1 OPEN HOUSE AGENDA 9:00-9:30 Coffee, Meet & Greet 9:30-10:30 Presentation 10:30-11:00 Q & A
2 University of Nevada, Reno Open House for Architects & Engineers
3 PRESENTATION OUTLINE Welcome & Introductions Sean McGoldrick Planning & Construction Denise Baclawski University Growth Projects Size & Type Business Center North Purchasing Ray Moran Updated Business Processes How to Do Business with the University Q&A
4 NEVADA S LARGEST UNIVERSITY 21,000+ Students 3,100 Full-Time Faculty & Staff 131 Buildings; 3.9M GSF 268 Acres
5 PLANNING & CONSTRUCTION SERVICES NATIONALLY RECOGNIZED 30+ Employees Multiple Awards & Honors
6 Earthquake Engineering Laboratory Scott Brown, Sr. Project Manager Concrete Reinforcing Steel Institute 2016 Award Winner
7 LEED Gold Certification Peavine Hall Scot Orchard, Project Manager
8 Marty Sillito & Brandon Hill, Grounds Services Professional Grounds Management Society: Green Star Award
9 Award Placeholder Tree Campus USA 2016 Designation
10 Planning & Construction Leadership Melissa Rutter, Director of Planning & Business Services Kevin Knuf, Director of Construction Services Sean McGoldrick, Associate Vice President of Facilities Services Denise Baclawski, Senior Director of Planning & Construction Dean Hitchcock, Director of Design Services
11 Design Services Dean Hitchcock Director, Design Services Brad Taylor Senior Electrical Engineer John Walsh Senior Project Manager, Architecture Scott Brown Senior Project Manager, Architecture Lynn Hampton Mechanical Engineer Linda Bauder Project Manager, Architecture Rita Johnson Project Manager, Architecture Quinn Lyttle Project Manager, Interior Design
12 Construction Services Kevin Knuf Director, Construction Services Lyle Woodward Senior Project Manager, Architecture Scot Orchard Project Manager I Gina Dory Project Manager, Architecture Cory Jennings Project Manager, Architecture Ariel Lauzardo Project Manager, Architecture Chad Strawn Project Manager I Dave Carvin Project Manager I
13 Planning & Business Services Melissa Rutter Director, Planning & Business Services Jordan DeWeerd Manager, Planning & Space Inventory Kelly Norman Manager, Drafting & Doc Control Scott Geib A&E Drafter III/GIS Jeff Graham Campus Sr. Bldg. Inspector Harley LaRoche Bldg. Construction Inspector III Vacant A&E Drafter I Jayson Ault Business Data Analyst Adriel Hollandsworth Business Data Analyst
14 Growth - Enrollment
15 Growth Faculty & Staff
16 Growth - Projects 21% Increase in Number 24% Increase in Value
17 Growth Department Funded
18 Project Summary FY 2015 FY 2016 Projects By Type Dollar Value Number Dollar Value Number Deferred Maintenance $ 6,002, $ 8,186, Department Funded $ 5,776, $ 8,171, Upgrades & Renovations $ 2,082,031 8 $ 10,783, Large CIP $ 49,544,106 6 $ 50,896,386 5 Projects in Planning $ 27,710 2 $ 665,850 3 Total: $ 63,432, $ 78,702,
19 OVER 200 ONGOING CONSTRUCTION PROJECTS
20
21 $0-25K Utility Installation Painting & Flooring Small-Scale Classroom & Lab Renovation Signage Asbestos Abatement
22 $25-100K Medium-Scale Remodels Building Repair Job Order Contracts
23 $100K-$1M Lab Renovations Large-Scale Repairs Pavement & Concrete Repairs Utility Upgrades
24 $1M+ New Building Construction Full Building Repairs & Renovations Infrastructure Improvements Laboratory Remodels
25 17 Projects Great Basin Hall E. L. Wiegand Fitness Center New Fine Arts Building Palmer Engineering Renovation Mackay Stadium Seating Upgrade Thompson Building Renovation Lombardi Renovation West Campus 25kV Loop High Temperature Hot Water Piping Repairs
26 BCN Purchasing A/E Contracts +$100K through BCN Purchasing What s BCN Purchasing? Purchasing and Contracting Office for 5 of 8 institutions of the Nevada System of Higher Education: DRI, GBC, TMCC, UNR & WNC Annually, we o Issue 5,000+ purchase orders worth more than $225M o Process thousands of bids, contracts & other transactions
27 BCN Purchasing Who Are We? Ray Moran, Director Fred Harvey, Buyer IV Betsy Brownfield, Buyer III Ryan Caddel, Buyer I rcaddel@unr.edu Rose Belcher, Purchasing Tech. II roseb@unr.edu Sharon Thygesen, Asst. Director sthygesen@unr.edu William Bailey, Buyer III baileyw@unr.edu Vikki Plants, Buyer III vplants@unr.edu Jodi Gillenwater, Supply Tech. IV jodig@unr.edu Ryan Fitzgerald, Supply Tech. II ryanfitzgerald@unr.edu
28 BCN Purchasing Big Changes Are A-Coming: Workday In October, NSHE will implement a new financial system, called Workday. Workday will replace eight individual archaic systems and piles of paper with a unified, real-time, state-wide system. Includes on-line purchasing and contract maintenance. BCN Purchasing will go from pushing paperwork from the IN box to the OUT box to analyzing data, conducting bids and RFPs, and providing service to our customers, both internal and vendors-suppliers
29 BCN Purchasing Big Changes Are A-Coming: Supplier Registration (SReg) In order to have one state-wide financial system, NSHE needed one state-wide supplier database This would replace eight separate data bases, one at each institution In order to accomplish this NSHE needs to have all our suppliers register again This time, one registration will apply across Nevada In order to make registration as painless as possible NSHE is implementing on-line supplier registration Suppliers will go on-line, fill in information, and then you re set!
