1 MAINTENENCE COVENANT PROPERTY OWNER REQUIRED TO MAINTAIN STORMWATER FACILITIES AND MEASURES (REPRESENTATIVE VERSION) INSTRUCTIONS FOR APPLICANTS AND STAFF When d I have t cmplete this cvenant fr my prperty? This cvenant is required fr develpment activity that triggers Minimum Requirements (MR) #1 thrugh #5 (prjects that trigger MR#1 thrugh MR#5 are required t prepare an Advanced Abbreviated Plan as part f their Site Develpment Permit). AND The Advanced Abbreviated Plan includes any f the fllwing Best Management Practices (BMPs): dwnsput infiltratin, dwnsput dispersin, sheet flw dispersin, perfrated stub-ut cnnectin, biretentin, cncentrated flw dispersin, sil amendment, rain garden, shreline dispersin facility, permeable pavement, 65/10 dispersin area, r prus gravel driveway. AND The prperty wner is currently a crpratin, partnership, r ther business entity. If all these ANDs are true, this frm is required. Wh prepares this cvenant? This cvenant will be prepared by the Develpment Engineering staff that reviews the Site Develpment Permit Applicatin. I knw that the wner has t sign and ntarize this cvenant, s what is the prcess fr actually cmpleting it? 1.) At the time Develpment Engineering staff is ready t apprve the Advanced Abbreviated Plan, he/she will fill ut the first page and will identify which strmwater facilities and measures have been selected fr the site n the secnd page. 2.) Develpment Engineering staff will then attach the applicable maintenance instructins t the cvenant based n the selected strmwater facilities and measures. 3.) Develpment Engineering staff will then the cmpleted cvenant t the prperty wner. Pierce Cunty Planning and Land Services, 2401 Suth 35 th Street, Tacma, Washingtn Page 1 f 2

2 4.) The prperty wner must sign the dcument in frnt f a Ntary Public. 5.) After the dcument is signed and ntarized, the prperty wner (r agent) must recrd the dcument with the Pierce Cunty Auditr at the Pierce Cunty Annex. It shuld be nted the Auditr can nly recrd the riginal dcument. 6.) A cpy f the recrded dcument must then be delivered t the Develpment Engineering Divisin at the Develpment Center. 7.) Develpment Engineering staff will then save the dcument and/r recrding number int the PALS Plus electrnic permit system, and will release the related hld that is placed n the final building inspectin. Des this cvenant need t be recrded befre my building permit is issued? N. Hwever, it must be recrded prir t signff f the final building inspectin. In rder nt t delay the final building inspectin, it is recmmended t get the cvenant cmpleted and signed ff at the time f permit issuance r shrtly thereafter. Pierce Cunty Planning and Land Services, 2401 Suth 35 th Street, Tacma, Washingtn Page 2 f 2

3 After recrding return t: Develpment Engineering Divisin Planning and Land Services Department 2401 Suth 35 th Street Tacma, WA MAINTENANCE COVENANT PROPERTY OWNER REQUIRED TO MAINTAIN STORMWATER FACILITIES AND MEASURES (REPRESENTATIVE) Fr purpses f this agreement and fr indexing by the Auditr as required by R.C.W. Ch , the parties t this agreement are Grantr (als knwn as present wner), and Pierce Cunty, Grantee. Grantr is the wner f certain real prperty in Pierce Cunty, Washingtn, as described belw and referred t in this agreement as the Prperty. Parcel Number(s): Parcel Address: Legal Descriptin: Site Develpment Permit Number:

4 Grantr prpses t develp (cnstruct buildings, clear, grade, etc.) the Prperty. If left unmitigated, this develpment will cause pllutin f surface waters and will increase the amunt f strmwater runff that leaves the prperty. Pierce Cunty requires strmwater facilities be installed and/r strmwater measures be implemented that will prevent the pllutin f surface water and grundwater. Pierce Cunty als requires that strmwater facilities and/r measures be implemented that will prevent an increase in strmwater runff. The upkeep and maintenance f these strmwater facilities and/r measures are essential t the prtectin f the Cunty s surface and grundwater resurces, as well as dwnstream prperties. The fllwing strmwater facilities/measures are lcated n the Prperty and are intended t mitigate the impacts f the develpment: Dwnsput Infiltratin Facility Dwnsput Dispersin Sheet Flw Dispersin Perfrated Stub-Out Cnnectin Biretentin Facility Cncentrated Flw Dispersin Sil Amendment Rain Garden Shreline Dispersin Facility Permeable Pavement 65/10 Dispersin Area Prus Gravel Driveway Other In cnnectin with the Grantr s develpment, Pierce Cunty requires, and the Grantr agrees t maintain, the abve strmwater facility/measures in accrdance with the maintenance instructins attached herein. Apprved site develpment drawings and cnstructin phts fr the strmwater facility/measures fr this prperty can be viewed n the Pierce Cunty Planning and Land Services n-line permit system web site using the permit number n the frnt f this dcument. Cunty apprval must be btained prir t any mdificatin t, relcatin f, r remval f these strmwater facilities r measures. This cvenant runs with the land, and is binding n all parties having r acquiring any right, title, r interest in the Prperty. This cvenant cannt be terminated unless a ntice f cvenant terminatin is recrded by Pierce Cunty. Directr r Designee Signature Pierce Cunty Planning and Land Services

5 Signature f wner(s): Print Name: STATE OF WASHINGTON ) ) ss COUNTY OF PIERCE ) I certify that I knw r have satisfactry evidence that is the persn wh appeared befre me, and said persn acknwledged that (he/she/they) signed this instrument, n ath stated that (he/she/they) was authrized t execute the instrument and acknwledged it as the f (type f authrity e.g. fficer, trustee) (n behalf f whm instrument was executed) t be the free and vluntary act f such party fr the uses and purpses mentined in the instrument. Given under my hand and fficial seal this day f,. Ntary Public in and fr the State f Washingtn Residing at My cmmissin expires AFFIX SEAL OR STAMP ABOVE THIS LINE

6 65/10 Dispersin Area What is a 65/10 Dispersin Area? A 65/10 Dispersin Area is a frested/native vegetatin area that has nt been mdified r disturbed. 65/10 Dispersin Areas are used t cntrl the increased strmwater runff frm driveways, rfs, lawns, sidewalks, rads and ther develped areas. The 65/10 Dispersin methdlgy is typically used n parcels f land 1 acre r larger when a prperty wner des nt plan n remving existing frest and native vegetatin frm a large prtin (65% apprximately) f their prperty. The use f 65/10 Dispersin benefits a prperty wner because they d nt have the cnstructin csts assciated with ther strmwater facilities r measures, such as prus cncrete, dwnsput infiltratin, rain gardens, bifiltratin, etc. Prperty wners that chse t use 65/10 Dispersin t address the strmwater impacts f their prject must agree t retain, maintain, and prtect native vegetatin in a specific prtin f their prperty. Hw des a 65/10 Dispersin Area Wrk? 65/10 Dispersin cntrls strmwater runff thrugh infiltratin, and evaptranspiratin. 65/10 Dispersin als remves pllutants thrugh sedimentatin, filtratin, adsrptin, and phytremediatin. What if I want t remve my 65/10 Dispersin Area? This 65/10 Dispersin Area must remain in place in perpetuity, unless the prperty wner elects t btain a new site develpment permit and address the strmwater impacts f their prject by cnstructing anther type f strmwater facility r measure. A Ntice f Terminatin f Maintenance Cvenant will need t be recrded by the Cunty. What can I d in my 65/10 Dispersin Area? The area can be used fr passive recreatin such as pedestrian and bicycle trails, nature viewing areas, camping areas and ther similar activities that d nt require permanent structures, prvided that cleared areas and areas f cmpacted sil assciated with these areas are kept t a minimum. The area can cntain utilities and utility easements, but nt septic systems (utilities are defined as ptable and wastewater undergrund piping, undergrund wiring, and utility ples). Invasive, nn-native vegetatin and weeds listed n the State Nxius Weed List may be remved by clipping, hand-pulling, hand-digging, r ther methd that leaves the native vegetatin, trees, duff, and tpsil intact. Trees that are dangerus t life r prperty may be remved, but the stump must be left in place.

7 Hw d I knw where the bundaries f my 65/10 Dispersin Area are? The apprved site develpment drawings fr the prperty identify the lcatin f the 65/10 Dispersin Area. These drawings can be viewed n the Pierce Cunty Planning and Land Services n-line permit system web site using the site develpment permit number n page 1 f this dcument. What d I need t d t maintain and prtect my 65/10 Dispersin Area? A prperty wner shuld: a) understand where the bundaries f the area are lcated in relatinship t prperty lines and ther visual/cnstructed features, and b) prevent remval f existing native vegetatin frm the area, and c) prevent intrusin int area with mtrized equipment that might cmpact the grund r damage the vegetatin, and d) replant areas with native shrubs, grundcver and trees, if existing vegetatin is smehw damaged r dies.

