patersongroup Phase I - Environmental Site Assessment Vacant Property 1034 McGarry Terrace and 1117 Longfields Drive Ottawa, Ontario Prepared For

Size: px
Start display at page:

Download "patersongroup Phase I - Environmental Site Assessment Vacant Property 1034 McGarry Terrace and 1117 Longfields Drive Ottawa, Ontario Prepared For"

Transcription

1 Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Phase I - Environmental Site Assessment Vacant Property 1034 McGarry Terrace and 1117 Longfields Drive Ottawa, Ontario Archaeological Services Prepared For Ontario Inc. Paterson Group Inc. Consulting Engineers 154 Colonnade Road South Ottawa (Nepean), Ontario Canada K2E 7J5 November 3, 2017 Tel: (613) Fax: (613)

2 TABLE OF CONTENTS PAGE EXECUTIVE SUMMARY.... i i 1.0 INTRODUCTION PROPERTY INFORMATION SCOPE OF INVESTIGATION RECORDS REVIEW General Environmental Source Information Physical Setting Sources INTERVIEWS SITE RECONNAISSANCE General Requirements Specific Observations at the Phase I Property Enhanced Investigation Property Phase I-ESA Study Area REVIEW AND EVALUATION OF INFORMATION Land Use History Areas of Potential Environmental Concern and Potential Contaminating Activities Conceptual Site Model CONCLUSIONS STATEMENT OF LIMITATIONS REFERENCES November 3, 2017 Page i

3 List of Figures Figure 1 - Key Plan Figure 2 - Topographic Map Drawing PE Site Plan Drawing PE Surrounding Land Use Plan List of Appendices Appendix 1 Chain of Title Topographical and Survey Plans Aerial Photographs Appendix 2 Appendix 3 MOE Freedom of Information Response TSSA Correspondence City of Ottawa HLUI Response MOE Well Records Qualifications of Assessors November 3, 2017 Page ii

4 EXECUTIVE SUMMARY Assessment The historical research indicated that 1034 McGarry Terrace has been owned primarily by individuals since at least 1859, and was originally developed as a residential farmstead. The property at 1117 Longfields Drive has always been vacant and undeveloped. An automotive garage was later constructed and operated on the subject site (1034 McGarry Terrace portion). As discussed in this report, Paterson reviewed a Phase I-II-ESA report and a remediation report prepared by another consultant which addressed the garage operation. Contaminated soil and liquid waste materials were removed from the site. Based on the results of the remediation report, the clean-up was considered to have been effective in removing the contamination. The results of the historical research and site assessment identified two (2) types of potentially contaminating activities (PCAs) on the subject site and none on adjacent properties. The resulting areas of potential environmental concern include: former use of the property as an automotive service garage (APEC1) and former underground fuel storage tanks (APEC2). No other PCAs or APECs were identified within the study area. Adjacent lands have been used for residential and agricultural purposes for many years, until recently, when commercial establishments have been constructed to the west of the site, and an institutional building to the east of the site. No environmental concerns were identified with regards to the historical use of adjacent lands. Following the historical review, a site visit was conducted in At the time, a residential building and two (2) garage buildings are present on the west side of the subject property, while the east side of the property remains vacant and covered with vegetation. No environmental concerns were identified with regards to properties within the Phase I-ESA study area. Neighbouring properties were observed to be residential to the north, institutional to the east, new residential construction to the south and a commercial centre to the west. Following a recent review of site photos, it was determined that the residential dwelling and one of the garages have been demolished following a fire. Although a remediation was conducted on the property to address the former auto garage, the works were conducted in 1997, under different standards than those currently in use. In order to verify that the findings of the remediation satisfy the current MOE standards, in our opinion, a Phase II - Environmental Site Assessment will be required for the property. November 3, 2017 Page iii

5 Recommendations As discussed in Section 6.2 of this report, due to the age of the structures on the subject property, asbestos may be present within the drywall joint compound, plaster and ceiling tiles. Lead-based paint may also be present within the buildings. Potentially asbestos containing materials and painted surfaces were generally in good condition at the time of the site visit. Prior to the demolition of the subject structures as part of the future redevelopment of the site, it is recommended that a Designated Substance Survey be conducted. The aforementioned building materials and painted surfaces would be tested for asbestos and lead as part of this survey. The drinking water well on the property should be abandoned prior to redevelopment, according to Ontario Regulation 903. November 3, 2017 Page iv

6 1.0 INTRODUCTION At the request of Ontario Inc., Paterson Group (Paterson) conducted a Phase I - Environmental Site Assessment (ESA) Update for the property located at 1034 McGarry Terrace and 1117 Longfields Drive, Ottawa, Ontario. The purpose of this Phase I ESA was to research the past and current use of the site and study area and to identify any environmental concerns with the potential to have impacted the subject property. This report has been prepared specifically and solely for the above noted project which is described herein. It contains all of our findings and results of the environmental conditions at this site. This report has been prepared in general accordance with the agreed scope-of-work and the general requirements of Ontario Regulation 269/11, amending O.Reg. 153/04 made under the Environmental Protection Act and also complies with the requirements of CSA Z The conclusions presented herein are based on information gathered from a limited historical review and field inspection program. The findings of the Phase I - ESA are based on a review of readily available geological, historical and regulatory information and a cursory review made at the time of the field assessment. The historical research relies on information supplied by others, such as local, provincial and federal agencies, and was limited within the scope-of-work, time and budget of the project herein. November 3, 2017 Page 1

7 2.0 PROPERTY INFORMATION Address: Parcel Identification Number: Legal Description: Location: Latitude and Longitude: 1034 McGarry Terrace and 1117 Longfields Drive, Ottawa, Ontario , (1034 McGarry Terrace) (1117 Longfields Drive) Part Lot 15, Concession 2, Rideau Front, (1034 McGarry Terrace) and Block 4 of Plan 4M1303 (1117 Longfields Drive), in the City of Ottawa, Ontario. The portion of the subject site addressed as 1034 McGarry Terrace (a cul-de-sac road) is located at the very end of McGarry Terrace, and the portion of the subject site addressed as 1117 Longfields Drive is located in the northwest corner of the intersection of Longfields Drive and Marketplace Avenue. Refer to Figure 1 - Key Plan, following the body of this report, for the site location ' 17" N, 75 44' 21" W Site Description: Configuration/Area: Zoning: Current Use: Services: Irregular, 0.9 hectare. MC - Mixed use. The subject site is currently vacant. The site is located in a municipally serviced area, however the residential dwelling was formerly equipped with a drinking water well and septic tank. November 3, 2017 Page 2

8 3.0 SCOPE OF INVESTIGATION The scope of work for this Phase I-Environmental Site Assessment was as follows: Determine the historical activities on the subject site and study area by conducting a review of readily available records, reports, photographs, plans, mapping, databases and regulatory agencies; Investigate the existing conditions at the subject site and study area by conducting site reconnaissance; Conduct interviews with persons knowledgeable of current and historic operations on the subject property, and if warranted, neighbouring properties; Present the results of our findings in a comprehensive report in general accordance with the requirements of Ontario Regulation 269/11 (amending Ontario Regulation 153/04) made under the Environmental Protection Act and in compliance with the requirements of CSA Z768-01; Provide a preliminary site evaluation based on our findings; Provide preliminary remediation recommendations and further investigative work if contamination is suspected or encountered. November 3, 2017 Page 3

9 4.0 RECORDS REVIEW 4.1 General Phase I Study Area Determination A radius of 250 m was determined to be appropriate as a Phase I study area for the Phase I Environmental Site Assessment. Properties outside the 250 m radius are not considered to have impacted the subject land, based on their significant distances from the site. First Developed Use Determination Based on available information at the time of preparing this report (aerial photographs), it appears as though the subject property was developed as early as the mid 1940's. City directories covering the area of the subject site are not available prior to Fire Insurance Plans No fire insurance plans covering the area of the subject site are available. City of Ottawa Street Directories Ottawa city directories from 1991 to 2010 were reviewed, at approximate ten year intervals, for the subject site and properties located within the Phase I ESA study area. No concerns were identified in the sparse city directories. Chain of Title Paterson verified the current land titles for the subject property with Read Abstracts Ltd. According to the Chain of Title, dated September 3, 2013, the first available records for the subject property are dated 1859, when the deed was transferred between Richard Powell and John Neil Junior. Deeds were transferred between individuals until 1934, when a quit claim deed was registered from Leonard A. Davis to the Agricultural Development Board. The deed was later transferred from the Commisioner of Agricultural Loans to W.G. Standing in November 3, 2017 Page 4

10 In 1998, through power of sale, Caisse Populaire Ste-Anne-Laurier D Ottawa Inc. transferred the deed to Sat Paul Singh Bhullar. Finally, in 2009, the deed was transferred from Sat Paul Singh Bhullar to Masha Bhullar, the present property owner. Environmental Reports The following reports/correspondence were reviewed as part of this assessment: Phase I/II Environmental Site Assessment, 3641 Strandherd Drive, City of Nepean, prepared by Oliver, Mangione, McCalla and Associates Limited, dated September 1997; Site Remediation, 3641 Strandherd Drive, Nepean, prepared by Oliver, Mangione, McCalla and Associates Limited, dated December A Phase I and Phase II Environmental Site Assessment was conducted for a portion of the subject site (currently 1034 McGarry Terrace, formerly known as 3641 Strandherd Drive). Historical information collected as part of the report indicated that at the time, the site was unoccupied, however an automotive garage (Strandherd Auto Center) was formerly located on the property. During a site visit conducted as part of the project, several environmental concerns were identified. These include underground storage tanks and aboveground storage tanks (used for storing diesel fuel, heating oil, used motor oil), areas of stained floor surfaces, and several drums containing various automotive fluids. A Phase II Environmental Site Assessment was conducted to address some of these concerns. Trenches, test pits and coreholes were excavated in select areas in order to investigate the subsurface conditions in areas where environmental concerns were identified. Areas of impacted soil material were encountered in the vicinity of the garage floor drains as well as around an abandoned underground storage tank. Based on these findings, a site remediation program was conducted. A site remediation program was conducted on the subject property in December 1997, to address environmental issues encountered during the Phase II ESA program. The remediation included the removal of the floor drains and contaminated soil from within the garage, the removal of heavily stained asphalt from near the main garage, the removal of the abandoned underground storage tank and associated contaminated soil, and finally, the removal of all liquid waste found stored in drums and barrels. November 3, 2017 Page 5

