Inter-American Elementary Magnet School 851 W Waveland Ave Chicago, IL 60613

Size: px
Start display at page:

Download "Inter-American Elementary Magnet School 851 W Waveland Ave Chicago, IL 60613"

Transcription

1 8 W Waveland Ave Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report). Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a -point scale: rank means the item is in new or in good condition and no work is required while rank means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank or ) or full replacement (rank 2, 3 or ). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main ,8 $,8,09 Addition ,9 $9,33 SITE $82,30 Campus Total 0,3 $,83,22 Building: Main Category: Building Exterior Entrance Entrance Control - Audio and Video 2 EA $,3 Exterior Doors - Exterior FRP Door 8 EA $,3 Exterior Doors - Exterior Steel Door EA $,922 Exterior Doors - Transom Lite 8 EA $2,0 Exterior Stairs - Concrete 80 LF $2,99 Exterior Stairs - Concrete 232 LF $8,90 Power Door Operator and Controls 3 EA Ramp Handrail - Steel_Ramp Handrail 92 LF $, Ramps - Concrete 9 LF $,23 Stair Handrail - Steel_Stair Handrail 8 LF $ Foundation Lighting Foundation - Concrete 92 LF Superstructure - Steel with Clay Tile Arch 90,8 SF Exterior Lighting - Parapet or Roof Mounted 0 EA $,3 Exterior Lighting - Wall Mounted 8 EA $,9 ITER-AMERICA Page of 2 Assessment Date: 0//20

2 Building: Main Category: Building Exterior Roof System 8 W Waveland Ave Chicago, IL 03 Chimney - Brick Chimney- Concrete/ Mortar Liner LF $23,8 Coping - Metal 20 LF $8,029 Coping - Terra Cotta LF $90,809 Downspouts - Exterior Downspouts 99 LF $3,290 Downspouts - Interior Downspouts 8 LF $2,92 Parapet - " - 30" Height 30 LF $9,98 Parapet - Parapet < " Height LF $,9 Parapet - Parapet > 30" LF $, Parapet - Parapet > 30" 9 LF $23,9 Roof - EPDM/ Synthetic Rubber 3,3 SF $292,3 Roof Structure - Steel with Clay Tile Arch 3,3 SF Walls Windows Canopy - Concrete/ Stucco,80 SF $38,02 Cheek-Wall - Concrete SF $,92 Cornice - Masonry Projecting Limestone 0 LF $20,980 Exterior Walls - Brick,220 SF $23,39 Exterior Walls - Brick 22,2 SF $0,833 Exterior Walls - Concrete Block 2 SF $,88 Exterior Walls - Prefabricated Metal Panel Wall,0 SF $,3 Exterior Walls - Stone-Cast, SF $,0 Exterior Walls - Terra Cotta 3, SF $2,20 Guard - Guards perforated 3,3 SF $2,28 Lintels - Steel,9 LF $3,22 Skylite - Glass Single-Pane 32 SF $, Windows - Sash Aluminum Double-pane 0,2 SF $9,3 Building Exterior Subtotal: $,,898 Building: Main Category: Electrical System Emergency System Automatic Transfer Switch 2 EA $8 Emergency A/C Power - Auditoium and Aisle Lighting 9,880 SF $,228 Emergency A/C Power - Corridors and Stairs 22,88 SF $,8 ITER-AMERICA Page 2 of 2 Assessment Date: 0//20

3 Building: Main Category: Electrical System Emergency System 8 W Waveland Ave Chicago, IL 03 Emergency A/C Power - Gym 2,8 SF $,09 Emergency A/C Power - Students Toilets,8 SF $ Emergency Battery Packs - Corridors and Stairs EA $3,3 Exit Signs - Auditoium 2 EA $,9 Exit Signs - Corridors and Stairs 3 EA $,9 Exit Signs - Gym 3 EA $2 Security System - CCTV 90,8 SF $2,28 Security System - Intrusion Detection 90,8 SF $23,388 Main Service Power Distribution Independent Electrical Service for emergency power EA $2,92 Main Electrical Service - Greater than 3000 A 20/208/3PH EA $,38 PA System 90,8 SF $29,88 Lighting and Power Panels - 00 A 3 EA $89 Lighting and Power Panels - Above 00 A EA $,8 Lighting and Power Panels - Above 00 A 9 EA $,3 Lighting and Power Panels - Above 00 A 3 EA Main Distribution Panels - Greater than 00 amp 3 EA $2,9 Electrical System Subtotal: $3,3 Building: Main Category: Safty System Fire Alarm Fire Alarm Panel EA $, Fire Alarm Strobe Lights 90,8 SF $0, Fire Alarm_System 90,8 SF $0,30 Safty System Subtotal: $,92 Building: Main Category: Mechanical System ITER-AMERICA Page 3 of 2 Assessment Date: 0//20

4 Building: Main Category: Mechanical System Air Handling Systems 8 W Waveland Ave Chicago, IL 03 Air Handling Unit- Built Up- Single Zone- Steam Coils cfm EA $,22 Air Handling Unit- Built Up-Multi Zone-Double Delivery- Steam Coils cfm EA $238,2 Air Intake 2 EA $,29 Auxiliaries cfm EA $,88 Auxiliaries cfm EA $0,328 Return Duct Work - Masonry and Ducts- Missing or Existing Shaft 300 LF Zone Dampers 2 EA $99,0 Boiler Systems Gas Booster Heating Devices Mechanical Plumbing Temperature Control Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler HP EA $2, Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler HP EA $998 Chemical Feeder EA $,08 Combustion Dampers 2 EA $88 Condensate Pump 2 EA $3,392 Feed Water Pumps and Tank EA $3, on Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure Boiler HP EA $,0 on Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure Boiler HP EA $2,9 Piping - Condensate Pipe- Steel 200 LF $2, Piping - Condensate Pipe- Steel 200 LF $38 Piping - Steam Pipe- Steel 200 LF $,3 Piping - Steam Pipe- Steel 200 LF $2,8 Steam Traps 0 EA $8,89 Gas Booster 2 EA $998 Fin Tube - Steam 20 LF $89 Unit Heater - Electric 2 EA $2,0 Unit Heater - Electric 0 EA $2,8 Wall Heater - Electric EA $ Hot Water Pump - Less than 0 2 EA $2,222 Pneumatic System 90,8 SF $33, Thermostats - Pneumatic EA $2,99 Thermostats - Pneumatic 3 EA ITER-AMERICA Page of 2 Assessment Date: 0//20

