ENVIRONMENT MANAGEMENT PLAN
|
|
- Myrtle Newman
- 5 years ago
- Views:
Transcription
1 ENVIRONMENT MANAGEMENT PLAN
2 ENVIRONMENT MANAGEMENT PLAN 1.0. INTRODUCTION: The proposed M/s. Ordinary sand Mine of Shree Ramjibhai samjibhai Gujarati Area at near village Survey No.Bhadar River Bed, Vill. Bhola, Tal.Dhoraji, Dis.Rajkot, (Gujarat) has been granted to Ramjibhai samjibhai Gujarati. Vill. Bhola, Tal.Dhoraji, Dis.Rajkot, (Gujarat). Applied area ha. Proposed production 24,000 TPA The Ordinary sand mine near Bhola, is a hub for Ordinary sand extraction. The Ordinary sand industry is a thriving industry because of profile use of Ordinary sand in building industry. The project is aimed at producing Ordinary sand slabs from the lease mine. The mining methodology consists of carving up blocks of dimensions with help of loader, in this method there is a reject of 95% of the production and about 05% of the yield is usable. Climate date From Secondary Sources The M/s. Ordinary sand Mine of Shree Ramjibhai samjibhai Gujarati area is situated in district Rajkot. Rajkot has semi-arid climate, with hot, dry summers from mid-march to mid- June and the wet monsoon season from mid-june to oct., when the city receives 500 mm of rain on average. The months from November to February are mild, the average temperature being around 20 C, with low humidity. During summer time, the temperature ranges between 24 C and 42 C. In the months of winter, Rajkot temperature varies between 10 C and 22 C but on a whole winters are pleasant.
3 Flora & Fauna No forests land the area. It is entirely a private Ag. Land. No endangered Species found in the core zone, so no adverse impact on the flora & Fauna. Since, there are no endangered spices of flora & fauna observed in core zone. The environmental Management plan has been developed with a view to bring down the levels of impacts as discussed in the last chapter within limits. In each of the areas of impact, measures have to be taken to reduce potentially significant adverse impacts are to be enhanced/ augmented so that the overall adverse impacts are reduced to as low level as possible. The mining in the area has been proposed with time bound management plan so that impacts on different environmental parameters are minimized at every stage of mining. Measures to be taken for each of the impact areas are detailed in the following para: Air Environment Water Environment Noise Environment Reclamation & Rehabilitation of lands Discharge of Effluents Corporate Social Responsibilities Risk assessment & Disaster Management Plan
4 2.0. ENVIRONMENT IMPACT & MEASURES 2.1. AIR ENVIRONMENT Anticipated impacts The opencast mining operations are generally prone to generation of high levels of PM and to a limited extent SO2, NOx due to fossil fual based vehicles and machines etc. Air pollution due to SO2, NOx and PM may result in irritation and inflammation of eyes and congestion of throat and infection in lungs Mitigation Measures: In addition to the above the following measures will be adopted:- 1. Water spraying on the roads for suppression of dust. 2. Development of green belt. 3. Water sprinklers will be sprayed at all loading / transfer points. 4. Wet cutting will be adopted. 5. PPE will be provided to the workers. 6. To control the emissions regular preventative maintenance of equipment will be carried out WATER ENVIRONMENT Anticipated impacts No impact on the surface water resources is envisaged. The rain water accululates in the area, which will be used for dust suppression and plantation purpose. The ground water table in this region range from m from the surface level. Due to mining, ground water will not intersect in this project. Since no chemicals or explosives are used for mining of building Limestone, there is no source of contaminants that can contaminate surface waters or the ground waters Mitigation Measures There is not the case with this lease, as mineral or soil does not contain any harmful ingredients that could leach to the water table. Thus the area working shall not affect the ground water quality.
