1 ADDENDUM NO. 1 Date: for Library Building Waterproofing Project Irvine Valley College - BID No. 344 South Orange County Community College District General-All project documents including contract documents, drawings, and specifications, shall remain unchanged with the exception of those elements added, revised, deleted, or clarified by this addendum. CONTENTS ADDENDUM ITEMS INDEX PAGE 1 ITEMS: 1-1 Questions and Answers PAGE Revised Bid Documents PAGE Job Walk Sign-In Sheet Attachment This part of the page left intentionally blank Page 1 of 12
2 1-1 Questions and Answers Q1. At the job walk the consultant mentioned that the Task Items contained the estimated quantities for the project. However, upon further review, they are not in that section. Can the consultant please provide us the estimated quantities for the work? A1. The updated Task Item specification (including quantities) is attached hereto as part of this Addendum 1. Q2. Can you please provide us with the job walk sign in sheet? A2. The sign in sheet is attached hereto, as part of this Addendum 1. Q3. Can an acrylic coating be used instead of the specified silicone coating on the stucco façade? A3. No. The coating used on the façade must be a silicone elastomeric coating product as specified in the bid documents. Q4. Does the silicone coating need to be applied to the underside of soffit of overhangs? A4. Yes. The silicone coating will change the color and appearance of the building, and therefore will need to be applied to all exterior stucco façade areas. This includes soffits of overhangs, gables at the top of the sloped roofs, and inset walls that will need to be accessed from second floor roofs. Q5. Will site visits for sub consultants be permitted prior to bid due date? A5. Yes. Contact IVC s Construction Manager for the project Anna Petrossian to coordinate additional site visits. Page 2 of 12
3 Q6. How are the gutters attached to the façade? Will replacement require alterations to the metal sloped roofing? A6. The gutter replacement is shown in Detail 5/BE3.0. As specified in Note 3 of the gutter replacement detail, removal of the existing drip flashing at the end of the metal sloped roof will be required to install new membrane and gutter sheet metal. Q7. Are the wider coping caps at the third floor roof parapet being replaced? Are coping caps at higher walls on roofs (approximately 6 feet high) being replaced? A7. Yes. All coping caps throughout the building are being replaced. Q8. Can equipment be driven over pavement? Can equipment be driven over grass? A8. General requirement: all construction activities to be coordinated with and approved by college prior to start of constriction. It is required that at least 48-hour notice is given. Construction Equipment such as Boom lifts can be driven over pavement. Advance notice to be given to college before equipment can be driven over grass. Scaffolding or other means will be required to access construction areas (such as third floor gutters over second floor roofs) not accessible from boom lifts. This part of the page left intentionally blank Page 3 of 12
4 1-2 Revised Bid Documents Replace Specification Section TASK ITEMS with updated specification. See attached revised Section TASK ITEMS on page 5. This part of the page left intentionally blank Page 4 of 12
5 Page 5 of 12
6 Page 6 of 12
7 Page 7 of 12
8 Page 8 of 12
9 Page 9 of 12
10 Page 10 of 12
11 1-3 Job Walk Signs in Sheet The Job Walk Sign-In Sheet is attached: Page 11 of 12
12 Page 12 of 12
ADDENDUM NO. 1. Date: July 6, Lot 3 Improvements Project Irvine Valley College. BID No South Orange County Community College District
ADDENDUM NO. 1 Date: Lot 3 Improvements Project BID No. 352 South Orange County Community College District General-All project documents including contract documents, drawings, and specifications, shall
More informationButte County Fire Department Fire Prevention Bureau 176 Nelson Avenue Oroville, CA Office (530)
2016 CBC Chapter 7A and CRC Section R337 (The use of paints, coatings, stains, or other surface treatments are not an approved method of protection as required in this chapter.) The Wildland Urban Interface
More informationADDENDUM NO. 1. Date: January 11, for. RFQ for Design-Build Entity, Health Center/ Concession Project at Irvine Valley College. BID No.
ADDENDUM NO. 1 Date: January 11, 2017 for RFQ for Design-Build Entity, Health Center/ Concession Project at Irvine Valley College BID No. 332 South Orange County Community College District General-All
More informationDOCUMENT ADDENDUM NO. 1
DOCUMENT 00 91 01 ADDENDUM NO. 1 1. GENERAL This document includes requirements that clarify or supersede portions of the bid and/or contract requirements for the project. This Addendum is a Contract Document.
