ENVIRONMENT MANAGEMENT PLAN

Size: px
Start display at page:

Download "ENVIRONMENT MANAGEMENT PLAN"

Transcription

1

2 Table of Contents 1 INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN (EMP) Impacts on Land Environment Mitigation Measures WATER ENVIRONMENT Impacts on Water Environment Mitigation measures AIR ENVIRONMENT Impacts on Air Environment Mitigation Measures NOISE ENVIRONMENT Impacts on Noise Environment Mitigation Measures BIOLOGICAL ENVIRONMENT Impacts on Biological Environment Mitigation Measures SOLID WASTE MANAGEMENT: Impacts of Solid Waste Generation PROPOSED SET UP BUDGET ALLOCATION FOR EMP IMPLEMENTATION Occupational Health & Safety

3 1 INTRODUCTION In each of the areas of impact, measures have to be taken to reduce potentially significant adverse impacts and where these are beneficial in nature, such impacts are to be enhanced/ augmented so that the overall adverse impacts are reduced to as low level as possible. Measures to be taken for each of the impact areas are detailed in the following paras: 1.1 ENVIRONMENTAL MANAGEMENT PLAN (EMP) Environmental management plan is proposed for extraction of Sand, Stone & Bajri, the lease is situated in Yamuna riverbed, which is a main tributary of Ganges River, Mauza & Mohal Paonta, Tehsil Paonta Sahib, District Sirmaur HP. Proposed by Sh. Kush Parmar LAND ENVIRONMENT 1.2 Impacts on Land Environment The mining activities involved the extraction of Sand, Stone & Bajri. Mauza & Mohal Paonta, Minerals which are to be extracted will get replenished in every monsoon season so the project will not change the existing Landuse pattern. The mining lease area is devoid of any vegetation. The land under active mining would always remain river bed, during as well as post mining. Activity may cause a few environmental degradations and the most anticipated are detailed here under River bank cutting and erosion. Upstream erosion as a result of an increase in channel slope and changes in flow velocity. Downstream changes in patterns of deposition. Changes in channel bed and habitat type Mitigation Measures Minerals which are to be extracted will get replenished in every monsoon season so the project will not change the existing land use pattern. In order to prevent the environmental degradation of leased mine area and its surroundings, the following measures shall be taken,

4 No mining near the banks upto 1/10 th of its width, i.e. from 5 to 6 meters shall be resorted to. Mining shall be undertaken to a depth of one meter only. Minimal damage to the flora standing on the river bank. Check dams are constructed in order to check the land degradation. Movement of the vehicles on the road will be increased; however, non-metaled road leading to minerals from mining area will be sprinkled with water at regular intervals. In addition to prevent spillage by tractor trolley, over loading should be controlled along with speed limit. 1.3 WATER ENVIRONMENT Impacts on Water Environment Mining of Sand, Stone & Bajri from river bed has no permanent and direct impact on the physico-chemical characteristics. These characteristics includes in stream roughness elements, depth, velocity, turbidity, sediment transport and stream discharge. Altering these characteristics can have negative impacts on both in-stream biota and associated riparian habitat. The mining will confine to central part of river bed, away from banks. Thus mining would channelize the river flow. The detrimental effects, if any, to biota resulting from bed material mining are caused by following: i. Alteration of flow patterns resulting from modification of the river bed. ii. An excess of suspended sediment. iii. Damage to riparian vegetation and in-stream habitat Mitigation measures The major source of surface water pollution due to mining is negligible, however, the following measures shall be undertaken to prevent water pollution. A: Surface Water Drains and their Catchments will be constructed just beside the access roads so 2

5 that the storm water gets settled before flowing to the river. The washing of trucks and tractor trolleys in the river will be avoided and disposal of domestic waste in the water body will be prevented. B: Ground Water There would not be any adverse effect on the ground water quality. The mineral formation does not contain any harmful element, which could percolate into the ground and pollute the ground water. Mining will be done up to the depth of 1 meter bgl or below ground water table whichever comes first. It ensured that the project will not intercept the ground water table. The mining will be undertaken during dry seasons. One day monitoring of the ground water in lease area:- Ground water monitoring result S.N Parameters Result Standard limits Desirable limits permissible limits (in absence of better alternate source) 1 ph Value No Relaxation 2 Chloride as Cl- 1 (mg/l) Total hardness as CaCO3(mg/L) Total Dissolved Solids (mg/l) Electrical Conductivity (µs/cm) Sulphate as SO4 2- (mg/l) Iron (mg/l) < No Relaxation 8 Color (Hazen) < Odour (Agreeable) Agreeable Agreeable Agreeable 10. Calcium as Ca (mg/l) Magnesium as Mg (mg/l) Fluoride (mg/l) < Alkalinity(as CaCO3) Zinc as (Zn Zn) < Nitrate as (NO3) No Relaxation 3

6 16 Copper as (Cu) < Escherichia coli Absent Absent/ Coliform Bacteria Absent absent/ All the parameters are well within the standard limits prescribed by CPCB guidelines One day monitoring of the water (surface water and ground water) in lease area:- Surface water monitoring result Sr. No. Parameters Result Tolerance limit As per CPCB (Class-B) 1 ph Value Electrical Conductivity (ms) Chloride(as Cl) Total Hardness (as CaCO3) Total Dissolved Solids Sulphate(SO4) Dissolved Oxygen (mg/l) Chemical Oxygen Demand (mg/l) 8 Biological Oxygen Demand(mg/L) 9 Faecal Coliform <1600/100ml Total Coliform <1600/100ml 11 Fluoride (as F) All the parameters are well within the standard limits prescribed by CPCB guidelines 1.4 AIR ENVIRONMENT Impacts on Air Environment Emission of fugitive dust is envisaged due to: I. Mining Activities includes extraction of minerals. The whole process will be done II. manually. No blasting material is to be used. Therefore the dust generated is likely to be insignificant as compared to other mining processes. Transportation of minerals will be done by road using trucks. Fugitive dust emission is expected from the transportation of trucks on the haul roads. 4