5 The impact of mining on ground water is not anticipated; therefore measures are not required LAND ENVIRONMENT Anticipated impacts In open cast mining, the top crust of earth i.e. top soil/sub soil is completely removed below which are mineral deposits. The earth rock and other strata, called O/B are completely removed to provide access to the mineral deposit. In this manner land use pattern of an area always changes in the form of voids formed due to excavation of mineral. Topography of the surrounding area will remain unchanged. The drainage pattern due to proposed mining will not be disturbed within core zone as well as buffer zone. The thickness of the top soil is 1.0 m, it shall be scrapped and stack at separate place and will be used for plantation Mitigation measures The mining area will be affected to the land environment. The excavated area will be backfilled for aesthetic purpose at the life of area. The top soil will be stack at separate earmarked site and use for the plantation NOISE ENVIRONMENT Anticipated impacts As far as noise pollution is concerned, Limestone mining does not contribute much to noise pollution, except the noise generated from stone cutter. Noise level in the working environment is compared with the standards prescribed by central pollution control board which will be adopted and enforced by the govt. of india through the noise pollution (Regulation and control) Rules, 2000 The exposures to excessive noise levels can lead to: Prevention of sleep, insomnia & fatigue. Decrease in speech reception, communication, disturbance and diminished concentration thus adversely affecting job performance efficiency. Irreparable psychological disturbance including impaired hearing Mitigation measures Mitigate the noise level following control measures will be adopted:-
6 1. Periodical monitoring of noise will be done. 2. Regular and proper maintenance of noise generating machinery. 3. Proper PPE in form of earplugs and safety eye wear shall be provided to workers working with the stone cutter and those in immediate vicinity of it. 4. Plantation in applied area will also reduce propagation of noise outside the core zone. 5. Green belt shall provide at the lease periphery, within the applied area BIOLOGICAL ENVIRONMENT No forests land the area. It is entirely a private Ag. Land. No endangered species found in the applied area, so no adverse impact on the flora & fauna. Since, there are no endangered spices of flora & fauna observed in core zone as well as buffer zone. Therefore, measures are not required. 2.5Socio-Economic The impact of mining on social demographic profile is positive because displacements of habitat are not involved in this project. Bhola project will generate rural employment. The mining activities in the area will raise economic status of the mine workers. 2. ENVIRONMENTAL MANAGEMENT PLAN IMPLEMENTATION Environmental Management plan serves no purpose if it is not implemented with true spirit. Thus, an implementation and monitoring program has to be prepared. Implementation of proposed control measures and monitoring programmed has an implementation on the surrounding area as well as for the region. Therefore mining management should be strengthening the existing control measures implemented within the sandstone mining area relating to the following specific areas. Collection of air and water samples at strategic location with frequency suggested and by analyzing thereof. If the parameters exceed the permissible tolerance limits, corrective regulation measure should be taken. Collection of soil samples at strategic locations once in a year and analysis thereof with regard to deleterious constituents, if any.
7 Regular visual examination will be carried out to look for possibilities of erosion. Any abnormal condition, if observed should be taken care of. Measurement of noise levels at mine site, stationary and mobile sources, and adjacent villages will be done. Plantation will be done as per program i.e. along the boundary ENVIRONMENTAL OFFICER Environmental professional should be hired to implement the environment management plan. The officer shall ensure the suitability, adequacy and effectiveness of the environment management programme:- Environmental officer will be responsible for proper maintenance and operation of the programme and it will oversee the following aspect: Conduct environmental awareness program to the workers, supervisory staff and contract laborers during the mining and operation period. Regularly monitor the environmental parameters and prepare reports as required by the GPCB. Recommend necessary measures to improve environmental conditions. Conduct safety program to create safety awareness among workers/staff. Train the staff and other workers on safety measures and conduct safety drills to educate them. Environmental officer will be in regular touch with state pollution control board and state mining department and send them annual progress report. Any new regulations considered by state/central pollution control board for the building stone mining would be taken care of PROPOSED SET UP The Environmental professional/ officer will be responsible for: Liaison with environment monitoring laboratory for collecting and analyzing water and air samples from surrounding area and work zone monitoring for pollutants. Implementing the control and protective measures. Co-coordinating the environment related activities within the project as well as with outside agencies.
