1 PREFEASIBILITY STUDY FOR SHREE SWAMI SAMARTH STONE CRUSHER. Sadekar Enviro Engineers Pvt. Ltd Page 1

2 Executive summary Shree Swami Samarth Stone Crusher. has been granted a quarrying over an area 1.00 Ha. In the Survey No. 379, Village Kombhalne, Taluka - Akole, District- Ahmednagar, Maharashtra. Quarrying capacity of the same is /A The major highlights of the project are: The project comes under non agriculture land. Project site has proper road accessibility. No displacements of settlement are required. No sensitive places of notified archaeological, historical or tourist importance within or nearby the buffer zone. Project Description Location: The site is located at Survey No. 379, Village Kombhalne, Taluka - Akole, District- Ahmednagar, Maharashtra. The site is accessible from SH-44 at a distance of Km. Land: The land comes under mining area approved by the government of Maharashtra. Therefore no need of human displacement is needed in the project area. The land provided for stone mining is 1.00 hectare to the project proponent. Co-ordinate: The coordinates of the plant site are latitude 19 36'34.58"N and longitude 73 54'36.33"E. Water: Water requirement of the project will be met through the water tanker and borewell which is existing in the human settlement area. Company does not exploit any other water resources or ground water; therefore no adverse impact is anticipated on water environment. The water requirement is estimated to be maximum of 2000 lit/day. Electric Supply: The power requirement for the project will be Nil. Project Cost: The total cost of the project including all facilities is estimated to be INR 45 lakhs. Sadekar Enviro Engineers Pvt. Ltd Page 2

3 Location: The project site falls under the district of Ahmednagar. Ahmednagr is the largest district of Maharashtra State with geographical area of Sq. km., which is 5.66% of area of Maharashtra State. Out of total areas sq. km. is urban area and remaining 16,656.5 sq. k. m. is rural area. Ahmednagar is centrally located in western Maharashtra. Topography: The Ahmednagar district is bounded on the north by Nasik district, on the north east by Aurangabad district, in the east by Beed and Osmanabad, on the south by Solapur and in the south west by Thane and Pune district. There is various land forms founds in Ahmednagar district. These different types of land forms in the region constitute its physical set-up. The physical of Ahmednagar district are the following divisionsa. Western hilly region- The main Sahyadri range touches Akola Tahsil in the western area of Ahmednagar and forms this main range three spears viz. Kalsubai, Baleshwar and Harishchandragad. Kalsubai is the highest peak of Sahyadri (1654 mtr.). b. Central plateau region- Parner, Ahmednagar Tahsil and parts of Sangamner, Shrigoda and Karjat Tahsils are included in this region. c. Northern and southern plain regions- It includes northern Koperagaon, Rahata, Shrirampur, Rahuri, Newasa, Shevgaon and Pathardi Tahsils. This is the region of the Godavari and the Pravara river basins. Parts of the southern tahsils of Shrigoda, Karjat and Jamkhed are also included in this physical division. This region covers basins of the Ghod, Bhima and the Sina rivers. Soil Quality: The entire district is occupied by basaltic lava flow, which is popularly known as the Deccan Traps. These lava flows are sometimes associated with inter-trappen beds such as lime stones, sand stones, clay shales, red bole beds, porous thin mantle of black cotton soil present almost every where on the basaltic area. According to the Dry Farming Research Station, Solapur, considering the depth of soil and other factors, only 26% of the area is suitable for double cropping while the rest is suitable only for crops like Bajra, Groundnut, Sunflower, Grasses and Plantation. Meteorology: The average annual rainfall in the district is mm. The district mostly is in rain shadow to the east of western ghats. Near the western border of the district the rainfall decreases rapidly as one proceeds towards east. But from a line roughly north-south in the central parts of the district the rainfall gradually increases towards the east. The minimum temperature in the district in cold season is approx o C. however maximum Sadekar Enviro Engineers Pvt. Ltd Page 3

4 temperatures during summer season ranges from about 38 0 C to 42.0 C. The air is generally dry during the months from February to May and particularly so in the afternoons when the humidity is about 20 per cent on the average. The relative humidity during south-west monsoon period are between 60 and 80 per cent. Thereafter they decrease rapidly. Water: Water needed for operation requirement shall be drawn from water tankers and borewell which is present in the human settlement area and not in the lease area. Ecology: No extra land will be acquired during the operation of the project there will be no adverse impact on some of the environmental aspect. In the area of the project proponent clustered green belt is found in the vicinity, hence there will not be any kind of deforestation. No rare or endangered species of flora and fauna are present in the immediate vicinity as well as the study area. Thus, there will not be any adverse impact on flora and fauna. Socio-economic: The project will provide positive impact on the economic development of the region in terms of employment opportunities. Moreover the above unit will be operating in an authorized mining land declared by the Govt. of India. Therefore no population will be displaced. Risk assessment plan Risks likely to pose threat to man, environment or property associated with various activities are addressed in this report. Such activities include transport, storage; handling and usage of fuels. All equipments vulnerable to explosion or fire would be designed to relevant IS codes and statutory regulations. Conclusion The minor mineral project of stone crushing will not have any adverse impact on the environment. Altogether the project will have a positive impact on social environment by providing employment opportunity for the skilled and unskilled labors living in the surrounding villages. Also the infrastructure around the site will be improved due to the project. Sadekar Enviro Engineers Pvt. Ltd Page 4

