1 CITY OF PALM BEACH GARDENS PURCHASING DEPARTMENT SOLICITATION ADDENDUM Addendum No. 1 DATE: January 30, 2018 TO: SOLICITATION NO.: TITLE: OPENING DATE: All Potential Bidders ITB GF Prefabricated Metal Building Shell for Golf Maintenance Facility Friday, February 16, 3:00PM This Addendum is and does become a part of the above-mentioned Solicitation. A. The following questions were received from potential Bidders, and the responses are provided as shown. Question 1: We request that a 150-day duration be used for this project. See list below which does not include weather or holiday delays. a. Contract Award Start b. Release of PEMB Order 5 c. Receipt of PEMB plans, foundation design complete 24 d. Approval of PEMB shop drawings with revised as noted & No resubmittal 7 e. Final PEMB plans 7 f. Permitting 7 g. Permit approved & mobilization 7 h. Slab & foundation install w/5 days for in-slab trades 30 i. Curing of slabs & foundation 7 j. Erection of PEMB 35 k. Install of OH doors, windows, man doors, exterior finishes 14 TOTAL: 143 calendar days Please submit your proposed schedule for completion as part of the bid package.
2 Question 2: Regarding the graded pad; a. Will it be to slab subbase elevation? b. Will it be compacted to design density? The sub-base will be at the required height per the awarded Bidder s design. The awarded Bidder shall obtain the density required per their design. Question 3: Please confirm that others working for the city will perform all; M.E.P. Trade-work, Fire Sprinklers, Fire Alarms, Utility Connections, Metal Framing/Drywall, & All Interior Finishes. The awarded Bidder shall build the foundation, shell, roof, coiling doors, windows, doors, fan enclosure, stone work, etc. The awarded Bidder shall work with the City s other contractors including M.E.P., trade-work, fire sprinklers, fire alarms, utility connections, metal framing/drywall, and all interior finishes. Question 4: What are the size & specification for the windows bidder is required to provide? The windows are 3-0 w x 5-0 H. Question 5: Question 6: Question 7: Question 8: Regarding the requirements to exhaust air, shouldn t this be performed by the City s mechanical contractor? Typically, pre-engineered building contractor would only provide framed openings for intake & exhaust air. Yes, this will be performed by the City s mechanical contractor. The awarded Bidder shall only provide framed openings for intake & exhaust air. Per section 3.2, iv; Can the 2 concrete slab around outside of the building be poured separately? Typically, we see aprons poured from 4-8 below the finished floor slab, unless it s at a door, to prevent water intrusion. Yes; it can be poured separately but should be part of this contract. Per section 3.3; Shall requirement for drawings be restricted to bidder s scope (PEMB & Foundations) or shall it include all other City provided trade work (i.e.: electrical, mechanical, plumbing, sprinkler, & fire alarm design work)? Section 3.1 mentions the city has hired an architect for the interior work. Yes; the drawings shall be restricted to the builder s scope. The awarded Bidder shall build the foundation, shell, roof, coiling doors, windows, doors, fan enclosure, stone work, etc. The awarded Bidder shall work with the City s other contractors including M.E.P., tradework, fire sprinklers, fire alarms, utility connections, metal framing/drywall, and all interior finishes. Per section 3.5, No mechanical or HVAC work is mentioned, is this to be provided by the City? Yes; the drawings shall be restricted to the builder s scope. The awarded Bidder shall build the foundation, shell, roof, coiling doors, windows, doors, fan enclosure, stone work, etc. The awarded Bidder shall work with the City s other contractors including M.E.P., tradework, fire sprinklers, fire alarms, utility connections, metal framing/drywall, and all interior finishes.
3 Question 9: Question 10: Question 11: Question 12: Is the requirement 3.6.ii to indicate bidder is to provide pre-engineered building plans or is this a requirement for architectural plans as well? The scope of this solicitation requires the provision of pre-engineered building plans. The plan shows a loft; will bidders need to provide structural enhancements for the loft? No; if it is determined that the loft requires structural enhancements, it will be added to the project once the design for the loft is complete. Will the items listed in section 3 supersede keynotes and plan A2.10? We noted some conflicts and differences. Yes. Was a custom color used for the cart storage building wall panels as Nucor color chart doesn t appear to have a color to match SW6380? See colors below that should be used for the bidding. Question 13: We need to know the color that was used on the cart barn coiling doors and if it is a standard or custom color. The coiling doors should be unfinished metal.