8 Sil Amendment What is Sil Amendment? Sil amendment (r amended sils as they are smetimes called) is the intrductin f cmpst, tp sil, r anther rganic additives int the sils that have been disturbed during cnstructin. The intent f this practice is t recreate the existing duff layer that existed prir t cnstructin. Hw des Sil Amendment wrk? In cnjunctin with sil rganisms and vegetatin, undisturbed sil, r sil amended after cnstructin disturbance, prvides imprtant strmwater management functins, such as: Water infiltratin Shallw subsurface water strage and transmissin Nutrient, sediment, and pllutant adsrptin Sediment and pllutant bifiltratin Pllutant decmpsitin These functins are largely lst when develpment strips away native sil and vegetatin and replaces it with un-amended sil and sd. Mrever, withut prper amendment, disturbed landscapes can als becme pllutin-generating surfaces due t sil cmpactin; increased use f pesticides, fertilizers, and ther landscaping and husehld chemicals; the cncentratin f pet wastes; and pllutants assciated with radside litter. The practice f amending sil helps t regain strmwater functins, minimize the need fr sme landscaping chemicals (thus reducing pllutin thrugh preventin), and prvide increased treatment f pllutants and sediments (that can result frm develpment and habitatin). Hw d I maintain my Amended Sils? The fllwing are required maintenance practices fr amended sils: D Replenish the sil rganic matter by leaving leaf litter and grass clippings nsite (r by adding cmpst and mulch regularly). Prtect amended sils frm ersin r re-cmpactin by heavy equipment. D Nt Cmpact r pave ver amended sils. Use fertilizers, herbicides, r pesticides.

9 Dwnsput Infiltratin Facility What is a Dwnsput Infiltratin Facility? A dwnsput infiltratin facility is an undergrund strmwater strage area that is created by excavating a trench r deep pit (drywell) and filling it with washed drain rck. The drain rck creates vid spaces and these vid spaces temprarily stre the strmwater until it saks (infiltrates) int the sil. Strmwater runff frm building rfs is piped int the trench r drywell and distributed within it via a perfrated pipe. Hw d I maintain my Dwnsput Infiltratin Facility? The fllwing are required maintenance practices fr Dwnsput Infiltratin Facilities: D Check fr accumulated trash, debris, r sediment that impedes sheet flw r cnveyance int the trench r drywell. Remve if present. Check infiltratin trench r drywell fr mss r vegetatin grwth impedes flw and remve if present. Check fr blckages in pipes t r frm sump, trench, r drywell. Remve blckage if present. Ensure that the access lid n the catch basin (if present) is accessible and easy t pen (i.e., nt buried r missing). Check fr accumulated sediment in catch basin sump, and remve and dispse f in accrdance with slid waste requirements. Check underdrain/ perfrated pipe fr standing water. If standing water remains in the dispersin area fr mre than 3 days hurs fllwing a strm, address cause f pnding (e.g., remve sediment frm pipe). Check fr accumulated sediment and debris in drain rck r underdrain/ perfrated pipe. Remve sediment and debris. Check fr evidence f cntaminants such as il, gasline, r paint and clean as sn as pssible (Crdinate surce cntrl, remval, and/r cleanup with Pierce Cunty Surface Water Management and/r Dept. f Eclgy Spill Respnse ). D Nt Pave ver trench r drywell area. Discharge debris t the infiltratin trench frm rf cleaning practices.

10 Rain Garden What is a Rain Garden? A rain garden is a, shallw landscaped depressin, with cmpst amended native sils and adapted plants that cllects, absrbs, and filters strmwater runff frm rf tps, driveways, patis, and ther hard surfaces. Rain gardens are sized t pnd and temprarily stre strmwater runff and allw strmwater t sak int the grund. Hw des a Rain Garden Wrk? Rain gardens are designed t cntrl strmwater runff thrugh detentin, infiltratin, and evaptranspiratin. Rain gardens als remve pllutants thrugh sedimentatin, filtratin, adsrptin, and phytremediatin. Hw d I maintain my Rain Garden? The fllwing are required maintenance practices fr Rain Gardens: Remve trash r debris. Remve accumulated leaves. D Remve weeds and apply mulch as needed. Water plants during plant establishment (first 1-3 years). Water plants during drught cnditins (after 3 years). Check fr standing water: If standing water remains in the rain garden fr mre than 48 hurs fllwing a strm, address cause f pnding (fr example: remve debris r litter built up in the bttm f the rain garden). If standing water remains in the rain garden fr mre than 3 days fllwing a strm, cver all inlets, verflws, and penings with msquit screens t cntrl ptential pest activity. Check fr ersin r scur n rain garden walls and side slpes. Re-direct inflws t inlet r stabilize walls. Check fr instability f the walls and side slpes (nte: may require cnsultatin with a prfessinal engineer). Check fr sediment accumulatin r depsitin in the bttm f the rain garden. Remve sediment and eliminating sediment surce. Check fr bare spts withut mulch. Add 2-3 inches f mulch where needed.

11 Check verflw spillway fr missing rck, and replace if needed. Check inlets, utlets, and verflw fr accumulated leaves, sediment, debris, r vegetatin. Remve any leaves, sediment, debris, r vegetatin that blcks r inhibits flw. Check inlets, utlets, and verflw pipes fr damage (fr example: cracks r punctures frm rts). Repair r replace pipes as needed. Ensure that site water is being directed int the rain garden. If water is being directed away frm the inlet, recnfigure the inlet r splashblck t direct flws int the rain garden. Check fr ersin r missing rck arund the inlet and utlet. Address the cause f ersin and cver grund with rck r cbble t prtect subgrade sils. Check the vegetatin fr ptential issues (fr example: disclratin, lack f flwers, is blcking access t rain garden), and replace r address as needed. D Nt Cmpact r walk in the rain garden area. Remve installed vegetatin (unless it is blcking flws r is being replaced). Plant additinal vegetatin that is nt apprpriate fr the rain garden. Allw fr vegetatin t blck line-f-sight clearances and sidewalks. Use fertilizers, herbicides, r pesticides.

12 Biretentin Facility What is a Biretentin Facility? A Biretentin Facility is a shallw pnd that is designed by an engineer that temprarily stres and treats strmwater runff. It is designed t remve pllutants and t mitigate the peak strmwater flws caused by rfs, driveways r ther impervius surfaces. Biretentin Facilities are lined with a special sil mixture and are typically planted with water lving vegetatin. Biretentin Facilities cntrl strmwater runff thrugh detentin, retentin and evapratin. Bifiltratin Facilities remve pllutants thrugh sedimentatin, filtratin, adsrptin, and phytremediatin. There are three main types f Biretentin: Biretentin cells: Shallw depressins with a planting sil mix and a variety f plant material including trees, shrubs, grasses, and/r ther herbaceus plants. Biretentin swale: Similar t biretentin cells, hwever, biretentin swales are designed t als cnvey excess strmwater. Biretentin planters and planter bxes: Planters have an pen bttm and allw infiltratin t the subgrade. Hw d I maintain my Biretentin Facility? Biretentin Facilities are engineered systems, and sme larger r mre cmplex designs may require the assistance f prfessinal experts t perfrm maintenance inspectins and activities. If yu have questins r cncerns abut perfrming the required maintenance, cntact the Cunty fr further infrmatin. The fllwing are required maintenance practices fr Biretentin Facilities. D General Remve trash r debris. Remve accumulated leaves. Remve weeds and apply mulch as needed. Water plants during plant establishment (1-3 years). Water plants during drught cnditins (after 3 years). Check fr evidence f rdents and remve/eliminate if present. Check fr evidence f rdents and remve/eliminate if present. Check fr vandalism r damage and restre t riginal cnditins if needed.

13 Pnding Area Check fr standing water: If standing water remains in the Biretentin Facility fr mre than 48 hurs fllwing a strm, remve leaf r debris buildup, clean underdrain, investigate ther water inputs (e.g., grundwater, illicit cnnectins), and verify cntributing area. If these d nt slve the prblem, replace biretentin sil and replant the area. If standing water remains in the Biretentin FacilityMP: fr mre than 3 days fllwing a strm, cver all inlet, verflws and penings with msquit screens t cntrl ptential pest activity. Check fr ersin, scur, r cracks wider than 0.5 inch (in cncrete) n walls r side slpes. Address by stabilizing walls and side slpes r repairing/replacing cncrete. Check fr any instability f the walls and side slpes (nte: may require cnsultatin with a prfessinal engineer). Check berm betweden cells fr leaks r seeps. Plug hles r cnsult with a prfessinal engineer. Check berm fr settlement. Restre design height with additinal mulch if needed. Check fr sediment accumulatin r depsitin in the bttm f the Biretentin Facility. Remve sediment and eliminate sidement surce. Check fr bare spts withut mulch. Add 2-3 inches f mulch where needed. Ensure that side slpes d nt exceed 1H:3V (this can be a safety hazard). Inlets, Outlets, Overflw and Underdrain Ensure that site water is being directed prperly t the Biretentin Facility inlet structure. If water is being directed away frm the inlet, recnfigure the inlet r splashblck t direct flws int the Biretentin Facility. Check fr ersin (gullies/rills) arund inlets, utlets, verflw, and n side slpes. Regrade area r add rck, vegetatin, r ersin cntrl blanket. Check fr ersin r missing rck arund the inlet and utlet. Address the cause f ersin and cver grund with rck r cbble t prtect subgrade sils. Check inlets, utlets, and verflw fr accumulated leaves, sediment, debris, r vegetatin. Remve any leaves, sediment, debris, r vegetatin that blcks r inhibits flw. Check inlets, utlets, and verflw pipes fr damage and cracks r punctures greater than 0.25 inches. Repair r replace pipes as needed. Check trash rack fr missing r damaged bar screens. Repair r replace t design standards if needed. Check verflw spillway fr missing rck, and replace if needed. Check underdrain pipe fr blckage (plant rts, sediment, r debris), and remve if needed. Ensure that pipes and culverts are cvered and secured if they are hazards t children.