5 1. INTRODUCTION OF THE PROJECT 1.1 Identification of the project proponent PREFEASIBILITY REPORT Shree Swami Samarth Stone Crusher. has been granted a quarrying over an area 1.00 Ha. In the Gut No. 379, Village Kombhalne, Taluka - Akole, District- Ahmednagar, Maharashtra. Quarrying capacity of the same is / A Shree Swami Samarth Stone Crusher. has appointed M/s. Sadekar Enviro Engg. Pvt. Ltd to carry out Prefeasibility and EMP report for the existing project of their Minor Mineral Activity of the order /A. The major highlights of the project are: The project comes under non agriculture land. No displacements of settlement are required. No sensitive places of notified archaeological, historical or tourist importance within or nearby the buffer zone. 1.2 Crushing Activity No crusher installed in lease area. 1.3 Need of the Project The project proponent has proposed inclusion of Stone Crushing in the mining lease as explorations have shown that these deposits occur in the subject lease area. The proposed mining production is covered under the Ministry of Environment & Forests Notification This report of Prefeasibility & Environmental Management Plan is given here as a part of the information to be furnished to the SEAC, Govt of Maharashtra for obtaining Environmental Clearance as per office Memorandum No. L-11000/47/2011/IA-II (M) dated To meet the ever-increasing local demand for Crushed stone by the building industry and construction company the project proponent intends to produce the following quantities of crushed stones by Manual method of quarry activity. The year wise production and development details for the five years plan period are summarized in the table below. Sadekar Enviro Engineers Pvt. Ltd Page 5

6 Table No. 1: Production Plan for Five years Year I ( ) II ( ) III ( ) IV ( ) V ( ) Total Crushed Stone 12,500 Brass 1.4 Demand Supply Gap Since it is an allied industry of the construction sector, growth in construction sector may be considered as proxy for the growth in stone crushing sector, i.e. around 7-8%. Crushed stone has a very minor share among the exports of non-metallic mineral products of India. It is observed that total export volume of the crushed stone has been very low, whereas, Marble has the highest share and remained at the top. The market scope for crushed stone is found to be encouraging in local market with the increased demand from building industry & construction fields. There is also a sufficient demand from Govt. Contractors for laying of roads and construction of industries etc. The entry in the target market is easy and there is a narrow gap in the supply and demand, which is expected to grow in the coming years. The business opportunity to fill the demand and supply gap would be quite profitable. 1.5 Employment Generation The establishment of this project will improve the socio-economic status of the surrounding area by way of direct & indirect employment. The Employment opportunity will be created for skilled and specially unskilled people. Sadekar Enviro Engineers Pvt. Ltd Page 6

7 2. PROJECT DESCRIPTION 2.1 Location: Shree Swami Samarth Stone Crusher. has been granted a quarrying over an area 1.00 Ha. In the Survey No. 379, Village Kombhalne, Taluka - Akole, District- Ahmednagar, Maharashtra. Quarrying capacity of the same is / A Table No.2 SALIENT FEATURES OF LOCATION Project Site Co-ordinates Nearest Highway Nearest City Nearest Railway station Survey No. 379, Village Kombhalne, Taluka - Akole, District- Ahmednagar, Maharashtra latitude 19 36'34.58"N and longitude 73 54'36.33"E. State Highway- 44 at the site Km City Akole 12 km Lahavit Railway Station 27 km Average rainfall mm in 2011 (Source IMD ) Average temperature 38 0 C to 42.0 C Average humidity 70-80% Archaeological monument Human settlement Not present in the 10 km radius of the site. No human settlement is observed in 0.40 km around the lease area. Sadekar Enviro Engineers Pvt. Ltd Page 7

8 2.2 Land Distribution around Site The project site is having quarry area, office area and shelter provided for the workers. 2.3 Size and Magnitude of Operation The estimated cost of the project is going to be INR 45 lakhs, including a capital expenditure of INR 9.0 Lakh on environmental matters. It is expected that the recurring costs on environmental matters would be INR 90,000. The project capacity is / A 2.4 Present mining technology Four technology namely bucket wheel system, Dragline system, shovel dumper system and surface mine with pay loader system are well known for quarrying plan. Due to multi seam, abrasive sandstone, hard carb shale and many faults bucket wheel system has not been considered. Dragline system has also not been considered due to many faults. Shovel dumper system is very flexible and offer convenient mining. The project proponent is using Shovel dumper system and manual method for the quarrying of stones. Surface miner system can be considered when overburden generated can be backfilled. Surface miner system is costly; this can be the reason for its less use. 2.5 Water Sources Water is required in the project site for various purposes like spraying to control the dust generation. Water is also used during the drilling process. The water requirement will be around 2.0 CMD. The source of the water will be bore well. Table No. 3: Water Consumption Details Sr. No. Activities Demand (CMD) 1 Domestic Purpose Mine a. Drilling 0.5 b. Dust Suppression c. Equipment/Vehicle washing 3 Crushing/ Screening Dust suppression Green Belt 0.5 Total 2.0 CMD Sadekar Enviro Engineers Pvt. Ltd Page 8

