A NEW CIVIC CENTER VISION REPURPOSING CHARITY HOSPITAL NEW ORLEANS
|
|
- Nathaniel Miles
- 6 years ago
- Views:
Transcription
1 A NEW CIVIC CENTER VISION REPURPOSING CHARITY HOSPITAL NEW ORLEANS
2
3 New Civic Center Vision Honors and Repurposes a Civic Icon Showcases Historic Preservation Revitalizes Adjacent Neighborhoods Provides a Financeable Strategy Catalyzes Redevelopment of Decommissioned VA Site Stabilizes Annual Operating Costs Below Current Levels Improves Efficiency & Quality of Workplace for Workforce Operational by Fall 2017
4 Why City Hall & CDC Need to Move City Hall and CDC buildings are both over 50 years old and becoming functionally obsolete Maintenance on aging equipment, including originally installed elevators, HVAC systems, generators, pump systems and incidentals are costing the City and Court: City Hall $350,000 (2012) CDC $250,000 (2012) Annualized Operating Expenses for City Hall and CDC are currently $240,000 per year in janitorial expenses, plus an additional $630,000 in staff salaries for engineers/maintenance workers, totaling $870,000 for both buildings Both buildings are facing a number of structural issues including aging plumbing and fixtures, leaks and subsidence Both buildings are lacking modern, up-to-date Computer IT infrastructure including inadequate wiring and electrical power to properly run and cool IT equipment, lack of space for data centers and IT equipment, and poor wireless capabilities throughout buildings Both buildings are at maximum capacity with limited office space and storage available: City Hall 316,622 SF CDC 116,602 SF
5
6
7 Adjacent to Existing City Hall & CDC
8 3-5 Minute Walk to Civic Center Complex from current City Hall/CDC
9 Tulane Avenue Arrival
10 Occupancy Distribution
11 Debunking the Myths about the Charity Hospital Building Charity s structural integrity has been validated as structurally sound. Charity s basement will be filled with concrete and pilings to reinforce foundation. Courtrooms will have high ceilings that are fully open spaces with no obstruction from ceiling beams or columns. Charity provides large floor layout possibilities.
12 19 th Judicial District Courthouse Precedent
13 Typical Standard Courtroom (1,700 SF; Corner Bench) Courtroom Fit
14 Vertical Stacking
15 Programmatic Stacking
16 Area Summary Total Project Sizing and Areas GSF Total GSF City Hall Tenant Space (Existing Inefficient Footprint is 338,905 sf) 281,325 Civil District Courts Tenant Space (Includes Courtrooms) 284,695 City Council Tenant Space (Includes Chamber) (Existing Footprint is 35,640 sf) 34,320 Public Commons Tenant Space 23,650 Mothballed Future Tenant Space 0 Fourth Floor (Dedicated to Central, Mechanical, Electrical and Plumbing Services) 48,005 Decommissioned Basement (Used for Total Foundation Infrastructure Replacement) 109,785 Selective Demolition (Two Rear Flanking Wings on Gavier Street Side) 194,415 Original Gross Total Area (NIC Post-1939 Extraneous Additions) 976,195 GSF Less Decommissioned Basement 109,785 Less Selective Demolition 194,415 Net total Area (NIC Post-1939 Extraneous Additions, Basement, Selective Demolition 671,995 Add New Atrium Court 10,240 Add New Elevator Shafts 31,740 New Gross Total Area 713,975 GSF New Gross Total Area Less Common Areas 600,340 GSF City Hall and City Council Percentage Share Breakdown 315, % CDC Percentage Share Breakdown 284, % NOTE: CDC is currently 116,602 SF
17 Project Development Costs Total Building Construction Costs and FF&E Allowance Total Project Construction Cost (713,975 GSF at $265 PSF) $189,203,375 Total FF&E Allowance Cost (Total for City Hall, City Council, and Courts $20,000,000 Selective Demolition Allowance $5,000,000 AFC $214,203,375 Design & Engineering Fees per FP&C (8.86%) $16,680,128 Total Building and Furniture, Fixtures and Equipment Construction Costs Site Infrastructure Improvement Costs Utility Infrastructure Upgrades (Including Co-Gen linkage) $2,000,000 Total Costs $230,883,503 AFC $2,000,000 Design & Engineering Fees per FP&C (7.6997%) $893,165 Site Infrastructure Total Construction Cost $2,893,165 Building & Infrastructure Total Construction Cost $243,376,668 Construction Cost $18,253,250 Gross Total for Construction Cost & Contingency $261,629,918 Developer/ Project Management 4% $10,465,197 Overarching Project Contingency (on both construction cost and mgmt. 3% $8,162,853 TOTAL PROJECT DEVELOPMENT COST $270,657,968