14 Check dams, weirs, and flw spreaders Check sediment, vegetatin, and debris accumulatin at check dam r weir. Clear blckage and eliminate surce. Check fr ersin and/r undercutting f check dam r weir. Address ersin and undercutting as needed. Check the weir, grade bard, r baffle fr settlement r damage. Restre t level psitin. Check sediment accumulatin alng flw spreader. Remve and dispse f the sediment if it blcks 35 percent r mre f the prts/ntches. Vegetatin Check vegetatin arund inlets and utlets. Remve vegetatin if within 1 ft f inlets and utlets. Check the vegetatin fr ptential issues (fr example: disclratin, lack f flwers, blcking access t Biretentin Facility), and replace r address as needed. Check fr dead standing vegetatin. Remve any dead standing vegetatin. Replace any plants with high mrtality rate with a mre apprpriate species. Ensure that large trees and shrubs d nt interfere with peratin f the basin r access fr maintenance. Prune trees r shrubs if they d interfere with peratin r access. Ensure that emergent vegetatin (vegetatin n the bttm f the Biretentin Facility) desn t blck flw f water. Remve grass r ther vegetatin clippings if accumulated t 2 inches r greater. Check vegetatin cverage. If less than 75 percent f the Biretentin Facility is cvered, replant as needed. Check fr presence f nxius weeds and remve accrding t applicable regulatins. Check irrigatin system and refer t manufacturer s instructins fr maintenance. Cntaminants Use spill preventin measures when handling r string ptential cntaminants in the vicinity. Check fr evidence f cntaminants such as il, gasline, r paint and clean as sn as pssible (Crdinate surce cntrl, remval, and/r cleanup with Pierce Cunty Surface Water Management and/r Dept. Of Eclgy Spill Respnse ).

15 D Nt Cmpact r walk in the Biretentin Facility. Cmpact biretentin sil media. Remve installed vegetatin (unless it is blcking flws r is being replaced). Plant additinal vegetatin that is nt apprpriate fr the Biretentin Facility. Allw fr vegetatin t blck line-f-sight clearances and sidewalks. Use fertilizers, herbicides, r pesticides.

16 Dwnsput Dispersin What is a Dwnsput Dispersin? Dwnsput Dispersin are gravel-filled trenches r splashblcks lcated at the rf dwnsput, which serve t spread rf runff ver vegetated areas. Hw des a Dwnsput Dispersin wrk? Dwnsput dispersin methds reduce peak flws by slwing strmwater runff entering int the cnveyance system, allwing fr sme infiltratin, and prviding sme water quality benefits. Hw d I maintain my Dwnsput Dispersin? The fllwing are required maintenance practices fr Dwnsput Dispersin methds: Check rf dwnsput fr leaves and debris and remve if present. D Ensure that the splashblck r rck pad is directed away frm the building structure. Check fr ersin r disruptin f the sil arund the splashblck r rck pad that is causing cncentrated flw (cnfined flw). Replace r restre sil if needed. Check rck pad fr adequate cverage (shuld be mre than ne layer f rck abve native sil). Add rck t meet design standards if needed. Check dispersin trench fr accumulated trash, debris, r sediment and remve and dispse f in accrdance with slid waste requirements if present. Check dispersin trench fr mss r vegetatin that impedes flw and remve if present. Check dispersin trench fr evidence f cncentrated flw (flw that is channelizing and nt evenly flwing ver the trench). Realign ntched grade bard r ther type f level spreader t prevent channelized flw, r rebuild trench t standards. Ensure that the access lid n the catch basin (if present) is accessible and easy t pen (i.e., nt buried r missing). Check fr sediment accumulatin in the sump f the catch basin r pipes frm sump t trench and remve if present. D Nt Cmpact r pave dispersal area. Use fertilizers, herbicides, r pesticides.

17 Check inlets, utlets, and verflw pipes fr damage and cracks r punctures greater than 0.25 inches. Repair r replace pipes as needed. Check fr ersin (gullies/rills) f the dispersal area. Ersin greater than 2 deep shuld be addressed by replacing tpsil/vegetatin. Check fr accumulated sediment r debris in the dispersal area that is blcking flw. Remving accumulated sediment r debris and eliminate surce. Check fr standing water. If standing water remains in the dispersal area fr mre than 3 days fllwing a strm, address cause f pnding (i.e., regrade depressins) and cver all inlets, verflws and penings with msquit screens. Check vegetatin cverage and ensure that vegetatin is healthy and watered during perids f n rain. Ensure that the vegetatin is nt blcking r inhibiting flw. Trim, weed, r replant as needed t restre flw path. Cnversely, ensure that vegetatin cverage is sufficient t prevent ersin r scur f the flw path. Check fr presence f nxius weeks and remve accrding t applicable regulatins. Check fr evidence f rdents and remve/eliminate if present.

18 Perfrated Stub-ut Cnnectins What is a Perfrated Stub-ut Cnnectin? A Perfrated Stub-ut Cnnectin cnsists f a length f perfrated pipe within a gravelfilled trench that is placed between rf dwnsputs and a stub-ut t the dwnstream drainage system. Hw des a Perfrated Stub-ut Cnnectin wrk? Rf runff is cnveyed t the perfrated stub-ut cnnectin, and infiltrates int the underlying sils. These systems prvide infiltratin during drier mnths, hwever during the wet winter mnths, they may prvide little r n flw cntrl. Hw d I maintain my Perfrated Stub-ut Cnnectin? The fllwing are required maintenance practices fr Perfrate Stub-ut Cnnectins: D Inspect perfrated stub-ut cnnectin during heavy rain t ensure that water is cnveyed t the drainage stub-ut. Replace drain rck r remve sediment and debris if present and blcking flw thrugh t the perfrated pipe. D Nt Pave ver trench area. Ensure that the access lid n the catch basin (if present) is accessible and easy t pen (i.e., nt buried r missing). Check underdrain/ perfrated pipe fr standing water. If standing water remains in the dispersin area fr mre than 3 days hurs fllwing a strm, address cause f pnding (e.g., remve sediment frm pipe). Check fr accumulated sediment and debris in drain rck r underdrain/ perfrated pipe. Remve sediment and debris. Check fr evidence f cntaminants such as il, gasline, r paint and clean as sn as pssible (Crdinate surce cntrl, remval, and/r cleanup with Pierce Cunty Surface Water Management and/r Dept. f Eclgy Spill Respnse ).

19 Permeable Pavement What is Permeable Pavement? Permeable pavement (als knwn as pervius and prus pavement) lks very much like rdinary pavement except it has small penings that allw water t pass thrugh and eventually sak int the grund. Permeable paving significantly reduces the amunt f strmwater runff cmpared t cnventinal pavement. Hw des Permeable Pavement Wrk? After water drains thrugh permeable pavement, it is held in a strage reservir bed (made up f aggregate rck, r drain rck), and then slwly saks (infiltrates) int the grund. There are fur main types f permeable pavement. Prus asphalt Pervius cement cncrete Interlcking cncrete paver blcks Open-celled paving grid systems Hw d I maintain my Permeable Pavement? Permeable pavements are engineered systems, and sme larger r mre cmplex designs may require the assistance f prfessinal experts t perfrm maintenance inspectins and activities. The fllwing are required maintenance practices fr Permeable Paving. Nte that nt all design elements will be present in all permeable pavement applicatins: D General Check adjacent areas t ensure that they are nt depsiting sil, mulch, r sediment n the permeable pavement area. Replant r stabilize adjacent pervius areas t reduce ersin if needed. Check fr fallen leaves r debris and remve if present. Check fr sediment r debris accumulatin between paver blcks, n surface f pavement, r in grid vids and remve if present. Inlet, utlet, and underdrain pipes (if present) Check inlet and utlet pipes fr clgging r damage. Repair, replace, and remve debris as needed. Check areas arund inlet and utlet pipes fr ersin (expsed sil), and eliminate cause f ersin if present. Check underdrain pipe fr plant rts, sediment, r debris. Jet clean, cut rts, and remve debris f present. Check and clean rifice (if present).

20 Prus asphalt and pervius cement cncrete Check adjacent vegetatin t ensure it is nt grwing int the permeable pavement area. Trim r remve vegetatin that encraches upn the permeable pavement area. Perfrm regular maintenance t prevent clgging with fine sediments. Use a vacuum r pwer washer with rtating brushes tw t three times annually. Prtect permeable pavement area frm any adjacent cnstructin site runff during prject cnstructin. Check fr cracks r trip hazards in the pavement area. Fr pthles r small cracks, fill with patching mixes. Fr larger cracks and settlement, cut and replace the pavement sectin as needed. Replace any cuts in the pavement (i.e., utility cuts) with the same permeable pavement material. Interlcking cncrete paver blcks Check fr any damaged r missing paver blcks. Remve damaged paver blcks and replace r repair per manufacturer s recmmendatins. Check fr settlement f surface. If settlement seems t be impeding functin f the pavement, reestablish riginal grade (may require resetting individual paver blcks). Check fr lss f gravel material between paver blcks and refill per manufacturer s instructins if needed. Open-celled paving grid with gravel r grass Check fr lss f gravel material in the gravel grid. If the gravel level is belw the plastic rings, refill per manufacturer s recmmendatins. Check fr lss f sil and/r grass material in the grass grid. Refill r replant per manufacturer s recmmendatins. Restre grwing medium, aerate the sil, and reseed r replant grass grid area as needed. Cntaminants Use spill preventin measures when handling r string ptential cntaminants in the vicinity. Check fr evidence f cntaminants such as il, gasline, r paint and clean as sn as pssible (Crdinate surce cntrl, remval, and/r cleanup with Pierce Cunty Surface Water Management and/r Dept. f Eclgy Spill Respnse ).

21 D Nt Apply sand, sealant, r deicers t the permeable pavement area. Use snw plws r stckpile plwed snw (i.e., dirty snw) n the pavement area, unless unavidable. Stckpile landscaping materials (such as mulch, sil, and cmpst) near r n the permeable pavement area.

