1 NORTHSIDE INDEPENDENT SCHOOL DISTRICT Facilities Construction December 2017 Leroy San Miguel ASST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta EXECUTIVE DIRECTOR OF CONSTRUCTION & ENGINEERING Jim Berg AIA DIRECTOR OF FACILITIES CONSTRUCTION 1

2 2014 BOND PROJECTS 2

3 DR. LINDA G. MORA ELEMENTARY SCHOOL Architect Noonan Rittiman Project Architect John Rittiman NISD Project Manager Chris Parker Contractor DL Bandy Constructors, Inc. Contract Amount - $24,465,000 Construction Period March 2017 May 2018 Construction Status 47% Project Scope New 800 Student Elementary School (Prototype of Boldt ES and Cole ES) CMU walls/roofing/steel structure in progress. MEP rough-in in progress. Entrance Classroom Wing 3

4 DR. LINDA G. MORA ELEMENTARY SCHOOL 4

5 ADDITIONS AND RENOVATIONS PROJECTS IN PROGRESS 5

6 NORTHSIDE ACTIVITY CENTER RENOVATIONS Architect Richard Sanchez Architects, Inc. Project Architect Richard Sanchez NISD Project Manager Thomas Curiel Contractor O Haver Contractors Co. Contract Amount - $5,319,485 Construction Period February 2017 January 2018 Construction Status 65% Project Scope Addition/Renovation Interior framing, MEP work, fire sprinkler. Hydronic piping from chiller yard to boiler being tested. Waterproofing exterior. Masonry in progress. Roof top units being installed. Ductwork installed, electrical rough-in underway. Track & motors for partitions at new building installed. 6

7 NORTHSIDE ACTIVITY CENTER RENOVATIONS Building Exterior Exterior Doors Mechanical Yard Wall 7

8 COLONIES NORTH ELEMENTARY Window Upgrades / ADA Work Architect Huckabee Architects Project Architect Jeff Rodriquez NISD Project Manager Chris Parker Contractor Central Builders Contract Amount - $2,022,000 Construction Period June 2017 December 2017 Construction Status 92% Project Scope Window Upgrades and ADA Work Interior work complete. Masonry in progress. Front Windows 8

9 KNOWLTON ELEMENTARY Cafeteria / Kitchen Renovations / Library Addition Architect Pfluger Project Architect Carr Hornbuckle NISD Project Manager Chris Parker Contractor O Haver Contract Amount $2,335,100 Construction Period June 2017 January 2018 Construction Status 65% Project Scope Renovations and Additions to Cafeteria, Kitchen & Library Concrete and plumbing in progress. Kitchen interior walls and MEP rough-in in progress. Phase 1 Library is complete. Kitchen Loading Dock Story Telling Area Kitchen Interior Walls 9

10 GLENN ELEMENTARY School Building Replacements / Security Lobby Architect LPA Project Architect Mark Oppelt / Lowell Tacker NISD Project Manager Marilyn Sevedge Contractor Suburban Construction Contract Amount - $6,850,000 Construction Period June 2017 August 2018 Foundation Construction Construction Status 17% Project Scope Replacement of Administration/Classroom Building Site cutting & excavation complete. Two-thirds floor slab poured, 30% Columns complete. Underground utilities complete. Steel on Site. Rendering of Building Replacement Foundation Construction 10

11 TIMBERWILDE ELEMENTARY Cafeteria/Kitchen Renovations/Library Addition Architect Shawn Kaarlsen & Associates Project Architect Shawn Kaarlsen NISD Project Manager Chris Parker Contractor Workman Commercial Construction Contract Amount $2,231,800 Construction Period June 2017 December 2017 Construction Status 65% Project Scope Renovations and Additions to Cafeteria, Kitchen & Library Kitchen interior walls and MEP rough-in in progress. Phase 1 Library is complete. Cafeteria Entrance Reading Area Canopy Structure 11

12 HOLMES HS FINE ARTS Auditorium Architect Alamo Architects Project Architect Jerry Lammers NISD Project Manager Thomas Curiel Contractor Bartlett Cocke Contract Amount - $27,000,000 Construction Period June 2017 December 2018 Construction Status 18% Package 2 (Building) Project Scope Fine Arts Building Replacement Building piers being drilled. Underground Utilities underway. Lower level concrete foundation poured. Rendering of New Auditorium 12

13 BOONE ELEMENTARY SCHOOL Architect Garza Architects Project Architect Jesse Garza NISD Project Manager James Evans Contractor Central Builders, Inc. Contract Amount - $4,900,000 Construction Period June 2017 May 2018 Construction Status 50% Project Scope New Administration Area and New Bus/Student Walkway Canopy Administration scheduled for move-in December 18. Phase 3 Library scheduled to start in December. Administration Front Entrance Rendering of New Administration Entrance Entry Lobby 13

14 2014 BOND PROJECTS IN BID/DESIGN PHASE SUMMER

15 RAYBURN MIDDLE SCHOOL Building Replacment Architect Marmon Mok Project Architect Monty Howard NISD Project Manager James Evans Contractor Turner Construction Construction Budget - $6,400,000 Tentative Construction Period June 2018 August 2019 Project Scope Building Replacement Schematic Design in Progress. Turner Construction selected as CMAR at December Board Meeting. 15

16 SCOBEE ELEMENTARY SCHOOL Additional Canopy Architect CMP Project Architect TBD NISD Project Manager James Evans Contractor TBD Construction Budget - $400,000 Tentative Construction Period June 2018 August 2018 Project Scope Additional Canopy Schematic Design approved November 14, Construction Documents in progress. 16

