1 Asbestos and TCLP Survey Former Tannery Building 3723 Abbotts Bridge Road Duluth, Georgia October 12, 2015 Terracon Project No Prepared for: City of Duluth Duluth, Georgia Prepared by: Terracon Consultants, Inc. Duluth, Georgia

2

3 TABLE OF CONTENTS 1.0 INTRODUCTION Project Objective Reliance BUILDING DESCRIPTION FIELD ACTIVITIES Asbestos Visual Assessment - Asbestos Physical Assessment - Asbestos Sample Analysis - Asbestos Toxicity Characteristics Leaching Procedure Sample Analysis Toxicity Characteristics Leaching Procedure REGULATORY OVERVIEW Asbestos Toxicity Characteristics Leaching Procedures FINDINGS Asbestos Toxicity Characteristics Leaching Procedure LIMITATIONS/GENERAL COMMENTS... 6 APPENDIX A APPENDIX B APPENDIX C APPENDIX D APPENDIX E ASBESTOS AND TCLP SURVEY SAMPLE LOCATION SUMMARY ASBESTOS AND TCLP ANALYTICAL LABORATORY DATA SAMPLE LOCATION DIAGRAM LICENSES AND CERTIFICATIONS PHOTOGRAPHS

4 ASBESTOS AND TCLP SURVEY Former Tannery Building Duluth, Georgia 1.0 INTRODUCTION Terracon Project No October 12, 2015 Terracon Consultants, Inc. (Terracon) conducted an asbestos and toxicity characteristics leaching procedure (TCLP) survey at the facility located at 3723 Abbotts Bridge Road in Duluth, Georgia. The survey was conducted on September 22, 2015 in general accordance with Terracon Proposal No. P dated September 8, 2015 and the asbestos sampling protocols established in Environmental Protection Agency (EPA) regulation 40 Code of Federal Regulations (CFR) Part 763 Subpart E , (Asbestos Hazard Emergency Response Act, AHERA). Sample collection of suspect asbestos-containing materials (ACM) and TCLP was located throughout the interior and exterior of the facility, and consisted of safely and reasonably accessible building materials. 1.1 Project Objective The objective of this project was to identify the presence or absence of ACM and lead in the TCLP sample that may be impacted by the impending demolition activities. EPA regulation 40 CFR 61, Subpart M, the National Emission Standards for Hazardous Air Pollutants (NESHAP) prohibits the release of asbestos fibers to the atmosphere during renovation or demolition activities. The asbestos NESHAP requires that regulated ACM be identified, classified and quantified prior to planned disturbances, renovations, or demolition activities. 1.2 Reliance This report is for the exclusive use of the City of Duluth, Georgia for the project being discussed. Reliance by any other party on this report is prohibited without written authorization of Terracon and the City of Duluth, Georgia. Reliance on this report by the City of Duluth, Georgia and all authorized parties will be subject to the terms, conditions, and limitations stated in the proposal, this report and Terracon s Agreement for Services. The limitations of liability defined in Terracon s Agreement for Services are the aggregate limit of Terracon s liability to the City of Duluth, Georgia. Responsive Resourceful Reliable 1

5 Asbestos and TCLP Survey Former Tannery Building Duluth, Georgia October 12, 2015 Terracon Project No BUILDING DESCRIPTION The site is a former single-story with basement tannery building located at 3723 Abbotts Bridge Road in Duluth, Georgia. The building is approximately 9,280ft 2, sits on approximately 1.9 deeded acres, and is shared by Parcel No. R and R According to the Gwinnett County Tax Assessor, the building was originally constructed in The exterior of the building is comprised of stucco and concrete masonry unit (CMU) block with wood trimmings around entrances and windows. The roof is made up of sheet metal over asphalt shingles and underlying felt paper. On the inside, the building is roughly divided into northeast and southwest halves. The northeast half consists of a poured concrete floor with masonry block and gypsum wallboard walls. The ceiling is made of wood. This part of the building has vaulted ceilings and is an open space. The southwest half of the building has offices with gypsum wallboard walls, carpet on top of wood floors, and gypsum ceilings. The northern half of offices have popcorn ceiling texture. The corridor connecting all of the offices has a drop down ceiling with 2 x 4 ceiling tiles. The breakroom and restrooms, located approximately in the middle of the building in the southwest half, have ceramic floor tiles. Located in the far south corner of the building is a shower room with vinyl floor tiles laid on top of wood floors. There is significant damage to the interior gypsum walls and ceilings as well as to the drop down ceiling tiles. Water damage is present throughout encouraging large black mold growths on the ceilings and walls in and near the shower room. The downstairs basement or crawlspace consists of dirt floors, concrete masonry block walls, and wood ceilings. The building s furnace is located in the basement. No samples were taken on this level of the building. 3.0 FIELD ACTIVITIES 3.1 Asbestos The survey was conducted by Mr. Adam Jones, an AHERA-accredited asbestos inspector. Copies of pertinent and training certifications are included in Appendix D. The asbestos portion of the survey was conducted in general accordance with the sample collection protocols established in EPA 40 CFR Part 763 Subpart E , AHERA. A summary of survey activities is provided below. Responsive Resourceful Reliable 2

6 Asbestos and TCLP Survey Tannery Duluth, Georgia October 12, 2015 Terracon Project No Visual Assessment - Asbestos Survey activities were initiated with visual observation of the interior and exterior of the building to identify homogeneous areas of suspect ACM. A homogeneous area (HA) consists of building materials that appear similar throughout in terms of color and texture with consideration given to the date of application. Interior assessment was conducted in visually accessible areas of the building. Suspect ACM was not observed in the basement/crawlspace: therefore, no samples were collected in that area. 3.3 Physical Assessment - Asbestos A physical assessment of each HA of suspect ACM was conducted to assess the friability and condition of the materials. A friable material is defined by the EPA as a material which can be crumbled, pulverized or reduced to powder by hand pressure when dry. Friability was assessed by physically touching suspect materials. Based on results of the visual observation, bulk samples of suspect ACM were collected in general accordance with EPA AHERA sampling protocols. Samples of suspect materials were collected from randomly selected locations in each homogeneous area located within the building. Samples were placed in sealable containers and labeled with unique sample numbers using an indelible marker. The selection of sample locations and frequency of sampling were based on Terracon s observations and the assumption that like materials in the same area are homogeneous in content. Terracon collected 68 bulk samples from 20 homogeneous areas of suspect ACM. A summary of suspect ACM samples collected during the survey is included as Appendix A. 3.4 Sample Analysis - Asbestos Asbestos bulk samples were submitted under chain of custody to Moody Labs, Inc. (Moody) in Farmers Branch, Texas for analysis by polarized light microscopy with dispersion staining techniques per EPA methodology 600/R-93/116. The percentage of asbestos, where applicable, was determined by microscopic visual estimation. Moody is accredited under the National Voluntary Laboratory Accreditation Program (NVLAP) Accreditation No Toxicity Characteristics Leaching Procedure Terracon collected representative proportions of building materials to determine the Resource Conservation and Recovery Act (RCRA) lead at the site. TCLP analysis was used to characterize Responsive Resourceful Reliable 3

7 Asbestos and TCLP Survey Tannery Duluth, Georgia October 12, 2015 Terracon Project No waste and will be used to properly dispose of construction and demolition waste materials, including painted surfaces. The RCRA gave the EPA authority to regulate the waste status of demolition and renovation debris. Specific notification and testing requirements must be addressed prior to transporting, treating, storing, or disposing of hazardous wastes. EPA exempts from most RCRA requirements those generators whose combined hazardous waste generation is less than 100 kilograms (kg) per month. 3.6 Sample Analysis Toxicity Characteristics Leaching Procedure TCLP samples were submitted under chain of custody to Analytical Environmental Services, Inc. (AES) in Atlanta, Georgia for analysis per EPA methodology SW1311/6010C. AES is accredited under the American Industrial Hygiene Association (AIHA) Lab # REGULATORY OVERVIEW 4.1 Asbestos The asbestos NESHAP (40 CFR Part 61, Subpart M) regulates asbestos fiber emissions and asbestos waste disposal practices. The asbestos NESHAP regulation also requires the identification and classification of existing ACM according to friability prior to demolition or renovation activity. Friable ACM is a material containing more than 1% asbestos that, when dry, can be crumbled, pulverized or reduced to powder by hand pressure. All friable ACM is considered regulated asbestos-containing material (RACM). The asbestos NESHAP regulation classifies ACM as either RACM, Category I non-friable ACM or Category II non-friable ACM. RACM includes all friable ACM, along with Category I and Category II non-friable ACM that has become friable, will be or has been subjected to sanding, grinding, cutting or abrading, or ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder in the course of renovation or demolition activity. Category I non-friable ACM are exclusively asbestos-containing packings, gaskets, resilient floor coverings, resilient floor covering mastics and asphalt roofing products that contain more than 1% asbestos. Category II non-friable ACM are all other non-friable materials other than Category I non-friable ACM that contain more than 1% asbestos. Friable ACM, Category I and Category II non-friable ACM which is in poor condition and has become friable or which will be subjected to drilling, sanding, grinding, cutting or abrading and which could be crushed or pulverized during anticipated renovation or demolition activities are considered RACM. RACM must be removed prior to renovation or demolition activities which will disturb the materials. If the amount of RACM exceeds 10 linear feet or 10 square feet, the owner or operator must provide the State of Georgia with written notification of planned removal activities at least 10 working days prior to the commencement of asbestos abatement activities. Responsive Resourceful Reliable 4

8 Asbestos and TCLP Survey Tannery Duluth, Georgia October 12, 2015 Terracon Project No Removal of RACM must be conducted by an appropriately accredited and licensed asbestos abatement contractor. Please note that in the State of Georgia for any demolition project a 10- notice is required regardless of the ACM content within the structure. The United States Occupational Safety and Health Administration (USOSHA) asbestos standard for construction (29 CFR ) regulates workplace exposure to asbestos. The USOSHA standard requires that employee exposure to airborne asbestos must not exceed 0.1 fibers per cubic centimeter of air (0.1 f/cc) as an eight hour time weighted average (TWA) and not exceed 1.0 fibers per cubic centimeter of air (1.0 f/cc) over a 30 minute time period known as an excursion limit (EL). The TWA and EL are known as USOSHA s asbestos permissible exposure limits (PELs). The USOSHA standard classifies construction and maintenance activities which could disturb ACM, and specifies work practices and precautions which employers must follow when engaging in each class of regulated work. 4.2 Toxicity Characteristics Leaching Procedures The RCRA gave the EPA authority to regulate the waste states of demolition or renovation debris including lead containing materials. Specific identification and testing requirements must be addressed prior to transporting, treating, storing, or disposing of hazardous wastes. Leadcontaining wastes are considered hazardous wastes under RCRA if TCLP results exceed 5 milligrams per liter (mg/l). 5.0 FINDINGS 5.1 Asbestos Asbestos was not identified in the samples collected and analyzed. Laboratory analytical reports are included as Appendix B. It should be reemphasized that although reasonable efforts were made to survey accessible suspect materials, additional suspect but un-sampled materials could be located under existing building materials, inside walls, above ceilings, in isolated areas or in other concealed areas. Therefore, if suspicious materials are encountered during renovation activities that do not appear to have been characterized as ACM or non-acm, these materials must be assumed to be ACM until samples are collected and analyzed to prove otherwise. Any assumed material should be treated as asbestos or sampled to determine asbestos content before disturbing the material. Responsive Resourceful Reliable 5

9 Asbestos and TCLP Survey Tannery Duluth, Georgia October 12, 2015 Terracon Project No Toxicity Characteristics Leaching Procedure The TCLP lead composite sample was below the laboratory detection limit. The debris generated by the building demolition may be disposed of in a construction and demolition landfill. The laboratory analytical report is included in Appendix B. 6.0 LIMITATIONS/GENERAL COMMENTS This asbestos and TCLP survey was conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions in the same locale. The results, findings, conclusions and recommendations expressed in this report are based on conditions observed during our survey of the site. The information contained in this report is relevant to the date on which this survey was performed, and should not be relied upon to represent conditions at a later date. This report has been prepared on behalf of and exclusively for use by the City of Duluth, Georgia for specific application to their project as discussed. This report is not a bidding document. Contractors or consultants reviewing this report must draw their own conclusions regarding further investigation or remediation deemed necessary. Terracon does not warrant the work of regulatory agencies, laboratories or other third parties supplying information which may have been used in the preparation of this report. No warranty, express or implied is made. Responsive Resourceful Reliable 6