5 Building: Main Category: Mechanical System Unit Ventilation 8 W Waveland Ave Chicago, IL 03 Unit Ventilators- Floor Mounted- Electric- Electric Heating & DX Cooling Coil W/ Remote Mounted Compressor EA $,99 Ventilation Exhaust Fans- Indoor - Less than 00 CFM EA $29 Exhaust Fans- Roof Mounted CFM EA $2,30 Exhaust Fans- Roof Mounted CFM 2 EA $,8 Type II Exhaust Hood- Warming Kitchen EA $920 Mechanical System Subtotal: $,009,232 Building: Main Category: Plumbing System Hot Water Gas Heater BTU/HR 2 EA $20 Piping Pumps Domestic Piping-Cold Water from Risers to Fixtures 90,8 SF $8,9 Domestic Piping-Cold Water Horizontal Lines 90,8 SF $22,089 Domestic Piping-Cold Water Risers 90,8 SF $,892 Domestic Piping-Hot Water from Risers to Fixtures 90,8 SF $,293 Domestic Piping-Hot Water Horizontal Lines 90,8 SF $,892 Domestic Piping-Hot Water Return Lines 90,8 SF $2,99 Domestic Piping-Hot Water Return Risers 90,8 SF $2,99 Sanitary Piping 90,8 SF $83,9 Storm Piping 90,8 SF $9,2 Vent Piping 90,8 SF $,00 Pumps - Domestic Booster Pump-Simplex EA $8,93 Pumps - Domestic Booster Pump-Simplex EA $, Pumps - Sump-Simplex EA $ Plumbing System Subtotal: $39,80 Building: Main Category: Classrooms ITER-AMERICA Page of 2 Assessment Date: 0//20

6 8 W Waveland Ave Chicago, IL 03 Art Room ( room) Computer Lab (2 rooms) Dance Room ( room) Music Room ( room) AC Units EA $9 Ceiling - Plaster/Drywall 80 SF $2,99 Doors - Transom Window 9 SF $2 Doors - Wood Doors inclu hw EA $30 Floor - Wood 80 SF $,99 Lighting - Pendent/Surface EA Marker Board LF $33 Storage/ Closet 20 SF $80 Walls - Masonry SF $88 Walls - Plaster/Drywall 90 SF $,230 AC Units 2 EA $99 AC Units 2 EA Casework 8 LF $202 Ceiling - Plaster/Drywall 90 SF $8,28 Ceiling - Plaster/Drywall 800 SF $2,8 Doors - Transom Window 8 SF $30 Doors - Wood Doors inclu hw 3 EA $3,22 Doors - Wood Doors inclu hw EA $30 Floor - Tile 90 SF $,09 Floor - Wood 800 SF $, Lighting - Pendent/Surface 28 EA Walls - Plaster/Drywall,99 SF $,9 Wireless System EA $32 Work Sink EA $39 AC Units EA $9 Ceiling - Plaster/Drywall 2 SF $2,9 Doors - Transom Window 9 SF $2 Doors - Wood Doors inclu hw 2 EA 2 Floor - Wood 2 SF $8,0 Lighting - Pendent/Surface EA Marker Board LF $33 Storage/ Closet SF $290 Wall Mirrors EA Walls - Plaster/Drywall 28 SF $,33 AC Units EA $9 ITER-AMERICA Page of 2 Assessment Date: 0//20

7 Building: Main Category: Classrooms Music Room ( room) 8 W Waveland Ave Chicago, IL 03 Ceiling - Plaster/Drywall 80 SF $2,99 Doors - Transom Window 9 SF $2 Doors - Wood Doors inclu hw EA $30 Floor - Wood 80 SF $22, Lighting - Pendent/Surface EA Marker Board LF $33 Storage/ Closet 20 SF $80 Walls - Plaster/Drywall 32 SF $2,020 Pre School (2 rooms) AC Units 2 EA $99 Ceiling - Plaster/Drywall,02 SF $3, Ceiling - Plaster/Drywall,20 SF Doors - Transom Window 9 SF $2 Doors - Wood Doors inclu hw EA $,20 Floor - Tile,02 SF $2,2 Floor - Wood,20 SF $,89 Lighting - Pendent/Surface 20 EA $3, Lighting - Pendent/Surface 20 EA Marker Board 2 LF $8 Storage/ Closet 0 SF $,0 Walls - Plaster/Drywall,23 SF $3, (22 rooms) AC Units EA $8,2 AC Units EA Casework 2 LF $, Ceiling - Plaster/Drywall 80 SF $,0 Ceiling - Plaster/Drywall,802 SF $,8 Chalk Board 2 LF $,02 Chalk Board 2 LF $28 Doors - Transom Window SF $2,99 Doors - Wood Doors inclu hw 23 EA $,923 Floor - Wood 80 SF $22, Floor - Wood 3,20 SF $,2 Floor - Wood 2,82 SF $89, Lighting - Metal Halide/Sodium Vapor EA Lighting - Pendent/Surface EA $8,0 ITER-AMERICA Page of 2 Assessment Date: 0//20

8 Building: Main Category: Classrooms (22 rooms) 8 W Waveland Ave Chicago, IL 03 Lighting - Pendent/Surface EA $2, Lighting - Pendent/Surface 2 EA $3,22 Lighting - Pendent/Surface 230 EA Marker Board 30 LF $, Storage/ Closet,9 SF $,09 Walls - Plaster/Drywall 880 SF $,0 Walls - Plaster/Drywall,0 SF $,0 Work Sink 2 EA $8 Science ( room) AC Units EA Casework 32 LF $808 Ceiling - Plaster/Drywall 80 SF $2,99 Doors - Transom Window 2 SF $203 Doors - Wood Doors inclu hw EA $30 Floor - Wood 80 SF $,99 Lighting - Pendent/Surface EA Marker Board 2 LF $2 Walls - Plaster/Drywall 880 SF $2,29 Work Sink 2 EA $8 Special Education ( room) AC Units EA $9 Ceiling - Plaster/Drywall 30 SF $,2 Doors - Wood Doors inclu hw EA $30 Floor - Wood 30 SF $2,38 Lighting - Pendent/Surface EA Marker Board LF $32 Storage/ Closet SF $29 Walls - Plaster/Drywall 0 SF $,39 Classrooms Subtotal: $,28 Building: Main Category: Rooms (Other Than Classrooms) Administrative Suites/Offices AC Unit 3 EA $,8 ITER-AMERICA Page 8 of 2 Assessment Date: 0//20

