1 PLANNING FOR LEVEE BREACH IN DUBUQUE, IA: MODELING & DEVELOPMENT OF MITIGATION STRATEGIES Andy McCoy, PhD, PE 2014 HDR, Inc., all rights reserved.

2 INTRODUCTION

3 A LOOK BACK - LEVEE BREACH IN DES MOINES, IOWA, DURING 2008 FLOOD Disasters - Levee Breaches - not expected but result in very severe consequences Major impacts to transportation grid, power grid, communication, property, and public pysche Des Moines River, Des Moines, Iowa 2008 Flood Birdland Levee Breached (USACE 2009 (Kelley, Vroman, Groves, Harder, & Sills ) Temporary flood barrier construction started too late 200 homes, 50 businesses, and North High School were inundated

4 BACKGROUND AND OBJECTIVES

5 PROJECT AREA AND GOALS DUBUQUE, IOWA Extend analysis performed by Rock Island District - USACE in 2015 Update HEC-RAS model with up to date version Create breach and response database Add to Mississippi River Conditions Perform parameter sensitivity Define emergency response actions and strategies

6 MODEL UPDATES

7 TERRAIN, HYDRAULIC CONTROLS, GRID DEVELOPMENT LIDAR vs Photogrammetry Added Buildings Assumption based on wanting conservative travel times Newer version of HEC-RAS Spatially varying surface roughness (manning s roughness coefficients) Better breakline control

8 HYDRAULIC RESULTS AND SENSITIVITY

9 ADDITIONAL MISSISSIPPI RIVER CONDITIONS AND BREACH PARAMETERS Design Final Width Time to Breach

10 BREACH PARAMETERS Nearly 50 breach scenarios Maximum breach widths were estimated from a study identifying the median (likely) and the 84% confidence level (not as likely, and larger) in similar levee reaches (URS 2013) Similar Levees - 30 ft per hour to 200 ft per hour (Used 100 ft per hour and 200 ft per hour) Not as much guidance for Flood Walls (Used 15 minute to 30 minutes)

11 BREACH LOCATION YEAR EVENT FLOODWALL FAILURE

12 BREACH LOCATION YEAR EVENT MEDIAN BREACH CHARACTERISTICS

13 BREACH LOCATION YEAR EVENT FLOODWALL FAILURE

14 HARNESSING THE DATA

15 HARNESSING DATA OVER 50 SIMULATIONS Buildings Transportation Sewers Maximum Travel Travel Time Depth Impacts Time At To 1-ft at On Evacuation To 1-ft at Buildings Evacuation Evacuation Routes Routes Points of Interest

16 HARNESSING DATA INCREMENTAL INUNDATION EXTENTS FOR OVER 50 SIMULATIONS INITIATION 30 MIN 60 MIN 2 HR

17 EMERGENCY PLANNING ACTIONS

18 TEMPORARY FLOOD BARRIERS 7 LOCATIONS IDENTIFIED

19 AT EACH TEMPORARY BARRIER LOCATION FLOOD DEPTH + ALIGNMENT

20 AT EACH FLOOD BARRIER LOCATION FLOOD DEPTHS IDENTIFIED

21 AT EACH FLOOD BARRIER LOCATION QUANTITIES CALCULATED FOR BARRIER LENGTH, FILL, CONSTRUCTION TIME, AND TOTAL CONSTRUCTION HOURS

22 FLOOD FIGHTING PREPARATION TESTING SCENARIOS Emergency Response effort Mississippi River Forecast - USACE Assume 25.4 ft Forecast Assume a boil or weak area has been identified near upstream end of levee system Near Breach Location 7 Tabbed Flood Binder (+electronic)

23 FLOOD FIGHTING PREPARATION TESTING SCENARIOS NEAR BREACH 7 Inundation Extents Evacuation Area Transportation Impacts Water Plant

24 FLOOD FIGHTING PREPARATION TESTING SCENARIOS

25 CONSTRUCTION OF SHIRAS, FENGLER, FENGER RR CROSS LEVEES DURING 200-YR BREACH 1,500 ft of 4-ft barrier (City already has HESCO) 650 cy of sand 200 hours of labor Reasonable as long as long as planning, stockpiling, and practice occur

26 SUMMARY

27 LEVEE BREACH MODELING INTO EMERGENCY PLANNING 2D hydraulic models excellent tool for scenarios (but better learn how to script post-processing) Inundation extents and flood timing can be used by emergency managers in evacuation (reverse 911 and cutting edge alerts) The creation a of comprehensive database compliments emergency flood operations and can inform desktop and practice emergency response exercises The City of Dubuque can now stockpile (and purchase) materials required for and plan for construction time and alignments required to erect life and property saving temporary flood barriers in case of levee weakening during Mississippi River flooding

28 THANK YOU! QUESTIONS? 2014 HDR, Inc., all rights reserved.

29 Percent Decrease in Time to 1-ft Depth RESULTS SENSITIVITY Based on points of interest, moving from 50th percentile to 84 th percentile breach Width and breach time decreased time to 1-ft depth significantly (5 to 50 %) 1 Day Time to 1-ft Depth USACE (Design) 31.5 hr 14 hr 1 hr 4 hr