10 APPENDIX A

11 Asbestos and TCLP Survey Tannery Duluth, Georgia October 12, 2015 Terracon Project No ASBESTOS SURVEY SAMPLE LOCATION SUMMARY HA Sample No. Description Sample Location Asbestos Content Stucco Exterior of NW Wall None Detected Stucco North Corner of Exterior None Detected Stucco Exterior of SE Wall None Detected Stucco Exterior of SW Wall None Detected Stucco Exterior of SW Wall None Detected Plaster Wall and Texture on Wall White Door Next to NW Walk- (White) In Entrance None Detected Plaster Wall and Texture on Wall White Door Next to NW Walk- (White) In Entrance None Detected Plaster Wall and Texture on Wall White Door Next to NW Walk- (White) In Entrance None Detected Window Sealant Window on NW Wall None Detected Window Sealant Window on N End of SW Wall None Detected Window Sealant Window on S End of SW Wall None Detected Plaster Door Frame NW Walk-In Entrance None Detected Plaster Door Frame NW Walk-In Entrance None Detected Plaster Door Frame NW Walk-In Entrance None Detected Asphalt Roof Shingle North Corner of Building None Detected Asphalt Roof Shingle East Corner of Building None Detected Asphalt Roof Shingle East Corner of Building None Detected Roof Felt North Corner of Building None Detected Roof Felt East Corner of Building None Detected Roof Felt East Corner of Building None Detected CMU Texture Interior of NW Wall None Detected CMU Texture Exterior of NE Wall None Detected CMU Texture Exterior of NE Wall None Detected Gypsum Wallboard N End of Middle Wall None Detected Gypsum Wallboard W Corner Office None Detected Gypsum Wallboard Near Break Room None Detected Gypsum Wallboard Office SW of Break Room None Detected Gypsum Wallboard Farthest S Office None Detected Exposed CMU Along Mastic for Wallboard (White) on CMU Building s Center Wall None Detected 09 Exposed CMU Along Mastic for Wallboard (White) on CMU Building s Center Wall None Detected Mastic for Wallboard (White) on CMU Exposed CMU Along Building s Center Wall None Detected Levelling Compound for Tiles Break Room None Detected Levelling Compound for Tiles Break Room None Detected Levelling Compound for Tiles Break Room None Detected x4 Bathroom Floor Tile Bathroom Next to Break Room None Detected 11 Bathroom Next to Break x4 Bathroom Floor Tile Room None Detected Bathroom Next to Break x4 Bathroom Floor Tile Room None Detected Popcorn Ceiling Texture Offices in NW Part of None Detected

12 Asbestos and TCLP Survey Tannery Duluth, Georgia October 12, 2015 Terracon Project No HA Sample No. Description Sample Location Asbestos Content Building, All North of Break Room Popcorn Ceiling Texture Offices in NW Part of Building, All North of Break None Detected Room Popcorn Ceiling Texture Offices in NW Part of Building, All North of Break None Detected Room Popcorn Ceiling Texture Offices in NW Part of Building, All North of Break None Detected Room Popcorn Ceiling Texture Offices in NW Part of Building, All North of Break Room None Detected x4 Ceiling Tile NW Office None Detected x4 Ceiling Tile Just N of Break Room None Detected x4 Ceiling Tile Break Room None Detected Tile Grout Break Room None Detected Tile Grout Break Room None Detected Tile Grout Break Room None Detected Cove Base Mastic Office N of Break Room on W Wall None Detected Cove Base Mastic Office S of Break Room on W Wall None Detected Two Offices N of Break Room Cove Base Mastic on W Wall None Detected Throughout Offices S of Gypsum Ceiling Break Room None Detected Gypsum Ceiling Throughout Offices S of Break Room None Detected Throughout Offices S of Gypsum Ceiling Break Room None Detected Throughout Offices S of Gypsum Ceiling Break Room None Detected Throughout Offices S of Gypsum Ceiling Break Room None Detected x12 Vinyl Floor Tile (Gray) Shower Room None Detected x12 Vinyl Floor Tile (Gray) Shower Room None Detected x12 Vinyl Floor Tile (Gray) Shower Room None Detected Floor Concrete Texture Open Storage Bay None Detected Floor Concrete Texture Open Storage Bay None Detected Floor Concrete Texture Open Storage Bay None Detected CMU Mortar Along Building s Central Wall None Detected CMU Mortar Along Building s Central Wall None Detected CMU Mortar Along Building s Central Wall None Detected Beige Mastic on CMU Along Building s Central Wall None Detected Beige Mastic on CMU Along Building s Central Wall None Detected Beige Mastic on CMU Along Building s Central Wall None Detected

13 Asbestos and TCLP Survey Tannery Duluth, Georgia October 12, 2015 Terracon Project No TOXICITY CHARACTERISTICS LEACHING PROCEDURE SUMMARY Sample No. Result Units Reporting Limit Method TCLP BRL mg/l SW1311/6010C BRL Not Detected at the Reportable Limit

14 APPENDIX B

15 2051 Valley View Lane Farmers Branch, TX Phone: (972) PLM Summary Report NVLAP Lab Code TDSHS License No Client : Project : Project # : Identification : Test Method : Terracon - Duluth, GA Tannery Asbestos, Bulk Sample Analysis Polarized Light Microscopy / Dispersion Staining (PLM/DS) EPA Method 600 / R-93 / 116 Lab Job No. : 15B Report Date : 09/30/2015 Sample Date : 07/30/2015 Page 1 of 5 On 9/24/2015, sixty eight (68) bulk material samples were submitted by Adam Jones of Terracon - Duluth, GA for asbestos analysis by PLM/DS. The PLM Detail Report is attached; additional information may be found therein. The results are summarized below: Sample Number Client Sample Description / Location Asbestos Content Stucco, Exterior of Building None Detected - Stucco None Detected - Paint Stucco, Exterior of Building None Detected - Stucco None Detected - Paint Stucco, Exterior of Building None Detected - Stucco None Detected - Paint Stucco, Exterior of Building None Detected - Stucco None Detected - Paint Stucco, Exterior of Building None Detected - Stucco None Detected - Paint Texture (White) on Wall, White Door next to Walk-in Entrance Texture (White) on Wall, White Door next to Walk-in Entrance Texture (White) on Wall, White Door next to Walk-in Entrance None Detected - Plaster None Detected - Textured Paint None Detected - Plaster None Detected - Textured Paint None Detected - Plaster None Detected - Textured Paint Window Sealant, Various Windows on Southwest Side None Detected - Sealant Window Sealant, Various Windows on Southwest Side None Detected - Sealant Window Sealant, Various Windows on Southwest Side None Detected - Sealant Plaster Door Frame, White Feature by Walk-in Entrance None Detected - Plaster None Detected - Paint Plaster Door Frame, White Feature by Walk-in Entrance None Detected - Plaster None Detected - Paint Plaster Door Frame, White Feature by Walk-in Entrance None Detected - Plaster None Detected - Paint Asphalt Roof Shingle, Roof None Detected - Black Mastic Asphalt Roof Shingle, Roof None Detected - Black Mastic

16 2051 Valley View Lane Farmers Branch, TX Phone: (972) PLM Summary Report NVLAP Lab Code TDSHS License No Client : Project : Project # : Identification : Test Method : Terracon - Duluth, GA Tannery Asbestos, Bulk Sample Analysis Polarized Light Microscopy / Dispersion Staining (PLM/DS) EPA Method 600 / R-93 / 116 Lab Job No. : 15B Report Date : 09/30/2015 Sample Date : 07/30/2015 Page 2 of 5 On 9/24/2015, sixty eight (68) bulk material samples were submitted by Adam Jones of Terracon - Duluth, GA for asbestos analysis by PLM/DS. The PLM Detail Report is attached; additional information may be found therein. The results are summarized below: Sample Number Client Sample Description / Location Asbestos Content Asphalt Roof Shingle, Roof None Detected - Black Mastic Roof Felt, Roof None Detected - Roofing Felt Roof Felt, Roof None Detected - Roofing Felt Roof Felt, Roof None Detected - Roofing Felt CMU Texture, Inside on Northwest Wall None Detected - Plaster None Detected - Paint CMU Texture, Exterior Wall on Northeast Side None Detected - Texture None Detected - Paints CMU Texture, Exterior Wall on Northeast Side None Detected - Plaster None Detected - Texture None Detected - Paints Gypsum Wallboard, Throughout Office Side of Building None Detected - Drywall Material None Detected - Texture / Joint Cmpd Gypsum Wallboard, Throughout Office Side of Building None Detected - Drywall Material None Detected - Texture / Joint Cmpd Gypsum Wallboard, Throughout Office Side of Building None Detected - Drywall Material Gypsum Wallboard, Throughout Office Side of Building None Detected - Drywall Material Gypsum Wallboard, Throughout Office Side of Building None Detected - Drywall Material Mastic (White) for Wallboard, On CMU in Storage Bay None Detected - White Compound Mastic (White) for Wallboard, On CMU in Storage Bay None Detected - White Compound Mastic (White) for Wallboard, On CMU in Storage Bay None Detected - White Compound Leveling Compound for Tiles, Break Room None Detected - CMU None Detected - Glass Fiber Mesh None Detected - Plaster

17 2051 Valley View Lane Farmers Branch, TX Phone: (972) PLM Summary Report NVLAP Lab Code TDSHS License No Client : Project : Project # : Identification : Test Method : Terracon - Duluth, GA Tannery Asbestos, Bulk Sample Analysis Polarized Light Microscopy / Dispersion Staining (PLM/DS) EPA Method 600 / R-93 / 116 Lab Job No. : 15B Report Date : 09/30/2015 Sample Date : 07/30/2015 Page 3 of 5 On 9/24/2015, sixty eight (68) bulk material samples were submitted by Adam Jones of Terracon - Duluth, GA for asbestos analysis by PLM/DS. The PLM Detail Report is attached; additional information may be found therein. The results are summarized below: Sample Number Client Sample Description / Location Asbestos Content Leveling Compound for Tiles, Break Room None Detected - CMU None Detected - Glass Fiber Mesh None Detected - Plaster Leveling Compound for Tiles, Break Room None Detected - CMU None Detected - Glass Fiber Mesh None Detected - Plaster " x 4" Tile, Bathroom next to Break Room None Detected - Ceramic Tile " x 4" Tile, Bathroom next to Break Room None Detected - Ceramic Tile " x 4" Tile, Bathroom next to Break Room None Detected - Ceramic Tile None Detected - Grout Ceiling Texture (Popcorn), Various Offices along Southwest Side Ceiling Texture (Popcorn), Various Offices along Southwest Side Ceiling Texture (Popcorn), Various Offices along Southwest Side Ceiling Texture (Popcorn), Various Offices along Southwest Side Ceiling Texture (Popcorn), Various Offices along Southwest Side None Detected - Acoustic Texture None Detected - Acoustic Texture None Detected - Acoustic Texture None Detected - Acoustic Texture None Detected - Acoustic Texture ' x 4' Ceiling Tile, Corridor for Offices and Break Room None Detected - Acoustic Tile ' x 4' Ceiling Tile, Office Corridor / Break Room None Detected - Acoustic Tile ' x 4' Ceiling Tile, Office Corridor / Break Room None Detected - Acoustic Tile Tile Grout, Break Room / Bathroom Area None Detected - Grout Tile Grout, Break Room / Bathroom Area None Detected - Grout Tile Grout, Break Room / Bathroom Area None Detected - Grout

