City of Virginia Beach Department of Public Works/Engineering

Size: px
Start display at page:

Download "City of Virginia Beach Department of Public Works/Engineering"

Transcription

1 City of Virginia Beach Department of Public Works/Engineering Civil & Environmental Engineering Visiting Council Spring 2010 Seminar Phil Pullen, P.E. Transportation Division May 6,

2 Public Works Overview Sustains and improves the physical and environmental quality of the City for the benefit of its citizens. Three management divisions: Engineering, Operations, and Operations Support Engineering divisions consist of Buildings, Water Resources, Transportation, and Traffic Engineering 2

3 3

4 Upcoming Buildings Projects Project Cost Project Cost Recreation Centers (3) Replace Front Reception/Desk Area Recreation Centers (3) Replace Bollard Lights with Security Lighting Recreation Centers (3) Pool Liner Replacement $350,000 Judicial Center Water Infiltration (Foundations) $690,000 $300,000 Replace Skylights at Aquarium $100,000 $100,000 Creeds Police Training Facility Phase 3 Simulation City $350,000 CAC Fire Alarms $170,000 Lighthouse Multi-Service Center $4,291,000 LETA HVAC $300,000 Fire Station #10 Generator $100,000 Lake Lawson/Lake Smith Phase One Construction Plans $2,000,000 VBCC Kitchen Hood and Hot Water Venting Design Gutter Repairs on Jail $60,000 Electrical and Generator Upgrade for PW Highways Judicial Center Roof Panel Replacement $1,371,460 $100,000 $375,000 4

5 Buildings Contracts Architectural & Engineering Services Building Construction Projects Proposal Due Date: May 21, 2010; Award Date: July 2010 Mechanical & Electrical Engineering Services Building Construction Projects Proposal Due Date: May 19, 2010; Award Date: July

6 Upcoming Water Resources Projects Project Cost Project Cost Stormwater Flood Control and Water Quality Projects South Lake Holly Watershed $4,000,000 Baker Road Culvert & Ditch Imp. $450,000 Thoroughgood Drainage $600,000 Beach Garden Park $1,500,000 Stormwater Quality Retrofits in the Chesapeake Bay Basin (in response to TMDL) Bellamy Manor Outfall Ditch $450,000 $500,000 Elizabeth River Shores Phase II $1,000,000 Coastal Projects Lawson Forest Drainage $550,000 Western Branch Lynnhaven River Maintenance Dredging $4,000,000 North Lake Holly Watershed Section II $6,000,000 Various Minor Dredging Projects $300,000 Rosemont Forest Drainage Improvements Phase II $750,000 Sandbridge Beach Access Improvement & Sand Management $250,000 6

7 Water Resources Projects in FY 11 North Lake Holly Watershed $6M South Lake Holly Watershed $4M Sandbridge Beach Access Improvement & Sand Management $250K Elizabeth River Shores $1M 7

8 Water Resources Contracts Stormwater Environmental (2), selection underway, Max 3-year current contracts GER (June 2007 to June 2010) Kimley Horn Associates (August 2007 to August 2010) Solid Waste Engineering Services (1), existing Malcolm Pirnie, Inc. (June 2008 to June 2011) Storm water management, drainage, water quality (1), existing, CH2M Hill (September 2008 to September 2011) Storm water management, modeling, and VPDES Permit compliance (1), existing, URS Corp (September 2008 to September 2011) 8

9 Water Resources Contracts Coastal Beach Profile Monitoring Program (1), existing, Waterway Surveys & Engineering, Ltd. (October 2009 to October 2012) General Coastal Engineering Services (1), existing, Moffatt & Nichol (January 2009 to January 2012) 9

10 Upcoming Roadways Projects Project Cost Project Cost Atlantic Ave Sidewalk $30,000 Goodspeed Road $585,000 Cypress Ave Sidewalk $39,000 Princess Anne/Pleasant Ridge Int. Imp. $750,000 West Great Neck Sidewalk $101,000 Dam Neck/Landstown Int. Imp. $855,000 Shore Dr/Pleasure House Rd. Int. Imp. $157,000 Independence/Lynnhaven Pkwy Int. Imp. $900,000 Shore Dr/Lake Joyce Pedestrian Imp. $157,000 General Booth/London Bridge Int. Imp. $956,000 London Bridge/Shipps Corner Int. Imp. $280,000 Independence Blvd/Dahlia Int. Imp. $1,000,000 Dam Neck Rd/Galvani Dr Int. Imp. $290,000 Avalon Avenue $1,015,000 N. Great Neck/Lynnhaven Dr Turn Lanes $295,000 Bonney Rd/Kentucky Ave Int. Imp. $1,500,000 Animal Shelter Turn Lanes $319,600 Baker Road $3,225,000 Stumpy Lake Parking Lot $425,500 West Neck Rd Ph I $4,091,103 Independence Blvd Sidewalks $498,000 Lynnhaven Great Neck Ramps $22,454,000 Virginia Beach Blvd Sidewalks $498,000 Laskin Gateway Phase 3 $30,622,010 Princess Anne Rd/Gum Bridge Int. Imp. $570,000 Princess Anne Rd Ph IV $71,000,000 Princess Anne Commons Gateway $571,000 Princess Anne Rd/Kempsville Int. Imp. $89,600,000 10

