1 Alabama A&M University Thigpen Hall Renovations Project No ADDENDUM NUMBER 3 SECTION ADDENDUM NUMBER 3 PARTICULARS 1.01 DATE: MAY 11, PROJECT: THIGPEN HALL RENOVATIONS 1.03 PROJECT NUMBER: B. C. NO OWNER: ALABAMA A&M UNIVERSITY 1.05 ARCHITECT: NOLA VAN PEURSEM ARCHITECTS, PC TO PROSPECTIVE BIDDERS 2.01 THIS ADDENDUM FORMS A PART OF THE CONTRACT DOCUMENTS AND MODIFIES THE BIDDING DOCUMENTS DATED APRIL 6, 2018, WITH AMENDMENTS AND ADDITIONS NOTED BELOW ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE SPACE PROVIDED IN THE PROPOSAL FORM. FAILURE TO DO SO MAY DISQUALIFY THE BIDDER THIS ADDENDUM CONSISTS OF 9 PAGES. CHANGES TO THE PROJECT MANUAL 3.01 SECTION SUPPLEMENTARY INSTRUCTIONS TO BIDDERS: A. Paragraph 1.03.B Change paragraph to read as follows, All sealed bids will be received by 2:00 p.m. CDT on May 24, 2018 at which time each bidder must submit a sealed envelope properly titled containing two copies each of the Proposal form, and the Bid Bond. Bids will be held unopened until 3:00 p.m. CDT at which time each bidder must submit a sealed envelope properly titled containing one copy each of the Accounting of Sales Tax - ABC Form C-3A form, and List of Alternates (Section Supplement C). Upon receipt of these documents the bids will be publicly opened and read aloud. Supplement A List of Subcontractors (section ) is to be hand delivered or ed to the Architect within 24 hours after receipt of bids. No changes to the base bid will be allowed after 2:00 p.m SECTION SUMMARY: A. Paragraph 1.03.A: Attached herewith are the minutes and sign-in sheet of the Pre-Bid Conference held on May 9, SECTION ALLOWANCES: A. Add Paragraph 1.04.H to read as follows: H. Include the stipulated sum of $25, in the base bid for floor reinforcements if the existing concrete strength is less than 3,500 PSI, per drawings S-1.0 General Notes. If

2 Alabama A&M University Thigpen Hall Renovations Project No ADDENDUM NUMBER 3 floor reinforcements are not required per drawing S-1.0 General Notes then Contractor shall return allowance to Owner SECTION CONSTRUCTION PROGRESS SCHEDULE: A. Replace this section in its entirety. CHANGES TO THE DRAWINGS 4.01 DRAWING A-1.1 DEMOLITION FIRST FLOOR PLAN: A. Demolition Notes: Note 8 Change note to read as follows, Remove wood paneling, trim and associated furring. B. Partial Enlarged First Floor Demo Plan: Remove note 27 from Lobby L106, Corridor L107, Mens L105, Storage L110, and Womens L111. (Abatement contractor will remove these ceilings) DRAWING A-1.4 FIRST FLOOR PLANS: A. Construction Notes: Note 12 Change note to read as follows, Install 5/8 inch gypsum board on 7/8 inch furring channels to deck where wood paneling has been removed (Type X at rated walls). B. Partial Enlarged floor Plan: In Isometrics L107, add note #1 at the stair, stair landing and ramps DRAWING A-2.0 BUILDING SECTION: A. Section 1/A-2.0: Change note reading 1½ in S.S. Handrail to read 1½ inch steel pipe handrail paint DRAWING A-4.0 REFLECTED CEILING PLANS: A. Detail 5/A-4.0: 1. Change note reading Paint everything above ceiling line (7-6 ) Black to read Paint everything above ceiling line (8-0 ) Black including conduit, wire mold, junction boxes, etc. 2. Add note at ceiling edge trim to read, Armstrong Axiom 2 inch Classic Trim or equal DRAWING S-2.1 FIRST FLOOR PLAN: A. Remove drawing tags 1, 2, and 3. B. Remove note 3 requiring core drilling. (The owner has hired a consultant for this work) DRAWING P-1.0 PLUMBING SCHEDULES & LEGEND: A. Plumbing Fixture Schedule: Change description of P7 to read, Terrazzo shower basin and trap guard (tile and trim by others). END OF ADDENDUM NUMBER 3

3 Alabama A&M University Thigpen Hall Renovations PRE-BID CONFERENCE May 9, :00 am MINUTES Rob VanPeursem with Nola Van Peursem Architects introduced Pam Bruce also with Nola VanPeursem Architects, Jerry Latham and Vindetta Medlock with Alabama A&M and Tyce Hudson and Brandon Tucker with Turner Construction. A sign in sheet was passed around and is attached for the Contractor s use. Brandon Tucker with Turner Construction explained their role as Construction Managers. They will be the Owner s representatives and will help all members of the design and construction team achieve success. General Contractors & Electrical, Mechanical & Plumbing contractors have been Pre-Qualified and the lists of approved contractors were issued in addendum #1. The Bid Date, Location and Procedures were discussed. The contractors were instructed to include all properly executed forms for Accounting of Sales Tax, Unit Prices, and Alternates. Do not qualify bids. The Project Funding Source is local. Sales tax is NOT to be included in the bid and the accounting of Sales Tax Form shall be included with the bid. Alternates were discussed and can be found in the Project Manual - See Section Allowances were discussed and can be found in the Project Manual- See Section The Contract Schedule was discussed. Work may begin after notice-to-proceed. Onsite work may begin after asbestos removal July 16 th and Substantial Completion is noted in section as April 30 th, There will be Liquidated Damages as Noted in Appendix C Supplementary Conditions of the Contract. Permit Requirements were discussed. The Alabama Building Commission has reviewed and approved the plans. The Alabama Building Commission will issue a Permit & Fees will be charged. No City of Huntsville building permit is required. The Huntsville Fire Marshall is reviewing the plans and addenda will be issued if changes are required. The following Contract Considerations were discussed- - Be aware of long lead-time items. - The E-Verify Program will be enforced. - See the Project Schedule Submission and Update Requirements Section The number of sets of prints to be turned over to the contractor after award of contract is to be five. CAD files of civil and architecture base floor plans are available for submittal purposes. It is the contractor s responsible to incorporate addenda items into the hard copy and any electronic files of the construction documents. - A full-time superintendent is required as noted in Section Specific finish materials and colors have been requested by owner/users. Substitutions for the finishes may be submitted for approval but must match exactly,