22 Sheet Flw Dispersin What is Sheet Flw Dispersin? Sheet Flw Dispersin is the simplest methd f runff cntrl. This methd can be used fr any impervius r pervius surface that is flat r mderately slped (less than 15 percent slpe) such as driveways, sprt curts, patis, rfs withut gutters, lawns, pastures; r any situatin where cncentratin f flws can be avided. Hw d I maintain Sheet Flw Dispersin? The fllwing are required maintenance practices fr Sheet Flw Dispersin: D Check the rck pad, transitin zne, and/r dispersin trench fr the fllwing: Ersin r disruptin f the sil that is causing cncentrated flw (cnfined flw). Replace r restre sil if needed. Adequate rck cverage (shuld be mre than ne layer f rck abve native sil). Add rck t meet design standards if needed. Accumulated trash, debris, r sediment and remve and dispse f in accrdance with lcal slid waste requirements if present. Mss r vegetatin that impedes flw and remve if present. Evidence f cncentrated flw (flw that is channelizing and nt evenly dispersing ver the transitin zne). Rebuild transitin zne t standards. Check the dispersal area fr the fllwing: Ersin (gullies/rills). Ersin greater than 2 deep shuld be addressed by replacing tpsil/vegetatin. Accumulated sediment r debris that is blcking flw. Remving accumulated sediment r debris and eliminate surce. Standing water. If standing water remains fr mre than 3 days hurs fllwing a strm, address cause f pnding (i.e., regrade depressins) and cver all inlets, verflws and penings with msquit screens. D Nt Cmpact r pave dispersal area, transitin zne, r dispersin trench. Use fertilizers, herbicides, r pesticides.

23 Vegetatin cverage. Ensure that the vegetatin is nt blcking r inhibiting flw. Trim, weed, r replant as needed t restre flw path. Cnversely, ensure that vegetatin cverage is sufficient t prevent ersin r scur f the flw path. Als ensure that vegetatin is healthy and watered during perids f n rain. Check fr presence f nxius weeks and remve accrding t applicable regulatins. Check fr evidence f rdents and remve/eliminate if present.

24 Cncentrated Flw Dispersin What is Cncentrated Flw Dispersin? Cncentrated Flw Dispersin is used n cncentrated flws frm driveways r ther hard surface areas. Cncentrated flws are directed t a dispersal berm and dispersin trench, and then dispersed thrugh a vegetated flw path. Hw d I maintain my Cncentrated Flw Dispersin? The fllwing are required maintenance practices fr Cncentrated Flw Dispersin: D Check the rck pad, transitin zne, and/r dispersin trench fr the fllwing: Ersin r disruptin f the sil that is causing cncentrated flw (cnfined flw). Replace r restre sil if needed. Adequate rck cverage (shuld be mre than ne layer f rck abve native sil). Add rck t meet design standards if needed. Accumulated trash, debris, r sediment and remve and dispse f in accrdance with lcal slid waste requirements if present. Mss r vegetatin that impedes flw and remve if present. Evidence f cncentrated flw (flw that is channelizing and nt evenly dispersing ver the transitin zne). Rebuild transitin zne t standards. Check the dispersal area fr the fllwing: Ersin (gullies/rills). Ersin greater than 2 deep shuld be addressed by replacing tpsil/vegetatin. Accumulated sediment r debris that is blcking flw. Remving accumulated sediment r debris and eliminate surce. Standing water. If standing water remains fr mre than 3 days hurs fllwing a strm, address cause f pnding (i.e., regrade depressins) and cver all inlets, verflws and penings with msquit screens. D Nt Cmpact r pave dispersal area r dispersin trench. Use fertilizers, herbicides, r pesticides.

25 Vegetatin cverage. Ensure that the vegetatin is nt blcking r inhibiting flw. Trim, weed, r replant as needed t restre flw path. Cnversely, ensure that vegetatin cverage is sufficient t prevent ersin r scur f the flw path. Als ensure that vegetatin is healthy and watered during perids f n rain. Check fr presence f nxius weeks and remve accrding t applicable regulatins. Check fr evidence f rdents and remve/eliminate if present.

26 Shreline Dispersin Discharge What is Shreline Dispersin Discharge? Shre line dispersin discharge is a cllectin f strmwater runff frm rf and/r driveway that is directed t the shreline fr dispersin. Runff is cllected by rf dwnsputs and driveway catch basins then piped t a Sediment Cntrl Structure. It is then directed by pipe t the landward side f a bulkhead fr direct discharge behind the bulkhead r t the seaward side f the bulkhead t a T perfrated pipe anchred at high water mark n the bulkhead. If there is n bulkhead the T perfrated pipe is cvered with jute matt stapled t the grund then anchred t the grund with crssed rebar. Hw d I maintain the Shreline Dispersin Discharge Facility? The fllwing are required maintenance practices fr Shreline Dispersin Discharge: D Keep gutters clean frm debris, leaves r pine needs. Check catch basin lid fr trash/debris blcking mre than 20% f the inlet. Check fr sediment buildup in the sump and dispse f in accrdance with slid waste requirements. Check inside fr cracks n walls and bttm. Check inside the Sediment Cntrl Structure fr blckages in the pipes t r frm the sump. Check inside fr trash/debris n the inlet/utlet T pipe wire cvering. Check fr cracks n walls and bttm. Check fr sediment build up in the sump and dispse f in accrdance with slid waste requirements. Ensure the access lid is accessible and easy t pen. Check pipes fr cracks/dents that impedes flw r allws leaking f strmwater. If pipe is butt fused, check the fused areas fr cracks r leaks. Check pipe anchrs fr lse rebar r lse wire ties. If anchr is cncrete check the pipe strap is secure and fr cracked cement. Check perfrated T dispersin pipe fr clgged hles. Check fr lse rebar anchrs and wire ties. Check jute matting fr hles and that the staples fr matting are in place. Check that end caps are in place. Check anchrs fr T pipe when elevated t high water mark seaward f bulkhead. D Nt Discharge debris t the gutters frm rf cleaning practices.

27 Prus Gravel Driveway What is a Prus Gravel Driveway? A prus gravel driveway is a special mix f angular gravel that allws runff t perclate thrugh the gravel and int the underlying subgrade. The mix is a 1:1 blend f WSDOT Crushed Surfacing Base Curse and Pierce Cunty specified #57 rck. It lks very much like rdinary gravel except it has a larger vid cntent. Hw des Prus Gravel Wrk? The larger vid cntent (i.e. pen space within the gravel) allws water t pass thrugh the gravel and eventually sak int the grund. Prus gravel significantly reduces the amunt f strmwater runff cmpared t cnventinal impervius surfaces. Hw d I maintain my Prus Gravel? The fllwing are required maintenance practices fr prus gravels. D General Check adjacent areas t ensure that they are nt depsiting sil, mulch, r sediment n the permeable pavement area. Replant r stabilize adjacent pervius areas t reduce ersin if needed. Check fr fallen leaves r debris and remve if present. Inlet, utlet, and underdrain pipes (if present) Check inlet and utlet pipes fr clgging r damage. Repair, replace, and remve debris as needed. Check areas arund inlet and utlet pipes fr ersin (expsed sil), and eliminate cause f ersin if present. Check underdrain pipe fr plant rts, sediment, r debris. Jet clean, cut rts, and remve debris f present. Check and clean rifice (if present). Cntaminants Use spill preventin measures when handling r string ptential cntaminants in the vicinity. Check fr evidence f cntaminants such as il, gasline, r paint and clean as sn as pssible (Crdinate surce cntrl, remval, and/r cleanup with Pierce Cunty Surface Water Management and/r Dept. f Eclgy Spill Respnse ).

28 D Nt Use snw plws r stckpile plwed snw (i.e., dirty snw) n the pavement area, unless unavidable. Stckpile landscaping materials (such as mulch, sil, and cmpst) near r n the permeable pavement area.

[Note to Engineer: Choose one below. Confirm with your geotech if you need further compaction.]

[Note to Engineer: Choose one below. Confirm with your geotech if you need further compaction.] 2-06 SUBGRADE PREPARATION (******) 2-06.3 Cnstructin Requirements 2-6.3(1) Subgrade fr Surfacing This sectin is supplemented with the fllwing: The subgrade must be suitable, as determined by the Engineer,

More information

Draper City SWPPP Checklist

Draper City SWPPP Checklist Draper City SWPPP Checklist FOR PROJECTS LESS THAN 1 ACRE AND NOT PART OF A COMMON PLAN OF DEVELOPMENT TABLE OF CONTENTS I. Submittal requirements II. Review/Prvide at time f initial SWPPP Inspectin: III.