11 Roadways Projects in FY 11 Baker Road $3.2M Laskin Gateway $30M Princess Anne Rd/Kempsville Rd Improvements $89.6 M 11

12 Roadways Contracts General Civil Engineering Services Parsons Brinckerhoff, Inc. (June 2008 to June 2011) General Civil Engineering Services for Federally and State Funded Projects HDR, Inc. (June 2009 to June 2012) Traffic Engineering Services Vanasse Hangen Brustlin (VHB), Inc. (January 2009 to January 2012) General Civil Engineering Services Advertised Summer 2010 Geotechnical Soil & Material Testing, Utilities, Designation Advertised

13 Contract Selection Process Professional Qualifications Specialized Experience Familiarity with Project Quality of Past Performance Experience/Qualification of Consultants Cost Control Volume of Work Project Accessibility Public Participation 13

14 Points of Contact Public Works (757) Buildings: Everette Herndon (757) Transportations: Heather Ham (757) Water Resources: Mike Mundy (757) Transportation Engineering: Bob Gey (757)

15 Questions? 15

FY Virginia Beach Budget Response to Council Questions

FY Virginia Beach Budget Response to Council Questions FY 2018-2019 Virginia Beach Budget Response to Council Questions Question Number: FY19 70 Question: Building on my question number FY19 69 above, under the column heading Budgeted for FY 2019 please provide

More information

FY STORMWATER UPDATE TO CITY COUNCIL

FY STORMWATER UPDATE TO CITY COUNCIL FY 2017-2022 STORMWATER UPDATE TO CITY COUNCIL MARCH 8, 2016 1 OVERVIEW Fund Summary Functional Components Closing Discussion 2 FUND SUMMARY 3 FY17 PROPOSED REVENUE ERU Daily Fee = $0.433 ERU Annual Fee

More information

PRINCESS ANNE DISTRICT STORMWATER PROJECTS

PRINCESS ANNE DISTRICT STORMWATER PROJECTS PRINCESS ANNE DISTRICT STORMWATER PROJECTS Topics o o o o o Sea Level Rise and the Southern Watersheds Ashville Park Sherwood Lakes Kingston Estates Drainage Operations & Maintenance in the Southern Watersheds

More information

PROPOSED STORMWATER PROJECT IMPLEMENTATION PLAN. o Execution of New and Expanded Flood Control Projects o Program Options

PROPOSED STORMWATER PROJECT IMPLEMENTATION PLAN. o Execution of New and Expanded Flood Control Projects o Program Options PROPOSED STORMWATER PROJECT IMPLEMENTATION PLAN o Execution of New and Expanded Flood Control Projects o Program Options PHILLIP A. DAVENPORT DIRECTOR OF PUBLIC WORKS APRIL 25, 2017 FLOOD CONTROL PROJECTS

More information

Public Works Director Jason E. Cosby P.E. City Engineer John E. Fowler, P.E. Water Resources Division. Phillip J. Roehrs, P.E.

Public Works Director Jason E. Cosby P.E. City Engineer John E. Fowler, P.E. Water Resources Division. Phillip J. Roehrs, P.E. City of Virginia Beach Public Works/Engineering CEEVC Presentation May 3, 2012 1 Discussion Organizational Overview City of Virginia Beach Qualifications Based Selection Procedures for A/E Services Upcoming

More information

ASHVILLE PARK STORMWATER UPDATE JULY 18, 2017 1 ASHVILLE PARK CHRONOLOGY 2005: Ashville Park conditionally rezoned. Consisted of Five Villages 2006-2007: Village A Wilshire Village was approved and construction

More information

CITY OF SAFETY HARBOR ENGINEERING

CITY OF SAFETY HARBOR ENGINEERING CITY OF SAFETY HARBOR ENGINEERING The Engineering Department provides the city with technical services including design of construction and maintenance projects, review of development plans, field surveys,

More information

ASHVILLE PARK STORMWATER UPDATE

ASHVILLE PARK STORMWATER UPDATE ASHVILLE PARK STORMWATER UPDATE JULY 18, 2017 1 ASHVILLE PARK CHRONOLOGY 2005: Ashville Park conditionally rezoned. Consisted of Five Villages 2006-2007: Village A Wilshire Village was approved and construction

More information

PROTECTING OUR WATERWAYS: STORMWATER POLLUTION REDUCTION EFFORTS

PROTECTING OUR WATERWAYS: STORMWATER POLLUTION REDUCTION EFFORTS PROTECTING OUR WATERWAYS: STORMWATER POLLUTION REDUCTION EFFORTS Public Information Meeting ~ May 2, 2018 Public Works Stormwater Management Division OVERVIEW Surface Water Quality Protection Municipal

More information

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 ADOT Yuma District Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 Active Construction Projects SR 95@ Bill Williams River NWR Rd CAP Intersection US 95, Castle

More information

Wetlands Board Hearing Procedures

Wetlands Board Hearing Procedures Wetlands Board Hearing Procedures The Virginia Beach Wetlands Public Hearing is held at 10:00 a.m. in the Council Chamber of the City Hall Building, Municipal Center. A staff briefing is held at 8:30 a.m.

