TENDER DOCUMENT. TENDER No.: BHI/PI-(S)/675/1005 FOR
|
|
- Maximillian Holt
- 6 years ago
- Views:
Transcription
1 TENDER DOCUMENT TENDER No.: BHI/PI-(S)/675/1005 FOR Tender for Construction of Civil works above pile cap for 5 Nos of RCC Mixing Bins (Silos) of Storage Capacity 500MT (each) and columns, beams independent of SILOS upto 32m height for Augmentation of Fuel & Flux Crushing Facilities. (Package - 064), Bhilai at VOLUME IV (Price Bid) ENGINEERING PROJECTS (INDIA) LIMITED (A GOVT. OF INDIA ENTERPRISE) B- 252, Street No.-5, Smriti Nagar, Bhilai, Chhattisgarh
2 Name of Work : Construction of RCC column 2 nos. 32 mtr. height in Silo area of Augmentation of Fuel & Flux Price Bid Sl. No. Description Unit Qty. I I-1 I-2 Column/Beam Providing and laying in position machine batched and matchine mixed design mix M25 grade cement concrete for reincored cement concrete works in column, beam at all heights and levels excluding cost of centering, shuttering and reinforcement including admixture to accelerate, retard setting of concrete, improve workability all as per specification, approved drawing Providing and fixing Steel reinforcement for R.C.C. work of column, beam, circular beam & hoppers at all heights and lvevels using high yield strength deformed bars confirming to Grade Fe 415/ Fe 500 of IS: 1786 or equivalent TMT bars including straightening, cutting, bending, placing in position and binding all complete and as per cum 60 MT 12 words)
3 I-3 II Providing and fixing Centering and Shuttering including strutting, propping, etc. and removal of form for column/beam except circular beams and hoppers at all heights as per the specification and drawings enclosed. Structural & Embedments sqm 300 II-1 Supply, Fabrication & Erection of Inserts including edge protection angle as per specification. MT 1.0 II-2 Supply, Fabrication & Erection of Anchor Bolts as per Specification. Total cost MT 0.5 (Price Bid)
4 Name of Work Sr. No. Particular Current Bill Up to Previous Bill Total Bill Gross bill Value Cost of civil Work as per Annexure Attached A] Value of Labour services is ----%of Gross Billing Amount Net Cost of Labour Value is Rs Add:- Service 12% Education 2% Higher Education 1% Value of Supply items B] Total Supply Value VAT of 14% of 5% [A+ B] Gross Total Less :- Deduction 1) Mobilisation Advance 2) Security Deposit 3) W.C.T. 4) L.T.D.S. 5) Other Deduction Balance Receivable For
5 Annexure-A Name of Work : Construction of Civil works above pilecap for "5 nos. RCC Mixing Bins ( Silos) of storage capacity 500MT (each) for the Augmentation of Fuel & Flux crushing facilities (PKG-064) of Bhilai Steel Plant at Chattisgarh PRICE BID Sl. No. Description Unit Quantity words) I I-1 I-2 Column/Beam/Circular beam/hopper Providing and laying in position machine batched and matchine mixed design mix M25 grade cement concrete for reincored cement concrete works in column, beam, circular beam & hoppers at all heights and levels excluding cost of centering, shuttering and reinforcement including admixture to accelerate, retard setting of concrete, improve workability all as per specification, approved drawing and the direction of Engineer-in-charge. Providing and fixing Steel reinforcement for R.C.C. work of column, beam, circular beam & hoppers at all heights and lvevels using high yield strength deformed bars confirming to Grade Fe 415/ Fe 500 of IS: 1786 or equivalent TMT bars including straightening, cutting, bending, placing in position and binding all complete and as per the approved drawings enclosed. cum 350 MT 127
6 Sl. No. I-3 Description Unit Quantity providing and fixing Centering and Shuttering including strutting, propping, etc. and removal of form for column/beam except circular beams and hoppers at all heights as per the specification and drawings enclosed. sqm 983 words) I-4 II II-1 II-2 Providing and fixing Circular Shuttering works for circular beams and hoppers at all heights as per the specification and the drawings enclosed. Silo shell work Providing and laying in position machine batched and matchine mixed design mix M25 grade cement concrete for reincored cement concrete works in Silo shell at all heights excluding cost of centering, shuttering and reinforcement including admixture to accelerate, retard setting of concrete, improve workability all as per specification a, approved drawings and the directions of Engineer-in-charge. Providing and fixing Steel reinforcement for R.C.C. work of Silo shell at all heights using high yield strength deformed bars confirming to Grade Fe 415/ Fe 500 of IS: 1786 or equivalent TMT bars including straightening, cutting, bending, placing in position and binding all complete and as per the approved drawings enclosed sqm 484 cum 580 MT 99