30 BCN Purchasing Big Changes Are A-Coming: IonWave: Online Bidding This is the icing on the cake : good-bye to reading & filling out dozens of pages of bid documents, ensuring your bid arrives on time, some times having bids thrown out because of failure to initial correctly, and waiting weeks for results NSHE is implementing IonWave, the bidding system used by over a dozen agencies in Las Vegas and Washoe County IonWave will provide numerous benefits for suppliers: transparency, foolproof completion of forms, and access to state-wide opportunities This project was just given the green light to proceed, so we don t know all the details, but look for more info shortly
31 Doing Business at UNR How Can My Firm Do Business with the University? Review the Facilities Design and Construction Standards and BCN Purchasing Guidelines Complete the Consultants Pre-Qualification Questionnaire Monitor the BCN Purchasing Solicitations webpage for current solicitations
32 Doing Business at UNR Two Entry Points: A/E Contracts valued over $100K BCN Purchasing Formal RFQ selection process 5 in A/E Contracts valued under $100K Facilities Services Consultants Pre-Qualification Questionnaire 70+ of these in 2016
33 Doing Business at UNR A/E Contracts Under $100K Facilities Services Process: FSD receives all end-user requests for UNR planning & construction FSD creates a ROM estimate for requester, and vets project for approval and budget funding Viable, funded projects are assigned to Design Team
34 Doing Business at UNR A/E Contracts Under $100K Facilities Services Process continued: Design Team reviews pre-qualified list of professional service providers and determines the best-qualified firm and asks for a proposal Firm is notified of award for contract Contract takes ~2 weeks after fee proposal receipt
35 Doing Business at UNR A/E Contracts Under $100K Facilities Services Factors that determine selection: Firm s qualifications for scope of work History of related work New business opportunity Capacity to respond in a timely manner
36 Doing Business at UNR A Few More Things Contract & RFP Templates available on our website for pre-review Upcoming Projects Deferred Maintenance roofs, asphalt, utilities Building Remodels Tenant Improvements New Construction (new Business Building)
37 Questions? More info, documents, helpful links and this presentation available at:
Update to Business, Finance, and Facilities Committee regarding the Purchasing Office Structure and their Collaboration Efforts
Page 1 of 5 Update to Business, Finance, and Facilities Committee regarding the Purchasing Office Structure and their Collaboration Efforts February 17, 2017 Currently, there are eight separate vendor
More informationP U R C H A S I N G D E P A R T M E N T K R I S T E N J. S P I C O L A, CPPB A N N U A L R E P O R T P U R C H A S I N G A G E N T
P U R C H A S I N G D E P A R T M E N T A N N U A L R E P O R T K R I S T E N J. S P I C O L A, CPPB P U R C H A S I N G A G E N T The mission of the Purchasing Department of the Board of Water Works of
More informationPROPOSITION R Citizen s Bond Oversight Committee
PROPOSITION R Citizen s Bond Oversight Committee June 15, 2011 Southwestern Community College District 900 Otay Lakes Road, Room L246 Chula Vista, CA 91910 Proposition R AGENDA 1. Call to Order / Roll
More informationRequest for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents
Request for Qualifications (Architect / Engineer) Administration of Project: Local Higher Education Project Name Technolgy Building Related Infrastructure Response Deadline Oct. 5, 2018 11:00 am local
More informationTime Item Notes: Presenter. 7:15-7:45 Washington Elementary Design Updates JJ Henri
WOODBURN SCHOOL DISTRICT 103 Bond Advisory & Accountability Committee Agenda Woodburn School District Office 1390 Meridian Drive May 17, 2017 6:30-8:30 pm Time Item Notes: Presenter 6:30-6:35 6:35-6:40
More informationRecessed Board Meeting March 20, 2018
Agenda Item #11: Award of Contract No. 17-169-RFP for design services for the interior renovation of the Ellen M. Bozman Government Center located at 2100 Clarendon Blvd. Recessed Board Meeting March 20,
More informationAdministrative Faculty Job Evaluation Model
Administrative Faculty Job Evaluation Model Implemented December 1, 2016; Revisions Effective October 1, 2017 INTRODUCTION CONTENTS MODEL 1 JOB FAMILIES 2 MINIMUM REQUIREMENTS 4 POSITION TITLES 5 POLICIES