18 2051 Valley View Lane Farmers Branch, TX Phone: (972) PLM Summary Report NVLAP Lab Code TDSHS License No Client : Project : Project # : Identification : Test Method : Terracon - Duluth, GA Tannery Asbestos, Bulk Sample Analysis Polarized Light Microscopy / Dispersion Staining (PLM/DS) EPA Method 600 / R-93 / 116 Lab Job No. : 15B Report Date : 09/30/2015 Sample Date : 07/30/2015 Page 4 of 5 On 9/24/2015, sixty eight (68) bulk material samples were submitted by Adam Jones of Terracon - Duluth, GA for asbestos analysis by PLM/DS. The PLM Detail Report is attached; additional information may be found therein. The results are summarized below: Sample Number Client Sample Description / Location Asbestos Content Cove Base Mastic, Various Offices on Southwest Side None Detected - Cove Base None Detected - Yellow Mastic Cove Base Mastic, Various Offices on Southwest Side None Detected - Cove Base None Detected - Yellow Mastic Cove Base Mastic, Various Offices on Southwest Side None Detected - Cove Base None Detected - Yellow Mastic Gypsum Ceiling, Various Offices on Southwest Side None Detected - Drywall Material None Detected - Texture / Joint Cmpd Gypsum Ceiling, Various Offices on Southwest Side None Detected - Drywall Material None Detected - Texture / Joint Cmpd Gypsum Ceiling, Various Offices on Southwest Side None Detected - Drywall Material Gypsum Ceiling, Various Offices on Southwest Side None Detected - Drywall Material Gypsum Ceiling, Various Offices on Southwest Side None Detected - Drywall Material None Detected - Texture / Joint Cmpd " x 12" Vinyl Tile (Gray), Shower Room None Detected - Floor Tile Insufficient Mastic " x 12" Vinyl Tile (Gray), Shower Room None Detected - Floor Tile None Detected - Yellow Mastic " x 12" Vinyl Tile (Gray), Shower Room None Detected - Floor Tile Insufficient Mastic Floor Concrete Texture, On Concrete Floor in Storage Bay None Detected - Coatings None Detected - Floor Material Floor Concrete Texture, On Concrete Floor in Storage Bay None Detected - Coatings None Detected - Floor Material Floor Concrete Texture, On Concrete Floor in Storage Bay None Detected - Coatings None Detected - Floor Material CMU Mortar, Storage Bay None Detected - Mortar

19 2051 Valley View Lane Farmers Branch, TX Phone: (972) PLM Summary Report NVLAP Lab Code TDSHS License No Client : Project : Project # : Identification : Test Method : Terracon - Duluth, GA Tannery Asbestos, Bulk Sample Analysis Polarized Light Microscopy / Dispersion Staining (PLM/DS) EPA Method 600 / R-93 / 116 Lab Job No. : 15B Report Date : 09/30/2015 Sample Date : 07/30/2015 Page 5 of 5 On 9/24/2015, sixty eight (68) bulk material samples were submitted by Adam Jones of Terracon - Duluth, GA for asbestos analysis by PLM/DS. The PLM Detail Report is attached; additional information may be found therein. The results are summarized below: Sample Number Client Sample Description / Location Asbestos Content CMU Mortar, Storage Bay None Detected - Mortar CMU Mortar, Storage Bay None Detected - CMU None Detected - Mortar Mastic (Beige), On CMU in Storage Bay None Detected - Beige Mastic Mastic (Beige), On CMU in Storage Bay None Detected - Beige Mastic Mastic (Beige), On CMU in Storage Bay None Detected - Beige Mastic These samples were analyzed by layers. Quantification, unless otherwise noted, is performed by calibrated visual estimate. The test report shall not be reproduced, except in full, without written approval of the laboratory. The results relate only to the items tested. These test results do not imply endorsement by NVLAP or any agency of the U.S. Government. Accredited by the National Voluntary Laboratory Accreditation Program for Bulk Asbestos Fiber Analysis under Lab Code Analyst(s): Beverly Lorenzana Lab Manager : Heather Lopez Approved Signatory : Lab Director : Bruce Crabb Approved Signatory : Thank you for choosing Moody Labs

20 This Page Left Intentionally Blank

21 Client : Project : Project # : Terracon - Duluth, GA Tannery PLM Detail Report Moody Labs NVLAP Lab Code Valley View Lane Supplement to PLM Summary Report TDSHS License No Farmers Branch, TX Phone: (972) % Of Sample Number Layer Components Sample Lab Job No. : 15B Report Date : 09/30/2015 % of Layer Analysis Date Page 1 of Stucco (Grey) 95% Aggregate 65% 09/29 BL Stucco (Grey) 95% Calcite / Binders 35% 09/29 BL Paint (Light Grey) 5% Pigment / Binders 100% 09/29 BL Stucco (Grey) 95% Aggregate 65% 09/29 BL Stucco (Grey) 95% Calcite / Binders 35% 09/29 BL Paint (Light Grey) 5% Pigment / Binders 100% 09/29 BL Stucco (Grey) 95% Aggregate 65% 09/29 BL Stucco (Grey) 95% Calcite / Binders 35% 09/29 BL Paint (Light Grey) 5% Pigment / Binders 100% 09/29 BL Stucco (Grey) 95% Aggregate 65% 09/29 BL Stucco (Grey) 95% Calcite / Binders 35% 09/29 BL Paint (Light Grey) 5% Pigment / Binders 100% 09/29 BL Stucco (Grey) 95% Aggregate 65% 09/29 BL Stucco (Grey) 95% Calcite / Binders 35% 09/29 BL Paint (Light Grey) 5% Pigment / Binders 100% 09/29 BL Plaster (Grey) 50% Aggregate 65% 09/29 BL Plaster (Grey) 50% Calcite / Binders 35% 09/29 BL Textured Paint (White) 50% Calcite 25% 09/29 BL Textured Paint (White) 50% Pigment / Binders 75% 09/29 BL Plaster (Grey) 50% Aggregate 65% 09/29 BL Plaster (Grey) 50% Calcite / Binders 35% 09/29 BL Textured Paint (White) 50% Calcite 25% 09/29 BL Textured Paint (White) 50% Pigment / Binders 75% 09/29 BL Plaster (Grey) 50% Aggregate 65% 09/29 BL Plaster (Grey) 50% Calcite / Binders 35% 09/29 BL Textured Paint (White) 50% Calcite 25% 09/29 BL Textured Paint (White) 50% Pigment / Binders 75% 09/29 BL Sealant (White) 100% Calcite 50% 09/29 BL Sealant (White) 100% Binders / Fillers 50% 09/29 BL Analyst

22 Client : Project : Project # : Terracon - Duluth, GA Tannery PLM Detail Report Moody Labs NVLAP Lab Code Valley View Lane Supplement to PLM Summary Report TDSHS License No Farmers Branch, TX Phone: (972) % Of Sample Number Layer Components Sample Lab Job No. : 15B Report Date : 09/30/2015 % of Layer Analysis Date Page 2 of Sealant (White) 100% Calcite 50% 09/29 BL Sealant (White) 100% Binders / Fillers 50% 09/29 BL Sealant (White) 100% Calcite 50% 09/29 BL Sealant (White) 100% Binders / Fillers 50% 09/29 BL Plaster (Grey) 95% Aggregate 65% 09/29 BL Plaster (Grey) 95% Calcite / Binders 35% 09/29 BL Paint (White) 5% Pigment / Binders 100% 09/29 BL Plaster (Grey) 95% Aggregate 65% 09/29 BL Plaster (Grey) 95% Calcite / Binders 35% 09/29 BL Paint (White) 5% Pigment / Binders 100% 09/29 BL Plaster (Grey) 95% Aggregate 65% 09/29 BL Plaster (Grey) 95% Calcite / Binders 35% 09/29 BL Paint (White) 5% Pigment / Binders 100% 09/29 BL Black Mastic (Black) 5% Tar Binders 100% 09/29 BL Roofing Shingle (Grey) 95% Glass Wool Fibers 20% 09/29 BL Roofing Shingle (Grey) 95% Aggregate 20% 09/29 BL Roofing Shingle (Grey) 95% Calcite / Tar Binders 60% 09/29 BL Black Mastic (Black) 5% Tar Binders 100% 09/29 BL Roofing Shingle (Grey) 95% Glass Wool Fibers 20% 09/29 BL Roofing Shingle (Grey) 95% Aggregate 20% 09/29 BL Roofing Shingle (Grey) 95% Calcite / Tar Binders 60% 09/29 BL Black Mastic (Black) 5% Tar Binders 100% 09/29 BL Roofing Shingle (Grey) 95% Glass Wool Fibers 20% 09/29 BL Roofing Shingle (Grey) 95% Aggregate 20% 09/29 BL Roofing Shingle (Grey) 95% Calcite / Tar Binders 60% 09/29 BL Roofing Felt (Black) 100% Cellulose Fibers 85% 09/29 BL Roofing Felt (Black) 100% Tar Binders 15% 09/29 BL Roofing Felt (Black) 100% Cellulose Fibers 85% 09/29 BL Roofing Felt (Black) 100% Tar Binders 15% 09/29 BL Analyst

23 Client : Project : Project # : Terracon - Duluth, GA Tannery PLM Detail Report Moody Labs NVLAP Lab Code Valley View Lane Supplement to PLM Summary Report TDSHS License No Farmers Branch, TX Phone: (972) % Of Sample Number Layer Components Sample Lab Job No. : 15B Report Date : 09/30/2015 % of Layer Analysis Date Page 3 of Roofing Felt (Black) 100% Cellulose Fibers 85% 09/29 BL Roofing Felt (Black) 100% Tar Binders 15% 09/29 BL Plaster (White) 80% Aggregate 65% 09/29 BL Plaster (White) 80% Calcite / Binders 35% 09/29 BL Paint (White) 20% Pigment / Binders 100% 09/29 BL Texture (White) 50% Mica 5% 09/29 BL Texture (White) 50% Calcite / Binders 95% 09/29 BL Paints (Multi-colored) 50% Pigment / Binders 100% 09/29 BL Plaster (Grey) 20% Aggregate 65% 09/29 BL Plaster (Grey) 20% Calcite / Binders 35% 09/29 BL Texture (Tan) 60% Calcite / Binders 100% 09/29 BL Paints (Multi-colored) 20% Pigment / Binders 100% 09/29 BL Drywall Material (White) 85% Glass Wool Fibers 2% 09/29 BL Drywall Material (White) 85% Cellulose Fibers 1% 09/29 BL Drywall Material (White) 85% Gypsum / Binders 97% 09/29 BL DW Paper / Tape (Tan / White) 5% Cellulose Fibers 100% 09/29 BL Texture / Joint Cmpd (White) 10% Calcite / Talc / Binders 100% 09/29 BL Drywall Material (White) 90% Cellulose Fibers 5% 09/29 BL Drywall Material (White) 90% Gypsum / Binders 95% 09/29 BL DW Paper Facing (Tan) 5% Cellulose Fibers 100% 09/29 BL Texture / Joint Cmpd (White) 5% Calcite / Talc / Binders 100% 09/29 BL Drywall Material (White) 95% Cellulose Fibers 5% 09/29 BL Drywall Material (White) 95% Gypsum / Binders 95% 09/29 BL DW Paper Facing (Tan) 5% Cellulose Fibers 100% 09/29 BL Drywall Material (White) 95% Cellulose Fibers 5% 09/29 BL Drywall Material (White) 95% Gypsum / Binders 95% 09/29 BL DW Paper Facing (Tan) 5% Cellulose Fibers 100% 09/29 BL Drywall Material (White) 95% Cellulose Fibers 5% 09/29 BL Drywall Material (White) 95% Gypsum / Binders 95% 09/29 BL DW Paper Facing (Tan) 5% Cellulose Fibers 100% 09/29 BL Analyst