More information

Stormwater Control and Treatment

Stormwater Control and Treatment Stormwater Control and Treatment EXISTING CONDITIONS The topography of Pinellas County is mostly flat to gently sloping, characterized by sandy soils and high groundwater levels. Elevations range from

More information

Modified FY ,100, ,329,791

Modified FY ,100, ,329,791 Retail/North Andrews Gardens Neighborhood Improvement Program Expenses Through FY 4 Modified FY 5 Budget FY 26-21 North Andrews Gardens Neighborhood Improvement Project 21,524,34 22,75,757 --- 6,1, 6 ---

More information

FY CAPITAL IMPROVEMENT PROGRAM MID-YEAR STATUS REPORT

FY CAPITAL IMPROVEMENT PROGRAM MID-YEAR STATUS REPORT FY 15-20 CAPITAL IMPROVEMENT PROGRAM MID-YEAR STATUS REPORT Department of Public Works Robert B. Boxer, Director PROJECT MODEL PROFESSIONAL SERVICES STUDIES FEASIBILITY CLAIMS 1- PROJECT DEFINITION 2-

More information

ATTACHMENT 4 Section Project Status Quarterly Report - Dec 31, 2015 Measure V - Clean Beaches and Ocean Parcel Tax

ATTACHMENT 4 Section Project Status Quarterly Report - Dec 31, 2015 Measure V - Clean Beaches and Ocean Parcel Tax ATTACHMENT 4 Section 3.0 - Project Status Quarterly Report - Dec 31, 2015 Completed Projects Description Bicknell Avenue Green Street Pier Storm Drain Improvement Pier Water Quality Improvement Permeable

More information

CONSOLIDATED CITY - COUNTY Duval County City of Jacksonville, Florida. Adopted Capital Improvement Program FY

CONSOLIDATED CITY - COUNTY Duval County City of Jacksonville, Florida. Adopted Capital Improvement Program FY CONSOLIDATED CITY - COUNTY Duval County City of Jacksonville, Florida Adopted Capital Improvement Program FY 2012-2016 FY 13-17 ADOPTED CAPITAL IMPROVEMENT PROJECTS FUNDING SOURCE FY 12/13 FY 13/14 FY

More information

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements SECTION 3 DRAINAGE 3-1 General All Drainage plans for proposed development shall be prepared by a Professional Engineer registered in Virginia, except as noted below. Further, their seal and signature

More information

AS A COURTESY, PLEASE TURN OFF CELL PHONES AND PAGERS WHILE MEETING IS IN PROGRESS.

AS A COURTESY, PLEASE TURN OFF CELL PHONES AND PAGERS WHILE MEETING IS IN PROGRESS. Table of Contents Agenda 2 Wastewater Treatment Plant (WWTP) Hydraulic Capacity Update Staff Report 3 WWTP Capacity Outline 5 WWTP Capacity Charts 6 Drainage Concerns on Oak Hill Drive and Quail Drive

More information

Bijou Area Erosion Control Project

Bijou Area Erosion Control Project Join the City of South Lake Tahoe for a Ribbon Cutting Ceremony for the Bijou Area Erosion Control Project Thursday, October 30th at 3:30pm Ceremony will be held at the cul-de-sac at the end of Bal Bijou

More information

City of Poquoson Virginia Adopted Capital Improvements Plan FY 2016 Beyond FY 2020

City of Poquoson Virginia Adopted Capital Improvements Plan FY 2016 Beyond FY 2020 City of Poquoson Virginia Adopted Capital Improvements Plan FY 2016 Beyond FY 2020 Photo by: Henry Ayer, Poquoson, VA The City of Poquoson s Capital Improvement Plan (CIP) is a planning and budget tool

More information

Request for Proposals No ; Various On-call Professional Design and Engineering Services Addendum No. 1 Page 2

Request for Proposals No ; Various On-call Professional Design and Engineering Services Addendum No. 1 Page 2 Addendum Number 1 Request for Proposals No. 17-001 Various On-call Professional Design and Engineering Services To all prospective firms under specifications for Request for Proposals (RFP) No. 17-001,

More information

Civil and Environmental Engineering. Engineering

Civil and Environmental Engineering. Engineering Civil and Environmental Engineering Dr. David Martinelli Chairman Department of Civil and Environmental Engineering West Virginia University What is civil engineering? Designing and operating new systems

More information

Municipal Stormwater Management Planning

Municipal Stormwater Management Planning Municipal Stormwater Management Planning Christopher C. Obropta, Ph.D., P.E. Water Resources Extension Specialist with Rutgers Cooperative Extension Assistant Professor with Department of Environmental

More information

UPPER HOOD CANAL WATERSHED

UPPER HOOD CANAL WATERSHED UPPER HOOD CANAL WATERSHED 2014 Water Quality Monitoring Report Kitsap Public Health District 1 2 UPPER HOOD CANAL WATERSHED The Upper Hood Canal (UHC) watershed, most of which is designated as Extraordinary