17 MARY HULL ELEMENTARY SCHOOL Bus Canopy Architect Garza Bomberger Project Architect Roy Lewis NISD Project Manager Thomas Curiel Contractor TBD Construction Budget $300,000 Tentative Construction Period - June August 2018 Project Scope Bus Canopy Schematic Design approved September 26, Contract Documents in progress. 17

18 LINTON ELEMENTARY SCHOOL Additional Student Canopy Architect Munoz & Company Architects Project Architect Randy Hohlaus NISD Project Manager Chris Parker Contractor TBD Construction Budget $400,000 Tentative Construction Period - June August 2018 Project Scope Student Canopy Schematic Design approved September 26, Contract Documents in progress. 18

19 BRAUN STATION ELEMENTARY Cafeteria/Kitchen Renovations & Window Upgrades Architect Nextgen Architects Project Architect Joel Hernandez NISD Project Manager Thomas Curiel Contractor TBD Construction Budget - $1,600,000 Tentative Construction Period April November 2018 Project Scope Cafeteria/Kitchen Renovations and Window Upgrades Schematic Design approved September 26, Contract Documents in progress. 19

20 PEASE MIDDLE SCHOOL Fine Arts Addition & Bus Canopy Architect Garza Architects Project Architect Jesse Garza NISD Project Manager Thomas Curiel Contractor TBD Construction Budget - $2,350,000 Tentative Construction Period June 2018 December 2018 Project Scope Fine Arts Addition & Bus Canopy Schematic Design approved October 24, Contract Documents in progress. 20

21 STINSON MIDDLE SCHOOL Science Classroom/Library Addition & Renovation Architect Pfluger Architects Project Architect Carr Hornbuckle NISD Project Manager Marilyn Sevedge Contractor TBD Construction Budget - $5,200,000 Tentative Construction Period June August 2019 Project Scope Science Classroom / Library Addition & Renovation Schematic Design approved October 24, Contract Documents in progress. 21

22 EVERS ELEMENTARY SCHOOL Flooring Project Architect CWS Project Architect Robert Watts NISD Project Manager Chris Parker Contractor TBD Construction Budget - $100,000 Construction Period June August 2018 Project Scope Flooring Schematic Design in progress 22

23 CLARK HIGH SCHOOL Cafeteria / Kitchen Renovation Architect Garza Architects Project Architect Jesse Garza NISD Project Manager Chris Parker Contractor TBD Construction Budget - $4,000,000 Tentative Construction Period May February 2019 Project Scope Cafeteria/Kitchen Renovation Schematic Design approved October 24, Contract Documents in progress. 23

24 KALLISON RANCH AREA MIDDLE SCHOOL Architect Alamo Architects Project Architect Jerry Lammers NISD Project Manager Thomas Curiel Contractor TBD Construction Budget - $39,000,000 Construction Period February 2019 February 2021 Project Scope New Middle School Schematic Design in progress. 24

25 HELOTES ELEMENTARY & POWELL ELEMENTARY Window Upgrades / ADA Work Architect Shawn Kaarlsen & Associates Project Architect Shawn Kaarlsen NISD Project Manager Marilyn Sevedge Contractor TBD Construction Budget - $600,000 Construction Period June 2018 September 2018 Project Scope Window Upgrades and ADA Work Schematic Design pending Board approval. 25

26 COLBY GLASS ELEMENTARY Window Upgrades / ADA Work Architect Marmon Mok Project Architect Monty Howard NISD Project Manager Chris Parker Contractor TBD Construction Budget - $1,500,000 Construction Period June 2018 August 2018 Project Scope Window Upgrades and ADA Work Schematic Design approved November 14,

27 MARSHALL HIGH SCHOOL Cafeteria / Kitchen Renovation Architect Garza Bomberger Project Architect Roy Lewis NISD Project Manager Thomas Curiel Contractor TBD Construction Budget - $4,400,000 Construction Period June 2018 December 2018 Project Scope Cafeteria/Kitchen Renovation Schematic Design approved November 14,

28 2017 GROWTH & IMPROVEMENT 28

29 2017 GROWTH IMPROVEMENT Athletic Areas Upgrades Hobby MS and Taft HS - Complete Athletic Areas Upgrades Pease MS - Complete 3. Interior Painting Project Jordan Middle School - Complete 4. Athletic Storage Building Taft HS Complete and John Jay HS - 95% Complete 29

30 ROOFING PROJECTS 30

31 VILLARREAL ELEMENTARY SCHOOL Roofing Project Roofing Consultant Austech Contractor Samuel Dean Sheet Metal Inc. Construction Budget $97,090 Construction Period June 2016 August 2016 Construction Status: 98% Project Scope Roof Repair & Waterproofing Project Closeout in Progress. 31

32 2016 HAIL DAMAGE ROOFING PROJECTS PHASE I & II 32

33 LIST OF SCHOOLS Hail Damage Roofing Projects Phase I Beard Elementary School Carnahan Elementary School Clark High School South Transportation Stevenson Middle School Carlos Coon Elementary School Elrod Elementary School Fernandez Elementary School Phase II Esparza Elementary School Nichols Elementary School Connally Middle School Howsman Elementary School Leon Valley Elementary School Scarborough Elementary School Alternative ES & MS - North Burke Elementary School Brauchle Elementary School Leon Springs Elementary School Raba Elementary School 33

Facilities Construction

Facilities Construction NORTHSIDE INDEPENDENT SCHOOL DISTRICT Facilities Construction January 2017 Leroy San Miguel ASSIST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta EXECUTIVE DIRECTOR CONSTRUCTION & ENGINEERING