24 Client : Project : Project # : Terracon - Duluth, GA Tannery PLM Detail Report Moody Labs NVLAP Lab Code Valley View Lane Supplement to PLM Summary Report TDSHS License No Farmers Branch, TX Phone: (972) % Of Sample Number Layer Components Sample Lab Job No. : 15B Report Date : 09/30/2015 % of Layer Analysis Date Page 4 of White Compound (White) 100% Calcite / Talc / Binders 100% 09/29 BL White Compound (White) 100% Calcite / Talc / Binders 100% 09/29 BL White Compound (White) 100% Calcite / Talc / Binders 100% 09/29 BL CMU (Grey) 60% Aggregate 65% 09/30 BL CMU (Grey) 60% Cement Binders 35% 09/30 BL Glass Fiber Mesh (White) 15% Glass Wool Fibers 100% 09/30 BL Plaster (Off-White) 25% Aggregate 55% 09/30 BL Plaster (Off-White) 25% Perlite 10% 09/30 BL Plaster (Off-White) 25% Calcite / Binders 35% 09/30 BL CMU (Grey) 60% Aggregate 65% 09/30 BL CMU (Grey) 60% Cement Binders 35% 09/30 BL Glass Fiber Mesh (White) 15% Glass Wool Fibers 100% 09/30 BL Plaster (Off-White) 25% Aggregate 55% 09/30 BL Plaster (Off-White) 25% Perlite 10% 09/30 BL Plaster (Off-White) 25% Calcite / Binders 35% 09/30 BL CMU (Grey) 60% Aggregate 65% 09/30 BL CMU (Grey) 60% Cement Binders 35% 09/30 BL Glass Fiber Mesh (White) 15% Glass Wool Fibers 100% 09/30 BL Plaster (Off-White) 25% Aggregate 55% 09/30 BL Plaster (Off-White) 25% Perlite 10% 09/30 BL Plaster (Off-White) 25% Calcite / Binders 35% 09/30 BL Ceramic Tile (White) 100% Sintered Clays 100% 09/30 BL Ceramic Tile (White) 100% Sintered Clays 100% 09/30 BL Ceramic Tile (White) 95% Sintered Clays 100% 09/30 BL Grout (White) 5% Aggregate 65% 09/30 BL Grout (White) 5% Calcite / Binders 35% 09/30 BL Acoustic Texture (White) 100% Synthetic Foam 50% 09/30 BL Acoustic Texture (White) 100% Calcite / Talc / Binders 50% 09/30 BL Analyst

25 Client : Project : Project # : Terracon - Duluth, GA Tannery PLM Detail Report Moody Labs NVLAP Lab Code Valley View Lane Supplement to PLM Summary Report TDSHS License No Farmers Branch, TX Phone: (972) % Of Sample Number Layer Components Sample Lab Job No. : 15B Report Date : 09/30/2015 % of Layer Analysis Date Page 5 of Acoustic Texture (White) 100% Synthetic Foam 50% 09/30 BL Acoustic Texture (White) 100% Calcite / Talc / Binders 50% 09/30 BL Acoustic Texture (White) 100% Synthetic Foam 50% 09/30 BL Acoustic Texture (White) 100% Calcite / Talc / Binders 50% 09/30 BL Acoustic Texture (White) 100% Synthetic Foam 50% 09/30 BL Acoustic Texture (White) 100% Calcite / Talc / Binders 50% 09/30 BL Acoustic Texture (White) 100% Synthetic Foam 50% 09/30 BL Acoustic Texture (White) 100% Calcite / Talc / Binders 50% 09/30 BL Acoustic Tile (Light Grey) 100% Cellulose Fibers 50% 09/30 BL Acoustic Tile (Light Grey) 100% Mineral Wool Fibers 30% 09/30 BL Acoustic Tile (Light Grey) 100% Perlite 20% 09/30 BL Acoustic Tile (Light Grey) 100% Cellulose Fibers 50% 09/30 BL Acoustic Tile (Light Grey) 100% Mineral Wool Fibers 30% 09/30 BL Acoustic Tile (Light Grey) 100% Perlite 20% 09/30 BL Acoustic Tile (Light Grey) 100% Cellulose Fibers 50% 09/30 BL Acoustic Tile (Light Grey) 100% Mineral Wool Fibers 30% 09/30 BL Acoustic Tile (Light Grey) 100% Perlite 20% 09/30 BL Grout (Grey) 100% Aggregate 65% 09/30 BL Grout (Grey) 100% Cement Binders 35% 09/30 BL Grout (Grey) 100% Aggregate 65% 09/30 BL Grout (Grey) 100% Cement Binders 35% 09/30 BL Grout (Grey) 100% Aggregate 65% 09/30 BL Grout (Grey) 100% Cement Binders 35% 09/30 BL Cove Base (White) 95% Calcite / Vinyl Binders 100% 09/30 BL Yellow Mastic (Yellow) 5% Calcite 40% 09/30 BL Yellow Mastic (Yellow) 5% Glue Binders 60% 09/30 BL Cove Base (White) 95% Calcite / Vinyl Binders 100% 09/30 BL Yellow Mastic (Yellow) 5% Calcite 40% 09/30 BL Yellow Mastic (Yellow) 5% Glue Binders 60% 09/30 BL Analyst

26 Client : Project : Project # : Terracon - Duluth, GA Tannery PLM Detail Report Moody Labs NVLAP Lab Code Valley View Lane Supplement to PLM Summary Report TDSHS License No Farmers Branch, TX Phone: (972) % Of Sample Number Layer Components Sample Lab Job No. : 15B Report Date : 09/30/2015 % of Layer Analysis Date Page 6 of Cove Base (White) 95% Calcite / Vinyl Binders 100% 09/30 BL Yellow Mastic (Yellow) 5% Calcite 40% 09/30 BL Yellow Mastic (Yellow) 5% Glue Binders 60% 09/30 BL Drywall Material (White) 90% Cellulose Fibers 5% 09/30 BL Drywall Material (White) 90% Gypsum / Binders 95% 09/30 BL DW Paper Facing (Tan) 5% Cellulose Fibers 100% 09/30 BL Texture / Joint Cmpd (White) 5% Calcite / Talc / Binders 100% 09/30 BL Drywall Material (White) 90% Cellulose Fibers 5% 09/30 BL Drywall Material (White) 90% Gypsum / Binders 95% 09/30 BL DW Paper Facing (Tan) 5% Cellulose Fibers 100% 09/30 BL Texture / Joint Cmpd (White) 5% Calcite / Talc / Binders 100% 09/30 BL Drywall Material (White) 95% Cellulose Fibers 5% 09/30 BL Drywall Material (White) 95% Gypsum / Binders 95% 09/30 BL DW Paper Facing (Tan) 5% Cellulose Fibers 100% 09/30 BL Drywall Material (White) 95% Cellulose Fibers 5% 09/30 BL Drywall Material (White) 95% Gypsum / Binders 95% 09/30 BL DW Paper Facing (Tan) 5% Cellulose Fibers 100% 09/30 BL Drywall Material (White) 90% Cellulose Fibers 5% 09/30 BL Drywall Material (White) 90% Gypsum / Binders 95% 09/30 BL DW Paper Facing (Tan) 5% Cellulose Fibers 100% 09/30 BL Texture / Joint Cmpd (White) 5% Calcite / Talc / Binders 100% 09/30 BL Floor Tile (Light Grey) 100% Calcite / Vinyl Binders 100% 09/30 BL Insufficient Mastic 09/30 BL Floor Tile (Light Grey) 100% Calcite / Vinyl Binders 100% 09/30 BL Yellow Mastic (Yellow) <1% Glue Binders 100% 09/30 BL Floor Tile (Light Grey) 100% Calcite / Vinyl Binders 100% 09/30 BL Insufficient Mastic 09/30 BL Analyst

27 Client : Project : Project # : Terracon - Duluth, GA Tannery PLM Detail Report Moody Labs NVLAP Lab Code Valley View Lane Supplement to PLM Summary Report TDSHS License No Farmers Branch, TX Phone: (972) % Of Sample Number Layer Components Sample Lab Job No. : 15B Report Date : 09/30/2015 % of Layer Analysis Date Page 7 of Coatings (Green) 65% Pigment / Binders 100% 09/30 BL Floor Material (Light Tan) 35% Aggregate 65% 09/30 BL Floor Material (Light Tan) 35% Calcite / Binders 35% 09/30 BL Coatings (Green) 65% Pigment / Binders 100% 09/30 BL Floor Material (Light Tan) 35% Aggregate 65% 09/30 BL Floor Material (Light Tan) 35% Calcite / Binders 35% 09/30 BL Coatings (Green) 65% Pigment / Binders 100% 09/30 BL Floor Material (Light Tan) 35% Aggregate 65% 09/30 BL Floor Material (Light Tan) 35% Calcite / Binders 35% 09/30 BL Mortar (Grey) 100% Aggregate 65% 09/30 BL Mortar (Grey) 100% Cement Binders 35% 09/30 BL Mortar (Grey) 100% Aggregate 65% 09/30 BL Mortar (Grey) 100% Cement Binders 35% 09/30 BL CMU (Grey) 50% Aggregate 65% 09/30 BL CMU (Grey) 50% Cement Binders 35% 09/30 BL Mortar (Grey) 50% Aggregate 65% 09/30 BL Mortar (Grey) 50% Cement Binders 35% 09/30 BL Beige Mastic (Beige) 100% Calcite 50% 09/30 BL Beige Mastic (Beige) 100% Glue Binders 50% 09/30 BL Beige Mastic (Beige) 100% Calcite 50% 09/30 BL Beige Mastic (Beige) 100% Glue Binders 50% 09/30 BL Beige Mastic (Beige) 100% Calcite 50% 09/30 BL Beige Mastic (Beige) 100% Glue Binders 50% 09/30 BL Analyst

28 October 01, 2015 Adam Jones Terracon 2855 Premiere Parkway Duluth GA TEL: FAX: (770) (770) RE: Tannery Dear Adam Jones: Order No: 1509J97 Analytical Environmental Services, Inc. received for the analyses presented in following report. 1 samples on 9/23/2015 4:23:00 PM No problems were encountered during the analyses. Additionally, all results for the associated Quality Control samples were within EPA and/or AES established limits. Any discrepancies associated with the analyses contained herein will be noted and submitted in the form of a project Case Narrative. AES certifications are as follows: -NELAC/Florida Certification number E87582 for analysis of Environmental Water, soil/hazardous waste, and Drinking Water Microbiology, effective 07/01/15-06/30/16. -AIHA-LAP, LLC Laboratory ID: for Industrial Hygiene samples (Organics, Inorganics), Environmental Lead (Paint, Soil, Dust Wipes, Air), and Environmental Microbiology (Fungal) Direct Examination, effective until 09/01/17. These results relate only to the items tested. This report may only be reproduced in full. If you have any questions regarding these test results, please feel free to call. Ioana Pacurar Project Manager Page 1 of 5

29 Page 2 of 5

30 Analytical Environmental Services, Inc Date: 1-Oct-15 Client: Terracon Project Name: Tannery Lab ID: 1509J Client Sample ID: Collection Date: Matrix: TCLP 9/22/2015 3:00:00 PM Solid Analyses Result Reporting Limit Qual Units BatchID Dilution Factor Date Analyzed Analyst ICP METALS, TCLP SW1311/6010C (SW3010A) Lead BRL mg/l /29/ :02 TA Qualifiers: * Value exceeds maximum contaminant level E Estimated (value above quantitation range) BRL Below reporting limit S Spike Recovery outside limits due to matrix H Holding times for preparation or analysis exceeded Narr See case narrative N Analyte not NELAC certified NC Not confirmed B Analyte detected in the associated method blank < Less than Result value > Greater than Result value J Estimated value detected below Reporting Limit Page 3 of 5