4 - Other substitutions must meet design intent, with burden of proof and coordination on the Contractor and his supplier to ensure that adequate space, clearance, and accessibility is available within the design for a properly functioning system. Any costs incurred by changes will be the Contractor s burden. See each spec section to confirm required Installer Qualifications - Subcontractors are required to be familiar with requirements of all documents, not just documents specific to their trade The following Site Conditions were discussed- - See the attached Logistics Plan for Work Limits. Fencing will be at the discretion of the contractor - The jobsite is on an active college campus and University activity must not be disturbed. Contractor shall work during hours as permitted by city ordinance. Other hours will require permission by the Owner. - Existing Electric and Water Utilities will be owner furnished - Be mindful of traffic control and keep roads clean. - Firearms and tobacco (including electronic and chewing) are strictly prohibited on campus. The following Up Coming Addenda were discussed- - Pre-bid meeting minutes and sign-in sheet - Detail of hall ACT cloud edge - Scheduling Consultant requirements - Delete 3 required core samples shown on Structural drawing S-2.1 (Owner has hired a testing agency to do this work) - Allowance for structural changes based on concrete strength results will either be removed if test shows appropriate strength or moved to Allowance section if needed. - The Bid Date is changing to May 24 th The following Questions were asked 1.) Should the contractor reuse the existing furring devices behind the removed wood paneling or include new furring channels between the CMU and new gypsum board wall finishes? Include new furring channels per Addendum #3 2.) Are the fire alarm devices in the basement only installed if Alternate #3 is accepted? This will be clarified by a future addendum. 3.) Are the terrazzo shower basins part of the plumbing contractors work requirements? Yes, the terrazzo shower basins are to be included in the contract. 4.) Will stainless steel handrails be required or will they be painted steel? All handrails shall be painted steel not stainless steel and will be noted in Addendum #3. 5.) Will the asbestos contactor be removing the ceilings in the Lobby area? The asbestos contractor will be removing the Lobby area ceilings. This will be noted in Addendum #3. 6.) Who will be responsible for removing the camera attached to the ceiling in the Lobby? The asbestos contractor will need to remove the camera on the Lobby ceiling and turn it over to the owner. 7.) Are the poles the data fiber is shown on across campus existing? Yes, the poles are existing. 8.) Where are the new Communication Rooms? The new Communication rooms are shown on the Electrical drawings. 9.) Is the VCT shown in the basement Stair part of the base bid? Yes, the stair finishes in the basement are part of the base bid. 10) The asbestos contractor will reinstall the existing light fixtures after asbestos removal.if Alternate #5 is not accepted. Submit all additional questions at least 48 hours before the bid. Send to Nola VanPeursem Architects: - Melinda Brooks: melinda@nvparchitects.com - Pam Bruce: pam@nvparchitects.com

5

6 Op R oa lay en da Co -do spa va lay ord wn ce p i o l. a i a ff wi do na r b k lim l th w te i e n f g co n o a d i o t st & rc ns n dit oa lay on tru an io dd cti as nal t d r ow ac iti on ne ou o t or n m ed td na an ed oo l ag b r er asi. s Google Maps Green line above designates path for construction access to project site. Gate off Covington Road to Thigpen will be responsibility of contractor to lock and unlock each day. Thigpen Hall Initial Logistics Plan - 4/30/2018

7 Alabama A&M University Thigpen Hall Renovations Project No CONSTRUCTION PROGRESS SCHEDULE SECTION CONSTRUCTION PROGRESS SCHEDULE PART 1 GENERAL 1.01 SECTION INCLUDES A. Preliminary schedule. B. Construction progress schedule, bar chart type RELATED SECTIONS A. Section Summary: Work sequence REFERENCES A. AGC (CPSM) - Construction Planning and Scheduling Manual; B. M-H (CPM) - CPM in Construction Management - Project Management with CPM; O'Brien; SUBMITTALS A. Within 5 days after date established in Notice to Proceed, submit preliminary schedule.. B. If preliminary schedule requires revision after review, submit revised schedule within 5 days. C. Submit updated schedule every 30 days. D. Submit under transmittal letter form specified in Section QUALITY ASSURANCE A. Contractor shall furnish, at a minimum, a monthly, published update of the project schedule in CPM (Critical Path Method) format for review with the Owner, Architect and Construction Manager. Schedule shall designate the critical path in red and initial schedule shall publish target dates of activities to compare against for future published schedules. This work shall be performed within scheduling software that automatically updates the critical path. Schedule shall, include approximately 50 items but should not exceed 75 items of activity. Activities shall not exceed more than 20 working days in duration. Should an activity exceed the noted duration limit, activity should be divided based on areas to achieve the 20 working day duration. Should the critical path change as a result of a progress update, contractor shall provide written explanation of the cause for such a change to be agreed to by the Owner, Architect and the Construction Manager. B. Contractor's Administrative Personnel: Five years minimum experience in using and monitoring CPM schedules on comparable projects SCHEDULE FORMAT A. Listings: In chronological order according to the start date for each activity. Identify each activity with the applicable specification section number. B. Diagram Sheet Size: Maximum 24 x 36 inches or width required. C. Sheet Size: Multiples of 8-1/2 x 11 inches. D. Scale and Spacing: To allow for notations and revisions.

8 The University of Alabama in Huntsville Student Services Building - Copy Project No CONSTRUCTION PROGRESS SCHEDULE PART 2 PRODUCTS - NOT USED PART 3 EXECUTION 3.01 PRELIMINARY SCHEDULE A. Prepare preliminary schedule in the form of a horizontal bar chart CONTENT A. Show complete sequence of construction by activity, with dates for beginning and completion of each element of construction. B. Identify each item by specification section number. C. Identify work of separate stages and other logically grouped activities. D. Provide sub-schedules for each stage of Work identified in Section E. Provide sub-schedules to define critical portions of the entire schedule. F. Include conferences and meetings in schedule. G. Show accumulated percentage of completion of each item, and total percentage of Work completed, as of the first day of each month. H. Coordinate content with schedule of values specified in Section I. Provide legend for symbols and abbreviations used BAR CHARTS A. Include a separate bar for each major portion of Work or operation. B. Identify the first work day of each week REVIEW AND EVALUATION OF SCHEDULE A. Participate in joint review and evaluation of schedule with Architect at each submittal. B. Evaluate project status to determine work behind schedule and work ahead of schedule. C. After review, revise as necessary as result of review, and resubmit within 10 days UPDATING SCHEDULE A. Maintain schedules to record actual start and finish dates of completed activities. B. Indicate progress of each activity to date of revision, with projected completion date of each activity. C. Update diagrams to graphically depict current status of Work. D. Identify activities modified since previous submittal, major changes in Work, and other identifiable changes. E. Indicate changes required to maintain Date of Final Completion. F. Submit reports required to support recommended changes. G. Provide narrative report to define problem areas, anticipated delays, and impact on the schedule. Report corrective action taken or proposed and its effect.