More information

Facilities Construction

Facilities Construction NORTHSIDE INDEPENDENT SCHOOL DISTRICT Facilities Construction March 2017 Leroy San Miguel ASSIST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta EXECUTIVE DIRECTOR CONSTRUCTION & ENGINEERING Jim

More information

Facilities Construction

Facilities Construction NORTHSIDE INDEPENDENT SCHOOL DISTRICT Facilities Construction May 2017 Leroy San Miguel ASSIST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta EXECUTIVE DIRECTOR CONSTRUCTION & ENGINEERING Jim

More information

Facilities Construction

Facilities Construction NORTHSIDE INDEPENDENT SCHOOL DISTRICT Facilities Construction July 2016 Leroy San Miguel ASSIST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta EXECUTIVE DIRECTOR CONSTRUCTION & ENGINEERING Paul

More information

Facilities Construction

Facilities Construction NORTHSIDE INDEPENDENT SCHOOL DISTRICT Facilities Construction January 2016 Leroy San Miguel ASSIST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta EXECUTIVE DIRECTOR CONSTRUCTION & ENGINEERING

More information

Facilities Construction

Facilities Construction NORTHSIDE INDEPENDENT SCHOOL DISTRICT 2010 BOND Facilities Construction September 2015 Leroy San Miguel ASSIST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Ceasar Ponce, A.I.A. EXECUTIVE DIRECTOR CONSTRUCTION

More information

Facilities Construction

Facilities Construction NORTHSIDE INDEPENDENT SCHOOL DISTRICT 2010 BOND Facilities Construction August 2013 Leroy San Miguel Dr. Folks Middle School ASSIST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Ceasar Ponce, A.I.A. EXECUTIVE

More information

Engineering Services

Engineering Services NORTHSIDE INDEPENDENT SCHOOL DISTRICT 2014 CITIZENS BOND ADVISORY COMMITTEE Engineering Services 2014 Bond March 2017 Update Leroy San Miguel ASST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta

More information

Facilities Construction

Facilities Construction NORTHSIDE INDEPENDENT SCHOOL DISTRICT 2014 CITIZENS BOND ADVISORY COMMITTEE Facilities Construction 2014 Bond September 2018 Update Leroy San Miguel ASST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry

More information

Facilities Construction

Facilities Construction NORTHSIDE INDEPENDENT SCHOOL DISTRICT 2014 CITIZENS BOND ADVISORY COMMITTEE Facilities Construction 2014 Bond March 2018 Update Leroy San Miguel ASST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta

More information

Facilities Construction

Facilities Construction NORTHSIDE INDEPENDENT SCHOOL DISTRICT 2010 BOND Facilities Construction October 2013 Leroy San Miguel ASSIST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Ceasar Ponce, A.I.A. EXECUTIVE DIRECTOR CONSTRUCTION

More information

Facilities Construction

Facilities Construction NORTHSIDE INDEPENDENT SCHOOL DISTRICT 2010 BOND Facilities Construction December 2013 Leroy San Miguel ASSIST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Ceasar Ponce, A.I.A. EXECUTIVE DIRECTOR CONSTRUCTION

More information

BOND CONSTRUCTION UPDATE

BOND CONSTRUCTION UPDATE BOND CONSTRUCTION UPDATE March 31, 2015 PROJECTS: 1. CIBOLO VALLEY ELEMENTARY SCHOOL BOND 2013 2. STEELE HIGH SCHOOL ADDITIONS & RENOVATIONS BOND 2013 3. DOBIE MIDDLE SCHOOL ADDITIONS & RENOVATIONS BOND

More information

SAMUEL CLEMENS ADDITIONS & RENOVATIONS ( )

SAMUEL CLEMENS ADDITIONS & RENOVATIONS ( ) SAMUEL CLEMENS ADDITIONS & RENOVATIONS (06-05-2018) BUDGET - $ 72,000,000 2020 PROJECTED COMPLETION DATE ARCHITECT MARMON MOK GENERAL CONTRACTOR Bartlett Cocke CONSTRUCTION MGMT. AG CM 63% COMPLETE As

More information

PROJECT UPDATE August 28, 2014

PROJECT UPDATE August 28, 2014 PROJECT UPDATE August 28, 2014 Information shown above was provided to district tax payers and stakeholders prior to May bond election. ELEMENTARY SCHOOL #8 $ 34,000,000 Bond Allocation BOND 2013 PROJECT

More information

PROJECT UPDATE SEPTEMBER 11, 2014

PROJECT UPDATE SEPTEMBER 11, 2014 PROJECT UPDATE SEPTEMBER 11, 2014 Information shown above was provided to district tax payers and stakeholders prior to May bond election. ELEMENTARY SCHOOL #8 $ 34,000,000 Bond Allocation BOND 2013 PROJECT

More information

Seattle Public Schools Building Excellence IV Projects Under Construction

Seattle Public Schools Building Excellence IV Projects Under Construction Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee

More information

SAMUEL CLEMENS ADDITIONS & RENOVATIONS ( )

SAMUEL CLEMENS ADDITIONS & RENOVATIONS ( ) SAMUEL CLEMENS ADDITIONS & RENOVATIONS (02-26-2018) BUDGET - $ 72,000,000 2020 PROJECTED COMPLETION DATE ARCHITECT MARMON MOK GENERAL CONTRACTOR Bartlett Cocke CONSTRUCTION MGMT. AG CM 39% COMPLETE As