9 2.6 Power Sources The power requirement of the project will be nil. 2.7 Waste Generated The possible waste generated by the mining process will be some rejection which can be used for leveling of the land. No solid or liquid waste will be generated from the mining process. 2.8 Explosive Storage Project proponent conducts explosions at site through help of licensed practioner. Hence there is no storage of explosives on the quarry site Manpower The total manpower is 10 people at the project site. Both the skilled and the unskilled labors are included. Table 4: Organization Table Sr. No Category Operative Phase 1 Administrative 2 2 Supervisory 4 3 Skilled Worker 2 4 Unskilled Worker 1 5 Security 1 Sadekar Enviro Engineers Pvt. Ltd Page 9

Shri MANOJ VASANT ALKUNTE

Shri MANOJ VASANT ALKUNTE Executive summary Shri Manoj Vasant Alkunte has been granted quarrying lease over an area 4.7500 Ha. In the Survey no. 43/1, 43/2, 43/3, 43/4, 44/7, 44/12 and 44/13 and the lease period is for 5 years

More information

Pramod S. Kambli. Page 1

Pramod S. Kambli. Page 1 PREFEASIBILITY STUDY FOR SHREE. PRAMOD S. KAMBLI Page 1 Executive summary Shree.., has laterite stone quarry in an area 2.61 Ha in the survey No. 1091 With quarrying capacity of 10259.31 TPA. The major

More information

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL

More information

SHRI.LAKSHMAN NAMDEV KOLI

SHRI.LAKSHMAN NAMDEV KOLI PRE-FEASIBILITY REPORT (PFR) FOR PROPOSED STONE QUARRY BY SHRI.LAKSHMAN NAMDEV KOLI AREA. 1.00 HA., GAT. NO. 811/2 PART, VILLAGE BASTAWADE, TAL.: TASGAON, DIST.: SANGLI PREPARED BY EQUINOX ENVIRONMENTS

More information

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1.0. INTRODUCTION: The proposed M/s. Ordinary sand Mine of Shree Ramjibhai samjibhai Gujarati Area at near village Survey No.Bhadar River Bed, Vill.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

PRE-FEASIBILITY REPORT OF SAND QUARRY

PRE-FEASIBILITY REPORT OF SAND QUARRY PRE-FEASIBILITY REPORT OF SAND QUARRY Survey No Village Taluka District Lease area : 1 Paiki : Marigana : Anjar, : Kutch, Gujarat, : 2.00 Ha. Submitted to MINISTRY OF ENVIRONMENT & FORESTS STATE LEVEL

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KATIKELA RIVER SAND BED OVER 15.00 ACRES OR 6.070 HA IN VILLAGE KATIKELA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20)

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN VILLAGE - KUNDLA TEHSIL - NAGDA DISTRICT - UJJAIN STATE - MADHYA PRADESH KHASRA NO. - 574 AREA - 8.00 Hectare PRODUCTION - 98800 cu.m/ Year PREPARED UNDER RULE 42 C OF MP MINOR

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

MODIFIED QUARRYING PLAN FOR SHINGATALOOR SAND MINING BLOCK-2 EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY. MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT -12.00 Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.NO - 129 & 131OF SHINGATALOOR - VILLAGE MUNDARGI - TALUK GADAG - DISTRICT

More information

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0. ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920

More information

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others 1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines

More information

PRE-FEASIBILITY REPORT FOR ORDINARY SAND

PRE-FEASIBILITY REPORT FOR ORDINARY SAND PRE-FEASIBILITY REPORT FOR ORDINARY SAND Proponent NISANT TRADERS At- Opp. Survey No.- 3 Panam River Area-2.50.00 Hectare Village-Ramji-ni-Nal, Taluka- Shahera Dist.- Panchmahal Mob.- +91924040782 CONTENTS

More information

CHAPTER - V OVERVIEW OF DAIRY FARMING IN AHMEDNAGAR DISTRICT Growth and development of dairy farming of Ahmednagar district

CHAPTER - V OVERVIEW OF DAIRY FARMING IN AHMEDNAGAR DISTRICT Growth and development of dairy farming of Ahmednagar district CHAPTER - V OVERVIEW OF DAIRY FARMING IN 5.1. General Introduction: 5.2. Growth and development of dairy farming of Ahmednagar district 5.3. Structure of dairy farming of Ahmednagar district. 5.4. Milk