30 RESULTS SENSITIVITY PERCENT CHANGE TO 1- FT DEPTH AT US HWY 151

31 SENSITIVITY RESULTS MAXIMUM DEPTH

32 SENSITIVITY RESULTS PERCENT CHANGE TO 1-FT DEPTH BY BREACH LOCATION

33 FLOOD FIGHTING - LOCATIONS

34 BREACH LOCATIONS Added 2 additional locations

35 TERRAIN DEVELOPMENT Assumption based on wanting conservative travel times

36 GRID DEVELOPMENT Newer version of HEC-RAS Better breakline control

37 POINTS OF INTEREST - BUILDINGS

38 POINTS OF INTEREST EVACUATION ROUTES

39 EVACUATION ROUTES MAXIMUM DEPTH

40 POINTS OF INTEREST MAXIMUM DEPTH

41 POINTS OF INTEREST TRAVEL TIME

42 EVACUATION ROUTES TRAVEL TIME

43 BREACH LOCATION YEAR EVENT MEDIAN BREACH CHARACTERISTICS

44 CONSTRUCTION OF SHIRAS, CROSS LEVEE TO PROTECT WATER PLANT DURING DESIGN EVENT 2,175 ft of 4-ft barrier (City already has HESCO) 965 cy of sand 276 hours of labor May want to consider Permanent barrier

DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE

DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 80 119 27 252 174.59 110 135 120 112 92 56 IOWA ASCE WATER RESOURCES DESIGN CONFERENCE

More information

Association of State Floodplain Managers May 2, 2017 Rob Davis, P.E., ENVSP Flood Control System Program Manager

Association of State Floodplain Managers May 2, 2017 Rob Davis, P.E., ENVSP Flood Control System Program Manager Association of State Floodplain Managers May 2, 2017 Rob Davis, P.E., ENVSP Flood Control System Program Manager 2008 vs. 2016 Cedar Rapids Population 130,000 Second largest city in Iowa Industrial roots:

More information

COASTAL RESILIENCE SYMPOSIUM Mathijs van Ledden & Maarten Kluyver (Haskoning Inc.)

COASTAL RESILIENCE SYMPOSIUM Mathijs van Ledden & Maarten Kluyver (Haskoning Inc.) HURRICANE RISK REDUCTION PROGRAM NEW ORLEANS STRUCTURAL SOLUTIONS AND RESILIENCE Mathijs van Ledden Royal Haskoning COASTAL RESILIENCE SYMPOSIUM Mathijs van Ledden & Maarten Kluyver (Haskoning Inc.) HOUSTON

More information

Lessons [being] learnt 2016 Flood in Cedar Rapids. Sandy Pumphrey Project Engineer II Flood Mitigation

Lessons [being] learnt 2016 Flood in Cedar Rapids. Sandy Pumphrey Project Engineer II Flood Mitigation Lessons [being] learnt 2016 Flood in Cedar Rapids Sandy Pumphrey Project Engineer II Flood Mitigation 319 286 5363 s.pumphrey@cedar-rapids.org Agenda 2008 Flood Event 2016 Flood Event [Long Term] Flood

More information

Modeling a Complex Hydraulic Environment Using a 1-D Approach Supplemented with Simple 2-D Principles Manas Borah Ed Dickson June 5, 2014

Modeling a Complex Hydraulic Environment Using a 1-D Approach Supplemented with Simple 2-D Principles Manas Borah Ed Dickson June 5, 2014 ASFPM 2014 Annual Conference Modeling a Complex Hydraulic Environment Using a 1-D Approach Supplemented with Simple 2-D Principles Manas Borah Ed Dickson June 5, 2014 Agenda Overview and Background Hydrology

More information

Environmental Protection (NJDEP) The Louis Berger Group, Inc.

Environmental Protection (NJDEP) The Louis Berger Group, Inc. Hydraulic Modeling for Preliminary Evaluation of Potential Flooding Impacts for Various Dredging, Capping and Armoring Scenarios of The Lower Passaic River Restoration Abdulai Fofanah, PE, D.WRE, CFM Murat

More information

Geneva Dam. Design of a Steep, Temporary, Riprap Ramp

Geneva Dam. Design of a Steep, Temporary, Riprap Ramp Geneva Dam Design of a Steep, Temporary, Riprap Ramp A Run-of of-river Dam Analysis for Geneva Dam Credit to: Yu-Chun Su, Ph.D., P.E., CFM David T. Williams. Ph.D., P.E, CFM Presentation Purpose History

More information

ENGINEERING AND CONSTRUCTION BULLETIN

ENGINEERING AND CONSTRUCTION BULLETIN ENGINEERING AND CONSTRUCTION BULLETIN No. 2017-15 Issuing Office: CECW-CE Issued: 14 Jul 17 Expires: 14 Jul 19 SUBJECT: Managed Overtopping of Levee Systems CATEGORY: Guidance APPLICABILITY: The U.S. Army

More information

Lower San Joaquin River Feasibility Study PLAN FORMULATION ADDENDUM

Lower San Joaquin River Feasibility Study PLAN FORMULATION ADDENDUM PLAN FORMULATION ADDENDUM Non-Structural Measure Descriptions Elevate Critical Infrastructure This measure would raise at-risk critical structures above the design inundation level. Elevation would be

More information

Missouri River Flood Inundation Maps

Missouri River Flood Inundation Maps State Risk Management Team Missouri 's hazard mitigation team Missouri River Flood Inundation Maps Which is more useful, inundation maps tied to the river stage or tied to flow? Percent Count River stage

More information

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017 City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017 Phasing of Meetings April Meeting May Meeting October Review of Tax Day Storm Event and Immediate Actions Taken By City Review of Coordination

More information

DRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E.

DRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E. \ Memorandum SSPEED Center at Rice University Department of Civil & Environmental Engineering 6100 Main MS-317 Houston, Texas 77005-1827 sspeed.rice.edu tel: 713-348-4977 To Andy Yung, P.E. CFM; Lane Lease,

More information

Gwinnett County Stormwater System Assessment Program

Gwinnett County Stormwater System Assessment Program Gwinnett County Stormwater System Assessment Program Jonathan Semerjian, PE Dept. of Water Resources Stormwater Management Sam Fleming, PE Dewberry Presentation Overview Project Background Drivers Enhanced

More information

Civil Engineer USACE, Omaha District. 28 February 2017 FLOOD FIGHTING AND SURVEILLANCE

Civil Engineer USACE, Omaha District. 28 February 2017 FLOOD FIGHTING AND SURVEILLANCE 217 FLOOD FIGHTING AND SURVEILLANCE 237 200 237 217 200 Don Moses, 237 P.E. 217 200 Civil Engineer USACE, Omaha District 255 0 163 131 255 0 163 132 255 0 163 122 28 February 2017 239 65 53 80 119 27 110

More information

Are You Ready for Risk and Uncertainty Analysis?

Are You Ready for Risk and Uncertainty Analysis? Are You Ready for Risk and Uncertainty Analysis? Presented to: Illinois Association for Floodplain And Stormwater Management Presented by: David T. Williams, Ph.D., P.E., P.H., CFM. D.WRE Senior Technical

More information

Flood Risk Management on the Elwha: Case Study of the Federal Levee Modification Project

Flood Risk Management on the Elwha: Case Study of the Federal Levee Modification Project Flood Risk Management on the Elwha: Case Study of the Federal Levee Modification Project US Army Corps of Engineers Zac Corum, PE, Hydraulic Engineer Travis Ball, PE, CFM, Hydraulic Engineer Seattle District

More information

Impact of Sea Level Rise on Roadway Design. Paul Carroll, PE

Impact of Sea Level Rise on Roadway Design. Paul Carroll, PE Impact of Sea Level Rise on Roadway Design Paul Carroll, PE September 14, 2016 State of Maryland Action Executive Order by Gov. O Malley established the Maryland Commission on Climate Change (MCCC) - 2007

More information

Freight Street Development Strategy

Freight Street Development Strategy Freight Street Development Strategy Appendix B: Naugatuck River Floodplain Analysis Freight Street Development Strategy DECEMBER 2017 Page B-1 1.0 NAUGATUCK RIVER FLOODPLAIN AT FREIGHT STREET 1.1 Watershed

More information

Chapter A-9 GEOTECHNICAL ANALYSIS NORTH KANSAS CITY - LOWER (HARLEM AREA)

Chapter A-9 GEOTECHNICAL ANALYSIS NORTH KANSAS CITY - LOWER (HARLEM AREA) Kansas Citys, Missouri and Kansas Flood Damage Reduction Feasibility Study (Section 216 Review of Completed Civil Works Projects) Engineering Appendix to the Interim Feasibility Report Chapter A-9 GEOTECHNICAL

More information

Fargo-Moorhead Metropolitan Area Flood Risk Management Project

Fargo-Moorhead Metropolitan Area Flood Risk Management Project Fargo-Moorhead Metropolitan Area Flood Risk Management Project 52ND ANNUAL IOWA ASCE ENVIRONMENTAL & WATER RESOURCES CONFERENCE 03 April 2014 Aaron W. Buesing Senior Hydraulic Engineer Corps of Engineers,

More information

Levees and Extreme Water Levels in the Southern Louisiana

Levees and Extreme Water Levels in the Southern Louisiana Proactive By Design. Our Company Commitment Levees and Extreme Water Levels in the Southern Louisiana ASFPM 2015 Conference Kenneth D. Hunu, PE GZA GeoEnvironmental, Inc. Page 1 Hydrologic Setting Page

More information

OVERVIEW OF RESERVOIR OPERATIONS AND FLOOD RISK MANAGEMENT

OVERVIEW OF RESERVOIR OPERATIONS AND FLOOD RISK MANAGEMENT OVERVIEW OF RESERVOIR OPERATIONS AND FLOOD RISK MANAGEMENT 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 COLUMBIA RIVER BASIN 131 132 122 239 65 53 80 119 27 110 135 120 252 174.59

More information

HEC-RAS 2D Modeling in Support of Ascension Parish Levee Certification

HEC-RAS 2D Modeling in Support of Ascension Parish Levee Certification HEC-RAS 2D Modeling in Support of Ascension Parish Levee Certification OFMA 2017 Annual Conference September 19, 2017 Presented by: Jeff Doudrick, PE, ENV SP Project Manager HNTB Corporation Agenda Project

More information

Lesson 4: Flood Response Methods

Lesson 4: Flood Response Methods Lesson 4: Flood Response Methods In this lesson, you will learn the advantages and disadvantages of expedient flood works. Selecting the proper flood response technique is essential to the success of the

More information

Chapter A-15. CID-MO Structural Analysis

Chapter A-15. CID-MO Structural Analysis Kansas Citys, Missouri and Kansas Flood Risk Management Feasibility Study Engineering Appendix to the Final Feasibility Study Chapter A-15 CID-MO Structural Analysis Chapter A-15 CID-MO Structural Analysis

More information

BOARD OF REGENTS AGENDA ITEM 14 STATE OF IOWA APRIL 29-30, 2009 REGISTER OF UNIVERSITY OF IOWA CAPITAL IMPROVEMENT BUSINESS TRANSACTIONS

BOARD OF REGENTS AGENDA ITEM 14 STATE OF IOWA APRIL 29-30, 2009 REGISTER OF UNIVERSITY OF IOWA CAPITAL IMPROVEMENT BUSINESS TRANSACTIONS BOARD OF REGENTS AGENDA ITEM 14 STATE OF IOWA APRIL 29-30, 2009 Contact: Sheila Doyle REGISTER OF UNIVERSITY OF IOWA CAPITAL IMPROVEMENT BUSINESS TRANSACTIONS Actions Requested: Consider approval of: 1.