7 Sl. No. Description Unit Quantity words) II-3 Providing and fixing Slip form shuttering arrangements with all tools & tackles for silo shell at all heights and as per the direction of Engineer-in-charge. sqm 4480 III III-1 III-2 III-3 Deck slab works Providing and laying in position machine batched and matchine mixed design mix M25 grade cement concrete for reincored cement concrete works in deck slab at all heights excluding cost of centering, shuttering and reinforcement including admixture to accelerate, retard setting of concrete, improve workability all as per the specification, approved drawings and the direction of Engineer-in-charge. Providing and fixing Steel reinforcement for R.C.C. work of Deck slab at all heights using high yield strength deformed bars confirming to Grade Fe 415/ Fe 500 of IS: 1786 or equivalent TMT bars including straightening, cutting, bending, placing in position and binding all complete and as per the approved drawings enclosed. Providing and fiximg Shuttering with deck sheet for Deck slab including welding / belts for connection of sheets and structural steel beams wherever necessary & as per the approved drawing cum 58 MT 6 sqm 368
8 Sl. No. (P ric IV Description Unit Quantity providing and fixing Centering and Shuttering including strutting, propping, etc. and removal of form for kerb wall on deck slab at all heights as per the specification and drawings enclosed. Structural & Embedments sqm 29 words) IV-1 IV-2 Providing, fabrication & fixing of MS insert plates on slab & silo walls, insert for handail fixing on kerb wall of deck slab and bolts in corbel in posotion for the purpose of erection of portal frames which is not inder this scope. All work shall be as per the specification, drawings enclosed and the direction of Engineer-incharge. Erection of fabricated structural steel beams in position as per the specification,drawings enclosed and the direction of Engineer-in-charge MT 3.4 MT 24 Total cost
TENDER DOCUMENT. TENDER No.: BHI/PI(S)/675/1007 FOR
TENDER DOCUMENT TENDER No.: BHI/PI(S)/675/1007 FOR Tender for supply of perforated cable tray for the Project of - Augmentation of Fuel & Flux Crushing Facilities (Pkg- 064) for Bhilai Steel Plant at Chhattisgarh
More informationBOQ for Lintel, Chajja, Brick work & Plastering work at Pkg. - III - Phase - I
BOQ for Lintel, Chajja, Brick work & Plastering work at Pkg. - III - Phase - I S.No. Description Unit Qty RATE Amount PART-I CIVIL WORKS B-PLAIN AND REINFORCED CEMENT CONCRETE : Notes : ( the following
More informationPRICED BILL OF QUANTITIES
Engineering Projects (dia) Limited (A Govt of dia Enterprise) Words 1 EARTH WORK 1.1 Earth work in excavation by mechanical means (Hydraulic Excavator) / Manual means over areas (exceeding 30 cm in depth,
More informationEstimate FOR THE SEPTIC TANK
Estimate FOR THE SEPTIC TANK S.NO ITEM DESCRIPTION. 1 Excavation in soil,soft & hard murum... Qty UNIT Rate Excavation for footing, machine foundation, plinth beams, wall footing, gutters,brick wall, tanks
More informationSCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI.
SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST RAIGARH, MUMBAI. Tender Reference No. BL/LI/CC/TCWMUM/BOUNDARY WALL/1617/04
More informationCIVIL WORKS Mahesh G. Nair
MEASUREMENT BOOK SUNIL Date Work Order Contractor : : EARTH WORKS CIVIL WORKS Mahesh G. Nair GROUND FLOOR 1 EARTH WORKS EXCAVATION : Earth work excavation for foundation trenches in all classes of soil
More informationMISHRA DHATU NIGAM LIMITED P.O.KANCHANBAGH, HYDERABAD. Part-II (PRICE BID)
MISHRA DHATU NIGAM LIMITED P.O.KANCHANBAGH, HYDERABAD Part-II (PRICE BID) RETROFITTING OF B5 & C5 COLUMNS OF FORGE SHOP, MIDHANI, KANCHANBAGH, HYDERABAD-58. PURCHASE DEPARTMENT Tender Notice No: MDN/PUR/AP2061032/ADVT/146/16-17
More informationGUJARAT ENERGY TRANSMISSION CORPORATION LTD. Division Office,Jamla, 220 kv Sub-Station Compound
GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Division Office,Jamla, 220 kv Sub-Station Compound Website : www.gseb.com Phone No. 02764 280551 E-mail : eetrjamla.getco@gebmail.com TENDER NO : JTD 14 Technical
More informationWORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00
Description Page No Summary Amount Summary 1/7 230,694.60 22,019.25 22,642.65 2/6 96,801.30 80,150.60 114,056.00 Total Per Unit (MYR) 327,495.90 102,169.85 136,698.65 Total Unit(s) X 1 2 2 Total Per Type
More informationDESIGN CRITERIA. Allowable Stress Design (ASD) AISC-1999.
