land Surface Soil water
More informationTABLE OF CONTENTS. 1.0 Background Watershed Description Hydrology - HEC-HMS Models Hydraulics - HEC-RAS Models...
TABLE OF CONTENTS 1.0 Background... 1 2.0 Watershed Description... 1 3.0 Hydrology - HEC-HMS Models... 2 3.1 Hydrologic Approach... 2 3.2 Drainage Areas... 2 3.3 Curve Numbers... 2 3.4 Lag Times... 3 3.5
More informationUS Army Corps of Engineers Kansas City District. A Dam Safety Study Involving Cascading Dam Failures
A Dam Safety Study Involving Cascading Dam Failures Policy / Technical Issues How to account for the failure of other dams in the drainage basin How to account for the behavior of all basin dams acting
More informationDistribution Restriction Statement Approved for public release; distribution is unlimited.
CECW-EH-Y Regulation No. 1110-2-1464 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design HYDROLOGIC ANALYSIS OF WATERSHED RUNOFF Distribution Restriction
More informationPWD s Systematic Watershed-wide Approach to Stormwater Mgmt.
PWD s Systematic Watershed-wide Approach to Stormwater Mgmt. Jeffrey Featherstone, PhD Director, Center for Sustainable Communities, Temple University Paul DeBarry, PE, PH, GISP, D.WRE Director, Geospatial
More informationDRAINAGE STUDY CROWS LANDING INDUSTRIAL BUSINESS PARK. Stanislaus County. Prepared by:
DRAINAGE STUDY FOR CROWS LANDING INDUSTRIAL BUSINESS PARK Stanislaus County Prepared by: March, 2017 Revised November, 2017 Table of Contents EXECUTIVE SUMMARY... 1 1. INTRODUCTION... 2 2. HYDROLOGY...
More information4.1 General Methodology and Data Base Development
Chapter 4 METHODOLOGY 4.1 General and Data Base Development This report project utilized several computer software models and analysis techniques to create the numeric data on which decisions for this
More informationClimate and Land Use Consequences to 100-Year Flooding
Climate and Land Use Consequences to 100-Year Flooding Robert Roseen D.WRE, PE, PhD, Ann Scholz, PE, CPSWQ, Thomas Ballestero, PhD, PE, PH, UNH Stormwater Center Nebraska Post- Construction Stormwater
More informationIMPROVED MODELING OF THE GREAT PEE DEE RIVER: DOCUMENTATION IN SUPPORT OF FEMA APPEAL. Horry County, South Carolina
IMPROVED MODELING OF THE GREAT PEE DEE RIVER: DOCUMENTATION IN SUPPORT OF FEMA APPEAL Horry County, South Carolina July 15, 2016 CONTENTS 1 Introduction... 2 2 Hydrology... 3 3 HEC-RAS Model... 7 3.1 Cross
More informationGISHYDRO: Developing Discharges and Watershed Parameters
GISHYDRO: Developing Discharges and Watershed Parameters A Case Study with Baltimore City Watersheds by Mathini Sreetharan, Ph.D., P.E., CFM, Dewberry, VA Kim Dunn, P.E., CFM, Dewberry, PA Baltimore City
More informationTechnical Memorandum No River Geometry
Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.5 River Geometry Task: Collection and Analysis of River Geometry Data To: PRWFPA Staff Working Group Prepared by: J. Schaaf
More informationAnalyzing Flood Risk from the I&M Canal s Non-Levee Embankments A Modified Application of FEMA s Natural Valley Procedure
Analyzing Flood Risk from the I&M Canal s Non-Levee Embankments A Modified Application of FEMA s Natural Valley Procedure Tiffany Coleman, PE Senior Project Engineer Stantec/STARR September 10, 2015 How
More informationHydrologic Engineering Center. Training Course on. Hydrologic Modeling with HEC-HMS. Davis, CA. Course Description
Hydrologic Engineering Center Training Course on Hydrologic Modeling with HEC-HMS Davis, CA Course Description The course provides an introduction to HEC-HMS for new users, focusing both on using the program
More informationOutlet Structure Modeling
Watershed Modeling using HEC-RAS Outlet Structure Modeling Jeff Wickenkamp, P.E., CFM, D.WRE Patrick Lach, P.E. Hey and Associates, Inc. Water Resources, Wetlands and Ecology Outline of Presentation Why
More information5/25/2017. Overview. Project Background Information. Project Background Information Modeling Approach Model Development Results Next Steps
City of Corpus Christi Downtown 2D Mapping Effort Brandon Hilbrich, PE, CFM Jake Fisher, PE, CFM Curtis Beitel, PE, CFM 2016 HDR, Inc., all rights reserved. Overview Project Background Information Modeling
More informationAirport Master Plan. Floodplain Report. Prepared by: Prepared for: Illinois Department of Transportation
Airport Master Plan Floodplain Report Prepared by: Prepared for: Illinois Department of Transportation July 10, 2013 Table of Contents Topic Page Number Cover Sheet... Cover Sheet Table of Contents...