7 III. Details of tractor & trolleys to be deployed for mining operation is given below. Max Yearly Production IV TRAFFIC ITENSITY TPA (Sand, Stone & Bajri) No. of working days Per day production Truck capacity No. of trips Working hours per days No. of trucks deployed/hr 280 Days 335 tonnes/day 9 tonnes 37 trips each/day 8 hours 4-5 trucks/hr Mitigation Measures The major source of dust generation is the transport of material by trucks and tractor trolleys. Adequate control measures shall be taken during mining operations as well as transportation of minerals. The following steps shall be adopted to prevent air pollution due to airborne dust. The only air pollution sources are the road transport network of the trucks. The dust suppression measures like water sprinkling will be done on the un-metaled part of the haul road. Utmost care will be taken to prevent spillage of Sand, Stone & Bajri from the trucks and materials will be covered with tarpaulin sheet. Overloading will be prevented. Plantation activities in consultation with local competent authority along the roads will also reduce the impact of dust in the nearby villages. One day monitoring of the air environment in lease area:- S.No. Parameters Result Standard Limits (NAAQS) 1. Particulate Matter PM(2.5) µg/m Particulate Matter PM(10) µg/m Nitrogen Oxides as NO2 µg/m Sulphur Oxides as SO2 µg/m

8 All the parameters are well within the standard limits (NAAQS) prescribed by CPCB. 1.5 NOISE ENVIRONMENT Impacts on Noise Environment The proposed mining activity is manual in nature. No drilling & blasting is proposed for this mining activity. Hence the only impact is anticipated is due to movement of vehicles deployed for transportation of minerals. About 4-5 truck trips would be required for transporting mined material per working day from mining area to crusher Mitigation Measures The following control measures shall be taken to keep the ambient noise levels well within limits: Minimum use of horns and speed limit of 10 kms in the village area. Only PUC certified vehicles will be used for transportation purpose. The dedicated tipper truck would be properly and regularly undergo maintenance so as to create minimum noise. Special care would be taken to properly maintain the silencers of the vehicles. A thick belt of broad leaf trees, bushes and shrubs would be planted near the banks of Khad to screen the noise and stabilize the banks. One day monitoring of the noise environment in lease area:- S. No. Location Avg Day noise Avg night noise Noise standard by level level CPCB(Industrial Area) 1. Project Site Response Leq in Response Leq in Limits in Limits in db (A) db (A) db(a)leq in db(a)leq in Daytime night time BIOLOGICAL ENVIRONMENT Impacts on Biological Environment The mining activity will have insignificant effect on the existing flora and fauna. The purpose of the project itself is to save the flora around the project area from river 6

9 widening, excessive erosion and floods. It was found that the mining activity will not have any significant impact on the biological environment of the region Mitigation Measures There is a requirement to establish a stable ecosystem with both ecological and economic returns. To minimize of soil erosion and dust pollution and enhances the beauty of the core and the buffer zone, plantation of suitable plant fast growing endemic species are proposed along the haulage road side for Mangifera indica, Dalbergia sissoo, Azadirachta indica, Cassia fistula, Syzygium cumini, Bauhinia variegata etc. The basic objectives of plantations are as follows:- Improvement of Soil quality Quick vegetative cover to check soil erosion Improvement in river bank stability Conservation of biological diversity Provide forage and browse for wild life 1.7 SOLID WASTE MANAGEMENT: Impacts of Solid Waste Generation Nominal amount of domestic waste will be generated at the mine site by the workers which will be disposed-off by municipal way no plantation is possible within this area. However, plantation can be taken up along the P W D road, with the consent of the P W D authorities. Clay and Silt mixture will be used for plantation by fast growing endemic species like Mangifera indica, Dalbergia sissoo, Azadirachta indica, Cassia fistula, Syzygium cumini, Bauhinia variegata etc along the haulage road sides. The entire mining lease area falls within river course and gets flooded during monsoons; therefore, no plantation is possible within this area PROPOSED SET UP Keeping the utility the implementation of the environmental management program in view, an organizational structure is proposed which will be responsible for: 7

10 a. Collecting water and air samples from surrounding area and work zone for monitoring the levels of pollutants. b. Implementing the control and protective measures. c. Co-coordinating the environment related activities within the project as well as with outside agencies. d. Monitoring the progress of implementation of environmental management program. 1.8 BUDGET ALLOCATION FOR EMP IMPLEMENTATION Annual budget for EMP is very essential for successful implementation of EMP. As there are no pollution control systems, no capital cost of Pollution Control systems are envisaged. Costs will be annual operating costs as given below. 1.9 Occupational Health & Safety TABLE: - COST OF EMP S.NO TITLE CAPITAL COST RS IN LAKHS RECURRING COST RS IN LAKHS 1. Monitoring of Air, Water, Soil, etc twice a year Air Pollution Control- Management of Haulage Roads including Sprinkling. Tractor trolley with sprinkler 3. Plantation Occupational Health Measures Provision of PPE, First Aid and other miscellaneous expenditure. Total Occupational safety and health (OSH) also commonly referred to as occupational health and safety (OHS) or workplace health and safety (WHS) is an area concerned with the safety, health and welfare of people engaged in work or employment CORPORATE SOCIAL RESPONSIBILITY (CSR) PLAN AND BUDGET CSR Activity The deponent will construct two toilets separate for male & Female at Balmiki Basti Location Near the mine site Paonta Sahib, Himachal Pradesh 8

11 Install two solar light at Balmiki Basti Cost of implementation 1,00,000 Annual maintenance cost for 6000*5=30,000 five years Total 1,30,000 ************************** 9

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN EMP 1 INTRODUCTION In each of the areas of impact, measures have to be taken to reduce potentially significant adverse impacts and where these are beneficial in nature, such impacts are to be enhanced/

More information

Environment Management Plan For B 2 Category Project

Environment Management Plan For B 2 Category Project Environment Management Plan For B 2 Category Project Project Proponent - Kirtikumar Nathubhai Shah Address - N/V Damlai, Taluka- Jhagadia District - Bharuch Near Village Taluka District Area Survey No.