18 Sources & Uses of Funds Sources of Funds Percentage Credit Basis for Credit State Contribution* $100,000,000 Historic Tax Credits on Net Total Area Improvements (State Only) (NIC Post-1939 Additions, Basement)* 25% $178,078,675 $33,389,752 New Markets Tax Credits * $18,000,000 FEMA Funds from Existing City Hall FEMA Project Worksheets $11,000,000 Estimated Contribution from CDC $0 Recovery Dollars $30,400,000 City-Issued Revenue Bonds $77,868,217 *Funds specifically attached to Charity Hospital building Total Sources of Funds $270,657,968 Total Project Development Cost $270,657,968
19 Annual Civic Center Complex Operating Costs Annualized Operating Expenses (Responsibility of City and CDC) Civic Complex Operating Expenses 713,975 $8.00 psf $5,375,960 Reserve/Maintenance on 713,975 sf at $1.0 psf $713,975 Annualized Cost of Debt Service (Tax Exempt Bonds to support $77,868,217 Bond Issue) $5,979,176 Total Gross Annual Costs (for both City and Courts) $12,069,111 CITY OF NEW ORLEANS ANNUAL COSTS* 52.58% $6,805,717 *Share split based on prorated occupancy square footage. CDC ANNUAL COSTS* 47.42% $6,138,394
Civil District Court Parish of New Orleans. Image Courtesy of EDR MA. Renovation & Utilization Feasibility
Civil District Court Parish of New Orleans Image Courtesy of EDR MA Renovation & Utilization Feasibility Challenges with Courthouse Design Courthouse Space Standards and Requirements Charity Hospital Building
More informationSTILLWATER COUNTY COURTHOUSE ALTERNATE 1
STILLWATER COUNTY COURTHOUSE ALTERNATE 1 ALTERNATE 1: The current plan developed for the Old Hospital will bring all County services into this facility except for the following: 1. Sheriff, 2. County Attorney,
More informationCITY COUNCIL MEETING INTRODUCTION
CIVIC CENTER MASTER PLAN CITY COUNCIL MEETING INTRODUCTION CITY OF CUPERTINO OCTOBER. 21, 2014 ATTACHMENT L CIVIC CENTER MASTER PLAN WHY WE ARE HERE City Hall Options Library Expansion Parking Options
More informationCommercial Remodel Permit
Commercial Remodel Permit Zoning requirements Staff recommends always verifying the zoning requirements for your project before deciding to build. Warrensburg has eleven separate zoning districts, each
More informationProject Scope & Budget Breakdown. Mandatory Scope Recommended Additional Scope Wish List Scope
Project Scope & Budget Breakdown Mandatory Scope Recommended Additional Scope Wish List Scope Site Plan EXISTING Site Plan PROPOSED First Floor Plan PROPOSED Basement Floor Plan PROPOSED Mandatory Scope
More informationTO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM
GB1 Office of the President TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: For the Meeting of May 20, 2015 ACTION ITEM AMENDMENT OF THE BUDGET AND APPROVAL OF EXTERNAL FINANCING, CLINICAL SCIENCES
More informationMajor Project Request Biennium
Agency Institution Major Project Request 217-19 Biennium G16 University of Wisconsin Platteville Project Title Sesquicentennial Hall Project Request The UW System requests enumeration of $55,189, ($54,62,
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 I DATE: May 9-11, 2017 ****************************************************************************** SUBJECT: SDSU Harding Hall Renovation
More informationElement Z General Design Requirements Existing Facilities Information
Anderson Central 100B, PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G
More informationSchool Assessment Report
School Assessment Report School: Morningside Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:29:07 AM FOR OFFICIAL USE ONLY Final School Assessment
More informationDRAFT September 26th, 2003
Harrelson Hall Renovation and Replacement Study DRAFT September 26th, 2003 Summary of Renovation Issues As part of the 2000 Capital Bond Program, funds were allocated for the renovation of Harrelson Hall
More informationFACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017
FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 SDSU requests approval of this Facility Design Plan for renovation and addition to Harding