9 The University of Alabama in Huntsville Student Services Building - Copy Project No CONSTRUCTION PROGRESS SCHEDULE 3.06 DISTRIBUTION OF SCHEDULE A. Distribute copies of updated schedules to Contractor's project site file, to Subcontractors, suppliers, Architect, Owner. B. Instruct recipients to promptly report, in writing, problems anticipated by projections shown in schedules. END OF SECTION

SECTION NETWORK ANALYSIS SCHEDULES (NCA)

SECTION NETWORK ANALYSIS SCHEDULES (NCA) PART 1- GENERAL 1.1 DESCRIPTION: SECTION 01 32 16.13 NETWORK ANALYSIS SCHEDULES (NCA) SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Coordinate this section with the paragraphs of FAR

More information

SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT DOCUMENT BID PROPOSAL

SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT DOCUMENT BID PROPOSAL DOCUMENT 00 41 13 BID PROPOSAL TO: SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT, a California Community College District, acting by and through its Board of Trustees ("the District"). FROM: (Name of

More information

BID PACKAGES 3-21, Addendum No. 03

BID PACKAGES 3-21, Addendum No. 03 WEBER MURPHY FOX Addendum Date: January 23, 2018 Bid Due Date: January 26, 2018 BID PACKAGES 3-21, Addendum No. 03 to the Plans and Specifications for Cuyahoga Community College West Science and IT Labs

More information

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk REQUEST FOR PROPOSAL Construction Management Services Not at Risk The St. Charles County Ambulance District proposes to retain a qualified firm/team for the Construction Management Services Not at Risk

More information

TECHNICAL QUESTIONS FOR ITB-DOT-17/ LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE

TECHNICAL QUESTIONS FOR ITB-DOT-17/ LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE TECHNICAL QUESTIONS FOR ITB-DOT-17/18-7004LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE Question 1: Question 2: Question 3: Question 4: Question 5: Question 6: When area configurations

More information

Addendum # 1 Perdue Stadium Seating Bowl Improvements Date of Addendum: 09/07/16

Addendum # 1 Perdue Stadium Seating Bowl Improvements Date of Addendum: 09/07/16 Wicomico County Purchasing 125 N. Division St. Room B-3 Salisbury, MD 21801 Ph. 410-548-4805 Fax 410-334-3130 Email: purchasing@wicomicocounty.org Addendum # 1 Perdue Stadium Seating Bowl Improvements

More information

ADDENDUM NO. 3. IFB J Emergency Communication Center Renovation and Addition Project

ADDENDUM NO. 3. IFB J Emergency Communication Center Renovation and Addition Project ADDENDUM NO. 3 DATE: May 26, 2017 INVITATION FOR BID: DATED: May 4, 2017 RECEIPT DATE: May 31, 2017 OPENING DATE: June 1, 2017 SUBJECT: Ladies/Gentlemen: Please take note of the following: Receipt/Opening

More information

March 6, Subject: Addendum No. 2 Invitation for Bid No Toyota Park Transit Center Phase II. Ladies and Gentlemen:

March 6, Subject: Addendum No. 2 Invitation for Bid No Toyota Park Transit Center Phase II. Ladies and Gentlemen: March 6, 2018 Subject: Addendum No. 2 Toyota Park Transit Center Phase II Ladies and Gentlemen: This Addendum No. 2 is being issued to provide responses to questions submitted by potential bidders and

More information

All Approved Contractors / Interested Parties Re: ADDENDUM #1 Project: Burton ISD Rock Building Renovation Date: April 9, 2015

All Approved Contractors / Interested Parties Re: ADDENDUM #1 Project: Burton ISD Rock Building Renovation Date: April 9, 2015 T S G TSG Architects AIA 427 Saint George, Suite 300 Gonzales, Texas 78629 8 3 0. 6 7 2. 7 8 0 1 8 3 0. 6 7 2. 4 3 4 0 f a x Member of the American Institute of Architects To: All Approved Contractors

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA This section is used for projects under $1,000,000 use other section if more than $1M SECTION 01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION PART 1 - GENERAL 1.1 SCOPE A. Preliminary Contract Schedule, Contract

More information

Ogden Regional Medical Center Courtyard Remodel. Construction Documents. MountainStar Healthcare PROJECT MANUAL FOR

Ogden Regional Medical Center Courtyard Remodel. Construction Documents. MountainStar Healthcare PROJECT MANUAL FOR PROJECT MANUAL FOR Ogden Regional Medical Center 5475 South 500 East Ogden, UT 84405 for MountainStar Healthcare Construction Documents NJRA Architects, Inc. 5272 South College Dr. Murray, Utah 84123 Telephone:

More information

SOLICITATION ADDENDUM NO. 1 RFP THE FOLLOWING CHANGES TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED.