More information

ENVIRONMENT MANAGMENT PLAN

ENVIRONMENT MANAGMENT PLAN ENVIRONMENT MANAGMENT PLAN DETAIL OF MINE- NAME OF MINERAL SANDSTONE (FURSHI PATTHAR) MINING LEASE FOR FINISHED SANDSTONE VILLAGE PARASWAHA, TEHSEEL JABERA DISTRICT - DAMOH KHASRA NO. 22/1, AREA 1.0 HECTARE

More information

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report Limestone Mining Project (Area: 16.18 ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For MINING ACTIVITY CATEGORY B2 UNDER

More information

M/s.NEERAJ KUMAR JAIN

M/s.NEERAJ KUMAR JAIN EXECUTIVE SUMMARY OF DARSHANI LATERITE AND RED OCHRE DEPOSIT Area : 15.00 Ha. Village Budhanwara, Tahsil Bohriband, Dist. Katni MADHYA PRADESH For M/s.NEERAJ KUMAR JAIN KATNI 1 BUDHANWARA LATERITE AND

More information

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND EXECUTIVE SUMMARY Kumhari Stone Mine is situated in Village - Kumhari, P.O. Basia, P.S. - Basia, District : Gumla, Jharkhand over an area of 2.02 Hectares or 5.00 Acres [ Plot no. 2085(P)]. Kumhari Stone

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVE SUMMARY 1.1 Introduction Road Metal of M/s. Lakshmi Stone Crusher covering an extent of 2.10 Ac is located at Sy. No. 379/1 of Perecherla Village, Medikonduru Mandal, Guntur District, Andhra

More information

EXECUTIVE SUMMARY. 1.1 Executive Summary

EXECUTIVE SUMMARY. 1.1 Executive Summary 1.1 Executive Summary EXECUTIVE SUMMARY Chobe ki Guwari Sand Stone Mining Project (M.L. No- 26-R-01/2001) is situated near village Chobe ki Guwari, Tehsil Sapotra, District Karoli, State Rajasthan over

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR AT VILLAGE:- BRAHMPURI, TALUKA:- Sayla, DIST.:-Surendranagar 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE

More information

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 PRE-FEASIBILITY REPORT 1. SUMMARY Project Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 Village Kudeli Taluka Baikunthpur District Koriya

More information

PRE-FEASIBILTY REPORT

PRE-FEASIBILTY REPORT Aug 2018 PRE-FEASIBILTY REPORT OF M/S. J.M.R.MINES (MINING OF FELDSPAR, QUARTZ & MICA MINE) Lease Area : 5.78 Hectares(14.29 Acres) Sy.No.941,942,943 &947 Giddalur (V), Sydapuram (M), SPSR Nellore District

More information

Agricultural Productivity of the Baramati Tahsil, Pune District (Maharashtra).

Agricultural Productivity of the Baramati Tahsil, Pune District (Maharashtra). IOSR Journal of Agriculture and Veterinary Science (IOSR-JAVS) e-issn: 2319-2380, p-issn: 2319-2372. Volume 7, Issue 5 Ver. II (May. 2014), PP 25-30 Agricultural of the Baramati Tahsil, Pune District (Maharashtra).

More information

S. No Parameter Details 1 Name & Address of the Applicant

S. No Parameter Details 1 Name & Address of the Applicant 1. EXECUTIVE SUMMARY S. No Parameter Details 1 Name & Address of the Applicant M/s AMULYA GRANITES Prop: Smt CH.SARALA H. No. FLAT NO.207 Roja Kishore Residency, Chenchupet, Tenali, AP-522 202 Guntur District,

More information

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) 1) Executive Summary Project Name of Company / Mine Owner Location Village Taluka District State Girgita Limestone Mine M/s KJS

More information

THE CONCEPT OF ORGANIC FARMING:

THE CONCEPT OF ORGANIC FARMING: INTRODUCTION : Agriculture is one of the oldest and most fundamental primary occupation of all human beings since stone age. It is a foundation of all social Cultural and Economical condition of mankind.

More information

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU PRE-FEASIBILTY REPORT OF SUNATHAR STONE QUARRY VILLAGE: Sunathar TAHASIL: Purushottampur DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU Vill/Po- Gandala, P.S.- Hinjili, Dist.-Ganjam Odisha. CONTENTS CHAPTER

More information

PREFEASIBILITY REPORT FOR BRICK EARTH MINE

PREFEASIBILITY REPORT FOR BRICK EARTH MINE Page 1 PREFEASIBILITY REPORT FOR BRICK EARTH MINE Developed By- Village-Chandauhan, Tehsil-Phulpur, District-Allhabaad, Uttar Pradesh. RAI ENVIROMENTAL SERVICES PVT. LTD. Website: www.raienviro.com Email

More information

PROJECT PARTICULARS. Lease address - Village panchayat - Nara, Tahsil -Kanker, Name of the proponent - Village panvhayat Nara