More information

GREENVILLE ISD BID PACKAGES AND UPDATES 2014 Bond Program OCTOBER 2015

GREENVILLE ISD BID PACKAGES AND UPDATES 2014 Bond Program OCTOBER 2015 GREENVILLE ISD BID PACKAGES AND UPDATES 2014 Bond Program OCTOBER 2015 TABLE OF CONTENTS Bid Package 1 Crockett Elementary School Additions and Renovations 3 L.P. Waters Early Childhood Center Renovations

More information

Update on FCPS Construction/Renovation Projects. June 2016

Update on FCPS Construction/Renovation Projects. June 2016 Update on FCPS Construction/Renovation Projects Squires Elementary -- Renovation Architect: General Contractor: JRA Architects D.W. Wilburn, Inc. GC Contract Sum: $12,166,000 Total Project Cost: $15,207,000

More information

GEORGETOWN ISD 2010 BOND PROGRAM UPDATE. Huckabee APRIL 2012

GEORGETOWN ISD 2010 BOND PROGRAM UPDATE. Huckabee APRIL 2012 GEORGETOWN ISD 2010 BOND PROGRAM UPDATE APRIL 2012 TABLE OF CONTENTS East View High School Phase 2 Additions, Package 2 3 Georgetown High School Additions and Renovations 7 Completed Projects 12 Georgetown

More information

Building Excellence IV Capital Levy Projects Under Construction

Building Excellence IV Capital Levy Projects Under Construction Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee Hill Elementary

More information

SAMUEL CLEMENS ADDITIONS & RENOVATIONS ( )

SAMUEL CLEMENS ADDITIONS & RENOVATIONS ( ) SAMUEL CLEMENS ADDITIONS & RENOVATIONS (02-05-2018) BUDGET - $ 72,000,000 2020 PROJECTED COMPLETION DATE ARCHITECT MARMON MOK GENERAL CONTRACTOR Bartlett Cocke CONSTRUCTION MGMT. AG CM 33% COMPLETE As

More information

PRESENTATION JANUARY 24, 2017

PRESENTATION JANUARY 24, 2017 4918 HOVENKAMP DRIVE DALLAS, TEXAS 75227 PRESENTATION JANUARY 24, 2017 RGM ARCHITECTS OCTOBER 25, 2016 1 2 COMMUNITY INPUT DESIGN DOCUMENT PROCUREMENT CONSTRUCTION PD SD DD CD BD CA PROJECT PROCESS 3 Construction

More information

2007 Projects: MEDFORD SCHOOL DISTRICT 549C Bond Funded Construction Projects Updated: September 4, North Medford High School:

2007 Projects: MEDFORD SCHOOL DISTRICT 549C Bond Funded Construction Projects Updated: September 4, North Medford High School: MEDFORD SCHOOL DISTRICT 549C Bond Funded Construction Projects Updated: September 4, 2007 North Medford High School: Project Summary: Renovate and add new addition based on facility evaluation and design.

More information

Update on FCPS Construction/Renovation Projects. December 2015

Update on FCPS Construction/Renovation Projects. December 2015 Update on FCPS Construction/Renovation Projects Squires Elementary -- Renovation Architect: General Contractor: JRA Architects D.W. Wilburn, Inc. GC Contract Sum: $12,166,000 Total Project Cost: $15,207,000

More information

Update on FCPS Construction/Renovation Projects. September 2015

Update on FCPS Construction/Renovation Projects. September 2015 Update on FCPS Construction/Renovation Projects Jessie Clark Middle -- Renovation Architect: General Contractor: Tate Hill Jacobs Architects Alliance Corporation GC Contract Sum: $18,041,500 Total Project

More information

SAMUEL CLEMENS ADDITIONS & RENOVATIONS ( )

SAMUEL CLEMENS ADDITIONS & RENOVATIONS ( ) SAMUEL CLEMENS ADDITIONS & RENOVATIONS (01-22-2018) BUDGET - $ 72,000,000 2020 PROJECTED COMPLETION DATE ARCHITECT MARMON MOK GENERAL CONTRACTOR Bartlett Cocke CONSTRUCTION MGMT. AG CM 29% COMPLETE SAMUEL

More information

Update on FCPS Construction/Renovation Projects. August 2015

Update on FCPS Construction/Renovation Projects. August 2015 Update on FCPS Construction/Renovation Projects Jessie Clark Middle -- Renovation Architect: General Contractor: Tate Hill Jacobs Architects Alliance Corporation GC Contract Sum: $18,041,500 Total Project

More information

NEW MIDDLE SCHOOL PROJECT

NEW MIDDLE SCHOOL PROJECT Monthly Report May 2017 2 INTRODUCTION P.J. Dick Incorporated is pleased to present to the Chartiers Valley Board of School Directors the following Construction Report for the Chartiers Valley Middle School

More information

Update on FCPS Construction/Renovation Projects. July 2016

Update on FCPS Construction/Renovation Projects. July 2016 Update on FCPS Construction/Renovation Projects Squires Elementary -- Renovation Architect: General Contractor: JRA Architects D.W. Wilburn, Inc. GC Contract Sum: $12,166,000 Total Project Cost: $15,207,000

More information

Capital Projects Update

Capital Projects Update Issaquah School District Issaquah High School Reconstruction March 2010 Installation of exterior masonry and siding panels continues on the classroom wings. Library windows are complete. Window and storefront

More information

Building Excellence IV Capital Levy Projects Under Construction

Building Excellence IV Capital Levy Projects Under Construction Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary

More information

Safety Update Crossing study is in final review stages. Facilities Update Construction Progress

Safety Update Crossing study is in final review stages. Facilities Update Construction Progress Major Projects Update September 2017 Prepared by Business and Operations September 11, 2017 Transportation Update As of 9/6/17 we have 4,803 students registered for busing, up 643 from last month s update.