9 Building: Main Category: Rooms (Other Than Classrooms) Administrative Suites/Offices 8 W Waveland Ave Chicago, IL 03 Ceiling - Lay-in 02 SF $30 Ceiling - Plaster/Drywall 38 SF $3, Ceiling - Plaster/Drywall 2,88 SF $9,302 Doors - Side-lite 9 SF $0 Doors - Steel Doors incl hw EA $30 Doors - Transom Window 8 SF $30 Doors - Wood Doors inclu hw EA $,0 Floor - Tile SF $2,32 Floor - Tile 2,09 SF $, Floor - Wood 0 SF $3,98 Lighting - Lay-in 2 EA Lighting - Pendent/Surface 9 EA $3,9 Lighting - Pendent/Surface 2 EA $28 Lighting - Pendent/Surface 3 EA Power Distribution 8 EA $38,28 Storage/ Closet 20 SF $,98 Walls - Concrete Block SF $33 Walls - Masonry 3 SF $,3 Walls - Plaster/Drywall 3, SF $9,983 Work SInk EA 8 Auditorium & Theater Balcony Seating 200 EA $3,83 Ceiling - Plaster/Drywall,98 SF $,8 Doors - Wood Doors inclu hw 8 EA $2,8 Floor - Wood,98 SF $,30 Lighting - Metal Halide/Sodium Vapor 8 EA $,9 Lighting - Pendent/Surface 0 EA Lighting - Wall Mounted 2 EA $,8 Main Floor Seating 90 EA $02, Sound System EA $0,2 Stage 8 SF $,0 Stage Curtain 8 EA Stage Lighting System EA $8,0 Stage-Stairs - Wood 8 LF $9 Stairs - Asphalt 0 LF $93 Walls - Plaster/Drywall 9,8 SF $3,33 ITER-AMERICA Page 9 of 2 Assessment Date: 0//20

10 Building: Main Category: Rooms (Other Than Classrooms) Gymnasia 8 W Waveland Ave Chicago, IL 03 Ceiling - Plaster/Drywall 3,03 SF $3,90 Doors - Wood Doors inclu hw EA $,20 Floor - Wood 3,03 SF $2,389 Lighting - Pendent/Surface 32 EA Scoreboards EA $2,2 Walls - Plaster/Drywall 3,89 SF $2,3 Kitchen Library MDF_IDF Ceiling - Lay-in,33 SF $,033 Doors - Steel Doors incl hw 2 EA 2 Floor - Tile,33 SF $2,938 Lighting - Lay-in EA Storage/ Closet 22 SF $,900 Walls - Concrete Block 2 SF $2,23 Walls - Plaster/Drywall 2 SF $2,3 AC Unit EA $,982 Ceiling - Plaster/Drywall 0 SF $2 Ceiling - Plaster/Drywall,0 SF $,8 Doors - Transom Window 9 SF $2 Doors - Wood Doors inclu hw 2 EA 2 Floor - Carpet, SF Lighting - Pendent/Surface 28 EA $3,9 Storage/ Closet 0 SF $ Walls - Plaster/Drywall,382 SF $3,8 AC Unit EA $9 Doors - Steel Doors incl hw 2 EA 2 Finishes 9 SF $2,990 Mechanical/ Service Rooms Boiler Room, SF $,2 Interior Stairs 20 LF $80 Janitor's Closet 8 SF $ Mechanical/ Service Rooms,028 SF $,3 Storage Room 28 SF $,88 ITER-AMERICA Page 0 of 2 Assessment Date: 0//20

11 Building: Main Category: Rooms (Other Than Classrooms) Restroom 8 W Waveland Ave Chicago, IL 03 Accessories 2, SF $9,98 Ceiling - Lay-in 32 SF $39 Ceiling - Plaster/Drywall 3 SF $, Ceiling - Plaster/Drywall,2 SF $,308 Doors - Steel Doors incl hw 3 EA $903 Doors - Wood Doors inclu hw 2 EA 2 Floor - Tile 2 SF $82 Floor - Tile Ceramic/ Porcelain 8 SF $0,0 Floor - Tile Ceramic/ Porcelain,90 SF $2,9 Floor Drain EA $,29 Lavatory 23 EA $,3 Lighting - Lay-in 3 EA Lighting - Pendent/Surface EA $9 Lighting - Pendent/Surface 2 EA Partitions 3 EA $9,20 Urinals EA $,3 Walls - Concrete Block 02 SF $299 Walls - Plaster/Drywall,9 SF $3, Walls - Structural Glazed Tile,9 SF $3,9 Water Closet 3 EA $,23 Rooms (Other Than Classrooms) Subtotal: $,0 Building: Main Category: Building Interior Corridor Ceiling - Plaster/Drywall 22,2 SF $39, Drinking Fountains - Single Fountain 2 EA $3,309 Floor - Tile/Sheet 22,22 SF $2,238 Lighting - Pendent/Surface 32 EA Student Lockers - Two Tiers EA $2,3 Walls - Plaster/Drywall 2,902 SF $,82 Safety Camera Viewing Station EA $83 Metal Dedector EA $88 ITER-AMERICA Page of 2 Assessment Date: 0//20

12 Building: Main Category: Building Interior Safety 8 W Waveland Ave Chicago, IL 03 Security Cameras 3 EA $82 Stairs Vertical Conveyance Ceiling - Plaster/Drywall 2,2 SF $,8 Floor - Terrazzo 2,2 SF $20,3 Handrails 80 LF $,993 Lighting - Lay-in 2 EA Stairs - Concrete 20 LF $,09 Walls - Plaster/Drywall 2,89 SF $,9 Elevator - Elevator- Roped Holeless Hydraulic EA $9,238 Building Interior Subtotal: $32, Total Building Cost $,8,09 Building: Addition Category: Building Exterior Entrance Exterior Doors - Exterior FRP Door EA $2,2 Exterior Doors - Side lite EA $,23 Exterior Doors - Transom Lite EA $,23 Exterior Stairs - Concrete 0 LF $,0 Exterior Stairs - Concrete 3 LF $2,9 Foundation Lighting Roof System Foundation - Concrete 300 LF Superstructure - Steel with Clay Tile Arch 9,9 SF Exterior Lighting - Wall Mounted EA $, Coping - Terra Cotta LF $,93 Coping - Terra Cotta 32 LF $3,88 Downspouts - Interior Downspouts 82 LF $2,2 Parapet - " - 30" Height LF $2,8 ITER-AMERICA Page 2 of 2 Assessment Date: 0//20