More informationJMU Capital Projects SWaM Outreach Event Presentations
JMU Capital Projects SWaM Outreach Event Presentations Kjellstrom + Lee Contact: Jessica Marcus jmarcus@kjellstromandlee.com Project: College of Business Renovation/Expansion Please contact Kjellstrom
More informationWESTERN ILLINOIS UNIVERSITY CONSTRUCTION PROJECT PROCEDURES WESTERN ILLINOIS UNIVERSITY CONSTRUCTION POLICY
WESTERN ILLINOIS UNIVERSITY CONSTRUCTION PROJECT PROCEDURES WESTERN ILLINOIS UNIVERSITY CONSTRUCTION POLICY Management of all campus construction projects will be provided exclusively through the Facilities
More informationGrossmont-Cuyamaca Community College District Facilities Construction Update
Grossmont-Cuyamaca Community College District Facilities Construction Update April 17, 2018 Presented by Fred Parker Program Manager Gafcon, Inc. Agenda Grossmont College Update Cuyamaca College Update
More informationHIGHER EDUCATION CENTER NATIONAL CITY BUILDING ADDITION
HIGHER EDUCATION CENTER NATIONAL CITY BUILDING ADDITION PROPOSITIONS R & Z PROGRAM UPDATE EXECUTIVE UPDATE NOVEMBER 14, 2017 1 National City Addition Ready for the start of 2018 spring semester Building
More informationBUCKNELL UNIVERSITY PROCEDURES FOR RENOVATIONS AND NEW CONSTRUCTION
I. PURPOSE BUCKNELL UNIVERSITY PROCEDURES FOR RENOVATIONS AND NEW CONSTRUCTION To ensure the proper process to request and obtain approval for all renovation or new construction projects within Bucknell
More informationChase Center and Warriors Mixed Use Office and Retail Development. Project Tip Off Meeting Procurement Package #2 November 16, 2016
Chase Center and Warriors Mixed Use Office and Retail Development Project Tip Off Meeting Procurement Package #2 November 16, 2016 AGENDA Welcome Key Stakeholders Mortenson Clark Overview Project Team
More informationELECTRONIC AND INFORMATION TECHNOLOGY (EIT) PROCUREMENT POLICY AND PROCEDURES UNIVERSITY OF NEVADA, RENO
FINAL DRAFT ELECTRONIC AND INFORMATION TECHNOLOGY (EIT) PROCUREMENT POLICY AND PROCEDURES 8/22/2015 Contents EIT Procurement Policy and General Procedure 2 EIT Purchasing Request Process... 5 EIT Procurement
More informationUNIVERSITY OF NEVADA, RENO Lawlor Events Center Internal Audit Report July 1, 2009 through December 31, 2010
UNIVERSITY OF NEVADA, RENO Lawlor Events Center Internal Audit Report July 1, 2009 through December 31, 2010 GENERAL OVERVIEW Lawlor Events Center (LEC) is an 11,600 seat multipurpose facility that hosts
More informationBasic renewal/restoration and safety projects
Basic renewal/restoration and safety projects Board Update September 9, 2013 Bond Team Support Team Agenda Program Management Goals Program Budget Status 2013 Project Updates Labor Distribution Study 2014
More informationJackson Miracle Building Plan Outreach Roundtable. February 14, 2017
Jackson Miracle Building Plan Outreach Roundtable February 14, 2017 $1.8 billion Expanded Footprint Improved Patient Experience World-Class Facilities Innovative, Leading-Edge Care A Stronger, More Competitive
More informationGuam Adequate Education Act Trust Account - CIP/STEM: Formerly SFSF Federal ARRA Grant Year End Report FY
Guam Adequate Education Act Trust Account - CIP/STEM: Formerly SFSF Federal ARRA Grant Year End Report FY 2010-2011 October 1, 2010 to September 30, 2011 On August 3, 2011, the US Department of Education
More informationContracting for Architectural and Engineering (A/E) Services Webinar. August 30, AM to 11:30 AM
Contracting for Architectural and Engineering (A/E) Services Webinar August 30, 2011 10 AM to 11:30 AM 1 Where We're Going Today Webinar Operation - Fred Ward 5 minutes (+/-) Topic Introduction - John
More informationKENTUCKY STATE UNIVERSITY
KENTUCKY STATE UNIVERSITY Proposed Projects Involving the State General Fund (cash or bonds)* Priority Project Title / Description Total Budget 2004-2006 1 Hathaway Hall Renovation Phase II $11,200,000
More informationFacilities Maintenance & Operations Update. Presidents Executive Cabinet March 6, 2017
Facilities Maintenance & Operations Update Presidents Executive Cabinet March 6, 2017 1 Update Proposition 39 Year 4: March 6 March 31 Will complete all exterior lighting upgrades to LED Aquatic Center
More informationSANTA ANA COLLEGE FACILITIES COMMITTEE MEETING OCTOBER 18, 2016
FACILITIES COMMITTEE MEETING OCTOBER 18, 2016 1 ACTIVE PROJECTS Santa Ana College Central Plant, Infrastructure and Mechanical Upgrades 2 COMPLETED PROJECTS Santa Ana College Perimeter Site Improvements