DESIGN CRITERIA 1. INTRODUCTION This appendix summarizes the codes, standards, criteria, and practices that are generally used in the design and construction structural engineering system for the Sarker
More informationName of Work: - Providing PVC Coated GI Chain Link Fencing around Pond in NISER Campus, Jatni. Dt
Name of Work: - Providing PVC Coated GI Chain Link Fencing around Pond in NISER Campus, Jatni NIT No. & Date: - NISER/IWD-Civil/Services/2016/08 Dt-27.10.2016. Estimated Cost of Tender: - 4, 41,733.00
More informationPRE-CAST HOUSE CONSTRUCTION
PRE-CAST HOUSE CONSTRUCTION BDA is a Planning and Development Authority Jurisdictional Area is 1370 sq.km. Developed 64 Layouts Distributed 1,40,000 of sites Developed Infrastructure Works like Ring Roads
More informationTENDER INVITATION FOR CONSTRUCTION OF 06 NOS. FOUR MULTI PURPOSE SHEDS MULTI PURPOSE SHEDS AT DIFFERENT BEEJ NIGAM FARMS UNDER RKVY.
M.P.RAJYA BEEJ EVAM FARM VIKAS NIGAM (An ISO 9001:2008 certified Organization) (MP Govt. Undertaking) 36, BEEJ BHAWAN MOTHER TERESA MARGARERA HILLS BHOPAL Phone:0755-2775048, 2571368 FAX: 0755-2775042
More informationComparative Study of R.C.C and Steel Concrete Composite Structures
RESEARCH ARTICLE OPEN ACCESS Comparative Study of R.C.C and Steel Concrete Composite Structures Shweta A. Wagh*, Dr. U. P. Waghe** *(Post Graduate Student in Structural Engineering, Y.C.C.E, Nagpur 441
More informationSCHEDULE A BILL OF QUANTITIES Part - I : Road Work
Sl.Pg.No.193 Name of Work : Construction of 36.0 m. wide road and storm water drains along BPCL compound wall at Dronagiri, Navi Mumbai. SCHEDULE A BILL OF QUANTITIES Part - I : Road Work 1. Demarcation
More information4.6 Procedures for Connections
4.6 Procedures for Connections This section provides Tier 2 evaluation procedures that apply to structural connections: anchorage for normal forces, shear transfer, vertical components, interconnection
More informationDESIGN SPECIFICATION FOR FOUNDATIONS
FOR HINDUSTAN PETROLEUM CORPORATION LTD. VISAKH REFINERY DHT PROJECT JOB NO. : 6261 DOCUMENT NO. : A-6261-110-006 TOTAL NO. OF PAGES: 11 (INCLUDING THIS PAGE) 0 16-11-2009 FOR APPROVAL
More informationIITMRP - BUILDING EXTERNAL SERVICES - CIVIL WORKS - BILL OF QUANTITIES - GAS BANK AND SEWAGE COLLECTION TANKS
CONSTRUCTION OF NEW BUILDINGS (PHASE - 2) FOR IIT MADRAS RESEARCH PARK IITMRP - BUILDING EXTERNAL SERVICES - CIVIL WORKS - BILL OF QUANTITIES - GAS BANK AND SEWAGE COLLECTION TANKS Sr. No. Particulars
More informationBrahmaputra Cracker and Polymer Limited SCHEDULE OF RATES
SCHEDULE OF RATES NAME OF WORK: EXECUTION PACKAGE I (Part-A: Earthwork in Railway Formation & Part-B: Laying of Railway Track), FOR RAIL INFRASTRUCTURE OF BRAHMAPUTRA CRACKER AND POLYMER LIMITED (BCPL)
More informationElevated Slab Sequence
Elevated Slab Sequence The following group of photos shows the sequence for installa4on of a one- way elevated slab. (Slab & Beam with Reinforcing & Post- Tensioning) Columns Placed & Form Support (Scaffolding)
More informationDescription Unit Quantity Rate Kshs. Amount Kshs.