More information

Update on FCPS Construction/Renovation Projects. November 2015

Update on FCPS Construction/Renovation Projects. November 2015 Update on FCPS Construction/Renovation Projects Squires Elementary -- Renovation Architect: General Contractor: JRA Architects D.W. Wilburn, Inc. GC Contract Sum: $12,166,000 Total Project Cost: $15,207,000

More information

Berryessa Union School District Measure L Bond Construction Program

Berryessa Union School District Measure L Bond Construction Program Berryessa Union School District Measure L Bond Construction Program Board of Trustees Update December 8, 2015 Introduction The following presentation is intended to provide the Board of Trustees with an

More information

Building Excellence IV Capital Levy Projects Under Construction

Building Excellence IV Capital Levy Projects Under Construction Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary

More information

MARCH BOND & TIF PROJECT UPDATE. Grapevine-Colleyville ISD

MARCH BOND & TIF PROJECT UPDATE. Grapevine-Colleyville ISD MARCH 2018 2016 BOND & TIF PROJECT UPDATE Grapevine-Colleyville ISD GHS Agricultural Sciences Building Renovation Multipurpose Activity Centers Additions and Renovations to TES and GMS Cannon Elementary

More information

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project

More information

MOORESTOWN HIGH SCHOOL REFERENDUM PROJECTS

MOORESTOWN HIGH SCHOOL REFERENDUM PROJECTS MOORESTOWN HIGH SCHOOL 06/22/15 08/28/15 Security vestibule at main entrance and transportation office; replacement of selected exterior doors; access controls at exterior doors 06/22/15 12/31/15 Upgrade

More information

PROJECT COMPLETED. Bayside High School. Comprehensive Additions and Renovations

PROJECT COMPLETED. Bayside High School. Comprehensive Additions and Renovations Project Update Project Update September 8, 2006 November 6, 2009 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Ed Schwartz Project Budget Project

More information

Oconomowoc Area School District Facility Construction Update July 27, 2018

Oconomowoc Area School District Facility Construction Update July 27, 2018 Oconomowoc Area School District Facility Construction Update July 27, 2018 IXONIA ELEMENTARY SCHOOL The exterior of Ixonia Elementary School looks more complete every day! Concrete work for the exterior

More information

May 12, 2007 Bond Election Information (Proposed Projects, Estimated Costs and Estimated Tax Impact)

May 12, 2007 Bond Election Information (Proposed Projects, Estimated Costs and Estimated Tax Impact) May 12, 2007 Bond Election Information (Proposed Projects, Estimated Costs and Estimated Tax Impact) 2006-07 Expenditures 4.6% 7.1% 3.5% 0.0% 26.9% Payroll Costs Contracted Services Supplies and Materials

More information

LANSDOWNE HIGH SCHOOL RENOVATION PRELIMINARY DESIGN PRESENTATION. The Board of Education of Baltimore County Verletta White, Interim Superintendent

LANSDOWNE HIGH SCHOOL RENOVATION PRELIMINARY DESIGN PRESENTATION. The Board of Education of Baltimore County Verletta White, Interim Superintendent RENOVATION PRELIMINARY DESIGN PRESENTATION The Board of Education of Baltimore County Verletta White, Interim Superintendent AGENDA 2 Project Location General Information Existing Conditions Structural

More information

Through. February Current Strong Schools Bond Capital Improvement Projects. Prepared by

Through. February Current Strong Schools Bond Capital Improvement Projects. Prepared by MONTHLY PROGRESS REPORT Through February 2012 Current Strong Schools Bond Capital Improvement Projects Prepared by O Connor Construction Management, Inc. & Gilbane Building Company TABLE OF CONTENTS Executive

More information

Oconomowoc Area School District Facility Construction Update June 29, 2018

Oconomowoc Area School District Facility Construction Update June 29, 2018 Oconomowoc Area School District Facility Construction Update June 29, 2018 IXONIA ELEMENTARY SCHOOL Finishing touches and final cleaning has begun inside the new addition at Ixonia Elementary, and major

More information

a collaborative process

a collaborative process 2017 Referendum Belleville Public Schools July 26, 2017 a collaborative process Introduction Di Cara Rubino Architects Jerry Rubino, AIA Firm Principal Allen Barnett, AIA, LEED AP Senior Project Manager

More information

LLANO ISD SCHOOL BOARD MEETING. January 2016

LLANO ISD SCHOOL BOARD MEETING. January 2016 LLANO ISD SCHOOL BOARD MEETING January 2016 LLANO ELEMENTARY AREAS A & C STUCTURAL STEEL AND EXTERIOR WALLS ARE IN PLACE INSTALLATION OF HVAC DUCT WORK IS ON- GOING ELECTRICAL AND PLUMBING ROUGH-IN IS

More information

Table of Contents. Project Status: Bowden Academy Project Status: Bowden Academy. Executive Summary

Table of Contents. Project Status: Bowden Academy Project Status: Bowden Academy. Executive Summary Committee Meeting December 12, 2018 : Bowden Academy : Bowden Academy Table of Contents Executive Summary Project Update Report Bowden Academy J.T. Brackenridge Elementary School Irving Dual Language Academy

More information

Cherry Hill School District Building Project Summary. August 8, 2018

Cherry Hill School District Building Project Summary. August 8, 2018 Cherry Hill School District Building Project Summary August 8, 2018 Progress Update: Bond Referendum 2018 As of August 8, 2018, the Cherry Hill Public School District has not yet received approval from