More information

2

2 1 2 3 4 5 6 The program is designed for surface water hydrology simulation. It includes components for representing precipitation, evaporation, and snowmelt; the atmospheric conditions over a watershed.

More information

Hydrology and Flooding

Hydrology and Flooding Hydrology and Flooding Background The 1996 flood Between February 4, 1996 and February 9, 1996 the Nehalem reporting station received 28.9 inches of rain. Approximately 14 inches fell in one 48 hour period.

More information

multiconsult.no Hydropower modelling Vientiane January

multiconsult.no Hydropower modelling Vientiane January Hydropower modelling Vientiane January 24. 2018 Head, dh Energy from hydropower Hydropower plants transforms the potential energy in water to electricity. Energy is calculated by the following equation:

More information

Practical Needs and Approaches for Water Resources Adaptation to Climate Uncertainty

Practical Needs and Approaches for Water Resources Adaptation to Climate Uncertainty Practical Needs and Approaches for Water Resources Adaptation to Climate Uncertainty Rolf Olsen, PhD Senior Lead, Climate Change Institute for Water Resources U.S. Army Corps of Engineers Alexandria, Virginia

More information

Chapter A-8 GEOTECHNICAL ANALYSIS FAIRFAX-JERSEY CREEK (JERSEY CREEK SHEET PILE WALL)

Chapter A-8 GEOTECHNICAL ANALYSIS FAIRFAX-JERSEY CREEK (JERSEY CREEK SHEET PILE WALL) Kansas Citys, Missouri and Kansas Flood Damage Reduction Feasibility Study (Section 216 Review of Completed Civil Works Projects) Engineering Appendix to the Interim Feasibility Report Chapter A-8 GEOTECHNICAL

More information

Floods of 2008 Urban Systems Wayne Petersen, Urban Conservationist, IDALS. What lessons did we learn? (or should have learned)

Floods of 2008 Urban Systems Wayne Petersen, Urban Conservationist, IDALS. What lessons did we learn? (or should have learned) Floods of 2008 Urban Systems Wayne Petersen, Urban Conservationist, IDALS What lessons did we learn? (or should have learned) 100 year storms and 100 year floodplains are not a good standard for the future

More information

Creating a Flood Forecasting System for the San Diego River Watershed

Creating a Flood Forecasting System for the San Diego River Watershed Creating a Flood Forecasting System for the San Diego River Watershed Rand Allan County of San Diego Flood Control Martin J. Teal, P.E., P.H., D.WRE WEST Consultants inc. OUTLINE San Diego River Watershed

More information

Engineering and legal aspects of a distributed storage flood mitigation system in Iowa

Engineering and legal aspects of a distributed storage flood mitigation system in Iowa University of Iowa Iowa Research Online Theses and Dissertations Fall 2011 Engineering and legal aspects of a distributed storage flood mitigation system in Iowa Travis Baxter University of Iowa Copyright

More information

Outlet Structure Modeling

Outlet Structure Modeling Watershed Modeling using HEC-RAS Outlet Structure Modeling Jeff Wickenkamp, P.E., CFM, D.WRE Patrick Lach, P.E. Hey and Associates, Inc. Water Resources, Wetlands and Ecology Outline of Presentation Why

More information

Training Course Brochure Building Capacity in Rural & Urban Water Management

Training Course Brochure Building Capacity in Rural & Urban Water Management Training Course Brochure 2015 Building Capacity in Rural & Urban Water Management Introduction The WastePro Academy seeks to encourage the use of desktop software applications in the water and environmental

More information

LOWER CACHE CREEK, YOLO COUNTY WOODLAND AREA FEASIBILITY STUDY

LOWER CACHE CREEK, YOLO COUNTY WOODLAND AREA FEASIBILITY STUDY Background LOWER CACHE CREEK, YOLO COUNTY WOODLAND AREA FEASIBILITY STUDY Energy and Water Development Appropriations Act of 1993 Reconnaissance Study completed June 1994 Feasibility Cost Share Agreement

More information

APPENDIX A HYDROLOGIC AND HYDRAULIC ANALYSIS

APPENDIX A HYDROLOGIC AND HYDRAULIC ANALYSIS APPENDIX A HYDROLOGIC AND HYDRAULIC ANALYSIS GENERAL The Hydrologic and Hydraulic information presented in this appendix is provided as a supplement to the Dallas Floodway Extension General Re-evaluation

More information

SURREY COASTAL FLOOD ADAPTATION STRATEGY (CFAS) Improving Coastal Flood Adaptation Approaches (ICFAA) Stakeholder Workshop

SURREY COASTAL FLOOD ADAPTATION STRATEGY (CFAS) Improving Coastal Flood Adaptation Approaches (ICFAA) Stakeholder Workshop SURREY COASTAL FLOOD ADAPTATION STRATEGY (CFAS) Improving Coastal Flood Adaptation Approaches (ICFAA) Stakeholder Workshop Workshop Introductions and Opening Remarks Our objectives for the day To explore

More information

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project IAFSM 2010 Annual Conference City of Rockford Keith Creek Greenway Flood Mitigation Project March 10, 2010 Introduction Problem Overview 1890 s Building of homes along Keith Creek 1920 s Home construction

More information

Appendix J Hydrology and Hydraulics

Appendix J Hydrology and Hydraulics Appendix J Hydrology and Hydraulics Marsh Lake Dam Ecosystems Restoration Feasibility Study Hydraulics & Hydrology Appendix January 2011 Contents List of Figures iii List of Tables iii I. General 1 II.