More informationThe Housing Authority of the County of Marin ( MHA ) 4020 Civic Center Drive. San Rafael, CA Addendum #1. Released October 3, 2016
The Housing Authority of the County of Marin ( MHA ) 4020 Civic Center Drive San Rafael, CA 94903 Addendum #1 Released October 3, 2016 Addendum #1 to IFB MHA-010-2016 Re-Roofing, HVAC Unit Replacements
More informationNFL Building Sloped Roof Replacement
NFL Building Sloped Roof Replacement Summary of Scope of Work The NFL Building has sloped asphalt shingle roofs and flat roofs, this project includes the replacement of the sloped main roofs and small
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1
SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 3: Roofs 1 & 3 DATE: December 29, 2017 1235 Mission
More informationWesleyan University 1.1 RELATED INFORMATION, DOCUMENTS AND REQUIREMENTS
Wesleyan University SCOPE OF WORK 346 WASHINGTON STREET ASPHALT ROOF REPLACEMENT PROJECT 23AB VINE STREET ASPHALT ROOF REPLACEMENT PROJECT 72 HOME NORTH SIDE ROOF REPLACEMENT 64 FOUNTAIN AVE ROOF REPAIR
More informationTELEPHONE: (215) ADDENDUM No. 1
THE SCHOOL DISTRICT OF PHILADLPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 ADDENDUM No. 1 Subject:
More informationPebbletex Wall System Class PB Exterior Insulation and Finish System providing a primary moisture barrier. Typical Details
Pebbletex Wall System Class PB Exterior Insulation and Finish System providing a primary moisture barrier Typical Details (THIS PAGE INTENTIONALLY LEFT BLANK Pebbletex Wall System Class PB Exterior Insulation
More informationSECTION R327.3 STANDARDS OF QUALITY
California Residential Code Section R327 Conformance Checklist Per CRC R327.1.4 The local building official shall, prior to construction, provide the owner or applicant a certification that the building
More informationROME ART AND COMMUNITY CENTER
ROME ART AND COMMUNITY CENTER 308 W. Bloomfield St. Rome, NY 13440 INSULATION AND SLATE ROOFING REPAIRS SCOPE OF WORK: A. SPRAY FOAM INSULATE ATTIC AREA B. FRONT ROOF REPAIR C. REAR ROOF REPAIRS D. INTERIOR
More informationSpring Lake Public Schools. Spring Lake, MI. March RE: High School Storage Buildings
Spring Lake Public Schools Spring Lake, MI March 2018 RE: High School Storage Buildings Advertisement for bids Bid Proposal Sealed bids for Spring Lake Public Schools-High School Storage Buildings will
More informationS C H A M U M A C H O W S K I G R E C O PROJECT #11526 WEST VIRGINIA NORTHERN COMMUNITY COLLEGE WHEELING CAMPUS STUDENT CENTER/BARNES & NOBLE
S C H A M U M A C H O W S K I G R E C O ADDENDUM #3 PROJECT #11526 WEST VIRGINIA NORTHERN COMMUNITY COLLEGE WHEELING CAMPUS STUDENT CENTER/BARNES & NOBLE MARYLAND 1016 MORTON ST. BALTIMORE, MD 21201 TEL
More informationTable of Contents. 3. Exposed Fastener Panels
Table of Contents 895 North Parkway 3. Exposed Fastener Panels Exposed Fastener Panels Table of Contents... PE1-2 PBR... PE3-4 PBA... PE5-6 AVP... PE7-8 PBU... PE9-10 PBC... PE11-12 PBD... PE13-14 7.2...
More information(d) Metal buildings used for industrial uses are not exempt from additional landscape standards as required in Section (e).