11 Following the remedial works, confirmatory samples were collected from the excavations, and were analyzed for a combination of gas and diesel range petroleum hydrocarbons as well as volatile organic compounds and polycyclic aromatic hydrocarbons. All confirmatory samples were found to be in compliance with the selected Ministry of the Environment and Energy standards applicable to the subject site (at the time of remediation) based on a residential land use using potable groundwater and fine grained soils. Paterson Group has also conducted other Phase I ESAs within the study area. With the exception of the abovementioned former automotive garage, no significant environmental concerns were identified. Paterson has also recently conducted a geotechnical investigation on the subject property, whose boreholes are presented on drawing PE Site Plan. No signs of impacted soil material were encountered during this investigation. Plan of Survey A survey plan of the property at 1117 Longfields Drive, dated May 2, 2007, and prepared by Stantec Geomatics Ltd., was provided to Paterson for review. The property boundary appears the same as that identified on the current City of Ottawa electronic mapping website. A topographic plan (showing property boundaries) of the property at 1034 McGarry Terrace, prepared by Annis, O Sullivan, Vollebeck Ltd., was also provided to Paterson for review. A copy of both plans are provided in Appendix Environmental Source Information Environment Canada A search of the National Pollutant Release Inventory (NPRI) was conducted electronically on March 28, The subject site was not listed in the NPRI database. No properties within the 250 m Phase I study area were listed in the NPRI database. PCB Inventory A search of national PCB waste storage sites was conducted. The subject property is not registered as a PCB waste storage site. No properties within the Phase I study area were listed as PCB waste storage sites. November 3, 2017 Page 6

12 Ontario Ministry of the Environment and Climate Change (MOECC) Instruments A request for information was submitted to the MOECC Freedom of Information office, for information with respect to Certificates of Approval, Permits to Take Water, Certificates of Property Use or any other similar MOECC issued instruments for the site. The MOECC response, dated September , indicated that no records were located for the subject property. A copy of the MOECC response is provided in Appendix 2. MOECC Coal Gasification Plant Inventory The Ontario Ministry of the Environment and Climate Change document titled Municipal Coal Gasification Plant Site Inventory, 1991" was reviewed to reference the location of former plants with respect to the subject site. No coal gasification plant sites were identified within the Phase I study area. MOECC Incident Reports A request was submitted to the MOECC Freedom of Information office for information with respect to records concerning environmental incidents, orders, offences, spills, discharges of contaminants or inspections maintained by the MOECC for the site or adjacent properties. The MOECC response, dated September , indicated that no records were located for the subject property. A copy of the MOECC response is provided in Appendix 2. MOECC Waste Management Records A request was submitted to the MOECC Freedom of Information office for information regarding waste management records within the files maintained by the MOE. The MOECC response, dated September , indicated that no records were located for the subject property. A copy of the MOECC response is provided in Appendix 2. MOECC Submissions A request was submitted to the MOECC Freedom of Information office for information regarding reports related to environmental conditions which are expected to have been submitted to the MOECC. The MOECC response, dated September , indicated that no records were located for the subject property. A copy of the MOECC response is provided in Appendix 2. November 3, 2017 Page 7

13 Ontario Ministry of the Environment and Climate Change (MOECC) Notices and Instruments A search of the MOECC Brownfields Environmental Site Registry was conducted as part of this assessment, for the subject site and properties located within the Phase I study area. There are no records of site condition (RSC) listed in the registry, for the subject site or for properties within the 250 m Phase I ESA study area. MOECC Waste Disposal Site Inventory The Ontario Ministry of Environment and Climate Changedocument entitled Waste Disposal Site Inventory in Ontario, 1991" was reviewed as part of the historical research. This document includes all recorded active and closed waste disposal sites, industrial manufactured gas plants and coal tar distillation plants in the Province of Ontario. Based on a review of this document, there are no open or closed waste disposal sites within the study area. Areas of Natural Scientific Interest (ANSI) According to the Ministry of Natural Resources (MNR) electronic mapping website, the subject property is not listed as an area of natural and scientific interest. Properties located within the 250 m Phase I-ESA study are also not identified as ANSIs. Technical Standards and Safety Authority (TSSA) The TSSA, Fuels Safety Branch in Toronto was contacted on August 15, 2013, to inquire about current and former underground storage tanks, spills and incidents for the site and neighbouring properties with potential environmental concerns. No such records exist for subject properties within the study area. A copy of the TSSA response is provided in Appendix 2. City of Ottawa Old Landfill Document The document entitled Old Landfill Management Strategy, Phase I - Identification of Sites, City of Ottawa, prepared by Golder, was reviewed. There are no old landfills within the study area. November 3, 2017 Page 8

14 City of Ottawa Historic Land Use Inventory A search of the City of Ottawa s Historical Land Use Inventory (HLUI) database was conducted as part of this assessment. The HLUI search returned one (1) activity. This activity was located at 3651 Strandherd Drive, to the west of the subject site. The activity is described as a photographer, and is not considered to pose an environmental concern to the subject property. 4.3 Physical Setting Sources Air Photo Research Historical air photos were reviewed for the subject property and adjacent sites. A summary of our findings is presented below It appears as though the subject site is occupied by buildings, however, due to the poor scale of the photograph, it is difficult to distinguish. Adjacent properties to the north, south, east and west appear to be vacant, and used as agricultural lands. A road is located north of the site, and travels in an east-west direction (presumably Strandherd Drive) No significant changes appear to have been made to the subject property. In this photograph, more than one building is clearly defined on the subject site. Adjacent properties appear to be vacant agricultural lands, however, there may be a structure (or structures) present on the property to the north of the site (across the roadway) No significant changes appear to have been made to the subject property, or neighbouring properties At least one of the garage structures appears to have been constructed on the subject property. Neighbouring properties appear to be used for agriculture No changes appear to have been made to the subject site or neighbouring properties No changes appear to have been made to the subject site or neighbouring properties. November 3, 2017 Page 9

15 1999 No changes appear to have been made to the subject site or neighbouring properties. In this photograph, three (3) buildings are clearly present on the subject site. They appear to be consistent with those currently present on site (City of Ottawa website) No apparent changes have been made to the subject property. The neighbouring property to the west has been redeveloped with a large building, presently occupied by Wal-Mart. To the south of the subject site a roadway appears to be under construction (known today as Market Place Avenue). Beyond the new road is another large building and vacant lots. To the east of the subejct site are vacant lots, and to the north, beyond Strandherd Drive, are more vacant lots (City of Ottawa website) No significant changes appear to have been made to the subject site. Significant changes have been made to neighbouring properties. To the north of the site, a new road, a cul-desac, leading to the subject site has been constructed (McGarry Terrace). However, the former laneway can still be seen. Further north, beyond Strandherd Drive, is a new residential subdivision. To the east of the subject property, a large residential building has been constructed, and further east, is a large school building. To the south of the subject site, the construction of Market Place Avenue has been completed. The lands beyond Market Place Avenue appear to be undergoing some form of development. To the west of the subject site, the large Wal-Mart building remains, along with newer buildings to the south of that (City of Ottawa Website) The residential dwelling and one of the garages have been demolished. No other changes have been made to the subject property or adjacent sites. Laser copies of selected aerial photographs reviewed are included in Appendix 1 following the body of this report. Topographic Maps Topographic maps were obtained from Natural Resources Canada - The Atlas of Canada website. The topographic maps indicate that the regional topography in the general area of the subject site slopes downward to the southeast. According to the maps, the Jock River is present approximately 1 km to the southeast of the property. November 3, 2017 Page 10

16 No environmental concerns were identified on the topographic mapping. An illustration of the referenced topographic map is present on Figure 2 - Topographic Map following the body of this report. Physiographic Maps A Physiographic Map was reviewed from the Natural Resources Canada - The Atlas of Canada website. According to this physiographic map, the site is located in the St. Lawrence Lowlands. According to the mapping description provided: The lowlands are plain-like areas that were all affected by the Pleistocene glaciations and are therefore covered by surficial deposits and other features associated with the ice sheets. The subject site is located in the Central St. Lawrence Lowland, where the land is rarely more than 150 m above sea level, except for the Monteregion Hills, which consist of intrusive igneous rocks. Geological Maps The Geological Survey of Canada website on the Urban Geology of the National Capital Area was consulted as part of this assessment. Based on the information from NRCAN, bedrock in the area of the site consists of interbedded sandstone and dolomite of the March Formation. Based on the maps, the thickness of overburden ranges from 10 to 15 m and consists of till. Water Well Records Water well records pertaining to wells located on the subject property and within the 250 m Phase I ESA study area were obtained from the MOE by Well Record Search Request. Based on the search results provided by the MOE, there are no wells drilled on the subject property, and one (1) well within the study area. Based on the information contained in the well record, it appears as though the well is located approximately 160 m to the southwest of the subject site. A copy of the well record is provided in Appendix 2. Fill Materials No obvious signs of fill material were noted on the subject property. Small amounts of fill material were observed on the adjacent property to the north. November 3, 2017 Page 11