More information

THE WATER IS RISING SCALABLE, RELIABLE, AND RELEVANT INFORMATION SUPPORTING FIRST RESPONDERS. May 3, 2017

THE WATER IS RISING SCALABLE, RELIABLE, AND RELEVANT INFORMATION SUPPORTING FIRST RESPONDERS. May 3, 2017 THE WATER IS RISING SCALABLE, RELIABLE, AND RELEVANT INFORMATION SUPPORTING FIRST RESPONDERS May 3, 2017 Association of State Floodplain Managers 2017 Conference Jim Keith, PE, CFM Walter P Moore Andy

More information

Presentation Overview

Presentation Overview Little Dry Creek Restoration Deep River Flood Risk Management Final Presentation to LCRBDC June 10, 2015 Presentation Overview Project Overview & Background Information Data Collection Model Development

More information

Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY

Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY Draft Reformulation Public Information October 2016 US Army Corps of Engineers Presentation Outline Project Overview

More information

S.R. 4031, SECTION FVR OVER BEAVER RUN SEGMENT 0170, OFFSET 6093 EAST NANTMEAL TOWNSHIP, CHESTER CO. ENGINEERING DISTRICT 6-0

S.R. 4031, SECTION FVR OVER BEAVER RUN SEGMENT 0170, OFFSET 6093 EAST NANTMEAL TOWNSHIP, CHESTER CO. ENGINEERING DISTRICT 6-0 S.R. 4031, SECTION FVR OVER BEAVER RUN SEGMENT 0170, OFFSET 6093 EAST NANTMEAL TOWNSHIP, CHESTER CO. ENGINEERING DISTRICT 6-0 HYDROLOGIC & HYDRAULIC STUDY REPORT OCTOBER 2007 Prepared For: Prepared By:

More information

ASFPM 2015 Atlanta. Automated Hydrological and Hydraulic (2D and 1D-2D) Model Construction, Model Running, and Flood Map Production

ASFPM 2015 Atlanta. Automated Hydrological and Hydraulic (2D and 1D-2D) Model Construction, Model Running, and Flood Map Production ASFPM 2015 Atlanta Automated Hydrological and Hydraulic (2D and 1D-2D) Model Construction, Model Running, and Flood Map Production Dr Richard Crowder Elise Ibendahl Content The challenge and opportunities

More information

Flood Consequence Assessment. Proposed Commercial Development, Tank Farm Way, Sully

Flood Consequence Assessment. Proposed Commercial Development, Tank Farm Way, Sully Flood Consequence Assessment Proposed Commercial Development, Tank Farm Way, Sully Client O Reilly Concrete Group Larchfield Kingscourt County Cavan Ireland By RVW Consulting 6 Neptune Court Vanguard Way

More information

U.S. Army Corps of Engineers Los Angeles District. US Army Corps of Engineers BUILDING STRONG

U.S. Army Corps of Engineers Los Angeles District. US Army Corps of Engineers BUILDING STRONG U.S. Army Corps of Engineers Los Angeles District US Army Corps of Engineers BUILDING STRONG 1. Opening Comments; 2. Los Angeles County Drainage Area Project As-Built Condition, Current Condition, and

More information

WWTP Protection Memo INTRODUCTION AND PURPOSE MODEL DEVELOPMENT AND ALTERNATIVES. August 31, PROJECT: TO: FROM: Re:

WWTP Protection Memo INTRODUCTION AND PURPOSE MODEL DEVELOPMENT AND ALTERNATIVES. August 31, PROJECT: TO: FROM: Re: WWTP Protection Memo August 31, 2017 PROJECT: TO: FROM: Re: City of Montesano WWTP Protection Log Jacks Matt Kastberg, Parametrix, Inc. Keelan Jensen, Dan Eggers, Henry Hu, WEST Consultants, Inc. WWTP

More information

POOL 11 ISLANDS SUNFISH LAKE AND MUD LAKE OPERATION AND MAINTENANCE MANUAL

POOL 11 ISLANDS SUNFISH LAKE AND MUD LAKE OPERATION AND MAINTENANCE MANUAL MISSISSIPPI RIVER POOL 11 ISLANDS SUNFISH LAKE AND MUD LAKE GRANT COUNTY, WISCONSIN AND DUBUQUE COUNTY, IOWA U.S. ARMY CORPS OF ENGINEERS ENVIRONMENTAL MANAGEMENT PROGRAM HABITAT REHABILITATION AND ENHANCEMENT

More information

Risk and Safety in Engineering: Lessons from Hurricane Katrina. Byron Newberry Mechanical Engineering

Risk and Safety in Engineering: Lessons from Hurricane Katrina. Byron Newberry Mechanical Engineering Risk and Safety in Engineering: Lessons from Hurricane Katrina Byron Newberry Mechanical Engineering Is Katrina an engineering ethics issue? There was no evidence of government or contractor negligence

More information

Analysis of Floodplain Fish Habitat on the San Joaquin for the San Joaquin River Restoration Project (SJRRP)

Analysis of Floodplain Fish Habitat on the San Joaquin for the San Joaquin River Restoration Project (SJRRP) Analysis of Floodplain Fish Habitat on the San Joaquin for the San Joaquin River Restoration Project (SJRRP) Daniel Dombroski (ddombroski@usbr.gov), Blair Greimann, Elaina Gordon, Katrina Harrison (Reclamation)

More information

Climate Change Impacts on Joint Riverine and Coastal Flooding on Calleguas Creek in Ventura County, CA

Climate Change Impacts on Joint Riverine and Coastal Flooding on Calleguas Creek in Ventura County, CA Climate Change Impacts on Joint Riverine and Coastal Flooding on Calleguas Creek in Ventura County, CA James Gregory, James Jackson (ESA) Lily Verdone (TNC) FMA, September 8, 2016 Project Overview Coastal