More informationFacility Improvements
CA-SI-01 ACCESSIBLE PARKING STALL ADDITIONS CA-SI-07 BASEBALL & SOFTBALL INFIELD IMPROVEMENTS Additional parking stalls and signage needed for disabled individuals and to meet ADA requirements. Installation
More informationBOARD OF TRUSTEES OCTOBER 13, 2014
Measure E BOARD OF TRUSTEES OCTOBER 13, 2014 FACILITIES UPDATE Measure Q 1 RECENTLY COMPLETED PROJECTS Santa Ana College Perimeter Site Improvements Building G Renovation Artesia Street Improvements Property
More informationCODE ANALYSIS REPORT SECOND FLOOR
CODE ANALYSIS REPORT SECOND FLOOR 384 DWIGHT STREET HOLYOKE, MA Prepared by Dietz & Company Architects, Inc. 17 Hampden Street Springfield, MA March 2014 INTRODUCTION The following report is a preliminary
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 6 O DATE: December 5-7, 2017 ****************************************************************************** SUBJECT USD Dakota Dome Renovation
More informationFDA OC/ORA Office Building
FDA OC/ORA Office Building Table of Contents Executive Summary... 3 Introduction... 4 Structural System... 5 Foundation:... 5 Floor System:... 7 Building 31:... 7 Building 32:... 9 Columns... 10 Lateral
More informationAmes Public Library. Ames Public Library
Public Forum Library Planning Associates (Library Planning) Meyer, Scherer & Rockcastle, Ltd. (Architecture, Interior Design, and Furniture) with TSP, Inc. (Architecture and Engineering), CPMI, Inc. (Cost
More informationSite Comparison. Cornelius Arts Center. Town of Cornelius, North Carolina Prepared by Craig Gaulden Davis Greenville, South Carolina May 18, 2012
Cornelius Arts Center Town of Cornelius, North Carolina Prepared by Craig Gaulden Davis Greenville, South Carolina May 18, 2012 Summary The Town of Cornelius, North Carolina asked Craig Gaulden Davis to
More informationSchool Assessment Report
School Assessment Report School: KIPP Vision Report: Dec 15, 14 Condition Assessment: Suitability Assessment: Generated: 12/15/14 12:33:33 PM Final School Assessment Report - Charter Schools, KIPP Vision
More informationBorough President and City Council Capital Funding Requests FY 2008
Borough President and City Council Capital Funding Requests FY 2008 CIP Number Phase* Request $ Performing Arts Center - Phase 1 BY-1008031127 C $1,000,000 148 Ingersoll Roof Replacement BY-0928061526
More informationEJ Industrial Spine BOA Nomination Study
A. Selecting Priority Sites Section V. Redevelopment of Priority Sites Section IV of this Nomination Study presents a summary of the analyses of the Study Area and market conditions affecting the E-J BOA
More informationRFP Feasibility Design Services: Clinical Education & Assessment Center Expansion Questions & Answers: February 13 th, 2018
Question & Answer: #1 The RFP calls for a survey of the building to gain a comprehensive understanding of the existing building, utilities, building systems, occupancies and all existing conditions as
More informationNew Commercial Construction Permit
New Commercial Construction Permit Zoning requirements Staff recommends always verifying the zoning requirements for your project before deciding to build. Warrensburg has eleven separate zoning districts,
More informationThe Waldinger Corporation Office & Production Building
The Waldinger Corporation Office & Production Building Scout Trail Des Moines, IA 50321 SVPA Project No 18036 U.D.R.B. PROJECT NARRATIVE September 19, 2018 The Waldinger Corporation Office & Production
More informationVIRGINIA TIF PROGRAM. 2. Property assembly costs, including acquisition, demolition, site preparation and improvement, etc;
VIRGINIA TIF PROGRAM Illinois statute provides for municipalities to designate areas TIF districts (TID). These areas qualify for designation by suffering from such factors as blight, obsolescence, deterioration,
More informationCOMMERCIAL PROJECT INFORMATION
Community Development Building and Inspection Services 2100 Ridge Avenue Evanston, Illinois 60201-2798 T 847.448.4311 FAX 847.448.8020 www.cityofevanston.org COMMERCIAL PROJECT INFORMATION The Community
More informationThe courthouse exterior. Courtesy of NLA/HLM Architects. United States. Courthouse Sacramento, Robert D. McCartney, S.E.