More information

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. July 2007 Update to Design Bulletin #16/2003: Added under Design Criteria Culverts of 600mm diameter are commonly used to

More information

Flood risk management and land use planning in changing climate conditions Mikko Huokuna Finnish Environment Institute, SYKE

Flood risk management and land use planning in changing climate conditions Mikko Huokuna Finnish Environment Institute, SYKE 10th International Drainage Workshop of ICID 06.-11. July 2008 Flood risk management and land use planning in changing climate conditions Mikko Huokuna Finnish Environment Institute, SYKE Background hydrological

More information

King County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds

King County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds News Release Contact: Al Sanders 206-477-1016 August 31, 2015 Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds The Flood Control District

More information

APPENDIX E PROJECT EVALUATION SUMMARY TABLE

APPENDIX E PROJECT EVALUATION SUMMARY TABLE APPENDIX E PROJECT EVALUATION SUMMARY TABLE This page left blank intentionally. Table of Contents E.1 INTRODUCTION... E-1 E.2 SURFACE WATER STORAGE SWRP COMPONENT EVALUATION SUMMARY... E-7 E.3 WATERSHED

More information

KRISTOPHER J. KRZYSTON, CEI, CEM

KRISTOPHER J. KRZYSTON, CEI, CEM PERMITTING IN NEW JERSEY KRISTOPHER J. KRZYSTON, CEI, CEM Kristopher J. Krzyston Rutgers graduate 1994 B.S. Environmental Planning Certificate in G.I.S. Assistant Division Manager Environmental Science

More information

Indian River Watershed MDPU. Master Drainage Plan. April Department of Public Works. URS Corporation

Indian River Watershed MDPU. Master Drainage Plan. April Department of Public Works. URS Corporation Indian River Watershed MDPU Master Drainage Plan Department of Public Works URS Corporation Table of Contents Executive Summary... 1 Background... 2 Methodology... 3 Treatment of Nodal Flooding... 3 Vertical

More information

Conditions of Section 401 Certification for Nationwide Permits and General Conditions. General Condition 12 (Soil Erosion and Sediment Controls)

Conditions of Section 401 Certification for Nationwide Permits and General Conditions. General Condition 12 (Soil Erosion and Sediment Controls) Conditions of Section 401 Certification for Nationwide Permits and General Conditions General Condition 12 (Soil Erosion and Sediment Controls) Erosion control and sediment control BMPs described in Attachment

More information

Project Type: Drainage and Storm Systems

Project Type: Drainage and Storm Systems 580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install

More information

ENCROACHMENT/EXCAVATION PERMIT APPLICATION

ENCROACHMENT/EXCAVATION PERMIT APPLICATION PERMIT / PROJECT INFORMATION: PARCEL INFO: APPLICANT S INFO: Public Works/Engineering 595 SILVER LACE BLVD, FERNLEY, NV 89408 (775)-784-9910 ENCROACHMENT/EXCAVATION PERMIT APPLICATION PERMIT APPLICATIONS,

More information

Mountain States Chapter International Erosion Control Association Conference

Mountain States Chapter International Erosion Control Association Conference Mountain States Chapter International Erosion Control Association Conference November 5, 2015 Ian Paton, P.E, CFM Wright Water Engineers, Inc. Eliot Wong P.E., CFM Contech Engineered Solutions Hayes Lenhart,

More information

PUBLIC WORKS. Public Works

PUBLIC WORKS. Public Works PUBLIC WORKS Department includes CIP and Production, Operations, Transportation, and Finance divisions Overall, 66 positions eliminated in FY2010 Details on the two largest divisions follow; representative

More information

What Does the Future Hold?

What Does the Future Hold? What Does the Future Hold? City of Norfolk Department of Public Works May 03, 2012 Norfolk Public Works Design Division Sid Kitterman, City Engineer Chuck Joyner, Asst. City Engineer Wayne Rountree, Special

More information

DRAFT TOTAL PHOSPHORUS TOTAL MAXIMUM DAILY LOADS ACTION PLAN DRAFT FOR PUBLIC COMMENT (JULY 1, 2016 JUNE 30, 2021)

DRAFT TOTAL PHOSPHORUS TOTAL MAXIMUM DAILY LOADS ACTION PLAN DRAFT FOR PUBLIC COMMENT (JULY 1, 2016 JUNE 30, 2021) DRAFT TOTAL PHOSPHORUS TOTAL MAXIMUM DAILY LOADS ACTION PLAN DRAFT FOR PUBLIC COMMENT (JULY 1, 2016 JUNE 30, 2021) May 2, 2018 Certification Statement I certify under penalty of law that this document

More information

APPENDIX L Hydrology and Stormwater Pond Analysis

APPENDIX L Hydrology and Stormwater Pond Analysis APPENDIX L Hydrology and Stormwater Pond Analysis This page is left intentionally blank. Hydrology and Stormwater Pond Analysis Liesch Associates, Inc. June 1, 2012 Minneapolis-St. Paul International Airport

More information

VIRGINIA UTILITY PROTECTION SERVICE, INC. Title: Ticket Entry - Work Type List Working Document