17 Water Bodies and Areas of Natural and Scientific Interest (ANSI) No water bodies are located within the 250 m Phase I-ESA study area. The nearest water body to the subject site is the Jock River, located approximately 1 km to the south. 5.0 INTERVIEWS Previous Property Owner The owner of the property at the time of the original Phase I-ESA conducted by Paterson, Ms. Masha Tiwana, was present on site during the Phase I-ESA site visit. Ms. Tiwana indicated that her husband purchased the property in the late 1990's, approximately 20 years ago. She indicated that the property was once used as an automotive garage, however, when she purchased the property, it had not been used as a garage for at least 10 years. She indicated that several renovations had been constructed in the dwelling, including extensions to the original farm house, which she indicated was approximately 100 years old. Ms. Tiwana indicated that the gas furnace within the dwelling had been replaced four (4) years ago. 6.0 SITE RECONNAISSANCE 6.1 General Requirements The site investigation was carried out on December 7, 2012, between 1:00 and 4:00 PM, by Ms. Nadine Kopp, a member of the Environmental Department of Paterson Group. The weather conditions were overcast with a temperature of 4 C. In addition to the site, the uses of neighbouring properties within the Phase I ESA study area were also assessed at the time of the site investigation. A follow-up site investigation was conducted by Mr. Adrian Menyhart, of the Environmental Department of Paterson Group on August 22, A review of recent information was conducted in Specific Observations at the Phase I Property Buildings and Structures There are no buildings or structures located on the property at 1117 Longfields Drive. The residence and one of the garages at 1034 McGarry Terrace have been demolished November 3, 2017 Page 12

18 following a fire in The structure of the second garage remains. In 2013, a 900L aboveground storage tank was observed in the basement of the residential dwelling. The tank appeared to be in good condition and there was no staining observed on the concrete floor below the tank. The tank was formerly used to hold fuel oil prior to the building s conversion to natural gas as its heat source. The tank s vent and fill pipes are located on the east side of the building. The presence of the aboveground storage tank is not considered to have impacted the subject property. Below Ground Structures No below ground structures were observed at the time of the site visit. Drains, Pits and Sumps At the time of the site visit, no drains or sump pits were observed. It should be noted that the subject site utilises a private septic system. The septic tank is located on the east side of the property. No concerns were identified with the use of the septic tank. Unidentified Substances There were no unidentified substances on the interior or exterior of the subject property at the time of the site assessment. Current and Former Wells Based on information included in the Phase I and Phase II ESA report produced by Oliver, Mangione, McCalla and Associated (1997), the subject building draws potable water from a groundwater well. There are no known wells on the property at 1117 Longfields Drive. Ground Surface The exterior surface at 1034 McGarry Private consists primarily of asphaltic concrete and grass. The ground surface at 1117 Longfields Drive consists of tall grasses and other vegetation. November 3, 2017 Page 13

19 The ground surface slopes down to the east, from the property at 1034 McGarry Terrace, to 1117 Longfields Drive, as well as to Marketplace Avenue to the south. No areas of stained soil, vegetation or pavement or areas of stressed vegetation were observed at the time of the site assessment. Railway Lines No railway lines were observed on the subject site or within the Phase I ESA study area. Potentially Contaminating Activities No potentially contaminating activities were observed on the subject site at the time of the site visit. Potentially Hazardous Building Products Based on the age of the buildings, asbestos and lead may be present in building materials. Fluorescent light ballasts manufactured prior to 1980 may contain PCBs, however, it is expected that most, if not all of the light ballasts, have been replaced with new non-pcb containing ballasts by this time. 6.3 Enhanced Investigation Property On-site Operations Formerly, an automotive garage was present on the subject property. The garage was equipped with a private underground storage tank and floor drains. Based on a review of previous reports (described earlier in this report), it appears as though the soil below a large portion of the garage area, as well as the underground storage tank area, was removed from site during a remediation program. The present owner of the property indicated that a garage had not operated on the property for at least 10 years prior to her ownership. Hazardous Materials Used or Stored at the Phase I-ESA Property No significant quantities of chemicals were observed. November 3, 2017 Page 14

20 Products Manufactured at the Phase I-ESA Property No products have ever been manufactured at the Phase I-ESA property. By-Products and Wastes No by-products were observed at the Phase I ESA property. Waste recently generated on site includes domestic waste and recycling typical of that of a residence. Raw Materials Handling Storage Locations No raw materials were stored on the subject property at the time of the site inspection. Drums, Totes and Bins No drums, totes or bins were observed at the subject property at the time of the site visit. Oil-Water Separators No oil-water separator was observed at the property during the current site visit. Vehicle and Equipment Maintenance Areas No vehicle or equipment maintenance areas were observed at the time of the site visit. The two (2) garages on the property are primarily used for storage. On-Site Spills No significant signs of spilling were observed on the subject property. Hydraulic Lift Equipment No hydraulic lift equipment was observed within the subject buildings. November 3, 2017 Page 15

21 6.4 Phase I ESA Study Area An inspection of the neighbouring properties within the 250 m Phase I-ESA study area, was conducted from publicly accessible roadways at the time of the site assessment. Immediately adjacent properties consist of commercial establishments to the west (Wal- Mart, Staples), residential dwellings to the north (across Strandherd Drive), a seniors residence to the east, and new residential construction to the south (across Marketplace Avenue). The current uses of the immediately adjacent properties are not considered to pose a concern to the subject site. Potentially contaminating activities (PCAs) identified in the Phase I ESA study area at the time of the site visit (excluding the subject site), as per Column A of Table 2 in O.Reg 269/11, include Gasoline and Associated Products Storage in Fixed Tanks. This PCA is associated with the retail fuel outlet located at 3580 Strandherd Drive, approximately 220 m to the northeast of the subject site. Based on this separation distance, and the fact that the fuel outlet has been constructed within the past 10 years, the abovementioned PCA is not considered to be an area of potential environmental concern. 7.0 REVIEW AND EVALUATION OF INFORMATION 7.1 Land Use History The following table indicates the current and past uses of the site as well as ownership and other observations dating back to the first known date of ownership of the site. November 3, 2017 Page 16

22 Table 1: Land Use History Year Name of Owner Description of Property Use Property Use Other Observations from Aerial Photographs, Fire Insurance Plans, Etc Various Private Individuals Agricultural Agricultural The Agricultural Development Board/Commis sioner of Agricultural Loans Residential/ Agricultural Residential/ Agricultural Various Private Individuals Residential/ Automotive Service garage Residential/ Commercial Based on aerial photos, the property appeared to be used for agriculture, however, it was indicated in past reports that an automotive garage operated on the property from the 1970's to 1990's Masha Bhullar Residential Residential The subject property was owned by private individuals from 1859 (the first registered deed) until 1934 when it was acquired by The Agricultural Development Board (also listed as the Commissioner of Agricultural Loans) in In 1936, the property was once again acquired by a private individual. In 1998, the property was sold by power of sale by the Caisse Populaire Ste-Anne-Laurier D Ottawa Inc. to Sat Paul Singh Bhullar. Finally, in 2009, Masha Bhullar acquired the property. 7.2 Areas of Potential Environmental Concern and Potentially Contaminating Activities Current and historical potentially contaminating activities identified on the subject site and which are considered to pose a potential environmental concern to the subject property, are provided in Table 2 below. PCAs were identified as per Column A of Table 2, from Ontario Regulation 153/04 as amended by Ontario Regulation 296/11. November 3, 2017 Page 17

23 Table 2 Areas of Potential Environmental Concern Area of Potential Environmental Concern (APEC) Location of PEC on Phase One Property Potential Contaminating Activities (PCA) Location of PCA (onsite/offsite) Contaminants of Potential concern (CPC) Media Potentially Impacted (Groundwater, Soil and/or Sediment) Former Automotive Service Garage (APEC 1) Southwest corner of subject property Item 27 - Garages and Maintenance and Repair of Rail Cars, Marine Vehicles and Aviation Vehicles on-site VOCs and PHCs Soil and Groundwater Former USTs (APEC 2) South edge of property, south of residential dwelling and west of garages Item 28 - Gasoline and Associated Products Storage in Fixed Tanks on-site VOCs and PHCs Soil and Groundwater The former use of the subject property as an automotive service garage, as well as the former presence of underground storage tanks are considered to be potentially contaminating activities which have resulted in areas of potential environmental concern on the subject site. Potential contaminants of concern in the soil and groundwater beneath the subject site include volatile organic compounds (VOCs) and petroleum hydrocarbons (PHCs). No off-site areas of potential environmental concern were identified within the study area. The retail fuel outlet located at the intersection of Strandherd Drive and Longfields Drive is located at a significant distance from the subject property and as a result, is not considered to be an APEC. November 3, 2017 Page 18

24 7.3 Conceptual Site Model Existing Buildings and Structures The subject site was formerly occupied by a two-storey residential dwelling with basement, and two (2) single storey, slab on grade storage garages. The remainder of the subject property is vacant and partially grass-covered. The dwelling consists of a brick-clad building, with a sloped and shingled roof. The building is heated by natural gas. The two (2) garages located on the subject property were both constructed with concrete block and sloped and shingled roofs. These buildings did not appear to be heated at the time of the site visit in An automotive service garage operated from the southwest-most garage. Following a remediation program below this building, a new concrete floor was poured. The location of the structure is depicted on Drawing: PE Site Plan. In 2014, the residence and one of the garages have been demolished following a fire. The adjacent properties consist of residential dwellings to the north (across Strandherd Drive), new residential dwellings (under construction) to the south (across Marketplace Avenue), a high school to the east (across Longfields Drive) and a Wal-Mart store to the west. The uses of the adjacent and neighbouring properties in the Phase I study area are identified on Drawing PE Surrounding Land Use Plan. Water Bodies There are no water bodies on the subject site or in the study area. Areas of Natural and Scientific Interest (ANSI) No ANSIs were identified on the subject property or within the Phase I ESA study area. Drinking Water Wells According to the Ministry of the Environment s well record database, there are no records for potable water wells on the subject site. A potable drinking water well is located approximately 160 m southwest of the subject site. November 3, 2017 Page 19