More information

Environment Management Plan For B 2 Category Project

Environment Management Plan For B 2 Category Project Environment Management Plan For B 2 Category Project Project Proponent Shri Alihusen Haji Mohammadali Alirajpurwala Address - N/V Kanawant, Taluka & District - Chhotaudepur Near Taluka District Area Survey

More information

ENVIRONMENTAL MANAGEMENT PLAN PHASIGUDA SAND QUARRY. For Sri Kalu Charan Behera. Prepared By AMARESH RATH RQP/OD/076/2017

ENVIRONMENTAL MANAGEMENT PLAN PHASIGUDA SAND QUARRY. For Sri Kalu Charan Behera. Prepared By AMARESH RATH RQP/OD/076/2017 ENVIRONMENTAL MANAGEMENT PLAN OF PHASIGUDA SAND QUARRY OVER AN AREA OF 12.842 ACRE / 5.196 HA IN VILLAGE PHASIGUDA OF DIGAPAHANDI TAHASIL OF GANJAM DISTRICT OF ODISHA. For Sri Kalu Charan Behera Village

More information

MECON LIMITED RANCHI , INDIA

MECON LIMITED RANCHI , INDIA ORISSA MINING CORPORATION LIMITED BANGUR CHROMITE MINING PROJECT POST CLEARANCE ENVIRONMENTAL MONITORING REPORT FOR THE MONTH OF JULY 2011 MECON LIMITED RANCHI 834 002, INDIA 11.S2.2011 SEPTEMBER, 2011

More information

GLOBAL TECH. ENVIRO EXPERTS PVT. LTD. (FORMERLY GLOBAL EXPERTS) An ISO-9001:2008 Certified Company

GLOBAL TECH. ENVIRO EXPERTS PVT. LTD. (FORMERLY GLOBAL EXPERTS) An ISO-9001:2008 Certified Company STACK MONITORING RESULT Name of Industry & Address Date of Monitoring 08-11-17 Date of Analysis 12-11-17 Reference No Stk-05/11/17 M/s SHIVA CEMENT LIMITED: Sl. No. Parameters Cement Mill 1 Kiln (Result)

More information

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area. ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked

More information

GRAVEL & ROUGH STONE QUARRY

GRAVEL & ROUGH STONE QUARRY ENVIRONMENTAL MANAGEMENT REPORT Of GRAVEL & ROUGH STONE QUARRY Sy. No. 211 (Carved out of Sy.No.1) Tarluwada Village & Anandapuram Mandal, Visakhapatnam District, Andhra Pradesh. AREA OF MINING LEASE 23.760

More information

MECON LIMITED RANCHI , INDIA

MECON LIMITED RANCHI , INDIA ORISSA MINING CORPORATION LIMITED BANGUR CHROMITE MINING PROJECT POST CLEARANCE ENVIRONMENTAL MONITORING REPORT FOR THE MONTH OF SEPTEMBER 2011 MECON LIMITED RANCHI 834 002, INDIA 11.S2.2011 OCTOBER, 2011

More information

Mahabal Enviro Engineers Pvt. Ltd. Pollution monitoring, Engineers & Contractors in Environmental Management

Mahabal Enviro Engineers Pvt. Ltd. Pollution monitoring, Engineers & Contractors in Environmental Management PROPOSED RESIDENTIAL CUM COMMERCIAL PROJECT WITH MCGM PARKING LOT, AT LOWER PAREL, MUMBAI, MAHARASHTRA GROUND WATER ANALYSIS October, 2017 Parameter Units Sample 1 Source Location Date of collection of

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION An Environmental Management Plan (EMP) is a site-specific plan developed to ensure that all necessary measures are identified and implemented in order to protect

More information

KKB Micro Testing Labs Pvt. Ltd., , 2 nd Floor, Tarun Plaza, NFC Main Road, Krishna Nagar Colony, Moula Ali, Hyderabad, Telangana

KKB Micro Testing Labs Pvt. Ltd., , 2 nd Floor, Tarun Plaza, NFC Main Road, Krishna Nagar Colony, Moula Ali, Hyderabad, Telangana Last Amended on - Page 1 of 7 I. AIR, GASES & ATMOSPHERE 1. Ambient Air Monitoring RSPM ( PM 10) IS 5182 (Part 23): 2006 (RA ) 5 µg/m 3 to 750 µg/m 3 PM 2.5 SOP 11 dated 17.11.2014 12.5 µg/m 3 to 500 µg/m

More information

Environmental Management Plan. For Mining of. Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village,

Environmental Management Plan. For Mining of. Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village, Environmental Management Plan For Mining of Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village, Palakurthy Mandal, Peddapally District, Telangana State Applicant Sri

More information

Action Plan along with the budgetary allocation for the queries raised in the public hearing is given below:

Action Plan along with the budgetary allocation for the queries raised in the public hearing is given below: 7.1 PUBLIC CONSULTATION Public hearing was conducted on 04 th Oct 2016, at Stone crusher site of M/s Sukker Stone Crusher, for mining of riverbed (production capacity 106875 TPA) at Khasra No. 1324 situated

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN At Narmada River Mining Project:-Category B2 Lease Area: 20.000 Hect. Khasra No. 735 Vill.-Boras, Tehsil- Udaipura District- Raisen (M.P) Project Proponent M/s Shiva Corporation

More information

DHANWADA CRUSHER STONE QUARRY

DHANWADA CRUSHER STONE QUARRY ENVIRONMENT MANAGEMENT PLAN FOR Mining of Crusher Stone Area 1.910 Hect, Kh. No. 95 AT Village: Dhanwada, Tehsil: Khirkiya, Dist: Harda (MP) Proponent Shri Atul Kumar Agrawal S/o- Shri Ashok Agrawal Resi-