SOLICITATION ADDENDUM NO. 1 RFP THE FOLLOWING CHANGES TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED. Beaverton School District Capital Program Purchasing 16550 SW Merlo Road, Beaverton, OR 97006 Phone: 503-591-4539 SOLICITATION ADDENDUM NO. 1 RFP 15-0013 THE FOLLOWING CHANGES TO THE ABOVE CITED SOLICITATION

More information

Both envelopes must have the following information in the lower left hand corner:

Both envelopes must have the following information in the lower left hand corner: SECTION 001116 INVITATION TO BID The City of Morgantown is requesting a bid for masonry restoration for the City Hall Building in Morgantown, WV. The Project is for building envelope rehabilitation including

More information

JMU Capital Projects SWaM Outreach Event Presentations

JMU Capital Projects SWaM Outreach Event Presentations JMU Capital Projects SWaM Outreach Event Presentations Kjellstrom + Lee Contact: Jessica Marcus jmarcus@kjellstromandlee.com Project: College of Business Renovation/Expansion Please contact Kjellstrom

More information

Forsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101

Forsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101 Forsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101 Request for Qualifications Construction Manager at Risk (CMAR) INSTRUCTIONS

More information

Johns Hopkins University APL Building 201 December 5, Rob Dahms,

Johns Hopkins University APL Building 201 December 5, Rob Dahms, INVITATION TO BID BID DUE DATE: January 5, 2018 TO: 1:00 PM Rob Dahms, rdahms@tcco.com MWSDBE OUTREACH/ PRE-BID CONFERENCE: LOCATION: December 19, 2017 Tentative 9:00 AM JHU APL Building 200, 1 st Floor

More information

LEVEL I PREQUALIFICATION DOCUMENTS

LEVEL I PREQUALIFICATION DOCUMENTS Project No. LEVEL I PREQUALIFICATION DOCUMENTS for MUIR BIOLOGY BUILDING 3RD FLOOR RENOVATION University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North Torrey Pines Road La Jolla,

More information

LEIPSIC LOCAL SCHOOLS Locker Room Alterations Leipsic, Ohio B ADDENDUM NO. 1

LEIPSIC LOCAL SCHOOLS Locker Room Alterations Leipsic, Ohio B ADDENDUM NO. 1 March 22, 2013 LEIPSIC LOCAL SCHOOLS Locker Room Alterations Leipsic, Ohio B2-4393 ADDENDUM NO. 1 This Addendum becomes a part of the Contract Documents and modifies them only to the extent herein set

More information

Addendum No. 1 Page 1 of 2

Addendum No. 1 Page 1 of 2 Addendum No. 1 Page 1 of 2 DATE: March 14, 2016 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Bidders SUBJECT: Addendum No. 1 PROJECT NAME: Parking Lot S7 Improvements JJC PROJECT

More information

Division 09 FINISHES TABLE OF CONTENTS

Division 09 FINISHES TABLE OF CONTENTS Division 09 FINISHES TABLE OF CONTENTS 09 1000 GENERAL... 3 A. RELATED SECTIONS... 3 B. MAINTENANCE OF FINISHES... 3 C. PUBLIC AREAS... 3 D. CUTTING AND PATCHING... 3 E. CLEANING... 3 F. RECOMMENDED FLOORING

More information

University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA 01003

University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA 01003 University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA 01003 May 16, 2016 Addendum #1 Contract Number: UMA16-25 Project Number: 1000730 Speedtype: 157194 Title:

More information

The following shall be incorporated into the Contract Documents dated 26 MAR 2018.

The following shall be incorporated into the Contract Documents dated 26 MAR 2018. ADDENDUM NO. 2 DATE: April 12, 2018 PROJECT: OWNER: BID DATE: Munising Public Schools Mather Elementary Renovation Munising Public Schools Friday, April 20, 2018 at 10:00 a.m. The following shall be incorporated

More information

The Town will coordinate with the adjacent property Owner for access allowing work to the East side of the building.

The Town will coordinate with the adjacent property Owner for access allowing work to the East side of the building. ADDENDUM #1 EXTERIOR REPAIRS YOUTH SERVICES BUREAU 63 LINDEN STREET MANCHESTER, CT 06040 BID #15/16-68 S/P+A PROJECT NO. 15.207 DATE: March 15, 2016 The following changes to the Drawings and Project Specifications

More information

Construction Contract Basics

Construction Contract Basics PDHonline Course P120 (2 PDH) Construction Contract Basics Instructor: Kevin D. Waddell, P.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org

More information

LEVEL I PREQUALIFICATION DOCUMENTS GEISEL RESTROOM RENOVATIONS

LEVEL I PREQUALIFICATION DOCUMENTS GEISEL RESTROOM RENOVATIONS Project No. 5005/A4L-424/ 962520 LEVEL I PREQUALIFICATION DOCUMENTS for GEISEL RESTROOM RENOVATIONS University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North Torrey Pines Road La

More information

NC State University OESAD GUIDELINES Contract Year

NC State University OESAD GUIDELINES Contract Year July 1, 2014 NC State University OESAD GUIDELINES Contract Year 2014-2016 I. Informal Projects A. Preface Based on the North Carolina Administrative Code (NCAC), Title 01, Subchapter 30D Section.0300 Selection

More information

Northwest Business Park, Building 5, Bay 3. Issued for Tender: August 24, Substantial Date: November 17, 2017

Northwest Business Park, Building 5, Bay 3. Issued for Tender: August 24, Substantial Date: November 17, 2017 Exterior Alterations and New Office/ Warehouse for All Weather Shelters Northwest Business Park, Building 5, Bay 3 13459-149 Street Edmonton, AB Issued for Tender: Site Visit: Available upon request. Closing

More information

COST LOADED CONSTRUCTION SCHEDULES PART 1 - GENERAL

COST LOADED CONSTRUCTION SCHEDULES PART 1 - GENERAL SECTION 01310 COST LOADED CONSTRUCTION SCHEDULES PART 1 - GENERAL 1.01 SCOPE: A. COST LOADED CONSTRUCTION SCHEDULE (Construction Schedule): The WORK under this Contract shall be planned, scheduled, executed,

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE St. Charles County Ambulance District Base 3 & Training Facility Construction 4169 Old Mill Parkway St. Peters, MO 63376 September

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-31 31 16.19 (August 2014) ------------------------------ Preparing Activity: NAVFAC Superseding UFGS-31 31 16.19 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

Architectural Services

Architectural Services Architectural Services 2016 Capital Improvement Program Request for Proposal Number: 18-20 Title of the Projects: Renovations to Weaver Middle School Procurement Department Bibb County School District

More information

ADDENDUM NO. A. April 18, 2017 BIDDING AND CONTRACT DOCUMENTS FOR

ADDENDUM NO. A. April 18, 2017 BIDDING AND CONTRACT DOCUMENTS FOR ADDENDUM NO. A April 18, 2017 BIDDING AND CONTRACT DOCUMENTS FOR LOTHIAN RESIDENCE HALL SEISMIC UPGRADES BID PACKAGE 4 PROJECT NO. 956366 CONTRACT NO. 956366-LF-2017-163 UC Rev. 0, August 1, 2007 UCR Rev