More information

City of Vancouver Planning By-law Administration Bulletins

City of Vancouver Planning By-law Administration Bulletins City f Vancuver Planning By-law Administratin Bulletins Planning, Urban Design and Sustainability Department 453 West 12th Avenue, Vancuver, BC V5Y 1V4 tel: 3-1-1, utside Vancuver 604.873.7000 fax: 604.873.7100

More information

WETLAND AND RIVER CROSSINGS: GENERIC CROSSING PROCEDURE

WETLAND AND RIVER CROSSINGS: GENERIC CROSSING PROCEDURE METHOD STATEMENT Wetland and River Crssings METHOD STATEMENT WETLAND AND RIVER CROSSINGS: GENERIC CROSSING PROCEDURE 0 02.07.2012 Issued fr Review Semane Jnes & Wagener Rev. Date Reasn fr Issue Prepared

More information

The Basics of Polk County s Impervious Surface Regulations

The Basics of Polk County s Impervious Surface Regulations The Basics f Plk Cunty s Impervius Surface Regulatins Plk Cunty Land Infrmatin Department Plk Cunty Gvernment Center 100 Plk Cunty Plaza, Suite 130 Balsam Lake, WI 54810 715-485-9111 715-485-9246 Fax www.c.plk.wi.us/landinf/zning

More information

FLOOD CONTROL DETENTION PLAN REVIEW CHECKLIST November, 2008

FLOOD CONTROL DETENTION PLAN REVIEW CHECKLIST November, 2008 FLOOD CONTROL DETENTION PLAN REVIEW CHECKLIST Office Use: Case N: Review Date: Reviewer: Detentin Plan Review Checklist This Plan Review Checklist is designed as a tl t assist the design engineer and review

More information

CITY OF MIAMI ENVIRONMENTAL RESOURCES Tree Permit Process and Checklist

CITY OF MIAMI ENVIRONMENTAL RESOURCES Tree Permit Process and Checklist Page 1 f 6 CITY OF MIAMI ENVIRONMENTAL RESOURCES Tree Permit Prcess and Checklist Submittals: Tree Permit Prcess 1. Cmpleted tree permit applicatins, alng with the required supprting dcumentatin, must

More information

Memo. Background. South Rochford Road Type recipient(s) here HDR, Inc. Roadway Options for Protection of Iron Fen Wetlands. Rochford Cemetery Fen

Memo. Background. South Rochford Road Type recipient(s) here HDR, Inc. Roadway Options for Protection of Iron Fen Wetlands. Rochford Cemetery Fen Mem Date: Mnday, January 05, 2015 Prject: T: Frm: Subject: Suth Rchfrd Rad Type recipient(s) here HDR, Inc. Radway Optins fr Prtectin f Irn Fen Wetlands Backgrund Sphagnum angustiflium a U.S. Frest Service

More information

Erosion and Sediment Control Plan (ESCP) Review Checklist

Erosion and Sediment Control Plan (ESCP) Review Checklist Ersin and Sediment Cntrl Plan (ESCP) Review Checklist General Infrmatin: Review Date: Prject Name: Prject Address: Legal Respnsible Persn: Persn Perfrming the Review: Reviewer s Certificatin: QSD N. Wrking

More information

BIO. Post Construction Stormwater Control Practices. PTP-10 Bioretention Systems. Bowling Green, KY Stormwater Best Management Practices BIO

BIO. Post Construction Stormwater Control Practices. PTP-10 Bioretention Systems. Bowling Green, KY Stormwater Best Management Practices BIO 3.4 POST CONSTRUCTION STORMWATER CONTROL FACT SHEETS (PTP) Pst Cnstructin Strmwater Cntrl Practices PTP-10 Biretentin Systems BIO Symbl BIO TSS Reductin: 80% Descriptin Biretentin systems are structural

More information

NJDEP PROPOSES TO CHANGE FLOOD HAZARD AREA CONTROL ACT RULES

NJDEP PROPOSES TO CHANGE FLOOD HAZARD AREA CONTROL ACT RULES NJDEP PROPOSES TO CHANGE FLOOD HAZARD AREA CONTROL ACT RULES NJDEP has prpsed far-reaching regulatins which culd effect stream encrachment wetlands and buffers alng streams and tidal areas. Key highlights

More information

PS ACID SULPHATE MATERIALS

PS ACID SULPHATE MATERIALS PS ACID SULPHATE MATERIALS PURPOSE AND SCOPE The purpse f this primary standard is t eliminate r minimise risk f envirnmental harm caused by acid sulphate materials including acid sulphate sils and acid

More information

Instructions Fee Schedule

Instructions Fee Schedule City f Lndn Tree Prtectin By-Law C.P.-1515-228 Tree Prtectin Area Permit Applicatin Frestry Management Planning Services - Urban Frestry 267 Dundas Street, 3rd Flr Lndn, Ontari N6A 1H2 Telephne: 519-661-CITY

More information

STAFF REPORT. Peter Zielsdorf

STAFF REPORT. Peter Zielsdorf STAFF REPORT Applicatin: Cnstruct a new septic drainfield t replace the existing drainfield apprximately 64 feet frm Mink Lake (min. 75 ft required). Applicant: Agenda Item: 4(a) Peter Zielsdrf Backgrund

More information

Draft Hazardous Substances and Spill Management Plan

Draft Hazardous Substances and Spill Management Plan Page 1 Draft Hazardus Substances and Spill Management Plan Cntents 1 Intrductin... 2 1.1 Purpse... 2 1.2 Scpe... 2 2 Hazardus Substances... 2 3 Persnnel and Respnsibilities... 3 4 Methdlgies... 3 4.1 Strage

More information

Pesticide use notification plan

Pesticide use notification plan Pesticide use ntificatin plan 1 Intrductin This plan has been prepared accrding t the requirements f the Pesticides Regulatin 2009. This plan utlines hw and when Sydney Water will infrm the cmmunity when

More information

Waste Water Discharge

Waste Water Discharge Plicy 1102 1102.1 PURPOSE AND SCOPE The practices detailed in this plicy are intended t minimize run-ff releases assciated with firefighting, fire training, emergency scene spills and discharges, trauma

More information

Request for Proposals. Develop a New Personnel Policy Manual. for the. Red Wing Housing and Redevelopment Authority

Request for Proposals. Develop a New Personnel Policy Manual. for the. Red Wing Housing and Redevelopment Authority Request fr Prpsals t Develp a New Persnnel Plicy Manual fr the Red Wing Husing and Redevelpment Authrity March 20, 2015 Red Wing Husing and Redevelpment Authrity 428 West Fifth Street Red Wing, MN 55066

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Strmwater Pllutin Preventin Plan NUMBER: SPECIFIC SUBJECT: APPROVAL: Strmwater

More information

BROCHURE # 50 DOES MY BUILDING DESIGN NEED ENGINEERING?

BROCHURE # 50 DOES MY BUILDING DESIGN NEED ENGINEERING? BROCHURE # 50 DOES MY BUILDING DESIGN NEED ENGINEERING? Overview Building cnstructin has becme increasingly cmplex during the last tw decades. Buildings are larger and use new materials and cnstructin

More information

Chapter 7 Construction BMPs

Chapter 7 Construction BMPs Cnstructin BMPs Cntents 1.0 Intrductin... 1 2.0 Fundamental Ersin and Sediment Cntrl Principles... 2 2.1 Ersin... 2 2.2 Sedimentatin... 3 2.3 Effective Ersin and Sediment Cntrl... 3 3.0 Lcal and State

More information

ABLE Commission Q&A Q&A Regarding Licensing and Application

ABLE Commission Q&A Q&A Regarding Licensing and Application ABLE Cmmissin Q&A Q&A Regarding Licensing and Applicatin When can the interim licenses applicatins be submitted? They can be submitted between nw and September 30, 2018, hwever; the Able Cmmissin wuld

More information

Commercial Tax Abatement

Commercial Tax Abatement A cnfirmatin letter is issued by the City upn receipt f this applicatin. This applicatin is nt effective and nt cnsidered filed until the cnfirmatin letter has been issued. Filing des nt assure the apprval

More information

COST ANALYSIS REPORT. Prepared for Washington State Department of Ecology

COST ANALYSIS REPORT. Prepared for Washington State Department of Ecology COST ANALYSIS REPORT COST ANALYSIS FOR WESTERN WASHINGTON LID REQUIREMENTS AND BEST MANAGEMENT PRACTICES Prepared fr Washingtn State Department f Eclgy Prepared by City f Puyallup Washingtn Strmwater Center

More information

9.0 Water Use and Conservation

9.0 Water Use and Conservation 9.0 Water Use and Cnservatin Many explratin activities require a surce f ptable and nn-ptable water. As explratin prgrams mve frm early t advanced stage, expect an increase in demand fr water and additinal

More information

Table of Contents. London BRT Transit Project Assessment Process Draft Environmental Project Report

Table of Contents. London BRT Transit Project Assessment Process Draft Environmental Project Report Lndn BRT Transit Prject Assessment Prcess Draft Envirnmental Prject Reprt Table f Cntents 6 Permits and Apprvals... 6-1 Federal... 6-2 Prvincial... 6-2 Municipal... 6-3 Utilities... 6-3 Institutins...

More information

TOWN OF PAYSON WATER DEPARTMENT BACKFLOW PREVENTION PROGRAM CUSTOMER INFORMATION PACKAGE

TOWN OF PAYSON WATER DEPARTMENT BACKFLOW PREVENTION PROGRAM CUSTOMER INFORMATION PACKAGE TOWN OF PAYSON WATER DEPARTMENT BACKFLOW PREVENTION PROGRAM CUSTOMER INFORMATION PACKAGE TOWN OF PAYSON Backflw Preventin Prgram Develpers, Cntractrs and Paysn Residents: An apprved backflw preventin assembly

More information

1. Applicant / Contact Information

1. Applicant / Contact Information WOODFORD MANUFACTURING BUILDING ADDITION LOT 1, BLOCK 1, WAYNOKA ROAD INDUSTRIAL 2121 WAYNOKA ROAD, COLORADO SPRINGS, CO STORMWATER MANAGEMENT PLAN (SWMP) PCD File N. PPR-1837 September, 2018 1. Applicant

More information

Division of Energy, Mineral and Land Resources Land Quality Section National Pollutant Discharge Elimination System NCG140000

Division of Energy, Mineral and Land Resources Land Quality Section National Pollutant Discharge Elimination System NCG140000 Divisin f Energy, Mineral and Land Resurces Land Quality Sectin Natinal Pllutant Discharge Eliminatin System NCG140000 FOR AGENCY USE ONLY Date Received Year Mnth Day Certificate f Cverage N C G 1 4 Check

More information

SEWAGE SYSTEM PERMIT APPLICATION INSTRUCTIONS FOR COMPLETION

SEWAGE SYSTEM PERMIT APPLICATION INSTRUCTIONS FOR COMPLETION SEWAGE SYSTEM PERMIT APPLICATION INSTRUCTIONS FOR COMPLETION Incmplete applicatins will nt be prcessed. Accepted applicatins must include the fllwing cmpleted frms: Prvincial Frms: Applicatin t Cnstruct

More information

CHERRYTREE FARM CAMPING WEBSITE AND MARKETING PRIVACY NOTICE

CHERRYTREE FARM CAMPING WEBSITE AND MARKETING PRIVACY NOTICE CHERRYTREE FARM CAMPING WEBSITE AND MARKETING PRIVACY NOTICE INTRODUCTION Welcme t the Cherry Tree Farm Camping's privacy ntice. Cherry Tree Farm Camping respects yur privacy and is cmmitted t prtecting

More information

Module 10: Economics of Nutrient Management and Environmental Issues. To view the chapter for this topic click here.