VIRGINIA UTILITY PROTECTION SERVICE, INC. Title: Ticket Entry - Work Type List Working Document Printed copies are for reference only. Please refer to the electronic copy for the latest version. Purpose: To provide instructions for editing the work type list through Newtin administrator accounts

More information

Municipal Separate Storm Sewer Systems (MS4) Implementation. Craig Carson Montgomery County Department of Environmental Protection

Municipal Separate Storm Sewer Systems (MS4) Implementation. Craig Carson Montgomery County Department of Environmental Protection Montgomery County Maryland Municipal Separate Storm Sewer Systems (MS4) Implementation Craig Carson Montgomery County Department of Environmental Protection Montgomery County, Maryland 500 sq. miles 970,000

More information

State College March 6, 2017

State College March 6, 2017 State College March 6, 2017 Paul Racette Pennsylvania Environmental Council Mike Hickman Center for Watershed Protection Alice R. Baker PennFuture 1 Pennsylvania Environmental Council Photos: Rutgers Cooperative

More information

COUNTY OF SUFFOLK STEVEN BELLONE SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF PUBLIC WORKS

COUNTY OF SUFFOLK STEVEN BELLONE SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF PUBLIC WORKS CEE BS, Fulltime (3 positions) Posted 1/30/2017 COUNTY OF SUFFOLK STEVEN BELLONE SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF PUBLIC WORKS SUFFOLK COUNTY IS AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA Central, Contract 3 DBNUM: 15419 / UPC: 154190 This contract will bring projects into compliance with current ADA design requirements that could

More information

ENGINEERING MEMORANDUM

ENGINEERING MEMORANDUM ENGINEERING MEMORANDUM March 12, 2018 TO: FROM: City Council Mike Payne, City Engineer SUBJECT: Consideration and action to award contracts for Bid Schedule B - 2018: C2018-1 Monterey Area Removal and

More information

Campus Energy Plant Tufts University

Campus Energy Plant Tufts University IDEA CampusEnergy2017 Combined Heat and Power to Provide Energy Efficiency to Medium Size Campus February 20-24, 2017 Campus Energy Plant Tufts University Overview Presentation Overview: Campus Introduction

More information

ALMY POND TMDL MANAGEMENT PLAN

ALMY POND TMDL MANAGEMENT PLAN ALMY POND TMDL MANAGEMENT PLAN PUBLIC WORKSHOP Presented by: City of Newport Department of Utilities And Pare Corporation May 7, 2014 Presentation Overview Introduction to Almy Pond Project Introduction

More information

Annual Update. Large-Scale Oyster Restoration in Support of the Chesapeake Bay Agreement Oyster Goal. Stephanie Reynolds Westby, NOAA

Annual Update. Large-Scale Oyster Restoration in Support of the Chesapeake Bay Agreement Oyster Goal. Stephanie Reynolds Westby, NOAA Annual Update Large-Scale Oyster Restoration in Support of the Chesapeake Bay Agreement Oyster Goal Stephanie Reynolds Westby, NOAA Susan Conner, USACE- Norfolk District Policy Drivers Executive Order

More information

MS4 Permits. Understanding MS4 Permits (Municipal Separate Storm Sewer System) P508-17

MS4 Permits. Understanding MS4 Permits (Municipal Separate Storm Sewer System) P508-17 Understanding (Municipal Separate Storm Sewer System) P508-17 1 Edward R. Umbrell, P.E. Mr. Umbrell obtained his civil engineering degree from The University of Maryland and has over 20 years of design

More information

COMMONWEALTH of VIRGINIA

COMMONWEALTH of VIRGINIA Molly Joseph Ward Secretary of Natural Resources May 23, 2016 COMMONWEALTH of VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY Street address: 629 East Main Street, Richmond, Virginia 23219 Mailing address:

More information

MS4 Programs: Quality, the Other Stormwater Q. Dan Bounds, PE, D.WRE IAFSM March 9, 2017

MS4 Programs: Quality, the Other Stormwater Q. Dan Bounds, PE, D.WRE IAFSM March 9, 2017 MS4 Programs: Quality, the Other Stormwater Q Dan Bounds, PE, D.WRE IAFSM March 9, 2017 MS4 Rule and Regulations MS4 Municipal Separate Storm Sewer System A conveyance or system of conveyances (catch basins,

More information

Project Activity Description Water Plan Category Primary Activity Resource of Concern Priority. known)

Project Activity Description Water Plan Category Primary Activity Resource of Concern Priority. known) Board of Water and Soil s Water of Concern Targeting Projects and Activities (A) (B) (C) (D) (E) (F) (G) (H) (I) (J) (K) Conventional Subwatershed: 12- Water Quality Water Quality Scale of Activity Watershed:

More information

Suffolk Downs Redevelopment. Appendix G: Stormwater Management Supporting Documentation

Suffolk Downs Redevelopment. Appendix G: Stormwater Management Supporting Documentation Suffolk Downs Redevelopment Expanded PNF Appendix G: Stormwater Management Supporting Documentation Suffolk Downs Redevelopment Phase 1 Stormwater Management Report Boston, Massachusetts 285402RP004 TABLE