8 Collecting statistics of health of workers and population of surrounding villages. Monitoring the progress of implementation of environmental management program. Greenbelt development along the area.
Proposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from
More informationENVIRONMENT MANAGEMENT PLAN FOR STONE MINING
ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING 1. Name and Address of Quarry Lease Holder: a. Name of applicant Priyesh Singh Thakur S/o Shri Karan Singh Thakur b. Designation of applicant Owner c. Name
More informationEnvironmental Management Plan
Environmental Management Plan Building Stone (Granite), Khandas & Gitti, Boulder Mining Project Gata No. 989, Khand No. 10 Area 1.61 Ha.(4.0 Acre) Village Makrbai, Tehsil Mahoba, District Mahoba, Uttar
More informationENVIRONMENTAL MANAGEMENT PLAN
ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION An Environmental Management Plan (EMP) is a site-specific plan developed to ensure that all necessary measures are identified and implemented in order to protect
More informationOverburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.
ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN OF ALAMPUR THIKARIYA SAND DEPOSIT QUARRY KHASRA NO. 149, TOTAL AREA- 8.0 Hect. (MALENI RIVER) AT VILLAGE- ALAMPUR THIKARIYA, TEHSIL-JAORA, DISTRICT- RATLAM, STATE-MADHYA PRADESH
More informationPRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:
PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.
More informationM/s.NEERAJ KUMAR JAIN
EXECUTIVE SUMMARY OF DARSHANI LATERITE AND RED OCHRE DEPOSIT Area : 15.00 Ha. Village Budhanwara, Tahsil Bohriband, Dist. Katni MADHYA PRADESH For M/s.NEERAJ KUMAR JAIN KATNI 1 BUDHANWARA LATERITE AND
More informationPiplyakamil Murrum Quarry located at Khasra No 90/2, near Village Piplyakamil, Tehsil- Dharampuri, District Dhar M.P
1. INTRODUCTION The project namely Piplyakamil Murrum Quarry having an area of 2.0 ha at Khasra No.- 90/2 near Village- Piplyakamil Tehsil- Dharampuri, District-Dhar, State-Madhya Pradesh belongs to Shree
More informationRisk Assessment Nagla
Risk and Hazards HAZARD Major Risks involved in River Bed Mining are following: 1. River Bed Inundation 2. Soil Erosion 3. Disturbance of Ground water Level 4. Damage of River bank due to access of Ramps
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN VILLAGE - KUNDLA TEHSIL - NAGDA DISTRICT - UJJAIN STATE - MADHYA PRADESH KHASRA NO. - 574 AREA - 8.00 Hectare PRODUCTION - 98800 cu.m/ Year PREPARED UNDER RULE 42 C OF MP MINOR
More informationENVIRONMENT MANAGEMENT PLAN. For Excavation of Brick Earth (Total Mining Area Ha.) (for Manufacturing of Bricks)
ENVIRONMENT MANAGEMENT PLAN For Excavation of Brick Earth (Total Mining Area 2.121 Ha.) (for Manufacturing of Bricks) By M/s Bhagwati Eth (bzv) Udyog Village Shokanangla, Pargana & Tehsil Bazpur, District-
More informationEnvironment Management Plan For B 2 Category Project
Environment Management Plan For B 2 Category Project Project Proponent - Kirtikumar Nathubhai Shah Address - N/V Damlai, Taluka- Jhagadia District - Bharuch Near Village Taluka District Area Survey No.