5.22. Non-Residential and Multifamily Design Standards. 5.22-1 Applicability of Non-Residential Design Standards. All non-residential and multifamily buildings, with the exception of those described in
More informationMASONRY, ARCHITECTURE DESIGN AND BUILDING STANDARDS
MASONRY, ARCHITECTURE DESIGN AND BUILDING STANDARDS 4.5500 RESERVED 4.5501 MASONRY STANDARDS FOR CENTRAL BUSINESS DISTRICT (CBD) a) All buildings and structures shall be of exterior fire resistant construction,
More informationSTONE COATED METAL ROOF SHINGLE
GUIDE SPECIFICATION Manufacturer: A Fletcher Building Company 1230 Railroad Street Corona, CA 92882 951-272-8180 phone 951-272-4476 facsimile www.decra.com SECTION 07313 [07 31 13] STONE COATED METAL ROOF
More informationMaintaining Materials Within the District
Maintaining Materials Within the District The prevalent styles found within the district utilize various common building materials of the Tampa Bay area. Wood siding and brick flourish as the dominant
More informationADDENDA #5- RFP Sylvania CC building Re-Roof Progressive Design Build for Sylvania Campus CC Building Re-Roof Services
ADDENDA #5- RFP Sylvania CC building Re-Roof Progressive Design Build for Sylvania Campus CC Building Re-Roof Services Addenda Dated: 01/16/2018 PURPOSE: The purpose of this Addenda #5 is to provide a
More informationMETACRYLICS ACRYLIC ROOF TOP PENETRATION ROOF DETAILS
METS TOP PENETRATION DRAWING INDEX: C-01 - COVER PAGE & DRAWING INDEX SHEET A-01 - WALKING PAD A-02 - METAL PARAPET CAP AND BASE FLASHING A-03 - SKYLIGHT A-04 - PLUMBING VENT A-05 - DRAIN A-06 - SCUPPER
More informationBuilding Enclosure Detailing for Balconies
Building Enclosure Detailing for Balconies COLIN SHANE M.ENG., P.ENG., P.E. ASSOCIATE, SENIOR PROJECT MANAGER RDH BUILDING SCIENCE INC. AUGUST 2016 Disclaimer: This presentation was developed by a third
More informationCITY SECTION 701A 702A. of this chapter. Protection
CITY OF BIG BEAR LAKE BUILDING CODE CHAPTER 7A MATERIALS AND CONSTRUCTION METHODS FOR EXTERIOR WILDFIRE EXPOSURE SECTION 701A SCOPE, PURPOSE AND APPLICATION 701A.1 Scope. This chapter applies to building
More informationJ.DAVID POUNDER LIMITED CONSULTING ENGINEER AND ARCHITECT
J.DAVID POUNDER LIMITED CONSULTING ENGINEER AND ARCHITECT Using a Multidisciplinary Approach to Projects for Over 0 Years Project 5 Mapleview Terrace Apartments, 59 South Pelham Road, Welland Addendum
More informationRFI REPLY. Project: Palm Coast Readiness Center Date: 07/22/16 Flagler County, Florida Comm. No.: 09005
Project: Palm Coast Readiness Center Date: 07/22/16 Flagler County, Florida Comm. No.: 09005 To: All Bidding General Contractors Fax Email U.S. Mail Attn. Messenger We are sending the following: Quick
More informationArchitectural Standards
Page 1 PROJECT INFORMATION Project Name: Applicant/Agent: Date: File # OFFICIAL USE NON-RESIDENTIAL STANDARDS INDUSTRIAL DISTRICTS Cohesive Design, Non-Residential Standards (cds) 1.00 Promote visually
More informationInstallation Guide MATTERHORN METAL ROOFING TO LAST A LIFETIME. MATTERHORN Tile
Installation Guide MATTERHORN METAL ROOFING TO LAST A LIFETIME MATTERHORN Tile Watch detailed installation videos online at matterhornmetalroofing.com/tile-installation Table of Contents Accessories: Most
More informationPROLOK EAVE PROLOK ROOFING PANEL ROOFING NAIL
EAVE ROOFING NOTE: ROOF PITCH IS REQUIRED FOR FABRICATION LOW SLOPE ADD SEALER TAPE ROOFING NAIL 2x4 SUB- 2x8 EAVE TRIM 1. Install the eave trim using roofing nails. 2. If sealer tape is being used, install
More informationVirginia. County of Powhatan, Application: Development Design Pattern Book. For Office Use Only. Case Number. Date of Approval
County of Powhatan, Virginia Application: Development Design Pattern Book For Office Use Only Case Number Date of Approval Powhatan County, Virginia Department of Community Development 3834 Old Buckingham
More informationDIVISION 7 - THERMAL AND MOISTURE PROTECTION
07100 WATERPROOFING 07150 DAMPPROOFING 07175 Water Repellent Coatings 07190 VAPOR AND AIR RETARDERS 07192 Vapor Retarders 07200 INSULATION 07240 Exterior Insulation and Finish Systems 07250 FIREPROOFING
More informationYOU ARE DIRECTED TO MAKE THE FOLLOWING
MCA Michael Calafati Architect, LLC 510 Bank Street, P.O.Box 2363, Cape May, NJ 08204 T 609 884 4922 F 609 884 8608 www.calafati.com Addendum No. 1 Date: Friday, August 10, 2018 To: Re: From: Copy: Length:
More informationOREGON ROOF CONSULTING - ROOF INSPECTION FORM