More information

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department: Permit Requirements: Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install,

More information

ADDENDUM NO. 1. GOODWYN, MILLS AND CAWOOD, INC st Avenue South Suite 100 Birmingham, Alabama Ph: Fax:

ADDENDUM NO. 1. GOODWYN, MILLS AND CAWOOD, INC st Avenue South Suite 100 Birmingham, Alabama Ph: Fax: ADDENDUM NO. 1 GOODWYN, MILLS AND CAWOOD, INC. 2701 1 st Avenue South Suite 100 Birmingham, Alabama Ph: 205-879-4462 Fax: 205-879-4493 To: ALL PLAN HOLDERS Date: March 24, 2017 Fax #: Pages: 10, including

More information

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 SCOPE This document establishes the minimum quality program requirements for a contractor providing equipment, material,

More information

CLARIFICATIONS. Item 3. Specification Sections and A. All finish wood shall have sealer coat and two coats of finish material REVISIONS

CLARIFICATIONS. Item 3. Specification Sections and A. All finish wood shall have sealer coat and two coats of finish material REVISIONS Addendum #2 Project Name: Global Campus Interior Renovation Project Address: 2 E. Center Street Fayetteville, AR 72701 Date: 06/14/17 This document is issued as a response to Clarifications. These revisions

More information

(August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS **************************************************************************

(August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** USACE / NAVFAC / AFCEC / NASA UFGS-02 42 91 (May 2010) ------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS SECTION TABLE

More information

GILA RIVER INDIAN COMMUNITY GEORGE WEBB VILLAGE SUBDIVISION INFRASTRUCTURE IFB # ADDENDUM NO. 2 September 14, 2011

GILA RIVER INDIAN COMMUNITY GEORGE WEBB VILLAGE SUBDIVISION INFRASTRUCTURE IFB # ADDENDUM NO. 2 September 14, 2011 TO: All Bidders From: Gila River Indian Community, Property and Supply Department The following addendum to the George Webb Village Subdivision Infrastructure construction project is made. Acknowledgment

More information

6494 Latcha Rd. Walbridge, Ohio v: f: Table of Contents

6494 Latcha Rd. Walbridge, Ohio v: f: Table of Contents Document (00 21 13) Rudolph/Libbe Inc. www.rlcos.com 6494 Latcha Rd. Walbridge, Ohio 43465 v: 419.241-5000 f: 419.837.9373 Table of Contents 1.0 General Instructions 1.1 Document Hierarchy 1.2 Safety 1.3

More information

ARMSTRONG SHALL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT OF THE USE OF ANY OF ITS GUIDE SPECIFICATIONS. SECTION PERIMETER TRANSITION SYSTEM

ARMSTRONG SHALL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT OF THE USE OF ANY OF ITS GUIDE SPECIFICATIONS. SECTION PERIMETER TRANSITION SYSTEM Armstrong World Industries, Inc. Please understand that you are responsible for the accuracy of all project specifications, including any Armstrong Ceilings guide specifications that you use. ARMSTRONG

More information

ADVERTISEMENT FOR BIDS

ADVERTISEMENT FOR BIDS 1. INVITATION ADVERTISEMENT FOR BIDS Sealed proposals for the following work will be received by the University of Kentucky, Capital Construction Procurement Section, Room #322 Peterson Service Building,

More information

Florida Army National Guard Construction Facilities Management Office. Scope of Work:

Florida Army National Guard Construction Facilities Management Office. Scope of Work: Florida Army National Guard Construction Facilities Management Office Florida Armory Revitalization Program (FARP) Design Guidelines October 2008 Scope of Work: To provide complete design for the renovation/alterations

More information

VILLAGE OF ORLAND PARK, ILLINOIS ADDENDUM NO. 1 REBID # STELLWAGEN FARMHOUSE RESTORATION: PHASE 1 EXTERIOR FOUNDATION

VILLAGE OF ORLAND PARK, ILLINOIS ADDENDUM NO. 1 REBID # STELLWAGEN FARMHOUSE RESTORATION: PHASE 1 EXTERIOR FOUNDATION VILLAGE OF ORLAND PARK, ILLINOIS ADDENDUM NO. 1 REBID #15-019 STELLWAGEN FARMHOUSE RESTORATION: PHASE 1 EXTERIOR FOUNDATION Date: Wednesday, April 13, 2016 To: From: RE: All Potential Bidders Village of

More information

All Plan Holders 3/3/

All Plan Holders 3/3/ All Plan Holders 3/3/2017 14-044 Marina Middle School Window Replacement and Seismic Retrofit 5 Window Replacement and Seismic Retrofit 11 DSA No. 01-116273 San Francisco Unified School District 16 SFUSD

More information

Superior Aluminum Guide Specification 10/4/2016 Non-Welded Aluminum Pipe Railing

Superior Aluminum Guide Specification 10/4/2016 Non-Welded Aluminum Pipe Railing The following specification has been developed by: Superior Aluminum Products 555 East Main Street Russia, Ohio 45363-0430 to assist Architects and Designers in the specification of Non Welded Concealed

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Project Control Schedule C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Project Control Schedule C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 01310 - Project Control Schedule C O N T E N T S PART 1 - SCHEDULE REQUIREMENTS PROGRESS SCHEDULE... 1 PART 2 - SUBMITTAL PROCEDURES... 2 PART 3 - DEFINITIONS...