BILL No.1 40m3 MASONRY STORAGE TANK No. Description Unit Quantity Rate Kshs. Amount Kshs. 1 SETTING OUT AND EARTH WORKS 1.1 General site clearance and setting out 1.2 Excavate over site 200mm to remove
More informationInstalling DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site
Installing DELTABEAM Installation of DELTABEAM These DELTABEAM installation instructions are intended to complement the project s erection plan. Peikko s technical support can help with the erection plan
More informationGUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410
GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 Note to user: These guide specifications are provided by Mid- States Concrete Products as a service to you; they are NOT specific
More informationBill of Quantity (BOQ)
PAL 10-92895 - Emergency Removal and Crushing of Rubble and Debris Management Lot # 10: Site Preparation and Crushing of Concrete Rubble Bill of Quantity (BOQ) Bill of Quantity (BOQ) ITB 2015-039 PREAMBLE
More informationA-One Polar Ltd. Bhulta,Rupgonj,Narayangonj. ( , ) 27th April 2014
1 A-One Polar Ltd Bhulta,Rupgonj,Narayangonj. (23.754782,90545710) 27th April 2014 2 Observations Observations Knitting & Garments building Building 1 1 3 4 Observations Roof structure: no roof bracing
More informationSTOCKHOLDING DOCUMENT MANAGEMENT SERVICES LIMITED FORMERLY KNOWN AS SHCIL PROJECTS LIMITED
STOCKHOLDING DOCUMENT MANAGEMENT SERVICES LIMITED FORMERLY KNOWN AS SHCIL PROJECTS LIMITED REQUEST FOR PROPOSAL (RFP) 130616 FOR SUPPLY INSTALLATION AND COMMISSIONING OF STEEL MEZZANINE FLOORING AT MAHAPE
More informationBALMER LAWRIE & CO. LTD. 32, Sattangadu Village, Manali, Chennai Phone: /628, Fax No:
BALMER LAWRIE & CO. LTD. 32, Sattangadu Village, Manali, Chennai 600068 Phone: 044-25946621/628, Fax No: 044-25941436 Email No: srinivas.pcs@balmerlawrie.com DUE DATE & TIME: [16/02/2018 at 15:00 Hrs.]
More informationNTPC Ltd. KORBA VOLUME-II (FINANACIAL BID) Consultants
NTPC Ltd. KORBA OPEN TENDER NOTICE NO.RITES/GGM/NGP/T-07-2015, DATED 05.03.2015 Name of work: Earthwork in Drain Foundation, construction of minor bridges and RCC drain, P-Way works etc for the construction
More information1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.
PAGE 051200-1 SECTION 051200 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,
More informationSeismic Detailing of RC Structures (IS: )
Seismic Detailing of RC Structures (IS:13920-1993) Sudhir K Jain Indian Institute of Technology Gandhinagar November 2012 1 Outline This lecture covers: Covers important clauses of IS13920 With particular
More informationUNIT III Earthwork Estimation & Reinforcement Estimation
SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road 517583 QUESTION BANK (DESCRIPTIVE) Subject with Code : ECV(13A01605) Year & Sem: IV-B.Tech & I-Sem Course & Branch: B.Tech
More informationMEJA URJA NIGAM PVT. LIMITED
MEJA URJA NIGAM PVT. LIMITED NAME OF WORK: TENDER AND CONTRACT DOCUMENT FOR Supply of PSC Sleepers, P-Way materials (except rails) including Points & Crossings, Laying and linking of track including Points
More informationSCOPE OF WORK FOR PILING JOB
SCOPE OF WORK FOR PILING JOB 1.0 PURPOSE This document defines the scope of works and specific requirements for the tank pad construction including pile foundation system for the proposed tanks at Wadala
More informationLifting Sockets. Flat Lifting Sockets
Lifting sockets are widely used in the application of precast concrete construction, such as lifting beams, wall and floor slabs etc.. A reinforcement bar is to be inserted through the cross hole to transfer
More informationBILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil
United Nations Development Programme Programme of Assistance to the Palestinian People-PAPP Construction and Rehabilitation of wadi Gaza Bridges PAL10-00054031 Funded by Government of Brazil BILL OF QUANTITIES
More informationCode Requirements for Nuclear Safety-Related Concrete Structures (ACI ) and Commentary An ACI Standard
ACI 349-06 Code Requirements for Nuclear Safety-Related Concrete Structures (ACI 349-06) and Commentary An ACI Standard Reported by ACI Committee 349 Ronald J. Janowiak Chair Hansraj G. Ashar Partha S.