Oregon CCB: 199121 PO Box 220190, Milwaukie, OR 97222 Washington License: OREGORC871MR OREGON ROOF CONSULTING - ROOF INSPECTION FORM General Roof Conditions: NA = Not Applicable Debris on Roof Physical
More informationADVERTISEMENT FOR BIDS
ADVERTISEMENT FOR BIDS 1. INVITATION Sealed proposals for the following work will be received by the University of Kentucky, Construction Procurement Section, Peterson Service Building, 411 South Limestone,
More informationAddendum # 1 Perdue Stadium Seating Bowl Improvements Date of Addendum: 09/07/16
Wicomico County Purchasing 125 N. Division St. Room B-3 Salisbury, MD 21801 Ph. 410-548-4805 Fax 410-334-3130 Email: purchasing@wicomicocounty.org Addendum # 1 Perdue Stadium Seating Bowl Improvements
More informationSTATE PROJECT NUMBER TZ MnDOT
1.1 NOTICE TO RESPONDERS ADDENDUM NUMBER SIX DATED 24 October 2014 MnDOT LITTLE FALLS TRUCK STATION 15038 Pine Avenue, Little Falls MN 56345 STATE PROJECT NUMBER TZ 90468 WIDSETH SMITH NOLTING 610 Fillmore
More informationFOR IFB #PC436 Exterior Improvements at Colton Public Housing Complex
HOUSING AUTHORITY OF THE COUNTY OF SAN BERNARDINO PROCUREMENT AND CONTRACTS DEPARTMENT 715 E. BRIER DRIVE, SAN BERNARDINO, CA 92408 (909) 890-0644 FAX (909) 890-2349 http://www.hacsb.com/procurement.htm
More informationMarch 28, Addendum #4 IFB SA 1713 POTOMAC MILLS T23 WATER TANK REHABILITATION
Procurement Department P.O. Box 2266 Woodbridge, Virginia 22195-2266 Fax (703) 335-7954 March 28, 2017 Addendum #4 IFB SA 1713 POTOMAC MILLS T23 WATER TANK REHABILITATION THIS SOLICITATION IS HEREBY AMENDED
More informationADDENDUM # 2 LOUISA COUNTY PUBLIC LIBRARY ROOF REPLACEMENT PROJECT IFB# GS-18-02
August 25, 2017 To: From: Prospective Bidders, and Plan Holders County of Louisa, Dewberry and HDH Associates ADDENDUM # 2 LOUISA COUNTY PUBLIC LIBRARY ROOF REPLACEMENT PROJECT IFB# GS-18-02 CHANGES AND
More informationBid due date has been extended. Bids are due Wednesday, December 7 th at 2:00PM
AA. GENERAL STANDARDS AND CONDITIONS AA.1 AA.2 AA.3 AA.4 Bid due date has been extended. Bids are due Wednesday, December 7 th at 2:00PM Bids shall be emailed to Doug Sage at GSG Group, Inc. - Doug@GSGGroup.net.
More informationInsured: John Doe Home: (123) Property: 123 Meadow Road. Hail City, TX 43252
1 Insured: John Doe Home: (123) 456-7891 Property: 123 Meadow Road E-mail: Johhn@1yahoo.com Hail City, TX 43252 Estimator: Company: E877879 Claim Number: 123456789 Policy Number: 123-45-678EE Type of Loss:
More informationCLARIFICATION #4 HARRISON / DEVER CRIB COMPLEX STRUCTURAL RENOVATIONS. SPECIFICATION Number:
CLARIFICATION #4 HARRISON / DEVER CRIB COMPLEX STRUCTURAL RENOVATIONS SPECIFICATION Number: 300528 Bids will be opened in the Bid & Bond Room 103, City Hall Chicago, Illinois 60602, on April 18, 2017 at
More informationUpdate In Progress. Division 7 Thermal and Moisture Protection Page Section ROOFING AND WATERPROOFING
Section 07 10 00 ROOFING AND WATERPROOFING Page 07 10 00-1 1. GENERAL REQUIREMENTS A. Indicate applicable American Society for Testing and Materials (ASTM) specification in this section. 01. Fire resistance
More informationBuilding Enclosure Detailing for Balconies
Building Enclosure Detailing for Balconies COLIN SHANE M.ENG., P.ENG., P.E. PRINCIPAL, SENIOR PROJECT MANAGER RDH BUILDING SCIENCE INC. JUNE 2017 Disclaimer: This presentation was developed by a third
More informationOscar Stanton De Priest House Preservation Consultant Request for Proposal due February 12, 2018, COB January 18, 2018
Oscar Stanton De Priest House Preservation Consultant Request for Proposal due February 12, 2018, COB January 18, 2018 Project Overview Landmarks Illinois (LI) is seeking qualified Preservation Consultant
More informationARCHITECTURAL GUIDELINES
ARCHITECTURAL GUIDELINES The Hamptons/Newport Series April 2011 Page 1 Newport Series Addendum - May 2014 2.1 Siting The minimum front yard setback is 3.0 meters when a landscaped
More informationE Main Street June 14, 2010 Landmarks Commission Meeting
Madison Landmarks Commission First Settlement Historic District Criteria for the review of new construction Address: Date: Form Prepared By: 517-523 E Main Street June 14, 2010 Landmarks Commission Meeting
More informationNEW ILLUMINATED LED SIGNAGE PAINTED STOREFRONT W/ VINYL GRAPHIC AND NEW LED SIGNAGE PAINT FINISHES (PROVIDE (2) COATS FOR ALL PAINTING) PT-1
MTA RR APPARATUS NEW ILLUMINATED LED SIGNAGE LIGHTWEIGHT REMOVABLE ALUMINUM PANEL FENCE 88 NORTH AVE CDR JOB NO. 60 NORTH AVE NORTH AVE CURRENT VIEW OF 88 NORTH AVENUE PROPOSED FACADE AT 88 NORTH AVENUE