31 Page 4 of 5

32 Analytical Environmental Services, Inc Client: Project Name: Workorder: Terracon Tannery 1509J97 Date: 1-Oct-15 ANALYTICAL QC SUMMARY REPORT BatchID: Sample ID: MB Client ID: Units: mg/l Prep Date: 09/29/2015 Run No: SampleType: MBLK TestCode: ICP METALS, TCLP SW1311/6010C BatchID: Analysis Date: 09/29/2015 Seq No: Analyte Result RPT Limit SPK value SPK Ref Val %REC Low Limit High Limit RPD Ref Val %RPD RPD Limit Qual Lead BRL Sample ID: LCS Client ID: Units: mg/l Prep Date: 09/29/2015 Run No: SampleType: LCS TestCode: ICP METALS, TCLP SW1311/6010C BatchID: Analysis Date: 09/29/2015 Seq No: Analyte Result RPT Limit SPK value SPK Ref Val %REC Low Limit High Limit RPD Ref Val %RPD RPD Limit Qual Lead Sample ID: 1509J97-001AMS Client ID: TCLP Units: mg/l Prep Date: 09/29/2015 Run No: SampleType: MS TestCode: ICP METALS, TCLP SW1311/6010C BatchID: Analysis Date: 09/29/2015 Seq No: Analyte Result RPT Limit SPK value SPK Ref Val %REC Low Limit High Limit RPD Ref Val %RPD RPD Limit Qual Lead Sample ID: 1509J97-001AMSD Client ID: TCLP Units: mg/l Prep Date: 09/29/2015 Run No: SampleType: MSD TestCode: ICP METALS, TCLP SW1311/6010C BatchID: Analysis Date: 09/29/2015 Seq No: Analyte Result RPT Limit SPK value SPK Ref Val %REC Low Limit High Limit RPD Ref Val %RPD RPD Limit Qual Lead Qualifiers: > Greater than Result value < Less than Result value B Analyte detected in the associated method blank BRL Below reporting limit E Estimated (value above quantitation range) H Holding times for preparation or analysis exceeded J Estimated value detected below Reporting Limit N Analyte not NELAC certified R RPD outside limits due to matrix Page 5 of 5 Rpt Lim Reporting Limit S Spike Recovery outside limits due to matrix

33 APPENDIX C

34

35 APPENDIX D

36

37 APPENDIX E

38 Photo 1: 3723 Abbotts Bridge Road, Duluth, Georgia (view of site from Abbotts Bridge Road) Photo 2: Rear view of site Photo 3: Southeast side of site Photo 4: Northeast half of building (open storage area) Terracon Project No.: Project Name: Tannery Date Photos Taken: September 22, 2015

39 Photo 5: Corridor connecting offices on southwest half of building Photo 6: Non-asbestos popcorn ceiling texture, gypsum wall system, and window sealant Photo 7: Non-asbestos bathroom floor tile Photo 8: Non-asbestos break room floor tile, grout, and leveling compound Terracon Project No.: Project Name: Tannery Date Photos Taken: September 22, 2015

40 Photo 9: Non-asbestos cove base mastic Photo 10: Mold growth in south corner of building near shower room Photo 11: Non-asbestos beige mastic along CMU in northeast open area Photo 12: Non-asbestos roofing materials Terracon Project No.: Project Name: Tannery Date Photos Taken: September 22, 2015

41 Photo 13: Non-asbestos CMU (does not contain CMU block filler) Photo 14: Non-asbestos white gypsum wallboard mastic Photo 15: Non-asbestos concrete covering/texture in northeast open area Photo 16: Non-asbestos gray floor tile in shower room with water damage to ceiling Terracon Project No.: Project Name: Tannery Date Photos Taken: September 22, 2015

Asbestos Survey Report

Asbestos Survey Report Asbestos Survey Report Downtown Duluth Old City Hall Block Buildings for renovation 3087 Main Street, 3097 Main Street, New Dawn Theater, 3530 W. Lawrenceville Street, Old City Hall/Church Duluth, Georgia

More information

ASBESTOS INSPECTION REPORT 3801 HARNEY STREET OMAHA, NEBRASKA 68132

ASBESTOS INSPECTION REPORT 3801 HARNEY STREET OMAHA, NEBRASKA 68132 ASBESTOS INSPECTION REPORT 3801 HARNEY STREET OMAHA, NEBRASKA 68132 Prepared For: Women s Center for Advancement 222 South 29 th Street Omaha, Nebraska 68131 June 20, 2016 Prepared By: New Horizons Enterprises,

More information

Comprehensive Asbestos & Lead Base Paint Survey

Comprehensive Asbestos & Lead Base Paint Survey Report of Comprehensive Asbestos & Lead Base Paint Survey Prepared for: Freese and Nichols, Inc. 4055 International Plaza, Suite 200 Fort Worth, TX 76109 Building Surveyed: Readiness Center - Hondo Pass

More information

Comprehensive Asbestos & Lead Base Paint Survey

Comprehensive Asbestos & Lead Base Paint Survey Report of Comprehensive Asbestos & Lead Base Paint Survey Prepared for: Freese and Nichols, Inc. 4055 International Plaza, Suite 200 Fort Worth, TX 76109 Building Surveyed: Readiness Center National Guard

More information

Pre-Renovation Asbestos Survey

Pre-Renovation Asbestos Survey Pre-Renovation Asbestos Survey L640 Level 2 Remodel College Complex Los Medanos College Pittsburg, California November 23, 2016 Terracon Project No. R1167D98 Prepared for: Contra Costa Community College

More information

Limited Asbestos Demolition Survey

Limited Asbestos Demolition Survey Limited Asbestos Demolition Survey Limited Asbestos Demolition Survey Former Fire Station Facility 25 to 45 S. Orlando Avenue Cocoa Beach, Florida Client: City of Cocoa Beach Public Works Department 1600

More information

Comprehensive Asbestos and Lead Survey

Comprehensive Asbestos and Lead Survey Report of Comprehensive Asbestos and Lead Survey Prepared for: City of Garland 200 N. 5th Street Garland, TX 75040 Building Surveyed: Garland Civic Theater Garland, TX Report Date: Friday, September 16,

More information

ADDENDUM # 1 To: File IFB for: 24 Gus Garcia Demolition and Reconstruction

ADDENDUM # 1 To: File IFB for: 24 Gus Garcia Demolition and Reconstruction 818 S. FLORES ST. SAN ANTONIO, TEXAS 78204 www.saha.org Procurement Department ADDENDUM # 1 To: File 1601-909-62-4465 - IFB for: 24 Gus Garcia Demolition and Reconstruction Please note the following change:

More information

Memphis-Shelby County Airport Authority Project # Tchulahoma Warehouse Asbestos Survey Report

Memphis-Shelby County Airport Authority Project # Tchulahoma Warehouse Asbestos Survey Report Memphis-Shelby County Airport Authority Project # 14-1379-21 3130 Tchulahoma Warehouse Asbestos Survey Report The Memphis International Airport Facility located at 3130 Tchulahoma Road in Memphis, Shelby

More information

LIMITED ASBESTOS ASSESSMENT

LIMITED ASBESTOS ASSESSMENT LIMITED ASBESTOS ASSESSMENT FORMER DORAN MILL SITE 404 POLKVILLE ROAD SHELBY, NORTH CAROLINA 28150 ECS PROJECT NO. 49:4683 FOR CLEVELAND COUNTY ECONOMIC DEVELOPMENT JUNE 30, 2017 June 30, 2017 Mr. Matt

More information

ASBESTOS SURVEY. Old Detective s Building Wadesboro, NC INSPECTED &PREPARED BY:

ASBESTOS SURVEY. Old Detective s Building Wadesboro, NC INSPECTED &PREPARED BY: ASBESTOS SURVEY Old Detective s Building Wadesboro, NC PREPARED FOR: Alex Sewell Town Manager Town of Wadesboro 124 E. Wade Street Wadesboro, NC Date of Inspection September 28, 2016 Date of Report October

More information

Asbestos Survey Proposed Roosevelt Development Roosevelt Way NE Seattle, King County, Washington

Asbestos Survey Proposed Roosevelt Development Roosevelt Way NE Seattle, King County, Washington Asbestos Survey Proposed Roosevelt Development 6814-6820 Roosevelt Way NE Seattle, King County, Washington June 19, 2015 Terracon Project No. 81157083 Prepared for: Seattle, Washington Prepared by: Terracon

More information

Source Tracing Event for Outfall 2771 February 10, 2014

Source Tracing Event for Outfall 2771 February 10, 2014 Source Tracing Event for Outfall 2771 February 10, 2014 Source Tracing Performed by: Glenn Kenobbie (Integrated Science & Engineering) On February 10, 2014 while performing Dry Weather Screening for the

More information

November 12, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California

November 12, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California November 12, 2014 Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California 95993-2240 RE: Pre-Renovation Asbestos Survey Report 5862 Rupert Avenue, Marysville, California

More information

Investigation Remediation Citation Drive, Suite 100 Compliance Restoration Brighton, MI 48116

Investigation Remediation Citation Drive, Suite 100 Compliance Restoration Brighton, MI 48116 Investigation Remediation 10448 Citation Drive, Suite 100 Compliance Restoration Brighton, MI 48116 Mailing Address: P.O. Box 2160 Brighton, MI 48116-2160 800 395-ASTI Fax: 810.225.3800 www.asti-env.com

More information

Engineers and. Limited Asbestos and Lead Containing Materials Evaluation 273 D Street & 244 Athens Street Boston, Massachusetts

Engineers and. Limited Asbestos and Lead Containing Materials Evaluation 273 D Street & 244 Athens Street Boston, Massachusetts GZA GeoEnvironmental, Inc. Engineers and Scientists April 4, 2013 File No. 01.0171487.10 Mr. Jonathan Wright Caritas Communities Inc. 25 Braintree Hill Office Park, Suite 206 Braintree, MA 02184 249 Vanderbilt

More information

The following non-friable asbestos products were identified at the site:

The following non-friable asbestos products were identified at the site: April 27, 2018 Ms. Jessica Kenney Boulder Housing Partners 4800 Broadway Street Boulder, Colorado 80304 RE: Limited Asbestos-Containing Building Materials Survey Canyon Point Apartments First Floor 700

More information

July 13, 2011 TTL Project No NESHAP Asbestos and Limited Hazardous Materials Survey Report 500 North Congress Street Ypsilanti, Michigan

July 13, 2011 TTL Project No NESHAP Asbestos and Limited Hazardous Materials Survey Report 500 North Congress Street Ypsilanti, Michigan July 13, 2011 TTL Project No. 7615.02 Ms. Paula Boase Downriver Community Conference Brownfield Consortium 15100 Northline Road Southgate, Michigan 48195 Dear Ms. Boase: NESHAP Asbestos and Limited Hazardous

More information

CONTRACT FOR SALE AND MOVING OF HOUSE

CONTRACT FOR SALE AND MOVING OF HOUSE CONTRACT FOR SALE AND MOVING OF HOUSE This contract of sale ( Contract ) is made by and between the City of Southlake, Texas, a home rule municipal corporation located in Tarrant County, Texas ( Seller

More information

Final Asbestos Inspection Report and Lead Paint Survey

Final Asbestos Inspection Report and Lead Paint Survey Final Asbestos Inspection Report and Lead Paint Survey Proposed Retail Takeover, Store #3178-00 2444 East Powell Boulevard Gresham, Multnomah County, Oregon October 7, 2011 Terracon Project No. 82117017

More information

ROY CONSULTING GROUP CORPORATION 9823 Balmoral Circle Charlotte, North Carolina Phone: Fax:

ROY CONSULTING GROUP CORPORATION 9823 Balmoral Circle Charlotte, North Carolina Phone: Fax: ROY CONSULTING GROUP CORPORATION 9823 Balmoral Circle Charlotte, North Carolina 28210 Phone: 704.968.4111 Fax: 704.553.9458 March 27, 2015 Mr. Barry Blevins Harnett County General Services 103 East Ivey

More information

Material Description Quantity Asbestos Content Location

Material Description Quantity Asbestos Content Location May 3, 2018 Ms. Jessica Kenney Boulder Housing Partners 4800 Broadway Street Boulder, Colorado 80304 RE: Asbestos-Containing Building Materials Survey Glen Willow 303 333 Pearl Street, Boulder, Colorado

More information

ASBESTOS INSPECTION FOR LASALLE ROAD MONTROSE, CO

ASBESTOS INSPECTION FOR LASALLE ROAD MONTROSE, CO ASBESTOS INSPECTION FOR 61935 LASALLE ROAD MONTROSE, CO Prepared for: Montrose County 949 N. 2 nd Street Montrose, CO Prepared by: July 27, 2018 Montrose County 949 N. 2 nd Street Montrose, CO 81401 Attn.:

More information

HART ENVIRONMENTAL RESOURCES

HART ENVIRONMENTAL RESOURCES HART ENVIRONMENTAL RESOURCES 262 Hedge Dr. Springfield, OH 45504 (937) 325-8777 (937) 324-0288 FAX ASBESTOS INSPECTION REPORT 143 N. Marion St. Dayton, OH 45417 PREPARED FOR: Mr. Dennis Zimmer Montgomery