More informationSimulation of Daily Streamflow
US Army Corps of Engineers Hydrologic Engineering Center Simulation of Daily Streamflow April 1968 Approved for Public Release. Distribution Unlimited. TP-6 REPORT DOCUMENTATION PAGE Form Approved OMB
More informationINITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257
INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 HUFFAKER ROAD (PLANT HAMMOND) PRIVATE INDUSTRIAL LANDFILL (HUFFAKER ROAD LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion
More informationProject Summary: - Hydrologic Models. - LiDAR Based - 10 Synthetic Events - No Historic Events - 100yr Runoff is Largest - Assumes Even Rainfall
Project Summary: - Hydrologic Models Phase 2 Underway Nearly Completed (Park/Pembina EOY) - LiDAR Based - 10 Synthetic Events - No Historic Events - 100yr Runoff is Largest - Assumes Even Rainfall Phase
More informationHydrostatistics Principles of Application
US Army Corps of Engineers Hydrologic Engineering Center Hydrostatistics Principles of Application July 1969 Approved for Public Release. Distribution Unlimited. TP-15 REPORT DOCUMENTATION PAGE Form Approved
More informationHydrologic Engineering Center. Training Course on. Hydrologic Modeling with HEC-HMS April 2018 Davis, CA. Course Description
Hydrologic Engineering Center Training Course on Hydrologic Modeling with HEC-HMS 23-27 April 2018 Davis, CA Course Description The course provides an introduction to HEC-HMS for new users, focusing both
More informationBridge Replacement Project. Preliminary Hydraulic Study. Lincoln, California BRLS-5089 (021) BRIDGE 19C Mcbean Park Drive at Auburn Ravine
Bridge Replacement Project Preliminary Hydraulic Study Lincoln, California BRLS-5089 (021) BRIDGE 19C 0059 Mcbean Park Drive at Auburn Ravine Prepared By: Prepared By: Date 11/25/2014 Thomas S. Plummer
More informationPresentation Overview
Little Dry Creek Restoration Deep River Flood Risk Management Final Presentation to LCRBDC June 10, 2015 Presentation Overview Project Overview & Background Information Data Collection Model Development
More informationLOWER SWEETWATER CREEK
LOWER SWEETWATER CREEK STORMWATER MANAGEMENT MASTER PLAN Prepared for the Hillsborough County Board of County Commissioners By Public Works Department/Engineering Division Stormwater Management Section
More informationPilot Study for Storage Requirements for Low Flow Augmentation
US Army Corps of Engineers Hydrologic Engineering Center Pilot Study for Storage Requirements for Low Flow Augmentation April 1968 Approved for Public Release. Distribution Unlimited. TP-7 REPORT DOCUMENTATION
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment
More informationAPPENDIX J-3 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed, Airport Creek Hydrologic Models
APPENDIX J-3 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed, Airport Creek Hydrologic Models Introduction Technical Report on Airport Drainage Appendix J-3:
More informationSection 600 Runoff Table of Contents
Section 600 Runoff Table of Contents 601 INTRODUCTION...600-1 602 RATIONAL METHOD...600-1 602.1 Rational Method Formula...600-2 602.2 Time of Concentration...600-2 602.3 Intensity...600-4 602.4 Runoff
More informationLAKE COUNTY HYDROLOGY DESIGN STANDARDS
LAKE COUNTY HYDROLOGY DESIGN STANDARDS Lake County Department of Public Works Water Resources Division 255 N. Forbes Street Lakeport, CA 95453 (707)263-2341 Adopted June 22, 1999 These Standards provide
More informationReservoir on the Rio Boba
Reservoir on the Rio Boba Michael J. Burns II Guillermo Bustamante J. James Peterson Executive Summary The National Institute of Water Resources in the Dominican Republic (INDRHI) plans to construct a
More informationRisk. Management Center
Risk Hydro-Metrologic Modeling Tools for Water Management and Analysis Management Center US Army Corps of Engineers William Charley Hydrologic Engineering Center Institute for Water Resources June 2016
More informationSAW MILL RIVER DAYLIGHTING ANALYSIS AT RIVER PARK CENTER
SAW MILL RIVER DAYLIGHTING ANALYSIS AT RIVER PARK CENTER Prepared for: Struever Fidelco Cappelli LLC McLaren Project No. 6 August 28 TABLE OF CONTENTS. INTRODUCTION 2. SAW MILL RIVER: FEMA STUDY... 2..
More informationDRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E.