More informationADDENDUM NO. 1 REQUEST FOR CLARIFICATIONS/INTERPRETATIONS FOR. RFQ No. 16P3
ADDENDUM NO. 1 REQUEST FOR CLARIFICATIONS/INTERPRETATIONS FOR RFQ No. 16P3 CHAFFEY COMMUNITY COLLEGE DISTRICT ARCHITECTURAL DESIGN SERVICES MEASURE L PROJECT RANCHO CUCAMONGA, CA July 30, 2015 CHAFFEY
More informationNMHU STUDENT UNION BUILDING STUDIO SW PROJECT NO 0918
NMHU STUDENT UNION BUILDING STUDIO SW PROJECT NO 0918 MAY 03, 2010 ADDENDUM 4 Project: NMHU Student Union Building Architect's Project Number: 0918 IFB # 905 From: Studio Southwest Architects To: Prospective
More information4615 E. State Street Suite 206 Rockford Illinois /
ADDENDUM NO. 2 Date: April 29th 2015 4615 E. State Street Suite 206 Rockford Illinois 61108 815 / 397-3330 Project: Whiteside County Health Department New Facility and Interior Renovation Project Number:
More informationRoof Tutorial. Chapter 3:
Chapter 3: Roof Tutorial The majority of Roof Tutorial describes some common roof styles that can be created using settings in the Wall Specification dialog and can be completed independent of the other
More information2. House Designs. SAL Review
2. House Designs 1 Roof has a minimum of 6:12 pitch 2 Minimum roof overhang is 2 feet 3 Roof design must incorporate dormers or gables to the 4 Long slopes of unbroken roof line will not be accepted 5
More informationADDENDUM NO. 6. Date: July 27, Health Center Concessions and Parking Lot Phase 1A Irvine Valley College
ADDENDUM NO. 6 Date: July 27, 2018 Health Center Concessions and Parking Lot Phase 1A Irvine Valley College Bid No. 350 South Orange County Community College District General-All project documents including
More informationMagnum Board Coatings
Master Wall Mesh and Base Coat Plastic Control Joint Accessory, Plastic Components 22027-16 or equal. See notes for placement recommendations Notes: Control joints are required and should be located by
More informationMulti-Institutional Academic Health Science & Research Center Evansville, IN
SECTION 061600 - SHEATHING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationCERTIFICATE OF APPROPRIATENESS APPLICATION
City Planning and Development Department - Historic Preservation Office 16 th Floor, City Hall, Room 1603 414 East 12 th Street (816) 513-2902 Kansas City, Missouri 64106-2795 Fax (816) 513-2899 kchp@kcmo.org
More informationRESPONSES TO QUESTIONS. March 1, 2018
MPA CONTRACT NO. H275-C1 HANSCOM AIRCRAFT RESCUE FIRE FIGHTING / UNITED STATES CUSTOMS AND BORDER PROTECTION FACILITY L.G. HANSCOM FIELD, BEDFORD, MASSACHUSETTS RESPONSES TO QUESTIONS March 1, 2018 The
More informationWeatherproofing Masonry For Northern Climates
The enduring strength, beauty and performance of a brick wall assembly is critically dependant on three components: design, workmanship and materials. If even one of these factors has not been diligently
More informationROOFING CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION
ROOFING CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION Revised September 14 The General Trade Knowledge portion of the examination is administered daily in Computer Based Testing (CBT)
More informationNEW SINGLE-FAMILY, MAJOR MODIFICATION, AND ACCESSORY DWELLING UNIT Submittal Checklist
NEW SINGLE-FAMILY, MAJOR MODIFICATION, AND ACCESSORY DWELLING UNIT Submittal Checklist All new single-family residences, major modifications to existing single-family residences, and accessory dwelling
More informationSAMPLE REPORT Location:
Stucco Check Inspections, LLC Invasive Stucco Inspection Prepared for: SAMPLE REPORT Location: Sample Houston, TX PHONE: 713.319.5751 EMAIL: Info@stuccocheck.com I. INTRODUCTION 1.1 PURPOSE: Enclosed is
More informationEIFS Rain Control EIFS. Face Sealed Perfect Barrier. Beware of EIFS: They must be done correctly They leak at joints Avoid moist sensitive substrate
EIFS Rain Control Both Drained and Perfect Barrier can be used Joints and Element can be designed differently Face Sealed Perfect Barrier The problem wall of the past Relies on sealant = dangerous Often
More informationDIVISION 07 THERMAL AND MOISTURE PROTECTION ROOFING
07 00 00 PART 1 - GENERAL 1.01 DESIGN CRITERIA A. Preferred roofing types include Membrane, Metal, and Composition Shingles. 1. Membrane roofing is preferred for flat roof decks. 2. Use of asphalt-based
More informationRoof Tutorial. Getting Started with Automatic Roof Styles
Roof Tutorial The majority of Roof Tutorial describes some common roof styles that can be created using settings in the Wall Specification dialog and can be completed independent of the other tutorials.