More information

BID FORMS AND SPECIFICATIONS FOR THE DEMOLITION OF COMMERCIAL STRUCTURES IN THE 1700 BLOCK OF M STREET. CITY OF BELLEVILLE

BID FORMS AND SPECIFICATIONS FOR THE DEMOLITION OF COMMERCIAL STRUCTURES IN THE 1700 BLOCK OF M STREET. CITY OF BELLEVILLE BID FORMS AND SPECIFICATIONS FOR THE DEMOLITION OF COMMERCIAL STRUCTURES IN THE 1700 BLOCK OF M STREET. CITY OF BELLEVILLE BIDS DUE: December 22 nd 2016 @ 2:00 P.M. Belleville City Hall City Hall 1819

More information

INVITATION FOR BIDS IFB NO FOR CDCA BATHROOMS/KITCHEN UPDATES. Dr. Julius R. Scruggs, Pastor

INVITATION FOR BIDS IFB NO FOR CDCA BATHROOMS/KITCHEN UPDATES. Dr. Julius R. Scruggs, Pastor INVITATION FOR BIDS First Missionary Baptist Church The Church that is striving to become one of the most loving churches in all the world. 3509 Blue Spring Road, Huntsville, Alabama 35810 256-852-4318,

More information

Scope of Work Bid Package C-4 - West Polished Concrete

Scope of Work Bid Package C-4 - West Polished Concrete Scope of Work Bid Package C-4 - West Polished Concrete CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools,

More information

Exhibit B - A/E Scope of Services (General Contracting Project) State of Ohio Professional Services Agreements for Public Facility Construction

Exhibit B - A/E Scope of Services (General Contracting Project) State of Ohio Professional Services Agreements for Public Facility Construction - State of Ohio Professional Services Agreements for Public Facility Construction TABLE OF CONTENTS ARTICLE 1 - BASIC SERVICES... 1 ARTICLE 2 - PROGRAM VERIFICATION STAGE... 2 ARTICLE 3 - SCHEMATIC DESIGN

More information

JEFFERSON PARISH SHERIF S OFFICE

JEFFERSON PARISH SHERIF S OFFICE ADDENDUM NO. 1 TO THE BID DOCUMENTS FOR: NEW JEFFERSON PARISH SHERIFF S OFFICE 1 ST DISTRICT STATION 3620 HESSMERAVENUE METAIRIE, LOUISIANA 70002 JEFFERSON PARISH SHERIF S OFFICE Jefferson Parish Bid No.:

More information

FACILITIES MANAGEMENT

FACILITIES MANAGEMENT FACILITIES MANAGEMENT Planning, Design & Construction March 7, 2013 Re: Request for Proposals- Commissioning Services Mayflower Hall Permanent Flood Recovery & Mitigation (UI# 0200201) University of Iowa

More information

BuildingName The Description of the Project P DOCUMENTS

BuildingName The Description of the Project P DOCUMENTS ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION

More information

Main Building Auditorium

Main Building Auditorium Main Building Auditorium Theatre and Lighting Upgrade Moberly Area Community College 101 College Avenue Moberly, Missouri This document contains all necessary instructions and specifications to perform

More information

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application DATE: / / PERMIT # REQUEST FOR: NEW BUILDING ADDITION REMODEL PLUMBING ONLY ELECTRIC ONLY

More information

Hardware. A. PRODUCT DATA: Submit manufacturer's technical information for each item of hardware.

Hardware. A. PRODUCT DATA: Submit manufacturer's technical information for each item of hardware. Sections Included In This Standard: 1.1 General 1.2 Quality Assurance 1.3 Submittals 1.4 Keying 1.5 Product Handling 1.6 Job Conditions 1.7 Warranties 2.1 Scheduled Hardware PART I - GENERAL 1.1 GENERAL

More information

Bid Package# 500 Org. 046 Fred Florence Middle School Org. 164 Anson Jones Elementary School

Bid Package# 500 Org. 046 Fred Florence Middle School Org. 164 Anson Jones Elementary School ADDENDUM No. 002 For Bid Package# 500 Org. 046 Fred Florence Middle School Org. 164 Anson Jones Elementary School DALLAS INDEPENDENT SCHOOL DISTRICT September 24, 2014 The following items modify the Project

More information

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS April 1, 2009 CITY OF PORTSMOUTH Public Works Department Bid #54-09 2009 Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS This Addendum forms part of the original document marked Bid #54-09 2009

More information

BORTOLOTTO ADDENDUM #2

BORTOLOTTO ADDENDUM #2 BORTOLOTTO ADDENDUM #2 Project LI15-028 English Language Program Lakehead University Chancellor Paterson Library Project # el1606 Location 955 Oliver Road Thunder Bay, Ontario Date June 9, 2016 Pages 1

More information

ADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES

ADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES ADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES BID PACKAGE DESCRIPTION REQUIRED LICENSE Bid Package No. 1 Asbestos Abatement C-22 Bid Package No. 2 Hard Demolition C-21 Bid Package No.

More information

EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT/ENGINEER. A. Basic Services... A-2. B. Architectural Programming... A-5

EXHIBIT A RESPONSIBILITIES AND SERVICES OF ARCHITECT/ENGINEER. A. Basic Services... A-2. B. Architectural Programming... A-5 EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT/ENGINEER A. Basic Services... A-2 B. Architectural Programming... A-5 1. Project Initiation... A-5 C. Design Services... A-6 1. Schematic Design Phase...

More information

Flooring Contractor QA/QC Plan Sample Selected pages (not a complete plan)

Flooring Contractor QA/QC Plan Sample Selected pages (not a complete plan) Flooring Contractor QA/QC Plan Sample Selected pages (not a complete plan) Part 1: Project Specific Quality Plan Part 2: Quality Manual Part 3: Submittal Forms Part 4: Inspection Checklist Forms Contact:

More information

ALLEGAN PUBLIC SCHOOLS

ALLEGAN PUBLIC SCHOOLS ALLEGAN PUBLIC SCHOOLS Bid Package 2 High School & Alternative High School Pre Bid Meeting November 15, 2012 The SKILLMAN Corporation Project Administration Construction Management Allegan Public Schools

More information

PROJECT MANUAL Volume 1. Project: Clayton Greenway System -Mark s Creek Bridge Replacement

PROJECT MANUAL Volume 1. Project: Clayton Greenway System -Mark s Creek Bridge Replacement PROJECT MANUAL Volume 1 Project: Clayton Greenway System -Mark s Creek Bridge Replacement Owner: Town of Clayton Construction Manager: Lysaght & Associates Issued August 9, 2017 COVER SHEET 000000-1 TABLE

More information

Addendum No. 3 Queens College TV Production Studio Renovation - System Integration Project No: QC SI

Addendum No. 3 Queens College TV Production Studio Renovation - System Integration Project No: QC SI Facilities Planning, Construction, and Management Office of Financial Management Procurement Services 555 West 57 th Street 16 th Floor New York, New York 10019 CUNY.Builds@mail.cuny.edu October 27, 2015