More informationCONSENT CALENDAR 5 Agreement for Architectural Design Services for the COS Hanford Educational Center Student Quad
COLLEGE OF THE SEQUOIAS COMMUNITY COLLEGE DISTRICT Board of Trustees Meeting December 14, 2015 CONSENT CALENDAR 5 Agreement for Architectural Design Services for the COS Hanford Educational Center Student
More informationWill County Justice Center Trade Contractor Outreach Session May 3, 2017
Will County Justice Center Trade Contractor Outreach Session May 3, 2017 Replace Cover Image on Master Slide Gilbane Building Company May 2017 1 Trade Contractor Outreach Session Agenda Meet and Greet
More informationFairview Park City Schools Facilities Advisory Committee Meeting: 4/12/2017
Fairview Park City Schools Facilities Advisory Committee Meeting: 4/12/2017 Facilities Advisory Committee (FAC) AGENDA FAC focus and framework FPCS Preliminary Design and Construction Schedule Meet our
More informationCAPITAL IMPROVEMENT PROJECT PROJECT STATUS UPDATE PRESENTATION STAFF PRESENTATION APRIL 18, 2016
CAPITAL IMPROVEMENT PROJECT PROJECT STATUS UPDATE PRESENTATION STAFF PRESENTATION APRIL 18, 2016 CAPITAL IMPROVEMENT PROJECT Agenda -Project Team Members Introduction -Review Project Referendum -Review
More informationUniversity of Washington. Request for Qualifications ARCHITECTURAL DESIGN SERVICES FOR. UW Fluke Hall Labs and Building Renewal Project Number:
Capital Projects Office Request For Qualifications for Architectural Design Services University of Washington Request for Qualifications ARCHITECTURAL DESIGN SERVICES FOR UW Fluke Hall Labs and Building
More informationINSTRUCTIONS FOR DIVISION 00 DOCUMENTS
INSTRUCTIONS FOR DIVISION 00 DOCUMENTS Division 00 is the first section of the specifications for construction. For each advertised bid project, the College/University must direct the Architect/Engineer
More informationConstruction & Engineering 1845 East Russell Road Suite 300 Las Vegas, NV 89119
Clark County Department of Aviation Construction & Engineering 1845 East Russell Road Suite 300 Las Vegas, NV 89119 Professional Service Contracts Construction Contracts Professional Service Contracts
More informationTransportation Multi-Modal Meeting
Transportation Multi-Modal Meeting by Brian Wolfe, P.E. November 18, 2015 MDTA Overview Established in 1971 Purpose Construct, manage, operate, and improve toll facilities Funded by toll revenues Headquarters
More information2016 Technology Procurement Outreach Event July 18,2016. M/WBE Office Procurement and Contracts Division Technology Management Department
2016 Technology Procurement Outreach Event July 18,2016 M/WBE Office Procurement and Contracts Division Technology Management Department Agenda 2 Introductions M/WBE Program Procurement Overview Solicitations
More informationChase Center and Warriors Mixed Use Office and Retail Development. Project Tip Off Meeting Procurement Package #4 June 5, 2018
Chase Center and Warriors Mixed Use Office and Retail Development Project Tip Off Meeting Procurement Package #4 June 5, 2018 AGENDA Welcome Key Stakeholders Mortenson Clark Overview Project Overview Project
More informationCOLLEGE OF SOUTHERN NEVADA PURCHASING DEPARTMENT Internal Audit Report July 1, 2008 through December 31, 2009
COLLEGE OF SOUTHERN NEVADA PURCHASING DEPARTMENT Internal Audit Report July 1, 2008 through December 31, 2009 GENERAL OVERVIEW The Purchasing department at the College of Southern Nevada (CSN) operates
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 Y DATE: December 6-8, 2016 ****************************************************************************** SUBJECT: SDSU Student Wellness
More informationAuburn University Construction Project Update March 2010
New Basketball Arena: Construction Cost: $68.5 million. The Arena is currently 91% complete. Contract completion is July 25, 2010, but the project is on schedule to complete by May 2010. Interior finish
More informationDoing Business with the Metropolitan Washington Airports Authority
Doing Business with the Metropolitan Washington Airports Authority MWMCA Quarterly Economic Summit Brown Advisory November 7, 2017 Introduction to MWAA Ronald Reagan Washington National Airport Washington
More informationAmendment 01. Issued: August 18, For. RFP 18-KG-0725(BF): Professional Design Services for Douglass Valley Elementary School