The courthouse exterior. Courtesy of NLA/HLM Architects. United States Courthouse Sacramento, Robert D. McCartney, S.E. CA Modern Steel Construction / November 2001 Public entrances to courtrooms occur
More informationSANDPIPER PROFESSIONAL CENTER 8100 SANDPIPER CIRCLE WHITE MARSH, MARYLAND 21236
SANDPIPER PROFESSIONAL CENTER 8100 SANDPIPER CIRCLE WHITE MARSH, MARYLAND 21236 1,421-1,991 sq. ft. available Free surface parking High-image building is located on a beautifully landscaped 3.5 acre property
More informationSTATE UNIVERSITY CONSTRUCTION FUND
STATE UNIVERSITY CONSTRUCTION FUND The following checklist show the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the Schedule B of the Consultant
More informationSUNY Hospitals & A Healthier New York. Capital Briefing March 1, 2013
SUNY Hospitals & A Healthier New York Capital Briefing March 1, 2013 Profile of SUNY Capital Programs Square Footage (in millions) 18.9 20.5 58.5 3.3 Educational Facilities Residence Halls Hospitals Community
More informationCommercial Solar Photovoltaic System Permit
Commercial Solar Photovoltaic System Permit Zoning requirements Staff recommends always verifying the zoning requirements for your project before deciding to build. Warrensburg has eleven separate zoning
More informationPROPOSAL FOR ARCHITECTURAL SERVICES. June 22, 2015
PROPOSAL FOR ARCHITECTURAL SERVICES June 22, 2015 FIRM BACKGROUND Dimension IV Madison Design Group is built on a vision of architecture and professional services that puts the client and users, the building
More informationACADEMY BUILDING RESTORATION AND REUSE FEASIBILITY STUDY
ACADEMY BUILDING RESTORATION AND REUSE FEASIBILITY STUDY August 29, 2012 BRIDGEWATER BUILDING REUSE STUDY 1 TEAM INTRODUCTION Municipal Building Committee (MBC) John Gerrish Pat Discroll Chris Flynn Marille
More informationModular Wood Framing Goes Vertical
Modular Wood Framing Goes Vertical By: Troy Bean, P.E., S.E. DCI Engineers January 2013 The Wood Products Council is a Registered Provider with. Credit(s) earned on completion of this program will be reported
More informationBUILDING INTEGRATION
RETROFIT OF HISTORIC WAREHOUSE TO NEW MEDICAL CLINIC IN TULSA, OK BUILDING INTEGRATION TEAM 2010-5 JACQUELINE BAYER JEFFREY DOWGALA LIAM HENDRICKEN LAUREN MCNALLY APRIL 9, 2010 INTRODUCTION ASCE CHARLES
More informationSTRUCTURAL BUILDING CONDITION SURVEY
STRUCTURAL BUILDING CONDITION SURVEY Our Project No. 140565 Prepared For: Mayfair Hotel Development Corporation Date: 3 December 2014; Revised: 15 December 2014 15 December 2014 Mayfair Hotel Development
More informationMontague Proposed DPW FAQ
Montague Proposed DPW FAQ Prepared by the Public Works Facility Planning Committee 1. What does the DPW do for the community? Montague DPW touches the lives of residents every day by maintaining the Town
More informationTIF ASSISTANCE APPLICATION. Village of Lena, Illinois
TIF ASSISTANCE APPLICATION Village of Lena, Illinois 1. Name and Address of Applicant: (Location where project will occur): 2. Are you a Tenant or Owner: 3. Description of Project (use back, or another
More informationSchool Assessment Report
School Assessment Report School: Morningside Elementary School Report: Dec 15, 2014 Condition Assessment: Suitability Assessment: Generated: 12/15/2014 12:11:31 PM FOR OFFICIAL USE ONLY Final School Assessment
More informationTechnical Facility Management FACILITY CONSULTING SERVICES. The Facility Audit Program
Technical Facility Management FACILITY CONSULTING SERVICES The Facility Audit Program TFM Audit Program - Schedule Customer: Dates of Visit: AREA TFM CUSTOMER SUBJECT Goals/Objectives Schedule Key Interviews
More informationReport For Class D Construction Cost Estimate