More informationGUIDANCE DOCUMENT IGNITION RESISTANT EAVE CONSTRUCTION
GUIDANCE DOCUMENT IGNITION RESISTANT EAVE CONSTRUCTION Since the 1980s, the County s fire and building codes have been strengthened in successive code adoption cycles with the primary goal of protecting
More informationINSPECTION TYPE EIFS system, Visual, Tramex & Delmhorst probe moisture readings
FINEGAN INSPECTION SERVICES, INC. 27 Laurelwood Drive Milford Ohio, 45150 513 683-0733 RESIDENCE LOCATION INSPECTION TYPE EIFS system, Visual, Tramex & Delmhorst probe moisture readings OVERVIEW The report
More informationSpan-Lok hp, Curved Span-Lok, & SpanSeam Guide Specifications
Span-Lok hp, Curved Span-Lok, & SpanSeam Guide Specifications MANUFACTURER - AEP SPAN 2141 Milwaukee Way, Tacoma, WA 98421, 800-733-4955 10905 Beech Avenue, Fontana, CA 92337 This Guide Specification is
More informationTrims for flat roofing. GRP Trims for flat roofing
Trims for flat roofing GRP Trims for flat roofing SUITABLE FOR BOTH NEW BUILD AND REFURBISHMENT PROJECTS ROOFLOCK GRP Trims for flat roofing Maintenance free and easy to install Lightweight, with superior
More informationA. Submit product data sheets and literature verifying physical properties of materials.
I. GENERAL ACRYPLY ROOFING SYSTEM Installation Guide Specification 07560 1-Ply All Acrylic System for EPDM Roofs - 10 Year Saving Money, Safeguarding the Environment One Roof at a Time. 1.01 SUMMARY A.
More informationCONSTRUCTION IMPORTANT TERMS AND FACTS CHAPTER 15
CONSTRUCTION IMPORTANT TERMS AND FACTS CHAPTER 15 Copyright 2004 CONSTRUCTION The following are twenty key construction components and basic facts that are to be considered high priority. Please refer
More informationRoof Tutorial Wall Specification
Roof Tutorial The majority of Roof Tutorial describes some common roof styles that can be created using settings in the Wall Specification dialog and can be completed independent of the other tutorials.
More informationARTICLE 12 INTERNATIONAL RESIDENTIAL CODE 2012 International Residential Code Modification Summary (Statutory Authority: 1976 Code Section )
8-1200. International Residential Code. ARTICLE 12 INTERNATIONAL RESIDENTIAL CODE 2012 International Residential Code Modification Summary (Statutory Authority: 1976 Code Section 6-9-40) NOTE-This article
More informationROLL CALL APPROVAL OF THE AGENDA 1. WORKSESSION TOPICS
Design Review & Historic Preservation Board Meeting Agenda Puyallup City Hall - Room 504 333 South Meridian, Puyallup 98371 Thursday, November 15, 2018 4:00 PM ROLL CALL APPROVAL OF THE AGENDA 1. WORKSESSION
More informationCentral Texas Metal Roofing Supply Co., Inc NET COVERAGE SHEET WIDTH
1 2 " 1 24" GAUGE PANEL FINISH NET COVERAGE SHEET WIDTH WEIGHT PER SQ. 26 5 Vee GALVALUME 24 26 3/8 95.00 PRICE PER SQ. PRICE PER LINEAR FOOT PANEL PRICING: 1. Price per Square is based on 26 3/8 sheet
More informationOHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO
OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO 43216-0899 July 20, 2018 To: Users of the Bridge Design Manual From: Tim Keller, Administrator, Office of Structural
More informationPublic Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California Tel
Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California 93030 Tel 805.385.8280 October 24, 2018 ADDENDUM NO. 2 Vineyard Avenue Street Resurfacing Project PW 16-12 SCHEDULED
More informationArchitectural Inspection Pitched Roofing
Architectural Inspection Pitched Roofing 0511 Pitched Roofing All components of the roof system including insulation Description of the building system Three types of pitched roofing are found at the Gastineau
More informationSECTION Tile Roof Guideline. B. "Pan" Tile: Clay tile on the underlayment, convex in shape.