4 Question 14: Question 15: With a 14-6 eave height the overhead coiling doors closest to the B column line will encroach into the structural roof beam. Shall the eave height be raised? If raised to 16 the doors will fit. Yes, if it is required for your design to meet the design guidelines. The doors need to provide for a minimum Similarly, to previous question the 14 height of the center door will create a conflict with the door coil mounted above the door and the structural roof beam. Shall the eave height be raised, or the door height lowered? Yes, if it is required for your design to meet the design guidelines. The doors need to provide for a minimum Question 16: Item 3.4 states the awarded Bidder shall agree to complete the work no later than (90) ninety days from Notice to Proceed (NTP) issuance. Item 2.17 states completion date shall not exceed ninety days (90) calendar days after date of the Purchase Order. Please clarify the timeline. Engineered shop drawings for metal buildings can be a lengthy process so does the NTP or PO timeline start after the approval of engineered shop drawings? Does the timeline start after permit approval for the project according to item 3.3 in Statement of Work? The timeline begins from the issuance of the Notice to Proceed. The City issues a Purchase Order as the Notice to Proceed. See Response to Question 1. Question 17: Item 3.5 in SOW indicates work to be done by others. Item 3.2, number xiii indicates coordination with other trades. Is the GC required to put in U/G electric and plumbing under the slab for the metal building? Is the GC required to install fire sprinklers? Is the GC required to install HVAC systems? The awarded Bidder shall build the foundation, shell, roof, coiling doors, windows, doors, fan enclosure, stone work, etc. The awarded Bidder shall work with the City s other contractors including M.E.P., trade-work, fire sprinklers, fire alarms, utility connections, metal framing/drywall, and all interior finishes. Question 18: Item 3.11 number xiv of SOW indicates city will deliver the pad at grade ready. Please define this. Will the pad be at under slab elevation, compacted to correct density? The sub-base will be at the required height per the awarded Bidder s design. The awarded Bidder shall obtain the density required per their design. The following additional questions were received from attendees at the Pre-Bid Conference: Question 19: Question 20: Question 21: Does the stonework go on the east side of the building or on all the sides? East side. Who is responsible for the Builder s Risk deductible? The awarded Bidder. Would the City consider installing the stonework as a wainscoting instead of only at the sides? Yes; but the bid submittal needs to reflect the current bid specifications.
5 Question 22: Are permitting delays not the fault of the contractor claimed against the total project completion schedule? No. Subsequent to the Pre-Bid Conference and Site Visit held on January 26, 2018, the following additional information is provided. B. A copy of the Pre-Bid Conference Sign-In Sheet is attached to this Addendum. All other terms, covenants and conditions of the subject solicitation and any addenda issued thereto shall apply, except to the extent herein amended. Km! Ra CPPO, CPPB, CPSM, C.P.M., CAP-OM, CPCP, FCCM, PMP Purchasing and Contracts Director Attachment
SOLICITATION ADDENDUM
CITY OF PALM BEACH GARDENS PURCHASING DEPARTMENT SOLICITATION ADDENDUM Addendum No. 7 DATE: August 22, 2018 TO: SOLICITATION NO.: TITLE: OPENING DATE: All Potential Bidders ITB2018-095RC Construction of
More informationSOLICITATION ADDENDUM
TO: SOLICITATION NO.: CITY OF PALM BEACH GARDENS PURCHASING DEPARTMENT SOLICITATION ADDENDUM Addendum No. 8 All Potential Bidders ITB2017-078PS DATE: June 18, 2018 TITLE: OPENING DATE: Municipal Complex
More informationADDENDUM NO. 1 FOR RENOVATIONS TO LINCOLN ANIMAL SHELTER RFP # February 1, 2018
ADDENDUM NO. 1 FOR RENOVATIONS TO LINCOLN ANIMAL SHELTER RFP #2018-09-01 NOTICE TO PROSPECTIVE BIDDERS February 1, 2018 Prospective bidders are hereby informed of the following corrections, additions,
More informationA D D E N D U M T O B I D PRE-ENGINEERED METAL BUILDING
Guadalupe County Auditor s Office 307 W. Court, Suite 205 Seguin, Texas 78155 830-303-4188 Ext. 1328 A D D E N D U M T O B I D PRE-ENGINEERED METAL BUILDING Bid Title: PRE-ENGINEERED METAL BUILDING Bid
More informationINVITATION FOR BID (IFB):
DATE: May 8, 2018 ADDENDUM NO. 1 INVITATION FOR BID (IFB): B180022132 RPD Furnish & Install Ballistic Glass Lobby Counters IFB #B180022132 WAS ISSUED: Wednesday April 25, 2018 RECEIPT DATE: May 23, 2018
More informationThe bid is being postponed to comply with State rules requiring 4 calendar days for receipt of bids after an addendum.