More information

ENVIRNOMANTAL ANAGEMENT PLAN KUAKHAI RIVER SAND

ENVIRNOMANTAL ANAGEMENT PLAN KUAKHAI RIVER SAND ENVIRNOMANTAL ANAGEMENT PLAN OF KUAKHAI RIVER SAND IN VILLAGE NARANPUR OF BARANG TAHASIL OF CUTTACK DISTRICT OF ODISHA.. For Smt Sukanti Sahoo, W/o Nirmala Sahoo, At - Bidyadharpur, Po - Nayabazar, Ps

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF ALAMPUR THIKARIYA SAND DEPOSIT QUARRY KHASRA NO. 149, TOTAL AREA- 8.0 Hect. (MALENI RIVER) AT VILLAGE- ALAMPUR THIKARIYA, TEHSIL-JAORA, DISTRICT- RATLAM, STATE-MADHYA PRADESH

More information

Annex 7.1 National Ambient Air Quality Standards for Nepal, 2003

Annex 7.1 National Ambient Air Quality Standards for Nepal, 2003 Annex 7.1 National Ambient Air Quality Standards for Nepal, 2003 Parameters Units Averaging Time TSP (Total Suspended Particulars) Concentration in Ambient Air, maximum Test method µg/m 3 Annual - 24-hours*

More information

ANNEXURE- II Proposed TOR

ANNEXURE- II Proposed TOR ANNEXURE- II Proposed TOR Annexure II Terms of Reference for EIA for Setting up of Ligno-Cellulosic Biomass based second generation (2G) Ethanol Bio-Refinery with capacity of 100 KLPD at village-sainjani,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN VILLAGE - KUNDLA TEHSIL - NAGDA DISTRICT - UJJAIN STATE - MADHYA PRADESH KHASRA NO. - 574 AREA - 8.00 Hectare PRODUCTION - 98800 cu.m/ Year PREPARED UNDER RULE 42 C OF MP MINOR

More information

Risk Assessment Nagla

Risk Assessment Nagla Risk and Hazards HAZARD Major Risks involved in River Bed Mining are following: 1. River Bed Inundation 2. Soil Erosion 3. Disturbance of Ground water Level 4. Damage of River bank due to access of Ramps

More information

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING 1. Name and Address of Quarry Lease Holder: a. Name of applicant Priyesh Singh Thakur S/o Shri Karan Singh Thakur b. Designation of applicant Owner c. Name

More information

Environmental Management Plan. For Mining of. Building Stone & Road Metal

Environmental Management Plan. For Mining of. Building Stone & Road Metal Environmental Management Plan For Mining of Building Stone & Road Metal Over an extent of 5.65 Ha at Survey No. 427,428 & 429 Alladurg Village, Alladurg Mandal, Medak District, Telangana State Lessee M/s

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Pathari Basouda : Basouda : Vidisha (M.P.) : 2.00 Hectare : Stone KHASRA No : 177/1/2 PRODUCTION CAP : 10000 Cu.mt/year Stone APPLICANT

More information

Piplyakamil Murrum Quarry located at Khasra No 90/2, near Village Piplyakamil, Tehsil- Dharampuri, District Dhar M.P

Piplyakamil Murrum Quarry located at Khasra No 90/2, near Village Piplyakamil, Tehsil- Dharampuri, District Dhar M.P 1. INTRODUCTION The project namely Piplyakamil Murrum Quarry having an area of 2.0 ha at Khasra No.- 90/2 near Village- Piplyakamil Tehsil- Dharampuri, District-Dhar, State-Madhya Pradesh belongs to Shree

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. EXECUTIVE SUMMARY: The mining lease located at near Mauza & Mohal Paonta, Tehsil Paonta Sahib, District Sirmour, Himachal Pradesh. The lease has been sanctioned in favours of

More information

ENVIRONMENTAL MANAGEMENT REPORT COLOUR GRANITE MINE

ENVIRONMENTAL MANAGEMENT REPORT COLOUR GRANITE MINE ENVIRONMENTAL MANAGEMENT REPORT Of COLOUR GRANITE MINE Sy. No.Old: 52/2B1 (New 52/2B1) of Peddavelagatur Village, Peddapanjani Mandal,Chittor District, Andhra Pradesh AREA OF MINING LEASE 5.70 Ha. For

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN A. Attach a note on the status of baseline information with regard to the following: To identify with the interrelationship between the eco-friendly quarry operations and

More information

Larsen & Turbo Limited ENVIRONMENTAL MANAGEMENT PLAN

Larsen & Turbo Limited ENVIRONMENTAL MANAGEMENT PLAN ` Larsen & Turbo Limited The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plans for which the

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN For BUILDING STONE AND M SAND QUARRY Sri. N.C. Prasanna Kumar #663, Somanahalli Maddur Taluk Mandya District - 571429 Prepared by SMS ENVOCARE LIMTED # 301, 3 RD FLOOR, SHRESHTA

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Krishna Construction Company AT Khasra No.1046 Vill.-Pipalya Hamir, Tehsil-Barod, District-Agar Malwa (M.P.) Production Capacity: 40000 Cu.mt Crusher Stone for 18 Months

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1.0. INTRODUCTION: The proposed M/s. Ordinary sand Mine of Shree Ramjibhai samjibhai Gujarati Area at near village Survey No.Bhadar River Bed, Vill.

More information

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R. WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.Global Granites Production Granite Black Granits At Survey

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

EMP ENVIRONMENTAL MANAGEMENT PLAN FOR BUILDING STONE QUARRY M/S. SIDDARTHA STONE CRUSHING INDUSTRIES Sy.No. 1118/4, Bangaramakki Bengre II Village, Bh

EMP ENVIRONMENTAL MANAGEMENT PLAN FOR BUILDING STONE QUARRY M/S. SIDDARTHA STONE CRUSHING INDUSTRIES Sy.No. 1118/4, Bangaramakki Bengre II Village, Bh EMP ENVIRONMENTAL MANAGEMENT PLAN FOR BUILDING STONE QUARRY M/S. SIDDARTHA STONE CRUSHING INDUSTRIES Sy.No. 1118/4, Bangaramakki Bengre II Village, Bhatkal Taluk, Uttara Kannada District PREPARED BY SMS

More information

Panasonic India Pvt. Ltd.