More information

Rainfall, runoff and sediment transport in the Napa River watershed: now and a possible future

Rainfall, runoff and sediment transport in the Napa River watershed: now and a possible future Rainfall, runoff and sediment transport in the Napa River watershed: now and a possible future Lester McKee San Francisco Estuary Institute 5/24/2017 1 The importance of the natural water cycle of infiltration

More information

Stormwater Maintenance. Committee of the Whole Middleton Common Council Updated March 12, 2013

Stormwater Maintenance. Committee of the Whole Middleton Common Council Updated March 12, 2013 Stormwater Maintenance Committee of the Whole Middleton Common Council Updated March 12, 2013 What is Stormwater Runoff? The waters derived from rains falling or snowmelt or ice melt occurring within the

More information

Appendix G Preliminary Hydrology Study

Appendix G Preliminary Hydrology Study Appendix G Preliminary Hydrology Study Preliminary Hydrology Study VESTING TTM 72608 Long Beach, CA Prepared for: The Long Beach Project, LLC 888 San Clemente, Suite 100 New Port Beach, CA May 28, 2014

More information

Kim DeLaney, Ph.D. Strategic Development Coordinator. Overview & Project Approach 1/30/2014. Waterways Forum 3 - Regulation (1/29/2014) 1

Kim DeLaney, Ph.D. Strategic Development Coordinator. Overview & Project Approach 1/30/2014. Waterways Forum 3 - Regulation (1/29/2014) 1 Waterways Forum #3: Regulation & Management of the Waterways Kim DeLaney, Ph.D. Strategic Development Coordinator Treasure Coast Regional Planning Council January 29, 2014 120+ Miles of Waterways St. Lucie

More information

Tampa Bay Region. FY2015 Cooperative Funding Initiative. Preliminary Project Evaluations and Rankings

Tampa Bay Region. FY2015 Cooperative Funding Initiative. Preliminary Project Evaluations and Rankings SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT Tampa Bay Region FY2015 Cooperative Initiative Preliminary Project s and Rankings Table of Contents Cooperative Projects - Ranked 1A... 1 L737 - WMP - Duck Lake

More information

Rocky Hill. Challenges

Rocky Hill. Challenges Rocky Hill Rocky Hill is located in the southern portion of the Capitol Region. Its land area covers 13.9 square miles with an estimated 2010 Census population of 19,703. Elevation in Rocky Hill ranges

More information

Princess Anne Plaza and The Lakes Neighborhoods Stormwater Management System Flood Mitigation Plan

Princess Anne Plaza and The Lakes Neighborhoods Stormwater Management System Flood Mitigation Plan CITY OF VIRGINIA BEACH Princess Anne Plaza and The Lakes Neighborhoods Stormwater Management System Flood Mitigation Plan FINAL APRIL 5, 2018 osemont Road Extent London Bridge Creek Windsor Woods Canal

More information

U.S. Army Corps of Engineers Permit Application Tips

U.S. Army Corps of Engineers Permit Application Tips U.S. Army Corps of Engineers Permit Application Tips MnDOT Environmental Conference Ben Orne and Sarah Wingert, USACE 4-29-2015 US Army Corps of Engineers BUILDING STRONG Outline Introduction to Corps

More information

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS Section 1 Intent. 49 Section 2 Floodplain Requirements 49 Section 3 Water-Oriented Accessory Structures 50 Section 4 Stairways,

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four DISTRICT FOUR PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Four. In fiscal years 2014 and 2015, current Turnpike projects total over $127

More information

Elizabeth River Project Engagement Strategies

Elizabeth River Project Engagement Strategies Elizabeth River Project Engagement Strategies Joe Rieger Director of Watershed Restoration www.elizabethriver.org Mission: Restore the Elizabeth River to the highest practical level of environmental quality

More information

Go Green, Save Money: Lowering Flood Insurance Rates in Virginia with Stormwater Management. Kristen Clark VCPC Alumna, Spring 2014

Go Green, Save Money: Lowering Flood Insurance Rates in Virginia with Stormwater Management. Kristen Clark VCPC Alumna, Spring 2014 Go Green, Save Money: Lowering Flood Insurance Rates in Virginia with Stormwater Management Kristen Clark VCPC Alumna, Spring 2014 Rising Waters, Rising Rates Coastal Communities in Virginia are confronted

More information

Municipal Separate Storm Sewer System (MS4) Awareness Presentation. March 8 th, :00AM 12:00PM Video Conference

Municipal Separate Storm Sewer System (MS4) Awareness Presentation. March 8 th, :00AM 12:00PM Video Conference Municipal Separate Storm Sewer System (MS4) Awareness Presentation March 8 th, 2012 10:00AM 12:00PM Video Conference AGENDA 1. Stormwater Introduction 2. Overview of VDOT s MS4 Program 3. Total Maximum

More information

D Olive Watershed. Path Toward Restoration

D Olive Watershed. Path Toward Restoration D Olive Watershed Path Toward Restoration Water is the most critical resource issues of our lifetime and our children s lifetime. The health of our waters is the principal measure of how we live on the

More information

Introduction Who We Are

Introduction Who We Are Introduction Who We Are We offer a diverse scope of professional services that often enables us to serve as a reliable one-source partner, efficiently tackling time-sensitive projects with customized solutions.