ADDENDUM NO. FOUR March 5, 2018 NORTH IDAHO COLLABORATIVE EDUCATION BUILDING North Idaho College, Coeur d Alene, ID DPW PROJECT 16251 - H2A PROJECT 1616 This addendum is hereby incorporated into and is
More informationCity of Roanoke. Commercial Permit Submittal Guidelines
City of Roanoke Commercial Permit Submittal Guidelines These guidelines are for information purposes only. The contractor is obligated to comply with all adopted codes and ordinances BUILDING INSPECTIONS
More informationDick s Sporting Goods Demolition Package
REQUEST FOR PROPOSAL FOR COMPETITIVE SEALED PROPOSALS TO PROVIDE: Dick s Sporting Goods Demolition Package at Salt Lake City, UT 2425 E. Camelback Rd. Suite 750 Phoenix AZ 85016 Notice of Extended Payment
More informationDOCUMENT BID DOCUMENT
DOCUMENT 00 40 00 BID DOCUMENT 1 Submit bids in compliance with Document 00 21 00Instructions to Bidders. Fill in blanks which pertain to the project or indicate N/A. The Owner reserves the right to reject
More informationCOMMERCIAL PLAN SUBMITTAL GUIDELINES JAN 2018
COMMERCIAL PLAN SUBMITTAL GUIDELINES JAN 2018 CONSTRUCTION CODES The City of Colleyville has adopted and enforces the following codes which are applicable to building construction activities within the
More informationAddendum #1. January 22, 2018
Addendum #1 January 22, 2018 Building B 8500 Public Works Drive Renovation for City of Manassas Water & Sewer Department 8500 Public Works Drive Manassas, VA 20110 Job Description Renovation of the existing
More informationC o u n t y o f F a i r f a x, V i r g i n i a
001961 Page 2 C o u n t y o f F a i r f a x, V i r g i n i a A D D E N D U M DATE: August 2, 2016 ADDENDUM NO. 4 TO: REFERENCE: FOR: DUE DATE/TIME: ALL PROSPECTIVE BIDDERS Government Center Generator System
More informationSTUDIO 2LR ARCHITECTURE + INTERIORS
Orangeburg Spec Industrial Building Orangeburg, South Carolina September 29, 2015 ADDENDUM NO. 1 This addendum forms a part of the Contract documents and modifies the original Bidding Documents and any
More informationADDENDUM 2 KODIAK ISLAND BOROUGH CHINIAK TSUNAMI CENTER AND LIBRARY Kodiak, AK
ADDENDUM 2 KODIAK ISLAND BOROUGH LIBRARY Kodiak, AK March 7, 2018 TO ALL PLAN HOLDERS OF RECORD: This addendum forms part of and modifies the contract documents as noted below. Bidders must acknowledge
More informationPAWLEYS ISLAND TOWN HALL
DOCUMENT 001116 - INVITATION TO RE-BID 1.1 PROJECT INFORMATION A. Notice to Bidders: Prequalified bidders are invited to submit bids for Project as described in this Document according to the Instructions
More informationRequests for Information pm Draft for Request for Proposals Sprouts - Shell/Civil Issued on April 25, 2018
Requests for Information - 05.0.1 5pm Draft for Request for Proposals Sprouts - Shell/Civil Issued on April 25, 201 RFI 01 Is the RFP due at 4pm or 5pm on May 16th? Response: RFI 02 Do you have an anticipated
More informationPort KC RFP NORTHLAND PARK BUILDING V
Port KC RFP NORTHLAND PARK BUILDING V 1. The RFP refers to landscaping plans. However, it does not appear that the landscaping plans were issued with the rest of the RFP. Will these be issued with an addendum?
More informationARCHITECTURE, PLANNING AND HISTORIC PRESERVATION, INC. ADDENDUM NO. 1. September 9, to the BIDDING DOCUMENTS for
AUSTIN ARCHITEXAS DALLAS ARCHITECTURE, PLANNING AND HISTORIC PRESERVATION, INC. ADDENDUM NO. 1 September 9, 2014 to the BIDDING DOCUMENTS for ELLIS COUNTY COMPLEX Records Storage Building Waxahachie, Texas
More informationTown of Milton Halton Paramedic Services Station No. 17 and Milton Fire Station No. 5 Tender No and
Town of Milton No. 17 and Milton Fire Station No. 5 Tender No. 19-500-1 and 19-500-2 BID SUBMISSION 19-500-2 Part Two In accordance with Tender No. 19-500-2, Tender Form Part Two must be submitted electronically
More informationRevised Drawings A, E, and M dated 11/13/18 (that include additional specifications)
Addendum No. 1 To: All Prospective Bidders Description: Holocaust Resource Center Expansion Stockton University Galloway, New Jersey 08205 Bid Number: B190003 Date: November 19, 2018 Pursuant to N.J.S.A.
More informationRFP /ME - ADDENDUM 2
RFP 201013/ME - ADDENDUM 2 RFP Closing: February 5, 2015 at 2:00 PM (Local Time) Page 1 of 33 RFP Number: 201013/ME Date: January 28, 2015 RETURN PROPOSALS AS SHOWN BELOW Copies of proposal required: Eight
More informationA Homeowner s Guide to Renovation and Addition Permits
A Homeowner s Guide to Renovation and Addition Permits What is a Building? The Building Code Act of Ontario defines a building as: 1. A structure occupying an area greater than 10 m2 (108 sq. ft.) consisting
More informationALL PROSPECTIVE CONTRACTORS, PLAN ROOMS AND SUPPLIERS
Architect: Studio 2H Design, LLC 1721 4 th Avenue North, Suite 101 Birmingham, Alabama 35203 (205) 264-9988 July 26, 2018 ADDENDUM NO. 5 UA Project No.: 712-17-1081 EDA Investment No.: 04-79-07154 B.C.
More informationTRIAD ENGINEERING CONSULTANTS, INC.