Panasonic India Pvt. Ltd. Panasonic India Pvt. Ltd. December-2014 FOR Industrial Building of Panasonic India Ltd At Jhajjar, Haryana 1 Details of Environmental Monitoring INTRODUCTION M/s Panasonic India Pvt Ltd granted its Environmental

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

EnvironmEntal management Plan

EnvironmEntal management Plan EnvironmEntal management Plan FOR BORAGAM SAND QUARRY Lease Area: 5.018 Ha. / 12.40 Acres of Sri Padman Kumar Bisoi S/o- Motising Bisoi At/ Po- Kerla, Tahasil Kodinga, Dist. Nabarangpur, Odisha Prepared

More information

ToR Letter No. SEIAA/AP/ANT/ Dated Monitoring Period : October 2016 to December Applicant

ToR Letter No. SEIAA/AP/ANT/ Dated Monitoring Period : October 2016 to December Applicant EXECUTIVE SUMMARY of Proposed Quartz Mine (30.667 Ha.) with a Production of 91,125 TPA at Sy. No. 410, D.Cherlopalli Village, Bathalapalli Mandal, Anantapur District, Andhra Pradesh. ToR Letter No. SEIAA/AP/ANT/2015-3568

More information

Dt:18/04/2016. Dear Sir,

Dt:18/04/2016. Dear Sir, Dt:18/04/2016 Dear Sir, As per amendment to EIA notification S.O. no. 141(E) dated 15.01.2016, this is a minor mineral mining project of marble and the proposal falls under cluster situation for which

More information

Salient Features of Mining Mining is proposed by opencast manual method. Estimated Mineable Reserves: Hard/Lumps Iron ore = 5, 33,940 tonnes.

Salient Features of Mining Mining is proposed by opencast manual method. Estimated Mineable Reserves: Hard/Lumps Iron ore = 5, 33,940 tonnes. EXECUTIVE SUMMARY INTRODUCTION Agaria Iron Ore mine is situated in village Agaria, Tehsil- Sihora, District Jabalpur of Madhya Pradesh State. The mining lease period was for 20 years w.e.f 06.03.1987 to

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Parsen : Gwalior : Gwalior (M.P.) : 3.345 Hectare : Stone KHASRA No : 4154 PRODUCTION CAP : 50,000 Cu.mt/year (avg.) Stone APPLICANT

More information

Discipline Chemical Testing Issue Date Certificate Number T-3790 Valid Until Last Amended on - Page 1 of 5

Discipline Chemical Testing Issue Date Certificate Number T-3790 Valid Until Last Amended on - Page 1 of 5 Last Amended on - Page 1 of 5 AT LABORATORY I. WATER 1. Drinking Water, Colour IS 3025 (Part 4): 1983 (RA 2002) Spectrometer method 2120C Odour IS 3025 (Part 5): 1983 (RA 2002) 2 Hazen units to 500 Hazen

More information

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0. ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan Building Stone (Granite), Khandas & Gitti, Boulder Mining Project Gata No. 989, Khand No. 10 Area 1.61 Ha.(4.0 Acre) Village Makrbai, Tehsil Mahoba, District Mahoba, Uttar

More information

ENVIRONMENT MANAGEMENT PLAN. For Excavation of Brick Earth (Total Mining Area Ha.) (for Manufacturing of Bricks)

ENVIRONMENT MANAGEMENT PLAN. For Excavation of Brick Earth (Total Mining Area Ha.) (for Manufacturing of Bricks) ENVIRONMENT MANAGEMENT PLAN For Excavation of Brick Earth (Total Mining Area 2.121 Ha.) (for Manufacturing of Bricks) By M/s Bhagwati Eth (bzv) Udyog Village Shokanangla, Pargana & Tehsil Bazpur, District-

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

Submitted by: M/s Panasonic India Ltd

Submitted by: M/s Panasonic India Ltd Environmental Monitoring Report (June-2014) FOR Industrial Building of Panasonic India Ltd At Jhajjar, Haryana Submitted by: M/s Panasonic India Ltd INDUSTRIAL PLOT NO-1, VILLAGE- BID DADRI JHAJJAR (HARYANA)

More information

Annexure - I. Name of the Project Proponent District Mining Officer, Nashik Name of District Nashik. Latitude / Longitude

Annexure - I. Name of the Project Proponent District Mining Officer, Nashik Name of District Nashik. Latitude / Longitude Annexure - I Information with respect to the name of Project Proponent, location of sand ghat along with survey number, Gat number, Khasra number and all point latitude, longitude (geographic location)

More information

ENVIRONMENT MANAGEMENT PLAN OF KHAIRA SAND QUARRY

ENVIRONMENT MANAGEMENT PLAN OF KHAIRA SAND QUARRY ENVIRONMENT MANAGEMENT PLAN OF KHAIRA SAND QUARRY Production of Sand 5,001m 3 /Annum (Max) OVER AN AREA OF 14.00ACRES OR 5.665HA. IN VILLAGE- KHAIRA UNDER TANGI- CHOUDWAR TAHASIL OF CUTTACK DISTRICT OF

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

EIA Report for ha Bhatia Limestone Mine EXECUTIVE SUMMARY

EIA Report for ha Bhatia Limestone Mine EXECUTIVE SUMMARY EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 Introductions The lease area is being hold by M/s KJS Cement Ltd, and Pawan Kumar Ahluwalia is the Managing Director and correspondence address is M/s KJS

More information

APPENDIX I PROPOSED TERMS OF REFERENCE

APPENDIX I PROPOSED TERMS OF REFERENCE APPENDIX I PROPOSED TERMS OF REFERENCE 1. Environment Impact Assessment/Environment Management Plan document shall be in accordance with the provisions & generic structure stipulated in the EIA Notification