More informationSPECIAL REQUIREMENTS FOR PROCUREMENT OF HEAVY DUTY RACKS ASSEMBLY TERMS & CONDITIONS OF RFP 1. The bidder is to submit compliance for each item with reference to Technical Evaluation Matrix and Commercial
More informationSECTION US Patent 8,857,130 B1 CAST-IN-PLACE CONCRETE WITH ARDEX CONCRETE MANAGEMENT SYSTEMS (ACMS ) EARLY MC APPLICATION
ARDEX GUIDE SPECIFICATION ARDEX CONCRETE MANAGEMENT SYSTEMS (ACMS ) Cast-In-Place Concrete to Receive the ARDEX Concrete Management Systems including ARDEX Self-Leveling Underlayments SECTION 03 30 00
More informationItem 442 Metal for Structures
Item 442 Metal for Structures 1. DESCRIPTION 2. MATERIALS Provide structural steel, high-strength bolts, forgings, steel castings, iron castings, wrought iron, steel pipe and tubing, aluminum castings
More informationCANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE
CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE This specification is intended to describe the general requirements applicable to a proper structural cantilever rack design. In addition, it is
More informationSTATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014
STATE STRUCTION FUND DIRECTIVE 5-1 Issue date: October 2014 STRUCTURAL STEEL 1. General: It is the Fund's policy that the design of the structural steel is the prime responsibility of the project's Structural
More informationDesign and Estimation of Reinforced Building: A Case Study
Design and Estimation of Reinforced Building: A Case Study Akshay Chaudhary 1, Payal Sachdeva 2, Maninderpal Singh 3 1, 2 (Assistant Professor, Department of Civil Engineering, CGC Technical Campus, Jhanjeri,
More informationC H E N N A I M E T R O R A I L L I M I T E D A D D E N D U M - 1
C H E N N A I M E T R O R A I L L I M I T E D C H E N N A I M E T R O R A I L P R O J E C T P H A S E - 1 E X T E N S I O N A D D E N D U M - 1 T O B I D D I N G D O C U M E N T S for CONTRACT ATW-07 Installation,
More informationTENDER FOR SUPPLY, PROVIDING & FIXING HEAVY DUTY PVC FLOORING FOR M/S BALMER LAWRIE & CO LTD 21, NETAJI SUBHASH ROAD KOLKATA
TENDER FOR SUPPLY, PROVIDING & FIXING HEAVY DUTY PVC FLOORING FOR M/S BALMER LAWRIE & CO LTD AT 21, NETAJI SUBHASH ROAD KOLKATA 700 001 TENDER REFERENCE ADMIN / 12 CORRSP TENDER NO: - 11/2015-2016 DATED
More informationMarch 3, Addendum No. 1
March 3, 2017 Addendum No. 1 North Branch Riverwalk: Underbridge Connection at Addison Street from Clark Park to California Park CDOT Project No. E-9-121 Specification No. 133860 For which proposals will
More informationINTERNSHIP REPORT GOUTHAM.J
INTERNSHIP REPORT GOUTHAM.J M.E Structural Engineering SNS College of Technology, Coimbatore Mail : tcegoutham@gmail.com TEEMAGE PRECAST IN College Road, 1st Cross Street, Tirupur 641602. TamilNadu, India.
More informationBANK OF INDIA. TENDER DOCUMENT PART B (Financial Bid) Last Date of submission of Tenders: BOQ
BANK OF INDIA ELECTRICAL & DATA CABELING WORK OF CHANDIGARH SME CITY CENTRE/ BRANCH/ZONAL OFFICE OF BANK OF INDIA AT SCO 76-82, SECTOR 31-A, CHANDIGARH TENDER DOCUMENT PART B (Financial Bid) Last Date
More informationStructural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)
Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction
More informationSection 906. STRUCTURAL STEEL
906.01 Section 906. STRUCTURAL STEEL 906.01. General Requirements. Finished rolled shapes must be free from imperfections that affect strength and durability in accordance with ASTM A 6. Rolled shapes
More informationREQUIREMENTS FOR CONCRETE MIX DESIGN
REQUIREMENTS FOR CONCRETE MIX DESIGN Requirements of concrete mix design should be known before calculations for concrete mix. Mix design is done in the laboratory and samples from each mix designed is
More informationPRECAST CEMENT PRODUCTS
Profile No.: 30 NIC Code: 23959 PRECAST CEMENT PRODUCTS 1. INTRODCUTION: Reinforced cement concrete products are becoming popular as modular house and apartment buildings are based on standard designs.
More informationThe difference is Guidance for the preparation of Deck Manufacturing Schedules
The difference is Guidance for the preparation of Deck Manufacturing Schedules innovation, commitment, support. 2 Guidance for the preparation of Deck Manufacturing Schedules Minimum Requirements for Schedule
More informationD D TYPE A1, A2 & B MICHIGAN DEPARTMENT OF TRANSPORTATION 5-40 CONNECTION. L4" x 4" x 3/8" Brace. C8 x 4.25 Strut. WT9 x 17.5.