Report For Class D Construction Cost Estimate Douglas McNeill Director Jon Gilford Senior Cost Manager Turner & Townsend 170 Laurier Avenue West Suite 604 Ottawa Ontario K1P 5V5 t: +1 (613) 221 9560 e:
More information3 CUMULATIVE METHODS AND PROJECTS
3 CUMULATIVE METHODS AND PROJECTS 3.1 INTRODUCTION This chapter is an introduction to the cumulative impacts analysis contained within each respective environmental impact category subsection of Chapter
More informationSchool Assessment Report
School Assessment Report School: Sutton Middle School (Powers Ferry) Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:32:59 AM FOR OFFICIAL USE ONLY Final School
More informationShow how a KM database impacts: cost, time, and quality. Demonstrate how Parametric Design could be used to save time, money, and improve quality
Executive Summary: Thesis Proposal Final Draft The following pages contain a final draft of the thesis proposal for the South Baltimore District Court House. The basic layout consists of focusing on Knowledge
More informationCITY OF KIRKWOOD. Community Center and Theatre Concept Design. City Council Workshop August 20, 2015
CITY OF KIRKWOOD Community Center and Theatre City Council Workshop August 20, 2015 Agenda Committee Workshop Summary July 15 th Review Meeting Community Preferred Concept Center Stakeholder from July
More informationTO MEMBERS OF THE FINANCE AND CAPITAL STRATEGIES COMMITTEE: ACTION ITEM CONSENT
Office of the President TO MEMBERS OF THE FINANCE AND CAPITAL STRATEGIES COMMITTEE: For the Meeting of November 16, 2016 ACTION ITEM CONSENT APPROVAL OF THE NON-STATE BUDGET AND APPROVAL OF EXTERNAL FINANCING,
More informationHOUSE ADDITIONS A guide to the plans required when applying for a Building Permit
PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT HOUSE ADDITIONS A guide to the plans required when applying for a Building Permit November 2017 contents Introduction... 3 Site Plan... 4 Floor Plan... 6 Foundation
More informationBYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax
BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI 49315 616-878-9155/Fax 616-878-0699 Applicant to complete all items in Section I, II, III, IV, V Note: Separate applications
More informationProud of its Heritage, Preparing for its Future
TUSTIN Proud of its Heritage, Preparing for its Future Revised August 2013 USER GUIDE FOR THE INSTALLATION OF RESIDENTIAL ROOM ADDITIONS OR ALTERATIONS PURPOSE This guide describes the City of Tustin s
More informationOffice/High-End Manufacturing/Warehouse Space: 43,091 SF Office Available for Lease/175,737 SF Building For Sale
Office/High-End Manufacturing/Warehouse Space: 43,091 SF Office Available for Lease/175,737 SF Building For Sale 175,737 SF Building for Lease or Sale Office-Call Center/High-End Manufacturing/Warehouse
More informationDemolition Permit Procedure
Building Permits & Inspection Division General Information: (916) 875-5296 www.building.saccounty.net Full Service Center 827 7th Street, Room 102 Sacramento, CA 95814 M-F 8:30am - 4:30pm Bradshaw Center
More informationName of Project: Address: Zip Code Owner/Authorized Agent: Phone # ( ) - Owned By: Select one Code Enforcement Jurisdiction: Select one
2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of Project: Address:
More informationName of Project: Address: Zip Code Owner/Authorized Agent: Phone # ( ) - Owned By: Select one Code Enforcement Jurisdiction: Select one
2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of Project: Address:
More information110 North Court Street Versailles, Woodford County, Kentucky
3 Buildings +23,477 SF Click to View Portfolio For more information: Al Isaac, President alisaac@ Jamie Adams, LEED AP, Senior Associate +1 859 422 4413 jadams@ Property Highlights Three-building, +23,477