More informationEnvironment Management Plan For B 2 Category Project
Environment Management Plan For B 2 Category Project Project Proponent Shri Alihusen Haji Mohammadali Alirajpurwala Address - N/V Kanawant, Taluka & District - Chhotaudepur Near Taluka District Area Survey
More informationGRAVEL & ROUGH STONE QUARRY
ENVIRONMENTAL MANAGEMENT REPORT Of GRAVEL & ROUGH STONE QUARRY Sy. No. 211 (Carved out of Sy.No.1) Tarluwada Village & Anandapuram Mandal, Visakhapatnam District, Andhra Pradesh. AREA OF MINING LEASE 23.760
More informationHind Energy & Coal Beneficiation (India) Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to
More informationENVIRONMENTAL MANAGEMENT PLAN
ENVIRONMENTAL MANAGEMENT PLAN BANKUCHIA STONE DEPOSIT VILLAGE POLICE STATION DISTRICT STATE AREA PRODUCTION RATE BANKUCHIA PATAMDA EAST SINGHBHUM JHARKHAND 29.00 ACRES (11.74 HA) 854755 TPA PROJECT PROPONENT
More informationHINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED
HALF YEARLY PROGRESS REPORT ON IMPLEMENTATION OF ENVIRONMENTAL CLEARANCE CONDITION BY MoEF (PERIOD FROM OCTOBER 13 TO MARCH 14) HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED SIX MONTHLY
More informationDHANWADA CRUSHER STONE QUARRY
ENVIRONMENT MANAGEMENT PLAN FOR Mining of Crusher Stone Area 1.910 Hect, Kh. No. 95 AT Village: Dhanwada, Tehsil: Khirkiya, Dist: Harda (MP) Proponent Shri Atul Kumar Agrawal S/o- Shri Ashok Agrawal Resi-
More informationFORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A
(I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process
More informationPRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location
1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease
More informationLimestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report
Limestone Mining Project (Area: 16.18 ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For MINING ACTIVITY CATEGORY B2 UNDER
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name
More informationTable 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others
1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines
More informationPramod S. Kambli. Page 1
PREFEASIBILITY STUDY FOR SHREE. PRAMOD S. KAMBLI Page 1 Executive summary Shree.., has laterite stone quarry in an area 2.61 Ha in the survey No. 1091 With quarrying capacity of 10259.31 TPA. The major
More informationENVIRONMENT MANAGEMENT PLAN
EMP 1 INTRODUCTION In each of the areas of impact, measures have to be taken to reduce potentially significant adverse impacts and where these are beneficial in nature, such impacts are to be enhanced/
More informationPROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.
PROJECT BRIEF PROJECT LOCATION: - Pahar Kua Marble Range Mining Project Q L No 235 is located near village Pahar Kua, Tehsil Makrana., District Nagaur Rajasthan. Project is approachable from national highway.
More informationCONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999
(No. JPBN. 1509/27 Vol. II CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999 In exercise of the powers conferred by section 5 of the Conservation
More informationV: PROJECT SCOPING & METHODOLOGY
V: PROJECT SCOPING & METHODOLOGY 5.0 INTRODUCTION The scoping exercise is carried out to define the focus and scope of the EIA Study. The scoping exercise is required to understand the type of activities
More informationProject Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006
Name of the Project: North North Naubasta Limestone Mine (ML 2) (A unit of M/s Jaiprakash Associates Limited) of Mining Capacity 1.85 MTPA at villages Naubasta, Sumeda, Atrauli and Garhwa Tehsil Huzur
More informationEnvironment Management Plan
Environment Management Plan Environmental Impact Assessment Statement describing the impact of mining and beneficiation on environment on the following: i) Land area indicating the area likely to be degraded
More informationProject Details-Minor Minerals (Sand Stone)
Project Details-Minor Minerals (Sand Stone) Sr.No. Details Particulars PROPOSAL 1. Name of Lease Holder Singhal Maladebhai Nebhabhai 2. Location address At Village : Rajthali, Ta : Wankaner, Dist : Morbi.