More information

TENANT IMPROVEMENT MANUAL

TENANT IMPROVEMENT MANUAL TENANT IMPROVEMENT MANUAL July 8, 2011 Revisions Revision # Date Description LOUIS ARMSTRONG NEW ORLEANS INTERNATIONAL AIRPORT PLANNING & DEVELOPMENT Design Manager (504) 303-7621 P.O. Box 20007 New Orleans,

More information

Interior Construction Specification. Dr. Kalinowski. 2nd Floor, United Health Centre Street, Edmonton, AB

Interior Construction Specification. Dr. Kalinowski. 2nd Floor, United Health Centre Street, Edmonton, AB Interior Construction Specification Dr. Kalinowski 2nd Floor, United Health Centre 7609 109 Street, Edmonton, AB Issued for Tender: May 18, 2017 Mandatory Site Visit: May 23, 2017 @ 2:00 PM Closing Date:

More information

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12 SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 4000 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

NOTICE INVITING SEALED BIDS East Campus Exterior EIFS and Painting Project

NOTICE INVITING SEALED BIDS East Campus Exterior EIFS and Painting Project Bid No. B17/9963 April 11, 2017 NOTICE INVITING SEALED BIDS East Campus Exterior EIFS and Painting Project Sealed Bids will be received until 3:00 P.M. (Tucson Time), May 4, 2017, by Pima County Community

More information

BASEMENT FINISH CONSTRUCTION

BASEMENT FINISH CONSTRUCTION BASEMENT FINISH CONSTRUCTION June 2017 A City of Rochester Hills Building Department Guide to Finishing a Basement Rochester Hills Building Department 1000 Rochester Hills Dr. 248-656-4615 Guidebooks/Basement

More information

10/16/2017 REQUEST FOR PROPOSALS. Accounting-Bookkeeping Services. Two (2) Year Term

10/16/2017 REQUEST FOR PROPOSALS. Accounting-Bookkeeping Services. Two (2) Year Term 10/16/2017 REQUEST FOR PROPOSALS Accounting-Bookkeeping Services Two (2) Year Term REQUEST FOR PROPOSALS Accounting-Bookkeeping Services CONTENTS 1.0 DESCRIPTION OF THE BRANDON & AREA PLANNING DISTRICT

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 3: Roofs 1 & 3 DATE: December 29, 2017 1235 Mission

More information

KIOSK DESIGN CRITERIA

KIOSK DESIGN CRITERIA KIOSK DESIGN CRITERIA ADDENDUM LOG July, 2008 Full Update September, 2011 Content update (image replacements and content additions) November, 2011 Grammar corrections, minor cleanup. (5, 11) January, 2012

More information

THE HOUSING AUTHORITY OF THE BOROUGH OF HIGHLAND PARK 242 SOUTH SIXTH AVENUE, HIGHLAND PARK, NJ PHONE (732)

THE HOUSING AUTHORITY OF THE BOROUGH OF HIGHLAND PARK 242 SOUTH SIXTH AVENUE, HIGHLAND PARK, NJ PHONE (732) THE HOUSING AUTHORITY OF THE BOROUGH OF HIGHLAND PARK 242 SOUTH SIXTH AVENUE, HIGHLAND PARK, NJ 08904 PHONE (732)572-4420 February 10, 2017 Window Replacements at Samuel J Kronman Building and Park Terrace

More information

Residence Hall Phase XVI Code Item 308 Code Item 312 Advanced Planning

Residence Hall Phase XVI Code Item 308 Code Item 312 Advanced Planning The University of North Carolina at Charlotte Capital Projects Facilities Management 9201 University City Blvd. Charlotte, N.C. 28223-0001 TEL: 704/687-0558 PROJECT: UNC Charlotte Residence Hall Phase

More information

Bid Form. Schedule 2 Alternate Bid No. 4: Install gutters and downspouts. (100% Local Funded)

Bid Form. Schedule 2 Alternate Bid No. 4: Install gutters and downspouts. (100% Local Funded) Bid Form TxDOT CSJ No. 17HGRCKPT Project: Aransas County Airport - 2017 Hangar Project Project Description: Schedule 1A Base Bid: Construct TxDOT 360 concrete apron pavement for box hangar. Schedule 1A

More information

DOCUMENT BID FORM - STIPULATED SUM

DOCUMENT BID FORM - STIPULATED SUM DOCUMENT 004113 BID FORM - STIPULATED SUM Architect s Project No. 2007024EXC Project: Excell Academy for Tenant: Excell Academy for Higher Learning, Inc. Higher Learning Interiors Package 6510 Zane Avenue

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT 2018.03 EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3 The following changes are made to the Proposal, Specifications, and Plans. PROPOSAL Proposal Sheets

More information

Finance & Technology Administrator (815) ext 223

Finance & Technology Administrator (815) ext 223 2017 PAVING IMPROVEMENTS BID PACKET Due: Location: April 26, 2017 by 10:00 am Oregon Park District Fairgrounds Park 607 Fair Park Drive Oregon, IL 61061 Bid Proposal: 2017 Paving Improvements Administrative

More information

HISD DAVILA ELEMENTARY SCHOOL ROOF REPLACEMENT ADDENDUM #1 JOB NO A PAGE 1

HISD DAVILA ELEMENTARY SCHOOL ROOF REPLACEMENT ADDENDUM #1 JOB NO A PAGE 1 HISD DAVILA ELEMENTARY SCHOOL ROOF REPLACEMENT ADDENDUM #1 JOB NO. 09-23A PAGE 1 To the Plans and Specifications for Jaime Davila Elementary School Roof Replacement, this addendum forms a part of the Contract

More information

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products.