Module 10: Economics of Nutrient Management and Environmental Issues. To view the chapter for this topic click here. Mdule 10: Ecnmics f Nutrient Management and Envirnmental Issues T view the chapter fr this tpic click here. Intrductin The bjective f nutrient management is t select the prper nutrient rate, placement,

More information

1 INTRODUCTION AND SCOPE OF WORK

1 INTRODUCTION AND SCOPE OF WORK C & D Landfill 2 Landfill Rd Happy Valley Attentin: Christine Mrgan Dear Christine, RE: Review f Slpe Stability fr Resurce Cnsent, C & D Landfill, Happy Valley Our Reference: 09870.000.000 1 INTRODUCTION

More information

MS4 REQUIREMENTS TABLE INSTRUCTIONS

MS4 REQUIREMENTS TABLE INSTRUCTIONS COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF CLEAN WATER MS4 REQUIREMENTS TABLE INSTRUCTIONS Revised, July 29, 2016 Intrductin The Pennsylvania Department f Envirnmental

More information

Water Body and Riparian Area Boundary Delineation Course

Water Body and Riparian Area Boundary Delineation Course Water Bdy and Riparian Area Bundary Delineatin Curse This training prvides an eclgical perspective n the delineatin f water bdies, with a specific fcus n riparian habitat adjacent t streams, rivers, lakes,

More information

DEPARTMENT OF WATERSHED MANAGEMENT SITE DEVELOPMENT PLAN REVIEW

DEPARTMENT OF WATERSHED MANAGEMENT SITE DEVELOPMENT PLAN REVIEW DEPARTMENT OF WATERSHED MANAGEMENT SITE DEVELOPMENT PLAN REVIEW SUBMITTAL REQUIREMENTS ONE & TWO FAMILY RESIDENTIAL I. General 1. Cmplete plans- All plans submitted fr permit review must be cmplete and

More information

Project: Sydney Metro - Utility in stigations, Application Title:

Project: Sydney Metro - Utility in stigations, Application Title: Sydney Metr Integrated Management System (IMS) (Uncntrlled when printed) Iv' sydney METRO Pre-Cnstructin Minr Wrks Apprval Frm Minr Wrks are defined as any lw impact activities that are undertaken prir

More information

Building Permit Application Accessory Buildings/ Detached Garages

Building Permit Application Accessory Buildings/ Detached Garages Parkland Cunty 53109A Hwy 779 Parkland Cunty, Alberta T7Z 1R1 Phne: (780) 968-8888 Fax: (780) 968-3225 Tll Free: 1-888-880-0858 Email: safetycdest@parklandcunty.cm Building Permit Applicatin Accessry Buildings/

More information

MARINE CONSENTS GUIDANCE

MARINE CONSENTS GUIDANCE MARINE CONSENTS GUIDANCE FEBRUARY 2008 CONTROLLED DOCUMENT STATUS PROJECT TITLE DOCUMENT TITLE DOCUMENT REF BR Marine Cnsents Guide.dc REVISION RECORD STATUS DATE SUMMARY OF CHANGES CHECKED APPROVED 0

More information

o Mitigation measures are required to be identified. Soil

o Mitigation measures are required to be identified. Soil Mitigatin measures are required t be identified. Sil Pllutin f sil due t handling, use and strage f hazardus substances during cnstructin and peratin. The lss f available tp sil. Mitigatin measures are

More information

EAGLE SCOUT CANDIDATE PREPARATION GUIDE. The Eagle Scout Service Project

EAGLE SCOUT CANDIDATE PREPARATION GUIDE. The Eagle Scout Service Project September 2018 ~ Previus versins nt valid Sufflk Cunty Cuncil By Scuts f America EAGLE SCOUT CANDIDATE PREPARATION GUIDE T maintain the high standards f excellence recgnized in thse wh have achieved the

More information

PERMIT REQUIREMENTS. City of West Park Permit Application (signed and notarized by the owner and contractor)

PERMIT REQUIREMENTS. City of West Park Permit Application (signed and notarized by the owner and contractor) CITY OF WEST PARK ROOF AND REROOF PERMIT PACKAGE PERMIT REQUIREMENTS City f West Park Permit Applicatin (signed and ntarized by the wner and cntractr) Cntract signed between wner and cntractr *All cntracts

More information

3. Direct the Engineer to prepare a feasibility study that complies with the requirements of the USACE and BCWMC criteria.

3. Direct the Engineer to prepare a feasibility study that complies with the requirements of the USACE and BCWMC criteria. Memrandum T: Bassett Creek Watershed Management Cmmissin Frm: Barr Engineering C. Subject: Item 6Dii Cnsider Apprval f Prpsal t Prepare Feasibility Study fr Westwd Lake Water Quality Imprvement Prject

More information

CCE Application Guidelines

CCE Application Guidelines CCE Applicatin Guidelines - 2017 General This dcument cntains infrmatin n hw t cmplete and submit yur CCE applicatin. If yu have any questins, please cntact Susan McGuire at smcguire@acce.rg. Tips befre

More information

Months: Days: Hours: 11. What is the surface type of the county/state road in which the facility accesses? Paved Gravel Dirt

Months: Days: Hours: 11. What is the surface type of the county/state road in which the facility accesses? Paved Gravel Dirt Please Answer the Fllwing Questins: (attach sheet if needed) 1. What type f facility is being prpsed? CAMPGROUND & RV PARK FORM Yakima Cunty Public Services 128 Nrth Secnd Street Furth Flr Curthuse Yakima,

More information

CCE Application Guidelines

CCE Application Guidelines CCE Applicatin Guidelines - 2018 General This dcument cntains infrmatin n hw t cmplete and submit yur CCE applicatin. If yu have any questins, please cntact Susan McGuire at smcguire@acce.rg. Tips befre

More information

PSI Cementitious Patching Guide

PSI Cementitious Patching Guide PSI Cementitius Patching Guide Material Use TuffPatch VOH fr Vertical and Overhead Repairs and TuffPatch DOT fr any Hrizntal r frm and pur applicatins. Use neat materials fr applicatins up t 2 inches thick.

More information

Instructions for Conducting Sampling During Underground Storage Tank Closure

Instructions for Conducting Sampling During Underground Storage Tank Closure Instructins fr Cnducting Sampling During Undergrund Strage Tank Clsure Permitting and Cmpliance Assistance Prgram Divisin f Waste Management Flrida Department f Envirnmental Prtectin April 2016 [Incrprated

More information

Stormwater Technical Guidance Documents. Post-Construction Storm Water

Stormwater Technical Guidance Documents. Post-Construction Storm Water Strmwater Technical Guidance Dcuments Pst-Cnstructin Strm Water City f Ames Strmwater Technical Guidance Dcuments Updated January 25, 2015 Page x Table f Cntents Intrductin 1 Applicatin 2 Smart Watershed

More information

Family Support Service Provider Quick Reference Guide to CYBER

Family Support Service Provider Quick Reference Guide to CYBER Welcme Page: Family Supprt Service Prvider Quick Reference Guide t CYBER Links t Mnitr Regularly: Authrizatin Current: Will list all currently pen authrizatins; shuld include nly thse yuth currently receiving

More information

FREQUENTLY ASKED QUESTIONS REMEDIATION TECHNOLOGIES WORKSHOP

FREQUENTLY ASKED QUESTIONS REMEDIATION TECHNOLOGIES WORKSHOP FREQUENTLY ASKED QUESTIONS REMEDIATION TECHNOLOGIES WORKSHOP Objectives Q1. What are the bjectives f the Remediatin Technlgies prjects? A1. Kuwait Oil Cmpany is cmmitted t a sustainable remediatin slutin

More information

Analysis of water quality parameters and discharge rate through conventional and geotextile based filter

Analysis of water quality parameters and discharge rate through conventional and geotextile based filter Internatinal Research Jurnal f Engineering and Technlgy (IRJET) e-issn: 2395-0056 Vlume: 03 Issue: 08 Aug-2016 www.irjet.net p-issn: 2395-0072 Analysis f water quality parameters and discharge rate thrugh

More information

erosion&sedimentcontrol

erosion&sedimentcontrol Auckland Reginal Cuncil Wrks Within a Watercurse: 3 1 Wrks within watercurses have very high ptential fr ersin and discharge f sediment. This is because such wrk is undertaken in r near flwing water the

More information

Isetan Personal Data Protection Policy (PDPP)

Isetan Personal Data Protection Policy (PDPP) Isetan Persnal Data Prtectin Plicy (PDPP) ISETAN OF JAPAN SDN BHD (IOJ) and ICJ DEPARTMENT STORE (M) SDN BHD (ICJ) are cmmitted t ensure that Custmer s privacy is prtected in accrdance t the Persnal Data

More information

Stormwater NPDES Compliance Rule 5. February 23, 2017

Stormwater NPDES Compliance Rule 5. February 23, 2017 Strmwater NPDES Cmpliance Rule 5 February 23, 2017 Presenter Kathy Allen Strmwater Prgram Department f Public Wrks City f Indianaplis Kathy.Allen@indy.gv Agenda Overview EPA Audit New INDOT Requirements

More information

ROXBORO STEAM ELECTRIC PLANT RISK CLASSIFICATION

ROXBORO STEAM ELECTRIC PLANT RISK CLASSIFICATION ROXBORO STEAM ELECTRIC PLANT RISK CLASSIFICATION Apprx. lcatin f Unnamed Eastern Extensin Impundment Rxbr Steam Electric Plant Overall Risk Classificatin DEQ has prpsed the risk classificatin fr the East

More information

Instructions for Creating a Vegetable/Fruit Nutrient Management Plan

Instructions for Creating a Vegetable/Fruit Nutrient Management Plan Instructins fr Creating a Vegetable/Fruit Nutrient Management Plan Preliminary Steps: 1. Make sure that recent sil test are available (within 3 yrs.) fr all fields that are included in the NMP. Sil tests

More information

Your visits have NOT been prescheduled.