\ Memorandum SSPEED Center at Rice University Department of Civil & Environmental Engineering 6100 Main MS-317 Houston, Texas 77005-1827 sspeed.rice.edu tel: 713-348-4977 To Andy Yung, P.E. CFM; Lane Lease,
More informationChicago Waterways Tail Water Conditions Modeling
MEMORANDUM Chicago Waterways Tail Water Conditions Modeling TO: FROM: Tim Coleman, Phil Bonn, CH2MHILL Marion Kessy, FLUIDCLARITY DATE: June 1, 2008 PROJECT NUMBER: FCL 7000 Purpose This memorandum is
More informationHYDROLOGY WORKSHEET 1 PRECIPITATION
HYDROLOGY WORKSHEET 1 PRECIPITATION A watershed is an area of land that captures rainfall and other precipitation and funnels it to a lake or stream or wetland. The area within the watershed where the
More informationMODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1. Precipitation
Watershed MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1 A watershed is an area of land thaaptures rainfall and other precipitation and funnels it to a lake or stream or wetland. The area within the watershed
More informationNote that the Server provides ArcGIS9 applications with Spatial Analyst and 3D Analyst extensions and ArcHydro tools.
Remote Software This document briefly presents the hydrological and hydraulic modeling software available on the University of Nice Server with Remote Desktop Connection. Note that the Server provides
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationAlternatives for Willow Creek Flood Mitigation Study
Alternatives for Willow Creek Flood Mitigation Study Presented by: Anil Tangirala, PE, CFM, ENV SP ms consultants, inc. June 22, 2016 Presentation Overview Introduction Project Background Willow Creek
More information1 THE USGS MODULAR MODELING SYSTEM MODEL OF THE UPPER COSUMNES RIVER
1 THE USGS MODULAR MODELING SYSTEM MODEL OF THE UPPER COSUMNES RIVER 1.1 Introduction The Hydrologic Model of the Upper Cosumnes River Basin (HMCRB) under the USGS Modular Modeling System (MMS) uses a
More informationThe Challenge of Urban Flooding. Steve Eubanks, P.E., CFM Burton Johnson, P.E., CFM Brenda Gasperich, P.E., CFM Jeff Whanger, P.E., S.I.
The Challenge of Urban Flooding Steve Eubanks, P.E., CFM Burton Johnson, P.E., CFM Brenda Gasperich, P.E., CFM Jeff Whanger, P.E., S.I.T, CFM The Challenge Typically older parts of town Long-term
More informationEngineering Report Preliminary Floodplain Study. Executive Summary
Executive Summary Engineering Report Preliminary Floodplain Study The Federal Emergency Management Agency (FEMA) has updated the Flood Insurance Rate Maps (FIRM) for Finney County, including the City of
More informationBear Creek Dam and Reservoir NID# OR Douglas County, Oregon
Bear Creek Dam and Reservoir NID# OR00614 Douglas County, Oregon FINAL Dam Breach Study and Flood Inundation Mapping March, 2009 Prepared for: The City of Drain, Oregon 129 West C Avenue Drain, OR 97435
More informationModeling a Complex Hydraulic Environment Using a 1-D Approach Supplemented with Simple 2-D Principles Manas Borah Ed Dickson June 5, 2014
ASFPM 2014 Annual Conference Modeling a Complex Hydraulic Environment Using a 1-D Approach Supplemented with Simple 2-D Principles Manas Borah Ed Dickson June 5, 2014 Agenda Overview and Background Hydrology
More informationUpper San Jacinto River Regional Watershed Flood Mitigation Plan Preliminary Scope of Services. July 2, 2018
INTRODUCTION BACKGROUND Upper San Jacinto River Regional Watershed Flood Mitigation Plan Preliminary Scope of Services In August 2017, Hurricane Harvey struck the Texas coast, bringing a historic amount
More informationwater resource specialists
Memorandum Northwest Hydraulic Consultants 16300 Christensen Road, Suite 350 Seattle, WA 98188 206.241.6000 206.439.2420 (fax) DATE: January 7, 2011 PROJECT: 21865 TO: Jerry Schuster AGENCY: City of Edmonds
More informationPrepared for: City of Jeffersonville. November Prepared by
JEFFERSONVILLE STORMWATER MASTER PLAN HYDRAULICS APPENDIX JEFFERSONVILLE, INDIANA Prepared for: City of Jeffersonville November 2011 Prepared by Christopher B. Burke Engineering, Ltd. 115 W. Washington
More informationThe Iowa Watershed Approach
Larry Weber Director, IIHR Hydroscience & Engineering Larry-weber@uiowa.edu 1 North Kickoff Raccoon meeting River follow-up Watershed Project Update 2 Review: National Disaster Resilience Competition Funder:
More informationPermeable Pavement Hydrologic Modeling
Permeable Pavement Hydrologic Modeling Robin Kirschbaum, PE, LEED AP Alice Lancaster, PE April 24, 2013 Presentation Overview Overview of Hydrologic Modeling Performance Standards Modeling Guidelines,
More informationAPPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY)
APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY) Hydromodification design criteria for the North Orange County permit area are based on the 2- yr, 24-hr
More informationHEC-HMS Modeling Summary: Cherry Creek Basin Tributary to Cherry Creek Dam
HEC-HMS Modeling Summary: Cherry Creek Basin Tributary to Cherry Creek Dam October 2008 Prepared by: U.S. Army Corps of Engineers, Omaha District Hydrology Section - Hydrologic Engineering Branch 66 Capitol
More informationIntroduction to Hydrology, Part 2. Notes, Handouts
Introduction to Hydrology, Part 2 Notes, Handouts Precipitation Much of hydrology deals with precipitation How much? How frequently/infrequently? What form? How quickly? Seasonal variation? Drought frequency?