25 However, based on a previous report, an on-site drinking water well is located to the west of the residential dwelling. Groundwater Monitoring Wells Three (3) groundwater monitoring wells are currently present on the subject property. The wells were installed during the Phase II-ESA investigation carried out in conjunction with this report. Neighbouring Land Use Neighbouring land use in the Phase I study area was a combination of residential and commercial, with one (1) institutional property to the east. No potentially contaminating activities with the potential to impact the subject property were identified within the Phase I study area. Neighbouring land use within the Phase I-ESA study area is depicted on Drawing: PE Surrounding Land Use Plan. Areas of Potential Environmental Concern and Potentially Contaminating Activities As per Column A of Table 2 outlined in Ontario Regulation 153/04 and amended by O.Reg. 279/11, potentially contaminating activities considered to be areas of potential environmental concern, identified on the subject property include the following: Garages and Maintenance and Repair of Rail Cars, Marine Vehicles and Aviation Vehicles (Item 27) and Gasoline and Associated Products Stored in Fixed Tanks (Item 28). Two (2) historical areas of potential environmental concern (APECs) were identified on the subject site. The former use of one of the garages on the subject property as an automotive service garage is considered to be an APEC (APEC1). In addition to the garage, an underground diesel storage tank was formerly located to the south of the residence (APEC2). Potential contaminants of concern associated with the aforementioned APECs include VOCs and PHCs. No other APECs were identified within the study area. November 3, 2017 Page 20

26 8.0 CONCLUSIONS Assessment The historical research indicated that 1034 McGarry Terrace has been owned primarily by individuals since at least 1859, and was originally developed as a residential farmstead. The property at 1117 Longfields Drive has always been vacant and undeveloped. An automotive garage was later constructed and operated on the subject site (1034 McGarry Terrace portion). As discussed in this report, Paterson reviewed a Phase I-II-ESA report and a remediation report prepared by another consultant which addressed the garage operation. Contaminated soil and liquid waste materials were removed from the site. Based on the results of the remediation report, the clean-up was considered to have been effective in removing the contamination. The results of the historical research and site assessment identified two (2) types of potentially contaminating activities (PCAs) on the subject site and none on adjacent properties. The resulting areas of potential environmental concern include: former use of the property as an automotive service garage (APEC1) and former underground fuel storage tanks (APEC2). No other PCAs or APECs were identified within the study area. Adjacent lands have been used for residential and agricultural purposes for many years, until recently, when commercial establishments have been constructed to the west of the site, and an institutional building to the east of the site. No environmental concerns were identified with regards to the historical use of adjacent lands. Following the historical review, a site visit was conducted in At the time, a residential building and two (2) garage buildings are present on the west side of the subject property, while the east side of the property remains vacant and covered with vegetation. No environmental concerns were identified with regards to properties within the Phase I-ESA study area. Neighbouring properties were observed to be residential to the north, institutional to the east, new residential construction to the south and a commercial centre to the west. Following a recent review of site photos, it was determined that the residential dwelling and one of the garages have been demolished following a fire. November 3, 2017 Page 21

27 Although a remediation was conducted on the property to address the former auto garage, the works were conducted in 1997, under different standards than those currently in use. In order to verify that the findings of the remediation satisfy the current MOE standards, in our opinion, a Phase II - Environmental Site Assessment will be required for the property. Recommendations As discussed in section 6.2 of this report, due to the age of the structures on the subject property, asbestos may be present within the drywall joint compound, plaster and ceiling tiles. Lead-based paint may also be present within the buildings. Potentially asbestos containing materials and painted surfaces were generally in good condition at the time of the site visit. Prior to the demolition of the subject structures as part of the future redevelopment of the site, it is recommended that a Designated Substance Survey be conducted. The aforementioned building materials and painted surfaces would be tested for asbestos and lead as part of this survey. The drinking water well on the property should be abandoned prior to redevelopment, according to Ontario Regulation 903. November 3, 2017 Page 22

28 9.0 STATEMENT OF LIMITATIONS This Phase I - Environmental Site Assessment report has been prepared in general accordance with the agreed scope-of-work, in compliance with O. Reg. 269/11 and meets the requirements of CSA Z The conclusions presented herein are based on information gathered from a limited historical review and field inspection program. The findings of the Phase I-ESA are based on a review of readily available geological, historical and regulatory information and a cursory review made at the time of the field assessment. The historical research relies on information supplied by others, such as, local, provincial and federal agencies and was limited within the scope-of-work, time and budget of the project herein. Should any conditions be encountered at the subject site and/or historical information that differ from our findings, we request that we be notified immediately in order to allow for a reassessment. This report was prepared for the sole use of Ontario Inc. Permission and notification from Ontario Inc. and Paterson Group will be required to release this report to any other party. Paterson Group Inc. 29/01/2018 Adrian Menyhart, P.Eng. Mark D Arcy, P.Eng. Report Distribution: Ontario Inc. (6 copies and 1 electronic copy) Paterson Group (1 copy) November 3, 2017 Page 23

29 10.0 REFERENCES Federal Records Air photos at the Energy Mines and Resources Air Photo Library. National Archives. Maps and photographs (Geological Survey of Canada surficial and subsurface mapping). Natural Resources Canada - The Atlas of Canada. Environment Canada, National Pollutant Release Inventory. Environment Canada, Access to Information and Privacy Office. PCB Waste Storage Site Inventory. Provincial Records MOE Freedom of Information and Privacy Office. MOE Municipal Coal Gasification Plant Site Inventory, MOE document entitled Waste Disposal Site Inventory in Ontario. MOE Brownfields Environmental Site Registry. Office of Technical Standards and Safety Authority, Fuels Safety Branch. MNR Areas of Natural Significance. MOE Water Well Inventory. Municipal Records City of Ottawa HLUI Records. City of Ottawa electronic map. Local Information Sources Chain of Title - Read Abstracts Topographical Plan, prepared by Annis, O Sullivan, Vollebekk Ltd. Previous Engineering Reports (Oliver, Mangione, McCalla and Associated Limited (1997) and Paterson Group Inc.) Personal Interviews. Public Information Sources Google Earth Google Maps/Street View November 3, 2017 Page 24

30 APPENDIX AERIAL PHOTOGRAPHS FIGURE 1 - KEY PLAN DRAWING PE SITE PLAN 16

31 SITE AERIAL PHOTOGRAPH 1945

32 SITE AERIAL PHOTOGRAPH 1954

33 SITE AERIAL PHOTOGRAPH 1960

34 AERIAL PHOTOGRAPH 1973 SITE

35 SITE AERIAL PHOTOGRAPH 1979

36 AERIAL PHOTOGRAPH 1987 SITE

37 SITE AERIAL PHOTOGRAPH 1999

38 SITE FIGURE 1 KEYPLAN

39

40

August 28, 2018 File: PE2122-LET.01

August 28, 2018 File: PE2122-LET.01 patersongroup August 28, 2018 File: PE2122-LET.01 Minto Communities 200-180 Kent Street Ottawa, Ontario K1P 0B6 Attention: Mr. Kevin Harper Consulting Engineers 154 Colonnade Road South Ottawa, Ontario

More information

patersongroup Phase I Environmental Site Assessment Vacant, Undeveloped Land 1021 Thomas Spratt Place Ottawa, Ontario Prepared For

patersongroup Phase I Environmental Site Assessment Vacant, Undeveloped Land 1021 Thomas Spratt Place Ottawa, Ontario Prepared For Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Phase I Environmental Site Assessment Vacant, Undeveloped Land 1021

More information

patersongroup Phase I - Environmental Site Assessment Vacant Land, Strandherd Drive at Kennevale Drive Ottawa, Ontario Prepared For Regional Group

patersongroup Phase I - Environmental Site Assessment Vacant Land, Strandherd Drive at Kennevale Drive Ottawa, Ontario Prepared For Regional Group Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Vacant Land, Strandherd Drive at Kennevale Drive Ottawa, Ontario

More information

This report updates a Phase I-Environmental Site Assessment report prepared by Paterson, dated March 2008, as detailed below.