TRIAD ENGINEERING CONSULTANTS, INC. 2638 Willard Dairy Rd Providing High Point, NC Suite 100 Plumbing, Mechanical and 27265 (336) 454-0225 Electrical Engineering Services Since 1984 admin@triadengmep.com
More informationREQUEST FOR PROPOSAL
September 20, 2016 REQUEST FOR PROPOSAL Design/Build Services for Wood Frame, Metal Siding, Open Front Storage Building for Sewer Department RFP Due October 12, 2016 @ 2:00 pm (local time) BIDDER NAME:
More information603 Summit Avenue, Suite 102 Greensboro, N.C Voice/FAX (336)
Ricky L. Loman, AIA Architect 603 Summit Avenue, Suite 102 Greensboro, N.C. 27405-7700 Voice/FAX (336) 273-7999 ADDENDUM: Number 1 ISSUED: March 14, 2017 SUBJECT: New Agriculture & Equipment Storage Barn
More informationCity Of Mendota Construction Procedures
City Of Mendota Construction Procedures Building Permit Application: A permit shall be obtained prior to commencing work of any type. Failure to do so may result in doubling the permit fees. At the time
More informationCONSTRUCTION PROGRESS DOCUMENTATION (SCHEDULING)
01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION (SCHEDULING) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
More informationADDENDUM NO. 3, February 8, Renovations to the Existing Shelby County Center Architect s job no. 2598/BN
ADDENDUM NO. 3, February 8, 2013 RE: Renovations to the Existing Shelby County 9-1-1 Center Architect s job no. 2598/BN FROM: TurnerBatson 1950 Stonegate Drive, Suite 200 Birmingham, Alabama 35242 (205)
More informationSurgical Associates Commercial Remodel
ADDENDUM Project Name: Studio 951 Project No.: 17-012 Surgical Associates Commercial Remodel Addendum No.: 01 Issue Date: 6 December 2017 This Addendum serves to clarify, revise and supersede information
More informationADDENDUM #2 REQUEST FOR COMPETITIVE SEALED PROPOSALS FOR A GENERAL CONTRACTOR. The University of Texas Health Science Center at San Antonio
ADDENDUM #2 REQUEST FOR COMPETITIVE SEALED PROPOSALS FOR A GENERAL CONTRACTOR The University of Texas Health Science Center at San Antonio Renovate Floor 1 and Floor 2 of the PARC Bldg. RFP No.: 745-16-9935
More informationRESIDENTIAL BUILDING PERMIT PROCEDURES
RESIDENTIAL BUILDING PERMIT PROCEDURES Community Development Dept. 9220 Bonita Beach Road, Ste. 111 Bonita Springs, FL 34135 (239) 444-6150 permitting@cityofbonitaspringscd.org THREE (3) SETS OF PLANS
More informationBUREAU Joe Iuviene, AIA January 20, 2017
architectural BUREAU Joe Iuviene, AIA January 20, 2017 Alterations & Additions NEW TOWN HALL for TOWN OF AUSTERLITZ 816 State Route 203, Spencertown, New York 12165 ADDENDUM NO. 1 This addendum amends
More informationBuilding Standards Department. Guide to Building Permits Understanding the Different Building Permit Types and their Submission Requirements
Guide to Building Permits Understanding the Different Building Permit Types and their Submission Requirements Building Standards March 2018 CONTENTS BUILDING PERMIT APPLICATIONS... 2 GENERAL INFORMATION...
More informationTOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT
TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT 06045-0191 138 MCKEE STREET MANCHESTER, CT BID NO. 16/17-5 ADDENDUM NO. 1 1. The bid opening has been
More informationPermit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE
STAFF USE ONLY RECEIVED BY: DATE: Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE Applicant must complete numbered items
More informationADDENDUM NO. 3 REQUEST FOR PROPOSALS HANGAR 1610/1612 FIRE SUPPRESSION RETROFIT PROJECT
ADDENDUM NO. 3 REQUEST FOR PROPOSALS HANGAR 1610/1612 FIRE SUPPRESSION RETROFIT PROJECT Effective September 6, 2018, Addendum No. 3 (THREE), {Pages 1-7 and the applicable attachment(s)}, is associated
More informationADDENDUM NO. B. TO THE BID DOCUMENTS, dated 1/5/16 FOR THE
ADDENDUM NO. B TO THE BID DOCUMENTS, dated 1/5/16 FOR THE CVUSD M&O/WAREHOUSE/PRINTING SERVICES TENANT IMPROVEMENT 667 Building & 750 Building #DO-15C1024 & #DO-15C1026 CONEJO VALLEY UNIFIED SCHOOL DISTRICT
More informationUniversity of Akron. Addendum No. 2. For. Zook Hall Renovation Phase 2A Abatement & Demolition Project #: UAK120015
University of Akron Addendum No. 2 For Zook Hall Renovation Phase 2A Abatement & Demolition Project #: UAK120015 University of Akron Capital Planning & Facilities Management Lincoln Building Akron, Ohio
More informationCONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS
CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS (August 28, 2018) PIERCE HALL IMPROVEMENTS PROJECT NO. 950511-950532 UNIVERSITY OF CALIFORNIA, RIVERSIDE PREQUALIFICATION PROCESS ALL
More informationHAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016
HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016 1. THIS ADDENDUM IS HEREBY MADE AS PART OF THIS CONTRACT SPECIFICATION. THIS ADDENDUM IS ISSUED
More informationCONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST
CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST Check off each item that is included within the submitted Contract Documents Review Package. Provide a written explanation for any omissions. The following items,
More informationADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:
ADDENDUM NO. 1 TO THE DRAWINGS AND SPECIFICATIONS FOR THE New Dishman-McGinnis Elementary School Bowling Green Independent Schools Bowling Green, Kentucky BG 12-256 RTA 1209 March 11, 2013 To All Plan
More informationWINDOW REPLACEMENT FOR ARCHITECT'S NO NORWOOD ELEMENTARY SCHOOL. A. Project Name: Window Replacement for Norwood Elementary School.