More information

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades $300,000 C. Tilden Entrance Upgrades $50,000 D. Door and Glass Improvements $500,000 E. Alert Systems $800,000

More information

NEW MIDDLE SCHOOL PROJECT

NEW MIDDLE SCHOOL PROJECT Monthly Report October 2017 INTRODUCTION P.J. Dick Incorporated is pleased to present to the Chartiers Valley Board of School Directors the following Construction Report for the Chartiers Valley Middle

More information

WARREN CONSOLIDATED SCHOOLS 2016 BOND PROJECT UPDATE M a y

WARREN CONSOLIDATED SCHOOLS 2016 BOND PROJECT UPDATE M a y WARREN CONSOLIDATED SCHOOLS 2016 BOND PROJECT UPDATE M a y 2 0 1 8 Agenda Overview of the Bond 2018 Work 2 Agenda Overview of the Bond 2018 Work 3 Overview of Bond Why Now? Interest rates remain at historic

More information

Update on FCPS Construction/Renovation Projects. August 2016

Update on FCPS Construction/Renovation Projects. August 2016 Update on FCPS Construction/Renovation Projects New High at Winchester Road Architect: General Contractor: Tate Hill Jacobs: Architects D.W. Wilburn, Inc. GC Contract Sum: $62,044,000 Total Project Cost:

More information

CONSTRUCTION REPORT. Zionsville Community Schools Zionsville, Indiana. October 2014 TSC NO

CONSTRUCTION REPORT. Zionsville Community Schools Zionsville, Indiana. October 2014 TSC NO CONSTRUCTION REPORT TSC NO. 21319.1 October 2014 Zionsville Community Schools Zionsville, Indiana The SKILLMAN Corporation Project Administration Construction Management Zionsville Community Schools 2005

More information

La Porte Independent School District 2014 Bond Program Status Report August 11, 2015

La Porte Independent School District 2014 Bond Program Status Report August 11, 2015 La Porte Independent School District 2014 Bond Program Status Report August 11, 2015 La Porte ISD 2014 Bond Program ADMINISTRATION: Superintendent: Lloyd Graham Deputy Superintendent: Dr. Linda Wadleigh

More information

Project Status Update & Progress Report

Project Status Update & Progress Report UCSD Board of Education Project Status Update & Progress Report March 27, 2018 Capital Project Presentation March 2018 1. Kernan Elementary School Addition & Renovations Part 1 Construction Progress Update

More information

Capital Projects Update

Capital Projects Update Issaquah School District Issaquah High School Reconstruction December 2009 West side of the site: North classroom building is being sheet-rocked, taped, and primed. Data and electrical wiring is being

More information

NEIDIG ELEMENTARY SCHOOL ADDITION & RENOVATION PHASING. Neidig Community Meeting July 2018

NEIDIG ELEMENTARY SCHOOL ADDITION & RENOVATION PHASING. Neidig Community Meeting July 2018 NEIDIG ELEMENTARY SCHOOL ADDITION & RENOVATION PHASING Neidig Community Meeting July 2018 PROPOSED NEIDIG ELEMENTARY SCHOOL Expanded parking Separate bus loop Gymnasium Addition 2 story classroom wing

More information

FACILITIES LIFE CYCLE ANALYSIS

FACILITIES LIFE CYCLE ANALYSIS FACILITIES LIFE CYCLE ANALYSIS Scottsdale Unified School District Governing Board Study Session September 8, 2016 Terry Worcester A.I.A. COCHISE Elementary School 1991 Media Center 2001 Classrooms, Administration

More information

Board Work Session Feasibility Study. January 9, 2017

Board Work Session Feasibility Study. January 9, 2017 Board Work Session Feasibility Study January 9, 2017 1 Process Staff Input Sessions at all schools What can you tell us about your building, your site, your space? Group collaboration exercise looking

More information

Chino Valley Unified School District Monthly Construction Update

Chino Valley Unified School District Monthly Construction Update h Construction of One Classroom Wing Cattle Elementary School Architect: WLC Architects, Inc. Contractor: Pacwest Corporation Construction Manager: Bernards Contract Amount: $2,974,000 Contract Start:

More information

CEFPI Monthly Meeting

CEFPI Monthly Meeting CEFPI Monthly Meeting LISD School Construction Cost Information Background Information School Cost Information How Does LISD Compare? Other District Comparisons Background Information Cost Discussion Type

More information

Biddeford School Department

Biddeford School Department Biddeford School Department 5 Plan Buildings, Grounds & Equipment Table of Contents: John F Kennedy Memorial School Page: 1-2 Biddeford Primary School Page: 3-4 Biddeford Intermediate School Page: 5-6

More information

Basic renewal/restoration and safety projects

Basic renewal/restoration and safety projects Basic renewal/restoration and safety projects Board Update September 9, 2013 Bond Team Support Team Agenda Program Management Goals Program Budget Status 2013 Project Updates Labor Distribution Study 2014

More information

CORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan. Community Information Meeting

CORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan. Community Information Meeting CORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan Community Information Meeting October 2017 AGENDA Meeting Objectives Draft Plan Overview School Improvements for specific site Feedback/Listening

More information

DRAFT FY15/16. TBD Roof Repairs $50,000

DRAFT FY15/16. TBD Roof Repairs $50,000 FY15/16 Building Albemarle HS Design: Main Gym Floor Replacement $35,000 Burley MS Fieldhouse Restroom Facility Repairs $60,000 Burley MS Gym Partition Replacement with Curtain $30,000 CATEC Building Envelope

More information

Lemm Elementary. Restoring the Heart of the Community. Klein Independent School District