13 Building: Addition Category: Building Exterior Roof System 8 W Waveland Ave Chicago, IL 03 Parapet - Parapet > 30" 0 LF $39, Roof - EPDM/ Synthetic Rubber,2 SF $2,3 Roof Structure - Steel with Clay Tile Arch,2 SF Walls Windows Cheek-Wall - Concrete 2 SF $2 Cornice - Masonry Projecting Limestone 2 LF $9,90 Exterior Walls - Brick 3,30 SF $22,83 Exterior Walls - Stone-Cast 23 SF $,3 Guard - Guards perforated,08 SF $3,88 Lintels - Steel 32 LF $9,3 Windows - Sash Aluminum Double-pane 3,2 SF $2,32 Building Exterior Subtotal: $29,92 Building: Addition Category: Electrical System Emergency System Emergency A/C Power - Corridors and Stairs 2,2 SF $829 Emergency A/C Power - Lunchrooms 3, SF $,20 Emergency Battery Packs - Corridors and Stairs EA $,2 Emergency Battery Packs - Lunchrooms 3 EA 8 Exit Signs - Corridors and Stairs EA $,08 Exit Signs - Lunchroom 8 EA $,98 Security System - CCTV 9,9 SF $,880 Security System - Intrusion Detection 9,9 SF $,0 Main Service Power Distribution PA System 9,9 SF $, Lighting and Power Panels - 00 A 2 EA Lighting and Power Panels - Above 00 A EA Electrical System Subtotal: $23,2 ITER-AMERICA Page 3 of 2 Assessment Date: 0//20

14 Building: Addition Category: Safty System Fire Alarm 8 W Waveland Ave Chicago, IL 03 Fire Alarm Strobe Lights 9,9 SF $,9 Fire Alarm_System 9,9 SF $2,838 Safty System Subtotal: $3,9 Building: Addition Category: Mechanical System Air Handling Systems Air Intake EA $, Auxiliaries cfm EA $2,908 Reheat Boxes - Reheat Boxes with Steam Coil EA $,20 Return Duct Work - Masonry and Ducts- Missing or Existing Shaft 00 LF Zone Dampers 2 EA $9,99 Boiler Systems Heating Devices Temperature Control Ventilation Piping - Condensate Pipe- Steel 0 LF $,89 Piping - Steam Pipe- Steel 0 LF $,3 Steam Traps 0 EA $2, Fin Tube - Steam LF $38 Radiators - Steam 3 EA $833 Pneumatic System 9,9 SF $, Thermostats - Pneumatic EA $3 Thermostats - Pneumatic 0 EA Exhaust Fans- Roof Mounted CFM EA $92 Type II Exhaust Hood- Warming Kitchen EA $920 Mechanical System Subtotal: $,2 Building: Addition Category: Plumbing System ITER-AMERICA Page of 2 Assessment Date: 0//20

15 Building: Addition Category: Plumbing System Piping 8 W Waveland Ave Chicago, IL 03 Domestic Piping-Cold Water from Risers to Fixtures 9,9 SF $3,920 Domestic Piping-Cold Water Horizontal Lines 9,9 SF $,0 Domestic Piping-Cold Water Risers 9,9 SF $3, Domestic Piping-Hot Water from Risers to Fixtures 9,9 SF $3,080 Domestic Piping-Hot Water Horizontal Lines 9,9 SF $3, Domestic Piping-Hot Water Return Lines 9,9 SF $2,800 Domestic Piping-Hot Water Return Risers 9,9 SF $2,800 Sanitary Piping 9,9 SF $,99 Storm Piping 9,9 SF $,09 Vent Piping 9,9 SF $3,9 Pumps Pumps - Ejector-Simplex EA $ Plumbing System Subtotal: $3, Building: Addition Category: Classrooms (8 rooms) AC Units 8 EA Ceiling - Plaster/Drywall,38 SF $22,03 Chalk Board 2 LF $,0 Chalk Board 2 LF $28 Doors - Transom Window 9 SF $,2 Doors - Wood Doors inclu hw 8 EA $2,8 Floor - Wood 3,983 SF $28,080 Lighting - Pendent/Surface 2 EA Marker Board 9 LF $2,0 Walls - Plaster/Drywall,3 SF $20,29 Classrooms Subtotal: $83,33 Building: Addition Category: Rooms (Other Than Classrooms) ITER-AMERICA Page of 2 Assessment Date: 0//20

16 Building: Addition Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Lunch & Multipurpose Room Mechanical/ Service Rooms 8 W Waveland Ave Chicago, IL 03 Ceiling - Plaster/Drywall SF 9 Doors - Transom Window 9 SF $2 Doors - Wood Doors inclu hw EA $30 Floor - Tile SF $322 Lighting - Pendent/Surface 2 EA Power Distribution 2 EA $,20 Walls - Plaster/Drywall 9 SF $ Ceiling - Plaster/Drywall 3,88 SF $2,0 Doors - Steel Doors incl hw EA $,80 Floor - Tile 3,88 SF $,3 Lighting - Pendent/Surface 2 EA Serving Line 3 LF $2,3 Walls - Plaster/Drywall,00 SF $,0 Janitor's Closet 3 SF $2 Storage Room 0 SF $88 Restroom Accessories SF $90 Ceiling - Plaster/Drywall SF $8 Doors - Wood Doors inclu hw EA $30 Floor - Tile Ceramic/ Porcelain SF $,022 Lavatory EA $320 Lighting - Pendent/Surface 2 EA Partitions 2 EA $9 Walls - Plaster/Drywall SF $20 Water Closet 2 EA $2 Rooms (Other Than Classrooms) Subtotal: $,09 Building: Addition Category: Building Interior Corridor Ceiling - Plaster/Drywall,890 SF $30,28 ITER-AMERICA Page of 2 Assessment Date: 0//20

17 Building: Addition Category: Building Interior Corridor 8 W Waveland Ave Chicago, IL 03 Drinking Fountains - Single Fountain EA $, Floor - Tile/Sheet,890 SF $2, Lighting - Pendent/Surface 3 EA Student Lockers - One Tier 2 EA $,8 Walls - Plaster/Drywall,22 SF $2,922 Stairs Ceiling - Plaster/Drywall,8 SF $,3 Floor - Terrazzo,8 SF $3,2 Handrails 20 LF $3, Lighting - Lay-in 2 EA Stairs - Terrazzo 2 LF $2,00 Walls - Plaster/Drywall, SF $3,080 Building Interior Subtotal: $99,20 Total Building Cost $9,33 SITE Category: Site Athletic Civil/Drainage Fencing Landscape Lighting 2 EA $,209 Surface - Asphalt,80 SF $,03 Civil/ Drainage - Catch Basin 9 EA $9,8 Civil/ Drainage - Site Manhole 2 EA $,93 Fencing - Guard Rail LF $ Fencing - ew Standard Ornamental,83 LF $8,0 Fencing - Wood Fencing w/ Steel Frame 2 LF $,3 Benches 8 EA $3, Landscape - Grass,82 SF $, Landscape - Hardscape- Concrete,00 SF $20,90 ITER-AMERICA Page of 2 Assessment Date: 0//20