More information

Asbestos & Lead Based Paint Assessment City of Spartanburg 620 Humphrey Street Spartanburg, South Carolina

Asbestos & Lead Based Paint Assessment City of Spartanburg 620 Humphrey Street Spartanburg, South Carolina Asbestos & Lead Based Paint Assessment City of Spartanburg 620 Humphrey Street Spartanburg, South Carolina Prepared for: The City of Spartanburg 440 South Church St., Suite B Spartanburg, SC 29306 Prepared

More information

ASBESTOS REINSPECTION SURVEY REPORT GENERAL SERVICES ADMINISTRATION AUBURN ADMINISTRATION BUILDING BUILDING WA0811KA AUBURN, WASHINGTON

ASBESTOS REINSPECTION SURVEY REPORT GENERAL SERVICES ADMINISTRATION AUBURN ADMINISTRATION BUILDING BUILDING WA0811KA AUBURN, WASHINGTON ASBESTOS REINSPECTION SURVEY REPORT GENERAL SERVICES ADMINISTRATION AUBURN ADMINISTRATION BUILDING BUILDING WA0811KA AUBURN, WASHINGTON May 23, 2007 Prepared for: Mr. Ron Smith GSA 400-15 th Street SW

More information

Asbestos & Lead Based Paint Assessment City of Anderson 1409 Watson Street Anderson, South Carolina 29624

Asbestos & Lead Based Paint Assessment City of Anderson 1409 Watson Street Anderson, South Carolina 29624 Asbestos & Lead Based Paint Assessment City of Anderson 1409 Watson Street Anderson, South Carolina 29624 Prepared for: City of Anderson Community Development Department 601 South Main Street Anderson,

More information

Asbestos & Lead Based Paint Assessment City of Anderson 710 A&B Beechwood Avenue Anderson, South Carolina 29624

Asbestos & Lead Based Paint Assessment City of Anderson 710 A&B Beechwood Avenue Anderson, South Carolina 29624 Asbestos & Lead Based Paint Assessment City of Anderson 710 A&B Beechwood Avenue Anderson, South Carolina 29624 Prepared for: City of Anderson Community Development Department 601 South Main Street Anderson,

More information

Asbestos Containing Materials Assessment 631 Fulton Avenue Spartanburg, South Carolina

Asbestos Containing Materials Assessment 631 Fulton Avenue Spartanburg, South Carolina Asbestos Containing Materials Assessment 631 Fulton Avenue Spartanburg, South Carolina Prepared for: Northside Development Group 410 Magnolia Street Spartanburg, South Carolina Prepared by: Apex Environmental

More information

Asbestos Assessment Report Residential Structure 1530 W Bramlett Road Greenville, South Carolina S&ME Project No Phase 49

Asbestos Assessment Report Residential Structure 1530 W Bramlett Road Greenville, South Carolina S&ME Project No Phase 49 Attachment B Asbestos Assessment Report Residential Structure 1530 W Bramlett Road Greenville, South Carolina S&ME Project No. 4226-18-003 Phase 49 Asbestos Identified Asbestos Design Required Asbestos

More information

Asbestos Assessment Report Residential Structure Walcott Street Greenville, South Carolina S&ME Project No Phase 45

Asbestos Assessment Report Residential Structure Walcott Street Greenville, South Carolina S&ME Project No Phase 45 Attachment C Asbestos Assessment Report Residential Structure - 110 Walcott Street Greenville, South Carolina S&ME Project No. 4226-18-003 Phase 45 Asbestos Identified Asbestos Design Required Asbestos

More information

ASBESTOS SURVEY WARNER ROBINS HOUSING AUTHORITY PROJECT SITE GA06P WARNER ROBINS, GEORGIA. December 28, 2005

ASBESTOS SURVEY WARNER ROBINS HOUSING AUTHORITY PROJECT SITE GA06P WARNER ROBINS, GEORGIA. December 28, 2005 ASBESTOS SURVEY WARNER ROBINS HOUSING AUTHORITY PROJECT SITE GA06P160003 WARNER ROBINS, GEORGIA Prepared for: Warner Robins Housing Authority Ms. Charles Alexander Prepared by: Holley Consultants, Inc.

More information

Asbestos Inspection Report

Asbestos Inspection Report ECH CONSULTANTS Asbestos Inspection Report 113 E. Pine Street Florence, South Carolina Prepared for: The City of Florence Prepared by: Enga Hair, AHERA Building Inspector License #BI-01591 Project Number:18-192-1

More information

Asbestos & Lead Based Paint Assessment City of Spartanburg 250 Palisade Street Spartanburg, South Carolina

Asbestos & Lead Based Paint Assessment City of Spartanburg 250 Palisade Street Spartanburg, South Carolina Asbestos & Lead Based Paint Assessment City of Spartanburg 250 Palisade Street Spartanburg, South Carolina Prepared for: The City of Spartanburg 201 Caulder Avenue Spartanburg, South Carolina Prepared

More information

ASBESTOS SURVEY REPORT. Kroger Store D-578 Expansion 850 South Monroe Street Monroe, Michigan

ASBESTOS SURVEY REPORT. Kroger Store D-578 Expansion 850 South Monroe Street Monroe, Michigan ASBESTOS SURVEY REPORT Kroger Store D-578 Expansion 850 South Monroe Street Monroe, Michigan Prepared by: AMEC Environment & Infrastructure, Inc. 15933 Clayton Road, Suite 215 Ballwin, MO 63011 636.386.3800

More information

Limited Asbestos-Containing Materials Inspection Platt Road Ann Arbor, Michigan. Ann Arbor Housing Commission.

Limited Asbestos-Containing Materials Inspection Platt Road Ann Arbor, Michigan. Ann Arbor Housing Commission. Limited Asbestos-Containing Materials Inspection 3451-3457 Platt Road Ann Arbor, Michigan Ann Arbor Housing Commission November 11, 2013 Limited Asbestos-Containing Materials Inspection 3451-3457 Platt

More information

ASBESTOS INSPECTION AND ASSESSMENT

ASBESTOS INSPECTION AND ASSESSMENT ASBESTOS INSPECTION AND ASSESSMENT CHURCH OF SCIENTOLOGY BUILDING LOCATED AT 709 E. SOUTH TEMPLE SALT LAKE CITY, UTAH 84102 May 14, 2015 Prepared for: Kirsten McIntyre Church of Scientology International

More information

At your request, on September 20, 2017 HazCorp Environmental Services, Inc. performed an asbestos inspection at the aforementioned residence.

At your request, on September 20, 2017 HazCorp Environmental Services, Inc. performed an asbestos inspection at the aforementioned residence. September 26, 2017 Mr. Cory Estes Crawford County Land Reutilization Corporation 112 East Mansfield Street Bucyrus, OH 44820 Phone: 419-562-7861 Email: cclb@crawford-co.org Re: Asbestos Survey of 1323

More information

Mr. Charles Michal Weller & Michal Architects, Inc. 71 Main Street, Mill #2 Claremont, New Hampshire TLG File Number

Mr. Charles Michal Weller & Michal Architects, Inc. 71 Main Street, Mill #2 Claremont, New Hampshire TLG File Number Mr. Charles Michal Weller & Michal Architects, Inc. 71 Main Street, Mill #2 Claremont, New Hampshire 03743 RE: Asbestos & Lead Survey Upper Floor of the Farwell Block, Harrisville, New Hampshire TLG File

More information

Roseville OFFICE* 1911 Douglas Blvd, ste * Roseville, CA Phone (916) * Fax (916) *

Roseville OFFICE* 1911 Douglas Blvd, ste * Roseville, CA Phone (916) * Fax (916) * Roseville OFFICE* 1911 Douglas Blvd, ste 85-349* Roseville, CA 95661 Phone (916) 628-0050 * Fax (916) 781-6837 * www.hazmanage.com Camino Union Elementary School District Maintenance Building Demolition

More information

AHERA/NESHAP ASBESTOS INSPECTION REPORT. CLIENT: City of Florence 324 West Evans Street Florence, SC (843)

AHERA/NESHAP ASBESTOS INSPECTION REPORT. CLIENT: City of Florence 324 West Evans Street Florence, SC (843) AHERA/NESHAP ASBESTOS INSPECTION REPORT CLIENT: City of Florence 324 West Evans Street Florence, SC 29501-3430 (843) 665-3173 LOCATION: 558 N. Alexander Street Florence, SC 29501 DATE OF INSPECTION: September

More information

At your request, on September 19, 2017 HazCorp Environmental Services, Inc. performed an asbestos inspection at the aforementioned residence.

At your request, on September 19, 2017 HazCorp Environmental Services, Inc. performed an asbestos inspection at the aforementioned residence. September 26, 2017 Mr. Cory Estes Crawford County Land Reutilization Corporation 112 East Mansfield Street Bucyrus, OH 44820 Phone: 419-562-7861 Email: cclb@crawford-co.org Re: Asbestos Survey of 969 Harding

More information

Asbestos Assessment Report Residential Structure th Street Greenville, South Carolina S&ME Project No Phase 47

Asbestos Assessment Report Residential Structure th Street Greenville, South Carolina S&ME Project No Phase 47 Attachment A Asbestos Assessment Report Residential Structure - 28 11 th Street Greenville, South Carolina S&ME Project No. 4226-18-003 Phase 47 Asbestos Identified Asbestos Design Required Asbestos Air

More information

August 19, GBT Realty Corporation 9010 Overlook Boulevard Brentwood, TN Mr. Jason Horowitz

August 19, GBT Realty Corporation 9010 Overlook Boulevard Brentwood, TN Mr. Jason Horowitz August 19, 2014 GBT Realty Corporation 9010 Overlook Boulevard Brentwood, TN 37027 Attn: RE: Mr. Jason Horowitz Asbestos Demolition Survey Report Proposed Dollar General Retail Property 1418 1 st Street

More information

At your request, on September 19, 2017 HazCorp Environmental Services, Inc. performed an asbestos inspection at the aforementioned residence.

At your request, on September 19, 2017 HazCorp Environmental Services, Inc. performed an asbestos inspection at the aforementioned residence. September 26, 2017 Mr. Cory Estes Crawford County Land Reutilization Corporation 112 East Mansfield Street Bucyrus, OH 44820 Phone: 419-562-7861 Email: cclb@crawford-co.org Re: Asbestos Survey of 117 &

More information

Asbestos & Lead Based Paint Assessment City of Anderson 220 Wardlaw Street Anderson, South Carolina 29624

Asbestos & Lead Based Paint Assessment City of Anderson 220 Wardlaw Street Anderson, South Carolina 29624 Asbestos & Lead Based Paint Assessment City of Anderson 220 Wardlaw Street Anderson, South Carolina 29624 Prepared for: City of Anderson Community Development Department 601 South Main Street Anderson,

More information

Asbestos & Lead Based Paint Assessment City of Anderson 1508 Mitchell Street Anderson, South Carolina 29624

Asbestos & Lead Based Paint Assessment City of Anderson 1508 Mitchell Street Anderson, South Carolina 29624 Asbestos & Lead Based Paint Assessment City of Anderson 1508 Mitchell Street Anderson, South Carolina 29624 Prepared for: City of Anderson Community Development Department 601 South Main Street Anderson,

More information

NESHAP Asbestos Survey Report Vacant Single-Family Home 5955 Woodhall Street Detroit, Michigan

NESHAP Asbestos Survey Report Vacant Single-Family Home 5955 Woodhall Street Detroit, Michigan NESHAP Asbestos Survey Report Vacant Single-Family Home 5955 Woodhall Street Detroit, Michigan July 2013 1915 North 12 th Street Toledo, OH 43604-5305 T (419) 324-2222 F (419) 321-6252 www.ttlassoc.com

More information

ASBESTOS INSPECTION REPORT Completed in accordance with 40 CFR, and (a)(4)

ASBESTOS INSPECTION REPORT Completed in accordance with 40 CFR, and (a)(4) ASBESTOS INSPECTION REPORT Completed in accordance with 40 CFR, 763.86 and 763.85(a)(4) Assessment Completed for Clint Moore, ASLA Planning, Research and Development City of Florence 324 West Evans Street