This report updates a Phase I-Environmental Site Assessment report prepared by Paterson, dated March 2008, as detailed below. Consulting Engineers October 13, 2016 Bassi Construction 2575 Del Zotto Avenue Ottawa, Ontario K1T 3V7 Attention: Subject: Phase I - Environmental Site Assessment Update Residential and Vacant Property

More information

patersongroup Phase I - Environmental Site Assessment Retirement Home Colonial Road Ottawa (Sarsfield), Ontario Prepared For

patersongroup Phase I - Environmental Site Assessment Retirement Home Colonial Road Ottawa (Sarsfield), Ontario Prepared For Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Archeological Studies Retirement Home - 2980 Colonial Road Ottawa

More information

patersongroup Phase I - Environmental Site Assessment 538, 544 & 560 Rideau Street and 501 Besserer Street Ottawa, Ontario Prepared For

patersongroup Phase I - Environmental Site Assessment 538, 544 & 560 Rideau Street and 501 Besserer Street Ottawa, Ontario Prepared For Geotechnical Engineering Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science 538, 544 & 560 Rideau Street and 501 Besserer Street Ottawa, Ontario Archaeological

More information

patersongroup Phase I Environmental Site Assessment Commercial Property 890 and 900 Bank Street Ottawa, Ontario Prepared For Canderel Management Inc.

patersongroup Phase I Environmental Site Assessment Commercial Property 890 and 900 Bank Street Ottawa, Ontario Prepared For Canderel Management Inc. Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Phase I Environmental Site Assessment Commercial Property 890 and

More information

patersongroup Phase I - Environmental Site Assessment Existing Commercial Property 319 McRae Avenue Ottawa, Ontario Prepared For

patersongroup Phase I - Environmental Site Assessment Existing Commercial Property 319 McRae Avenue Ottawa, Ontario Prepared For Geotechnical Engineering Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Phase I - Environmental Site Assessment Existing Commercial Property 319 McRae

More information

patersongroup Phase I - Environmental Site Assessment 450 Churchill Avenue North Ottawa, Ontario Prepared For Kitchissippi United Church March 8, 2010

patersongroup Phase I - Environmental Site Assessment 450 Churchill Avenue North Ottawa, Ontario Prepared For Kitchissippi United Church March 8, 2010 Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing 450 Churchill Avenue North Building Science Prepared For Kitchissippi United Church

More information

patersongroup Phase I - Environmental Site Assessment 73 Harvey Street Ottawa, Ontario Prepared For Delbrook Homes Inc.

patersongroup Phase I - Environmental Site Assessment 73 Harvey Street Ottawa, Ontario Prepared For Delbrook Homes Inc. Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science 73 Harvey Street Prepared For Delbrook Homes Inc. Paterson Group

More information

patersongroup Phase I Environmental Site Assessment Vacant Property 3735 St. Joseph Boulevard Ottawa, Ontario Prepared For Mr.

patersongroup Phase I Environmental Site Assessment Vacant Property 3735 St. Joseph Boulevard Ottawa, Ontario Prepared For Mr. Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Phase I Environmental Site Assessment Vacant Property 3735 St. Joseph

More information

patersongroup Phase I - Environmental Site Assessment Proposed Cardinal Creek Village Subdivision Lands Old Montreal Road Ottawa (Cumberland), Ontario

patersongroup Phase I - Environmental Site Assessment Proposed Cardinal Creek Village Subdivision Lands Old Montreal Road Ottawa (Cumberland), Ontario Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Archaeological Studies Building Science Proposed Cardinal Creek Village Subdivision

More information

patersongroup Prepared For C. Fleming Developments Ltd. November 14, 2005 Report: PE0644-1

patersongroup Prepared For C. Fleming Developments Ltd. November 14, 2005 Report: PE0644-1 Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Mer Bleue Road and Tenth Line Road Prepared For C. Fleming Developments

More information

patersongroup Phase I Environmental Site Assessment 112 Nelson Street Ottawa, Ontario Prepared For Domicile Developments Inc.

patersongroup Phase I Environmental Site Assessment 112 Nelson Street Ottawa, Ontario Prepared For Domicile Developments Inc. Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Phase I Environmental Site Assessment 112 Nelson Street Ottawa, Ontario

More information

patersongroup Phase I Environmental Site Assessment Parking Lot 2A, Campus Avenue Carleton University, 1125 Colonel By Drive Ottawa, Ontario

patersongroup Phase I Environmental Site Assessment Parking Lot 2A, Campus Avenue Carleton University, 1125 Colonel By Drive Ottawa, Ontario Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Phase I Environmental Site Assessment Parking Lot 2A, Campus Avenue

More information

patersongroup Phase I Environmental Site Assessment Vacant Garage and Office Property Comstock Road Ottawa, Ontario Prepared For

patersongroup Phase I Environmental Site Assessment Vacant Garage and Office Property Comstock Road Ottawa, Ontario Prepared For Geotechnical Engineering patersongroup 777 Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Phase I Environmental Site Assessment Vacant Garage and Office

More information

patersongroup Phase I - Environmental Site Assessment 1026 to 1054 Hunt Club Road Ottawa, Ontario Prepared For Claridge Homes March 28, 2017

patersongroup Phase I - Environmental Site Assessment 1026 to 1054 Hunt Club Road Ottawa, Ontario Prepared For Claridge Homes March 28, 2017 Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Phase I - Environmental Site Assessment 1026 to 1054 Hunt Club Road

More information

REPORT ON PHASE I ENVIRONMENTAL SITE ASSESSMENT 1358 COKER STREET OSGOODE WARD, GREELY CITY OF OTTAWA, ONTARIO. Submitted to:

REPORT ON PHASE I ENVIRONMENTAL SITE ASSESSMENT 1358 COKER STREET OSGOODE WARD, GREELY CITY OF OTTAWA, ONTARIO. Submitted to: Civil Geotechnical Structural Environmental Industrial Health & Safety 215 Sanders Street, Unit 1 (613) 860-0923 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 REPORT ON PHASE I ENVIRONMENTAL

More information

patersongroup Consulting Engineers March 19, 2013 File: PE2927-LET.01 Broccolini Construction 130 Slater Street, Suite 1300 Ottawa, Ontario K1P 6E2

patersongroup Consulting Engineers March 19, 2013 File: PE2927-LET.01 Broccolini Construction 130 Slater Street, Suite 1300 Ottawa, Ontario K1P 6E2 patersongroup March 19, 2013 File: PE2927-LET.01 Broccolini Construction 130 Slater Street, Suite 1300 Ottawa, Ontario K1P 6E2 Attention: Mr. James Beach Consulting Engineers 154 Colonnade Road South Ottawa,

More information

patersongroup Phase I Environmental Site Assessment 443 and 447 Kent Street 423 and 425 McLeod Street Ottawa, Ontario Prepared For

patersongroup Phase I Environmental Site Assessment 443 and 447 Kent Street 423 and 425 McLeod Street Ottawa, Ontario Prepared For Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Phase I Environmental Site Assessment 443 and 447 Kent Street Archaeological

More information

patersongroup Phase I - Environmental Site Assessment Proposed Multi-Storey Building 233 Armstrong Street and 3 Hamilton Avenue North Ottawa, Ontario

patersongroup Phase I - Environmental Site Assessment Proposed Multi-Storey Building 233 Armstrong Street and 3 Hamilton Avenue North Ottawa, Ontario Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Phase I - Environmental Site Assessment Proposed Multi-Storey Building

More information

patersongroup Potable Water Supply Assessment Commercial Site Development 4139 Moodie Drive Ottawa, Ontario Prepared For

patersongroup Potable Water Supply Assessment Commercial Site Development 4139 Moodie Drive Ottawa, Ontario Prepared For Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Potable Water Supply Assessment Commercial Site Development 4139

More information

Phase I Environmental Site Assessment 349 Olmstead Street, Ottawa, Ontario

Phase I Environmental Site Assessment 349 Olmstead Street, Ottawa, Ontario Phase I Environmental Site Assessment 349 Olmstead Street, Ottawa, Ontario Type of Document: Final Client: Conseil des écoles catholiques du Centre-Est (CECCE) 4000 Labelle Street Ottawa, Ontario K1J 1A1

More information

New York State Department of Environmental Conservation August Receive Site Fact Sheets by . See "For More Information" to Learn How.

New York State Department of Environmental Conservation August Receive Site Fact Sheets by  . See For More Information to Learn How. New York State Department of Environmental Conservation August 2013 FACT SHEET Environmental Restoration Program Receive Site Fact Sheets by Email. See "For More Information" to Learn How. Site Name: 1201

More information

PHASE I ENVIRONMENTAL SITE ASSESSMENT

PHASE I ENVIRONMENTAL SITE ASSESSMENT PHASE I ENVIRONMENTAL SITE ASSESSMENT 11 Garden Street, Whitby, Ontario SUBMITTED TO: ABC Land Holdings Ltd. Suite 202, 1513 Dundas Street, Whitby, Ontario SUBMITTED BY: GAEA Technologies Ltd. 202, 1614

More information

the former Honeywell plant building (3 Hamilton Avenue) a single-storey brick industrial/commercial building (233 Armstrong Street)

the former Honeywell plant building (3 Hamilton Avenue) a single-storey brick industrial/commercial building (233 Armstrong Street) consulting engineers memorandum to: Tega Developments - Mr. Spyro Dimitrakopoulos - spyro@tegadevelopments.com re: Environmental Remedial Action Plan Proposed Residential Building 233 Armstrong Street

More information

Phase I Environmental Site Assessment

Phase I Environmental Site Assessment Phase I Environmental Site Assessment 256 Rideau Street & 211 Besserer Street Ottawa, Ontario Prepared For: DCR Phoenix Development Corporation Limited 18 Bentley Avenue Ottawa, Ontario K2E 6T8 Trow Associates

More information

Tartan Land Corporation and Barrett Farms Enterprises Partnership 233 Metcalfe Street, Ottawa, Ontario K2P 2C2. Attention: Mr.