More information

Structural Stormwater Pollution Reduction Targeting Floatables, Gross-Pollutants, and Trash in Myrtle Beach

Structural Stormwater Pollution Reduction Targeting Floatables, Gross-Pollutants, and Trash in Myrtle Beach Structural Stormwater Pollution Reduction Targeting Floatables, Gross-Pollutants, and Trash in Myrtle Beach T. J. Mullen, President, Best Management Products, Inc., Lyme, CT Eric Sanford, PE. Principal/Director

More information

REQUEST FOR STATEMENT OF QUALIFICATIONS SOQ #

REQUEST FOR STATEMENT OF QUALIFICATIONS SOQ # REQUEST FOR STATEMENT OF QUALIFICATIONS SOQ #2018-010 for PROFESSIONAL SERVICES Architectural, Landscape Architectural, Appraisal, Title, Engineering and Survey FY 2018 Issue date: January 25, 2018 Lake

More information

Public Utilities - Sewer

Public Utilities - Sewer County of Henrico, Virginia Capital Improvement Program FY 2017-18 through FY 2021-22 Fund 51 Enterprise Fund - W&S Request Request Request Request Request Project/Work Phase Priority FY 17-18 FY18-19

More information

III. INVENTORY OF EXISTING FACILITIES

III. INVENTORY OF EXISTING FACILITIES III. INVENTORY OF EXISTING FACILITIES Within the Growth Management Boundary, the existing storm drainage facilities are largely associated with development that has historically occurred in the ten drainage

More information

CONSULTING ENGINEERS

CONSULTING ENGINEERS Civil WATER,WASTEWATER & REUSE Environment STORMWATER & HYDROLOGY TRAFFIC & Transport Structural Process Electrical EDUCATION Capability statement CONSULTING ENGINEERS Nov 2010 QUEENSLAND AUSTRALIA admin@macreadyassociates.com.au

More information

CHAPTER 2B - PHASE I, INITIAL ROADWAY INVESTIGATION & PRELIMINARY FIELD INSPECTION

CHAPTER 2B - PHASE I, INITIAL ROADWAY INVESTIGATION & PRELIMINARY FIELD INSPECTION CHAPTER 2B - PHASE I, INITIAL ROADWAY INVESTIGATION & PRELIMINARY FIELD INSPECTION SECTION 2B 1 - GROUND SURVEYS Survey Authorization... 2B-1 Interstate... 2B-1 Principal / Minor Arterial... 2B-1 Urban...

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM NY Susquehanna and Western Rail Line Bicycle/Pedestrian Path DBNUM: NS9803 / UPC: 058018 The 4.8 mile New York, Susquehanna, and Western Railway (NYS&W)

More information

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY Ryers Station Improvement Project Robert L. Lund, Jr., PE Assistant General Manager Engineering, Maintenance and Construction Division David J. Sands,

More information

Richard V. Busche, P.E., CFM

Richard V. Busche, P.E., CFM Florida Stormwater Association EXCELLENCE AWARDS STORMWATER PROGRAMS & PROJECTS 2015 NOMINATION FORM I. Nomination Information Nomination Category (please check only one box): Program (Department/Division)

More information

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit)

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit) CHESAPEAKE BAY TMDL ACTION PLAN (2013 2018 MS4 General Permit) Piedmont Virginia Community College A Plan for Achieving a 5% Reduction of Existing Loads June 30, 2015 Main Campus This plan satisfies the

More information

SFPUC Flooding Workshop Tuesday, February 9, 2016

SFPUC Flooding Workshop Tuesday, February 9, 2016 Presenters: SFPUC Flooding Workshop Tuesday, February 9, 2016 Tommy Moala, Assistant General Manager, Wastewater Enterprise Stefani Harrison, Project Manager Photo: Dec 3, 2014 End of Cayuga Street 25-year

More information

MSD Integrated Watershed Management Planning Approach to Achieve Sustainable Communities

MSD Integrated Watershed Management Planning Approach to Achieve Sustainable Communities MSD Integrated Watershed Management Planning Approach to Achieve Sustainable Communities MaryLynn Lodor MSD of Greater Cincinnati Sharon Jean-Baptiste CH2M HILL April 4, 2013 Overview MSD s Environmental

More information

Request Modification of Conditions (Modification of conditions of existing Conditional Use Permit approved on March 22, 2011 to expand a borrow pit)

Request Modification of Conditions (Modification of conditions of existing Conditional Use Permit approved on March 22, 2011 to expand a borrow pit) Applicant/Property Owner Public Hearing March 9, 2016 City Council Election District Beach Agenda Item 4 Request Modification of Conditions (Modification of conditions of existing Conditional Use Permit

More information

Coastal Stormwater Best Management Practices Guidance. Listening Session ANAHUAC December 9, 2013

Coastal Stormwater Best Management Practices Guidance. Listening Session ANAHUAC December 9, 2013 Coastal Stormwater Best Management Practices Guidance Listening Session ANAHUAC December 9, 2013 Who We Are Dr. Michael Barrett, Ph.D., P.E. University of Texas at Austin CRWR Danica Adams, MSCRP, MSSD