Lemm Elementary. Restoring the Heart of the Community. Klein Independent School District Lemm Elementary Restoring the Heart of the Community Target Date: August 2018 June Work Update - Project is on schedule Exterior brick is ongoing in Area A addition Area A walls have been covered Main

More information

Facilities Planning & Construction

Facilities Planning & Construction Facilities Planning & Construction Weekly Report Goose Creek CISD Week of May 27 June 2, 2017 [Edition 2, Volume 49] In This Issue: GCM Wing Addition GCM Wing Addition Security Vestibules Transportation

More information

Introduction & Project Background

Introduction & Project Background Introduction & Project Background Project Background is located in Pasadena, Maryland and is owned and maintained by Anne Arundel County School District. A new elementary school to replace the existing

More information

EASTERN HIGH SCHOOL. Site Plan East Capitol Street, N.E., Washington, DC INITIAL YEAR BUILT 1923

EASTERN HIGH SCHOOL. Site Plan East Capitol Street, N.E., Washington, DC INITIAL YEAR BUILT 1923 INITIAL YEAR BUILT 1923 BUILDING AREA 288,800 SF CURRENT PROGRAM CAPACITY 1,425 ENROLLMENT 2008 565 WARD 6 PROPOSED PROGRAM CAPACITY 1,100 Site Plan EASTERN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Through. June Current Strong Schools Bond Capital Improvement Projects. Prepared by

Through. June Current Strong Schools Bond Capital Improvement Projects. Prepared by MONTHLY PROGRESS REPORT Through June 2012 Current Strong Schools Bond Capital Improvement Projects Prepared by O Connor Construction Management, Inc. & Gilbane Building Company TABLE OF CONTENTS Executive

More information

Facilities Planning & Construction

Facilities Planning & Construction Facilities Planning & Construction Weekly Report Goose Creek CISD Week of August 14 August 20, 2017 [Edition 3, Volume 60] In This Issue: Technology Technology FCA Cover Cover Durotech Construction Transportation

More information

Facilities Planning & Construction

Facilities Planning & Construction Facilities Planning & Construction Weekly Report Goose Creek CISD Week of September 16 September 22, 2017 [Edition 3, Volume 64] Technology In This Issue: Technology Cover FCA Cover Transportation 2 SCC/Kilgore

More information

Architect and Engineer: Friar Associates inc.

Architect and Engineer: Friar Associates inc. Architect and Engineer: Friar Associates inc. BACKGROUND In June, after soliciting and interviewing several professional firms, Friar Associates was hired to perform an Existing Conditions Survey and Facilities

More information

Program Update. Data and Telecom Cabling-VPA, New Gym, & Physical Science. Physical Science Complex-Roof Replacement

Program Update. Data and Telecom Cabling-VPA, New Gym, & Physical Science. Physical Science Complex-Roof Replacement Projects under Construction Data and Telecom Cabling-VPA, New Gym, & Physical Science Architect/Engineer: P2S Engineering Original Contract: $154,882 Construction Manager: Bernards Approved Change Orders:

More information

ROD Grant Round 4 Presentation June 9, 2014

ROD Grant Round 4 Presentation June 9, 2014 ROD rant Round 4 Presentation June 9, 2014 713 Creek Road Bellmawr, NJ 08031 Telephone (856) 396-6200 Facsimile (856) 396-6205 Please visit us on the web at www.garrisonarch.com 2 Agenda NJDOE Application

More information

Stevens High School Pre Bond Presentation Claremont, NH

Stevens High School Pre Bond Presentation Claremont, NH Stevens High School Pre Bond Presentation Claremont, NH Existing Conditions Existing Conditions Existing Conditions Existing Conditions Proposed site features New main entry that is ADA accessible New

More information

RR Program Summary: Complete renovation with addition and code upgrades for a historic academic building

RR Program Summary: Complete renovation with addition and code upgrades for a historic academic building Program Summary: Complete renovation with addition and code upgrades for a historic academic building Program Statement: Damaged in Hurricane Katrina, the circa-1929 former high school in historic Marigny

More information

Cheldelin Middle School

Cheldelin Middle School Facility Information Address: 987 NE Conifer Blvd Corvallis Site Size: Building Area: Construction Date: Improved Parking: Grade Levels Served: Regular Classrooms: Portable Classrooms: Sept. 2007 Enrollment:

More information

2019 Construction

2019 Construction 2019 Construction Estimates @ 18 10 01 1 Oak Flat Elementary IDENTIFIED BASE BID SCOPE ITEMS Project BSSD replace door hardware to meet ADA, including re-key to master system $ 75,000 Shelter Lockdown

More information

*Additional Projects were not part of the voter-approved 2006 Bond. They were able to be completed due to savings from other projects.

*Additional Projects were not part of the voter-approved 2006 Bond. They were able to be completed due to savings from other projects. SECONDARY SCHOOLS Kirby Middle School Demolish 300, 400, and 500 buildings partial Change in total rebuild design New academic building - 33 classrooms *Rent portables for temporary classrooms partial

More information

Through. November Current Strong Schools Bond Capital Improvement Projects. Prepared by

Through. November Current Strong Schools Bond Capital Improvement Projects. Prepared by MONTHLY PROGRESS REPORT Through November 2010 Current Strong Schools Bond Capital Improvement Projects Prepared by O Connor Construction Management, Inc. & Gilbane Building Company TABLE OF CONTENTS Executive

More information

NEW MIDDLE SCHOOL PROJECT

NEW MIDDLE SCHOOL PROJECT Monthly Report September 2017 INTRODUCTION P.J. Dick Incorporated is pleased to present to the Chartiers Valley Board of School Directors the following Construction Report for the Chartiers Valley Middle