Amendment 01 Issued: August 18, 2017 For RFP 18-KG-0725(BF): Professional Design Services for Douglass Valley Elementary School Academy District 20 Proposals Due: August 25, 2017 by 2:00pm MST Issued by:
More informationSOUTH DAKOTA BOARD OF REGENTS. Committee on Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Committee on Budget and Finance AGENDA ITEM: II D DATE: December 3-4, 2014 ****************************************************************************** SUBJECT: FY16 HEFF
More informationCITY OF BELLINGHAM, WASHINGTON Purchasing-Vendor Guide
P U R C H A S I N G O F F I C E, 2 2 2 1 P A C I F I C S T, B E L L I N G H A M W A. 9 8 2 2 9 P H O N E 360-778-7750 F AX 3 6 0-778-7706 P U R C H A S I N G O F F I C E, 2 7 7 8-7 7 5 0 CITY OF BELLINGHAM,
More informationGoverning Board Capital Construction Program Annual Workshop September 10, 2013 Agenda
Governing Board Capital Construction Program Annual Workshop September 10, 2013 Agenda Prop R Status Projects Completed Status of Facilities Master Plans Prop R 5-Year Construction Plan Summary; IPP s
More informationRequest for Qualifications. for. Seattle Public Schools Miscellaneous Consultants and Professional Services Roster
Seattle Public Schools Contracting Services 2445 Third Avenue South Seattle, WA 98134 Telephone: (206) 252-0566 Fax: (206) 743-3018 contractingservices@seattleschools.org Request for Qualifications for
More informationRequest for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents
Request for Qualifications (Architect / Engineer) Administration of Project: Local Higher Education Project Name Founders Tunnel Response Deadline Jan. 30, 2018 2:00 pm local time Project Location Bowling
More informationADVERTISEMENT FOR BIDS (AFTER PREQUALIFICATION)
ADVERTISEMENT FOR BIDS (AFTER PREQUALIFICATION) Subject to conditions prescribed by the University of California, San Francisco (the University or UCSF ), bids for a Construction Manager at Risk Agreement
More informationPRECONSTRUCTION SERVICES LEVERAGING A BUILDER DURING DESIGN ATHLETIC BUSINESS CONFERENCE
PRECONSTRUCTION SERVICES LEVERAGING A BUILDER DURING DESIGN ATHLETIC BUSINESS CONFERENCE December 4, 2008 Outline Introductions When and Why of Preconstruction Services Role of Builder in LEED Preconstruction
More informationArchitectural Services
Architectural Services 2016 Capital Improvement Program Request for Proposal Number: 18-20 Title of the Projects: Renovations to Weaver Middle School Procurement Department Bibb County School District
More informationRequest for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents
Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Campus Wide HVAC Upgrades - Steam Lines Response
More informationFinding and Buying Local Foods Introduction to Procurement
Finding and Buying Local Foods Introduction to Procurement February 4, 2016 Welcome! Today s Speakers Bob Gorman MPRO Farm to School Lead USDA FNS Christina Conell Program Analyst USDA FNS Housekeeping
More informationFirst theatre in Utah aiming for
First theatre in Utah aiming for LEED CERTIFICATION R&O Construction is completing the third phase of the Valley Fair Mall renovation in November with the construction of a Megaplex Theatre on the site
More information10 Year Plan. Facilities Planning Guide. December 15, 2014
10 Year Plan Facilities Planning Guide December 15, 2014 October 21, 2014 Facilities Study Session o Existing funding sources established relating to facilities Routine Restricted Maintenance Account (RRMA)
More informationC. of O. / P.A. Program bonded. Energy Conservation bonded Science Lab Upgrades bonded Minor Repairs hard dollar
Section Contents Five-Year Capital Plan FY 2018-19 through FY 2022-23 Project Funding Type Five - Year Plan Total ( $ 000 s ) State match to existing City funding bonded $79,200 Critical Maintenance for
More informationThe Architectural and Engineering professional services RFQ identified the qualifications for the professional service providers as follows:
For: Fort Bend ISD Board of Trustees Date: December 17, 2018 Action: Consent: Consideration and Approval: Professional Service Firms: Architectural and Engineering (A/E) Design Firms for 2018 Bond Program
More informationSan Francisco State University
San Francisco State University Campus Sustainability Committee October 20, 2016 Agenda Updates Introduction of new members - VP Cortez Energy Information System - Caitlin Steele Ethics Week for the College
More informationAgenda Special Meeting of the Ames Public Library Board of Trustees Conference Room 620 Lincoln Way, Ste. 4 July 8, 2013