More informationAdministration Building Needs Assessment
Town Hall Meeting with the Habersham County Board of Commissioners Administration Building Needs Assessment JUNE 13, 2016 Detailed Evaluation Performed in 2015 Engineering Evaluation Site/Civil Architectural
More informationTHE USE OF FRICTION DAMPERS FOR SESIMIC RETROFIT OF THE MONTEREY COUNTY GOVERNMENT CENTER
THE USE OF FRICTION DAMPERS FOR SESIMIC RETROFIT OF THE MONTEREY COUNTY GOVERNMENT CENTER Carlos Y.L. Chang, S.E. 1, Avtar Pall, Ph.D., P.Eng. 2, and Jason J.C. Louie, S.E. 1 ABSTRACT Built in 1966, the
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 Y DATE: December 6-8, 2016 ****************************************************************************** SUBJECT: SDSU Student Wellness
More informationSEATTLE CENTRAL COLLEGE BROADWAY PERFORMANCE HALL SEATTLE, WASHINGTON STRUCTURAL EVALUATION FOR PREPARED BY PCS STRUCTURAL SOLUTIONS
STRUCTURAL EVALUATION FOR SEATTLE CENTRAL COLLEGE BROADWAY PERFORMANCE HALL SEATTLE, WASHINGTON PREPARED BY PCS STRUCTURAL SOLUTIONS NOVEMBER 1, 2017 17-733 TABLE OF CONTENTS Page I. PREFACE ii II. EXECUTIVE
More informationPERMITS REQUIRED BEFORE OBTAINING A PERMIT
Detached Single Family Dwelling Warren County Department of Building Inspections 220 North Commerce Avenue, Suite 400 Front Royal, Virginia 22630 Phone-540-636-9973 Fax-540-636-4698 www.warrencountyva.net
More informationFacilities Feasibility Study Frederick Douglass HS Condition Assessment
Summary of Findings The Frederick Douglass HS Facility located at 2301 Gwynns Falls Parkway in Baltimore, Maryland, was built in 1927. It comprises 194,249 gross square feet. The total current deficiencies
More informationMontague DPW Facility Planning Committee Public Works Facility Public Information Session. April 4, Photo Credit: Recorder
Montague DPW Facility Planning Committee Public Works Facility Public Information Session April 4, 2017 Photo Credit: Recorder 500 Avenue A Tour Agenda Meet the Committee and Engineer Presentation of Project
More informationArchitectural Review Board Report
Architectural Review Board Report To: From: Cc: Subject: Architectural Review Board Architectural Review Board Meeting: July 31, 2017 Agenda Item: 7.8 Russell Bunim, Associate Planner Stephanie Reich,
More informationHealth Life Safety Survey and Master Facilities Plan
Health Life Safety Survey and Master Facilities Plan Community Presentation Board Meeting June 22, 2015 June 22, 2014 Board Presentation Overview and Summary of the Health Life Safety Survey and Master
More informationBelmont Mill Renovation Project. February 23, :30 P.M. Informational Session
Belmont Mill Renovation Project February 23, 2015 6:30 P.M. Informational Session Belmont Mill Renovation Project In December 2012, the Board of Selectmen were asked to consider replacement of the carpet
More informationPractice Points NUMBER
Practice Points NUMBER 17 BUILDING CODES A Road Map to Structural Alterations in the International Existing Building Code LORI FERRISS AND MICHAEL J. AUREN In a climate of constantly evolving building
More informationInterior Architects, P.C REV 2 CONCEPTUAL ESTIMATE. Brooklyn Heights Library, Brooklyn Public Library, Brooklyn, NY GARDINER AND THEOBALD INC FOR: AT:
REV 2 CONCEPTUAL ESTIMATE FOR: Interior Architects, P.C Brooklyn Heights Library, Brooklyn Public Library, Brooklyn, NY AT: BY: GARDINER AND THEOBALD INC Issued: 6/20/2013 BROOKLYN HEIGHTS LIBRARY, BROOKLYN
More informationWelcome Center, New Student Services, and Career and Employment Services
Architectural Program Welcome Center, New Student Services, and Career and Employment Services East Memorial Stadium Renovation May 2014 Prepared By Table of Contents Introduction.... 1 Competitive Market....