More information

Project Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006

Project Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006 Name of the Project: North North Naubasta Limestone Mine (ML 2) (A unit of M/s Jaiprakash Associates Limited) of Mining Capacity 1.85 MTPA at villages Naubasta, Sumeda, Atrauli and Garhwa Tehsil Huzur

More information

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED HALF YEARLY PROGRESS REPORT ON IMPLEMENTATION OF ENVIRONMENTAL CLEARANCE CONDITION BY MoEF (PERIOD FROM OCTOBER 13 TO MARCH 14) HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED SIX MONTHLY

More information

V: PROJECT SCOPING & METHODOLOGY

V: PROJECT SCOPING & METHODOLOGY V: PROJECT SCOPING & METHODOLOGY 5.0 INTRODUCTION The scoping exercise is carried out to define the focus and scope of the EIA Study. The scoping exercise is required to understand the type of activities

More information

ENVIPRO Laboratories, 2nd Floor, Sy. No. 63/4, Site No. 5, P&T Layout Road, Ashwath Nagar, Srigandhada Kaval, Sunkadakatte, Bangalore, Karnataka

ENVIPRO Laboratories, 2nd Floor, Sy. No. 63/4, Site No. 5, P&T Layout Road, Ashwath Nagar, Srigandhada Kaval, Sunkadakatte, Bangalore, Karnataka Certificate Number TC-6325 Page 1 of 5 Range ing / CHEMICAL TESTING I. WATER 1. Surface Water, Ground Water, Industrial Water, Drinking Water, Irrigation Water, Water From Purifiers & Swimming Pool Water

More information

ENVIRONMENTAL MANAGEMENT

ENVIRONMENTAL MANAGEMENT ENVIRONMENTAL MANAGEMENT PLAN RAJBANDH STONE DEPOSIT VILLAGE Rajbandh POLICE STATION MALPAHARI DISTRICT PAKUR STATE JHARKHAND AREA 9.00 ACRES (3.64 HA) PRODUCTION RATE 338850 TPA PROJECT PROPONENT M/S

More information

Scanned by CamScanner

Scanned by CamScanner Scanned by CamScanner ENVIRONMENT STATEMENT (FORM V) Udaipur Cement Works Limited Daroli Limestone Mine-1 YEAR 2017-18 Udaipur Cement Works Limited SHRIPATINAGAR, P.O. CFA: DABOK, DISTRICT UDAIPUR (RAJASTHAN)-313021

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

Environmental Management Plan Report

Environmental Management Plan Report Environmental Management Plan Report DUMERDIHI SAND QUARRY Over an area of 12.547 Ac/5.078 Ha in Village Dumerdihi, Nuapada Tahasil, Nuapada District. Odisha 2015-16 To 2019-20 CHAPTER 1 1. ENVIRONMENTAL

More information

The study area covers 10 km radius around the existing coal washery premises. The environmental setting of the expansion plant site is as follows:

The study area covers 10 km radius around the existing coal washery premises. The environmental setting of the expansion plant site is as follows: 1.0 EXECUTIVE SUMMARY 1.1 Introduction M/s Mahavir Benefication Pvt. Ltd. (MBPL) proposes expansion of its coal washery from 1.0 MTPA to 5.0 MTPA capacity at Dhiroul Village, Anuppur District, Madhya Pradesh

More information

Discipline Chemical Testing Issue Date Certificate Number T-3553 Valid Until Last Amended on - Page 1 of 9

Discipline Chemical Testing Issue Date Certificate Number T-3553 Valid Until Last Amended on - Page 1 of 9 Last Amended on - Page 1 of 9 I. ORES & MINERALS 1. Iron Ore Total Iron IS 1493: 1981 (RA 2006) 10 % to 70 % Silicon IS 1493: 1981 (RA 2006) 0.5 % to 25 % Aluminum IS 1493: 1981 (RA 2006) 0.5 % to 20 %

More information

Point wise compliance for the conditions stipulated in Environmental Clearance of (Phase- I & II)

Point wise compliance for the conditions stipulated in Environmental Clearance of (Phase- I & II) SIX MONTHLY ENVIRONMENTAL COMPLIANCE STATUS REPORT (PERIOD : OCT, 2017 to MARCH, 2018) Ref: J-13011/23/2007-IA-II (T) Dated: 17/07/2007 (as amended in the Year, 2013 & 2014) and J-13011/46/2007-IA-II (T)

More information

EXECUTIVE SUMMARY. Dec 2017 PREPARED BY

EXECUTIVE SUMMARY. Dec 2017 PREPARED BY Dec 2017 OF M/S. SAINT GOBAIN GLASS INDIA LTD (Mining of silica sand) Sri SN. Eisenhower, Director, Plot 98, APIIC, Near Integrated Check Post, Karur Village, Tada 524401, Nellore District Site Address

More information

Environmental Clearance Maliparbat Bauxite Mines-Compliance Report Page 2

Environmental Clearance Maliparbat Bauxite Mines-Compliance Report Page 2 A. Specific Conditions: (i) All the conditions stipulated by the State Pollution Control Board in their consent to establish should be effectively implemented. Submission: Implementation is ongoing. (ii)

More information

EXECUTIVE SUMMARY. Latitude N to Longitude E to EIA of Badari Limestone Mine of Shri Ashok Kr.

EXECUTIVE SUMMARY. Latitude N to Longitude E to EIA of Badari Limestone Mine of Shri Ashok Kr. EXECUTIVE SUMMARY INTRODUCTION Shri Ashok Kumar Dubey S/o Late Shri Gorelal Dubey and Smt Vidya Devi Dubey, Abhinav Kumar Dubey & Shri Akchai Kumar Dubey resident of Nadipar, P.O.and District Katni of

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

CORPORATE OFFICE BUILDING, C-11, URBAN ESTATE-II CITY CENTRE SECTOR 29, GURUGRAM, HARYANA

CORPORATE OFFICE BUILDING, C-11, URBAN ESTATE-II CITY CENTRE SECTOR 29, GURUGRAM, HARYANA ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan () would consist of all mitigation measures for each component of the environment due to the activities increased during the, operation and the

More information

Mining is being carried out keeping safe distance from seasonal nallah/ stream.