Sign length minus Adjust to avoid interference with sign legend A Deck fascia A 6" Equal Equal 6" Sign length (L) varies 6 to 12 PLAN 0 CONNECTION (DECK FASCIA) Angle connection assembly F Face of concrete
More informationUNION BANK OF INDIA STAFF COLLEGE
UNION BANK OF INDIA STAFF COLLEGE Proposed Furniture Works in Class Rooms at Union Bank of India Staff College, Kalkere Post, Bannerghatta Road, BENGALURU 560 083. TENDER FOR FURNITURE WORKS TECHNICAL
More informationChallenging Skew: Higgins Road Bridge over I-90
Challenging Skew: Higgins Road Bridge over I-90 Lance Peterman, P.E.,S.E. 13th Annual Midwest Bridge Symposium April 28, 2016 2014 HDR, all rights reserved. Presentation Outline Project Overview Design
More informationS.No Description Unit Quantity Rate (Rs) Amount (Rs)
, S.No Description Unit Quantity Rate (Rs) Amount (Rs) 1 2 Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge method and preparation
More informationConcreting (UNDER CONSTRUCTION)
Concreting (UNDER CONSTRUCTION) Clauses From IS 456 10.2 Batching To avoid confusion and error in batching, consideration should be given to using the smallest practical number of different concrete
More informationWATER WORKS SECTION भ रत य प र द य स स थ खड़गप र Indian Institute of Technology, Kharagpur TENDER NOTICE
WATER WORKS SECTION भ रत य प र द य स स थ खड़गप र Indian Institute of Technology, Kharagpur TENDER NOTICE No. : IIT/WW/2017-18/ 35 Dt. : 19.01.2018 The Sr. Executive Engineer (Water Works), IIT Kharagpur
More informationGUJARAT ENERGY TRANSMISSION CORPORATION LIMITED SARDAR PATEL VIDYUT BHAVAN RACE COURSE, VADODARA
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED SARDAR PATEL VIDYUT BHAVAN RACE COURSE, VADODARA - 390 007 TENDER FOR Supply, Erection, Testing and Commissioning of 220/132/66KV C & R Panels and SCADA
More informationCIVIL ENGINEERING YEAR QUESTION BANK
CE 6505-DESIGN OF RC ELEMENTS CIVIL ENGINEERING SEM- V YEAR 2015-16 STAFF NAME: THIVAKAR.S A/P QUESTION BANK Subject Name: DESIGN OF RC ELEMENTS Subject Code: CE6505 PART-A UNIT I 1. What are the advantages
More informationPayment due to variation in prices of materials after receipt of tender
CLAUSE 10 CA Payment due to variation in prices of materials after receipt of tender If after submission of the tender, the price of materials specified in Schedule F increases/ decreases beyond the price(s)
More information1. Cast-in-place concrete is specified in Section
SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record
More informationModel # 358-R48. 7/7/2011 Page 1 of 11
Model # 358-R48 7/7/2011 Page 1 of 11 7/7/2011 Page 2 of 11 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic
More informationInvestigation on Behaviour of Reinforced Concrete Beam Column Joints Retrofitted with FRP Wrapping
International Journal of Civil Engineering Research. ISSN 2278-3652 Volume 5, Number 3 (2014), pp. 289-294 Research India Publications http://www.ripublication.com/ijcer.htm Investigation on Behaviour
More informationBILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil
United Nations Development Programme Programme of Assistance to the Palestinian People-PAPP Construction and Rehabilitation of wadi Gaza Bridges PAL10-00054031 Funded by Government of Brazil BILL OF QUANTITIES
More informationComparative Study on Post - Tensioned and Reinforced Concrete flat Slab Systems for a Multistory Building
Comparative Study on Post - Tensioned and Reinforced Concrete flat Slab Systems for a Multistory Building Thayapraba M Civil Department, NIT Trichy, (India) ABSTRACT Designers have a huge number of choices
More informationSTRUCTURE AND BRIDGE DIVISION
VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Corrosion Resistant Reinforcing Steels (CRR) SPECIFIC SUBJECT: Plan Modifications
More informationKANTI BIJLEE UTPADAN NIGAM LIMITED (KBUNL) (A Joint Venture of NTPC Ltd. And BSEB ) SCHEDULE (BILL) OF QUANTITIES (Percentage Rate Contract)
KANTI BIJLEE UTPADAN NIGAM LIMITED (KBUNL) (A Joint Venture of NTPC Ltd. And BSEB ) TENDER NO. 39/OT/R/KBUNL-MTPP/Formation /PKG- II/2013 Dated 27.08.2013 Tender and Contract document for earthwork in
More informationPremier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017
Premier Inn, Wilson Street, Middlesbrough, TS1 1AE Site progress report February 2017 Site set up Currently 4 weeks in to the build the site has been cleared and hoardings have been erected. Welfare cabins