More information

Appendix VI: Illustrative example

Appendix VI: Illustrative example Central Valley Hydrology Study (CVHS) Appendix VI: Illustrative example November 5, 2009 US Army Corps of Engineers, Sacramento District Prepared by: David Ford Consulting Engineers, Inc. Table of contents

More information

GRIMSBY TIDAL DEFENCES: WAVE OVERTOPPING AND COASTAL FLOODING

GRIMSBY TIDAL DEFENCES: WAVE OVERTOPPING AND COASTAL FLOODING 14 May 2013 GRIMSBY TIDAL DEFENCES: WAVE OVERTOPPING AND COASTAL FLOODING EMAY TOHA B&V WATER INTRODUCTION, CONTENTS AND WHY GRIMSBY? 2 I N T R O D U C T I O N S & C O N T E N T S INTRODUCTIONS Senior

More information

Mid-Barataria Sediment Diversion Project

Mid-Barataria Sediment Diversion Project Mid-Barataria Sediment Diversion Project PROJECT RISK REGISTER Risk ID Risk Category Risk Identity & Cause Current Assessment Mitigation Risk Proba Cost Time Risk Description Cause & Effect bility Impact

More information

The newly updated and comprehensive SWMP shall:

The newly updated and comprehensive SWMP shall: RFQ SCOPE OF SERVICES 2.1 Project Purpose The City of Miami, ( City ) is seeking professional engineering services from a qualified firm for the purpose of planning and developing a newly updated and comprehensive

More information

Fort Leonard Wood, Missouri. September 2013

Fort Leonard Wood, Missouri. September 2013 Fort Leonard Wood, Missouri September 2013 1 Presenters Shannon Kelly, Physical Scientist Clean Water Act Program Manager Directorate of Public Works Environmental Division Environmental Compliance Branch

More information

Performance Evaluation of the New Orleans and Southeast Louisiana Hurricane Protection System

Performance Evaluation of the New Orleans and Southeast Louisiana Hurricane Protection System Performance Evaluation of the New Orleans and Southeast Louisiana Hurricane Protection System Final Report of the Interagency Performance Evaluation Task Force Volume VI The Performance Interior Drainage

More information

BRAZOS RIVER FLOOD GATES FEASIBILITY STUDY

BRAZOS RIVER FLOOD GATES FEASIBILITY STUDY BRAZOS RIVER FLOOD GATES FEASIBILITY STUDY Stakeholder Involvement August 4, 2015 Texas Department of Transportation MISSION STATEMENT Work with others to provide safe and reliable transportation solutions

More information

U. S. Army Corps of Engineers Charleston District Overview

U. S. Army Corps of Engineers Charleston District Overview U. S. Army Corps of Engineers Charleston District Overview Diane C. Perkins, AICP Charleston District Chief, Planning & Environmental Branch Diane.Perkins@usace.army.mil US Army Corps of Engineers General

More information

CLIMATE CHANGE ADAPTATION IN MASSACHUSETTS

CLIMATE CHANGE ADAPTATION IN MASSACHUSETTS CLIMATE CHANGE ADAPTATION IN MASSACHUSETTS Kathleen Baskin, Director of Water Policy June 3, 2013 MA Global Warming Solutions Act of 2008 Mitigation Reduce greenhouse gas emissions below 1990 levels by

More information

Risk-Based Analysis for Corps Flood Project Studies A Status Report

Risk-Based Analysis for Corps Flood Project Studies A Status Report US Army Corps of Engineers Hydrologic Engineering Center Risk-Based Analysis for Corps Flood Project Studies A Status Report June 1996 Approved for Public Release. Distribution Unlimited. TP-153 REPORT

More information

Initial Application of a Landscape Evolution Model to a Louisiana Wetland

Initial Application of a Landscape Evolution Model to a Louisiana Wetland Initial Application of a Landscape Evolution Model to a Louisiana Wetland by Carl F. Cerco PURPOSE: Corps planning projects encompass a wide variety of restoration goals. These include wetland restoration,

More information

UPPER MISSISSIPPI RIVER COMPREHENSIVE PLAN

UPPER MISSISSIPPI RIVER COMPREHENSIVE PLAN UPPER MISSISSIPPI RIVER COMPREHENSIVE PLAN APPENDIX D COST ESTIMATES Prepared by the U.S. Army Corps of Engineers Rock Island, St. Louis, and St. Paul Districts March 2008 UPPER MISSISSIPPI RIVER COMPREHENSIVE

More information

Maryland Adaptation and Vulnerability Assessment Maryland State Highway Administration

Maryland Adaptation and Vulnerability Assessment Maryland State Highway Administration Maryland Adaptation and Vulnerability Assessment Maryland State Highway Administration October 4, 2016 Maryland: Introduction Atlantic Ocean and Chesapeake Bay 7,719 miles of shoreline Coastal in the East

More information

A Defensible Approach to Flood Mitigation, Stream Restoration and Water Quality. Kevin Corwin, PE, PLS, PMP Todd Williams, PE

A Defensible Approach to Flood Mitigation, Stream Restoration and Water Quality. Kevin Corwin, PE, PLS, PMP Todd Williams, PE A Defensible Approach to Flood Mitigation, Stream Restoration and Water Quality Kevin Corwin, PE, PLS, PMP Todd Williams, PE City of St. Charles, MO River town Mississippi River Population of 68K 23 Sq

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432 PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION:

More information

COSIDERATION OF MULTIPLE HAZARDS IN HIGHWAY BRIDGE DESIGN - A Current FHWA Sponsored Project