Agenda Special Meeting of the Ames Public Library Board of Trustees Conference Room 620 Lincoln Way, Ste. 4 July 8, 2013 Call to Order: 5:30 p.m. New Business 1. Preliminary Plans and Specifications for
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 X DATE: March 27-29, 2018 ****************************************************************************** SUBJECT USD North Commons Renovation
More informationThe Lothian Residence Hall Building System Infrastructure Analysis project will develop a phased strategy that will include the following elements:
UNIVERSITY OF CALIFORNIA, RIVERSIDE REQUEST FOR PROPOSAL PRE-DESIGN AND PRE-ENGINEERING PROGRAMMING LOTHIAN RESIDENCE HALL BUILDING SYSTEM INFRASTRUCTURE AND SEISMIC ANALYSIS Introduction The University
More informationLANSDOWNE HIGH SCHOOL RENOVATION PRELIMINARY DESIGN PRESENTATION. The Board of Education of Baltimore County Verletta White, Interim Superintendent
RENOVATION PRELIMINARY DESIGN PRESENTATION The Board of Education of Baltimore County Verletta White, Interim Superintendent AGENDA 2 Project Location General Information Existing Conditions Structural
More informationM $336M .73 S/L/A/M CONSTRUCTION SERVICES BY THE NUMBERS A BETTER WAY TO BUILD. YEARS OF CONSTRUCTION SERVICES DESIGN-BUILD PROJECTS
A BETTER WAY TO BUILD. S/L/A/M CONSTRUCTION SERVICES BY THE NUMBERS Our team of construction professionals has more than 30 years of building experience in New England. We pride ourselves on the personal
More informationFacilities Council Minutes October 4, 2016
Facilities Council Minutes October 4, 2016 Building I, Room I-202 3:00 p.m./3:05 pm Attendees: Melinda Merrell, Barry Baker, Mark Daniels, Mike Biell, Dave Parker, Mark White, Jose Perdomo, Doug Medbury,
More information(Continued on next page)
FULL TEXT OF BALLOT MEASURE E LONG BEACH UNIFIED SCHOOL DISTRICT REPAIR AND SAFETY MEASURE. To improve outdated classrooms/neighborhood schools by: improving technology/labs/career education classrooms/electrical
More informationEntry Deadline March 4th
Index Advertising Campaign of the Year... 12 Advertisements of the Year... 6 Best Amenity of the Year... 15 Best Entrance of the Year... 16 Best Floor Plan of the Year... 20 Best Interior Merchandising
More informationCounty of Santa Cruz %
County of Santa Cruz % PROBATION DEPARTMENT P.O. BOX 1812, SANTA CRUZ, CA 95061-1812 (831) 454-2150 FAX: (831) 454-3035 JOHN P. RHOADS CHIEF PROBATION OFFICER December 3,1999 Agenda: December 14, 1999
More informationConstruction Back-Log Solution Begins With Proposal Stage
Construction Back-Log Solution Begins With Proposal Stage Developing the Job Order Contract Request for Proposal (RFP) By: Vince Duobinis, Senior Market Development Manager Kelvin King, Director, Market
More informationCompleted. Project. Melbourne High School. Comprehensive Additions and Renovations
Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project
More informationLETTER OF INTENT Steamfitters Local 601 Training Facility March 23 rd, 2016
LETTER OF INTENT Steamfitters Local 601 Training Facility To: Re: City of Madison Planning Department and Plan Commission 215 Martin Luther King Jr. Blvd. LL110 Madison, WI 53703 Major Amendment to Approved
More informationdate: 10 july 2012 the pennsylvania state university: burrowes building
the pennsylvania state university: burrowes building. faculty/staff committee project overview introductions goals of the renovation critical considerations exterior envelope mechanical systems interior
More informationUniversity of Central Florida Downtown Campus / Dr. Phillips Academic Commons Pre-Bid Phase II Package Structural, Architectural and MEP
University of Central Florida Downtown Campus / Dr. Phillips Academic Commons Pre-Bid Phase II Package Structural, Architectural and MEP Agenda Introduction (5 minutes) UCF Introduction (5 minutes) Project
More informationRequest for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents
Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Agency Project Name Stadium Project Response Deadline 1/9/14 12 pm local time
More informationSemi-Annual Report. January 1, 2012 June 30, 2012
Semi-Annual Report January 1, 2012 June 30, 2012 G.O. Bond Project Status As of June 30, 2012 Completed OCC Soccer Fields GWC Library/Classroom Improvements OCC South Campus Utilities Upgrade GWC Student
More informationBUILDING SCHOOLS. WORKING WITH THE SDA.