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-
More informationENVIRONMENTAL MANAGEMENT
ENVIRONMENTAL MANAGEMENT PLAN RAJBANDH STONE DEPOSIT VILLAGE Rajbandh POLICE STATION MALPAHARI DISTRICT PAKUR STATE JHARKHAND AREA 9.00 ACRES (3.64 HA) PRODUCTION RATE 338850 TPA PROJECT PROPONENT M/S
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Parsen : Gwalior : Gwalior (M.P.) : 3.345 Hectare : Stone KHASRA No : 4154 PRODUCTION CAP : 50,000 Cu.mt/year (avg.) Stone APPLICANT
More informationCMPDI. 4.6 Mine Closure Plan
4.6 Mine Closure Plan Post-mining Land Use Planning The mine closure planning with regard to for Lekhapani OCP will broadly involve the following aspects: 1. Technical Aspects 2 Environmental Aspects 2.
More informationENVIRONMENT MANAGMENT PLAN
ENVIRONMENT MANAGMENT PLAN DETAIL OF MINE- NAME OF MINERAL SANDSTONE (FURSHI PATTHAR) MINING LEASE FOR FINISHED SANDSTONE VILLAGE PARASWAHA, TEHSEEL JABERA DISTRICT - DAMOH KHASRA NO. 22/1, AREA 1.0 HECTARE
More informationHind Energy & Coal Beneficiation (India) Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh
More informationShree Swami Samarth Stone Crusher
PREFEASIBILITY STUDY FOR SHREE SWAMI SAMARTH STONE CRUSHER. Sadekar Enviro Engineers Pvt. Ltd Page 1 Executive summary Shree Swami Samarth Stone Crusher. has been granted a quarrying over an area 1.00
More informationM/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA
1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which
More informationEXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION
EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,
More informationPeriod of Compliance Report : April, 2017 to September, 2017
Name of the Project Project Code Clearance Letter No. with date : OSTAPAL CHROMITE MINES, M/S. FACOR LTD. : Mining (Non-Coal) : No. J-11015/183/2007-IA-II (M) dt.13-05-09 Period of Compliance Report :
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Pathari Basouda : Basouda : Vidisha (M.P.) : 2.00 Hectare : Stone KHASRA No : 177/1/2 PRODUCTION CAP : 10000 Cu.mt/year Stone APPLICANT
More informationPRE-FEASIBILITY REPORT OF SAND QUARRY
PRE-FEASIBILITY REPORT OF SAND QUARRY Survey No Village Taluka District Lease area : 1 Paiki : Marigana : Anjar, : Kutch, Gujarat, : 2.00 Ha. Submitted to MINISTRY OF ENVIRONMENT & FORESTS STATE LEVEL
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN At Narmada River Mining Project:-Category B2 Lease Area: 20.000 Hect. Khasra No. 735 Vill.-Boras, Tehsil- Udaipura District- Raisen (M.P) Project Proponent M/s Shiva Corporation
More informationName of Project: Panchagavi Laterite Mine, M/s J.K. Cement Works, Muddapur (Karnataka)
Panchagavi Laterite Mine, Village- Panchagavi, Taluka-Ramdurg, District- Belgaum, Karnataka Ref: - MoEF Letter No. SEIAA 107 MIN 2014 dtd. 24th December 2014 Compliance Report for the period from October
More informationMODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.
MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT -12.00 Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.NO - 129 & 131OF SHINGATALOOR - VILLAGE MUNDARGI - TALUK GADAG - DISTRICT
More informationReport on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan
Report on 1. PROJECT LOCATION & LAND USE The Ganesh Park 3 is a residential building project constructed on plot 608 to 613/5 Vil: GIDC Ankleshwar in Bharuch district of Gujarat state. The project land
More information2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given.
PROPOSED TERMS OF REFERENCES (A) Suggested by the Applicant 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED
More informationFROM I, PRE FEAsIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN FOR. M/s. BUILDING LIME stone MINE OF KARIBEN MAsARIBHAI BARIYA AREA
FROM I, PRE FEAsIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN FOR M/s. BUILDING LIME stone MINE OF KARIBEN MAsARIBHAI BARIYA AREA (survey NO. 50/2 PAIKI 1 AND 51/1 PAIKI 2, VILL. MADHAVPUR(GHED), TAL. &
More informationEnvironmEntal management Plan
EnvironmEntal management Plan FOR BORAGAM SAND QUARRY Lease Area: 5.018 Ha. / 12.40 Acres of Sri Padman Kumar Bisoi S/o- Motising Bisoi At/ Po- Kerla, Tahasil Kodinga, Dist. Nabarangpur, Odisha Prepared
More informationENVIRONMENTAL MANAGEMENT PLAN
INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN An environmental management plan (EMP) has been prepared for the proposed construction of commercial project to minimize negative impacts and is formed on the
More informationNMDC Limited Arki Limestone Project, Post: Arki, Tehsil: Arki, District: Solan, H.P.