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products. SECTION 05720 ORNAMENTAL ALUMINUM RAILING ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products. This section is based on the products of Superior Aluminum Products,

More information

PLANNING AND EVALUATION PRELIMINARY DESIGN

PLANNING AND EVALUATION PRELIMINARY DESIGN PLANNING AND EVALUATION Project Initiation Discuss and refine client requirements Project brief, Schedule, Budget Confirm client's space needs and program Establish scope of work Obtain client-supplied

More information

SECTION SANITARY WASTE INTERCEPTORS

SECTION SANITARY WASTE INTERCEPTORS SECTION 22 13 23 SANITARY WASTE INTERCEPTORS PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

ADDENDUM # 3 DATE: February 16, 2018

ADDENDUM # 3 DATE: February 16, 2018 ADDENDUM # 3 DATE: February 16, 2018 REFERENCE: Invitation for Bid No.: S-LB-18607 IFB Issue Date: January 25, 2018 Title: Stonewall Middle School Addition and Renovations Architect/Engineer: Architecture

More information

ADDENDUM NO. 2 PROJECT: Omaha Nation Food Distribution Building Macy, Nebraska Project No ARCHITECT:

ADDENDUM NO. 2 PROJECT: Omaha Nation Food Distribution Building Macy, Nebraska Project No ARCHITECT: ADDENDUM NO. 2 PROJECT: ARCHITECT: Omaha Nation Food Distribution Building Macy, Nebraska Project No. 7-7 PETERS AND ASSOCIATES, ARCHITECTS, P.C. 427 Dayton Circle, Suite Omaha, Nebraska 6837-5558 Date

More information

COUNTY OF SAN JOAQUIN

COUNTY OF SAN JOAQUIN August 1, 2012 COUNTY OF SAN JOAQUIN General Services Department 44 North San Joaquin Street, Suite 590 Stockton, California 95202-2778 (209) 468-3357, Fax (209) 468-2186 GABRIEL E. KARAM Director Capital

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND STATE UNIVERSITY CONSTRUCTION FUND The following checklist show the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the Schedule B of the Consultant

More information

OUTAGAMIE COUNTY REQUEST FOR BID FOR CISCO & AXIOM HARDWARE FOR IT DEPARTMENT

OUTAGAMIE COUNTY REQUEST FOR BID FOR CISCO & AXIOM HARDWARE FOR IT DEPARTMENT OUTAGAMIE COUNTY REQUEST FOR BID FOR CISCO & AXIOM HARDWARE FOR IT DEPARTMENT DUE BY: JUNE 26, 2017 1.0 Specifications Requesting bids for Cisco and Axiom equipment. The bidding vendor must be able to

More information

Door Hardware

Door Hardware 08 71 00 Door Hardware Submittals 1. Door Hardware Schedule: Prepared by or under the supervision of supplier, detailing fabrication and assembly of door hardware, as well as procedures and diagrams. Coordinate

More information

House Doctor Consulting Services Application Package

House Doctor Consulting Services Application Package Public Facilities Department House Doctor Consulting Services Application Package For FY2013 FY2015 House Doctor Consulting Services Project #7005 City of Boston Thomas M. Menino, Mayor Michael Galvin

More information

ADVERTISEMENT FOR BIDS

ADVERTISEMENT FOR BIDS Mr. & Mrs. FL Schlagle Library Improvements Kansas City Kansas Public Schools USD 500 IFB 16-043 ADVERTISEMENT FOR BIDS 1.1 PROJECT INFORMATION A. Notice to Bidders: Qualified bidders may submit bids for

More information

INVITATION TO BID. Prospective bidders are encouraged to conduct a pre-bid site visit to aid in their bidding assessments.

INVITATION TO BID. Prospective bidders are encouraged to conduct a pre-bid site visit to aid in their bidding assessments. February 12, 2014 INVITATION TO BID The City of Coffeyville, Kansas, is accepting sealed bids for the demolition and removal of certain structures located within the City. The proposed work will be on

More information

Attachment 3 Statement of Work Statement PROJECT NUMBER MA DIRECTORATE OF PUBLIC WORKS FORT BRAGG, NORTH CAROLINA

Attachment 3 Statement of Work Statement PROJECT NUMBER MA DIRECTORATE OF PUBLIC WORKS FORT BRAGG, NORTH CAROLINA Request for Task Order Proposal Number: Attachment 3 Statement of Work Statement PROJECT NUMBER MA-00006-15 DIRECTORATE OF PUBLIC WORKS FORT BRAGG, NORTH CAROLINA PROJECT TITLE: Restore one Men s and one

More information

WOOD FLOORING WOOD FLOORING

WOOD FLOORING WOOD FLOORING 09550 - WOOD FLOORING 09550-1 PART ONE: GENERAL 1.1 Description WOOD FLOORING 1.1.1 Work in this Section, as shown or specified, shall be provided by the Interior Contractor and shall be in accordance

More information

Chapter 3 DESIGN. C. Project Scope: The Designer may proceed only with the authorized scope of work. Scope changes must be approved by the OFD-PM.

Chapter 3 DESIGN. C. Project Scope: The Designer may proceed only with the authorized scope of work. Scope changes must be approved by the OFD-PM. Chapter 3 DESIGN 3.01 INTRODUCTION A. The Designer, in providing professional services for the project in accordance with the terms and conditions of the Owner/Designer Agreement, should adhere to the

More information

SECTION BID PROPOSAL FORM. Telephone NO: ( ) Facsimile NO: ( ) Oklahoma License NO:

SECTION BID PROPOSAL FORM. Telephone NO: ( ) Facsimile NO: ( ) Oklahoma License NO: ISSUE DATE: MARCH 21, 2012 (REVISION 2-08/31/12) PROJECT: CNB BUILDINGS 2 AND 3 CATOOSA, OKLAHOMA OWNER: BID TO: (Mail & Fax) CHEROKEE NATION BUSINESSES 777 WEST CHEROKEE STREET CATOOSA, OKLAHOMA 74015

More information

Notice to Bidders Page 1 of 6

Notice to Bidders Page 1 of 6 Page 1 of 6 COYOTE CREEK LEVEE RODENT DAMAGE REPAIR DOWNSTREAM OF SR 237 Project No. 62084001, Task No. 5171 Contract No. C0637 1. Notice. Notice is hereby given that sealed Bids will be accepted by the

More information

WINTERHAVEN PUBLIC SAFETY FACILITY PROJECT

WINTERHAVEN PUBLIC SAFETY FACILITY PROJECT WINTERHAVEN PUBLIC SAFETY FACILITY PROJECT Funded by: California Department of Housing and Community Development (HCD) through its Community Development Block Grant (CDBG) Program and the County of Imperial.

More information

VOLUME 4 DIVISION SPECIFICATIONS

VOLUME 4 DIVISION SPECIFICATIONS Page 1 Section Title Consultant Pages VOLUME 4 DIVISION 00-01 SPECIFICATIONS Division 00 - Procurement and Contracting Requirements 00 01 07 SEALS PAGE All 5 00 01 11r6 TABLE OF CONTENTS All 7 00 21 13r1

More information