1 BUILDING SCHOOLS. WORKING WITH THE SDA. Presented in Partnership with the City of Camden New Jersey Friday, June 30, 2017 Presented by: Charles McKenna, Chief Executive Officer Karon Simmonds, Director-Risk
More informationBOARD OF TRUSTEES OCTOBER 13, 2014
Measure E BOARD OF TRUSTEES OCTOBER 13, 2014 FACILITIES UPDATE Measure Q 1 RECENTLY COMPLETED PROJECTS Santa Ana College Perimeter Site Improvements Building G Renovation Artesia Street Improvements Property
More informationADDENDUM # 1 TO: FROM:
ADDENDUM # 1 TO: FROM: SUBJECT: DATE: bidders Somsri Bond, RA, LEEDap Assistant Architect for Research, University Architect s Office 20180123 - EA802 - Whitewater Hall - Rms 221,223,225-Interior Finishes
More informationCONSTRUCTION UPDATE SEPTEMBER 2015 THIS IS AUBURN.
CONSTRUCTION UPDATE SEPTEMBER THIS IS AUBURN. JORDAN-HARE STADIUM VIDEO BOARD INSTALLATION ATHLETICS DEPARTMENT ENGINEER: LBYD, INC. CONSTRUCTION MANAGER: BRASFIELD & GORRIE $13.9 AUGUST The video board
More informationEVANSTON PUBLIC LIBRARY BOARD OF TRUSTEES FACILITIES COMMITTEE
EVANSTON PUBLIC LIBRARY BOARD OF TRUSTEES FACILITIES COMMITTEE Wednesday, May 17, 2017 5:30 P.M. Evanston Public Library, Friedberg Storytelling Room, 1703 Orrington Ave. 1. CALL TO ORDER AGENDA 2. NEW
More informationOBJECTIVE 1.1: To establish the acceptable use and capacity of each building.
GOAL 1: To implement planned and routine maintenance programs which will extend the useful life of all buildings and prevent premature capital outlay for replacement. Through managed maintenance, Facilities
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance Consent ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance Consent AGENDA ITEM: 7 L DATE: June 27-29, 2017 ****************************************************************************** SUBJECT: FY18 HEFF M&R Projects
More informationADMINISTRATION AND OPERATIONS. All Campus Meeting January 31, 2018
ADMINISTRATION AND OPERATIONS All Campus Meeting January 31, 2018 ADMINISTRATION AND OPERATIONS UPDATES Chrome River Implementation Spring Semester 2018 January System Testing February/March System Training
More informationSOUTH DAKOTA BOARD OF REGENTS. Committee on Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Committee on Budget and Finance AGENDA ITEM: III E DATE: December 4-5, 2013 ****************************************************************************** SUBJECT: FY15 HEFF
More informationContract No Amendment: Conversion Management Associates, Inc. for the Center Street Garage Replacement Project
Office of the City Manager CONSENT CALENDAR April 28, 2015 To: From: Honorable Mayor and Members of the City Council Christine Daniel, City Manager Submitted by: Andrew Clough, Director, Public Works Subject:
More informationClark County Department of Aviation Purchasing. Purchasing and Contracts 1845 East Russell Road, Suite 300 Las Vegas, NV 89119
Clark County Department of Aviation and Contracts 1845 East Russell Road, Suite 300 Las Vegas, NV 89119 Clark County Department of Aviation Use Clark County Supplier Registration: https://supplierregistration.clarkcountynv.gov//
More informationWUPRPM Regulations and Procedures Effective: November 11, 2005 R. Purchasing and Financial Obligations Revision Date: July 1, 2015.
Table of Contents 1. Purpose... 3 2. Definitions... 3 3. Limits and Thresholds... 4 4. Competitive Bidding... 4 5. Request for Quotation/Request for Proposal... 5 6. Bid Information... 5 7. Bid Bonds...
More informationPROJECT INFORMATION. Project Name: ON-CALL ELECTRICAL CONTRACTORS PROGRAM FOR PROJECTS GREATER THAN $100,000 & LESS THAN $500,000
Project Number: OC.ELEC2018 PROJECT INFORMATION Project Name: ON-CALL ELECTRICAL CONTRACTORS PROGRAM FOR PROJECTS GREATER THAN $100,000 & LESS THAN $500,000 Procurement Agent: WALT DALIA PURCHASING AGENT
More informationBusiness Administrators Forum
Business Administrators Forum 401 A/D Benson May 20, 2015 Agenda Update on Key Activities Presenter: Brandon Gilliland Fiscal Year End Calendar Presenter: Jennifer Killingsworth Capital Project Policy
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance Consent ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance Consent AGENDA ITEM: 4 P DATE: December 5-7, 2017 ****************************************************************************** SUBJECT FY19 HEFF M&R Projects
More informationThe University of Texas at San Antonio Request for Qualifications for University Center Update Common Lounge. RFQ No.