COSIDERATION OF MULTIPLE HAZARDS IN HIGHWAY BRIDGE DESIGN - A Current FHWA Sponsored Project COSIDERATION OF MULTIPLE HAZARDS IN HIGHWAY BRIDGE DESIGN - A Current FHWA Sponsored Project George C. Lee (1), Mai Tong (2) and W. Phillip Yen (3) Abstract Following the philosophy approach of the AASHTO

More information

PRELIMINARY HYDROLOGY/HYDRAULICS ANALYSES RESULTS

PRELIMINARY HYDROLOGY/HYDRAULICS ANALYSES RESULTS PRELIMINARY HYDROLOGY/HYDRAULICS ANALYSES RESULTS Coldstream Park Stream Corridor Restoration and Preservation Consent Decree SEP Prepared for Lexington-Fayette Urban County Government Division of Water

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN. Bremo Power Station CCR Surface Impoundment: North Ash Pond INFLOW DESIGN FLOOD

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN. Bremo Power Station CCR Surface Impoundment: North Ash Pond INFLOW DESIGN FLOOD INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN Bremo Power Station CCR Surface Impoundment: North Ash Pond Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo

More information

Prepared for Urban Drainage and Flood Control District

Prepared for Urban Drainage and Flood Control District BERM FAILURE TECHNICAL ANALYSES SOUTH PLATTE GRAVEL PIT EVALUATION CRITERIA Prepared for Urban Drainage and Flood Control District Wright Water Engineers, Inc. January 2013 121-030.000 TABLE OF CONTENTS

More information

Drop Height For Channel Erosion Control

Drop Height For Channel Erosion Control Drop Height For Channel Erosion Control James C.Y. Guo, Professor and Director Department of Civil Engineering, U. of Colorado at Denver, Denver, Colorado 8017 E-mail: James.Guo@cudenver.edu Introduction

More information

CEIWR-HEC Engineering Assistance. Summary of Recent Activities and FY 2017 Outlook

CEIWR-HEC Engineering Assistance. Summary of Recent Activities and FY 2017 Outlook CEIWR-HEC Engineering Assistance Summary of Recent Activities and FY 2017 Outlook September 2016 Overview The requested engineering and modeling support for FY 2017 has changed. We added new capabilities

More information

Open Trench Construction Plan Review The open trench construction plan review involves the following general investigative elements:

Open Trench Construction Plan Review The open trench construction plan review involves the following general investigative elements: TNC Fisher Slough Final Design and Permitting Subject: Inverted Siphon Construction Feasibility To: From: Jenny Baker (TNC) Dave Olson (DD3) Brian Olson (DD17) Bob Boudinot Skagit County David Cline (Tetra

More information

HYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE

HYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE HYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE by James C.Y. Guo. Professor, Civil Engineering, U. Of Colorado at Denver, James.Guo@cudenver.edu.. And Eric Hsu, Project Engineer, Parson

More information

Kentucky Dam Safety Hazard Mitigation Driving Local Mitigation Actions through Risk Map

Kentucky Dam Safety Hazard Mitigation Driving Local Mitigation Actions through Risk Map Kentucky Dam Safety Hazard Mitigation Driving Local Mitigation Actions through Risk Map Michelle Meehan, PE Carey Johnson ASFPM 2013 Conference June 12, 2013 What We ll Talk About Today Overview of KDOW

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

PRESENTATION FOR THE POTENTIAL ADDITION OF SPECIAL FLOOD HAZARD AREAS

PRESENTATION FOR THE POTENTIAL ADDITION OF SPECIAL FLOOD HAZARD AREAS PRESENTATION FOR THE POTENTIAL ADDITION OF SPECIAL FLOOD HAZARD AREAS 1 255 255 255 237 237 237 217 217 217 200 200 200 Part 1: Summary of Floodplain Analysis for Los 0 Angeles 163 131 River239 110 112

More information

PRINCESS ANNE DISTRICT STORMWATER PROJECTS

PRINCESS ANNE DISTRICT STORMWATER PROJECTS PRINCESS ANNE DISTRICT STORMWATER PROJECTS Topics o o o o o Sea Level Rise and the Southern Watersheds Ashville Park Sherwood Lakes Kingston Estates Drainage Operations & Maintenance in the Southern Watersheds

More information

Peninsula Drainage District #2 Encroachment Evaluation Summary Report

Peninsula Drainage District #2 Encroachment Evaluation Summary Report Peninsula Drainage District #2 Encroachment Evaluation Summary Report Levee Ready Columbia / Peninsula Drainage District #2 / 1880 NE Elrod Drive, Portland, Oregon 97211 Table of Contents Contents Summary...

More information

Coordinated Hazard Assessment and Mapping Program

Coordinated Hazard Assessment and Mapping Program Coordinated Hazard Assessment and Mapping Program Mississippi River flood, 1993 A PREDICTABLE DISASTER Floods are the most common natural disaster in Illinois, accounting for well over 90% of declared

More information

Assessment of Agricultural Flood Damages Along the James River in South Dakota

Assessment of Agricultural Flood Damages Along the James River in South Dakota Assessment of Agricultural Flood Damages Along the James River in South Dakota Ron S. Beyer Hydraulic Engineer Omaha District US Army Corps of Engineers 2007 Eastern South Dakota Water Conference October

More information

GEOMORPHIC EFECTIVENESS OF FLOODS ON LOWER TAPI RIVER BASIN USING 1-D HYDRODYNAMIC MODEL,HEC-RAS

GEOMORPHIC EFECTIVENESS OF FLOODS ON LOWER TAPI RIVER BASIN USING 1-D HYDRODYNAMIC MODEL,HEC-RAS GEOMORPHIC EFECTIVENESS OF FLOODS ON LOWER TAPI RIVER BASIN USING 1-D HYDRODYNAMIC MODEL,HEC-RAS Darshan Mehta 1, Raju Karkar 2, Lalji Ahir 3 Assistant Professor, CED, S.S.A.S.I.T, Surat, Gujarat, India

More information

Adaptation to Extreme Weather Events and Climate Change

Adaptation to Extreme Weather Events and Climate Change Office of Planning, Environment and Realty Office of Infrastructure Adaptation to Extreme Weather Events and Climate Change SASHTO Meeting Robert Kafalenos, FHWA August 25, 2014 1 Planning for the Future

More information

Farmington Dam Repurpose Project

Farmington Dam Repurpose Project Farmington Dam Repurpose Project 2017 $158,100,000 to re-purpose the Farmington Dam from flood protection only to a long-term water storage facility that increases water supply reliability to the region.