More informationRETENTION BASIN EXAMPLE
-7 Given: Total Tributary Area = 7.5 ac o Tributary Area within Existing R/W = 5.8 ac o Tributary Area, Impervious, Outside of R/W = 0.0 ac o Tributary Area, Pervious, Outside of R/W = 1.7 ac o Tributary
More informationTerm Project. NFIE-River: Cross section approximations for hydraulic channel routing model in the San Antonio and Guadalupe River Basins.
Flood Forecasting Spring - 2015 Due Friday 05/08/2015 Alfredo Hijar Term Project NFIE-River: Cross section approximations for hydraulic channel routing model in the San Antonio and Guadalupe River Basins.
More informationRadar-based flood forecasting: Quantifying hydrologic prediction uncertainty
Severe Storms Prediction and Global Climate Impact on the Gulf Coast, Rice University, October 29 31, 2008 Radar-based flood forecasting: Quantifying hydrologic prediction uncertainty Baxter E. Vieux,
More informationHYDROLOGIC & HYDRAULIC ASPECTS of the Walnut Street Bridge over the Schuylkill River Philadelphia, PA
HYDROLOGIC & HYDRAULIC ASPECTS of the Walnut Street Bridge over the Schuylkill River Philadelphia, PA J. Richard Weggel CAEE201 Lectures 30 April & 2 May 2007 HYDROLOGY (Natural Science) Study of the waters
More informationThe prioritization list along with the estimated probable construction cost and future cost index is shown in Table 1.
EXECUTIVE SUMMARY To address flooding concerns and assess costs of potential capital improvement projects associated with flooding in the downtown Town Center Area Plan (TCAP), the Town of Cary commissioned
More informationRainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area
Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area Bruce McEnroe, Bryan Young, Ricardo Gamarra and Ryan Pohl Department of Civil, Environmental, and Architectural
More informationWatershed Response to Water Storage. 8/1/2012 Paul Wymar Scientist Chippewa River Watershed Project
Watershed Response to Water Storage 8/1/2012 Paul Wymar Scientist Chippewa River Watershed Project Chippewa River Watershed 1.3 Million Acres Largest tributary watershed in the Minnesota River Basin 7
More informationInflow Design Flood Control System Plan for Louisa Generating Station CCR Impoundment. MidAmerican Energy Company
Control System Plan for Louisa Generating Station CCR Impoundment MidAmerican Energy Company October 10, 2016 Control System Plan for Louisa Generating Station CCR Impoundment Prepared for MidAmerican
More informationHey and Associates, Inc.
Hey and Associates, Inc. Table 1: 100-Year Study Existing Conditions Discharges and Elevations vs. FIS Results Location Existing FIS Q (cfs) Existing FIS Elevation Existing XP- SWMM Q (cfs) Existing XP-SWMM
More informationCVEN 339 Summer 2009 Final Exam. 120 minutes allowed. 36 Students. No curve applied to grades. Median 70.6 Mean 68.7 Std. Dev High 88 Low 24.
CVEN 339 Final Exam 120 minutes allowed 36 Students No curve applied to grades Median 70.6 Mean 68.7 Std. Dev. 13.7 High 88 Low 24.5 Name: CVEN 339 Water Resources Engineering Summer Semester 2009 Dr.
More informationAppendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South
Appendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South Fork Dead Horse Slough in the, California Draft Location
More informationAbstract. What is big data? Successfully overcoming big data and big analysis challenges for the California Central Valley Hydrology Study
Successfully overcoming big data and big analysis challenges for the California Central Valley Hydrology Study At left: San Joaquin River Basin reservoir operation model schematic. The model includes 35
More informationTechnical Memorandum. Hydraulic Analysis Smith House Flood Stages. 1.0 Introduction
Technical Memorandum Hydraulic Analysis Smith House Flood Stages 1.0 Introduction Pacific International Engineering (PIE) performed a hydraulic analysis to estimate the water surface elevations of the
More information