WINDOW REPLACEMENT FOR ARCHITECT'S NO. 2638 NORWOOD ELEMENTARY SCHOOL DOCUMENT 00 9113A - ADDENDUM NO. 1 1.1 PROJECT INFORMATION A. Project Name: Window Replacement for Norwood Elementary School. B. Owner:
More informationPermit Application Commercial / Industrial / Mutli-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE (Form #2)
STAFF USE ONLY RECEIVED BY: DATE: Permit Application Commercial / Industrial / Mutli-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE (Form #2) Applicant must complete
More informationAddendum # 4 August 9, 2018
Addendum # 4 August 9, 2018 Richards Consulting & Associates Limited R.R.3 Red Deer, Alberta T4N 5E3 Phone: 403-886-2919 Fax: 403-886-2733 PROJECT: Connector Building Phase 2, Lac La Biche, Alberta THIS
More informationDIVISION 1 GENERAL REQUIREMENTS CONSULTANT/VENDOR REQUIREMENTS BUILDING INFORMATION MODELING (BIM) REQUIREMENTS
DIVISION 1 GENERAL REQUIREMENTS CONSULTANT/VENDOR REQUIREMENTS BUILDING INFORMATION MODELING (BIM) REQUIREMENTS PART 1 - GENERAL 1.0 RELATED DOCUMENTS 1.0.1 Drawings, General Conditions of the Contract
More informationSpring Lake Public Schools. Spring Lake, MI. March RE: High School Storage Buildings
Spring Lake Public Schools Spring Lake, MI March 2018 RE: High School Storage Buildings Advertisement for bids Bid Proposal Sealed bids for Spring Lake Public Schools-High School Storage Buildings will
More informationNOTE: For construction other than new commercial or additions (renovations), only those areas below describing the scope of work will be applicable.
Applicant s Name: New Commercial - Commercial Additions Renovations Permit Plan Submittal Check List Applicant s Phone Number (s): Project Address: Project Type: _New Commercial or Commercial Addition
More informationAll subcontractor bidders are responsible for assuring that their subcontractors and vendors are properly apprised of the contents of this Addendum.
ADDENDUM NUMBER: 2 PROJECT: UNC Charlotte Residence Hall Phase XIV - Elevator Bid Package DATE: May 28, 2015 OWNER: UNC Charlotte ARCHITECT: FWA Group NOTICE TO BIDDERS: This addendum is issued prior to
More informationNorthwest Business Park, Building 5, Bay 3. Issued for Tender: August 24, Substantial Date: November 17, 2017
Exterior Alterations and New Office/ Warehouse for All Weather Shelters Northwest Business Park, Building 5, Bay 3 13459-149 Street Edmonton, AB Issued for Tender: Site Visit: Available upon request. Closing
More informationADDENDUM NO. 2 PROJECT: Omaha Nation Food Distribution Building Macy, Nebraska Project No ARCHITECT:
ADDENDUM NO. 2 PROJECT: ARCHITECT: Omaha Nation Food Distribution Building Macy, Nebraska Project No. 7-7 PETERS AND ASSOCIATES, ARCHITECTS, P.C. 427 Dayton Circle, Suite Omaha, Nebraska 6837-5558 Date
More informationThis Addendum Number One forms part of the Contract Documents and modifies the original Bidding Documents dated June 8, 2016.