Tartan Land Corporation and Barrett Farms Enterprises Partnership 233 Metcalfe Street, Ottawa, Ontario K2P 2C2. Attention: Mr. September 211 REPORT ON Phase I Environmental Site Assessment 457 Bank Street, Ottawa, Ontario Submitted to: Tartan Land Corporation and Barrett Farms Enterprises Partnership 233 Metcalfe Street, Ottawa,

More information

DRAFT. Preliminary Evaluation. Analysis of Brownfields Cleanup Alternatives (ABCA)

DRAFT. Preliminary Evaluation. Analysis of Brownfields Cleanup Alternatives (ABCA) DRAFT Analysis of Brownfields Cleanup Alternatives (ABCA) Preliminary Evaluation Ball Square Station Site Boston Avenue and Broadway Somerville and Medford, Massachusetts Massachusetts DEP Release Tracking

More information

FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) Site Location

FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) Site Location Maryland Department of the Environment Site Location FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) This 2.4581-acres site (Site) consists of four parcels of

More information

A REPORT TO MADISON BROCK LIMITED PHASE ONE ENVIRONMENTAL SITE ASSESSMENT PROPOSED RESIDENTIAL DEVELOPMENT 2480, 2490 AND 2510 BROCK ROAD

A REPORT TO MADISON BROCK LIMITED PHASE ONE ENVIRONMENTAL SITE ASSESSMENT PROPOSED RESIDENTIAL DEVELOPMENT 2480, 2490 AND 2510 BROCK ROAD A REPORT TO MADISON BROCK LIMITED PHASE ONE ENVIRONMENTAL SITE ASSESSMENT PROPOSED RESIDENTIAL DEVELOPMENT 2480, 2490 AND 2510 BROCK ROAD CITY OF PICKERING Reference No. 1703-E057 June 7, 2017 DISTRIBUTION

More information

Phase I Environmental Site Assessment

Phase I Environmental Site Assessment Phase I Environmental Site Assessment Proposed New Riverside South Catholic Elementary School, Ralph Hennessey Avenue and Mount Nebo Way, Ottawa, Ontario Type of Document: Final Client: Centre Des Ecoles

More information

Phase I Environmental Site Assessment 2725 Old Montreal Road, Ottawa, Ontario

Phase I Environmental Site Assessment 2725 Old Montreal Road, Ottawa, Ontario Phase I Environmental Site Assessment 2725 Old Montreal Road, Ottawa, Ontario Type of Document: Final Client: V.S. Aggarwal Brampton, Ontario Project Number: OTT-283-A Prepared By: Shawn Doherty, P.Eng..

More information

Chapter 11: Hazardous Materials A. INTRODUCTION

Chapter 11: Hazardous Materials A. INTRODUCTION Chapter 11: Hazardous Materials A. INTRODUCTION This chapter relies on the analysis from the Fresh Kills Park Final Generic Environmental Impact Statement (FGEIS) and summarizes the conclusions drawn from

More information

Information Sheet Questions & Answers New Edinburgh Park, 193 Stanley Avenue

Information Sheet Questions & Answers New Edinburgh Park, 193 Stanley Avenue Information Sheet Questions & Answers New Edinburgh Park, 193 Stanley Avenue Environmental Risk Management Program Q1 What was the historical use of this site? A1 A portion of New Edinburgh Park was historically

More information

Niagara College Greenhouse Nursery 135 Taylor Road, Niagara-on-the-Lake, Ontario Phase I Environmental Site Assessment

Niagara College Greenhouse Nursery 135 Taylor Road, Niagara-on-the-Lake, Ontario Phase I Environmental Site Assessment Niagara College Greenhouse Nursery 135 Taylor Road, Niagara-on-the-Lake, Ontario Phase I Environmental Site Assessment Prepared by: Sunmola Abeeb Environmental Management & Assessment, Niagara College

More information

PHASE ONE ENVIRONMENTAL SITE ASSESSMENT PROPOSED RESIDENTIAL DEVELOPMENT 6791 REGIONAL ROAD #25 MILTON, ONTARIO

PHASE ONE ENVIRONMENTAL SITE ASSESSMENT PROPOSED RESIDENTIAL DEVELOPMENT 6791 REGIONAL ROAD #25 MILTON, ONTARIO PHASE ONE ENVIRONMENTAL SITE ASSESSMENT PROPOSED RESIDENTIAL DEVELOPMENT 6791 REGIONAL ROAD #25 MILTON, ONTARIO Prepared for: GILBACH REAL ESTATE DEVELOPMENT Yonge and Richmond Centre 151 Yonge Street,

More information

Memorandum. Rian Amiton; City of Brockton Planning Department. John McRobbie and Thomas Biolsi; TRC Environmental Corporation

Memorandum. Rian Amiton; City of Brockton Planning Department. John McRobbie and Thomas Biolsi; TRC Environmental Corporation TRC Wannalancit Mills 650 Suffolk Street Lowell, Massachusetts 01854 Main 978.970.5600 Fax 978.453.1995 Memorandum To: From: Subject: Rian Amiton; City of Brockton Planning Department John McRobbie and

More information

PHASE ONE ENVIRONMENTAL SITE ASSESSMENT 100 INLET PRIVATE OTTAWA, ONTARIO

PHASE ONE ENVIRONMENTAL SITE ASSESSMENT 100 INLET PRIVATE OTTAWA, ONTARIO PHASE ONE ENVIRONMENTAL SITE ASSESSMENT 100 INLET PRIVATE OTTAWA, ONTARIO Prepared for: Brigil 98 Lois Street Gatineau, QC J8Y 3R7 SPL Project No.:10000024-720 January 27, 2014 ii TABLE OF CONTENTS 1.

More information

2384 QUEENSWAY DRIVE BURLINGTON, ON

2384 QUEENSWAY DRIVE BURLINGTON, ON 2384 QUEENSWAY DRIVE BURLINGTON, ON Interim Phase One Environmental Site Assessment Project Location: 2384 Queensway Drive Burlington, ON Prepared for: Habitat for Humanity Halton c/o Mr. Roger Broad Director

More information

Prepared for: Research Division Canada Mortgage and Housing Corporation 700 Montreal Road Ottawa, Ontario K1A 0P7. CMHC Project Manager: Don Fugler

Prepared for: Research Division Canada Mortgage and Housing Corporation 700 Montreal Road Ottawa, Ontario K1A 0P7. CMHC Project Manager: Don Fugler PHASE 1 ENVIRONMENTAL SITE ASSESSMENT INTERPRETATION GUIDELINES Prepared for: Research Division Canada Mortgage and Housing Corporation 700 Montreal Road Ottawa, Ontario K1A 0P7 CMHC Project Manager: Don

More information

Phase I Environmental Site Assessment 112 Montreal Road, Ottawa, Ontario

Phase I Environmental Site Assessment 112 Montreal Road, Ottawa, Ontario Phase I Environmental Site Assessment 112 Montreal Road, Ottawa, Ontario Type of Document: Final Client: 1147310 Ontario Incorporated 7 Strathearn Avenue Brampton, Ontario L6T 4P1 Project Number: OTT-00214936-A0

More information

Final. Phase One Environmental Site Assessment. Project Location: 75 Allen Street East Waterloo, ON

Final. Phase One Environmental Site Assessment. Project Location: 75 Allen Street East Waterloo, ON ST. LOUIS SCHOOL Final Phase One Environmental Site Assessment Project Location: 75 Allen Street East Waterloo, ON Prepared for: City of Waterloo 100 Regina Street South Waterloo ON N2J 4A8 July 20, 2012

More information

PHASE I ENVIRONMENTAL ASSESSMENT 55 DELHI STREET GUELPH, ONTARIO. Prepared For: VESTERRA INC. Prepared by: TRY ENVIRONMENTAL SERVICES INC.

PHASE I ENVIRONMENTAL ASSESSMENT 55 DELHI STREET GUELPH, ONTARIO. Prepared For: VESTERRA INC. Prepared by: TRY ENVIRONMENTAL SERVICES INC. PHASE I ENVIRONMENTAL ASSESSMENT 55 DELHI STREET GUELPH, ONTARIO Prepared For: VESTERRA INC. Prepared by: TRY ENVIRONMENTAL SERVICES INC. Project: 13-2703 March 29, 2013 8 Widdicombe Hill Etobicoke, Ontario

More information

Phase I Environmental Site Assessment

Phase I Environmental Site Assessment Phase I Environmental Site Assessment 97204 Prepared for: Multnomah County 401 NE Dixon Avenue, Suite 274 97227 TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY... 1 2.0 PROPERTY AND REPORT INFORMATION... 3 2.1

More information

PHASE I ENVIRONMENTAL SITE ASSESSMENT

PHASE I ENVIRONMENTAL SITE ASSESSMENT PHASE I ENVIRONMENTAL SITE ASSESSMENT Commercial and Light Industrial Development Area North of Prairie Street Between Corbin and Shirley Avenues Northridge, California AES Project No. 02-225 June 13,

More information

Appendix C Chapter 1 Initial Site Assessment Worksheet

Appendix C Chapter 1 Initial Site Assessment Worksheet Appendix C Chapter 1 Initial Site Assessment Worksheet Contents Section 1 Overview...1-2...1-3 C-1-1 Section 1 Overview Section 1 Overview Disclaimer The following worksheet is an example and provides

More information

Overview of Ministry Contaminated Sites and Brownfields Program

Overview of Ministry Contaminated Sites and Brownfields Program Overview of Ministry Contaminated Sites and Brownfields Program 57 th Ontario Building Officials Association Conference October 7, 2013 Jennifer Volpato P.Geo., P.Eng. Guelph District Office, Ontario Ministry

More information

PHASE I ENVIRONMENTAL SITE ASSESSMENT

PHASE I ENVIRONMENTAL SITE ASSESSMENT 103 DUNDAS CORPORATION PHASE I ENVIRONMENTAL SITE ASSESSMENT 103 Dundas Street West, Oakville, Ontario FINAL REPORT OCTOBER 30, 2014 Terrapex Environmental Ltd. 90 Scarsdale Road Toronto, Ontario, M3B

More information

Submitted to: Mr. Marc Rivet, Senior Planner J.L. Richards & Associates Ltd. 864 Lady Ellen Place Ottawa, Ontario K1Z 5M2

Submitted to: Mr. Marc Rivet, Senior Planner J.L. Richards & Associates Ltd. 864 Lady Ellen Place Ottawa, Ontario K1Z 5M2 September 2011 REPORT ON Phase I Environmental Site Assessment 3406/3450 Frank Kenny Road Ottawa (Orleans), Ontario Submitted to: Mr. Marc Rivet, Senior Planner J.L. Richards & Associates Ltd. 864 Lady