Mining is being carried out keeping safe distance from seasonal nallah/ stream. Name of the Project : Gurha East Lignite Mine Project (1MTPA) of M/s. V.S. Lignite Power Private Ltd. Located at village- Gurha, Kolayat, Bikaner, Rajasthan. Project Code : Raj-456/753/09 Clearance Letter

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN BANKUCHIA STONE DEPOSIT VILLAGE POLICE STATION DISTRICT STATE AREA PRODUCTION RATE BANKUCHIA PATAMDA EAST SINGHBHUM JHARKHAND 29.00 ACRES (11.74 HA) 854755 TPA PROJECT PROPONENT

More information

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005 Name of the Project: Naubasta Limestone Mine ( A Unit of M/s Jaiprakash Associates Limited ) for Expansion of Mining Capacity from 3.3 MTPA to 4.0 MTPA at villages Atrauli, Gadhwa, Kachoor, Naubasta, Kauadhan,

More information

A. SPECIFIC CONDITIONS. No. Conditions Status of Compliance. Noted and Agreed

A. SPECIFIC CONDITIONS. No. Conditions Status of Compliance. Noted and Agreed Status of compliance as on 1 st March, 2015 (Period :, 2014 March 2015) to the conditions stipulated in Environmental clearance granted by MoEF vide letter No:- J- 11015/42/2005-IA-II(M) Dated 18 th May

More information

Environmental Management Plan. For Mining of. Rough Stone & Road Metal

Environmental Management Plan. For Mining of. Rough Stone & Road Metal Environmental Management Plan For Mining of Rough Stone & Road Metal Over an extent of 6.53 Ha at Survey No.312/1 of Ramalingampalli (V), Bommalaramaram (M), Yadadri Bhuvangairi (D), Telangana State. Lessee

More information

EXECUTIVE summary. Khasra No. Area Ownership/Occupancy Hects. Govt. Land

EXECUTIVE summary. Khasra No. Area Ownership/Occupancy Hects. Govt. Land EXECUTIVE summary 11.1 PROJECT DESCRIPTION has been granted Mining lease over an extent of 8.09 Ha in village Tihai, District Satna, Madhya Pradesh for a period of 20 years with effect from 22.11.1995

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan () would consist of all mitigation measures for each component of the environment due to the activities increased during the construction and

More information

ENVIRONMENTAL MONITORING REPORT BASED ON DATA GENERATED FROM OCTOBER 2016 MARCH 2017 FOR OCL INDIA LIMITED At/Po: RAJGANGPUR, District: SUNDARGARH, ODISHA AT LANJIBERNA LIMESTONE & DOLOMITE MINES PROJECT

More information

Project Details - Riverbed Sand Mining Project

Project Details - Riverbed Sand Mining Project Project Details - Riverbed Sand Mining Project Sr. N Details Particulars PROPOSAL 1. Name of Lease Holder Mrs. Lataben Shaileshbhai Oad (Proprietor) 2. Location address M/s. Shaileshbhai Ramanbhai Oad

More information

1 Name of the Project Gonua Iron & Mn. Mine of Sri Pawan Kumar Ahluwalia

1 Name of the Project Gonua Iron & Mn. Mine of Sri Pawan Kumar Ahluwalia HALF YEARLY PROGRESSIVE CLEARANCE ACCORDED BY THE MINISTRY OF ENVIRONMENT & FOREST, GOVT. OF INDIA, TO THE PROJECT EXPANSION OF GANUA IRON & MN. MINE OF SHRI PAWAN KUMAR AHLUWALIA (FROM 0.140 MTPA TO 0.36

More information

SCHEDULE I LIST I GENERAL STANDARDS AND CRITERIA FOR THE DISCHARGE OF INDUSTRIAL EFFLUENTS INTO INLAND SURFACE WATERS

SCHEDULE I LIST I GENERAL STANDARDS AND CRITERIA FOR THE DISCHARGE OF INDUSTRIAL EFFLUENTS INTO INLAND SURFACE WATERS SCHEDULE I LIST I GENERAL STANDARDS AND CRITERIA FOR THE DISCHARGE OF INDUSTRIAL EFFLUENTS INTO INLAND SURFACE WATERS UNIT TOLERANCE LIMIT NO. PARAMETER TYPE OF LIMIT VALUES 01 Total suspended solids mg/1,

More information

Prakruti Environmental Engineers (Environmental Laboratory), 1, Utkanth Society, B/H Alkapuri Club, Alkapuri, Vadodara, Gujarat

Prakruti Environmental Engineers (Environmental Laboratory), 1, Utkanth Society, B/H Alkapuri Club, Alkapuri, Vadodara, Gujarat Prakruti Environmental Engineers (Environmental ), Last Amended on - Page 1 of 7 I. WATER 1. Water (Ground Water/ Surface Water/ Drinking Water/ Treated Water) ph APHA 4500-H + B, Temperature APHA 2550

More information

Attachment 1 WORLD BANK ENVIRONMENT, HEALTH AND SAFETY GUIDELINES 1 MINING AND MILLING UNDERGROUND (INTERIM)

Attachment 1 WORLD BANK ENVIRONMENT, HEALTH AND SAFETY GUIDELINES 1 MINING AND MILLING UNDERGROUND (INTERIM) TAILINGS DISPOSAL Attachment 1 WORLD BANK ENVIRONMENT, HEALTH AND SAFETY GUIDELINES 1 MINING AND MILLING UNDERGROUND (INTERIM) Tailings must be disposed of in a manner that optimizes protection of human

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MINING PROJECT LOCATED AT TIKKA/ MOHAL SACHUHI, MAUJA JANGAL RAJGIR TEHSIL SUJANPUR, DISTRICT HAMIRPUR IN KHASRA NO 6, 7, 8 AND 9 MEASURING 04-84-35 HACTARES (126 03 KANALS) FOR