18 8 W Waveland Ave Chicago, IL 03 SITE Category: Site Landscape Parking Lot Playground Sidewalks Signage Parkway trees 2 EA $,8 Planting Beds/ Area,2 SF $8,2 Play Area - Synthetic Turf Play Field,0 SF $, Trash Receptacles 2 EA $2 Walking Path - Crushed Stone 2 SF $2 Concrete Curbs 8 LF $0, Lighting - Pole Mounted EA $,80 Surface - Asphalt,0 SF $2,3 Trash Compactor EA Trash Enclosure - Masonry,00 SF $9,8 Vehicular Screening 3 LF $28,39 Equipment - Pre K 3- EA $3, Equipment - School Age -2 EA $3, Surface - Poured Surface,0 SF $2,02 Sidewalks - Internal Walks LF $,8 Sidewalks - Perimeter Sidewalks 9,8 SF $8,2 Flag Pole - Building Mounted Flag Pole EA $828 Flag Pole - Flag Pole EA $, Monument - Sign EA Site Subtotal: $82,30 Total Site Cost $82,30 Campus Total ² ³ $,83,22 ¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked in this report; by the time the report is compiled, they have been resolved. ITER-AMERICA Page 8 of 2 Assessment Date: 0//20

19 8 W Waveland Ave Chicago, IL 03 ² As stated above, Total Assessed Campus eed does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus eed includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Definitions Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated. Unit means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). Cost means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Total Campus eed listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. ITER-AMERICA Page 9 of 2 Assessment Date: 0//20

20 8 W Waveland Ave Chicago, IL 03 Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main Art Room Computer Lab Computer Lab Dance Room Music Room Pre School Pre School Science Special Education Computer Lab Pre School Pre School Special Education st Floor st Floor st Floor st Floor st Floor st Floor st Floor st Floor A / ,20, Addition ITER-AMERICA Page 20 of 2 Assessment Date: 0//20

21 8 W Waveland Ave Chicago, IL 03 Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Addition ITER-AMERICA Page 2 of 2 Assessment Date: 0//20

Amos Alonzo Stagg Elementary School 7424 S Morgan St Chicago, IL 60621

Amos Alonzo Stagg Elementary School 7424 S Morgan St Chicago, IL 60621 2 S Morgan St Chicago, IL 21 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Charles H Wacker Elementary School 9746 S Morgan St Chicago, IL 60643

Charles H Wacker Elementary School 9746 S Morgan St Chicago, IL 60643 9 S Morgan St Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

James E McDade Elementary Classical School 8801 S Indiana Ave Chicago, IL 60619

James E McDade Elementary Classical School 8801 S Indiana Ave Chicago, IL 60619 880 S Indiana Ave Chicago, IL 09 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Stephen Decatur Classical Elementary School 7030 N Sacramento Ave Chicago, IL 60645

Stephen Decatur Classical Elementary School 7030 N Sacramento Ave Chicago, IL 60645 030 Sacramento Ave Chicago, IL 04 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Frederic Chopin Elementary School

Frederic Chopin Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Henry R Clissold Elementary School 2350 W 110th Pl Chicago, IL 60643

Henry R Clissold Elementary School 2350 W 110th Pl Chicago, IL 60643 30 W 0th Pl Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Perkins Bass Elementary School 1140 W 66th St Chicago, IL 60621

Perkins Bass Elementary School 1140 W 66th St Chicago, IL 60621 0 W th St Chicago, IL 02 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Donald Morrill Math & Science Elementary School 6011 S Rockwell St Chicago, IL 60629

Donald Morrill Math & Science Elementary School 6011 S Rockwell St Chicago, IL 60629 0 S Rockwell St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Harold Washington Elementary School 9130 S University Ave Chicago, IL 60619

Harold Washington Elementary School 9130 S University Ave Chicago, IL 60619 930 S University Ave Chicago, IL 09 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This

More information

John T Pirie Fine Arts & Academic Center ES 650 E 85th St Chicago, IL 60619

John T Pirie Fine Arts & Academic Center ES 650 E 85th St Chicago, IL 60619 E 8th St Chicago, IL 19 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Minnie Mars Jamieson Elementary School 5650 N Mozart St Chicago, IL 60659

Minnie Mars Jamieson Elementary School 5650 N Mozart St Chicago, IL 60659 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

Charles H Wacker Elementary School

Charles H Wacker Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Louis A Agassiz Elementary School

Louis A Agassiz Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Walter S Christopher Elementary School 5042 S Artesian Ave Chicago, IL 60632

Walter S Christopher Elementary School 5042 S Artesian Ave Chicago, IL 60632 42 S Artesian Ave Chicago, IL 2 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

John D Shoop Math-Science Technical Academy ES S Bishop St Chicago, IL 60643

John D Shoop Math-Science Technical Academy ES S Bishop St Chicago, IL 60643 S Bishop St Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

James B Farnsworth Elementary School 5414 N Linder Ave Chicago, IL 60630

James B Farnsworth Elementary School 5414 N Linder Ave Chicago, IL 60630 Linder Ave Chicago, IL 030 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

George Armstrong International Studies ES 2110 W Greenleaf Ave Chicago, IL 60645

George Armstrong International Studies ES 2110 W Greenleaf Ave Chicago, IL 60645 W Greenleaf Ave Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Jane Addams Elementary School S Avenue H Chicago, IL 60617

Jane Addams Elementary School S Avenue H Chicago, IL 60617 00 S Avenue H Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Velma F Thomas Early Childhood Center

Velma F Thomas Early Childhood Center Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Edgar Allan Poe Elementary Classical School S Langley Ave Chicago, IL 60628

Edgar Allan Poe Elementary Classical School S Langley Ave Chicago, IL 60628 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation

More information

Eugene Field Elementary School 7019 N Ashland Ave Chicago, IL 60626

Eugene Field Elementary School 7019 N Ashland Ave Chicago, IL 60626 79 Ashland Ave Chicago, IL 6626 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each