PROJECT PARTICULARS. Lease address - Village panchayat - Nara, Tahsil -Kanker, Name of the proponent - Village panvhayat Nara PROJECT PARTICULARS Name of the project - Sand mining Lease address - Village panchayat - Nara, Tahsil -Kanker, Dist Kanker (C.G.) Khasra No. - 1025 Sand mining area - 5.00 Hectares Name of the mineral

More information

The upper Pravara basin in the Akole tahsil of the Ahmednagar district, Maharashtra

The upper Pravara basin in the Akole tahsil of the Ahmednagar district, Maharashtra Methodology: Study Area: The upper Pravara basin in the Akole tahsil of the Ahmednagar district, Maharashtra (India) (figure 1) is selected for proposed study of dairy activity. The offshoots i.e. Kulangarh-Navaricha

More information

Riverbed Sand/Morrum Mining at Gata No. 747/16, Village- Patharehta, Tehsil- Kalpi, District- Jalaun, U.P. Area: 22 Acres (8.

Riverbed Sand/Morrum Mining at Gata No. 747/16, Village- Patharehta, Tehsil- Kalpi, District- Jalaun, U.P. Area: 22 Acres (8. PRE-FEASIBILITY EXECUTIVE SUMMARY Shri Vishwas Parmani S/o Shri H. Parmani is the lessee for the RBM (River Betwa) for an area of 22 Acres (8.90 Ha) in Gata No. 747/16,Village- Patharehta, Tehsil- Kalpi,

More information

Annexure - I. Name of the Project Proponent District Mining Officer, Nashik Name of District Nashik. Latitude / Longitude

Annexure - I. Name of the Project Proponent District Mining Officer, Nashik Name of District Nashik. Latitude / Longitude Annexure - I Information with respect to the name of Project Proponent, location of sand ghat along with survey number, Gat number, Khasra number and all point latitude, longitude (geographic location)

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT EXECUTIVE SUMMARY 1.0 Executive Summary The Mining lease was granted in favour of Shri Mukesh Kumar S/o Shri Harish Chandra, R/o Tatol vaya Bagra, Tehsil - Bhinmal, Dist.-Jalore

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT BANDOL CRUSHER STONE QUARRY OF SHRI TULSIRAM SAHU AT Khasra No. 15/2,23/2 Village Bandol Tehsil District State Madhya Pradesh Production Capacity 45030 M3/Year Area 3.150 Hectare

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Excavation of Brick Earth (Total Mining Area 1.112Ha.) (For Manufacturing of Bricks) Submitted By M/s New Kaptan Brick Field Shri Krishna Kr. Singh S/o Shri Brahma DevSingh Pure

More information

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd.

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd. SEIAA KARTAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd. Sl. No DOCUMENTS / X 1 Form -1 2 Pre-Feasibility Report

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF ALAMPUR THIKARIYA SAND DEPOSIT QUARRY KHASRA NO. 149, TOTAL AREA- 8.0 Hect. (MALENI RIVER) AT VILLAGE- ALAMPUR THIKARIYA, TEHSIL-JAORA, DISTRICT- RATLAM, STATE-MADHYA PRADESH

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

International Multidisciplinary e-journal ISSN

International Multidisciplinary e-journal ISSN International Multidisciplinary e-journal ISSN 2277-4262 AGRICULTURAL PROBLEMS OF WEST MAHARASHTRA (SPECIALLY AHMEDNAGAR DISTRICT) Prof. Waghmode B.M. Department of Economics S.S.G.M.College, Kopargaon

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR STONE QUARRY - 3.40 ha VILLAGE - MARSUL T. SENDURSENA, TALUKA VASMAT DISTRICT HINGOLI MR. ASHISH ASHOK KASAT ENVIRO TECHNO CONSULT PVT.LTD. 68, MAHAKALI NAGAR MANEWADA HINGOLI

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVESUMMARY 1.1 Introduction Road Metal of M/s. Venkata Ramana Stone Crusher covering an extent of 0.89 Ac is located at Sy.No.379/1 of Perecherla Village, Medikonduru Mandal, Guntur District,

More information

PRE-FEASIBILIY REPORT

PRE-FEASIBILIY REPORT BENDRI LIMESTONE QUARRY NO. - 4 3 (Quarry No. 1) (Quarry No. 1)MINERALS - DOLOMITE (LEASE PERIOD 20.05.2002 TO 19. 05.2022) LEASE AREA - 42.754 HECTARES MINING PROJECT - CATEGORY- B PRE-FEASIBILIY REPORT

More information

PRE FEASIBILITY REPORT. PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent

PRE FEASIBILITY REPORT. PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent PRE FEASIBILITY REPORT PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent M/s Veet Rag Homes Pvt. Ltd. 267, Ganesh Phadnavis Bhavan,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN At Narmada River Mining Project:-Category B2 Lease Area: 20.000 Hect. Khasra No. 735 Vill.-Boras, Tehsil- Udaipura District- Raisen (M.P) Project Proponent M/s Shiva Corporation

More information

Project Details-Minor Minerals (Blacktrap)