More information

SOIL MANAGEMENT PLAN

SOIL MANAGEMENT PLAN SOIL MANAGEMENT PLAN BELFAST BOATYARD 39 & 41 FRONT STREET BELFAST, MAINE Prepared by: Ransom Consulting, Inc. 400 Commercial Street, Suite 404 Portland, Maine 04101 (207) 772-2891 March 22, 2013 1.0 INTRODUCTION

More information

EXECUTIVE SUMMARY. The following is our conclusions of the environmental issues at the Site based on our investigations:

EXECUTIVE SUMMARY. The following is our conclusions of the environmental issues at the Site based on our investigations: EXECUTIVE SUMMARY Engineers, Inc. (), on behalf of the Town of East Lyme, Connecticut performed a Phase II Environmental Site Assessment (Phase II ESA) on the property located at 224 Main Street (the Site

More information

Phase l Environmental Site Investigation

Phase l Environmental Site Investigation Phase l Environmental Site Investigation 124 Dunlevy Avenue Vancouver, BC Prepared for: City of Vancouver Real Estate & Facilities Management 453 West 12th Avenue Vancouver, BC V5Y 1V4 Prepared by: Pottinger

More information

Environmental Site Assessment (Phase 1) 2418 Khalsa Gate Oakville, Ontario. Prepared for:

Environmental Site Assessment (Phase 1) 2418 Khalsa Gate Oakville, Ontario. Prepared for: KodiaK ENVIRONMENTAL 1101 North Service Road East, Oakville, Ontario L6H 1A6 LIMITED 905-825-2943 www.kodiakenviro.ca Environmental Site Assessment (Phase 1) 2418 Khalsa Gate Oakville, Ontario Prepared

More information

PHASE I ENVIRONMENTAL SITE ASSESSMENT 123 MAIN STREET SAN DIEGO, CALIFORNIA. September 15, 2002

PHASE I ENVIRONMENTAL SITE ASSESSMENT 123 MAIN STREET SAN DIEGO, CALIFORNIA. September 15, 2002 2847 Barnard Street San Diego California 92110 Phone 619.501.0185 Mobile 619.203.9774 Fax 619.501.9843 hoveyenv@cox.net Final Report PHASE I ENVIRONMENTAL SITE ASSESSMENT 123 MAIN STREET SAN DIEGO, CALIFORNIA

More information

patersongroup Phase II Environmental Site Assessment Commercial Properties 1445 and 1451 Wellington Street West Ottawa, Ontario Prepared For

patersongroup Phase II Environmental Site Assessment Commercial Properties 1445 and 1451 Wellington Street West Ottawa, Ontario Prepared For Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Phase II Environmental Site Assessment Commercial Properties 1445

More information

UNITED STATES FORGECRAFT

UNITED STATES FORGECRAFT UNITED STATES FORGECRAFT STATE PRIORITY LIST SITE FORT SMITH, ARKANSAS ADEQ 5301 Northshore Drive North Little Rock, Arkansas 72118 EPA RCRA ID No: ARD006341747 EPA CERCLA ID No: ARD006341747 AFIN: 66-00145

More information

Figure 1 illustrates the location of the Site and Figure 2 illustrates the Site layout, including borehole locations.

Figure 1 illustrates the location of the Site and Figure 2 illustrates the Site layout, including borehole locations. 1.0 Introduction Stantec Consulting Ltd. (Stantec) was retained by Mr. John Doe, on behalf of The Client to conduct a Phase II Environmental Site Assessment (ESA) at a property located at 151 Main Street,

More information

Phase I Environmental Site Assessment Marion Hall, MacDonald Hall and the Cube, University of Ottawa, Ottawa, Ontario

Phase I Environmental Site Assessment Marion Hall, MacDonald Hall and the Cube, University of Ottawa, Ottawa, Ontario Phase I Environmental Site Assessment Marion Hall, MacDonald Hall and the Cube, University of Ottawa, Ottawa, Ontario Revision: 0 (Final) Prepared for: Office of Risk Management University of Ottawa 840-1

More information

(this cover page left intentionally blank)

(this cover page left intentionally blank) 4. Siting the Well (this cover page left intentionally blank) 4. Siting the Well Chapter Table of Contents Chapter Table of Contents Chapter Description... 4 Regulatory Requirements Well Siting... 4 Relevant

More information

PHASE I ENVIRONMENTAL SITE ASSESSMENT REPORT

PHASE I ENVIRONMENTAL SITE ASSESSMENT REPORT PHASE I ENVIRONMENTAL SITE ASSESSMENT REPORT AIP #74 Various Properties South Burlington, Vermont 05403 October 14, 2011 Prepared for: Stantec Consulting Inc. 55 Green Mountain Drive South Burlington,

More information

DECISION DOCUMENT. Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013

DECISION DOCUMENT. Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013 DECISION DOCUMENT Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013 Prepared by Division of Environmental Remediation New York State Department of Environmental

More information

Case Studies in Risk Management Methods as a Component of the Remedial Process

Case Studies in Risk Management Methods as a Component of the Remedial Process Case Studies in Risk Management Methods as a Component of the Remedial Process Cecile Willert, P.Eng., QP RA January/February 2013 Agenda Issues Summary Case Study # 1 RA of DNAPL site (combined with remediation)

More information

PHASE I ENVIRONMENTAL SITE ASSESSMENT REPORT

PHASE I ENVIRONMENTAL SITE ASSESSMENT REPORT PHASE I ENVIRONMENTAL SITE ASSESSMENT REPORT Miscellaneous Property Group Various Properties South Burlington, Vermont 05403 October 14, 2011 Prepared for: Stantec Consulting Inc. 55 Green Mountain Drive

More information

Section 3.11: Hazardous Materials

Section 3.11: Hazardous Materials Section 3.11: Hazardous Materials Section 3.11 Hazardous Materials 3.11 HAZARDOUS MATERIALS 3.11.1 Introduction to Analysis This section provides information regarding known contaminated sites and general

More information

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH JULY 2013 DOCUMENT CONTROL Client: Project Name: Report Title: IBI Reference: 25528 Cityview Drive Version: JULY 2013 Digital Master: Originator: Reviewer: Authorization: [File Location] Scott MacDonald,

More information

PHASE I ENVIRONMENTAL SITE ASSESSMENT REPORT

PHASE I ENVIRONMENTAL SITE ASSESSMENT REPORT PHASE I ENVIRONMENTAL SITE ASSESSMENT REPORT AIP #87 Various Properties South Burlington, Vermont 05403 October 14, 2011 Prepared for: Stantec Consulting Inc. 55 Green Mountain Drive South Burlington,

More information

Ontario Ministry of the Environment and Climate Change - Record of Site Condition #

Ontario Ministry of the Environment and Climate Change - Record of Site Condition # Ontario Ministry of the Environment and Climate Change - Record of Site Condition # 219027 Record of Site Condition Under Part XV.1 of the Environment Protection Act Summary Record of Site Condition Number

More information

RemTech 2011: BC Perspectives. Vapour Intrusion in High Density Development Mark Adamson, P.GEO, CSAP

RemTech 2011: BC Perspectives. Vapour Intrusion in High Density Development Mark Adamson, P.GEO, CSAP RemTech 2011: BC Perspectives Vapour Intrusion in High Density Development Mark Adamson, P.GEO, CSAP Who is Mark? Introduction Mark Adamson Geoscientist by training (C.Geol UK, P.Geo) Environmental consultant

More information

Fproduct. patersongroup. Phase II-Environmental Site Assessment Proposed Mixed Use Development 137 Bay Street and 350 Sparks Street Ottawa, Ontario

Fproduct. patersongroup. Phase II-Environmental Site Assessment Proposed Mixed Use Development 137 Bay Street and 350 Sparks Street Ottawa, Ontario Geotechnical Engineering patersongroup Fproduct Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Phase IIEnvironmental Site Assessment Proposed Mixed Use

More information

APPENDIX A TRANSACTION SCREEN QUESTIONNAIRE

APPENDIX A TRANSACTION SCREEN QUESTIONNAIRE APPENDIX A TRANSACTION SCREEN QUESTIONNAIRE Instructions: Interview the owner of the property (or a knowledgeable representative). If the owner is the only major occupant of the property, skip over the

More information

APPENDIX F ASTM USER QUESTIONNAIRE

APPENDIX F ASTM USER QUESTIONNAIRE APPENDIX F ASTM USER QUESTIONNAIRE Project No. 366158 December 16, 2016 2009 and 2011 Addison Street, Berkeley, CA 94704 Mark Morrisette December 5, 2016 Unknown Unknown property engineering controlsinstitutional

More information

Phase I and II Environmental Site Assessment 5026 Bank Street Ottawa, Ontario

Phase I and II Environmental Site Assessment 5026 Bank Street Ottawa, Ontario Phase I and II Environmental Site Assessment 5026 Bank Street Ottawa, Ontario Prepared for: MacEwen Petroleum Ltd. Attn.: Ian McLean, Manager Marketing & Site Development 18 Adelaide Street, P.O. Box 100

More information

SUPPLEMENTAL PHASE II ENVIRONMENTAL SITE ASSESSMENT APPLEBY MALL 5111 NEW STREET AND 499 & 505 APPLEBY LINE BURLINGTON, ONTARIO

SUPPLEMENTAL PHASE II ENVIRONMENTAL SITE ASSESSMENT APPLEBY MALL 5111 NEW STREET AND 499 & 505 APPLEBY LINE BURLINGTON, ONTARIO SUPPLEMENTAL PHASE II ENVIRONMENTAL SITE ASSESSMENT APPLEBY MALL 5111 NEW STREET AND 499 & 505 APPLEBY LINE BURLINGTON, ONTARIO SUPPLEMENTAL PHASE II ENVIRONMENTAL SITE ASSESSMENT APPLEBY MALL 5111 NEW

More information

FINAL PLAN OF REMEDIAL ACTION

FINAL PLAN OF REMEDIAL ACTION FINAL PLAN OF REMEDIAL ACTION DELAWARE CAR COMPANY Second and Lombard Streets Wilmington, Delaware DNREC Project No. DE-1059 October 2000 Department of Natural Resources and Environmental Control Division

More information

JACKSON CREEK FLOW DIVERSION PETERBOROUGH, ON

JACKSON CREEK FLOW DIVERSION PETERBOROUGH, ON JACKSON CREEK FLOW DIVERSION PETERBOROUGH, ON Final Screening Level Phase I ESA Project Location: Bethune Street and Townsend Street Peterborough, ON Prepared for: City of Peterborough 500 George Street

More information

IV.ENVIRONMENTAL IMPACT ANALYSIS H. HAZARDOUS MATERIALS

IV.ENVIRONMENTAL IMPACT ANALYSIS H. HAZARDOUS MATERIALS IV.ENVIRONMENTAL IMPACT ANALYSIS H. HAZARDOUS MATERIALS This section summarizes a Phase I Environmental Site Assessment (ESA) Report prepared for parcels located at 11703, 11707 and 11715 San Vicente Boulevard

More information

New York State Department of Environmental Conservation. Receive Site Fact Sheets by . See "For More Information" to Learn How.