More information

Asbestos & Lead Based Paint Assessment City of Anderson 225 Caughlin Avenue Anderson, South Carolina 29624

Asbestos & Lead Based Paint Assessment City of Anderson 225 Caughlin Avenue Anderson, South Carolina 29624 Asbestos & Lead Based Paint Assessment City of Anderson 225 Caughlin Avenue Anderson, South Carolina 29624 Prepared for: City of Anderson Community Development Department 601 South Main Street Anderson,

More information

Ontario Inc. March 10, Jardin Des Sapins Orleans, ON

Ontario Inc. March 10, Jardin Des Sapins Orleans, ON 2150 Thurston Drive, Suite 203 Ottawa, Ontario K1G 5T9 Tel.: (613) 748-1415 or 1-877-378-3745 Fax: (613) 748-1356 E-Mail: ottawa@dstgroup.com 2357976 Ontario Inc. March 10, 2014 1698 Jardin Des Sapins

More information

US-29 (E. Cherokee St.) Bridge over I-85 (Exit 106) Cherokee County, South Carolina Asbestos and Lead-Based Paint Survey Report

US-29 (E. Cherokee St.) Bridge over I-85 (Exit 106) Cherokee County, South Carolina Asbestos and Lead-Based Paint Survey Report US-29 (E. Cherokee St.) Bridge over I-85 (Exit 106) Cherokee County, South Carolina Asbestos and Lead-Based Paint Survey Report ARM Project #16-314-15 March 8, 2017 Prepared For: HDR-ICA 1122 Lady Street,

More information

AHERA/NESHAP ASBESTOS INSPECTION REPORT 460 FEWELL STREET ROCK HILL, SC. CLIENT: City of Rock Hill P.O. Box Rock Hill, SC 29731

AHERA/NESHAP ASBESTOS INSPECTION REPORT 460 FEWELL STREET ROCK HILL, SC. CLIENT: City of Rock Hill P.O. Box Rock Hill, SC 29731 AHERA/NESHAP ASBESTOS INSPECTION REPORT 460 FEWELL STREET ROCK HILL, SC CLIENT: City of Rock Hill P.O. Box 11706 Rock Hill, SC 29731 LOCATION: 460 Fewell Street Rock Hill, SC 29730 DATE OF INSPECTION:

More information

Advanced Industrial Hygiene Services, Inc. All Facets of Industrial Hygiene Service

Advanced Industrial Hygiene Services, Inc. All Facets of Industrial Hygiene Service Advanced Industrial Hygiene Services, Inc. All Facets of Industrial Hygiene Service Orchard Supply Company, LLC October 3, 2016 6450 Via Del Oro Page 1 of 9 pages Re: Pre-Renovation Survey for Asbestos

More information

Asbestos Inspection Report

Asbestos Inspection Report ECH CONSULTANTS Asbestos Inspection Report 406 Vista Street Florence, South Carolina Prepared for: City of Florence Prepared by: Enga Hair, AHERA Building Inspector License #BI-01591 May 30, 2017 Project

More information

Asbestos & Lead Based Paint Assessment City of Anderson 1002 East Whitner Street Anderson, South Carolina 29624

Asbestos & Lead Based Paint Assessment City of Anderson 1002 East Whitner Street Anderson, South Carolina 29624 Asbestos & Lead Based Paint Assessment City of Anderson 1002 East Whitner Street Anderson, South Carolina 29624 Prepared for: City of Anderson Community Development Department 601 South Main Street Anderson,

More information

Asbestos Inspection Cover Letter

Asbestos Inspection Cover Letter Asbestos Inspection Cover Letter Date Issued: January 27, 2016 Site Name/Location Residential Structure 4 Cauthen Street Rock Hill, South Carolina Asbestos Inspection Performed For Hank Williams Right

More information

MICHIGAN STATE UNIVERSITY

MICHIGAN STATE UNIVERSITY ASBESTOS SURVEY REPORT MICHIGAN STATE UNIVERSITY CENTER FOR INTEGRATIVE PLANT SYSTEMS EAST LANSING, MICHIGAN Prepared By: TEK Environmental & Consulting Services, Inc. 9670 Chilson Commons Circle Suite

More information

S (Blacksburg Hwy) Bridge over I-85 (Exit 100) Cherokee County, South Carolina Asbestos and Lead-Based Paint Survey Report - Revised

S (Blacksburg Hwy) Bridge over I-85 (Exit 100) Cherokee County, South Carolina Asbestos and Lead-Based Paint Survey Report - Revised S-11-83 (Blacksburg Hwy) Bridge over I-85 (Exit 100) Cherokee County, South Carolina Asbestos and Lead-Based Paint Survey Report - Revised ARM Project # 16-314-15 April 17, 2017 Prepared For: HDR-ICA 1122

More information

S (Tribal Road) Bridge over I-85 (Exit 104) Cherokee County, South Carolina Asbestos and Lead-Based Paint Survey Report

S (Tribal Road) Bridge over I-85 (Exit 104) Cherokee County, South Carolina Asbestos and Lead-Based Paint Survey Report S-11-99 (Tribal Road) Bridge over I-85 (Exit 104) Cherokee County, South Carolina Asbestos and Lead-Based Paint Survey Report Structure # 117009900100 ARM Project #16-314-15 March 8, 2017 Prepared For:

More information

LIMITED ASBESTOS INSPECTION REPORT

LIMITED ASBESTOS INSPECTION REPORT LIMITED ASBESTOS INSPECTION REPORT FOR CITY OF ROCK HILL 150 Johnson Street Rock Hill, SC 29731 (803) 817-5147 LOCATION Building #838 & #840 Crest Street Rock Hill, South Carolina INSPECTION DATE: February

More information

ASBESTOS AND LEAD PAINT INSPECTION REPORT

ASBESTOS AND LEAD PAINT INSPECTION REPORT ASBESTOS AND LEAD PAINT INSPECTION REPORT for the former HENRY SILER SCHOOL 502 WEST THIRD STREET SILER CITY, NC March 2012 prepared by Herrick Engineering, Inc. 526 Lochness Lane Cary, NC 27511 (919)

More information

May 17, 2012 KAS PROJECT # PREPARED FOR: Stantec, Inc. 55 Green Mountain Drive South Burlington, VT P.O. BOX 787 WILLISTON, VT 05495

May 17, 2012 KAS PROJECT # PREPARED FOR: Stantec, Inc. 55 Green Mountain Drive South Burlington, VT P.O. BOX 787 WILLISTON, VT 05495 ASBESTOS INSPECTION REPORT 13, 57 & 72 Dumont Avenue, 23 Maryland Street, 2 & 6 Patrick Street, 392 White Street and 6 Elizabeth Street South Burlington, VT 05403 AIP 87 May 17, 2012 KAS PROJECT # 509110229

More information

Asbestos Survey Report

Asbestos Survey Report Asbestos Survey Report for Peppertree Circle 1471 Mercy Drive Orlando, FL Mercy Drive Project Professional Air Monitoring August 12, 2015 HSW Engineering, Inc Attn: Mr. Andrew M. Lawn 605 East Robinson

More information

HAZARDOUS MATERIALS EVALUATION STRUCTURAL DEMOLITION PROJECT LOCH LOMOND WAY LAS VEGAS, NEVADA. Prepared for:

HAZARDOUS MATERIALS EVALUATION STRUCTURAL DEMOLITION PROJECT LOCH LOMOND WAY LAS VEGAS, NEVADA. Prepared for: HAZARDOUS MATERIALS EVALUATION STRUCTURAL DEMOLITION PROJECT 162-04-311-025 1801 LOCH LOMO WAY LAS VEGAS, NEVADA Prepared for: Nevada Department of Transportation 1263 South Stewart Street Carson City,

More information

for Palm Tree Lodge Motel West Mission Avenue Escondido, California Apex Project Number: 3616-A December 20, 2016 Prepared for:

for Palm Tree Lodge Motel West Mission Avenue Escondido, California Apex Project Number: 3616-A December 20, 2016 Prepared for: PRE-DEMOLITION ASBESTOS AND LEAD-BASED PAINT SURVEY REPORT for Palm Tree Lodge Motel 425 427 West Mission Avenue Escondido, California Apex Project Number: 3616-A3021-001 December 20, 2016 Prepared for:

More information

ASBESTOS ASSESSMENT Curtis House Memorial University of Newfoundland St. John s, NL

ASBESTOS ASSESSMENT Curtis House Memorial University of Newfoundland St. John s, NL Project #: 13916 ASBESTOS ASSESSMENT Curtis House Memorial University of Newfoundland St. John s, NL Prepared for: Sheila Miller Director, Department of Health and Safety Memorial University of Newfoundland

More information

REVISED ASBESTOS AND LEAD-BASED PAINT SURVEYS REPORT BUILDING 3285 SCOTT AIR FORCE BASE, ILLINOIS

REVISED ASBESTOS AND LEAD-BASED PAINT SURVEYS REPORT BUILDING 3285 SCOTT AIR FORCE BASE, ILLINOIS REVISED ASBESTOS AND LEAD-BASED PAINT SURVEYS REPORT BUILDING 3285 SCOTT AIR FORCE BASE, ILLINOIS Prepared for: KUHLMANN DESIGN GROUP Maryland Heights, Missouri Prepared by: GEOTECHNOLOGY, INC. St. Louis,

More information

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22 Page 1 of 22 Asbestos Survey Project Summary Pursuant to your request; Environmental, Inc., has performed an Asbestos Building Survey on 8/13/2014 and limited to the above referenced location. The Interior/Exterior/Roof

More information

Hikone. Sincerely, Enclosures

Hikone. Sincerely, Enclosures August 8, 2013 Mr. Richard Higgins Norstar Development USA, L.P. 733 Broadway Albany, New York 12207 Re: Asbestos Containing Material Survey Hikone 2702 2760 Hikone Road, Ann Arbor, Michigan ERG Project

More information

ASBESTOS AND LEAD-BASED PAINT SURVEY 697 Cook Avenue St. Paul, Minnesota. Prepared for:

ASBESTOS AND LEAD-BASED PAINT SURVEY 697 Cook Avenue St. Paul, Minnesota. Prepared for: ASBESTOS AND LEAD-BASED PAINT SURVEY 697 Cook Avenue St. Paul, Minnesota Prepared for: City of St. Paul Department of Planning and Economic Development 1100 City Hall Annex 25 West 4 th Street St. Paul,

More information

ASBESTOS AND LEAD PAINT BUILDING MATERIALS SURVEY FOR: C-CORE BUILDING MEMORIAL UNIVERSITY OF NEWFOUNDLAND

ASBESTOS AND LEAD PAINT BUILDING MATERIALS SURVEY FOR: C-CORE BUILDING MEMORIAL UNIVERSITY OF NEWFOUNDLAND ASBESTOS AND LEAD PAINT BUILDING MATERIALS SURVEY FOR: C-CORE BUILDING MEMORIAL UNIVERSITY OF NEWFOUNDLAND Prepared for: Memorial University of Newfoundland St. John s, NL Pinchin LeBlanc Environmental

More information

ASBESTOS-CONTAINING MATERIALS SURVEY AND LEAD-BASED PAINT SURVEY OLD CITY HALL 229 WALNUT STREET GREEN COVE SPRINGS, CLAY COUNTY, FLORIDA

ASBESTOS-CONTAINING MATERIALS SURVEY AND LEAD-BASED PAINT SURVEY OLD CITY HALL 229 WALNUT STREET GREEN COVE SPRINGS, CLAY COUNTY, FLORIDA ASBESTOS-CONTAINING MATERIALS SURVEY AND LEAD-BASED PAINT SURVEY OLD CITY HALL 229 WALNUT STREET GREEN COVE SPRINGS, CLAY COUNTY, FLORIDA PREPARED FOR: Mr. Steve Thomas Field Supervisor Public Works 900

More information

Asbestos & Lead Based Paint Assessment City of Anderson 1406 West Whitner Street Anderson, South Carolina 29624

Asbestos & Lead Based Paint Assessment City of Anderson 1406 West Whitner Street Anderson, South Carolina 29624 Asbestos & Lead Based Paint Assessment City of Anderson 1406 West Whitner Street Anderson, South Carolina 29624 Prepared for: City of Anderson Community Development Department 601 South Main Street Anderson,