Project Details-Minor Minerals (Blacktrap) Project Details-Minor Minerals (Blacktrap) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name of Lease Holder Shri Ram Stone Crusher Co. 2. Location Address At Village : Bhopalka, Ta : Kalyanpur, Dist

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Smt. J N Rukmini, has applied for extracting of Building stone in Sy No. 40, Kuroda Bore Kavala village, Hassan Taluk & District, Karnataka over an extent

More information

GEOGRAPHICAL STUDY OF A NATURAL FOREST IN SOLAPUR DISTRICT OF MAHARASHTRA, INDIA

GEOGRAPHICAL STUDY OF A NATURAL FOREST IN SOLAPUR DISTRICT OF MAHARASHTRA, INDIA GEOGRAPHICAL STUDY OF A NATURAL FOREST IN SOLAPUR DISTRICT OF MAHARASHTRA, INDIA G.U. Todkari* 1 and B. D. Patil 2 1. Shri Snat Damaji Collage, Mangalwedha, Solapur, M.S., (INDIA) 2. Vidyan Mhahavidhalaya,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT Page 0 of 14 EXECUTIVE SUMMARY The proposed project of 24.0 Ha or 59.28 Acre area is of stream bed sand mining and falls under Category- B1 as per EIA Notification 2006 amended till

More information

FORM-I. 13. Name of Applicant District Collector Nasik 14. Registered Address Address : Collector Office, Nasik

FORM-I. 13. Name of Applicant District Collector Nasik 14. Registered Address Address : Collector Office, Nasik FORM-I (I) Basic Information Item Details. 1. Name of the Project Proposal for Sand Quarry in Kas Village, Taluka Trimbakeshwar, District Nasik, State Maharashtra over an area of 1.5400 Ha at Damanganga

More information

DRAFT TERMS OF REFERENCE FOR EIA STUDY

DRAFT TERMS OF REFERENCE FOR EIA STUDY Four laning of Balaghat - Gondia Section of NH 54 from km 0.000 to km 48.070 (Package-1A & Package-1B) under Bharatmala Pariyojana in the State of Madhya Pradesh and Maharashtra DRAFT TERMS OF REFERENCE

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT GRANITE BUILDING STONE QUARRY MINING PROJECT STATE : KERALA DISTRICT : KANNUR THALUK : THALASSERY VILLAGE : THRIPPANGOTTUR BLOCK NO. : NIL SURVEY NO. : 275/1A MINERAL : GRANITE BUILDING

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Sri D. Ujjinappa has applied for quarry lease for extracting of Building stone in Sy No. 19/2, Chatnihalli Village, Harpanahalli Taluk, Davangere District,

More information

Relief & Rehabilitation Revenue & Forests Department Mantralaya, Mumbai- 32.

Relief & Rehabilitation Revenue & Forests Department Mantralaya, Mumbai- 32. GOVERNMENT OF MAHARASHTRA FINAL COPY OF DOCUMENTATION ON THE DROUGHT OF 2002-03 STATE LEVEL EFFORTS Relief & Rehabilitation Revenue & Forests Department Mantralaya, Mumbai- 32. THE DROUGHT OF 2002-03 STATE

More information

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri Door No. 39/49/39,

More information

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING 1. Name and Address of Quarry Lease Holder: a. Name of applicant Priyesh Singh Thakur S/o Shri Karan Singh Thakur b. Designation of applicant Owner c. Name

More information

1.1 SALIENT FEATURES OF THE PROJECT Pipeline extension from VVSPL Vijayawada to the proposed Dharmapuri Storage Terminal

1.1 SALIENT FEATURES OF THE PROJECT Pipeline extension from VVSPL Vijayawada to the proposed Dharmapuri Storage Terminal 1.0 EXECUTIVE SUMMARY Hindustan Petroleum Corporation Limited (HPCL) is one of the major Public Sector Navratna Oil Company engaged in refining, marketing and distribution of Petroleum Products in India.

More information

Piplyakamil Murrum Quarry located at Khasra No 90/2, near Village Piplyakamil, Tehsil- Dharampuri, District Dhar M.P

Piplyakamil Murrum Quarry located at Khasra No 90/2, near Village Piplyakamil, Tehsil- Dharampuri, District Dhar M.P 1. INTRODUCTION The project namely Piplyakamil Murrum Quarry having an area of 2.0 ha at Khasra No.- 90/2 near Village- Piplyakamil Tehsil- Dharampuri, District-Dhar, State-Madhya Pradesh belongs to Shree

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

1. PRE-FEASIBILITY REPORT

1. PRE-FEASIBILITY REPORT 1. PRE-FEASIBILITY REPORT 1.1 Executive Summary Sri. T. Thimmegowda, has applies quarry lisence for extracting of Building Stone Quarry in Sy No. 33/2, Kurodbore Kaval village, Hassan Taluk, Hassan District,

More information

INSPIRE INDUSTRIES PVT. LTD.