More information

ISO-9001:Quality Management System Progress Report

ISO-9001:Quality Management System Progress Report ISO-9001:Quality Management System Progress Report Department of Street Services May 2, 2007 Purpose Provide an overview of the Department of Street Services Provide background of ISO 9001 certification

More information

UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report

UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report Prepared for: Cameron McCarthy Landscape Architects LLP

More information

Maryland Adaptation and Vulnerability Assessment Maryland State Highway Administration

Maryland Adaptation and Vulnerability Assessment Maryland State Highway Administration Maryland Adaptation and Vulnerability Assessment Maryland State Highway Administration October 4, 2016 Maryland: Introduction Atlantic Ocean and Chesapeake Bay 7,719 miles of shoreline Coastal in the East

More information

Design-Build Capital Infrastructure Project

Design-Build Capital Infrastructure Project Design-Build Capital Infrastructure Project US$60 Million Project Duration 2012 Responsible for drainage systems and construction QA-QC oversight and project documentation and as-built review and acceptance.

More information

Life Cycle Cost Analysis

Life Cycle Cost Analysis Life Cycle Cost Analysis Washington Street Widening 144 th Avenue to 148 th Avenue City of Thornton Deborah Turner, PE Overview Project Location What is Life Cycle Cost Analysis? Project Background 7 Steps

More information

City of Virginia Beach Urban Tree Canopy Implementation Plan. Susan French, City Arborist Barbara Duke, Senior Planner

City of Virginia Beach Urban Tree Canopy Implementation Plan. Susan French, City Arborist Barbara Duke, Senior Planner City of Virginia Beach Urban Tree Canopy Implementation Plan Susan French, City Arborist Barbara Duke, Senior Planner Urban Tree Canopy Implementation Plan Motivation In 2012: PAR began active development

More information

Restoring The Elizabeth River From The Bottom Up

Restoring The Elizabeth River From The Bottom Up Restoring The Elizabeth River From The Bottom Up Presented by: Joe Rieger Elizabeth River Project Co-author: Walter Priest, NOAA Restoration Center www.elizabethriver.org The Elizabeth River Project Mission:

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) South Inlet Transportation Improvement Project DBNUM: 09361 / UPC: 093610 The Casino Redevelopment Authority (CRDA) has identified certain road improvements to be performed in Atlantic City on certain

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Virginia Stormwater Management Program SPECIFIC SUBJECT: Application of the

More information

WATER QUALITY WORKSHOP

WATER QUALITY WORKSHOP OAK HILL PARKWAY WATER QUALITY WORKSHOP August 25, 2015 6 8 PM Oak Hill United Methodist Church Fellowship Hall AGENDA I. Welcome Lynda Rife, Facilitator II. III. Green Mobility Challenge Melissa Hurst,

More information

BCWMC Capital Improvement Program (approved April 19, 2018; pending minor Plan amendment)

BCWMC Capital Improvement Program (approved April 19, 2018; pending minor Plan amendment) BCWMC Capital Improvement Program 2020 2024 (approved April 19, 2018; pending minor Plan amendment) Project Name City Number 2019 2020 2021 2022 2023 2024 2025 Totals Medicine Lake Rd and Winnetka Ave

More information

Public Hearing January 13, Request Conditional Use Permit (Auto Repair Garage) Staff Planner Carolyn A.K. Smith

Public Hearing January 13, Request Conditional Use Permit (Auto Repair Garage) Staff Planner Carolyn A.K. Smith Applicant Property Owner Holland Century Associates, LLP Public Hearing January 13, 2016 Request Conditional Use Permit (Auto Repair Garage) Staff Planner Carolyn A.K. Smith Location 3949 Holland Road

More information

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit)

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit) CHESAPEAKE BAY TMDL ACTION PLAN (2013 2018 MS4 General Permit) Central Virginia Community College A Plan for Achieving a 5% Reduction of Existing Loads June 30, 2015 Main Campus This plan satisfies the

More information

Transportation Public Relations RFP Kit

Transportation Public Relations RFP Kit 4752 Euclid Road Virginia Beach, VA 23462 757.473.8152 Transportation Public Relations RFP Kit The following pages contain standard key documents from Seventh Point to assist with the public relations

More information

What is a stormwater utility fee?

What is a stormwater utility fee? What is a stormwater utility fee? A stormwater utility fee is similar to a water or sewer utility fee. In essence, customers pay a fee to convey stormwater from their properties. The City of Goodlettsville

More information

US ARMY CORPS OF ENGINEERS ACTIONS DURING 2016 TEXAS SPRING FLOOD

US ARMY CORPS OF ENGINEERS ACTIONS DURING 2016 TEXAS SPRING FLOOD 1 US ARMY CORPS OF ENGINEERS ACTIONS DURING 2016 TEXAS SPRING FLOOD 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62

More information

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: June 17, 2014 Comment Deadline: July 17, 2014 Corps Action ID#: SAW-2009-00655 NC DOT TIP: R-4903 The Wilmington District, Corps