Your visits have NOT been prescheduled. Pied Piper Facility Ratings.cm Evaluatr Instructin Guide Crdinating Yur Visit Yur visits have NOT been prescheduled. Once yu have accepted the assignment nline yu will need t schedule the date and time

More information

IESBA Meeting (March 2013) Agenda Item

IESBA Meeting (March 2013) Agenda Item Agenda Item 7-A Backgrund Lng Assciatin f Senir Persnnel (Including Partner Rtatin) with an Audit Client Matters fr Cnsideratin 1. Paragraph 290.150 f the IESBA Cde f Ethics fr Prfessinal Accuntants (the

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directorate B Growth and Innovation Circular Economy and Industrial Leadership

EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directorate B Growth and Innovation Circular Economy and Industrial Leadership EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directrate B Grwth and Innvatin Circular Ecnmy and Industrial Leadership Seville, 6 th April 2018 Level(s) testing phase Guidance and rules

More information

Guidelines for the Use of Residential Leased Properties at HYCO LAKE

Guidelines for the Use of Residential Leased Properties at HYCO LAKE PERSON-CASWELL LAKE AUTHORITY Guidelines fr the Use f Residential Leased Prperties at HYCO LAKE INCORPORATED AS ATrr ACHMENT NUMBER ONE PERSON-CASWELL LAKE AUTHORITY LEASE OF THE CONTROL STRIP TO PROPERTY

More information

Residential Decks. Building Permit Information Guide

Residential Decks. Building Permit Information Guide Residential Decks Building Permit Infrmatin Guide Municipal Office Bx 70, 263 Main St. Odessa, Ontari K0H 2H0 Phne: 613-386-7351 www.lyalisttwnship.ca Office Hurs Winter September thrugh April Mn Fri 8:30

More information

EVAPOTRANSPIRATION IN FOREST STANDS OF THE SOUTHERN APPALACHIAN MOUNTAINS J. L. KOVNEE Southeastern Forest Experiment Station, Forest Service, USDA

EVAPOTRANSPIRATION IN FOREST STANDS OF THE SOUTHERN APPALACHIAN MOUNTAINS J. L. KOVNEE Southeastern Forest Experiment Station, Forest Service, USDA EVAPOTRANSPIRATION IN FOREST STANDS OF THE SOUTHERN APPALACHIAN MOUNTAINS J. L. KOVNEE Sutheastern Frest Experiment Statin, Frest Service, USDA Experiments at the Cweeta Hydrlgic Labratry in the high rainfall

More information

The PennEast Pipeline Project. Delaware Township, New Jersey September 29, 2014

The PennEast Pipeline Project. Delaware Township, New Jersey September 29, 2014 The Prject Delaware Twnship, New Jersey September 29, 2014 Abut the Prject AGL Resurces; NJR Pipeline Cmpany; PSEG Pwer; Suth Jersey Industries; and UGI Energy Services (UGIES) cmprise Cmpany, LLC. Apprximately

More information

Wellesley Water Presentation to the Wellesley Green Collaborative

Wellesley Water Presentation to the Wellesley Green Collaborative Wellesley Water Presentatin t the Wellesley Green Cllabrative Presented by Raina McManus n behalf f the Friends f Brkside, September 16, 2013. The Friends f Brkside, (frmerly the Lngfellw Pnd Neighbrhd

More information

ARTIFICIAL RECHARGE AGAINST SEA WATER INTRUSION & SECURED GROUNDWATER AVAILABILITY IN THE COASTAL AREA OF VANUR TALUK, VILLUPURAM DISTRICT, TAMIL NADU

ARTIFICIAL RECHARGE AGAINST SEA WATER INTRUSION & SECURED GROUNDWATER AVAILABILITY IN THE COASTAL AREA OF VANUR TALUK, VILLUPURAM DISTRICT, TAMIL NADU ARTIFICIAL RECHARGE AGAINST SEA WATER INTRUSION & SECURED GROUNDWATER AVAILABILITY IN THE COASTAL AREA OF VANUR TALUK, VILLUPURAM DISTRICT, TAMIL NADU A PROJECT SUBMITTED BY AUROVILLE WATER HARVEST Centre

More information

Customer best practices

Customer best practices Custmer dcument Custmer best practices Recmmendatins fr new Basware transactin services custmers Basware Crpratin Cpyright Basware Crpratin All rights reserved 1 (11) 1 Intrductin Our best advice This

More information

Permeable Pavement. Pavements constructed with these units create joints that are filled with permeable

Permeable Pavement. Pavements constructed with these units create joints that are filled with permeable Permeable Permeable pavement is a paving system which allows rainfall to percolate through the surface into the underlying soil or an aggregate bed, where stormwater is stored and infiltrated to underlying

More information

Guidance notes for completing the International Start-up Form

Guidance notes for completing the International Start-up Form Guidance ntes fr cmpleting the Internatinal Start-up Frm These guidance ntes are designed t supprt yu in cmpleting the Internatinal start-up frm. Yu will als need t refer t a) yur Stage 2 applicatin frm

More information

Single Family Residential Development Guide City of McCall and McCall Impact Area

Single Family Residential Development Guide City of McCall and McCall Impact Area Single Family Residential Develpment Guide City f McCall and McCall Impact Area TABLE OF CONTENTS Intrductin... 2 What is the zning f my prperty?... 2 Des my prject need planning apprval?... 2 What are

More information

Chapter 11: Water. A. The Water Cycle Water is a resource because it is circulated in the water cycle.

Chapter 11: Water. A. The Water Cycle Water is a resource because it is circulated in the water cycle. Chapter 11: Water Sectin 1: Water Resurces Objectives 1. Describe the distributin f Earth s water resurces. 2. Explain why fresh water is ne f Earth s limited resurces. 3. Describe the distributin f Earth

More information

Guidance on Calculation of Outdoor Water Use Reductions for LEED Canada for Homes Credits SS 2.5 and/or WE 2.3

Guidance on Calculation of Outdoor Water Use Reductions for LEED Canada for Homes Credits SS 2.5 and/or WE 2.3 Guidance n Calculatin f Outdr Water Use Reductins fr LEED Canada fr Hmes Credits SS 2.5 and/r WE 2.3 This guidance dcument prvides an verview f the calculatin prcedures fr estimating the reductin in utdr

More information

Purpose. Contaminated Materials. Contaminated Materials Management Team (CMMT) Contacts

Purpose. Contaminated Materials. Contaminated Materials Management Team (CMMT) Contacts Cntaminated Materials Cntaminated Materials Management Team (CMMT) Cntacts Michelle Waters Districts 2, 4, Metr West (651) 366-3627 michelle.waters@state.mn.us Carlyn Bben - Districts 1, 3, Metr Nrth &

More information

Mersham Sports Club Flood Street, Mersham, Ashford, Kent, TN25 6NX

Mersham Sports Club Flood Street, Mersham, Ashford, Kent, TN25 6NX Mersham Sprts Club Fld Street, Mersham, Ashfrd, Kent, TN25 6NX www.mershamsprtsclub.cm PRIVACY NOTICE FOR VOLUNTEERS We are cmmitted t respecting yur privacy. This ntice is t explain hw we may use persnal

More information

Mats Inc. Installation and Maintenance Instructions

Mats Inc. Installation and Maintenance Instructions Mats Inc. Installatin Instructins fr Mats Inc. Carpet Matting 4000, 5000, 6500, 8850 Page 1 f 5 Mats Inc. Installatin and Maintenance Instructins fr Mats Inc. Carpet Matting 4000, 5000, 6500, 8850 These

More information

erosion&sedimentcontrol

erosion&sedimentcontrol Auckland Reginal Cuncil Ersin Cntrl: 1 15 ersin&sedimentcntrl Guidelines fr Land Disturbing Activities in the Auckland Regin 1.6.4 Turfing Plate 1.6.4 Turfing Definitin The establishment and permanent

More information

Quality Hotel View is a full-service conference hotel located in Malmö, Sweden, and is a part of the hotel chain Nordic Choice Hotels.