More informationTHIS IS NOT A PERMIT DO NOT START CONSTRUCTION. City of Pell City. Residential Building Permit Application
THIS IS NOT A PERMIT DO NOT START CONSTRUCTION City of Pell City Residential Building Permit Application 1905 First Avenue North Pell City, AL 35125 (205) 338-2244 (205) 814-9088- Fax MLA Residential Permit
More informationPRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016
PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016 WORK LEGEND OVERALL WORK TO BOTH BUILDINGS 1 2 3 4 Existing corridors will receive new
More informationENERGY STAR Portfolio Manager Data Collection Worksheet
ENERGY STAR Portfolio Manager Data Collection Worksheet This worksheet was designed to help building owners and managers collect data to benchmark buildings using EPA s ENERGY STAR Portfolio Manager. The
More informationCENTRAL ELEMENTARY SCHOOL
all images courtesy of www.gettyimages.com Renovation vs. Rebuild Analysis SCHLENKER & McKITTRICK ARCHITECTS, P.C. www.gettyimages.com RENOVATION VS. REBUILD ANALYSIS Central School Site Advantages Project
More informationTOWAMENCIN TOWNSHIP BUILDING PERMIT PROCEDURES
TOWAMENCIN TOWNSHIP BUILDING PERMIT PROCEDURES NON-RESIDENTAL BUILDING PERMIT APPLICATION FORM PART I Location of Property Address, Zoning District, Parcel Number and Lot & Block must be provided on all
More informationSafeguarding Our Civic Icon for Future Generations
Safeguarding Our Civic Icon for Future Generations Project Overview - Pasadena City Hall Seismic Upgrade & Rehabilitation PROJECT FACTS: Largest Public Works Capital Project in City s History! $117.5 million
More informationYMCA BUCYRUS BOILER REPLACEMENT DESIGN
Bucyrus, Ohio Mechanical Engineering $130,000 Professional Services 2014 Project Team Gregory P. Wright, P.E., Mechanical Engineer Steven Bond, Technician YMCA BUCYRUS BOILER REPLACEMENT DESIGN PDG was
More informationStructural Conditions Assessment of Current Lapeer District Schools Administration Building 250 Second Street, Lapeer, Michigan
November 2, 2015 Melissa A. Malcolm Library Director Lapeer District Library 201 Village West Dr S Lapeer, MI 48446 RE: Structural Conditions Assessment of Current Lapeer District Schools Administration
More informationINFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS
INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS November 2018 Contents 1. Introduction... 1 2. Ontario Building Code and Second Dwelling Units... 1 3. How Do I Make My Secondary Dwelling Unit
More informationMARKET COMMON CLARENDON - PH II - SP #339 AMENDMENT Arlington, VA
1 Strong National Footprint We have a strong national footprint, with a presence in 35 of the top 50 U.S. markets. Dense community populations combined with strong household incomes work together with
More informationSchool Assessment Report
School Assessment Report School: Carver High School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:37:23 AM FOR OFFICIAL USE ONLY Final School Assessment Report
More informationCost Estimating & AE Evaluation Service. Manual for Preparation of Cost Estimates & Related Documents for VA Facilities
Cost Estimating & AE Evaluation Service Manual for Preparation of Cost Estimates & Related Documents for VA Facilities March 8, 2011 MANUAL FOR PREPARATION OF COST ESTIMATES & RELATED DOCUMENTS FOR VA
More informationMueller Laboratory Renovation. Technical Report #2 By Mark Jackson Construction Management Option 10/17/14
Mueller Laboratory Renovation Technical Report #2 By Mark Jackson Construction Management Option 10/17/14 1 Table of contents Executive Summary 3 Project Schedule 5 Detailed Estimate 8 Site Layout Planning
More informationAPPENDIX A DEFINITIONS OF BUILDING AREAS
A. GENERAL REQUIREMENTS DEFINITIONS OF BUILDING AREAS 1. The Project Architect/Engineer shall submit an estimate with the Schematic Design Phase submission, and shall submit calculations with the Design
More informationMAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE
MAXINE HALL HEALTH CENTER RENOVATION AND SEISMIC UPGRADE CIVIC DESIGN REVIEW - PHASE 1 - JUNE 19, 2017 CITY & COUNTY OF SAN FRANCISCO DEPARTMENT OF PUBLIC HEALTH PROJECT LOCATION: 1301 Pierce Street San
More informationBuilding Area Definitions Authored by: The Office of Space Management and Analysis
Building Area Definitions Authored by: The Office of Space Management and Analysis Adopted from: Postsecondary Education Facilities Inventory and Classification Manual (FICM): 2006 Edition November 30,