More information

Asbestos Assessment Report 1114 Bennett Street Greenville, South Carolina S&ME Project No Phase 27

Asbestos Assessment Report 1114 Bennett Street Greenville, South Carolina S&ME Project No Phase 27 Attachment A Asbestos Assessment Report 1114 Bennett Street Greenville, South Carolina S&ME Project No. 4226-18-003 Phase 27 Asbestos Identified Asbestos Design Required Asbestos Air Monitoring Required

More information

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for. Barton Malow/Clark MSU Spartan Stadium 58 Shaw Lane East Lansing, Michigan

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for. Barton Malow/Clark MSU Spartan Stadium 58 Shaw Lane East Lansing, Michigan POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT for Barton Malow/Clark MSU Spartan Stadium 58 Shaw Lane East Lansing, Michigan 48824-1215 at Michigan State University I.M. West Building East

More information

J July 12, Asbestos Assessment and Lead Paint Screening 77 Maple Street Springfield, Massachusetts

J July 12, Asbestos Assessment and Lead Paint Screening 77 Maple Street Springfield, Massachusetts July 12, 2018 Asbestos Assessment and Lead Paint Screening 77 Maple Street Springfield, Massachusetts PREPARED FOR: 29 Elliot Street Springfield, Massachusetts 01105 PREPARED BY: O Reilly, Talbot & Okun

More information

LIMITED ASBESTOS INSPECTION REPORT

LIMITED ASBESTOS INSPECTION REPORT LIMITED ASBESTOS INSPECTION REPORT FOR CITY OF ROCK HILL 150 Johnson Street Rock Hill, SC 29731 (803) 817-5147 LOCATION Building #842, #844, #846, & #848 Crest Street Rock Hill, South Carolina INSPECTION

More information

Asbestos & Lead Based Paint Assessment City of Spartanburg 444 Tryon Street Spartanburg, South Carolina

Asbestos & Lead Based Paint Assessment City of Spartanburg 444 Tryon Street Spartanburg, South Carolina Asbestos & Lead Based Paint Assessment City of Spartanburg 444 Tryon Street Spartanburg, South Carolina Prepared for: The City of Spartanburg 201 Caulder Avenue Spartanburg, South Carolina Prepared by:

More information

INVITATION TO BID NUMBER ITB/DM-12/13-44 DEMOLITION AND RENOVATION AT THE POMPANO STATE FARMERS MARKET

INVITATION TO BID NUMBER ITB/DM-12/13-44 DEMOLITION AND RENOVATION AT THE POMPANO STATE FARMERS MARKET December 7, 2012 Please respond to: SB-8 Mayo Building Tallahassee, Florida 32399 ADDEUM 2 TO: FROM: RE: Vendors Christie Hutchinson, Purchasing Director INVITATION TO BID NUMBER ITB/DM-12/13-44 DEMOLITION

More information

HAZARDOUS MATERIALS SURVEY IN SUPPORT OF PROJECT. Reconfigure Security Flight Sim Bldg 2048 Project Number: GJKZ

HAZARDOUS MATERIALS SURVEY IN SUPPORT OF PROJECT. Reconfigure Security Flight Sim Bldg 2048 Project Number: GJKZ HAZARDOUS MATERIALS SURVEY IN SUPPORT OF PROJECT Reconfigure Security Flight Sim Bldg 2048 Project Number: AT FAIRCHILD AIR FORCE BASE, WASHINGTON Contract.: FA4620-10-D-B001 Task Order.: 0027 February

More information

Limited Asbestos-Containing Materials Inspection Broadway Street Ann Arbor, Michigan. Ann Arbor Housing Commission.

Limited Asbestos-Containing Materials Inspection Broadway Street Ann Arbor, Michigan. Ann Arbor Housing Commission. Limited Asbestos-Containing Materials Inspection 1504-1508 Broadway Street Ann Arbor, Michigan Ann Arbor Housing Commission November 11, 2013 Limited Asbestos-Containing Materials Inspection 1504-1508

More information

EVALUATION ON PROJECT Prepared for: Carson. City, Nevada

EVALUATION ON PROJECT Prepared for: Carson. City, Nevada HAZARDOUS MATERIALS EVALUATION STRUCTURAL DEMOLITIO ON PROJECT 162-04-501-0033 1111 DESERT LANE LAS VEGAS, NEVADA Prepared for: Nevada Department of Transportation 1263 South Stewart Street Carson City,

More information

Asbestos & Lead Based Paint Assessment City of Spartanburg 187 Sunny Street Spartanburg, South Carolina

Asbestos & Lead Based Paint Assessment City of Spartanburg 187 Sunny Street Spartanburg, South Carolina Asbestos & Lead Based Paint Assessment City of Spartanburg 187 Sunny Street Spartanburg, South Carolina Prepared for: The City of Spartanburg 201 Caulder Avenue Spartanburg, South Carolina Prepared by:

More information

LIMITED SUPPLEMENTAL ASBESTOS AND LEAD PAINT SURVEY REPORT. Highland Park Middle School 7000 SW Wilson Avenue Beaverton, OR 97008

LIMITED SUPPLEMENTAL ASBESTOS AND LEAD PAINT SURVEY REPORT. Highland Park Middle School 7000 SW Wilson Avenue Beaverton, OR 97008 LIMITED SUPPLEMENTAL ASBESTOS AND LEAD PAINT SURVEY REPORT Highland Park Middle School 7000 SW Wilson Avenue Beaverton, OR 97008 Prepared for: Beaverton School District 16550 SW Merlo Road Beaverton, OR

More information

Asbestos Inventory Survey of James Anderson Learning Centre, Avenue, Langley (Formerly Langley Fundamental Middle School)

Asbestos Inventory Survey of James Anderson Learning Centre, Avenue, Langley (Formerly Langley Fundamental Middle School) October 31, 2016 200753 AIS R1 James Anderson Learning Centre School District #35 (Langley) 20260 64 th Avenue Langley, BC V2Y 1N3 E mail: Attention: Reference: KWagner@sd35.bc.ca Karen Wagner Asbestos

More information

Limited Asbestos Inspection Report

Limited Asbestos Inspection Report Limited Asbestos Inspection Report LIMITED ASBESTOS INSPECTION DALLAS/FORT WORTH INTERNATIONAL AIRPORT DEPARTMENT OF ENVIRONMENTAL AFFAIRS PROJECT NAME DFW PROJECT ID NO. DFW PERMIT NO. DFWEAD2019028 A18-233B

More information

HOL-11 Exterior Pipe wrap Lagging (fiber) PLM None detected. HOL-09 Room 10 - Floor Tile, Grey 12x12 PLM None detected

HOL-11 Exterior Pipe wrap Lagging (fiber) PLM None detected. HOL-09 Room 10 - Floor Tile, Grey 12x12 PLM None detected Laboratory results - Asbestos School Sample no. Sample Location Material Sample Type Result Holbrook Elementary HOL-01 Room 12 Floor - Linoleum Tan Linoleum PLM 30% Chrysotile Floor tile PLM None detected

More information

RESULTS OF AN ASBESTOS and LEAD PAINT IDENTIFICATION SURVEY. Prepared For: Town of Bethlehem 2155 Main Street Bethlehem, New Hampshire 03574

RESULTS OF AN ASBESTOS and LEAD PAINT IDENTIFICATION SURVEY. Prepared For: Town of Bethlehem 2155 Main Street Bethlehem, New Hampshire 03574 RESULTS OF AN ASBESTOS and LEAD PAINT IDENTIFICATION SURVEY Prepared For: Town of Bethlehem 2155 Main Street Bethlehem, New Hampshire 03574 Performed at: Summit/Cruft Building 2111 Main Street Bethlehem,

More information

eriod from date submitted Must include fee See Consolidated Fee Schedule (Table 11) http1/

eriod from date submitted Must include fee See Consolidated Fee Schedule (Table 11) http1/ Notification # I 1. TYPE OF NOTIFICATION ~riginal D Revised D Cancelled): NOTIFICATION OF DEMOLITION Southwest Clean Air Agency 11815 NE 99th Street, Suite 1294 Vancouver, WA 98682 Voice: (360) 574-3058

More information

Limited Hazardous Materials Survey Report

Limited Hazardous Materials Survey Report Limited Hazardous Materials Survey Report Applied Arts and Administrative (AA) Building Contra Costa College 2600 Mission Bell Drive San Pablo, California Project No: R1177058 March 12, 2017 Prepared for:

More information

1. Sign-in sheet from the Pre-Proposal Conference on April 19, 2017 at Atherton Elementary.

1. Sign-in sheet from the Pre-Proposal Conference on April 19, 2017 at Atherton Elementary. DATE: April 20, 2017 ARLINGTON INDEPENDENT SCHOOL DISTRICT 1203 W. Pioneer Parkway Arlington, Texas 76013 ADDENDUM II FROM: Tammy Craig Director Purchasing RE: CSP 17-79 Amos & Atherton Elementary Renovations

More information

ASBESTOS BUILDING INSPECTION REPORT. for. Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823

ASBESTOS BUILDING INSPECTION REPORT. for. Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823 ASBESTOS BUILDING INSPECTION REPORT for Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823 at the Dairy Cattle Teaching and Research Center Building

More information

licensed Asbestos Building Inspector 1119 Fifth Avenue, Beaver Falls, PA15010 Phone

licensed Asbestos Building Inspector 1119 Fifth Avenue, Beaver Falls, PA15010 Phone Mark D. Stowe licensed Asbestos Building Inspector 1119 Fifth Avenue, Beaver Falls, PA15010 Phone 11241846-1150 November 12, 2013 Ms. Shannon Schlosser, Secretary Franklin Township, Beaver County 897 State

More information

Prepared for: Infrastructure Consulting Engineers, PLLC Turnbull Avenue North Charleston, South Carolina 29405

Prepared for: Infrastructure Consulting Engineers, PLLC Turnbull Avenue North Charleston, South Carolina 29405 ASBESTOS & LEAD-BASED PAINT ASSESSMENT REPORT I-85 Widening MM80-96 SC 18 BRIDGE OVER I-85 STRUCTURE NO. 1140001800400 GAFFNEY, SOUTH CAROLINA S&ME Project No. 1426-14-161 Prepared for: Infrastructure

More information

ASBESTOS BUILDING INSPECTION REPORT. for. Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823

ASBESTOS BUILDING INSPECTION REPORT. for. Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823 ASBESTOS BUILDING INSPECTION REPORT for Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823 at the Demonstration Hall Building #57 East Lansing, Michigan

More information

LIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT. for

LIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT. for LIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT for Michigan State University Physical Plant Division Engineering and Architectural Services Department

More information

REVISED ASBESTOS AND LEAD-BASED PAINT SURVEY MOUNT VERNON AVENUE BRIDGE SAN BERNARDINO, CALIFORNIA

REVISED ASBESTOS AND LEAD-BASED PAINT SURVEY MOUNT VERNON AVENUE BRIDGE SAN BERNARDINO, CALIFORNIA REVISED ASBESTOS AND LEAD-BASED PAINT SURVEY MOUNT VERNON AVENUE BRIDGE SAN BERNARDINO, CALIFORNIA PREPARED FOR: IFC Jones & Stokes 9775 Businesspark Avenue San Diego, California 92131 PREPARED BY: Ninyo

More information

Michigan State University

Michigan State University Michigan State University ASBESTOS BUILDING INSPECTION REPORT Botany Field Lab (Plant Pathology) Building Number 452 Inspection conducted by Zach Hansmann Office of Environmental Health and Safety 150

More information

PIER 26 and 28 BULKHEAD LIMITED ASBESTOS and LEAD SURVEY NTE Project No.: NT-3278

PIER 26 and 28 BULKHEAD LIMITED ASBESTOS and LEAD SURVEY NTE Project No.: NT-3278 PIER 26 and 28 BULKHEAD LIMITED ASBESTOS and LEAD SURVEY NTE Project No.: NT-3278 PREPARED FOR: Mr. Roberto Aguirre City of San Francisco DPW, SAR, BCM 1680 Mission Street San Francisco, California PREPARED

More information