More informationCURRICULUM FOR STEEL FIXER
CURRICULUM FOR STEEL FIXER 6-MONTHS (Certificate course) National Vocational & Technical Training Commission, Islamabad (February, 20) CONTENTS Training Objectives... 3 Curriculum Salient Points... 3 Skill
More informationFAILURES IN STEEL STRUCTURES : A COLLECTION OF CASE STUDIES
FAILURES IN STEEL STRUCTURES : A COLLECTION OF CASE STUDIES Surovi Ganguly Senior General Manager, Tata Consulting Engineers Limited, Sheriff Centre, 73/1 St. Marks Road Bangalore 560001, India. E-mail:
More informationSECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
SECTION 220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationInternational Journal of Engineering Trends and Technology (IJETT) Volume 25 Number 3- July 2015
ANALYSIS AND DESIGN OF STEEL CANOPY WITH HOT WELDED PIPES Yaswanth gorantla #1, Dr. B. Panduranga Rao #2, V.Ramesh #3 #1,2,3 Department of Civil Engineering V R Siddhartha Engineering College Vijayawada,
More informationGUJARAT STATE ELECTRICITY CORPORATION LTD. KUTCH LIGNITE THERMAL POWER STATION, SKV NAGAR, TAL: LAKHPAT, KUTCH
GUJARAT STATE ELECTRICITY CORPORATION LTD. KUTCH LIGNITE THERMAL POWER STATION, SKV NAGAR, TAL: LAKHPAT, KUTCH - 370 601.... TECHNICAL BID e-tender KLTPS-01 WE-214 RFQ-21397 TENDER BOOKLET Name of Work:
More informationQuotation Notice for installation of 20 Street Lights in Kaloor JLN Stadium premises
Quotation Notice for installation of 20 Street Lights in Kaloor JLN Stadium premises Kochi Metro Rail Ltd (KMRL), Invites quotation for Supply, Installation, Testing and Commissioning of decorative cast
More informationThe Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee
The Structural Redesign of Boyds Bear Country and its Related Systems Included in this Presentation: Background and Existing System Proposal Problem / Solution Structural System Redesigns Pre-cast Concrete
More informationSection 9: Concrete STANDARD SPECIFICATION FOR ROAD WORKS KERAJAAN MALAYSIA JABATAN KERJA RAYA MALAYSIA J KR/SPJ/ JKR
r J KR/SPJ/2008-59 JKR 20403-0004-08 KERAJAAN MALAYSIA JABATAN KERJA RAYA MALAYSIA STANDARD SPECIFICATION FOR ROAD WORKS Section 9: Concrete CAWANGAN I
More informationTalk to us, THE SMART DECKING PEOPLE Visit or Global Roofing Solutions Bond-Dek Composite Deck
Talk to us, THE SMART DECKING PEOPLE Visit www.globalroofs.co.za or email info@globalroofs.co.za Global Roofing Solutions Bond-Dek Composite Deck Bond-Dek composite deck Bond-Dek is a composite steel flooring
More informationSECTION CLIMBING WALLS
SECTION 13120-1 PART 1 - GENERAL 1.1 SUMMARY A. This section includes the following: 1. Custom Climbing Wall. B. Related Sections 1. Section Structural Steel 2. Section Rough Carpentry 3. Finishes 1.2
More information: Supply, Installation, Testing &Commissioning of 2 Nos. Façade cleaning Roof Top Trolleys at SCOPE Minar, Laxmi Nagar, Delhi
SCOPE Minar/MMO/17-18/173 15/12/2017 NOTICE INVITING TENDER Subject: Supply, Installation, Testing &Commissioning of 2 Nos. Facade cleaning Roof Top Trolleys at SCOPE Minar, Laxmi Nagar, Delhi-110092.
More informationSmarter. Safer. Leaner.
Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter
More informationfischer Test Report Fixing Tests for Bison Hollow Core Slabs
fischer Test Report Fixing Tests for Bison Hollow Core Slabs Testing on Bison Hollow Core Slabs 1. Introduction Contents Test Parameters Bison Hollow Core Slab Information 2. Fixings Products Tested FISV
More informationCouncil on Tall Buildings
Structure Design of Sino Steel (Tianjin) International Plaza Xueyi Fu, Group Chief Engineer, China Construction Design International 1 1 Brief of Project 2 Location: Tianjin Xiangluowan Business District
More informationThe Ultimate Structural Engineering Software Package!
RCsolver Superior Concrete Design Software by Deep Excavation LLC in association with Civil Engineering Department of A.U.TH. The Ultimate Structural Engineering Software Package! Deep Excavation LLC proudly
More information16. Design of Pipeline Structures.
16. Design of Pipeline Structures. a. General. 1) The following guidelines are for the design of structures for water and sewer pipelines including structural concrete and miscellaneous metals design.