More informationCorridor Commercial Traditional District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations
16.20.080 - Corridor Commercial Traditional District ( CCT ) CCT-1 Figure REFERENCE Typical Buildings in the CCT District CCT-2 Sections: 16.20.080.1 Composition of Corridor Commercial Traditional 16.20.080.2
More informationVillage of Corinth Water System Improvements Project DWSRF No Water Meter Project Additional information and FAQ s Last Revised July 19, 2017
Page 1 of 7 Village of Corinth Water System Improvements Project DWSRF No. 17623 Water Meter Project Additional information and FAQ s Last Revised July 19, 2017 Below please find water meter project questions
More informationSteidle Building Renewal Project
Steidle Building Renewal Project Rendering courtesy of Mascaro Construction Company Technical Report I Jeffrey E. Duclos Construction Option Executive Summary For this report, the general aspects of the
More informationMunicipal Services Agency Building Inspection General Information: (916)
Municipal Services Agency Building Inspection General Information: (916) 875-5296 www.bldginspection.org 4101 Branch Center Rd Sacramento 95827 Fax (916) 854-9228 827 7 th St Room 102 Sacramento 95814
More informationOngoing and Future Project Work. Construction Management
Ongoing and Future Project Work New Broward County Courthouse Tower 1,000 Car Courthouse Garage Midrise Building Renovations 714,000 square foot, 20-story Civil/Family Courthouse replacing 1950 s era
More informationSchool Assessment Report
School Assessment Report School: Cascade Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:37:55 AM FOR OFFICIAL USE ONLY Final School Assessment
More informationOctober 21, RE: Draft Environmental Impact Report (DEIR), Los Angeles Street Civic Building Project. Dear Mr. Doty:
Submitted electronically Jim Doty, Environmental Affairs Officer City of Los Angeles Bureau of Engineering 1149 S. Broadway, Suite 600 Los Angeles, CA 90012 Email: jim.doty@lacity.org October 21, 2013
More informationMemo to Project File. Life Sciences Building 1 DRAFT October 14, 2013
University of Washington Life Sciences Building ZGF Architects September 30, 2013 Memo to Project File Life Sciences Building 1 DRAFT October 14, 2013 This memo was developed to assist with transitioning
More informationOrange Education Center Project Update. Board Of Trustees Meeting November 9, 2015
Orange Education Center Project Update Board Of Trustees Meeting November 9, 2015 1 PROJECT BACKGROUND Existing building is 85,130 g.s.f., concrete tilt-up industrial building on 6.37 acres of land. Built
More informationCONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS
CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS (August 28, 2018) PIERCE HALL IMPROVEMENTS PROJECT NO. 950511-950532 UNIVERSITY OF CALIFORNIA, RIVERSIDE PREQUALIFICATION PROCESS ALL
More informationCOURTYARD INFILL STRUCTURE DESIGN
COURTYARD INFILL STRUCTURE DESIGN Executive Summary The existing design for the courtyard within the G wing is for a cast-in-place concrete structure. The design being proposed within this analysis is
More informationProject Seismic Vulnerability Assessment For SFCC District Building 33 Gough Street San Francisco, California 94103
Project For SFCC District Building 33 Gough Street San Francisco, California 94103 Prepared For San Francisco Community College District 33 Gough Street San Francisco, California 94103 Prepared By Thornton
More informationStructural Breadth. Landmark Façade
Jessica Lucas Hearst Tower Mechanical Option New York, NY Structural Breadth Landmark Façade As mentioned before, the building has two distinct pieces: the historic landmark façade and the new office tower.
More informationWaverley Elementary School Feasibility Study
Waverley Elementary School Feasibility Study FREDERICK COUTY PUBLIC SCHOOLS Feasibility Study Meeting #7 February 1, 2018 1 AGEDA 1. PROJECT OVERVIEW schedule 2. SITE ISSUES ALTA survey, site constraints
More informationStandard Plan Review - Project Submittal Checklist
Standard Plan Review - Project Submittal Checklist DATE: PROJECT ADDRESS: PROJECT MANAGER: RETURN TO PM WITH CORRECTIONS 2 nd INTAKE APPOINTMENT Submit the following requirements, as applicable, at the
More informationAIRPORT AREA INFRASTRUCTURE TIF DISTRICT: Public Hearing Presentation Oct 21, 2013
AIRPORT AREA INFRASTRUCTURE TIF DISTRICT: Public Hearing Presentation Oct 21, 2013 THE GOALS: 1. Utilize state-enabled tools to better economic development in the Airport Area of Londonderry; to improve
More information