INSPIRE INDUSTRIES PVT. LTD. For Proposed 0.999 MTPA Coal Washery At Village: Bhelai, Tehsil: Baloda, District: Janjgir-Champa, Chhattisgarh Envirotech East (P) Limited An ISO 9001:2008, 14001:2004 & OHSAS:18001:2007 Company Laboratory

More information

Environment Management Plan For B 2 Category Project

Environment Management Plan For B 2 Category Project Environment Management Plan For B 2 Category Project Project Proponent - Kirtikumar Nathubhai Shah Address - N/V Damlai, Taluka- Jhagadia District - Bharuch Near Village Taluka District Area Survey No.

More information

DHANWADA CRUSHER STONE QUARRY

DHANWADA CRUSHER STONE QUARRY ENVIRONMENT MANAGEMENT PLAN FOR Mining of Crusher Stone Area 1.910 Hect, Kh. No. 95 AT Village: Dhanwada, Tehsil: Khirkiya, Dist: Harda (MP) Proponent Shri Atul Kumar Agrawal S/o- Shri Ashok Agrawal Resi-

More information

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha 1. EXECUTIVE SUMMARY 1.1 Introduction The Eknampuram Quartz mine of 89.80 Acres/ 36.34 ha is located in Sy. No. 60, Eknampuram Village, C.S. Puram Mandal, Prakasam District, Andhra Pradesh has been allotted

More information

Hubert Enviro care systems Pvt. Ltd.

Hubert Enviro care systems Pvt. Ltd. ENVIRONMENTAL CLERANCE FOR MINOR MINERAL (STONE QUARRY) PROJECT FOR SHRI KRISHNA VITHU PATIL Survey no. 53/3 & 53/4 Village: LOHAPE, Taluka: WADA District: PALGHAR, state: MAHARASHTRA. Area: 1.0500 Hectare

More information

Environment Management Plan For B 2 Category Project

Environment Management Plan For B 2 Category Project Environment Management Plan For B 2 Category Project Project Proponent Shri Alihusen Haji Mohammadali Alirajpurwala Address - N/V Kanawant, Taluka & District - Chhotaudepur Near Taluka District Area Survey

More information

V: PROJECT SCOPING & METHODOLOGY

V: PROJECT SCOPING & METHODOLOGY V: PROJECT SCOPING & METHODOLOGY 5.0 INTRODUCTION The scoping exercise is carried out to define the focus and scope of the EIA Study. The scoping exercise is required to understand the type of activities

More information

PROPOSED TERMS OF REFERENCE (TOR) FOR

PROPOSED TERMS OF REFERENCE (TOR) FOR PROPOSED TERMS OF REFERENCE (TOR) FOR ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR PROPOSED NEW NATIONAL HIGHWAY -NH-754K GREENFIELD ALIGNMENT SANCHORE-SANTALPUR SECTION

More information

HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES

HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES Maton Rock Phosphate Mine of M/s HZL is proposing

More information

BRIEF SUMMARY OF THE PROJECT

BRIEF SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT This proposal of Nuagaon Iron ore mines of M/s K.J.S.Ahluwalia is for expansion of Iron ore production capacity from 5.62 MTPA to 7.99MTPA of ROM along with existing beneficiation

More information

Hubert Enviro care systems Pvt. Ltd.

Hubert Enviro care systems Pvt. Ltd. ENVIRONMENTAL CLERANCE FOR MINOR MINERAL (STONE QUARRY) PROJECT FOR M/S INFRA TRANSMISSION PVT. LTD. Survey no. 51/2 Village: KUNDEWAHAL, Taluka: PANVEL District: RAIGAD, State: MAHARASHTRA. Area: 1.4000

More information

A Geographical Perspective on Land Use Pattern in Solapur District of Maharashtra

A Geographical Perspective on Land Use Pattern in Solapur District of Maharashtra A Geographical Perspective on Land Use Pattern in Solapur District of Maharashtra Dr. P. P. Ubale Associate Professor,UG & PG, Department Of Geography, K.B.Patil Mahavidyalaya, Pandharpur, Dist. Solapur

More information

KAS SAND QUARRY ENVIRONMENT MANAGEMENT PLAN. I. DESCRIPTION OF ENVIRONMENT AND MITIGATION MEASURES 1.1 Geography

KAS SAND QUARRY ENVIRONMENT MANAGEMENT PLAN. I. DESCRIPTION OF ENVIRONMENT AND MITIGATION MEASURES 1.1 Geography ENVIRONMENT MANAGEMENT PLAN I. DESCRIPTION OF ENVIRONMENT AND MITIGATION MEASURES 1.1 Geography 1 Nasik district is surrounded by Dhule district in the north, Dangs and Surat district of Gujarat State

More information

International Journal of Advance ISSN and Applied Research (IJAAR) A GEOGRAPHICAL ANALYSIS OF GHOD FOREST DIVISION, JUNNAR, DISTRICT -PUNE

International Journal of Advance ISSN and Applied Research (IJAAR) A GEOGRAPHICAL ANALYSIS OF GHOD FOREST DIVISION, JUNNAR, DISTRICT -PUNE International Journal of Advance ISSN 2347-7075 and Applied Research (IJAAR) Vol. 1 No.3 Peer Reviewed Bi-Monthly Jan Feb 2014 A GEOGRAPHICAL ANALYSIS OF GHOD FOREST DIVISION, JUNNAR, DISTRICT -PUNE Mr.