More information

Thomas J Higgins Elementary Community Academy S Morgan St Chicago, IL 60643

Thomas J Higgins Elementary Community Academy S Morgan St Chicago, IL 60643 Facility Assessment Report Thomas J Higgins Elementary Community Academy This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors

More information

James B Farnsworth Elementary School 5414 N Linder Ave Chicago, IL 60630

James B Farnsworth Elementary School 5414 N Linder Ave Chicago, IL 60630 544 Linder Ave Chicago, IL 60630 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate

More information

Horace Greeley Elementary School 832 W Sheridan Rd Chicago, IL 60613

Horace Greeley Elementary School 832 W Sheridan Rd Chicago, IL 60613 832 W Sheridan Rd Chicago, IL 3 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each

More information

Walter Q Gresham Elementary School

Walter Q Gresham Elementary School Facility Assessment Detail This report contains the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Ole A Thorp Elementary Scholastic Academy 6024 W Warwick Ave Chicago, IL 60634

Ole A Thorp Elementary Scholastic Academy 6024 W Warwick Ave Chicago, IL 60634 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation

More information

Paul Laurence Dunbar Career Academy High School 3000 S King Dr Chicago, IL 60616

Paul Laurence Dunbar Career Academy High School 3000 S King Dr Chicago, IL 60616 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation

More information

FACILITY COMPONENTS - ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Two stalls fewer than minimum standard. Parking and Access - Service / Delivery 2.0 1.0 0.16 Parking and Access - Staff 1.0 3.0 0.24 Thirty-seven stalls

More information

Appendix J - Custom Uniformat for EDU Migration

Appendix J - Custom Uniformat for EDU Migration Appendix J - Custom Uniformat for EDU Migration Nr. MTC Uniformat for VFA.facility Life (Years) Weight (1-100) Out of Scope Cost Y/N 1 A Substructure 150 N 2 A10 Foundations 150 N 3 A1010 Standard Foundations

More information

FACILITY COMPONENTS - MIDDLE SCHOOL

FACILITY COMPONENTS - MIDDLE SCHOOL SITE AREAS Parking and Access - Buses 2.0 2.0 0.30 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 1.0 3.0 0.22 Four fewer stalls

More information

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2 School and Site Level Deficiencies Site K Play Area Requires Impact Resistant Material 1320 1 Ea. 2 Exterior Basketball Goals Are Damaged And Require Replacement 1322 1 Ea. 4 Bus drop-off area does not

More information

FACILITY COMPONENTS - ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Five fewer bus stalls than minimum standard. Parking and Access - Service / Delivery 1.0 1.0 0.08 No delivery parking adjacent to delivery entrance. Parking

More information

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3 School and Site Level Deficiencies Site Concrete Walks Are Damaged And Require Replacement 5539 4,000 SF 3 Bus drop-off area does not have a canopy. 14005 250 LF 5 Paved Play Requires Recoating And Resurfacing

More information

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment Summary of Findings The Laurence G. Paquin Building Facility located at 2200 SINCLAIR LANE in Baltimore, Maryland, was built in 1975. It comprises 65,666 gross square feet. The total current deficiencies

More information

Facilities Feasibility Study Frederick Douglass HS Condition Assessment

Facilities Feasibility Study Frederick Douglass HS Condition Assessment Summary of Findings The Frederick Douglass HS Facility located at 2301 Gwynns Falls Parkway in Baltimore, Maryland, was built in 1927. It comprises 194,249 gross square feet. The total current deficiencies

More information

COOLIDGE SENIOR HIGH SCHOOL

COOLIDGE SENIOR HIGH SCHOOL INITIAL YEAR BUILT 1940 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1240 ENROLLMENT 2008 652 WARD 4 PROPOSED PROGRAM CAPACITY 1100 Site Plan COOLIDGE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment Summary of Findings The Matthew A. Henson ES Facility located at 1600 N. Payson Street in Baltimore, Maryland, was built in 1964. It comprises 75,228 gross square feet. The total current deficiencies for

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope

More information

Timberglen Recreation Center Summary

Timberglen Recreation Center Summary Timberglen Recreation Center Summary Address Building Purpose 3810 Timberglen Road Dallas, TX 75287 Recreation Center Original Year of Construction 2003 Building Area 15,000 SF Inspection Date August 2,

More information

POWELL ELEMENTARY SCHOOL

POWELL ELEMENTARY SCHOOL INITIAL YEAR BUILT 1925 BUILDING AREA 38,500 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 319 WARD 4 PROPOSED PROGRAM CAPACITY 325 Site Plan POWELL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-3

More information

RAYMOND EDUCATION CAMPUS

RAYMOND EDUCATION CAMPUS INITIAL YEAR BUILT 1924 BUILDING AREA 73,600 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 302 WARD 1 PROPOSED PROGRAM CAPACITY 600 Site Plan RAYMOND - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205 5yr Condition Assessment 2006/07 to 2010/11 Construction Year Area 1951 3,813 Page 1 of 25 1. Architectural / Structural & Site Exec Summary Hillcrest Public School is a two storey structure of masonry

More information

HERITAGE MIDDLE SCHOOL. Overview: Livingston School District Heritage Middle School

HERITAGE MIDDLE SCHOOL. Overview: Livingston School District Heritage Middle School HERITAGE MIDDLE SCHOOL Overview: The is located at 20 Foxcroft Drive and consists of a three-story building with Three-Story Classroom and Multi-Purpose Room Additions completed in 2002. The building has

More information

Hinsdale Township High School District 86 Referendum Project Listing April 2, Approved

Hinsdale Township High School District 86 Referendum Project Listing April 2, Approved Hinsdale Township High School District 86 Referendum Project Listing April 2, 2019 - Approved 1-12-2019 Project Category and Description Central South Total Security Replace Intercom System Install a completely

More information

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS

More information

LASALLE - BACKUS EDUCATION CAMPUS

LASALLE - BACKUS EDUCATION CAMPUS INITIAL YEAR BUILT 1957 BUILDING AREA 63,000 SF CURRENT PROGRAM CAPACITY 406 ENROLLMENT 2008 349 WARD 4 PROPOSED PROGRAM CAPACITY 425 Site Plan LASALLE - BACKUS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

SEATON ELEMENTARY SCHOOL

SEATON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1969 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 428 ENROLLMENT 2008 280 WARD 2 PROPOSED PROGRAM CAPACITY 325 Site Plan SEATON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Minuteman Regional Vocational Technical School