New York State Department of Environmental Conservation. Receive Site Fact Sheets by  . See For More Information to Learn How. New York State Department of Environmental Conservation November 2013 FACT SHEET Brownfield Cleanup Program Receive Site Fact Sheets by Email. See "For More Information" to Learn How. Site Name: West 28th

More information

Environmental Site Assessment for Lenders April EPA All Appropriate Inquiry and. ASTM Phase I Environmental Site Assessment

Environmental Site Assessment for Lenders April EPA All Appropriate Inquiry and. ASTM Phase I Environmental Site Assessment Environmental Site Assessment for Lenders April 2017 EPA All Appropriate Inquiry and ASTM Phase I Environmental Site Assessment 1 CONTENT 1. CERCLA Liability & AAI 2. Typical Contaminants Encountered 3.

More information

5.14 CONTAMINATED MATERIALS

5.14 CONTAMINATED MATERIALS 5.14 CONTAMINATED MATERIALS 5.14.1 Introduction Contaminated materials are toxic or potentially harmful substances that may be present in soil, groundwater, and building materials. Contaminated materials

More information

STANLEY FARM SUBDIVISION

STANLEY FARM SUBDIVISION STANLEY FARM SUBDIVISION SERVICING OPTIONS AND STORMWATER MANAGEMENT REPORT BRIEF CITY OF OTTAWA PREPARED FOR: STANLEY FARM DEVELOPMENTS PREPARED BY: (November 2014 - Revision 0) LOT 9, CONCESSION 5 WATER

More information

Appendix O. Environmental Site Assessment

Appendix O. Environmental Site Assessment Appendix O Environmental Site Assessment AECOM 3292 Production Way, Floor 4 604 444 6400 tel Burnaby, BC, Canada V5A 4R4 604 294 8597 fax www.aecom.com April 12, 2017 Metro Vancouver 4330 Kingsway Burnaby,

More information

PHASE I ENVIRONMENTAL SITE ASSESSMENT

PHASE I ENVIRONMENTAL SITE ASSESSMENT PHASE I ENVIRONMENTAL SITE ASSESSMENT Part of Lot 10, Concession 1 Oakville, ON Client 2259229 Ontario Inc. c/o Royal Ready-Mix Inc. 2447 Royal Windsor Drive Oakville, ON L6J 7X6 Attn: Mr. Leo Capobianco

More information

FINAL PLAN OF REMEDIAL ACTION. Burns and McBride. South Market and A Streets August 19, 2008

FINAL PLAN OF REMEDIAL ACTION. Burns and McBride. South Market and A Streets August 19, 2008 FINAL PLAN OF REMEDIAL ACTION Burns and McBride South Market and A Streets August 19, 2008 Wilmington, Delaware DNREC Project No. DE-0325 This Revised Final Plan of Remedial Action (Final Plan) presents

More information

Standard for Commercial Vehicle Salvage Facilities

Standard for Commercial Vehicle Salvage Facilities Standard for Commercial Vehicle Salvage Facilities Effective December 1, 2019 Crown copyright, Province of Nova Scotia, 2019 January 2019 ISBN 978-1-55457-918-1 Table of Contents 1 Applicability... 1 2

More information

n introduction to environmental site assessments

n introduction to environmental site assessments a n introduction to environmental site assessments CMHC Home to Canadians Canada Mortgage and Housing Corporation (CMHC) is the Government of Canada s national housing agency. We help Canadians gain access

More information

Introduction to Brownfields: Site Assessment and Cleanup

Introduction to Brownfields: Site Assessment and Cleanup consulting engineers and scientists Introduction to Brownfields: Site Assessment and Cleanup Presented by: Barry Giroux, P.E., LEP, Senior Project Manager TAB Technical Assistance for Brownfields Team

More information

Ontario Ministry of the Environment - Record of Site Condition # Record of Site Condition Under Part XV.1 of the Environment Protection Act

Ontario Ministry of the Environment - Record of Site Condition # Record of Site Condition Under Part XV.1 of the Environment Protection Act Ontario Ministry of the Environment - Record of Site Condition # 211208 Record of Site Condition Under Part XV.1 of the Environment Protection Act Summary Record of Site Condition Number 211208 Date Filed

More information

KORA_Req._for_Eng._Studies_on_Stouffer_Apts. KU Reference No

KORA_Req._for_Eng._Studies_on_Stouffer_Apts. KU Reference No 000130 1 PURPOSE: Professional Engineering Consultants, P.A. (PEC) was engaged by University of Kansas Design & Construction Management to perform an assessment of Stouffer Place Apartment Building 20

More information

GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS

GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 180 NOVEMBER 2005 GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS TABLE OF CONTENTS 180.01 SCOPE 180.02 REFERENCES 180.03 DEFINITIONS

More information

New York State Department of Environmental Conservation

New York State Department of Environmental Conservation New York State Department of Environmental Conservation FACT SHEET Voluntary Cleanup Program Rochester Gas and Electric Corporation (RG&E) February 2014 RG&E-Brockport MGP Site, Perry and Erie Street(s)

More information

PROPOSED DECISION DOCUMENT. CE - E. 19th St. Station Voluntary Cleanup Program New York, New York County Site No. V00542 October 2017

PROPOSED DECISION DOCUMENT. CE - E. 19th St. Station Voluntary Cleanup Program New York, New York County Site No. V00542 October 2017 PROPOSED DECISION DOCUMENT CE - E. 19th St. Station Voluntary Cleanup Program New York, New York County Site No. V00542 October 2017 Prepared by Division of Environmental Remediation New York State Department

More information

Introduction to Brownfields: Site Assessment and Cleanup

Introduction to Brownfields: Site Assessment and Cleanup consulting engineers and scientists Introduction to Brownfields: Site Assessment and Cleanup Presented by: Ileen S. Gladstone, P.E., LSP, LEED AP Vice President & Senior Practice Leader TAB Technical Assistance

More information

Phase I and Phase II Environmental Site Assessments

Phase I and Phase II Environmental Site Assessments Phase I and Phase II Environmental Site Assessments Society of Women Environmental Professionals Capital Chapter Ira Walton Environmental Director United Environmental Services, Inc. May 1, 2018 Who Needs

More information

80 Carl Hall Road Class 4 Noise Area Classification (NPC-300) Final Report

80 Carl Hall Road Class 4 Noise Area Classification (NPC-300) Final Report STAFF REPORT ACTION REQUIRED 80 Carl Hall Road Class 4 Noise Area Classification (NPC-300) Final Report Date: December 14, 2017 To: From: Wards: Reference Number: North York Community Council Director,

More information

Environmental Assessment. Appendix G Hazardous Materials Technical Report

Environmental Assessment. Appendix G Hazardous Materials Technical Report Environmental Assessment Appendix G Hazardous Materials Technical Report Hazardous Materials and Waste Sites Summary Technical Memorandum Kansas City Streetcar Main Street Extension December 20, 2018 DRAFT

More information

patersongroup Phase II-Environmental Site Assessment 135 Barrette Street Ottawa, Ontario Prepared For Linebox Studio Inc.

patersongroup Phase II-Environmental Site Assessment 135 Barrette Street Ottawa, Ontario Prepared For Linebox Studio Inc. Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Phase IIEnvironmental Site Assessment 135 Barrette Street Ottawa,

More information

ADDRESSING ENVIRONMENTAL CONCERNS DURING THE EAST VILLAGE BROWNFIELD REDEVELOPMENT PROJECT

ADDRESSING ENVIRONMENTAL CONCERNS DURING THE EAST VILLAGE BROWNFIELD REDEVELOPMENT PROJECT Remediation Technologies Symposium October 21 st, 2010 East Village and Fort Calgary circa 2008, looking west Source: CMLC (East Village Master Plan Executive Summary) ADDRESSING ENVIRONMENTAL CONCERNS

More information

APPENDIX M: Hazardous Waste Technical Report

APPENDIX M: Hazardous Waste Technical Report APPENDIX M: Hazardous Waste Technical Report M.1 Existing Conditions A hazardous waste review was conducted to provide preliminary information regarding the potential presence of any hazardous substances

More information

Reference: OTCD B 17 September Soil Sampling Program th Line Road, Metcalfe, ON

Reference: OTCD B 17 September Soil Sampling Program th Line Road, Metcalfe, ON Trow Associates Inc. 154 Colonnade Road South Ottawa, Ontario K2E 7J5 Telephone: (613) 225-9940 Facsimile: (613) 225-7337 E-mail: ottawa@trow.com Web Site: www.trow.com Reference: OTCD00019239B 17 September

More information