The University of Texas at San Antonio Request for Qualifications for University Center Update Common Lounge RFQ No. 743-15-110315SC RFQ Deadline Date: November 25, 2015 1.1. OBJECTIVE AND OVERVIEW SECTION
More informationFMD Project File Management Procedures
Issued: November 10, 2014 Revised: April 9, 2015 GUIDELINE: Applies to: All Planning, Project Management and Business Office Employees of the Facilities Management Department (FMD) PURPOSE: To establish
More informationSubcontractor Pre-qualification Statement
Subcontractor Pre-qualification Statement By submitting this Statement, Subcontractor affirms that the information provided herein is true and sufficiently complete so as not to be misleading. All fields
More informationCommittee Meeting. Procurement Processes for Professional Services and Contractors
Citizen s i Oversight Committee Meeting Procurement Processes for Professional Services and Contractors March 2, 2011 1 Procurement Process for Professional Services 2 Procurement Process for Professional
More informationRequest for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents
Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Olscamp Central Chiller Plant CCP-3 Response
More informationPHYSICAL PLANT DEPARTMENT MAINTENANCE AND PLANNING DIVISION AUDIT OF ALLEGED CONFLICT OF INTEREST
PHYSICAL PLANT DEPARTMENT MAINTENANCE AND PLANNING DIVISION AUDIT OF ALLEGED CONFLICT OF INTEREST THE UNIVERSITY OF NEW MEXICO September 8, 2009 J.E. Gene Gallegos, Chair Carolyn Abeita, Vice Chair James
More informationFinance and Administration Division May 2018
Vice President for Finance & Administration Executive I Health Systems Chief Financial Officer Dean, College of Medicine Finance and Administration Senior Associate Vice President, Finance & Administration
More informationDenver Procurements. Bid Due: 7/11/2008 3:00:00 PM
http://www.denvergov.org/apps/procurements/olbmain.asp Page 1 of 3 7/8/2008 Denver Procurements Purchasing Bid#: RFP ELEVATOR_MAINT_0572U Issued: 7/8/2008 Description: Elevator Maintenance & Service Buyer:
More informationWelcome. The Housing and Neighborhood Department City of Jacksonville. Neighborhood Stabilization Program NSP
Welcome The Housing and Neighborhood Department City of Jacksonville Neighborhood Stabilization Program 1 BIDDING PROCESS & CONSTRUCTION MANAGEMENT SINGLE FAMILY HOMES REHABILITATION General Contractor
More informationQUARTERLY REPORT. (July 1, 2013 September 30, 2013) December 18, 2013
QUARTERLY REPORT (July 1, 2013 September 30, 2013) December 18, 2013 Closed CCC NBLC Lease Revenue Bond Retirement Completed DIST Help Desk Software OCC Gym Acoustic Retrofit OCC Large Lecture Hall Seating
More informationSouth Whidbey School District - Elementary Kitchen Remodel Project - General Information p - 1
Request for Proposal for Design Services South Whidbey Elementary School Kitchen Remodel Project: F2017-03-01 The South Whidbey School District is seeking qualified design consultants to submit a proposal
More informationSACRAMENTO VALLEY STATION
Transportation, Historic Rehabilitation and Sustainability Station Overview Opened in 1926 Approximately 66,000 GSF Designed in 1926 by San Francisco Architects Bliss & Faville Eclectic Architectural Style
More informationPlanned Procurement Opportunities Report. April 2018
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the
More informationQuestions received on Creedmoor PC Major Renovation for Outpatient Residence, Building 70 and DASNY s responses:
Questions received on Creedmoor PC Major Renovation for Outpatient Residence, Building 70 and DASNY s responses: 1. Will Building 70 be an Article 28 DOH compliant facility? 2. Are the clients/patients
More informationRequest for Proposal for GC/CM Consultant Services Ferndale School District. Secondary High School GC/CM Program. October 19, 2018
Request for Proposal for GC/CM Consultant Services Ferndale School District Secondary High School GC/CM Program October 19, 2018 The Ferndale School District is requesting proposals for project management,
More informationStarted in Europe in the early 1980 s Developed & tested by the U.S. Military s Mainstream U.S.A.!!!
Job Order Contracting One Answer to Several Public Works Dilemmas 2009 APWA International Public Works Congress & Exposition Columbus, Ohio Charlie D. Bowers Operations Manager Parsons Commercial Technology
More informationREQUEST FOR LETTERS OF INTEREST TO PERFORM PROFESSIONAL ARCHITECTURAL/ENGINEERING SERVICES
REQUEST FOR LETTERS OF INTEREST TO PERFORM PROFESSIONAL ARCHITECTURAL/ENGINEERING SERVICES Service Plaza Facility Improvements Project No. 71-18-10 Middle Ridge and Vermillion Valley Service Plazas in
More information