Minuteman Regional Vocational Technical School Minuteman Regional Vocational Technical School List of Recommendations L1 AAB compliance: Improvements to front entrance (concrete ramps, railings, etc.) Required by AAB cost trigger L2 AAB compliance:

More information

GFW Schools Task Force Meeting 1/23/19 R.A. MORTON & ASSOCIATES GLT ARCHITECTS 1

GFW Schools Task Force Meeting 1/23/19 R.A. MORTON & ASSOCIATES GLT ARCHITECTS 1 GFW Schools Task Force Meeting 1/23/19 1 AGENDA 1. Introductions 2. Review of building tours Primary Needs 3. Review Space Programs 4. Review Concept Options District and Facility needs 5. Review Concept

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 82 82% 2.3 Structural 0 7 7% 2.4 Building Envelope 0 47 47% 2. Interior

More information

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades $300,000 C. Tilden Entrance Upgrades $50,000 D. Door and Glass Improvements $500,000 E. Alert Systems $800,000

More information

NALLE ELEMENTARY SCHOOL

NALLE ELEMENTARY SCHOOL INITIAL YEAR BUILT 1950 BUILDING AREA 83,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 372 WARD 7 PROPOSED PROGRAM CAPACITY 400 Site Plan NALLE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

BALLOU SENIOR HIGH SCHOOL

BALLOU SENIOR HIGH SCHOOL INITIAL YEAR BUILT 1960 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1565 ENROLLMENT 2008 9-12 (1,252) STAY (753) WARD 8 PROPOSED PROGRAM CAPACITY 1200 Site Plan BALLOU - 1 PROPOSED PROGRAM PROFILE

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

Delco Activity Center Site Summary

Delco Activity Center Site Summary 1 Site Summary Address 4601 Pecan Brook Austin, TX 78724 Number of Permanent Campus Facilities 1 Original Year of Construction 2003 Total Campus Building Area (combined) 60,294 SF Introduction The is located

More information

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements % 8/13/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 64 64% 2.2 Accessibility 0 66 66% 2.3 Structural 0 77 77% 2.4 Building Envelope 0 4 4% 2. Interior

More information

KEY ELEMENTARY SCHOOL

KEY ELEMENTARY SCHOOL INITIAL YEAR BUILT 1925 BUILDING AREA 52,000 SF CURRENT PROGRAM CAPACITY 320 ENROLLMENT 2008 328 WARD 3 PROPOSED PROGRAM CAPACITY 325 Site Plan KEY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Chenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017

Chenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017 Chenango Bridge Elementary School Phase 1 Asphalt Pavement Reconstruction Reconstruct asphalt parking located on west side of building including access drive. Sidewalk Replacement Replace cracked sections

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California PROGRAM COST MODEL for PEER Tall Buildings Study Concrete Structural Option Los Angeles, California March 8, 2010 PEER Tall Buildings Study Concrete Structural Option March 8, 2010 CONTENTS Page Nos. Overall

More information

Mills Elementary School Site Summary

Mills Elementary School Site Summary 1 Mills Elementary School Site Summary Address 6201 Davis Lane Austin, TX 78749 Number of Permanent Campus Facilities 1 Original Year of Construction 1998 Total Campus Building Area (combined) 81,368 SF

More information

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 11 00 Notice To Bidders 00 21 00 Instructions To Bidders 00 22 00 Supplementary Instructions To Bidders

More information

Harry Stone Recreation Center Summary

Harry Stone Recreation Center Summary Harry Stone Recreation Center Summary Address Building Purpose 2400 Millmar Drive Dallas, TX 75228 Recreation Center Original Year of Construction 1957 (Expansion 2013) Building Area 22,281 SF Inspection

More information

GARFIELD ELEMENTARY SCHOOL

GARFIELD ELEMENTARY SCHOOL INITIAL YEAR BUILT 1910 BUILDING AREA 58,908 SF CURRENT PROGRAM CAPACITY 446 ENROLLMENT 2008 278 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan GARFIELD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 163 82% Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 92 92% 2.3 Structural 0 91 91% 2.4 Building Envelope 0 84 84% 2. Interior

More information

NYC Department of Education

NYC Department of Education Building Assessment Survey 2017-2018 Asset: HS FOR MATH, SCI & ENGINEERING-M, 240 CONVENT AVENUE, New York, 10031 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-12-20

More information

Lake Highlands North Recreation Center Summary

Lake Highlands North Recreation Center Summary Lake Highlands North Recreation Center Summary Address Building Purpose 9940 White Rock Trail Dallas, TX 75238 Recreation Center Original Year of Construction 1971 Building Area 33,036 SF Inspection Date

More information

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School HILLSIDE ELEMENTARY SCHOOL Overview: The is located at 98 Belmont Drive and consists of a two-story building which has had a number of additions added to it over the years, the latest of which was a two-story

More information

Facility Improvements

Facility Improvements CA-SI-01 ACCESSIBLE PARKING STALL ADDITIONS CA-SI-07 BASEBALL & SOFTBALL INFIELD IMPROVEMENTS Additional parking stalls and signage needed for disabled individuals and to meet ADA requirements. Installation

More information

Reilly Elementary School Site Summary

Reilly Elementary School Site Summary 1 Reilly Elementary School Site Summary Address 405 Denson Drive Austin, TX 78752 Number of Permanent Campus Facilities 1 Original Year of Construction 1954 Total Campus Building Area (combined) 41,622

More information

PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016

PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016 PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016 WORK LEGEND OVERALL WORK TO BOTH BUILDINGS 1 2 3 4 Existing corridors will receive new

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Asset: Building Assessment Survey 2017-2018 NYC SCHOOL CONSTR. AUTHORITY - QUEENS, 30-30 THOMSON AVE, New York, 11101 Inspection Id Inspection Type Time In Last Edited SA : Architectural

More information

Legend. ANTICIPATED LONG-TERM CAPITAL PROJECTS: PER SCHOOL through

Legend. ANTICIPATED LONG-TERM CAPITAL PROJECTS: PER SCHOOL through Legend Highlights Priority 1 Projects Highlights the projects identified through the building conditions survey that have been included in the 2017-18 through 2022-2023 Long Term Capital Plan ANTICIPATED

More information

March 2018 Progress. Work Completed, Week Ending 3/23/18:

March 2018 Progress. Work Completed, Week Ending 3/23/18: March 2018 Progress Work Completed, Week Ending 3/23/18: Continued draft curtains and liner panels. Continued running power to hangar doors. Continued installation of bath accessories in the gang bathrooms.