More information

CENTENNIAL SCHOOL DISTRICT

CENTENNIAL SCHOOL DISTRICT CENTENNIAL SCHOOL DISTRICT Middle School Feasibility Study Project PLANNING STUDY PRESENTATION 24 May 2016 Middle School Master Planning Process 1. Familiarized team with existing middle schools and sites

More information

Hartsville Area Schools - Building Evaluations

Hartsville Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 8, 2012 Hartsville Area Schools - Building Evaluations School Name: West Hartsville Elementary Observed By: Cannon/Carter Principal:

More information

Hinsdale Township High School District 86 Referendum Project Listing April 2, Approved

Hinsdale Township High School District 86 Referendum Project Listing April 2, Approved Hinsdale Township High School District 86 Referendum Project Listing April 2, 2019 - Approved 1-12-2019 Project Category and Description Central South Total Security Replace Intercom System Install a completely

More information

New Ringgold Middle School. Project Slideshow August 26, 2017

New Ringgold Middle School. Project Slideshow August 26, 2017 New Ringgold Middle School Project Slideshow August 26, 2017 Aerial Photo from West Provided by Hudson Group Taken 8.16.2017 Aerial Photo from North Provided by Hudson Group Taken 8.16.2017 Aerial Photo

More information

FEASIBILITY STUDY SEPTEMBER 1 8,

FEASIBILITY STUDY SEPTEMBER 1 8, FEASIBILITY STUDY SEPTEMBER 1 8, 2 0 1 2 OVERVIEW PAUL SWARTZ, AIA, PP PRINCIPAL-IN-CHARGE JIM PETRO, AIA PROJECT ARCHITECT STUART J. HEISEY, PE MECHANICAL ENGINEER LEED AP BD+C The last feasibility study

More information

Fleet Elementary School

Fleet Elementary School Fleet Elementary School Community Newsletter (January 2019) This is the January update on the status and progress of construction for the project. All monthly updates will also be posted to the project

More information

ENTRY FORM. DVASE 2018 Excellence in Structural Engineering Awards Program

ENTRY FORM. DVASE 2018 Excellence in Structural Engineering Awards Program ENTRY FORM DVASE 2018 Excellence in Structural Engineering Awards Program PROJECT CATEGORY (check one): Buildings under $5M Buildings Over $100M Buildings $5M - $15M Other Structures Under $1M Buildings

More information

Richard L. Johnson Associates, Inc. Architects Interior designers. ARCHITECT S FIELD REPORT No. 13

Richard L. Johnson Associates, Inc. Architects Interior designers. ARCHITECT S FIELD REPORT No. 13 Richard L. Johnson Associates, Inc. Architects Interior designers ARCHITECT S FIELD REPORT No. 13 Project: Addition and Renovation to Millikin Elementary School Architect s Project No.: 15-032 Date: 9-29-16

More information

Frost Technical Center

Frost Technical Center Frost Technical Center 1955 Greenhouses Addition Various other additions and renovations Provide site security improvements Provide improved Admin area field of view to site entrance Provide security camera

More information

Upper Adams School District Facility Study Presentation Part 2 November 17, 2016

Upper Adams School District Facility Study Presentation Part 2 November 17, 2016 Upper Adams School District Facility Study Presentation Part 2 November 17, 2016 Providing a Client Oriented Approach to Architecture Crabtree, Rohrbaugh & Associates, Architects Agenda Part 1 Current

More information

What is a Master Plan

What is a Master Plan What is a Master Plan Master planning A long-term, comprehensive approach to facilities planning (10-12 years) Align facilities plan with mission, vision, strategic goals and community values Recognizes

More information

Fleet Elementary School

Fleet Elementary School Fleet Elementary School Community Newsletter (August 2018) This is the August update on the status and progress of construction for the project. All monthly updates will also be posted to the project website

More information

DENNIS TOWNSHIP FEASIBILITY STUDY

DENNIS TOWNSHIP FEASIBILITY STUDY DENNIS TOWNSHIP FEASIBILITY STUDY October 29, 2015 TABLE OF CONTENTS I. INTRODUCTION II. EXECUTIVE SUMMARY III. GENERAL FACILITY DATA A. Primary School B. Elementary / Middle School IV. FACILITIES ASSESSMENT

More information

Existing Site Aerial Frederick High School Feasibility Study September 5, 2012

Existing Site Aerial Frederick High School Feasibility Study September 5, 2012 Existing Site Aerial Building Developmental History 1981 1966 1939 1977 1978 1955 1966 Exterior Roof: Most of existing roof has multi ply built up roofing. Some areas have gravel ballast, others have cap

More information

Building & Grounds Committee Meeting Tuesday, 13 September Minutes

Building & Grounds Committee Meeting Tuesday, 13 September Minutes Building & Grounds Committee Meeting Tuesday, 13 September 2016 Minutes Present: Johnson, Laverghetta (joined at 8:00 am) and McCarthy. Also present: Kettrich, Koch, Prior, Crolius, Marsenison. Mrs. Johnson

More information

DALLAS INDEPENDENT SCHOOL DISTRICT

DALLAS INDEPENDENT SCHOOL DISTRICT DALLAS INDEPENDENT SCHOOL DISTRICT PROCUREMENT SERVICES CONSTRUCTION SERVICES DOCUMENT DISTRIBUTION CONSTRUCTION SERVICES BID PACKAGE # 008 Org 017 H. Grady Spruce High School 1. DOCUMENT DISTRIBUTION:

More information