SECTION 07 32 13 Tile Roof Guideline PART 1 GENERAL 1.1 RELATED DOCUMENTS A. The drawings and general provisions of the contract, including General and Specific Conditions, and Division 1 (General Requirements)
More information1 Exam Prep Architectural Sheet Metal Manual Tabs and Highlights
1 Exam Prep Architectural Sheet Metal Manual Tabs and Highlights These 1 Exam Prep tabs are based on the 2012 Sheet Metal and Air Conditioning Contractors' National Association, Inc., seventh edition.
More informationCity of Miami ADDENDUM NO. 5. January 12, 2017 INVITATION TO BID NO.: CURTIS PARK NEW SWIMMING POOL FACILITY
City of Miami ADDENDUM NO. 5 January 12, 2017 INVITATION TO BID NO.: 15-16-040 CURTIS PARK NEW SWIMMING POOL FACILITY OFFICE OF CAPITAL IMPROVEMENTS ( OCI ) PROJECT NO.: TO: ALL PROSPECTIVE BIDDERS: The
More informationCollege Hill Building Stabilization College Hill Community Urban Redevelopment Corporation
MEET AND CONFER AGENDA MEETING DATE: August 28, 2018 TIME: 9:00 A.M. LOCATION: City of Cincinnati, 805 Central Avenue, 7 th Floor MEETING FACILITATOR: Nyemah Stark, Senior Community Development Analyst
More informationApplication Specification:
Application Specification: August 2014 Supersedes 8/11 DIVISION: 07 57 00 22 MIL GACOFLEX S-20 SERIES SOLVENT-FREE SILICONE ELASTOMERIC COATING SYSTEM OVER SEAMLESS SPRAYED IN PLACE POLYURETHANE FOAM INSULATION
More informationThe Reconstruction of the Tony Dapolito Recreation Center 1 Clarkson Street New York, NY March 20, 2018
The Reconstruction of the Tony Dapolito Recreation Center 1 Clarkson Street New York, NY 10014 March 20, 2018 Table of Contents: Site Location Historical Context Existing Conditions Scope of Work Roof
More information6" TRIM AT GARAGE DOORS (TYP) 6" TRIM (TYP) OPTIONAL PATIO DOOR
GABLE END x0 TRIM (TYP) A6. PTD. ALUM GUTTER (TYP) MODEL 67 - OVATION MODEL - BRAVO 0.670.7 09'- /8" 00'-0" " WATER 6" CORNER TRIM (TYP) 6" TRIM AT GARAGE DOORS (TYP) OPTIONAL PATIO DOOR AMERICAN TRADITIONAL
More informationADDENDUM #1 REQUEST FOR COMPETITIVE SEALED PROPOSALS FOR A GENERAL CONTRACTOR. UT Health San Antonio Roof Replacement, Administration Bldg.