NMDC Limited Arki Limestone Project, Post: Arki, Tehsil: Arki, District: Solan, H.P. Sub: Ref: Period: Six Monthly Environmental Progress Report Environmental clearance no: No.J-11015/82/2009-IA.II(M),
More informationHINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES
HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES Maton Rock Phosphate Mine of M/s HZL is proposing
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN OF Shri Krishna Construction Company AT Khasra No.1046 Vill.-Pipalya Hamir, Tehsil-Barod, District-Agar Malwa (M.P.) Production Capacity: 40000 Cu.mt Crusher Stone for 18 Months
More informationGUIDELINES FOR PREPARATION OF MINE CLOSURE PLAN
Preamble : GUIDELINES FOR PREPARATION OF MINE CLOSURE PLAN 1. The Central Government vide Notification No. GSR 329 (E) dated 10.04.2003 and No. GSR 330 (E) dated 10.04.2003 amended the Mineral Concession
More informationChapter- V MANAGEMENT PLAN (EMP)
Chapter- V MANAGEMENT PLAN (EMP) The Environment Management Plan (EMP) for a development project prescribes the mitigation measures to be adopted to nullify or to minimize various anticipated environment
More informationTerms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P
Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P SITUATED AT KAKKUR VILLAGE KOZHIKODE TALUK KOZHIKODE DISTRICT KERALA STATE EXTENT: 2.0437 Ha STANDARD TERMS OF REFERENCE (TOR)
More information4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:
4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:
More information1.0 The Need for EIA. (a) the project proponent; (b) the regulatory agencies; and, (c) all stakeholders and interest groups.
1.0 The Need for EIA Every anthropogenic activity has some impact on the environment. More often it is harmful to the environment than benign. However, mankind as it is developed today cannot live without
More informationLarsen & Turbo Limited ENVIRONMENTAL MANAGEMENT PLAN
` Larsen & Turbo Limited The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plans for which the
More informationMATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES
MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES Environmental / Social issue/ aspect/ activity Anticipated negative impact Management and mitigation
More information1 Name of the Project Gonua Iron & Mn. Mine of Sri Pawan Kumar Ahluwalia
HALF YEARLY PROGRESSIVE CLEARANCE ACCORDED BY THE MINISTRY OF ENVIRONMENT & FOREST, GOVT. OF INDIA, TO THE PROJECT EXPANSION OF GANUA IRON & MN. MINE OF SHRI PAWAN KUMAR AHLUWALIA (FROM 0.140 MTPA TO 0.36
More informationProject Details-Minor Minerals (Blacktrap)
Project Details-Minor Minerals (Blacktrap) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name of Lease Holder Shri Ram Stone Crusher Co. 2. Location Address At Village : Bhopalka, Ta : Kalyanpur, Dist
More informationJ.K. Cement WORKS, NIMBAHERA (RAJ)
A. SPECIFIC CONDITIONS : J.K. Cement WORKS, NIMBAHERA (RAJ) Compliance report of Environment Clearance for Nimbahera - Ahirpura Lime Stone Mine (For the Period from April 2013 to September 2013) Reference
More informationEIA-EMP REPORT GRAVEL QUARRY (Category-B2)
EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar
More informationWELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.
WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.Global Granites Production Granite Black Granits At Survey
More informationProject Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005
Name of the Project: Naubasta Limestone Mine ( A Unit of M/s Jaiprakash Associates Limited ) for Expansion of Mining Capacity from 3.3 MTPA to 4.0 MTPA at villages Atrauli, Gadhwa, Kachoor, Naubasta, Kauadhan,
More informationDeccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II
Status of Environmental Clearances received from MOEF vide MoEF No.J- 11015/497/2007-IA II(M) dated 18.10.2007-Bhavanipuram Limestone Mine 2 (73.93.11 Ha), as on September 2018 1. Compliance reports are
More informationENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.
ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920
More informationIntroduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and
Introduction There are many tools that a reviewer of environmental impact assessment documents can use to help determine whether such documents are complete and adequate. Among the powerful tools that
More information(A govt. of Kerala Undertaking)
Annexure - 1 Basic Information Important Note: Please send the information by e-mail in word format and a signed & scanned copy to the Member Secretary prior to the EAC meeting. Please also provide a copy
More informationDeccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II
Status of Environmental Clearances received from MOEF vide MoEF No.J- 11015/497/2007-IA II(M) dated 18.10.2007-Bhavanipuram Limestone Mine 2(73.93.11 Ha), as on March 2017 1. Compliance reports are enclosed
More informationAnnex F Scoping Checklist
Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve
More informationPROJECT PARTICULARS. Lease address - Village panchayat - Nara, Tahsil -Kanker, Name of the proponent - Village panvhayat Nara
PROJECT PARTICULARS Name of the project - Sand mining Lease address - Village panchayat - Nara, Tahsil -Kanker, Dist Kanker (C.G.) Khasra No. - 1025 Sand mining area - 5.00 Hectares Name of the mineral
More informationAPPENDIX- I FORM- 1. (I) Basic Information:
(I) Basic Information: APPENDIX- I FORM- 1 Item Details 1. Name of Project Sand Stone Mining Project, M.L..-08/1987, Area 150.926 Ha., located n/v -Gubrenda, Tehsil -Karauli, District Karauli, (Rajasthan)
More informationSMARA Reclamation Standards Review
SMARA Reclamation Standards Review Focused Discussion SMARA Section 3704.1 - Performance Standards for Reclamation and Section 2711 Extraction of Minerals Essential to Well-Being of the State and the Needs
More informationProject Details - Riverbed Sand Mining Project
Project Details - Riverbed Sand Mining Project Sr. N Details Particulars PROPOSAL 1. Name of Lease Holder Mrs. Lataben Shaileshbhai Oad (Proprietor) 2. Location address M/s. Shaileshbhai Ramanbhai Oad
More informationMining is being carried out keeping safe distance from seasonal nallah/ stream.
Name of the Project : Gurha East Lignite Mine Project (1MTPA) of M/s. V.S. Lignite Power Private Ltd. Located at village- Gurha, Kolayat, Bikaner, Rajasthan. Project Code : Raj-456/753/09 Clearance Letter
More informationENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan () would consist of all mitigation measures for each component of the environment due to the activities increased during the construction and
More informationPREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR
PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR AT VILLAGE:- BRAHMPURI, TALUKA:- Sayla, DIST.:-Surendranagar 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE
More informationChapter MINERAL EXTRACTION AND MINING OPERATIONS
Chapter 17.31 MINERAL EXTRACTION AND MINING OPERATIONS Sections: 17.31.010 Purpose 17.31.020 Procedure for Extraction and Rehabilitation Requests 17.31.030 Operation and Rehabilitation Standards for all
More informationROADS: OPERATION AND MAINTENANCE
ROADS: OPERATION AND MAINTENANCE GEMS Environmental Compliance- ESDM Training Series Kabul July / August 2016 8/1/2016 1 ROADS AND DEVELOPMENT Improved access = benefits across economic sectors Service
More informationSTONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)
Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL
More informationAction Plan along with the budgetary allocation for the queries raised in the public hearing is given below:
7.1 PUBLIC CONSULTATION Public hearing was conducted on 04 th Oct 2016, at Stone crusher site of M/s Sukker Stone Crusher, for mining of riverbed (production capacity 106875 TPA) at Khasra No. 1324 situated
More informationFlorida Department of Environmental Protection. Bureau of Mining and Minerals Regulation. Regulation of Mines. Howard J. Hayes, Program Administrator
Florida Department of Environmental Protection Bureau of Mining and Minerals Regulation Regulation of Mines Howard J. Hayes, Program Administrator April 2011 What is a mine? Nonphosphate mine: Subsections
More informationMINING REGULATIONS IN FOREST AND ECO-FRAGILE AREAS A PRESENTATION BY RAJEEVA, IFS, ADDITIONAL PRINCIPAL CHIEF CONSERVATOR OF FORESTS.