Quality Hotel View is a full-service conference hotel located in Malmö, Sweden, and is a part of the hotel chain Nordic Choice Hotels. Privacy Plicy - Quality Htel View Quality Htel View is a full-service cnference htel lcated in Malmö, Sweden, and is a part f the htel chain Nrdic Chice Htels. This privacy plicy explains which persnal

More information

Mats Inc. Installation and Maintenance Instructions for 3M Nomad Carpet Matting 4000, 5000, 6500, 8850

Mats Inc. Installation and Maintenance Instructions for 3M Nomad Carpet Matting 4000, 5000, 6500, 8850 Mats Inc. Installatin Instructins fr 3M Nmad Carpet Matting 4000, 5000, 6500, 8850 Page 1 f 5 Mats Inc. Installatin and Maintenance Instructins fr 3M Nmad Carpet Matting 4000, 5000, 6500, 8850 These instructins

More information

What You Should Know About GDPR. What is the GDPR?

What You Should Know About GDPR. What is the GDPR? What Yu Shuld Knw Abut GDPR What is the GDPR? The Eurpean Unin s General Data Prtectin Regulatin ( GDPR), effective May 25, 2018, is a far-reaching regulatin applicable t rganizatins with Eurpean Ecnmic

More information

What You Should Know About GDPR. What is the GDPR?

What You Should Know About GDPR. What is the GDPR? What Yu Shuld Knw Abut GDPR What is the GDPR? The Eurpean Unin s General Data Prtectin Regulatin ( GDPR), effective May 25, 2018, is a far-reaching regulatin applicable t rganizatins with Eurpean Ecnmic

More information

ALABAMA STATE PORT AUTHORITY REQUEST FOR PROPOSAL

ALABAMA STATE PORT AUTHORITY REQUEST FOR PROPOSAL ALABAMA STATE PORT AUTHORITY REQUEST FOR PROPOSAL PROFESSIONAL SERVICE CONTRACT PIER B SOUTH REHABILITATION RFQ Number: ASPA-TS-2018-02 MARCH 2018 REQUEST FOR QUALIFICATIONS (RFQ) FOR ENGINEER DESIGN &

More information

BACKGROUND INFORMATION DOCUMENT DMR REFERENCE: Pending

BACKGROUND INFORMATION DOCUMENT DMR REFERENCE: Pending Hlanga Sand Mining (Pty) Ltd SAND MINING APPLICATION Tugela River (KwaZulu-Natal) BACKGROUND INFORMATION DOCUMENT DMR REFERENCE: Pending BACKGROUND INFORMATION An applicatin has been submitted t the Department

More information

Disaster Recovery Planning Guide

Disaster Recovery Planning Guide Disaster Recvery Planning Guide Disaster Recvery Planning Guide A Business Cntinuity Plan (BCP) is a written strategy which ensures that persnnel and assets are prtected and able t functin in the event

More information

PROFESSIONAL SERVICES BULLETIN 17-3 ADDENDUM 2

PROFESSIONAL SERVICES BULLETIN 17-3 ADDENDUM 2 PROFESSIONAL SERVICES BULLETIN 17-3 ADDENDUM 2 ADDENDUM 2 des nt change the due date r time. STATEMENTS OF INTEREST are due by 4:30:00 p.m. (lcal time) Due Date: May 4, 2017 Successful Offerrs will be

More information

Proposed EASR Regulation Standard Systems and Equipment. AWMA Breakfast Sessions Fall 2013

Proposed EASR Regulation Standard Systems and Equipment. AWMA Breakfast Sessions Fall 2013 Prpsed EASR Regulatin Standard Systems and Equipment AWMA Breakfast Sessins Fall 2013 What This Presentatin Will Cver New prpsed activities t be added t the EASR Prpsed exemptins t be added t O. Reg. 524/98

More information

Cleves Pump Station Stabilization, Project ID Date Issued: August 6, 2012

Cleves Pump Station Stabilization, Project ID Date Issued: August 6, 2012 Cleves Pump Statin Stabilizatin, Prject ID 10210020 Date Issued: August 6, 2012 ADDENDUM NO. 2 This addendum will nly be distributed via e-mail, but will remain available fr viewing n the MSDGC website

More information

Resource Tracker User Guide

Resource Tracker User Guide Revisin: 05 Effective Date: 02/22/2019 Prepared By: PJM Client Management [Type text] PJM User Guide: Resurce Tracker Table f Cntents Apprval... 2 Current Revisin... Errr! Bkmark nt defined. Intrductin...

More information

CENTRAL OREGON STORMWATER MANUAL CHAPTER 8 CONVEYANCE

CENTRAL OREGON STORMWATER MANUAL CHAPTER 8 CONVEYANCE CHAPTER 8 CONVEYANCE Chapter Organizatin 8.1 Intrductin... 8-1 8.1.1 Design Flw... 8-1 8.2 Cnstructed Channels... 8-3 8.2.1 Channel Analysis... 8-3 8.2.2 Minimum Requirements fr Cnstructed Channels...

More information

Eagle Scout Notebook Golden Eagle District (October 22, 2012)

Eagle Scout Notebook Golden Eagle District (October 22, 2012) Eagle Scut Ntebk Glden Eagle District (Octber 22, 2012) Purpse The purpse f this dcument is guide the Eagle Scut candidate thugh the prcess f creating the Eagle Scut Ntebk that is t be submitted t the

More information

North Hockey Umpiring Association (NHUA) PRIVACY NOTICE FOR OUR MEMBERS

North Hockey Umpiring Association (NHUA) PRIVACY NOTICE FOR OUR MEMBERS Nrth Hckey Umpiring Assciatin (NHUA) PRIVACY NOTICE FOR OUR MEMBERS We are cmmitted t respecting yur privacy. This ntice is t explain hw we may use persnal infrmatin we cllect befre, during and after yur

More information

The Grannies Cricket Club

The Grannies Cricket Club The Grannies Cricket Club PRIVACY NOTICE FOR OUR MEMBERS We are cmmitted t respecting yur privacy. This ntice is t explain hw we may use persnal infrmatin we cllect befre, during and after yur membership

More information

TALUS Insect Growth Regulator Dry Flowable

TALUS Insect Growth Regulator Dry Flowable 2016-3215 2016-08-16 GROUP 16 INSECTICIDE TALUS Insect Grwth Regulatr Dry Flwable COMMERCIAL GUARANTEE: Buprfezin 70% READ THE LABEL BEFORE USING KEEP OUT OF REACH OF CHILDREN Cntains the allergen, sulfites

More information

Safety and Security Checks for Tank Container HSE CoP 613. Safety and Security Checks for Tank Container. HSE Code of Practice 613

Safety and Security Checks for Tank Container HSE CoP 613. Safety and Security Checks for Tank Container. HSE Code of Practice 613 Safety and Security Checks fr Tank Cntainer HSE Cde f Practice 613 Table f Cntents 1. Purpse... 3 2. Definitins... 3 3. Scpe... 3 4. Mandatry principles r standards... 3 4.1 Legal... 4 4.2 Prcess requirements...

More information

FLOOD HAZARD ZONE DEVELOPMENT PERMIT

FLOOD HAZARD ZONE DEVELOPMENT PERMIT COUNTY OF MENDOCINO DEPARTMENT OF PLANNING AND BUILDING SERVICES 860 NORTH BUSH STREET UKIAH CALIFORNIA 95482 120 WEST FIR STREET FORT BRAGG CALIFORNIA 95437 STEVE DUNNICLIFF, DIRECTOR PHONE: 707-234-6650

More information

SA Happy Island Water World

SA Happy Island Water World SA Happy Island Water Wrld Rad K6 Cnstructin Backgrund Infrmatin Dcument INTEGRATED ENVIRONMENTAL AUTHORISATION FOR THE PROPOSED DEVELOPMENT OF A WATERPARK, RIETFONTEIN, MOGALE CITY Purpse f Dcument The

More information

Cloud services Information and records management considerations

Cloud services Information and records management considerations Clud services Infrmatin and recrds management cnsideratins December 2018 Part f the Department f Internal Affairs Dcument details Dcument Identifier: 18/G15 Versin Date Descriptin Revisin due 0.1 Oct 2018

More information

Penketh Panther Netball Club

Penketh Panther Netball Club Penketh Panther Netball Club PRIVACY NOTICE FOR OUR MEMBERS We are cmmitted t respecting yur privacy. This ntice is t explain hw we may use persnal infrmatin we cllect befre, during and after yur membership

More information

STORMWATER CONTROL PLAN APPLICATION AND COVERSHEET

STORMWATER CONTROL PLAN APPLICATION AND COVERSHEET 1) APPLICATION INFORMATION Applicant Name: Mailing Address: Daytime Phne: Email Address: STORMWATER CONTROL PLAN APPLICATION AND COVERSHEET Engineering Department City f Pism Beach 760 Mattie Rad, Pism

More information

In 1961 a new Lift Station was constructed, the trickling filter was repaired and some minor modifications were made to the treatment plant.

In 1961 a new Lift Station was constructed, the trickling filter was repaired and some minor modifications were made to the treatment plant. WITH TIME COMES CHANGE This is true with everything, Yes even in the wnderful wrld f wastewater treatment. In the 1920 s we were knwn as the Sanitary Sewage Department, in 1951 Plant City Sewage Treatment

More information

OLIVENHAIN MUNICIPAL WATER DISTRICT DCMWTP SEWER MANHOLE REHAB PROJECT Pre-Bid Meeting Minutes (All changes/updates are shown in italics)

OLIVENHAIN MUNICIPAL WATER DISTRICT DCMWTP SEWER MANHOLE REHAB PROJECT Pre-Bid Meeting Minutes (All changes/updates are shown in italics) RHB Cpl OLIVENHAIN MUNICIPAL WATER DISTRICT DCMWTP SEWER MANHOLE REHAB PROJECT Pre-Bid Meeting Minutes (All changes/updates are shwn in italics) Date and Time: Tuesday June 19, 2018 10:00 AM Lcatin: DCMWTP

More information