ADDENDUM #1 REQUEST FOR COMPETITIVE SEALED PROPOSALS FOR A GENERAL CONTRACTOR UT Health San Antonio Roof Replacement, Administration Bldg. RFP No.: 745-18-P05 RFP Submittal Due Date 3:00 PM; Tuesday, September
More informationCentral Texas Metal Roofing Supply Co., Inc 36" SHEET WIDTH 38 ¼ 40 ¼ 38 ¼ 40 ¼ 38 ¼ 40 ¼ 40 ¼ 40 ¼ NET COVERAGE
3 4 " 9" 36" GAUGE PANEL FINISH 26 26 26 26 24 24 24 24 FRONTIER RIB LAP GUARD FRONTIER RIB LAP GUARD FRONTIER RIB LAP GUARD LAP GUARD LAP GUARD GALVALUME GALVALUME SMP SMP GALVALUME GALVALUME KYNAR500
More informationCentral Texas Metal Roofing Supply Co., Inc 36" NET COVERAGE SHEET WIDTH 38 ¼ 40 ¼ 38 ¼ 40 ¼ 38 ¼ 40 ¼ 40 ¼ 40 ¼
36" 1 2 " 6" GAUGE PANEL FINISH NET COVERAGE SHEET WIDTH WEIGHT PER SQ. 26 26 26 26 24 24 24 24 TEXAS RIB CHANNEL GUARD TEXAS RIB CHANNEL GUARD TEXAS RIB CHANNEL GUARD CHANNEL GUARD CHANNEL GUARD GALVALUME
More informationSOLAR COATING SYSTEMS ACRYLIC RENOVATION ROOF 4.5. Specification for Built-Up Roofing SUMMARY
SOLAR COATING SYSTEMS ACRYLIC ROOF RENOVATION 4.5 Specification for Built-Up Roofing 07590 PART 1. GENERAL 1.01 SUMMARY NAME ADDRESS A. Furnish and install a seamless, waterproof spray applied elastomeric
More informationTELEPHONE: (215) Addendum No. 1
THE SCHOOL DISTRICT OF PHILADLPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor - Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 1 Subject:
More informationChapter MXRR-DRO RIVER ROADMIXED USE DESIGN REVIEW OVERLAY ZONE
Chapter 20.52 MXRR-DRO RIVER ROADMIXED USE DESIGN REVIEW OVERLAY ZONE Sections: 20.52.001 MXRR-DRO zone. 20.53.002 Applicability. 20.52.003 Repealed. Design review and historic preservation board review.
More informationSee attached sketches showing clarifications to Gaylord Entry Roof and Bridge Roof per review and on site and with Central States Roofing.
ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS AIA DOCUMENT G710 (Instructions on reverse side) Owner 1 Architect 1 Consultant 1 Contractor 1 Field 0 Other 0 PROJECT: OWNER: The Edge @ City Park 1855 Gaylord Street
More informationRESIDENTIAL/COMMERICIAL ROOFING APPLICATION Date / / BUILDING PERMIT APPLICATION
Community Development 1050 W Romeo Rd, Romeoville, IL 60446-1530 (815) 886-7200 Fax: 815/886-2724 Email: buildinginspections@romeoville.org RESIDENTIAL/COMMERICIAL ROOFING APPLICATION Date / / BUILDING
More informationDIVISION 7 THERMAL AND MOISTURE PROTECTION
DIVISION 7 THERMAL AND MOISTURE PROTECTION UCSC Campus Standards Handbook Waterproofing Standards 07100 1 SECTION 07100: WATERPROOFING STANDARDS A. Guarantee 1. Provide a guarantee on Contractor's letterhead
More informationAddendum #4 NEW LOW HEAD OXYGEN SYSTEM Contractor EXHIBIT T SPECIAL PROVISIONS SECTION METAL SHADE STRUCTURE
SECTION 13 34 00 METAL SHADE STRUCTURE PART 1 - GENERAL 1.01 STRUCTURE TYPE A. Structure shall be free standing rigid frame and gable roof with slopes as indicated. Structure shall also include foundation,
More informationAn ordinance amending CHAPTER 51A, "PART II OF THE DALLAS. DEVELOPMENT CODE," of the Dallas City Code, as amended, by establishing
I ORDINANCE NO. --=2=--2 8=--;_7_9;;. 9-03-96 An ordinance amending CHAPTER 51A, "PART II OF THE DALLAS DEVELOPMENT CODE," of the Dallas City Code, as amended, by establishing Historic Overlay District
More informationSC-01 Cross-Section. Cement Board Substrate Master Wall Mesh and Base Coat Superior Finish
Master Wall Mesh and Base Coat Plastic Control Joint Accessory, Plastic Components 22027-16 or equal. See notes for placement recommendations Notes: Control joints are required and should be located by
More informationFirstEnergy Program Overview
FirstEnergy Program Overview Builder incentives $400 per unit + $0.10/kWh in projected savings Eligibility Located in service area of a FirstEnergy Utility Certificate of Occupancy Dates: FirstEnergy Ohio
More informationADDENDUM #1. A non-mandatory site visit has been scheduled for Thursday, January 5, 2017 at 1:30 p.m.
Steven V. Stenger County Executive Pamela J. Reitz, CPFO Director of Administration Rick Schaeffer Director of Procurement December 27, 2016 ADDENDUM #1 To: From: Subject: All Potential Proposers St. Louis
More informationAccent is cracked with stains Accent is sloped away from the home Flat accent is not sealed to window
Glossary of Terms Accent Bands/Trim Bands An accent band is decorative stucco trim constructed over a wood or EIFS foam attachment. Trim bands are decorative bands constructed of wood or other material.
More information