MINING REGULATIONS IN FOREST AND ECO-FRAGILE AREAS A PRESENTATION BY RAJEEVA, IFS, ADDITIONAL PRINCIPAL CHIEF CONSERVATOR OF FORESTS. MINERAL RESOURCES IN INDIA The mineral resources in India consist of
More informationPre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)
Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) 1) Executive Summary Project Name of Company / Mine Owner Location Village Taluka District State Girgita Limestone Mine M/s KJS
More informationNOC GRANTED FOR THE EXPANSION OF KASHLOG LIMESTONE MINES OF AMBUJA CEMENTS TIMITED
Sr. STIPULATION ACTION No. 2A. Specific Conditions (i) (ii) All the conditions stipulated by the State Pollution Control Board in their Consent should be effectively implemented. The project proponent
More informationPre- Feasibility RepoRt
Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY
More informationEXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT
EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged
More informationENVIRONMENTAL MONITORING REPORT
ENVIRONMENTAL MONITORING REPORT BASED ON DATA GENERATED FROM APRIL 2018 SEPTEMBER 2018 FOR OCL INDIA LIMITED At/Po: RAJGANGPUR, District: SUNDARGARH, ODISHA AT LANJIBERNA LIMESTONE & DOLOMITE MINES PROJECT
More informationCORPORATE OFFICE BUILDING, C-11, URBAN ESTATE-II CITY CENTRE SECTOR 29, GURUGRAM, HARYANA
ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan () would consist of all mitigation measures for each component of the environment due to the activities increased during the, operation and the
More informationShri MANOJ VASANT ALKUNTE
Executive summary Shri Manoj Vasant Alkunte has been granted quarrying lease over an area 4.7500 Ha. In the Survey no. 43/1, 43/2, 43/3, 43/4, 44/7, 44/12 and 44/13 and the lease period is for 5 years
More informationRegulation of Mines In South Florida
Florida Department of Environmental Protection Bureau of Mining and Minerals Regulation Regulation of Mines In South Florida Howard J. Hayes, Program Administrator February 8, 2011 What is a mine? Nonphosphate
More informationScanned by CamScanner
Scanned by CamScanner ENVIRONMENT STATEMENT (FORM V) Udaipur Cement Works Limited Daroli Limestone Mine-1 YEAR 2017-18 Udaipur Cement Works Limited SHRIPATINAGAR, P.O. CFA: DABOK, DISTRICT UDAIPUR (RAJASTHAN)-313021
More information1. ENVIRONMENT MANAGEMENT PLAN
1. ENVIRONMENT MANAGEMENT PLAN The Environment Management Action Plan (EMP) is required to ensure sustainable development of the proposed Sewerage System in District A of Allahabad, Uttar Pradesh. The
More informationPROPOSED TERMS OF REFERENCE (TOR) FOR
PROPOSED TERMS OF REFERENCE (TOR) FOR ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR PROPOSED NEW NATIONAL HIGHWAY -NH-754K GREENFIELD ALIGNMENT SANCHORE-SANTALPUR SECTION
More informationTERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;
TERMS OF REFERENCE 1.0 PROPOSED SCOPE OF WORK FOR EIA STUDY The components of the EIA study include: Determination of baseline data using primary data generation and secondary data available from various
More information