More informationTECHNICAL BID. Name of the party :
TENDER FORM FOR QUOTED RATE FOR THE SUPPLY OF. TENDER FORM II TECHNICAL BID Name of the party : --------------------------------------- Address : ---------------------------------------- ----------------------------------------
More informationTENDER SPECIFICATION
TENDER SPECIFICATION BHEL PSSR SCT 1324 FABRICATION & ERECTION OF STRUCTURAL STEEL IN POWER HOUSE, MILL BUNKER BAY, AUXILLIARY BUILDINGS AND PIPE RACK ETC FOR 2 X 600 MW TPP FOR TAMIL NADU ELECTRICITY
More informationPRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
325.0 957 100.130 F.L.=99.780 12205 2300 2300 2300 2720 125 EXPANSION GAP 125 EXPANSION GAP OUTER COVER PLATE 640X40X1070 938.5 1350 1350 1350 1282.5 1350 1350 1122.5 1350 1356.5 1356.5 1350 1122.5 1350
More informationParametric Comparison of Rectangular and Trapezoidal Box Girder Bridge Deck System
Parametric Comparison of Rectangular and Trapezoidal Box Girder Bridge Deck System Pragya Soni 1, Dr. P.S. Bokare 2 1Post graduate student in Civil Engineering, RSR Rungta college of Engineering and Technology,
More informationTERMS OF REFERENCE UPGRADING THE FISHERY SECTOR IN SOUTH SUDAN
UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION ORGANISATION DES NATIONS UNIES POUR LE DEVELOPPEMENT INDUSTRIEL TERMS OF REFERENCE UPGRADING THE FISHERY SECTOR IN SOUTH SUDAN CONSTRUCTION OF A FISH
More informationSEM.2016(01)-I CIVIL ENGINEERING. Paper -1. Please read each of the following instructions carefully before. attempting questions.
Roll No. Candidate should write his/her Roll No. here. Total No. of Questions : 5 No. of Printed Pages : 11 SEM.2016(01)-I CIVIL ENGINEERING Paper -1 Time : 3 Hours ] [ Total Marks : 300 Instructions to
More informationCONCRETE & MASONRY SAFETY
CONCRETE & MASONRY SAFETY Safety and Quality Relationship REINFORCING MISS-PLACED IN CONCRETE RESULTS IN WEAKEN STRUCTURE IMPROPER PLACEMENT OF LINTEL BEAMS INCORRECT MASONRY CEMENT OR GROUT MIX DESIGN
More informationGround + 4 floor RCC frame structure in Goa Floor to floor height is 3.0m Plan dimension, 24.0 m x 13.5 m SBC = 20 t/sqm, hard Strata is consider for
Ground + 4 floor RCC frame structure in Goa Floor to floor height is 3.0m Plan dimension, 24.0 m x 13.5 m SBC = 20 t/sqm, hard Strata is consider for seismic analysis Analysis done using structural designing
More information3. Bond, Anchorage and Shear This chapter will discuss the following topics:
3. Bond, Anchorage and Shear This chapter will discuss the following topics: Outline the theory of calculating the anchorage bond length. Determination of anchorage bond length, tension lap length and
More information1 Site Preparation & marking L.S 1, brickwork in basement in cm 1: cft 19,975.00
GURUKULAM' TRUST CHILDREN SCHOOL KOVALAM - CHENNAI ESTIMATE FOR CONSTRUCTION OF THREE CLASS ROOMS - GROUND + TWO FLOORS BUILDING - INCLUDING STAIR-CASE Plinth area : Class Room - 28.50 x 23.25 = 662.625
More informationFor uploading No. PHC/TB/ EE (NAG)/ S. P. Wardha/2200/2013 Date: - 18/06/2013. To, Contractors / Bidders
For uploading PHC/TB/ EE (NAG)/ S. P. Wardha/2200/2013 Date: - 18/06/2013 To, Contractors / Bidders Sub: - Construction of Administrative Office Building for S. P. Wardha at Wardha including all infrastructural
More informationSEISMIC ANALYSIS OF SIX STOREYED RC FRAMED BUILDING WITH BRACING SYSTEMS
SEISMIC ANALYSIS OF SIX STOREYED RC FRAMED BUILDING WITH BRACING SYSTEMS ABSTRACT Megha Kalra Assistant Professor, The North Cap University, Gurgaon(India) Multistoreyed buildings are most affected by
More informationBISON PRECAST FLOORING SPECIFICATION
BISON PRECAST FLOORING SPECIFICATION 1.0 SCOPE OF THE SPECIFICATION 1.01 Relates to: This specification covers the design, manufacture and associated site work of the following types of floors:- Hollowcore
More informationSECTION REINFORCING STEEL
SECTION REINFORCING STEEL 1. DESCRIPTION This specification shall govern the furnishing and placing of reinforcing steel, deformed and smooth, of the size and quantity designated on the plans and in accordance
More informationSCHEDULE A BILL OF QUANTITIES Part - I : Construction of Road
Sl.Pg.No.193 Name of Work : Construction of 20.0 m. wide road in Sector 16 under 12.5% scheme around Shelghar Village at Ulwe Node, Navi Mumbai. SCHEDULE A BILL OF QUANTITIES Part - I : Construction of
More information