ADDENDUM NUMBER ONE - June 15, 2016 CITY OF CLARKSVILLE TO: All Bidders of Record This Addendum Number One forms part of the Contract Documents and modifies the original Bidding Documents dated June 8,
More informationADDENDUM NUMBER ONE (1) September 30, 2015
ADDENDUM NUMBER ONE (1) September 30, 2015 TO: LAWRENCE H. PEEK ARCHITECTS P.O. Box 2932; Homer, Alaska 99603 CITY OF WHITTIER PUBLIC SAFETY FACILITY WHITTIER, ALASKA ARCHITECT S PROJECT NUMBER - 14003
More informationADDENDUM NO. 3. Project: GREENE COUNTY FSMF DOT BID PACKAGE #1
ADDENDUM NO. 3 Project: GREENE COUNTY FSMF DOT-170005 BID PACKAGE #1 Index of Contents Addendum No. 3... 3 Pages Pre-Bid Meeting Agenda... 4 Pages Pre-Bid Meeting EDGE Requirements... 2 Pages Pre-Bid Meeting
More informationCITY OF OAK CREEK SINGLE FAMILY & TWO-FAMILY CONSTRUCTION/PERMIT REQUIREMENTS
CITY OF OAK CREEK SINGLE FAMILY & TWO-FAMILY CONSTRUCTION/PERMIT REQUIREMENTS Update April 29, 2013 12 Permit application forms and contact information can be found on our website under Inspection Department
More informationCompleted. Project. Melbourne High School. Comprehensive Additions and Renovations
Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project
More informationCity of Miami ADDENDUM NO. 5. January 12, 2017 INVITATION TO BID NO.: CURTIS PARK NEW SWIMMING POOL FACILITY
City of Miami ADDENDUM NO. 5 January 12, 2017 INVITATION TO BID NO.: 15-16-040 CURTIS PARK NEW SWIMMING POOL FACILITY OFFICE OF CAPITAL IMPROVEMENTS ( OCI ) PROJECT NO.: TO: ALL PROSPECTIVE BIDDERS: The
More informationBuilding Architecture
The front of the building consists of the three story town homes with facades to remain, as well as one leg of the condominium tower that reaches the street. The main condo portion of the building is L
More informationOCONEE COUNTY PROCUREMENT OFFICE 415 S. PINE STREET, ROOM 100 WALHALLA, SC Robyn M. Courtright, CPPO, Procurement Director
OCONEE COUNTY PROCUREMENT OFFICE 415 S. PINE STREET, ROOM 100 WALHALLA, SC 29691 Robyn M. Courtright, CPPO, Procurement Director Tronda Spearman, CPPB, Assistant Procurement Director Telephone: 864-638-4141
More informationExisting Construction Conditions
Tracy Lo Terrell Place 575 7 th Street NW Washington DC September 23, 2002 Construction Management Existing Construction Conditions Executive Summary For this assignment, I have sent out an email to gather
More informationALL BIDDERS OF RECORD, CONSULTANTS, OWNER:
ADDENDUM NUMBER ONE for Project No.: U-787-14-1 State Permanent Improvement Project No.: H27-Z167 COLUMBIA, SOUTH CAROLINA PREPARED BY: The Boudreaux Group 1330 Lady Street, Columbia, SC 29201 DATE OF
More informationDOCUMENT BID FORM - STIPULATED SUM
DOCUMENT 004113 BID FORM - STIPULATED SUM Architect s Project No. 2007024EXC Project: Excell Academy for Tenant: Excell Academy for Higher Learning, Inc. Higher Learning Interiors Package 6510 Zane Avenue
More informationADDENDUM B - IFB 5236-BC. UNLV White Hall Animal Care Facility. University of Nevada, Las Vegas. Purchasing Department Maryland Parkway
ADDENDUM B - IFB 5236-BC UNLV White Hall Animal Care Facility University of Nevada, Las Vegas Purchasing Department 4505 Maryland Parkway Las Vegas, Nevada 89154-1033 (702) 895-3521 Date of Addendum: August
More informationDATE: December 15, 2009 BID NO.: FWC 09/ CALENDAR OF EVENTS-BID OPENING DATE CHAGED FROM DECEMBER 18, 2009 to DECEMBER 22, 2009 AT 3:00 PM
DATE: December 15, 2009 ADDENDUM NO.: 1 BID NO.: FWC 09/10-48 BID TITLE: CHANGE: ADD: RENOVATION OF THE PRAIRIE LAKES FIELD OFFICE AT THE THREE LAKES WMA CALENDAR OF EVENTS-BID OPENING DATE CHAGED FROM
More informationField House Proposal
Field House Proposal For Experienced Dependable Resourceful 5802 Akron Cleveland Rd. Hudson, OH 44236 Table Of Contents Cost Projection 3 Funding Summary 4 Site Plan 5 Field House Layout 6 Field House
More informationRequests for Information pm Draft for Request for Proposals Sprouts - Shell/Civil Issued on April 25, 2018
Requests for Information - 0.08.18 pm Draft for Request for Proposals Sprouts - Shell/Civil Issued on April 2, 2018 RFI 01 Is the RFP due at 4pm or pm on May 16th? An Addendum will change to due date to
More informationManufacturing Facilities Proposal
Manufacturing Facilities Proposal Construction proposal To assist business owners with expansion projects, Wisconsin Public Service has compiled information and renderings of common building types in business
More informationModule 4 Waterside Bensalem, Pa Date
Date 2-12-16 WATERSIDE CONSTRUCTION, L.P. Building to be fully sprinklered per NFPA13R General Notes GN-1 General Notes DIAGRAMMATIC STAIR DETAIL GN-2 General Notes ¾" - GN-3 General Notes (R301.2.2.4
More informationSECTION BID PROPOSAL FORM. Telephone NO: ( ) Facsimile NO: ( ) Oklahoma License NO:
ISSUE DATE: MARCH 21, 2012 (REVISION 2-08/31/12) PROJECT: CNB BUILDINGS 2 AND 3 CATOOSA, OKLAHOMA OWNER: BID TO: (Mail & Fax) CHEROKEE NATION BUSINESSES 777 WEST CHEROKEE STREET CATOOSA, OKLAHOMA 74015
More informationJune 12, 2017 Addendum #6 RFP # Modular Relocation & Site Development
June 12, 2017 Addendum #6 RFP #2017-003 Modular Relocation & Site Development Questions & Answers 1) To better facilitate a functional and qualified design build budget, please provide details, drawings,
More informationMETROPOLITAN PIER AND EXPOSITION AUTHORITY INVITATION FOR BIDS (IFB) # M OFFICE BUILD OUT, 5 TH FLOOR OF ABC BUILDING ADDENDUM NO.