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Metal Stone Area 2.000 Hectare, Khasra No. 1127/1 Village Tehsil District State AT KHILCHIPUR KHILCHIPUR RAJGARH MADHYA PRADESH Proponent SHRI ALTAF KHA S/O SHRI

More information

INDEX. S. No. Item Page No. 1 EXECUTIVE SUMMARY 3 2 INTRODUCTION OF THE PROJECT / BACKGROUND

INDEX. S. No. Item Page No. 1 EXECUTIVE SUMMARY 3 2 INTRODUCTION OF THE PROJECT / BACKGROUND PRE-FEASIBILITY REPORT PREPARED FOR D. SESHA REDDY [Mine Lease Area 3.253 Ha.] Sy. No. 12/D Nagarur Village, Yadiki Mandal, Ananthapur District, Andhra Pradesh. PREPARED BY ISO 9001: 2008 Certified Accredited

More information

ENVIRONMENTAL MONITORING REPORT

ENVIRONMENTAL MONITORING REPORT ENVIRONMENTAL MONITORING REPORT BASED ON DATA GENERATED FROM APRIL 2018 SEPTEMBER 2018 FOR OCL INDIA LIMITED At/Po: RAJGANGPUR, District: SUNDARGARH, ODISHA AT LANJIBERNA LIMESTONE & DOLOMITE MINES PROJECT

More information

EMP ENVIRONMENTAL MANAGEMENT PLAN FOR BUILDING STONE QUARRY M/S. SIDDARTHA STONE CRUSHING INDUSTRIES Sy.No. 1118/4, Bangaramakki Bengre II Village, Bh

EMP ENVIRONMENTAL MANAGEMENT PLAN FOR BUILDING STONE QUARRY M/S. SIDDARTHA STONE CRUSHING INDUSTRIES Sy.No. 1118/4, Bangaramakki Bengre II Village, Bh EMP ENVIRONMENTAL MANAGEMENT PLAN FOR BUILDING STONE QUARRY M/S. SIDDARTHA STONE CRUSHING INDUSTRIES Sy.No. 1118/4, Bangaramakki Bengre II Village, Bhatkal Taluk, Uttara Kannada District PREPARED BY SMS

More information

Gurha PF - NNE - 7.0km 11. Nearest major city with Nil population within 10km radius 12. Nearest Town / City within 10km radius

Gurha PF - NNE - 7.0km 11. Nearest major city with Nil population within 10km radius 12. Nearest Town / City within 10km radius EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 Introductions Capacity expansion of existing granite quarry (6.0 ha) is proposed, which is operational at village- Kathara, Tehsil- Lovekush Nagar & Dist.

More information

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P SITUATED AT KAKKUR VILLAGE KOZHIKODE TALUK KOZHIKODE DISTRICT KERALA STATE EXTENT: 2.0437 Ha STANDARD TERMS OF REFERENCE (TOR)

More information

GREENCINDIA Consulting Pvt. Limited

GREENCINDIA Consulting Pvt. Limited Expansion of Tamar Bauxite Mine from 10,000 TPA to 40,000 TPA in Tamar & Kirkiran Villages, Majhgawan Tehsil, Satna District, Madhya Pradesh : The M.P. State Mining : GREENCINDIA Consulting Pvt. Limited

More information

M/s. Mumbra Stone Industries

M/s. Mumbra Stone Industries 1. Executive Summary PRE-FEASIBILITY REPORT M/s Mumbra Stone Industries Mine proposes to continue the minor mining activity at survey no 161 part having a lease area of 1.13 hector from the Forest Department.

More information

Table 1-1:- Salient Features of the Project

Table 1-1:- Salient Features of the Project PRE FEASIBILITY REPORT OF LAMBA & BHATIA BAUXITE MINE MINERALS - BAUXITE LAMBA SURVEY. NO. 30/P, 415/A, 949, BHATIA-358 (LEASE PERIOD 14.06.2000 TO 13. 06.2020) LEASE AREA 54.0861 HECTARE MINING PROJECT

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT Consultant-Ascenso Enviro Pvt. Ltd. Page 19 of 31 1.0 EXECUTIVE SUMMARY S.No. Information Details 1. Project name Sand Mining Project at Hatidah Ghat on River Ganga, District Patna,

More information

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area. PROJECT BRIEF PROJECT LOCATION: - Pahar Kua Marble Range Mining Project Q L No 235 is located near village Pahar Kua, Tehsil Makrana., District Nagaur Rajasthan. Project is approachable from national highway.

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries

More information

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R. WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.Global Granites Production Granite Black Granits At Survey

More information