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

SHEPHERD ELEMENTARY SCHOOL

SHEPHERD ELEMENTARY SCHOOL INITIAL YEAR BUILT 1932 BUILDING AREA 79,700 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 355 WARD 4 PROPOSED PROGRAM CAPACITY 400 Site Plan SHEPHERD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Facility Condition Assessment: Final Report. University of Delaware Newark Main Campus McKinly Lab Newark, DE 19716

Facility Condition Assessment: Final Report. University of Delaware Newark Main Campus McKinly Lab Newark, DE 19716 Facility Condition Assessment: Final Report University of Delaware Newark Main Campus McKinly Lab Newark, DE 19716 Submitted by: VFA, Inc. Carlo Pagliarini Project Manager 266 Summer St. Boston, MA 02210-1112

More information

NYC Department of Education

NYC Department of Education Building Assessment Survey 2017-2018 Asset: SAINT FRANCIS COLLEGE - BROOKLYN, 180 REMSEN STREET, New York, 11201 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-02-05

More information

CODE COMPLIANCE PLAN REVIEW PROCEDURES

CODE COMPLIANCE PLAN REVIEW PROCEDURES CODE COMPLIANCE PLAN REVIEW PROCEDURES 1. All construction for state agencies on state-owned or state leased-purchased properties or facilities are to submit design documents for code compliance plan reviews

More information

ADDENDUM 2 - JULY 14, 2015

ADDENDUM 2 - JULY 14, 2015 7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

NYC Department of Education

NYC Department of Education Asset: Building Assessment Survey 2017-2018 PRE-K CENTER @ 132-10 JAMAICA AVENUE - QUEENS, 132-10 JAMAICA AVENUE, New York, 11418 Inspection Id Inspection Type Time In Last Edited SA : Architectural -

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S. 207 - QUEENS, 159-15 88 STREET, New York, 11414 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-03-23

More information

Corsicana High School

Corsicana High School Contents Corsicana High School...2 General comments, campus capacity, and student demographics...2 1.0 School Site...4 2.0 Building Systems and Components...6 3.0 Building Safety and Security...19 4.0

More information

2016 BOND INFORMATION

2016 BOND INFORMATION 2016 BOND INFORMATION This publication is provided as a public service by the offices of Operations and Maintenance, Communications and Financial Services. www.svvsd.org @svvsd 395 South Pratt Parkway,

More information

6 Holub Middle School Overall Site Plan Gymnasium Floor Plan Exterior Perspective Before Exterior Perspective - After

6 Holub Middle School Overall Site Plan Gymnasium Floor Plan Exterior Perspective Before Exterior Perspective - After Contents 1 Program Outline Gymnasium Restrooms Storage rooms IDF 2 Finish Outline Walls Flooring Ceiling Roof 3 MEP Outline Plumbing Mechanical Electrical 4 Communication and Security Guideline Communication

More information

Existing Site Aerial Frederick High School Feasibility Study September 5, 2012

Existing Site Aerial Frederick High School Feasibility Study September 5, 2012 Existing Site Aerial Building Developmental History 1981 1966 1939 1977 1978 1955 1966 Exterior Roof: Most of existing roof has multi ply built up roofing. Some areas have gravel ballast, others have cap

More information

Menchaca Elementary School Site Summary

Menchaca Elementary School Site Summary 1 Menchaca Elementary School Site Summary Address 12120 Manchaca Road Austin, TX 78704 Number of Permanent Campus Facilities 1 Original Year of Construction 1975 Total Campus Building Area (combined) 60,104

More information

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING PROPOSED MAIN ENTRY - EXTERIOR RENDERING EXISTING SITE AERIAL PHOTOGRAPH 6TH STREET NW PEDESTRIAN ACCESS School access to existing alley leads students through vehicular path CHAIN LINK ENCLOSED PARKING

More information

STUART-HOBSON MIDDLE SCHOOL

STUART-HOBSON MIDDLE SCHOOL INITIAL YEAR BUILT 1927 BUILDING AREA 105,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 399 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan STUART-HOBSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington VPS Project No. 2013022.00 Page 1 SPECIFICATIONS VOLUME I INTRODUCTORY INFORMATION Document 000010 - Table of Contents... 6 Document 000011 - Certification and Seals... 2 Document 000012 - Project Directory...

More information

DESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST

DESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST DESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST Check off each item that is included within the submitted Design Development Review Package. Provide a written explanation for any omissions. The following items,

More information

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements SECTION A CM INSTRUCTIONS TO BIDDERS SECTION B BID CATEGORY DESCRIPTIONS & BID FORMS BC-07: Building HVAC and Plumbing BC-08: Building Electric BC-09: General Trades BC-10: Masonry BC-11: Precast Structural

More information

School Without Walls

School Without Walls INITIAL YEAR BUILT 1938 BUILDING AREA 59,400 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 276 WARD 1 PROPOSED PROGRAM CAPACITY 400 SCHOOL WITHOUT WALLS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S. 290 - MANHATTAN, 311 EAST 82 STREET, New York, 10028 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior

More information

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Warnica PS, 9283

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Warnica PS, 9283 5yr Condition Assessment 2006/07 to 2010/11 Construction Year Area 1964 3,035 Page 1 of 27 1. Architectural / Structural & Site Exec Summary Warnica Public School is a one storey structure of masonry construction

More information

Exhibit A Library Shell Construction

Exhibit A Library Shell Construction Exhibit A Library Shell Construction Library Component Building Requirements Approximately 15,000-17,000 square feet plus 900 square feet for mechanical room and additional space on roof for installation

More information

N o v e m b e r

N o v e m b e r WARREN CONSOLIDATED SCHOOLS 2016 BOND PROJECT UPDATE N o v e m b e r 2 0 1 7 Agenda Overview of the Bond 2017 Update 2018 Work 2 Agenda Overview of the Bond 2017 Update 2018 Work 3 Overview of Bond Why

More information

TABLE OF CONTENTS Public Safety Building

TABLE OF CONTENTS Public Safety Building DOCUMENT 00 01 10 - TABLE OF CONTENTS VOLUME I DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 00 31 32 Geotechnical Data DIVISION 01 GENERAL REQUIREMENTS 01 10 00 Summary

More information

WILKINSON ELEMENTARY SCHOOL

WILKINSON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1976 BUILDING AREA 144,900 SF CURRENT PROGRAM CAPACITY 508 ENROLLMENT 2008 451 WARD 8 PROPOSED PROGRAM CAPACITY 600 Site Plan WILKINSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information