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Metal Stone Area 2.000 Hectare, Khasra No. 1127/1 Village Tehsil District State AT KHILCHIPUR KHILCHIPUR RAJGARH MADHYA PRADESH Proponent SHRI ALTAF KHA S/O SHRI

More information

DRAFT TERMS OF REFERENCE FOR EIA STUDY

DRAFT TERMS OF REFERENCE FOR EIA STUDY Four laning of Balaghat - Gondia Section of NH 54 from km 0.000 to km 48.070 (Package-1A & Package-1B) under Bharatmala Pariyojana in the State of Madhya Pradesh and Maharashtra DRAFT TERMS OF REFERENCE

More information

Nichrome Testing Laboratory and Research Private Limited, No nd Main, German Hospital Road, Narayanpur, Dharwad, Karnataka

Nichrome Testing Laboratory and Research Private Limited, No nd Main, German Hospital Road, Narayanpur, Dharwad, Karnataka Last Amended on - Page 1 of 9 I. WATER 1. Drinking Water Colour 2120 B 1 to 100 Hazen Units ph 4500 H+, B 3 to 12 Electrical conductivity 2510 B 5 to 10,000 µs/cm Turbidity 2130 B 1 to 100 NTU Chloride

More information

Nexus Test Labs Pvt. Ltd., No. 29, 2 nd Floor, 3 rd Cross, Singaiahnapalya, Mahadevapura, Bangalore, Karnataka

Nexus Test Labs Pvt. Ltd., No. 29, 2 nd Floor, 3 rd Cross, Singaiahnapalya, Mahadevapura, Bangalore, Karnataka Certificate Number TC-5069 (in lieu of T-3362 & T-3363) Page 1 of 17 Range ing / BIOLOGICAL TESTING I. WATER 1. Drinking Water R.O. Water, Ground Water, Surface Water, Treated Water. 2. Waste Water/ Effluents

More information

Promoter: Navkar Prime Developers Private Limited ENVIRONMENTAL MANAGEMENT PLAN & CER

Promoter: Navkar Prime Developers Private Limited ENVIRONMENTAL MANAGEMENT PLAN & CER ENVIRONMENTAL MANAGEMENT PLAN & CER 52 ENVIRONMENTAL & SOCIAL MANAGEMENT PLAN 1.1 INTRODUCTION: The Environmental impact can be defined as any alteration of environmental conditions, adverse or beneficial,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 23 23 23 15 ` For GUDUWADHAR RIVER SAND DEPOSIT QUARRY LEASE AREA (1.60 HA) VILLAGE : GUDUWADHAR TEHSIL : KUSHMI DISTRICT : SIDHI STATE : MADHYA PRADESH LEASE AREA : 1.60 HECTARES

More information

ANACON LABORATORIES PVT. LTD. 1

ANACON LABORATORIES PVT. LTD. 1 1.1 HINDALCO INDUSTRIES LIMITED (Hindalco) is one among the flagship companies of the Aditya Birla Group of Industries and is one of the largest corporate groups in India. This group is a leading manufacturer

More information

ADITYA BIRLA. EMil. Please find enclosed herewith the environmental statement report duly filled-in Form-V

ADITYA BIRLA. EMil. Please find enclosed herewith the environmental statement report duly filled-in Form-V / ADITYA BIRLA EMil Ref. No. EMILIGEOLI '35, 12017-18 Date-07.09.2017 0V The Member Secretary, State Pollution Control Board, Odisha Department of Forests ft Environment, Govt. of Odisha, Paribesh Bhawan,

More information

Gurha PF - NNE - 7.0km 11. Nearest major city with Nil population within 10km radius 12. Nearest Town / City within 10km radius

Gurha PF - NNE - 7.0km 11. Nearest major city with Nil population within 10km radius 12. Nearest Town / City within 10km radius EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 Introductions Capacity expansion of existing granite quarry (6.0 ha) is proposed, which is operational at village- Kathara, Tehsil- Lovekush Nagar & Dist.

More information

ENVIRONMENTAL AUDIT REPORT [STATEMENT] CONSTRUCTION WORK [ HALF YEARLY ] PERIOD OCTOBER 2012 TO MARCH 2013 FOUNDRY PARK

ENVIRONMENTAL AUDIT REPORT [STATEMENT] CONSTRUCTION WORK [ HALF YEARLY ] PERIOD OCTOBER 2012 TO MARCH 2013 FOUNDRY PARK ENVIRONMENTAL AUDIT REPORT [STATEMENT] ON CONSTRUCTION WORK [ HALF YEARLY ] PERIOD OCTOBER 2012 TO MARCH 2013 FOUNDRY PARK HOULI BAGAN, RANIHATI AMTA ROAD, HOWRAH Prepared by: FOUNDRY CLUSTER DEVELOPMENT

More information

NOC GRANTED FOR THE EXPANSION OF KASHLOG LIMESTONE MINES OF AMBUJA CEMENTS TIMITED

NOC GRANTED FOR THE EXPANSION OF KASHLOG LIMESTONE MINES OF AMBUJA CEMENTS TIMITED Sr. STIPULATION ACTION No. 2A. Specific Conditions (i) (ii) All the conditions stipulated by the State Pollution Control Board in their Consent should be effectively implemented. The project proponent

More information

[FORM-V] PART-A PART-B

[FORM-V] PART-A PART-B [FORM-V] (See Rule 14) Environment Statement for the financial year ending the 31 st March 2015 PART-A (1) Name and address of the owner - M/s. Serajuddin and Co. / Occupier of the industry, Balda Block

More information

NMDC Limited Arki Limestone Project, Post: Arki, Tehsil: Arki, District: Solan, H.P.

NMDC Limited Arki Limestone Project, Post: Arki, Tehsil: Arki, District: Solan, H.P. NMDC Limited Arki Limestone Project, Post: Arki, Tehsil: Arki, District: Solan, H.P. Sub: Ref: Period: Six Monthly Environmental Progress Report Environmental clearance no: No.J-11015/82/2009-IA.II(M),