METROPOLITAN PIER AND EXPOSITION AUTHORITY INVITATION FOR BIDS (IFB) #2017-20-M OFFICE BUILD OUT, 5 TH FLOOR OF ABC BUILDING ADDENDUM NO. (1) September 28, 2017 This Addendum No. 1 consists of seven (7)
More informationADDENDUM # 1 To: File RFP for: New Affordable Home Construction Services
Procurement Department ADDENDUM # 1 To: File 1605-909-23-4532 RFP for: New Affordable Home Construction Services Please note the following change: Change #1 RFP closing date and time is changed to July
More informationADDENDUM #1 TO ALL PROSPECTIVE BIDDERS: SUBJECT: IFB # \ Science Labs Conversions Luther Jackson Middle School, Falls Church, VA
TO ALL PROSPECTIVE BIDDERS: ADDENDUM #1 SUBJECT: IFB # \17-020 Science Labs Conversions Luther Jackson Middle School, Falls Church, VA BID DUE DATE: May 17, 2017 May 15, 2017 THIS ADDENDUM IS SUPPLEMENTARY
More informationPermit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE
STAFF USE ONLY RECEIVED BY: DATE: Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE Applicant must complete numbered items
More informationNOTTAWASEPPI HURON BAND of the POTAWATOMI
NOTTAWASEPPI HURON BAND of the POTAWATOMI Widoktadwen New Government Center Bid Pkg #2 Pre Bid Meeting October 4, 2012 The SKILLMAN Corporation Project Administration Construction Management Nottawaseppi
More informationBIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D
HOSKINS ARCHITECTURE, LLC 1827 1 ST AVENUE NORTH, SUITE 104 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 3 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS
More informationAddendum #4 To Request for Proposal For Rackham Relocations: Project / Dated December 13, 2018
` Division of Finance and Business Operations Procurement & Strategic Sourcing 5700 Cass Avenue, suite 4200 Detroit, Michigan 48202 (313) 577-3734 FAX (313) 577-3747 January 11, 2019 Addendum #4 To Request
More informationPROVIDENCE COLLEGE - RUANE FRIAR DEVELOPMENT CENTER
PROVIDENCE COLLEGE - RUANE FRIAR DEVELOPMENT CENTER NOTICE TO CONSTRUCTION MANAGERS: Dimeo Construction Company (DCC), Providence College s Owner Project Manager (OPM) is soliciting Guaranteed Maximum
More informationPERMIT SUBMITTAL GUIDE FOR COMMERCIAL PROJECTS
Collier Township 2418 Hilltop Road, Suite 100, Presto, PA 15142 Ph. 412-279-9998 PERMIT SUBMITTAL GUIDE FOR COMMERCIAL PROJECTS This guide applies to all projects except 1 & 2 family dwellings and townhouses
More informationFarmington Public Schools 2015 Bond Issue Bid Package 9- Beechview & Kenbrook Elementary School Remodeling Project Wednesday, January 24, 2018
Farmington Public Schools 2015 Bond Issue Bid Package 9- Beechview & Kenbrook Elementary School Remodeling Project Wednesday, January 24, 2018 POST-BID ADDENDUM 1 CONSTRUCTION MANAGEMENT PACKAGE - Bidding
More informationModule 4 Waterside Bensalem, Pa Date
Date 8-8-16 WATERSIDE CONSTRUCTION, L.P. Building to be fully sprinklered per NFPA13D General Notes GN-1 General Notes DIAGRAMMATIC STAIR DETAIL GN-2 General Notes ¾" - GN-3 General Notes (R301.2.2.4 &
More informationPURCHASING DEPARTMENT
PURCHASING DEPARTMENT The bid listed below has had addenda issued. Documents are available over the Internet at http://www.norwalkct.org Adobe Acrobat reader is required to view this document. If you do
More informationAIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7
AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7 www.airwayscrossing.ca Excellent access to Barlow Trail/McKnight Blvd. Bays starting at 4,000 sq. ft. Surface loading T5 lighting
More informationADDENDUM NO. 1 FOR CHASE FARM VISITORS CENTER RFP # June 2, 2017
ADDENDUM NO. 1 FOR CHASE FARM VISITORS CENTER RFP #2017-13 NOTICE TO PROSPECTIVE BIDDERS June 2, 2017 Prospective bidders are hereby informed of the following corrections, additions, deletions, and/or
More informationREQUEST FOR PROPOSAL (RFP) INSTRUCTIONS AND SUPPLEMENTAL CONDITIONS
REQUEST FOR PROPOSAL (RFP) INSTRUCTIONS AND SUPPLEMENTAL CONDITIONS Project Title: Parking Lot Sealcoating, Striping and Numbering RFP Number: EQ5P2SSAC-17-0008 RFP Issue Date: Monday, August 14, 2017
More informationJanuary 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT
January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY MONTHLY CONSTRUCTION PROGRESS REPORT Metropolitan Entertainment & Convention Authority
More informationFlorida Department of Environmental Protection
Florida Department of Environmental Protection Marjory Stoneman Douglas Building 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Rick Scott Governor Carlos Lopez-Cantera Lt. Governor Ryan E.