More information

December 7, Dr. Christine Pomeroy University of Utah Civil and Environmental Engineering MCE Salt Lake City, UT. Dear Dr.

December 7, Dr. Christine Pomeroy University of Utah Civil and Environmental Engineering MCE Salt Lake City, UT. Dear Dr. December 7, 2012 Dr. Christine Pomeroy University of Utah Civil and Environmental Engineering MCE 2042 Salt Lake City, UT 84112 Dear Dr. Pomeroy, The following document is the final report of the Red Butte

More information

Simulation of Event Based Runoff Using HEC-HMS Model for an Experimental Watershed

Simulation of Event Based Runoff Using HEC-HMS Model for an Experimental Watershed International Journal of Hydraulic Engineering 213, 2(2): 28-33 DOI: 1.5923/j.ijhe.21322.2 Simulation of Event Based Runoff Using HEC-HMS Model for an Experimental Watershed Reshma T *, Venkata Reddy K,

More information

Village of Winnetka Flood Risk Reduction Assessment. Christopher B. Burke Engineering, Ltd. (CBBEL) October 11, 2011

Village of Winnetka Flood Risk Reduction Assessment. Christopher B. Burke Engineering, Ltd. (CBBEL) October 11, 2011 Village of Winnetka Flood Risk Reduction Assessment October 11, 2011 Christopher B. Burke Engineering, Ltd. (CBBEL) Thomas T. Burke, Jr., PhD, PE David Buckley, PE, CFM Introduction The September 2008

More information

Pre-Application Meeting Minutes

Pre-Application Meeting Minutes Hydrologic & Hydraulic Report S.R. 0034 Spring Road Bridge Replacement Over Conodoguinet Creek ATTACHMENT M Pre-Application Meeting Minutes PA DEP PRE-APPLICATION MEETING MINUTES SR 0034, Section 024,

More information

Flood hazard assessment in the Raval District of Barcelona using a 1D/2D coupled model

Flood hazard assessment in the Raval District of Barcelona using a 1D/2D coupled model 9 th International Conference on Urban Drainage Modelling Belgrade 2012 Flood hazard assessment in the Raval District of Barcelona using a 1D/2D coupled model Beniamino Russo, David Suñer, Marc Velasco,

More information

Interagency Performance Evaluation Task (IPET) Force. Engineering and Operational Risk and Reliability Analysis. Robert C. Patev

Interagency Performance Evaluation Task (IPET) Force. Engineering and Operational Risk and Reliability Analysis. Robert C. Patev Interagency Performance Evaluation Task (IPET) Force Engineering and Operational Risk and Reliability Analysis Robert C. Patev Deputy and Technical Lead, IPET Risk and Reliability Team IPET Risk Assessment

More information

Risk MAP in Louisiana Louisiana Floodplain Management Association. Shona Gibson, PE Risk Analysis FEMA Region VI April 29, 2010

Risk MAP in Louisiana Louisiana Floodplain Management Association. Shona Gibson, PE Risk Analysis FEMA Region VI April 29, 2010 in Louisiana Louisiana Floodplain Management Association Shona Gibson, PE Risk Analysis FEMA Region VI April 29, 2010 Overview Paradigm Shift Vision Program Goals and Measures Project Selection Process

More information

ENGINEERING REPORT ANALYSIS OF CLOSURES. HOUSATONIC RIVER and NAUGATUCK RIVER FLOOD PROTECTION PROJECTS SECTION 1. ANSONIA and DERBY, CONNECTICUT

ENGINEERING REPORT ANALYSIS OF CLOSURES. HOUSATONIC RIVER and NAUGATUCK RIVER FLOOD PROTECTION PROJECTS SECTION 1. ANSONIA and DERBY, CONNECTICUT ENGINEERING REPORT ANALYSIS OF CLOSURES HOUSATONIC RIVER and NAUGATUCK RIVER FLOOD PROTECTION PROJECTS SECTION 1 ANSONIA and DERBY, CONNECTICUT December 2010 MMI #1560-119 and #3118-03 Prepared for: City

More information

CHAPTER 12 BRIDGE DECK DRAINAGE SYSTEMS

CHAPTER 12 BRIDGE DECK DRAINAGE SYSTEMS OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 12 BRIDGE DECK DRAINAGE SYSTEMS APRIL 2011 APRIL 2011 Page 1 Chapter Table of Contents 12.1 Policy... 12-3 12.1.1 Table 1... 12-3

More information

Vulnerability Assessment

Vulnerability Assessment Brief coastal vulnerability assessment for the City of Cocoa Beach, conducted utilizing available NOAA and UF GeoPlan tools. Vulnerability Assessment City of Cocoa Beach East Central Florida Regional Planning

More information

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS PART 3 - STANDARDS FOR SEWERAGE FACILITIES 3.3 - DESIGN OF STORM SEWERS 3.301 Design of Storm Sewers A. General Information B. Investigations and Surveys C. Special Projects 3.302 Design Criteria for Storm

More information