More informationMARCH BOND & TIF PROJECT UPDATE. Grapevine-Colleyville ISD
MARCH 2018 2016 BOND & TIF PROJECT UPDATE Grapevine-Colleyville ISD GHS Agricultural Sciences Building Renovation Multipurpose Activity Centers Additions and Renovations to TES and GMS Cannon Elementary
More informationADDENDUM NO. 1. This Addendum is issued to clarify and revise the construction documents dated July 6, 2016 as follows:
Date Issued: July 21, 2016 To: Project Name: All Bidders Project Number: 1441.6628.90 Subject: ADDENDUM NO. 1 Kalkaska Public Transit Authority (KPTA) This Addendum is issued to clarify and revise the
More informationItem # 1: Attached are the revised Table of Contents and Specifications added: Section Cabinets and Vanities
ADDENDUM NO. 1 Proposed Residence 422 Hickory Street Buffalo, New York 14204 February 15, 2019 Long Associates, Architects 189 Kenmore Avenue Buffalo, New York 14223 This addendum is issued to amend the
More informationENGINEERING & CONSTRUCTION MANAGEMENT RESIDENTIAL PERMIT APPLICATION CHECKLIST
DIVISION OF ENGINEERING & CONSTRUCTION MANAGEMENT PLAN REVIEW PERMITTING ENGINEERING CONSTRUCTION RESIDENTIAL PERMIT APPLICATION CHECKLIST Building permits are required for the construction, alteration,
More informationRequest for Proposals: New Hangar Building Project, Port of St. Helens Scappoose Industrial Airpark
Request for Proposals: New Hangar Building Project, Port of St. Helens Scappoose Industrial Airpark Columbia City, Oregon December 2017 Purpose The Port of St. Helens, a municipal corporation and port
More informationTOWN OF EAST HADDAM INVITATION TO BID EAST HADDAM COMPANY #1 FIREHOUSE INTERIOR RENOVATIONS ADDENDUM NO. 1 TO CONTRACT DOCUMENTS
TOWN OF EAST HADDAM INVITATION TO BID EAST HADDAM COMPANY #1 FIREHOUSE INTERIOR RENOVATIONS ADDENDUM NO. 1 TO CONTRACT DOCUMENTS The Town of East Haddam is seeking bids from qualified contractors who will
More informationC ITY OF D ARIEN Community Development Department 1702 Plainfield Road Phone: (630) Fax: (630)
C ITY OF D ARIEN Community Development Department 1702 Plainfield Road Phone: (630) 353-8115 Fax: (630) 852-4709 BUILDING PERMIT INFORMATION PACKET Revised: October 2018 Building Codes: International Residential
More informationSTUDIO 2LR ARCHITECTURE + INTERIORS
STUDIO 2LR ARCHITECTURE + INTERIORS University of South Carolina Longstreet Theatre Shutter Replacement 1300 Greene Street, Columbia, South Carolina State Project Number: H27-6100-F February 18, 2015 ADDENDUM
More informationPrescriptive Design for Pole Barns Using the Larimer County Prescriptive Handout
Prescriptive Design for Pole Barns Using the Larimer County Prescriptive Handout Building Department 200 W. Oak Street 3 rd Floor Fort Collins, CO 80521 970-498-7700 DEFINITIONS High Wind Areas Those areas
More informationSterling Public Schools 07/13/17 Preschool Addition Sterling, Nebraska ADDENDUM NO. 2
Sterling Public Schools 07/13/17 ADDENDUM NO. 2 The Architect/ Engineer issues this addendum, applicable to the above named project, to all known Contractors before receipt of proposal. This addendum includes
More informationCARVER ELEMENTARY SCHOOL PROJECT May 2017 Monthly Status Report
CARVER ELEMENTARY SCHOOL PROJECT May 2017 Monthly Status Report Project: Current Phase: Construction Construction Type: New Construction Construction Start Date: 03Oct2016 Building Size (New): 112,350